1 Blackstone Community Phase 4-8 Functional Servicing Report Project # Prepared for: Ontario Inc. Prepared by: Stantec Consulting Ltd.

2 Sign-off Sheet This document entitled Blackstone Community Phase 4-8 Functional Servicing Report was prepared by Stantec Consulting Ltd. ( Stantec ) for the account of Ontario Inc. (the Client ). Any reliance on this document by any third party is strictly prohibited. The material in it reflects Stantec s professional judgment in light of the scope, schedule and other limitations stated in the document and in the contract between Stantec and the Client. The opinions in the document are based on conditions and information existing at the time the document was published and do not take into account any subsequent changes. In preparing the document, Stantec did not verify information supplied to it by others. Any use which a third party makes of this document is the responsibility of such third party. Such third party agrees that Stantec shall not be responsible for costs or damages of any kind, if any, suffered by it or any other third party as a result of decisions made or actions taken based on this document. Prepared by Dustin Thiffault, P.Eng. (signature) Reviewed by Amanda Lynch, P.Eng. (signature)

3 Table of Contents 1.0 INTRODUCTION OBJECTIVE BACKGROUND POTABLE WATER ANALYSIS BACKGROUND PROPOSED WATERMAIN SIZING AND LAYOUT Ground Elevations Water Demand Connection to Existing Infrastructure HYDRAULIC ASSESSMENT Allowable Pressures Fire Flow POTABLE WATER SUMMARY WASTEWATER SERVICING BACKGROUND DESIGN CRITERIA PROPOSED SERVICING STORMWATER MANAGEMENT EXISTING CONDITIONS STORMWATER MANAGEMENT DESIGN Proposed Conditions Design Methodology DEVIATIONS FROM PREVIOUS STUDIES OVERLAND FLOW POST-DEVELOPMENT INFILTRATION GRADING UTILITIES HYDRO ENBRIDGE GAS TELECOMMUNICATIONS APPROVALS EROSION CONTROL GEOTECHNICAL INVESTIGATION CONCLUSIONS AND RECOMMENDATIONS

4 11.1 POTABLE WATER ANALYSIS WASTEWATER SERVICING STORMWATER MANAGEMENT GRADING UTILITIES LIST OF TABLES Table 1: Residential Water Demands Table 2: Institutional Water Demands Table 3: Contributions to Rouncey Road Sanitary Sewer Table 4: Wastewater Connections to Downstream Infrastructure Table 5: Contributions to SWM Ponds 6 and LIST OF FIGURES Figure 1: Approximate Location of Blackstone Phase 4-8 Draft Plan Area LIST OF APPENDICES : HYDRAULIC ANALYSIS EXCERPTS... A.1 : SANITARY SEWER CALCULATIONS... B.2 : STORM SEWER CALCULATIONS... C.3 : GEOTECHNICAL INVESTIGATION... D.4 : DRAWINGS... E.5

5 Introduction 1.0 INTRODUCTION Ontario Inc. (Mattamy (Monarch) Ltd.) has commissioned Stantec Consulting Ltd. to prepare the following Functional Servicing Report for phases 4-8 of the Blackstone Community. The subject property is located northwest of the intersection of Fernbank Road and Terry Fox Drive within the Fernbank Community. The property is currently zoned Development Reserve (DR) with the exception of the proposed school block currently zoned I1A/R3Z, and is bordered by Fernbank Road to the south, Phase 4 of the Fernbank Crossing subdivision (currently under approvals) to the west, Fernbank MSS Ponds 6 and 8 as well as the Monahan Drain to the north, and existing commercial developments to the west. The property is indicated in Figure 1. The proposed residential development comprises approximately 55.1ha of land, and contains a mixture of townhomes, single family units, a secondary and elementary school block, residential condominium blocks, as well as a 1.1ha park. Figure 1: Approximate Location of Blackstone Phase 4-8 Draft Plan Area td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 1.1

6 Introduction 1.1 OBJECTIVE The intent of this report is to build on the servicing principles outlined in the Fernbank Master Servicing Study (MSS) and updated based on existing infrastructure placed as a part of development of adjacent sites to create a servicing strategy specific to the subject property. The report will establish criteria for future detailed design of the subdivision, in accordance with the associated background studies, City of Ottawa Guidelines, and all other relevant regulations. td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 1.2

7 Background 2.0 BACKGROUND The following documents were referenced in the preparation of this report: Fernbank Community Design Plan Master Servicing Study (MSS), Novatech Engineering Consultants Ltd., June West Park Pond 6 Stormwater Management Report and Design Brief, IBI Group, March Fernbank Community Ultimate Pond 8 Stormwater Management Facility Design Report, Stantec Consulting Ltd., April Geotechnical Investigation Proposed Residential Development Blackstone Community, Terry Fox Drive Ottawa, Paterson Group Inc., February Servicing Report, Monarch Corporation / Cardel Homes, Blackstone Community Phase 2-3, Stantec Consulting Ltd., October Letter Addendum to Blackstone Phase 2-3, Stantec Consulting Ltd., June Proposed Commercial Development, Terry Fox Drive at Fernbank Road, Serviceability Study, Stantec Consulting Ltd., September Proposed Commercial Development, Terry Fox Drive at Fernbank Road, Stormwater Management Report, Stantec Consulting Ltd., September Servicing Addendum 1180 Terry Fox Drive, Stantec Consulting Ltd., September City of Ottawa Sewer Design Guidelines, 2nd Ed., City of Ottawa, October 2012 City of Ottawa Design Guidelines Water Distribution, Infrastructure Services Department, City of Ottawa, First Edition, July 2010 td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 2.3

8 Potable Water Analysis 3.0 POTABLE WATER ANALYSIS 3.1 BACKGROUND The proposed development is located within Zone 3W of the City of Ottawa s water distribution system. This zone is fed by the Glen Cairn Pump Station. The Fernbank Community Design Plan (CDP) was issued with the Fernbank Master Servicing Study. Proposed watermain sizing for the larger watermains has not changed from that of the CDP, with watermain alignment changing only slightly to reflect the changes in road and lotting alignments. A 300mm diameter watermain exists along Cope Drive immediately east of the Blackstone Community development area, a 300mm diameter main also exists within Rouncey Road to the north and crossing below the Monahan Drain, and a 300mm watermain connection is proposed through the adjacent Fernbank Crossing subdivision to the west. 400mm watermains exist further east along Terry Fox Drive. No watermains currently exist along the adjacent portion of Fernbank Road. 3.2 PROPOSED WATERMAIN SIZING AND LAYOUT The proposed watermain alignment and sizing for this development is shown on Drawing WTR-1 with 203mm diameter and 305mm diameter piping. It should be noted that the pipe layout and sizing for the development is preliminary, and is to be verified upon detailed hydraulic analysis for the development area Ground Elevations The proposed ground elevations of the development range from approximately 97.25m to m. Preliminary grading and elevations have been determined for the site and included on Drawing GP Water Demand The current draft plan for the Blackstone Phase 4-8 Development calls for a total of 423 single units, 284 townhouse units, 92 back-to-back townhouse units, condominium blocks consisting of approximately 224 units, and an estimated total population of 2,932 persons. An additional 9.35ha of institutional development is expected to contribute to overall demands from the proposed watermains within the development. Water demands for the development were estimated using the City of Ottawa s Water Distribution Design Guidelines. For residential developments, the average day (AVDY) per capita td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 3.1

