A Building Commissioning Overview. Presented by: Goetting & Associates Commissioning

Size: px
Start display at page:

Download "A Building Commissioning Overview. Presented by: Goetting & Associates Commissioning"

Transcription

1 A Building Commissioning Overview Presented by: Goetting & Associates Commissioning

2 What is the Definition of Commissioning? Building Commissioning is a Quality Assurance Process of documentation, testing, adjusting, verification, and training performed specifically to ensure that the finished facility operates in accordance with the owner s documented project requirements and the construction documents. Building Commissioning is a scope driven Quality Assurance Process. Commissioning begins in predesign and continues through design, construction, and occupancy of the facility. Commissioning is not a single event placed at the end of the contractor s schedule

3 Commissioning Groups The following industry leaders promote training, publish procedural Standards, offer certification programs and all agree on a process approach BCA-Building Commissioning Assc. NEBB-National Environmental Balancing Bureau ASHRAE PECI-Portland Energy Conservative

4 Types of Commissioning Commissioning Recommissioning Retrocommissioning Continuous Commissioning

5 Commissioning Documents Commissioning Specifications Commissioning Plan Deficiency Log - Commissioning Issues Log - Resolution Log

6 Commissioning The Building Commissioning process has five major phases for new or renovated projects: Pre-Design Design Construction Acceptance Post Acceptance

7 Commissioning Pre-Design Phase Document Owner s Project Requirements Set scope of Commissioning Services Set a budget for commissioning Select Commissioning Authority Create draft Commissioning Plan

8 Commissioning Design Phase Document Basis of Design Refine and detail scope of Commissioning Perform Design Review 30%-50%-95% Update Commissioning Plan Include Commissioning requirements in specifications Assist in preparation of construction documents Assist in preventing overlaps and scope gaps on the project manual

9 Commissioning Construction Phase Final Commissioning Plan & schedule Review Construction submittals Review building control sequences Write Pre-Functional Checklists Write Functional Test procedures Document construction observation Help reconcile discovered issues

10 Commissioning Acceptance Phase Training of O&M Personnel Functional Performance Testing Documentation of deficiencies found during FPT Deficiency correction and retesting Final Report

11 Commissioning Post Acceptance (Warranty) Phase Assist with Maintenance management program Adjust for occupancy/warranty period Off-season tests Possible Lessons-Learned meeting Continuing Commissioning

12 Recommissioning The Recommissioning process is a program that is intended to retest the facility periodically in order to return the building and systems to the original commissioned conditions.

13 Recommissioning Use the same Functional test procedures and documents as used in the original commissioning Prepare a final report Could be an Owner supplied service

14 Retrocommissioning The Retrocommissioning program is designed to commission an existing building that was never initially commissioned. It is a systematic process for investigating, analyzing, and optimizing the performance of building systems by improving the operation and maintenance to ensure the continued performance over time. Retrocommissioning helps make the building systems perform interactively to meet the owner s current facility requirements.

15 Retrocommissioning The Retrocommissioning process has five major phases: Contract Discovery Corrective Action Construction Acceptance

16 Retrocommissioning Contract Phase Commissioning Agent Selection Commissioning project contract

17 Retro Cx Plan Retrocommissioning Discovery Phase Document-Discovery and Review Maintenance Staff Interview Occupant Interview Site Investigation Controls System Investigation Problem Analysis Discovery Phase Report Report Presentation Remedial Design (internal)

18 o Corrective Action Retrocommissioning Corrective Action Phase o Construction Procurement o Construction Cx Scoping Meeting o Prepare Schedule for Cx activities o Submittal and shop drawing review o Finalize Construction Plan o Initiate Prefunctional checks o Meetings as necessary

19 Retrocommissioning Acceptance Phase Complete all Prefunctional checks Perform all operational checks, point to point tests and TAB Functional Performance Testing Prepare final Commissioning Report

20 Continuous Commissioning* All too often building performance declines over time due to unintended side effects of control engineering, operator decisions and equipment wear and tear. Continuous Commissioning is an ongoing process to resolve operating problems, improve comfort, optimize energy use and identify retrofits for existing commercial and institutional buildings and central plant facilities. *As defined by Texas A&M / ESL for the Federal Energy Management Program (FEMP)

21 Continuous Commissioning has 2 Major Phases Phase 1-Project Development Step 1 Identify building or facility Step 2 Audit and Project Scope

22 Continuous Commissioning has 2 Major Phases Phase 2-Implementation and Verification Step 1 - Develop CC plan and team Step 2 - Develop performance base Step 3 - Conduct System Measurements and Proposed CC measures Step 4 - Implement CC Measures Step 5 - Document comfort improvements and energy savings Step 6 - Don t stop, keep on doing it!

23 Commissioning & LEED Certification Increased demand for quality assurance Commissioning is a pre-requisite. Commissioning complements Green Design Means to achieve environmental, economic and health-safety goals resides in the commissioning process Commissioning is an integral component of LEED certification.

24 Commissioning & LEED Certification Commissioning requirements are specific to each LEED Rating System Cx is a prerequisite in: LEED New Construction NC v2.2 LEED for Schools 2007 LEED Commercial Interiors v2.0 LEED Core and Shell v2.0 LEED Retail New construction Pilot v2.0 Commercial Interiors Pilot v1.0

25 Commissioning & LEED Certification Four systems are required to meet minimum prerequisites: HVAC and controls Daylighting and lighting and controls Domestic hot water system Renewables

26 LEED Prereq and Enhanced Timeline

27 LEED for EB: O&M (Site Selection) Site Selection (SS) SS Credit 8: Light Pollution Reduction Electrical Design or Lighting Consultant

