1 Wildlife Connectivity Assessment Bakersfield to Palmdale Project Section Presenters: Bill Goggin and John ko May 2017

2 HIGH-SPEED RAIL: Connecting California

3 STUDY AREA Tehachapi Mountains» Critical Linkage Approximately 80 miles (Bakersfield to Palmdale)» 74% At-Grade» 14% Elevated» 12% Underground

4 PROJECT DESIGN FEATURES At-Grade Sections At-Grade Fill Section Tunnel Sections At-Grade Cut Section Double Bore Tunnel Single Bore Tunnel

5 PROJECT DESIGN FEATURES Bridge and Viaduct Segments Viaduct Rendering Viaducts Profile

6 REGIONAL CORRIDOR STUDY Missing Linkage Study» Cost Raster Data Land Cover Road Density Elevation Topographic Position» Least Cost Corridors Mountain Lion Mule Deer American Badger Western Gray Squirrel San Joaquin Kit Fox Blunt-nosed Leopard Lizard Tipton Kangaroo Rat Listed Species

7 REGIONAL CORRIDORS Tehachapi Linkage Design» Based on least cost corridors Conserved and Protected Lands Future Conservation Dedication

8 HOW TO MEASURE PERMEABILITY? How do we differentiate? Bakersfield to Palmdale Permeability» 74% of alignment at-grade segments and 26% (viaducts and tunnels)» 62 crossing opportunities (green arrows) - 53 viaducts and 9 tunnels

9 METHODS - LOCAL PERMEABILITY ASSESSMENT (LPA) Movement Cost Data» Land cover type» Road density» Elevation» Topographic position Focal species» Mt. Lion» Mule deer» Badger» Blunt-nosed leopard lizard» San Joaquin kit fox» Desert tortoise» Tipton K-rat» Desert kit fox» Western gray squirrel Listed Species 6 km Green = origin and destination habitat Red = wildlife movement habitat

10 CORRIDOR MODEL FUNCTION OUTPUTS Using ArcGIS Corridor function Existing Conditions Project

11 RESULTS LOCAL PERMEABILITY ASSESSMENT Quantify Results» Mean Accumulative Movement Cost Sum of Raster» Moving Window Average 90m radius every 50m Model Runs - Scenarios» Existing Conditions» Project» Project with Crossings Sum of Raster

12 WILDLIFE CROSSING PARAMETERS Crossing Intervals:» Small Crossings every 0.3 miles 6ft culvert» Large Crossings every 1.0 miles 20 ft culvert or bridge structure Length less than 200 ft Slope less than 2% Substrate natural bottom substrate Grade near natural grade

13 SAN JOAQUIN KIT FOX PERMEABILITY VISUALIZATION

14 SAN JOAQUIN KIT FOX PERMEABILITY VISUALIZATION

15 MOUNTAIN LION PERMEABILITY VISUALIZATION

16 MOUNTAIN LION PERMEABILITY VISUALIZATION

17 CONSIDERATION OF CONTEXT Vegetation Roadkill Stakeholders Conserved Land Engineering Road Infrastructure Aerial Photograph Hydrology

18 PRELIMINARY CROSSING LOCATIONS

19 PRELIMINARY CROSSING LOCATIONS

20 WILDLIFE CROSSING CONCEPT - PRELIMINARY RENDERING Small Crossing Dual-Use Road Undercrossing Dual-Use Road Overcrossing Dual-Use Drainage Crossing

21 IMPACT AVOIDANCE AND MINIMIZATION FEATURES Restoration and Revegetation Plan Biological Resources Management Plan Annual Vegetation Management Plan Weed Control Plan Security Fence Maintenance Plan Construction Work Windows Biological Monitoring During Construction Activities Entrapment Prevention Equipment Staging Areas Consider habitat connectivity/animal movement when mitigating for listed species Dewatering and Water Diversion Compliance Reporting Construction Site Best Management Practices Night Lighting Construction Noise Reduction Measures Wildlife Exclusion Fencing Vehicle/Equipment Traffic Controls

22 NEXT STEPS Refine Refine Design from 15 Percent Moving Forward Stakeholder Engagement Agency Consultation Refine Build

23 DISCUSSION AND QUESTIONS

24 CONTACT INFORMATION Bakersfield to Palmdale Project Section WCA Contacts Bill Goggin - Sr Permitting Specialist/Certified Wildlife Biologist william.goggin@hsr.ca.gov (916) John Ko - Sr Biologist/Restoration Ecologist John.Ko@lsa.net (949) Southern California Regional Office California High-Speed Rail Authority 700 N. Alameda St. Room Los Angeles, CA facebook.com/californiahighspe youtube.com/cahighspeedrail

25 INCREASED CROSSING DISTANCE c a b 6km (2.73mi) a 2 + b 2 = c 2

Tejon Ranch. A Threatened California Legacy. Proposed Reserve Design for. Prepared by Conservation Biology Institute and South Coast Wildlands

