1 [Author]: Naoyuki Takezawa Project Manager, LNG Projects JGC Corporation Address: 2-3-1, Minato Mirai, Nishi-ku, Yokohama , Japan [Abstract] Floating LNG Plant (FLNG) is a real alternative for land-based LNG Plant. Since completion of initial floating LNG studies in the 1990 s, JGC has developed technical studies and considerations, conducted project-specific FEED and is conducting EPCIC of Floating LNG plants. As a pioneer for Floating LNG plants, JGC who introduced the FLNG concept to the industry, would present the history, technical developments, and insights of on-going EPCIC and FEED projects for both mid-scale (1-2 MTPA) and large scale (2 8 MTPA) FLNG. Technical developments and studies specifically tailored for FLNG taking account for limited footprints included to: - Selection of Process technology and type of Refrigerant - Motion movement and Equipment design - Selection of refrigerant compressor and its driver - Plot layout and piping design and modularization - HSSE studies - Approach study for LNGC to FLNG - Loading facilities And so on. Some of FLNG Projects experienced to date are also presented. 1 / 17
2 1. Introduction LNG demand is increasing and timely LNG supply is required, especially for power generation in Japan after the earthquake in Recent oil price reduction becomes stable, and gas demand may increase. Floating LNG Plant (FLNG) is a real alternative for land-based LNG Plant. Since completion of initial floating LNG studies in the 1990 s, JGC has led advanced studies and project-specific FEED, and is conducting the Engineering, Procurement, Construction, Integration and Commissioning (EPCIC) of FLNG projects. JGC is securing a unique position as a Contractor for both, Onshore and FLNG Projects. In fact, JGC has vast experiences for On-shore LNG Plant projects and such experiences and knowledge have been applied to the FLNG plants with specific technical developments and considerations. If the gas field to be developed is Offshore, FLNG will be one of the alternatives, which has all of functions on the hull, as illustrated in the following. Fig.1 Concept of FLNG for Offshore Gas Field Fig.2 History of FLNG Projects 2. Background of Development In early 1990 s the concept of FLNG was developed based on technical feasibility and commercial studies. JGC as a pioneer of FLNG, developed concepts and conducted studies for the installation of LNG facilities on the ship hull with ship builders. Such study involved to visit major LNG related companies including process licensors, equipment suppliers i.e. compressor Fig.3 Concept of FLNG in 1990 s and driver vendor, mooring facilities supplier, loading facility vendors and Flare supplier and ship classification authorities. Through the visit, Floating LNG concept was propagated to LNG related industry, which should be a trigger to commence their own studies and empirical development for their equipment and facilities. 2 / 17
3 In late 1990 s and early 2000 s, JGC conducted the preliminary FLNG Concept Studies for major oil companies with shipbuilders. In 2000 s, JGC conducted the EPCIC for Floating LPG Plants for Indonesia and Angola, obtaining technical feedback for the design, movement effects, integration, fabrication, towing, installation and operation. In parallel, Pre-FEED and FEED work for ranges of 2 to 5 MTPA FLNG were conducted for Indonesia, Australia, and Brazil. JGC conducted further technology development for movements, cooling methodology, equipment design, piping and control design, interfaces between Subsea and Hull, including HSSE considerations. Fig.4 LPG FPSO for Angola Fig.3 LPG FPSO for Angola Fig.5 LPG FPSO for Indonesia In 2010 s, JGC conducted the EPCIC of 1.5 MTPA Floating LNG plant for Malaysia, which is the 3 rd FLNG EPCIC project in the world with1 st Fig.6 FLNG for Malaysia deep water (deeper than 500 m) FLNG. JGC has conducted FEED for FLNG for Indonesia and Mozambique. JGC also conducting the construction and commissioning serves to the Prelude FLNG. 3. Technical Developments and Studies Technical developments and studies specifically tailored for FLNG taking account for limited footprints included to: - Selection of Process technology and type of Refrigerant - Study of Motion Effect and Equipment design - Selection of refrigerant compressor and its driver - Plot layout and Piping design and Modularization - HSSE studies including, Quantative Risk Assessment (QRA), Explosion Risk Assessment (ERA), Fire Risk Assessment (FRA) and so on - Application of Codes and Standards, including requirements by Ship Classification Authorities 3 / 17
4 - Subsea interface, mooring, flow lines, umbilical and flow stabilities - Approach study for LNG Carrier (LNGC) to FLNG - Loading facilities 3.1 Process Selection The following will be considered for selection of Liquefaction technology for FLNG, which should be remarkably different to Onshore LNG plant: 1) Robustness to the motion movement 2) Safety considerations including inventory and type of Refrigerant 3) Suitable for plant capacity 4) Efficiency 5) Simplicity The following figure shows the sample of selection of Liquefaction technology for FLNG. Fig 7 Sample of Selection of Liquefaction Technology From mid to large scale FLNG, N2 Expansion Processes, Single MR Process, DMR Process were selected to date, due to limited area and difficulty in escape route, if disasters occur on FLNG. Refrigerant type shall be selected considering less hydrocarbon content, especially less propane inventory. Process Capacity Efficiency Motion Movement DMR Large (> 2 MTPA) High Mid SMR Mid (1-2 MTPA) Mid Mid N2 Expander Small (less than1.5 MTPA) Low Good Table 1 Comparison of Liquefaction Technology for FLNG 4 / 17