28 Water Efficiency (WE) LEED for EB: O&M Water Efficiency (WE) WE Prerequisite 1: Minimum Indoor Plumbing Fixture and Fitting Efficiency Reduce indoor potable water Demonstrate fixture performance (calcs) Policy for upgrades to higher efficient devices WE Credit 1.1: Permanently installed meter for total use WE Credit 1.2: and at least one other systems WE Credit 2.1: 10% potable water reduction (indoor) WE Credit 2.2: 20% potable water reduction (indoor) WE Credit 2.3: 30% potable water reduction (indoor) WE Credit 3.1: 50% landscaping water reduction WE Credit 3.2: 75% landscaping water reduction WE Credit 3.3: 100% landscaping water reduction WE Credit 4.1: Cooling Tower Chemical Management WE Credit 4.2: Cooling Tower Nonpotable Water Source Use

29 LEED for EB: O&M (Energy & Atmosphere) Energy and Atmosphere (EA) EA Prerequisite 1: Energy Efficiency Best Management Practices Planning, documentation and Opportunity Assessment Document SOO Building operation and maintenance plan Create narrative for mechanical and electrical systems Create narrative for preventative maintenance plan ASHRAE Level 1 Energy Audit EA Prerequisite 2: Minimum Energy Efficiency Performance Establish min level of operating efficiency-in conjunction with Credit 1. EA Prerequisite 3: Refrigerant management Ozone Protection Verify non use of CFCs EA Credit 1: Optimize Energy Efficiency Performance Option A: verify Energy Star Rating Option B: Demonstrate 19% energy efficiency over average building Option C: Use alternate method

30 LEED for EB: O&M (Energy & Atmosphere) cont d EA Credit 2.1: Existing Building Commissioning: Investigation and Analysis Option A: Commissioning Process (plan for RetroCx, ReCx or CCx) Option B: ASHRAE Level II Energy Audit EA Credit 2.2: Existing Building Commissioning: Implementation Low cost improvements and capital plan for major retrofits and upgrades Provide training for sustainable building operations Anticipated financial costs and benefits Update the building operating plan EA Credit 2.3: Existing Building Commissioning: Implementation Implement ongoing commissioning program Create a written plan summarizing the overall commissioning cycle Complete 50% of work in the first commissioning cycle Update the building operating plan

31 LEED for EB: O&M (Energy & Atmosphere) cont d EA Credit 3.1: Performance Measurement Have in place Building Automation System EA Credit 3.2: Performance Measurement: System Level Meter Metering in place for at least 40% of annual energy consumption EA Credit 3.3: Performance Measurement: System Level Meter Metering in place for at least 80% of annual energy consumption EA Credit : Renewable Energy 1 to 4 available for on/off site renewable energy EA Credit 5: Refrigerant Management Option A: No refrigerant use Option B: Minimize or eliminate Refrigerants that contribute to ozone depletion EA Credit 6: Emissions Reduction Reporting Identify and report on building performance that reduces energy and emissions.

32 LEED for EB: O&M (Indoor Environmental Quality) EQ Prerequisite 1: Outdoor Air Introduction & Exhaust Systems Option A: Comply with ASHRAE Option B: or maintain at least 10 cfm per person EQ Prerequisite 2: Environmental Tobacco Smoke (ETS) Control Option A: Prohibit smoking Option B: Establish smoking areas under negative pressure Option C: Residential EQ Credit 1.1: IAQ Best Management Practices: IAQ Management Program Develop management program based on EPA I- BEAM

33 LEED for EB: O&M (Indoor Environmental Quality) EQ Credit 1.2: IAQ Best Management Practices: Outdoor Air Delivery Monitoring Provide OA measurement devices CO2 sensors for densely populated areas. EQ Credit 1.3: IAQ Best Management Practices: Increased Ventilation Increase OA at least 30% above ASHRAE EQ Credit 1.3: IAQ Best Management Practices EQ Credit 1.5: IAQ Best Management Practices: Management for Facility Alterations and Additions Implement IAQ management plan for construction and occupancy Filtration for construction and occupancy HVAC and lighting returned to designed SOO EQ 2.1: Occupant Comfort: Occupant Survey Comfort and complaint survey for thermal, acoustics, IAQ, and other issues EQ 2.2: Occupant Comfort: Lighting controls for at least 50% of people EQ 2.2: Occupant Comfort: Thermal Comfort Monitoring Monitor as stated in ASHRAE EQ 2.4: Occupant Comfort: Daylight and Views Achieve 2% daylight factor in 50% of spaces for critical visual tasks.eq 2.5: Occupant Comfort: Daylight and Views. Achieve 2% daylight factor in 75% of spaces for critical visual tasks

34 LEED for EB: O&M (Innovation in Operations) IO Credit 1: Innovation in Operations Credits 1.1 to 1.4 for exemplary or significant performance IO Credit 2: LEED Accredited Professional IO Credit 3: Documenting Sustainable Cost Impacts Document overall building costs for previous 5 years

35 Costs of Commissioning Whole Building from design to acceptance.75 to 1.5% of Construction Cost (average is 1% of Construction cost) HVAC/Automated Controls/Plumbing 2.5 to 4.5% of Mechanical, Controls and Plumbing contracts Electrical Systems ONLY 1.0 to 1.5% of Electrical Contract Origin - USGBC Owner slide show PECI Portland Energy

36 Costs of Commissioning Commissioning Cost as % of total construction cost by project size and type Total Construction cost less than $5 million Cx cost ~ 2%-4% Total Construction cost between $5 - $10 million Cx cost ~ 1%-3% Total Construction cost between $10 - $50 million Cx cost ~ 0.8%-2.0% Total Construction cost greater than $50 million Cx cost ~ 0.5%-1.0% Laboratories and complex buildings Add 0.25% to 1.0% to Cx cost

37 Questions, Comments & Ideas?

Prerequisite. prerequisite.

