LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR

Size: px
Start display at page:

Download "LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR"

Transcription

1 LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR July 12, 2002 A Paper Submitted for the AREMA Annual Conference by: Paul B. Satterly, P.E. HNTB CORPORATION 111 Monument Circle, Suite 1200 Indianapolis, Indiana Fax

2 Abstract Lafayette Railroad Relocation, Norfolk Southern Corridor Paul B. Satterly, P.E. The Norfolk Southern Corridor project is the phase of the Lafayette, Indiana Railroad Relocation project that moved the Norfolk Southern Railway (NSR) from their existing corridor through the City to the new corridor adjacent to the Wabash River. The main focus of the railroad relocation project has been safety. When the Environmental Impact Statement (EIS) was put together in 1979, there were approximately 20 trains per day traveling on the NSR mainline. Since the split of Conrail, there is now an average of 50 to 60 trains per day and peaks of 80 trains per day have occurred. The Norfolk Southern Corridor project eliminated 20 busy grade crossings that have had a history of accidents resulting in many injuries and several fatalities. Components of the new 4.5-mile corridor have been under design and construction since The final construction to complete the NSR corridor started in 1999 and the NSR mainline tracks were cut-over on January 22, The alignment is designed for 50 mph and has two mainline tracks throughout. The corridor is grade separated and is shared with CSX. The corridor features four sets of railroad bridges over roadways and two highway overpasses. Because of innovative financing and the compression of the design schedule, the project schedule was reduced by four years, which allowed the project to provide earlier relief to the City from potential accidents in the existing corridor. Key Words: railroad relocation, railroad corridor

3 LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR Background and Project History Relocation of the railroads in Lafayette, Indiana has been discussed since the predecessor to the CSX railroad was first constructed up the middle of 5 th Street in the 1850 s. Serious consideration was given to railroad relocation in the 1920 s but it was not until the 1970 s that work began on studies for the railroad relocation project. The Environmental Impact Statement for the project was completed in Design of the project started soon thereafter and the first phase of construction began in HNTB was hired for construction engineering and inspection for the first phase and continued as the lead designer and construction engineers for the remaining phases of the project. The project was broken down into phases, each designed to be a stand-alone project in case Federal Railroad Relocation Demonstration Project funding was constrained. The project goal was to eliminate 41 railroad-highway grade crossings through the downtown area by relocating the Norfolk Southern and CSX railroads to a corridor that parallels the east bank of the Wabash River. The CSX Railroad was relocated from the middle of 5 th Street to the new corridor in July 1994 and trains of the Norfolk Southern Railway were relocated to the new corridor in January Reference Figure 1 for the overall project map. The project consisted of independently usable segments and construction began on the first phase in This required a significant planning effort with the railroads and a track design that was completed ahead of the major design components. The segments for this project and their completion dates are as follows:

4 Wabash Avenue Grade Separation 1987 SR 26 Grade Separation and Wabash River Bridge th Street Grade Separation 1993 CSX Relocation, Harrison Bridge Grade Separation 1994 Wabash Avenue and 9 th Street Bridges 1996 US 52 Grade Separation and Embankment 1998 SR 25 Grade Separation 1999 Norfolk Southern Corridor 2001 The Norfolk Southern Corridor project was the final railroad related phase, with all other phases preparing the way for both the CSX and Norfolk Southern railroad relocations. The Norfolk Southern Corridor construction project represents approximately a third of the $180 million cost of the overall project. The Norfolk Southern Railway alignment through the City consisted of a double track mainline with 20 highway/railroad grade crossings. Train speeds were limited to 25 mph because of the numerous grade crossings. The City had enacted a whistle ban through the City because of the noise associated with the frequent trains. Many grade crossings did not have gates and car/train collisions were caused in part by trains passing each other on this section of track. The main focus of the railroad relocation project has been safety. When the Environmental Impact Statement (EIS) was put together, there were approximately 20 trains per day traveling

5 on the Norfolk Southern mainline and there was not much anticipated growth. Since the split of Conrail in 1999, there has been a considerable increase in train traffic. There now is an average of 50 to 60 trains per day and peaks of 80 trains per day though the City. The two track Norfolk Southern mainline crossed through Lafayette diagonally creating angled grade crossings at almost every street. In the three years prior to the writing of the EIS, there were 50 accidents along the Norfolk Southern of which 16 involved personal injuries. In recent years there were fatalities at the NSR crossings and collisions of vehicles running around lowered gates then hit by trains. The Norfolk Southern relocation eliminates 20 busy grade crossings that had the greatest potential for accidents, injuries and fatalities. The Norfolk Southern mainline now has no grade crossings within the central city. The new corridor is fenced throughout to prevent pedestrian trespassing. The city aggressively pursued an advanced construction schedule in 1998 by proposing an innovative financing plan. Norfolk Southern and the Indiana Department of Transportation together advanced funds totaling $16.4 million to accelerate the project, to be paid back in later years as federal funds became available. The advance of these funds and the acceleration of the project schedule became more important because of the increase of train traffic on the Norfolk Southern corridor due to the Conrail split. The City was concerned that with the increased train traffic, additional accidents might occur at

6 the grade crossings before Norfolk Southern tracks were relocated. Design was completed in October 1998 and construction began in early The alignment along the new corridor is approximately one-half mile longer than the old alignment but speeds have been increased significantly. General freight can travel up to 50 mph and the road-railers can travel up to 60 mph. These speeds match the speeds allowed on the mainline north and south of the City. Trains can also stop at the East Yard and not block grade crossings. Updated track signaling allows train traffic in both directions on both tracks. Additional crossovers allow greater flexibility in train movements and also increase capacity on the line. Design and Design Criteria Close to 4.5 miles of two track mainline were built in this final railroad construction project. The Norfolk Southern mainline is single track north and south of the project. Two tracks were constructed in the corridor to replace the two tracks that traversed through the City. Along with the mainline track, a three track interchange yard was constructed between Harrison Bridge and 9 th Street, a two wye track yard connection was constructed at the south end of the East Yard along with the construction of a pull-back track using an existing NS mainline track south of Underwood Street. Portions of the railroad grade and all railroad bridges had been constructed during previous construction projects. The railroad grade had been constructed between Wabash Avenue and 9 th Street and between US 52 and SR 25.

