Neil M Craigie Pty Ltd ACN ABN CASEY GROWTH AREA BALLARTO ROAD PSP 57 STORMWATER MANAGEMENT STRATEGY (SWMS) 5 March 2013

Size: px
Start display at page:

Download "Neil M Craigie Pty Ltd ACN ABN CASEY GROWTH AREA BALLARTO ROAD PSP 57 STORMWATER MANAGEMENT STRATEGY (SWMS) 5 March 2013"

Transcription

1 Neil M Craigie Pty Ltd ACN ABN Waterway Management Consultants CASEY GROWTH AREA BALLARTO ROAD PSP 57 STORMWATER MANAGEMENT STRATEGY (SWMS) (DRAFT-Version 1) 5 March 2013 Neil M Craigie Director Neil McKinnon Craigie BE(Civil), MEngSci, MIEAust, CPEng nmcraigie@bigpond.com 40 Jamieson Court, Vic. 3939, Australia Mobile:

2 TABLE OF CONTENTS 1. INTRODUCTION 1 2. REQUIREMENTS OF THE BRIEF 1 3. BACKGROUND INFORMATION 3 4. DESIGN CRITERIA AND ASSUMPTIONS Flood Storage Systems Water Quality and Quantity Treatment Protocol Water Reuse Cross PSP Boundary Issues in the Western Port Catchment 7 5. CATCHMENTS AND DRAINAGE OUTFALLS 8 6. THE OUTFALL 4 WLRB Levels Wetland Sizing Flood Mitigation Storage Volume Allowable Peak Flows WLRB Reserve Area Is there an alternative? STAGING/IMPLEMENTATION CONSIDERATIONS General Principles Development Application Requirements and Compliance 14 Figures 1-4 Neil M Craigie Pty Ltd ii

3 1. INTRODUCTION In partnership with Casey City Council (CCC), the Growth Areas Authority (GAA) is managing the preparation of Precinct Structure Plans (PSPs) for the Casey Growth Area. These precincts have been created as a result of the extension of the Urban Growth Boundary through Amendment V68 passed by the Victorian Government in July 2010 and the boundaries are shown on Figure 1. Management of surface water (drainage, flooding, water quality, waterway values) and protection of local environmental values and Western Port Bay are key issues across all PSP s. This study has been commissioned by Newland Developers (owners of 365 Clyde- Five Ways Road, Clyde) acting on behalf of landowners in PSP 57 to: assess the current drainage and hydrological makeup of the land in PSP 57; develop a surface water management strategy (SWMS) that responds to and effectively mitigates the impacts of urban development on receiving waterways and environments; provide concept designs for stormwater management that detail alignment of drainage lines, location and size of retarding basins, water quality treatment wetlands, waterway setbacks, and key habitat protection and enhancement measures; confirm the allocation of land take in the draft urban structure plan for stormwater management infrastructure and associated mitigation works and to confirm potential future stormwater assets for Melbourne Water (MW) which will be included in future MWC Development Services Schemes (DSS). The northeast sector of PSP 57 is part of the Clyde Creek catchment in PSP 54. The Clyde Creek catchment has been considered in detail as part of the PSP 53 and PSP 54 investigations and the outcomes and recommendations have been adopted for this report. The balance of PSP 57 drains to the south and into PSP 58 on the south side of Ballarto Road. All of the lands form part of the greater Clyde Creek/Western Contour Drain catchment which outfalls to Western Port Bay. Figure 2 shows the lands included in PSP 57, with the likely expansion of Casey Fields. Neil M Craigie Pty Ltd 1

4 PSP 53 PSP 55 PSP 57 PSP 54 PSP 58 PSP 56 Figure 1 Casey Growth Area and Precincts Neil M Craigie Pty Ltd 2

5 Catchment boundaries Figure 2 PSP 57 boundaries (red dash) with Option 3 Layout for Casey Fields Expansion, and showing existing drainage outfall alignments (blue dash) Neil M Craigie Pty Ltd 3

6 2. REQUIREMENTS OF THE BRIEF Although not commissioned by the GAA, this study for PSP 57 has been carried out in sympathy with the general requirements applied to PSP 53 and 54 drainage investigations. With suitable modifications to suit PSP 57 circumstances these are as set out below. The drainage strategy shall: 1. Provide a drainage design solution that generally complies with the Precinct Structure Planning Guidelines and: Incorporates design methods and innovation where possible to minimise land take. Maximises the ability to utilise land set aside for drainage for open space, recreation and other urban purposes. Contributes to a green urban environment with extensive tree and other planting. Integrates with other proposed elements of the PSP such as town centres, education and community facilities, as well as, the quarry site. Allows for appropriate maintenance access and integrates this with recreation uses where practical (e.g. access tracks/pedestrian and cycle paths). 2. Provide an overall drainage design solution that also incorporates a time allowance for iterative local drainage system design refinement in consultation with the GAA (to achieve the objectives outlined in point one above). 3. Retard water flow to pre-development levels for flow events up to the 1 in 10 year Average Recurrence Interval (ARI) level and Best Practice treatment performance, prior to entering Clyde Creek and the Western Outfall Drain. 4. Retard stormwater runoff flows to the capacity of the downstream system or predeveloped flows up to 1 in 100 year events. 5. Ensure adequate buffers are provided around wetland habitats and waterways depending on the quality of terrestrial habitat or dispersal corridors (remnant native vegetation to be retained within the buffers). 6. Enable existing channels within the CGA to be re-modelled to cater for increased flows as they have low geomorphological value (GGF and DG do not rely on these in-channel habitats). Neil M Craigie Pty Ltd 1

