1 POLLUTION REDUCTION PLAN (PRP) FOR PLUM BOROUGH PA BOROUGH OF PLUM 4575 NEW TEXAS ROAD PITTSBURGH, PA PREPARED FOR: PA DEPARTMENT OF ENVIRONMENTAL PROTECTION JULY, 2017 PREPARED BY:
2 POLLUTION REDUCTION PLAN (PRP) PLUM BOROUGH, PA INTRODUCTION: The purpose of this Pollution Reduction Plan (PRP) is to develop a strategy to decrease the amount of harmful sediment and nutrients going into impaired streams from Plum Borough stormwater discharges. Stormwater discharge can be produced by many different ways including outfalls, roadway runoff, swales, roof drains from structures, sheet flow into streams and other things of that nature. A PRP for Plum Borough is required by the DEP in conjunction with the Municipal Separate Storm Sewer System (MS4) program and General Permit requirements. TABLE OF CONTENTS: SECTION A PUBLIC PRECIPITATION: PAGE 1 SECTION B MAPPING PAGE 2 SECTION C POLLUTANTS OF CONCERN PAGE 3 SECTION D DETERMINE EXISTING LOADING FOR POLLUTANTS OF CONCERN PAGE 4 SECTION E BMPS TO ACHIEVE THE MINIMUM REQUIRED REDUCTIONS IN POLLUTANT LOADING PAGE 5 9 SECTION F IDENTIFY FUNDING MECHANISMS PAGE 10 SECTION G RESPONSIBLE PARTIES FOR OPERATION AND MAINTENANCE (O&M) OF BMPs PAGE 10 APPENDIX: A PLUM BOROUGH PRP MAP PAGE 11 B SECTION A PUBLIC PRECIPITATION: O BLOCK RD FLOOD CONTROL PLAN As per DEP requirements, this plan has been made available to the public. We encourage any resident to provide comments on the report and/or provide any general suggestions you have to help reduce harmful sediments and nutrients to our streams. Comments can be sent directly via to cprokopik@mitallengineering.com. The comments and suggestions will be added to this report before submitting the final report to the DEP on September 16, P age
3 SECTION B MAPPING Plum Borough was analyzed using GIS software and information provided by the DEP to determine the urban areas of Plum Borough. Out of the 18,560 acres that makes up Plum Borough, 11,114 acres are considered urban areas. The urban areas of Plum Borough are illustrated in the picture below (PIC #1). Out of the 11,114 acres of urban areas, 1,062 acres are considered to be impervious and 10,052 acres are pervious. In the appendix (A) is an overall PRP map of Plum Borough that goes into greater detail of the different aspects of this report. The HUC 12 (Subwatersheds) that were considered in this report are Plum Creek, Haymakers Run Turtle Creek, and Thompson Run due to the fact these sub watersheds are within Plum Borough limits and within the urban area. These subwatersheds were separated into three different PRP s (#1, #2 & #3 respectively) within this report. Pucketa Creek was not considered in the report because only 5 acres are within the urban area of Plum. Allegheny River watershed was also not considered because no urban area of Plum runs to an impaired stream of the Allegheny River watershed. PIC #1 2 P age
4 SECTION C POLLUTANTS OF CONCERN Based on the DEP s Developed Land Loading Rates for PA Counties, Plum s current loading rates were calculated. Loading rates are split into three different categories which include TN (Total Nitrogen), TP (Total Phosphorus) & TSS (Total Suspended Solids). Per DEP guidelines, only the TP and TSS reduction were considered in the PRPs. The table below (TABLE #1) displays an overview of the Plum Borough system as a whole and demonstrates how the loading rates and required reductions were calculated: TABLE #1 As per DEP guidelines, Plum Borough s PRPs were developed for impaired waters (Appendix E). The pollutant(s) are based on the impairment listing as provided in the MS4 Requirements Table (TABLE #2, shown below). TABLE #2 MS4 Name Permit # HUC 12 Name ALLEGHENY COUNTY PLUM BORO PAG Brush Creek, Haymakers Run Turtle Creek, Sawmill Run Turtle Creek, Thompson Run Plum Creek, Pucketa Creek Allegheny River Ohio River, Chartiers Run Allegheny River Turtle Creek, Sawmill Run Turtle Creek, Thompson Run Plum Creek Impaired Dowstream Waters or Applicable TMDL Name Thompson Run, Turtle Creek Little Plum Creek, Plum Creek, Pucketa Creek Allegheny River Piersons Run, Turtle Creek, Unnamed Tributaries to Thompson Run Little Plum Creek, Plum Creek, Unnamed Tributaries to Little Plum Creek Requirement(s) Appendix A Metals, ph Appendix E Nutrients, Siltation Appendix C Chlordane, PCB Appendix E Nutrients, Siltation Appendix A Metals, ph If the impairment is based on siltation only, a minimum 10% sediment reduction is required. If the impairment is based on nutrients a minimum 5% TP reduction is required. If the impairment is due to both siltation and nutrients, both sediment (10% reduction) and TP (5% reduction) must be addressed. PRP s may use a presumptive approach in which it is assumed that a 10% sediment reduction will also accomplish a 5% TP reduction. However, MS4s may not presume that a reduction in nutrients will accomplish a commensurate reduction in sediment. In the Plum Boro MS4 Requirement table above, the HUC 12 name, Impaired Downstream Waters or Applicable TMDL Name and Requirements are highlighted in yellow to indicate what areas were considered for the reduction requirements in the PRP s. 3 Page