7 The Norfolk Southern corridor was designed for 50 mph freight operations with a maximum 4º00 horizontal curvature, although road-railer trains are able to travel at 60 mph through the corridor. Refinements in design at the north end of the project introduced two 5º00 curves and a compound curve of 4º30 /4º00 reducing the design speed to 40 mph. These refinements consisted of extending the wye track lead up to the US 52 bridge where the 4º00 curve was changed to two 5º00 curves with enough tangent track in between to install a No. 15 turnout. The compound curve alignment allowed the mainline track to be tied into existing track at an earlier point than what was originally designed allowing the reuse of additional existing trackage and yard leads. This change provided additional clearance between the mainline tracks and the yard lead. Conventional track construction was used in this project. Wood ties, cut spikes and 136 lb. rail were used. No. 10, 15 and 20 turnouts were used and a double crossover is located approximately half way through the new corridor. The maximum grade is 0.75% and is used on either end of the corridor as the line drops down next to the Wabash River. Areas of Concern and Design Focus To make the project successful, many years of planning and redesign were required to satisfy the operating needs of the two railroads that were to share the corridor. The EIS in 1979 was concerned about the basic placement of the railroad corridor. It was not until later in the project that design issues concerning track and train operation details had to be addressed. Many track alignment details were worked out in this final railroad construction contract. This section addresses the

8 refinements in the final design for the Norfolk Southern Corridor made as a result of numerous meetings and discussions with Norfolk Southern, the City of Lafayette and HNTB personnel. Lafayette Junction Lafayette Junction is located at the south end of the project. This is where the Norfolk Southern Muncie line crosses the CSX and also where the two railroads diverge from each other. The original design did not address the railroad s current operating needs such as trackage rights for NSR on CSX as a result of the Conrail split. The original alignment concept had NSR as a single track though the junction and then splitting into two tracks at the north end. To resolve the single track bottleneck and to allow NSR to CSX movements, the eastern most NSR track was extended to make a direct connection with the NSR Muncie line and an additional No. 10 crossover was added. The junction now consists of one No. 15 crossover between the No. 1 and No. 2 NSR mains, a No. 20 crossover between the No. 1 and No. 2 mains, and two No. 10 crossovers between NSR No. 2 main and CSX. Signal mounds were added for signal bungalows and signal bridges. The original and final junction designs are shown in Figure 2. Interchange Yard The interchange yard consists of a double ended three track arrangement that can be switched by both railroads at both ends. Each track is approximately 2,200 ft. in length. The yard is located between the mainlines at the south end of the CSX yard.

9 The track alignment at the south end of the interchange yard was modified from the original design. The double track lead into the yard was reduced to one track to simplify operations, improve safety and to allow the installation of split point derails. The railroads were concerned about the possibility of cars rolling out the south end of the yard due to the 0.30% grade. To prevent cars from rolling on to the NSR and CSX mainline, split point derails were installed on both mainline leads to the yard. The previous yard design had its entire 2,200 foot length at 0.30%. Modifications to the north end of the yard, interchange lead and interchange bridge, allowed the north half of the yard to be constructed at a 0.00% grade. The original and final interchange yard lead designs are shown in Figure 3. East Yard The original design of the Railroad Relocation project was approved in 1983 by the Indiana Department of Transportation and other agencies. The original design included a single wye track connecting the south end of the East yard to the realigned mainline tracks and a pullback track to switch the East yard that ended at Underwood Street. The goal of the relocation project was to remove tracks from all grade crossings within the City including Underwood Street. Upon further discussions with Norfolk Southern, it was determined that modifications were needed to the wye track arrangement and that terminating the pull-back track at Underwood Street was unacceptable in terms of yard operations. The pull-back track was not of sufficient length to efficiently switch the yard; another 2,200 feet of track was needed. Norfolk Southern requested that the pull-back track be extended up to Greenbush Street, requested the addition of another wye track and requested that the wye track lead be extended up to the US 52 bridge.

10 The City was determined to keep tracks from crossing Underwood Street. Therefore, a study was performed to investigate alternatives to the extended pull-back track. Four alternatives, discussed below, were studied that included: a beltway pull-back track, a north end pull-back track, the originally designed pull-back track and the extended pull-back track. See Figure 4 for the location of these alternatives. Norfolk Southern needed wye track lengths of at least 2,200 feet to handle cuts of cars from the yard and the pull-back track had to be a sufficient length (at least 2,400 feet from the end of the wye tracks) to allow for the switch moves. Beltway Pull-Back Track - The beltway track was connected to only two of the main yard tracks and could not be connected to any other yard tracks or the proposed wye tracks without major reconstruction of the yard. Reconfiguration of the yard, to make the other tracks accessible, would have cut the yard capacity in half. Industrial activity in the Lafayette area required the use of the yard with its existing capacity. The sharp curvature of the beltway track made it unsuitable for pulling and pushing long cuts of cars due to the undesirable train handling characteristics of this type of movement on a sharp curve and the lack of visibility. For these reasons, the beltway pull-back track alternative was determined to be unacceptable. North End Pull-Back Track - This alternative required the construction of a bridge across the Wildcat Creek to allow pull-back operations to be conducted from the north end of the yard. It also required the reconstruction of the ladder track on the north end of the yard and the construction of four tracks parallel to the proposed NSR mainlines between the north end of

11 the yard and the SR 25 bridge. The topography of the north end of the yard was not conducive to switching operations since the north end of the yard slopes toward Wildcat Creek. This grade would have made it difficult to shove cars south into the yard and to couple to cars within the yard. This grade would have caused additional difficulties by allowing cars to roll out of the yard and onto the switch leads. This alternative cost was estimated at $10 million, but the cost issue was not the deciding factor since the north end pull-back alternative was found to be operationally unacceptable to Norfolk Southern due to the grades and the need to cross the creek. Pull-Back Track Ending Before Underwood Street - Ending the pull-back track at Underwood Street would have required shortening the two wye tracks from a length of 2,200 feet to a length of 1,200 feet each. Each track would have had a capacity of 15 to 20 cars and the total capacity of these two tracks (30 to 40 cars) would be approximately half of what would be available with an extended pull-back track. It was not possible to add two additional tracks to the wye track group to increase the track capacity because of restrictions in geometry at the east end of the SR 25 bridge and because of restrictions created by the track curvature. Norfolk Southern needed a total car capacity of cars in the wye track group to adequately service their westbound trains. Therefore, the pull-back track ending before Underwood Street was found to be an unacceptable alternative to Norfolk Southern. Pull-Back Track Ending Before Greenbush Street - In order to accommodate a pull-back track in the preferred location, the track needed to extend to a point 300 feet north of Greenbush Street. This design provided enough room for a switch locomotive with cars to

