SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT LIQUEFIED NATURAL GAS TERMINAL PROJECT IN INDIA

Size: px
Start display at page:

Download "SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT LIQUEFIED NATURAL GAS TERMINAL PROJECT IN INDIA"

Transcription

1 SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT LIQUEFIED NATURAL GAS TERMINAL PROJECT IN INDIA June 2003

2 ABBREVIATIONS ADB Asian Development Bank BOD biochemical oxygen demand COD chemical oxygen demand CPP captive power plant EIA environmental impact assessment GMB Gujarat Maritime Board GPCB Gujarat Pollution Control Board LNG liquefied natural gas MOEF Ministry of Environment and Forest NOx nitrogen oxide NOC no objection certificate PLL Petronet LNG Limited SO 2 sulfur dioxide STV shell and tube vaporizer TSPM total suspended particulate matter WEIGHTS AND MEASURES C degree Celsius db(a) decibel acoustic m 3 cubic meter MW megawatt s second NOTE In this report, $ refers to the US dollar.

3 CONTENTS Page I. INTRODUCTION 1 II. PROJECT DESCRIPTION 1 III. DESCRIPTION OF THE ENVIRONMENT 5 A. Physical Environment 5 B. Biological Environment 7 C. Sociocultural Environment 8 IV. ALTERNATIVES 8 A. No Project 8 B. Alternative Locations 8 C. Alternative Technology 9 V. ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 9 A. Physical Environment 9 B. Biological Environment 11 C. Socioeconomic Impacts 12 D. Risk Analysis 13 VI. ECONOMIC ASSESSMENT 13 VII. INSTITUTIONAL REQUIREMENTS AND MONITORING PROGRAM 14 VIII. PUBLIC INVOLVEMENT 14 IX. CONCLUSIONS 15 APPENDIXES 1. Major Environmental Impacts, Mitigation Measures, and Monitoring Program Main Environmental Requirements and General Standards for Discharge of Environmental Pollutants 18

4

5 I. INTRODUCTION 1. As India progresses into the 21 st century, oil and gas supplies are going to play important roles in the country s economic development. India s energy demand is one of the fastest growing in the world, and energy management is one of the country s prime concerns. Pressure is mounting to reduce air pollution from sources such as diesel vehicles and power plants, and increased awareness is prompting a switch to cleaner fuels such as natural gas or low-sulfur diesel. Recognizing this trend, the Government of India decided to form a group named India Hydrocarbon Vision 2025, whose mandate included promoting the development and use of natural gas including other liquefied natural gas (LNG) and other alternative fuels. The panel s analysis recommended that 20 30% of total gas imports be in the form of LNG. The Government has chosen Petronet LNG Limited (PLL), with Gaz de France as an equity holder, to set up LNG receiving terminals in India through four public-sector projects. PLL has decided to set up one terminal at Dahej, Gujarat (the Project), followed by another terminal at Kochi, Kerala. The Gas Authority of India Limited will transport and market the regasified LNG to consumers. In July 1999, PLL struck a long-term sale and purchase agreement for Ras Laffan Liquefied Natural Gas Company (RasGas) of Qatar to supply the country with LNG. 2. As stated in the environmental impact assessment (EIA) notification in 1994, India s Environmental Protection Act of 1986 requires a project such as this to produce an EIA before it obtains statutory environmental clearance from the Ministry of Environment and Forest (MOEF). The Institute of Petroleum Safety and Environment Management, the Oil and Natural Gas Corporation, and Water and Power Consultancy Services (India) Limited prepared an EIA for the Dahej LNG terminal in 2000, while the National Institute of Oceanography prepared an EIA for the marine facilities in The reports were submitted to the Gujarat Pollution Control Board (GPCB) and MOEF. GPCB granted a no-objection certificate (NOC) for the Project on 2 February MOEF approved the environmental clearance on 27 December The Project was classified by the Asian Development Bank (ADB) under category A, which means it could have significant environmental impact if proper mitigating measures are not implemented. This summary EIA is circulated to ADB s Board of Director s 120 days prior to loan consideration. The main EIA reports are available from the ADB project office and PLL. PLL produced this summary EIA, and ADB has not evaluated it. ADB s evaluation of the Project s impacts will include relevant public comments and suggestions, all of which will be included in the loan document submitted to ADB s Board of Directors. II. PROJECT DESCRIPTION 4. PLL intends to develop, construct, own, and operate an LNG import and regasification terminal with a first-phase throughput capacity of 5 million metric tons (t) per annum. This amount can be doubled in a second phase. The Project will be located at Dahej in the state of Gujarat. The location is shown on the map, and the land uses are shown in Figure 1. The indicative layout of the Project is shown in Figure 2, and Figure 3 shows the process diagram. The Project s chief components are (i) a LNG receiving and regasification terminal, henceforth called the terminal; and (ii) a marine work loading/unloading facility, hereafter called the unloading facility.

6 2

7 3

8 4 Figure 3: LNG Terminal Plant Process Diagram Boil-off Gas Compressor HP submerged combustion vaporizers Fuel gas metering a Recondenser from LNG carrier LNG unloading arm LNG storage tanks & LP pumps LNG HP pumps HP shell & tube vaporizer Gas metering stations Send out NG to pipeline Utility b HP = high pressure, LNG = liquefied natural gas, LP = low pressure, NG = natural gas. a For captive power plant. b Power, industrial water, demineralized water and ethylene glycol (other utility requirements are met by captive generation). 5. The terminal consists of (i) two full-containment LNG storage tanks, each with a gross capacity of 160,000 cubic meters (m 3 ); (ii) a gas-recovery system to recondense the evaporated gas; (iii) dispatching facilities, including vaporizers; and (iv) auxiliary facilities, which include a captive power plant, electrical and control systems, utility production, metering, systems for fire and gas detection and protection, as well as other buildings and structures. 6. The size of the LNG storage tanks is based on (i) the size and unloading capacity of the LNG tankers, (ii) the dispatch flow rate, and (iii) possible delivery delays because of poor weather. PLL proposes to construct two tanks to ensure uninterrupted supply, even with a maximum delivery delay. Each of the storage tanks will have a net storage capacity of 148,000 m 3 and a gross capacity of 160,000 m 3. The storage tanks will be full-containment tanks, which consist of a primary layer of 9% nickel stainless-steel plate and a secondary layer of reinforced cement. 7. The evaporated gas recovery system is designed to recondense the gas in the storage tanks during both normal operations and unloading from the ship. This will ensure that there are no gas flares. Three cryogenic compressors each with a flow rate of 11,500 m 3 /hour and one recondensor have been proposed.

9 5 8. PLL has decided to install shell and tube vaporizers (STVs) for regasification, in view of high levels of suspended solids in the seawater at Dahej and possible impact on marine life. STVs use glycol and water solution and ambient air heat to regasify LNG, which is sent to customers at a pressure of kilograms per square centimeter. 9. The dispatching facilities are designed to handle 1,550 m 3 per hour, with provision to expand to 3,100 m 3 per hour in the second phase. Design parameters permit modulation of the dispatch flow rate from % of the nominal flow rate, depending on customers requirements. The dispatching facilities include (i) three low-pressure pumps per storage tank, with provision of a well for installation of an additional pump; (ii) four high-pressure pumps, including one pump as standby, for the first phase; (iii) a vaporization system; (iv) seven STVs, each with a loop of glycol and water solution heated by air heaters; and (v) two submerged combustion vaporizers. PLL intends to maximize the use of one such vaporizer by using the heat recovered from the exhaust of the captive power plant. 10. The auxiliary facilities consist of power and water supplies. The power requirement for the terminal is estimated at 12 megawatts (MW) or as much as 14 MW during unloading from the tankers. The power will come from two independent sources: (i) the captive power plant, consisting of three gas turbines each of 7.8 MW; and (ii) a 220 kilovolt-ampere connection from the state power grid. Water usage in the terminal is mainly for drinking, fire protection, and maintenance of a greenbelt. The terminal will be connected to Gujarat Industrial Development Corporation s main water supply. No other outside utility supplies are needed. Instrumentation air, plant air, nitrogen, and fuel gas will be generated within the Project. 11. The marine works will comprise (i) an all-weather, deep-sea, single-berth jetty with a 2,430-meter (m) approach trestle and jetty head; (ii) a C-shaped breakwater approximately 700 m long and southwest of the jetty; and (iii) unloading facilities, which include three unloading arms, one vapor return arm, two unloading lines with flow rates of 10,000 m 3 per hour, and one vapor return line. 12. The port facilities will consist of a single berth to accommodate LNG tankers of 65, ,000 m 3 capacity, with a provision after possible adaptations for tankers up to 160,000 m 3 in capacity. Three LNG unloading arms of 16 diameter each, and two unloading lines of 30 diameter each, are proposed to facilitate unloading operations. In addition, one loading arm and one vapor return line will be installed to transfer the evaporated gas during unloading operations. Unloading time will be about 14 hours, and the berthing time of the tanker will be hours. The unloading facility will comprise an approach trestle including the jetty head with a total length of 2,430 m. The jetty will be a deep-sea jetty, extending 15 m below mean sea level. 13. A breakwater will create tranquil conditions for tankers and increase the availability of the jetty head during the monsoon season. The design of the breakwater would provide sufficient sheltered water to (i) enable harbor tugs to maneuver alongside tankers and secure their towing lines, (ii) allow tankers to come to a complete stop before docking, and (iii) help tankers berth and discharge their cargoes safely during monsoon season. III. DESCRIPTION OF THE ENVIRONMENT 14. The site is in the Gulf of Khambhat, Bharuch District, in the state of Gujarat on the west coast of India. The site is about 45 kilometers (km) from Bharuch, the nearest major town. The terminal area is at latitude and longitude. A trestle will extend to the LNG berth,

