1 Maximizing Nutrient Removal in an Existing SBR With a Full-Scale BioMag Demonstration Brian L. Lubenow 1 *, Steven Woodard 2, David W. Stewart 1, Rachel A. Kirkham 1 1 CDM 2 Cambridge Water Technology * lubenowb@cdm.com ABSTRACT The 1.1-million-gallon-per-day (mgd) city of Taneytown (Maryland) wastewater treatment plant (WWTP) consists of two sequencing batch reactors (SBRs). The city intends to upgrade the existing plant by incorporating BioMag, by Cambridge Water Technology, to provide enhanced nutrient removal (ENR). A full-scale trial of the BioMag system was conducted in 2010, representing its first application to an SBR. BioMag is an enhanced biological wastewater treatment process that uses magnetite, an inert iron ore (Fe 3 O 4 ), to increase the specific gravity of biological floc, to increase settling rates. This application demonstrated stable, high-level treatment throughout a wide range of influent concentrations. Effluent total nitrogen and total phosphorus concentrations averaged 1.2 milligrams per liter (mg/l) and 0.11 mg/l, respectively. Key components of this application are the ability to increase mixed liquor suspended solids concentrations and appreciably reduce the duration of the settle phase, increasing aerobic and/or anoxic react phase durations. KEYWORDS: Sequencing batch reactor, BioMag, enhanced nutrient removal, activated sludge, retrofit, mixing, polymer INTRODUCTION Background The city of Taneytown s wastewater treatment plant (WWTP) is located in Carroll County, Maryland, and was constructed in The 1.1-million-gallon-per-day (mgd) WWTP receives primarily municipal wastewater and consists of two sequencing batch reactors (SBRs), which were designed to achieve biological nutrient removal (BNR) with effluent concentrations of 6 milligrams per liter (mg/l) of total nitrogen (TN) and 2 mg/l of total phosphorus (TP). In the near future, the plant s annual National Pollutant Discharge Elimination System (NPDES) permit limits for TN and TP will be lowered to 3 mg/l and 0.3 mg/l, respectively. Table 1 lists the proposed design criteria. The city intends to upgrade the existing plant by incorporating the BioMag system into the existing SBRs to provide enhanced nutrient removal (ENR). A full-scale demonstration of the BioMag system in one of the SBRs was successfully completed in fall 2010.

2 Table 1. Taneytown WWTP design criteria. Parameter Influent Effluent Units Average day flow rate mgd Maximum month flow rate mgd Maximum day flow rate mgd Peak hour flow rate mgd Average daily BOD 111 mg/l Average daily TSS 178 mg/l Average daily TKN 29 mg/l Required final effluent TN < 3.0 mg/l Assumed average daily TP 4 mg/l Required final effluent TP < 0.3 mg/l Each SBR provides the specific phases of biological treatment within a single tank. One tank fills and reacts, while the other undergoes react (polishing), settle (clarification), and decant phases. Alternating periods of aeration and non-aeration provide the conditions necessary for biological nitrification and denitrification, respectively. Table 2 lists the dimensions and capacity of each SBR. Table 2. Existing SBR sizing. Parameter Number/Size Number of SBR basins 2 Volume, low water level 590,000 gallons Volume, high water level 944,000 gallons Length 75 feet Width 75 feet Depth, low water level 14 feet Depth, high water level 22.4 feet BioMag process The BioMag ballasted activated sludge process is an emerging technology by Cambridge Water Technology (CWT) that can achieve low effluent suspended solids, biological oxygen demand (BOD), nitrogen, and phosphorus concentrations in a compact footprint. BioMag has the ability to substantially reduce biological treatment reactor volume requirements and dramatically decrease the footprint needed for BOD, TN, and TP removal. The process can achieve compliance with stringent nutrient standards without the need for tertiary filters or membranes. The key to BioMag s effectiveness is its marked ability to improve secondary sludge and SBR settling rates and provide high-quality secondary effluent with low suspended solids. BioMag is an enhanced biological wastewater treatment process that uses magnetite, an inert iron ore (Fe 3 O 4 ), to increase the specific gravity of biological floc. With a specific gravity of 5.2 and a strong affinity for biological solids, the ballast substantially increases the settling rate of the biomass. Increasing the specific gravity and settling rate of the biological floc provides the

3 opportunity to increase the mixed liquor concentration, while still maintaining adequate settling and thickening in the SBR. BioMag improves the treatment capabilities of the existing SBRs through the following mechanisms: Ability to operate the activated sludge system at increased mixed liquor suspended solids (MLSS) concentrations, increasing treatment capacity. Increased secondary settling and thickening rates, resulting in increased treatment reliability and transfer of time from settle phase to react phase. Increasing MLSS concentration results in longer sludge ages, increasing nitrification efficiency. Enhanced, reliable removal of suspended solids, nitrogen, and phosphorus. Figure 1 below shows a typical process flow diagram for BioMag applied to an SBR. The process flow diagram shows that virgin magnetite ballast and recovered magnetite (ballast) are blended with secondary sludge in the ballast mix tank. The ballasted secondary sludge then flows back to the SBR. A small amount of polymer is typically added to the mixed liquor just before it enters the settle phase to enhance sludge settling and thickening. The magnetite recovery process is based on sending the biosolids through a shear mill to separate the ballast from the floc. This stream then flows to a rotating drum lined with fixed magnets, which enable a very efficient separation and recovery of magnetite from the biological floc. The recovered ballast is reblended with the mixed liquor in the ballast mix tank. The excess biological solids (minus the magnetite) are wasted to the sludge discharge sump.

4 Figure 1. This trial represents the first application of the BioMag process to an SBR. Objectives The primary objective of this trial was to demonstrate that incorporating BioMag into the existing SBR process will enable the plant to effectively and reliably achieve compliance with the proposed permit limits, including the TN and TP limits of 3 mg/l and 0.3 mg/l, respectively. This trial represents the first application of the BioMag process to a sequencing batch reactor (SBR). Secondary objectives were as follows: Demonstrate the peak hydraulic and mass load handling capabilities of the system Quantify the increased settling rate and investigate polymer feed and mixing parameters Determine the mixing requirements METHODOLOGY CWT entered into a contract with the city to conduct a full-scale BioMag trial at the WWTP. Oversight of the trial was provided by CDM. The five phases of the trial are identified in Table 3, below.

5 Table 3. Taneytown WWTP BioMag trial phases. Phase Time Operations 1. Mobilization & baseline testing 2. Charge system with magnetite 3. Steady state operation 4. Modify SBR cycle structure, increase MLSS concentration & increase mass loading 5. Single basin operation 30 days 14 days 30 days 30 days 7 days Mobilize and install all process equipment. Collect daily samples to establish baseline operational performance. Begin running one SBR with BioMag process and fully charge mixed liquor with magnetite. Demonstrate consistent compliance with proposed permit limits, including TN and TP. Optimize the process based on dissolved oxygen monitoring. Conduct mixing tests & settling column tests. Optimize BioMag concentration and polymer dosage. Modify SBR cycle structure to decrease settling time and increase react/react fill cycle lengths. Supplement the influent with carbon and nitrogen to simulate high mass loading. Direct full plant flow to the BioMag SBR. The performance parameters were set forth in a contract between the City and CWT and are presented in Table 4. Table 4. Pilot plant performance parameters. Success Parameters Influent Characteristics Required Performance Measure Average daily flow 0.55 MGD MGD 1 Maximum month average daily flow MGD MGD 1 TKN 25 mg/l mg/l 3 30 day average TP 4 mg/l 0.3 mg/l 4 30 day average TSS 175 mg/l 2 20 mg/l 30 day average BOD 115 mg/l 2 20 mg/l 30 day average 1. These flows represent half of the WWTP design flow, since the pilot will only be conducted in one of the two SBRs. 2. These figures represent the typical influent wastewater concentrations at the WWTP over the last two years. Total suspended solids (TSS) is the only parameter that differs significantly from the original design value (140 mg/l).