7 7. Include the construction of waterways designed to protect movement opportunity of fish and other aquatic fauna between suitable habitats. 8. Determine locations and sizing of in-catchment treatment of stormwater (to Best Practice - 80% Total Suspended Solids, 45% Phosphorus and 45% Nitrogen reduction) prior to water entering Clyde Creek and Western Outfall Drain or any existing or constructed wetland for habitat purposes. 9. Undertake an options analysis for the potential location of retarding basins and stormwater quality treatment assets within the CGA. The drainage strategy should:- 10. Quantify volumes of water that can be harvested at key locations in the system to protect waterway values, it is suggested that developments should harvest stormwater to prevent excess run-off from events up to the 1 in 1 year ARI. MW will continue to work with the GAA, South East Water and Council to ensure that any stormwater harvesting opportunity is not lost as part of the PSP planning for the area. 11. Ensure designs of RB within the CGA maximise connectivity for aquatic species. 12. Comply with SEPP F8 water quality targets for Western Port Bay. It is intended that the proposed RB/wetland downstream of the CGA will provide additional water quality treatment to achieve SEPP F8 targets. Based on other modelling in Western Port, the SEPP target are likely to be as high as: - 93% reduction in suspended solids loads. - 66% reduction in total phosphorus loads. - 63% reduction in total nitrogen loads. However, Melbourne Water in consultation with stakeholders will adopt a practical water quality treatment target for the stormwater discharging from the proposed large RB/wetland. It is intended that the entire stormwater system will provide stormwater treatment above the current Best Practice guidelines. Neil M Craigie Pty Ltd 2

8 3. BACKGROUND INFORMATION In late 2011 MW engaged SKM to assess the Casey Growth Area (CGA). The assessment included a study of environmental issues of the area including aquatic ecology, geomorphology, water quality, hydrological, cultural heritage and groundwater issues affecting Clyde Creek, Muddy Gates Drain and the Western Outfall Drain. All these drain into Western Port Bay. The SKM 2012 report Casey Growth Area Planning: Assessment of the risk to water dependant environmental values from development of the Casey Growth Area (Part A Clyde Creek/Western Outfall Drain and Muddy Gates Drain) has been used to inform the SWMS. A further study of water use and reuse across the CGA is being carried out in parallel with the SWMS. South East Water (SEW), MW and Southern Rural Water (SRW) have developed a draft Integrated Water Management (IWM) strategy for the South East Region of Melbourne which coincides with the extension of the urban growth boundary in the municipalities of Casey and Cardinia. The aim is to develop the optimal mix of water related solutions for the community in this region taking account the many values of water, the associated environmental footprint, optimisation of resources and infrastructure, supporting customer choice and providing community value. SEW is preparing a Servicing Master Plan for the Casey Cardinia Growth Expansion. The aim of this master plan is to develop a servicing plan with consideration given to meeting demand through non-conventional means incorporating elements of IWM. The non-conventional means include local sewerage treatment and reuse, stormwater harvesting (with potential treatment and re-use), and rainwater tanks. SKM acting as consultants for SEW are currently investigating 9 options for service delivery. Outputs from the SWMS investigations (volumes and quality of surface water, location and sizing of various storage and treatment systems, will be used to directly inform SKM s options analysis. MW have supplied detailed LiDAR survey overlaid on aerial photography for use in the investigations. In addition to the draft reports and modelling completed by Neil M Craigie P/L for PSP 53 and 54, other reports and studies that have influenced development of the SWMS for PSP 57 include: Drainage, An analysis of opportunities and constraints in Investigation Areas. Beveridge Williams and Neil M Craigie P/L February This study was part of the Melbourne@5Million investigations and it defined an initial drainage layout for the CGA areas. Neil M Craigie Pty Ltd 3

9 Southeast Urban Growth Zone, The Proposed Western Contour Drain Wetland/Retarding Basin Strategic Investigation Discussion Paper, for Melbourne Water, Neil M Craigie P/L, 13 March The RORB 1 hydrologic model and MUSIC 2 water quality model have been used for all investigations in the wider catchment studies for Clyde Creek/Muddy Gates Creek. This work is reported in the PSP 53 and 54 SWMS documents and is not repeated herein. 4. DESIGN CRITERIA AND ASSUMPTIONS 4.1 Flood Storage Systems The process of urbanisation dramatically increases impervious areas (increasing the proportion of rainfall which becomes surface runoff) and modifies the drainage system characteristics through piping of minor catchments and construction of open waterways (typically reducing the response time for surface runoff). The net hydrologic impact in the absence of appropriate countermeasures is significantly increased peak discharges, volumes and frequency of surface runoff events. To offset the impacts of increased peak discharges, flood retarding storages are provided and constructed open waterways are designed to slow velocities. However retarding storages have little effect on volumes or frequency of runoff events and it can be these impacts which are of most concern (a) for ecological conditions in receiving natural waterways, and (b) for agricultural operations on lands downstream. The SKM report has found that the receiving waterways in the CGA in the greater Clyde Creek/Muddy Gates Creek catchments have been so modified that there are negligible remnant environmental values, apart from the Category 1 Growling Grass Frog (GGF) corridor in the lower end of Clyde Creek. However the report also emphasises that there are opportunities to restore and rehabilitate naturalised open waterways with improved values as part of overall drainage planning. 1 RORB is the name given to an industry-standard Runoff Routing Model originally due to Laurenson EM and Mein RG. It is an interactive runoff and streamflow routing program that calculates catchment losses and streamflow hydrographs resulting from rainfall events and/or other forms of inflow to channel networks. It is used for flood estimation, spillway and retarding basin design and flood routing. 2 MUSIC is the acronym used for the Model for Urban Stormwater Improvement Conceptualisation software developed by the Cooperative Research Centre for Catchment Hydrology to model urban stormwater quality management schemes. Neil M Craigie Pty Ltd 4