Prerequisite. prerequisite. LEED v4 for Building Operations and Maintenance Summary of changes from LEED 2009 LOCATION AND TRANSPORTATION SUSTAINABLE SITES Alternative Transportation Site Management Policy LEED Certified Design and

More information

Welcome ESC Educational Webinar Green Performance Contracting

Welcome ESC Educational Webinar Green Performance Contracting Your Webinar will begin shortly. Welcome ESC Educational Webinar Green Performance Contracting For today s webinar support, contact Tony Philips at 601-602-4604 If you have any questions or need additional

More information

LEED Application Guide for Multiple Buildings and On-Campus Building Projects

LEED Application Guide for Multiple Buildings and On-Campus Building Projects LEED Application Guide for Multiple Buildings and On-Campus Building Projects For Use with 2009 LEED Rating Systems for Design and Construction and Operations and Maintenance Released October 31, 2011

More information

HPBS [ HIGH PERFORMANCE BUILDING STANDARD]

HPBS [ HIGH PERFORMANCE BUILDING STANDARD] HPBS [ HIGH PERFORMANCE BUILDING STANDARD] STATE OF MONTANA HIGH PERFORMANCE BUILDING STANDARDS MINIMUM REQUIREMENTS FOR ALL PROJECTS UNDER 17-7-201, MCA PART 2 1.1 DESIGN AND DOCUMENTATION A. Incorporate

More information

How LEED & The Retro-Commissioning Credits Produce Energy Savings. James Vallort Vice President Environmental Systems Design, Inc.

How LEED & The Retro-Commissioning Credits Produce Energy Savings. James Vallort Vice President Environmental Systems Design, Inc. How LEED & The Retro-Commissioning Credits Produce Energy Savings James Vallort Vice President Environmental Systems Design, Inc. Retro-Commissioning Today s session will focus on the following items:

More information

ENERGY AND ENVIRONMENT DESIGN AND CONSTRUCTION STANDARDS ENERGY AND ENVIRONMENT

ENERGY AND ENVIRONMENT DESIGN AND CONSTRUCTION STANDARDS ENERGY AND ENVIRONMENT ENERGY AND ENVIRONMENT The University has committed to approaching new building construction and major renovations with an emphasis on Life Cycle Cost (LCC). Part of this approach is a focus on maximizing

More information

LEED LEED. Leadership in Energy and Environmental Design. A voluntary, consensus-based. high-performance, sustainable buildings and neighborhoods

LEED LEED. Leadership in Energy and Environmental Design. A voluntary, consensus-based. high-performance, sustainable buildings and neighborhoods LEED An Introduction to LEED V3 2009 LEED Leadership in Energy and Environmental Design A voluntary, consensus-based national standard for developing high-performance, sustainable buildings and neighborhoods

More information

2016 LEED Equivalency Analysis for Stanford Campus

2016 LEED Equivalency Analysis for Stanford Campus 6 LEED Equivalency Analysis for Stanford Campus Analysis performed by: Moira Hafer, LEED AP O+M Office of Sustainability Department of Sustainability & Energy Management Stanford University Category Type

More information

Appendix C APPLICATION #: ADDRESS: CITY OF SANTA CRUZ GREEN BUILDING PROGRAM GREEN POINTS CHECK LIST FOR NON-RESIDENTIAL BUILDINGS

Appendix C APPLICATION #: ADDRESS: CITY OF SANTA CRUZ GREEN BUILDING PROGRAM GREEN POINTS CHECK LIST FOR NON-RESIDENTIAL BUILDINGS Appendix C APPLICATION #: ADDRESS: CITY OF SANTA CRUZ GREEN BUILDING PROGRAM GREEN POINTS CHECK LIST FOR NON-RESIDENTIAL BUILDINGS November 2006 Version 2.2 Instructions for Completing Check List Use this

More information

LEED for Operations and Maintenance

LEED for Operations and Maintenance LEED for Operations and Maintenance Bill Green PE, LEED AP Jessie Jones, EIT, LEED AP O+M The RMH Group September 16, 2010 Topics of Discussion Overview of USGBC s LEED Rating System(s) Benefits of LEED

More information

The USGBC booklet, LEED for Existing Buildings: Operations

The USGBC booklet, LEED for Existing Buildings: Operations SPATIALOPERATIONS Is Your Campus ACHIEVING SUSTAINABILITY? We Can Help You Keep Your LEED Certification The USGBC booklet, LEED for Existing Buildings: Operations & Maintenance Recertification Guidance,

More information

LEEDv4: What s New? February 18, 2016

LEEDv4: What s New? February 18, 2016 LEEDv4: What s New? February 18, 2016 CLAYTON BARTCZAK, LEED-AP BD+C Sustainable Design Team Leader TRACEY WHALEY, PE, FPE, CxAP Commissioning Team Leader 2016 Ambient Energy all rights reserved. 2015

More information

What s New in LEED O+M v4: Get Ready for the Future! A Presentation by The Sustainability Experts Leonardo Academy At NFMT Las Vegas

What s New in LEED O+M v4: Get Ready for the Future! A Presentation by The Sustainability Experts Leonardo Academy At NFMT Las Vegas What s New in LEED O+M v4: Get Ready for the Future! A Presentation by The Sustainability Experts Leonardo Academy At NFMT Las Vegas Today s Speakers Michael Arny, P.E., LEED AP President & Director of

More information

DESIGN AND CONSTRUCTION STANDARDS OUTLINE SPECIFICATIONS

DESIGN AND CONSTRUCTION STANDARDS OUTLINE SPECIFICATIONS SECTION 01 91 13 GENERAL COMMISSIONING REQUIREMENTS GENERAL The University of South Alabama is officially and formally committed to the concept of Commissioning all new buildings and major renovations.

More information

LEED 2009 Core and Shell, Commercial Project Summary and Checklist New Construction

LEED 2009 Core and Shell, Commercial Project Summary and Checklist New Construction Date of Application Path Project Project Address Owner Architect Contractor Third Party Provider LEED 2009 Core and Shell, Commercial Project Summary and Checklist New Construction Summary Permit. Provider.