9 Potable Water Analysis water demand is 350 L/cap/d. For maximum day (MXDY) demand, AVDY was multiplied by a factor of 2.5 and for peak hour (PKHR) demand, MXDY was multiplied by a factor of 2.2. For institutional use, the AVDY is based on the area of land use and is shown in the following tables. For MXDY demand, AVDY was multiplied by a factor of 1.5 and for PKHR demand, MXDY was multiplied by a factor of 1.8. The calculated residential water consumption and institutional water consumption is represented in Table 1 and Table 2 for the Blackstone Phase 4-8 development: Table 1: Residential Water Demands Unit Type Units Person/Unit Population AVDY (L/s) MXDY (L/s) PKHR (L/s) Singles Townhomes Back-to-back Condo Block Condo Block Total Table 2: Institutional Water Demands Area (ha) Demand (L/day) AVDY (L/s) MXDY (L/s) PKHR (L/s) High School Elem. School Connection to Existing Infrastructure Potable water supply will be connected to the existing watermains located on Rouncey Road, Cope Drive, and Defence Street. Drawing WTR-1 shows the location of the connection points to the existing watermains. It is anticipated that the development will be phased from east to west and north to south. A minimum of two connections to the surrounding 300mm watermains will be provided as development proceeds to the west and south, with no more than 49 units serviced on a temporary basis via single feed per City guidelines. 3.3 HYDRAULIC ASSESSMENT A hydraulic model was built for the Fernbank MSS analysis in The model assumed two proposed 300mm mains bisecting the Blackstone development, along with existing 400mm and 300mm mains within Terry Fox Drive and Cope Drive. The majority of internal watermains to the Blackstone development were considered as being of 200mm in diameter. As boundary td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 3.2

10 Potable Water Analysis conditions for the area were not available at the time of preparation of this report, anticipated pressures in this development are based on the MSS analysis to meet basic day and peak hour demands. A fire flow analysis was also performed under maximum day conditions (see Appendix A for MSS model results) Allowable Pressures The City of Ottawa Water Distribution Design Guidelines state that the desired range of system pressures under normal demand conditions (i.e. basic day, maximum day, and peak hour) should be in the range of 350 to 552 kpa (50 to 80 psi) and no less than 275kPa (40 psi) at the ground elevation in the streets (i.e. at hydrant level). The maximum pressure at any point in the distribution system is to be no higher than 552kPa (80 psi). As per the Ontario Building Code & Guide for Plumbing, if pressures greater than 552kPa (80 psi) are anticipated, pressure relief measures are required. Under emergency fire flow conditions, the minimum pressure in the distribution system is allowed to drop to 138kPa (20 psi) Fire Flow A maximum fire flow of 19,000 L/min for proposed back-to-back townhomes was assessed based on Fire Underwriters Survey (FUS) requirements, and considered a worst case scenario of wood frame construction, a 600m2 floor plate area, and minimal exposure distances to adjacent structures. Upon receipt of boundary conditions, a fire flow analysis for the proposed system will be performed to verify that such a flow may be provided at nodes adjacent to back-to-back townhomes. Should the 19,000 L/min rate not be achievable, internal fire separations will be proposed to limit FUS fire flow requirements to available levels. It should be noted that as per the City s most recent technical bulletin in regards to fire flow (ISDTB ) for traditional side-by-side towns and row houses constructed in accordance with the OBC, the fire flow requirement shall be capped at 10,000 L/min. As such, nodes that are able to meet the 10,000 L/min fire flow are expected to perform adequately for the proposed development. Required fire flows for residential development blocks were assumed at 10,000 L/min. A final Fire flow assessment will be required at the subdivision approval phase in which local watermains are checked for their ability to provide the objective FUS fire flows, which in turn will be determined based on final unit layouts. Smaller, local internal watermains will need to be assessed and verified as development planning proceeds. td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 3.3

11 Potable Water Analysis 3.4 POTABLE WATER SUMMARY The proposed piping alignment and sizing is capable of achieving the level of service in the subdivision based on the hydraulic analysis created at the Master Servicing level: The proposed water distribution system is recommended to include a combination of 305mm and 203mm diameter pipes; During peak hour conditions, the proposed system is capable of operating above the minimum pressure objective of 276kPa (40psi); During fire conditions, the proposed system is capable of providing sufficient fire flows (10,000L/min and above) while maintaining a residual pressure of 138kPa (20 psi) in the majority of the Blackstone Phase 4-8 development. Sizing of internal mains on local streets will be coordinated to ensure a minimum fire flow of 10,000 L/min may be achieved. td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 3.4

12 Wastewater Servicing 4.0 WASTEWATER SERVICING 4.1 BACKGROUND As indicated in the Fernbank Master Servicing Study, wastewater servicing for the Blackstone Phase 4-8 Development is conveyed to the Hazeldean Pump Station via two free flow gravity trunks; one running east along the existing Cope Drive, and one running north along Rouncey Road through Phases 1-3 of the Blackstone Development, and to the 1200mm diameter collector sewer within the Trans Canada Trail. The MSS outlines the sanitary servicing requirements for the subject property, and identifies a 250mm trunk sewer through the Blackstone Phase 4-8 Development to service portions of the Fernbank Crossing Development lands to the west. Drainage areas for this link have been modified since the Fernbank MSS was issued, diverting much of the lands within the Fernbank Crossing Development north to a secondary connection to the Rouncey Road sewer (majority of the areas noted as A19, A20 in the MSS) to suit construction timelines. The Sanitary Drainage Plans for the MSS and Fernbank Crossing are included in Appendix B. The current Sanitary Drainage Area Plan for Fernbank Crossing Phase 4 (Novatech, 2017) identifies a future population of and a residential area of 8.28ha forming external drainage west of the proposed Blackstone Community Phase 4-8 that will be conveyed through the development north to the Rouncey Road sanitary sewer connection point. 4.2 DESIGN CRITERIA As outlined in the City s Sewer Design Guidelines, the following design parameters were used to calculate estimated wastewater flow rates and to preliminarily size on-site sanitary sewers: Minimum Full Flow Velocity 0.6 m/s Maximum Full Flow Velocity 3.0 m/s Manning s roughness coefficient for all smooth walled pipes Single Family Persons per unit 3.4 Townhouse Persons per unit 2.7 Extraneous Flow Allowance 0.28 L/s/ha Residential Average Flows 350 L/cap/day Institutional Flows 28,000 L/ha/day Manhole Spacing 120 m Minimum Cover 2.5m In addition, a residential peak factor based on Harmon s Equation was used to determine the peak design flows. Institutional were assigned a peaking factor of 1.5 per Ottawa s Sewer Design Guidelines. For the purposes of this report, a conservative assumption for design flows from the future development blocks located within the Blackstone Phase 4-8 area has been applied to ensure td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 4.5

13 Wastewater Servicing sufficient sizing of downstream infrastructure. In conjunction with estimated flows generated from existing developments within Blackstone, West Park, and Fernbank Crossing subdivisions, external sewers/areas through the overall Blackstone Development were assessed to ensure appropriate sizing of the Rouncey Road sewer (see drainage areas on Drawing SAN-1 and background documents in Appendix B). Table 3: Contributions to Rouncey Road Sanitary Sewer Subdivision Total Area (ha) Residential Area (ha) Blackstone Phase 4-8 (Includes Fernbank Crossing Phase 4) Institutional Area (ha) Blackstone Phase West Park Phase Fernbank Crossing Phase Total Population 4.3 PROPOSED SERVICING The Blackstone Phase 4-8 will be serviced by a network of gravity sewers which will direct wastewater flows north and east to the trunk sewers within Rouncey Road and Cope Drive. Flows from external lands to the west will also be conveyed through the subject property as directed in the MSS. The proposed sanitary sewer design sheet and associated Sanitary Drainage Area Plan can be found in Appendix B & Appendix E respectively. The connection points and associated flows are summarized in Table 4 below, and have been coordinated with the latest available plans for existing downstream sewers. Previously allocated flows for the available connection points are noted in the table below. The allotted flow from MH1000 is based on the Servicing Brief for Blackstone Phases 1-3, whereas allotted flow to MH2000 is based on the MSS assumed inflow from Node 04 to the Cope sewer stub less commercial inflows from adjacent sites. Based on the estimated peak flows from the development, proposed modifications to sanitary sewer layout will not have negative impact on downstream infrastructure. Table 4: Wastewater Connections to Downstream Infrastructure MH ID Total Area (ha) Residential Area (ha) Institutional Area (ha) Population Total Flow (L/s) Alotted Flow (L/s) Total Sewer Dia. (mm) td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 4.6