Tejon Ranch. A Threatened California Legacy. Proposed Reserve Design for. Prepared by Conservation Biology Institute and South Coast Wildlands Proposed Reserve Design for Tejon Ranch A Threatened California Legacy 2003 Andrew M. Harvey www.visualjourneys.net 2003 Andrew M. Harvey www.visualjourneys.net Prepared by Conservation Biology Institute

More information

Michael Gillam Deputy Program Director - Southern California

Michael Gillam Deputy Program Director - Southern California International Right of Way Association Los Angeles Chapter: C A L I F O R N I A H I G H - S P E E D R A I L Michael Gillam Deputy Program Director - Southern California January 25, 2011 A Statewide System

More information

California High-Speed Train Program FEIR/EIS

California High-Speed Train Program FEIR/EIS Page 2-30 Page 2-31 Page 2-32 Page 2-33 Page 2-34 Page 2-35 Page 2-36 of Enrique Manzanilla, Director U.S. Environmental Protection Agency, August 31, 2004 (Letter AF008) AF008-1 Acknowledged. AF008-2

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Expo Project Briefing Phase 1 and 2 For IRWA October 26, 2010 Phase 1 Phase 1 Project Description Phase 1 from Downtown Los Angeles to Culver City: 8.6 mile corridor

More information

Rio Grande National Forest Update

Rio Grande National Forest Update Rio Grande National Forest Update Wildlife Movement Workshop: Connectivity in the Upper Rio Grande Watershed December 2016 1 2 Forest Background: 1.8 Million Acres encompassing the headwaters for Rio Grande

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM California High-Speed Train Project TECHNICAL MEMORANDUM 15% Design Scope Guidelines TM 0.1 Signed document on file Prepared by: 12 May 08_ Ken Jong, PE Checked by: Signed document on file 12 May 08_ John

More information

Project Goals and Scoping

Project Goals and Scoping Prepared for: Boulder County, Colorado Flood Planning & Preliminary Design Services for South St. Vrain Creek Restoration at Hall Ranch and Scoping May 24, 2016 Meeting with General Public In association

More information

WELCOME! Mill Creek Daylighting Technical Feasibility Study. Thank you! Open House December Please sign in and get a comment form.

WELCOME! Mill Creek Daylighting Technical Feasibility Study. Thank you! Open House December Please sign in and get a comment form. WELCOME! Daylighting Technical Feasibility Study Open House December 2016 Please sign in and get a comment form. Thank you! WHAT IS DAYLIGHTING? Daylighting refers to the process of re-establishing creeks

More information

ARIZONA MISSING LINKAGES. Gila Bend - Sierra Estrella Linkage Design

ARIZONA MISSING LINKAGES. Gila Bend - Sierra Estrella Linkage Design ARIZONA MISSING LINKAGES Gila Bend - Sierra Estrella Linkage Design Paul Beier, Emily Garding, Daniel Majka 2008 GILA BEND - SIERRA ESTRELLA LINKAGE DESIGN Acknowledgments This project would not have

More information

3.6 Riparian Ecosystem Wildlife

3.6 Riparian Ecosystem Wildlife 3.6 Riparian Ecosystem Wildlife 3.6.1 Introduction and Methodology Riparian areas and associated wetlands are widely recognized for the significant and diverse roles they play in the landscape. They clean

More information

Kern Water Bank. Kern Water Bank Authority

Kern Water Bank. Kern Water Bank Authority Kern Water Bank Kern Water Bank Authority THE KERN WATER BANK Ensuring a Reliable Water Supply to the Southern San Joaquin Valley Providing for Exceptional Upland and Riparian Habitat Kern Water Bank Authority

More information

FINDINGS CALIFORNIA DEPARTMENT OF TRANSPORTATION FINDINGS FOR THE INTERSTATE 10 CORRIDOR PROJECT SAN BERNARDINO AND LOS ANGELES COUNTIES, CALIFORNIA

FINDINGS CALIFORNIA DEPARTMENT OF TRANSPORTATION FINDINGS FOR THE INTERSTATE 10 CORRIDOR PROJECT SAN BERNARDINO AND LOS ANGELES COUNTIES, CALIFORNIA FINDINGS CALIFORNIA DEPARTMENT OF TRANSPORTATION FINDINGS FOR THE INTERSTATE 10 CORRIDOR PROJECT SAN BERNARDINO AND LOS ANGELES COUNTIES, CALIFORNIA DISTRICT 7 LA 10 (PM 44.0/48.3) DISTRICT 8 SBD 10 (PM

More information

Chapter 13: Wildlife and Vegetation

Chapter 13: Wildlife and Vegetation Chapter 13: Wildlife and Vegetation Introduction and Setting Nevada County contains an extremely wide range of plants, animals and habitat types. With topographic elevations ranging from 300 feet in the

More information

Suncoast Parkway 2/SR Toll 589 FPID: & 3, -4

Suncoast Parkway 2/SR Toll 589 FPID: & 3, -4 When will the Turnpike have right-of-way and parcel maps available? We anticipate receipt of 100% plans, parcel sketches and legal descriptions in late June or early July of 2015. When will the Turnpike

More information

NEVADA. Smart Solar Focusing on Low-Conflict Zones to Promote Nevada s Economy, Protect Wildlands, and Build a Clean Energy Future.