More information

Allowance Table for: General:

Allowance Table for: General: Allowance Table for: Adopting Credits from LEED Canada for New Construction and Major Renovations (NC) 2009 and LEED Canada for Core and Shell Development (CS) 2009 for LEED Canada-NC v1.0 (with or without

More information

A. General Design and Construction Requirements

A. General Design and Construction Requirements A. General Design and Construction Requirements 1. Introduction This portion of the Facility Standards includes general design and construction requirements for use by the Consultant in the course of a

More information

LEED v4: the program

LEED v4: the program LEED v4: the program LEED v4: Where are we now? Engagement Completed six public comment periods Received over 22,000 public comments Over 70 projects enrolled in LEED v4 Beta Program Program Tools Development

More information

THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS

THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS SUSTAINABLE DESIGN FORM 010.901 REV 1211 THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS SUSTAINABLE DESIGN GUIDE StopWaste.Org LEED-NC Platinum Energy Foundation LEED-CI Platinum Adobe East Tower LEED-EB

More information

LEED EB:OM Credit Catagories

LEED EB:OM Credit Catagories LEED EB:OM Credit Catagories Engr Theresa Palma-Austria, LEED AP O+M Arch Laurice Orillano-Ayab, LEED GA LEED for Existing Buildings : Operations & Maintenance Barone International LEED EB:OM Categories

More information

Crawford House Office Building

Crawford House Office Building Page of 4 LEED Certification Review Report This report contains the results of the technical review of an application for LEED certification submitted for the specified project. LEED certification is an

More information

500 WEST PUTNAM AVENUE GREENWICH, CT

500 WEST PUTNAM AVENUE GREENWICH, CT LEED-CI ANALYSIS June 2015 500 WEST PUTNAM AVENUE GREENWICH, CT To learn more please visit the sustainability section of our website: www.slgreen.com or contact Jay Black, SL Green s director of sustainability

More information

Green Building Rating System

Green Building Rating System An Introduction to the U.S. Green Building Council and the LEED TM Green Building Rating System March 2004 U.S. Green Building Council The nation's foremost coalition of leaders from across the building

More information

Building Commissioning

Building Commissioning Building Commissioning Roles, Responsibilities, and Benefits 2010 ASHRAE Annual Meeting CxA WORKSHOP Saturday, June 26, 2010 Jim Magee, CxA, LEED-AP Facility Commissioning Group Overview Cx Advocacy, Economics,

More information

and LEED Energy and Atmosphere Credits Jean Ascoli, LEED AP BD+C Architect, Energy Specialist

and LEED Energy and Atmosphere Credits Jean Ascoli, LEED AP BD+C Architect, Energy Specialist ASHRAE University of Illinois Student Chapter April 20, 2011 Building Energy Efficiency and LEED Energy and Atmosphere Credits Jean Ascoli, LEED AP BD+C Architect, Energy Specialist Building Research Council,

More information

Green Globes NC Criteria Comparison to LEED 2009 and LEED v4

Green Globes NC Criteria Comparison to LEED 2009 and LEED v4 Comparison of the Criteria for the New Release of for New Construction ( ),, and (As of 02/02/15) Overview of and Certification Requirements Both versions of have prerequisites for certification, and certification

More information

DIRECTIVE 15H-9 Issue date: October 2018 COMMISSIONING

DIRECTIVE 15H-9 Issue date: October 2018 COMMISSIONING DIRECTIVE 15H-9 Issue date: October 2018 COMMISSIONING Purpose: The purpose of this Directive is to describe, in outline, the requirements of Commissioning on SUCF Projects. 1. Applicability a. New York

More information

Table of Contents Green Associate Study Guide LEED v4 First Edition

Table of Contents Green Associate Study Guide LEED v4 First Edition CHAPTER 1 1 Introductory conversations into sustainable design and construction and the associated benefits of the roles of the LEED AP and LEED rating systems Introduction 1 About the Studio4 LEED Green

More information

How LEED v4 Impacts Energy Professionals and Mirrors Broader Sustainability Trends. Dan LeBlanc Senior Sustainability Manager

How LEED v4 Impacts Energy Professionals and Mirrors Broader Sustainability Trends. Dan LeBlanc Senior Sustainability Manager How LEED v4 Impacts Energy Professionals and Mirrors Broader Sustainability Trends Dan LeBlanc Senior Sustainability Manager dleblanc@yrgxyz.com LEED CERTIFICATION TRENDS MARKET SECTOR ADAPTATIONS Data

More information

LEED 2009 for Commercial Interiors. Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP

LEED 2009 for Commercial Interiors. Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP LEED 2009 for Commercial Interiors Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP Homes Commercial Interiors Core & Shell New Construction Schools Healthcare Existing Building Operations

More information

LEED 2009 for New Construction and Major Renovations

LEED 2009 for New Construction and Major Renovations LEED 2009 for New Construction and Major Renovations Bayshore District Operations Building Project Checklist 4.28.6 20 4 0 Sustainable Sites Possible Points: 26 Y? N d/c Notes: Y C Prereq Construction

More information

CALGreen & Commissioning: Challenges & Opportunities

CALGreen & Commissioning: Challenges & Opportunities CALGreen & Commissioning: Challenges & Opportunities Maia Speer, Guttmann & Blaevoet 21 st National Conference on Building Commissioning Presentation Description The California Green Building Standards

More information

L E E D S C O R E C A R D ( B U I L D I N G D E S I G N & C O N S T R U C T I O N )

L E E D S C O R E C A R D ( B U I L D I N G D E S I G N & C O N S T R U C T I O N ) Project Zip Code: 92101 Project Anticipated Rating: LEED-NC Gold L E E D 2 0 0 9 S C O R E C A R D ( B U I L D I N G D E S I G N & C O N S T R U C T I O N ) 62 22 26 Project Totals A-Achieved X-Documented

More information

Process. Montreal ASHRAE. NEBB Immediate Past-President

Process. Montreal ASHRAE. NEBB Immediate Past-President Retrocommissioning Process Montreal ASHRAE Steve Wiggins NEBB Immediate Past-President 770-335-3655 swiggins@newcomb-boyd.com 1 Retrocommissioning Experience: Working in Facilities Since 1975. Began Developing