5 SECTION D DETERMINE EXISTING LOADING FOR POLLUTANTS OF CONCERN Based upon the information shown in TABLE #1 and using the DEP simplified method, the required reductions were applied to all three subwatershed based upon their areas. The calculations for the reductions within each subwatershed is shown below in TABLE #3. TABLE #3 4 P age
6 SECTION E BMPS TO ACHIEVE THE MINIMUM REQUIRED REDUCTIONS IN POLLUTANT LOADING Plum Borough has many existing structural BMPs that were implemented prior to development of the PRP that can be credited toward reducing loading estimates. As per DEP instructions, if the sediment is reduced by 10% then sufficient reduction requirements for Phosphorus and Nitrogen are met as well. The remainder of the report focuses on accomplishing the 10% reduction strictly in sediment (TSS). The BMPs and their existing Load reductions are listed below (TABLE #4a, 4b & 4c) and shown on the overall map in the appendix for each watershed PRP. The following tables and pictures are as followed: TABLE #4A: Plum Creek Existing BMPs and Load Reduction calculations (PRP #1) TABLE #4B: Turtle Creek Existing BMPs and Load Reduction calculations (PRP #2) TABLE #4C: THOMPSON RUN Existing BMPs and Load Reduction calculations (PRP #3) TABLE #5: APPENDIX: Updated Loading Estimate for Plum Borough A Overall map of Plum with the locations of the BMPs within all three PRP areas. 5 P age
7 TABLE #4A: Plum Creek Existing BMPs and Load Reduction calculations (PRP #1) 6 P age
8 TABLE #4B: Turtle Creek Existing BMPs and Load Reduction calculations (PRP #2) TABLE #4C: THOMPSON RUN Existing BMPs and Load Reduction calculations (PRP #3) 7 P age
9 The table below shows the updated loading calculations from TABLE #3 factoring in the load reductions from Plum s existing BMPs (TABLE# 4A, 4B & 4C). TABLE #5: Updated Loading Estimate for Plum Borough 8 P age
10 As demonstrated in the table above the only watershed that the existing sediment reduction is not met is the Turtle Creek Watershed. A reduction of 28,688 lbs per year must be planned for in the Turtle Creek Watershed to reduce loads within the next 5 years. The portion of the Turtle Creek Watershed within Plum Borough encompasses mostly the Holiday Park area. Holiday Park is one of the oldest developed sections of Plum Borough and was constructed before BMPs were strictly enforced. It is believed that the lack of BMPs originally constructed is the reason why the 10% reduction of sediments are not met. Areas within the Turtle Creek watershed were investigated for potential locations of new or retrofitted BMPs that could be constructed to reduce the sediment loads. The following table (TABLE #6) illustrates the proposed BMPs from our study in order to meet the required reductions. TABLE #6 Proposed Turtle Creek BMPs to Reduce TSS Loading: As shown in the table above the four proposed BMPs to reduce the load is estimated at 41, lbs/year which is 13, lbs/year over the required 10% reduction. The plan for the O Block Rd Flood Control project, which includes both BMP #1 & #2 improvements from TABLE #6 above, is attached to this report. This project will involve increasing the runoff volume capacity of the pond, eliminating a direct outfall into the stream by rerouting it into the pond then and then stabilizing the stream bank near the pond. Over the next 5 years, Plum Borough plans to increase the amount of road sweeping and storm sewer solids removal along Plum roads running parallel to the impaired streams within the Turtle Creek watershed as well as Plum Creek and Thompson watersheds. These Plum roads that are to be focused more on are indicated on the Overall Plum PRP Map in the Appendix. By accomplishing these four BMPs above and focusing more on road sweeping and solid removal on the roads described above, Plum will be able to meet the sediment removal regulations and increase the overall quality of its streams. 9 P age
11 SECTION F IDENTIFY FUNDING MECHANISMS The proposed O Block Rd Flood Control project, which includes both BMP #1 & #2 improvements has been funded by a grant from the Allegheny County Economic Development, Community Infrastructure & Tourism Fund. Plum Borough is receiving $100, from the grant which was approved in May of The increase of road sweeping and inlet solid removals will come out of the Public Works General Construction fund as well as the Operation and Maintenance of all of the existing Structural BMPs. SECTION G RESPONSIBLE PARTIES FOR OPERATION AND MAINTENANCE (O&M) OF BMPs The Plum Borough Public Works Department has always maintained the existing BMPs in Plum by removing solids and debris away from their structures and repairing anything wrong with how the BMPs operate. The BMPs are inspected several times a year to ensure this and addressed accordingly. Also, the Public Works department as implemented a complaint program which has made the response time faster when trying to determine if a BMP has malfunctioned. On September 16 of 2016 the DEP inspected the Plum Borough MS4 program which included how the existing BMPs were Operated and Maintained. The DEP representative was very pleased with the operation and maintenance of the BMPs. He did however instruct Plum to cut down large amount of vegetation from the banks and removing trees growing within and around the ponds. After the inspection, the Plum Public Works Department began doing so and implemented a log and tracking system to ensure the BMPs were well maintained every year per DEP regulations. 10 P age