NEVADA. Smart Solar Focusing on Low-Conflict Zones to Promote Nevada s Economy, Protect Wildlands, and Build a Clean Energy Future. Focusing on Low-Conflict Zones to Promote the West s Economy, Protect Wildlands, and Build a Clean Energy Future NEVADA Southern boasts some of the best solar resources in the nation, with great potential

More information

State Route 37 Stewardship Study

State Route 37 Stewardship Study State Route 37 Stewardship Study Road Ecology Center, University of California, Davis Caltrans District 4 System Planning & Environmental Divisions Caltrans Headquarters Sonoma Land Trust, Sonoma Ecology

More information

Los Angeles Westside Purple Line Extension Project Challenges and Lessons Learned

Los Angeles Westside Purple Line Extension Project Challenges and Lessons Learned Los Angeles Westside Purple Line Extension Project Challenges and Lessons Learned Ashok Kothari, P.E. WSP USA, Sr. Vice President Los Angeles, California Michael McKenna, P.E. LACMTA Executive Officer,

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Downtown & Mid-Corridor Project Status Update Meeting Holman United Methodist Church Thursday, July 23, 2009 Phase 1 Project Description 8.6 mile corridor from Downtown

More information

Stockton Freight & Passenger Rail Mobility Enhancement

Stockton Freight & Passenger Rail Mobility Enhancement Stockton Freight & Passenger Rail Mobility Enhancement 2017 $10.34 million in 2017 FASTLANE Grant funding to complete engineering design, permitting, and construction of the Stockton Track Extension and

More information

Annual CSAH Needs Update for 2017

Annual CSAH Needs Update for 2017 Annual CSAH Needs Update for 2017 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segments and project data using the SANeeds system.

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing Page 1 of 6 Background DECISION MEMO USDA Forest Service Madison Ranger District Madison County T12S, R4W, Section 30 The project is in the Gravelly Landscape, Snowcrest Recommended Wilderness Management

More information

High Desert Corridor: Investment Grade Ridership & Revenue Forecasts

High Desert Corridor: Investment Grade Ridership & Revenue Forecasts High Desert Corridor: Investment Grade Ridership & Revenue Forecasts High Desert Corridor Joint Powers Authority Executive Summary March 2017 Our ref: 22876601 High Desert Corridor: Investment Grade Ridership

More information

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM I-15 South, MP 0 to MP 16 Environmental Assessment Public Hearing August 7, 2012 5:00 PM to 7:00 PM 1 PROJECT OVERVIEW The Federal Highway Administration (FHWA) and the Utah Department of Transportation

More information

Enterprise Parkway Improvement Project, CIP# E364

Enterprise Parkway Improvement Project, CIP# E364 Exhibit A SCOPE OF SERVICES AND FEES This project, in general, consists of: Construction of roadway improvements to extend Enterprise Parkway east of Superior Industries and Lockheed Martin to connect

More information

Appendix D - Evaluation of Interim Solutions

Appendix D - Evaluation of Interim Solutions Appendix D - Evaluation of Interim Solutions D.1 Introduction The implementation of long-term improvements is projected to take 5 to 8 years. To reduce the number of years of flooding impacts, the partner

More information

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN BACKGROUND INFORMATION Project SWIM? Aquatic Control? Exotic Control? Mitigation Bank? Type No No No No Mitigation Restoration and enhancement Type

More information

Purple Line Extension Section 1 Construction Community Meeting September 26, 2017

Purple Line Extension Section 1 Construction Community Meeting September 26, 2017 Purple Line Extension Section 1 Construction Community Meeting September 26, 2017 1 Agenda Sections 1 & 2 Section 1 Construction Updates TBM Art and Naming Contest Project Construction Updates: Wilshire/Western

More information

COLORADO PARKS AND WILDLIFE ACTIONS TO MINIMIZE ADVERSE IMPACTS TO WILDLIFE RESOURCES (2 nd Revision October 17, 2016)

COLORADO PARKS AND WILDLIFE ACTIONS TO MINIMIZE ADVERSE IMPACTS TO WILDLIFE RESOURCES (2 nd Revision October 17, 2016) COLORADO PARKS AND WILDLIFE ACTIONS TO MINIMIZE ADVERSE IMPACTS TO WILDLIFE RESOURCES (2 nd Revision October 17, 2016) The purpose of this document is to enumerate best management practices that minimize