More information

LEED-CI ANALYSIS 115 STEVENS AVENUE VALHALLA, NY

LEED-CI ANALYSIS 115 STEVENS AVENUE VALHALLA, NY LEED-CI ANALYSIS June 2015 115 STEVENS AVENUE VALHALLA, NY To learn more please visit the sustainability section of our website: www.slgreen.com or contact Jay Black, SL Green s director of sustainability

More information

LEED for Existing Buildings:

LEED for Existing Buildings: LEED for Existing Buildings: Operations and Maintenance 101 0 Agenda 1. Overview of changes to LEED-EBOM 2009 3. Assessing Building Opportunities Building Exterior and Site Water Efficiency Energy & Atmosphere

More information

10. LEED RATING EVALUATION

10. LEED RATING EVALUATION 0. LEED RATING EVALUATION In order to quantify the green-ness of a building, the United States Green Building Council (USGBC) utilizes a point system for sustainable design elements. The total points a

More information

Commissioning & Retro-Commissioning Helping You Get the Most of Your Facilities

Commissioning & Retro-Commissioning Helping You Get the Most of Your Facilities Commissioning & Retro-Commissioning Helping You Get the Most of Your Facilities John Rimer, CFM Introduction John Rimer, CFM 16+ Years Facility Management Numerous Industries & Various Roles Owner, FM360

More information

The Application of LEED Green Building Rating System in Indonesia

The Application of LEED Green Building Rating System in Indonesia The Application of LEED Green Building Rating System in Indonesia Baharuddin Hasanuddin University, Faculty of Engineering, Department of Architecture, Makassar-Indonesia baharsyah@yahoo.com Abstract:

More information

Fact Sheet. Commissioning WHAT IS THE PURPOSE OF THIS REQUIREMENT? WHAT VALUE DOES IT PROVIDE TO THE OWNER? HOW DOES IT SAVE ENERGY?

Fact Sheet. Commissioning WHAT IS THE PURPOSE OF THIS REQUIREMENT? WHAT VALUE DOES IT PROVIDE TO THE OWNER? HOW DOES IT SAVE ENERGY? Commissioning Fact Sheet Funding for this publication is provided by the Northwest Energy Efficiency Alliance. OCTOBER 2017 VOLUME 1, ISSUE 2 WHAT IS THE PURPOSE OF THIS REQUIREMENT? There is a saying

More information

LEED Application Guide for Multiple Buildings and On Campus Building Projects

LEED Application Guide for Multiple Buildings and On Campus Building Projects LEED Application Guide for Multiple Buildings and On Campus Building Projects For Use with 2009 LEED Rating Systems for Design and Construction and Operations and Maintenance Released October 31, 2011

More information

Commissioning Green Buildings

Commissioning Green Buildings Commissioning Green Buildings Hazem Elzarka, PhD, PE, LEED AP University of Denver Denver, CO, USA Owners are increasingly recognizing building commissioning as an effective means of ensuring quality and

More information

Commissioning & Retro-Commissioning Meet Energy Code

Commissioning & Retro-Commissioning Meet Energy Code Commissioning & Retro-Commissioning Meet Energy Code Agenda Introductions What is Commissioning Value of Commissioning Code Required Cx Process Customize your Cx Process What documentation should be expected

More information

Title: In-House Green Building Certification Supporting Documentation Issued by: Sustainability Department (Green Building Department)

Title: In-House Green Building Certification Supporting Documentation Issued by: Sustainability Department (Green Building Department) Guideline No.: GB/007 Issue Date: 1/04/2013 Title: In-House Green Building Certification Supporting Documentation Issued by: Sustainability Department (Green Building Department) Introduction This document

More information

Sustainable Sites (SS): where the building is located matters. SSc1 Site Selection

Sustainable Sites (SS): where the building is located matters. SSc1 Site Selection The 425 Cherry Street, SE, Grand Rapids, MI location of Planned Parenthood is seeking LEED certification. The USGBC created the LEED rating systems to support the choice to build green and to provide third

More information

Introduction to LEED v4 Lyle Scott May 22, 2014

Introduction to LEED v4 Lyle Scott May 22, 2014 Introduction to LEED v4 Lyle Scott May 22, 2014 Agenda Introduction to LEED v4 Taking a Global Approach New and More Stringent Major & Resources Introduction to LEED v4 Global Approach LEED Online Alternative

More information

DIRECTIVE 1B-7 Issue date: October Energy, Sustainability, LEED and Executive Orders

DIRECTIVE 1B-7 Issue date: October Energy, Sustainability, LEED and Executive Orders DIRECTIVE 1B-7 Issue date: October 2017 Energy, Sustainability, LEED and Executive Orders As of December 28, 2012, Executive Order No. 88 (E.O. 88) replaced E.O.111 ( Green and Clean State Buildings and

More information

THE ECONOMICS OF LEED FOR EXISTING BUILDINGS FOR INDIVIDUAL BUILDINGS 2008 EDITION A WHITE PAPER APRIL 21, 2008

THE ECONOMICS OF LEED FOR EXISTING BUILDINGS FOR INDIVIDUAL BUILDINGS 2008 EDITION A WHITE PAPER APRIL 21, 2008 THE ECONOMICS OF LEED FOR EXISTING BUILDINGS FOR INDIVIDUAL BUILDINGS 2008 EDITION A WHITE PAPER BY LEONARDO ACADEMY INC. APRIL 21, 2008 THIS WHITE PAPER SPONSORED BY JOHNSON CONTROLS This is a Leonardo

More information

What Contractors Need to Know about LEED Commissioning & IAQ Management

What Contractors Need to Know about LEED Commissioning & IAQ Management What Contractors Need to Know about LEED Commissioning & IAQ Management Presented by Energy Ace, Inc. Wayne Robertson, PE, CxA What is Commissioning? Commissioning is a systematic process of assuring that

