1 Energy and Atmosphere SS WE EA MR EQ Overview Buildings consume approximately 37% of the energy and 68% of the electricity produced in the United States annually, according to the U.S. Department of Energy. Electricity generated from fossil fuels oil and coal impact the environment in a myriad of adverse ways, beginning with their extraction, transportation, refining and distribution. Coal mining disrupts habitats and can devastate landscapes. Acidic mine drainage further degrades regional ecosystems. Coal is rinsed with water, which results in billions of gallons of sludge stored in ponds. Mining is a dangerous occupation in which accidents and the long-term effects of breathing coal dust result in shortened life spans of coal miners. Conventional fossil-based generation of electricity releases carbon dioxide, which contributes to global climate change. Coal-fired electric utilities emit almost one-third of the country s anthropogenic nitrogen oxide, the key element in smog, and two-thirds the sulfur dioxide, a key element in acid rain. They also emit more fine particulate material than any other activity in the United States. Because the human body is incapable of clearing these fine particles from the lungs, they are contributing factors in tens of thousands of cancer and respiratory illness-related deaths annually. Natural gas, nuclear fission and hydroelectric generators all have adverse environmental impacts as well. Natural gas is a major source of nitrogen oxide and greenhouse gas emissions. Nuclear power increases the potential for catastrophic accidents and raises significant waste transportation and disposal issues. Hydroelectric generating plants disrupt natural water flows, resulting in disturbance of habitat and depletion of fish populations. Green buildings address these issues in two primary ways: by reducing the amount of energy required, and by using more benign forms. The better the energy performance of a project, the lower the operations costs. As world competition for the available supply of fuels heightens, the rate of return on energy-efficiency measures improves. Electrical generation using sources other than fossil fuels reduces environmental impacts. Energy & Atmosphere Credit Characteristics Table 1 shows which credits were substantially revised for LEED for New Construction Version 2.2, which credits are eligible to be submitted in the Design Phase Submittal, and which project team members are likely to carry decision-making responsibility for each credit. The decision-making responsibility matrix is not intended to exclude any party, rather to emphasize those credits that are most likely to require strong participation by a particular team member. Overview of LEED Prerequisites and Credits EA Prerequisite 1 Fundamental Commissioning of the Building Energy Systems EA Prerequisite 2 Minimum Energy Performance EA Prerequisite 3 Fundamental Refrigerant Management EA Credit 1 Optimize Energy Performance EA Credit 2 On-Site Renewable Energy EA Credit 3 Enhanced Commissioning EA Credit 4 Enhanced Refrigerant Management EA Credit 5 Measurement & Verification EA Credit 6 Green Power LEED for New Construction Version

2 SS WE EA MR EQ Overview Table 1: EA Credit Characteristics Credit EAp1: Fundamental Commissioning of the Building * * * * * Energy Systems EAp2: Minimum Energy Performance * * * EAp3: Fundamental Refrigerant Management * * EAc1: Optimize Energy Performance * * * EAc2: On-Site Renewable Energy * * * EAc3: Enhanced Commissioning * * * * * EAc4: Enhanced Refrigerant Management * * * EAc5: Measurement & Verification * * * EAc6: Green Power * * * Significant Change from Version 2.1 Design Submittal Construction Submittal Owner Decision-Making Design Team Decision-Making Contractor Decision-Making 152

3 Fundamental Commissioning of the Building Energy Systems Intent Verify that the building s energy related systems are installed, calibrated and perform according to the owner s project requirements, basis of design, and construction documents. Benefits of Commissioning Benefits of commissioning include reduced energy use, lower operating costs, reduced contractor callbacks, better building documentation, improved occupant productivity, and verification that the systems perform in accordance with the owner s project requirements. SS WE EA MR EQ Prerequisite 1 Required Requirements The following commissioning process activities shall be completed by the commissioning team, in accordance with this Reference Guide. 1) Designate an individual as the Commissioning Authority (CxA) to lead, review and oversee the completion of the commissioning process activities. a) The CxA shall have documented commissioning authority experience in at least two building projects. b) The individual serving as the CxA shall be independent of the project s design and construction management, though they may be employees of the firms providing those services. The CxA may be a qualified employee or consultant of the Owner. c) The CxA shall report results, findings and recommendations directly to the Owner. d) For projects smaller than 50,000 square feet, the CxA may include qualified persons on the design or construction teams who have the required experience. 2) The Owner shall document the Owner s Project Requirements (OPR). The design team shall develop the Basis of Design (BOD). The CxA shall review these documents for clarity and completeness. The Owner and design team shall be responsible for updates to their respective documents. 3) Develop and incorporate commissioning requirements into the construction documents. 4) Develop and implement a commissioning plan. 5) Verify the installation and performance of the systems to be commissioned. 6) Complete a summary commissioning report. Commissioned Systems Commissioning process activities shall be completed for the following energy-related systems, at a minimum: q Heating, ventilating, air conditioning, and refrigeration (HVAC&R) systems (mechanical and passive) and associated controls LEED for New Construction Version

4 SS WE EA MR EQ Prerequisite 1 q Lighting and daylighting controls q Domestic hot water systems q Renewable energy systems (wind, solar, etc.) Potential Technologies & Strategies In order to meet this prerequisite, owners are required to use qualified individuals to lead the commissioning process. Qualified individuals are identified as those who possess a high level of experience in the following areas: q Energy systems design, installation and operation q Commissioning planning and process management q Hands-on field experience with energy systems performance, interaction, start-up, balancing, testing, troubleshooting, operation, and maintenance procedures q Energy systems automation control knowledge Owners are encouraged to consider including water-using systems, building envelope systems, and other systems in the scope of the commissioning plan as appropriate. The building envelope is an important component of a facility which impacts energy consumption, occupant comfort and indoor air quality. While it is not required to be commissioned by LEED, an owner can receive significant financial savings and reduced risk of poor indoor air quality by including building envelope commissioning. This Reference Guide provides guidance on the rigor expected for this prerequisite for the following: q Owner s Project Requirements q Basis of Design q Commissioning Plan q Commissioning Specification q Performance Verification Documentation q Commissioning Report 154

5 Summary of Referenced Standard There is no standard referenced for this prerequisite. Approach and Implementation Relationship Between Fundamental and Enhanced Commissioning LEED for New Construction addresses building commissioning in two places, EA Prerequisite 1 and EA Credit 3. For any given LEED project, the scope of services for the CxA and project team should be based on the Owner s Project Requirements (OPR). To meet the requirements of this prerequisite, the commissioning process activities must, at a minimum, address the commissioned systems noted in the prerequisite. Other systems, including the building envelope, stormwater management systems, water treatment systems, information technology systems, etc., may also be included in the commissioning process at the owner s discretion. Table 1 outlines the team members primarily responsible to perform each project requirement; and also which requirements are common to EA Prerequisite 1 and EA Credit 3. All individuals on the project team are encouraged to participate in the commissioning activities as part of a larger commissioning team. Strategies The commissioning process is a planned, systematic quality-control process that involves the owner, users, occupants, operations and maintenance staff, design professionals and contractors. It is most effective when begun at project inception. An explanation of the steps satisfying this prerequisite is summarized in the following sections. SS WE EA MR EQ Prerequisite 1 Table 1: Primary Responsibilities Chart for EA Prerequisite 1 and EA Credit 3 Tasks Responsibilities If you are only meeting If you are meeting the EAp1 EAp1 AND EAc3 Designate Commissioning Authority (CxA) Owner or Project Team Owner or Project Team Document Owner's Project Requirements Owner Owner (OPR) Develop Basis of Design Design Team Design Team Incorporate commissioning requirements Project Team or CxA Project Team or CxA into the construction documents Conduct commissioning design review N/A CxA prior to mid-construction documents Develop and implement a commissioning Project Team or CxA Project Team or CxA plan Review contractor submittals applicable N/A CxA to systems being commissioned Verify the installation and performance CxA CxA of commissioned systems Develop a systems manual for the N/A Project Team and CxA commissioned systems Verify that the requirements for training N/A Project Team and CxA are completed Complete a summary commissioning CxA CxA report Review building operation within 10 N/A CxA months after substantial completion LEED for New Construction Version

6 SS WE EA MR EQ Prerequisite 1 1. Designate an individual as the Commissioning Authority (CxA) to lead, review and oversee the completion of the commissioning process activities. It is recommend for the project to designate an individual as the CxA as early as possible in the project timeline, ideally during pre-design. The qualified individual designated as the CxA serves as an objective advocate for the owner, and is responsible for 1) directing the commissioning team and process in the completion of the commissioning requirements 2) coordinating, overseeing, and/or performing the commissioning testing and 3) reviewing the results of the systems performance verification. For LEED for New Construction projects a qualified CxA should have experience with two other projects of similar managerial and technical complexity. The owner may want to develop additional experience or qualifications requirements in selecting the CxA, depending on the scope and nature of the commissioning. There are a number of CxA certification programs administered by various industry groups. For projects larger than 50,000 sq.ft. the individual serving as the CxA on a LEED for New Construction project shall be independent of the project s design and construction teams. The CxA may be a qualified staff member of the Owner, an Owner s consultant to the project, or an employee of one of the firms providing design and/or construction management services. The CxA shall not, however, have responsibility for design (e.g., engineer-of-record) or for construction. The CxA shall report results, findings and recommendations directly to the Owner. For projects smaller than 50,000 sq.ft., the CxA may be a qualified staff member of the Owner, an Owner s consultant to the project, or an individual on the design or construction, and may have additional project responsibilities beyond leading the commissioning services. 2. The Owner shall document the Owner s Project Requirements (OPR). The design team shall develop the Basis of Design (BOD). The CxA shall review these documents for clarity and completeness. The Owner and design team shall be responsible for updates to their respective documents. Clear and concise documentation of the Owner s Project Requirements and the Basis of Design is a valuable part of any successful project delivery and commissioning process. These documents are utilized throughout the Commissioning Process to provide an informed baseline and focus for validating systems energy and environmental performance. Owner s Project Requirements (OPR) The OPR shall be completed by the Owner, Commissioning Agent, and Project Team prior to the approval of contractor submittals of any commissioned equipment or systems. Subsequent updates to the OPR during the design and construction process are the primary responsibility of the Owner. The OPR should detail the functional requirements of a project and the expectations of the building s use and operation as it relates to the systems to be commissioned. It is recommended that the OPR address the following issues, as applicable to the project: q Owner and User Requirements Describe the primary purpose, program, 156

7 and use of the proposed project (e.g., office building with data center) and any pertinent project history. Provide any overarching goals relative to program needs, future expansion, flexibility, quality of materials, and construction and operational costs. q Environmental and Sustainability Goals Describe any specific environmental or sustainability goals (e.g., LEED certification). q Energy Efficiency Goals Describe overall project energy efficiency goals relative to local energy code or ASHRAE Standard or LEED. Describe any goals or requirements for building siting, landscaping, façade, fenestration, envelope and roof features that will impact energy use. q Indoor Environmental Quality Requirements As applicable and appropriate, for each program/usage area describe the intended use; anticipated occupancy schedules; space environmental requirements (including lighting, space temperature, humidity, acoustical, air quality, ventilation and filtration criteria); desired user ability to adjust systems controls; desire for specific types of lighting; and accommodations for after-hours use. q Equipment and System Expectations As applicable and appropriate, describe the desired level of quality, reliability, type, automation, flexibility, and maintenance requirements for each of the systems to be commissioned. When known, provide specific efficiency targets, desired technologies, or preferred manufacturers for building systems. q Building Occupant and O&M Personnel Requirements Describe how the facility will be operated, and by whom. Describe the desired level of training and orientation required for the building occupants to understand and use the building systems. Basis of Design The design team must document the Basis of Design (BOD) for the systems to be commissioned prior to approval of contractor submittals of any commissioned equipment or systems. Subsequent updates to this document during the design and construction process are the responsibility of the design team. The Commissioning Agent shall review the BOD to ensure that it reflects the OPR. The BOD shall provide a narrative describing the design of the systems to be commissioned and outlining any design assumptions that are not otherwise included in the design documents. The BOD should be updated with each subsequent design submission with increasing specificity as applicable. The BOD shall, at a minimum, include the following as applicable: q Primary Design Assumptions including space use, redundancy, diversity, climatic design conditions, space zoning, occupancy, operations and space environmental requirements q Standards including applicable codes, guidelines, regulations, and other references that will be followed q Narrative Descriptions including performance criteria for the HVAC&R systems, lighting systems, hot water systems, on-site power systems, and other systems that are to be commissioned 3. Develop and incorporate commissioning requirements into the construction documents. Typically the project specifications are used to inform the contractor(s) of their responsibilities in the commissioning process. These specifications may describe the components listed in Table 2. Often, all commissioning requirements are outlined in one section of the general conditions of the construction SS WE EA MR EQ Prerequisite 1 LEED for New Construction Version

8 SS WE EA MR EQ Prerequisite 1 Table 2: Commissioning Requirements in Construction Documents q Commissioning team involvement q Contractors' responsibilities q Submittals and submittal review procedures for Cx process/systems q Operations and maintenance documentation, system manuals q Meetings q Construction verification procedures q Start-up plan development and implementation q Functional performance testing q Acceptance and closeout q Training q Warranty review site visit specifications. Placing all commissioning requirements in one location puts responsibility for commissioning work with the prime contractor, who can then appropriately assign responsibility to sub-contractors. It is also valuable to reference commissioning requirements on the drawings, in any bid forms, and in specification sections related to the systems to be commissioned. 4. Develop and implement a Commissioning Plan. Unique to a particular project, the Commissioning Plan is the reference document that identifies the strategies, aspects and responsibilities within the commissioning process for each phase of a project, for all of the project team members. This document outlines the overall process, schedule, organization, responsibilities and documentation requirements of the commissioning process. The Commissioning Plan is developed at the start of the commissioning process, preferably during design development. The Commissioning Plan is updated during the course of a project to reflect changes in planning, schedule, or other supplemental information added as warranted. The following outlines recommended components of the Commissioning Plan: q Commissioning Program Overview Goals and objectives General project information Systems to be commissioned q Commissioning Team Team members, roles and responsibilities Communication protocol, coordination, meetings and management q Description of Commissioning Process Activities Documenting the Owner s Project Requirements Preparing the Basis of Design Developing systems functional test procedures Verifying systems performance Reporting deficiencies and the resolution process Accepting the building systems Project teams pursuing the enhanced commissioning credit (EA Credit 3) may need to expand the Commissioning Plan to include the following commissioning process activities: q Documenting the commissioning review process q Reviewing contractor submittals q Developing the systems manual 158

9 q Verifying the training of operations personnel q Reviewing building operation after final acceptance 5. Verify the installation and performance of the systems to be commissioned. The purpose of commissioning is to verify the performance of commissioned systems as installed to meet the OPR, BOD, and contract documents. Verification of the installation and performance of commissioned systems typically includes the following steps for each commissioning system: q Installation Inspection q Systems Performance Testing q Evaluation of Results Compared to OPR/BOD Installation Inspections (sometimes referred to as pre-functional inspections) are a systematic set of procedures intended to identify whether individual components of the systems to be commissioned have been installed properly. Often this process occurs at start-up of individual units of equipment and may use pre-function checklists or start-up and check-out forms to insure consistency in the inspections and to document the process. Installation inspections may be performed by the CxA, the installing contractor, or by others, depending on the procedures outlined in the Commissioning Plan. Installation inspections provide quality control to insure that relatively minor issues (e.g., a mis-wired sensor, a control valve installed backwards) are discovered and corrected prior to systems performance testing. Systems Performance Testing (sometimes referred to as functional performance testing) occurs once all system components are installed, energized, programmed, balanced and otherwise ready for operation under part and full load conditions. Testing should include each sequence in the sequence of operations under central and packaged equipment control; including startup, shutdown, capacity modulation, emergency and failure modes, alarms and interlocks to other equipment. Systems performance testing typically relies on testing procedures developed by the CxA specifically for the system to be tested. Systems performance testing may use a wide variety of means and methods to simulate and evaluate that the system being tested performs as expected (per the OPR, BOD, and contract documents) in all modes of operation. Systems performance testing may be performed by some combination of the CxA, the installing contractor, and others, depending on the procedures outlined in the commissioning specifications and the Commissioning Plan.Systems performance testing may yield minor or significant issues with the performance of the commissioned systems and may require significant follow-up and coordination between members of the project team to address and resolve these issues.evaluation of Results Compared to OPR/BOD at each point in the process of Installation Inspections and Systems Performance Testing the CxA and the commissioning team should evaluate whether the installed systems meet the criteria for the project as set forth by the owner in the OPR and the designers in the BOD. Any discrepancies or deficiencies should be reported to the owner and the team should work collaboratively to find an appropriate resolution. 6. Complete a summary commissioning report. Upon completion of installation inspections and performance verification SS WE EA MR EQ Prerequisite 1 LEED for New Construction Version

10 SS WE EA MR EQ Prerequisite items, the results are tabulated and assembled into a summary commissioning report. The summary report should include confirmation from the CxA indicating whether individual systems meet the requirements of the OPR, BOD, and Contract Documents. The summary commissioning report should include the following: q Executive summary of the process and the results of the commissioning program including observations, conclusions and any outstanding items q A history of any system deficiencies identified and how they were resolved including any outstanding issues or seasonal testing scheduled for a later date q Systems performance test results and evaluation (Any other supporting information can be complied as a Cx record but is not required in the summary report.) In addition, for projects pursuing EA Credit 3, the commissioning report should include the following: q A summary of the design review process q A summary of the submittal review process q A summary of the O&M documentation and training process Calculations There are no calculations associated with this prerequisite. Exemplary Performance There is no exemplary performance point available for this prerequisite. Submittal Documentation This prerequisite is submitted as part of the Construction Submittal. The following project data and calculation information is required to document prerequisite compliance using the v2.2 Submittal Templates: q Provide the name and company information for the CxA. q Confirm that the 6 required tasks have been completed. q Provide a narrative description of the systems that were commissioned and the results of the commissioning process. Considerations Economic Issues Implementation of a commissioning process maintains the focus on quality control and high performance building principles from project inception through operation. Commissioning typically results in optimized mechanical, electrical and architectural systems maximizing energy efficiency and thereby minimizing environmental impacts. A properly designed and executed Commissioning Plan may reduce errors and omissions in the design and installation process, improve coordination, reduce change orders, and generate substantial operational cost savings compared to systems that are not commissioned. Successful implementation of the commissioning process often yields improvements in energy efficiency of 5% to 10%. In addition to improved energy performance, improved occupant well-being and productivity are potential benefits when commissioning results in building systems functioning as intended. Such benefits include avoiding employee illness, tenant turnover and vacant office space, liability related to indoor air quality and premature equipment replacement. Researchers at Lawrence Berkeley National Lab completed a meta-analysis of 85 new construction commissioning projects in LBNL developed a detailed and uniform methodology for characterizing,

11 analyzing, and synthesizing the results. For new construction, this study found that median commissioning costs were $1.00/sq.ft. (0.6% of total construction costs), yielding a median payback time of 4.8 years from quantified energy savings alone (excluding savings from non-energy impacts and other benefits of commissioning). This study further concludes Some view commissioning as a luxury and added cost, yet it is only a barometer of the cost of errors promulgated by other parties involved in the design, construction, or operation of buildings. Commissioning agents are just the messengers ; they are only revealing and identifying the means to address pre-existing problems. We find that commissioning is one of the most cost-effective means of improving energy efficiency in commercial buildings. Resources Please see the USGBC Web site at www. usgbc.org/resources for more specific resources on materials sources and other technical information. Web Sites American Society of Heating, Refrigeration and Air-Conditioning Engineers (ASHRAE) (800) Building Commissioning Association (BCxA) (877) 666-BCXA (2292) Promotes building commissioning practices that maintain high professional standards and fulfill building owners expectations. The association offers a five-day intensive course focusing on how to implement the commissioning process, intended for Commissioning Authorities with at least two years experience. California Commissioning Collaborative (CCC) (503) The CCC is a nonprofit 501(c)3 organization committed to improving the performance of buildings and their systems. The CCC is made up of government, utility and building services organizations and professionals who have come together to create a viable market for building commissioning in California. Cx Assistant Commissioning Tool This web-based tool provides project-specific building commissioning information to design teams and enables users to evaluate probable commissioning cost, identify an appropriate commissioning scope, and access sample commissioning specifications related to their construction project. Portland Energy Conservation Inc. (PECI) PECI develops the field for commissioning services by helping building owners understand the value of commissioning, and producing process and technical information for commissioning providers. Their focus includes both private and public building owners, and a wide range of building types. PECI manages the annual National Conference on Building Commissioning. Department of Engineering Professional Development University of Wisconsin, Madison (800) Offers commissioning process training courses for building owners, architects, engineers, operations and maintenance staff, and other interested parties. The program also offers accreditation of commissioning process providers and managers. SS WE EA MR EQ Prerequisite 1 LEED for New Construction Version

12 SS WE EA MR EQ Prerequisite Print Media ASHRAE Guideline : The Commissioning Process, American Society of Heating, Refrigerating and Air-Conditioning Engineers, (800) The purpose of this Guideline is to describe the Commissioning Process capable of verifying that a facility and its systems meet the Owner s Project Requirements. The procedures, methods, and documentation requirements in this guideline describe each phase of the project delivery and the associated Commissioning Processes from pre-design through occupancy and operation, without regard to specific elements, assemblies, or systems, and provide the following: (a) overview of Commissioning Process activities, (b) description of each phase s processes, (c) requirements for acceptance of each phase, (d) requirements for documentation of each phase, and (e) requirements for training of operation and maintenance personnel. These Commissioning Process guideline procedures include the Total Building Commissioning Process (TBCxP) as defined by National Institute of Building Sciences (NIBS) in its Commissioning Process Guideline 0. ASHRAE Guideline : The HVAC Commissioning Process, American Society of Heating, Refrigerating and Air-Conditioning Engineers, (800) The purpose of this guideline is to describe the commissioning process to ensure that heating, ventilating and airconditioning (HVAC) systems perform in conformity with design intent. The procedures, methods and documentation requirements in this guideline cover each phase of the commissioning process for all types and sizes of HVAC systems, from pre-design through final acceptance and post-occupancy, including changes in building and occupancy requirements after initial occupancy. ASHRAE Guideline : Preparation of Operations & Maintenance Documentation for Building Systems, American Society of Heating, Refrigerating and Air-Conditioning Engineers, (800) The purpose of this guideline is to guide individuals responsible for the design, construction and commissioning of HVAC building systems in preparing and delivering O&M documentation. Building Commissioning Guide, Office of Energy Efficiency and Renewable Energy Federal Energy Management Program, U.S. Department of Energy (800) DIAL-DOE The Energy Policy Act of 1992 requires each federal agency to adopt procedures necessary to ensure that new federal buildings meet or exceed the federal building energy standards established by the U.S. Department of Energy (DOE). DOE s Federal Energy Management Program, in cooperation with the General Services Administration, developed the Building Commissioning Guide. Commissioning for Better Buildings in Oregon, Oregon Office of Energy CONS/BUS/comm/bldgcx.shtml (503) This document (and Web site of the same name) contains a comprehensive introduction to the commissioning process, including research, financial benefits and case studies. The Cost-Effectiveness of Commercial Buildings Commissioning: A Meta- Analysis of Existing Buildings and New Construction in the United States, available at:

13 Cx-Costs-Benefits.html PECI Model Building Commissioning Plan and Guide Specifications, Portland Energy Conservation Inc (503) Details the commissioning process for new equipment during design and construction phases for larger projects. In addition to commissioning guidelines, the document provides boilerplate language, content, format and forms for specifying and executing commissioning. The document builds upon the HVAC Commissioning Process, ASHRAE Guideline , with significant additional detail, clarification and interpretation. Commissioning Fact Sheets Coalition For High Performance Schools (CHPS) These fact sheets explore how commissioning can help school districts ensure their schools are built as high performance. The Building Commissioning Handbook, Second Edition by John A. Heinz & Rick Casault, The Building Commissioning Association, shtm This popular handbook has been revised by the original authors to include the most up-to-date information on all aspects of building commissioning. This is your guide to: Staying on Budget; Improving the Quality of your Buildings; Meeting your Schedule; Increasing Energy Efficiency. Chapters outline the commissioning process from pre-design to occupancy and explain the economics of commissioning and retro-commissioning. Definitions Basis of Design (BOD) includes design information necessary to accomplish the owner s project requirements, including system descriptions, indoor environmental quality criteria, other pertinent design assumptions (such as weather data), and references to applicable codes, standards, regulations and guidelines. Commissioning (Cx) is the process of verifying and documenting that the facility and all of its systems and assemblies are planned, designed, installed, tested, operated, and maintained to meet the Owner s Project Requirements. Commissioning Plan is a document that outlines the organization, schedule, allocation of resources, and documentation requirements of the commissioning process. Commissioning Report is the document that records the results of the commissioning process, including the as-built performance of the HVAC system and unresolved issues. Commissioning Specification is the contract document that details the commissioning requirements of the construction contractors. The Commissioning Team includes those people responsible for working together to carry out the commissioning process. Installation Inspection is the process of inspecting components of the commissioned systems to determine if they are installed properly and ready for systems performance testing. Owner s Project Requirements (OPR) is a written document that details the functional requirements of a project and the expectations of how it will be used and operated. Systems Performance Testing is the process of determining the ability of the commissioned systems to perform in accordance with the owner s project requirements, basis of design, and construction documents. SS WE EA MR EQ Prerequisite 1 LEED for New Construction Version