10 6 which will be in deep water. The site is part of an existing industrial complex, with two operational jetties, and a third under construction, to serve nearby industries. The site occupies 50 hectares (ha). 15. The site is north of the confluence of the Narmada River with the Gulf of Khambat. The site is an industrial area and is not environmentally sensitive. It already has the infrastructure necessary for heavy industries, and the Project will use many existing facilities. 16. Industrial units and a few small villages surround the site. The major industries nearby are Birla Copper (Indo Gulf), about 2.1 km to the north; Indian Petrochemicals Ltd, about 1.3 km east; BASF Styrene Ltd, about 2.8 km northeast; and Gujarat Alkali and Chemicals Ltd, 6.0 km away and also to the northeast. 17. To the north of the terminal site is an empty area separating it from the Gujarat Chemical Port Trust Company Ltd. For the purposes of the EIA, the core area lies within a 10 km radius of the project site. The core area includes five villages: Ambheta, Dahej, Jageshwar, Lakhigam, and Lurare. A. Physical Environment 18. Terrestrial Environment. The climate in the project area has four distinct seasons: (i) winter (December to March), (ii) summer (April to June), (iii) rainy season (July to September), and (iv) monsoon season (October to November). The maximum temperature is usually in April May (about 40 o C), and the mean daily minimum temperature during winter is about 13 o C. Humidity exceeds 70% during the rainy season. The skies are mostly heavily clouded during the rainy season but clear up quickly after the monsoon months. During the rest of the year, skies are generally clear. Groundwater analysis showed low biochemical (BOD) and chemical (COD) oxygen demand demands, which indicated little domestic or industrial pollution. The absence or low readings of phenol compounds, cyanide, and heavy metals such as chromium, zinc, copper, nickel, and cadmium indicated an absence of industrial pollution. 19. Ambient air quality was monitored at four stations in the core area for three seasons. Higher levels of total suspended particulate matter (TSPM) were within the prescribed limit for industrial and mixed uses, i.e., 500 milligrams per cubic meter (mg/m 3 ). The ambient sulfur dioxide (SO 2 ) concentration was well below the prescribed limit of 120 mg/m 3. The maximum nitrogen oxide (NOx) level of 26.2 mg/m 3 observed at Dahej was well below the prescribed limit of 120mg/m 3 for industrial and mixed-use areas. Carbon monoxide and hydrocarbon concentrations were below detectable limits. 20. Noise readings ranged from 47.7 to 70.4 decibels acoustic (db[a)]. High noise levels came from construction and associated vehicular movement. 21. Groundwater samples were taken during winter, summer, monsoon, and post-monsoon seasons. The water temperature remained more or less constant throughout the year, and acidity, ranging from ph 7.7 to 8.4, showed no significant seasonal variation. The total dissolved solids ranged from 200 to 5,300 mg per liter (l). This data showed a marginal increase in dissolved solids from winter to summer, followed by a marginal reduction during monsoon season. The BOD and COD values at all locations were low. 22. Marine Environment. The site adopted for the port facility is in the Gulf of Khambat. The gulf connects several major Indian rivers to the northeastern Arabian Sea. The project site

11 7 is a flat stretch of sandy soil along the gulf s east coast, bordered by the Narmada River to the south and Dhadha Creek to the north. The wide, shallow Narmada estuary meets the gulf at Luhara. Extensive sand banks, many of them exposed during low tide, are present in the estuary. Bharuch Channel is the principal entrance to the estuary. The river floods during the rainy season in July and August. The shallow Dahej creek along the coast north of Luhara has a wide, bar-strewn mouth and nearly dries up during low tide. With its tidal port, however, it forms an important commercial link across the gulf. Several saltpans and stretches of marsh with isolated mangroves fringe the southern side. The north side of the creek supports some mangrove forest. 23. Tides, currents, circulation, and stratification influence the marine environment. The tides at Lakhigam are semidiurnal, with a considerable diurnal inequality. Tides are m 34% of the time. Large tidal flows generate strong currents, and speeds of meters per second (m/s) have been recorded in the interior gulf. Farther from the shore, where the water is 27 m deep, the current has been measured as fast as 2.8 m/s at a distance of 1 m below the surface. Near shore, the surface speeds are less than 1 m/s, except during spring tide, when the peak speed rises to 1.6 m/s. The data indicates that offshore currents have a small but definite effect on water circulation. 24. The salinity and temperature measurements at different locations showed an absence of stratification in the coastal water both before and after the monsoon season, even in the presence of large amounts of discharge from the Narmada River. This was because the dynamic tides and strong currents did not allow the water to stratify. The coastal water of Dahej is muddy and turbid, with high and variable amounts of suspended matter. Along the near shore, mean values of suspended matter at the surface ranged from 108 to 5,628 milligrams per liter (mg/l). Dissolved oxygen levels in the water were fairly high, varying from mg/l in near-shore water to mg/l in open-shore areas. The BOD values of the near-shore ( mg/l) and open-shore waters ( mg/l) were as expected for this dynamic environment. The observed BOD data indicated that the anthropogenic organic matter entering the coastal water was effectively oxidized. Data on nitrates and phosphates was high and varied widely, likely because fertilizers drain from nearby agricultural land. The concentrations of nitrites and ammonium salts are low in the near shore, as well as in the open shore, suggesting good oxidizing conditions. B. Biological Environment 25. Terrestrial Environment. There are no reserve forests or national parks in the core area. For administrative purposes, the core area is under the jurisdiction of the Rajpipla West Forest Division, which will be responsible for any compensatory tree planting required. 26. The core area has no endangered plant or animal species, because it is already industrial and agricultural land. 27. Marine Environment. The EIA of the marine environment indicated very high levels of aerobic heterotrophic bacteria, about two times more in sediment than in water. In general, bacterial counts, except total coliforms, were marginally higher during ebb than flood periods. This indicated that onshore activities influenced the marine ecosystem. Aerobic bacteria were common and played an active role in mineralizing organic matter in the gulf. Levels of fecal coliform in the Dahej-Jogeshwar segment of the gulf were higher than the limits set down in the United States Environmental Protection Agency s criteria for water quality. The levels of phytopigments varied in a narrow range, and the observed values were low, indicating poor-to-