10 Hence for the purposes of developing this strategy for PSP 57 it has been assumed that: there are no ecological obstacles to construction of pipelines or new naturalised waterways to replace the existing (largely artificial) minor drainage lines; design of new waterways should aim at maximising potential habitat, recreational and landscape values, in addition to providing flood conveyance at minimum velocities; water quality treatment will be required on all tributary catchments to protect the ultimate downstream receiving environments; online wetland and pondage systems may also be implemented as part of the water quality treatment trains where topography creates the opportunities, provided that such assets can be designed to comply with MWC guidelines and do not create significant ecological barriers; online wetland and pondage systems can and should be integrated with flood storage wherever feasible. It is recognised that land values in town centres and other activity centres and industrial zones will usually favour the use of pipelines rather than open waterways. The same applies for drainage lines passing through schools and major active open space land. Integrated flood retarding storage and water quality treatment pondages take two main forms: Sediment basin/retarding basins (SBRB s); Wetland/retarding basins (WLRB s). Wetlands and sediment basins that are not intended to provide flood retarding storage (ie., those for which airspace volume is only sufficient to provide for the necessary extended detention storage for water quality treatment) are labelled as WL s and SB s respectively. Water surface areas are sized to comply with specified water quality treatment standards. In conjunction with the relevant level constraints, this in turn then Neil M Craigie Pty Ltd 5

11 determines the potential flood storage capacity in the airspace above the water surfaces. It follows then that selection of the appropriate design forms is dependent to a large degree on the adopted water quality treatment protocol to be followed across the CGA, as well as on topographic opportunity, environmental values and planning proposals. 4.2 Water Quality and Quantity Treatment Protocol Water quality treatment standards are quoted as percentage removal of the typical urban loads of Gross Pollutants/Total Suspended Solids/Total Phosphorus/Total Nitrogen (GP/TSS/TP/TN). Current best practice standards are 70/80/45/45 percent removals of the typical urban loads. Gross pollutants are removed in either purpose built traps or sediment basins and wetlands. Whatever technique is used GP removal does not impact on water surface area or flood storage systems. Hence the focus of this strategy is on TSS/TP/TN removals. From the guiding objectives set out in the brief and after consideration of the results of the SKM study for the southerly draining catchments to Western Port, the appropriate water quality treatment protocol for lands in PSP 57 have been derived. Lands draining north into the Cranbourne East PSP will form part of the extension of Casey Fields and no further work is required in this SWMS. Those parts of PSP 57 draining south across Ballarto Road, pass firstly into PSP 58 (future industrial land), and thence through PSP 56. The downstream drainage infrastructure is over-taxed under existing conditions. Rural grazing dominates across PSP 58 lands. Intensive agriculture enterprises dominate along the drainage lines through PSP 56. Development of PSP 57 is likely to precede the ultimate development of PSP 58 and the residential development in PSP 56 further downstream. Therefore, to protect downstream rural industries it will be necessary to provide sufficient retardation storage in PSP 57 to maintain existing peak discharges for all events up to and including the 100 year ARI event. Having regard to the fact that PSP 57 land is remote from eventual outfall to Western Port, it is considered that conventional best practice water quality treatment standards (80/45/45) will suffice in all outfalls at Ballarto Road. Neil M Craigie Pty Ltd 6

12 For the balance lands in the north east sector which drain into the Clyde Creek catchment at Clyde-Five Ways Road, all permanent water quality treatment infrastructure is to be provided downstream within PSP 54. Hence lands within PSP 57 will be required to pay contributions to the MWC DSS on an equivalent basis to those lands in PSP 54, according to zoning. 4.3 Water Reuse The beneficial impacts of water reuse in support of or in lieu of treatment and disposal to the drainage system have not been factored into the above protocol. It is considered that until such time as an agreed strategy is in place locking in such reuse, the drainage strategy must assume no reuse for the purposes of sizing treatment facilities across the drainage system. 4.4 Cross PSP Boundary Issues in the Western Port Catchment Topographic opportunities for surface water management assets do not always match the PSP boundaries. In some drainage lines overall drainage scheme planning could favour locating wetland systems downstream of the PSP boundaries. Cost offsets for all such asset transfers can be resolved via the MWC DSS. It has been agreed by MWC/GAA that the strategy across the CGA should be founded on best matching topographic opportunity and constraints (and planning constraints) to location of main drainage assets. This means that some site-specific variations to the water quality treatment protocol set out in Section 4.2 could occur. Of most benefit for PSP 57 is the location of all major drainage management assets for land draining east to Clyde-Five Ways Road downstream in PSP 54. Neil M Craigie Pty Ltd 7

13 5. CATCHMENTS AND DRAINAGE OUTFALLS The tributary drainage subcatchments for the Clyde Creek/Muddy Gates Creek RORB model (as used in the original SE WLRB study) are shown on Figure 3. It can be seen that PSP 57 is split three ways. The north-westerly part drains into Casey Fields and the Cranbourne East PSP (Clyde Creek) catchment. All land draining north in PSP 57 will form part of the extension of Casey Fields and is not considered further in this report. The bulk of PSP 57 is basically represented by one subarea in the northeast sector (PSP 54 outfall) and one other for the balance land to Ballarto Road. For the recent PSP 53 and 54 studies the northeast sector was split into two subcatchments, reflecting two outfall crossings of Clyde-Five Ways Road. No further modelling is required for this part of PSP 57 because all major drainage management assets are to be located east of Clyde-Five Ways Road within PSP 54. Permanent drainage works comprising conventional 5 year ARI capacity pipelines and overland flowpaths are all that is required in the easterly draining parts of PSP 57. Figure 4 shows a more detailed subcatchment layout and likely alignments for the main pipelines draining to the Clyde-Five Ways Road outfalls labelled 1 and 2. The total developable land area draining to Clyde-Five Ways Road is estimated at 46.0 ha. For the balance southerly draining land there are two outfall points shown on Figure 4; one in the far southwest corner of PSP 57 (outfall ha developable catchment), and one adjacent to the existing major dam (outfall 4-56 ha developable land plus 28.7 ha Casey Fields extension). A major wetland/retarding basin (WLRB) is required at outfall 4. In theory another minor WLRB will be required at outfall 3. However this site will have high land values given its immediate proximity to the main Casey Fields Boulevard crossing of Ballarto Road. The LiDAR contour data indicates that a 5 year ARI capacity pipeline could be used to divert flows eastwards to the outfall 4 WLRB with overland flows passing across Ballarto Road via future culverts. This will increase the size of the outfall 4 WLRB but will prove more economic to construct than a separate WLRB. Neil M Craigie Pty Ltd 8