14 SS WE EA MR EQ Prerequisite 1 164

15 SS WE EA MR EQ Minimum Energy Performance Prerequisite 2 Intent Establish the minimum level of energy efficiency for the proposed building and systems. Required Requirements Design the building project to comply with both q the mandatory provisions (Sections 5.4, 6.4, 7.4, 8.4, 9.4 and 10.4) of ASHRAE/ IESNA Standard ; and q the prescriptive requirements (Sections 5.5, 6.5, 7.5 and 9.5) or performance requirements (Section 11) of ASHRAE/IESNA Standard Potential Technologies & Strategies Design the building envelope, HVAC, lighting, and other systems to maximize energy performance. The ASHRAE User s Manual contains worksheets that can be used to document compliance with this prerequisite. For projects pursuing points under EA Credit 1, the computer simulation model may be used to confirm satisfaction of this prerequisite. If a local code has demonstrated quantitative and textual equivalence following, at a minimum, the U.S. Department of Energy standard process for commercial energy code determination, then it may be used to satisfy this prerequisite in lieu of ASHRAE Details on the DOE process for commercial energy code determination can be found at LEED for New Construction Version

16 SS WE EA MR EQ Prerequisite 2 Summary of Referenced Standard ASHRAE/IESNA : Energy Standard for Buildings Except Low- Rise Residential American Society of Heating, Refrigerating and Air-Conditioning Engineers (800) Standard was formulated by the American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (ASHRAE), under an American National Standards Institute (ANSI) consensus process. The Illuminating Engineering Society of North America (IESNA) is a joint sponsor of the standard. Standard 90.1 establishes minimum requirements for the energy-efficient design of buildings, except low-rise residential buildings. The provisions of this standard do not apply to single-family houses, multi-family structures of three habitable stories or fewer above grade, manufactured houses (mobile and modular homes), or buildings that do not use either electricity or fossil fuel. Building envelope requirements are provided for semi-heated spaces, such as warehouses. The standard provides criteria in the general categories shown in Table 1. Within each section, there are mandatory provisions that must always be complied with, as well as additional prescriptive requirements. Some sections also contain a performance alternate. The Energy Cost Budget option (section 11) allows the user to exceed some of the prescriptive requirements provided energy cost savings are made in other prescribed areas. The Performance Rating Method option (Appendix G) provides a method for demonstrating performance beyond ASHRAE/IESNA In all cases, the mandatory provisions must still be met. See Design Strategies below for a more detailed summary of the requirements included in each section. Approach and Implementation LEED for New Construction addresses building energy efficiency in two places, EA Prerequisite 2 and EA Credit 1. EA Prerequisite 2 requires that the building comply with the mandatory provisions, and either the prescriptive or Energy Cost Budget Method performance requirements of ASHRAE/IESNA (Std ). If energy simulations have been developed to document points earned for EA Credit 1, these energy simulations (based on Std Appendix G) may be used rather than the Energy Cost Budget Method (Std Section 11) to demonstrate compliance with the prerequisite. Strategies Table 1: Scope of Requirements Addressed by ASHRAE Each section of Std describes the applicability of the provisions (e.g., ASHRAE/IESNA Components Section 5 Section 6 Section 7 Section 8 Section 9 Section 10 Building Envelope (including semi-heated spaces such as warehouses) Heating, Ventilating and Air-Conditioning (including parking garage ventilation, freeze protection, exhaust air energy recovery, and condenser heat recovery for service water heating) Service Water Heating (including swimming pools) Power (including all building power distribution systems) Lighting (including lighting for exit signs, building exterior, grounds, and parking garage) Other Equipment (including all permanently wired electrical motors) 166

17 definitions and the building elements of interest), lists the mandatory provisions, and lists the prescriptive requirements for complying with the standard. Building Envelope Requirements (Std Section 5) apply to enclosed spaces heated by a heating system whose output capacity is equal to or greater than 3.4 Btu/hour-square foot, or cooled by a cooling system whose sensible output capacity is equal to or greater than 5 Btu/hour-square foot. Std Section 5.4 describes mandatory provisions for insulation installation (5.4.1); window, skylight and door ratings (5.4.2); and air leakage (5.4.3). Std part 5.5 contains the prescriptive provisions for fenestration and opaque assemblies. Each county in the United States is assigned into one of eight representative climate zones (Std Table B-1). Climate zone assignments for Canadian cities can be determined from Std Table B-2, and climate zone assignments for other international cities can be determined from Std Table B-3. Prescriptive building envelope requirements are determined based on the building s climate zone classification (Std Tables to 5.5-8). For projects following the prescriptive compliance method, all building envelope components must meet the minimum insulation and maximum U-factor and SHGC requirements listed for the project s climate zone. Also, window area must be less than 50% of the gross wall area, and the skylight area must be less than 5% of the gross roof area. For projects following the Energy Cost Budget Method in Section 11, the project may exceed the envelope prescriptive requirements, provided that the design energy cost for the project does not exceed the energy cost budget for the entire building; OR provided that the project uses energy simulation to document points earned for EA Credit 1. Heating Ventilation and Air Conditioning Requirements (Std Section 6) apply for all building heating and air conditioning systems. Mandatory provisions for HVAC performance are documented in Std Section 6.4, and include minimum system efficiency requirements (6.4.1); load calculation requirements (6.4.2); controls requirements (6.4.3); HVAC System Construction and Insulation requirements (6.4.4); and completion requirements (6.4.5). The minimum system component efficiency requirements listed in Std Tables 6.8.1A-G must be met even when using the Energy Cost Budget or Performance Rating methods. Std Section 6 lists minimum control schemes forthermostats (offhours including setback and optimum start/stop), stairand elevator vents, outdoor air supply and exhaust vents, heat pumpauxiliary heat, humidification and dehumidification, freeze protection,snow/ ice melting systems, and ventilation for high occupancy areas. Std Part 6.5 provides a prescriptive compliance option. Prescriptive provisions are included for air and water economizers (6.5.1); simultaneous heating and cooling limitations (6.5.2); air system design and control including fan power limitation and variable speed drive control (6.5.3); hydronic system design and control including variable flow pumping (6.5.4); heat rejection equipment (6.5.5); energy recovery from exhaust air and service water heating systems (6.5.6); kitchen and fume exhaust hoods (6.5.7); radiant heating systems (6.5.8); and hot gas bypass limitations (6.5.9). For projects served by existing HVAC systems, such as a central plant on a campus or district heating and cooling, SS WE EA MR EQ Prerequisite 2 LEED for New Construction Version

18 SS WE EA MR EQ the exception to section applies. The existing systems and existing equipment are not required to comply with Prerequisite 2 the standard. Service Water Heating Requirements (Std Section 7) include mandatory provisions (7.4); and a choice of prescriptive (7.5) or performance based compliance (11). Mandatory provisions include requirements for load calculations (7.4.1); efficiency (7.4.2); piping insulation (7.4.3); controls 7.4.4); pool heaters and pool covers (7.4.5); and heat traps for storage tanks (7.4.6). Power Requirements address mandatory provisions related to voltage drop (Std Section 8.4.1). Lighting Requirements (Std Section 9) apply to all lighting installed on the building site including interior and exterior lighting. Mandatory provisions include minimum requirements for controls (9.4.1); tandem wiring (9.4.2); luminaire source efficacy for exit signs (9.4.3); exterior lighting power definitions (9.4.5); and luminaire source efficacy for exterior lighting fixture (9.4.6). Per , occupancy controls are required in classrooms, conference rooms and employee lunch and break rooms. Interior lighting compliance must be documented using either the Building Area Method (9.5) or the Space-by-Space Method (9.6). Lighting power calculations for Performance Methods must use the Building Area Method or the Space-by-Space Method. For both methods, the total installed interior lighting power is calculated by summing the luminaire wattages for all permanently installed general, task and furniture lighting, where the luminaire wattage includes lamps, ballasts, current regulators and control devices. Building Area Method calculations can only be used in cases where the project involves the entire building, or a single independent occupancy within a multioccupancy building. Allowable lighting power for this method is calculated by multiplying the allowable lighting power density for the given building type (found in Std Table 9.5.1) by the interior building area. Allowable lighting for the Space-by-Space Method is determined by summing the product of the allowable lighting power density for each space function in the building (found in Std Table 9.6.1) by the corresponding area for each space function. If the total installed interior lighting power is lower than the interior lighting power allowance calculated using either the Building Area or Space-by-Space Method, the project complies. The exterior lighting power allowance is calculated by summing the product of the allowable lighting power allowance for each exterior surface (found in Std Table 9.4.5) by the total area or length associated with that surface, and then multiplying this number by For non-tradable exterior lighting surfaces, the allowed lighting power can only be used for the specific application and cannot be traded between surfaces or with other exterior lighting. Other Equipment Requirements including requirements for electric motors are addressed in Std Section 10. This section only contains mandatory provisions (10.4). The Energy Cost Budget Method is presented in Std Section 11 and describes the process to set up and execute a building simulation to demonstrate compliance. This is the alternate to following the prescriptive provisions of this standard. The Performance Rating Method is presented in Std Appendix G, and is the required method for claiming credit under EA Credit 1: Optimize Energy Performance. If the project is using the Performance Rating Method to 168

19 achieve points under EA Credit 1, the EA Credit 1 documentation can be used to prove compliance with the performance requirements (the second part) of this Prerequisite. The Performance Rating Method does not, however, exempt the project from also meeting the mandatory ASHRAE/IESNA Standard requirements listed for this prerequisite. EA Credit 1 includes a more detailed discussion of the Performance Rating Method. Calculations Follow the calculation and documentation methodology as prescribed in Std Record all calculations on the appropriate forms. These forms (see Table 2) and further information regarding the calculation methodology are available with the ASHRAE/IESNA Standard User s Guide. Exemplary Performance There is no exemplary performance point available for this prerequisite. Submittal Documentation This prerequisite is submitted as part of the Design Submittal. The following project data and calculation information is required to document prerequisite compliance using the v2.2 Submittal Templates: q Confirm that the project meets the requirements of ASHRAE Std q Provide an optional narrative regarding special circumstances or considerations regarding the project's prerequisite approach. Resources Please see the USGBC Web site at www. usgbc.org/resources for more specific resources on materials sources and other technical information. Web Sites Advanced Buildings Hosted by a Canadian public/private consortium, this site provides explana- SS WE EA MR EQ Prerequisite 2 Table 2: Forms for documenting compliance with ASHRAE Std ASHRAE/IESNA Compliance Forms Mandatory Measures All Projects: Building Envelope Compliance Documentation (Part I) Mandatory Provisions Checklist HVAC Compliance Documentation (Part II) Mandatory Provisions Checklist Service Water Heating Compliance Documentation (Part I) Mandatory Provisions Checklist Lighting Compliance Documentation (Part I) Mandatory Provisions Checklist Prescriptive Requirements Projects Using Prescriptive Compliance Approach: Building Envelope Compliance Documentation (Part II) HVAC Compliance Documentation Part I (for small buildings < 25,000 square feet using the simplified approach), and Part III (for all other buildings) Service Water Heating Compliance Documentation Performance Requirements Projects Using Performance Compliance Approach: Energy Cost Budget Compliance Report (when credit is not being sought under EA Credit 1) Performance Rating Report (when credit is being sought under EA Credit 1) Table documenting energy-related features included in the design and including all energy features that differ between the Baseline Design and Proposed Design models LEED for New Construction Version

20 SS WE EA MR EQ tions, costs, and information sources for 90 technologies and practices that Prerequisite 2 improve the energy and resource efficiency of commercial and multi-unit residential buildings. American Council for an Energy Efficient Economy (202) ACEEE is a nonprofit organization dedicated to advancing energy efficiency as a means of promoting both economic prosperity and environmental protection. Buildings Upgrade Manual ENERGY STAR w w w. e n e r g y s t a r. g o v / i n d e x. cfm?c=business.bus_upgrade_manual (888) This document from the EPA is a guide for ENERGY STAR Buildings Partners to use in planning and implementing profitable energy-efficiency upgrades in their facilities and can be used as a comprehensive framework for an energy strategy. New Buildings Institute, Inc. (509) The New Buildings Institute is a nonprofit, public-benefits corporation dedicated to making buildings better for people and the environment. Its mission is to promote energy efficiency in buildings through technology research, guidelines and codes. Building Energy Codes Program U.S. Department of Energy (800) DIAL-DOE The Building Energy Codes program provides comprehensive resources for states and code users,including news, compliance software, code comparisons and the Status of State Energy Codes database. The database includes state energy contacts, code status, code history, DOE grants awarded and construction data. The program is also updating the COMCheckEZ compliance tool to include ANSI/ASHRAE/IESNA This compliance tool includes the prescriptive path and trade-off compliance methods. The software generates appropriate compliance forms as well. Office of Energy Efficiency and Renewable Energy U.S. Department of Energy (800) DIAL-DOE A comprehensive resource for Department of Energy information on energy efficiency and renewable energy, including access to energy links and downloadable documents. Print Media ASHRAE 90.1 User s Manual The 90.1 User s Manual was developed as a companion document to the ANSI/ ASHRAE/IESNA Standard (Energy Standard for Buildings Except Low-Rise Residential Buildings). The User s Manual explains the new standard and includes sample calculations, useful reference material, and information on the intent and application of the standard. The User s Manual is abundantly illustrated and contains numerous examples and tables of reference data. The manual also includes a complete set of compliance forms and worksheets that can be used to document compliance with the standard. The User s Manual is helpful to architects and engineers applying the standard to the design of buildings; plan examiners and field inspectors who must enforce the standard in areas where it is adopted as code; and contractors who must construct buildings in compliance with the standard. A compact disc containing electronic versions of the compliance forms found in the User s Manual is included. 170

21 Fundamental Refrigerant Management Intent Reduce ozone depletion. SS WE EA MR EQ Prerequisite 3 Required Requirements Zero use of CFC-based refrigerants in new base building HVAC&R systems. When reusing existing base building HVAC equipment, complete a comprehensive CFC phase-out conversion prior to project completion. Phase-out plans extending beyond the project completion date will be considered on their merits. Small HVAC units (defined as containing less than 0.5 lbs of refrigerant), and other equipment such as standard refrigerators, small water coolers, and any other cooling equipment that contains less than 0.5 lbs of refrigerant, are not considered part of the base building system and are not subject to the requirements of this credit. Potential Technologies & Strategies When reusing existing HVAC systems, conduct an inventory to identify equipment that uses CFC refrigerants and provide a replacement schedule for these refrigerants. For new buildings, specify new HVAC equipment in the base building that uses no CFC refrigerants. LEED for New Construction Version

22 SS WE EA MR EQ Summary of Referenced Prerequisite 3 Standard There is no standard referenced for this prerequisite. Approach and Implementation Replace or retrofit any CFC-based refrigerants in existing base building HVAC&R and fire suppression systems. If the building(s) is connected to an existing chilled water system, that system must be CFC-free; or a commitment to phasing out CFC-based refrigerants, with a firm timeline of five years from substantial completion of the project, must be in place. Prior to phase-out, reduce annual leakage of CFC-based refrigerants to 5% or less using EPA Clean Air Act, Title VI, Rule 608 procedures governing refrigerant management and reporting. An alternative compliance path for buildings connected to a central chilled water system requires a third party (as defined in the LEED-EB Reference Guide) audit showing that system replacement or conversion is not economically feasible. The definition of the required economic analysis is: the replacement of a chiller(s) will be considered to be not economically feasible if the simple payback of the replacement is greater than 10 years. To determine the simple payback, divide the cost of implementing the replacement by the annual cost avoidance for energy that results from the replacement and any difference in maintenance costs, including make-up refrigerants. If CFC-based refrigerants are maintained in the central system, reduce annual leakage to 5% or less using EPA Clean Air Act, Title VI, Rule 608 procedures governing refrigerant management and reporting, and reduce the total leakage over the remaining life of the unit to less than 30% of its refrigerant charge. Consider the characteristics of various CFC substitutes. Refrigerants have varying applications, lifetimes, ozone-depleting potentials (ODPs) and global-warming potentials (GWPs). Table 1 shows the Ozone Depleting Potential (ODP) and direct Global Warming Potential (GWP) of many common refrigerants. Refrigerants chosen should have short environmental lifetimes, small ODP values and small GWP values. No ideal alternative for CFCs has been developed. See the EPA s List of Substitutes for Ozone-Depleting Substances ( for a current listing of alternatives to CFC refrigerants. Note that some alternatives are not suitable for retrofits. Calculations There are no calculations associated with this prerequisite. Exemplary Performance There is no exemplary performance point available for this prerequisite. Submittal Documentation This prerequisite is submitted as part of the Design Submittal. The following project data and calculation information is required to document prerequisite compliance using the v2.2 Submittal Templates: q Confirm that the project does not use CFC refrigerants. OR q Confirm that the project has a phaseout plan for any existing CFC-based equipment. q Provide a narrative description of the phase-out plan, including dates and refrigerant quantities as a percentage of the overall project equipment. 172

23 Table 1: Ozone-depletion and global-warming potentials of refrigerants (100-yr values) Refrigerant ODP GWP Common Building Applications Chlorofluorocarbons CFC ,680 Centrifugal chillers CFC ,720 Refrigerators, chillers CFC ,800 Centrifugal chillers CFC ,900 Centrifugal chillers, humidifiers CFC ,600 Low-temperature refrigeration Hydrochlorofluorocarbons HCFC ,780 Air conditioning, chillers, HCFC CFC-11 replacement Hydrofluorocarbons HFC-23 ~ 0 12,240 Ultra-low-temperature refrigeration HFC-134a ~ 0 1,320 CFC-12 or HCFC-22 replacement HFC-245fa ~ 0 1,020 Insulation agent, centrifugal chillers HFC-404A ~ 0 3,900 Low-temperature refrigeration HFC-407C ~ 0 1,700 HCFC-22 replacement HFC-410A ~ 0 1,890 Air conditioning HFC-507A ~ 0 3,900 Low-temperature refrigeration Natural Refrigerants Carbon Dioxide (CO2) Ammonia (NH3) 0 0 Propane 0 3 SS WE EA MR EQ Prerequisite 3 Considerations Cost Issues Renovations of some existing buildings will require additional first costs to convert or replace existing HVAC&R and fire suppression systems currently using CFCs. Replacement rather than conversion of HVAC systems may increase equipment efficiencies and enable projects to reap energy savings over the life of the building. Environmental Issues Older refrigeration equipment used chlorofluorocarbons (CFCs) in refrigerants. CFCs, when inevitably released to the atmosphere, cause significant damage to the protective ozone layer in the earth s upper atmosphere. The reaction between a CFC and an ozone molecule in the earth s stratosphere destroys the ozone and reduces the stratosphere s ability to absorb a portion of the sun s ultraviolet (UV) radiation. Overexposure to UV rays can lead to skin cancer, cataracts and weakened immune systems. Increased UV can also lead to reduced crop yield and disruptions in the marine food chain. CFCs fall into a larger category of ozone depleting substances (ODSs). Recognizing the profound human health risks associated with ozone depletion, 160 countries have agreed to follow the Montreal Protocol on Substances that Deplete the Ozone Layer since the late 1980s. This treaty includes a timetable for the phaseout of production and use of ODSs. In compliance with the Montreal Protocol, CFC production in the United States ended in As part of the U.S. commitment to implementing the Montreal Protocol, Congress added new provisions to the Clean Air Act designed to help preserve and protect the stratospheric ozone layer. These amendments require the U.S. En- LEED for New Construction Version

24 SS WE EA MR EQ vironmental Protection Agency (EPA) to develop and implement regulations for Prerequisite 3 the responsible management of ozone depleting substances in the United States. EPA regulations include programs that ended the domestic production of ODSs, identified safe and effective alternatives to ODSs, and require manufacturers to label products either containing or made with chemicals that have a significant ozone depleting potential. Banning the use of CFCs in refrigerants has slowed the depletion of the ozone layer. Specification of non-cfc building equipment is now standard and CFCbased refrigerants are no longer available in new equipment. Resources Please see the USGBC Web site at www. usgbc.org/resources for more specific resources on materials sources and other technical information. Web Sites Ozone Depletion U.S. Environmental Protection Agency Provides information about the science of ozone depletion, the regulatory approach to protecting the ozone layer (including phase-out schedules) and alternatives to ozone-depleting substances. The Treatment by LEED of the Environmental Impact of HVAC Refrigerants w w w. u s g b c. o r g / D i s p l a y P a g e. aspx?cmspage=154 This report was prepared under the auspices of the s LEED Technical and Scientific Advisory Committee (TSAC), in response to a charge given TSAC by the LEED Steering Committee to review the atmospheric environmental impacts arising from the use of halocarbons as refrigerants in building heating, ventilating, and air conditioning (HVAC) equipment. Print Media CFCs, HCFC and Halons: Professional and Practical Guidance on Substances that Deplete the Ozone Layer, ASHRAE, The Refrigerant Manual: Managing The Phase-Out of CFCs, BOMA International, Definitions Chlorofluorocarbons (CFCs) are hydrocarbons that deplete the stratospheric ozone layer. Hydrochlorofluorocarbons (HCFCs) are refrigerants that cause significantly less depletion of the stratospheric ozone layer compared to CFCs. Refrigerants are the working fluids of refrigeration cycles. They absorb heat from a reservoir at low temperatures and reject heat at higher temperatures. 174

25 SS WE EA MR EQ Optimize Energy Performance Credit 1 Intent Achieve increasing levels of energy performance above the baseline in the prerequisite standard to reduce environmental and economic impacts associated with excessive energy use. Requirements Select one of the three compliance path options described below. Project teams documenting achievement using any of the three options are assumed to be in compliance with EA Prerequisite 2. NOTE: LEED for New Construction projects registered after June 26th, 2007 are required to achieve at least two (2) points under EAc1. OPTION 1 WHOLE BUILDING ENERGY SIMULATION (1 10 Points) Demonstrate a percentage improvement in the proposed building performance rating compared to the baseline building performance rating per ASHRAE/IESNA Standard by a whole building project simulation using the Building Performance Rating Method in Appendix G of the Standard. The minimum energy cost savings percentage for each point threshold is as follows: 1 10 points 2 Points mandatory for LEED for New Construction projects registered after June 26, 2007 New Buildings Existing Building Renovations Points 10.5% 3.5% 1 14% 7% % 10.5% 3 21% 14% % 17.5% 5 28% 21% % 24.5% 7 35% 28% % 31.5% 9 42% 35% 10 * Note: Only projects registered prior to June 26, 2007 may pursue 1 point under EAc1. Appendix G of Standard requires that the energy analysis done for the Building Performance Rating Method include ALL of the energy costs within and associated with the building project. To achieve points using this credit, the proposed design q must comply with the mandatory provisions (Sections 5.4, 6.4, 7.4, 8.4, 9.4 and 10.4) in Standard ; q must include all the energy costs within and associated with the building project; and q must be compared against a baseline building that complies with Appendix G to Standard The default process energy cost is 25% of the total energy cost for the baseline building. For buildings where the process energy cost is less than 25% of the baseline building energy cost, the LEED submittal must include supporting documentation substantiating that process energy inputs are appropriate. LEED for New Construction Version

26 SS WE EA MR EQ Credit 1 For the purpose of this analysis, process energy is considered to include, but is not limited to, office and general miscellaneous equipment, computers, elevators and escalators, kitchen cooking and refrigeration, laundry washing and drying, lighting exempt from the lighting power allowance (e.g., lighting integral to medical equipment) and other (e.g., waterfall pumps). Regulated (non-process) energy includes lighting (such as for the interior, parking garage, surface parking, façade, or building grounds, except as noted above), HVAC (such as for space heating, space cooling, fans, pumps, toilet exhaust, parking garage ventilation, kitchen hood exhaust, etc.), and service water heating for domestic or space heating purposes. For EA Credit 1, process loads shall be identical for both the baseline building performance rating and for the proposed building performance rating. However, project teams may follow the Exceptional Calculation Method (ASHRAE G2.5) to document measures that reduce process loads. Documentation of process load energy savings shall include a list of the assumptions made for both the base and proposed design, and theoretical or empirical information supporting these assumptions. OR OPTION 2 PRESCRIPTIVE COMPLIANCE PATH (4 Points) Comply with the prescriptive measures of the ASHRAE Advanced Energy Design Guide for Small Office Buildings The following restrictions apply: q Buildings must be under 20,000 square feet q Buildings must be office occupancy q Project teams must fully comply with all applicable criteria as established in the Advanced Energy Design Guide for the climate zone in which the building is located OR OPTION 3 PRESCRIPTIVE COMPLIANCE PATH: Advanced Buildings Core Performance Guide (2 5 Points) Comply with the prescriptive measures identified in the Advanced Buildings Core Performance Guide developed by the New Buildings Institute. q The Core Performance Guide is applicable for buildings under 100,000 square feet. q The Core Performance Guide is NOT applicable for health care, warehouse or laboratory projects. q Project teams must fully comply with Sections One, Design Process Strategies and Two, Core Performance Requirements. Minimum points achieved under Option 3 (2 3 points): q 3 points are available for all office, school, public assembly, and retail projects under 100,000 square feet that comply with Sections One and Two of the Core Performance Guide. q 2 points are available for all other project types under 100,000 square feet (except health care, warehouse, or laboratory projects) that implement the basic requirements of the Core Performance Guide 176