More information

International Bank for Reconstruction and Development International Development Association

International Bank for Reconstruction and Development International Development Association International Bank for Reconstruction and Development International Development Association PROGRESS REPORT TO THE BOARD OF EXECUTIVE DIRECTORS ON THE IMPLEMENTATION OF THE MANAGEMENT ACTION PLAN IN RESPONSE

More information

Sections:

Sections: DIVISION 15: NATURAL RESOURCES REGULATIONS CHAPTER 9-1500 NATURAL RESOURCES REGULATIONS: INTENT AND ORGANIZATION 9-1500.1 Title and Intent. 9-1500.2 Organization. 9-1500.1 TFlZE AND INTENT. Division 15

More information

Works, services and infrastructure code

Works, services and infrastructure code 9.4.11 Works, services infrastructure code 9.4.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Works, services infrastructure code by the

More information

Metro Blue Line Improvements & Project Update

Metro Blue Line Improvements & Project Update Metro Blue Line Improvements & Project Update February 9, 2018 MBL Operational Improvements - External Metro & LADOT coordination to identify traffic signal and intersection treatments aimed at increasing

More information

Rattlesnake Mountain OHV Trails

Rattlesnake Mountain OHV Trails Rattlesnake Mountain OHV Trails Location The project area is approximately 8,000 acres in size and is located in the vicinity of Rattlesnake Mountain and southeast to Big Pine Flat. The area is generally

More information

GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA. March 25, 2006 INTRODUCTION

GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA. March 25, 2006 INTRODUCTION GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA March 25, 2006 INTRODUCTION This document is intended to provide general guidance for use in conducting

More information

Guidelines for Culvert Construction to Accommodate Fish & Wildlife Movement and Passage

Guidelines for Culvert Construction to Accommodate Fish & Wildlife Movement and Passage Guidelines for Culvert Construction to Accommodate Fish & Wildlife Movement and Passage Introduction/Background General Recommendations Types of Structures Large Mammals Medium Mammals Small Mammals Bats

More information

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report Notice of Preparation For Link Union Station (Link US) Project Joint Environmental Impact Statement and Environmental Impact Report Date: May 27, 2016 To: Subject: Project Title: From: All Interested Agencies,

More information

Guidelines for Culvert Construction to Accommodate Fish & Wildlife Movement and Passage

Guidelines for Culvert Construction to Accommodate Fish & Wildlife Movement and Passage Guidelines for Culvert Construction to Accommodate Fish & Wildlife Movement and Passage Arizona Game and Fish Department, Habitat Branch Introduction/Background General Recommendations Types of Structures

More information

Intermodal Facility Study

Intermodal Facility Study Intermodal Facility Study January 16, 2008 Submitted to: City of Shafter 336 Pacific Avenue Shafter, CA 93263 Prepared by: WZI Inc. 1717 28 th Street Bakersfield, California 93301 1 7 1 7 2 8 th S t r

More information

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan TES Industrial Development Lacombe County Outline Plan 112849297 June 2012 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc i Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE... 1

More information

Zoning Ordinance Chapter 7

Zoning Ordinance Chapter 7 CHAPTER 7 - HILLSIDE SECTION 7.0 GENERAL A. Purpose: To allow for the reasonable use and development of hillside areas while promoting the public health, safety, and general welfare of the citizens of

More information

Western Rail Link To Heathrow

Western Rail Link To Heathrow Non-T echnical Summar y - Initi al Envir onmental Infor mati on R eport Networ k R ail Western Rail Link To Heathrow Network Rail Non-Technical Summary - Initial Environmental 129088-JAC-REP-HEN-000014

More information

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Welcome Public Information Event Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Please sign in to be added to the study mailing list and receive

More information

Post-Fire BAER Assessment Burned Area Emergency Response (BAER)

Post-Fire BAER Assessment Burned Area Emergency Response (BAER) November 2017 Post-Fire BAER Assessment Burned Area Emergency Response (BAER) Information Brief Diamond Creek Fire Values at Risk Matrix and Treatments CentralWashingtonFireRecovery.info EMERGENCY DETERMINATION

More information

407 TRANSITWAY. Planning & Preliminary Design

407 TRANSITWAY. Planning & Preliminary Design FROM EAST OF HIGHWAY 400 TO KENNEDY ROAD GWP #252-96-00 Public Information Centre #2 June 24 th and 29 th, 2010 Purpose of Public Information Centre #2 The first Public Information Centre (PIC #1) was

More information

Executive Summary for the Record of Decision

Executive Summary for the Record of Decision for the Record of Decision for the Record of Decision for the Land Use Plan Amendment to the California Desert Conservation Plan, Bishop Resource Management Plan, and Bakersfield Resource Management Plan

More information

Background OREGON SILVERSPOT BUTTERFLY HABITAT ANALYSIS. & Woodland Zoos. GEOG 492 / 592 March 15, 2012