12 8 moderate primary production in the gulf. The quantity and variety of zooplankton varied widely and indicated poor-to-moderate secondary production potential in the gulf. The zooplankton were primarily copepods, chaetognaths, and decapod larvae. The studies revealed very poor annual benthic production potential among macrofauna. 28. High tides and turbidity, coupled with strong tidal currents, made trawling and gill netting difficult and risky. The gulf had only limited shore-based net fishing. Experimental trawling by the National Institute of Oceanography also indicated a very low potential catch. The gulf was not suitable for commercial fishing in any season. C. Sociocultural Environment 29. The population density in the study area was about 82 people per square km, with about 890 females per 1000 males. The overall literacy rate was fairly high: 65.5% for males and 39.0% for females. 30. Each of the five villages in the core area had at least one primary school. Dahej village had one primary health center and one veterinary hospital. The area in general faced a shortage of drinking water. In the core area, only Dahej village had piped-in water supply. The others relied on water from tankers. 31. Around 50 project personnel and their families are expected to settle in the core area. These people are likely to be reasonably affluent; to fill their needs, ancillary services are likely to grow and have a positive impact in the area. At present, about unauthorized occupants are on the project land. 32. Fishing is prohibited near the unloading facilities because of heavy chemical industries. IV. ALTERNATIVES A. No Project 33. Energy demand is increasing rapidly in India. India s proven hydrocarbon reserves were approximately 5,390 million t in Coal continues to be the country s main energy source, but the use of natural gas is increasing gradually. India s natural gas production has been stable in recent years. Gas demand may exceed supply by about 280 billion m 3 per day by , and reserves at the end of 1999 were estimated at only 1,340 billion m 3. India needs to import natural gas to meet future energy needs. LNG is being promoted as a reliable alternative fuel. The India Hydrocarbon Vision 2025 report concluded that 20 30% of total gas imports could be LNG, taking into account various factors including energy security. The demand for an additional 2.0 million t of LNG every year indicates that a project like the one at Dahej will be needed every 2 years. B. Alternative Locations 34. The project location was determined by proximity to consumers and suppliers; suitability of port facilities; proximity to an existing pipeline network; and availability of existing infrastructure such as power, roads, telecommunications, and water. M/s Engineers India Limited studied alternative locations in Gujarat and concluded that Dahej offers the most advantages because of its ready consumer access and availability of infrastructure. Capital costs for a port facility at Dahej were minimum. Costs for extra pipelines to transport gas to

13 9 consumers were also relatively low. The Gujarat Maritime Board (GMB), an authority responsible for developing port facilities in the state, had shown keen interest, and land was available close to shore for the terminal. 35. The location has many advantages, such as (i) a large back-up transmission facility thanks to the nearby 2,700 km Hazira, Bijapur, Jagdishpur pipeline, which runs from western to northern India; (ii) proximity to major gas consuming industries, both in Gujarat and along the aforementioned pipeline; (iii) relative proximity to the identified LNG source in Qatar; (iv) natural water depth of more than 12 m, facilitating berthing of large tankers and eliminating the need for dredging; (v) moderate wind and climatic conditions; (vi) a sparse population and no permanent structures to act as safety hazards; and (vii) readily available infrastructure in an existing industrial park. C. Alternative Technology 36. The technology for an LNG terminal is fairly simple and well established. Various national and international codes are available for design, including the Oil Industry Safety Directorate s OISD 194, the European EN 1473, and the United States National Fire Protection Association s NFPA 59A. These codes formed the basis for the Dahej design, with certain modifications tailored to the site. 37. Containment. Risk analysis for major hazards such as a major spill or fire indicated that single-containment tanks would not be safe for amounts of LNG this large. The doublecontainment tank was not recommended, either, because it needs a large protection system and extensive vapor clouds could form in the event of a spill. The net difference in price between double-containment and full-containment tanks is not significant when compared with the safety advantages of a full-containment tank. Full-containment tanks also offer (i) a higher operating pressure, which would reduce boil-off during unloading; (ii) a design that separates the weight of the piping, structure, and accessories from the primary container; (iii) no risk of leakage; (iv) excellent protection against external impact; and (v) additional space to store LNG in the secondary container. 38. Unloading Facilities. Two systems for transferring LNG from ships were considered during the EIA. First was a conventional jetty where ships would berth. The second involved submerged port moorings that could be installed and operating much faster. Although coaxial pipes were being investigated internationally, no commercial use of these pipes for LNG was known. A conventional jetty was chosen. The approach bridge would be approximately 2.4 km long, connecting the jetty head to the shore. The design of the unloading facilities was optimized. Modifications included passing bays at regular intervals to narrow the road on the approach bridge. V. ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATING MEASURES A. Physical Environment 1. Construction Phase 39. Terminal. The Project s main impacts during construction will be noise and dust during excavation and construction. The soil texture is sandy, and particles are not expected to drift. Even in the worst weather, dust pollution should remain within m of the road in the direction of the wind. During construction, runoff from the quarry could increase

14 10 soil erosion, and rainwater could form pools that would breed mosquitoes. Contractors will be instructed to provide drainage, as per standard engineering practice, so that runoff does not accumulate. About 400 workers will be needed during construction. While most workers will commute from local villages, a few will stay in temporary facilities near the site. This could create problems such as pollution from sewage; water runoff; and use of local wood for domestic fuel, especially during the nonmonsoon months. Trenches will absorb excess water during construction, and the contractor will be required to provide adequate facilities for the construction workers. 40. The major airborne pollutants during construction will come from diesel-burning construction equipment. Fuel analysis of various construction equipment indicated that the maximum short-term increase in SO 2 will be mg/m 3 at a distance of 200 m from the emission source. The increase in airborne particles will be about mg/m 3, an amount so small it will not require any specific control measures. 41. Loading Facility. Construction is expected to (i) destroy some marine habitats through physical disturbance, and (ii) indirectly affect other marine habitats by modifying prevailing water movements, landforms, and erosion patterns on the nearby coast. Largescale rock dumping during breakwater construction would disturb the bottom sediment, and the particles would remain in the water column because swift currents would discourage them from settling. An increase in suspended sediment would reduce algae proliferation. Digging, filling, and resettling of sediment may change sediment texture in localized areas, particularly in the intertidal zone. To ensure the least disturbance to land and water, the length of breakwater and its orientation were decided based on the model studies. 2. During Operation 42. Terminal. LNG storage and regasification do not involve combustion of any synthetic fuel, so the Project is not expected to affect air quality. The terminal will be equipped with a power plant of approximately 15.0 MW capacity, as well as gas vaporizers for LNG regasification during winter. These two components will be the terminal s main consumers of fuel gas, which will be regasified LNG. Based on a standard model, emissions of NOx and SO 2 should be insignificant 100 m from the power plant, and those from the gas vaporizers should be negligible. 43. LNG storage and regasification do not generate much noise, and project design has restricted machinery noise by imposing stringent controls on suppliers and contractors. Minimal noise is anticipated during operation. 44. The terminal is not expected to have any adverse impact on land, water, or air quality after completion. During construction, there might be marginal impact, and mitigation procedures will be imposed on the contractor. A low-pressure flame will burn incidental gas. Based on radiation analysis, the flame needs to be 10.4 m above ground, and the minimum height recommended under emission regulations is 30 m. PLL has decided to burn the gases at 40 m. The terminal will not use processes that generate significant noise. The engineering design will limit machinery noise. 45. Unloading Facility. Potential hazards to the marine environment during operation include spills of LNG or dry bulk cargo; wastes generated by ships/port terminals; and largescale release of cargo, fuel, and chemicals in the event of an accident or collision. Air and water temperatures at the site are very high compared with the boiling point of LNG, which

15 11 evaporates as soon as it leaks. LNG is very light with a density of 0.45 grams per cubic centimeter so if a leak occurs under water, it will surface very quickly. An LNG spill would have negligible impact on the water column. 46. The proposed C-shaped breakwater will facilitate ship movements and berthing, particularly for LNG tankers. Natural water currents and waves will be reduced in an area three to four times the length of breakwater, but currents should return to normal beyond that. 47. Currents are expected to decrease on the north side of the breakwater during rising tides and on the south side during falling tides. Waves from the south and southwest will also be reduced, creating a calm zone in the lee of the breakwater where sediment levels could rise. In extreme conditions, a sand spit could even form. Erosion will likely deepen the bottom on western side of the breakwater. 48. During operation, the breakwater s impact on water quality should be negligible. It should not affect the plankton, but bottom-dwelling organisms could be affected by sediment buildup. 49. General Impact. With the development of the terminal, nearby industry will likely switch to regasified LNG for fuel. LNG has the obvious advantages of low carbon dioxide and NOx emissions, negligible release of SO 2 and TSPM, and no ash or other hazardous wastes. This terminal should have a significant positive impact on air quality. The facility requires water only for heating, drinking, and washing, with no discharge of cold water into the marine environment. Runoff water will be channeled and removed through storm drains during monsoons. B. Biological Environment 1. Construction Phase 50. Terminal. The proposed site is generally barren, but does have a few mesquite. About 200 people are expected to stay near the site during construction, and their domestic fuel needs will amount to about 1 kg of wood per person per day. They will likely try to meet their fuel needs by cutting the trees, a problem that should be solved by requiring the contractor to supply an alternate fuel such as kerosene. 51. There were no major animal species observed in or near the project area. The Project s impact on fauna is not expected to be significant. 52. Unloading Facility. The construction of the jetties and the breakwater will have an impact on marine life on the ocean floor. The damage should be localized but irreversible along the proposed marine structures, except in the case of the bridge, where the seabed could recover in 2 3 years. Construction will destroy about 16 ha of the coastal marine ecosystem. The proposed structures should, however, provide an additional surface area of about ha. This will result in a net gain of 6.64 ha of intertidal habitat and a net loss of 2.68 ha of subtidal habitat. Overall, project implementation will result in a net gain of 3.96 ha of bottom habitat. The proposed development may kill an estimated 1.52 x 10 7 bottomdwelling creatures such as crabs, insects, shellfish, shrimp, and worms with a total wet weight of about 79.4 kilograms. Overall, the impact of proposed development on the gulf s bottom-dwelling communities should be minor.