12 APPENDIX: A PLUM BOROUGH PRP MAP B O BLOCK RD FLOOD CONTROL PLAN 11 P age
13 LOGANS FERRY HEIGHTS LOWER BURRELL ALLEGHENY RIVER PUCKETA CREEK OAKMONT RUSTIC RIDGE POND #3 (BMP #12) EAST OAKMONT RUSTIC RIDGE POND #2 (BMP #11) LOWER PLUM CREEK RUSTIC RIDGE POND #1 (BMP #10) BALL FIELDS STREAM BANK STAB. (BMP #13) PLUM MUNICIPAL CENTER (BMP'S 1.a.-1.e.) HIGHLANDS POND #3 (BMP #9) HIGHLANDS POND #2 (BMP #8) HIGHLANDS FOREBAY #1 (BMP #7) (PRP #1) RENTON LITTLE PLUM CREEK AF T PLUM CREEK HIGHLANDS POND #1 (BMP #6) GREEN VALLEY POND (BMP #2) UNITY ROCKLAND MANOR PONDS: (BMP #4 & 5) UPPER PLUM CREEK BRIARWOOD: (BMP#3) CHAVELLE CT POND #2: (BMP #23) OLD FARM WET. POND: (BMP #21) R CHAVELLE CT POND #1: (BMP #22) WIMBLEDON POND: BMP/POND RETROFIT (BMP#29) HOLIDAY PARK PROP. STREAM BANK STABILIZATION : (PROP. BMP#2) LARRY MILLS POND & PERV. PAVEMENT: (BMP #15 & 16) PROP. O'BLOCK RD. POND RETROFIT: RETROFIT (PROP. BMP#1) EDGEMEDE. POND #1: (BMP#27) O'BLOCK RD. POND: (BMP#19) EDGEMEDE FAWN CT. POND: (BMP #20) D MONROEVILLE MURRYSVILLE BOYCE PARK WET POND (BMP #24) EDGEMEDE. POND #2: (BMP#28) THOMPSON RUN WHISPERING PINES PONDS: (BMP's #17&18) (PRP #3) TURTLE CREEK (PRP #2) LEGEND WATERSHED BOUNDARY MS4 IMPAIRED STREAMS MS4 UNIMPAIRED STREAMS MS4 URBAN AREAS HUC12 EXISTING STRUCTURAL BMP'S PROPOSED STRUCTURAL BMP'S INCREASE IN ROAD SWEEPING & SOLIDS REMOVAL OF SEWERS PLUM BOROUGH POLLUTION REDUCTION PLAN Made For Situated In BOROUGH OF PLUM 0' 2000' SCALE: 1" = 2000' 4000' 6000' 1" = 2000' DRAWN CHECKED CMP RFM FILE RELEASE RATE MAP DATE 7/19/2017 PROJECT No PLUM BOROUGH COUNTY OF ALLEGHENY SCALE PENNSYLVANIA R.F. MITALL & ASSOCIATES, INC. SURVEYORS CONSULTANTS ENGINEERS 117 SAGAMORE HILL ROAD PITTSBURGH, PA TEL: (724) FAX: (724) SHEET 1 of 1 PRP REVISIONS:
14 SCALE: 1"=20' OUTLET STRUCTURE CROSS SECTION GABION / RENO MATTRESS CROSS SECTION LOW FLOW PIPE HEADWALL DETAIL LOW FLOW CHANNEL PROPOSED CONDITIONS O'BLOCK RD FLOOD CONTROL COUNTY OF ALLEGHENY For Made For THE BOROUGH OF PLUM Situated In BORO OF PLUM PENNSYLVANIA R.F. MITALL AND ASSOCIATES, INC. ENGINEERS CONSULTANTS SURVEYORS 117 SAGAMORE HILL ROAD PITTSBURGH, PA TEL: (724) FAX: (724) SCALE DRAWN CHECKED FILE DATE PROJECT No. SHEET AS NOTED GJA RFM 16235Base SHEET SP1 REVISIONS:
Pollution Reduction Plan For Municipal Separate Storm Sewer System
Pollution Reduction Plan For Municipal Separate Storm Sewer System West Chester University of Pennsylvania September 2017 Table of Contents Purpose and Scope Permit Requirements Pollution Reduction Conclusion
More informationSeptember Prepared For: 55 Township Road Richboro, PA (215) Prepared By:
Pollutant Reduction Plan (PRP) and Total Maximum Daily Load (TMDL) Plan for Neshaminy Creek and Little Neshaminy Creek in Bucks County, Pennsylvania September 2017 Prepared For: 55 Township Road Richboro,
More informationPA Municipal Separate Storm Sewer System (MS4) TMDL Plan
PA Municipal Separate Storm Sewer System (MS4) TMDL Plan Instructor: Bryan Seipp, Watershed Manager- CWP Lee Epstein, Director, Lands Program- CBF 1 To Adjust How the Slides Appear on Your Screen To make
More informationJoint Pollutant Reduction Plan
Paxton Creek Watershed TMDL, Chesapeake Bay PRP, Wildwood Lake PRP, and UNT to Spring Creek PRP August 23, 2017 2018 PAG 13 Regulation NPDES (National Pollutant Discharge Elimination System) Individual
More informationWest Earl Township. Pollutant Reduction Plan. Prepared for: West Earl Township. 157 W. Metzler Road P.O. Box 787 Brownstown, PA 17508
West Earl Township Brownstown, PA July 24, 2017 Prepared for: West Earl Township 157 W. Metzler Road P.O. Box 787 Brownstown, PA 17508 Prepared by: LandStudies, Inc. 315 North Street Lititz, PA 17543 717-627-4440
More informationWest Donegal Township. Pollutant Reduction Plan. Prepared for: West Donegal Township. One Municipal Drive Elizabethtown, PA 17022
Elizabethtown, PA Draft June 2017 Prepared for: One Municipal Drive Elizabethtown, PA 17022 Prepared by: LandStudies, Inc. 315 North Street Lititz, PA 17543 717-627-4440 www.landstudies.com Table of Contents
More informationThe Borough of Penbrook 150 South 28th Street Penbrook, PA NPDES MS4 Permit PAG DRAFT for Public Review: July 21, 2017