5 3.2 Motion Effect Based on enveronmental data, oceanological and meteological information of planned area for installation, motion characteristics of FLNG will be estimated. Forces by wave, wind and current are considered for heading of FLNG and motion movement. Significant wave hight,peak period of wind wave and swell, cyclone also considered. Fig.8 Sample of RAO and Heading Study Sample of Response Amplitude Operators (RAO) of roll motion and heading are shown. 3.3 Equipment Selection against Motion Movement Motion movement will affect equipment performances, both mechanical and process. 1) Tower internals Distillation columns, Absorbers, liquid-gas contactors will be selected to packing rather than tray. Fig.10 Pilot Plant (Sulzer Chemtek) Fig.9 Comparison of Internals 5 / 17
6 Packing supplier (Sulzer Chemtek) conducted the pilot test for motion movement. Static inclination will also affect to the performance of equipment; which will be estimated considering hull design and equipment installation. 2) Heat Exchangers Fig.11 Kettle Type vs. Vertical Thermo siphon type Reboiler (Typical) Heat exchangers and Reboilers which have liquid surface need to be re-considered to minimize effects by motion movement. 3) Compressor Due to motion movement, nozzle force and moment of rotating equipment should be larger than Onshore application. Refrigerant compressors which have large bore nozzles need to have increased strength of nozzles with reduced piping mass so as to increase flexibility. 4) Compressor Driver Fig.12 Piping around Compressor Selection of compressor driver is one of the important technical decisions for FLNG, considering power demand, safety, plot space, utility, robustness to motion movement, availability, maintainability and durability for offshore application. Type of Driver Pros Cons Judge Steam Turbine Not ignition source, less Complicate utility system Fair operation & Maintenance Gas Turbine (Aero derivative) Light & Compact Safety Good Electrical Motor (e-lng) Compact, Operability Large Electrical Power system Fair Table 2 Comparison of Compressor Driver 6 / 17
7 3.4 Topside Layout and Module Locations Topside layout will be conducted basically along with process flow and consideration of safety / hazard and risk mitigations. The following will be key points to be considered for Layout study: 1. Define swivel turret to be external or internal. 2. Define location of Living quarters and Warehouse, aft or fore. 3. Define type of LNG storage tank so as to allow processing facilities installed on the topsides over the LNG storage tanks. 4. Define product load out system, side by side or tandem LNG offloading. 5. Location of Flare boom. 6. Utility facility location. 7. Helideck and helicopter operations. 8. Supply boat operations. Following are sample of layout: Fig.13 Sample of Layout of FLNG with External Turret In this sample, living quarters are located in aft area, with safe distance to process area. Process modules are plotted as per process flow and utility facilities are located between process area and living quarters. 7 / 17
8 3.5 LNG Container LNG Cotainer will be installed in the Hull of FLNG. The following are currently available types of LNG Containers: Apart from LNG Carrier (LNGC) whose operation is full cargo or empty in laden voyage, FLNG will be located at installed Offshore and the level of LNG varies from full to empty, which may be suffered by sloshing occurred by motion movement. Fig.14 Type of LNG Container SPB (Self Supporting Prismatic Shape IMO Type-B) and Spherical containers can be withstanding in the harsh marine environment, whereas membrane type container will be used for mild marine environment. Recently membrane type is adopted for FLNG projects by cost advantages and topside utilization. 8 / 17
9 3.6 Module Due to work space limitation and fabrication schedule, modules as part of process facilities are designed and fabricated in parallel to the hull construction. Combined structure and piping design modeling method was developed. Support location shall be well coordinated with hull beam, so as to distribute load to hull. Module Weight and center of gravity need to be confirmed with shipbuilder. 3.7 LNG and Condensate Offloading Loading method from FLNG to LNG Carrier (LNGC) should be one of study items. Several methods were proposed, i.e. side by side using loading arms, tandem loading using flexible hoses, tandem loading using swivel system, etc. TechnipFMC as a major loading arm supplier developed the targeting system for side by side loading system using guide wire. Fig.15 Sample of Module Design Fig.16 Side by Side Loading (World Maritime News) Another method is the tandem loading using swivel system which was adopted for Brunei LNG plant, or flexible hose withstanding cryogenic temperature. For condensate, tandem loading system can be available as shown below. Fig.17 Tandem Loading for Condensate Fig.18 Targeting System (FMC HP) 9 / 17
10 3.8 LNGC Approaching Study Simulations of approaching the LNG Carrier (LNGC) to FLNG were conducted to ensure that the LNGC can safely approach and aboardage to FLNG. The following shows the sample of study results: Fig.19 Approach of LNGC to FLNG 3.9 Safety Studies Since FLNG has limited space for escape if any disease occur. Safety studies are inevitable to ensure safety of crews and facilities. Safety studies include: - Quantitative Risks Analysis (QRA) - Explosion Risks Analysis (ERA) - Cryogenic Spill Risks Analysis (CRA) - Evacuation, Temporary Refuge, Escape and Rescue analysis (ETRERA) - Emergency System Survivability (ESSA ) Countermeasures will be considered such as safe distance between fire zones, active and passive fire protection, escape routing, temporary refuge, totally enclosed motor propelled survival craft (TEMPSC), helicopter etc. Fig.20 Sample of ERA Fig.21 Sample of TEMPSC 10 / 17
