SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY October, 2016
|
|
- Joleen McDaniel
- 6 years ago
- Views:
Transcription
1 SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY COASTWIDE CIVIL PTY LTD ADDRESS: 19 CROOME LANE, ALBION PARK, 2527 POSTAL: P.O.BOX 116, KIAMA, info@coastwidecivil.com.au ABN: TELEPHONE: (02) FAX: (02) MOBILE: A.H.: (02)
2 Coastwide Civil Contents 1. Preliminaries Background Introduction Monitoring Requirements Water Quality Noise Air Quality Vibration Blasting Acid Sulphate Soils Water Quality Near Shore Monitoring Monitoring Points 8, 9, 12 and Surface Water: Inbound flow Monitoring Points 10, 11, 14, 21 and Outbound Flow Monitoring Points 12 and Storage Pond Monitoring Point Air, Noise and Vibration Testing Noise Testing Air Quality Vibration Blasting Acid Sulphate Soils Odour Monitoring Appendix A Site Map Appendix B Lab Testing Results Appendix C Rainfall Monitoring Results 2 P a g e
3 1. Preliminaries 1.1. Background Coastwide Civil This project involves the construction of a boat harbour consisting of inner and outer harbour basins located behind an existing beach dune system in what is currently a degraded swamp, and an access channel across the beach. Included in the boat harbour project are: inner and outer harbour basins; boardwalk/promenade surrounding the inner and outer harbours; regional boat launching ramp located in the outer harbour; 470m long rock breakwater on the northern side of the access channel; 282m long rock groyne on the southern side of the access channel; dune construction and beach nourishment; land platform works for hotel, shopping centre, residential development, marina support facilities and dry boat storage surrounding the boat harbour; a staged 300 berth floating marina in the inner harbour; vessel fuelling facilities and sewage pump out facilities in the outer harbour; and a boat lift and hardstand area for vessel maintenance. The works are to be conducted over multiple stages. Coastwide Civil have won the contract to conduct Stage 2 works. The main components of Stage 2 works are: Excavation of the remainder of the Boatharbour which was not excavated in Stage 1 Surcharging (and removal) of the P2B Surcharge Area and any incomplete portions of the P3 Surcharge Area Removal of the surcharge material from Surcharge P1A, P1B and P2A Construct edge treatment for the Boatharbour Install boardwalk piles Construct boat ramp in the Outer Harbour 1.2. Introduction This document provides a summary of monthly environmental performance on site. It includes the following: Section 2 outlines monitoring requirements as per the conditions of the Environmental Protection Licence (EPL), the Site Environmental Management Plan (SEMP) and the Construction Environmental Management Plan (CEMP); Sections 3 to 5 detail the results of environmental monitoring undertaken on site; and Results of any lab testing are included as Appendix B. A copy of rainfall monitoring results for the month is attached as Appendix C. 3 P a g e
4 2. Monitoring Requirements 2.1. Water Quality Coastwide Civil Water Quality Inbound and Outbound Channels Monitoring Locations See Appendix A - Site Map for location of monitoring points As nominated in EPL 12426, Section 2, P1.3 Station no. Location Testing Required 10 Upstream Location Runoff into site from West Oil and Grease, ph, Total Suspended Solids, Turbidity and Colour 11 Upstream Location Runoff into site from North Oil and Grease, ph, Total Suspended Solids, Turbidity and Colour 12 Shellharbour Swamp Discharge into near shore Oil and Grease, ph, Total Suspended Solids, Turbidity and Colour zone 14 Upstream Location Runoff into site from South Oil and Grease, ph, Total Suspended Solids, Turbidity and Colour 20 Beach Zone Rectangular Pond Discharge into near Oil and Grease, ph, Total Suspended Solids, Turbidity and Colour shore zone 21 Southern Channel Downstream of Precinct B1 and C1 Oil and Grease, ph, Total Suspended Solids, Turbidity and Colour Monitoring Requirements As nominated in EPL 12426, Section 5, M2. No limit values for monitoring of inflows and outflows are specified in the EPL. Station no. Testing Requirement Compliance Criteria Frequency Oil and Grease Not specified in EPL 10,11,12,14, 20,21 ph Total Suspended solids Turbidity Not specified in EPL Not specified in EPL Not specified in EPL Special Frequency 2 daily if turbidity >5NTU at MP8,9,12, otherwise weekly 4 P a g e
5 Coastwide Civil Near Shore Monitoring Monitoring Locations See Appendix A - Site Map for location of monitoring points As nominated in EPL 12426, Section 2, P1.3 for MP8, 9, 12 and 20: Station no. Location Testing Required 8 Surf zone, 100m south of groyne Colour, Turbidity 9 Surf zone 100m north of breakwater Colour, Turbidity 12 Surface Water leaving site into the near shore zone Colour, Turbidity 20 Beach zone rectangular pond Colour, Turbidity Monitoring Requirements Limit criteria for points 8 and 9 are as established in the SEMP Section The EPL establishes a 5 NTU turbidity trigger value at points 8, 9, and 12 to initiate monitoring at monitoring points 10, 11, 12, 14, 20 and 21 as per special frequency 2. Station no. Testing Requirement Compliance Criteria Frequency Turbidity <5 NTU Special Frequency 1 weekly during dry weather, daily during wet weather (>20mm 8,9,12,20 rainfall within 24 hours in rain gauge), daily Colour Visual Assessment during any water break out on site Daily during marine works The amber alert level triggers an investigation and review of the source of turbidity, and may prompt and adjustment in site practices if the source of turbidity is due to marine construction. Station no. Testing Requirement Action Criteria Frequency 8, 9 Turbidity >15 NTU (Amber Alert) Special Frequency 1 weekly during dry weather, daily during wet weather (>20mm rainfall within 24 hours in rain gauge), daily during any water break out on site Daily during marine works 5 P a g e
6 Coastwide Civil Real Time Water Monitoring Monitoring Locations not shown in Appendix A, due to distance offshore As nominated in EPL 12426, Section 2, P1.3: Station no. Location Testing Required m south of groyne, approx. 250m offshore Electrical conductivity, ph, temperature, turbidity m north of breakwater, approx. 250m offshore Electrical conductivity, ph, temperature, turbidity 26 Background location near bathing area, approx. 250m offshore Electrical conductivity, ph, temperature, turbidity Monitoring Requirements Limit criteria for points 24, 25 and 26 are as established in the SEMP Section The amber alert level triggers an investigation and review of the source of turbidity, and may prompt and adjustment in site practices if the source of turbidity is due to marine construction. The red alert level triggers an investigation and review of the source of turbidity, and triggers a temporary stop to work if the source of turbidity is due to marine construction. Station no. Testing Requirement Action Criteria Frequency 24, 25, 26 Turbidity 3 consecutive readings >15 NTU Every 15 Minutes (Amber Alert) 24, 25, 26 Turbidity 4 consecutive readings >29NTU + background (Red Alert) Every 15 Minutes 6 P a g e
7 Coastwide Civil Storage Pond Monitoring Monitoring Locations See Appendix A - Site Map for location of monitoring points As nominated in EPL 12426, Section 2, P1.3: Station no. Location Testing Required 7 Storage Pond Oil and Grease, Suspended Solids, Acidity, Turbidity, Nitrate, 22 West of Boatharbour Excavation 23 Outer Boatharbour Nitrogen (Ammonia), Biochemical Oxygen Demand (BOD) Oil and Grease, Suspended Solids, Acidity, Turbidity, Nitrate, Nitrogen (Ammonia), Biochemical Oxygen Demand (BOD) Oil and Grease, Suspended Solids, Acidity, Turbidity, Nitrate, Nitrogen (Ammonia), Biochemical Oxygen Demand (BOD) Monitoring Requirements As nominated in EPL 12426, Section 5, M2 for monitoring requirements and Section 3, L2 for concentration limits: Station no. Testing Requirement Compliance Criteria Frequency Oil and Grease Not visible Suspended Solids <50 mg/l Acidity ph 7, 22, 23 Turbidity Nitrate Nitrogen (Ammonia) Biochemical Oxygen Demand (BOD) Not specified in EPL /CEMP Not specified in EPL /CEMP Not specified in EPL /CEMP Not specified in EPL /CEMP Prior to any release into the clean water system. Daily during any discharge from the storage pond. 7 P a g e