14 Stormwater Management 5.0 STORMWATER MANAGEMENT 5.1 EXISTING CONDITIONS The proposed development site measures approximately 55 ha in area and is currently undeveloped. The topography across the site is relatively flat and has a gradual downward slope to the northeast. The site is bound by the Monahan Drain to the north, Fernbank Road to the south, existing commercial development to the west and further residential areas to the east. The neighboring lands to the west are currently under design/construction. Existing grades are provided on the conceptual grading plan (Drawing GP-1). In the past, runoff from the eastern half of the proposed draft plan area sheet drained towards Terry Fox Drive, and ultimately to the Monahan Drain. Currently, overland flows from the development are currently captured via temporary engineered channel immediately west of the existing commercial development area and are conveyed to the Monahan Drain. Fernbank Pond 6 receives flows from development areas further west of the proposed lands, and discharge to a realigned Monahan Drain segment running eastwards along the development s northern property line where it intercepts outflows from interim Pond 8 and crosses Terry Fox Drive further east. 5.2 STORMWATER MANAGEMENT DESIGN Proposed Conditions The proposed residential development contains a mixture of townhome and single family units, two school blocks and a centrally located park. The Fernbank stormwater management Pond 6 is located to the northwest of the property, and Pond 8 is located to the northeast. Site sewers for areas west of Rouncey Road and south of Cope drive are to be directed to Pond 6, whereas the remaining minor system areas and overland flow for the entirety of the site are to outlet to the ultimate Pond 8, with drainage areas roughly divided to utilize existing trunk sewer stubs previously installed for the proposed development. Inlet control devices and road sag storage points will be used to restrict inflow rates to the sewer and to provide attenuating surface storage as described in the design briefs for the Pond 6 and Pond 8 tributary areas Design Methodology The design methodology for the SWM component of the development is as follows: General Use of the dual drainage principle (City of Ottawa). Wherever feasible and practical, site-level measures should be used to reduce and control the volume and rate of runoff (City of Ottawa). Assess impact of 2-year storm (using 24hr SCS design event), 5-year storm, and the worst case 100-year storm events in addition to the 100-year events outlined in the City of Ottawa Sewer td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 5.7

15 Stormwater Management Design Guidelines, and climate change scenarios with a 20% increase of rainfall intensity, on the major & minor drainage system (City of Ottawa). Storm Sewer & Inlet Controls Size storm sewers to convey at minimum the 2-year storm event under free-flow conditions using 2012 City of Ottawa I-D-F parameters. Storm sewers servicing collector streets to convey the 5-year storm event. (City of Ottawa.) Restrict inflows to the sewer to the 2-year rate (5-year for collector streets) or as required. Institutional blocks within the development area are to retain additional runoff up to 50m 3 /ha in their respective areas as per Pond 8 recommendations (see Appendix C). Analysis to be conducted using the 100 year 24hour SCS distribution and 3-hour Chicago events (City of Ottawa). 100-year Storm HGL to be a minimum of 0.30 m below building foundation footing (City of Ottawa). Maximum climate change HGL to be lower than proposed basement elevations (City of Ottawa Sewer Design Guidelines (2012)). Surface Storage & Overland Flow No rear-yard ponding volumes to be accounted for in SWM model preparation (City of Ottawa). The product of depth times velocity on streets not to be greater than 0.6 during the 100-year storm (City of Ottawa). Building openings to be above the 100-year water level (City of Ottawa). Total maximum depth of flow under static and dynamic conditions shall be less than 0.35m (City of Ottawa). Major and minor flow to be conveyed to SWM ponds 6 and 8 for quality (80% TSS Removal) and quantity control (Fernbank MSS). Surface storage of 50m 3 /ha in residential areas and 100m 3 /ha in institutional areas to be provided (Pond 8 Design Report). Provide adequate emergency overflow conveyance off-site (City of Ottawa). The site is to be designed using the dual drainage principle, whereby the minor (pipe) system is designed to convey the peak rate of runoff from at minimum the 2-year design storm and runoff from larger events is conveyed by both minor (pipe) and major (overland) channels, such as roadways and walkways, safely off site without impacting proposed or existing downstream properties. In keeping with the inlet restriction criterion (2-year for local sewers, 5-year for collector streets, 10-year for arterial roads), inlet control devices (ICDs) or orifice plates will be specified during the detailed design stage for all street and rear yard catchbasins to limit the inflow to the minor system. Restricted inlet rates to the sewer are necessary to prevent the hydraulic grade line from surcharging storm sewers into basements during major storms. Drawing STM-1 outlines the proposed storm sewer alignment and drainage divides. The major system flows generated from larger events will be safely conveyed to Cope Drive, Street 3, and td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 5.8

16 Stormwater Management ultimately SWM Pond 8 by engineered (overland) channels such as roadways and walkways. Further details of overland flow routes to SWM pond 8 can be found in the Stormwater Management Facility Design Report for Pond 8 (Stantec, 2014). Per the requirements noted in the PCSWMM model prepared as part of the Pond 8 Design Report, it is intended to convey major system flows to Pond 8 providing 50m 3 /ha of surface storage in residential areas and 100 m 3 /ha of surface storage in institutional areas, and to ensure a maximum depth of flow of 0.35m (including static storage depths) as necessary to meet current City of Ottawa SWM criteria. The minor system from the proposed subdivision will be conveyed and modeled up to the point of discharge to Ponds 6 and 8 from the existing storm trunk sewers within Cope Drive (see Drawing STM-1 for locations). Pond 6 has been designed and sized to permit servicing of the proposed development area per IBI s West Park Pond 6 Stormwater Management Report and Design Brief (see Appendix C). Per the report, Pond 6 infrastructure is sufficient to service the development up to a total contributing area of 24.62ha at 56% imperviousness. Given capture of the full 5-year storm event and preliminary drainage areas and runoff coefficients as noted on Drawing STM-1, Pond 6 design criteria can be achieved for the development. Runoff coefficients for the proposed subdivision were estimated as follows, and are to be reassessed as part of detailed design: Singles/Townhomes 0.59 (average of 0.68 and 0.50 for front and rear yard runoff coefficients) Condominium blocks and back-to-back townhomes 0.70 Institutional areas 0.70 Parks 0.40 The general grading of the site will not likely permit additional major system (road sag) storage above the required 50m 3 /ha noted in the Pond 8 report before the 0.35m maximum flow depth is exceeded. As such, the design sheets included as part of Appendix C have been created to permit full capture of the 5-year design event rather than the minimum 2-year per City of Ottawa design criteria. Major system design will be reassessed at the detailed design stage, with the possibility of reducing required storm trunk sewer sizing should additional major system storage be available. A full dual-drainage dynamic model will be prepared as part of detailed design of the subdivision to assess hydraulic gradelines and their freeboard from proposed underside of footing elevations, as well as surface water depths along major system corridors through the subdivision. 5.3 DEVIATIONS FROM PREVIOUS STUDIES Based on the West Park Pond 6 Stormwater Management Report and Design Brief as prepared by IBI Group, a tributary area of 24.62ha at 56% imperviousness (equates to a runoff coefficient C=0.592, and 5-year AxC of ) has been allotted for the Blackstone Phase 4-8 Development (see Post-Development Drainage Area Plan Figure 2 in Appendix C for details). The storm sewer td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 5.9