11 3.10 Water Intake Cooling media study was conducted so as to define cooling media and its conditions. As a final heat sink, air, sea water, circulating cooling water, were considered. The following table shows pros and cons of cooling media: Air Cooling Water Cooling SW Direct Cooling SW Indirect cooling Effect of high Ambient Temp High Low Low (Effect to Comp Power) Increase NA NA Initial Investment Cheaper Relatively high High Corrosion No High Less than Direct SW Maintenance Duration Short Long Shorter than Direct SW Plot Area Large Small Small Table 3 Comparison of Cooling Media Water cooling either direct cooling or indirect cooling was selected for FLNG. Considering efficiency of LNG plant, lower intake temperature should be better for overall efficiency of LNG process, therefore deep sea water utilization will be one of the options. Benefit of lower water temperature can be utilized for reduction of driver power or reduction of intake water amount. Sea Water Temperature Driver Power (MW) or Water Depth ( m ) Base case 5 deg DOW Amount of Cooling Water Base case 5 deg DOW Fig.22. Water Depth vs. Temperature Profile 11 / 17
12 4. FLNG for Mid-scale LNG Plant 4.1 Standard Design FLNG for Mid Scale FLNG Standard design FLNG was announced by Shell as g-flng concept in early 2000 s. In parallel, JGC conducted its own internal development for FLNG both technical and commercial of Fig.23 Standard Design Mid-Scale FLNG standard FLNG for range of 1 to 2 MTPA production capacities, assuming utilization of stranded gas fields in South-East Asia and Oceania area. The following are the major features of standard design FLNG. 1 MTPA Model 2 MTPA Model Hull Size (m) 293 x 60 x x 65 x 36 LNG Tank (m3) 155,000 (SPB Alum.) 200,000 (SPB Alum.) Condensate Tank (m3) 16,000-20,000 Offloading Side by side Liquefaction Technology APCI SMR APCI DMR Driver Aero-derivative gas turbine Table 4. Major Feature of Standard Design of FLNG Due to generic design, cold section such as Liquefaction, LNG storage and Loading systems to be remain unchanged, whereas hot section, such as MEG, Acid Gas Removal, Dehydration and Fractionation systems can be modified by characteristics of feed gas from each gas fields. 12 / 17
13 4.2 EPCIC of PFLNG-2 Project Engineering, Procurement, Construction, Integration and Commissioning (EPCIC) of Petronas FLNG 2 Project was awarded to JGC/SHI consortium, to utilize the gas from Rotan Gas Field in offshore of Sabah Province of Malaysia. This project is the 3 rd FLNG project in Fig.24 PFLNG2 EPCIC, 1 st deep water FLNG project of 1500m, and 1 st Lump sum contract for FLNG project. Due to reduced oil price and economic circumstances, the Project was once slowdown in progress, but recently resumed. The following shows the major feature of PFLNG 2 Project. Fig.25 Location of PFLNG 2 Client Contractor Petronas JGC-SHI Consortium (JSC) Contract Award 1Q-2014 Plant Capacity Liquefaction Technology 1.5 MTPA APCI N2 Expansion Process (due to safety measures ; Less HC Inventory in the Facilities) Sea Water Temperature Hull Dimension About 15 deg C 333L x 64W x 31H LNG Tank 177,000m3 Dry Weight: Topside/Hull 60,000 ton/ 90,000 ton Table 5. Major Feature of PFLNG 2 13 / 17
14 5. FLNG for Large-scale LNG Plant 5.1 Coral FLNG Project in Mozambique Coral FLNG project is planned to utilize the recently discovered large gas field offshore of Mozambique to LNG. FEED and bid proposal of EPCIC was Fig.26 Coral FLNG conducted by Technip-JGC-SHI consortium, which Final Investment Decision (FID) is expected. This project is 1 st FLNG in East Africa and utilizing Rovuma Basin Gas Field. Client Contractor Eni East Africa spa. Technip-JGC-SHI Consortium FEED Conducted Plant Capacity Liquefaction Technology Hull Dimension 3.5 MTPA APCI DMR Process 414m(L) x 66m(B) x 38.5m(D) LNG Tank Membrane type 234,600m3 Mooring Internal Turret Table 6. Major Feature of Coral FLNG (TJS) Fig.27 Topside Layout of Coral FLNG (TJS) 14 / 17
15 5.2 Masela FLNG Project Masela FLNG project is intended to utilize gas from Abadi Gas Field in Arafura Sea, Indonesia by INPEX. Pre-FEED and FEED work were conducted in and , respectively. Plant capacity was changed from 4.5 MTPA to 2.3 MTPA, and further to7.5 MTPA. Due to political reason, the plant may change from FLNG to Onshore LNG plant. Fig.28 Concept of Masela FLNG Client INPEX Contractor JGC-Technip Pre-FEED Period Capacity 4.5 MTPA Liquefaction Technology APCI DMR Hull Dimension 500m(L) x 82m(B) x 38m(D) LNG Tank SPB (300,000 m3) Mooring External Turret Table 7. Major Feature of Masela FLNG-PreFEED Phase Fig.29 Layout of Masela FLNG 15 / 17
16 6. Module Fabrication, Construction and Integration 6.1 Module fabrication and Installation Module fabrication has been conducted by fabrication yards in Korea, China, Singapore, Indonesia and so on. Hull construction is conducted shipyard. Installation and integration of modules on the Hull will be conducted at quay side of shipyard. Fig.30 Module Installation at Shipyard 6.2 Towing Towing will be conducted by tug boats to the installing area. Fig.31 Towing and Installation of FLNG to Site Then hock-up with mooring system, connect the risers and umbilical with the turret at the site. Crews and workers will be stay in Flotel near by the installation site. A part of pre-commissioning and commissioning work will be conducted at module yards and integration yard in shipyard before towing. At the offshore, pre-commissioning and commissioning of mainly hydrocarbon related parts and overall facility as Gas Trial will be conducted. 16 / 17