8 Coastwide Civil 2.2. Noise Monitoring Locations See Appendix A - Site Map for location of monitoring points As nominated in EPL 12426, Section 2, P1.4: Monitoring Requirements Station no. Location 17 Southernmost property on Boollwarroo Parade 18 Nearest residence on Mary, William or Sophia Streets 19 Nearest residence on Whitsunday or Apollo Drives As nominated in EPL 12426, Section 3, L4: For any exceedance of the background noise level by more than 10 db(a) the licensee must undertake community liaison and consultation in order to identify and implement any additional reasonable and feasible noise mitigation options. L4.2 5dB(A) must be added to the measured noise levels if the noise is substantially tonal or impulsive in character. Table 4.6 of the CEMP summarises noise trigger values based on background levels determined by Wilkinson Murray in 2005 as: Parameter Trigger Value Measurement Location LAeq,15 min: 52 dba Nearest residence on Boollwarroo Parade Construction Noise LAeq,15 min: 44 dba Nearest residence on Mary, William or Sophia Streets LAeq,15 min: 44 dba Nearest residence on Whitsunday or Apollo Drives 8 P a g e
9 Coastwide Civil 2.3. Air Quality Monitoring Locations See Appendix A - Site Map for location of monitoring points As nominated in EPL Section 2, P1.1: Station no. Location 1 Southernmost property on Boollwarroo Parade 2 Nearest residence on Mary, William or Sophia Streets 3 Nearest residence on Whitsunday or Apollo Drives Monitoring Requirements Compliance limit criteria are not specified in the EPL. As per SEMP, Section 8: Station no. Testing Requirement Compliance Criteria Frequency 1,2,3 Dust <4g / m 2 / month, or <2g / m 2 / month over background levels Monthly 2.4. Vibration Monitoring Locations See Appendix A - Site Map for location of monitoring points Monitoring Points are not specified in the EPL. Points as nominated in SEMP Section 8 are: Station no. Location 1 Southernmost property on Boollwarroo Parade 2 Nearest residence on Mary, William or Sophia Streets 3 Nearest residence on Whitsunday or Apollo Drives Monitoring Requirements As per CEMP, Section 4.7.4: Station no. Testing Requirement 1,2,3 vibration Compliance Criteria Vibration dose: <0.4 m/s 1.75 Frequency Once during initial stages of work by plant likely to cause vibration 9 P a g e
10 Coastwide Civil 2.5. Blasting Monitoring Locations See Appendix A - Site Map for location of monitoring points As nominated in EPL Section 5, M7.1: Station no. Location 1 Southernmost property on Boollwarroo Parade 2 Nearest residence on Mary, William or Sophia Streets 3 Nearest residence on Whitsunday or Apollo Drives Monitoring Requirements As nominated in EPL Section 3 L and Section 5, M7.2: Station no. Testing Requirement Compliance Criteria Frequency 1,2,3 vibration <5mm/s for 95% of blasts <10mm/s for all blasts During each blast 1,2,3 overpressure <115 db for 95% of blasts <120 db for 100% of blasts During each blast 2.6. Acid Sulphate Soils Monitoring Requirements As nominated in EPL Section 4, O : Any acid sulphate soils disturbed during the project must be managed in accordance with the document titled ACID SULPHATE SOIL MANUAL, ASSMAC From the time when the acid sulphate soil is exposed to the atmosphere: a) the licensee must complete a log of odour observations. These observations must continue for a duration of 20 consecutive days and be used to assess compliance with the odour condition/s of this licence and to assess the risks of odours impacting residential areas under worst-case wind conditions. b) the licensee has 30 days to submit the log of odour observations to the EPA together with an assessment of actual and potential odour impacts on the nearest residential areas. 10 P a g e
11 3. Water Quality 3.1. Near Shore Monitoring Monitoring Points 8, 9, 12 and 20 Coastwide Civil Test Results Test frequency: Special Frequency 1 (Weekly in dry weather, daily in wet weather and daily during break out). To be completed daily during marine works. Date Pollutant Point 8 Point 9 Point 12 Point 20 31/10/2016 Colour Clear Clear Clear Turbidity /10/2016 Colour Clear Clear Clear Turbidity /10/2016 Colour Clear Clear Clear Turbidity /10/2016 Colour Clear Clear Clear Turbidity /10/2016 Colour Clear Clear Clear Turbidity /10/2016 Colour Clear Clear Clear Turbidity Colour Clear Clear Clear 21/10/2016 Turbidity Channel Dry Colour Clear Clear Clear 20/10/2016 Turbidity /10/2016 Colour Clear Clear Clear Turbidity /10/2016 Colour Clear Clear Clear Turbidity /10/2016 Colour Clear Clear Clear Turbidity /10/2016 Colour Clear Clear Clear Turbidity /10/2016 Colour Clear Clear Clear Turbidity /10/2016 Colour Clear Clear Clear Turbidity CEMP Compliance Limit Turbidity 5 5 SEMP Amber Alert Level Turbidity EPL Special Frequency 2 Trigger Value Turbidity P a g e
12 Coastwide Civil Date Pollutant Point 8 Point 9 Point 12 Point 20 11/10/2016 Colour Clear Clear Clear Turbidity /10/2016 Colour Clear Clear Clear Turbidity Colour Clear Clear Clear 07/10/2016 Turbidity Channel Dry Colour Clear Clear Clear 06/10/2016 Turbidity /10/2016 Colour Clear Clear Clear Turbidity /10/2016 Colour Clear Clear Clear Turbidity CEMP Compliance Limit Turbidity 5 5 SEMP Amber Alert Level Turbidity EPL Special Frequency 2 Trigger Value Turbidity Comments on Results Since the commencement of breakwater construction in the ocean on 07/09/16, a red and amber alert system has been implemented. As part of this system, an exceedance of 15 NTU at MP8 or MP9 triggers an amber alert, as detailed in Section 11.4 of the Site Environmental Management Plan (SEMP). A discussion of all amber alert events at MP8 and MP9 is included in Section 3.2 Below. Turbidity at MP8 and MP9 regularly exceeded the 5 NTU trigger value, but exceedances were typically minor. The 5 NTU trigger value was exceeded regularly at MP20, however this did not significantly impact upon turbidity levels at near shore points MP8 or MP9. o Turbidity at MP20 typically remained below 20 NTU. There were no significant elevations this month. Turbidity levels are attributable to stormwater flows through site. The northern stormwater channel remained closed to the ocean for the entire month, resulting in the water level at being too low to sample. The lower end of the southern stormwater diversion channel, just upstream of the culvert, was cleaned out in the first week of October. Silt and fine sediment that accumulated in this channel over time, and in particular following the flood event in early June 2016, was removed. 12 P a g e
13 3.2. Real Time Water Monitoring Monitoring Points 24, 25, and 26 Coastwide Civil Test Results Test frequency: Special Method 1 (Using a stationary water quality monitoring buoy that will monitor, record and transmit water quality data at approximately 15 minute intervals) 13 P a g e
14 Coastwide Civil Comments on Results The monitoring buoys were installed in late August and commenced logging data on 17/08/16, three weeks prior to the commencement of ocean based works. The monitors were installed early in order to provide background data prior to the start of works. Ocean based works began on 07/09/16. No legitimate amber or red alerts were triggered due to elevation of turbidity recorded at the monitoring buoys this month. An amber alert was triggered on one occasion at MP8 due to an elevation of turbidity. o 10/10/16 Alert triggered by near shore monitoring at MP8 only. Discolouration appeared to be due to wave action against the excavation at the northern breakwater and placement of rock at the northern breakwater. Turbidity appeared to remain largely localised around the work area. A false alarm amber alert was triggered on 10/10/16 at MP24, the southern monitoring buoy, however this was due to marine fouling. The buoys were cleaned as part of routine maintenance on 12/10/16 and there has been no further fouling issues recorded for the remainder of the month. During this period of fouling, this buoy recorded turbidity of over 200 NTU, despite no visual indications of turbidity. After cleaning, levels immediately returned to typical values. 14 P a g e
15 Coastwide Civil 3.3. Surface Water: Inbound flow Monitoring Points 10, 11, 14, 21 and Outbound Flow Monitoring Points 12 and 20 Test Results Test frequency: Special Frequency 2 (Weekly, or daily when turbidity at MP8, 9, 12 or 20 is greater than 5 NTU). On days where a monitoring point is not listed below, water was not flowing at that location. Date 31/10/ /10/ /10/ /10/ /10/2016 Monitoring Point Oil and Grease ph Turbidity (NTU) Colour Total Suspended Solids (mg/l) MP10 MP20 Not Visible Clear Awaiting results MP21 MP10 MP20 MP20 Not Visible Awaiting results MP21 MP10 Not Visible Slightly Brown/Yellow Awaiting results MP20 Not Visible Clear Awaiting results MP21 MP10 MP20 Not Visible Clear Awaiting results MP21 Not Visible Clear Awaiting results MP10 MP20 Not Visible Clear Awaiting results MP21 15 P a g e