6 3. The effluent TKN is measured as total nitrogen and includes refractory nitrogen up to 1.0 mg/l. 4. The effluent TP includes any non-reactive phosphorus up to 0.1 mg/l in the wastewater stream. Magnetite addition and recovery A full-scale BioMag enhanced nutrient removal trial was conducted in one of the SBRs at the city s WWTP. SBR No. 1 became the BioMag SBR, while SBR No. 2 served as the control. The core components of the magnetite feed and recovery system were housed in one of CWT s mobile BioMag trailers. Mixed liquor was pumped from the SBR to a 2-millimeter (mm) perforated screen using the existing submersible SBR secondary sludge transfer pump. The screen was used to remove rags, hair, and other stringy material that can build up in the shear mill and adversely impact shearing efficiency. The screened secondary sludge then flowed by gravity to the ballast mix tank sump containing two submersible pumps. One of the pumps was used to provide secondary sludge to the well-mixed ballast (magnetite) feed tank. The other pump was used to feed the shear mill (Figure 2), followed by the recovery drum (Figures 3 and 4). An automated feed system (Figure 5) metered dry magnetite into the magnetite mix tank, where the magnetite became enmeshed in the biological floc. Venturi eductors and plant water were used to transport both the powdered and recovered magnetite to the ballast feed tank. The ballasted mixed liquor flowed by gravity into the ballasted mixed liquor sump, where it was pumped back to the head of the SBR. The waste activated sludge (WAS), minus the recovered magnetite, was pumped from the bottom of the recovery drum to the aerobic digester. A polymer makedown/feed system was used to batch feed polymer to the BioMag SBR to aid solids settling and thickening. Phosphorus removal Ferric chloride was batch fed directly to the BioMag SBR to precipitate phosphorus and demonstrate that 0.3 mg/l TP will be readily achievable using chemical precipitation.

7 Figure 2. The shear mill separates the magnetite Figure 3. The magnetic recovery drum ballast from the floc. recovers 96 to 99% of the magnetite ballast. Figure 4. The biomass is separated and transferred to the aerobic digester. Figure 5. The dry feeder pneumatically adds virgin magnetite to the system. SBR cycle modifications The BioMag SBR continued to operate with five cycles per day. However, the cycle structure of the SBR was modified to account for the appreciable reduction in settling time. The project team worked with Aqua Aerobic Systems, Inc. (AASI) to modify the SBR programming. The settle phase was reduced from 60 minutes to as low as 20 minutes. The remaining 40 minutes per cycle were used to increase the treatment capacity of the SBR by lengthening the react and react fill phases. This and increased MLSS concentrations resulted in additional treatment capacity for both nitrification and denitrification. The cycle structures were changed regularly to optimize

8 nitrification and denitrification. The aeration provided was automatically varied based on a temporary dissolved oxygen (DO) control system. Mixing tests The existing 30-hp AquaDDM SBR mixer was installed as part of the plant construction in The mixers were designed to achieve complete mixing of the SBR at design TSS of 3,600 mg/l. Mixing tests were conducted using both the existing 30-hp and a new 40-hp AquaDDM mixer. The testing procedure consisted of pulling samples using a low-flow submersible sample pump at varied locations and depths throughout the tank, and analyzing TSS and magnetite ratio. Tests were conducted during un-aerated mixed SBR phases with TSS values ranging from 6,000 to 13,000 mg/l, including magnetite. Due to the symmetry of the SBR tank, sampling locations were selected within just one (northeastern) quadrant of the tank, as depicted in Figure 6. Sample depths were 1, 5, 10, and approximately 15 feet below the surface. The bottom sampling depth was altered as necessary to be approximately 1 foot above the bottom of the tank. Figure 6. Due to the symmetry of the SBR tank, mixing test sampling locations were selected exclusively in the northeastern quadrant. Settling tests and polymer feed and mixing optimization Full-scale SBR settling tests were conducted throughout the demonstration. A series of sampling events were conducted to measure the sludge blanket interface depth and settling rates of the BioMag SBR during the settle phase. Single basin operation Based on the success of the BioMag SBR throughout the trial, the trial was extended an additional week to operate the WWTP in single-sbr mode, with nearly continuous flow through the BioMag SBR. This single SBR phase was initiated on November 15 at 9:00 a.m. and ran

9 until 9:00 p.m., and then restarted November 16 at 7:00 a.m. and was monitored until November 18 at 9:00 p.m. Analytical testing System operation included routine inspections and adjustments of the BioMag test equipment, daily sampling rounds, chemical feed adjustments, and laboratory analyses. BioMag system monitoring is detailed in Table 5. Table 5. BioMag system monitoring parameters Parameter Location Frequency SBR Cycle Analysis Dissolved oxygen SBR Continuous Mixed Fill/React Fill/React Auto Temperature SBR Daily (Mon-Fri) React City ph SBR Daily (Mon-Fri) React City Settled sludge blanket level SBR Daily (Mon-Fri) Decant City Water level in SBR SBR Daily (Mon-Fri) Settle Auto WAS flow NA Daily (Mon-Fri) NA Auto Magnetite feed rate NA Daily (Mon-Fri) NA Auto Polymer feed rate NA Daily (Mon-Fri) NA Auto Aqueous ammonia feed rate NA Daily (Mon-Fri) NA Auto Ferric chloride feed rate NA Daily (Mon-Fri) NA Auto MLSS SBR Daily (Mon-Fri) React City Magnetite in SBR SBR Daily (Mon-Fri) React City MLVSS SBR Daily (Mon-Fri) React City Sludge Magnetite in WAS holding tank Daily (Mon-Fri) NA City Residual magnetite in WAS after Recovery recovery drum Weekly NA City Influent alkalinity Headworks Daily (Mon-Fri) Mixed Fill/React Fill Hach Effluent TSS SBR Daily (Mon-Fri) Decant City Effluent VSS SBR Daily (Mon-Fri) Decant City Influent TP Headworks Daily (Mon-Fri) Mixed Fill/React Fill Hach Effluent TP SBR Daily (Mon-Fri) Decant Hach Effluent soluble P SBR Daily (Mon-Fri) Decant Hach Influent BOD Headworks Daily (Mon-Fri) Mixed Fill/React Fill Lab Effluent BOD SBR Daily (Mon-Fri) Decant Lab Influent TKN Headworks Daily (Mon-Fri) Mixed Fill/ReactFill Hach

10 Effluent ammonia SBR Daily (Mon-Fri) Decant Hach Effluent nitrite SBR Daily (Mon-Fri) Decant Hach Effluent nitrate SBR Daily (Mon-Fri) Decant Hach Effluent organic nitrogen SBR Daily (Mon-Fri) Decant Hach RESULTS This report section presents and discusses the results of the full-scale BioMag trial. The demonstration began in August 2010 and concluded in November Nutrient removal Figure 7 is a time series plot of the BioMag daily (24-hour) flow totals. The BioMag SBR flow averaged 0.22 mgd for the first six weeks of the trial. This represented a very dry period in which wastewater flows were below normal and influent BOD, TSS, TN, and TP concentrations were above normal. A large storm occurred on September 29 and 30 and the 4.3 inches of rain resulted in appreciable infiltration and inflow. The total plant flow on September 30 was 4.5 mgd, 29 percent higher than the design maximum day flow of 3.5 mgd. The system operated in storm mode, which involves eliminating the react polish phase and filling the reactor while it settles. The system performed well, maintaining excellent treatment during these stressed conditions. Despite the fact that the SBR was often filling and decanting at the same time, the sludge blanket remained well under control, full nitrification was maintained, and effluent quality was excellent. After the storm rain event subsided, the BioMag SBR influent flows once again stabilized, varying between 0.2 and 0.7 mgd. Figure 8 shows the BioMag MLSS concentrations recorded during the trial, not including the weight of magnetite. The MLSS biosolids concentration ranged between 3,000 and 5,000 mg/l, with a general increasing trend. This was roughly twice that of the control SBR, whose MLSS concentrations ranged from 1,500 to 2,400 mg/l. Figure 7. Influent flow to BioMag SBR Figure 8. BioMag SBR MLSS concentration

11 Figure 9 shows the influent ammonia concentration throughout the trial. The BioMag SBR treated a surprisingly wide range of influent ammonia concentrations, ranging from 10 to 73 mg/l. Figure 10 shows both the influent and effluent TN concentrations. The influent TN was also highly variable, ranging from 10 to 95 mg/l, while the BioMag effluent TN was low and stable, averaging 1.2 mg/l and peaking at 4.8 mg/l. Control SBR data was taken less frequently, so there are not as many data points. Regardless, it is clear that the BioMag SBR demonstrated superior TN removal when compared to the control (7.36 mg/l). There are three basic reasons for the enhanced treatment: (1) the increased MLSS concentration results in higher reaction rates and improved nitrogen removal, (2) the enhanced settling rate provides for reduced settling time and increased reaction time, and (3) more flexibility in cycle structure to optimize and stabilize TN removal. The BioMag effluent TN concentration is shown on a smaller scale on Figure 11. All daily data points except one (the max day flow event on September 30) were less than 3 mg/l. Figure 12 shows the BioMag effluent nitrogen series, including ammonia, nitrite, and nitrate. The ammonia and nitrite remained low and steady through the trial, staying dependably below 1.0 mg/l. The nitrate was a little more variable, but remained less than 2.0 mg/l, except during startup and one day of storm flow. MicroC TM was added during the final anoxic phase until October 20 to enhance nitrate removal, but was discontinued at that time, as it was discovered that TN removal to the permit limit could be achieved without supplemental carbon addition. In fact, the lowest effluent nitrate concentrations were achieved after discontinuing MicroC TM feed during the final anoxic stage. Figure 9. Influent ammonia concentration Figure 10. Influent and effluent total nitrogen