17 7. Way Forward Base on technical development and actual execution of FEED and EPCIC, JGC has accumulated information and design methodologies, and will further apply to the future FLNG projects, as well as assisting and supporting to the currently conducting FLNG project. In future, economic development within deep water area of Exclusive Economic Zone (EEZ), and subsea systems will be one of the expected area. Fig.32 Expectation to Offshore Business 8. Finally Based on recent Shale Gas utilization to LNG and reduced oil price, the investment circumstances for gas monetization should be effected. For example, some of planned base load onshore LNG projects in Australia thought twice to proceed onshore, but consider FLNG option due to economic and HSSE reason. For stranded gas field in offshore, the FLNG has still a possible option and, may compete to conventional onshore LNG plant using plat form and long subsea pipelines. FLNG concept is still a final option to onshore LNG, however technology development and cost reduction effort may lead the bright future for FLNG. 17 / 17
Status of first generation of FLNG and trend and perspective for the next generation
Status of first generation of FLNG and trend and perspective for the next generation TITRE DE LA PRESENTATION Dominique Gadelle SOUS TITRE Technip DE LA Vice President PRESENTATION Upstream / LNG Atelier
More informationFloating LNG Business A breakthrough in offshore gas monetization
Floating LNG Business A breakthrough in offshore gas monetization LNG Malaysia Forum 2013 19-21 March, Kuala Lumpur Allan Magee, Ph.D. R&D Manager, Offshore Product Line and Technologies, Technip Geoproduction
More informationMEETING THE EXECUTION CHALLENGES OF SHELL PRELUDE FLNG
MEETING THE EXECUTION CHALLENGES OF SHELL PRELUDE FLNG Alain Poincheval Executive Project Director Technip, France Jun Cheol Kim EVP, FLNG Project Management Offshore Production Facilities Business Unit
More informationON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)
17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) HOW TO DEVELOP AN ECONOMICAL SMALL CAPACITY FLOATING
More informationDesign Concept and Features of the Mitsubishi LNG-FPSO (Floating Production, Storage and Offloading Unit)
7 Design Concept and Features of the Mitsubishi LNG-FPSO (Floating Production, Storage and Offloading Unit) YOSHIKAZU FUJINO *1 AKIRA ZAITSU *1 YASUHIKO HINATA *2 HIROTOMO OTSUKA *1 In recent years, floating
More informationTechnical Innovation for Floating LNG. Bengt Olav Neeraas & Jostein Pettersen, Statoil ASA
Technical Innovation for Floating LNG Bengt Olav Neeraas & Jostein Pettersen, Statoil ASA Table of contents Relevant know how for FLNG FLNG concept development Technology development & innovation Conclusions
More informationProcessing LNG Offshore: Maximizing Reliability, Performance & Safety. By Inga Bettina Waldmann at KANFA Aragon FLNG World Congress 28 th June 2016
Processing LNG Offshore: Maximizing Reliability, Performance & Safety By Inga Bettina Waldmann at KANFA Aragon FLNG World Congress 28 th June 2016 FLNG World Congress 2016 Agenda I. About KANFA Aragon
More informationTHE TRANSFER OF LNG IN OFFSHORE CONDITIONS. SAME SONG NEW SOUND
THE TRANSFER OF LNG IN OFFSHORE CONDITIONS. SAME SONG NEW SOUND Leendert Poldervaart Business Development Manager James Ellis Business Development Manager Single Buoy Moorings Gas Business Development
More informationOFF-THE-SHELF MID-SMALL-MINI-SCALE LNG PLANT CASE STUDYFOR APPLICATION
OFF-THE-SHELF MID-SMALL-MINI-SCALE LNG PLANT CASE STUDYFOR APPLICATION Yoshihisa Wakamatsu Deputy Manager, LNG Project Department International Project Division Shin Matsui Executive Officer, LNG Project
More informationFloating LNG: Origins and Future Impact on the LNG Industry
Floating LNG: Origins and Future Impact on the LNG Industry SPE Gulf Coast Region Ing. Paul Sullivan SVP Global LNG + FLNG - Worley Parsons 13 th July 2016 WP LNG Centres Vancouver LNG Marine I&E Houston
More informationGastech Singapore October Capital Cost and Efficiency Data for the ZR-LNG Dual Methane Expander Liquefaction Technology
Gastech Singapore October 2015 Capital Cost and Efficiency Data for the ZR-LNG Dual Methane Expander Liquefaction Technology Authors: GW Howe, GF Skinner, AD Maunder Presenter: GW Howe Introduction LNG
More informationBenefits of a cylindrically shaped floater for an FPSO application in cyclone exposed environments
Benefits of a cylindrically shaped floater for an FPSO application in cyclone exposed environments Presentation by: Fredrik Major, CBDO, Sevan Marine ASA for INTSOK DEEP WATER CONFERENCE Thursday 14 November
More informationFLOATING LNG OVERVIEW
FLOATING LNG OVERVIEW The global demand for LNG in 2016 was ca. 260 MTPA. This is projected to double to over 500 MTPA by 2030. As the market grows, the composition and characteristics of demand are changing,
More informationFLNG Economics and Market Potential
FLNG Economics and Market Potential Philip Fjeld CEO, FLEX LNG Management Ltd Singapore, 10 February 2011 Private and Confidential Brief Introduction to FLEX LNG FLNG Market and Size Considerations FLNG
More informationINCREASING THE CAPACITY OF NGL RECOVERY TRAINS. Stéphane MESPOULHES XVI CONVENCIÓN INTERNACIONAL DE GAS Caracas de Mayo de 2004
INCREASING THE CAPACITY OF NGL RECOVERY TRAINS Stéphane MESPOULHES XVI CONVENCIÓN INTERNACIONAL DE GAS Caracas WHO IS TECHNIP? 2 World Class Engineering & Construction Group in Oil & Gas Public Company
More informationMLNG DUA DEBOTTLENECKING PROJECT
MLNG DUA DEBOTTLENECKING PROJECT Yahya Ibrahim Senior General Manager Malaysia LNG Malaysia yahyai@petronas.com.my Tariq Shukri LNG Consultant Foster Wheeler Energy Limited Reading, U.K. Tariq_shukri@fwuk.fwc.com
More informationLarge LNG plant capabilities for capacity >2 MTPA Benefit from economies of scale and proven technology
Large LNG plant capabilities for capacity > MTPA Benefit from economies of scale and proven technology Benefits to our customers: Economical Production Air Products natural gas liquefaction processes and
More informationEnabling safe and reliable offshore LNG transfer operations By Vincent Lagarrigue, Marketing & Project Manager within Trelleborg Industrial Solutions
Enabling safe and reliable offshore LNG transfer operations By Vincent Lagarrigue, Marketing & Project Manager within Trelleborg Industrial Solutions Executive Summary Moving liquefied natural gas (LNG)