17 Stormwater Management design sheet within the Fernbank Community Ultimate Pond 8 Stormwater Management Facility Design Report indicates a contributing area of 31.34ha and accumulated 5-year AxC of (not including pond block). Table 5 demonstrates the proposed tributary areas to Pond 6 and 8 for the current draft plan, and demonstrates adherence to target outflow volume criteria. Reduction in proposed Pond 8 tributary area is due to removal of the interim area INT_EXT as noted in the pond 8 report as the construction of Pond 6 has preceded that of the ultimate Pond 8, and will not be required to be serviced to Pond 8 in the interim. Table 5: Contributions to SWM Ponds 6 and 8 Tributary Area Total Area (ha) A x C Allowable A x C Net Change Pond Pond Total Based on the above, peak minor system flow rates to SWM Ponds 6 and 8 are expected to be similar to that assumed during design of the ultimate ponds. As no significant increases in overall runoff volume are anticipated to either pond, overall operating characteristics of the ponds are anticipated to be unaffected. 5.4 OVERLAND FLOW The subject site in its majority maintains overland flow routes to the ultimate SWM Pond 8 via the proposed Cope Drive and Street #3 as depicted in Drawing STM-1. The PCSWMM model for Pond 8 identifies a peak major system flow of approximately 785L/s during the 100 year 3 hour Chicago event for the subdivision along proposed Street 3. A calculation sheet has been prepared based on design examples for gutter flows per Chapter 4 of the MTO Drainage Management Manual, and included as part of Appendix C. The calculation sheet demonstrates that a 0.21m flow depth over crests in Street 3 will be required along with a high-point to highpoint overland slope of 0.35% to ensure proper conveyance of the 785L/s through Street 3 s 18m ROW. Road sags in this region will be limited to 0.14m to ensure overall flow depths do not exceed the required 0.35m maximum, and will be reassessed during detailed design. Drawing GP-1 presents the conceptual grading plan for the site, along with proposed overland flow routes. 5.5 POST-DEVELOPMENT INFILTRATION As stated in the Pond 8 Design Report, development of the Blackstone Phases 4-8 subdivision will require lot level infiltration measures such as infiltration trenches, bio-swales, topsoil amendment, or a combination thereof to provide a target infiltration rate of 95mm/year. Details of the measures to be implemented will form part of the detailed subdivision design. td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 5.10

18 Grading 6.0 GRADING The Blackstone Phase 4-8 lands drain predominantly from west to east. Existing drainage for the development is provided by an overland engineered channel that runs from south to north along the eastern property line of the development to the interim Fernbank MSS pond 8. The Master Servicing Study report provided preliminary grading for the Blackstone development which has been included for reference in Appendix E. For the purposes of this report a conceptual grading plan has also been prepared which takes into account anticipated overland flow conveyance, cover over proposed sewers, and grade raise restrictions as identified in the geotechnical investigation (see Section 10.0), as well as existing connection points on Rouncey Road, Defence Street, Fernbank Road, and Cope Drive. The conceptual grading plan has been provided for reference in Appendix E. A detailed grading design will be developed at the time of final design. Detailed grading will adhere to all requirements as outlined in the City of Ottawa guidelines. td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 6.11

19 Utilities 7.0 UTILITIES 7.1 HYDRO Accessible Hydro infrastructure exists at the eastern boundary of the site via existing plant within Cope Drive, and along existing 4-party trenches within the Rouncey Road right-of-way, in addition to the existing hydro transmission corridor further north of the property. Overhead transmission lines also exist along Fernbank Road to the south of the development. Exact size, location and routing of hydro utilities will be finalized after design circulation. Transformer locations and positioning of required utility easements will be identified at the detailed design stage. Upgrades to the existing hydro infrastructure along Fernbank Road are anticipated due to the relatively low existing demand on plant in the area. 7.2 ENBRIDGE GAS Similarly to Hydro, existing gas infrastructure exists at the boundaries of the subject site. Exact size, location and routing of gas infrastructure will be finalized after design circulation. 7.3 TELECOMMUNICATIONS Both Bell and Rogers are expected to be able to service the subdivision. Infrastructure locations and easement requirements will be identified as part of the Composite Utility Planning process, following design circulation. td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 7.12

20 Approvals 8.0 APPROVALS Ontario Ministry of Environment and Climate Change (MOECC) Environmental Compliance Approvals (ECAs, formerly Certificates of Approval (CofA)) under the Ontario Water Resources Act will be required for proposed on-site storm and sanitary sewers and inlet control devices (Transfer of review) for the proposed development. The ultimate Pond 8 design will also require an ECA under the newly expanded MOECC transfer of review program. The Rideau Valley Conservation Authority should be circulated on such submissions so that CA sign-off may be given and submission of the ECAs may proceed. Design & construction of the urbanized Fernbank Road segments including intersection improvements at the extension of Rouncey Road and Fernbank are expected to be phased along with development of the subdivision at large, and will be subject to RMA processes. A MOE Permit to Take Water (PTTW) may be required for the site as some of the proposed works may be below the groundwater elevation shown in the geotechnical report. The geotechnical consultant shall determine whether a PTTW is required at the detailed design stage / prior to construction. td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 8.13

21 Erosion Control 9.0 EROSION CONTROL Erosion and sediment controls must be in place during construction. The following recommendations to the contractor will be included in contract documents. 1. Implement best management practices to provide appropriate protection of the existing and proposed drainage system and the receiving water course(s). 2. Limit extent of exposed soils at any given time. 3. Re-vegetate exposed areas as soon as possible. 4. Minimize the area to be cleared and grubbed. 5. Protect exposed slopes with plastic or synthetic mulches. 6. Provide sediment traps and basins during dewatering. 7. Install sediment traps (such as SiltSack by Terrafix) between catch basins and frames. 8. Plan construction at proper time to avoid flooding. The contractor will, at every rainfall, complete inspections and guarantee proper performance. The inspection is to include: 9. Verification that water is not flowing under silt barriers. 10. Clean and change silt traps at catch basins. A network of cutoff swales and a temporary sediment control basin is to installed to provide appropriate erosion and sediment control during earthworks operations. It is proposed to maintain the current erosion control scheme, and migrate the sediment basin and cutoff swales westwards along with construction phasing for the development. Refer to Erosion and Sediment Control Drawing EC-1 included in Appendix E for the proposed location of silt fences, cutoff swales, temporary sediment basins and other erosion control structures. td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 9.14

22 Geotechnical Investigation 10.0 GEOTECHNICAL INVESTIGATION A geotechnical investigation for the development was completed by Paterson Group Inc. in February of The report summarizes the existing soil conditions within the subject area and construction recommendations. For details which are not summarized below, please see the original Paterson report included in Appendix D. Subsurface soil conditions within the subject area were determined through field investigations between December 2006 and March In total, 65 boreholes were drilled and 8 test pits excavated throughout the subject lands. In general soil stratigraphy consisted of topsoil and/or a thin silty sand and clayey silt layer followed by a sensitive silty clay deposit. Bedrock was assumed at depths ranging from 10m to 30m below ground surface. The thickness of the existing topsoil ranged from 0 to 510mm. Groundwater levels were encountered between 0m and 6.8m in depth. It is expected that construction will occur below the existing groundwater table and therefore a permit to take water is required. A permit to take water for the overall Blackstone development was obtained in May 2013, and will expire on August 31, Based on the observed soil conditions, a grade raise restriction of between 0.8m and 2.0m above existing grade was recommended. The conceptual grading plan (Drawing GP-1) demonstrates adherence to the permissible grade raise recommendations, and will be reassessed at time of detailed design. td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 10.15