12 Figure 11. Effluent nitrogen Figure 12. Effluent nitrogen series Figure 13 is a time series plot of the BioMag SBR influent and effluent TP concentrations. Again, the influent was highly variable, ranging from 1.8 to 20 mg/l. The effluent TP was low and stable, averaging 0.11 mg/l after the system stabilized, with only single-point addition of ferric chloride directly to the SBR. The project team demonstrated that the BioMag SBR could average less than 0.1 mg/l by increasing the ferric feed rate during the last 30 days of the trial. Although the experiment was successful, the ferric dose (~18 mg/l as Fe) was relatively high, demonstrating that single-point coagulant addition may not be the most cost effective method of achieving compliance with ultra low TP limits, i.e. 0.1 mg/l or less. Control SBR data was taken less frequently, so there are not as many data points. Nonetheless, it is clear that the BioMag SBR demonstrated superior TP removal when compared to the control (1.92 mg/l). The increased ferric addition rate to the BioMag SBR certainly played an important role in achieving low effluent TP. Other important factors included BioMag s consistently low effluent TSS (4.6 mg/l trial average) and overall treatment stability.

13 Figure 13. BioMag and control SBR effluent phosphorus Figure 14. BioMag SBR effluent phosphorus Settling tests and polymer feed/mixing trials Settling tests were performed throughout the trial to minimize the required settling time. The SBR s decanter mechanism pulls effluent from approximately 8 inches below the water surface. For practical purposes, it is typically necessary to have multiple feet of clear water below the water surface to prevent the effluent flow s velocity from scouring and entraining solids from the top of the blanket. Given the rapid, consistent settling and the distinct, reliable blanket interface of BioMag s ballasted MLSS, it was typically considered acceptable to go into decant with a 2.5- to 3-foot clear water depth in the BioMag SBR. The control SBR utilized a settle time of 60 to 70 minutes during the pilot operation. This is longer than the design settle period of 45 minutes, and was required to accommodate the slow settling sludge that is common to SBRs. If a shorter settle time was used, the effluent typically suffered from high TSS, caused by slow settling floc and a poorly defined blanket interface. For the BioMag SBR, the settling time was reduced to as low as 20 minutes per cycle. This settle time was used in early October, although the BioMag settle time was set at 25 minutes for the majority of the trial. These settle times were utilized both with and without polymer. The comparatively short interval was impressive, considering that the energy from the DDM mixer continues to roll the tank contents for 6 to 10 minutes into the start of the settle phase. The actual settling doesn t begin until this momentum is dissipated. Polymer addition was also investigated during the trial. A cationic emulsion polymer was selected from Ashland Chemical and prepared to a 0.4 to 0.5 percent solution using a polymer makedown skid. This polymer makedown skid was used to fill a day tank. Immediately prior to the start of settling, polymer was fed using a peristaltic hose pump at 6 gallons per minute into the SBR tank. Through November 8, the polymer was directed approximately 8 feet from the center of the DDM mixer. It was assumed that this mixer would thoroughly mix the polymer into the tank volume prior to the settle step, developing larger, faster settling floc. The average settling rate over the settle phase during this period ranged from 0.09 feet per second (fps) to 0.25 fps and averaged 0.17 fps.

14 It was observed throughout the trial that the polymer had a significantly reduced impact in the actual basin compared a jar test at the same dosage. Different full-scale polymer addition timing sequences were investigated, and carrier water was added to try to improve polymer dispersion in the SBR basins. Overall, polymer use did not provide significant benefit in the SBR. TSS reduction and settling speed, two of the major drivers for polymer use, did not significantly improve when polymer was added. This was good news from a chemical use standpoint, but did not provide the rapid settling data that was routinely observed the jar tests. As such, the last two weeks of the trial (November 9 through November 18) were dedicated to optimizing polymer injection and mixing, and demonstrating accelerated settling, so these issues could be adequately addressed in the detailed design of a BioMag SBR system. It became apparent from detailed testing that the major issue with introducing polymer adjacent to the DDM mixer was excessive shear. A jar test imparts ideal mixing conditions. The polymer is injected quickly and then evenly distributed throughout the sample in a few seconds with a gentle stirring motion. Lab tests with a small laboratory aerator and diffuser stone demonstrated clearly that any vigorous aeration or high-speed propeller mixing quickly began to shear the floc. A negative impact on settling rate was observed in the beaker when the mixing was extended longer than 5 seconds. Because of the limited pilot equipment, dosing the SBR with the proper volume of diluted polymer took 15 to 30 minutes. During this period, the DDM mixer and/or aeration were on, shearing the floc within seconds, and then continuing to destroy the floc over the following minutes. Full-scale testing was then set up to identify and demonstrate a solution to this challenge. The details of this testing are listed below. 400 feet of 1.25 ID poly hose, with holes drilled for distribution, were installed in the SBR around the perimeter at a depth of approximately 9 ft above the floor. Larger capacity diluted polymer pumps were installed to batch feed the polymer into the SBR through the poly hose distribution network. The required dose could be fed in approximately 6 minutes, instead of 20 to 30 minutes. Additional carrier water was added to accommodate this higher polymer flow and to further improve polymer distribution. Several variables were manipulated in an attempt to optimize settling: o The duration of injection o The depth of injection o The period of injection (i.e., continuing to feed polymer during the first few minutes of the settle step with all mixers off) o Adding a final air fluff by turning on a single blower for a few seconds after all polymer had been injected to provide a final tank roll. Visually intense mixing could be observed, with the heavier, faster settling flocs lifted to the top of the tank and introduced to the slower flocs with less ballast o The polymer dose ranged from 1 to 3 part per million by volume (ppmv) (0.5 to 1.5 mg/l active). In a jar test, rapid settling occurred at any concentration more than 1 ppmv. The new distribution network improved settling speeds dramatically. The average settling rate over the settle phase during this period ranged from 0.14 to 0.35 fps and averaged 0.25 fps. It

15 was very clear that proper polymer addition, distribution and mixing, even at lower doses, results in a faster settling, more distinct blanket that keeps pace with decanting. Mixing tests The existing mixer is a 30-hp AquaDDM and was installed as part of the plant construction in The AquaDDM mixers were designed to achieve complete mixing of the SBR at design TSS of 3,600 mg/l. Mixing tests were conducted using both the existing 30-hp and a new 40-hp AquaDDM mixer. The coefficient of variation (standard deviation divided by the mean) was computed for each test and values up to 10 percent were considered to be well mixed. Using the 30-hp mixer, all but two of the 14 tests at locations other than the corner indicated well-mixed conditions. Using the 40- hp mixer, all four tests at locations other than the corner indicated well mixed conditions. The additional inertia associated with the 40-hp mixer extended the period of visible residual mixing (after the mixer had shut off) by several minutes and the settle phase had to be extended accordingly. Complete mixing in the corner of the square tank was inconsistent. Of the seven tests conducted in the corner using the 30-hp mixer, only three indicated well-mixed conditions. In each of the poorly mixed tests, the sample taken 1 foot off the bottom of the tank greatly exceeded the average TSS, at times by more than a factor of two. Similar results were evident using the 40-hp mixer, as only one of the two tests in the corner indicated well mixed conditions. Two tests were conducted in the corner using the 30-hp mixer during an aerated cycle to determine the effect of air on mixing. Both tests indicated well mixed conditions, with coefficients of variability of only 2 percent. It appears that while mixing is inconsistent at the bottom of the tank in the corners during anoxic cycles, the additional energy from the operation of the air diffusers during aerated cycles completely mixes the entire tank and resuspends any settled solids. The results suggest that the 30-hp AquaDDM mixer adequately mixes the SBR, even at TSS levels up to 13,000 mg/l. Single basin operation Based on the success of the BioMag SBR throughout the trial, the trial was extended an additional week to operate the WWTP in single-sbr mode, with nearly continuous flow through the BioMag SBR. This single SBR phase was initiated on November 15 at 9:00 a.m. and ran until 9:00 p.m., and then restarted November 16 at 7:00 a.m. and was monitored until November 18 at 9:00 p.m. Flow was directed to the control SBR at selected times during this testing period for several reasons: To provide a small amount of food to maintain healthy biomass in SBR #2 To allow for hydraulic surge conditions during the rain event on November 16. Because of the fixed decant flowrate, the BioMag SBR level was increasing throughout each