16 Construction should be optimized and well-coordinated to minimize negative impacts and complete the Project on schedule. The fabrication yard should be sufficiently far from the high-tide mark, and transfer of materials to the site should follow a predetermined path. The pipeline should be buried at a safe depth in the intertidal areas, near-shore subtidal areas, and estuary crossings. Cyclone-induced turbulence should also be accounted for in the pipeline design. 2. Operational Phase 54. Terminal. The project area is not known to contain any rare or endangered species, and the terminal is not expected to disturb the ecology of the core area. The Project is not expected to release any pollutants during normal operations. Its location and operation are not expected to affect the breeding habitats or migratory paths of any species. No adverse impacts on fauna are anticipated during construction or operation. 55. Unloading Facility. Deep-sea vessel traffic is confined to a 72 km navigational channel between the mouth of the gulf and the entrance to Dahej port. Traffic density in the gulf will rise 139% by 2005 because of the terminal. The probability of a collision will rise to once every 16.2 years, with accidents involving a tanker happening an average of once in 74.9 years. Boats will run aground an average of once every 3.2 years for all ships, with tankers meeting the same fate once in 14.9 years. A petroleum spill in the gulf is a distinct possibility. Major diesel spills caused by tanker accidents would contaminate the environment and harm marine life. A high-speed diesel spill s impact on the marine ecology would depend on the type of product and the quantity spilled, which could be as much as 5 10 t. Maximum stress would fall on bottom-living organisms if a spill reached shore. Ecological impact would be confined to the ecosystem around a spill zone, and the effects would dissipate after a short period. 56. PLL should develop a strategy to combat spills. It should maintain an in-house capability to fight spills of about 50 t. PLL has prepared a local disaster contingency plan, particularly for oil spills, which should be integrated with the regional disaster plan. A traffic scheme adequately separating shipping lanes and monitoring traffic directly or remotely would minimize the risk of tanker collisions or groundings. Navigational aids should clearly mark channels and indicate separation distances. Positions of the markers should be noted on navigational charts. As a part of an overall environmental strategy, policing should be introduced to prevent vessels from discharging wastewater, tanker washings, and oily slop into the marine waters. C. Socioeconomic Impacts 1. Construction Phase 57. Terminal. Peak construction periods could involve as many as 400 laborers. Although the contractor is expected to employ as many locals as possible, some migrant labor could change the sex and age ratios in the area. Migrants might stay with the Project during operation, but the impact of their numbers on the community is not expected to be significant. The Project is expected to include community facilities at the project site, such as water supply and sanitation, transportation, and solid waste disposal. These will limit negative effects from construction. GMB has already acquired land for the terminal, and no

17 13 private land will be acquired. At present, unauthorized occupants live and have planted crops on the project site. GMB has agreed to resettle and compensate them. 58. Unloading Facility. Temporary workers should be housed with proper sanitation sufficiently far from the high-tide line. Sewage and other wastes from workers settlements should not be released to the sea. 2. Operation Phase 59. Terminal. About 50 project personnel, along with their families, are expected to settle in the core area. They are likely to be relatively affluent, and secondary services are expected to develop to meet their needs. This will create some local jobs. 60. Unloading Facility. The area is not used for fishing because of nearby heavy chemical industries. No fishers will be displaced. D. Risk Analysis 61. Integrated risk analysis was carried out by ERM Hong Kong, with input from Tokyo Gas Engineering. Modeling studies for the breakwater, mooring, and unloading facilities were conducted by SOGREAH, a French company, and reviewed by Frederick Harris of the United Kingdom. The risk analysis showed that the risks to the public and to workers are very low, provided that (i) internationally accepted standards are used in the design; and (ii) the plant remains separated from the control room, administration block, and off-site areas. The study calculated that the off-site individual risk is less than 1x10-6 outside the site boundary. The control room, administration building, and other inhabited buildings should be constructed with few or no windows, and the overall window area should be minimized. Air conditioners should be protected on the roofs of buildings, or placed at ground level away from the process area, to prevent them from acting as missiles in the event of an explosion. Fire tanks and pumps should be located as far from process areas as possible. VI. ECONOMIC ASSESSMENT 62. The Project s quantifiable costs are (i) capital, (ii) LNG, (iii) shipping, (iv) regasification, (v) financial items, and (vi) taxes and duties. The total project cost is estimated at $540 million, of which the equity contribution is $160 million by the sponsors. A 50% equity share is earmarked for private and foreign companies. The Project is expected to generate substantial revenue for the national and state governments over 25 years. Costs for additional instruments, stand-by equipment, and personnel to assure safe and environmentally sound operation are estimated at $8.5 million. The Project will have a financial internal rate of return of 16%. 63. PLL has also spent money on the following: (i) road development, (ii) a contribution to local development through funds for the district collectorate 1, (iii) relief for earthquake victims, and (iv) a place of worship for the local community. District authorities have also advised PLL to participate in local community welfare activities. The company has also appointed a consultant for the development of a greenbelt at a cost of 20 million rupees, complying with local environmental and statutory requirements. Efforts have been made to 1 District collectorate is a local government unit in India. It is headed by the District Magistrate and Collector, and is the nerve center of district administration.

18 14 conserve natural resources. PLL has also included in the capital expenditure the cost for processing sewage and recovering treated water for use in the greenbelt. No separate cost estimates are available for such facilities. VII. INSTITUTIONAL REQUIREMENTS AND MONITORING PROGRAM 64. Residual environmental impacts will be systematically monitored and reported during construction and operation, in accordance with the agreements during the review by GPCB and MOEF. The Project is designed to comply with the requirements of GPCB and MOEF on air emissions, water inflows and outflows, and noise standards. PLL is duty-bound to follow the conditions imposed in the GPCB and MOEF clearance. Appendix 2 shows the parameters, frequency of sampling, location, and number of sampling stations. PLL s environmental and safety unit will be responsible for monitoring and reporting. 65. PLL will pay close attention at all stages of the Project to environmental performance. It will consult regularly with the responsible authorities and the community. PLL will participate in any local environmental monitoring committee constituted by state/local authorities. The plant organization will include a specialist responsible for environmental management and monitoring, and PLL s training programs will include environmental management activities for all operational staff. 66. PLL will submit to ADB every year a copy of all government licenses, permits, and certificates related to safety and the environment. In the event that the Project is cited for violations of environmental or safety regulations, the annual report will include a certification either that the defect has been corrected, or that an acceptable plan has been submitted to correct the defects. VIII. PUBLIC INVOLVEMENT 67. In any large-scale infrastructure project, the impact on local communities is significant in terms of employment, the environment, infrastructure, and activity. The Government has recognized this and involved the public when granting clearances for the Project. 68. Formal public involvement has taken place via public consultations, newspaper announcements, and advertisements to inform the public that such a large-scale project is under consideration. 69. The first public consultation was conducted on 19 November 1999 under the stewardship of local authorities, as a part of the GPCB review process. PLL made a presentation during the first public hearing, after which the public asked questions. There were 37 participants. The attendance and discussion were documented, and PLL has kept copies. Local authorities customarily ask attendees for their opinions before they issue the NOC, to establish whether they are satisfied with the answers from project proponents. 70. PLL applied to MOEF for the final clearance after obtaining an NOC. MOEF convened a review panel to examine the EIA, visit the site, and consult the public. The first presentation to the panel was made on 24 November 2000, and a second presentation answering the questions from the first meeting was made on 20 December Copies of the presentation material and discussion notes are available at PLL. After MOEF issued the NOC, PLL had to publish statements in the local newspaper and on the MOEF website for

19 15 public comments before the NOC became final and effective. Notices were published on 14 February 2001 in the Western Times of Ahmedabad, Gujarat and in the Gujarat Mitra of Surat, Gujarat. No objections were raised. 71. PLL confirms that all presentation material during the first public hearing was presented in Gujarati, the local language. All formal and informal discussions also took place in that language. Efforts were made to present the facts in a form comprehensible to laypeople. IX. CONCLUSIONS 72. The site is already industrial and is not environmentally sensitive, and much of the necessary infrastructure already exists. The Project is designed to comply with India s environmental standards, especially those related to air emission, air quality, wastewater effluent, received water quality, and noise. It will help reduce the gap between demand and supply of natural gas. It will not interfere with human settlements and does not require displacement of the local population. 73. The Project will encourage industry, not only in the nearby area but in other parts of the country, to switch to natural gas. The Project will greatly improve air quality, because natural gas burns more efficiently than coal or fuel oil and contains fewer impurities. 74. The main risk from the Project is accident. The design, construction, and operation opted for (i) total containment of gas storage tanks; (ii) standby and redundancy of sensitive parts, to prevent accident in case of equipment failure; (iii) online monitoring of process variables; (iv) automatic emergency cutoff; and (v) segregation of the tankers.