16 Coastwide Civil Date 24/10/ /10/ /10/ /10/ /10/ /10/2016 Monitoring Point Oil and Grease ph Turbidity (NTU) Colour Total Suspended Solids (mg/l) MP10 Not Visible Clear Awaiting results MP20 Not Visible Clear Awaiting results MP21 Not Visible Clear Awaiting results MP10 MP20 Not Visible Clear 5 MP21 MP10 Not Visible Clear 26 MP20 Not Visible Clear 8 MP21 MP10 Not Visible Clear 20 MP20 Not Visible Clear 10 MP21 Not Visible Clear 5 MP10 MP20 Not Visible Clear 14 MP21 MP10 Not Visible Clear 18 MP20 Not Visible Clear 6 MP21 16 P a g e
17 Coastwide Civil Date 14/10/ /10/ /10/ /10/ /10/ /10/2016 Monitoring Point Oil and Grease ph Turbidity (NTU) Colour Total Suspended Solids (mg/l) MP10 Not Visible Clear 11 MP20 Not Visible Clear 33 MP21 Not Visible Clear 24 MP10 Not Visible Slightly Brown 43 MP20 Not Visible Clear 27 MP21 Not Visible Clear 18 MP10 Not Visible Clear 20 MP20 Not Visible Clear 4 MP21 Not Visible Clear 42 MP10 MP20 Not Visible Clear 32 MP21 MP10 Not Visible Slightly Green/Yellow 28 MP20 Not Visible Clear 10 MP21 MP10 Not Visible Clear 30 MP20 Not Visible Clear 10 MP21 Not Visible Clear P a g e
18 Coastwide Civil Date 06/10/ /10/ /10/ /09/ /09/ /09/2016 Monitoring Point Oil and Grease ph Turbidity (NTU) Colour Total Suspended Solids (mg/l) MP10 Not Visible Clear 18 MP20 Not Visible Clear 16 MP21 Not Visible Clear 26 MP10 MP20 Not Visible Clear 18 MP21 Not Visible Clear 40 MP10 Not Visible Clear 28 MP20 Not Visible Clear 23 MP21 Not Visible Clear 9 MP10 Not Visible Clear 32 MP20 Not Visible Clear 26 MP21 Not Visible Clear 37 MP10 Not Visible Clear 24 MP20 Not Visible Clear 13 MP21 Not Visible Clear 18 MP10 Not Visible Clear 21 MP20 Not Visible Clear 10 MP21 Not Visible Clear P a g e
19 Coastwide Civil Date 26/09/2016 Monitoring Point Oil and Grease ph Turbidity (NTU) Colour Total Suspended Solids (mg/l) MP10 Not Visible Clear 19 MP20 Not Visible Clear 18 MP21 Not Visible Clear 30 Comments on Results Northern channel opening (): o Remained closed for the entire month. Southern channel opening (MP20): o Open naturally from the start of the month and closed naturally 13/10/16 o Opened mechanically 13/10/16 and closed naturally overnight. o Opened mechanically 14/10/16 and closed naturally overnight. o Opened mechanically 17/10/16 and closed naturally 19/10/16. o Opened mechanically 19/10/16 and closed naturally overnight. o Opened mechanically 20/10/16 and closed naturally overnight. o Opened mechanically 21/10/16 and closed naturally 26/10/16. o Opened mechanically 26/10/16 and closed naturally overnight. o Opened naturally 31/10/16 and remained open to the end of the month. Inbound streams: o MP10 was flowing about half the time this month, and was observed to be not flowing more commonly towards the end of the month. Turbidity was typically NTU with no high readings this month. The highest reading was NTU on 13/10/16. A small amount of rainfall was recorded that morning. o No ph readings above 9 were recorded at any monitoring point this month. o did not flow this month. o did not flow this month. o MP21 Turbidity was typically below 30 NTU this month. The highest reading was NTU, recorded on 07/10/16. On more than half the sampling occasions this month, the volume of water flow at this location was too low to sample. Notable Rainfall Events: o 7.5mm recorded 18/10/16 o 14.5mm recorded 24/10/16 o Various other minor rainfall events recorded, full rainfall records included in Appendix C 19 P a g e
20 Total Suspended Solids (mg/l) Biochemical Oxygen Demand (BOD) (mg/l) Coastwide Civil 3.4. Storage Pond Monitoring Points 7, 22 and 23 Test Results Test frequency: Daily during discharge. MP22 Pollutant Date Oil and Grease ph* Turbidity* (NTU) Nitrate (mg/l) Nitrogen (Ammonia ) (mg/l) 28/10/2016 Not Visible 6.36 Awaiting results Awaiting results 27/10/2016 Not Visible Awaiting results 26/10/2016 Not Visible Awaiting results 25/10/2016 Not Visible Awaiting results 21/10/2016 Not Visible Awaiting results 19/10/2016 Not Visible /10/2016 Not Visible 6.56 Awaiting results /10/2016 Not Visible 6.52 Awaiting results /10/2016 Not Visible < < /10/2016 Not Visible < /10/2016 Not Visible < /10/2016 Not Visible < /10/2016 Not Visible < /10/2016 Not Visible < /09/2016 Not Visible < /09/2016 Not Visible < EPA Discharge Criteria Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results P a g e
21 Total Suspended Solids (mg/l) Biochemical Oxygen Demand (BOD) (mg/l) Coastwide Civil MP23 Pollutant Date Oil and Grease ph* Turbidity* (NTU) Nitrate (mg/l) Nitrogen (Ammonia ) (mg/l) 27/10/2016 Not Visible 6.85 Awaiting results 4.82 Awaiting results 26/10/2016 Not Visible Awaiting results 25/10/2016 Not Visible Awaiting results 24/10/2016 Not Visible /10/2016 Not Visible 6.57 Awaiting results /10/2016 Not Visible 6.23 Awaiting results /10/2016 Not Visible 7.61 Awaiting results Awaiting results 18/10/2016 Not Visible Awaiting results 17/10/2016 Not Visible /10/2016 Not Visible /10/2016 Not Visible /10/2016 Not Visible <0.005 < /09/2016 Not Visible < /09/2016 Not Visible < EPA Discharge Criteria *Tests undertaken on site by Coastwide Civil Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Awaiting results Remarks MP22 Discharge was undertaken on the above listed days. All site based monitoring and received lab testing results were compliant with discharge criteria. Some data was not received in time for inclusion with this report. Remarks MP23 Discharge was undertaken on the above listed days. All site based monitoring and received lab testing results are compliant with discharge criteria Some data was not received in time for inclusion with this report. 21 P a g e
22 18/10/ /10/ Air, Noise and Vibration Testing Coastwide Civil 4.1. Noise Testing Test Results Test frequency: Weekly Date Location Time MP17 MP18 MP19 MP17 MP18 MP19 11:30am 11:45am 11:55am 12:10pm 12:30pm 12:45pm 10:20am 10:35am 10:45am 11:00am 11:20am 11:35am Measured Noise Levels L A10 = 56.5 L A90 = 43.1 L Aeq = 55.9 L max = 79.5 L min = 33.6 L A10 = 58.4 L A90 = 41.4 L Aeq = 54.8 L max = 74.2 L min = 35.2 L A10 = 54.0 L A90 = 45.4 L Aeq = 51.8 L max = 69.0 L min = 42.9 L A10 = 54.6 L A90 = 39.5 L Aeq = 56.1 L max = 78.1 L min = 37.9 L A10 = 54.1 L A90 = 44.6 L Aeq = 52.1 L max = 64.2 L min = 40.3 L A10 = 57.9 L A90 = 46.2 L Aeq = 53.8 L max = 69.4 L min = 43.2 Observed Noise Sources and notes (sound levels in db) Vehicles: 14 No., Av: Pedestrians: 52.3, 49.7 Birds: 5 No., Av: Site noise: 49.2, 48.5, 48.1 Some site noise audible from Breakwater works, but of similar volume to background noise. Site contribution = L Aeq 6dB Birds: 11 No., Av: Wind: 8 No., Av: Light plane: 69.9 Site noise inaudible. Site contribution = L A90 10dB Birds: 11 No., Av: Wind: 4 No., Av: Vehicles: 60.3 Site noise inaudible. Site contribution = L A90 10dB Wind: 16 No., Av: Pedestrians: 67.3, 62.1, 59.2 Vehicles: 6 No., Av: Site noise inaudible. Site contribution = L A90 10dB Birds: 13 No., Av: Wind: 8 No., Av: Pedestrians: 47.3, 53.2, 52.9 Site noise inaudible. Site contribution = L A90 10dB Wind: 15 No., Av: Birds: 6 No., Av: Vehicles: 51.7, 52.9, 57.8 Site noise inaudible. Site contribution = L A90 10dB Estimated L Aeq Contribution CEMP Trigger Value P a g e