16 cycle. Flow was diverted to the control SBR for only 2 hours to prevent the SBR from moving into storm flow programming mode To allow for monitoring of settling performance during accelerated settle testing led by CDM It is estimated that the BioMag SBR accepted the full plant flow for approximately 62 of 74 hours of this mini-trial. Overall, the data were impressive, given that influent was still entering the BioMag SBR at the same time the reactor was undergoing polish, settle, and decant phases. The BioMag effluent TSS concentration averaged 4.5 mg/l, with a maximum value of 10.2 mg/l. The TN remained less than 3.5 mg/l and the TP stayed below 0.3 mg/l. Long-term operation of the system in the single basin mode is not recommended. However, it is comforting to know that adequate effluent quality can still be achieved on occasions when only one SBR is available for treatment. DISCUSSION AND CONCLUSIONS The full-scale BioMag demonstration has met all of the project objectives, including the following: The BioMag SBR demonstrated stable, high-level treatment throughout a wide range of influent organic and nitrogen concentrations, even when elevated loadings were simulated by the addition of aqueous ammonia and MicroC TM to the influent wastewater. The ability to appreciably reduce the duration of the settle phase, thereby increasing aerobic and/or anoxic react phase durations, are key components of this enhanced treatment efficiency. Supplemental carbon feed is not required during the final anoxic phase to achieve consistent compliance with a 3.0 mg/l TN limit. Constructing a BioMag system to enhance both SBRs will allow the city to effectively and reliably achieve compliance with the state s proposed ENR permit limits, including the TN and TP limits of 3 and 0.3 mg/l, respectively, without the need for a tertiary treatment step. Effluent TN concentrations averaged 1.2 mg/l, and effluent TP concentrations averaged 0.11 mg/l. BioMag can effectively operate at elevated MLSS concentrations (i.e. 4,000 mg/l compared to 2,000 mg/l) over a wide range of flows and loadings, eliminating the need for additional tankage or tertiary filters to treat present and future loadings. BioMag demonstrated excellent TSS removal efficiency, averaging less than 5 mg/l over a wide range of flows and loadings. The BioMag system performed very well under maximum day flow conditions, effectively removing TN and TP and providing stable control over the sludge blanket. The shearing effect of the magnetite recovery process enhanced biosolids dewaterability, resulting in a 3- to 4-percentage point increase in cake dryness. The existing 30-hp mixer is sufficient to maintain adequate mixing of the magnetite ballasted mixed liquor. Special consideration should be given to the polymer feed and mixing systems to provide proper polymer distribution and floc development, as well as reduce floc shear in the permanent BioMag installation.

17 Although long-term operation in the single basin mode is not recommended, the BioMag system can provide adequate effluent quality on occasions when only one SBR is available for treatment. ACKNOWLEDGEMENTS The authors gratefully acknowledge the assistance of the Maryland Department of the Environment, Cambridge Water Technology (CWT), and the city of Taneytown, especially Mr. Andy Bishop of CWT and Mr. Kevin Smeak of the city, who each dedicated themselves to the success of this trial.

COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL

COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL Alvin C. Firmin CDM Jefferson Mill, 670 North Commercial Street Suite 201 Manchester, New Hampshire 03101 ABSTRACT Sequencing

More information

AquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic.

AquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic. PHASED ACTIVATED SLUDGE SYSTEM PHASED ACTIVATED SLUDGE SYSTEM Aqua-Aerobic Systems has led the industry in time-managed, biological technology since 1984. In 2004, Aqua-Aerobic applied its expertise in

More information

TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT

TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT Chester Yang, Ph.D., Gaowei Gu, Baowei Li, Hongyuan Li, Wanshen Lu, Lloyd Johnson,

More information

COMPARISON OF PROCESS ALTERNATIVES FOR ENHANCED NUTRIENT REMOVAL: PERSPECTIVES ON ENERGY REQUIREMENTS AND COSTS

COMPARISON OF PROCESS ALTERNATIVES FOR ENHANCED NUTRIENT REMOVAL: PERSPECTIVES ON ENERGY REQUIREMENTS AND COSTS COMPARISON OF PROCESS ALTERNATIVES FOR ENHANCED NUTRIENT REMOVAL: PERSPECTIVES ON ENERGY REQUIREMENTS AND COSTS Derya Dursun 1, Jose Jimenez 1, Aaron Briggs 2 1 Brown and Caldwell, 850 Trafalgar Court,

More information

ENHANCING THE PERFORMANCE OF OXIDATION DITCHES. Larry W. Moore, Ph.D., P.E., DEE Professor of Environmental Engineering The University of Memphis

ENHANCING THE PERFORMANCE OF OXIDATION DITCHES. Larry W. Moore, Ph.D., P.E., DEE Professor of Environmental Engineering The University of Memphis ENHANCING THE PERFORMANCE OF OXIDATION DITCHES Larry W. Moore, Ph.D., P.E., DEE Professor of Environmental Engineering The University of Memphis ABSTRACT Oxidation ditches are very popular wastewater treatment

More information

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100 MEMO To: Jeff Pelz (West Yost) Kathryn Gies (West Yost) Copies: Mark Hildebrand (NCA) ARCADIS U.S., Inc. 200 Harvard Mills Square Suite 430 Wakefield Massachusetts 01880 Tel 781 224 4488 Fax 781 224 3033

More information

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF

More information

Aqua MSBR MODIFIED SEQUENCING BATCH REACTOR

Aqua MSBR MODIFIED SEQUENCING BATCH REACTOR MODIFIED SEQUENCING BATCH REACTOR MODIFIED SEQUENCING BATCH REACTOR For over three decades, Aqua-Aerobic Systems has led the industry in sequencing batch reactor technology with performance proven and

More information

Review of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng

Review of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng Review of WEFTEC 2016 Challenge & Overview of 2017 Event Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng Agenda Review 2016 Challenge Provide overview of updates to 2017 event Frequency WEFTEC Scores

More information

BIOMAG/COMAG FREQUENTLY ASKED QUESTIONS

BIOMAG/COMAG FREQUENTLY ASKED QUESTIONS BIOMG/COMG FREUENTLY SKED UESTIONS 1. GENERL UESTIONS BOUT MGNETITE, THE FUNDMENTL ELEMENT USED IN BIOMG ND COMG TO INCRESE SETTLING RTES ND RELIBILITY. What is magnetite? Magnetite is fully oxidized iron

More information

GRANULAR ACTIVATED SLUDGE

GRANULAR ACTIVATED SLUDGE CLARKE PRIZE CONFERENCE ON WATER SUSTAINABILITY GRANULAR ACTIVATED SLUDGE THE FUTURE OF BIOLOGICAL NUTRIENT REMOVAL JAMES BARNARD CONTENTS Early observations of granular sludge Selection processes in activated

More information

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

WEFTEC.06. **Cobb County Water System, Marietta, Georgia CHEMICALLY ENHANCED PRIMARY TREATMENT FOR A LARGE WATER RECLAMATION FACILITY ON A CONSTRICTED SITE - CONSIDERATIONS FOR DESIGN, START-UP, AND OPERATION ABSTRACT Jeffrey A. Mills, P.E., BCEE,* Roderick

More information

Ballasted Activated Sludge Demonstration Study SEPTEMBER 30, 2016

Ballasted Activated Sludge Demonstration Study SEPTEMBER 30, 2016 Ballasted Activated Sludge Demonstration Study SEPTEMBER 30, 2016 Agenda Riverbend WRP Expansion Project Background Ballasted Activated Sludge Process Overview Special Equipment Overview Peninsula WRP

More information

Nutrient Removal Optimization at the Fairview WWTP

Nutrient Removal Optimization at the Fairview WWTP Alyssa Mayer, PE Principal Engineer Nutrient Removal Optimization at the Fairview WWTP Mark Strahota, PE Associate Presentation Overview Project Background Process Model Development BNR Design Considerations

More information

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred

More information

AquaNereda Aerobic Granular Sludge Technology

AquaNereda Aerobic Granular Sludge Technology Aerobic Granular Sludge AquaNereda Aerobic Granular Sludge Technology The AquaNereda Aerobic Granular Sludge (AGS) Technology is an innovative biological wastewater treatment technology that provides advanced

More information

SBR PROCESS FOR WASTEWATER TREATMENT

SBR PROCESS FOR WASTEWATER TREATMENT SBR PROCESS FOR WASTEWATER TREATMENT IMR E&T S.r.l. Maria Vittoria Marra maria.vittoria.marra@imr.it www.imr.it Purification of wastewater A process aimed at removing organic and inorganic contaminants

More information

ISAM INTEGRATED SURGE ANOXIC MIX

ISAM INTEGRATED SURGE ANOXIC MIX ISAM INTEGRATED SURGE ANOXIC MIX P r o v e n T e c h n o l o g y FLUIDYNE S ISAM IS A TOTAL TREATMENT SYSTEM incorporating BOD, TSS and nitrogen removal along with sludge reduction in an integrated system.