20 16 Appendix 1 MAJOR ENVIRONMENTAL IMPACTS, MITIGATION MEASURES, AND MONITORING PROGRAM Table A1.1: Construction Phase Impacts and Mitigation Measures Environmental Component Potential Impacts Impact Source Mitigation Measures Remarks Land Construction waste / trenches / borrows Construction activity Sloping to be provided as per standard engineering practices Short-term and negative Surface water - An increase in suspended solids and BOD - Public health problems, especially during monsoons Construction activity Construction of Sulabh Shauchalayas septic tanks and absorption trenches Short-term and negative Groundwater No impact No impact No impact No withdrawal Air quality Marginal increase in TSPM and RPM due to vehicular movement Vehicular movement Vehicles with PAC to be deployed, water sprayed, roads to be paved Short-term and negative Noise Increased noise level Construction activities / vehicles Equipment selection Short-term and negative Socioeconomic environment Immigration of labor, increase in stress on the natural resource and infrastructure Construction activity Deploy more locals in construction activities Positive and longterm, negative and short-term BOD = biochemical oxygen demand, PAC = pollution abatement control, RPM = respirable particulate matter, TSPM = total suspended particulate matter. Note: Petronet LNG Limited is responsible for implementing the mitigating measures.

21 Appendix 1 17 Table A1.2: Operation Phase Impact and Mitigation Measures Environmental Component Potential Impacts Source Mitigation Remarks Water balance Water to be supplied by GIDC No impact envisaged Surface water Disposal of accidental oil spill Accidental spill Physical removal of oil and disposal None Groundwater None None None Withdrawal Ambient air quality Marginal increase in NOx levels in ambient air -Flaring unabsorbed/ depressurized natural gas -Captive power emergency generation -The dispersion model indicates occasional flaring will be dispersed quickly, before reaching human settlements. -Generators will be maintained as per emissions standards. Negative and marginal Reduction in TSPM and NOx levels in the industrial area due to switching over to LNG for captive power generation by nearby industries, long-term and positive Noise Increased noise level due to vehicular movement Engine / compressor / human activity Greenbelt as noise barrier Negative and marginal Land use Industrial land to be developed; no acquisition of private land No impact Vegetation Plant cover to increase with greenbelt development Greenbelt development Positive impact Increase in plant cover; long-term and positive Employment Secondary services such as transport will generate jobs. Secondary employment Long-term and positive Population There will be an increase in the floating and fixed populations. Demand for houses and other products and services will increase villagers income. Some laborers may quit their regular jobs in favor of higher wages with the Project. Mechanization of labororiented jobs through cooperative societies Project Long-term and positive GIDC = Gujarat Industrial Development Corporation, LNG = liquefied natural gas, NO x = nitrogen oxide, TSPM = total suspended particulate matter. Note: Petronet LNG Limited is responsible for implementing the mitigating measures.

22 18 Appendix 2 MAIN ENVIRONMENTAL REQUIREMENTS AND GENERAL STANDARDS FOR DISCHARGE OF ENVIRONMENTAL POLLUTANTS Table A2.1: Effluent Standards Parameter (units) Inland Surface Water Public Sewer Land for irrigation Marine coastal areas Color and odor Suspended solids (mg/l) max Particulate size of suspended solids Nonobjectionable Nonobjectionable Non-objectionable For process wastewater 100 Shall pass 850 micron IS sieve ph Temperature max ( C) Oil and grease (mg/l) max Total residual chlorine, (mg/l) max Ammonia nitrogen (as N) (mg/l) max Total Kjeldahl nitrogen (as NH 3 ) (mg/l) max Free ammonia (as NH 3 ) (mg/l) max BOD (5 days at 20 C) (mg/l) max Shall not exceed the receiving water temperature by more than 5 C COD (mg/l) max Arsenic (elemental) (mg/l) max Mercury (elemental) (mg/l) max For cooling water effluent 10% above total suspended matter of influent -Floating solids max 3mm -Settling solids max 850 mm Shall not exceed the receiving water temperature by more than 5 C C = degree Celsius, BOD = biochemical oxygen demand, COD = chemical oxygen demand, IS = international standard, mg = milligram, mg/l = milligram per liter, mm = millimeter, NH 3 = ammonia, ph = measure of acidity. Note: One monitoring station will be established at the main effluent line and samples will be taken weekly. Additional sampling points maybe required by the authorities: specifically, GPCB.

23 Appendix 2 19 Table A2.2: General Emission Standards Parameters Standards Concentration-based standard Particulate matter 150 mg /mm 3 Equipment-based standards Sulfur dioxide 60 mg/scm Power generating capacity 500 MW and more 275 m 200 / 210 MW and above to less than 500 MW 200 m less than 200 / 210 MW H=14 (Q) 0.3 H = physical height of the stack in meters, m = meter, mg/mm 3 = milligram per cubic millimeter, mg/scm = milligram per standard cubic meter, MW = megawatt, Q = emission of SO 2 in kilogram per hour, SO 2 = sulfur dioxide. Note: Continuous stack monitoring equipment will be installed to measure the particulate matter and SO 2. Source: Ministry of Environment and Forest Environment (protection) Rules. India.

24 20 Appendix 2 Table A2.3: National Ambient Air Quality Standards Pollutant Average (Time Weighted) Concentration in Ambient Air µg/m 3 Method Industrial Residential Sensitive SO 2 Annual a 24 hours Improved West and Gaeke ultraviolet fluorescence NO 2 Annual 24 hours Jacob and Hochheiser (arsenite gas phase chemiluminescence) TSPM Annual 24 hours HVS avg > 1.1 m 3 /min. Same as annual RPM, size<10 µm)1 Annual 24 hours RPM sample Same as annual Lead (elemental) Annual 24 hours HVS Same as annual CO 8 hours b NDIR spectroscopy 1 hour Same as 8 hours µg/m3 = microgram per cubic meter, µm = micrometer, CO = carbon monoxide, HVS = high volume sampler, m 3 = cubic meter, NDIR = nondispersive infrared, NO 2 = nitrogen dioxide, RPM = respirable particulate matter, SO 2 = sulfur dioxide, TSPM = total suspended particulate matter. a b Annual arithmetic mean of at least 104 measurements per year, taken twice a week, hourly, at uniform intervals. 24-hourly/8-hourly values should meet criteria 98% of the time in a given year. In the remaining 2% of the time, they may exceed the criteria, but not on 2 consecutive days. Note: Four monitoring stations are initially planned. Measurements will be taken every month for the first year of operation, then every 3 months subsequently. Source: Gazette Notification CPCB. Part II, Sec 3 (ii).

25 Appendix 2 21 Table A2.4: Ambient Noise Standards Area Code Category of Area Limits in db(a) Day Night A Industrial area B Commercial area C Residential area D Silence zone db(a) = decibel acoustic. Notes: (i) Day time is 6 am to 9 pm. (ii) Night time is 9 pm to 6 am. (iii) A silence zone is an area up to 100 m around hospitals, educational institutions, and courts of law. The silence zones are to be declared by the competent authority. Vehicular horns, loudspeakers, and firecrackers are banned in these zones. (iv) Mixed-use areas should be placed under one of the four above-mentioned categories by the competent authority, and the corresponding standards will apply. (v) Noise monitoring will be carried out at different locations, inside and outside the plant, using portable noise-measuring equipment. Source: Ministry of Environment and Forest Environment (protection) Rules. India.