23 06/10/ /10/2016 Coastwide Civil Date Location Time MP17 MP18 MP19 MP17 MP18 MP19 11:20am 11:35pm 11:45am 12:00pm 12:15pm 12:30pm 11:27am 11:42am 11:50am 12:05pm 12:20pm 12:35pm Measured Noise Levels L A10 = 59.7 L A90 = 47.3 L Aeq = 56.1 L max = 79.3 L min = 43.6 L A10 = 48.3 L A90 = 42.6 L Aeq = 47.8 L max = 69.1 L min = 42.8 L A10 = 42.4 L A90 = 38.3 L Aeq = 42.7 L max = 59.2 L min = 35.3 L A10 = 56.2 L A90 = 42.7 L Aeq = 55.3 L max = 76.4 L min = 38.9 L A10 = 50.5 L A90 = 42.2 L Aeq = 48.3 L max = 71.5 L min = 40.2 L A10 = 56.7 L A90 = 39.4 L Aeq = 53.1 L max = 69.3 L min = 37.1 Observed Noise Sources and notes (sound levels in db) Vehicles: 13 No., Av: Wind: 6 No., Av: Site noise: 4 No., Av: Some site noise audible from Breakwater works, but of similar volume to background noise. Site contribution = L Aeq 6dB Birds: 13 No., Av: Wind: 5 No., Av: Vehicles: 58.3, 49.6 Site noise inaudible. Site contribution = L A90 10dB Vehicles: 4 No., Av: Pedestrians: 7 No., Av: Birds: 5 No., Av: Vehicles: 8 No., Av: Site noise: 5 No., Av: Birds: 4 No., Av: Some site noise audible from Breakwater works, but of similar volume to background noise. Site contribution = L Aeq 6dB Birds: 15 No., Av: Wind: 8 No., Av: Site noise inaudible. Site contribution = L A90 10dB Vehicles: 4 No., Av: Dogs: 5 No., Av: Birds: 13 No., Av: Site noise inaudible. Site contribution = L A90 10dB Estimated L Aeq Contribution CEMP Trigger Value Comments on Results At MP17, weekly L Aeq did not exceed the trigger value. At MP18, weekly L Aeq did not exceed the trigger value. At MP19, weekly L Aeq did not exceed the trigger value. Consultation with the community about the project has been ongoing. A community newsletter is being distributed monthly, explaining current works on site. The newsletter contains contact information to allow any residents to communicate concerns about noise levels. No complaints have been received in this month about noise levels. 23 P a g e
24 Coastwide Civil 4.2. Air Quality Test Results Test frequency: Monthly Date Pollutant Point 1 Point 2 Point 3 Ash Content (g/m 2 / month) /08/16 07/10/16 Combustible Matter (g/m 2 / month) Total dust (g/m 2 / month) SEMP Compliance Limit Total dust (g/m 2 / month) Comments on Results Dust results were below the compliance limits at all monitoring points Vibration Test Results Test frequency: During initial stages of potentially vibratory work No testing has been required this month Blasting Test Results Test frequency: During each blast Blast # Blast Date Blast Vibration (mm/s) Blast Overpressure (db) MP1 MP2 MP3 MP1 MP2 MP /10/ Nil trigger Nil trigger 97.7 Nil trigger Nil trigger EPL Compliance Limits Comments on Results Blast monitoring results were below the compliance limits at all monitoring points. 24 P a g e
25 5. Acid Sulphate Soils Coastwide Civil 5.1. Odour Monitoring The monitoring of odour from any encountered Acid Sulphate Soil areas is ongoing as per the requirements of the EPL. Completed odour monitoring logs have been forwarded to the EPA as required. 25 P a g e
26 Appendix A Site Map Coastwide Civil 26 P a g e
27
28 Appendix B Lab Testing Results Coastwide Civil 27 P a g e
29 PAGE 1OF 1 RESULTS OF WATER ANALYSIS 8 samples supplied by Coastwide Civil Pty Ltd on the 11th - Lab. Job No. F3870 Analysis requested by Nick Chalk. Your Project: Shell Cove Boat Harbour (19 Croome Lane, ALBION PARK NSW 2527). Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample 6 Sample 7 Sample 8 PARAMETER METHODS REFERENCE MP23 26/09/16 MP22 27/09/16 MP23 27/09/16 MP22 28/09/16 MP23 28/09/16 MP22 4/10/16 MP22 6/10/16 MP23 6/10/16 Job No. F3870/1 F3870/2 F3870/3 F3870/4 F3870/5 F3870/6 F3870/7 F3870/8 TOTAL SUSPENDED SOLIDS (mg/l) GFC equiv. filter - APHA 2540-D BIOCHEMICAL OXYGEN DEMAND 5 (mg/l O 2 ) APHA 5210-B <1.0 < < <1.0 < NITRATE (mg/l N) - APHA 4500 NO 3 -F <0.005 AMMONIA (mg/l N) APHA 4500 NH 3 -H < <0.005 Notes: 1. 1 mg/l (milligram per litre) = 1 ppm (part per million) = 1000 µg/l (micrograms per litre)= 1000 ppb (part per billion) 2. Analysis performed according to APHA, 2012, Standard Methods for the Examination of Water & Wastewater, 22nd Edition, except where stated otherwise. 3. Analysis conducted between sample arrival date and Report provision date 4. ** denotes these test procedure or calculation are as yet not NATA accredited but quality control data is available 5... Denotes not requested Environmental Analysis Laboratory, Southern Cross University, Tel , website: scu.edu.au/eal checked:... Graham Lancaster Laboratory Manager
30 PAGE 1OF 1 RESULTS OF WATER ANALYSIS 23 samples supplied by Coastwide Civil Pty Ltd on the 11th - Lab. Job No. F3871 Analysis requested by Nick Chalk. Your Project: Shell Cove Boat Harbour (re-issued 19th October 2016 with correction to sample dates) (19 Croome Lane, ALBION PARK NSW 2527) PARAMETER METHODS REFERENCE Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample 6 Sample 7 Sample 8 Sample 9 Sample 10 Sample 11 MP10 MP20 MP21 MP10 MP20 MP21 MP10 MP20 MP21 MP10 MP20 26/9/16 26/9/16 26/9/16 27/09/16 27/09/16 27/09/16 28/09/16 28/09/16 28/09/16 29/09/16 29/09/16 Job No. F3871/1 F3871/2 F3871/3 F3871/4 F3871/5 F3871/6 F3871/7 F3871/8 F3871/9 F3871/10 F3871/11 TOTAL SUSPENDED SOLIDS (mg/l) GFC equiv. filter - APHA 2540-D PARAMETER METHODS REFERENCE Sample 12 Sample 13 Sample 14 Sample 15 Sample 16 Sample 17 Sample 18 Sample 19 Sample 20 Sample 21 Sample 22 Sample 23 MP21 MP10 MP20 MP21 MP20 MP21 MP10 MP20 MP21 MP10 MP20 MP21 29/09/16 4/10/16 4/10/16 4/10/16 5/10/16 5/10/16 6/10/16 6/10/16 6/10/16 7/10/16 7/10/16 7/10/16 Job No. F3871/12 F3871/13 F3871/14 F3871/15 F3871/16 F3871/17 F3871/18 F3871/19 F3871/20 F3871/21 F3871/22 F3871/23 TOTAL SUSPENDED SOLIDS (mg/l) GFC equiv. filter - APHA 2540-D Notes: 1. 1 mg/l (milligram per litre) = 1 ppm (part per million) = 1000 µg/l (micrograms per litre)= 1000 ppb (part per billion) 2. For conductivity - 1 ds/m = 1 ms/cm = 1000 µs/cm 3. Analysis performed according to APHA, 2012, Standard Methods for the Examination of Water & Wastewater, 22nd Edition, except where stated otherwise. 4. Analysis conducted between sample arrival date and Report provision date Environmental Analysis Laboratory, Southern Cross University, Tel , website: scu.edu.au/eal checked:... Graham Lancaster Laboratory Manager
31 PAGE 1OF 1 RESULTS OF WATER ANALYSIS 6 samples supplied by Coastwide Civil Pty Ltd on the 17th - Lab. Job No. F4025 Analysis requested by Nick Chalk. Your Project: Shell Cove Boat Harbour (19 Croome Lane, ALBION PARK NSW 2527). PARAMETER METHODS REFERENCE Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample 6 MP22 MP22 MP22 MP23 MP22 MP23 10/10/16 11/10/16 12/10/16 12/10/16 13/10/16 14/10/16 Job No. F4025/1 F4025/2 F4025/3 F4025/4 F4025/5 F4025/6 TOTAL SUSPENDED SOLIDS (mg/l) GFC equiv. filter - APHA 2540-D BIOCHEMICAL OXYGEN DEMAND 5 (mg/l O 2 ) APHA 5210-B <1.0 <1.0 < < NITRATE (mg/l N) - APHA 4500 NO 3 -F AMMONIA (mg/l N) APHA 4500 NH 3 -H < Notes: 1. 1 mg/l (milligram per litre) = 1 ppm (part per million) = 1000 µg/l (micrograms per litre)= 1000 ppb (part per billion) 2. Analysis performed according to APHA, 2012, Standard Methods for the Examination of Water & Wastewater, 22nd Edition, except where stated otherwise. 3. Analysis conducted between sample arrival date and Report provision date 4. ** denotes these test procedure or calculation are as yet not NATA accredited but quality control data is available 5... Denotes not requested Environmental Analysis Laboratory, Southern Cross University, Tel , website: scu.edu.au/eal checked:... Graham Lancaster Laboratory Manager
32 PAGE 1OF 1 RESULTS OF WATER ANALYSIS 12 samples supplied by Coastwide Civil Pty Ltd on the 17th - Lab. Job No. F4026 Analysis requested by Nick Chalk. Your Project: Shell Cove Boat Harbour (19 Croome Lane, ALBION PARK NSW 2527) PARAMETER METHODS REFERENCE Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample 6 Sample 7 Sample 8 Sample 9 Sample 10 Sample 11 Sample 12 MP10 MP20 MP20 MP10 MP20 MP21 MP10 MP20 MP21 MP10 MP20 MP21 10/10/16 10/10/16 11/10/16 12/10/16 12/10/16 12/10/16 13/10/16 13/10/16 13/10/16 14/10/16 14/10/16 14/10/16 Job No. F4026/1 F4026/2 F4026/3 F4026/4 F4026/5 F4026/6 F4026/7 F4026/8 F4026/9 F4026/10 F4026/11 F4026/12 TOTAL SUSPENDED SOLIDS (mg/l) GFC equiv. filter - APHA 2540-D Notes: 1. 1 mg/l (milligram per litre) = 1 ppm (part per million) = 1000 µg/l (micrograms per litre)= 1000 ppb (part per billion) 2. For conductivity - 1 ds/m = 1 ms/cm = 1000 µs/cm 3. Analysis performed according to APHA, 2012, Standard Methods for the Examination of Water & Wastewater, 22nd Edition, except where stated otherwise. 4. Analysis conducted between sample arrival date and Report provision date Environmental Analysis Laboratory, Southern Cross University, Tel , website: scu.edu.au/eal checked:... Graham Lancaster Laboratory Manager