More informationLNG Plant Overview. Seminar with Supplier Association Murmanshelf Murmansk, 15 May 2012 Jostein Pettersen
LNG Plant Overview Seminar with Supplier Association Murmanshelf Murmansk, 15 May 2012 Jostein Pettersen Table of Content Part 1 : LNG plant overview (Jostein) Part 2 : Main equipment units (Jostein) Part
More informationWhen bigger is better Prelude FLNG, the world s biggest floating structure
When bigger is better Prelude FLNG, the world s biggest floating structure Photo: Shell Global Solutions International Imagine the largest LNG carrier in the world then multiply the size by a factor of
More informationA smart LNG Offloading to Conventional LNG Carriers in Severe Open Sea Environments
A smart LNG Offloading to Conventional LNG Carriers in Severe Open Sea Environments Marc CAHAY PAU, FRANCE 5 7 APRIL 2016 FLNG offloading state of the art Expected design features LNG loading of conventional/unmodified
More informationTECHNICAL AND OPERATIONAL INNOVATION FOR ONSHORE AND FLOATING LNG
TECHNICAL AND OPERATIONAL INNOVATION FOR ONSHORE AND FLOATING LNG Jostein Pettersen Øivind Nilsen Sivert Vist Lars Erik Noreng Giljarhus Arne Olav Fredheim Knut Aasekjær Bengt Olav Neeraas Statoil ASA
More informationFloating LNG: The Challenges of production systems and well fluids management By: Frederic MOLLARD, TECHNIP France 04/19/2013
17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) Floating LNG: The Challenges of production systems and well fluids management By: Frederic MOLLARD, TECHNIP France 04/19/2013
More informationSevan Marine ASA Floating LNG FPSO -how to put the gas into exportable parcels. Carnegie ASA Shippingklubben, Oslo January 28, 2008
Sevan Marine ASA Floating LNG FPSO -how to put the gas into exportable parcels Carnegie ASA Shippingklubben, Oslo January 28, 2008 1 ORGANISATION Sevan Marine ASA 100% 100% 100% 100% Sevan Production AS
More informationPT. INDONESIAN SERVICE BUREAU
PT. INDONESIAN SERVICE BUREAU PROJECT MANAGEMENT ENGINEERING CONSULTANCY Company Overview January 2013 PT. INDONESIAN SERVICE BUREAU Leading engineering, procurement, construction and installation company
More informationGAZOCEAN Pioneer in Maritime Transportation of Liquefied gas
GAZOCEAN Pioneer in Maritime Transportation of Liquefied gas AFG méditerranée GAZOCEAN 23 Mai 2014 Introduction to GAZOCEAN January 2014 This presentation is not to be reproduced without the permission
More informationLNG market developments. 12 th of February 2015 Jonathan Raes development EXMAR LNG Infrastructure
LNG market developments 12 th of February 2015 Jonathan Raes development EXMAR LNG Infrastructure Introduction EXMAR & LNG EXMAR Company Introduction Shipping & Energy Infrastructure Provider 1829 shipbuilding
More informationFloating LNG What are the key business development risks and mitigation strategies in a FLNG project?
Floating LNG 2013 What are the key business development risks and mitigation strategies in a FLNG project? What are the key challenges? What are some of the risk mitigation strategies? What are some of
More informationSafe, robust, cost-effective solutions for the nearshore LNG market
Terminale GNL Adriatico S.r.l. Safe, robust, cost-effective solutions for the nearshore LNG market Proven Solutions, Innovative Approach As the search for oil and gas takes energy companies to some of
More informationConceptual Design of CO 2 Transportation System for CCS
Available online at www.sciencedirect.com Energy Procedia 37 (2013 ) 2989 2996 GHGT-11 Conceptual Design of CO 2 Transportation System for CCS Abstract Takakazu Suzuki a *, Makoto Toriumi b, Takuya Sakemi
More informationLNG LIQUEFIED NATURAL GAS TECHNOLOGIES
LNG LIQUEFIED NATURAL GAS TECHNOLOGIES Air Liquide Group Air Liquide Engineering & Construction The world leader in gases, technologies and services for Industry and Health Air Liquide is present in 80
More informationOptimising. the LNG process. The rapidly expanding global LNG industry continues. Projects
Optimising the LNG process John Baguley, Liquefied Natural Gas Ltd, Australia, outlines the benefits of an innovative liquefaction process technology for mid scale LNG projects. The rapidly expanding global
More informationLNG Projects Development of the Future
LNG Projects Development of the Future Gastech, 7 th of April 2017 Hilary Mercer VP Integrated Gas Projects and Executive Director Prelude 1 Definitions & cautionary note The companies in which Royal Dutch
More informationModularized Plants. -Process Modules Buildings
Modularized Plants -Process Modules Buildings Modularized Plants The center of all our activities is our modern headquarters located in Mezzano, Italy. The headquarters has been based here for more than
More information2 nd Quarter Financial Results for Fiscal 2017 November 9, Tadashi Ishizuka Representative Director, President and COO
Business Overview 2 nd Quarter Financial Results for Fiscal 2017 November 9, 2017 Tadashi Ishizuka Representative Director, President and COO Contents 1. Project Orders for the First Half of FY2017 2.
More informationGas Processors Association Europe Promoting technical and operational excellence throughout the European Gas Industry
Gas Processors Association Europe Promoting technical and operational excellence throughout the European Gas Industry Gas pre-treatment on Molecular Sieves: Floating LNG specificities Alexandre TERRIGEOL
More informationWhite Rose Extension Project - Expression of Interest (EOI)/Prequalification Provision of Topsides Marine Transportation Reference No
White Rose Extension Project - Expression of Interest (EOI)/Prequalification Provision of Topsides Marine Transportation Reference No. 8.34.1.092 Husky Energy Inc. (Husky), operator of the White Rose field
More informationA BREAKTHROUGH FOR FLOATING LNG?