More information

AMMONIA REMOVAL USING MLE PROCESS EXPERIENCES AT BALLARAT NORTH. David Reyne. Central Highlands Water Authority

AMMONIA REMOVAL USING MLE PROCESS EXPERIENCES AT BALLARAT NORTH. David Reyne. Central Highlands Water Authority AMMONIA REMOVAL USING MLE PROCESS EXPERIENCES AT BALLARAT NORTH Paper Presented by : David Reyne Author: David Reyne, Plant Operator Wastewater Treatment, Central Highlands Water Authority 65 th Annual

More information

- 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants. by Glenn Thesing

- 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants. by Glenn Thesing - 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants by Glenn Thesing Through retrofitting IFAS systems, communities can upgrade and expand wastewater treatment without the expense and complication

More information

Nutrient Removal Processes MARK GEHRING TECHNICAL SALES MGR., BIOLOGICAL TREATMENT

Nutrient Removal Processes MARK GEHRING TECHNICAL SALES MGR., BIOLOGICAL TREATMENT Nutrient Removal Processes MARK GEHRING TECHNICAL SALES MGR., BIOLOGICAL TREATMENT Presentation Outline 1. Nutrient removal, treatment fundamentals 2. Treatment strategies Treatment methods: CAS, SBR,

More information

Preparing for Nutrient Removal at Your Treatment Plant

Preparing for Nutrient Removal at Your Treatment Plant Summer Seminar Emerging Issues in the Water/Wastewater Industry Preparing for Nutrient Removal at Your Treatment Plant Rajendra P. Bhattarai, P.E., BCEE Austin Water Utility Ana J. Peña-Tijerina, Ph.D.,

More information

NEW BIOLOGICAL PHOSPHORUS REMOVAL CONCEPT SUCCESSFULLY APPLIED IN A T-DITCH PROCESS WASTEWATER TREATMENT PLANT

NEW BIOLOGICAL PHOSPHORUS REMOVAL CONCEPT SUCCESSFULLY APPLIED IN A T-DITCH PROCESS WASTEWATER TREATMENT PLANT NEW BIOLOGICAL PHOSPHORUS REMOVAL CONCEPT SUCCESSFULLY APPLIED IN A T-DITCH PROCESS WASTEWATER TREATMENT PLANT ABSTRACT C. Yang*, L. Zhou**, W. Luo***, and L. Johnson**** *Corstar International Corp. 111

More information

Module 17: The Activated Sludge Process - Part III Answer Key

Module 17: The Activated Sludge Process - Part III Answer Key Module 17: The Activated Sludge Process - Part III Answer Key What other differences can you see between Complete Mix and Step Aeration? One of the features that make Complete Mix Aeration different from

More information

Lowering The Total Cost Of Operation

Lowering The Total Cost Of Operation Lowering The Total Cost Of Operation The system removes more solids than conventional clarification, so filters can run longer between backwash cycles. Fewer backwash cycles means less backwash water,

More information

Activated Sludge Process Control: Nitrification

Activated Sludge Process Control: Nitrification Activated Sludge Process Control: Nitrification 60 th Annual KWWOA Conference, Session 1: April 11, 2017 Dan Miklos, Senior Associate, Midwest Region, Hazen and Sawyer Agenda Overview of the Utopia Plant

More information

DEVELOPMENT OF THE. Ken Mikkelson, Ph.D. Ed Lang Lloyd Johnson, P.E. Aqua Aerobic Systems, Inc.

DEVELOPMENT OF THE. Ken Mikkelson, Ph.D. Ed Lang Lloyd Johnson, P.E. Aqua Aerobic Systems, Inc. DEVELOPMENT OF THE AquaMB PROCESS Ken Mikkelson, Ph.D. Ed Lang Lloyd Johnson, P.E. Aqua Aerobic Systems, Inc. Aqua-Aerobic Systems, Inc. 6306 N. Alpine Road Rockford, IL 61111 Copyright 2003 Aqua-Aerobic

More information

Pilot Testing Reveals Alternative Methods to Meet Wisconsin s Low Level Phosphorus Limits

Pilot Testing Reveals Alternative Methods to Meet Wisconsin s Low Level Phosphorus Limits Pilot Testing Reveals Alternative Methods to Meet Wisconsin s Low Level Phosphorus Limits Rachel M. Lee 1*, Jane M. Carlson 1, Jeremy Bril 2, Jeremy Cramer 3, Jeff Harenda 4 1 Strand Associates, Inc.,

More information

Startup and Performance of the World s first Large Scale Primary Dissolved Air Floatation Clarifier ABSTRACT KEYWORDS INTRODUCTION

Startup and Performance of the World s first Large Scale Primary Dissolved Air Floatation Clarifier ABSTRACT KEYWORDS INTRODUCTION Startup and Performance of the World s first Large Scale Primary Dissolved Air Floatation Clarifier Bruce R. Johnson 1 *, Jennifer Phillips 2, Tim Bauer 3, Greg Smith 4, George Smith 5, John Sherlock 6

More information

Biological Phosphorus Removal Technology. Presented by: Eugene Laschinger, P.E.

Biological Phosphorus Removal Technology. Presented by: Eugene Laschinger, P.E. Biological Phosphorus Removal Technology Presented by: Eugene Laschinger, P.E. Overview What is phosphorus and why do we care? How can you remove phosphorus? Biological phosphorus removal Biological phosphorus

More information

Domestic Waste Water (Sewage): Collection, Treatment & Disposal

Domestic Waste Water (Sewage): Collection, Treatment & Disposal Domestic Waste Water (Sewage): Collection, Treatment & Disposal Sanitary sewers Storm water sewers Combined sewers Types of sewers: Types of collection system Building sewer/building connections:connected

More information

EVALUATION OF A WASTEWATER TREATMENT FACILITY USING A ROTATING LOW-ENERGY NON-BLOWER AERATOR

EVALUATION OF A WASTEWATER TREATMENT FACILITY USING A ROTATING LOW-ENERGY NON-BLOWER AERATOR EVALUATION OF A WASTEWATER TREATMENT FACILITY USING A ROTATING LOW-ENERGY NON-BLOWER AERATOR Rob Richardson, Ege Richardson, Adrian Hanson, Kurt Moffatt * ABSTRACT The Rincon Wastewater Treatment Facility

More information

BOD5 REMOVALS VIA BIOLOGICAL CONTACT AND BALLASTED CLARIFICATION FOR WET WEATHER M. COTTON; D. HOLLIMAN; B. FINCHER, R. DIMASSIMO (KRUGER, INC.

BOD5 REMOVALS VIA BIOLOGICAL CONTACT AND BALLASTED CLARIFICATION FOR WET WEATHER M. COTTON; D. HOLLIMAN; B. FINCHER, R. DIMASSIMO (KRUGER, INC. BOD REMOVALS VIA BIOLOGICAL CONTACT AND BALLASTED CLARIFICATION FOR WET WEATHER M. COTTON; D. HOLLIMAN; B. FINCHER, R. DIMASSIMO (KRUGER, INC.) Bench-scale testing was conducted to quantify the effectiveness

More information

WASTEWATER TREATMENT SYSTEM

WASTEWATER TREATMENT SYSTEM WASTEWATER TREATMENT SYSTEM PrintStudioOne.com Nelson Environmental Inc. The Nelson Environmental OPTAER system is an efficient pond-based wastewater treatment solution utilized in a broad spectrum of

More information

Water Technologies. The AGAR Process: Make Your Plant Bigger Without Making it Bigger

Water Technologies. The AGAR Process: Make Your Plant Bigger Without Making it Bigger Water Technologies The AGAR Process: Make Your Plant Bigger Without Making it Bigger Enhanced Wastewater Treatment The unique, patented AGAR (Attached Growth Airlift Reactor) process from Siemens is the

More information

Troubleshooting Activated Sludge Processes. PNCWA - Southeast Idaho Operators Section Pocatello, ID February 11, 2016 Jim Goodley, P.E.