27 Additional points available under Option 3 (up to 2 additional points): q Up to 2 additional points are available to projects that implement performance strategies listed in Section Three, Enhanced Performance. For every three strategies implemented from this section, one point is available. Any strategies applicable to the project may be implemented within this section except: q 3.1-Cool Roofs q 3.8-Night Venting q 3.13-Additional Commissioning These strategies are addressed by different aspects of the LEED program and are not eligible for additional points under EA Credit 1. OR OPTION 4 PRESCRIPTIVE COMPLIANCE PATH (1 Point) Note: projects registered after June 26, 2007 may not use this option Comply with the Basic Criteria and Prescriptive Measures of the Advanced Buildings Benchmark Version 1.1 with the exception of the following sections: 1.7 Monitoring and Trend-logging, 1.11 Indoor Air Quality, and 1.14 Networked Computer Monitor Control. The following restrictions apply: Project teams must fully comply with all applicable criteria as established in Advanced Buildings Benchmark for the climate zone in which the building is located. Potential Technologies & Strategies Design the building envelope and systems to maximize energy performance. Use a computer simulation model to assess the energy performance and identify the most cost-effective energy efficiency measures. Quantify energy performance as compared to a baseline building. If a local code has demonstrated quantitative and textual equivalence following, at a minimum, the U.S. Department of Energy standard process for commercial energy code determination, then the results of that analysis may be used to correlate local code performance with ASHRAE Details on the DOE process for commercial energy code determination can be found at SS WE EA MR EQ Credit 1 LEED for New Construction Version

28 SS WE EA MR EQ Summary of Referenced Credit 1 Standard OPTION 1 ASHRAE/IESNA : Energy Standard for Buildings Except Low-Rise Residential, and Informative Appendix G Performance Rating Method. American Society of Heating, Refrigerating and Air-Conditioning Engineers (800) Standard was formulated by the American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (ASHRAE), under an American National Standards Institute (ANSI) consensus process. The Illuminating Engineering Society of North America (IESNA) is a joint sponsor of the standard. ASHRAE 90.1 Standards form the basis for many of the commercial requirements in codes that states consider for adoption. Standard 90.1 establishes minimum requirements for the energy-efficient design of buildings, except low-rise residential buildings. The provisions of this standard do not apply to single-family houses, multi-family structures of three habitable stories or fewer above grade, manufactured houses (mobile and modular homes), buildings that do not use either electricity or fossil fuel, or equipment and portions of building systems that use energy primarily for industrial, manufacturing or commercial processes. Building envelope requirements are provided for semi-heated spaces, such as warehouses. Appendix G is an informative appendix for rating the energy efficiency of building designs. This appendix is NOT to be included as part of the minimum requirements to comply with code; instead, Appendix G is used to quantify performance that substantially exceeds the requirements of Standard 90.1 (G1.1). For EA Credit 1, LEED relies extensively on the Performance Rating Method explained in Appendix G. The method provides performance criteria for the components listed in Table 1. The Performance Rating Method is intended to demonstrate performance beyond ASHRAE/IESNA through an interactive model that allows comparison of the total energy cost for the Proposed Design and a Baseline Design. To accomplish this efficiently, a number of restrictions on the modeling process are imposed by the method. Examples include simplified climate data, the fact that both buildings must have a mechanical system, and that process loads are to be included in both designs. Important restrictions that must be addressed to achieve compliance with the credit are highlighted in the Calculations section. Table 1: Scope of Requirements Addressed by ASHRAE/IESNA ASHRAE/IESNA Components Section 5 Section 6 Section 7 Section 8 Section 9 Section 10 Building Envelope (including semi-heated spaces such as warehouses) Heating, Ventilating and Air-Conditioning (including parking garage ventilation, freeze protection, exhaust air energy recovery and condenser heat recovery for service water heating) Service Water Heating (including swimming pools) Power (including all building power distribution systems) Lighting (including lighting for exit signs, building exterior, grounds and parking garage) Other Equipment (including all permanently wired electrical motors) 178

29 OPTION 2 ASHRAE Advanced Energy Design Guide for Small Office Buildings 2004 American Society of Heating, Refrigerating and Air-Conditioning Engineers (800) Advanced Energy Design Guide for Small Office Buildings 2004 was formulated by the American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (ASHRAE) to provide a simplified approach in small office buildings for exceeding ASHRAE standards. The guide provides climate-specific recommendations relative to the building envelope, interior lighting, and HVAC systems that will improve building energy performance beyond ASHRAE by approximately 30%. Option 3 Advanced Buildings Core Performance Program The Advanced Buildings Core Performance program has been adopted by the USGBC as a prescriptive path alternative to energy modeling for projects under 100,000 sf. Following the requirements of the Core Performance program can achieve 2 5 LEED points under EA credit 1. (See the application language in the credit discussion for project specific application and energy point achievement). The Advanced Buildings program was developed by the New Buildings Institute to provide a prescriptive program to exceed the energy performance requirements of ASHRAE The program was designed to provide a predictable alternative to energy performance modeling, and a simple set of criteria that can be implemented by design teams to significantly increase building energy performance. The Advanced Buildings Core Performance program is an updated version of the Advanced Buildings Benchmark program. Core Performance is calibrated to exceed the requirements of ASHRAE in all climate zones. Information about the Core Performance program requirements and a range of additional reference material is available at There are several aspects the Core Performance program that overlap with other LEED credits and prerequisites. Following the Core Performance program is not an alternative path to achieving any LEED credits other than EA credit 1, although some aspects of Core Performance may also support achievement of the requirements of other LEED credits and prerequisites. OPTION 4 Advanced Buildings Benchmark Version 1.1 New Buildings Institute Advanced Buildings Benchmark Version 1.1 was formulated by the New Buildings Institute to provide a method for exceeding national codes and standards, and to provide a standardized method for determining building performance. For EA Credit 1 OPTION 4, LEED requires full compliance with all applicable criteria in the Sections of the Advanced Buildings Benchmark Version 1.1 shown in Table 2. Approach and Implementation Option 1 The ASHRAE/IESNA Standards Informative Appendix G Performance Rating Method is an effective method for rating building energy performance, and for evaluating the relative costs and benefits of different energy efficiency strategies. The terminology used by the Performance Rating Method is used in this LEED credit. The term Proposed Building Performance refers to the the annual SS WE EA MR EQ Credit 1 LEED for New Construction Version

30 SS WE EA MR EQ Credit 1 Table 2: Scope of Requirements Addressed by Advanced Buildings Benchmark Version 1.1 as pertaining to LEED Credit 1 Option 3 Advanced Buildings Benchmark Version 1.1 Criteria Section 5 Required 1.1 Design Certification Required 1.2 Construction Certification Required 1.3 Operations Certification Required 1.4 Energy Code Compliance Required 1.5 Air Barrier Performance Required 1.6 Window, Skylight and Door Certification Required 1.8 Energy Efficient Transformers Required 1.9 Lighting Controls Required 1.10 Outdoor Lighting Required 1.12 Below-Grade Exterior Insulation Required 1.13 Refrigeration and Icemaker Efficiency Requirements Section 6 Required 2.1 Opaque Envelope Performance Required 2.2 Fenestration Performance Required 2.3 Cool Roofs and Ecoroofs Required 2.4 Mechanical System Design Required 2.5 Mechanical Equipment Efficiency Requirements Required 2.6 Variable Speed Control Required 2.7 Lighting Power Density energy cost calculated for a proposed design. The term Baseline Building Performance refers to the annual energy cost for a building design intended for use as a baseline for rating above standard design. The modeling methodology addressed in Appendix G of ASHRAE/ IESNA describes procedures for establishing the Proposed Building Performance and the Baseline Building Performance in order to evaluate the Percentage Improvement in energy cost for the project. The Performance Rating Method requires the development of an energy model for the Proposed Design, which is then used as the basis for generating the Baseline Design energy model. As the design progresses, any updates made to the Proposed Design energy model (such as changes to the building orientation, wall area, fenestration area, space function, HVAC system type, HVAC system sizing, etc.) should also be reflected in the Baseline Design energy model as dictated by Appendix G. The Performance Rating Method described in Appendix G is a modification of the Energy Cost Budget (ECB) Method in Section 11 of ASHRAE A model using the Energy Cost Budget Method will NOT be accepted for credit under EA Credit 1. The major differences between the ECB method and the Performance Rating Method are as follows: 1. Building Schedules (Table G3.1.4): In the Performance Rating Method, building occupancy, lighting, and other schedules may be altered to model efficiency measures as long as these modifications are both reasonable and defensible. In the Energy Cost Budget Method, schedules may not be altered. 2. Baseline Building Envelope (Table G3.1.5): a. Orientation: The Performance Rating Method requires that the Baseline Building be simulated 180

31 one time for each of four distinct building orientations, and that the results be averaged to calculate the Baseline Building Performance. The Energy Cost Budget requires that the Budget Building be modeled with an orientation identical to the Proposed Building. system type is determined based on the proposed design condenser cooling source, heating system classification, and single zone versus multi-zone classification. This method allows much less variation between the Proposed and Baseline Design Systems. SS WE EA MR EQ Credit 1 b. Opaque Assemblies: The Performance Rating Method specifies the type of assembly required for the Baseline Building wall, roof, and floor construction. The ECB method varies the construction assembly type modeled in the Budget Building Design based on the actual construction assembly type modeled in the Proposed Design. c. Vertical Fenestration: The Performance Rating Method limits the total fenestration modeled for the Baseline Building to 40% of the gross wall area or the actual fenestration percentage, whichever is less; and requires that this fenestration be uniformly distributed across all four orientations. The Energy Cost Budget Method limits the fenestration modeled to 50% of the gross wall area or the actual fenestration percentage, whichever is less; and requires that the fenestration be distributed similarly to the Proposed Design. 3. Baseline Building HVAC System: a. HVAC System Type Selection (Table G3.1.10, and Section G3.1.1, G3.1.2 and G3.1.3): Baseline Building system type selection using the Performance Rating Method is determined based on building type, building area, quantity of floors and the heating fuel source for the proposed design. This method allows credit for selecting inherently efficient HVAC system types. In the Energy Cost Budget Method, Budget Building b. Baseline Fan Power: With the Performance Rating Method, total fan power for the Baseline System is fixed based on total supply air volume, and system classification as constant volume or variable volume. This method reflects the savings achieved through an improved duct design that reduces static pressure. With the Energy Cost Budget Method, the fan static pressure remains the same in the budget and the proposed case. c. Baseline System Sizing: With the Performance Rating Method, the Baseline System is sized using default ratios. This allows credit for systems that are appropriately sized, and penalizes oversized systems. With the Energy Cost Budget Method, Budget Systems are sized with the same sizing factors as the Proposed Design. Starting the energy modeling early in the project design can provide insights for design decisions and can provide an early indication of what it will take to achieve certain levels of energy cost reductions (and associated EA Credit 1 points) for a particular project. The modeling methodology outlined in the Performance Rating Method enables the design team to identify the interactive effects of energy efficiency measures across all the building systems. For example, when the proposed lighting power is changed, this affects both the heating and cooling energy consumption. When building lighting power density is decreased in a hot climate with little or LEED for New Construction Version

32 SS WE EA MR EQ no heating, the model will indicate the quantity of additional cooling energy Credit 1 savings (due to lower internal loads) and how much the peak cooling equipment can be downsized (for first cost savings). For a cold climate, the model will reflect lower cooling energy savings, and an increase in heating energy (due to a lower internal load). In almost all cases, there will be savings beyond that of the lighting alone, with the greatest savings in the hottest climates and the least savings in the coldest climates. The Performance Rating Method requires that annual energy cost expressed in dollars be used to calculate the percentage improvement in energy usage. Annual energy costs are determined using rates for purchased energy such as electricity, gas, oil, propane, steam and chilled water that are based on actual local utility rates, or that are based on the state average prices published annually by the U.S. Department of Energy s Energy Information Administration (EIA) at Strategies Four fundamental strategies can increase energy performance: reduce demand, harvest free energy, increase efficiency, and recover waste energy. q Accomplish demand reduction by optimizing building form and orientation, by reducing internal loads through shell and lighting improvements, and by shifting load to off-peak periods. q Harvesting site energy includes using free resources such as daylight, ventilation cooling, solar heating and power, and wind energy to satisfy needs for space conditioning, service water heating and power generation. q Increasing efficiency can be accomplished with more efficient envelope, lighting, and HVAC systems, and by appropriately sizing HVAC systems. More efficient systems reduce energy demand and energy use. q Finally, waste energy can be recovered through exhaust air energy recovery systems, graywater heat recovery systems, and cogeneration. When applying these strategies, it is important to establish and document energy goals and expectations, and apply modeling techniques to reach these goals. Option 2 For small office buildings less than 20,000 sq.ft., the ASHRAE Advanced Energy Design Guide for Small Office Buildings 2004 provides an effective means of limiting building energy usage, and documenting improved building energy performance without the need for a building energy model. The climate-specific recommendations listed in the ASHRAE Advanced Energy Design Guide should be incorporated into the project early in the building design in order to optimize building performance with minimal impact on capital costs. To comply with the prescriptive measures of the ASHRAE Advanced Energy Design Guide, the project team must first identify the climate zone where the building is located. Section 3 includes a United States map defining the eight climate zones by county borders. The project team can then find the appropriate Climate Zone Recommendation table identifying all of the prescriptive criteria required for their project. These criteria include recommendations for roofs, walls, floors, slabs, doors, vertical glazing, skylights, interior lighting, ventilation, ducts, energy recovery, and service water heating. To achieve EA Credit 1, project teams must fully comply with all recommendations established in the Advanced Energy Design Guide for the climate zone in which the building is located. Option 3 The Core Performance Guide describes the requirements of the program. The 182

33 Guide is divided into five basic sections, describing different elements of the program requirements. In the Core Performance program, specific program requirements are referred to as criteria. Introduction The introduction section includes a brief overview of the Core Performance program, including the analysis protocols used to develop the program. The introduction also includes a Quick Start Guide that provides a program overview, and a table that correlates the program criteria (requirements) to other LEED credits. pared to ASHRAE Projects using the program to achieve EA credit 1 points prescriptively must implement all of the criteria listed in this section of the Core Performance Guide. (Note that under some specific conditions, certain criteria in Core Performance may not be applicable to specific projects. For example projects without server rooms need not implement the Dedicated Mechanical Systems criteria). The specific criteria in this section of Core Performance are: 1.1 Energy Code Compliance 1.2 Air Barrier Performance 1.3 Indoor Air Quality 1.4 Below Grade Insulation 1.5 Envelope Performance 1.6 Fenestration 1.7 Lighting Controls 1.8 Lighting Power Density 1.9 Mechanical Efficiency 1.10 Dedicated Mechanical Systems 1.11 Demand Control Ventilation 1.12 Hot Water System Efficiency 1.13 Fundamental Economizer Performance Section 3 - Enhanced Performance Strategies-(OPTIONAL for additional points) The criteria identified in this section are not required when using the Core Performance program as a prescriptive path in LEED. These strategies can be used to increase the number of LEED points achieved using the Core Performance program. For each three (3) additional Enhanced Performance Strategies implemented by a project, one (1) additional EA credit 1 point can be achieved. (A maximum of two (2) additional points can be achieved, in addition to the points achieved from the required measures under Sections One and Two.) SS WE EA MR EQ Credit 1 Section 1 - Design Process Requirements - (REQUIRED under Option 3) This section describes a series of requirements that address the design process to encourage the development of a more integrated building design. Most of the criteria in this section are typically implemented by LEED project teams, and can help the team to track building performance issues more effectively through the design and construction process. LEED projects following the prescriptive path for points under EA credit 1 must implement all of the criteria listed in this section of the Core Performance Guide. The specific criteria in this section of Core Performance are: 1.1 Identify Design Intent 1.2 Communicating Design Intent 1.3 Building Configuration 1.4 Mechanical System Design 1.5 Acceptance Testing 1.6 Operator Training 1.7 Performance Data Review Section 2 Core Performance Requirements - (REQUIRED under Option 3) This section includes the specific energy performance measures that form the basis of achievement of energy savings under the Core Performance program, com- LEED for New Construction Version

34 SS WE EA MR EQ Credit 1 Several of the criteria in the Enhanced Performance section of Core Performance do not qualify for additional points under EAc1. These strategies are addressed by different aspects of the LEED program. The list below identifies all of the Enhanced Strategy Criteria which can be used to achieve additional LEED EA credit 1 points: 3.1 (not applicable) 2.2 Daylighting and Controls 2.3 Additional Lighting Power Reductions 2.4 Plug Loads/Appliance Efficiency 2.5 Supply Air Temperature Reset (VAV) 2.6 Indirect Evaporative Cooling 2.7 Heat Recovery 2.8 (not applicable) 2.9 Premium Economizer Control 2.10 Variable Speed Drives 2.11 Demand Responsive Buildings 2.12 Renewable Energy 2.13 (not applicable) 2.14 Fault Detection Diagnostics Not all of the criteria listed in the Enhanced Strategy section can be applied effectively to all projects. The design team must evaluate the measures described to decide on applicability on a project by project basis. Section 4 - Energy Modeling (NOT APPLICABLE for Option 3 prescriptive path under EAc1) The Core Performance program is designed as a prescriptive path for energy performance. Energy modeling is included as an option in Core Performance for projects that wish to demonstrate comparable performance under some state and utility programs. This is not a part of the LEED prescriptive path option. Projects which undertake energy modeling for LEED credit must comply with the energy performance requirements described in LEED, using ASHRAE 90.1-Appendix G as a baseline. The Core Performance program is designed as a prescriptive measure program, and as such is calibrated to the prescriptive requirements of ASHRAE Projects which use Appendix G as a baseline may be required to utilize a different mechanical system baseline, and therefore may not be able to demonstrate the same level of relative energy savings as suggested by the Core Performance program. The relative performance of the baseline does not affect the predicted energy use of the proposed building, but does affect the performance of the project relative to LEED. OPTION 4 The Basic Criteria and Prescriptive Measures of the Advanced Buildings Benchmark Version 1.1 provide a prescriptive means of improving building energy performance. To comply with some of these measures, the project team must identify the climate zone where the building is located. The Advanced Buildings Benchmark Section 6.1 includes a United States map defining the eight climate zones by county borders. To achieve EA Credit 1, project teams must fully comply with all Advanced Buildings Benchmark v1.1 Criteria listed in Table 2 above in the Summary of Referenced Standards. Calculations Option 2, 3 and 4 of the EA Credit 1 credit use a prescriptive approach and do not require a software energy simulation of the project. Option 1 relies entirely upon the ASHRAE Appendix G Performance Rating Method, and requires extensive calculations using an approved energy simulation program. The Performance 184

35 Rating Method in 90.1 Appendix G is NOT equivalent to the Energy Cost Budget (ECB) Method in 90.1 Section 11, and the ECB Method will not be accepted for credit under LEED for New Construction v2.2 EA Credit 1. A total of five energy simulation runs are required in order to demonstrate compliance using the Performance Rating Method. This includes one Proposed Design simulation which models the building as designed (with some minor exceptions), and four Baseline Design simulations. The four Baseline Design energy models are identical to each other, except that the building orientation for each model is modified as described in ASHRAE Std Table G3.5.1(a), and the window SHGCs are revised to reflect the minimum ASHRAE Building Envelope Requirements for the revised building orientation. The total annual energy cost projected by the Proposed Design simulation is called the Proposed Building Performance. The average of the total projected annual energy costs for the four Baseline Design simulations is called the Baseline Building Performance. The basic method for demonstrating compliance is to first model and simulate the Proposed Design, and then revise the model parameters for the Baseline Design as described in Appendix G, and simulate the Baseline Design using each of the four prescribed orientations. A major difference between the Proposed Design and the Baseline Design is that the windows are distributed equally around the building in the Baseline Design. Both the Baseline Building model and the Proposed Building model must include all building energy components including, but not limited to, interior and exterior lighting, cooling, heating, fan energy (including garage ventilation and exhaust fans), pumping, heat rejection, receptacle loads, freeze protection, elevators and escalators, swimming pool equipment, refrigeration, and cooking equipment. Schedules of operation must be the same for the Proposed and Budget Building models unless schedule changes are necessary to model non-standard efficiency measures such as lighting controls, natural ventilation, demand control ventilation, or service water heating load reductions (ASHRAE Std Table G3.1.4). If there are schedule of operation differences between the Baseline Building model and the Proposed Building model these differences should be clearly and explicitly described in the EA Credit 1 submittal narrative. Design criteria, including both climate data and interior temperature and humidity setpoints, must be the same for the Proposed and Baseline Building models. Furthermore, both heating and cooling must be modeled in all conditioned spaces of both the Proposed and Baseline Building energy models, even if no heating or cooling system will be installed. Buildings that have no mechanical heating and/or cooling system, can achieve some credit by modeling fan systems as cycling in the Proposed Design versus continuously operated fans in the Baseline Design (ASHRAE Std Table G3.1 No. 4 Fan Schedules). Building Envelope (ASHRAE Std Table G3.1.5) will likely vary significantly between the Proposed and Baseline Design models. The Performance Rating Method requires that the Proposed Design be modeled as designed with a few minor exceptions. For the Baseline Design of new buildings, the above-grade walls, roof, and floor assemblies must be modeled using light-weight assembly types (i.e., steel-framed walls, roofs with insulation entirely above deck, and steeljoist floors), with the ASHRAE Std prescriptive maximum U-factors for the building s climate. Even if the Proposed Design incorporates mass wall construc- SS WE EA MR EQ Credit 1 LEED for New Construction Version

36 SS WE EA MR EQ tion, the Baseline Design must be modeled using a steel-framed assembly. Credit 1 The percentage of vertical fenestration modeled in the Budget Design should match that of the Proposed Design or 40% of the gross wall area, whichever is less. This fenestration must be equally distributed in horizontal bands across all four orientations. Cool roofs (light colored roof finishes that have low heat absorption) can be modeled in the Proposed Design to show the impact of reduced heat gains. If the proposed roof is rated at a minimum initial solar reflectance of 0.70 and a minimum thermal emittance of 0.75, the Proposed Design can use a modeled reflectivity of 0.45 (accounting for degradation in actual reflectivity) versus the default reflectivity value of 0.30 which will be modeled for the Baseline Design. Shading projections in the Proposed Design, which reduce the solar gains on the glazing, can also be modeled to demonstrate energy savings compared to the Baseline model which will have fenestration flush to the exterior wall. Manually controlled interior shading devices such as blinds and curtains should not be modeled in either the Proposed or Baseline Design. However, automatically controlled interior shading devices can be modeled for credit in the Proposed Design, per ASHRAE Std Appendix G. For existing buildings that are being renovated, the building envelope design parameters for the Baseline Design should be modeled using the existing (pre-retrofit) building envelope thermal parameters rather than the ASHRAE Std prescriptive building envelope requirements for the specified climate. Any proposed changes to the building envelope (such as replacing windows or increasing roof insulation) should be modeled in the Proposed Design. Lighting Systems for the Proposed Design should be modeled with the installed lighting power density, and should account for all installed lighting on the site including interior ambient and task lighting, parking garage lighting and exterior lighting. Any daylight responsive lighting control systems can be directly modeled in the Proposed Design energy simulation. Credit can also be taken for occupant sensor lighting controls (ASHRAE Std Table G3.1, No.6); however, note that such controls are mandatory per in classrooms, conference rooms and employee lunch and break rooms. Lighting for the Baseline Design is modeled using the Building Area (9.5) or Space-by-Space (9.6) methods. The Baseline Design model should also include the Exterior Lighting Power Allowance (9.4.5). Lighting excepted from the interior lighting power allowance should still be modeled in both the Proposed and Baseline Design; however, this lighting should be considered Process energy (ASHRAE Std Table G.3.1.6). HVAC system types will often vary between the Proposed Design and the Baseline Design models. The Proposed Design HVAC system type, quantities, capacities and efficiencies should reflect the actual design parameters except in cases where either a heating system or a cooling system has not been specified. If a heating system but no cooling system has been specified, the Proposed Design must include a cooling system modeled identically to the Baseline Design cooling system. If a cooling system, but no heating has been specified, the Proposed Design must include a heating system modeled identically to the Baseline Design heating system. For areas of the project without heating or cooling systems (such as parking garages), there is no need to model 186