12 move back and forth into the yard assembling a cut of cars that may be up to 2,200 feet long (30 to 35 cars) and then putting these cars in one of the two 2,200 foot wye tracks. The two wye tracks start just east of the SR 25 bridge, extend to just north of the Underwood Street grade crossing and have a total car capacity of 60 to 70 cars. There would be approximately 2,400 feet of track between the south switch of the wye tracks and the end of the pull-back track at Greenbush Street allowing 200 feet of track for margin of safety. This alternative would reuse a mainline track and would extend across Underwood Street. This alternative was preferred by Norfolk Southern and was accepted by the City of Lafayette. Once it was determined that tracks would not be removed from Underwood Street, the City took the issue to the public to determine the citizen s preference for keeping the crossing open with grade crossing protection, or closing the crossing to vehicles. Earlier studies determined that a grade separation at this location would not be feasible from a cost and neighborhood impact standpoint. After collecting input at the public meeting, the City decided to keep the grade crossing open to provide the mobility in the neighborhood that was desired. The crossing would have a single track and would have infrequent slow moving trains crossing at this location. Fencing was constructed on both sides of the pull-back track to prevent trespassing and landscaping was added along the pull-back track to mitigate the visual impact of the fence and track. Quad gates were installed at the crossing and motion detectors were used to activate the gates. Erie Street was constructed parallel to the pull-back track to connect Underwood

13 Street and Greenbush Street to provide an alternative route for neighborhood traffic in the event of a crossing blockage. Maintenance of Train Traffic Maintenance of train traffic was an important factor in the development of the design plans. The sequence of construction was driven by the need to maintain train movements. This was an added factor in the final design of the corridor. The construction of the mainline at the south end of the project required the NSR Muncie line to be taken out of service. This track was used by CSX for their trackage rights to the south side of Lafayette. Mainline track was constructed along the new corridor from Lafayette Junction to the wye tracks where a temporary connection was made to the NSR mainline. This trackage was used to transfer CSX traffic to the south end of the City, cars were routed north up the new mainline to the East Yard and back south though the City to get the south end once again. This arrangement eliminated the need for a costly temporary track and helped to speed construction south of the junction. Once the NSR mainline was cut-over, the old mainline was taken out of service to allow the construction of the Muncie line. The mainline tie-in at the north end of the project was modified to facilitate the maintenance of train traffic. The alignment was changed to tie into the existing mainline at a point where track shifts were more manageable and to eliminate the need for temporary track. This allowed more existing mainline track to be reused.

14 Other Design Details There are several other design details that were refined and developed after NSR s review of the concept drawings and during design. Details such as signal mounds, access roads, fencing and drainage were addressed during final design. The subgrade was widened at crossover locations to allow for the installation of signal bungalows and signal structures. This often necessitated piping the adjacent ditch and in some cases, using gabion retaining walls to allow encroachment into the earth sound attenuation berms. See Figure 5 for a typical section showing the use of gabion walls. Access roads were non-existent in the original design. Access roads were added by widening the subgrade and embankment where feasible throughout the corridor. The corridor through the downtown area has only 17 feet clearance to the retaining walls, therefore roads could not be installed in these areas. These roads provide access to all signal equipment, power operated turnouts and crossovers. To prevent pedestrian trespassing, 6 foot black vinyl chain link fencing was installed on both sides of the corridor. Gates were installed to provide access to the corridor. The fencing is also used to guard drop-offs at the tops of retaining walls and sound attenuation berms. Since the rail corridor is narrow in several areas, paved side ditches were designed to drain these areas. Where the clearance from centerline of track is 17 feet, a 5 foot paved side ditch

15 was used. A three foot paved side ditch was used in areas with 15 foot clearance. See Figure 6 for a paved side ditch typical section. Summary It is important to get input from all departments of the railroad during planning and final design. Many design factors can develop that may be unknown by the various departments without coordination. Train operations affect the sequence of construction and signaling needs affect the width of embankments and the design of the track. Because of the oversight by the City of Lafayette on this project, design changes and changes in the scope of the project had to be approved by the City. It was important to have the City participate in design discussions, especially because many of the proposed changes increased the cost of the project and affected the City and its neighborhoods. Anytime the project varied from the concepts outlined in the EIS, the proposed changes were presented at a public meeting. These public meetings were important to obtain consensus from the public. In most all instances, the changes presented at these public meetings were endorsed by the majority of the people in attendance. The Underwood Street crossing issue was the most difficult due to the City s desire to keep this crossing closed to trains. Through meetings with the railroad and meetings with the public, the need for a pull-back track through this crossing was understood and cleared for design.

16 Because of the size of this project, it was important to develop independently usable design segments due to uncertainty in federal funding. All project segments were packaged so they would be no more than $15 million, to match the funding stream. It is ironic that the lowest density line was relocated first followed by the next highest in terms of density (CSX). The big payoff in terms of removing the majority of trains from the center of the City was not realized until the final design segment with Norfolk Southern. The final relocation of Norfolk Southern was key in mitigating the increased train traffic experienced by Norfolk Southern due to the split of Conrail. The acceleration of the project scheduled helped to reduce the amount of time these grade crossings were exposed to the increase in train traffic. The City of Lafayette had the vision to relocate the railroads and devoted a staff to look after the project and assure its completion. This project has had widespread community support from the beginning of the planning process in the 1970 s all the way through the final relocation of the Norfolk Southern railroad. The project has been a success. The CSX and Norfolk Southern railroads can move through a conflict free corridor and have significantly increased their speeds and flexibility in operations. The biggest measure of success, of course, has been the elimination of 41 busy highway/railroad grade crossings within the City.