POLLUTANT REDUCTION PLAN FOR IMPAIRED WATERS OF THE COMMONWEALTH AND THE CHESAPEAKE BAY, AND TMDL PLAN TO PAXTON CREEK PENBROOK BOROUGH, DAUPHIN COUNTY, PA The Borough of Penbrook 150 South 28th Street
More informationTotal Maximum Daily Load (TMDL) & Pollutant Reduction Plan (PRP) For Skippack Creek Franconia Township Montgomery County, Pennsylvania
NPDES Stormwater Discharges from MS4 Total Maximum Daily Load (TMDL) & Pollutant Reduction Plan (PRP) For Skippack Creek Franconia Township Montgomery County, Pennsylvania September 2017 Prepared For:
More informationMS4: POLLUTANT REDUCTION PLANNING FOR IMPAIRED WATERWAYS. May 17, 2017
MS4: POLLUTANT REDUCTION PLANNING FOR IMPAIRED WATERWAYS May 17, 2017 How is a TMDL Different from a PRP? Pollutant Reduction Plan (PRP) A plan developed to identify and then reduce a baseline amount of
More informationMeeting the Chesapeake Bay TMDL
Meeting the Chesapeake Bay TMDL Local Stormwater Perspective Presented by Rob Hopper, PE Developed with Mike Morgan, PE September 14, 2015 Chesapeake Bay TMDL Local Stormwater Perspective Virginia Stormwater
More informationWater Quality Regulatory Programs and Our Citywide EPA / DEQ Stormwater Permit. Public Works Engineering City Council Briefing June 7, 2016
Water Quality Regulatory s and Our Citywide EPA / DEQ Stormwater Permit Public Works Engineering City Council Briefing June 7, 2016 Briefing Topics Introduction: Regulatory Overview Elements of the MS4
More informationBUREAU OF CLEAN WATER
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) STORMWATER DISCHARGES FROM SMALL MUNICIPAL SEPARATE STORM
More informationSeptember 15, 2014 Winston Salem, VA Stormwater Capital Improvement Planning for Total Maximum Daily Load Compliance
September 15, 2014 Winston Salem, VA Stormwater Capital Improvement Planning for Total Maximum Daily Load Compliance An Approach to Compliance with Stormwater MS4 Permits and TMDLs Outline TMDL Requirements
More informationMunicipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No.
Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates 2005 VNH File No. 35317-210-21 Table of Contents Introduction... 3 Goals... 3 Storm water Discussion...
More informationLEBANON COUNTY STORMWATER CONSORTIUM REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSULTING ENGINEER
LEBANON COUNTY STORMWATER CONSORTIUM REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSULTING ENGINEER I. PURPOSE AND INTENT Through this Request for Qualifications (RFQ), the Lebanon County Stormwater Consortium,
More informationChesapeake Bay TMDL Action Plan and MS4 Program Update. Presentation to the Herndon Town Council. May 5, 2015
Chesapeake Bay TMDL Action Plan and MS4 Program Update Presentation to the Herndon Town Council May 5, 2015 Overview Quick Background Meeting the Chesapeake Bay Restoration Requirements Draft Chesapeake
More informationIsle of Wight County Chesapeake Bay TMDL Action Plan. May 2015
Isle of Wight County Chesapeake Bay TMDL Action Plan May 2015 Background Chesapeake Bay Agreement 12/15/1987 Chesapeake Bay Preservation Act 1988 County Local Ordinance - November 1990 Chesapeake Bay 2000
More informationAppendix F Storm Drain Cleaning Program
Appendix F Storm Drain Cleaning Program Baltimore County Department of Environmental Protection and Sustainability Watershed Management and Monitoring Section Excerpts from Baltimore County MS4 Permit
More informationPOLLUTANT REDUCTION PLAN FOR IMPAIRED WATERS OF THE COMMONWEALTH NEWTOWN BOROUGH, BUCKS COUNTY, PA
POLLUTANT REDUCTION PLAN FOR IMPAIRED WATERS OF THE COMMONWEALTH NEWTOWN BOROUGH, BUCKS COUNTY, PA Newtown Borough 23 North State Street Newtown, PA 18940 215.968.2109 NPDES MS4 Permit PAG 130057 DRAFT
More informationCHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)
CHESAPEAKE BAY TMDL ACTION PLAN (2013 2018 MS4 General Permit) Piedmont Virginia Community College A Plan for Achieving a 5% Reduction of Existing Loads June 30, 2015 Main Campus This plan satisfies the
More informationIncorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan
Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Pennsylvania State Section American Water Resources Association Fall 2011
More informationJ. Sargeant Reynolds Community College. Chesapeake Bay TMDL Action Plan
J. Sargeant Reynolds Community College Prepared for: J. Sargeant Reynolds Community College Parham Road Campus Facilities Management & Planning 1651 E. Parham Road Richmond, VA 23228 June 30, 2015 Revised
More informationWatershed master planning, City of Griffin, Georgia, USA
Water Resources Management VII 3 Watershed master planning, City of Griffin, Georgia, USA J. K. Kaplan & B. J. Watson Tetra Tech, Water Resources Group, Atlanta, Georgia, USA Abstract Tetra Tech has assisted
More informationPaxton Creek Watershed TMDL Strategy
Paxton Creek Watershed TMDL Strategy Public Review Meetings: November 17, 2015 November 18, 2015 December 10, 2015 Paxton Creek Watershed Cooperative Progressive approach to achieving water quality improvements.