37 heating or cooling systems in either the Proposed or Baseline Designs. HVAC systems in green buildings are sometimes hybrid or experimental in nature. It may be necessary to approximate some or all of the functional aspects of Proposed Design experimental systems using the Exceptional Calculation Method (ASHRAE Std G2.5). The Baseline HVAC System Type shall be determined using the actual building area, quantity of floors, occupancy (residential or non-residential), and heating fuel source per ASHRAE Std Tables G3.1.1A and G3.1.1B. The same Baseline HVAC system type should be used for the entire building except for mixed use occupancies, areas where occupancy or process loads differ significantly from the rest of the building, or areas with varying pressurization, cross-contamination or air circulation requirements (ASHRAE Std G3.1.1). For projects served by existing HVAC systems, such as a central plant on a campus, Section 10(a) of Table G.3.1 states that when there is an existing HVAC system, the model shall reflect the actual system type using actual component capacities and efficiencies. When the Baseline HVAC system type is defined as a single zone system, the Baseline Design should model exactly one single zone HVAC system per thermal block. Preheat coils should be modeled identically in the Proposed and Baseline cases whenever preheat can be modeled for the given Baseline system type (ASHRAE Std G ). Baseline System fan supply air volume should be based on a supply-air-to-room-air temperature difference of 20 F (ASHRAE Std G ). This supply air volume is used to calculate the total Baseline System brake horsepower (i.e., the sum of the supply, return, relief, and exhaust fan brake horsepower), which is used to calculate the total fan power for the Baseline System design (ASHRAE Std G ). HVAC equipment capacities for the Baseline system should be oversized 15% for cooling, and 25% for heating (ASHRAE Std G and G ). Economizers and exhaust air energy recovery systems should be modeled in the Baseline HVAC systems when required for the given climate zone and system parameters (ASHRAE Std G and G ). Fan energy is separated from the cooling system in the Performance Rating Method. Thus, if the HVAC manufacturer provides an overall efficiency rating, such as an energy efficiency ratio (EER), it must be separated into the component energy using the coefficient of performance (COP) or other conversion (Equations G-A, G-B and G-C, Pages G-24 and G-26 of the ASHRAE User s Manual). Unmet load hours (occupied periods where any zone is outside its temperature setpoints) may not exceed 300 hours for either the Baseline or Proposed Design. Also, the difference in unmet load hours between the Baseline and Proposed Design must be no greater than 50 (G ). Other systems regulated by ASHRAE/ IESNA Standard include parking garage ventilation (ASHRAE Std ); freeze protection and snow/ice melting systems ( ); exhaust air energy recovery, which applies to laboratory systems unless they comply with ( ); condenser heat recovery for service water heating, which applies primarily to high-rise residential occupancies, hotels, hospitals, and laundry facilities ( ); kitchen hoods ( ); laboratory fume hoods ( ); swimming pools (7.4.2 and 7.4.5); all building power distribution systems (8.1); exit signs (9.4.3); exterior SS WE EA MR EQ Credit 1 LEED for New Construction Version

38 SS WE EA MR EQ building grounds lighting (9.4.4); parking garage lighting (Table 9.5.1, 9.6.1); Credit 1 exterior lighting power (9.4.5); and all permanently wired electrical motors (10.4.1). Where there are specific energy efficiency requirements for systems in ASHRAE Std. 90.1, the Baseline Design model shall reflect the lowest efficiency allowed by these requirements, and the Proposed Design shall reflect the actual installed efficiency. Process energy is considered to include, but is not limited to, office and general miscellaneous equipment, computers, elevators and escalators, kitchen cooking and refrigeration, laundry washing and drying, lighting exempt from the lighting power allowance (e.g., lighting integral to medical equipment) and other (e.g., waterfall pumps). Process energy cost shall be equal to at least 25% of the Baseline Building Performance. For buildings where the process energy cost is less than 25% of the baseline building energy cost, the LEED submittal must include supporting documentation substantiating that process energy inputs are appropriate. Table G-B of the ASHRAE User s Manual provides acceptable receptacle power densities per occupancy type, which can be incorporated into the building energy models. Other process energy inputs such as elevators, escalators, data center and telecom room computing equipment, refrigeration, process lighting, and non-hvac motors should be modeled based on actual power requirements, and assuming reasonable schedules of operation. For EA Credit 1, process loads shall be identical for both the Baseline Building Performance rating and for the Proposed Building Performance rating. However, project teams may follow the Exceptional Calculation Method (ASHRAE Std G2.5) to document measures that reduce process loads. If credit is taken for process loads, the calculations must include reasonable assumptions for the baseline and proposed case. Energy Rates are an important part of the Performance Rating Method. Rates from the local utility schedules are the default option to compute energy costs. The intent is to encourage simulations that provide owners value, and help them minimize their energy costs. The modeler needs to use the same rates for both the budget and proposed building designs. In the absence of a local utility rate schedule, or of energy rate schedules approved by the local ASHRAE/IESNA adopting authority, the applicant may use the energy rates listed in the state average prices published annually by the DOE Energy Information Administration (EIA) at Regardless of the source of the rate schedule used, the same rate schedule must be used in both the baseline and proposed simulations. On-Site Renewable Energy and Site- Recovered Energy costs are not included in the Proposed Building Performance (this is a LEED for New Construction exception to ASHRAE Std G2.4); therefore, these systems receive full credit using the Performance Rating Method. Examples of on-site renewable energy systems include power generated by photovoltaics or wind turbines, and thermal energy collected by solar panels. Examples of site-recovered energy include heat recovered with chiller heat recovery systems or waste heat recovery units on distributed generation systems. When the actual building design incorporates on-site renewable or site-recovered energy, the Baseline Design should be modeled based on the backup energy source for the actual building design, or electricity if no backup energy source is specified. Proposed Building Performance 188

39 can be determined using one of the following two methods when on-site renewable energy or site-recovered energy is incorporated into the building project: 1. Model the systems directly in the Proposed Design energy model. If the building simulation program has the capability of modeling the on-site renewable or site-recovered energy systems, these systems can be modeled directly within the building energy model. The model should reflect the cost savings achieved through the onsite renewable or site-recovered energy systems. 2. Model the systems using the Exceptional Calculation Method. If the building simulation program does not have the capability of modeling the on-site renewable or site-recovered energy systems, the energy saved by these systems can be calculated using the Exceptional Calculation Method. The renewable or site-recovered energy cost can then be subtracted from the Proposed Building Performance. The Exceptional Calculation Method (ASHRAE Std G2.5) shall be used to document any measures that cannot be adequately modeled in a simulation program. Documentation of energy savings using the exceptional calculation method shall include a list of the assumptions made for both the Baseline and Proposed Design, theoretical or empirical information supporting these assumptions, and the specific energy cost savings achieved based on the exceptional calculation. Examples of measures that may be modeled using the Exceptional Calculation Method include, but are not limited to, improvements to laboratory or kitchen exhaust systems, improved appliance efficiencies in high-rise residential buildings, graywater heat recovery, flat panel LCD computer monitors, improvements to refrigeration equipment efficiency, and zone VAV occupant sensor controls. Common mistakes made using the Performance Rating Method. The following is a list of common mistakes to avoid when using the Performance Rating Method for developing EA Credit 1 calculations and submittals: 1. The Energy Cost Budget Method (Section 11) is incorrectly used rather than the Performance Rating Method (Appendix G) to obtain EA Credit 1 credit. 2. Center-of-glass performance is incorrectly used rather than fenestration assembly U-factor and Solar Heat Gain Coefficient. The Building Envelope Requirements listed for each climate zone (ASHRAE Std Tables through 5.5-8) refer to fenestration assembly maximum U-factors and SHGCs for glazing (also see ASHRAE Std Sections and ). The fenestration assembly performance accounts for the impacts of both the frame and the glazing. To determine the fenestration assembly U-factor and Solar Heat Gain Coefficient, Tables 8.1A and 8.2 should be used; OR the fenestration U-factors, SHGCs and visual light SS WE EA MR EQ Credit 1 Figure 1: 3-D Rendering of Proposed Design Figure 2: 3-D Rendering of Baseline Design LEED for New Construction Version

40 SS WE EA MR EQ transmittance shall be certified and labeled in accordance with NFRC Credit 1 100, 200 and 300 respectively (A8). 3. Baseline Design window area percentages are not calculated in accordance with the Performance Rating Method. 4. Baseline Design fenestration is not uniformly distributed across all four building orientations as required by the Performance Rating Method. 5. The Proposed Design does not account for portable (task) lighting. 6. Non-tradable surfaces (such as building facades) are incorrectly treated as tradable surfaces when determining the exterior lighting power allowance. 7. The Baseline HVAC System type is incorrectly determined. 8. The Baseline System Capacities, Design Supply Air Volume, or total fan power are incorrectly calculated. 9. Manufacturer s overall cooling energy efficiency ratings, (such as EERs) are not separated into the component energy using the coefficient of performance (COP) or other conversion factors in accordance with 90.1 requirements. 10. The quantities and/or types of chillers and boilers are not determined in accordance with the Performance Rating Method (ASHRAE Std G , G ). 11. Insufficient information is provided for energy measures incorporating the Exceptional Calculation methodology. 12. Energy consumption is incorrectly used to calculate the Percentage Improvement rather than energy cost. Calculating the Percentage Improvement requires the following steps: First, the whole-building simulations are used to produce economic reports that show the total cost for electricity, gas and possibly other energy sources such as steam and chilled water. The total annual energy cost calculated for the Proposed Design simulation is the Proposed Building Performance. The average total energy cost for the four orientations simulated for the Baseline Design is the Baseline Building Performance. ASHRAE Std also requires that the energy consumption and peak demand be reported for each building end-use. In DOE-2-based programs such as equest or VisualDOE, this data can be found in the BEPS or BEPU and PS-E reports. In Trane Trace 700, this information is reported in the Energy Consumption Summary. As with the Baseline Building Performance, the average of the four Baseline Building simulation results is used to calculate the energy consumption by end-use, and the peak demand by end-use. NOTE: separate point scales are provided for New and Existing Buildings in recognition of the constraints inherent in renovating an existing shell compared to new construction. Example The following example shows how the Performance Rating Method is applied to a 100,000-sq.ft. project. The design case uses a high performance envelope with 23% glazing, Super T8 direct/indirect ambient lighting with supplemental task lighting, a VAV air system that receives chilled water from a 400-ton variable speed electric chiller, and 20 kw of photovoltaic panels installed on the roof. Using the Performance Rating Method system map, the budget HVAC system type is modeled as a Packaged VAV System with hot water reheat, variable speed fan control, and direct expansion cooling. To determine the Proposed Building Performance, the energy modeler creates a design building energy simulation model using DOE-2, Trane Trace 700, EnergyPlus, Carrier HAP-E20 II or another hourly load and energy-modeling 190

41 software tool. The model parameters for all loads, including receptacle and process loads and the expected building occupancy profile and schedule, are adjusted to determine central system capacities and energy use by system. Through parametric manipulation, the energy modeler working with the design team increases component efficiencies to exceed the referenced standard. The energy generated by the photovoltaic panels is calculated using PV Watts Version 1 software using the ASHRAE Std Exceptional Calculation Method. The Proposed Building Performance is calculated as the total projected energy cost for the Proposed Design Energy Model minus the energy generated by the photovoltaic panels as calculated in PV Watts Version 1. The Baseline Building Performance is then calculated by adjusting the model parameters to meet the requirements listed in ASHRAE/IESNA Standard Appendix G. The Baseline model includes the same plug and process loads and an identical building occupancy profile and schedule to the Proposed Design in order to accurately determine central system capacities and energy use by system. For the Baseline Model, the energy modeler redistributes the glazing uniformly across all four building orientations, but otherwise models the Baseline glazing percentage identically to the Proposed Design, since the ratio of window to wall area for the Proposed Design is less than 40%. The energy modeler adjusts the construction assembly types in accordance with ASHRAE Std Table G3.1.5, and to meet minimal Building Envelope Requirements for the building s climate zone. The Baseline HVAC System Type is modeled as a Packaged Variable Air Volume system with Hot Water Reheat (ASHRAE Std Table G3.1.1.A). The energy modeler uses minimum/prescriptive ASHRAE Std HVAC system component efficiencies and performs sizing runs to determine the fan supply air volume; and then uses this to calculate the total Baseline Design fan brake horsepower, and total Baseline Design fan power respectively. The energy modeled performs the Baseline Design simulation first with the actual building orientation, and then rotating the building 90, 180 and 270 respectively. For each of the four Baseline Building Design orientations, the energy modeler revises the window SHGC to reflect the minimum ASHRAE prescriptive requirements for the revised building orientations. The energy modeler takes the average of the total annual energy cost simulated for the four Baseline simulations to establish the Baseline Building Performance. In the example, the General Building Energy Model Information is summarized in Table 3, the Baseline and Proposed Design input parameters are summarized in Table 4, the Baseline Performance is calculated in Table 5, and the Baseline Design and Proposed Design results, as well as the Percentage Improvement (Equation 1) are summarized in Table 6. In Tables 5 and 6, energy is reported as site energy, not source energy. These four tables provide the format required for EA Credit 1 documentation submittal. Exemplary Performance Projects pursuing EAc1, Option 1, that demonstrate a percentage improvement in the proposed building performance rating compared to the baseline building performance rating per ASHRAE/IESNA Standard by the following SS WE EA MR EQ Credit 1 Equation 1 Percentage Improvement = 100 x 1 - Proposed Building Performance Baseline Building Performance LEED for New Construction Version

42 SS WE EA MR EQ Credit 1 Table 3: General Building Energy Model Information Performance Rating Method Compliance Report Page 1 Project Name: Midrastleton Office Building Project Address: 2850 W. Washington Ave. Date: October 5, 2006 Designer of Record: Maddlestobum Architects Telephone: Contact Person: Fenray Constrablik Telephone: City: Las Vegas, NV Principal Heating Source: Fossil Fuel Electricity Solar/Site Recovered Other Weather Data: Las Vegas, NV (LAS-VENV.bin) Climate Zone: 3B Space Summary Building Use Conditioned Area (sf) Unconditioned (sf) Total (sf) 1. Office (Open Plan) 40,000 40, Office (Executive / Private) 30,000 30, Corridor 10,000 10, Lobby 5,000 5, Restrooms 5,000 5, Conference Room 4,000 4, Mechanical / Electrical Room 4,000 4, Copy Room 2,000 2,000 Total 100, ,000 Advisory Messages Proposed Budget Difference Building Design Building (Proposed Budget) Number of hours heating loads not met (system / plant) Number of hours cooling loads not met (system / plant) Number of warnings Number of errors Number of defaults overridden Description of differences between the budget building and proposed design not x documented on other forms: Not Applicable Attached Additional Building Information Quantity of Floors Three Simulation Program equest v Utility Rate: Electricity Nevada Power Large General Service (average $0.0935/kWh) Utility Rate: Natural Gas Southwest Gas Medium General Service (average $1.04/therm) Utility Rate: Steam or Hot Water Utility Rate: Chilled Water Utility Rate: Other 192

43 Table 4: Baseline and Proposed Design Input Parameters Performance Rating Method Compliance Report Page 2 Comparison of Proposed Design versus Baseline Design Energy Model Inputs: Building Element Proposed Design Input Baseline Design Input Envelope Above Grade Wall Construction(s) 1. Steel-frame Construction, Steel-frame Construction, R-13 R-19 insulation, 16 in. OC, 6 insulation, U-factor = depth, U-factor = Below Grade Wall Construction Not applicable Not Applicable Roof Construction Built-up Roof, Insulation Insulation entirely above deck, entirely above deck, R-30 ci, R-15ci, U-factor = 0.063, Roof U-factor = 0.032, Roof Reflectivity = 0.30 Reflectivity = 0.45 (cool roof) Exterior Floor Construction Not Applicable Not Applicable Slab-On-Grade Construction Uninsulated, F Uninsulated, F Window-to-Gross Wall Ratio 23% 23% Fenestration Type(s) 1. Dual-Pane Metal Frame 1. North Orientation tinted low-e glass doors with 2. South, East, West Orientations thermal break 2. Dual-Pane Metal-Frame low-e glass windows with thermal break Fenestration Assembly U-factor Fenestration Assembly SHGC Fenestration Visual Light Transmittance Fixed Shading Devices 1. None 1. None Automated Movable Shading None None Devices Electrical Systems & Process Loads Ambient Lighting Power Density, Average: Watts/sf 1. Average: 1.05 Watts/sf (Spaceand Lighting Design Description by-space Method) Super T8 direct/indirect linear 2. Office (Enclosed or Open): 1.1 W/sf flourescents with occiupant 3. Conference Rooms: 1.3 W/sf sensor controls (10% lighting 4. Corridor: 0.5 W/sf credit); compact flourescents 5. Restroom: 0.9 W/sf used for some hallways and 6. Electrical/Mechanical Rooms: lobbies; average task lighting 1.5 W/sf power density of 0.10 W/sf 7. Lobby: 1.3 W/sf for office spaces is included in the calculations. Process Lighting None None Lighting Occupant Sensor Controls Installed in most spaces Not installed Daylighting Controls None None Exterior Lighting Power 3.7 kw 4.2kW (Tradable Surfaces) Exterior Lighting Power 0.8kW 0.8kW (Non-Tradable Surfaces) Receptacle Equipment 0.75 W/sf 0.75 W/sf Elevators or Escalators Two elevators operated Two elevators operated intermittently (5kW per elevator intermittently (5kW per elevator with 490 equivalent full load with 490 equivalent full load hours of operation per elevator) hours of operation per elevator Refrigeration Equipment None None Other Process Loads Telecom rooms, one per floor, Telecom rooms, one per floor, 2.3kW peak wirh 3, kW peak wirh 3,680 equivalent full load hours of equivalent full load hours of operation operation SS WE EA MR EQ Credit 1 LEED for New Construction Version

44 SS WE EA MR EQ Table 4 continued: Baseline and Proposed Design Input Parameters Credit 1 Performance Rating Method Compliance Report Page 3 Comparison of Proposed Design versus Baseline Design Energy Model Inputs (Continued): Building Element Proposed Design Input Baseline Design Input Mechanical & Plumbing Systems HVAC System Type(s) 1. Variable Air Volume with System Type 5: Packaged Reheat (one per floor) Rooftop Variable Air Volume 2. Packaged single Zone systems with Reheat. Packaged with gas furnace (gas furnace Single Zone systems with gas not in actual design) serving furnace serving telecom telecom rooms and elevator rooms and elevator equipment room. equipment room. Design Supple Air Temperature 23 deg. F 20 deg. F Differential Fan Control VSD Control VSD Control Fan Power 1. AH-1: 14.0 bhp supply; 94.8 total brake horsepower; 5.6 bhp return 75.3kW total fan power (Supply 2. AH-2: 14.5 bhp supply; Fans + Return Fans) 5.8 bhp return 3. AH-3: 14.4 bhp supply; 5.8 bhp return Economizer Control Differential Temperature None Economizers with maximum temperature of 70 deg. F Demand Control Ventilation Outside air quantity based on None DCV zone sensors; Minimum Outside Air Sizing method set by critical zone Unitary Equipment Cooling EER for Packaged Rooftop Efficiency SEER for two small PSZ VAV units systems SEER for two small PSZ systems Unitary Equipment Heating 80% furnace efficiency for two 80% furnace efficiency for two Efficiency small PSZ units small PSZ units Chiller Type, Capacity, and one 300-ton VSD centrifugal Not Applicable Efficiency chiller: 0.58kW/ton full loadefficiency, variable speed control for part-load operation Cooling Tower one two-cell cooling tower; Not Applicable each cell has a 15 hp fan with variable speed control Boiler Efficiency one 85% efficient boiler, 2.0 two boilers, 75% thermal MBTUH efficiency; 1.25 MBTUH each Chilled Water Loop and Pump Variable primary flow with Not Applicable Parameters 25 hp variable speed pump; Chilled Water Temperature reset from 42 to 50 deg. F Condenser Water Loop and Constant flow with 25 hp Not Applicable Pump Parameters variable speed pump; Condenser Water Temperature reset from 70 to 85 deg. F Hot Water Loop and Pump Variable primary flow with 3 Variable primary flow with 3 Parameters hp variable speed pump; Hot hp constant speed pump; Hot Water temperature reset based water supply temperature on load between 150 deg. and reset based on outdoor dry- 180 deg. F bulb temperature using the following schedule: 180 deg. F at 20 deg. F and below, 150 deg. F at 50 deg. F and above, and ramped linearly between 180 deg. F and 150 deg. F at temperatures between 20 deg. F and 50 deg. F Domestic Hot Water System(s) 100 gallon storage gas water 100 gallon storage gas water heater with 80% thermal heater with 80% thermal efficiency, 175,000 btuh efficiency, 175,000 btuh capacity, capacity, and 1,319 Btuh and 1,319 Btuh standby losses standby losses 194

45 Table 5: Baseline Performance SS WE EA MR EQ Credit 1 Performance Rating Method Compliance Report Page 4 Baseline Building Performance Table Baseline Building Energy Summary by End Use Process? 0 rotation 90 rotation 180 rotation 270 rotation Average End Use Energy Type Energy Peak Energy Peak Energy Peak Energy Peak Energy Peak Cost [10 6 Btu] [10 6 Btuh] [10 6 Btu] [10 6 Btuh] [10 6 Btu] [10 6 Btuh] [10 6 Btu] [10 6 Btuh] [10 6 Btu] [10 6 Btuh] [$/yr] Interior Lighting Electricity 1, , , , , $31,990 Interior Lighting X Electricity $0 (Process) Exterior Lighting Electricity $1,531 Space Heating Natural Gas , , , , ,300.0 $4,916 (fuel 1) Space Heating Electricity $0 (fuel 2) Space Cooling Electricity 1, , , , , $36,687 Pumps Electricity $86 Heat Rejection Electricity $0 Fans - Interior Electricity $6,315 Fans - Parking Electricity $0 Garage Service Water Natural Gas $557 Heating (fuel 1) Service Water Electricity $0 Heating (fuel 2) Receptacle X Electricity 1, , , , , $29,276 Equipment Refrigeration X Electricity $0 (food, etc.) Cooking X Electricity $0 (commercial, fuel 1) Cooking X Electricity $0 (commercial, fuel 2) Elevators and X Electricity $470 Escalators Other Process X Electricity $813 Total Building Consumption/Demand 4, , , , , , , , , ,981.5 $112,641 Total Process Energy 1, , , , , $30,559 Note: Energy Consumption is listed in units of site energy 10 3 Btu = kwh x Btu = therms / 100 Baseline Building Energy Cost and Consumption by Fuel Type Energy Type 0 rotation 90 rotation 180 rotation 270 rotation Average Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Consumption Cost Consumption Cost Consumption Cost Consumption Cost Consumption Cost [10 3 Btu] [$/Yr] [10 3 Btu] [$/Yr] [10 3 Btu] [$/Yr] [10 3 Btu] [$/Yr] [10 3 Btu] [$/Yr] Electricity 3,803.0 $107,174 3,818.3 $ ,802.7 $107,021 3,814.7 $107,079 3,809.7 $107,168 Natural Gas $5, $5, $5, $5, $5,473 Steam/Hot Water Other Total 4,376.1 $112,737 4,401.2 $113,048 4,346.7 $112,326 4,366.3 $112,452 4,372.6 $112,641 The process energy cost is 27% of the Baseline Building Performance. This meets the requirements of LEED EAc1. LEED for New Construction Version

46 SS WE EA MR EQ Credit 1 Table 6: Percentage Improvement Performance Rating Method Compliance Report Page 5 Performance Rating Table EAc1 Points: 5 Energy Summary by End Use EAc2 Points: 1 Proposed Building Baseline Building End Use Energy Energy Peak Energy Peak Energy Type [10 6 Btu] [10 3 Btu/h] [10 6 Btu] [10 3 Btu/h] [%] Interior Lighting (Ambient) Electricity , % Interior Lighting (Process) Electricity Exterior Lighting Electricity % Space Heating (fuel 1) Natural Gas , , % Space Heating (fuel 2) Electricity Space Cooling Electricity , % Pumps Electricity % Heat Rejection Electricity Fans - Interior Electricity % Fans - Parking Garage Electricity Service Water Heating (fuel 1) Natural Gas % Service Water Heating (fuel 2) Electricity Receptacle Equipment Electricity 1, , % Refrigeration (food, etc.) Electricity Cooking (commercial, fuel 1) Natural Gas Cooking (commercial, fuel 2) Electricity Elevators and Escalators Electricity % Other Process Electricity % Total Building Consumption 3, , , % Note: Energy Consumption is listed in units of site energy 10 3 Btu = kwh x Btu = therms / 100 Proposed Building Baseline Building Percentage Improvement Type Energy Energy Energy Energy Energy % Cost % Use Cost Use Cost [10 6 Btu] [$/yr] [10 6 Btu] [$/yr] Nonrenewable (Regulated & Unregulated) Electricity 2,975.0 $81,485 3,809.7 $107,168 22% 24% Natural Gas $4, $5,473 26% 24% Steam or Hot Water Chilled Water Other Total Nonrenewable 3,392.5 $85,669 4,372.6 $112,641 22% 24% (Regulated & Unregulated) Proposed Building Baseline Building Percentage Improvement Exceptional Calculation Energy Energy Energy Energy Energy % Cost % Method Savings Use Cost Use Cost (savings indicated as negative numbers) [10 6 Btu] [$/yr] [10 6 Btu] [$/yr] Site-Generated (96.4) $ (2,639) 2% 2% Renewable (REC) Site Recovered Exceptional Calculation #1 Savings Exceptional Calculation #2 Savings Exceptional Calculation #3 Savings Total including 3,296.2 $83,030 4,372.6 $112,641 25% 26% exceptional calculations Percentage Improvement = 100 x [1 - (Proposed Building Performance / Baseline Building Performance)] 26.29% Percent Renewable = REC / (Proposed Building Performance + REC) 3.08% 196