17 List of Figures Figures Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Overall Project Map Lafayette Junction Interchange Yard East Yard Pull Back Track Alternatives Typical Cross Section, Gabion Walls Typical Cross Section, Paved Side Ditch

18 FIGURE 1 Overall Project Map Lafayette Junction SR 26 Bridge Harrison Bridge New Corridor 9 th Street Bridge US 52 Bridge Wabash Ave. Bridge Wye Tracks SR 25 Bridge Old Corridor Pull Back Track East Yard

19 FIGURE 2 Lafayette Junction CSX Mainline KBSR Track NSR Muncie NSR Mainline Original Design Concept NSR Mainline CSX Mainline No. 10 Crossover No. 10 Crossover KBSR Track NSR Muncie No. 15 Crossover NSR Mainline No. 20 Crossover NSR Mainline Revised Design Concept

20 FIGURE 3 Interchange Yard CSX Mainline Interchange Tracks NSR Mainlines Original Design Concept CSX Mainline Interchange Tracks Split Point Derails Single Track Yard Lead NSR Mainlines Revised Design Concept

21 FIGURE 4 East Yard Pull Back Track Alternatives End of Wye Tracks 2,200 ft. 1,200 ft.

22 FIGURE 5 Typical Cross Section, Gabion Walls

23 FIGURE 6 Typical Cross Section, Paved Side Ditch

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Turnouts and Yard Tracks TM 2.1.8 Prepared by: Signed document on file 21 June 09 George Harris Date Checked by: Signed document on file 15 July 09 Thomas Carroll Date Approved by:

More information

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 1 Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 2 During this public meeting, we will explain the 75 th Street Corridor Improvement

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

2.0 Purpose. 3.0 Work Plan. Page 1 of 7

2.0 Purpose. 3.0 Work Plan. Page 1 of 7 2.0 Purpose The purpose of this document is to present the findings of the field investigation and concept design study, as well as recommend appropriate track relocation and bridge modifications to provide

More information

North Carolina Railroad Company Engineering Department. Design and Construction Guidelines

North Carolina Railroad Company Engineering Department. Design and Construction Guidelines North Carolina Railroad Company Engineering Department Design and Construction Guidelines January 2019 Version 2.0 PREFACE These Design and Construcion Guidelines are provided as information only to assist

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

Harlem Avenue Interchange Design Discussion. August 24, 2015

Harlem Avenue Interchange Design Discussion. August 24, 2015 Harlem Avenue Interchange Design Discussion August 24, 2015 1 Expressway Construction Pre-dates Modern Design Standards Expressway designed and constructed in 1950 s No past experience to base design standards

More information

Railway Alignment Design and Geometry

Railway Alignment Design and Geometry Railway Alignment Design and Geometry Pasi Lautala, Michigan Tech University Tyler Dick, HDR, Inc. Topics Horizontal and Vertical geometry Clearances Turnout design Structures and loading 1 REES Module

More information

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES 4.0 INTRODUCTION The ability to accommodate high volumes of intersecting traffic safely and efficiently through the arrangement of one or more interconnecting

More information

FINAL. Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East Prepared for: Sound Transit Prepared by: Parsons Brinckerhoff Quade & Douglas, Inc. FINAL March 2005 Foreword

More information

2.0 ALTERNATIVES. 2.1 Introduction. 2.2 No Build Alternative

2.0 ALTERNATIVES. 2.1 Introduction. 2.2 No Build Alternative 2.0 ALTERNATIVES 2.1 Introduction The alternatives selected for evaluation in this Environmental Assessment (EA) include the No Build Alternative and a Build Alternative that provides for increased HSR

More information

Interchange Workshop Report (August 2004)

Interchange Workshop Report (August 2004) U.S. Highway 14 Corridor Study New Ulm to North Mankato Table of Contents Section Interchange Workshop Report (August 2004) Page 1. Introduction and Next Steps 1 2. Interchange Workshop Participants &

More information

Optimal Scheduling of Railroad Track Inspection Activities and Production Teams

Optimal Scheduling of Railroad Track Inspection Activities and Production Teams Optimal of Railroad Track Inspection Activities and Production Teams Fan Peng The William W. Hay Railroad Engineering Seminar Series 11 February 2011 1 Importance of Track Maintenance U.S. Class I railroads

More information

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 INTERCHANGE MODIFICATION REPORT FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 PREPARED BY: VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT DECEMBER 13, 2006

More information

2010 Indiana Logistics Summit

2010 Indiana Logistics Summit 2010 Indiana Logistics Summit Michael B. Cline Commissioner, INDOT October 26, 2010 INDOT 3,912 INDOT employees 1,702 Highway Technicians 594 Managers/Supervisors 325 Engineers 805 District CO 3,106 State

More information

Frequently Asked Questions Connecting Palo Alto

Frequently Asked Questions Connecting Palo Alto Frequently Asked Questions Connecting Palo Alto www.cityofpaloalto.org/connectingpaloalto General Project Questions Q1: What is Connecting Palo Alto? A1: Connecting Palo Alto (formerly the Palo Alto Rail

More information

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA PUBLIC OFFICIALS MEETING MAY 11, 2016 AGENDA I. INTRODUCTIONS V. CURRENT PROJECT STATUS VI. PROJECT SCHEDULE VII. UPCOMING ACTIVITIES VOPEN DISCUSSION & QUESTIONS IX. ACTION ITEMS 1 A. Bridge Lighting

More information

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the

More information

Becoming part historian to identify unknown and abandoned utility infrastructure from the bygone eras of railroading within the same footprint.

Becoming part historian to identify unknown and abandoned utility infrastructure from the bygone eras of railroading within the same footprint. RANDOLPH STREET IMPROVEMENT PROJECT AT ROANOKE, VIRGINIA Brian L. Putman, P.E. Principal Design Engineer Design & Construction Norfolk Southern Railway Company 1200 Peachtree Street, NE Atlanta, GA 30309-3579

More information

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.1 INTRODUCTION A preliminary environmental review was performed on the proposed freeway improvements that form Concept C, which encompasses the three freeway corridors

More information

Bonnie Doon Grade Separation

Bonnie Doon Grade Separation 6. 2 Bonnie Doon Grade Separation Recommendation: That the April 18, 2017, Integrated Infrastructure Services report CR_4461, be received for information. Report Summary This report provides information

More information

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison T E C H N I C A L M E M O R A N D U M US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison PREPARED FOR: Mn/DOT District 7 PREPARED BY: CH2M HILL DATE: March 27, 2007 This technical

More information

Upgrading Rail Lines for Higher Speeds

Upgrading Rail Lines for Higher Speeds Upgrading Rail Lines for Higher Speeds Railroad Infrastructure Diagnosis and Prognosis David E. Staplin, PE University of Nevada Las Vegas, October 16, 2018 Upgrading Rail Lines for Higher Speeds A Perspective

More information

CHAPTER 3 SCOPE SUMMARY

CHAPTER 3 SCOPE SUMMARY CHAPTER 3 SCOPE SUMMARY GENERAL The SDDOT is an active member of AASHTO to share common national design standards for the state highway system. The AASHTO Task Force on Geometric Design has completed the