33 PAGE 1OF 1 RESULTS OF WATER ANALYSIS 9 samples supplied by Coastwide Civil Pty Ltd on the 24th - Lab. Job No. F4168 Analysis requested by Nick Chalk. Your Project: Shell Cove Boat Harbour (19 Croome Lane, ALBION PARK NSW 2527) PARAMETER METHODS REFERENCE Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample 6 Sample 7 Sample 8 Sample 9 MP 10 MP 20 MP 20 MP 10 MP 20 MP 21 MP 10 MP 20 MP 20 17/10/16 17/10/16 18/10/16 19/10/16 19/10/16 19/10/16 20/10/16 20/10/16 21/10/16 Job No. F4168/1 F4168/2 F4168/3 F4168/4 F4168/5 F4168/6 F4168/7 F4168/8 F4168/9 TOTAL SUSPENDED SOLIDS (mg/l) GFC equiv. filter - APHA 2540-D Notes: 1. 1 mg/l (milligram per litre) = 1 ppm (part per million) = 1000 µg/l (micrograms per litre)= 1000 ppb (part per billion) 2. For conductivity - 1 ds/m = 1 ms/cm = 1000 µs/cm 3. Analysis performed according to APHA, 2012, Standard Methods for the Examination of Water & Wastewater, 22nd Edition, except where stated otherwise. 4. Analysis conducted between sample arrival date and Report provision date Environmental Analysis Laboratory, Southern Cross University, Tel , website: scu.edu.au/eal checked:... Graham Lancaster Laboratory Manager
34 Environmental CERTIFICATE OF ANALYSIS Work Order : EW Page : 1 of 2 Client : COASTWIDE CIVIL Laboratory : Environmental Division NSW South Coast Contact : Nick Chalk Contact : Glenn Davies Address : 19 Croome Lane Address : 1/19 Ralph Black Dr, North Wollongong 2500 Albion Park /13 Geary Pl, North Nowra 2541 Australia Telephone : Telephone : Project : Shell Cove Marina Date Samples Received : 13-Oct :21 Order number : ---- Date Analysis Commenced : 18-Oct-2016 C-O-C number : ---- Issue Date : 21-Oct :28 Sampler : ---- Site : ---- Quote number : ---- No. of samples received : 3 No. of samples analysed : 3 This report supersedes any previous report(s) with this reference. Results apply to the sample(s) as submitted. This document shall not be reproduced, except in full. This Certificate of Analysis contains the following information: General Comments Analytical Results Additional information pertinent to this report will be found in the following separate attachments: Quality Control Report, QA/QC Compliance Assessment to assist with Quality Review and Sample Receipt Notification. Signatories This document has been electronically signed by the authorized signatories below. Electronic signing is carried out in compliance with procedures specified in 21 CFR Part 11. Signatories Position Accreditation Category Alison Graham Supervisor - Inorganic Newcastle - Inorganics, Mayfield West, NSW R I G H T S O L U T I O N S R I G H T P A R T N E R
35 Page : 2 of 2 Work Order : EW Client : COASTWIDE CIVIL Project : Shell Cove Marina General Comments The analytical procedures used by the Environmental Division have been developed from established internationally recognized procedures such as those published by the USEPA, APHA, AS and NEPM. In house developed procedures are employed in the absence of documented standards or by client request. Where moisture determination has been performed, results are reported on a dry weight basis. Where a reported less than (<) result is higher than the LOR, this may be due to primary sample extract/digestate dilution and/or insufficient sample for analysis. Where the LOR of a reported result differs from standard LOR, this may be due to high moisture content, insufficient sample (reduced weight employed) or matrix interference. When sampling time information is not provided by the client, sampling dates are shown without a time component. In these instances, the time component has been assumed by the laboratory for processing purposes. Where a result is required to meet compliance limits the associated uncertainty must be considered. Refer to the ALS Contact for details. Key : CAS Number = CAS registry number from database maintained by Chemical Abstracts Services. The Chemical Abstracts Service is a division of the American Chemical Society. LOR = Limit of reporting ^ = This result is computed from individual analyte detections at or above the level of reporting ø = ALS is not NATA accredited for these tests. ~ = Indicates an estimated value. Analysis as per AS Samples passed through a 1mm sieve prior to analysis. NATA accreditation does not apply for results reported in g/m².mth as sampling data was provided by the client. Sample exposure period outside AS specifications of 30 +/- 2 days. Analytical Results Sub-Matrix: DEPOSITIONAL DUST (Matrix: AIR) Compound EA120: Ash Content Ash Content Ash Content (mg) EA125: Combustible Matter Combustible Matter Combustible Matter (mg) EA141: Total Insoluble Matter Total Insoluble Matter Total Insoluble Matter (mg) CAS Number Client sample ID Client sampling date / time LOR Unit g/m².month mg g/m².month mg g/m².month mg MP1 31/08/ /10/2016 [13-Oct-2016] EW MP2 31/08/ /10/2016 [13-Oct-2016] EW MP3 31/08/ /10/2016 [13-Oct-2016] EW Result Result Result
36 Appendix C Site Rainfall Measurements Coastwide Civil 28 P a g e
37 Rainfall Monitoring Sheet Project: Shell Cove Boatharbour, Stage 2 Day Date Time of reading Rainfall (mm) Inspected by Saturday 01/10/2016 9:00 AM * * Sunday 02/10/2016 9:00 AM * * Monday 03/10/2016 9:00 AM Public Holiday * Tuesday 04/10/2016 9:00 AM 0.5 Long Weekend Total - Abi Wednesday 05/10/2016 9:00 AM 0.0 Jess Jefferies Thursday 06/10/2016 9:00 AM 0.0 Abi Friday 07/10/2016 9:00 AM 0.0 Abi Saturday 08/10/2016 9:00 AM * * Sunday 09/10/2016 9:00 AM * * Monday 10/10/2016 9:00 AM 0.0 Jess Jefferies Tuesday 11/10/2016 9:00 AM 0.0 Jess Jefferies Wednesday 12/10/2016 9:00 AM 0.0 Jess Jefferies Thursday 13/10/2016 9:00 AM 4.0 Jess Jefferies Friday 14/10/2016 9:00 AM 0.0 Jess Jefferies Saturday 15/10/2016 9:00 AM * * Sunday 16/10/2016 9:00 AM * * Monday 17/10/2016 9:00 AM 0.0 Jess Jefferies Tuesday 18/10/2016 9:00 AM 7.5 Jess Jefferies Wednesday 19/10/2016 9:00 AM 0.0 Jess Jefferies Thursday 20/10/2016 9:00 AM 0.0 Jess Jefferies Friday 21/10/2016 9:00 AM 0.0 Jess Jefferies Saturday 22/10/2016 9:00 AM * * Sunday 23/10/2016 9:00 AM * * Monday 24/10/2016 9:00 AM 14.5 Jess Jefferies Tuesday 25/10/2016 9:00 AM 0.0 Jess Jefferies Wednesday 26/10/2016 9:00 AM 0.0 Jess Jefferies Thursday 27/10/2016 9:00 AM 0.0 Jess Jefferies Friday 28/10/2016 9:00 AM 2.0 Jess Jefferies Saturday 29/10/2016 9:00 AM * * Sunday 30/10/2016 9:00 AM * * Monday 31/10/2016 9:00 AM 1.5 Jess Jefferies Coastwide Civil Pty Ltd Page 1 of 1 CWC-Form SP20 RMS-01 Issue 1 26/06/2012
SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY December, 2016
SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY COASTWIDE CIVIL PTY LTD ADDRESS: 19 CROOME LANE, ALBION PARK, 2527 POSTAL: P.O.BOX 116, KIAMA, 2533 E-MAIL: info@coastwidecivil.com.au ABN: 71
More informationSHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY November, 2016
SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY COASTWIDE CIVIL PTY LTD ADDRESS: 19 CROOME LANE, ALBION PARK, 2527 POSTAL: P.O.BOX 116, KIAMA, 2533 E-MAIL: info@coastwidecivil.com.au ABN: 71
More informationSHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY March, 2016
SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY COASTWIDE CIVIL PTY LTD ADDRESS: 19 CROOME LANE, ALBION PARK, 2527 POSTAL: P.O.BOX 116, KIAMA, 2533 E-MAIL: info@coastwidecivil.com.au ABN: 71
More informationSHELL COVE BOATHARBOUR STAGE 2 AND BREAKWATERS MONTHLY MONITORING SUMMARY September, 2017
SHELL COVE BOATHARBOUR STAGE 2 AND BREAKWATERS MONTHLY MONITORING SUMMARY COASTWIDE CIVIL PTY LTD ADDRESS: 19 CROOME LANE, ALBION PARK, 2527 POSTAL: P.O.BOX 116, KIAMA, 2533 E-MAIL: info@coastwidecivil.com.au
More informationSHELL COVE BOATHARBOUR STAGE 2 AND BREAKWATERS MONTHLY MONITORING SUMMARY November, 2017
SHELL COVE BOATHARBOUR STAGE 2 AND BREAKWATERS MONTHLY MONITORING SUMMARY COASTWIDE CIVIL PTY LTD ADDRESS: 19 CROOME LANE, ALBION PARK, 2527 POSTAL: P.O.BOX 116, KIAMA, 2533 E-MAIL: info@coastwidecivil.com.au
More information13 February Nathan Wood Hamcon Civil Pty Ltd PO Box 2356 Orange NSW Our ref: L Dear Nathan, Water analysis - Bald Hill Quarry
Envirowest Consulting Pty Ltd ABN 18 103 955 246 9 Cameron Place, PO Box 8158, Orange NSW 2800 Tel (02) 6361 4954 Fax (02) 6360 3960 Email admin@envirowest.net.au Web www.envirowest.net.au Environmental
More informationKaruah East Quarry. Monthly Environmental Monitoring Report
Karuah East Quarry June 2018 Table of Contents 1. INTRODUCTION... 1 2. DUST MONITORING... 1 2.1 Dust Deposition Results... 2 2.2 High Volume Air Sampling Results... 3 2.3 Dust Monitoring Results Summary...
More informationKaruah East Quarry. Monthly Environmental Monitoring Report
Karuah East Quarry July 2018 Table of Contents 1. INTRODUCTION... 1 2. DUST MONITORING... 1 2.1 Dust Deposition Results... 2 2.2 High Volume Air Sampling Results... 3 2.3 Dust Monitoring Results Summary...