47 minimum energy cost savings percentages will be considered for one additional point under the Innovation in Design category: New Buildings: 45.5% Existing Buildings: 38.5% Submittal Documentation This credit is submitted as part of the Design Submittal. The EA Credit 1 Submittal Template provides detailed tables and calculations to assist with the completion of this credit. Instructions are self-contained on the template and too lengthy to repeat here. Users are prompted for relevant project and model data, and the forms automatically generate percent savings and points achieved. Considerations electricity from fossil fuels creates air and water pollution; hydroelectric generation plants can make waterways uninhabitable for indigenous fish; and nuclear power has safety concerns as well as problems with disposal of spent fuel. Energy efficiency in buildings limits the harmful environmental side effects of energy generation, distribution and consumption. In an integrated design process, energy efficiency measures can be implemented in conjunction with indoor environmental quality measures to improve building comfort, while reducing facility operating costs. Resources Please see the USGBC Web site at www. usgbc.org/resources for more specific resources on materials sources and other technical information. SS WE EA MR EQ Credit 1 Cost Issues Some energy-efficiency measures may not require additional first costs. Many measures that do result in higher capital costs may generate cost savings from lower energy use, smaller equipment, reduced space needs for mechanical and electrical equipment, and utility rebates. These savings may vastly exceed the incremental capital costs associated with the energy efficiency measures. The importance of even small energyefficiency measures is significant. For instance, replacing one incandescent lamp with a fluorescent lamp will result in $30 to $50 in energy cost savings over the operating lifetime of the lamp. Environmental Issues Commercial and residential buildings consume approximately 2/3 of the electricity and 1/3 of all energy in the United States. Conventional forms of energy production may have devastating environmental effects. Production of Web Sites Advanced Buildings Technologies & Practices Natural Resources Canada This web resource supported by Natural Resources Canada presents energy efficient technologies and strategies for commercial buildings, along with pertinent case studies. American Council for an Energy Efficient Economy (ACEEE) (202) ACEEE is a nonprofit organization dedicated to advancing energy efficiency through technical and policy assessments; advising policymakers and program managers; collaborating with businesses, public interest groups, and other organizations; and providing education and outreach through conferences, workshops, and publications. LEED for New Construction Version

48 SS WE EA MR EQ Credit 1 American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) (800) ASHRAE has developed a number of publications on energy use in existing buildings, including Standard : Energy Conservation in Existing Buildings. This standard defines methods for energy surveys, provides guidance for operation and maintenance, and describes building and equipment modifications that result in energy conservation. Two publications referenced by this credit (ASHRAE and ASHRAE Advanced Energy Design Guide for Small Office Buildings 2004) are available through ASHRAE. Building Energy Codes Program U.S. Department of Energy (800) DIAL-DOE The Building Energy Codes program is updating the COMCheckEZ compliance tool to include ASHRAE/IESNA This compliance tool includes the prescriptive path and trade-off compliance methods. The software generates appropriate compliance forms as well. Building Energy Use and Cost Analysis Software Information and products from the developers of DOE-2 and DOE-2 based products including equest, PowerDOE and COMcheck-Plus. Energy Star (888) ENERGY STAR is a government/industry partnership managed by the U.S. Environmental Protection Agency and the U.S. Department of Energy. The program s Web site offers energy management strategies, benchmarking software tools for buildings, product procurement guidelines and lists of ENERGY STARlabeled products and buildings. Building Upgrade Manual b u s i n e s s. b u s _ u p g r a d e _ manual&layout=print This document is a guide for ENERGY STAR Buildings Partners to use in planning and implementing energy efficiency upgrades in their facilities, and can be used as a comprehensive framework for an energy strategy. Energy-10TM Energy Simulation Software National Renewable Energy Program (NREL) (303) and Sustainable Buildings Industry Council (SBIC) html (202) ext. 210 Energy-10TM is an award-winning software tool for designing low-energy buildings. Energy-10TM integrates daylighting, passive solar heating, and low-energy cooling strategies with energy-efficient shell design and mechanical equipment. The program is applicable to small commercial and residential buildings with up to two zones and simple HVAC equipment. The Energy-10TM software was developed by the National Renewable Energy Laboratory under funding from the Office of Building Technologies, Energy Efficiency and Renewable Energy, U.S. Department of Energy. It is distributed by the Sustainable Buildings Industry Council under license to the Midwest Research Institute. 198

49 New Buildings Institute (NBI) The mission of NBI is to encourage the efficient use of energy in buildings and to mitigate the adverse environmental impacts resulting from energy use. The site includes helpful information to plan building upgrades, such as the Advanced Lighting Guidelines that describe energyefficient lighting strategies. Office of Energy Efficiency and Renewable Energy U.S. Department of Energy (877) This extensive Web site for energy efficiency is linked to a number of DOEfunded sites that address buildings and energy. Of particular interest is the tools directory that includes the Commercial Buildings Energy Consumption Tool for estimating end-use consumption in commercial buildings. The tool allows the user to define a set of buildings by principal activity, size, vintage, region, climate zone and fuels (main heat, secondary heat, cooling and water heating), and to view the resulting energy consumption and expenditure estimates in tabular format. Daylight in Buildings: A Source Book on Daylighting Systems and Components, Lawrence Berkeley National Laboratory, Environmental Energy Technologies Division, Download at: gov/iea21/ (See Chapter 5 Daylight- Responsive Controls) Design Brief Lighting Controls Energy Design Resources Developed by Southern California Edison. Electricity Used by Office Equipment and Network Equipment in the U.S.: Detailed Report and Appendices, Kawamoto, et al, February 2001, Ernest Orlando, Lawrence Berkeley National Laboratory, University of California, Berkeley, CA.; Download at Energy Information Agency s (EIA) Commercial Building Energy Consumption Survey (CBECS); IESNA Lighting Handbook, Ninth Edition, IESNA, This handbook for industry professionals includes comprehensive information about lighting concepts, techniques, application, procedures and systems. SS WE EA MR EQ Credit 1 Print Media ASHRAE Publication User s Manual The User s Manual was developed as a companion document to the ANSI/ASHRAE/IESNA Standard (Energy Standard for Buildings Except Low-Rise Residential Buildings). The User s Manual explains the new standard and includes sample calculations, useful reference material, and information on the intent and application of the standard. ANSI/IESNA RP-1-04, American National Standard Practice for Office Lighting, ANSI International Energy Agency Solar Heating and Cooling Programme A report of the International Energy Agency (IEA) Solar Heating and Cooling Programme, Energy Conservation in Buildings and Community Systems (IEA SHC Task 21/ECBCS Annex 29, July 2000). Published by the Lawrence Berkeley National Laboratory with support from the Energy Design Resources. LBNL Report Number: LBNL Advanced Lighting Guidelines: 2001 Edition, Chapter 8 Lighting Controls Mechanical and Electrical Equipment for Buildings, 9th Edition by Benjamin LEED for New Construction Version

50 SS WE EA MR EQ Stein and John S. Reynolds, John Wiley and Sons, This reference resource Credit 1 details information on the relationship between mechanical and electrical systems in buildings. New Buildings Institute, Inc, Published by New Buildings Inc. Available as a free download or purchased as a printed manual of 390 pages. org/lighting.htm Sustainable Building Technical Manual, Public Technology Institute, Advanced Buildings Core Performance Guide The Advanced Buildings program was developed by the New Buildings Institute to provide a prescriptive program to exceed the energy performance requirements of ASHRAE The program was designed to provide a predictable alternative to energy performance modeling, and a simple set of criteria that can be implemented by design teams to significantly increase building energy performance. htm Definitions Baseline Building Performance is the annual energy cost for a building design intended for use as a baseline for rating above standard design, as defined in ASHRAE Informative Appendix G. Daylighting is the controlled admission of natural light into a space through glazing with the intent of reducing or eliminating electric lighting. By utilizing solar light, daylighting creates a stimulating and productive environment for building occupants. An Energy Star rating is the rating a building earns using the Energy Star Portfolio Manager to compare building energy performance to similar buildings in similar climates. A score of 50 represents average building performance. Interior Lighting Power Allowance is the maximum light power in watts allowed for the interior of a building. Lighting Power Density (LPD) is the installed lighting power, per unit area. Case Study Alberici St. Louis Office Building St. Louis, Missouri Owner: Alberici Corporation In the summer of 2005, after accumulating a total of 60 LEED points, the headquarters building for the Alberici Corporation was awarded LEED Platinum rating under LEED for New Construction v2.0. The building reduced its energy use so substantially that it managed to earn all of the possible 10 EA Credit 1 points. Through thermal envelope improvements, lower lighting power densities, daylighting, high efficiency HVAC, heat recovery and better pumps, the project demonstrated energy savings of 60%, relative to an ASHRAE building. Additionally, 18% of the building s regulated energy cost is provided by on-site renewable energy via a 65-kilowatt wind turbine. 200

51 Percentage Improvement is the percent energy cost savings for the Proposed Building Performance versus the Baseline Building Performance. Proposed Building Performance is the annual energy cost calculated for a proposed design, as defined in ASHRAE Informative Appendix G. Rated Power is the nameplate power on a piece of equipment. It represents the capacity of the unit and is the maximum a unit will draw. Receptacle Load refers to all equipment that is plugged into the electrical system, from office equipment to refrigerators. SS WE EA MR EQ Credit 1 LEED for New Construction Version

52 SS WE EA MR EQ Credit 1 202

53 SS WE EA MR EQ On-Site Renewable Energy Credit 2 Intent Encourage and recognize increasing levels of on-site renewable energy self-supply in order to reduce environmental and economic impacts associated with fossil fuel energy use. 1 3 points Requirements Use on-site renewable energy systems to offset building energy cost. Calculate project performance by expressing the energy produced by the renewable systems as a percentage of the building annual energy cost and using the table below to determine the number of points achieved. Use the building annual energy cost calculated in EA Credit 1 or use the Department of Energy (DOE) Commercial Buildings Energy Consumption Survey (CBECS) database to determine the estimated electricity use. (Table of use for different building types is provided in this Reference Guide.) % Renewable Energy Points 2.5% 1 7.5% % 3 Potential Technologies & Strategies Assess the project for non-polluting and renewable energy potential including solar, wind, geothermal, low-impact hydro, biomass and bio-gas strategies. When applying these strategies, take advantage of net metering with the local utility. LEED for New Construction Version

54 SS WE EA MR EQ Summary of Referenced Credit 2 Standard ASHRAE/IESNA : Energy Standard For Buildings Except Low- Rise Residential American Society of Heating, Refrigerating and Air-Conditioning Engineers (800) On-site renewable or site-recovered energy that might be used to capture EA Credit 2 is handled as a special case in the modeling process. If either renewable or recovered energy is produced at the site, the Performance Rating Method considers it free energy and it is not included in the Design Energy Cost. See the Calculation section for details. Approach and Implementation Renewable energy systems include technologies designed to capture solar, wind, geothermal, water, or bio-based energy to satisfy on-site electric power demand, or to directly offset space-heating, spacecooling, or water heating energy consumption. Renewable energy systems should be installed and commissioned to maximize useful contributions of renewable energy. Eligible systems will produce either electric power and/or thermal energy for use on-site. Systems producing on-site renewable electrical power should be designed to facilitate net metering back to the grid for periods when renewable energy system output exceeds the site demand. Cost savings from renewable energy systems shall be reported exclusive of energy costs associated with system operation (i.e., deduct energy costs of pumps, fans, and other auxiliary devices). Renewable Energy Systems Eligible for EA Credit 2 q Electrical Systems: Photovoltaic (PV), wind, hydro, wave, tidal, and bio-fuel based electrical production systems deployed at the project site are renewable energy technologies and may be eligible for this credit. q Geothermal Energy Systems: Geothermal energy systems using deepearth water or steam sources (and not using vapor compression systems for heat transfer) may be eligible for this credit. These systems may either produce electric power or provide thermal energy for primary use at the building. q Solar Thermal Systems: Active solar thermal energy systems that employ collection panels; heat transfer mechanical components, such as pumps or fans, and a defined heat storage system, such as a hot water tank are eligible for this credit. Thermo-siphon solar and storage tank batch heaters are also eligible. Systems Not Eligible for EA Credit 2 q Architectural Features: Architectural passive solar and daylighting strategies provide significant energy savings that are chiefly efficiency related. Their contributions shall be documented in EA Prerequisite 2, and may be considered under EA Credit 1. q Geo-exchange Systems: (a.k.a. geothermal or ground-source heat pumps) Earth-coupled HVAC applications which do not obtain significant quantities of deep-earth heat, and use vapor-compression systems for heat transfer are not eligible as renewable energy systems. These systems are adequately addressed in EA Prerequisite 2, and may be considered under EA Credit

55 q Green Power : Green power products (tradable renewable certificates, green TAGs, and renewable energy certificates [RECs]) that are purchased from qualified contractual sources and delivered to the site via electric transmission lines shall be accounted for in EA Credit 6. Table 1: EA Credit 2 Eligible On-Site Renewable Energy Systems Photovoltaic systems Solar thermal systems Bio-fuel based electrical systems (subject to Table 3) Geothermal heating systems Geothermal electric systems Low-impact hydro electric power systems Wave and tidal power systems Table 2: EA Credit 2 Ineligible On-Site Renewable Energy Systems Table 3: EA Credit 2 Eligible & Ineligible Bio-Fuels For the purposes of EA Credit 2, energy production using the following bio-fuels shall be considered renewable energy: Untreated wood waste including mill residues Agricultural crops or waste Animal waste and other organic waste Landfill gas Energy production based on the following bio-fuels are excluded from eligibility for this credit: Combustion of municipal solid waste Forestry biomass waste, other than mill residue Wood that has been coated with paints, plastics or formica Wood that has been treated for preservation with materials containing halogens, chlorine compounds, halide compounds, chromated copper arsenate (CCA) or arsenic. If more than 1% of the wood fuel has been treated with these compounds, the energy system shall be considered ineligible for EA Credit 2. SS WE EA MR EQ Credit 2 Architectural features Passive solar strategies Daylighting strategies Geo-exchange systems (Ground Source Heat Pumps) Renewable or Green-power from off-site sources Strategies Design and specify the use of on-site nonpolluting renewable technologies to contribute to the total energy requirements of the project. Consider and employ photovoltaic, solar thermal, geothermal, wind, biomass and bio-gas energy technologies. Make use of net metering arrangements with local utilities or electric service providers. Calculations The fraction of energy cost supplied by the renewable energy systems is calculated against the Proposed Building Performance determined in EA Credit 1. If no energy simulation was performed for EA Credit 1, then the fraction of energy cost shall be calculated based on the U.S. Department of Energy (DOE) Energy Information Administration (EIA) 2003 Commercial Sector Average Energy Costs by State (Table 5), in conjunction with the Commercial Buildings Energy Consumption Survey (CBECS) database of annual electricity and natural gas usage per square foot (see Table 4). This database provides electricity and fuel consumption factors in kwh/ft2 and kbtu/ft2 for various building types in the United States. Costs per square foot can be determined by multiplying the average electricity and natural gas costs by the electricity and fuel consumption factors respectively. The quantity of energy generated by onsite renewable systems should be estimated (either using the same simulation tool employed for EA Credit 1 calculations or a separate calculation methodology). Performance of the renewable system may be predicted using a bin type calculation. This requires the applicant to account for the contribution of variables associated LEED for New Construction Version

56 SS WE EA MR EQ Credit 2 Table 4: Default Energy Consumption Intensity for Different Building Types (from EIA 1999 Commercial Building Energy Consumption Survey Building Type Median Electrical Median Non-Electrical Intensity Fuel Intensity (kwh/sf-yr) (kbtu/sf-yr) Education Food Sales Food Service Health Care Inpatient Health Care Outpatient Lodging Retail (Other than Mall) Enclosed and Strip Malls Office Public Assembly Public Order and Safety Religious Worship Service Warehouse and Storage Other Table 5: Default Energy Costs by State (from EIA 2003 Commercial Sector Average Energy Costs by State) Electricity Natural Gas State ($/kwh) ($/kbtu) Alabama $ $ Alaska $ $ Arizona $ $ Arkansas $ $ California $ $ Colorado $ $ Connecticut $ $ Delaware $ $ District of $ $ Columbia Florida $ $ Georgia $ $ Hawaii $ $ Idaho $ $ Illinois $ $ Indiana $ $ Iowa $ $ Kansas $ $ Kentucky $ $ Louisiana $ $ Maine $ $ Maryland $ $ Massachusetts $ $ Michigan $ $ Minnesota $ $ Mississippi $ NA Electricity Natural Gas State ($/kwh) ($/kbtu) Missouri $ $ Montana $ $ Nebraska $ $ Nevada $ $ New Hampshire $ $ New Jersey $ $ New Mexico $ $ New York $ $ North Carolina $ $ North Dakota $ $ Ohio $ $ Oklahoma $ $ Oregon $ $ Pennsylvania $ $ Rhode Island $ $ South Carolina $ $ South Dakota $ $ Tennessee $ $ Texas $ $ Utah $ $ Vermont $ $ Virginia $ $ Washington $ $ West Virginia $ $ Wisconsin $ $ Wyoming $ $

57 with the renewable source. For example, a BIPV design would include the effects of sunny, cloudy and overcast conditions, the orientation and attitude of the array, and system losses. The method used to predict the quantity of energy generated by on-site renewable systems should be clearly stated in the LEED submittal narrative. The following example illustrates how to calculate the renewable energy cost contribution for EA Credit 2. Calculation based on EA Credit 1 Simulation Once the amount of energy generated by the renewable system is calculated, an energy cost must be computed to establish the EA Credit 2 level of achievement. To assign a dollar value to the on-site energy, either use local utility rates or determine the virtual energy rate by dividing the annual energy cost for the specified fuel type by the annual energy consumption for that fuel type. Multiply the predicted on-site energy produced by the applicable energy rate for this fuel type. When calculating the total energy cost of the Proposed Design using the Performance Rating Method, the contribution of any on-site renewable or recovered energy is accounted for by deducting the associated utility costs. In other words, the Renewable Energy Cost is excluded from the Proposed Building Performance. In the example project described in EA Credit 1, 20 kw of photovoltaics contribute 28,245 kwh (or 96.4 MBtu) of energy to meet building electric power requirements. The virtual electric rate for the project is used for this example and is calculated by dividing the annual electric energy cost simulated for the Proposed Design ($81,485) by the annual electric energy consumption simulated for the Proposed Design ( MBtu), resulting in a virtual electric rate of $0.094/ kwh (or $27.39/MBtu). This virtual electric rate is then multiplied by the PV contribution of 28,245 kwh to calculate the Renewable Energy Cost (REC) contribution from the PV of $2,639. The predicted Proposed Design building annual energy cost, prior to the energy cost offset by the PV, is $85,669. Dividing the REC by the building annual energy cost yields the Percent Renewable Energy (3.1%), which qualifies the project for one point under EA Credit 2. Calculation based on CBECS Data If no energy performance calculation has been performed for the project, CBECS data can be used to determine the annual energy consumption intensities (kwh/ft2 and therms/ft2) based on building type. The total estimated energy consumption for the project is then calculated by multiplying the energy consumption intensities by the total building area. Building Annual Energy Cost is then calculated by summing the product of the energy consumption and average cost for electricity and natural gas, where the average electricity and natural gas costs are determined based on EIA 2003 commercial sector rates for the state the building is located in (see Table 5). The Renewable Energy Cost (REC) is calculated by multiplying the renewable energy contribution by either the local utility rate or the EIA 2003 average energy cost for the renewable fuel type. Dividing the REC by the Building Annual energy cost yields the Percent Renewable Energy. Example EA Credit 2 Calculation based on CBECS Data For example, if a project is a 1,000,000 sq.ft. office building in New York, determine how much renewable energy is required to meet the requirements of EA Credit 2 by using Tables 4 and 5 above to find the default energy consumption intensity for office buildings and energy costs for New York State. SS WE EA MR EQ Credit 2 LEED for New Construction Version

58 SS WE EA MR EQ Default Annual Electrical Costs Credit 2 1,000,000 sf x 11.7 kwh/sf-yr x $0.1113/ kwh = $1,302,210/yr Default Annual Fuel Costs 1,000,000 sf x 58.3kBtu/sf-yr x $ / kwh = $521,785/yr Default Total Annual Energy Costs $1,302,210/yr + $521,785/yr = $1,823,995/yr This project would need to meet 2.5% of its annual energy costs ($45,600) with renewable energy systems to earn one point under EA Credit 2. The project plans to install a 300-kW PV system that is predicted to produce 450,000 kwh/yr. Using the default cost of electricity for New York State in Table 5 ($0.1113/kWh) this system will provide $50,085/yr of electricity or 2.7% enough for one point under EA Credit 2. Exemplary Performance An innovation in design point for exemplary performance may be available when the next incremental percentage threshold is achieved. For on-site renewable energy, the % of renewable energy must be 17.5% or greater. Submittal Documentation This credit is submitted as part of the Design Submittal. The EA Credit 2 Submittal Template provides calculations to assist with the completion of this credit. The following project data and calculation information is required to document prerequisite compliance using the v2.2 Submittal Templates: q Provide the On-Site Renewable Energy Source(s) used, the annual energy generated from each source, and the backup fuel for each source (i.e., the fuel that is used when the renewable energy source is unavailable). q Describe the source of the annual energy cost information (energy model or industry database), and provide the appropriate energy values and costs. Considerations Renewable energy can be generated on a building site by using technologies that convert energy from the sun, wind and biomass into usable energy. On-site renewable energy is superior to conventional energy sources such as coal, nuclear, oil, natural gas and hydropower generation, because of its negligible transportation costs and impacts. In addition to preventing environmental degradation, on-site use of renewable power can improve power reliability and reduce reliance on the local power distribution grid. Environmental Issues Use of renewable energy reduces environmental impacts associated with utility energy production and use. These impacts include natural resource destruction, air pollution and water pollution. Utilization of biomass can divert an estimated 350 million tons of woody construction, demolition, and land-clearing waste from landfills each year. Conversely, air pollution will occur due to incomplete combustion if these wastes are not processed properly. Economic Issues Use of on-site renewable energy technologies can result in energy cost savings, particularly if peak hour demand charges are high. Utility rebates are often available to reduce first costs of renewable energy equipment. In some states, first costs can be offset by net metering, where excess electricity is sold back to the utility. The reliability and lifetime of PV systems are also improving. Manufacturers typically guarantee their PV systems for up to 20 years. 208

59 Resources Please see the USGBC Web site at www. usgbc.org/resources for more specific resources on materials sources and other technical information. Web Sites American Wind Energy Association (AWEA) (202) AWEA is a national trade association representing wind power plant developers, wind turbine manufacturers, utilities, consultants, insurers, financiers, researchers and others involved in the wind industry. Database of State Incentives for Renewable Energy (DSIRE) The North Carolina Solar Center developed this database to contain all available information on state financial and regulatory incentives (e.g., tax credits, grants and special utility rates) that are designed to promote the application of renewable energy technologies. DSIRE also offers additional features such as preparing and printing reports that detail the incentives on a state-by-state basis. ENERGY Guide This Web site provides information on different power types, including green power, as well as general information on energy efficiency and tools for selecting power providers based on various economic, environmental and other criteria. Green Power Network U.S. Department of Energy The Green Power Network provides news and information on green power markets and related activities and is maintained by the National Renewable Energy Laboratory for the U.S. Department of Energy. National Center for Photovoltaics (NCPV) NCPV provides clearinghouse information on all aspects of PV systems. National Renewable Energy Laboratory The National Renewable Energy Laboratory (NREL) is a leader in the U.S. Department of Energy s effort to secure an energy future for the nation that is environmentally and economically sustainable. Office of Energy Efficiency and Renewable Energy (EERE) U.S. Department of Energy This Web site includes information on all types of renewable energy technologies and energy efficiency. U.S. EPA Green Power Partnership EPA s Green Power Partnership provides assistance and recognition to organizations that demonstrate environmental leadership by choosing green power. It includes a buyer s guide with listings of providers of green power in each state. Print Media Wind and Solar Power Systems by Mukund Patel, CRC Press, This text offers information about the fundamental elements of wind and solar power generation, conversion and storage, and detailed information about the design, operation, and control methods of both stand-alone and grid-connected systems. Wind Energy Comes of Age by Paul Gipe, John Wiley & Sons, This book provides extensive information on the wind power industry, and is one of several books SS WE EA MR EQ Credit 2 LEED for New Construction Version