More information

Rte. 66/29 Interchange Reconstruction Project: ,C505 Grade Separation of Two Crossings Norfolk Southern Railway Right of Way and Track

Rte. 66/29 Interchange Reconstruction Project: ,C505 Grade Separation of Two Crossings Norfolk Southern Railway Right of Way and Track Rte. 66/29 Interchange Reconstruction Project: 0066-076-113,C505 Grade Separation of Two Crossings Norfolk Southern Railway Right of Way and Track Mileposts B-8.1 thru B-8.8 DOT 714-363S, 714-364Y Gainesville,

More information

NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR & BR

NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR & BR NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR0013844 & BR0013846 CHARLESTON, CHARLESTON COUNTY, SOUTH CAROLINA CHARLESTON PORT ACCESS ROADWAY PROJECT (1) SITE - 1 - REPLACEMENT OF EXISTING US78/52 OVERHEAD

More information

Section IMPLEMENTATION PLAN. 7. Implementation Plan

Section IMPLEMENTATION PLAN. 7. Implementation Plan Section 7 IMPLEMENTATION PLAN 7. Implementation Plan 7.0 Implementation Plan The Tier 1 Final EIS has presented several improvements along the Chicago to St. Louis corridor to meet the purpose and need

More information

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 2004 Specifications CSJ: 0932-01-076 SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 1.0 Description of Project 1.1. General. This project provides for the widening of

More information

Preliminary Engineering Report. For the. Foxglove Trail. Prepared for: The City of Moore. Prepared By:

Preliminary Engineering Report. For the. Foxglove Trail. Prepared for: The City of Moore. Prepared By: Preliminary Engineering Report For the Foxglove Trail Prepared for: The City of Moore Prepared By: Certificate of Authorization No. CA#5714 Expires June 30, 2016 CE Project #264 May 2016 City of Moore

More information

Chapter 2. Alternatives

Chapter 2. Alternatives Chapter 2. Alternatives This chapter presents an overview of the process used to develop the reasonable alternatives considered for the 75 th Street Corridor Improvement Project (CIP), presents details

More information

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS SECTION PAGE NO. SECTION TITLE NO. EXECUTIVE SUMMARY -------------------------------------------------------------------- ES-1 1.0 INTRODUCTION

More information

Commercial Ties. Cost Effective Solutions for Mainline Track Applications

Commercial Ties. Cost Effective Solutions for Mainline Track Applications Commercial Ties Cost Effective Solutions for Mainline Track Applications Cost Effective Solutions for Mainline Track From the Leader in Pre-stressed Concrete Crossties The Rocla Concrete Tie Advantage

More information

CHAPTER 18 TEMPORARY ROADS AND BRIDGES

CHAPTER 18 TEMPORARY ROADS AND BRIDGES Change #1 - Revised 12/12 CHAPTER 18 TEMPORARY ROADS AND BRIDGES 18.0 INTRODUCTION These guidelines are to be used to design temporary roads and bridges where traffic will be maintained at the construction

More information

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV Noise Technical Report 2015 Addendum NOISE TECHNICAL REPORT 2015 Addendum PREPARED FOR: Federal Highway Administration and Georgia Department of Transportation PREPARED BY: Parsons Brinckerhoff Project

More information

Uinta-Wasatch-Cache National Forest Service. 857 W South Jordan Parkway MEMO

Uinta-Wasatch-Cache National Forest Service. 857 W South Jordan Parkway MEMO Uinta-Wasatch-Cache National Forest Service 857 W South Jordan Parkway MEMO To: WBLU #1-3 Well, Platte Petroleum NEPA Project File From: Kim J. Martin, Forest Engineer revised by Renee Flanagan, AFE cc:

More information

Passenger/Freight Railroad Projects in Michigan

Passenger/Freight Railroad Projects in Michigan Passenger/Freight Railroad Projects in Michigan Passenger/Freight Railroad Projects in Michigan Topics: Michigan Railroad Network State of Michigan Owned Railroad Corridors Michigan Accelerated Rail Program

More information

WELCOME HDR, all rights reserved.

WELCOME HDR, all rights reserved. WELCOME Public Meeting on Environmental Assessment East Side Corridor (SD100) I-90 to South of Madison Street Northern Segment of Hwy 100 Date: October 21, 2014 2014 HDR, all rights reserved. Introductions-

More information

COAST LINE CONNECTOR. Facilities Redevelopment Port Commerce Department

COAST LINE CONNECTOR. Facilities Redevelopment Port Commerce Department Title of Project: Name of Applicant: Contact & Job Title: STATEN ISLAND RAILROAD: CHEMICAL COAST LINE CONNECTOR Port Authority of New York and New Jersey Rudy Israel, General Manager Waterways & Facilities

More information

INCREASING CAPACITY ON THE SAN JOAQUIN CORRIDOR A PUBLIC-PRIVATE PARTNERSHIP

INCREASING CAPACITY ON THE SAN JOAQUIN CORRIDOR A PUBLIC-PRIVATE PARTNERSHIP INCREASING CAPACITY ON THE SAN JOAQUIN CORRIDOR A PUBLIC-PRIVATE PARTNERSHIP Presented By Ken Galt, Caltrans Division of Rail John Fleming, Burlington Northern Santa Fe Railway William Brewster, Hanson-Wilson

More information

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016 Cleveland Opportunity Corridor Project Section 3 Subcontractor Informational Meeting August 12, 2016 Agenda Welcome and Opening Remarks Project Overview Prequalifications & Work Types Procurement Overview

More information

LONG BRIDGE - PRESENT & FUTURE: A MULTIMODAL ANALYSIS

LONG BRIDGE - PRESENT & FUTURE: A MULTIMODAL ANALYSIS LONG BRIDGE - PRESENT & FUTURE: A MULTIMODAL ANALYSIS Review of the Potomac River Crossing a Rail Resource for the Washington, DC Region and Beyond Presenter: Edward La Guardia P.E. Michael Baker International

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design Exceptions / Waivers SPECIFIC SUBJECT: Design Exception Request Form

More information

Appendix B. Design. Page i. Design

Appendix B. Design. Page i. Design Page i Princeville, North Carolina Flood Risk Management Integrated Feasibility Report and Environmental Assessment Table of Contents 1.1. Introduction... 1 1.2. Existing Conditions... 1 1.3. Objectives...