More informationSURFACE WATER, DEPOSITIONAL DUST, HVAS AND METEOROLOGICAL MONITORING Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA
SURFACE WATER, DEPOSITIONAL DUST, HVAS AND METEOROLOGICAL MONITORING Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA Australia RCA ref 6880-1733/0 January 2017 RCA AUSTRALIA
More informationENVIRONMENT PROTECTION LICENCE NO: October 2018 Monthly Report. Princes Highway Upgrade between Berry and Bomaderry
ENVIRONMENT PROTECTION LICENCE NO: 21029 October 2018 Monthly Report FOR Princes Highway Upgrade between Berry and Bomaderry Document control File name DSWJV-EPL21029-October 2018 Report name Revision
More informationAIR, WATER AND METEOROLOGICAL MONITORING JUNE 2018 PINE DALE MINE, BLACKMANS FLAT
AIR, WATER AND METEOROLOGICAL MONITORING JUNE 2018 PINE DALE MINE, BLACKMANS FLAT Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA Australia RCA ref 6880-1771/0 RCA AUSTRALIA
More informationAIR, WATER AND METEOROLOGICAL MONITORING AUGUST 2018 PINE DALE MINE, BLACKMANS FLAT
AIR, WATER AND METEOROLOGICAL MONITORING AUGUST 2018 PINE DALE MINE, BLACKMANS FLAT Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA Australia RCA ref 6880-1775/0 RCA AUSTRALIA
More informationSURFACE WATER, DEPOSITIONAL DUST, HVAS AND METEOROLOGICAL MONITORING Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA
SURFACE WATER, DEPOSITIONAL DUST, HVAS AND METEOROLOGICAL MONITORING Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA Australia RCA ref 6880-1757/0 January 2018 RCA AUSTRALIA
More informationAIR, WATER AND METEOROLOGICAL MONITORING MAY 2018 PINE DALE MINE, BLACKMANS FLAT
AIR, WATER AND METEOROLOGICAL MONITORING MAY 2018 PINE DALE MINE, BLACKMANS FLAT Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA Australia RCA ref 6880-1769/0 RCA AUSTRALIA
More informationMONTHLY ENVIRONMENTAL MONITORING REPORT PORT BOTANY REDEVELOPMENT PATRICK STEVEDORES
MONTHLY ENVIRONMENTAL MONITORING REPORT PORT BOTANY REDEVELOPMENT PATRICK STEVEDORES JANUARY 2014 www.mcconnelldowell.com MCCONNELL DOWELL CORPORATION PAGE 1 OF 13 McConnell Dowell Constructors (Aust.)
More informationSURFACE WATER, DEPOSITIONAL DUST, HVAS AND METEOROLOGICAL MONITORING Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA
SURFACE WATER, DEPOSITIONAL DUST, HVAS AND METEOROLOGICAL MONITORING Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA Australia RCA ref 6880-882/0 May 2015 RCA AUSTRALIA ABN
More informationMONTHLY ENVIRONMENTAL MONITORING REPORT PORT BOTANY REDEVELOPMENT PATRICK STEVEDORES
MONTHLY ENVIRONMENTAL MONITORING REPORT PORT BOTANY REDEVELOPMENT PATRICK STEVEDORES DECEMBER 2013 www.mcconnelldowell.com MCCONNELL DOWELL CORPORATION PAGE 1 OF 13 McConnell Dowell Constructors (Aust.)
More informationMonthly Environmental Monitoring Report
\ Monthly Environmental Monitoring Report Name of Operation Name of Licensee Environmental Protection Licence Reporting Period start date Reporting Period end date Version Author Approver Moolarben Coal
More informationWILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425
WILPINJONG COAL PTY LTD Environment Protection Licence (EPL) 12425 Link to Environment Protection Licence EPL12425 LICENCE MONITORING DATA MONTHLY SUMMARY REPORT for 1 February 2018 to 28 February 2018
More informationWILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425
WILPINJONG COAL PTY LTD Environment Protection Licence (EPL) 12425 Link to Environment Protection Licence EPL12425 LICENCE MONITORING DATA MONTHLY SUMMARY REPORT for 1 March 2018 to 31 March 2018 Air Monitoring
More informationEnvironmental Noise Compliance Assessment Bass Point Quarry
P: 4421 4583 M: 0414 315 775 50 Junction Street, Nowra, NSW 2541 matthew@harwoodacsoutics.com.au www.harwoodacoustics.com.au ABN: 71634 997 937 Environmental Noise Compliance Assessment Bass Point Quarry
More informationGroundwater Monitoring Report - April 2018
Groundwater Monitoring Report - April 2018 12 April 2018 Groundwater Monitoring Report - April 2018 12 April 2018 MJM Environmental Pty Ltd ABN 21 089 600 019 Office 1, Level 2 355 Wharf Road Newcastle,
More informationWILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425
WILPINJONG COAL PTY LTD Environment Protection Licence (EPL) 12425 Link to Environment Protection Licence EPL12425 LICENCE MONITORING DATA MONTHLY SUMMARY REPORT for 1 July 2018 to 31 July 2018 Air Monitoring
More informationEnvironment Protection Licence 6538 Monthly Monitoring Data Summary
Bengalla Mining Company Pty Limited A.B.N. 32 053 909 470 Bengalla Road, Muswellbrook Locked Mail Bag 5, Muswellbrook NSW 2333 Australia Bengalla Mine Environment Protection Licence 6538 Monthly Monitoring
More informationWILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425
+ WILPINJONG COAL PTY LTD Environment Protection Licence (EPL) 12425 Link to Environment Protection Licence EPL12425 LICENCE MONITORING DATA MONTHLY SUMMARY REPORT for 1 August 2018 to 31 August 2018 Air
More informationEnvironment Protection Licence
Licence Details Number: Anniversary Date: 20001 22-August Licensee CLEARY BROS (BOMBO) PTY LTD PO BOX 210 PORT KEMBLA NSW 2505 Premises PORT KEMBLA OUTER HARBOUR OFF CHRISTY DRIVE PORT KEMBLA NSW 2505
More informationCulcairn Quarry Environmental Monitoring Report. Culcairn Quarry. Environmental Monitoring Report. October 2017
Environmental Monitoring Report Environmental Monitoring Report October 2017 Published: November 2017 1 Environmental Monitoring Report This monitoring report is to satisfy the requirements of Section
More informationPacific Highway Upgrade Frederickton to Eungai ENVIRONMENTAL MONITORING DATA EPL 20318
Pacific Highway Upgrade Frederickton to Eungai ENVIRONMENTAL MONITORING DATA EPL 20318 May 2014 1 INTRODUCTION The publishing of data refers to the compliance of the Frederickton to Eungai Project (the
More informationSydney Port Botany Terminal 3 Project Out of Hours Works Protocol
1/11 Terms and Definitions The following terms, abbreviations and definitions are used in this plan: Terms Explanation SPBT3 Sydney Port Botany Terminal 3 CEMP EM EPA ERAP OEH PAH OOHWP EIS MCoA Distribution
More informationWILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425
WILPINJONG COAL PTY LTD Environment Protection Licence (EPL) 12425 Link to Environment Protection Licence EPL12425 LICENCE MONITORING DATA MONTHLY SUMMARY REPORT for 1 June 2017 to 30 June 2017 Air Monitoring
More informationWILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425
WILPINJONG COAL PTY LTD Environment Protection Licence (EPL) 12425 Link to Environment Protection Licence EPL12425 LICENCE MONITORING DATA MONTHLY SUMMARY REPORT for 1 November 2017 to 30 November 2017
More informationWILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425
WILPINJONG COAL PTY LTD Environment Protection Licence (EPL) 12425 Link to Environment Protection Licence EPL12425 LICENCE MONITORING DATA MONTHLY SUMMARY REPORT for 1 September 2017 to 30 September 2017
More informationWILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425
WILPINJONG COAL PTY LTD Environment Protection Licence (EPL) 12425 Link to Environment Protection Licence EPL12425 LICENCE MONITORING DATA MONTHLY SUMMARY REPORT for 1 December 2017 to 31 December 2017
More informationEnvironment Protection Licence
Licence Details Number: Anniversary Date: 20734 26-February Licensee JOHN HOLLAND PTY LTD SAMSUNG C&T CORPORATION CPB CONTRACTORS PTY LIMITED PO BOX 411 BURWOOD NSW 1805 Premises WESTCONNEX M4 EAST, HOMEBUSH
More informationWILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425
WILPINJONG COAL PTY LTD Environment Protection Licence (EPL) 12425 Link to Environment Protection Licence EPL12425 LICENCE MONITORING DATA MONTHLY SUMMARY REPORT for 1 August 2017 to 31 August 2017 Air
More informationMonthly Environmental Monitoring Report. March 2018
Report 1 Final Date Rev. Status Page i Table of Contents 1. Introduction... 2 2. Monitoring Requirements... 2 3. Dust Depositional Monitoring... 5 4. Total Suspended Particulates... 7 5. Real Time PM 10
More informationANNUAL ENVIRONMENTAL MANAGEMENT REPORT
ORICA KURRI KURRI ANE PLANT ANNUAL ENVIRONMENTAL MANAGEMENT REPORT JULY 2014 Revision Date Description Author Approver 0 2014 Annual Environmental Report D Horne Manufacturing Superintendent Kurri R Powell
More informationWILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425
WILPINJONG COAL PTY LTD Environment Protection Licence (EPL) 12425 Link to Environment Protection Licence EPL12425 LICENCE MONITORING DATA MONTHLY SUMMARY REPORT for 1 October 2017 to 31 October 2017 Air
More informationEnvironment Protection Licence
Licence Details Number: Anniversary Date: 11649 01-January Licensee NEWMAN QUARRYING PTY LTD PO BOX 292 YAMBA NSW 2464 Premises NEWMANS QUARRY JACKYBULBIN ROAD MORORO NSW 2469 Scheduled Activity Extractive
More informationFebruary/March 2015 Air Quality Report Burma Road Site
February/March 2015 Air Quality Report Burma Road Site Attached is a technical summary of air quality data for February/March 2015 at the Burma Road cleanup site submitted by PPG Industries air monitoring
More informationBombo Quarry Environmental Monitoring Report. Bombo Quarry. Environmental Monitoring Report. October 2017
Bombo Quarry Environmental Monitoring Report October 2017 Published: November 2017 This monitoring report is to satisfy the requirements of Section 66 (6) of the Protection of the Environment and Operations
More informationMonthly Environmental Monitoring Report