More informationCost Efficiency and Other
Cost Efficiency and Other Factors in Urban Stormwater BMP Selection WIP Local Technical Meeting Series November 2013 Greg Busch MarylandDepartmentof the Environment gbusch@mde.state.md.us 1 Which BMPs
More informationChapter 2: Conditions in the Spring Lake Watershed related to Stormwater Pollution
Chapter 2: Conditions in the Spring Lake Watershed related to Stormwater Pollution To identify the primary causes and consequences of stormwater discharges to Spring Lake and its adjoining waterbodies,
More informationMS4 NPDES PERMITS FREQUENTLY ASKED QUESTIONS (FAQ) 1
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER MS4 NPDES PERMITS FREQUENTLY ASKED QUESTIONS (FAQ) 1 The Department of Environmental Protection (DEP) has developed
More informationCHESAPEAKE BAY TMDL PHASE III WIP NORTHERN VIRGINIA OPENING STAKEHOLDER MEETING AUGUST 17, 2018 NORMAND GOULET NVRC
CHESAPEAKE BAY TMDL PHASE III WIP NORTHERN VIRGINIA OPENING STAKEHOLDER MEETING AUGUST 17, 2018 NORMAND GOULET NVRC TODAYS AGENDA TMDL BACKGROUND WIP DEVELOPMENT PROGRESS AND TIMELINE 2017 NUTRIENT PROGRESS
More informationUrban Stormwater Management Achieving Compliance Goals
Celebrating 20 Years of Excellence in Environmental Science & Engineering www.kieser-associates.com Urban Stormwater Management Achieving Compliance Goals MWEA Annual Conference June 25, 2013 K. Brian
More informationUpper Eastern Shore WIP Workshop November 21, 2014
Clean Water Optimization Tool for Maryland s Eastern Shore Karen Cappiella Program Director Center for Watershed Protection Upper Eastern Shore WIP Workshop November 21, 2014 Funded by the Town Creek Foundation
More informationBest Management Practices for Stormwater Quality Treatment in Urban Settings. Lower Mississippi River WMO September 2017
Best Management Practices for Stormwater Quality Treatment in Urban Settings Lower Mississippi River WMO September 2017 Stormwater 101 Impervious surfaces (pavement, parking lots, etc.): quickly produce
More informationSusan Myerov, AICP Watersheds Program Director Pennsylvania Environmental Council Michael Helbing Staff Attorney Citizens for Pennsylvania s Future
Jenkintown Library - November 16, 2015 Susan Myerov, AICP Watersheds Program Director Pennsylvania Environmental Council Michael Helbing Staff Attorney Citizens for Pennsylvania s Future 1 PennFuture...
More informationMunicipal Separate Storm Sewer Systems (MS4) Implementation. Craig Carson Montgomery County Department of Environmental Protection
Montgomery County Maryland Municipal Separate Storm Sewer Systems (MS4) Implementation Craig Carson Montgomery County Department of Environmental Protection Montgomery County, Maryland 500 sq. miles 970,000
More informationChapter 7: Utilities and Stormwater Management
Chapter 7: Utilities and Stormwater Management Utilities are essential services that affect future land use and growth areas, stormwater management, and energy use. Chapter 7 of this Comprehensive Plan
More informationRevisiting the BMP Removal Rate Adjustor Curves. Mike Hickman PA DEP
Revisiting the BMP Removal Rate Adjustor Curves Mike Hickman PA DEP johickman@pa.gov BMP Enhancements Recommendations of the Expert Panel to Define Removal Rates for Urban Stormwater Retrofit Projects
More informationClean Water Optimization Tool Case Study: Kent County
Clean Water Optimization Tool Case Study: Kent County Through a grant from the Town Creek Foundation, the Center for Watershed Protection created a userfriendly and simple Clean Water Optimization Tool
More informationCHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)
CHESAPEAKE BAY TMDL ACTION PLAN (2013 2018 MS4 General Permit) Central Virginia Community College A Plan for Achieving a 5% Reduction of Existing Loads June 30, 2015 Main Campus This plan satisfies the
More informationChesapeake Bay Total Maximum Daily Loads Action Plan
Metropolitan Washington Airports Authority Chesapeake Bay Maximum Daily Loads Action Plan Small Municipal Separate Storm Sewer Systems General Permit Dulles Toll Road Permit Number VAR040120 In accordance
More informationClean Water Optimization Tool Case Study: Queen Anne s County
Clean Water Optimization Tool Case Study: Queen Anne s County Through a grant from the Town Creek Foundation, the Center for Watershed Protection created a userfriendly and simple Clean Water Optimization
More informationChesapeake Bay Pollutant Reduction Plan
Chesapeake Bay Pollutant Reduction Plan Cocalico Creek and Conestoga River Watershed East Cocalico Township, Lancaster County, PA MS4 Permit # PAG133572 April 2015 Prepared for: East Cocalico Township
More informationDC STORMWATER PLAN CONSOLIDATED TOTAL MAXIMUM DAILY LOAD (TDML) IMPLEMENTATION PLAN
DC STORMWATER PLAN CONSOLIDATED TOTAL MAXIMUM DAILY LOAD (TDML) IMPLEMENTATION PLAN CONTENTS Introduction 1 The Challenge 5 The Solution 7 Tracking Progress 11 What can you do? 15 INTRODUCTION The DC Stormwater