Background OREGON SILVERSPOT BUTTERFLY HABITAT ANALYSIS. & Woodland Zoos. GEOG 492 / 592 March 15, 2012 OREGON SILVERSPOT BUTTERFLY HABITAT ANALYSIS GEOG 492 / 592 March 15, 2012 Final Project Presentation: Paul Allen & Jalene Littlejohn Background! Endangered species! Extirpated from range! Captive rearing

More information

Stream Reaches and Hydrologic Units

Stream Reaches and Hydrologic Units Chapter United States 6 Department of Agriculture Natural Resources Conservation Service Chapter 6 Stream Reaches and Hydrologic Units Rain clouds Cloud formation Precipitation Surface runoff Evaporation

More information

HCP Development: Key Aspects of Conservation Planning

HCP Development: Key Aspects of Conservation Planning Section 3. The Santa Clara Valley HCP/NCCP Key Issues and Examples from Other HCPs and NCCPs HCP Development: Key Aspects of Conservation Planning Planning Biology Economics Public Involvement Regulatory

More information

Appendix B. Benefit-Cost Technical Memorandum

Appendix B. Benefit-Cost Technical Memorandum Appendix B Benefit-Cost Technical Memorandum This Page Left Blank Intentionally MEMORANDUM TO: FROM: Michael Kalnbach MnDOT District 1 Project Manager Graham Johnson, PE DATE: September 2, 2014 RE: TH

More information

Hoback 1. Sensitivity Analysis of Light Rail Transit Unit Capital Costs. Total Words: 3824 words + 3 figures + 5 tables = 5824 words.

Hoback 1. Sensitivity Analysis of Light Rail Transit Unit Capital Costs. Total Words: 3824 words + 3 figures + 5 tables = 5824 words. Hoback 1 Sensitivity Analysis of Light Rail Transit Unit Capital Costs Alan Hoback, Sc.D., PE Alan Hoback, Sc.D., PE Department of Civil & Environmental Engineering University of Detroit Mercy 4001 W.

More information

Large Diameter Highway Tunnels

Large Diameter Highway Tunnels Large Diameter Highway Tunnels Richard Prust Towards a solution Need Feasibility Whole-life cost Corridors for through trips SR-99 carries a significant proportion of total through trips SR-99 corridor

More information

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands SOUTH FLORIDA WATER MANAGEMENT DISTRICT Question 13: Wetlands 1. The wetland responses and topographical data provided in the ADA for the 520- acre project site are conceptual in nature. The referenced

More information

COMPARISON OF PROJECT AGAINST EXISTING CONDITIONS

COMPARISON OF PROJECT AGAINST EXISTING CONDITIONS Chapter 10 COMPARISON OF PROJECT AGAINST EXISTING CONDITIONS The December 2010 court ruling in Northern California, Sunnyvale West Neighborhood Assn, et al v. City of Sunnyvale City Council, has underscored

More information

Characteristics of Land Resources

Characteristics of Land Resources Chapter Chapter 1 Characteristics of Land Resources The geology, soils and topography of Woodford County T he geology, soils and topography of an area are important to the community planning process for

More information

PROJECT CHARTER South Coast 101 HOV Lanes Project Design Decision Phase

PROJECT CHARTER South Coast 101 HOV Lanes Project Design Decision Phase PROJECT CHARTER South Coast 101 HOV Lanes Project Design Decision Phase PRIMARY PROJECT SPONSOR Santa Barbara County Association of Governments (SBCAG) Date Prepared 03 April 2015 PROJECT PARTNERS Santa

More information

ENVIRONMENTAL IMPACT STATEMENT METRO NORTH BELINSTOWN TO SWORDS STOP AREA MN101 VOLUME 2 BOOK 1 OF 7

ENVIRONMENTAL IMPACT STATEMENT METRO NORTH BELINSTOWN TO SWORDS STOP AREA MN101 VOLUME 2 BOOK 1 OF 7 ENVIRONMENTAL IMPACT STATEMENT METRO NORTH BELINSTOWN TO SWORDS STOP AREA MN101 VOLUME 2 BOOK 1 OF 7 ENVIRONMENTAL IMPACT STATEMENT For ease of local identification this Environmental Impact Statement

More information

California Rangeland Conservation Coalition Biological Prioritization of Rangelands: Approach and Methods

California Rangeland Conservation Coalition Biological Prioritization of Rangelands: Approach and Methods California Rangeland Conservation Coalition Biological Prioritization of Rangelands: Approach and Methods Prepared by The Nature Conservancy Questions? Dick Cameron, TUdcameron@tnc.orgUT, (415) 281-0462

More information

SBEADMR Priority Treatment Areas Process and Results

SBEADMR Priority Treatment Areas Process and Results SBEADMR Priority Treatment Areas Process and Results GIS Optimization & Interdisciplinary Validation, September & October 2015 Purpose Use GIS to focus and prioritize potential treatment areas within the