60 SS WE EA MR EQ by the author covering general and technical information about wind power. Credit 2 Definitions Biomass is plant material such as trees, grasses and crops that can be converted to heat energy to produce electricity. The Environmental Attributes of Green Power include emission reduction benefits that result from green power being used instead of conventional power sources. Net Metering is a metering and billing arrangement that allows on-site generators to send excess electricity flows to the regional power grid. These electricity flows offset a portion of the electricity flows drawn from the grid. For more information on net metering in individual states, visit the DOE s Green Power Network Web site at greenpower/markets/netmetering.shtml. Renewable Energy Certificates (RECs) are a representation of the environmental attributes of green power, and are sold separately from the electrons that make up the electricity. RECs allow the purchase of green power even when the electrons are not purchased. 210

61 SS WE EA MR EQ Enhanced Commissioning Credit 3 Intent Begin the commissioning process early during the design process and execute additional activities after systems performance verification is completed. 1 point Requirements Implement, or have a contract in place to implement, the following additional commissioning process activities in addition to the requirements of EA Prerequisite 1 and in accordance with this Reference Guide: 1. Prior to the start of the construction documents phase, designate an independent Commissioning Authority (CxA) to lead, review, and oversee the completion of all commissioning process activities. The CxA shall, at a minimum, perform Tasks 2, 3 and 6. Other team members may perform Tasks 4 and 5. a. The CxA shall have documented commissioning authority experience in at least two building projects. b. The individual serving as the CxA shall be i. independent of the work of design and construction; ii. not an employee of the design firm, though they may be contracted through them; iii. not an employee of, or contracted through, a contractor or construction manager holding construction contracts; and iv. (can be) a qualified employee or consultant of the Owner. c. The CxA shall report results, findings and recommendations directly to the Owner. d. This requirement has no deviation for project size. 2. The CxA shall conduct, at a minimum, one commissioning design review of the Owner s Project Requirements (OPR), Basis of Design (BOD), and design documents prior to mid-construction documents phase and back-check the review comments in the subsequent design submission. 3. The CxA shall review contractor submittals applicable to systems being commissioned for compliance with the OPR and BOD. This review shall be concurrent with A/E reviews and submitted to the design team and the Owner. 4. Develop a systems manual that provides future operating staff the information needed to understand and optimally operate the commissioned systems. 5. Verify that the requirements for training operating personnel and building occupants are completed. 6. Assure the involvement by the CxA in reviewing building operation within 10 months after substantial completion with O&M staff and occupants. Include a plan for resolution of outstanding commissioning-related issues. LEED for New Construction Version

62 SS WE EA MR EQ Credit 3 Potential Technologies & Strategies Although it is preferable that the CxA be contracted by the Owner, for the enhanced commissioning credit, the CxA may also be contracted through the design firms or construction management firms not holding construction contracts. This Reference Guide provides detailed guidance on the rigor expected for following process activities: q Commissioning design review q Commissioning submittal review q Systems manual 212

63 Summary of Referenced Standards There is no standard referenced for this credit. Approach and Implementation Relationship Between Fundamental and Enhanced Commissioning LEED for New Construction addresses building commissioning in two places, EA Prerequisite 1 and EA Credit 3. The exact scope of services for commissioning a LEED for New Construction project should be based on the Owner s project requirements. Other systems, including the building envelope, stormwater management systems, water treatment systems, information technology systems, etc., may be included in the commissioning process based on the Owner s Project Requirements. Table 1 outlines the team members primarily responsible to perform each project requirement; and also which requirements are common to EA Prerequisite 1 and EA Credit 3. All individuals on the project team are encouraged to participate in the commissioning activities as part of a larger commissioning team. Strategies Commissioning is a planned, systematic quality-control process that involves the owner, users, occupants, operations and maintenance staff, design professionals and contractors. Commissioning often begins at project inception; provides ongoing verification of achievement of the owner s project requirements; requires integration of contractor-completed SS WE EA MR EQ Credit 3 Table 1: Primary Responsibilities Chart for EA Prerequisite 1 and EA Credit 3 Tasks Responsibilities If you are only meeting If you are meeting the EA Prerequisite 1 EAp1 AND EA credit 3 Designate Commissioning Authority Owner or Project Team Owner or Project Team (CxA) Document Owner's Project Owner Owner Requirements (OPR) Develop Basis of Design Design Team Design Team Incorporate commissioning Project Team or CxA Project Team or CxA requirements into the construction documents Conduct commissioning design review N/A CxA prior to mid-construction documents Develop and implement a Project Team or CxA Project Team or CxA commissioning plan Review contractor submittals N/A CxA applicable to systems being commissioned Verify the installation and CxA CxA performance of commissioned systems Develop a systems manual for the N/A Project Team and CxA commissioned systems Verify that the requirements for N/A Project Team and CxA training are completed Complete a summary commissioning CxA CxA report Review building operation within 10 N/A CxA months after substantial completion LEED for New Construction Version

64 SS WE EA MR EQ Credit 3 commissioning process activities into the construction documents; aids in the coordination of static and dynamic system testing; verifies staff training; and concludes with warranty verification and commissioning documentation. The specific tasks satisfying this LEED for New Construction credit include: 1. Prior to the start of the construction document phase, designate an independent Commissioning Authority (CxA) to lead, review, and oversee the completion of all commissioning process activities. The CxA shall, at a minimum, perform Tasks 2, 3 and 6 of the EA Credit 3 requirements. Other team members may perform Tasks 4 and 5. The minimum defined experience for the designated CxA for EA Credit 3 is the same as described for EA Prerequisite 1. The design and submittal review activities called for in EA Credit 3 must be conducted by a third party CxA, independent of the firms responsible for design and construction, or a qualified member of the Owner s staff. 2. The CxA shall conduct, at a minimum, one commissioning design review of the Owner s Project Requirements (OPR), Basis of Design (BOD), and design documents prior to mid-construction documents phase and back-check the review comments in the subsequent design submission. The CxA shall review the OPR, BOD and design documents to provide the owner and design team with an independent assessment of the state of the design for the commissioned systems. Typically the design review(s) performed by the CxA will focus on the following issues: q Clarity, completeness and adequacy of OPR q Verifying all issues discussed in OPR are addressed adequately in BOD q Reviewing design documents for achieving the OPR and BOD and coordination of commissioned systems Additional reviews by the CxA, throughout the design and construction process may be advisable and appropriate depending on the project duration, phasing, complexity and the owner s requirements. 3. The CxA shall review contactor submittals applicable to systems being commissioned for compliance with the OPR and BOD. This review shall be concurrent with A/E reviews and submitted to the design team and the Owner. The CxA shall provide a review of the contractor submittals to help identify any issues that might otherwise result in re-work and/or change orders. The CxA should specifically evaluate the submittals for: q Meeting the OPR and BOD q Operation and maintenance requirements q Facilitating performance testing The CxA review of contractor submittals does not, typically, substitute or alter the scope or responsibility of the design team's obligations to approve or reject submittals. 4. Develop a systems manual that provides future operating staff the information needed to understand and optimally operate the commissioned systems. Provide a Systems Manual in addition to the O&M Manuals submitted by the Contractor. The Systems Manual generally focuses on operating, rather than maintaining the equipment, particularly the interactions between equipment. 214

65 The Systems Manual shall include the following for each commissioned system: q Final version of the BOD q System single line diagrams q As-built sequences of operations, control drawings and original setpoints q Operating instructions for integrated building systems q Recommended schedule of maintenance requirements and frequency, if not already included in the project O&M manuals q Recommended schedule for retesting of commissioned systems with blank test forms from the original Commissioning Plan q Recommend schedule for calibrating sensors and actuators 5. Verify that the requirements for training operating personnel and building occupants are completed. Based on the particular project, establish and document training expectations and needs with the Owner. Ensure that operations staff and occupants receive this training and orientation. Pay particular attention to new or uncommon sustainable design features that may have a potential to be over-ridden or removed because of a lack of understanding. Document that the training was completed according to the contract documents. 6. Assure the involvement by the CxA in reviewing building operation within 10 months after substantial completion with O&M staff and occupants. Include a plan for resolution of outstanding commissioning-related issues. The CxA should coordinate with the Owner and the O&M staff to review the facility and its performance 8 to 10 months after handover of the facility. Any outstanding construction deficiencies or deficiencies identified in this post-occupancy review should be documented and corrected under manufacturer or contractor warranties. The CxA review of the building operation with operations staff and occupants should identify any problems in operating the building as originally intended. Any significant issues identified by the CxA that will not be corrected should be recorded in the systems manual. Calculations There are no calculations associated with this credit Exemplary Performance There is no exemplary performance point available for this credit. Submittal Documentation This credit is submitted as part of the Construction Submittal. The following project data and calculation information is required to document credit compliance using the v2.2 Submittal Templates: q Provide the name, firm and experience information for the CxA q Confirm that the 6 required tasks have been completed q Provide a narrative description of the results of the commissioning design review, implementation of the systems manual and training, and the plan for the review of building operation at 8 to 10 months. Considerations Cost Issues An effective commissioning process will typically result in increased project SS WE EA MR EQ Credit 3 LEED for New Construction Version

66 SS WE EA MR EQ soft costs and may require additional scheduling for commissioning activities. Credit 3 This investment is generally recouped in improved design and construction coordination, reduced change-orders, and reduced operating costs. Facilities that do not perform as intended may consume significantly more resources over the useful life of the building. Commissioning can minimize the negative environmental impacts buildings have on our environment by helping verify that buildings are designed, constructed, and operated as intended and in accordance with the owner s project requirements. Building occupant comfort and indoor air quality may have tremendous impact on occupant productivity, health and well-being, as well as the cost of ownership. Commissioning can significantly reduce repairs, construction change orders, energy costs, and maintenance and operation costs. Resources Please see the USGBC Web site at www. usgbc.org/resources for more specific resources on materials sources and other technical information. See the Resources section of EA Prerequisite 1 for a list of specific commissioning resources. Commissioning is the process of verifying and documenting that the facility and all of its systems and assemblies are planned, designed, installed, tested, operated, and maintained to meet the Owner s Project Requirements. Commissioning Plan is a document that outlines the organization, schedule, allocation of resources, and documentation requirements of the Commissioning Process. Commissioning Report is the document that records the results of the commissioning process, including the as-built performance of the HVAC system and unresolved issues. Commissioning Specification is the contract document that details the commissioning requirements of the construction contractors. Installation Inspection is the process of inspecting components of the commissioned systems to determine if they are installed properly and ready for systems performance testing. Owner s Project Requirements is a written document that details the functional requirements of a project and the expectations of how it will be used and operated. System Performance Testing is the process of determining the ability of the commissioned systems to perform in accordance with the owner s project requirements, basis of design, and construction documents. Definitions Basis of Design includes all information necessary to accomplish the owner s project requirements, including weather data, interior environmental criteria, other pertinent design assumptions, cost goals, and references to applicable codes, standards, regulations and guidelines. 216

67 SS WE EA MR EQ Enhanced Refrigerant Management Credit 4 Intent Reduce ozone depletion and support early compliance with the Montreal Protocol while minimizing direct contributions to global warming. 1 point Requirements OPTION 1 Do not use refrigerants. OR OPTION 2 Select refrigerants and HVAC&R that minimize or eliminate the emission of compounds that contribute to ozone depletion and global warming. The base building HVAC&R equipment shall comply with the following formula, which sets a maximum threshold for the combined contributions to ozone depletion and global warming potential: LCGWP + LCODP x Where: LCODP = [ODP r x (Lr x Life +Mr) x Rc]/Life LCGWP = [GWPr x (Lr x Life +Mr) x Rc]/Life LCODP: Lifecycle Ozone Depletion Potential (lbcfc11/ton-year) LCGWP: Lifecycle Direct Global Warming Potential (lbco 2 /Ton-Year) GWPr: Global Warming Potential of Refrigerant (0 to 12,000 lbco 2 /lbr) ODPr: Ozone Depletion Potential of Refrigerant (0 to 0.2 lbcfc11/lbr) Lr: Refrigerant Leakage Rate (0.5% to 2.0%; default of 2% unless otherwise demonstrated) Mr: End-of-life Refrigerant Loss (2% to 10%; default of 10% unless otherwise demonstrated) Rc: Refrigerant charge (0.5 to 5.0 lbs of refrigerant per ton of Gross ARI rated cooling capacity) Life: Equipment Life (10 years; default based on equipment type, unless otherwise demonstrated) For multiple types of equipment, a weighted average of all base building level HVAC&R equipment shall be applied using the following formula: [ (LCGWP + LCODP x 10 5 ) x Qunit ] / Qtotal 100 Where: Qunit = Gross ARI rated cooling capacity of an individual HVAC or refrigeration unit (Tons) Qtotal = Qtotal = Total Gross ARI rated cooling capacity of all HVAC or refrigeration LEED for New Construction Version

68 SS WE EA MR EQ Credit 4 Small HVAC units (defined as containing less than 0.5 lbs of refrigerant), and other equipment such as standard refrigerators, small water coolers, and any other cooling equipment that contains less than 0.5 lbs of refrigerant, are not considered part of the base building system and are not subject to the requirements of this credit. AND Do not install fire suppression systems that contain ozone-depleting substances (CFCs, HCFCs or Halons). Potential Technologies & Strategies Design and operate the facility without mechanical cooling and refrigeration equipment. Where mechanical cooling is used, utilize base building HVAC and refrigeration systems for the refrigeration cycle that minimize direct impact on ozone depletion and global warming. Select HVAC&R equipment with reduced refrigerant charge and increased equipment life. Maintain equipment to prevent leakage of refrigerant to the atmosphere. Utilize fire suppression systems that do not contain HCFCs or Halons. 218

69 Summary of Referenced Standard There is no standard referenced for this credit. Approach and Implementation Most commonly used refrigerants contained in building HVAC and refrigeration equipment are stable chemical compounds that, when released to the environment, result in damage to the atmosphere by the following: q Contributing to deterioration of the Earth s protective ozone layer (Ozone Depletion) q Contributing greenhouse gases to the atmosphere (Global Warming) Building HVAC&R systems also contribute to global warming through their associated energy consumption and power plant emissions of greenhouse gases. Over the life of the equipment, the indirect global warming impact of HVAC&R equipment may be much greater than the direct impact of releasing the refrigerant to the atmosphere. The indirect global warming impact of refrigerants in HVAC&R equipment is addressed by EA Credit 1, which credits the energy savings associated with more energy efficient equipment. EA Credit 4 addresses only the direct atmospheric impact of refrigerant selection and management decisions. If the building(s) is (are) connected to an existing chilled water system, have the chilled water supplier perform the required calculations and submit a letter showing compliance with the requirements. There are several strategies associated with reducing or eliminating the potential negative impact of refrigerant use on the environment. Do Not Use Refrigerants Green building designs that avoid the use of refrigerants by eliminating the use of vapor-compression HVAC&R equipment have no potential for atmospheric damage associated with refrigerant release. LEED projects that do not use refrigerants are awarded this LEED credit with no calculations or analysis required. For example, a naturally ventilated building with no active cooling systems (and therefore no refrigerants) is awarded this credit. Natural refrigerants including water, carbon dioxide, and ammonia are used in some HVAC&R systems. These naturally occurring compounds generally have much lower potential for atmospheric damage than more common manufactured chemical refrigerants. Projects that employ natural refrigerants are eligible for this credit. Select Refrigerants with Low ODP and GWP Table 1 shows the Ozone Depleting Potential (ODP) and direct Global Warming Potential (GWP) of many common refrigerants. The LEED Technical and Scientific Committee (TSAC) report that provides the basis of this LEED credit notes the following: The ozone-depletion potential (ODP) of the HCFCs (e.g., HCFC-123, HCFC- 22) is much smaller than the ODP of the CFCs, but is not negligible. In contrast, the HFCs (e.g., HFC-134a, HFC-410a) have an ODP that is essentially zero, but their global warming potential (GWP) is substantially greater than some of the HCFCs, leading to a direct global warming mechanism when the compound leaks into the atmosphere. Moreover, thermodynamic properties make the HFCs slightly less efficient refrigerants than the HCFCs given idealized equipment design, so the same amount of cooling may require more electricity and thereby SS WE EA MR EQ Credit 4 LEED for New Construction Version

70 SS WE EA MR EQ Table 1: Ozone-depletion and global-warming potentials of refrigerants (100-yr values) Credit 4 Refrigerant ODP GWP Common Building Applications Chlorofluorocarbons CFC ,680 Centrifugal chillers CFC ,720 Refrigerators, chillers CFC ,800 Centrifugal chillers CFC ,900 Centrifugal chillers, humidifiers CFC ,600 Low-temperature refrigeration Hydrochlorofluorocarbons HCFC ,780 Air conditioning, chillers, HCFC CFC-11 replacement Hydrofluorocarbons HFC-23 ~ 0 12,240 Ultra-low-temperature refrigeration HFC-134a ~ 0 1,320 CFC-12 or HCFC-22 replacement HFC-245fa ~ 0 1,020 Insulation agent, centrifugal chillers HFC-404A ~ 0 3,900 Low-temperature refrigeration HFC-407C ~ 0 1,700 HCFC-22 replacement HFC-410A ~ 0 1,890 Air conditioning HFC-507A ~ 0 3,900 Low-temperature refrigeration Natural Refrigerants Carbon Dioxide (CO2) Ammonia (NH3) 0 0 Propane 0 3 causes the indirect release of more CO 2 in generating that electricity. The dilemma, therefore, is that some refrigerants cause more ozone depletion than others, but the most ozone-friendly refrigerants cause more global warming. Refrigerants with non-zero ODP are being phased out according to an international agreement the Montreal Protocol. In accordance with the Montreal Protocol, all chlorinated refrigerants including CFCs and HCFCs will be phased out by the year In the meantime, selecting the appropriate refrigerant for any given project and HVAC system may be impacted by available equipment, energy efficiency, budget, and other factors. Where viable options are available, projects should select refrigerants with no or very little ODP and minimal GWP. Minimize Refrigerant Leakage Refrigerants cannot damage the atmosphere if they are contained and are never released to the environment. Unfortunately, in real world applications, some or all refrigerant provided for HVAC&R equipment is leaked to the environment during installation, operation, servicing, and/or decommissioning of the equipment. Under Section 608 of the Clean Air Act of 1990, the EPA has established regulations that q Require service practices that maximize recycling of ozone-depleting compounds (both CFCs and HCFCs) during the servicing and disposal of air-conditioning and refrigeration equipment. q Set certification requirements for recycling and recovery equipment, technicians, and reclaimers and restrict the sale of refrigerant to uncertified technicians. 220

71 q Require persons servicing or disposing of air-conditioning and refrigeration equipment to certify to EPA that they have acquired recycling or recovery equipment and are complying with the requirements of the rule. q Require the repair of substantial leaks in air-conditioning and refrigeration equipment with a charge of greater than 50 pounds. q Establish safe disposal requirements to ensure removal of refrigerants from goods that enter the waste stream with the charge intact (e.g., motor vehicle air conditioners, home refrigerators, and room air conditioners). q Prohibits individuals from knowingly venting ozone-depleting compounds (generally CFCs and HCFCs) used as refrigerants into the atmosphere while maintaining, servicing, repairing, or disposing of air-conditioning or refrigeration equipment (appliances). Federal regulation and best practices for refrigerant management and equipment maintenance can minimize the loss of refrigerant to the atmosphere. Manufacturers may offer leakage rate guarantees for certain types of major HVAC&R equipment (such as chillers) as part of a long-term service contract. Most refrigerant loss to the environment occurs due to undetected leaks in outdoor equipment and/or refrigerant loss during the installation, charging, servicing, or decommissioning of equipment. Select Equipment with Efficient Refrigerant Charge Refrigerant charge is the ratio of refrigerant required (lbs) to cooling capacity provided (tons) for a given piece of HVAC&R equipment. Equipment that uses refrigerant efficiently and therefore has low refrigerant charge has less potential to contribute to atmospheric damage. Table 2, below, shows the maximum refrigerant charge for any single unit of equipment that would comply with this credit for various common refrigerants and types of equipment. Most projects have multiple units of base building HVAC&R equipment, but if each unit is compliant with the table below, the project as a whole will comply with this credit. In the table below the calculations assume that refrigerant leakage default factors are used. Select Equipment with Long Service Life HVAC&R service equipment with long service life will generally reduce the potential amount of refrigerant leaked to the environment since a significant portion of refrigerant loss occurs during installation and decommissioning of equipment. The 2003 ASHRAE Applications Handbook provides general data on the typical service life of different types of SS WE EA MR EQ Credit 4 Table 2: Default Maximum Allowable Equipment Refrigerant Charge (lb/ton) for Compliance with EA Credit 4 Refrigerant 10 Year Life 15 Year Life 20 Year Life 23 Year Life (Room or (Unitary, split (Reciprocating (Centrifugal, Window AC & and packaged compressors Screw & Heat Pumps) AC and heat & chillers) Absorption pumps) Chillers) R R R-134a R-245fa R-407c R-410a LEED for New Construction Version

72 SS WE EA MR EQ HVAC equipment: Credit 4 q Window air-conditioning units and heat pumps 10 years q Unitary, split and packaged airconditioning units and heat pumps 15 years q Reciprocating compressors and reciprocating chillers 20 years q Centrifugal and absorption chillers 23 years Base Building HVAC&R Equipment Base building HVAC&R equipment includes any equipment permanently installed in the building that contains more than 0.5 lbs of refrigerant. This includes chillers, unitary (split and packaged) HVAC equipment, room or window air-conditioners, computer room air conditioning (CRAC) units, data and telecommunications room cooling units, and commercial refrigeration equipment. Portable cooling equipment (such as standard refrigerators), temporary cooling equipment, and equipment with less than 0.5 lbs of refrigerant (such as small water coolers) may be excluded from the calculations for this credit. Calculations To complete the calculations to demonstrate compliance with this credit, the following information will be required for each unit of base building HVAC&R equipment: q Refrigerant charge, (Rc) in lbs of refrigerant per ton of Gross ARI rated cooling capacity q Refrigerant type (used to determine ODPr and GWPr) q Equipment type (used to determine Life) Table 1 includes ODPr and GWPr values for many common refrigerants. These values should be used in the calculations associated with this credit. Equipment Life shall be assumed (as excerpted from 2003 ASHRAE Applications Handbook) to be the following: q Window air-conditioning units and heat pumps 10 years q Unitary, split and packaged air-conditioning units and heat pumps 15 years q Reciprocating compressors and reciprocating chillers 20 years q Centrifugal and absorption chillers 23 years All other HVAC&R equipment will be assumed to have a life of 15 years. Applicants may use an alternate value for Equipment Life if they demonstrate and document information in support of their claim. For example if there is a manufacturer s guarantee and long-term service contract assuring a 30-year life for a chiller installation, this alternate value of equipment life could be used in the calculations for that unit of equipment. Refrigerant Leakage Rate (Lr) is assumed to be 2%/yr for all equipment types. Endof-life Refrigerant Loss (Mr) is assumed to be 10% for all equipment types. Applicants may use alternate values for Lr and Mr if they demonstrate and document information in support of their claim, such as q Manufacturers test data for refrigerant leakage rates (%/yr); q Refrigerant leak detection equipment in the room where the equipment is located; q A preventative maintenance program for minimizing equipment refrigerant leakage; and q A program for recovering and recycling refrigerant at the end of the equipment lifecycle. Projects may not claim zero leakage over the lifecycle of the HVAC&R equipment installed in the project. 222

73 For each piece of HVAC&R equipment, the project should calculate the following values: q Lifecycle Ozone Depletion Potential (LCODP) = [ODP r x (Lr x Life +Mr) x Rc]/Life q Lifecycle Direct Global Warming Potential (LCGWP) = [GWPr x (Lr x Life +Mr) x Rc]/Life office building and the hotel) the overall project complies with EA Credit 4, although individual units of HVAC&R equipment have refrigerant atmospheric impact > 100. The school classroom building, overall, does not comply with EA Credit 4. Example Calculation 1 School Classroom Building SS WE EA MR EQ Credit 4 If there is only one piece of base building HVAC&R equipment, the following equation shall be used to demonstrate compliance with this LEED credit: Refrigerant Atmospheric Impact = LCGWP + LCODP x If there are multiple pieces of base building HVAC&R equipment, the project should use a weighted average of all equipment, based on Gross ARI rated cooling capacity: q Average Refrigerant Atmospheric Impact = [ (LCGWP + LCODP x 10 5 ) x Qunit ] / Qtotal 100 Where q Qunit = Gross ARI rated cooling capacity of an individual HVAC or refrigeration unit (tons) q Qtotal = Total Gross ARI rated cooling capacity of all HVAC or refrigeration Three examples of projects are shown below. In two of these examples (the q (12) 5-ton packaged HVAC units with HFC-410A for classrooms q (1) 2-ton split system HVAC units with HCFC-22 for a data room q (1) 1-ton window HVAC unit with HCFC-22 for an office Example Calculation 2 Office Building q (1) 500-ton centrifugal chiller with HFC-134a provided with manufacturers data and service contract guaranteeing less than 1% per year leakage q (1) 50-ton reciprocating pony chiller with HCFC-22 q (5) 10-ton computer room air conditioning units with HCFC-22 Example Calculation 3 Hotel q (3) 400-ton centrifugal chillers with HCFC-123 q (1) 40-ton commercial refrigeration compressor rack with HCFC-22 Example Calculation 1: School Classroom Building Inputs Calculations N Qunit Refrigerant GWPr ODPr Rc Life Lr Mr Tr LCGWP LCODP Refrigerant (LCGWP + (Number (Tons) (lb/ (yrs) (%) (%) Total (GWPr x x 10 5 Atmospheric LCODP x of Units) ton) Leakage Tr x Rc)/ 100,000 x Impact = 10 5 ) x N x (Lr x Life Life (ODPr x LCGWP + Qunit + Mr) Tr x Rc)/ LCODP x Life R410a 1, % 10% 40% R22 1, % 10% 40% R22 1, % 10% 30% Qtotal: 63 Subtotal: 6825 tons Average Refrigerant Atmospheric Impact = [ (LCGWP + LCODP x 105) x Qunit ] / Qtotal : LEED for New Construction Version