A BREAKTHROUGH FOR FLOATING LNG? Ilmars Kerbers 1, Graham Hartnell 2 1. Poten & Partners, Inc., New York 2. Poten & Partners (UK) Ltd., London Keywords: 1. Floating LNG; 2. LNG FPSO; 3. FLNG; 4. Liquefaction
More informationAppendix A: Project Characteristics
Gorgon Fourth Train Expansion Proposal Appendix A: Project Characteristics Appendices Project Characteristics A Key Characteristics table has been prepared to describe the elements of the Foundation Project
More informationINPEX Ichthys LNG Project
INPEX Ichthys LNG Project INPEX Ichthys LNG Project McDermott is delivering an engineering, procurement, construction and installation (EPCI) solution for one of the world s largest subsea gas field developments
More informationHeat Recovery Systems and Heat Exchangers in LNG Applications. Landon Tessmer LNG Technical Workshop 2014 Vancouver
Heat Recovery Systems and Heat Exchangers in LNG Applications Landon Tessmer LNG Technical Workshop 2014 Vancouver Presentation Overview LNG plant arrangement with heat recovery (OSMR Process by LNG Limited)
More informationTRAINING CATALOGUE. Academy Korea SAFER, SMARTER, GREENER
TRAINING CATALOGUE Academy Korea SAFER, SMARTER, GREENER 0001 Introduction to Shipbuilding 3 DAYS Shipbuilding, Shipping & Operation statistics Organization of maritime regime, Rules & Regulations, Class
More informationFUGRO GROUP LNG FIELD DEVELOPMENT AND FACILITIES. TACKLING your complex challenges. UNDERSTANDING your operational objectives
LNG FIELD DEVELOPMENT AND FACILITIES FUGRO GROUP UNDERSTANDING your operational objectives TACKLING your complex challenges DELIVERING your global success stories LNG FIELD DEVELOPMENT AND FACILITIES Developing
More informationDominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017
Dominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017 Note to Investors This presentation contains certain forward-looking statements, including projected future
More informationCOMPLETING THE LNG VALUE CHAIN
COMPLETING THE LNG VALUE CHAIN Reidar Strande, Director, LNG, Wärtsilä Oil & Gas Systems Tord Johnsson, Area Business Development Manager, Oil and Gas Business, Wärtsilä Power Plants [ ENERGY & MARINE
More informationSeismic Analysis of an SPB Tank Installed in the Offshore GBS LNG Terminal
Vol. 4 No. 2 August 27 Seismic Analysis of an SPB Tank Installed in the Offshore GBS LNG Terminal MANABE Hideo : Manager, Project Engineering Department, Engineering Division, IHI Marine United Inc. SAKURAI
More informationInvestor Presentation
Investor Presentation September 2016 Keppel Corporation Meeting the needs of sustainable urbanisation Offshore & Marine Property Infrastructure Investments Offshore rig design, construction, repair and
More informationThe Low Motion FPSO (LM-FPSO) The SCR and TTR Friendly Floater in Harsh Environment
The Low Motion FPSO (LM-FPSO) The SCR and TTR Friendly Floater in Harsh Environment Alaa Mansour, Ph.D Marine Engineering Manager Outlines Slide 2 Field Development Challenges The Low Motion FPSO (LM-FPSO)
More informationMarine Transportation of LNG. Intertanko Conference March 29, 2004 Bob Curt Ship Acquisition Manager, QatargasII Development
Marine Transportation of LNG Intertanko Conference March 29, 2004 Bob Curt Ship Acquisition Manager, QatargasII Development Marine Transportation of LNG Topics What is LNG? History of LNG Marine Transportation
More informationCurrent trends for the floating liquefied natural gas (FLNG) technologies
Korean J. Chem. Eng., 31(5), 732-743 (2014) DOI: 10.1007/s11814-014-0047-x REVIEW PAPER INVITED REVIEW PAPER pissn: 0256-1115 eissn: 1975-7220 Current trends for the floating liquefied natural gas (FLNG)
More informationModular Oil & Gas Equipment Onshore & Offshore
Modular Oil & Gas Equipment Onshore & Offshore Separators & Desalters AI Energy Solutions onshore and offshore oil process solutions offer innovative technologies packaged with global project management
More informationMonetising Natural Gas with the LNG Producer
Monetising Natural Gas with the LNG Producer Floating Production Seminar, NFF Wouter Pastoor, Vice President Business Development September 30 th, 2010 Contents FLEX LNG in brief The LNG Producer The Market
More informationClean LNG fuel for Black Sea-Danube-Rhine corridor
Clean LNG fuel for Black Sea-Danube-Rhine corridor SAGAU MIHAI Engineering and Environmental Sciences Department Maritime University of Constanta Constanta, Mircea street 104, PC 900663 ROMANIA mihai.sagau@yahoo.com
More informationINTERNATIONAL CONFERENCE & EXHIBITION ON
17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) DESIGN OF THE EVOLUTIONARY LNG CARRIER SAYAENDO
More informationGAS MONETISATION SOLUTIONS
GAS MONETISATION SOLUTIONS Global Flare Reduction programme Bill Spence & Guus Kessler UI CO 2 Shell International Exploration and - The Hague THE ASSOCIATED GAS MONETISATION CHALLENGE Barriers that impede
More informationClassification of the Largest Ever Floating Storage Regasification Unit
NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Classification of the Largest Ever Floating Storage Regasification Unit Philippe CAMBOS Bureau Veritas AGENDA 1. Introduction 2. The project 3. Liquid
More informationFUKUI AT A GLANCE. Ver. ENPD001 FUKUI SAFETY VALVE
FUKUI AT A GLANCE Ver. ENPD001 FUKUI SAFETY VALVE Main Markets Marine Market LNG Carrier LPG Carrier FPSO FLNG Demand for Natural gas is growing as clean energy. Our products boast 95% share in LNG carrier
More informationAlaska South Central LNG (SCLNG) Project
Alaska South Central LNG (SCLNG) Project Overview for Alaska Legislators February, 2013 - Overview BP, ConocoPhillips, ExxonMobil and TransCanada are working together to progress an Alaska LNG project:
More informationNatural Gas. and the Liquefaction Process
Natural Gas and the Liquefaction Process Table of Contents Cameron LNG.................... 2 Liquefied Natural Gas................ 4 LNG Safety...................... 5 Environmental Safety................