Troubleshooting Activated Sludge Processes. PNCWA - Southeast Idaho Operators Section Pocatello, ID February 11, 2016 Jim Goodley, P.E. Troubleshooting Activated Sludge Processes PNCWA - Southeast Idaho Operators Section Pocatello, ID February 11, 2016 Jim Goodley, P.E. Outline Process Types & Kinetics Influent Monitoring Process Monitoring

More information

Severn Trent Services Wastewater Solutions End-to-End Wastewater Treatment Solutions

Severn Trent Services Wastewater Solutions End-to-End Wastewater Treatment Solutions Severn Trent Services Wastewater Solutions End-to-End Wastewater Treatment Solutions 999C1310EU.2 MAY/09 Complete Solutions for Wastewater Treatment Severn Trent Services, one of the UK s leading suppliers

More information

General Information on Nitrogen

General Information on Nitrogen General Information on Nitrogen What is nitrogen? Nitrogen was discovered in 1772 by Daniel Rutherford in Scotland Nitrogen gas makes up nearly 80% of the air we breathe Nitrogen gas is not toxic Nitrogen

More information

DISCUSSION PAPER. 1 Objective. 2 Design Flows and Loads. Capital Regional District Core Area Wastewater Management Program

DISCUSSION PAPER. 1 Objective. 2 Design Flows and Loads. Capital Regional District Core Area Wastewater Management Program DISCUSSION PAPER Capital Regional District Core Area Wastewater Management Program Macaulay/McLoughlin Point Wastewater Treatment Plant Discussion Paper Liquid Process Alternatives Evaluation 034-DP-1

More information

EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT

EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT Matthew Valade, P.E. July 25, 2014 Barboe.pptx Presentation Outline Project Background Why Dewater Croton Residuals Offsite?

More information

Removal of High C and N Contents in Synthetic Wastewater Using Internal Circulation of Anaerobic and Anoxic/Oxic Activated Sludge Processes

Removal of High C and N Contents in Synthetic Wastewater Using Internal Circulation of Anaerobic and Anoxic/Oxic Activated Sludge Processes Removal of High C and N Contents in Synthetic Wastewater Using Internal Circulation of Anaerobic and Anoxic/Oxic Activated Sludge Processes Nittaya Boontian School of Environmental Engineering, Institute

More information

Conceptual Design for a Future Wastewater Treatment Plant

Conceptual Design for a Future Wastewater Treatment Plant Wastewater Master Plan DWSD Project No. CS-1314 Conceptual Design for a Future Wastewater Treatment Plant Technical Memorandum Original Date: April 1, 2003 Revision Date: September 2003 Author: CDM Table

More information

Integrated Activated Sludge and Biosolids Treatment to Conserve Energy & Waste Solids Disposal

Integrated Activated Sludge and Biosolids Treatment to Conserve Energy & Waste Solids Disposal Integrated Activated Sludge and Biosolids Treatment to Conserve Energy & Waste Solids Disposal Nathan Antonneau, P.E. Presentation Outline Typical Flowsheet Configurations Process Reconfiguration - ISBR

More information

New Developments in BioWin 5.3

New Developments in BioWin 5.3 New Developments in BioWin 5.3 December 6, 2017 BioWin 5.3 contains a new Granular Sludge Sequencing Tank element to model this process, which is gaining acceptance worldwide as an effective wastewater

More information

INVESTIGATION INTO REUSE OF DECOMMISSIONED STP INFRASTRUCTURE, IMPROVING TREATMENT OUTCOMES. Liz Millan & Aleisha Myles

INVESTIGATION INTO REUSE OF DECOMMISSIONED STP INFRASTRUCTURE, IMPROVING TREATMENT OUTCOMES. Liz Millan & Aleisha Myles INVESTIGATION INTO REUSE OF DECOMMISSIONED STP INFRASTRUCTURE, IMPROVING TREATMENT OUTCOMES Paper Presented by: Liz Millan & Aleisha Myles Authors: Liz Millan, Chief Trainer, Simmonds and Bristow & Aleisha

More information

Case Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia.

Case Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia. Case Study BiOWiSH Aqua Municipal Wastewater Bathurst Waste Water Treatment Works Australia BiOWiSH Aqua Executive Summary The main objective of the validation was to quantify cost savings in using BiOWiSH.

More information

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station City of St. Joseph, Missouri Hydraulic Analysis and Effluent Pump Station By Work Order No. 09-001 B&V Project 163509 May 20, 2010 Table of Contents 1.0 Executive Summary...1 2.0 Purpose of Study...2 3.0

More information

TWO YEAR CASE STUDY OF INTEGRATED FIXED FILM ACTIVATED SLUDGE (IFAS) AT BROOMFIELD, CO WWTP West 124th Street Broomfield, CO 80020

TWO YEAR CASE STUDY OF INTEGRATED FIXED FILM ACTIVATED SLUDGE (IFAS) AT BROOMFIELD, CO WWTP West 124th Street Broomfield, CO 80020 ABSTRACT TWO YEAR CASE STUDY OF INTEGRATED FIXED FILM ACTIVATED SLUDGE (IFAS) AT BROOMFIELD, CO WWTP Mr. Ken Rutt 1, Jim Seda 1 and Mr. Chandler H. Johnson 2 1 City & County of Broomfield 2985 West 124th

More information

Appendix D JWPCP Background and NDN

Appendix D JWPCP Background and NDN Appendix D JWPCP Background and NDN JWPCP Background JWPCP Water Quality Primary Clarifiers HPO Reactors Final Clarifiers Unit Influent Primary Effluent Secondary Effluent BOD mg/l 460 240

More information

Choices to Address Filamentous Growth

Choices to Address Filamentous Growth Michigan Water Environment Association Process Seminar November 12, 2015 Choices to Address Filamentous Growth Richard Beardslee City of Battle Creek Nathan Cassity Donohue & Associates Outline Battle

More information

MODIFIED SEQUENTIAL BATCH REACTOR (MSBR) A NEW PROCESS OF WASTEWATER TREATMENT

MODIFIED SEQUENTIAL BATCH REACTOR (MSBR) A NEW PROCESS OF WASTEWATER TREATMENT Ninth International Water Technology Conference, IWTC9 2005, Sharm El-Sheikh, Egypt 105 MODIFIED SEQUENTIAL BATCH REACTOR (MSBR) A NEW PROCESS OF WASTEWATER TREATMENT Medhat M. A. Saleh * and Usama F.

More information

Lagoons Operation and Management in New Brunswick

Lagoons Operation and Management in New Brunswick Lagoons Operation and Management in New Brunswick Lagoons Provide secondary treatment to domestic wastewater by the action of bacteria stabilizing the organic matter in the wastewater. Benefits of lagoons:

More information

A STRUVITE CONTROL AND PHOSPHORUS REMOVAL PROCESS FOR CENTRATE: FULL-SCALE TESTING. 850 Pembina Highway Winnipeg, MB

A STRUVITE CONTROL AND PHOSPHORUS REMOVAL PROCESS FOR CENTRATE: FULL-SCALE TESTING. 850 Pembina Highway Winnipeg, MB A STRUVITE CONTROL AND PHOSPHORUS REMOVAL PROCESS FOR CENTRATE: FULL-SCALE TESTING Simon Baker 1, Yoomin Lee 1, Wang Li 1 1 Earth Tech Canada Inc 850 Pembina Highway Winnipeg, MB ABSTRACT The North End

More information

REMOVAL OF COLOUR AND SOLIDS FROM QAL SEA WATER NEUTRALISATION EFFLUENT USING VEOLIA ACTIFLO HIGH RATE CLARIFIER

REMOVAL OF COLOUR AND SOLIDS FROM QAL SEA WATER NEUTRALISATION EFFLUENT USING VEOLIA ACTIFLO HIGH RATE CLARIFIER REMOVAL OF COLOUR AND SOLIDS FROM QAL SEA WATER NEUTRALISATION EFFLUENT USING VEOLIA ACTIFLO HIGH RATE CLARIFIER *Kane A 1, Leong T 1, Jenner R 2. 1 Queensland Alumina Limited 2 Formerly Veolia Water Solutions

More information

Closed Loop Reactor (CLR) Process. Innovative Technology, Flexible Orientation and Energy Saving Designs

Closed Loop Reactor (CLR) Process. Innovative Technology, Flexible Orientation and Energy Saving Designs Closed Loop Reactor (CLR) Process Innovative Technology, Flexible Orientation and Energy Saving Designs Lakeside Biological Treatment Processes Lakeside s oxidation ditch experience since 1963 has led

More information

Technical Memorandum-Low Cost Retrofits for Nitrogen Removal at Wastewater Treatment Plants in the Upper Long Island Sound Watershed

Technical Memorandum-Low Cost Retrofits for Nitrogen Removal at Wastewater Treatment Plants in the Upper Long Island Sound Watershed Technical Memorandum-Low Cost Retrofits for Nitrogen Removal at Wastewater Treatment Plants in the Upper Long Island Sound Watershed Prepared by JJ Environmental, LLC Prepared for NEIWPCC First Draft:

More information

Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation. J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc.

Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation. J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc. Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc. Facultative Lagoon System Designed for 1.5 MGD Discharging 1.15-1.35

More information

Nutrient Removal Enhancement Using Process Automation at Holly Hill

Nutrient Removal Enhancement Using Process Automation at Holly Hill F W R J Nutrient Removal Enhancement Using Process Automation at Holly Hill Brad T. Blais, Kevin A. Lee, John E. Olson, and David W. Dubey The City of Holly Hill, located on the Atlantic Coast just north

More information

Integrated Fixed Film Activated Sludge (IFAS) System for Additional Nitrification at the Coldwater WWTP

Integrated Fixed Film Activated Sludge (IFAS) System for Additional Nitrification at the Coldwater WWTP Fishbeck, Thompson, Carr & Huber, Inc. Integrated Fixed Film Activated Sludge (IFAS) System for Additional Nitrification at the Coldwater WWTP Jim Flamming, P.E., Senior Process Engineer, FTC&H Dave Woodman,

More information

Use of Biowin for Process Troubleshooting / Design for a Unique Wastewater

Use of Biowin for Process Troubleshooting / Design for a Unique Wastewater Use of Biowin for Process Troubleshooting / Design for a Unique Wastewater OWEA Plant Operations and Lab Analysis Workshop W. James Gellner Outline Introduction / Problem Overview Plant Issues Biowin Overview

More information

A Review of the Current State of Knowledge on Phosphorus Removal

A Review of the Current State of Knowledge on Phosphorus Removal A Review of the Current State of Knowledge on Phosphorus Removal Sam Jeyanayagam, Ph.D., P.E., BCEE Senior Associate Malcolm Pirnie sjeyanayagam@pirnie.com Phone: (614) 430-2611 OWEA Conference 16 June

More information

Flocculation Flotation Pretreatment Improves Operation of MBR Installed to Treat Snack Food Manufacturing Wastewater

Flocculation Flotation Pretreatment Improves Operation of MBR Installed to Treat Snack Food Manufacturing Wastewater Flocculation Flotation Pretreatment Improves Operation of MBR Installed to Treat Snack Food Manufacturing Wastewater *Miroslav Colic 1, Jack Hogan 1, Ariel Lechter 1 1 Clean Water Technology Inc. *To whom

More information

Process Control Testing Copyright February 1, All rights reserved.

Process Control Testing Copyright February 1, All rights reserved. Process Control Testing Copyright February 1, 2000. All rights reserved. TWC Enterprises Lynn S. Marshall 5505 Race Road Cincinnati, OH 45247 Phone/fax:513-574-7050 lmarshall3@zoomtown.com Revised 04/07/13

More information

The city of Venice hired Camp

The city of Venice hired Camp Concentrate Post-Treatment For Hydrogen Sulfide And Dissolved Oxygen Vipin Pangasa, Laura Andrews, and William Green The city of Venice hired Camp Dresser & McKee, Inc., to design an effective concentrate

More information

Advantages & Applications of MBBR Technologies

Advantages & Applications of MBBR Technologies Advantages & Applications of MBBR Technologies Wastewater Technologies Attached Growth Suspended Growth Static Fixed film Trickling filters Rope media Web media Biological active filters (BAF) Dynamic

More information

Wastewater Treatment Processes

Wastewater Treatment Processes Wastewater Treatment Processes CEL212 Environmental Engineering (2 nd Semester 2010-2011) Dr. Arun Kumar (arunku@civil.iitd.ac.in) Department of Civil Engineering Indian Institute of Technology (Delhi)

More information

Case History: Anaerobic and Aerobic Treatment of Textile Wastes at South Carolina Textile Plants. Introduction

Case History: Anaerobic and Aerobic Treatment of Textile Wastes at South Carolina Textile Plants. Introduction Case History: Anaerobic and Aerobic Treatment of Textile Wastes at South Carolina Textile Plants Charles C. Ross, P.E. Environmental Treatment Systems, Inc. Atlanta, Georgia John S. Cox, P.E. John S. Cox

More information

Field Validation of Sequencing Batch Reactor and Cloth Media Filtration Technologies To Attain Ultra-Low Nutrient Levels

Field Validation of Sequencing Batch Reactor and Cloth Media Filtration Technologies To Attain Ultra-Low Nutrient Levels Field Validation of Sequencing Batch Reactor and Cloth Media Filtration Technologies To Attain Ultra-Low Nutrient Levels Terence K. Reid 1*, Al Zerbato 2, Rungrod Jittawattanarat 1, Lloyd W. Johnson 1,

More information

membrane bioreactor performance compared to conventional wastewater treatment

membrane bioreactor performance compared to conventional wastewater treatment Water Technologies & Solutions technical paper membrane bioreactor performance compared to conventional wastewater treatment Authors: Thomas C. Schwartz and Brent R. Herring, Woodard and Curran Incorporated

More information

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS: FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:

More information

NPDES COMPLIANCE OF COOLING TOWERS BLOWDOWN AT POWER PLANTS WITH RECLAIMED WATER AS SOURCE WATER

NPDES COMPLIANCE OF COOLING TOWERS BLOWDOWN AT POWER PLANTS WITH RECLAIMED WATER AS SOURCE WATER NPDES COMPLIANCE OF COOLING TOWERS BLOWDOWN AT POWER PLANTS WITH RECLAIMED WATER AS SOURCE WATER Nathan Schmaus, P.E. *, Joseph Viciere, P.E., BCEE, CDM Smith CDM Smith, 1715 North Westshore Boulevard,

More information

Environmental Dynamics International

Environmental Dynamics International Corporate Profile Capabilities (EDI) specializes in the research, development, and application of advanced technology aeration and biological treatment solutions for municipal and industrial wastewater

More information

NITROGEN REMOVAL USING TERTIARY FILTRATION. Suzie Hatch & Colum Kearney. Sydney Water Corporation

NITROGEN REMOVAL USING TERTIARY FILTRATION. Suzie Hatch & Colum Kearney. Sydney Water Corporation Winner of Actizyme Prize for Best Paper at the NSW Operators Conference held in September 2004 NITROGEN REMOVAL USING TERTIARY FILTRATION Paper Presented by : Suzie Hatch & Colum Kearney Authors: Suzie

More information

WEF Residuals and Biosolids Conference Piloting to Establish Performance Criteria at Miami s South District WWTP

WEF Residuals and Biosolids Conference Piloting to Establish Performance Criteria at Miami s South District WWTP Piloting to Establish Performance Criteria at Miami s South District WWTP Terry Goss 1 ; Brian, Stitt 1 ; Manuel Moncholi 2 ; Mohammad Abu-Orf 3 ; Ismael Diaz 4 1 AECOM Water, 2 Miami-Dade Water and Sewer

More information

Short-term and long-term studies of the co-treatment of landfill leachate and municipal wastewater

Short-term and long-term studies of the co-treatment of landfill leachate and municipal wastewater This paper is part of the Proceedings of the 8 International Conference th on Waste Management and The Environment (WM 2016) www.witconferences.com Short-term and long-term studies of the co-treatment

More information

Watertown Wastewater Facility Plan. August 11, 2015

Watertown Wastewater Facility Plan. August 11, 2015 Watertown Wastewater Facility Plan August 11, 2015 Watertown Wastewater Wastewater Treatment Facility History Comprehensive Planning Wastewater Concerns Capacity Condition Permitting Requirements Watertown

More information

NUTRIENT REMOVAL PROCESSES IN WASTEWATER TREATMENT. We re Glad You re Here!