74 SS WE EA MR EQ Credit 4 q (12) 2-ton telephone/data room split system cooling units with HCFC-22 Exemplary Performance There is no exemplary performance point available for this credit. Submittal Documentation This credit is submitted as part of the Design Submittal. The following project data and calculation information is required to document credit compliance using the v2.2 Submittal Templates: q Enter into the template the HVAC&R equipment types, including number, size (tons), refrigerant, and refrigerant charge. q Provide a narrative describing any special circumstances or calculation explanations. Considerations LEED TSAC makes the following observation: An objective scientific analysis of tradeoffs between global warming and ozone depletion is extremely complex, and will only come from a full understanding of all interacting pathways and the effects on economic activities, human health, and terrestrial and oceanic ecosystems. Any quantitative credit scheme addressing both must involve some subjectivity in the relative weight given to each issue. Example Calculation 2: Office Building Inputs Calculations N Qunit Refrigerant GWPr ODPr Rc Life Lr Mr Tr LCGWP LCODP Refrigerant (LCGWP + (Number (Tons) (lb/ (yrs) (%) (%) Total (GWPr x x 10 5 Atmospheric LCODP x of Units) ton) Leakage Tr x Rc)/ 100,000 x Impact = 10 5 ) x N x (Lr x Life Life (ODPr x LCGWP + Qunit + Mr) Tr x Rc)/ LCODP x Life R134a 1, % 10% 33% R22 1, % 10% 50% R22 1, % 10% 40% Qtotal: 600 Subtotal: tons Example Calculation 3: Hotel Average Refrigerant Atmospheric Impact = [ (LCGWP + LCODP x 105) x Qunit ] / Qtotal : 87.7 Inputs Calculations N Qunit Refrigerant GWPr ODPr Rc Life Lr Mr Tr LCGWP LCODP Refrigerant (LCGWP + (Number (Tons) (lb/ (yrs) (%) (%) Total (GWPr x x 10 5 Atmospheric LCODP x of Units) ton) Leakage Tr x Rc)/ 100,000 x Impact = 10 5 ) x N x (Lr x Life Life (ODPr x LCGWP + Qunit + Mr) Tr x Rc)/ LCODP x Life R % 10% 56% R22 1, % 10% 50% R22 1, % 10% 40% Qtotal: 1264 Subtotal: tons 224 Average Refrigerant Atmospheric Impact = [ (LCGWP + LCODP x 10 5 ) x Qunit ] / Qtotal : 96.9

75 Refrigerant management to minimize the negative impacts of refrigerant use on ozone depletion and global warming is dependant on several factors that include q Designing buildings that do not rely on chemical refrigerants; q Designing HVAC&R equipment that uses energy efficiently; q Selecting refrigerants with zero or low ODP and minimal direct GWP; and q Maintaining HVAC&R equipment to reduce refrigerant leakage to the environment. Resources Please see the USGBC Web site at www. usgbc.org/resources for more specific resources on materials sources and other technical information. Web Sites EPA s Significant New Alternatives Policy (SNAP) SNAP is an EPA program to identify alternatives to ozone-depleting substances. The program maintains up-to-date lists of environmentally friendly substitutes for refrigeration and air conditioning equipment, solvents, fire suppression systems, adhesives, coatings and other substances. Stratospheric Ozone Protection: Moving to Alternative Refrigerants altrefrg.html w w w. u s g b c. o r g / D i s p l a y P a g e. aspx?cmspage=154 (202) 82-USGBC This report was prepared under the auspices of the s LEED Technical and Scientific Advisory Committee (TSAC), in response to a charge given TSAC by the LEED Steering Committee to review the atmospheric environmental impacts arising from the use of halocarbons as refrigerants in building heating, ventilating, and air conditioning (HVAC) equipment. Building Systems Analysis & Retrofit Manual, SMACNA, This manual provides an overview of a number of topics relating to HVAC retrofits, including energy management retrofits and CFC/HCFC retrofits. CFCs, HCFC and Halons: Professional and Practical Guidance on Substances that Deplete the Ozone Layer, CIBSE, This booklet provides background information on the environmental issues associated with CFCs, HCFCs, and halons, design guidance, and strategies for refrigerant containment and leak detection. The Refrigerant Manual: Managing the Phase-Out of CFCs, BOMA International, This manual gives an overview of the phase-out of CFCs, including information on retaining existing equipment, retrofitting existing equipment, or replacing equipment. SS WE EA MR EQ Credit 4 This EPA document includes 10 case histories on buildings that have been converted to accommodate non-cfc refrigerants. Print Media The Treatment by LEED of the Environmental Impact of HVAC Refrigerants Definitions Chlorofluorocarbons (CFCs) are hydrocarbons that deplete the stratospheric ozone layer. Halons are substances used in fire suppression systems and fire extinguishers in buildings. These substances deplete the stratospheric ozone layer. LEED for New Construction Version

76 SS WE EA MR EQ Hydrochlorofluorocarbons (HCFCs) are refrigerants used in building equipment that deplete the stratospheric ozone Credit 4 layer, but to a lesser extent than CFCs. Hydrofluorocarbons (HFCs) are refrigerants that do not deplete the stratospheric ozone layer. However, some HFCs have high global warming potential and, thus, are not environmentally benign. Refrigerants are the working fluids of refrigeration cycles that absorb heat from a reservoir at low temperatures and reject heat at higher temperatures. 226

77 SS WE EA MR EQ Measurement & Verification Credit 5 Intent Provide for the ongoing accountability of building energy consumption over time. 1 point Requirements q Develop and implement a Measurement & Verification (M&V) Plan consistent with Option D: Calibrated Simulation (Savings Estimation Method 2), or Option B: Energy Conservation Measure Isolation, as specified in the International Performance Measurement & Verification Protocol (IPMVP) Volume III: Concepts and Options for Determining Energy Savings in New Construction, April, q The M&V period shall cover a period of no less than one year of post-construction occupancy. Potential Technologies & Strategies Develop an M&V Plan to evaluate building and/or energy system performance. Characterize the building and/or energy systems through energy simulation or engineering analysis. Install the necessary metering equipment to measure energy use. Track performance by comparing predicted performance to actual performance, broken down by component or system as appropriate. Evaluate energy efficiency by comparing actual performance to baseline performance. While the IPMVP describes specific actions for verifying savings associated with energy conservation measures (ECMs) and strategies, this LEED credit expands upon typical IPMVP M&V objectives. M&V activities should not necessarily be confined to energy systems where ECMs or energy conservation strategies have been implemented. The IPMVP provides guidance on M&V strategies and their appropriate applications for various situations. These strategies should be used in conjunction with monitoring and trend logging of significant energy systems to provide for the ongoing accountability of building energy performance. LEED for New Construction Version

78 SS WE EA MR EQ Summary of Referenced Credit 5 Standard International Performance Measurement & Verification Protocol (IPMVP) Volume III: Concepts and Options for Determining Energy Savings in New Construction, April, Efficiency Valuation Organization (EVO) Inc. is a nonprofit organization whose vision is a global marketplace that properly values energy and water efficiency. IPMVP Volume III provides a concise description of best-practice techniques for verifying the energy performance of new construction projects. Chapter 2 describes the process for developing the theoretical Baseline for new construction projects and provides examples of relevant applications. Chapter 3 describes the basic concepts and structure of the M&V Plan. Chapter 4 describes specific M&V Methods for Energy Conservation Measure Isolation (Option B) and Whole Building Calibrated Simulation (Option D). Approach and Implementation The IPMVP Volume III presents four options for new construction M&V. Of these, Options B and D are deemed to be suitable for the purposes of LEED M&V (see Table 1). Option B (ECM Isolation) addresses M&V at the system or ECM level. This approach is suitable for smaller and/or simpler buildings that may be appropriately monitored by isolating the main energy systems and applying Option B to each on an individual basis. Projects following Option B may also need to implement whole-building metering and tracking to satisfy the intent of this credit. Option D (Whole Building Calibrated Simulation, Savings Estimation) addresses M&V at the whole-building level. This approach is most suitable for buildings with a large number of ECMs or systems that are interactive, or where the building design is integrated and holistic, rendering isolation and M&V of individual ECMs impractical or inappropriate. It essentially requires comparing the actual energy use of the building and its systems with the performance predicted by a calibrated computer model (presumably created from the computer models used for EA Credit 1 Option 1). Calibration is achieved by adjusting the as-built simulation to reflect actual operating conditions and parameters. To Table 1: Office Building M&V Option How Baseline Typical Applications is Determined B. ECM Isolation Savings are determined by Projected baseline energy use Variable speed control of a full measurement of the is determined by calculating fan motor. Electricity use is energy use and operating the hypothetical energy measured on a continuous parameters of the system(s) performance of the baseline basis throughout the M&V to which an ECM was system under measured period. applied, separate from the post-construction operating rest of the facility. conditions. Savings are determined at Projected baseline energy use Savings determination for the whole-building or is determined by energy the purposes of a new system level by measuring simulation of the baseline building Performance energy use at main meters under the post-construction Contract, with the local or sub-meters. operating conditions. energy code defining the baseline. 228

79 determine energy savings, similar calibrations or adjustments should be applied to the Baseline Building simulation. Option D serves two purposes: q Calibration of the as-built simulation model to actual energy use reveals ECM/design or operational underperformance. q Adjusting the Baseline simulation allows meaningful performance comparisons and the determination of verified savings. The IPMVP is not prescriptive regarding the application of M&V options, but instead defers to the professional judgment of the implementer(s) to apply the options in a manner that is appropriate to the project scale while still meeting the M&V objective (see Economic Issues below). IPMVP Vol. III provides specific requirements for the M&V Plan. In general the plan identifies the M&V option(s) to be applied, defines the Baseline or how it will be determined, identifies metering requirements, and outlines specific methodologies associated with implementing the M&V Plan. Responsibility for the design, coordination, and implementation of the M&V Plan should reside with one entity of the design team. The person(s) responsible for energy engineering and analysis is usually best-suited for this role, although third-party verification may be appropriate in some cases. Since the pursuit of this credit is largely affected by the option selected to achieve EA Credit 1, the Baseline definition will vary. For EA Credit 1 Option 1 the baseline is defined by ASHRAE 90.1 Appendix G. The Baselines for EA Credit 1 Options 2 and 3 are defined by the respective prescriptive standards, which in some cases may be effectively the same as the Design. In that case the M&V Plan is reduced to addressing Design performance only. However, it is necessary in all cases to project the energy performance of the Design and/or its systems. For Option B this can be accomplished through computer modeling or engineering analysis for simple buildings or systems. The start of the M&V period should occur after the building has achieved a reasonable degree of occupancy and operational stability. After the M&V period has been completed (after at least one year of stable and optimized operation) long term M&V can be economically implemented. Essentially, the one year of stable postconstruction operation becomes the Base Year against which subsequent energy performance is compared by applying operational adjustments and regression analysis. Refer to IPMVP Volume I, which focuses on the pertinent methods of M&V, for further information. Calculations IPMVP Volume III provides fundamental calculation formulae as well as quantitative guidelines for error estimation and tolerance for various M&V options. Exemplary Performance There is no exemplary performance point available for this credit. Submittal Documentation This credit is submitted as part of the Construction Submittal. The following project data and calculation information is required to document credit compliance using the v2.2 Submittal Templates: q Confirm the IPMVP Option pursued by the project. q Upload a copy of the M&V Plan. q Provide a narrative describing any special circumstances or calculation explanations. SS WE EA MR EQ Credit 5 LEED for New Construction Version

80 SS WE EA MR EQ Section 3.2 of IPMVP Volume III provides specific content requirements for Credit 5 the M&V Plan. Considerations The benefits of optimal building operation, especially in terms of energy performance, are substantial. The lifetime of many buildings is greater than 50 years. Even minor energy savings are significant when considered in aggregate. These long-term benefits often go unrealized due to maintenance personnel changes, aging of building equipment, and changing utility rate structures. Therefore, it is important to institute M&V procedures to achieve and maintain optimal performance over the lifetime of the building through continuous monitoring. The goal of M&V activities is to provide building owners with the tools and data necessary to identify systems that are not functioning as expected, and to optimize building system performance. Environmental Issues Measurement & Verification of a building s ongoing energy use allows for optimization of related systems over the lifetime of the building. As a result, the cost and environmental impacts associated with energy can be minimized. Economic Issues The added cost to institute an M&V program in a new construction project is strongly tied to the complexity of the building systems. Costs can come from additional instrumentation and metering equipment, additional controls programming, and/or labor for the monitoring and processing of the data collected. The extent to which these costs are considered extraneous will depend on the level of instrumentation and controls in the Baseline Design. Often times, projects with sophisticated digital controls can support an effective M&V program without incurring significant additional costs. In other instances, projects with a series of chillers and air handlers and simple controls may need to install a significant amount of equipment to generate the necessary data for an effective M&V program. Smaller buildings with packaged HVAC equipment and fewer pieces of equipment may have lower costs because there are fewer systems to measure and verify. The cost of an M&V program must be balanced against the potential performance risk. A simple method of estimating performance risk can be based on the project value and technical uncertainty. An illustration is provided below in Table 2. A capital and operational budget for M&V may be established as a percentage of the project s performance risk over a suitable period of years. As illustrated, the smaller project consisting of predictable technologies has less performance risk (and thus a lower M&V budget) than the large project that includes less predictable technologies. In general, higher M&V intensity and rigor means higher cost, both upfront and over time. The factors that typically affect M&V accuracy and costs are as follows (note that many are interrelated): q Level of detail and effort associated with verifying post-construction conditions Table 2 Sample Anticipated Estimated Estimated Performance Project Annual Energy Savings Uncertainty Risk Costs Small $250,000 $50,000 20% $10,000 Large $2,000,000 $500,000 30% $150,

81 q Number and types of metering points q Duration and accuracy of metering activities Web Sites International Performance Measurement and Verification Protocol (IP- MVP) SS WE EA MR EQ Credit 5 q Number and complexity of dependent and independent variables that must be measured or determined on an ongoing basis q Availability of existing data collecting systems (e.g., energy management systems) q Confidence and precision levels specified for the analyses Resources Please see the USGBC Web site at www. usgbc.org/resources for more specific resources on materials sources and other technical information. IPMVP Inc. is a nonprofit organization whose vision is a global marketplace that properly values energy and water efficiency. Definitions Energy Conservation Measures (ECMs) are installations of equipment or systems, or modifications of equipment or systems, for the purpose of reducing energy use and/or costs. Case Study Frito-Lay Jim Rich Service Center Rochester, NY Owner: Frito Lay, Inc. The Frito-Lay Jim Rich Service Center is a LEED for New Construction version 2 Gold Certified building serving as Frito-Lay s product storage and distribution center. The building houses offices and a warehouse facility, and was designed to utilize existing site resources and provide a positive work environment for its occupants. Frito-Lay has incorporated photovoltaics, daylighting, occupancy sensors, heat recovery cycles, natural ventilation, and high efficiency furnaces and compressors into its energy management system. A Building Energy Management System (EMS) provides ongoing monitoring of operation and equipment utilization, and control of systems. Electricity, natural gas, and water are all monitored by central meters in the building as well. LEED for New Construction Version

and LEED Energy and Atmosphere Credits Jean Ascoli, LEED AP BD+C Architect, Energy Specialist

and LEED Energy and Atmosphere Credits Jean Ascoli, LEED AP BD+C Architect, Energy Specialist ASHRAE University of Illinois Student Chapter April 20, 2011 Building Energy Efficiency and LEED Energy and Atmosphere Credits Jean Ascoli, LEED AP BD+C Architect, Energy Specialist Building Research Council,

More information

Errata Sheet. LEED for Schools Reference Guide First Edition for the document titled:

Errata Sheet. LEED for Schools Reference Guide First Edition for the document titled: Errata Sheet for the document titled: LEED for Schools Reference Guide First Edition 2007 Notes: Updates to this document are posted on the LEED for Schools Rating System page and the Reference Guide electronic

More information

Commissioning Guide. Transportation and Works Building Design and Construction Division

Commissioning Guide. Transportation and Works Building Design and Construction Division Commissioning Guide Transportation and Works December 13, 2013 TABLE OF CONTENTS 1. COMMISSIONING 12 STEP PROCESS... 1 2. PURPOSE OF THE GUIDE... 2 3. INTENT OF COMMISSIONING... 2 4. DEFINITION OF COMMISSIONING...

More information

DIRECTIVE 15H-9 Issue date: October 2018 COMMISSIONING

DIRECTIVE 15H-9 Issue date: October 2018 COMMISSIONING DIRECTIVE 15H-9 Issue date: October 2018 COMMISSIONING Purpose: The purpose of this Directive is to describe, in outline, the requirements of Commissioning on SUCF Projects. 1. Applicability a. New York

More information

ANSI/ASHRAE/IESNA Standard /2001/2004 Energy Standard for Buildings Except Low-Rise Residential Buildings

ANSI/ASHRAE/IESNA Standard /2001/2004 Energy Standard for Buildings Except Low-Rise Residential Buildings ANSI/ASHRAE/IESNA Standard 90.1-1999/2001/2004 Energy Standard for Buildings Except Low-Rise Residential Buildings Larry Spielvogel, PE Past Chair Standard 90.1-1999/2001/2004 Developed jointly by the

More information

Dayton Chapter February 9, Bob Thomson, P.E., LEED-AP, CDT

Dayton Chapter February 9, Bob Thomson, P.E., LEED-AP, CDT Dayton Chapter February 9, 2009 Bob Thomson, P.E., LEED-AP, CDT World Population is estimated to be 6,000,000,000 people U.S. Population is estimated to be 3,000,000 people U.S. makes up 5% of the world

More information

Errata Sheet. LEED for Schools Reference Guide First Edition for the document titled:

Errata Sheet. LEED for Schools Reference Guide First Edition for the document titled: Errata Sheet for the document titled: LEED for Schools Reference Guide First Edition 2007 Notes: Updates to this document are posted on the LEED for Schools Rating System page and the Reference Guide electronic

More information

A Building Commissioning Overview. Presented by: Goetting & Associates Commissioning

A Building Commissioning Overview. Presented by: Goetting & Associates Commissioning A Building Commissioning Overview Presented by: Goetting & Associates Commissioning www.goettingcx.com What is the Definition of Commissioning? Building Commissioning is a Quality Assurance Process of

More information

Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1

Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1 Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1 Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam

More information

Allowance Table for: General:

Allowance Table for: General: Allowance Table for: Adopting Credits from LEED Canada for New Construction and Major Renovations (NC) 2009 and LEED Canada for Core and Shell Development (CS) 2009 for LEED Canada-NC v1.0 (with or without

More information

Building Commissioning

Building Commissioning Building Commissioning Roles, Responsibilities, and Benefits 2010 ASHRAE Annual Meeting CxA WORKSHOP Saturday, June 26, 2010 Jim Magee, CxA, LEED-AP Facility Commissioning Group Overview Cx Advocacy, Economics,

More information

Commissioning & Retro-Commissioning Meet Energy Code

Commissioning & Retro-Commissioning Meet Energy Code Commissioning & Retro-Commissioning Meet Energy Code Agenda Introductions What is Commissioning Value of Commissioning Code Required Cx Process Customize your Cx Process What documentation should be expected

More information

Energy and Atmosphere

Energy and Atmosphere Energy and Atmosphere Energy and Atmosphere Energy and Atmosphere The Most! Energy and Atmosphere Goals Establish energy efficiency and system performance Optimize energy efficiency Support ozone protection

More information

Energy and Atmosphere

Energy and Atmosphere The Most! Goals Reduce Energy Use and Support the Use of More Environmentally Friendly Energy Sources Stop Global Warming / Reduce GHG Emissions Eliminate / Reduce Air Pollution EAP1 Fundamental Commissioning

More information

ASHRAE/USGBC/IES Standard What Does It Mean for Commissioning Providers?

ASHRAE/USGBC/IES Standard What Does It Mean for Commissioning Providers? ASHRAE/USGBC/IES Standard 189.1-2009 What Does It Mean for Commissioning Providers? Kent W. Peterson, PE, FASHRAE, LEED AP P2S Engineering, Inc. kent.peterson@p2seng.com What is Standard 189.1? ANSI standard

More information

DIRECTIVE 1B-7 Issue date: October Energy, Sustainability, LEED and Executive Orders

DIRECTIVE 1B-7 Issue date: October Energy, Sustainability, LEED and Executive Orders DIRECTIVE 1B-7 Issue date: October 2017 Energy, Sustainability, LEED and Executive Orders As of December 28, 2012, Executive Order No. 88 (E.O. 88) replaced E.O.111 ( Green and Clean State Buildings and

More information

What s My Baseline? ASHRAE

What s My Baseline? ASHRAE 2010 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Published in ASHRAE Transactions (2010, vol 116,part 2). For personal use only. Additional reproduction,

More information

OBC SB-10 AND ASHRAE COMPLIANCE SUMMARY

OBC SB-10 AND ASHRAE COMPLIANCE SUMMARY ONTARIO BUILDING CODE SUPPLEMENTARY STANDARD SB-10 PROJECT INFORMATION Project: Building Permit Application No.: Location: Date: Architectural Designer Information* Mechanical Designer Information* Electrical

More information

LEED Application Guide for Multiple Buildings and On Campus Building Projects

LEED Application Guide for Multiple Buildings and On Campus Building Projects LEED Application Guide for Multiple Buildings and On Campus Building Projects For Use with 2009 LEED Rating Systems for Design and Construction and Operations and Maintenance Released October 31, 2011

More information

CONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability

CONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability 01352 Sustainable Design Requirements This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications

More information

HPBS [ HIGH PERFORMANCE BUILDING STANDARD]

HPBS [ HIGH PERFORMANCE BUILDING STANDARD] HPBS [ HIGH PERFORMANCE BUILDING STANDARD] STATE OF MONTANA HIGH PERFORMANCE BUILDING STANDARDS MINIMUM REQUIREMENTS FOR ALL PROJECTS UNDER 17-7-201, MCA PART 2 1.1 DESIGN AND DOCUMENTATION A. Incorporate

More information

ENERGY MODELING GUIDELINES. D. Section Building Automation and Control System Guidelines

ENERGY MODELING GUIDELINES. D. Section Building Automation and Control System Guidelines 018130 ENERGY MODELING GUIDELINES PART 1: GENERAL 1.01 RELATED SECTIONS A. Section 018110 Green Building Guidelines B. Section 230000 Basic HVAC Requirements C. Section 230540 Laboratories D. Section 230900

More information

BGSU Construction Standards Office of Design & Construction Bowling Green State University

BGSU Construction Standards Office of Design & Construction Bowling Green State University TABLE O CONTENTS: ENERGY MANAGEMENT GUIDELINE... 1 PURPOSE... 1 REERENCES... 1 GENERAL... 1 1. ENERGY CONSERVATION GOALS... 1 2. ENERGY MODELING & ANALYSIS.... 3 3. MEASUREMENT AND VERIICATION (M&V)...