More information

I-405 Sepulveda Pass Widening Project. Community Advisory Committee Meeting June 24, 2010

I-405 Sepulveda Pass Widening Project. Community Advisory Committee Meeting June 24, 2010 I-405 Sepulveda Pass Widening Project Community Advisory Committee Meeting June 24, 2010 1 MWD LA-29 Project Drilling to install beams for shoring to support excavation at Sunset Bl and Church Ln 2 MWD

More information

7. Value Management Workshop

7. Value Management Workshop 7. Value Management Workshop 7.1 Introduction A two day Value Management Workshop (VMW) was held on 12 and 13 December 2005. The value management workshop was used to review and assess the four route options

More information

FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE

FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE OURAY RANGER DISTRICT OURAY COUNTY, COLORADO BACKGROUND The Owl Creek Gravel Pit, also known as the Spruce Ridge Pit,

More information

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project Memorandum Date: January 15, 2014 To: CC: From: Subject: Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project Paul Danielson, P.E. Project Manager, Southwest Light Rail

More information

Wildlife Road Kill Prevention in Western Macedonia, Greece: Results of the project LIFE ARCTOS/KASTORIA

Wildlife Road Kill Prevention in Western Macedonia, Greece: Results of the project LIFE ARCTOS/KASTORIA International Congress " Wildlife Road Kill Prevention: Theory, Research and Practice, 4-5 October 2016, Perugia, Italy. Wildlife Road Kill Prevention in Western Macedonia, Greece: Results of the project

More information

Effects of Geophysical Survey Energy Sources on Kangaroo Rat Abundance

Effects of Geophysical Survey Energy Sources on Kangaroo Rat Abundance Submitted: 12 September 2012; Accepted: 30 May 2014 Effects of Geophysical Survey Energy Sources on Kangaroo Rat Abundance Craig M. Fiehler 1, Brian L. Cypher 1, and Larry R. Saslaw 2 1 Endangered Species

More information

Shortage on the Colorado River: Analysis of Impacts to Water Users in Central Arizona. Ken Seasholes

Shortage on the Colorado River: Analysis of Impacts to Water Users in Central Arizona. Ken Seasholes Shortage on the Colorado River: Analysis of Impacts to Water Users in Central Arizona Ken Seasholes Manager, Resource Planning & Analysis AWRA Annual Conference, Denver November 19, 2015 Colorado River

More information

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows:

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows: UNION PACIFIC RAILROAD SCOPE OF HYDROLOGIC/HYDRAULIC DESIGN ENGINEERING AND PERMITTING SERVICES FOR SIZING WATERWAY OPENINGS AT NEW AND REPLACEMENT STRICTURES These flood passage criteria were developed

More information

Department of the Army Permit Application

Department of the Army Permit Application Department of the Army Permit Application DA File Number U.S. Army Corps of Engineers Honolulu District Date Received by CEPOH-RO Send Completed Application to: Honolulu District, U.S. Army Corps of Engineers

More information

Duwamish Waterway Self Guided Tour: Turning Basin Number Three and Terminal 105 Aquatic Habitat Restoration Sites

Duwamish Waterway Self Guided Tour: Turning Basin Number Three and Terminal 105 Aquatic Habitat Restoration Sites Duwamish Waterway Self Guided Tour: Turning Basin Number Three and Terminal 105 Aquatic Habitat Restoration Sites Text and illustrations in the following pages include: (1) summary information describing

More information

Chapter 4 Future Demand Forecasts

Chapter 4 Future Demand Forecasts Chapter 4 Future Demand Forecasts This chapter summarizes the work done under Task 4 to build the Action Plan, which is further described in Tech Memos 4a (Freight Demand) and 4b (System Performance Report).

More information

of structures and facilities.

of structures and facilities. EcoTrain Québec - Windsor A: Right-of-Way Acquisition 1 Residential Land 1.1 Québec-Montréal ha 1.2 Montréal-Ottawa ha 1.3 Ottawa-Toronto ha 1.4 Toronto-Windsor ha All costs associated with purchasing

More information

3.0 CUMULATIVE PROJECTS SCENARIO

3.0 CUMULATIVE PROJECTS SCENARIO 3.0 CUMULATIVE PROJECTS SCENARIO The CEQA Guidelines define cumulative impacts as two or more individual effects that, when considered together, are considerable or which compound or increase other environmental

More information

Information Sheet - Mountain Highway Interchange Noise Assessment and Sound Mitigation

Information Sheet - Mountain Highway Interchange Noise Assessment and Sound Mitigation Information Sheet - Mountain Highway Interchange Noise Assessment and Sound Mitigation Why is the project needed? The new Mountain Highway Interchange will provide additional Highway 1 access to better