More information

49-2A Clear-Zone Width for New Construction or Reconstruction B Clear-Zone Adjustment Factor, K cz, for Horizontal Curve...

49-2A Clear-Zone Width for New Construction or Reconstruction B Clear-Zone Adjustment Factor, K cz, for Horizontal Curve... 49-2A Clear-Zone Width for New Construction or Reconstruction...6 49-2B Clear-Zone Adjustment Factor, K cz, for Horizontal Curve...6 49-2C Clear-Zone Transition for Curve Adjustment, Radius 3000 ft...6

More information

Rail Division 2012 Annual Summary

Rail Division 2012 Annual Summary Rail Division 2012 Annual Summary Overview The Rail Division oversees rail planning and inspection, highway rail crossings, management of stateowned lines (such as the South Orient Rail line (SORR) and

More information

ESTIMATING MAINTENANCE COSTS FOR MIXED HIGHER SPEED PASSENGER AND FREIGHT RAIL CORRIDORS

ESTIMATING MAINTENANCE COSTS FOR MIXED HIGHER SPEED PASSENGER AND FREIGHT RAIL CORRIDORS Proceedings of the 2010 Joint Rail Conference JRC20104 April April 27-29, 27-29, 2010, 2010, Urbana, Urbana, Illinois, IL, USA JRC2010-36036 JRC2010- ESTIMATING MAINTENANCE COSTS FOR MIXED HIGHER SPEED

More information

Baltimore & Potomac Tunnel Project.

Baltimore & Potomac Tunnel Project. Baltimore & Potomac Tunnel Project MEETING AGENDA Project Background Review Purpose of Meeting Alternatives Carried Forward for Further Study Alternatives Evaluated & Screening Process Portal Renderings

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479),

More information

Appendix E Cost Estimating Methodology for High-Speed Rail on Shared Rightof-Way

Appendix E Cost Estimating Methodology for High-Speed Rail on Shared Rightof-Way Appendix E Cost Estimating Methodology for High-Speed Rail on Shared Rightof-Way Cost Estimating Methodology for High-Speed Rail on Shared Right-of- Way Prepared by: Quandel Consultants, LLC Version: April

More information

South Sounder Capital Improvements Program

South Sounder Capital Improvements Program Subarea South King/Pierce Primary Mode Commuter Rail Facility Type Infrastructure Improvement Length Date Last Modified July 1, 2016 PROJECT AREA AND REP RESENTATIVE ALIGNMENT SHORT PROJECT DESCRIPTION

More information

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0 SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605/SR-60 EA# 3101U0 October 9, 2017 Contents 1 Purpose of ICE Memo... 1 2 Background... 1 3 Existing Interchange Deficiencies... 1 4 Context Sensitive

More information

Village of Glendale Quiet Zone Evaluation. Final Report Presented by: Railroad Controls, LP March, 2007

Village of Glendale Quiet Zone Evaluation. Final Report Presented by: Railroad Controls, LP March, 2007 Village of Glendale Quiet Zone Evaluation Final Report Presented by: Railroad Controls, LP Sharon Road Albion Avenue Oak Street Quiet Zone Evaluation Village of Glendale, OH Introduction The Village of

More information

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting.

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting. On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting. Located in the heart of South Carolina, the I-20/26/126 Corridor is the crossroads of the state

More information

I-65/I-70 North Split Interchange Reconstruction Project Frequently Asked Questions

I-65/I-70 North Split Interchange Reconstruction Project Frequently Asked Questions I-65/I-70 North Split Interchange Reconstruction Project Frequently Asked Questions General Overview What is the I-65/I-70 North Split Reconstruction Project? The I-65/I-70 North Split Reconstruction Project

More information

Benefit Cost Analysis Narrative

Benefit Cost Analysis Narrative Chicago Region Environmental and Transportation Efficiency Program (CREATE) Grade Separations of: GS21a - Union Pacific and 95 th Street GS11 - Belt Railway Company of Chicago and Columbus Ave. GS 9 -

More information

Operations Analysis using Simulation Modeling to Evaluate Capacity Requirements. for Direct Intermodal Rail Facilities at the Port of Long Beach

Operations Analysis using Simulation Modeling to Evaluate Capacity Requirements. for Direct Intermodal Rail Facilities at the Port of Long Beach Operations Analysis using Simulation Modeling to Evaluate Capacity Requirements for Direct Intermodal Rail Facilities at the Port of Long Beach Beth C. Kulick Sr. Professional, TranSystems Corporation

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2018-12 RESOLUTION OF THE SOUTHEASTERN WISCONSIN REGIONAL PLANNING COMMISSION AMENDING THE TRANSPORTATION IMPROVEMENT PROGRAM FOR SOUTHEASTERN WISCONSIN: 2017-2020 WHEREAS, the Southeastern

More information

Long Bridge - Present & Future: A Multimodal Analysis

Long Bridge - Present & Future: A Multimodal Analysis Long Bridge - Present & Future: A Multimodal Analysis Edward La Guardia P.E. American Public Transportation Association (APTA); American Railway Engineering and Maintenance-of- Way Association (AREMA);

More information

CLA /10.54, PID Project Description:

CLA /10.54, PID Project Description: Project Description: The proposed project will consist of widening IR 70 to three lanes from Enon Road (SLM 06.75) to the US 68 interchange ramps (SLM 10.55). IR 70 is a component of the Strategic Highway

More information

500 Interchange Design

500 Interchange Design 500 Interchange Design Table of Contents 501 Interchange Design... 5-1 July 2015 501.1 General... 5-1 501.2 Interchange Type... 5-1 501.2.1 General... 5-1 502 Interchange Design Considerations... 5-2 502.1

More information

Project Purpose and Need Statements

Project Purpose and Need Statements Norfolk Southern Railway Company Pittsburgh Vertical Clearance Projects Purpose and Need Summary: Project Purpose and Need Statements August 2018 The principal purpose of the Pittsburgh Vertical Clearance

More information

Going/Greeley Interchange Enhancements for Truck Operations

Going/Greeley Interchange Enhancements for Truck Operations Going/Greeley Interchange Enhancements for Truck Operations City of Portland Table of Contents What Is The Problem?.1 What Is The Purpose Of The Study?...1 Review Of Alternatives.1 Table: Estimated Cost

More information

HAMPTON ROADS HIGH-SPEED AND INTERCITY PASSENGER RAIL PRELIMINARY VISION PLAN

HAMPTON ROADS HIGH-SPEED AND INTERCITY PASSENGER RAIL PRELIMINARY VISION PLAN PREPARED FOR HAMPTON ROADS TRANSPORTATION PLANNING ORGANIZATION July 2010 HAMPTON ROADS HIGH-SPEED AND INTERCITY PASSENGER RAIL PRELIMINARY VISION PLAN PROGRESS REPORT C: PRELIMINARY INFRASTRUCTURE ANALYSIS

More information

Port Jervis Line Service Strategy Report. Appendix C: Port Jervis Line Capacity Improvements Analysis

Port Jervis Line Service Strategy Report. Appendix C: Port Jervis Line Capacity Improvements Analysis Port Jervis Line Service Strategy Report Appendix C: Port Jervis Line Capacity Improvements Analysis January 2018 TABLE OF CONTENTS Introduction... 1 1. Future PJL Service... 1 2. Project Alternatives...