MACH Energy Australia Pty. Limited 21-Nov-2016 Monthly Environmental Monitoring Report Project - October 2016 Project - October 2016 Client: MACH Energy Australia Pty. Limited ABN: 34608495441 Prepared
More informationANNUAL ENVIRONMENTAL MANAGEMENT REPORT
ORICA KOORAGANG ISLAND ANNUAL ENVIRONMENTAL MANAGEMENT REPORT NOVEMBER 2010 Revision Date Description Author Reviewer Approver 0 30/11/2010 2010 Annual Environmental Report S Woodroffe Sustainability Manager
More informationCentennial Ivanhoe No2 Colliery. Environmental Monitoring Data
Centennial Ivanhoe No2 Colliery Environmental Monitoring Data October 2012 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. RAINFALL... 2 3. AIR QUALITY MONITORING... 2 3.1 Depositional Dust... 2 4. SURFACE WATER
More informationGROUND WATER DEPOSITIONAL DUST HVAS AND METEOROLOGICAL MONITORING
GROUND WATER DEPOSITIONAL DUST HVAS AND METEOROLOGICAL MONITORING Pine Dale Mine Pine Dale Mine Community Consultative Committee RCA Australia RCA ref 6880-801/0 July 2012 RCA AUSTRALIA ABN 53 063 515
More informationPollution Monitoring Data July 2014
Cristal Mining Australia Limited Broken Hill Mineral Separation Plant Pinnacles Road Broken Hill NSW 2880 Pollution Monitoring Data July 2014 Licence Details EPA Licence Number: 12314 Link to Licence:
More informationMonthly Noise Monitoring Assessment
Monthly Noise Monitoring Assessment Tomingley Gold Mine, December 2018 Prepared for: Tomingley Gold Operations Pty Limited December 2018 MAC160270RP28 Document Information Monthly Noise Monitoring Assessment
More informationEnvironment Protection Licence
Licence Details Number: Anniversary Date: 20772 17-May Licensee CPB CONTRACTORS PTY LIMITED PO BOX 6120 ALEXANDRIA NSW 2015 Premises WESTCONNEX NEW M5 BETWEEN BEVERLY HILLS AND ST PETERS BEVERLY HILLS
More information1 Introduction. Mine EPL. report. Dear Leonard, J13083L2_24 assessment. operation of. the crusher, RASP Mine. 2015); and
14 January 2016 Leonard Sharp Environment and Community Liaison Officer CBH Resources RASP Mine Broken Hill Operations Pty Ltd 130 Eyre St, Broken Hill, NSW 2880 Level 5, 21 Bolton Street Newcastle NSW
More informationEnvironment Protection Licence
Licence Details Number: Anniversary Date: 21149 09-October Licensee SAMSUNG C&T CORPORATION BOUYGUES CONSTRUCTION AUSTRALIA PTY LTD LENDLEASE ENGINEERING PTY LIMITED LVL 14 TWR3, INT TWRS, EXCHANGE PL
More informationPollution Monitoring Data January 2013
Cristal Mining Australia Limited Broken Hill Mineral Separation Plant Pinnacles Road Broken Hill NSW 2880 Pollution Monitoring Data January 2013 Licence Details EPA Licence Number: 12314 Hyperlink to Licence:
More informationWAMBO COAL PTY LIMITED MONTHLY ENVIRONMENTAL MONITORING REPORT. April 2011
WAMBO COAL PTY LIMITED MONTHLY ENVIRONMENTAL MONITORING REPORT Table of Contents April 2011 1.0 INTRODUCTION... 1 2.0 METEOROLOGICAL DATA... 1 3.0 SURFACE WATER SAMPLING... 1 4.0 GROUND WATER SAMPLING...
More informationTSS The TSS analyser was operational during the reporting period. The composite sampler is in place to cover any shortfalls in the TSS analyser.
Interim Environmental Report Period Ending: 28th May 28 Compiled By: Siobhan Quinn & Thomas McGlynn Approved By: Tony Doyle 1 Monitoring Data 1.1 Monitoring Equipment Axonics Axonics plant operated as
More informationPollution Monitoring Data April 2013
Cristal Mining Australia Limited Broken Hill Mineral Separation Plant Pinnacles Road Broken Hill NSW 2880 Pollution Monitoring Data April 2013 Licence Details EPA Licence Number: 12314 Hyperlink to Licence:
More informationEnvironmental Protection Licence 2688
Perilya Environmental Protection Licence 2688 Licensee Perilya Broken Hill Limited (PBHL) Address Wentworth Rd, Broken Hill, NSW, 2880. Environmental Protection Licence 2688 (Southern Operations) Link
More informationFortnightly Water Quality Report
Fortnightly Water Quality Report Ichthys Nearshore Environmental Monitoring Program Weeks 20/21: to 20 January 2013 Weeks 20/21: 7 to 20 January 2013 Prepared for INPEX June 2013 Fortnightly Water Quality
More informationCertificate of Analysis
Certificate of Analysis Multiquip Aggregates P/L 260 Tenth Ave Austral NSW 2179 NATA Accredited Accreditation Number 1261 Site Number 1254 Accredited for compliance with ISO/IEC 17025. The results of the
More information... 4... 5... 5... 6... 6... 6... 6 215 A Original Issue - R01 Rev Description A4 SE Drn. Datum: GDA 1994 MGA Zone 56 - AHD 430 12-08-2013 Date: 860 m Site Boundary Legend: Source: Base
More informationGunlake Quarry. Air Quality Management Plan
Gunlake Quarry Air Quality Management Plan August 2015 Table of Contents 1. Introduction 3 1.1 Overview 3 1.2 Aims and Objectives 3 2. Air Quality Criteria 3 2.1 Impact Assessment Criteria 4 2.2 Sources
More informationEnvironmental Monitoring Results Summary
Environmental Monitoring Results Summary Quarter 1 2016 Name of Mine: CSA Mine Environment Protection Licence: EPL 1864 Licensee Name and Operator: Cobar Management Pty Ltd Licensee Address: PO Box 31,
More informationKurnell Wharf Infrastructure Upgrade
Kurnell Wharf Infrastructure Upgrade Sediment and Water Quality Monitoring Program CALTEX REFINERIES (NSW) PTY LTD September 2013 Page 1 1 INTRODUCTION Caltex Refineries (NSW) Pty Ltd (Caltex) proposes
More informationNOISE MANAGEMENT PLAN
Young to Wagga Wagga Pipeline Looping Project Project No.: Q8291 Doc No: 8291-PLN-005 NOISE MANAGEMENT PLAN 1 07-08-10 Details revised as per NSW Dept of Planning G.O Mahony P. Grant G. O Mahony 0 28-07-10
More informationTSS The TSS analyser was operational during the reporting period. The composite sampler is in place to cover any shortfalls in the TSS analyser.
Interim Environmental Report Period Ending: 3 th April 28 Compiled By: Siobhan Quinn, Aoife Reynolds & Thomas McGlynn Approved By: Tony Doyle 1 Monitoring Data 1.1 Monitoring Equipment Axonics Axonics
More informationWEEKLY PROGRESS REPORT TRC SOLUTIONS. Gowanus Canal Turning Basin 4 Dredging and Capping Pilot Study Brooklyn, New York. Project number:
WEEKLY PROGRESS REPORT TRC SOLUTIONS Gowanus Canal Turning Basin 4 Dredging and Capping Pilot Study Brooklyn, New York Project number: 283126 Period: November 13 to 16, 2018 Date of Report: November 26,
More informationMINING OPERATION SERVICES
METROMIX PTY LIMITED Lower Level Management Plan Prepared in conjunction with: MINING OPERATION SERVICES SEPTEMBER 2016 CONTENTS Page COMMONLY USED ACRONYMS... 4 1 INTRODUCTION... 5 2 APPROVED ACTIVITIES...
More informationCertificate of Analysis
Certificate of Analysis Multiquip Aggregates P/L 260 Tenth Ave Austral NSW 2179 NATA Accredited Accreditation Number 1261 Site Number 1254 Accredited for compliance with ISO/IEC 17025 Testing The results
More informationMayo Renewable Power Killala Construction Works Monthly Environmental Report 010 April 2016
Mayo Renewable Power Killala Construction Works Monthly Environmental Report 010 April 2016 Executive Summary John Sisk & Son (Holdings) Ltd. commissioned NVM Ltd. to monitor and report on Noise, Dust
More informationOrica Kooragang Island. Community Reference Group. Monthly Briefing Paper #3 January 2012 ISSUED FOR CRG MEETING ON 30 JANUARY 2012
Orica Kooragang Island Community Reference Group Monthly Briefing Paper #3 January 2012 ISSUED FOR CRG MEETING ON 30 JANUARY 2012 1. Introduction This Briefing Paper focuses on activity and events during
More informationGROUND WATER DEPOSITIONAL DUST HVAS AND METEOROLOGICAL MONITORING PINE DALE MINE. Prepared for PINE DALE MINE COMMUNITY CONSULTATIVE COMMITTEE
GROUND WATER DEPOSITIONAL DUST HVAS AND METEOROLOGICAL MONITORING PINE DALE MINE Prepared for PINE DALE MINE COMMUNITY CONSULTATIVE COMMITTEE Prepared by RCA AUSTRALIA RCA-LE ref 6880-789/0 February 2012
More informationOdour Emission Report Summary odour testing exercise February 2018
Odour Emission Report Summary odour testing exercise 16 21 February 2018 1 INTRODUCTION The principal objectives of the tests were to measure odour emission concentrations from the stack and to determine
More informationEnvironmental Report - Status Week Ending: Thur 12 h May2006 Generated By: Siobhan Quinn/Mairtin Naughton/Sandra Barber Checked By: Leslie Finnegan
Environmental Report - Status Week Ending: Thur 12 h May2006 Generated By: Siobhan Quinn/Mairtin Naughton/Sandra Barber Checked By: Leslie Finnegan 1 Monitoring Data 1.1 Monitoring Equipment Axonics System
More informationOBERON WHITE GRANITE QUARRY
Mudgee Stone Company Pty Ltd Document Owner: MSC Revision Period: 3 Years Issue: Draft Last Revision Date: 31/1/2017 NOISE MANAGEMENT PLAN OBERON WHITE GRANITE QUARRY i Endorsement of NMP by Mudgee Stone
More informationMonthly Environmental Monitoring Report. February 2018
Report 1 Final Date Rev. Status Page i Table of Contents 1. Introduction... 2 2. Monitoring Requirements... 2 3. Dust Depositional Monitoring... 5 4. Total Suspended Particulates... 7 5. Real Time PM 10
More informationAppendix B Noise and Blasting Impact Assessment
Appendix B Noise and Blasting Impact Assessment 19 August 2010 Ref: J0130-42-L4 Hansen Bailey Pty Ltd P.O. Box 473 SINGLETON NSW 2330 Attn: Ms. Melissa Walker Dear Mel, ABN: 73 254 053 305 78 Woodglen
More informationRoyal North Shore Hospital - Acute Services Building
Royal North Shore Hospital - Acute Services Building Thiess Services Pty Ltd Environmental Monitoring Data for EPL 13358 Monitoring of the Cogeneration Plant for Q3, 2013 September 2013 Contents 1 INTRODUCTION...