More informationA MODEL FOR COST EFFECTIVE STORMWATER MANAGEMENT
Over 20 Years of Excellence in Environmental Science & Engineering www.kieser associates.com A MODEL FOR COST EFFECTIVE STORMWATER MANAGEMENT K. Brian Boyer, P.E. Environmental Engineering Manager and
More informationPOLLUTION REDUCTION PLAN SUSQUEHANNA RIVER AND CHESAPEAKE BAY WATERSHED. Perry County, PA. Marysville Borough
POLLUTION REDUCTION PLAN SUSQUEHANNA RIVER AND CHESAPEAKE BAY WATERSHED Marysville Borough Prepared For: Marysville Borough 200 Overcrest Road Marysville, PA 17053 (717) 957-3110 Prepared By: 1215 Manor
More informationAppendix 12. Pollutant Load Estimates and Reductions
Appendix 12. Pollutant Load Estimates and Reductions A pollutant loading is a quantifiable amount of pollution that is being delivered to a water body. Pollutant load reductions can be calculated based
More informationPennsylvania s Phase III Watershed Implementation Plan
Pennsylvania s Phase III Watershed Implementation Plan Informational Meeting Pennsylvania House and Senate Agriculture and Rural Affairs Committees August 16, 2017 Agenda Why Are We Doing This? Progress
More informationPROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS
PROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS Public Information Meeting ~ May 2, 2018 Public Works Stormwater Management Division OVERVIEW Surface Water Quality Protection Municipal
More informationShingle Creek Watershed Management Commission Wetland 639W Outlet Modifications Summary Feasibility Report
Shingle Creek Watershed Management Commission Wetland 639W Outlet Modifications Summary Feasibility Report The proposed project is the modification of the outlet of Wetland 27-0639W to reduce phosphorus
More informationDANVILLE COMMUNITY COLLEGE MS4 PROGRAM PROGRAM PLAN
DANVILLE COMMUNITY COLLEGE MS4 PROGRAM PROGRAM PLAN EFFECTIVE JULY 1, 2016 TABLE OF CONTENTS TAB TITLE 1 DCC MS4 PROGRAM PLAN MCM 1: PUBLIC EDUCATION AND OUTREACH ON STORMWATER IMPACTS BMP 1.1: Implement
More informationa landowner whose parcel was subjected to the discharge of a neighbor's ditch which was being used to drain a swamp;
PA Act 167 Watershed Stormwater Management Planning DEFINITION Stormwater management has been traditionally defined as measures used by property owners and local governments to limit the amount of stormwater
More informationStormwater Infrastructure Funding Study Public Education Session May 27, :00 9:00 pm City Hall, Multi-Purpose Room Level 100
Stormwater Infrastructure Funding Study Public Education Session May 27, 2015 7:00 9:00 pm City Hall, Multi-Purpose Room Level 100 What is the Stormwater Infrastructure funding study? Purpose of the Stormwater
More informationCity of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018
City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting June 11, 2018 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history,
More informationFINAL MA MS4 GENERAL PERMIT NEWTON TEDDER EPA REGION 1 BOSTON
FINAL MA MS4 GENERAL PERMIT NEWTON TEDDER EPA REGION 1 BOSTON PRESENTATION OVERVIEW HISTORY GENERAL OVERVIEW MS4 PERMIT REQUIREMENTS AND CHANGES FROM THE DRAFT PERMIT EPA TOOLS DISCUSSION MASSDEP TOOLS
More informationThe Next Generation of Stormwater Management and Site Design. Melanie R. Grigsby, P.E. Stormwater Resource Manager, City of Fort Myers
The Next Generation of Stormwater Management and Site Design Melanie R. Grigsby, P.E. Stormwater Resource Manager, City of Fort Myers History of WMD Stormwater Rule Florida passed the first rule requiring
More informationCity of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017
City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history, culture, economy
More informationPrimer introduction to watershed management Plan Process highlight the major steps of plan development Project types look at some examples of common
1 Primer introduction to watershed management Plan Process highlight the major steps of plan development Project types look at some examples of common projects Plan Organization how to read the plan Next
More informationClean Water SRF WATER RESOURCE RESTORATION Sponsored Projects. APPLICATION COMPLETENESS CHECKLIST September 2014
Clean Water SRF WATER RESOURCE RESTORATION Sponsored Projects APPLICATION COMPLETENESS CHECKLIST September 2014 Pre-application consultation held _January 15 th, 2015_ (date) Hard copy and CD containing
More informationProject Priority List scoring worksheet - stormwater Guidance document
www.pca.state.mn.us Project Priority List scoring worksheet - stormwater Guidance document PLEASE NOTE: THE MINNESOTA STATE FISCAL YEAR IS FROM JULY 1 JUNE 30 The first step towards receiving either a
More informationSouth Washington Watershed District. Stormwater Pollution Prevention Plan (SWPPP)
South Washington Watershed District Stormwater Pollution Prevention Plan (SWPPP) June 2008 1 I. Public Education and Outreach... 4 a) Distribute Educational Materials... 4 b) Education Implementation...