More information

WOO-SR Feasibility Study (PID 90541) Feasibility Study Report April 22, 2011

WOO-SR Feasibility Study (PID 90541) Feasibility Study Report April 22, 2011 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 CHAPTER 1: INTRODUCTION... 5 1.1 Study Purpose and background... 5 1.2 Study Approach... 6 1.3 Study Area... 6 CHAPTER 2: DESCRIPTIONS OF ALTERNATIVES... 7 2.1

More information

TCWR Route Alternatives Study St. Louis Park Presentation November 29, Mark Amfahr Amfahr Consulting

TCWR Route Alternatives Study St. Louis Park Presentation November 29, Mark Amfahr Amfahr Consulting TCWR Route Alternatives Study St. Louis Park Presentation November 29, 2010 Mark Amfahr Amfahr Consulting Study Purpose To provide additional information on the Chaska Cut off, Midtown and Hwy 169 alternatives

More information

I 244 Arkansas River LRT Track & Bridge Design Criteria Report

I 244 Arkansas River LRT Track & Bridge Design Criteria Report OKLAHOMA DEPARTMENT OF TRANSPORTATION I 244 Arkansas River LRT Track & Bridge Design Criteria Report Lockwood, Andrews & Newnam, Inc. 7/20/2009 TABLE OF CONTENTS Chapter 1 Track Alignment... 1 1.1 Introduction...

More information

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee MEMORANDUM Date: July 14, 2006 Project #: 6389 To: US 97 & US 20 Refinement Plan Steering Committee From: Sonia Hennum, P.E., Andrew Cibor, E.I.T., & Julia Kuhn, P.E. Project: US 97 & US 20 Refinement

More information

NOISE TECHNICAL MEMORANDUM. Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003)

NOISE TECHNICAL MEMORANDUM. Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003) NOISE TECHNICAL MEMORANDUM Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003) Attention: Kevin Hovey, Environmental Branch Chief, Caltrans District

More information

ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING. Kansas City Terminal Railway Company

ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING. Kansas City Terminal Railway Company James P. Hyland Page 1 ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING Kansas City Terminal Railway Company James P. Hyland, P.E. Senior Bridge Engineer TranSystems Corporation James P. Hyland Page 2

More information

Environmental Scoping Information Report

Environmental Scoping Information Report LINK OPERATIONS AND MAINTENANCE SATELLITE FACILITY Environmental Scoping Information Report CENTRAL PUGET SOUND REGIONAL TRANSIT AUTHORITY This page intentionally left blank Table of Contents Introduction...

More information

VII. FREIGHT MANAGEMENT

VII. FREIGHT MANAGEMENT VII. FREIGHT MANAGEMENT The regional transportation network must not only move people safely and efficiently, but must also facilitate the safe and efficient transportation of goods as well. Local freight

More information

WELCOME TO THE LONG BRIDGE PROJECT

WELCOME TO THE LONG BRIDGE PROJECT WELCOME TO THE LONG BRIDGE PROJECT Public Meeting Thursday, December 14, 2017 Open House Format: 4:00 p.m. to 7:00 p.m. Formal Presentations: 4:30 p.m. and 6:00 p.m. (same presentation at both times) Project

More information

9.0 I-26 & I-526 Interchange Improvements

9.0 I-26 & I-526 Interchange Improvements 9.0 I-26 & I-526 Interchange Improvements The I-26 & I-526 System-to-System interchange currently consists of a combination of directional and loop ramps providing for all movements from one Interstate

More information

NATIONAL WESTERN CENTER

NATIONAL WESTERN CENTER NATIONAL WESTERN CENTER Rail Consolidation Study March 2015 1 List of Appendices and Exhibits Exhibits Exhibit A Exhibit B Exhibit C Exhibit D Exhibit E Regional Rail Map Study Area Rail Map Concept Plan

More information

Willmar Wye Public Open House #4 and Public Hearing

Willmar Wye Public Open House #4 and Public Hearing Willmar Wye Public Open House #4 and Public Hearing February 23, 2017 www.dot.state.mn.us/d8/willmarwye Agenda Time Topic 5:00 pm Open House Opportunity for the public to ask questions of project staff

More information

Summary. 1. Introduction

Summary. 1. Introduction Summary 1. Introduction The 75 th Street Corridor Improvement Project (CIP) is a major element of the CREATE (Chicago Region Environmental and Transportation Efficiency) Program. The CREATE Program was

More information

Options for Sustained Freight Rail Growth

Options for Sustained Freight Rail Growth Options for Sustained Freight Rail Growth Existing freight rail infrastructure in San Diego is near capacity. With an expected growth rate for freight rail of 3% per year, the system will reach gridlock

More information

Appendix C Presentation Slides with Script

Appendix C Presentation Slides with Script Appendix C Presentation Slides with Script 32 Grand Crossing Rail Project 10 S. Riverside Plaza, Suite 400 Chicago, IL 60606 www.grandcrossingrail.com info@grandcrossingrail.com [title slide no narration]

More information

EXECUTIVE SUMMARY. Part 1 Introduction

EXECUTIVE SUMMARY. Part 1 Introduction EXECUTIVE SUMMARY The Maine Turnpike Authority s (MTA) Enabling Legislation in its Legislative Findings (23 M.R.S.A. 1961) makes the following findings of fact: the economic and social wellbeing of the

More information

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018 Project Prioritization for Urban and Rural Projects 2018 TEAM CONFERENCE March 7, 2018 Challenge Limited funding for transportation improvements requires strategic selection of projects to ensure resource