More information

Above: Northwest corner Below: Southwest corner

Above: Northwest corner Below: Southwest corner Above: Northwest corner Below: Southwest corner Above: Northeast corner (Former Ice House) Below: Southeast corner (Parking garage) Above: Office main entry along Third Street Below: South courtyard showing

More information

CE Option 1 and 2 - Provide the pre-development site run -off rate (cfs) CE Option 1 and 2 - Provide the pre-development site run -off quantity (cf)

CE Option 1 and 2 - Provide the pre-development site run -off rate (cfs) CE Option 1 and 2 - Provide the pre-development site run -off quantity (cf) LEED - 2009 for Retail - New and Major Renovations HINESBURG, VERMONT DPM Des.Proj.Mngr Mech., Elect., Plumbing Issued: 12-17-2010 Civil Eng. GC-S General Contractor - Site Revised: 4-9-12 Tasklist for

More information

LEED-CI ANALYSIS 4 LANDMARK SQUARE STAMFORD, CT

LEED-CI ANALYSIS 4 LANDMARK SQUARE STAMFORD, CT LEED-CI ANALYSIS June 2015 4 LANDMARK SQUARE STAMFORD, CT To learn more please visit the sustainability section of our website: www.slgreen.com or contact Jay Black, SL Green s director of sustainability

More information

COMMISSIONING for LEED New and Existing Buildings

COMMISSIONING for LEED New and Existing Buildings Better Buildings By Design Conference Burlington, Vermont February 11-12. COMMISSIONING for LEED New and Existing Buildings Ron Wilkinson, P.E., LEED AP rwilkinson@akf-eng.com AKF Group, LLC What is Commissioning?

More information

Absolute Energy Raters Commissioning Plan Outline Template

Absolute Energy Raters Commissioning Plan Outline Template IMPORTANT NOTICE: This sample document is provided for instructional purposes only. Absolute Energy Raters is not rendering advice concerning any commission project or practices. This document is neither

More information

LEED-CI ANALYSIS 1 LANDMARK SQUARE STAMFORD, CT

LEED-CI ANALYSIS 1 LANDMARK SQUARE STAMFORD, CT LEED-CI ANALYSIS June 2015 1 LANDMARK SQUARE STAMFORD, CT To learn more please visit the sustainability section of our website: www.slgreen.com or contact Jay Black, SL Green s director of sustainability

More information

6/4/2014. LEED Projects are

6/4/2014. LEED Projects are LEED Projects are responsible for over 80 million tons of waste diverted landfills in the 11 th percennle in the U.S. in terms of energy usage 57% lower Source Energy use intensity than the nanonal average

More information

Green Buildings, and LEED Certification. By Mohammad Tassi, BME, MEM, LEED AP, CxA, USGBC Faculty Sustainability & LEED Consultant

Green Buildings, and LEED Certification. By Mohammad Tassi, BME, MEM, LEED AP, CxA, USGBC Faculty Sustainability & LEED Consultant Green Buildings, and LEED Certification OUTLINE INTRODUCTION By Mohammad Tassi, BME, MEM, LEED AP, CxA, USGBC Faculty Sustainability & LEED Consultant President of Lebanese ASHRAE Chapter Senior Project

More information

LEED-CI ANALYSIS 6 LANDMARK SQUARE STAMFORD, CT

LEED-CI ANALYSIS 6 LANDMARK SQUARE STAMFORD, CT LEED-CI ANALYSIS June 2015 6 LANDMARK SQUARE STAMFORD, CT To learn more please visit the sustainability section of our website: www.slgreen.com or contact Jay Black, SL Green s director of sustainability

More information

ASHRAE/USGBC/IES Standard What Does It Mean for Commissioning Providers?

ASHRAE/USGBC/IES Standard What Does It Mean for Commissioning Providers? ASHRAE/USGBC/IES Standard 189.1-2009 What Does It Mean for Commissioning Providers? Kent W. Peterson, PE, FASHRAE, LEED AP P2S Engineering, Inc. kent.peterson@p2seng.com What is Standard 189.1? ANSI standard

More information

Construction Specifications Canada Conference May 23, BOMA BESt

Construction Specifications Canada Conference May 23, BOMA BESt Construction Specifications Canada Conference May 23, 2013 BOMA BESt Creating a sustainable environment one building at a time. BOMA Calgary BOMA Canada BOMA Calgary BOMA BESt local administrator BOMA

More information

SKILLS INVENTORY FOR BUILDING OPERATORS

SKILLS INVENTORY FOR BUILDING OPERATORS SKILLS INVENTORY FOR BUILDING OPERATORS Building operations is a dynamic, evolving profession. There are significant changes with regards to new skills, behaviors, and knowledge. The building operator

More information

Green Buildings at Harvard

Green Buildings at Harvard Green Buildings at Harvard Harvard Climate Collaborative Nathan Gauthier November 24, 2008 Sustainable Design and Construction Success Stories Rockefeller Hall 5 Cowperthwaite St. Dunster / Mather Kitchen

More information

Sustainable Design A DIVISION OF SHIVE-HATTERY

Sustainable Design A DIVISION OF SHIVE-HATTERY Sustainable Design A DIVISION OF SHIVE-HATTERY our transition to sustainability must be a deliberate choice to leave the linear surge of an extractive economy and enter a circulating, renewable one. Janine

More information

Every Building Can Be Green

Every Building Can Be Green Every Building Can Be Green BC Hydro PowerSmart Forum Vancouver October 15, 2009 Canada s 2007 Greenhouse Gas Inventory CaGBC Leadership Goals Verified 50% reduction in median energy & water use over 2005

More information

CxA Gap Session. April 25, :00 p.m. 4:30 p.m. Instructors: Derek De Jesús, CxA, LEED AP Darren Draper, PE, CxA, LEED AP

CxA Gap Session. April 25, :00 p.m. 4:30 p.m. Instructors: Derek De Jesús, CxA, LEED AP Darren Draper, PE, CxA, LEED AP CxA Gap Session April 25, 2017 2:00 p.m. 4:30 p.m. Instructors: Derek De Jesús, CxA, LEED AP Darren Draper, PE, CxA, LEED AP AIA Provider Number 50111116 Course Description This session and short quiz,