14 For the purposes of this report it has been assumed that this option will be adopted and pipe flows from outfall 3 will be directed eastwards along Ballarto Road. Hence total developable land area directed to outfall 4 is 61.5 ha. 6. THE OUTFALL 4 WLRB 6.1 Levels This will be the only major drainage management asset required in PSP 57. LiDAR data shows the existing lowpoint level of Ballarto Road to be about 37 m. Downstream of Ballarto Road a large on-stream dam is present with normal water level of m and top of bank m. To avoid the need for modification of the dam and outlet works it would be prudent to adopt a Normal Top Water Level (NTWL) not lower than 35.7 m for the proposed WLRB. With less than 1.3 m airspace storage depth above NTWL to overtopping level of Ballarto Road it may be necessary to construct a new embankment parallel to and just north of Ballarto Road to provide the necessary flood mitigation storage capacity in the WLRB. 6.2 Wetland Sizing The MUSIC Version 3 model was used to size the wetland water surface area, using Koo Wee Rup minute rainfall data and extended detention depth for the wetland of 0.3 m. The results in Table 1 comply with the water quality treatment protocol and were obtained with total inlet pond volume of 3,000 m 3 and wetland macrophyte area of 1.8 ha. Mean annual flow volumes can be used as inputs into the water reuse study being carried out by SEW. TABLE 1 MUSIC Model Results (PSP 57 South KWR min) Location/Asset/Parameter Catchment Source Loads Residual Loads % Load removal in system to asset outlet Outfall 4 WLRB Flow (ML/yr) Suspended Solids (Kg/yr) 71,600 14, Total Phosphorus (Kg/yr) Total Nitrogen (Kg/yr) 1, Gross Pollutants (kg/yr) 12, Neil M Craigie Pty Ltd 9

15 6.3 Flood Mitigation Storage Volume Given the lack of a proposed urban design layout for PSP 57, no new RORB modelling has as yet been carried out for this small catchment. Instead reliance has been placed on accepted estimating relations for the southeast areas draining to Western Port Bay, but which are not affected by tidal conditions. To maintain peak discharges as for existing conditions for all events up to and including the 100 year ARI flood a retarding storage capacity of not less than 500 m 3 /ha of developed land will be required. Hence for the total developed catchment area of 61.5 ha the airspace flood storage volume must be at least 61.5*500=30,750 m 3. Note that this estimate assumes Casey Fields will manage surface runoff to maintain existing conditions flows within its own confines. 6.4 Allowable Peak Flows Using the Rational Method with Adams Equation and runoff coefficients from Book 2 of Australian Rainfall and Runoff, the peak flows generated under existing conditions from the 61.5 ha catchment to Ballarto Road are 0.4 m3/s, 0.9 m3/s, and 1.8 m3/s for 1, 10 and 100 year ARI events respectively. These peak flows are the design objectives to be applied for discharge from the outfall 4 WLRB. 6.5 WLRB Reserve Area Sediment Drying Area The WSUD Engineering Guidelines-Stormwater (WSUDEG-SW) procedures (Chapter 4) are used to determine the required basin sizing as per MWC conditions. The relevant parameter values and design sizings have been assessed as follows, with target particle retention being 90% of 125 um size: Site Outfall 4 WLRB Urban Catchment Area (ha) % impervious Tc (mins) 1 year ARI peak flow (m3/s) Sediment loading rate (m3/ha/yr) Storage period (yrs) Sediment Accumulation Volume required (m3) Neil M Craigie Pty Ltd 10

16 MWC are now applying very conservative requirements for the provision of drying area to temporarily store and dry wet extracted sediments, pending eventual removal and disposal. The area required is determined as the 5 year cleanout interval/50% accumulation volume divided by average wet storage depth of 0.5 m. For this asset the sediment drying area is thus 442/0.5=884 m 2. The sediment accumulation volume of 442 m 3 has to be less than or equal to 50% of the total inlet pool storage volume at NTWL. This is easily satisfied by the 3,000 m 3 adopted. Site Area requirements Site requirements will also depend on batter treatments and access. For the purposes of this exercise it is assumed that a 6:1 average slope will be applied to embankments and excavated batters plus 4 m wide access/maintenance trails around the wetland edge and the reserve perimeter. An access ramp will be provided at 10:1 down to the drying bench and then into the base of the sediment pond. With total water surface area of 2.1 ha for the wetland and inlet pond the likely reserve area can be estimated using the following considerations: Not less than 20 m setback between water s edge at NTWL and any road or lot boundary; Sediment drying area of about 1,000 m 2 ; 3:1 edges to NTWL +0.3 m, 6:1 minimum above; Landscaping and recreational space of about 0.5 ha. The concept layout shown on Figure 4 provides for a reserve area of up to 4.8 ha. This area estimate is sensitive to the assumptions used in its derivation and hence is subject to variation with more detail functional design after preparation of an urban design for PSP 57. A key assumption to be tested in the future is the final land area required for the Casey Fields extension. If this is less than the area shown on Figure 4 then developable land area increases and so does wetland area and flood storage volume. Neil M Craigie Pty Ltd 11