23 Conclusions And Recommendations 11.0 CONCLUSIONS AND RECOMMENDATIONS Based on the preceding information, the following conclusions are summarized below: 11.1 POTABLE WATER ANALYSIS During peak hour conditions, the proposed system is expected to operate above the minimum pressure objective of 276kPa (40psi); The proposed system is capable of providing sufficient fire flow while maintaining a residual pressure of 138kPa (20 psi) in all areas based on hydraulic analysis done at the master servicing level. A final hydraulic analysis is to be completed at time of detailed design; Two 300mm diameter mains are anticipated for the proposed development along future extensions of Cope Drive and Rouncey Road. The remainder of internal watermains are assumed to be 200mm in diameter WASTEWATER SERVICING The Blackstone Phase 4-8 subdivision will be serviced by a network of gravity sewers which will direct wastewater flows north and east through the Rouncey Road and Cope Drive sewers, and ultimately to Hazeldean Pumping Station. External lands to the west will also be conveyed through the subject property as directed in the MSS and revised during design of the Fernbank Crossing development. The proposed sanitary sewer design indicates 2 connection points to the existing downstream Rouncey and Cope sewers, with total estimated peak outflows of 54.4L/s and 19.4L/s respectively. The proposed drainage area to the Rouncey Road sewer has been optimized to utilize remaining residual capacity of the sewer STORMWATER MANAGEMENT The proposed stormwater management plan is in compliance with the goals specified in the background reports and the 2012 City of Ottawa Sewer Guidelines and 2016 Technical Bulletin. Inlet control devices will be proposed to limit inflow from the site area into the minor system to the 5-year storm event based on City of Ottawa IDF curves. The storm sewer hydraulic grade line will be maintained at least 0.30 m below the underside of footing in the subdivision during design storm events up to the 100-year storm. All dynamic surface water depths are to be less than 0.35 m during all storm events up to the 100-year storm. Quality treatment of runoff and quantity control for the development will be provided by the existing downstream SWM pond 6 and proposed ultimate pond 8 adjacent to the Blackstone Development area. The proposed site design will maintain an emergency overland flow route to Pond 8 via Cope Drive and pathway to the pond via Street 3. Future institutional developments within the Blackstone Community will be required to provide on-site storage to 100m 3 /ha within their respective areas while restricting minor system inflows to the 5-year design event as appropriate. td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 11.16

24 Conclusions And Recommendations 11.4 GRADING A conceptual grading plan has been prepared taking into account required overland flow conveyance, cover over sewers, hydraulic grade line requirements, and grade raise restrictions as identified in the geotechnical investigation. A detailed grading design will be developed at the time of final design. Detailed grading will adhere to all requirements as outlined in the City of Ottawa guidelines UTILITIES Utility infrastructure exists in the general area of the subject site. Exact size, location and routing of utilities will be finalized at the detailed design stage. td w:\active\ _blackstone community phase 4 to 8\design\report\draft servicing\rpt_ _servicing.docx 11.17

Longfields Subdivision, Block 7, City of Ottawa

Longfields Subdivision, Block 7, City of Ottawa Longfields Subdivision, Block 7, City of Ottawa 160400850/160401231 Prepared for: Campanale Homes Prepared by: Stantec Consulting Ltd. Table of Contents 1.0 INTRODUCTION...1.1 2.0 BACKGROUND...2.2 3.0

More information

Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT

Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT Prepared by: Stantec Consulting Ltd. 1505 Laperriere Avenue Ottawa, ON K1Z 7T1 File: 160401004/83 January 17,

More information

Stormwater Management Report Bachman Terrace Residential Development

Stormwater Management Report Bachman Terrace Residential Development Stormwater Management Report Bachman Terrace Residential Development Project # 160401069 Prepared for: Tega Developments Prepared by: Stantec Consulting Ltd. April 14, 2014 Sign-off Sheet This document

More information

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY FOR CITY OF OTTAWA PROJECT NO.: 11-532 FOR TABLE OF CONTENTS 1.0 INTRODUCTION... 1 1.1 Existing Conditions... 2 1.2 Required Permits / Approvals...

More information

Half Moon Bay South Draft Plan #3

Half Moon Bay South Draft Plan #3 Half Moon Bay South Draft Plan #3 SERVICING REPORT Prepared for: Mattamy Homes Ltd. Prepared by: Stantec Consulting Ltd. Sign-off Sheet This document entitled Half Moon Bay South Draft Plan #3 was prepared

More information

Site Servicing and Stormwater Management Report Sélection Retraite - Orléans

Site Servicing and Stormwater Management Report Sélection Retraite - Orléans Site Servicing and Stormwater Management Report Sélection Retraite - Orléans Project # 160401451 November 22, 2018 Prepared for: Réseau Sélection Developpement Hors Quebec Inc. Prepared by: Stantec Consulting

More information

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1 Functional Servicing Report Winston Park West Proposed Business Park Development Project (IO) September 2011 14-11208-001-MU1 Winston Park West 2 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 3 1.1 SITE DESCRIPTION...

More information

10 LOUISA STREET - THORNBURY

10 LOUISA STREET - THORNBURY 10 LOUISA STREET - THORNBURY Town of The Blue Mountains Functional Servicing Report prepared by: C.C. Tatham & Associates Ltd. 115 Sandford Fleming Drive, Suite 200 Collingwood, ON L9Y 5A6 Tel: (705) 444-2565

More information

Site Servicing and Stormwater Management Report Orleans II Development Mer Bleue Road Phase 2

Site Servicing and Stormwater Management Report Orleans II Development Mer Bleue Road Phase 2 Site Servicing and Stormwater Management Report Orleans II Development - 2025 Mer Bleue Road Phase 2 Project # 160401242 Prepared for: SmartREIT (Orleans II) Inc. and Mer Bleue Shopping Centres Limited

More information

SITE SERVICING REPORT CHOICE PROPERTIES 1251 STITTSVILLE MAIN STREET

SITE SERVICING REPORT CHOICE PROPERTIES 1251 STITTSVILLE MAIN STREET 120 Iber Road, Suite 103 Ottawa, Ontario K2S 1E9 Tel. (613)836-0856 Fax (613) 836-7183 www.dsel.ca SITE SERVICING REPORT FOR CHOICE PROPERTIES 1251 STITTSVILLE MAIN STREET CITY OF OTTAWA PROJECT NO.: 17-959

More information

Servicing and Stormwater Management Brief 4450 Limebank Road Residential Development

Servicing and Stormwater Management Brief 4450 Limebank Road Residential Development Servicing and Stormwater Management Brief 4450 Limebank Road Residential Development Project # 160401232 Prepared for: Urbandale Corporation Prepared by: Stantec Consulting Ltd. Submission 3: Oct. 20,

More information

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario Site Servicing and Stormwater Management Report By Mohamad Salame, P.Eng. Kamco Technique Ltee. 60 Grand Avenue North Cambridge, Ontario N1S

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF 2200 Prince of Wales Drive Ottawa, Ontario Report No. 11068-SB February 3, 2012 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary

More information

WESTMINISTER WOODS EAST PHASE 10 (CLAIR/VICTORIA), GUELPH FUNCTIONAL SERVICING REPORT

WESTMINISTER WOODS EAST PHASE 10 (CLAIR/VICTORIA), GUELPH FUNCTIONAL SERVICING REPORT WESTMINISTER WOODS EAST PHASE 10 (CLAIR/VICTORIA), GUELPH FUNCTIONAL SERVICING REPORT Prepared for: West Minister Woods Ltd. R.R. #2 6783 Wellington Road #34 Cambridge ON N3C 2V4 Prepared by: Stantec Consulting

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF 406-408 Bank Street Ottawa, Ontario Report No. 10015-SB December 13, 2011 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 9 GRADING 9.1 GRADING REQUIREMENTS FOR VARIOUS SITUATIONS... 1 9.1.1 Subdivisions... 1 9.1.2 Site Plans... 1 9.1.3. Severances, Lifting of Part Lot Control & Infill Lots... 1 9.1.4 Blocks... 1 9.1.5 Capital

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 9 GRADING 9.1 GRADING REQUIREMENTS FOR VARIOUS SITUATIONS... 1 9.1.1 Subdivisions... 1 9.1.2 Site Plans... 1 9.1.3. Severances, Lifting of Part Lot Control & Infill Lots... 1 9.1.4 Blocks... 1 9.1.5 Capital

More information

To: Kevin Murphy From: Gregory Chochlinski David Schaeffer Engineering Ltd. 120 Iber Road, Unit 103 Stittsville, ON K2S 1E9

To: Kevin Murphy From: Gregory Chochlinski David Schaeffer Engineering Ltd. 120 Iber Road, Unit 103 Stittsville, ON K2S 1E9 Memo To: From: Gregory Chochlinski David Schaeffer Engineering Ltd. 120 Iber Road, Unit 103 Stittsville, ON K2S 1E9 Stantec Consulting Ltd. 400-1331 Clyde Avenue Ottawa, ON K2C 3G4 File: 163401487 Date:

More information

Site Servicing & Stormwater Management Report for Site Plan Control Application. Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario

Site Servicing & Stormwater Management Report for Site Plan Control Application. Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario Site Servicing & Stormwater Management Report for Site Plan Control Application Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario Prepared for: Martin Clement Attention: Mr. Martin

More information

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH JULY 2013 DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald,

More information

Yorkton Rona Commercial and Industrial development. Concept Plan and Serviceability Report

Yorkton Rona Commercial and Industrial development. Concept Plan and Serviceability Report Yorkton Rona Commercial and Industrial development Concept Plan and Serviceability Report Prepared for: 101242326 Sask Ltd. Box Ft Quappelle, SK Canada S0G 1S0 Prepared by: Stantec Consulting Ltd. 302-1345

More information

PRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc.

PRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc. PRELIMINARY MUNICIPAL SERVICING REPORT SUBDIVISION Prepared for: North Grassie Properties Inc. Prepared by: Stantec Consulting Ltd. 905 Waverley St. Winnipeg, MB R3T 5P4 July 2012 File: 116808030 SUBDIVISION

More information

JOHNSTON ROAD LAND USE STUDY

JOHNSTON ROAD LAND USE STUDY JOHNSTON ROAD LAND USE STUDY SERVICING FEASIBILITY STUDY Project No. 2814 Prepared for: City of Ottawa Planning Branch Infrastructure Approvals Branch Prepared by: David McManus Engineering Ltd. 400 30

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

EXECUTIVE SUMMARY DAVID SCHAEFFER ENGINEERING LTD. DSEL

EXECUTIVE SUMMARY DAVID SCHAEFFER ENGINEERING LTD. DSEL EXECUTIVE SUMMARY The Caivan Communities Village of Richmond Development consists of approximately 1,000 units comprised of approximately 60-70% single detached dwellings and 30-40% attached dwellings

More information

Dunpar Developments Inc.

Dunpar Developments Inc. Dunpar Developments Inc. Proposed Townhouse Development 2158, 2168, 2180 and 2192 Trafalgar Road Oakville, Ontario Functional Servicing and Stormwater Management Report (in Support of a Re-Zoning and Site

More information

STORMWATER DRAINAGE ASSESSMENT. 479 Line 1 Road, Niagara-on-the-Lake, Ontario

STORMWATER DRAINAGE ASSESSMENT. 479 Line 1 Road, Niagara-on-the-Lake, Ontario STORMWATER DRAINAGE ASSESSMENT 479 Line 1 Road, Niagara-on-the-Lake, Ontario November, 2015 1. Site Description Size: Location: Existing Land Use: Proposed Land Use: Soils: Stormwater Outlet: 1.38 hectares

More information

Stantec Consulting Ltd Hagey Boulevard, Waterloo ON N2L 0A4

Stantec Consulting Ltd Hagey Boulevard, Waterloo ON N2L 0A4 Stantec Consulting Ltd. 100-300 Hagey Boulevard, Waterloo ON N2L 0A4 November 17, 2017 File: 1614-13551/29 Attention: Ms. Nancy Shoemaker Black, Shoemaker, Robinson and Donaldson Ltd. Surveyors 351 Speedvale

More information

SITE SERVICING PRELIMINARY DESIGN BRIEF

SITE SERVICING PRELIMINARY DESIGN BRIEF 855 Carling Avenue Proposed Redevelopment SITE SERVICING PRELIMINARY DESIGN BRIEF March 2010 March 23, 2010 RVA 081785 Arnon Corporation 1801 Woodward Dr. Ottawa, ON K2C 0R3 Attention: Mike Casey Re: 855

More information

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN 441 324 326 DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT REPORT No. R 817 79A T. L. MAK ENGINEERING CONSULTANTS LTD.

More information

STORMWATER MANAGEMENT REPORT DRAFT PLAN OF CITY OF GUELPH

STORMWATER MANAGEMENT REPORT DRAFT PLAN OF CITY OF GUELPH Debrob Investments Limited STORMWATER MANAGEMENT REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH PRELIMINARY NOVEMBER 2, 2011 I B I G R O U P P R E L I M I N A R Y Debrob Investments Limited

More information

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN 441 324 326 DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT REPORT No. R 817 79A REV. 1 MAY 2018 T. L. MAK ENGINEERING

More information

TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST

TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST Instructions: This form must be included with an initial submittal of a Site Plan or Subdivision Application. Use the column to indicate if the SWPPP

More information

Marianneville Developments Ltd.

Marianneville Developments Ltd. Estates of Glenway Project No. L09-301 March 2012 Executive Summary Cole Engineering Group was retained by Marianneville Developments Limited to undertake a Functional Servicing Report in support of the

More information

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT 346 362 LAKESHORE ROAD WEST TOWN OF OAKVILLE PROJECT 2016-4442 JULY 2017 REVISED: APRIL 2017 C O N S U L T I N G E N G I N E E R S 64 Jardin

More information

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT Downtown Ottawa Transit Tunnel: Tunney s Pasture to Blair Station via a Downtown LRT Tunnel Prepared for: City of Ottawa 110 Laurier Avenue West Ottawa, ON

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF Mutchmor Public School Addition 185 Fifth Avenue Ottawa, Ontario Report No. 12073-SB February 15, 2013 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage

More information

STORM WATER REPORT. Proposed Row House Complex Clare and Hilson 566 Hilson Ave. & 148 Clare St. Ottawa, Ontario PREPARED FOR:

STORM WATER REPORT. Proposed Row House Complex Clare and Hilson 566 Hilson Ave. & 148 Clare St. Ottawa, Ontario PREPARED FOR: Civil Geotechnical Structural Environmental 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT Proposed Row House Complex Clare and