More information

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR July 12, 2002 A Paper Submitted for the AREMA Annual Conference by: Paul B. Satterly, P.E. HNTB CORPORATION 111 Monument Circle, Suite 1200 Indianapolis,

More information

Rail Freight and Economic Development. Economic Development

Rail Freight and Economic Development. Economic Development Rail Freight and Economic Development Glen Weisbrod Economic Development Research Group, Inc. 2 Oliver Street, 9 th Floor Boston, MA 02109 USA www. edrgroup.com 1 Three Themes 1. Underlying Trends: changing

More information

STONYBROOK CREEK SALMONID MIGRATION BARRIER REMOVAL PROJECT. October 2005

STONYBROOK CREEK SALMONID MIGRATION BARRIER REMOVAL PROJECT. October 2005 04-1016-01.003 STONYBROOK CREEK SALMONID MIGRATION BARRIER REMOVAL PROJECT October 2005 Prepared for: Gordon Becker Center for Ecosystem Management and Restoration (CEMAR) 4179 Piedmont Ave. Ste 325 Oakland,

More information

Appendix C Canadian Pacific Rail License of Entry Document

Appendix C Canadian Pacific Rail License of Entry Document Appendix C Canadian Pacific Rail License of Entry Document 01-13283-GG-0000-SE-RPT- 0001 Trans Mountain Expansion Project License of Entry CP Rail Contractor Revision Date: Contractor Revision No.: 2017-03-06

More information

Monterey Bay Area Sensitive Resource Mapping Project Final Report

Monterey Bay Area Sensitive Resource Mapping Project Final Report Monterey Bay Area Sensitive Resource Mapping Project Final Report The preparation of this documented was funded by the State Highways Research Program (SHRP2). Table of Contents 1. Introduction... 1 2.

More information

Table 3 4. Standardized Mitigation Ratios for Vernal Pool Fairy Shrimp in the EACCS Study Area

Table 3 4. Standardized Mitigation Ratios for Vernal Pool Fairy Shrimp in the EACCS Study Area Table 3 4. Standardized Mitigation Ratios for Vernal Pool Fairy Shrimp in the EACCS Study Area Location of Mitigation 1 Location of Impact 1 Inside Critical Habitat in EACCS study area and Inside Vernal

More information

PRENTISS CREEK (SUB-E) KENSINGTON PLACE CONCEPT PLAN VILLAGE OF DOWNERS GROVE, ILLINOIS AUGUST, 2011

PRENTISS CREEK (SUB-E) KENSINGTON PLACE CONCEPT PLAN VILLAGE OF DOWNERS GROVE, ILLINOIS AUGUST, 2011 PRENTISS CREEK (SUB-E) KENSINGTON PLACE CONCEPT PLAN VILLAGE OF DOWNERS GROVE, ILLINOIS AUGUST, 2011 Submitted to: NATHANIEL HAWK, STAFF ENGINEER VILLAGE OF DOWNERS GROVE 5101 WALNUT AVENUE DOWNERS GROVE,

More information

Struma Lot 3.2 EIA Development, Working Document

Struma Lot 3.2 EIA Development, Working Document Struma Lot 3.2 EIA Development, Working Document Revision 1, 03 February 2016 1 Introduction 1.1 Background Struma Motorway is one of the most challenging road projects in Bulgaria. The motorway is about

More information

The Los Angeles Desalination Project

The Los Angeles Desalination Project DRAFT PROPOSAL The Los Angeles Desalination Project Author: Brian Nissen Company: Bella Machines www.bellamachines.com The Los Angeles Desalination Project CALIFORNIA WATER The California water crisis

More information

New Reclaim Tunnel at Coal Fired Plant

New Reclaim Tunnel at Coal Fired Plant Omaha SAME Post Monthly Meeting 10 July 2014 New Reclaim Tunnel at Coal Fired Plant By: Steve Morrissette Zapata Incorporated Omaha, NE Coal Fired Power Plant Generating capacity: 2,090 megawatts base

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project ABSTRACT & POWERPOINT PRESENTATION Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project Tim Smith Principal Engineer Helix Water District La Mesa,

More information

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E. \ Memorandum SSPEED Center at Rice University Department of Civil & Environmental Engineering 6100 Main MS-317 Houston, Texas 77005-1827 sspeed.rice.edu tel: 713-348-4977 To Andy Yung, P.E. CFM; Lane Lease,

More information

XI. Thornton Planning Area

XI. Thornton Planning Area XI. A. OVERVIEW The covers 120 square miles in the northwest corner of San Joaquin County. It consists primarily of low-lying Delta islands, sloughs, and large farms. The town of Thornton, a small agriculturally-based