More informationFULL-CYCLE GLOBAL ENERGY SOLUTIONS
FULL-CYCLE GLOBAL ENERGY SOLUTIONS Opportunities in the global energy market are becoming more exciting yet the challenges continue to increase. In targeting unconventional, technically challenging; or
More informationNORTH CASPIAN OPERATING COMPANY (NCOC)
KASHAGAN / KAZAKHSTAN ONSHORE / OFFSHORE Caspian Sea KAZAKHSTAN Uzbekistan Kyrgyzstan THE GIANT KASHAGAN - KASHAGAN, 80 KM SOUTH-EAST OF ATYRAU, IN THE NORTH CASPIAN SEA, IS THE LARGEST OIL FIELD DISCOVERED
More informationsmall to mid-scale LNG solutions LNG-TO-POWER
small to mid-scale LNG solutions LNG-TO-POWER strong partnership between sister companies LNG-TO-POWER Combining small to mid-scale LNG Floating Storage and Regasification Units (FSRU) with floating power
More informationExcelerate Energy: Efficient And Cost-Effective Solutions for the Global Gas Market
Excelerate Energy: Efficient And Cost-Effective Solutions for the Global Gas Market 14 January 2014 Copyright Excelerate Energy L.P. Who We Are: Pioneer and world leader in innovative LNG midstream solutions.
More informationConstruction Costs LNG. Gorgon $52 Billion dollars. King & Spalding Gabriel Castaneda, P.E.
Construction Costs Gorgon $52 Billion dollars King & Spalding 2014 TABLE OF CONTENTS Approved and proposed projects in North America Specifications Turbines in Emissions Process Safety 49 CFR 193 and NFPA
More informationShip to Ship Transfer (POAC/Superintendent) for Liquefied Natural Gas and Liquefied Petroleum Gas (LNG or LPG) (3 days) (OCIMF)
2017-2018 Ship to Ship Transfer (POAC/Superintendent) for Liquefied Natural Gas and Liquefied Petroleum Gas (LNG or LPG) (3 days) (OCIMF) This training program was created based on the 2013 OCIMF, CDI,
More information11/18/2011. Moderate demand increase High depletion rate. Alfa Laval 1. Sammy Hulpiau Segment Manager Energy & Environment. mb/d.
Oil & Gas Sammy Hulpiau Segment Manager Energy & Environment Oil production investments are rapidly growing mb/d 120 100 80 60 NGLs Unconventional oil Crude oil fields yet to be developed or found Crude
More informationHOW TO SELECT BEST MEG RECOVERY UNIT s CONFIGURATION?
HOW TO SELECT BEST MEG RECOVERY UNIT s CONFIGURATION? PAPER PRESENTED AT GPA EUROPE Madrid, 17 th - 19 th September, 2014 Jérémie ESQUIER PROSERNAT Paris, France PROSERNAT Mr Jérémie ESQUIER - Business
More informationEngineering and technologies Hydrogen Technology
Engineering and technologies Hydrogen Technology Technip has been consistently recognised as the market leader in this field over the past decade Technip profile A world leader in engineering, project
More informationModified Reverse-Brayton Cycles for Efficient Liquefaction of Natural Gas
Modified Reverse-Brayton Cycles for Efficient Liquefaction of Natural Gas H.M. Chang 1, J.H. Park 1, K.S. Cha 2, S. Lee 2 and K.H. Choe 2 1 Hong Ik University, Seoul, Korea 121-791 2 Korea Gas Corporation,
More informationKASHAGAN / KAZAKHSTAN >>>
KASHAGAN / KAZAKHSTAN >>> Kashagan / Kazakhstan Kashagan Field Development Experimental Programme frame agreement mv/lv packaged substations Local equipment rooms process and utilities buildings >>> The
More informationSAFETY BENEFITS 18. Tide-independence 18 Rapid ballasting 19 Integrated hydraulic Ro-Ro ramps 20 Safety features, the future and engineering 22
HYDRO DECK CONTENTS OVERVIEW 3 DESIGN 4 OVERVIEW OF KEY FEATURES 6 DESIGN BENEFITS 8 Versatile 8 High capacity ballast system 9 High deck strength and space 10 Integrated mooring system 11 Adaptable 12
More informationINTEGRATED MARINE AGENCY AND LOGISTICS SERVICES
BEN LINE AGENCIES Your Partner in Asia INTEGRATED MARINE AGENCY AND LOGISTICS SERVICES liner agency offshore support & oilfield services project logistics marine agency Over 150 Years In Asia www.benlineagencies.com
More informationMITIGATION OF SEASONAL PRODUCTION LOSS FOR THREE PARALLEL 4.7MMTPA
17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION MITIGATION OF SEASONAL PRODUCTION LOSS FOR THREE PARALLEL 4.7MMTPA
More informationWe deliver gas infrastructure
We deliver gas infrastructure We are Uniper We are a leading international energy company with operations in more than 40 countries and around 13,000 employees. We combine a balanced portfolio of modern
More informationMarine Engineering Consulting
Korea Brazil Business Forum for Brazilian Shipyards 2013. 10. Korean Register Korea Brazil Business Forum INTRODUCTION OF KOREAN REGISTER Main Role in Maritime Industry Classification societies have a
More informationPlatform Construction and Installation
Platform Construction and Installation Platform Construction and Installation UK Construction Yards. Worldwide Construction. Construction Quality and Safety. Construction Risks. Offshore Installation.