More information

T a b l e o f C o n t e n t s

T a b l e o f C o n t e n t s C i t y o f G l a d s t o n e P u b l i c W o r k s D e s i g n S t a n d a r d s T a b l e o f C o n t e n t s SECTION THREE SANITARY SEWER REQUIREMENTS... 1 3.0000 SANITARY SEWERS... 1 3.0010 General

More information

Section IMPLEMENTATION PLAN. 7. Implementation Plan

Section IMPLEMENTATION PLAN. 7. Implementation Plan Section 7 IMPLEMENTATION PLAN 7. Implementation Plan 7.0 Implementation Plan The Tier 1 DEIS has presented several improvements along the Chicago to St. Louis corridor to meet the purpose and need of the

More information

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project 06/2014 PROJECT STUDY REPORT (Cal Poly Pomona Senior Project) For Conceptual Approval of an Interchange Improvement And Cooperative Agreement with The City of Lake Elsinore for completion of Project Approval

More information

Oversight Team Meeting

Oversight Team Meeting Oversight Team Meeting September 18, 2014 INTRODUCTIONS (15 MINUTES) Name and affiliation Review agenda Edits to June s Oversight Team meeting summary Review the policy statements 2 Agenda Introduction

More information

TABLE SUMMARY OF POTENTIAL CONFLICTS WITH MAJOR UTILITIES DUS ACCESS TO 162 ND AVENUE AREA

TABLE SUMMARY OF POTENTIAL CONFLICTS WITH MAJOR UTILITIES DUS ACCESS TO 162 ND AVENUE AREA 3.13 UTILITIES 3.13.1 Introduction to Analysis Impacts to existing utilities by transportation projects have the potential to adversely affect the cost and schedule of a project as well as neighboring

More information

Route Selection and Design of a Coal Shuttle Railroad: Experiences of a Recent Railroad Engineering Graduate

Route Selection and Design of a Coal Shuttle Railroad: Experiences of a Recent Railroad Engineering Graduate Route Selection and Design of a Coal Shuttle Railroad: Experiences of a Recent Railroad Engineering Graduate C. Tyler Dick, P.E. HDR Engineering Inc. University of Illinois W.W. Hay Railroad Engineering

More information

DRAFT AIR QUALITY TECHNICAL MEMORANDUM

DRAFT AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM PROJECT DEVELOPMENT AND ENVIRONMENT STUDY STATE ROAD 60 GRADE SEPARATION OVER CSX RAILROAD Polk County, Florida Financial Project ID: 436559-1-22-01 Prepared for: Florida

More information

Railroad Surveys, Profiles and Topographic Surveys

Railroad Surveys, Profiles and Topographic Surveys PDHonline Course L108 (2 PDH) Railroad Surveys, Profiles and Topographic Surveys Instructor: Harvey A. Crouch, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax:

More information

Guidelines for New Development in Proximity to Railway Operations

Guidelines for New Development in Proximity to Railway Operations Project Manger FCM-RAC Proximity Initiative SUMMARY In May 2003, the (FCM) and the Railway Association of Canada (RAC) signed a memorandum of understanding (MOU) to build common approaches to the prevention

More information

Public Meeting. US Highways 18 & 281 and SD Highway 50 From Douglas County Line to SD46 Charles Mix County

Public Meeting. US Highways 18 & 281 and SD Highway 50 From Douglas County Line to SD46 Charles Mix County Public Meeting US Highways 18 & 281 and SD Highway 50 From Douglas County Line to SD46 Charles Mix County Cary Cleland Road Design Engineering Supervisor January 17, 2017 Project Limits US18/US281 US281

More information

Rail Freight and Passenger

Rail Freight and Passenger Take Care of the System Critical Investments in the areas of: Rail Freight rehabilitate rail bridges o Rail Bridge Inventory Database... $0.5 - $1.0 million (one time) Rail Freight rail replacement and

More information

Preparation of an Environmental Impact Statement for High Capacity Transit

Preparation of an Environmental Impact Statement for High Capacity Transit This document is scheduled to be published in the Federal Register on 11/19/2013 and available online at http://federalregister.gov/a/2013-27583, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal Transit

More information

Chapter URBAN & RURAL FREEWAY DESIGN

Chapter URBAN & RURAL FREEWAY DESIGN Chapter 5 URBAN & RURAL FREEWAY DESIGN 5.1 INTRODUCTION This chapter provides standards and guidance for urban and rural freeways on new construction/reconstruction projects. The chapter also provides

More information

LA 23 NOGC Railway Relocation PE/NEPA Project. Public Meeting

LA 23 NOGC Railway Relocation PE/NEPA Project. Public Meeting LA 23 NOGC Railway Relocation PE/NEPA Project Public Meeting LA 23 New Orleans & Gulf Coast Railway (NOGC) Relocation Preliminary Engineering (PE) / National Environmental Policy Act (NEPA) Project RPC/FRA

More information

GREENE TOWNSHIP Pike County, Pennsylvania SPEED LIMIT STUDY T-370, T-372 & T-378

GREENE TOWNSHIP Pike County, Pennsylvania SPEED LIMIT STUDY T-370, T-372 & T-378 GREENE TOWNSHIP Pike County, Pennsylvania SPEED LIMIT STUDY T-370, T-372 & T-378 Greene Township Board of Supervisors 100 Fourth Street, Honesdale, PA 18431 570-251-9550 FAX 251-9551 www.shepstone.net

More information

Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction

Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction Date: Wednesday, April 26, 2017 Time: 3:00 pm to 5:00 pm and 7:00 pm to 8:00 pm 1 Your input is appreciated. You are encouraged to review

More information

Automated Condition Assessment as an Aid to Complying With the FTA State of Good Repair Regulations

Automated Condition Assessment as an Aid to Complying With the FTA State of Good Repair Regulations Automated Condition Assessment as an Aid to Complying With the FTA State of Good Repair Regulations 1 Metrolink Overview Commuter Railroad with Mixed Passenger and Freight Traffic 1. Most lines are former

More information

Sieve Size 2" 1" 3/8" No. 10 No. 40 No. 200 % Passing Size

Sieve Size 2 1 3/8 No. 10 No. 40 No. 200 % Passing Size VII. MATERIALS 7.01 SUBBALLAST Subballast shall be crusher-run stone (dense graded aggregate), preferably limestone or granite material and shall meet the requirements as set out in Chapter 1, Part 2,

More information