More information

Required Treatment of District Thermal Energy in LEED-NC version 2.2 and LEED for Schools

Required Treatment of District Thermal Energy in LEED-NC version 2.2 and LEED for Schools 1 Required Treatment of District Thermal Energy in LEED-NC version 2.2 and LEED for Schools Version 1.0 May 28, 2008 Administrative All LEED-NC v2.2 or LEED for Schools projects that register with USGBC

More information

Absolute Energy Raters Commissioning Plan Outline Template

Absolute Energy Raters Commissioning Plan Outline Template IMPORTANT NOTICE: This sample document is provided for instructional purposes only. Absolute Energy Raters is not rendering advice concerning any commission project or practices. This document is neither

More information

LEED BD+C: NC, CS, S, R, DC, WDC, HOS, HC

LEED BD+C: NC, CS, S, R, DC, WDC, HOS, HC LEED Building Design and Construction Activity #6 Energy and Atmosphere (EA) Before completing this Activity Read: Reference Guide for Building Design and Construction v4 Pages 318-465 Note the following

More information

USD 497. Request for Qualifications Commissioning Engineers Building Commissioning Services. August 11, 2017

USD 497. Request for Qualifications Commissioning Engineers Building Commissioning Services. August 11, 2017 USD 497 Request for Qualifications Commissioning Engineers Building Commissioning Services August 11, 2017 1 INTRODUCTION Lawrence Public Schools, in accordance with the policies of the Board of Education,

More information

A. General Design and Construction Requirements

A. General Design and Construction Requirements A. General Design and Construction Requirements 1. Introduction This portion of the Facility Standards includes general design and construction requirements for use by the Consultant in the course of a

More information

LEED Application Guide for Multiple Buildings and On-Campus Building Projects

LEED Application Guide for Multiple Buildings and On-Campus Building Projects LEED Application Guide for Multiple Buildings and On-Campus Building Projects For Use with 2009 LEED Rating Systems for Design and Construction and Operations and Maintenance Released October 31, 2011

More information

B. OPR and BoD documentation may be included by reference for information only.

B. OPR and BoD documentation may be included by reference for information only. SECTION 01 91 13 - GENERAL COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

EA PREREQUISITE 2: MINIMUM ENERGY PERFORMANCE

EA PREREQUISITE 2: MINIMUM ENERGY PERFORMANCE THRESHOLD ATTEMPTED LEED 29 for New Construction and Major Renovations EA PREREQUISITE 2: MINIMUM ENERGY PERFORMANCE Project # 138123 Jacobs Hall All fields and uploads are required unless otherwise noted.

More information

Codes, Standards & Guidelines, Oh My! Michael Chelednik, AIA Sr. Airport Terminal Architect URS

Codes, Standards & Guidelines, Oh My! Michael Chelednik, AIA Sr. Airport Terminal Architect URS Codes, Standards & Guidelines, Oh My! Michael Chelednik, AIA Sr. Airport Terminal Architect URS AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute

More information

LEED LEED. Leadership in Energy and Environmental Design. A voluntary, consensus-based. high-performance, sustainable buildings and neighborhoods

LEED LEED. Leadership in Energy and Environmental Design. A voluntary, consensus-based. high-performance, sustainable buildings and neighborhoods LEED An Introduction to LEED V3 2009 LEED Leadership in Energy and Environmental Design A voluntary, consensus-based national standard for developing high-performance, sustainable buildings and neighborhoods

More information

DESIGN AND CONSTRUCTION STANDARDS OUTLINE SPECIFICATIONS

DESIGN AND CONSTRUCTION STANDARDS OUTLINE SPECIFICATIONS SECTION 01 91 13 GENERAL COMMISSIONING REQUIREMENTS GENERAL The University of South Alabama is officially and formally committed to the concept of Commissioning all new buildings and major renovations.

More information

REQUEST FOR PROPOSAL COMMISSIONING AGENT SERVICES GARRISON ELEMENTARY SCHOOL RENOVATIONS PHASE I

REQUEST FOR PROPOSAL COMMISSIONING AGENT SERVICES GARRISON ELEMENTARY SCHOOL RENOVATIONS PHASE I Dover School District (Owner) requests written proposals to secure commissioning authority (CxA) services for the renovations project at the Garrison Elementary School in Dover, New Hampshire. The Owner

More information

LEED v4 LEED BD+C Credit-by-Credit Review

LEED v4 LEED BD+C Credit-by-Credit Review LEED v4 LEED BD+C Credit-by-Credit Review Location & Transportation Sustainable Sites Water Efficiency Energy & Atmosphere Materials & Resources Indoor Environmental Quality Innovation & Integrative Process

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Planning, Design & Construction November 26, 2014 Re: Request for Qualifications - Commissioning Services Bowen Science Building Modernize Building Systems University of Iowa The

More information

Commissioning Toolkit for In-House Commissioning of Small Buildings

Commissioning Toolkit for In-House Commissioning of Small Buildings 1 Commissioning Toolkit for In-House Commissioning of Small Buildings Dan Burgoyne Sustainability Manager California Department of General Services California Commissioning Collaborative April 12, 2007

More information

CODE REQUIREMENTS FOR BUILDING COMMISSIONING SCOTT WEAVER, PE, QCXP, LEED AP BD+C DIRECTOR, COMMISSIONING DECEMBER 1, 2017

CODE REQUIREMENTS FOR BUILDING COMMISSIONING SCOTT WEAVER, PE, QCXP, LEED AP BD+C DIRECTOR, COMMISSIONING DECEMBER 1, 2017 CODE REQUIREMENTS FOR BUILDING COMMISSIONING SCOTT WEAVER, PE, QCXP, LEED AP BD+C DIRECTOR, COMMISSIONING DECEMBER 1, 2017 OVERVIEW The recent adoption by the Centers for Medicaid and Medicare Services

More information

Building Energy Analysis for a Multi-Family Residential Building (Multi V III VRF Heat-Pump System)

Building Energy Analysis for a Multi-Family Residential Building (Multi V III VRF Heat-Pump System) Building Energy Analysis for a Multi-Family Residential Building (Multi V III VRF Heat-Pump System) Residential-Building Energy-Modeling Engineering Study VRF-ES-BH-001-US 012E03 Executive Summary Contents

More information

University of Minnesota Duluth Civil Engineering Building

University of Minnesota Duluth Civil Engineering Building Energy Data Attachment University of Minnesota Duluth Civil Engineering Building LEED Energy Modeling The energy modeling for LEED NC 2.2 was performed against ASHRAE 9.1-24 Appendix using equest version

More information

LEED v4 for Homes, Residential Project Summary and Checklist One and Two Family New Construction

LEED v4 for Homes, Residential Project Summary and Checklist One and Two Family New Construction LEED v4 for Homes, Residential Project Summary and Checklist One and Two Family New Construction Summary Date of Application Path Project Project Address Owner Architect Third Party Third Party Provider

More information

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST ENVELOPE REQUIREMENTS Project: Date: Instructions RECOMMENDED: List performance values, note exceptions that were applied, or provide other

More information

COMMISSIONING, OPERATION AND MAINTENANCE

COMMISSIONING, OPERATION AND MAINTENANCE CHAPTER 9 COMMISSIONING, OPERATION AND MAINTENANCE THIS CHAPTER IS PROVIDED FOR REFERENCE ONLY. IT IS NOT ADOPTED AS A REQUIREMENT OF THE CODE. SECTION 901 GENERAL 901.1 Scope. The provisions of this chapter

More information

Update on LEED v3. All projects registered after June 26, 2009 must be under the guidelines of LEEDv3. A LEEDv3 summary of changes:

Update on LEED v3. All projects registered after June 26, 2009 must be under the guidelines of LEEDv3. A LEEDv3 summary of changes: Update on v3 September 9, 2009 GP #7 The Green Building Rating system was recently updated and re-introduced April 27, 2009 as v3. This Green Piece will outline the major changes to the rating system and

More information

Fact Sheet. Commissioning WHAT IS THE PURPOSE OF THIS REQUIREMENT? WHAT VALUE DOES IT PROVIDE TO THE OWNER? HOW DOES IT SAVE ENERGY?

Fact Sheet. Commissioning WHAT IS THE PURPOSE OF THIS REQUIREMENT? WHAT VALUE DOES IT PROVIDE TO THE OWNER? HOW DOES IT SAVE ENERGY? Commissioning Fact Sheet Funding for this publication is provided by the Northwest Energy Efficiency Alliance. OCTOBER 2017 VOLUME 1, ISSUE 2 WHAT IS THE PURPOSE OF THIS REQUIREMENT? There is a saying

More information

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal The following documentation provides an example submittal for the LEED-NC v2.1 Energy & Atmosphere Credit 1 (EAc1). This sample EAc1 submittal

More information

Prerequisite. prerequisite.

Prerequisite. prerequisite. LEED v4 for Building Operations and Maintenance Summary of changes from LEED 2009 LOCATION AND TRANSPORTATION SUSTAINABLE SITES Alternative Transportation Site Management Policy LEED Certified Design and

More information

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations LEEDv4 Guideline February 1, 2017 Tony Sparks David Ritchey Stuart Ingham Karen Alarid Kris Callori Noreen Richards

More information

Michigan Energy Code Training and Implementation Program

Michigan Energy Code Training and Implementation Program Michigan Energy Code Training and Implementation Program 1.0 Hour Advanced Program Course Number 16202 Residential Energy Plan Review School of Planning, Design & Construction Michigan State University

More information

B. OPR, BoD, and BoD-HVAC documentation prepared by Owner and Architect contains requirements that apply to this Section.

B. OPR, BoD, and BoD-HVAC documentation prepared by Owner and Architect contains requirements that apply to this Section. SECTION 01815 - HVAC COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Light Control Solutions & LEED

Light Control Solutions & LEED E. info@ Light Control Solutions & LEED Potential Contribution LEED CANADA-NC & CS 2009 Mission CRISTAL CONTROLS manufactures energy management systems, low voltage lighting control systems, temperature

More information

REQUEST FOR PROPOSAL. Commissioning Services College of Pharmacy Building Construct New Facility University of Iowa #

REQUEST FOR PROPOSAL. Commissioning Services College of Pharmacy Building Construct New Facility University of Iowa # REQUEST FOR PROPOSAL Commissioning Services College of Pharmacy Building Construct New Facility University of Iowa # Addendum #1 Issued Wednesday, February 10, 2016 Changes: Item #01: Item #02: Section

More information

Pay for Performance - NC Technical Topic

Pay for Performance - NC Technical Topic Commissioning Resources and Clarifications Executive Summary Pay for Performance - NC Technical Topic This Technical Topic provides resources and clarifications for commissioning requirements of the Pay

More information

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL SECTION 01815 - HVAC COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

IECC Commercial Significant Changes Summary Tier I

IECC Commercial Significant Changes Summary Tier I 2009-2015 IECC Commercial Significant Changes Summary Tier I The first change is in the layout of the book. Instead of having Chapters 1-3 that applied to all projects and then having Chapter 4 Residential

More information

Recommended Amendments to the

Recommended Amendments to the Recommended Amendments to the And the energy provisions of the 2018 International Residential Code Governments Region (Climate Zone 3 of the IECC) The following sections, paragraphs, and sentences of the

More information

ENERGY STAR Qualified Homes National Program Requirements, Version 3.0

ENERGY STAR Qualified Homes National Program Requirements, Version 3.0 Qualifying Homes The following homes are eligible to earn the ENERGY STAR: Single-family homes; Units in multi-family buildings that are three stories or less; Units in multi-family buildings that are

More information

A PRACTICAL GUIDE TO SAN FRANCISCO'S GREEN BUILDING ORDINANCE

A PRACTICAL GUIDE TO SAN FRANCISCO'S GREEN BUILDING ORDINANCE A PRACTICAL GUIDE TO SAN FRANCISCO'S GREEN BUILDING ORDINANCE San Francisco's new Green Building Requirements Ordinance ("Ordinance") went into effect on November 3, 2008. 1 It affects most new construction

More information

Commissioning: The Most Important Component of LEED. Rick Miller, PE, LEED AP. RNM Engineering, Inc. San Luis Obispo, CA

Commissioning: The Most Important Component of LEED. Rick Miller, PE, LEED AP. RNM Engineering, Inc. San Luis Obispo, CA Commissioning: The Most Important Component of LEED by Rick Miller, PE, LEED AP RNM Engineering, Inc. San Luis Obispo, CA LEED and Commissioning EA Prerequisite Fundamental Commissioning of Building Energy

More information

LEED v4 Credit Guidance for Andersen Products LEED for Building Design and Construction: Homes and Multifamily Midrise

LEED v4 Credit Guidance for Andersen Products LEED for Building Design and Construction: Homes and Multifamily Midrise LEED v4 Credit Guidance for Andersen Products LEED for Building Design and Construction: Homes and Multifamily Midrise About LEED Certification The U.S. Green Building Council s LEED green building program

More information

Retail Effects of ANSI/ASHRAE/IES Standard

Retail Effects of ANSI/ASHRAE/IES Standard Retail Effects of ANSI/ASHRAE/IES Standard 90.1-2016 Prepared by Dialectic Inc. INTRODUCTION Background ANSI/ASHRAE/IES 90.1-2016 Energy Standard for Buildings Except Low-Rise Residential Buildings replaces

More information

COMMISSIONING PROCESS FOR BUILDINGS AND SYSTEMS ASHRAE STANDARD 202

COMMISSIONING PROCESS FOR BUILDINGS AND SYSTEMS ASHRAE STANDARD 202 COMMISSIONING PROCESS FOR BUILDINGS AND SYSTEMS ASHRAE STANDARD 202 Gerald J. Kettler, PE, CCP, CPMP 21 st National Conference on Building Commissioning AIA Quality Assurance The Building Commissioning

More information

Delmarva Power C&I Energy Savings Program. Retro-Commissioning for Existing Buildings and Enhanced Commissioning for New Construction

Delmarva Power C&I Energy Savings Program. Retro-Commissioning for Existing Buildings and Enhanced Commissioning for New Construction Delmarva Power C&I Energy Savings Program Retro-Commissioning for Existing Buildings and Enhanced Commissioning for New Construction Technical Resource Manual January 19, 2010 Page 1 of 16 Lockheed Martin

More information

Changes to the Minnesota Commercial Energy Code. Presented by: Andy Thielen, PE

Changes to the Minnesota Commercial Energy Code. Presented by: Andy Thielen, PE Changes to the Minnesota Commercial Energy Code Presented by: Andy Thielen, PE Warning! The following is an outline of proposed code changes. There is no guarantee that the final code adopted by the State

More information

Energy Code Compliance:

Energy Code Compliance: Energy Code Compliance: Wood-Frame Buildings and the IECC Presented 4 March 2015 by Andrew Klein, P.E. Disclaimer: This presentation was developed by a third party and is not funded by WoodWorks or the

More information

2016 SUPPLEMENT TO THE NEW YORK STATE ENERGY CONSERVATION CONSTRUCTION CODE

2016 SUPPLEMENT TO THE NEW YORK STATE ENERGY CONSERVATION CONSTRUCTION CODE 2016 SUPPLEMENT TO THE NEW YORK STATE ENERGY CONSERVATION CONSTRUCTION CODE Published by the New York State Department of State Publication Date: March, 2016 2016 New York State Department of State INTRODUCTION

More information

California Multi-Family New Homes

California Multi-Family New Homes California Multi-Family New Homes A Third-Party Program of the Pacific Gas and Electric Company (PG&E) ENERGY STAR Multi-Family High Rise Program November 5, 2014 Using GoToWebinar 2 Minimize or expand

More information

Energy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat Recovery VRF System)

Energy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat Recovery VRF System) Energy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat VRF System) (* Source: http://kr.lgeaircon.com/) Commercial Air-Conditioning Engineering Study ES-MultiVWaterIV_EnergyAnalysis-08-14

More information

Energy Code Compliance It s the Law

Energy Code Compliance It s the Law Energy Code Compliance It s the Law Evan Hallas & Yossi Bronsnick Multifamily Performance Program Partner Summit October 24, 2011 Taitem Engineering Taitem Engineering, PC, is a consulting engineering

More information

ICC 1000 APPLICATION OF THE COMMISSIONING PROCESS. March 27, Proposed Revision: GJKettler May 11, 2014

ICC 1000 APPLICATION OF THE COMMISSIONING PROCESS. March 27, Proposed Revision: GJKettler May 11, 2014 ICC 1000 APPLICATION OF THE COMMISSIONING PROCESS March 27, 2014 Updated April 2, 2014 By Formatting and Style Committee Committee Update April 17, 2014 Proposed Revision: GJKettler May 11, 2014 - = indicates

More information

Alpen Windows - LEED Impact Analysis

Alpen Windows - LEED Impact Analysis ALPEN WINDOWS MATERIALS: Energy Efficient Windows Alpen Windows - LEED Impact Analysis SECTION I. PRODUCT IDENTIFICATION Product Name: Alpen Windows Manufacturer: Alpen High Performance Products 6268 Monarch

More information

ENERGY AND ENVIRONMENT DESIGN AND CONSTRUCTION STANDARDS ENERGY AND ENVIRONMENT

ENERGY AND ENVIRONMENT DESIGN AND CONSTRUCTION STANDARDS ENERGY AND ENVIRONMENT ENERGY AND ENVIRONMENT The University has committed to approaching new building construction and major renovations with an emphasis on Life Cycle Cost (LCC). Part of this approach is a focus on maximizing

More information

LEED And Your Indoor Environment

LEED And Your Indoor Environment LEED And Your Indoor Environment An overview of LEED v3 and Indoor Air Quality David McCauley, CIE Council Certified Indoor Environmentalist ACAC CIE #1008005 USGBC's Mission To transform the way buildings

More information

Request for Proposal. for. Building Commissioning Services

Request for Proposal. for. Building Commissioning Services Page 1 of 11 Request for Proposal for Building Commissioning Services State College Area School District High School Project December 15, 2014 Page 2 of 11 Request for Proposal for Building Commissioning

More information

Commissioning Green Buildings

Commissioning Green Buildings Commissioning Green Buildings Hazem Elzarka, PhD, PE, LEED AP University of Denver Denver, CO, USA Owners are increasingly recognizing building commissioning as an effective means of ensuring quality and

More information

LEED BUDGET IMPACTS. LEED Architectural Credits

LEED BUDGET IMPACTS. LEED Architectural Credits LEED BUDGET IMPACTS LEED Architectural Credits Below is a summary description of the LEED points with architectural implications, provided by CKA / MHP. All costs are referenced from the Cost of LEED Report

More information

COMcheck Software Version Envelope Compliance Certificate

COMcheck Software Version Envelope Compliance Certificate COMcheck Software Version 4.0.2.8 Envelope Compliance Certificate Project Information Energy Code: 20 IECC Location: Cedar Hills, Utah Climate Zone: 5b Project Type: New Construction Vertical Glazing /

More information

Connecticut Housing Finance Authority. Construction Guidelines: Energy Conservation 2019

Connecticut Housing Finance Authority. Construction Guidelines: Energy Conservation 2019 Connecticut Housing Finance Authority Construction Guidelines: Energy Conservation 2019 These Guidelines are effective I. Energy Conservation Guidelines Energy efficiency is strongly encouraged. An objective

More information

EnviroLube LEED Point Contribution

EnviroLube LEED Point Contribution P.O. Box 3992 Grass Valley, CA 95945 800-700-3309 www.integratedlubeservices.com EnviroLube LEED Point Contribution This summary report is intended to inform any and all entities or parties on their EnviroLube

More information

PROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition

PROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition PROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition Chapter 1 GENERAL SECTION 101 GENERAL 101.1 Title. These regulations shall be known as the California San Francisco Green Building Standards

More information

LEED 2009 Core and Shell, Commercial Project Summary and Checklist New Construction

LEED 2009 Core and Shell, Commercial Project Summary and Checklist New Construction Date of Application Path Project Project Address Owner Architect Contractor Third Party Provider LEED 2009 Core and Shell, Commercial Project Summary and Checklist New Construction Summary Permit. Provider.

More information

DESIGN & CONSTRUCTION PHASE COMMISSIONING PLAN TEMPLATE

DESIGN & CONSTRUCTION PHASE COMMISSIONING PLAN TEMPLATE DESIGN & CONSTRUCTION PHASE COMMISSIONING PLAN TEMPLATE Based upon B3 Minnesota Sustainable Building Guidelines VERSION 2.1 Notes to the reader have been added to this document within numerous text boxes

More information

April 16 th Linda Morrison Jesse Stanley

April 16 th Linda Morrison Jesse Stanley April 16 th 2010 Linda Morrison Jesse Stanley Energy efficiency Renewable energy Net zero buildings Envelope HVAC systems Water efficiency and metering Rating system, codes, best practice LEED-NC Version

More information

OPTION 1: PERFORMANCE RATING METHOD

OPTION 1: PERFORMANCE RATING METHOD OPTION 1: PERFORMANCE RATING METHOD I confirm that the energy simulation software used for this project has all capabilities described in EITHER section `G2 Simulation General Requirements' in Appendix

More information

Energy Trigger (A Existing Building Upgrade Mechanism Model)

Energy Trigger (A Existing Building Upgrade Mechanism Model) Trigger (A-11.2.1.2 Existing Building Upgrade Mechanism Model) Applicability All Building Permit applications for projects related to existing buildings are required to follow the energy upgrade trigger

More information

THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS

THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS SUSTAINABLE DESIGN FORM 010.901 REV 1211 THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS SUSTAINABLE DESIGN GUIDE StopWaste.Org LEED-NC Platinum Energy Foundation LEED-CI Platinum Adobe East Tower LEED-EB

More information

BETA OPTION 1: PERFORMANCE RATING METHOD. Section General Information

BETA OPTION 1: PERFORMANCE RATING METHOD. Section General Information LEED-CS 2. Certification Submittal Template OPTION 1: PERFORMANCE RATING METHOD I confirm that the energy simulation software used for this project has all capabilities described in EITHER section `G2

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma LEED Green Building Certification The purpose of the LEED Green Building Rating is to provide a national standard that aims to improve environmental, health and economic performance of buildings using

More information

The baseline building system for compliance with Senate Bill 668 is defined by Appendix G,

The baseline building system for compliance with Senate Bill 668 is defined by Appendix G, Project: North Carolina A&T State University New Student Health Center SCO #: 08-08109-01A 1.0 Heating, Ventilating and Air Conditioning (HVAC) Baseline Building Systems Senate Bill 668 Compliance The

More information

What s New in LEED O+M v4: Get Ready for the Future! A Presentation by The Sustainability Experts Leonardo Academy At NFMT Las Vegas

What s New in LEED O+M v4: Get Ready for the Future! A Presentation by The Sustainability Experts Leonardo Academy At NFMT Las Vegas What s New in LEED O+M v4: Get Ready for the Future! A Presentation by The Sustainability Experts Leonardo Academy At NFMT Las Vegas Today s Speakers Michael Arny, P.E., LEED AP President & Director of

More information

GEW1-14 Chapter 6, , 302.1, 903.1, 904.3, , , , , , , , A106

GEW1-14 Chapter 6, , 302.1, 903.1, 904.3, , , , , , , , A106 GEW1-14 Chapter 6, 302.1.1, 302.1, 903.1, 904.3, 1007.3, 1007.3.1, 1007.3.2, 1007.3.3, 1007.3.3.1, 1007.3.3.2, 1007.3.3.3, A106 Proponent: Shaunna Mozingo, Colorado Code Consulting, LLC, representing Colorado

More information

Draft Policy for Commissioning/ Retro-Commissioning

Draft Policy for Commissioning/ Retro-Commissioning Draft Policy for Commissioning/ Retro-Commissioning Strategic Plan Task 3.2.4: Deliverable 2.E.3 Funded by: Southern California Edison Company Local Government Strategic Plan Strategies Program 2010 2012

More information

GREEN BUILDING IMPLEMENTATION GUIDELINES

GREEN BUILDING IMPLEMENTATION GUIDELINES PLANNING AND BUILDING SERVICES DEPARTMENT GREEN BUILDING IMPLEMENTATION GUIDELINES Application Materials: A. Discretionary Planning Entitlements. Application materials for all Covered Projects subject

More information

Commissioning Guidelines for the Arkansas Energy Performance Contracting Program

Commissioning Guidelines for the Arkansas Energy Performance Contracting Program Commissioning Guidelines for the Arkansas Energy Performance Contracting Program Version 1.1 March 2014 Arkansas Economic Development Commission Energy Office 900 West Capitol Avenue Little Rock, Arkansas

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Planning, Design & Construction September 24, 2014 Re: Request for Proposals- Commissioning Services Hardin Library for Health Sciences Upgrade Building Systems # University of Iowa

More information

PROJECT DESIGN EVALUATION AND APPROVAL PROCESS DESIGN AND CONSTRUCTION STANDARD

PROJECT DESIGN EVALUATION AND APPROVAL PROCESS DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL 1.01 General Requirements A. These guidelines are intended to provide a framework to evaluate building projects for the University of Texas at Austin to: 1. Verify the feasibility of options

More information

Crawford House Office Building

Crawford House Office Building Page of 4 LEED Certification Review Report This report contains the results of the technical review of an application for LEED certification submitted for the specified project. LEED certification is an

More information

CREDIT COMPLIANCE (Please complete the color coded criteria(s) based on the option path selected)

CREDIT COMPLIANCE (Please complete the color coded criteria(s) based on the option path selected) (Responsible Individual) (Company Name) I,, from verify that the information provided below is accurate, to the best of my knowledge. CREDIT COMPLIANCE (Please complete the color coded criteria(s) based

More information

ASHRAE 90.1 The evolution continues

ASHRAE 90.1 The evolution continues ASHRAE 90.1 The evolution continues 4 March 2009 Mick Schwedler, PE ASHRAE SSPC 90.1 Chair Manager, Trane Applications Engineering Historical Timeline 90.1-1980 updated 90.1-1999 major rewrite 90.1-2001