More information

STANLEY FARM SUBDIVISION

STANLEY FARM SUBDIVISION STANLEY FARM SUBDIVISION SERVICING OPTIONS AND STORMWATER MANAGEMENT REPORT BRIEF CITY OF OTTAWA PREPARED FOR: STANLEY FARM DEVELOPMENTS PREPARED BY: (November 2014 - Revision 0) LOT 9, CONCESSION 5 WATER

More information

Servicing Report 122 Daly Avenue

Servicing Report 122 Daly Avenue Servicing Report 122 Daly Avenue Project # 160401204 Prepared for: TC United Group Prepared by: Stantec Consulting Ltd. July 15, 2016 Sign-off Sheet This document entitled Servicing Report 122 Daly Avenue

More information

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of stormwater as it infiltrates into the ground. Dry wells, infiltration

More information

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART. January 2016

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART. January 2016 The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG

More information

Silver Seven Corporate Centre Phase 1

Silver Seven Corporate Centre Phase 1 SERVICING BRIEF Silver Seven Corporate Centre Phase 1 15 & 19 Frank Nighbor Place and 737 & 777 Silver Seven Road Kanata, Ontario Report No. 12022-SB May 31, 2012 Revised October 23, 2012 D. B. G R A Y

More information

A Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond.

A Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond. Engineering Page 3-1 3.0 STORM DRAINAGE 3.1 GENERAL Good drainage is vital to flat urban areas such as Lulu Island. It is essential that every storm sewer must be designed accurately minimizing conflicts

More information

4 Water Distribution System

4 Water Distribution System 4 Water Distribution System 4.1 Introduction 4.1.1 Overview The Former CFB Rockcliffe site is located north of Montreal Road between the Aviation Parkway and the NRC lands, and generally south of the Rockcliffe

More information

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013. Planning Considerations for Stormwater Management in Alberta R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013 Photo Optional Purpose The purpose of urban stormwater management is to provide solutions

More information

Section H - Site Plan Guidelines

Section H - Site Plan Guidelines H1 GENERAL REQUIREMENTS The following is an outline of procedures and requirements for preparation and submission of Grading Plans, Site Alteration Plans (Erosion and Sediment Control Plans), Site Servicing

More information

Biggars Lane Landfill Expansion Environmental Assessment Stormwater Management Assessment County of Brant

Biggars Lane Landfill Expansion Environmental Assessment Stormwater Management Assessment County of Brant R.J. Burnside & Associates Limited 17345 Leslie Street, Suite 200 Newmarket ON L3Y 0A4 CANADA telephone (905) 953-8967 fax (905) 953-8945 web www.rjburnside.com Technical Memorandum Date: Project Name:

More information

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves

More information

Drainage Servicing Report - Terms of Reference

Drainage Servicing Report - Terms of Reference Urban Form and Corporate Strategic Development City Planning 7th Floor, Edmonton Tower 10111 104 Avenue NW Edmonton, AB T5J 0J4 edmonton.ca July 2018 1 Introduction: Drainage Servicing Reports Drainage

More information

Mofan Holdings Inc. 249 Bayview Drive

Mofan Holdings Inc. 249 Bayview Drive Mofan Holdings Inc. 249 Bayview Drive Functioning Service Report Project Number 213586 Prepared By: Yousef Saigh, P. Eng. exp Services Inc. 4 Cedar Pointe Drive, Unit L Barrie, ON L4N 5R7 Canada T: +1.705.719.1100

More information

LITTLE CREEK WEST LANDS MUNICIPALITY OF CENTRAL ELGIN PRELIMINARY SERVICING REPORT

LITTLE CREEK WEST LANDS MUNICIPALITY OF CENTRAL ELGIN PRELIMINARY SERVICING REPORT LITTLE CREEK WEST LANDS MUNICIPALITY OF CENTRAL ELGIN PRELIMINARY SERVICING REPORT 0823D 7 January 2019 7 January 2019 0823D LITTLE CREEK WEST LANDS MUNICIPALITY OF CENTRAL ELGIN PRELIMINARY SERVICING

More information

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS March 18, 2003 This page left blank intentionally. March 18, 2003 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method

More information

Storm Sewers, Page 2

Storm Sewers, Page 2 Storm Sewers storm sewer systems are dendritic systems used to collect and direct stormwater runoff storm sewer systems are integral components of any urban infrastructure curbs, gutters and storm inlets

More information

St. Boniface Industrial Park Phase 2 Municipal Servicing Report

St. Boniface Industrial Park Phase 2 Municipal Servicing Report St. Boniface Industrial Park Phase 2 Municipal Servicing Report Prepared for: City of Winnipeg Prepared by: Stantec Consulting Ltd. File: 116809351 November 5, 2015 ST. BONIFACE INDUSTRIAL PARK PHASE 2

More information

MINTO COMMUNITIES INC.

MINTO COMMUNITIES INC. MINTO COMMUNITIES INC. STORM WATER MANAGEMENT, STORM SEWER, SANITARY SEWER AND WATERMAIN DESIGN BRIEF EAST URBAN COMMUNITY (Neighbourhood 2) 352 AQUAVIEW DRIVE CITY OF OTTAWA AUGUST 212 (Revision ) STORM

More information

Flood-Resilient Community Design: Disaster Mitigation, Best Practices for Building New Residential Subdivisions

Flood-Resilient Community Design: Disaster Mitigation, Best Practices for Building New Residential Subdivisions Flood-Resilient Community Design: Disaster Mitigation, Best Practices for Building New Residential Subdivisions Presented at: National Water and Wastewater Conference (November 15, 2016) Presented by:

More information

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario Site Servicing and Stormwater Management Report By Mohamad Salame, P.Eng. Kamco Technique Ltee. 60 Grand Avenue North Cambridge, Ontario N1S

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of storm water as it infiltrates into the ground. Dry wells, infiltration

More information

Table of Contents. 1.0 Introduction Existing Site Conditions Proposed Site Statistics Sanitary Servicing Review...

Table of Contents. 1.0 Introduction Existing Site Conditions Proposed Site Statistics Sanitary Servicing Review... Table of Contents 1.0 Introduction... 1 1.1. Existing Site Conditions... 1 1.2. Proposed Site Statistics... 1 2.0 Sanitary Servicing Review... 1 2.1. Potential Sanitary Sewage Outlets... 2 2.2. Internal

More information

DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN

DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN Submitted to: Town of Milton Regional Municipality of Halton Submitted by: AMEC Earth & Environmental 3215 North Service Road

More information

Julia Bahen, Urban Strategies Inc.

Julia Bahen, Urban Strategies Inc. THE MUNICIPAL INFRASTRUCTURE GROUP LTD. 8800 Dufferin Street, Suite 200 Vaughan, Ontario L4K 0C5 T 905.738.5700 F 905.738.0065 www.tmig.ca TECHNICAL MEMORANDUM DATE June 13, 2017 TO CC SUBJECT FROM PROJECT

More information

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements 4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for

More information

APPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS

APPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS ESTIMATING RUNOFF FROM SMALL WATERSHEDS June 2011 THIS PAGE LEFT BLANK INTENTIONALLY. June 2011 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method Values June 2011

More information

Sanitary Sewer Design. Sanitary Sewers, Page 1

Sanitary Sewer Design. Sanitary Sewers, Page 1 Sanitary Sewer Design Sanitary Sewers, Page 1 Sanitary Sewers, Page 2 Sanitary Sewer Design sanitary sewers collect and transport domestic and industrial wastes via gravity flow the ultimate destination

More information

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1 TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SECTION TITLE PAGE 105.1. SPECIFICATIONS AND SCOPE 105.1 105.2. METHODS OF ANALYSIS 105.1 105.2.1. Rational Method