17 Total flood storage volume available at 37.0 m on Figure 4 exceeds 33,000 m 3 so it may be possible to delete the embankment along Ballarto Road. This would reduce site area by at least 0.6 ha. 6.6 Is there an alternative? The layout shown on Figure 4 complies with known site constraints posed by Casey Fields extension, downstream drainage inverts, flat east-west topography, and limited flood storage depth to the level of Ballarto Road. It also meets the water quality and quantity treatment protocols. However Figure 4 should still be considered as a starting point for further modification as the PSP layout evolves following confirmation of cultural/heritage and environmental values and Casey Fields extension area, and other planning and transport objectives progress, and especially after landowner inputs are received. Receipt of field survey of existing drainage culverts will also be of benefit for design. If a deeper outfall invert is able to be negotiated at the time development occurs then the wetland NTWL can be lowered. This allows extended detention depth to be increased which will reduce wetland area. The increased airspace flood storage depth may also permit a lower embankment or no embankment at all along Ballarto Road. It may be feasible to relocate part or all of the WLRB into PSP 58 downstream. However given the higher density land uses proposed south of Ballarto Road it is not considered likely that this option could succeed. Neil M Craigie Pty Ltd 12

18 PSP57 SWMS (Draft V1) PSP 57 Figure 3 RORB subcatchment layout (Clyde Creek and Muddy Gates Catchments Outfall 4 WLRB Figure 4 Proposed Main Drainage Layout for PSP 57 (based on Casey Fields Extension Option 3). Drainage outfalls listed as 1-4. Neil M Craigie Pty Ltd 13

19 7. STAGING/IMPLEMENTATION CONSIDERATIONS 7.1 General Principles The location of the stormwater management assets shown on Figure 4 has been arranged to minimise overall capital and ongoing costs and to utilise as much land which is already encumbered by flooding as is practicable (rather than otherwise developable land), having regard to other constraints such as flora/fauna values, main roads, railway, and the Casey Fields extension. It is possible to split WLRB s into segments to better suit staged or out-of-sequence development, or to resolve property ownership demarcations. However there is an efficiency penalty in doing this. As storage depths are basically fixed by flood levels and creek levels, and batter lengths are increased, splitting storages directly increases land area requirements. Other studies indicate storage capacity requirements rise by about 20% on average when a WLRB is split into two segments. Similarly there is a penalty for ongoing operation and maintenance costs with increased numbers and total areas of assets. Subject to suitable arrangements being put in place to cover any capital cost or ongoing cost penalties and the same performance standards being met, there is no technical reason why a storage cannot be split to better suit development layouts or land ownership differences. It is standard practice in urban development contributory drainage schemes across the greater Melbourne area, for any temporary management facilities that may be required to service out-of-sequence development (as may be required to protect downstream undeveloped land and/or the environment) to be funded by the proponents of that development without reimbursement from the scheme. Timing of construction of WLRB s (and connecting pipelines or waterways) is entirely governed by the progress, rate and staging of development. The need for, and extent/size of any temporary management facilities that may be required to service out-of-sequence development is similarly affected. Subject to MWC and Council agreement (as the ongoing responsible bodies for operation and maintenance), flexibility should always be retained to allow different landowners to negotiate changes to drainage layout and design of assets-with any extra capital costs outside the DSS also being negotiated between them. 7.2 Development Application Requirements and Compliance Applications for development approval for lands within the PSP areas may include construction of permanent works included in the DSS, or temporary works to adequately service out-of-sequence developments or to defer major works expenditure. Neil M Craigie Pty Ltd 14

20 The following principles will be applied by MWC and Council in responding to all applications: Temporary works do not form part of the DSS and hence are to be fully funded by the development proponent, unless they are part of ultimate drainage design works (eg., partial excavation of a larger SBRB or waterway or wetland that are to be funded as part of the DSS). Development proponents are required to show in any application how the development proposal affects, or is affected by the requirements of this SWMS. Development proponents must provide Stormwater Environmental Management Plans (SEMP) which identify potential waterway stability/environmental/drainage/flooding problems and constraints arising from their development proposals (including upstream or downstream impacts on existing receiving environments, waterways, land uses and assets/works), and quantify and recommend what is required to ensure compliance with best practice water management objectives. Unless otherwise pre-approved by MWC and Council, temporary works are not to be designed in a manner which prevents free invert drainage and/or which causes under-design surcharging for any permanent pipeline system (eg., a 5 year ARI capacity pipeline being surcharged in lesser storm events because of outfall capacity restrictions). Every SEMP must include computations verifying compliance with this requirement. Every SEMP must deal explicitly with control over stormwater sediment loads and monitoring of same during estate construction works, and demonstrate how the works comply with best practice whilst addressing high constructionera sediment loads, potential acid sulphate soils and dispersive soils management issues. Potential acid sulphate soils and dispersive soils management issues are to be identified and appraised by suitably qualified geotechnical personnel. Where the proposed development drainage management measures do not form part of the DSS schedule, the development proponents are required to investigate, design, construct and fund all costs of establishment of the temporary works, including monitoring and reporting of water quality testing as may be required by MWC, Council, or DSE, and ongoing maintenance requirements and costs. Statements of compliance will be conditional, in part, on cleanout and resetting of sediment management assets before handover to MWC/Council for ongoing responsibility, and on satisfactory financial arrangements being reached with MWC/Council for ongoing maintenance and eventual reclamation of temporary works. Neil M Craigie Pty Ltd 15

21 Methodology and performance standards Best practice water quality performance is to be demonstrated using the MUSIC model. For hydrologic assessments (flow and storage computations), the RORB model or equivalent is to be used. For hydraulic modelling of one-dimensional flow systems the HEC-RAS model will suffice for water level, velocity and channel shear stress computations. For more complex hydraulic situations (generally wider floodplains), two-dimensional hydrodynamic models are to be used such as TuFlow or Mike 21 or their approved equivalents. Where no gauged streamflow data exists to allow peak flows for existing rural conditions to be derived, the Rational Method may be applied for this purpose using Adams equation for estimation of time of concentration with matched runoff coefficients, all in accord with the recommendations set out in Australian Rainfall and Runoff (ARR). The 10 year ARI runoff coefficients provided in Volume 2 of ARR should be used and not those listed in other references such as VicRoads Design Manuals. Unless specifically directed otherwise by MWC and/or Council: temporary drainage management works are to be sized to maintain existing conditions peak flows for all events up to and including 100 years ARI, on lands downstream of the subject property. temporary drainage management works are to be designed to maintain existing conditions flood levels for all events up to and including 100 years ARI, on lands upstream and downstream of the subject property. best practice water quality objectives must be achieved prior to water exiting from the boundaries of the relevant development. This allows for options such as overland flow dispersal across vegetated areas within a larger development to be implemented. Bioretention or infiltration systems will not be accepted as temporary sediment management works for any development application. Neil M Craigie Neil M Craigie Pty Ltd 16