More informationEnvironment Protection Licence
Licence Details Number: Anniversary Date: 21149 09-October Licensee SAMSUNG C&T CORPORATION BOUYGUES CONSTRUCTION AUSTRALIA PTY LTD LENDLEASE ENGINEERING PTY LIMITED EXCHANGE PLACE, 300 BARANGAROO AVENUE
More informationBoral Maldon Cement Works POELA Act 2011 Monitoring Data
Boral Maldon Cement Works POELA Act 2011 Monitoring Data Boral Cement Maldon, NSW Environmental Protection Licence No. 212 Explanation of units of measure: mg/m 3 = milligrams per cubic metre g/m2/month
More informationRoyal North Shore Hospital - Acute Services Building
Royal North Shore Hospital - Acute Services Building Thiess Services Pty Ltd Environmental Monitoring Data for EPL 13358 Preliminary Monitoring of the Cogeneration Plant March 2013 Contents 1 INTRODUCTION...
More informationGunlake Quarry. Noise and Blast Management Plan
Gunlake Quarry Noise and Blast Management Plan August 2015 Table of Contents 1. Introduction 3 1.1 Overview 3 1.2 Aims and Objectives 3 2. Noise Criteria 3 2.1 Operational Noise Assessment Criteria 3 2.2
More informationEnvironmental Noise Monitoring. Hanson Quarry Wagga Wagga, NSW. October 2012
Environmental Noise Monitoring Hanson Quarry Wagga Wagga, NSW October 2012 Contents 1. INTRODUCTION... 3 2. UNATTENDED NOISE MONITORING... 3 3. EXISTING BACKGROUND NOISE LEVELS... 5 4. EXISTING AMBIENT
More informationOut of hours works protocol
Out of hours works protocol March 2017 Document control File name TNR3N_OOH_Work _Protocol_Rev2 Report name Out of hours works protocol Revision number 2 Revision history Revision Date Description Approval
More informationEnvironmental Field Sampling
Environmental Field Sampling Water and Wastewater Kim Riddell Director of Business Development - Alloway Introduction The most precise and accurate analytical measurements are worthless and even detrimental
More informationBAAL BONE COLLIERY. January to March 2015 Environmental Monitoring Summary. Baal Bone Colliery Q Quarterly Environmental Monitoring Report
BAAL BONE COLLIERY January to March 2015 Environmental Monitoring Summary 1. Introduction In accordance with Schedule 5, Condition 9 of Project Approval 09_0178 this report provides a summary of environmental
More informationEnvironment Protection Licence
Licence Details Number: Anniversary Date: 20850 24-November Licensee MACH ENERGY AUSTRALIA PTY LTD LEVEL 2, 179 GREY STREET SOUTH BANK QLD 4101 Premises MOUNT PLEASANT OPERATION 1100 WYBONG ROAD MUSWELLBROOK
More informationAttachment N o F.2 EMISSIONS MONITORING AND SAMPLING POINTS
Attachment N o F.2 EMISSIONS MONITORING AND SAMPLING POINTS Lagan Cement Ltd. IPPC Licence Application Attachment N o F.2 EMISSIONS MONITORING AND SAMPLING POINTS Air Contents F.2.0 Air Emissions.3 Water
More informationPeak Gold Mines MONTHLY ENVIRONMENTAL MONITORING SUMMARY REPORT. February 2018
Peak Gold Mines MONTHLY ENVIRONMENTAL MONITORING SUMMARY REPORT EPL 3596 Hillston Road, Cobar NSW 2835 February 2018 Contents 1. INTENT... 3 2. SCOPE... 3 3. DEFINITIONS... 3 4. MONITORING RESULTS... 4
More informationPeet No Pty Ltd Level 1 Inspection and Testing, Bulk Earthworks Stage 3 and 4, Little Green Residential Precinct 1 GEOTABTF09878AA-AG
Peet No 1895 Pty Ltd Level 1 Inspection and Testing, Bulk Earthworks Stage 3 and 4, Little Green Residential Precinct 1 GEOTABTF09878AA-AG 29 September 2016 This page has been left intentionally blank
More informationThe data used for this reporting period was taken from the on-site meteorological station.
Environmental Report - Final Week Ending: Thur 15 th Mar 27 Generated By: Siobhan Quinn/Sandra Barber Checked By: Tony Doyle 1 Monitoring Data. 1.1 Monitoring Equipment Axonics Axonics plant ran for the
More informationTraffic Management Plan. Environmental Management and Monitoring Program. Appendix VI
Traffic Management Plan Environmental Management and Monitoring Program Appendix VI Gunlake Quarries December 2009 Olsen Consulting Group Pty Ltd 6/25 Victoria Street WOLLONGONG 2500 PO Box 353 FIGTREE
More informationAlbion Park Quarry Annual Environmental Management Report
DoP SUBMISSION Cleary Bros (Bombo) Pty Ltd Albion Park Quarry Annual Environmental Management Report Period 1 July 2011 30 June 2012 Reference GEN1208-02 Cleary Bros (Bombo) Pty Ltd 39 Five Islands Road
More informationSection 75J of the Environmental Planning and Assessment Act 1979
Project Approval Section 75J of the Environmental Planning and Assessment Act 1979 I approve the project application referred to in Schedule 1, subject to the conditions in Schedules 2 to 4. These conditions
More informationPOLLUTION INCIDENT RESPONSE MANAGEMENT PLAN SHELL COVE BOAT HARBOUR CONSTRUCTION FRASERS PROPERTY. 27 April 2017 Version 3
POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN SHELL COVE BOAT HARBOUR CONSTRUCTION FRASERS PROPERTY 27 April 2017 Version 3 Document title Document short title Status Project name POLLUTION INCIDENT RESPONSE
More informationStephenson CO-GENERATION PLANT STACK EMISSION TESTING TOOHEYS PTY LTD LIDCOMBE, NSW PROJECT NO.: 5522/S23794/15 DATE OF SURVEY: 15 JULY 2015
Stephenson Environmental Management Australia CO-GENERATION PLANT STACK EMISSION TESTING TOOHEYS PTY LTD LIDCOMBE, NSW PROJECT NO.: 5522/S23794/15 DATE OF SURVEY: 15 JULY 2015 DATE OF ISSUE: 31 JULY 2015
More informationEnvironmental Monitoring Data Monthly Monitoring Results January 2014
Environmental Monitoring Data Monitoring Results January 2014 Newcastle Grain Terminal Page 1 Table of Contents 1.0 Introduction and Background... 3 2.0 Newcastle Grain Terminal Site Information... 3 2.
More informationUse of long term monitoring data for defining baseline sound levels
Use of long term monitoring data for defining baseline sound levels Chris SKINNER 1 ; Sue THOMAS 2 ; Paul SHIELDS 3 1 AECOM, UK 2 Tideway/Amec Foster Wheeler, UK 3 AECOM, UK ABSTRACT With the trend towards
More informationStephenson CO-GENERATION PLANT STACK EMISSION TESTING TOOHEYS PTY LTD LIDCOMBE, NSW PROJECT NO.: 5648/S24184/16 DATE OF SURVEY: 24 MARCH 2016
Stephenson Environmental Management Australia CO-GENERATION PLANT STACK EMISSION TESTING - 2016 TOOHEYS PTY LTD LIDCOMBE, NSW PROJECT NO.: 5648/S24184/16 DATE OF SURVEY: 24 MARCH 2016 DATE OF ISSUE: 21
More informationEnvironment Protection Licence
Licence Details Number: Anniversary Date: 656 30-November Licensee MUSWELLBROOK COAL COMPANY LTD PO BOX 123 MUSWELLBROOK NSW 2333 Premises MUSWELLBROOK COLLIERY HOLDING COAL ROAD MUSWELLBROOK NSW 2333
More informationDRINKING WATER QUALITY MANAGEMENT PLAN 2016/2017 REPORT HINCHINBROOK SHIRE COUNCIL SP62
HINCHINBROOK SHIRE COUNCIL SP62 PO BOX 366 INGHAM QLD 4850 Phone: (07) 4776 4600 Email: council@hinchinbrook.qld.gov.au Version No: A Authorised By: Water and Sewerage Current Version Date: 01/12/2017
More information