Petronet LNG Ltd., India. LNG Terminal Design- Major Design Considerations

Petronet LNG Ltd., India. LNG Terminal Design- Major Design Considerations Petronet LNG Ltd., India LNG Terminal Design- Major Design Considerations OVERVIEW 1. What is LNG and LNG Chain 2. Project Development & Site Selection 3. Studies Required 4. Marine Facilities 5. Storage

More information

MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT

MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT The health of the world s oceans and marine life is degrading rapidly as a result of excess human activities.

More information

Japanese ODA Loan. Ex-Ante evaluation

Japanese ODA Loan. Ex-Ante evaluation Japanese ODA Loan Ex-Ante evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Matarbari Ultra Super Critical Coal-Fired Power Project (I) Loan Agreement: June 16, 2014 Loan

More information

Excerpt of Thermal Power Guidelines for New Plants

Excerpt of Thermal Power Guidelines for New Plants Excerpt of Thermal Power Guidelines for New Plants The following is an excerpt of the Thermal Power guidelines for New Plants, a complete version of which is found in the Pollution Prevention and Abatement

More information

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Compliance Report for Environmental Clearance No.11.63/2005.1A.III dated 19.12.2005 Specific Conditions

More information

Appendix A: Project Characteristics

Appendix A: Project Characteristics Gorgon Fourth Train Expansion Proposal Appendix A: Project Characteristics Appendices Project Characteristics A Key Characteristics table has been prepared to describe the elements of the Foundation Project

More information

Foundation Course. Semester 3 THREATS TO THE ENVIRONMENT

Foundation Course. Semester 3 THREATS TO THE ENVIRONMENT Foundation Course Semester 3 THREATS TO THE ENVIRONMENT INTRODUCTION Atmosphere, water and soil are the most important components of environment in which we live. Atmospheric factors like rainfall, humidity,

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Base Metal and Iron Ore Mining

Base Metal and Iron Ore Mining Multilateral Investment Guarantee Agency Environmental Guidelines for Base Metal and Iron Ore Mining Industry Description and Practices This document addresses the mining of base metal ores (copper, lead

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

Water Pollution. Objective: Name, describe, and cite examples of the eight major types of water pollution.

Water Pollution. Objective: Name, describe, and cite examples of the eight major types of water pollution. Water Pollution Objective: Name, describe, and cite examples of the eight major types of water pollution. Types of Water Pollution Water pollutants are divided into eight categories: 1. Sediment pollution

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Environmental and Social Review Summary. Dakar Port, DP World Container Terminal Modernization and Operation

Environmental and Social Review Summary. Dakar Port, DP World Container Terminal Modernization and Operation Environmental and Social Review Summary Dakar Port, DP World Container Terminal Modernization and Operation This Environmental and Social Review Summary (ESRS) is prepared by MIGA staff and disclosed in

More information

AP Environmental Science

AP Environmental Science AP Environmental Science Types of aquatic life zones MARINE Estuaries coral reefs mangrove swamps neritic zone pelagic zone FRESHWATER lakes and ponds streams and rivers wetlands Distribution of aquatic

More information

Read: Case Study: America s First River : A Success Story Summarize the story of the Hudson River and PCB s:

Read: Case Study: America s First River : A Success Story Summarize the story of the Hudson River and PCB s: Botkin & Keller: Environmental Science: Earth as a Living Planet- 8th Ed. APES- Chapter #19- Water Pollution and Treatment- Guided Reading Name: Brandon Tran Learning Objectives: Degradation of our surface-water

More information

ENVIRONMENTAL MONITORING PROGRAMME

ENVIRONMENTAL MONITORING PROGRAMME Stage-I (2x800 MW) Page 1 5 CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAMME 6.0 OBJECTIVES Regular monitoring program the environmental parameters is essential to take into account the changes in the environment.

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

ENVIRONMENTAL SCOPING PLAN

ENVIRONMENTAL SCOPING PLAN APPENDIX F ENVIRONMENTAL SCOPING PLAN F.1 DATA OF EXAMINATION Table F.1.1 Data of Examination No. Items Description 1 Full title of the Project and relevant report 2 Type of the study Development Study

More information

Questionnaire (Wood Processing)

Questionnaire (Wood Processing) Questionnaire (Wood Processing) QUESTIONNAIRE FOR WOOD PROCESSING (SECTOR-RELATED QUESTIONS) The completion of this questionnaire is voluntary. However, replying to the relevant questions as completely

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

Day in the Life of the Hudson & Harbor Vocabulary

Day in the Life of the Hudson & Harbor Vocabulary Day in the Life of the Hudson & Harbor Vocabulary adapt: to develop a way of dealing with conditions in a particular environment adaptation: a feature that allows an organism to adjust to differing environmental

More information

Module 12: Oceanography Topic 6 Content: Ocean Pollution Notes. Ocean Pollution

Module 12: Oceanography Topic 6 Content: Ocean Pollution Notes. Ocean Pollution Ocean Pollution 1 Ocean pollution is an important modern-day environmental issue. Pollution occurs when chemical, physical, and/or biological agents are introduced into an environment and cause undesirable

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

Water Chemistry. Water 101

Water Chemistry. Water 101 Water Chemistry Water 101 I. Introduction A. Water is not pure Many different kinds of chemicals dissolved in it Ions, organic chemicals, organic matter, particulate matter, and gases can all be in water

More information

TOWN OF HASTINGS, FLORIDA TOWN CODE. Chapter 18. Previous Page. Water and Sewer. Article II. Sewers -- Prohibited Discharges.

TOWN OF HASTINGS, FLORIDA TOWN CODE. Chapter 18. Previous Page. Water and Sewer. Article II. Sewers -- Prohibited Discharges. TOWN OF HASTINGS, FLORIDA TOWN CODE Chapter 18 Previous Page Water and Sewer Article II Sewers -- Prohibited Discharges. Sec. 18-20. General Prohibition No Person shall discharge or cause to be discharged

More information

Environmental Impact Assessment for TASNEE Petrochemicals Ethylene and Polyethylene Projects

Environmental Impact Assessment for TASNEE Petrochemicals Ethylene and Polyethylene Projects Environmental Impact Assessment for TASNEE Petrochemicals Ethylene and Polyethylene Projects ATTACHMENT 3: This document contains proprietary information belonging to Fluor B.V., its parent and/or affiliated

More information

Hydrology and Water Quality. Water. Water 9/13/2016. Molecular Water a great solvent. Molecular Water

Hydrology and Water Quality. Water. Water 9/13/2016. Molecular Water a great solvent. Molecular Water Hydrology and Water Quality Water Molecular Water Exists as an equilibrium But equilibrium altered by what is dissolved in it Water Molecular Water a great solvent In reality, water in the environment

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

ENVIRONMENTAL POLLUTION ENVR-252 CHAPTER # 2

ENVIRONMENTAL POLLUTION ENVR-252 CHAPTER # 2 ENVIRONMENTAL POLLUTION ENVR-252 CHAPTER # 2 POLLUTION Pollution - addition of undesirable material into the environment as a result of human activities. The agents which cause environmental pollution

More information

Marine Protection Rules Part 100 Port Reception Facilities Oil, Noxious Liquid Substances and Garbage

Marine Protection Rules Part 100 Port Reception Facilities Oil, Noxious Liquid Substances and Garbage Marine Protection Rules Part 100 Port Reception Facilities Oil, Noxious Liquid Substances and Garbage MNZ Consolidation Marine Protection Rules ISBN 978-0-947527-29-7 Published by Maritime New Zealand,

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

Life in Water. Chapter 3

Life in Water. Chapter 3 Life in Water Chapter 3 Outline Hydrologic Cycle Oceans Shallow Marine Waters Marine Shores Estuaries, Salt Marshes, and Mangrove Forests Rivers and Streams Lakes 2 The Hydrologic Cycle Over 71% of the

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity

More information

Ministerial Decision No: 159/2005 Promulgating the bylaws to discharge liquid waste in the marine environment

Ministerial Decision No: 159/2005 Promulgating the bylaws to discharge liquid waste in the marine environment Sultanate of Oman Ministry of Regional Municipalities, Environment & Water Resources Minister s Office Muscat Ministerial Decision No: 159/2005 Promulgating the bylaws to discharge liquid waste in the

More information

EUTROPHICATION. Student Lab Workbook

EUTROPHICATION. Student Lab Workbook EUTROPHICATION Student Lab Workbook THE SCIENTIFIC METHOD 1. Research Background literature research about a topic of interest 2. Identification of a problem Determine a problem (with regards to the topic)