More informationMS4 Pollution Reduction Plan (PRP) Boyertown Borough. August 2, Spotts, Stevens and McCoy Engineers and Environmental Consulting
S4 Pollution Reduction Plan PRP Boyertown Borough August 2, 217 Spotts, Stevens and ccoy Engineers and Environmental Consulting S4 Pollution Reduction Plan PRP Prepared for: Boyertown Borough 1 South Washington
More informationChesapeake Bay Pollutant Reduction Plan
Chesapeake Bay Pollutant Reduction Plan Williamsport Area Joint MS4s Permit Lycoming County, Pennsylvania April 1, 2015 Prepared by: Michael Baker Jr., Inc. and Lycoming County Department of Planning and
More informationNon-Point Source Nutrient Reductions Offset Proposal University Area Joint Authority S E P T E M B E R
Non-Point Source Nutrient Reductions Offset Proposal University Area Joint Authority S E P T E M B E R 2 0 1 6 1 Presentation Overview UAJA Overview Nutrient Challenges at UAJA Goal of Urban and Non-Point
More informationStormwater BMP Maintenance
Stormwater BMP Maintenance Background and Definitions What is Stormwater Runoff? Stormwater Stormwater is the result of precipitation that flows overland to streams and other bodies of water Stormwater
More informationWELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session #2 June 15 to July 13, 2018
WELCOME Eastern Subwatersheds Stormwater Management Retrofit Study Online Information Session #2 June 15 to July 13, 2018 1 Eastern Subwatersheds Stormwater Management Retrofit Study This study is one
More informationWashington State University Pullman Stormwater Management Program Plan 2017
Washington State University Pullman Stormwater Management Program Plan 2017 The Washington State University (WSU) Pullman Stormwater Management Program (SWMP) Plan has six elements derived from the Eastern
More informationMWEA Annual Conference June 25, 2013
Celebrating 20 Years of Excellence in Environmental Science & Engineering www.kieser associates.com Urban Stormwater Management Achieving Compliance Goals MWEA Annual C f Conference June 25, 2013 K. Brian
More information2014 Whatcom County Stormwater Management Program
2014 2014 Whatcom County Stormwater Management Program A component of the Western Washington Phase II Municipal Stormwater Permit Whatcom County Public Works Department Stormwater Division THIS PAGE INTENTIONALLY
More informationComfort Lake-Forest Lake Watershed District Six Lakes Total Maximum Daily Load Implementation Plan
Prepared by: for the Comfort Lake-Forest Lake Watershed District and the Minnesota Pollution Control Agency Comfort Lake-Forest Lake Watershed District Six Lakes Total Maximum Daily Load February 16, 2010
More informationThe Town of Chester Stormwater Mapping Report
The Town of Chester Stormwater Mapping Report Prepared by the Warren County Soil & Water Conservation District December 2013 Table of Contents Introduction and Location 3 Stormwater Runoff 3 Assessment
More informationOverview of the 2016 Small Municipal Separate Storm Sewer System (MS4) Permit
Overview of the 2016 Small Municipal Separate Storm Sewer System (MS4) Permit Outline Regulatory Context and MS4 Permit Status 2016 MS4 Permit Requirements NOI, SWMP, Annual Reports Minimum Control Measures
More informationBronx River Pollutant Loading Model Summary
Bronx River Pollutant Loading Model Summary Section of River Located in Bronx County Table of Contents Drainage Areas...2 Data Sets Used for Analysis...2 Land Use Statistics...3 Model Calculations...3
More informationStormwater Utility. Frequently Asked Questions. January 2019 CITY OF NORTH RIDGEVILLE Avon Belden Road North Ridgeville, Ohio 44039
Stormwater Utility Frequently Asked Questions January 2019 CITY OF NORTH RIDGEVILLE 7307 Avon Belden Road North Ridgeville, Ohio 44039 General Stormwater Information/Education 1. What is stormwater runoff?
More informationBig Creek Watershed Retrofit Ranking Project
Big Creek Watershed Retrofit Ranking Project John Stein and Jennifer Olson Tetra Tech, Inc. Bob Gardin, FOBC Innovative Stormwater Conveyance Through Green Infrastructure May 13, 2014 Presentation Outline
More informationMinnesota Pollution Control Agency requires that the City of Brainerd develop written procedures for
I. INTRODUCTION The owns and operates an MS4 ( Municipal Separate Storm Sewer System). The Minnesota Pollution Control Agency requires that the develop written procedures for the purpose of eliminating
More informationVirginia State University MS-4 Permit: VAR Chesapeake Bay TMDL Action Plan
Virginia State University MS-4 Permit: VAR040119 Chesapeake Bay TMDL Action Plan Prepared for Virginia State University Capital Outlay & Facilities Management PO Box 9414 Virginia State University, VA
More informationChesapeake Bay Action Plan
2016 Chesapeake Bay Action Plan Dale Chestnut JMU Facilities Engineering & Construction 3/23/2016 Chesapeake Bay Action Plan Harrisonburg, Virginia 2016 Update Submitted to satisfy the terms of the General
More informationIn order to develop these comprehensive watershed retrofit plans, six key tasks were undertaken, each of which is described further below:
Date: June 26, 2013 To: From: Christin Jolicoeur, Watershed Planner Jason Papacosma, Watershed Programs Manager Arlington County Department of Environmental Services Laura Gardner, Water Resources Engineer
More informationSustaining Our Water Resources Public Health. April 27, 2011
Sustaining the the Bay Bay Environmental Environmental Health Health Sustaining Our Water Resources Public Health Sustaining i i Our Our County Economic i Health Health lh IMPLEMENTATION: 2011 and Beyond
More informationEPA s 1990 Phase I and 1999 Phase II Stormwater Regulations
EPA s 1990 Phase I and 1999 Phase II Stormwater Regulations Green Country Stormwater Alliance Employee Training Workshop September 10, 2013 Tulsa Technology Center, Broken Arrow 1 NPDES Program Overview
More informationUpdates on EPA Stormwater Program