More informationA World of Solutions Visit Product Storage Terminals for Bulk Liquids
A World of Solutions Visit www.cbi.com Product Storage Terminals for Bulk Liquids United Arab Emirates The most global experience of any tank company CB&I has more than eight decades of experience designing
More informationPetronet LNG Ltd., India. LNG Terminal Design- Major Design Considerations
Petronet LNG Ltd., India LNG Terminal Design- Major Design Considerations OVERVIEW 1. What is LNG and LNG Chain 2. Project Development & Site Selection 3. Studies Required 4. Marine Facilities 5. Storage
More informationSAMSUNG Energy Plant: All-in-One Solution for Floating Power Plants with Gas-fired Combined Cycle Gas Turbines
SAMSUNG Energy Plant: All-in-One Solution for Floating Power Plants with Gas-fired Combined Cycle Gas Turbines GASTECH 2017 4-7 April, 2017 Chiba, Tokyo, Japan Myung-Kwan Song 1, Yongseok Song 2, Jeong
More informationInland Technologies Inc
Inc Evaluation of the Mono-ethylene Glycol [MEG] Concentrator to Recycle MEG used in Hydrate Prevention March 2007 Document Nr 0035_INL-OPT-REP-001 Client : Inland Technologies Inc Project : Evaluation
More informationShip Design and System Integration
Ship Design and System Integration Dipl.-Ing. Christina Vossen (Senior Engineer), Robert Kleppe (Principle Engineer, Electrical Systems), M.Sc. Siv Randi Hjørungnes (Principle Engineer, R&DT), Rolls-Royce
More informationSPE DISTINGUISHED LECTURER SERIES is funded principally through a grant of the SPE FOUNDATION
SPE DISTINGUISHED LECTURER SERIES is funded principally through a grant of the SPE FOUNDATION The Society gratefully acknowledges those companies that support the program by allowing their professionals
More informationEXPRESSION OF INTEREST
EXPRESSION OF INTEREST White Rose Extension Project (WREP) EOI / Prequalification Wellhead Control Panel EOI-101414-702.0 Mustang Canada, Inc. is seeking prequalification responses from interested companies
More informationPluto LNG Development Industry Briefing. 21 st November 2006
Pluto LNG Development Industry Briefing 21 st November 2006 Agenda Introduction David Kobelke Project Overview Lucio Della Martina Project Scope and Execution Mike Lutz Onshore Procurement Strategy Trevor
More informationStratus Development in Joint Venture with Middle East Petroleum Services (Offshore) SAL
Stratus Development in Joint Venture with Middle East Petroleum Services (Offshore) SAL Stratus Development in Joint Venture with Middle East Petroleum Services (Offshore) SAL is a service, general trading
More informationBrazed aluminium heat exchangers (BAHXs), also referred to
Brazed aluminium heat exchangers (BAHXs), also referred to as plate fin heat exchangers, are at the heart of many of the processes used for the liquefaction of natural gas. They are deployed across the
More informationFloating LNG/LPG production, storage and loading units
RULES FOR CLASSIFICATION Offshore units DNVGL-RU-OU-0103 Edition July 2015 Floating LNG/LPG production, storage and loading units The content of this service document is the subject of intellectual property
More informationFIRSTS IN THE LNG MARKET Approximately one-third of the LNG produced is produced using Dresser-Rand compressors.
LNG SOLUTIONS LNG Solutions LNG industry expects growth for the next five to 10 years. LNG INDUSTRY GROWTH Dresser-Rand has been involved with the world s leading LNG producers since the technology was
More informationOUR EXPERIENCE: BALLAST WATER MANAGEMENT SYSTEM (BWMS) RETROFIT
OUR EXPERIENCE: BALLAST WATER MANAGEMENT SYSTEM (BWMS) RETROFIT Presented By: Chandru Sirumal Rajwani (CEO of N-KOM) PREFERRED SHIPYARD DELIVERING SOLUTIONS ERHAMA BIN JABER AL JALAHMA SHIPYARD CONTENTS
More informationREFRIGERATION CYCLES
REFRIGERATION CYCLES Carnot Cycle We start discussing the well-known Carnot cycle in its refrigeration mode. Figure 2-1: Carnot Cycle In this cycle we define the coefficient of performance as follows:
More informationGGFR. Methane Expo Best practices for evaluating and reducing emissions from oil and gas production An evaluation of Flare Gas Reduction Opportunities
GGFR Methane Expo Best practices for evaluating and reducing emissions from oil and gas production An evaluation of Flare Gas Reduction Opportunities Bent Svensson March 12-15, 2013-1 - Today s presentation
More informationDevelopment of offshore fields
5.2 Development of offshore fields 5.2.1 Introduction Over the years different types of offshore structures have been designed for a multitude of purposes. There is no doubt, however, that the development
More informationProduct Line FGS FLOATING GAS SOLUTIONS OVERVIEW
Project Discipline Product Line FGS FLOATING GAS SOLUTIONS OVERVIEW FLOATING GAS SOLUTIONS AT A GLANCE SBM Offshore offers a catalogue of solutions, spanning the entire floating gas value chain, from small
More informationCreating Optimal LNG Storage Solutions. 40 in detail
[ MARINE / IN DETAIL ] [ MARINE / IN DETAIL ] Creating Optimal LNG Storage Solutions AUTHOR: Sören Karlsson, Business Development Manager, Wärtsilä Marine Solutions mail: soren.karlsson@wartsila.com 40
More informationClassNK Business Planning Department ACADEMY ClassNK Academy Center, South Asia and Oceania
ACADEMY ClassNK Academy s Mission ClassNK Academy was established in 2009 to provide people employed in the maritime industry with a working knowledge of shipping and shipbuilding, focusing specifically
More informationMarginal Field Production Vessel The Solution For Marginal Fields & Early Production!
Marginal Field Production Vessel The Solution For Marginal Fields & Early Production! 1 Presentation in Partnership with SOPETRO Offshore Nigeria Sopetro and IOC have formed a strategic alliance to pursue
More informationFloating Wind Power in Deep Water Competitive with Shallow-water Wind Farms?
Floating Wind Power in Deep Water Competitive with Shallow-water Wind Farms? a report by Eystein Borgen Sway AS Pioneering projects with a few bottom-mounted wind turbines in shallow water were first installed
More informationPetroVietnam Cooperate Structure
PetroVietnam Cooperate Structure PetroVietnam Refinery Petrochemical, Bio-fuel Oil & Gas Exploration And Production Petroleum Services (PTSC) Power Generation Gas Industry Marine Services Offshore Services
More information