More information

Chapter Concepts LIFE IN WATER. The Hydrologic Cycle. The Hydrologic Cycle

Chapter Concepts LIFE IN WATER. The Hydrologic Cycle. The Hydrologic Cycle Chapter Concepts Chapter 3 LIFE IN WATER The hydrologic cycle exchanges water among reservoirs The biology of aquatic environments corresponds broadly to variations in physical factors such as light, temperature,

More information

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics Multilateral Investment Guarantee Agency Environmental Guidelines for Coke Manufacturing Industry Description and Practices Coke and coke by-products (including coke oven gas) are produced by the pyrolysis

More information

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017 Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach October 2017 (Simulated FPF) INTRODUCTION Noront is proposing to develop a Ferrochrome Production Facility (FPF) in Northern

More information

Long Island s. Environmental Issues. Environmental Issues. Environmental Setting. Environmental Setting. Suburbia and the Environment

Long Island s. Environmental Issues. Environmental Issues. Environmental Setting. Environmental Setting. Suburbia and the Environment Environmental Issues Long Island s Environmental Issues Copyright 2011 AFG 1 agricultural land air pollution aquifers automobile barrier islands biozones fisheries groundwater recharge invasive species

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

Summary of Environmental Impacts associated with the Vlore Thermal Power Station

Summary of Environmental Impacts associated with the Vlore Thermal Power Station Summary of Environmental Impacts associated with the Vlore Thermal Power Station 0. Background The European Bank for Reconstruction and Development (EBRD) has been requested by Korporata Elektroenergjetike

More information

CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES

CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES Nova Scotia Environment and Labour CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES Approval Date: October 24, 1997 Effective Date: October 24, 1997 Approved By: Peter Underwood Version Control:

More information

TOPIC-NATURAL RESOURCES NATURAL RESOURCES

TOPIC-NATURAL RESOURCES NATURAL RESOURCES TOPIC-NATURAL RESOURCES ENVIRONMENT: The physical, biological and social aspects of our surroundings in which we live is known as environment.the natural environment consists of things which have been

More information

Extended Annual Review Report

Extended Annual Review Report Extended Annual Review Report Project Number: 39921 Loan Number: 7245- LN2256 November 2012 Loan Petronet LNG Limited Dahej Liquefied Natural Gas Terminal Expansion Project (India) In accordance with ADB

More information

QUESTIONNAIRE FOR INFRASTRUCTURE PROJECTS (SECTOR RELATED QUESTIONS)

QUESTIONNAIRE FOR INFRASTRUCTURE PROJECTS (SECTOR RELATED QUESTIONS) Questionnaire (Infrastructure Projects) QUESTIONNAIRE FOR INFRASTRUCTURE PROJECTS (SECTOR RELATED QUESTIONS) The completion of this questionnaire is voluntary. However, replying to the relevant questions

More information

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate Project Overview Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate a natural gas-tomethanol production plant and storage facilities, and a new marine terminal, in the

More information

Water Resources on PEI: an overview and brief discussion of challenges

Water Resources on PEI: an overview and brief discussion of challenges Water Resources on PEI: an overview and brief discussion of challenges Components: Components and links Atmospheric water Surface water (including glacial water) Groundwater Links: Precipitation (atm(

More information

npower who we are Tilbury Power Station

npower who we are Tilbury Power Station npower who we are npower who we are RWE npower, part of the RWE Group, is the leading UK energy company committed to conducting its business with a sense of responsibility for the environment, its customers

More information

Ambient Air Quality Monitoring Baseline Report, Kirby Misperton A Wellsite, KM8 Production Well

Ambient Air Quality Monitoring Baseline Report, Kirby Misperton A Wellsite, KM8 Production Well Ambient Air Quality Monitoring Baseline Report, Kirby Misperton A Wellsite, KM8 Production Well. Prepared for: Third Energy UK Gas Ltd. Document Control Page Client Third Energy UK Gas Ltd. Document Title

More information

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 (No. JPBN. 1509/27 Vol. II CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 In exercise of the powers conferred by section 5 of the Conservation

More information

JEDDAH INDUSTRIAL CITY

JEDDAH INDUSTRIAL CITY JEDDAH INDUSTRIAL CITY WASTEWATER TREATMENT PLANT A Presentation by : Engr. Mowafaq Al-Sugeir Managing Director ICDOC SAWEA 2007 WORKSHOP, AL-KHOBER 4 December 2007 Built & Being Operated by : on Build-Operate-Transfer

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

Protecting Our Water Keeping Our Water Healthy

Protecting Our Water Keeping Our Water Healthy Protecting Our Water Keeping Our Water Healthy Draw a bubble map about "Why Water is Important in Our Daily Lives". Include at least 5 reasons. Compare answers with your neighbors, noting similarities

More information

SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS

SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS Version 2 June 2006 1. Purpose These Guidelines are supplementary

More information

Emission accounts. Julian Chow United Nations Statistics Division September 2016 Putrajaya, Malaysia

Emission accounts. Julian Chow United Nations Statistics Division September 2016 Putrajaya, Malaysia Emission accounts Julian Chow United Nations Statistics Division 26-30 September 2016 Putrajaya, Malaysia SEEA Conceptual Framework Types of physical flows accounts in SEEA-CF Physical flow accounts Topics

More information

Gas Access To Europe

Gas Access To Europe Gas Access To Europe 2 3 LNG is cool and hot Import- and throughput of LNG at Gate terminal Close to the port entrance on the Maasvlakte, right at the corner of the North Sea, an LNG import and throughput

More information

33. Fate of pesticides in soil and plant.

33. Fate of pesticides in soil and plant. 33. Fate of pesticides in soil and plant. What Happens to Pesticides When a pesticide is released into the environment many things happen to it. Sometimes what happens is beneficial. For example, the leaching

More information

SAMSUNG Energy Plant: All-in-One Solution for Floating Power Plants with Gas-fired Combined Cycle Gas Turbines

SAMSUNG Energy Plant: All-in-One Solution for Floating Power Plants with Gas-fired Combined Cycle Gas Turbines SAMSUNG Energy Plant: All-in-One Solution for Floating Power Plants with Gas-fired Combined Cycle Gas Turbines Myung-Kwan Song, Yongseok Song, Jeong Oh Hwang, Changwoo Lee, and Wonkyu Lee 5 th April 2017

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

PART 3 TERMINAL INFORMATION

PART 3 TERMINAL INFORMATION International Safety Guide Part 3 Terminal information PART 3 TERMINAL INFORMATION Edition 1-2010 CCNR/OCIMF 2010 Page 235 International Safety Guide Part 3 Terminal information Edition 1-2010 CCNR/OCIMF

More information

Woodfibre LNG Limited Response to SIGTTO LNG Ports and Risk Reduction Options

Woodfibre LNG Limited Response to SIGTTO LNG Ports and Risk Reduction Options Woodfibre LNG Limited Response to SIGTTO LNG Ports and Risk Reduction Options Introduction: The following is in response to the Environmental Assessment Office request for the Society of International

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

Master 5.1, Newspaper Articles. Special Edition December 14. Special Edition March 17

Master 5.1, Newspaper Articles. Special Edition December 14. Special Edition March 17 Master 5.1, Newspaper Articles THE DAILY HERALD Special Edition December 14 Study Forecasts Future Food Shortage A new study published in the Journal of World Agriculture raises concerns that in the future

More information

Emergency Engine and Turbine Requirements

Emergency Engine and Turbine Requirements 1.0 Purpose and Applicability 1.1 The purpose of these guidelines is to identify the processes and requirements that must be followed to ensure compliance with the Massachusetts Department of Environmental

More information

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT Final Scoping Report - Non-Technical Summary Presentation Structure of the Presentation Introduction to the Tema LNG Project

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

Environmental Guideline for Saskatchewan Asphalt Plants

Environmental Guideline for Saskatchewan Asphalt Plants Environmental Guideline for Saskatchewan Asphalt Plants Ministry of Environment July 2015 saskatchewan.ca/environment For enquiries or reporting, please contact: Government of Saskatchewan Environmental

More information

How are Industry Standards, Engineering Codes, Best Management Practices and Other Measures of Compliance Being Met by Facilities?