Updates on EPA Stormwater Program Jeremy Bauer U.S. Environmental Protection Agency Office of Water Washington, DC August 2012 1 OVERVIEW OF STORMWATER IMPACTS 2 Impervious Cover and Stormwater Hydrology
More informationStormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)
Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater
More informationCHESAPEAKE BAY POLLUTANT REDUCTION PLAN FOR LONDONDERRY TOWNSHIP
369 East Park Drive Harrisburg, PA 17111 (717) 564-1121 www.hrg-inc.com July 2017 CHESAPEAKE BAY POLLUTANT REDUCTION PLAN FOR LONDONDERRY TOWNSHIP PREPARED FOR: LONDONDERRY TOWNSHIP DAUPHIN COUNTY, PENNSYLVANIA
More informationA Primer on Stormwater Management, your Facility and the Chesapeake Bay. Tom Schueler Chesapeake Stormwater Network June
A Primer on Stormwater Management, your Facility and the Chesapeake Bay Tom Schueler Chesapeake Stormwater Network June 5. 2017 Key Themes Why do we need to be concerned about Stormwater? What are all
More informationSTORMWATER MANAGEMENT DIVISION
STORMWATER MANAGEMENT DIVISION Western Branch Restoration Plan Public Meeting January 28, 2019 Welcome from Jerry Maldonado Purpose of Meeting Review why watershed restoration plans are needed in Prince
More informationStormwater Retrofit of Highwood Estates Detention Basins to address Water Quality Issues Low Impact Development Symposium Philadelphia, PA
Stormwater Retrofit of Highwood Estates Detention Basins to address Water Quality Issues 2011 Low Impact Development Symposium Philadelphia, PA Co-Authors Steven Trinkaus, PE, CPESC, CPSWQ of Trinkaus
More informationEffectiveness of Non-Structural Measures in Watershed Restoration
Effectiveness of Non-Structural Measures in Watershed Restoration Bill Frost, PE, D.WRE Sr. Water Resources Engineer KCI Technologies, Inc. Sparks, MD 2011 Low Impact Development Symposium Philadelphia,
More informationFinal TMDL Implementation Plan. Prepared for Minnesota Pollution Control Agency
Wirth Lake Final TMDL Implementation Plan Prepared for Minnesota Pollution Control Agency September 2010 4700 West 77 th Street Minneapolis, MN 55435-4803 Phone: (952) 832-2600 Fax: (952) 832-2601 wq-iw11-03c
More informationExisting Conditions and Environmental Consequences Water Quality
3.6 3.6.1 HOW IS WATER QUALITY ASSESSED? The Clean Water Act (CWA) of 1972 requires that each state set water quality standards for all contaminants in surface waters. These standards are typically based
More informationShifting Tides: Florida's Changing Water Quality Regulations
Shifting Tides: Florida's Changing Water Quality Regulations Statewide Stormwater Rule & EPA Numeric Nutrient Criteria Chris Martinez Assistant Professor University of Florida Outline - Statewide Stormwater
More informationEstimated Construction Cost: $30,000-$110,000
SITE 11 BMP retrofits at Smith Middle School Index Sheet No.: 16 Raw Data Name: IJ 34 Estimated Construction Cost: $30,000-$110,000 Page 73 CAMDEN LN CLAYMORE RD BURNS PL WHITMORE CIR S HAWICK CT ROGERS
More informationSTORMWATER MANAGEMENT PROGRAM. Pottawatomie County, Kansas Stormwater Management Program
STORMWATER MANAGEMENT PROGRAM Pottawatomie County, Kansas Stormwater Management Program AGENDA PROJECT BACKGROUND STORMWATER MANAGEMENT PLAN (SMP) ELBO CREEK WATERSHED SAND CREEK WATERSHED HOW IT ALL TIES
More informationA Summary of the International Stormwater BMP Database
A Summary of the International Stormwater Tuesday, February 12, 2013, 1:00PM Presented by: Katie Blansett, Ph.D., P.E. Pennsylvania Housing Research Center www.engr.psu.edu/phrc Objective The objective
More informationBCWMC Capital Improvement Program (approved April 19, 2018; pending minor Plan amendment)
BCWMC Capital Improvement Program 2020 2024 (approved April 19, 2018; pending minor Plan amendment) Project Name City Number 2019 2020 2021 2022 2023 2024 2025 Totals Medicine Lake Rd and Winnetka Ave
More informationChesapeake Bay Maryland Phase I WIP Strategy Key Concepts: Septics and Stormwater June 13 th, 2011
1 Chesapeake Bay Maryland Phase I WIP Strategy Key Concepts: Septics and Stormwater June 13 th, 2011 Topics Covered Purpose of Reviewing Phase I WIP Context of our WIP Planning Urban Stormwater Septic
More informationStormwater BMP/Facility Inspections Post-Construction Stormwater Management (PCSM)
Stormwater BMP/Facility Inspections Post-Construction Stormwater Management (PCSM) Southwest Pennsylvania Commission Fisher Hall at the Burrell Lake Park Facility Lower Burrell, PA October 28, 2016 Michael
More informationChesapeake Bay Total Maximum Daily Load (TMDL) Action Plan Permit Cycle:
Chesapeake Bay Total Maximum Daily Load (TMDL) Action Plan Permit Cycle: 2013-2018 Charlottesville, Virginia July 1, 2015 Prepared by: University of Virginia Facilities Management, Environmental Resources
More informationUW-MADISON GREEN INFRASTRUCTURE PLAN
UW-MADISON GREEN INFRASTRUCTURE PLAN Gary Brown, UW-Madison David Wolmutt, SmithGroupJJR GROWING SUSTAINABLE COMMUNITIES OCTOBER 3, 2017 PRESENTATION AGENDA Project Context Evolution of Campus Green Infrastructure
More informationCARNELIAN-MARINE- ST. CROIX WATERSHED DISTRICT COST SHARE PROGRAM 2013 ANNUAL REPORT PREPARED BY: WASHINGTON CONSERVATION DISTRICT
CARNELIAN-MARINE- ST. CROIX WATERSHED DISTRICT COST SHARE PROGRAM 2013 ANNUAL REPORT PREPARED BY: WASHINGTON CONSERVATION DISTRICT - 2 - - The Carnelian-Marine-St. Croix Watershed District ( District )
More informationStream and Watershed Restoration Design and Quantitative Benefits. Kelly Gutshall, RLA and Mike LaSala
Stream and Watershed Restoration Design and Quantitative Benefits Kelly Gutshall, RLA and Mike LaSala Suquehanna Greenway River Towns Workshop September 30, 2013 Benefit Stacking Single Function Multiple
More informationUMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist
UMD Storm Water Program Construction Requirements Greg Archer, MBA Environmental Compliance Specialist Phase 2 Regulatory Overview Dec. 1999 EPA issues Phase 2 Federal Register Municipalities (MS4) from
More information