Armstrong Creek West Precinct. Review of Stormwater Management Strategy

Armstrong Creek West Precinct. Review of Stormwater Management Strategy Armstrong Creek West Precinct Review of Stormwater Management Strategy 31 October 2011 Report by: Valerie Mag, B.E. Civil (Hons), M. Eng. Sci. Stormy Water Solutions stormywater@optusnet.com.au Ph 9511

More information

STORMWATER MANAGEMENT STRATEGY. McPherson Precinct Structure Plan (PSP 1055)

STORMWATER MANAGEMENT STRATEGY. McPherson Precinct Structure Plan (PSP 1055) STORMWATER MANAGEMENT STRATEGY McPherson Precinct Structure Plan (PSP 1055) March 2016 Document history Revision: Revision no. 04 Author/s Jenny Butcher Stuart Cleven Checked Approved Jonathon McLean Jonathon

More information

Morton West, Dacland. Hydrology / Stormwater Management Report Permit Application

Morton West, Dacland. Hydrology / Stormwater Management Report Permit Application Morton West, Dacland Hydrology / Stormwater Management Report Permit Application February 2014 Document history Revision: Revision no. Author/s R01 Jonathon McLean Approved Jonathon McLean Distribution:

More information

DRAINAGE REVIEW: Berwick Health and Education Precinct. for. Victorian Planning Authority

DRAINAGE REVIEW: Berwick Health and Education Precinct. for. Victorian Planning Authority DRAINAGE REVIEW: Berwick Health and Education Precinct for Victorian Planning Authority April 2017 Document history Revision: Revision no. 03 Author/s Jonathon McLean Approved Jonathon McLean Distribution:

More information

Neil M Craigie Pty Ltd ACN ABN LINCOLN HEATH SOUTH ESTATE POINT COOK ROAD, POINT COOK ADDENDUM TO SWMS

Neil M Craigie Pty Ltd ACN ABN LINCOLN HEATH SOUTH ESTATE POINT COOK ROAD, POINT COOK ADDENDUM TO SWMS Neil M Craigie Pty Ltd ACN 074 582 282 ABN 29 074 582 282 Waterway Management Consultants LINCOLN HEATH SOUTH ESTATE POINT COOK ROAD, POINT COOK ADDENDUM TO SWMS MANAGING THE EVC HYDROLOGY ISSUES For:

More information

Melbourne Water drainage explanatory brief, Minta Farm PSP

Melbourne Water drainage explanatory brief, Minta Farm PSP 5 th April 2018 Melbourne Water drainage explanatory brief, Minta Farm PSP 1. Melbourne Water is the Waterway, Floodplain and Regional Drainage Management Authority for the Port Phillip and Western Port

More information

Grasslands Retarding Basin and Wetland Functional Design. Officer

Grasslands Retarding Basin and Wetland Functional Design. Officer Hydrological and Environmental Engineering Grasslands Retarding Basin and Wetland Functional Design Officer 8 April 2011 Report by: Valerie Mag, B.E. Civil (Hons), M. Eng. Sci. Stormy Water Solutions stormywater@optusnet.com.au

More information

Pakenham East Precinct Structure Plan. Deep Creek Corridor Proposals

Pakenham East Precinct Structure Plan. Deep Creek Corridor Proposals Hydrological and Environmental Engineering Pakenham East Precinct Structure Plan Deep Creek Corridor Proposals 5 October 2014 Report by: Valerie Mag BE Civil (Hons), M Eng Sci Stormy Water Solutions stormywater@optusnet.com.au

More information

Minta Farm PSP Surface Water Management Strategy

Minta Farm PSP Surface Water Management Strategy Victorian Planning Authority Minta Farm PSP Surface Water Management Strategy Report October 2017 V5000_001 DISCLAIMER This report has been prepared on behalf of and for the exclusive use of Victorian

More information

Hume Planning Scheme Amendment C207. Expert Witness report provided to Planning Panels Victoria

Hume Planning Scheme Amendment C207. Expert Witness report provided to Planning Panels Victoria Hume Planning Scheme Amendment C207 Expert Witness report provided to Planning Panels Victoria Drainage Evidence (Property 94, 95, 96, 97, 98 and 99) Prepared for Hi Quality Pty Ltd and Trantaret Pty Ltd

More information

Neil M Craigie Pty Ltd ACN ABN LINCOLN HEATH ESTATE POINT COOK ROAD, POINT COOK SOUTHERN OUTFALL CATCHMENT

Neil M Craigie Pty Ltd ACN ABN LINCOLN HEATH ESTATE POINT COOK ROAD, POINT COOK SOUTHERN OUTFALL CATCHMENT Neil M Craigie Pty Ltd ACN 074 582 282 ABN 29 074 582 282 Waterway Management Consultants LINCOLN HEATH ESTATE POINT COOK ROAD, POINT COOK SOUTHERN OUTFALL CATCHMENT SURFACE WATER MANAGEMENT STRATEGY (UPDATE)

More information

DRAFT REPORT: Paynes Road PSP Drainage Review

DRAFT REPORT: Paynes Road PSP Drainage Review DRAFT REPORT: Paynes Road PSP Drainage Review November 2014 Document history Revision: Revision no. 01 Author/s Penny Clark Dan O Halloran Checked Jonathon McLean Approved Jonathon McLean Distribution:

More information

SURFACE/STORM WATER MANAGEMENT STRATEGY: 1960 & 2040 Mickleham Road, Mickleham. Lindum Vale. Satterley Property Group

SURFACE/STORM WATER MANAGEMENT STRATEGY: 1960 & 2040 Mickleham Road, Mickleham. Lindum Vale. Satterley Property Group SURFACE/STORM WATER MANAGEMENT STRATEGY: 1960 & 2040 Mickleham Road, Mickleham Lindum Vale Satterley Property Group October 2017 Document history Revision: Revision no. 04 Author/s Jonathon McLean Andrew

More information

SURFACE/STORM WATER MANAGEMENT STRATEGY: 1960 & 2040 Mickleham Road, Mickleham. Lindum Vale. Satterley Property Group

SURFACE/STORM WATER MANAGEMENT STRATEGY: 1960 & 2040 Mickleham Road, Mickleham. Lindum Vale. Satterley Property Group SURFACE/STORM WATER MANAGEMENT STRATEGY: 1960 & 2040 Mickleham Road, Mickleham Lindum Vale Satterley Property Group December 2017 Document history Revision: Revision no. 05 Author/s Jonathon McLean Andrew

More information

Neil M Craigie Pty Ltd ACN ABN AMENDMENT C301 CITY OF GREATER GEELONG PLANNING SCHEME ARMSTRONG CREEK SOUTH PRECINCT (ACSP)

Neil M Craigie Pty Ltd ACN ABN AMENDMENT C301 CITY OF GREATER GEELONG PLANNING SCHEME ARMSTRONG CREEK SOUTH PRECINCT (ACSP) Neil M Craigie Pty Ltd ACN 074 582 282 ABN 29 074 582 282 Waterway Management Consultants AMENDMENT C301 CITY OF GREATER GEELONG PLANNING SCHEME ARMSTRONG CREEK SOUTH PRECINCT (ACSP) STORMWATER MANAGEMENT

More information

SURFACE/STORM WATER MANAGEMENT STRATEGY: 1960 & 2040 Mickleham Road, Mickleham. Lindum Vale. Satterley Property Group

SURFACE/STORM WATER MANAGEMENT STRATEGY: 1960 & 2040 Mickleham Road, Mickleham. Lindum Vale. Satterley Property Group SURFACE/STORM WATER MANAGEMENT STRATEGY: 1960 & 2040 Mickleham Road, Mickleham Lindum Vale Satterley Property Group May 2018 Document history Revision: Revision no. 07 Author/s Jonathon McLean Andrew John

More information

Neil. M Craigie Pty Ltd. Berwick Waterways. Summary Issues Paper. 14 September 2009

Neil. M Craigie Pty Ltd. Berwick Waterways. Summary Issues Paper. 14 September 2009 AND Neil M Craigie Pty Ltd Berwick Waterways Summary Issues Paper 14 September 2009 Report by: Valerie Mag BE Civil (Hons), M Eng Sci Stormy Water Solutions stormywater@optusnet.com.au Ph 9511 5911, M

More information

COOPER STREET, EPPING STORMWATER MANAGEMENT STRATEGY. May Cooper Street Pty Ltd

COOPER STREET, EPPING STORMWATER MANAGEMENT STRATEGY. May Cooper Street Pty Ltd 415-425 COOPER STREET, EPPING STORMWATER MANAGEMENT STRATEGY May 2017 Cooper Street Pty Ltd Disclaimer Dalton Consulting Engineers Pty Ltd This report has been prepared solely for the benefit of Cooper

More information

Berwick Waterways Storm Water Management Plan

Berwick Waterways Storm Water Management Plan Hydrological and Environmental Engineering Berwick Waterways Storm Water Management Plan DRAFT 16 June 2014 Report by: Valerie Mag, BE Civil (Hons), M Eng Sci Stormy Water Solutions stormywater@optusnet.com.au

More information

Wetland Design Manual. Supporting document: Wetland form and function

Wetland Design Manual. Supporting document: Wetland form and function Wetland Design Manual Supporting document: Wetland form and function Table of contents Contents Water Sensitive Urban Design... 3 Protection of waterways... 3 Management of stormwater in urban landscapes...

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Expert Witness Report. Drainage Evidence 60 Buckland Way

Expert Witness Report. Drainage Evidence 60 Buckland Way Hume Planning Scheme Amendments C207 and C208: Sunbury South and Lancefield Road PSPs Permit Application Nos (P18858, P18854, P18855) Expert Witness Report Drainage Evidence 60 Buckland Way REVISION B

More information

Stormwater design considerations

Stormwater design considerations Stormwater design considerations Manage the small and frequent rainfall events first Bill Till Supervising Engineer Urban Water Management Stormwater management information Decision Process for Stormwater

More information

Integrated Water Management Developer Guidance

Integrated Water Management Developer Guidance WESTERN WATER Western Water Whole-of-water-cycle Strategy Integrated Water Management Developer Guidance Edition 1, 2018 For more information call 1300 650 422 or visit us at WesternWater.com.au Development

More information

SIENNA PARK ESTATE: 1525 POUND ROAD, CLYDE NORTH

SIENNA PARK ESTATE: 1525 POUND ROAD, CLYDE NORTH Dennis, Price + Miller Pty Ltd 22 Business Park Drive NOTTING HILL VIC 3168 t (03) 9538 5000 f (03) 9538 5050 e-mail: consulting@dpmvic.com.au web site: www.dpmvic.com.au Job No: 1962/M/A(ii) ABN 47 006

More information

TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST

TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST Instructions: This form must be included with an initial submittal of a Site Plan or Subdivision Application. Use the column to indicate if the SWPPP

More information

ENGINEERING EVIDENCE STATEMENT

ENGINEERING EVIDENCE STATEMENT ENGINEERING EVIDENCE STATEMENT SUNBURY SOUTH PSP & 35-60 FOX HOLLOW DRIVE, SUNBURY PREPARED BY ANDREW MATHESON FOR ASIA-PACIFIC PROPERTY GROUP PTY LTD AUGUST 2017 Building F 301 Ver 2.0 8, 270 Ferntree