More information

MOUNTAINEER XPRESS. Columbia Pipeline Group

MOUNTAINEER XPRESS. Columbia Pipeline Group MOUNTAINEER XPRESS Columbia Pipeline Group C169566.indd 1 TABLE OF CONTENTS CPG AT A GLANCE THE PLAN/PROJECT COMPONENTS COMMITMENT TO KEEPING YOU INFORMED PROJECT BENEFITS SAFETY FREQUENTLY ASKED QUESTIONS

More information

CEQA Scoping Meeting. West Desert Hot Springs Master Drainage Plan Program Environmental Impact Report

CEQA Scoping Meeting. West Desert Hot Springs Master Drainage Plan Program Environmental Impact Report CEQA Scoping Meeting West Desert Hot Springs Master Drainage Plan Program Environmental Impact Report CEQA Lead Agency: City of Desert Hot Springs January 8, 2014 Scoping Meeting Agenda 1. Welcome and

More information

Cotton Belt Corridor. Area Focus Group (AFG) North Dallas September 11, John Hoppie, Capital Planning

Cotton Belt Corridor. Area Focus Group (AFG) North Dallas September 11, John Hoppie, Capital Planning Cotton Belt Corridor Area Focus Group (AFG) North Dallas September 11, 2017 John Hoppie, Capital Planning 0 Agenda AFG Concerns Design Update Alignment/Cross-section/Stations Environmental Update Documentation

More information

US Army Corps of Engineers

US Army Corps of Engineers I I I ' A I US Army Corps of Engineers LA River Ecosystem Restoration, CA Preconstruction Engineering and Design Phase 104791 LOS ANGELES DISTRICT SOUTH PACIFIC DIVISION August 15, 2017 1 Table of Contents

More information

Well Pattern Progression in the Cahn Pool of the Lost Hills Field

Well Pattern Progression in the Cahn Pool of the Lost Hills Field Volume III, Chapter 5: Appendix 5.A Appendix 5.A Well Pattern Progression in the Cahn Pool of the Lost Hills Field Most of the wells in the Cahn pool of the Lost Hills field are hydraulically fractured

More information

Mitigation Framework for Sage-Grouse Habitats 20 March 2012 IMPLEMENTING HABITAT MITIGATION FOR GREATER SAGE-GROUSE UNDER THE CORE AREA APPROACH

Mitigation Framework for Sage-Grouse Habitats 20 March 2012 IMPLEMENTING HABITAT MITIGATION FOR GREATER SAGE-GROUSE UNDER THE CORE AREA APPROACH IMPLEMENTING HABITAT MITIGATION FOR GREATER SAGE-GROUSE UNDER THE CORE AREA APPROACH Purpose This whitepaper outlines interim guidance for development of Oregon Department of Fish and Wildlife (Department)

More information

Scoping Document. Precious Minerals Mining and Refining Corporation East Walker Clay Mine Expansion Project Lyon County, Nevada

Scoping Document. Precious Minerals Mining and Refining Corporation East Walker Clay Mine Expansion Project Lyon County, Nevada Scoping Document Precious Minerals Mining and Refining Corporation East Walker Clay Mine Expansion Project Lyon County, Nevada United States Department of Agriculture Forest Service USDA Forest Service

More information

Minimum Thresholds, MODFLOW, and Sustainable Yield Example of Model Application in a Coastal Groundwater Basin

Minimum Thresholds, MODFLOW, and Sustainable Yield Example of Model Application in a Coastal Groundwater Basin Minimum Thresholds, MODFLOW, and Sustainable Yield Example of Model Application in a Coastal Groundwater Basin Objectives United was asked to make a preliminary estimate of sustainable yield of groundwater

More information

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17 LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17 1 PROJECT TEAM & COLLABORATORS 2 OPEN HOUSE SERIES Tuesday, May 16, 2017 6-8:00 pm La Verne City Council Chambers 3660 D Street La

More information

Predicting Highway Construction Impacts on a Community

Predicting Highway Construction Impacts on a Community Predicting Highway Construction Impacts on a Community Making the Best Decisions in the Face of Conflicting Values What does this mean? Roadway elevation Noise Berms or Noise Walls Selective clearing or

More information

Community Information Session Surat Basin

Community Information Session Surat Basin Community Consultation June 2010 Community Information Session Surat Basin May 2011 1 INTRODUCTION OF PRESENTERS Tony Knight, Vice President, Exploration St John Herbert, Groundwater Modelling Coordinator

More information

Project Initiation Form

Project Initiation Form Meeting Date: The Project Initiation Form should be completed in conjunction with the Level 2 Screening Form. Process Leads and/or Planners should complete the Project Initiation Form to document coordination

More information

SECTION F UPDATED PERMIT REQUIREMENTS

SECTION F UPDATED PERMIT REQUIREMENTS SECTION F UPDATED PERMIT REQUIREMENTS F. UPDATED PERMIT REQUIREMENTS This section of the Final EIR, Volume I updates the permit requirements for the Twin Oaks Valley Water Treatment Plant project, based

More information