How are Industry Standards, Engineering Codes, Best Management Practices and Other Measures of Compliance Being Met by Facilities? How are Industry Standards, Engineering Codes, Best Management Practices and Other Measures of Compliance Being Met by Facilities? More on what we re seeing at inspections 1 RMP Facility Chemicals Ammonia

More information

Portbury Dock Renewable Energy Plant. Cumulative Impact Assessment Non-Technical Summary September 2009

Portbury Dock Renewable Energy Plant. Cumulative Impact Assessment Non-Technical Summary September 2009 Portbury Dock Renewable Energy Plant Cumulative Impact Assessment Non-Technical Summary September 2009 INTRODUCTION On 28 th August 2009 E.ON Climate & Renewables UK Developments Limited (EC&R) submitted

More information

Chapter 11 Industry and Manufacturing

Chapter 11 Industry and Manufacturing AP Human Geography Chapter 11 Industry and Manufacturing Key Issues Where is industry distributed? Why are situation and site factors important? Why does industry cause pollution? Why are situation and

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PETROCHEMICAL PLANTS C A G Citizen consumer and civic Action Group 1. What are the pollution problems associated with petrochemical plants? Petrochemical plants

More information

Water Quality and Pollution

Water Quality and Pollution Chapter 6 Water Quality and Pollution Guiding Principles: Chapter 4 details all the guiding principles relevant to the overall management of the Harbour. Whilst all should be given some consideration the

More information

AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental Quality

AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental Quality DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P. O. BOX 1229 GALVESTON, TEXAS 77553-1229 April 11, 2017 AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental

More information

ZEEBRUGGE LNG TERMINAL: FROM REGAS TERMINAL TO VERITABLE LNG HUB IN NORTH-WESTERN EUROPE

ZEEBRUGGE LNG TERMINAL: FROM REGAS TERMINAL TO VERITABLE LNG HUB IN NORTH-WESTERN EUROPE ZEEBRUGGE LNG TERMINAL: FROM REGAS TERMINAL TO VERITABLE LNG HUB IN NORTH-WESTERN EUROPE Pieterjan Renier Fluxys KEYWORDS: Zeebrugge LNG terminal, reloading LNG ships and trucks, HUB, small scale LNG developments

More information

Water and Waste Water Management in Yangon, Myanmar

Water and Waste Water Management in Yangon, Myanmar Union of Myanmar Ministry of Agriculture and Irrigation Irrigation Department Water and Waste Water Management in Yangon, Myanmar Mu Mu Than Staff Officer, Irrigation Department Myanmar March,2010 Socio-economical

More information

Public Notice: Wetland/Waterway/Water Quality Regulations

Public Notice: Wetland/Waterway/Water Quality Regulations Public Notice: Wetland/Waterway/Water Quality Regulations Pursuant to M.G.L. c.30a, the MA Department of Environmental Protection (DEP) gives notice of its intent to revise the following regulations under

More information

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building... Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3

More information

Port of Manzanillo. Port of Manzanillo: Climate Risks and Opportunities. IAIA Symposium: Sustainable Mega- Infrastructure and Impact Assessment

Port of Manzanillo. Port of Manzanillo: Climate Risks and Opportunities. IAIA Symposium: Sustainable Mega- Infrastructure and Impact Assessment Port of Manzanillo Port of Manzanillo: Climate Risks and Opportunities IAIA Symposium: Sustainable Mega- Infrastructure and Impact Assessment Panama City, December 3, 2015 Vladimir Stenek, IFC, World Bank

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

(1) Site Suitability PURPOSE

(1) Site Suitability PURPOSE 3.3 Code for Development and Use of Rural Service Industries PURPOSE This purpose of this code is to encourage the development and use of suitable rural service industries on rural, industrial or suitable

More information

Notification of Department of Industrial Works

Notification of Department of Industrial Works tification of Department of Industrial Works Subject: Type or category of factory required to prepare a report of type and quantity of pollutants discharged from a factory B.E. 2553 (2010) It is deemed

More information

TEKS Lesson 7.8C: Effects of Human Activity on Surface Water and Groundwater

TEKS Lesson 7.8C: Effects of Human Activity on Surface Water and Groundwater Class ----- Date -------- TEKS Lesson 7.SC TEKS 7.8e Model the effects of human activity on groundwater surface water in a watershed. and TEKS Lesson 7.8C: Effects of Human Activity on Surface Water and

More information

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS Sec. 26.001. DEFINITIONS. As used in this chapter: (1)

More information

Project Review Application Form

Project Review Application Form Project Review Application Form Information supplied in this application may be made public during consultation with adjacent municipalities, First Nations groups and other interested parties, as well

More information

Activity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes

Activity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes MINISTRY OF ENVIRONMENT AND NDU ENVIRONMENTAL GUIDELINE No. 31 Asphalt Plant Set Up Temporarily For The Purposes Of A Project By A Public Department 1.0 Purpose of guideline This environmental guideline

More information

The Cycling of Matter

The Cycling of Matter Section 2 Objectives Describe the short-term and long-term process of the carbon cycle. Identify one way that humans are affecting the carbon cycle. List the three stages of the nitrogen cycle. Describe

More information

E671 vol. 5. Lesson 11. Environmental Impact of Small-Scale Infrastructure Projects. November L&-~~A>f. Technical Support Staff Basic Training

E671 vol. 5. Lesson 11. Environmental Impact of Small-Scale Infrastructure Projects. November L&-~~A>f. Technical Support Staff Basic Training Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized -4L&-~~A>f Technical Support Staff Basic Training Training Documents (English Translations)

More information

LESSON 3 OTHER LAND RESOURCES C H A P T E R 6, C O N S E R V I N G O U R R E S O U R C E S

LESSON 3 OTHER LAND RESOURCES C H A P T E R 6, C O N S E R V I N G O U R R E S O U R C E S LESSON 3 OTHER LAND RESOURCES C H A P T E R 6, C O N S E R V I N G O U R R E S O U R C E S OBJECTIVES Compare renewable and nonrenewable resources. Describe how human activities affect the environment.

More information

Environmental Assessment Matrix

Environmental Assessment Matrix For FCC Use Only Date: Customer Name: Environmental Assessment Matrix Loan Number: Please complete each question. Some answers may require additional information. Attach additional documentation where

More information

Estuary Adventures. Background. Objective

Estuary Adventures. Background. Objective Estuary Adventures Objective Students will work in groups to understand the concept of estuaries, their importance, and the role that density plays in the mixing of fresh and salt water. Students will

More information

WATER RECYCLING PLANT IN WAFRA. Feras Al Salem

WATER RECYCLING PLANT IN WAFRA. Feras Al Salem WATER RECYCLING PLANT IN WAFRA Feras Al Salem Introduction 2 The Joint Operations (JO) was born in 1960 when the two oil companies formed a joint committee to oversee and supervise their operations with

More information

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and Introduction There are many tools that a reviewer of environmental impact assessment documents can use to help determine whether such documents are complete and adequate. Among the powerful tools that

More information

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... 4.17-1 4.17.0 Introduction... 4.17-1 4.17.1 Methodology... 4.17-2 4.17.2 Existing Conditions... 4.17-2 4.17.3 Impacts... 4.17-4 4.17.4 Applicant-Proposed

More information

Domestic grey water treatment and recovery to meet up the standards of characteristics of irrigation water

Domestic grey water treatment and recovery to meet up the standards of characteristics of irrigation water The Eighth Jordan International Chemical Engineering Conference (JIChEC 2017) November 7-9, 2017 Domestic grey water treatment and recovery to meet up the standards of characteristics of irrigation water

More information

Pollution of the Yangtze and Ganges Rivers & Air Pollution and Flooding in India and China

Pollution of the Yangtze and Ganges Rivers & Air Pollution and Flooding in India and China Pollution of the Yangtze and Ganges Rivers & Air Pollution and Flooding in India and China Pollution of the Yangtze and Ganges Rivers & Air Pollution and Flooding in India and China fdsafs The Ganges

More information

6 Risk assessment methodology

6 Risk assessment methodology Risk assessment methodology 6 Risk assessment methodology 6.1 Introduction INPEX has committed to a systematic risk assessment process as a means of achieving best practice in environmental management

More information

Environmental Management Plan (EMP)

Environmental Management Plan (EMP) SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit

More information

National Oceans Consultations Workshop on Sustainable Development Goal 14

National Oceans Consultations Workshop on Sustainable Development Goal 14 National Oceans Consultations Workshop on Sustainable Development Goal 14 Ravenala Attitude Hotel, Balaclava, Mauritius Environmental Issues Related To Port Activities Presentation By Mr. B.K Rughooputh

More information

Announcements. Contaminants in Puget Sound. Pollution principles. Contaminant Sources. End of next week: Sources, fates and effects

Announcements. Contaminants in Puget Sound. Pollution principles. Contaminant Sources. End of next week: Sources, fates and effects Announcements End of next week: Updated resume Cover letter Two-page report on one graduate school and one environmental consulting firm or environmental agency Meetings with research groups Today: Contaminants

More information