More information

LEED Project Delivery Process Manual Appendices

LEED Project Delivery Process Manual Appendices LEED Project Delivery Process Manual Appendices November 2016 Second Edition Appendices Page Appendix 1: Other Alberta Requirements and Green Building Standards 3 Appendix 2: Integrated Design Process

More information

LEED And Your Indoor Environment

LEED And Your Indoor Environment LEED And Your Indoor Environment An overview of LEED v3 and Indoor Air Quality David McCauley, CIE Council Certified Indoor Environmentalist ACAC CIE #1008005 USGBC's Mission To transform the way buildings

More information

George Bourassa, National Director, Commissioning Services Robert Bucey, Program Manager RETRO-COMMISSIONING

George Bourassa, National Director, Commissioning Services Robert Bucey, Program Manager RETRO-COMMISSIONING George Bourassa, National Director, Commissioning Services Robert Bucey, Program Manager RETRO-COMMISSIONING AIA Quality Assurance Learning Objectives Demonstrate global results of the analysis of energy

More information

Analysis 1. LEED Analysis of Laboratory Buildings. Penn State School of Forest Resources University Park, PA

Analysis 1. LEED Analysis of Laboratory Buildings. Penn State School of Forest Resources University Park, PA Analysis 1 LEED Analysis of Laboratory Buildings Background The LEED program (Leadership in Energy and Environmental Design) established by the U.S. Green Building Council is becoming the standard by which

More information

NAVY LEED COMMISSIONING NAVFAC Symposium 1 December 2010 David Bylund AIA LEED-AP Architects Hawaii

NAVY LEED COMMISSIONING NAVFAC Symposium 1 December 2010 David Bylund AIA LEED-AP Architects Hawaii NAVY LEED COMMISSIONING 2010 NAVFAC Symposium 1 December 2010 David Bylund AIA LEED-AP Architects Hawaii INTRODUCTION LEED v3 Navy & Sustainability Commissioning Lessons Learned LEED v3 LEED v3 LEED v3

More information

How to Interpret this Report

How to Interpret this Report How to Interpret this Report Purpose The Leadership in Energy and Environmental Design (LEED) Rating System was designed by the US Green Building Council to encourage and facilitate the development of

More information

LEED. Leadership in Energy and Environmental Design

LEED. Leadership in Energy and Environmental Design LEED Leadership in Energy and Environmental Design GREEN BUILDING In years past, the theory of high performance green buildings was hard to define and the practice even more obscure. All of that is rapidly

More information

How to Select a Project for the New LEED-EB Program

How to Select a Project for the New LEED-EB Program How to Select a Project for the New LEED-EB Program Robin Smith Emory University Synopsis Much has been written about the LEED-EB program and the fact that the market for LEED-EB is estimated to be over

More information

Retrocommissioning Within the U.S. Green Building Council s LEED for Existing Buildings (LEED-EB) Certification System

Retrocommissioning Within the U.S. Green Building Council s LEED for Existing Buildings (LEED-EB) Certification System Retrocommissioning Within the U.S. Green Building Council s LEED for Existing Buildings (LEED-EB) Certification System Eric Baxter, Hannah Friedman, Larry Luskay, and Tudi Haasl, Portland Energy Conservation,

More information

CITY COUNCIL AGENDA REPORT

CITY COUNCIL AGENDA REPORT CITY COUNCIL AGENDA REPORT Subject: COUNCIL MOTION SUSTAINABLE BUILDINGS On March 2, 2015 Councillor Prefontaine provided notice in accordance with Section 23 of Procedure Bylaw 35/2009 that he intended

More information

LEED-EB Checklist. Sustainable Sites - 14 points 3/9/ Documentation Required. Not Pursued Key Party. Purchase Record. Targeted.

LEED-EB Checklist. Sustainable Sites - 14 points 3/9/ Documentation Required. Not Pursued Key Party. Purchase Record. Targeted. Sustainable Sites - 4 points Map(s) ord Prereq Erosion & Sedimentation Control Required TC/JR/ BM X X X Prereq 2 Age of Building Required JJ X Credit. Green Site & Building Exterior Management, 4 actions

More information

LEED BD+C: NC, CS, S, R, DC, WDC, HOS, HC

LEED BD+C: NC, CS, S, R, DC, WDC, HOS, HC LEED Building Design and Construction Activity #6 Energy and Atmosphere (EA) Before completing this Activity Read: Reference Guide for Building Design and Construction v4 Pages 318-465 Note the following

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Planning, Design & Construction September 24, 2014 Re: Request for Proposals- Commissioning Services Hardin Library for Health Sciences Upgrade Building Systems # University of Iowa

More information

Update on LEED v3. All projects registered after June 26, 2009 must be under the guidelines of LEEDv3. A LEEDv3 summary of changes:

Update on LEED v3. All projects registered after June 26, 2009 must be under the guidelines of LEEDv3. A LEEDv3 summary of changes: Update on v3 September 9, 2009 GP #7 The Green Building Rating system was recently updated and re-introduced April 27, 2009 as v3. This Green Piece will outline the major changes to the rating system and

More information

ENGINEERING AND CONSTRUCTION BULLETIN

ENGINEERING AND CONSTRUCTION BULLETIN ENGINEERING AND CONSTRUCTION BULLETIN No. 2016-29 Issuing Office: CECW-CE Issued: 13 Dec 16 Expires: 13 Dec 18 SUBJECT: Lessons Learned from LEED v4 Pilot Projects CATEGORY: For Information 1. References:

More information

LEED v4 LEED BD+C Credit-by-Credit Review

LEED v4 LEED BD+C Credit-by-Credit Review LEED v4 LEED BD+C Credit-by-Credit Review Location & Transportation Sustainable Sites Water Efficiency Energy & Atmosphere Materials & Resources Indoor Environmental Quality Innovation & Integrative Process