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

Chapter 8. Inlets. 8.0 Introduction. 8.1 General

Chapter 8. Inlets. 8.0 Introduction. 8.1 General . Introduction This chapter provides criteria and design guides for evaluating and designing storm sewer inlets in the City of Centennial. The review of all planning submittals will be based on the criteria

More information

GENERAL PLAN OF SERVICING

GENERAL PLAN OF SERVICING No. REVISIONS By 400 333 Preston Street GENERAL PLAN OF SERVICING 38158 100 T UTILITY LEGEND TRANSFORMER SERVICING LEGEND SANITARY MANHOLE C/W IDENTIFICATION TRANSFORMER C/W CONCRETE WINGS SANITARY SEWER

More information

FLORIDA STATE UNIVERSITY MASTER PLAN 9 General Infrastructure

FLORIDA STATE UNIVERSITY MASTER PLAN 9 General Infrastructure GENERAL INFRASTRUCTURE ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee

More information

215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613)

215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) Civil Geotechnical Structural Environmental 215 Sanders Street, Unit 1 (613) 860-0923 210 Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 March 29, 2016 2343065 Ontario

More information

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

Orleans Family Health Hub

Orleans Family Health Hub Orleans Family Health Hub Stormwater Management & Servicing Report Type of Document: Site Plan Application Project Name: Orleans Family Health Hub (OFHH) Project Number OTT-00240132-A0 Prepared By: exp

More information

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FOUR WATER DISTRIBUTION SYSTEM

CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FOUR WATER DISTRIBUTION SYSTEM CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FOUR WATER DISTRIBUTION SYSTEM 2018 TABLE OF CONTENTS Section Four Water Distribution System SECTION PAGE NUMBER 1. Objective...1 2. Submissions

More information

Wastewater Collection System

Wastewater Collection System WASTEWATER COLLECTION SYSTEM CE 370 1 Wastewater Collection System The function of the collection system is to collect the wastewater from residential, commercial, and industrial areas within the service

More information

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E Ambassador Bridge Enhancement Project CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX E DRAFT EROSION AND SEDIMENT

More information

PROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT

PROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT PROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN 149 1162 ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT No. R-815-41 T. L. MAK ENGINEERING CONSULTANTS LTD. JUNE 2015

More information

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification 7. Introduction This chapter summarizes methods to evaluate runoff conveyance in various street cross sections and curb types in the Town of Castle Rock and identifies acceptable upper limits of street

More information

Stantec Consulting Ltd Clyde Avenue, Ottawa ON K2C 3G4

Stantec Consulting Ltd Clyde Avenue, Ottawa ON K2C 3G4 Stantec Consulting Ltd. 400-1331 Clyde Avenue, Ottawa ON K2C 3G4 February 10, 2016 File: 160401220 Attention: John Wu Development Review Urban Services Branch 110 Laurier Avenue West Ottawa, ON. K1P 1J1

More information

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST Project Name: Project Location: Date Submitted: TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST Last Revised January 31, 2014 Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( )

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

PROPOSED FOOD STORE 150 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For:

PROPOSED FOOD STORE 150 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For: PROPOSED FOOD STORE 150 TORONTO STREET SOUTH Job No. 16227 ENGINEERING REPORT Prepared For: MAVERICK DEVELOPMENT CORPORATION 150 Woodbine Avenue Suite 3005 Toronto, Ontario Prepared By: The Odan/Detech

More information

OHM Groups. FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph August 5, Prepared By:

OHM Groups. FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph August 5, Prepared By: Prepared By: OHM Groups FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph 114169 August 5, 2015 Guelph Owen Sound Listowel Kitchener Exeter Hamilton GTA 650 Woodlawn Rd. W., Block C, Unit 2, Guelph

More information

Detailed Stormwater Management Report David Manchester Road

Detailed Stormwater Management Report David Manchester Road Detailed Stormwater Management Report David Manchester Road Prepared for: Nortrax Canada Inc. 189 Cardevco Road Carp, Ontario K0A 1L0 Prepared by: McIntosh Perry Consulting Engineers Ltd. 115 Walgreen

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

Appendix J Conceptual Design of Watermain and Sanitary Sewer

Appendix J Conceptual Design of Watermain and Sanitary Sewer City of Barrie - Hewitt's Secondary Plan Class Environmental Assessment (Phase 3 and 4) Study Environmental Study Report Appendix J Conceptual Design of Watermain and Sanitary Sewer Hatch 2017 All rights

More information

DESIGN BRIEF MIX-USE DEVELOPMENT ICON 505 PRESTON STREET OTTAWA, ONTARIO

DESIGN BRIEF MIX-USE DEVELOPMENT ICON 505 PRESTON STREET OTTAWA, ONTARIO CLARIDGE HOMES (PRESTON) INC. DESIGN BRIEF MIX-USE DEVELOPMENT ICON 505 PRESTON STREET OTTAWA, ONTARIO PROJECT: 31637-5.2.2 OCTOBER 2014 IBI GROUP PROJECT: 31637-5.2.2 TABLE OF CONTENTS 1. INTRODUCTION...

More information

LOW IMPACT DEVELOPMENT INTERIM GUIDANCE DOCUMENT

LOW IMPACT DEVELOPMENT INTERIM GUIDANCE DOCUMENT 2017 LOW IMPACT DEVELOPMENT INTERIM GUIDANCE DOCUMENT 1 Low Impact Development Interim Guidance City of Barrie 1 Introduction This document was prepared to provide interim design guidance and the requirements

More information

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing B.5.1 Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing --Greenland Consulting Engineers-- 1 The Study Location (Prices Subdivision) consists of the lots fronting

More information

SERVICING AND STORM WATER MANAGEMENT REPORT

SERVICING AND STORM WATER MANAGEMENT REPORT The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED BANK PLACE D ORLEANS MALL OTTAWA, ONTARIO SERVICING

More information

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report Prepared for: Cameron McCarthy Landscape Architects LLP

More information

PART V - STORM DRAIN DESIGN CRITERIA

PART V - STORM DRAIN DESIGN CRITERIA PART V - STORM DRAIN DESIGN CRITERIA A. Hydrology Studies and Hydraulic Analyses 1. Drainage area master plans and calculations are to be submitted with all subdivision improvement plans, permit improvement

More information

PART V - STORM DRAIN DESIGN CRITERIA

PART V - STORM DRAIN DESIGN CRITERIA PART V - STORM DRAIN DESIGN CRITERIA A. Hydrology Studies and Hydraulic Analyses 1. Drainage area master plans and calculations are to be submitted with all subdivision improvement plans, permit improvement

More information

SITE GRADING (LOT GRADING) - CITY OF TORONTO In Compliance with Sentence B of the Ontario Building Code, every site is to be graded so that w

SITE GRADING (LOT GRADING) - CITY OF TORONTO In Compliance with Sentence B of the Ontario Building Code, every site is to be graded so that w SITE GRADING (LOT GRADING) - CITY OF TORONTO In Compliance with Sentence B-9.14.6.1 of the Ontario Building Code, every site is to be graded so that water will not accumulate at or near the building under

More information

Functional Servicing Report. Sorensen Court Townhouses. 25 Sorensen Court, Niagara-on-the-Lake, Ontario

Functional Servicing Report. Sorensen Court Townhouses. 25 Sorensen Court, Niagara-on-the-Lake, Ontario Functional Servicing Report Sorensen Court Townhouses 25 Sorensen Court, Niagara-on-the-Lake, Ontario Prepared by: Quartek Group Inc. Engineers, Architects & Planners 89-91 St. Paul Street, Suite 100 St.

More information