NUTRIENT REMOVAL PROCESSES IN WASTEWATER TREATMENT. We re Glad You re Here! NUTRIENT REMOVAL PROCESSES IN WASTEWATER TREATMENT We re Glad You re Here! Please, put your cell phones on vibrate during sessions and, take calls to the hallway NUTRIENT REMOVAL PROCESSES IN WASTEWATER

More information

FAIRMONT WASTEWATER TREATMENT PLANT

FAIRMONT WASTEWATER TREATMENT PLANT FAIRMONT WASTEWATER TREATMENT PLANT 2006 Page 1 PUBLIC UTILIES COMMISSION Bill Supalla Joe Kurtzman Andy Noll Jeff Ziemer David Kuhl SPECIAL THANKS TO CITY STAFF Jim Zarling, City Administrator Mike Humpal,

More information

Field and CFD Analysis of Jet Aeration and Mixing

Field and CFD Analysis of Jet Aeration and Mixing Field and CFD Analysis of Jet Aeration and Mixing Randal W. Samstag 1 *, Edward A. Wicklein 1, Roderick D. Reardon 2, Robert J. Leetch 3, R. (Robbie) M. Parks 3, and Colin D. Groff 3 1 Carollo Engineers,

More information

Center Sanitation District

Center Sanitation District EHLS Center Sanitation District EHLS Engineering Erik Jorgensen Suzanne Givler Heath Anderson Leryn Gorlitsky Outline of Presentation Background Current and Future Conditions Decision Matrix Description

More information

Aeration University Advanced Concepts in Energy Efficiency

Aeration University Advanced Concepts in Energy Efficiency Aeration University Advanced Concepts in Energy Efficiency Wisconsin Wastewater Operators Association 47 th Annual Conference October 23, 2013 Presented by Phil Korth Aeration and Energy Wastewater Treatment

More information

WASTEWATER TREATMENT. Nelson Environmental Inc. Nelson Environmental Inc.

WASTEWATER TREATMENT. Nelson Environmental Inc. Nelson Environmental Inc. The OPTAER system provides reliable nutrient removal in pond based wastewater treatment plants combining cost-effective technologies and low maintenance requirements. WASTEWATER TREATMENT PrintStudioOne.com

More information

Evaluation of Conventional Activated Sludge Compared to Membrane Bioreactors

Evaluation of Conventional Activated Sludge Compared to Membrane Bioreactors Evaluation of Conventional Activated Sludge Compared to Membrane Bioreactors Short Course on Membrane Bioreactors 3/22/06 R. Shane Trussell, Ph.D., P.E. shane@trusselltech.com Outline Introduction Process

More information

Activated Sludge Process Control:

Activated Sludge Process Control: 2015 Pacific Water Conference Activated Sludge Process Control: What s Important and How It s Easily Implemented February 2015 Presentation takeaways 1. MCRT/SRT is the only way to control the activated

More information

THE ROLE OF ACTIVATED SLUDGE SOLIDS IN AN ACTIFLO SYSTEM. Chen-An Lien and Andrew P. Kruzic

THE ROLE OF ACTIVATED SLUDGE SOLIDS IN AN ACTIFLO SYSTEM. Chen-An Lien and Andrew P. Kruzic THE ROLE OF ACTIVATED SLUDGE SOLIDS IN AN ACTIFLO SYSTEM Chen-An Lien and Andrew P. Kruzic ABSTRACT Civil and Environmental Engineering Department, University of Texas at Arlington Arlington, Texas 76011,

More information

Deicing Fluid and Stormwater Management At Cincinnati/Northern Kentucky International Airport

Deicing Fluid and Stormwater Management At Cincinnati/Northern Kentucky International Airport Deicing Fluid and Stormwater Management At Cincinnati/Northern Kentucky International Airport Kenton County Airport Board 2009 ACI-N/A/ATA/RAA Deicing Management Conference July 8, 2009 Don Chapman CVG

More information

Coupling Trickling Filter or RBC s with Activated Sludge

Coupling Trickling Filter or RBC s with Activated Sludge Coupling Trickling Filter or RBC s with Activated Sludge By John R. Harrison, P.E. Kennedy/Jenks Consultants 503-295-4911 or JohnHarrison@KennedyJenks.com 1. What are Combined or Coupled Plants? Most coupled

More information

Environmental Biotechnology Cooperative Research Centre Date submitted: March 2008 Date published: March 2011

Environmental Biotechnology Cooperative Research Centre Date submitted: March 2008 Date published: March 2011 final report Project code: A.ENV.0044 Prepared by: Environmental Biotechnology Cooperative Research Centre Date submitted: March 2008 Date published: March 2011 PUBLISHED BY Meat & Livestock Australia

More information

Innovative Use of Dissolved Air Flotation with Biosorption as Primary Treatment to Approach Energy Neutrality in WWTPs

Innovative Use of Dissolved Air Flotation with Biosorption as Primary Treatment to Approach Energy Neutrality in WWTPs Innovative Use of Dissolved Air Flotation with Biosorption as Primary Treatment to Approach Energy Neutrality in WWTPs H.-B. Ding *, M. Doyle **, A. Erdogan **, R. Wikramanayake ***, and P. Gallagher ***

More information

An Innovative Approach to Retrofitting for Nitrogen Removal

An Innovative Approach to Retrofitting for Nitrogen Removal June 29, 2017 An Innovative Approach to Retrofitting for Nitrogen Removal OWEA 2017 TECHNICAL CONFERENCE & EXPO Innovation From Wikipedia: The application of better solutions that meet new requirements.

More information

WASTEWATER 101 Fo r MOWA

WASTEWATER 101 Fo r MOWA WASTEWATER 101 For MOWA iochemical xygen emand BOD Reactions BOD 5 = 0.68 BOD u Lu Carbonaceous BOD BOD 5 Time, Days BOD w/ Nitrification Oxygen Used for Nitrificationifi ti BOD Point Nitrification Begins

More information

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l ATTACHMENT 1 GENERAL FACILITY INFORMATION 1. Facility Name: 2. Type of Facility: 3. Population Served: Present: Design: 4. Flow: Average Maximum Peak 5. Water Quality: Present Design Assumed Actual Source:

More information

Proposal by Russia to delete hot sub-spot Hot sub-spot name South-West Wastewater Treatment Plant

Proposal by Russia to delete hot sub-spot Hot sub-spot name South-West Wastewater Treatment Plant Proposal by Russia to delete hot sub-spot 18.4 LAND 14/2009, Document 6/3/Rev.1 ATTACHMENT 1. Hot sub-spot name South-West Wastewater Treatment Plant 2. Location Block 2, 123, Volkhonskoye shosse, St.

More information

Modelling of Wastewater Treatment Plants

Modelling of Wastewater Treatment Plants Modelling of Wastewater Treatment Plants Nevenka Martinello nevemar@gmail.com Why do we need WWTP models? to build a WWTP model CASE STUDY - WWTP model in Sweden Why do we need WWTP models? Rise awareness

More information

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment OWEA 2013 Annual Conference June 19, 2013 Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment Jeff Lamson, Superintendent, WPCC Robert Hrusovsky,

More information

Sulaibiya world s largest membrane water reuse project

Sulaibiya world s largest membrane water reuse project Water Technologies & Solutions technical paper Sulaibiya world s largest membrane water reuse project background In May 2001, a consortium including Mohammed Abdulmohsin Al-Kharafi and Sons (The Kharafi

More information

A REGULATORY GUIDE TO SEQUENCING BATCH REACTORS

A REGULATORY GUIDE TO SEQUENCING BATCH REACTORS A REGULATORY GUIDE TO SEQUENCING BATCH REACTORS Terry L. Kirschenman and Shahid Hameed Iowa Department of Natural Resources, Wallace State Office Building, 502 East 9th Street, Des Moines, Iowa, 50319-0034,

More information

Comparison on the Treatment Performance of Full-scale Sewage Treatment Plants using Conventional and Modified Activated Sludge Processes

Comparison on the Treatment Performance of Full-scale Sewage Treatment Plants using Conventional and Modified Activated Sludge Processes Comparison on the Treatment Performance of Full-scale Sewage Treatment Plants using Conventional and Modified Activated Sludge Processes FATIHAH SUJA 1, RAKMI ABDUL RAHMAN 2 AND OTHMAN JAAFAR 3 1,3 Department

More information

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS INTERIM GUIDE CRITERIA FOR AEROBIC BACTERIAL GENERATOR FOR INSERT INTO SEPTIC TANKS, GREASE INTERCEPTORS AND GREASE TRAPS IAPMO IGC 180-20023

More information