More information

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations LEEDv4 Guideline February 1, 2017 Tony Sparks David Ritchey Stuart Ingham Karen Alarid Kris Callori Noreen Richards

More information

Commissioning. National Training for Commissioning, Presented By Paul Sra and Mike Cavan

Commissioning. National Training for Commissioning, Presented By Paul Sra and Mike Cavan Commissioning National Training for Commissioning, 2006 Presented By Paul Sra and Mike Cavan 1 Scope of Presentation Commissioning overview Commissioning requirements for LEED Standard Roles and responsibilities

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma LEED Green Building Certification The purpose of the LEED Green Building Rating is to provide a national standard that aims to improve environmental, health and economic performance of buildings using

More information

LEED for Commercial Interiors

LEED for Commercial Interiors LEED-CI LEED for Commercial Interiors Kim Lam Renee Webley What is the LEED-CI Rating System? The benchmark for tenant improvements of new or existing office space. An integrated design tool that sets

More information

30 LEED O+M Documentation Mistakes to Avoid

30 LEED O+M Documentation Mistakes to Avoid 30 LEED O+M Documentation Mistakes to Avoid Copyright The content of this course is the copyrighted property of Green Building Education Services, LLC. Reproduction or distribution of this presentation

More information

CONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability

CONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability 01352 Sustainable Design Requirements This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications

More information

Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1

Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1 Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1 Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam

More information

BGSU Construction Standards Office of Design & Construction Bowling Green State University

BGSU Construction Standards Office of Design & Construction Bowling Green State University TABLE O CONTENTS: ENERGY MANAGEMENT GUIDELINE... 1 PURPOSE... 1 REERENCES... 1 GENERAL... 1 1. ENERGY CONSERVATION GOALS... 1 2. ENERGY MODELING & ANALYSIS.... 3 3. MEASUREMENT AND VERIICATION (M&V)...

More information

Commissioning Cx High Performance Facilities Green Projects-LEED

Commissioning Cx High Performance Facilities Green Projects-LEED Background High Performance Facilities Green Projects-LEED 15-or-so-Best Practices Thoughts & Ideas Glin W. Jay, CFM, CFMJ, PMP, IFMA Fellow Characteristics of FM O&M Models Deferred Industry Standard

More information

Understanding LEED for Homes v4

Understanding LEED for Homes v4 Understanding LEED for Homes v4 A Nine Part Series Module #8: IN/RP Continuing Education 1 Hour per course 9 Hours total Local Contractor/Architect may be applicable USGBC Education Provider Formerly Founded

More information

10 LEED STRATEGIES FACILITY MANAGERS CAN USE

10 LEED STRATEGIES FACILITY MANAGERS CAN USE 10 LEED STRATEGIES FACILITY MANAGERS CAN USE A GENSLER PRESENTATION APRIL 19, 2012 WHAT DEFINES SUSTAINABILITY? Meeting the needs of the present without compromising the ability of future generations to

More information

California State University, Sacramento February 24, 2010

California State University, Sacramento February 24, 2010 Leadership in Energy and Environmental Design (LEED) California State University, Sacramento February 24, 2010 Lower Operating Costs Reduce Energy Use Conserve Water Lower Maintenance Customer/Occupant

More information

PROJECT DESIGN EVALUATION AND APPROVAL PROCESS DESIGN AND CONSTRUCTION STANDARD

PROJECT DESIGN EVALUATION AND APPROVAL PROCESS DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL 1.01 General Requirements A. These guidelines are intended to provide a framework to evaluate building projects for the University of Texas at Austin to: 1. Verify the feasibility of options

More information

General Information. Building Name: RPUID #: Address: UFC Requirement 4-2 EMPLOY INTEGRATED ASSESSMENT, OPERATION, AND MANAGEMENT PRINCIPLES.

General Information. Building Name: RPUID #: Address: UFC Requirement 4-2 EMPLOY INTEGRATED ASSESSMENT, OPERATION, AND MANAGEMENT PRINCIPLES. HPSB Score sheet (Draft 09 July 2013 Questions) UFC 1-200-02 High Performance Sustainable Building Requirements Compliance Verification General Information Building Name: RPUID #: Address: UFC Requirement

More information

2. LEED for Interior Design + Construction credit-by-credit changes

2. LEED for Interior Design + Construction credit-by-credit changes NORTHERN CALIFORNIA 1. LEED v4 General Changes 2. LEED for Interior Design + Construction credit-by-credit changes a. Intro to Integrative Design Process b. Intro to Materials Transparency Credits 3. Q&A

More information

2008 Questions & Solutions Engineering, Inc.

2008 Questions & Solutions Engineering, Inc. BNP Media is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES Records for AIA members. Certificates

More information

Owner s Project Requirements for Federal Guiding Principles for High Performance and Sustainable Buildings

Owner s Project Requirements for Federal Guiding Principles for High Performance and Sustainable Buildings Owner s Project Requirements for Federal Guiding Principles for High Performance and Sustainable Buildings Project: Weaver Mountain Fire Station, L140D00737 Location: 33501 South Highway 89, Wickenburg,

More information

Special Mention, Architecture + Sustainability

Special Mention, Architecture + Sustainability Awards 2013 LOS ANGELES BUSINESS COUNCIL DESIGN AWARDS Grand Prize INTERNATIONAL INTERIOR DESIGN ASSOCIATION / SOUTHERN CALIFORNIA CALIBRE AWARDS Workplace Medium SAN FERNANDO VALLEY BUSINESS JOURNAL COMMERCIAL

More information

COLGATE UNIVERSITY'S

COLGATE UNIVERSITY'S 2015 COLGATE UNIVERSITY'S GREEN BUILDING STANDARDS Colgate University 13 Oak Drive Hamilton, NY 13346 Colgate University 2015 Table of Contents SECTION 1: Introduction... 4 1. Goals and Objectives... 5

More information