More information

LARA WEST GROWTH AREA (LWGA)

LARA WEST GROWTH AREA (LWGA) Neil M Craigie Pty Ltd ACN 074 582 282 ABN 29 074 582 282 Waterway Management Consultants LARA WEST GROWTH AREA (LWGA) SURFACE WATER MANAGEMENT STRATEGY For: SMEC Urban Pty Ltd 9 June 2012 Director Neil

More information

ST. GERMAIN CLYDE NORTH. Servicing and Utility Infrastructure Report. Beveridge Williams Melbourne Office 1 Glenferrie Road PO Box 61 Malvern 3144

ST. GERMAIN CLYDE NORTH. Servicing and Utility Infrastructure Report. Beveridge Williams Melbourne Office 1 Glenferrie Road PO Box 61 Malvern 3144 Beveridge Williams Melbourne Office 1 Glenferrie Road PO Box 61 Malvern 3144 Tel: (03) 9524 8888 Fax: (03) 9524 8899 www.beveridgewilliams.com.au ST. GERMAIN CLYDE NORTH Servicing and Utility Infrastructure

More information

3.3 Acceptable Downstream Conditions

3.3 Acceptable Downstream Conditions iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and

More information

Wetland Design Manual. Part B: Design acceptance process

Wetland Design Manual. Part B: Design acceptance process Wetland Design Manual Part B: Design acceptance process Table of contents Introduction 5 Design acceptance approaches for submitting proposals to Melbourne Water 8 Deemed to Comply approach... 8 Alternative

More information

Overview of Water Policy Challenges for Victoria. Dr Peter Coombes

Overview of Water Policy Challenges for Victoria. Dr Peter Coombes Overview of Water Policy Challenges for Victoria Dr Peter Coombes Insights from investigations into integrating urban drainage into water cycle management Working with Engineers Australia on this task

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

Wetland Design Manual. Supporting document: Planning, funding and. management

Wetland Design Manual. Supporting document: Planning, funding and. management Wetland Design Manual Supporting document: Planning, funding and management Contents Introduction... 2 Water Industry Act (1994)... 2 Water Act (1989)... 3 Planning and Environment Act (1987)... 3 Subdivisions

More information

Masters Geelong Stormwater Management Plan

Masters Geelong Stormwater Management Plan ` Masters Geelong Job Number: CG111748 ABN 47 106 610 913 150 Oxford Street, Collingwood Victoria 3066 Australia Telephone: 03 8415 7777 Facsimile: 03 8415 7788 International: +61 3 8415 7777 victoria@cardno.com.au

More information

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

Points. To encourage and recognise the minimisation of peak stormwater flows and the protection of receiving waters from pollutants.

Points. To encourage and recognise the minimisation of peak stormwater flows and the protection of receiving waters from pollutants. Points Available 3 Aim of Credit To encourage and recognise the minimisation of peak stormwater flows and the protection of receiving waters from pollutants. Credit Criteria Up to three points are available.

More information

Water sensitive urban design. Developing design objectives for urban development in South East Queensland

Water sensitive urban design. Developing design objectives for urban development in South East Queensland Water sensitive urban design Developing design objectives for urban development in South East Queensland Version 2-8 November 2007 Contents Contents......... ii Executive Summary............1 1 Introduction.........1

More information

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013. Planning Considerations for Stormwater Management in Alberta R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013 Photo Optional Purpose The purpose of urban stormwater management is to provide solutions

More information

A part of BMT in Energy and Environment Kosciusko Avenue Main Drain Catchment Drainage / Flood Study Draft Report

A part of BMT in Energy and Environment Kosciusko Avenue Main Drain Catchment Drainage / Flood Study Draft Report A part of BMT in Energy and Environment Kosciusko Avenue Main Drain Catchment Drainage / Flood Study Draft Report R.M7299.003.00.DraftReport January 2011 Kosciusko Avenue Main Drain Catchment Drainage

More information

East Werribee Employment Precinct. Analysis of stormwater management. Growth Areas Authority

East Werribee Employment Precinct. Analysis of stormwater management. Growth Areas Authority East Werribee Employment Precinct Analysis of stormwater management Growth Areas Authority Final Report March 2013 Executive Summary During 2009, the Department of Planning and Community Development (DPCD)

More information

Stormwater Management Report Bachman Terrace Residential Development

Stormwater Management Report Bachman Terrace Residential Development Stormwater Management Report Bachman Terrace Residential Development Project # 160401069 Prepared for: Tega Developments Prepared by: Stantec Consulting Ltd. April 14, 2014 Sign-off Sheet This document

More information

Flood Hazard Assessment of Potential Growth Areas Palmerston North City: Ashhurst

Flood Hazard Assessment of Potential Growth Areas Palmerston North City: Ashhurst Flood Hazard Assessment of Potential Growth Areas Palmerston North City: Ashhurst Report prepared for Palmerston North City Council by Philip Wallace River Edge Consulting Limited May 2013 Table of Contents

More information

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

LAKE COUNTY HYDROLOGY DESIGN STANDARDS LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide

More information

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT THE GOVERNMENT OF MALAYSIA PRIME MINISTER S DEPARTMENT ECONOMIC PLANNING UNIT THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT VOL. 5: TECHNICAL

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac) Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17

More information

PRELIMINARY DRAINAGE STUDY

PRELIMINARY DRAINAGE STUDY PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,

More information

Flow Diversion Banks: General

Flow Diversion Banks: General Flow Diversion Banks: General DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Flow diversion

More information

Let Them Count An Argument for Inclusion of the Impact of. Household Rainwater Tanks When Designing an Urban Drainage. Network

Let Them Count An Argument for Inclusion of the Impact of. Household Rainwater Tanks When Designing an Urban Drainage. Network Let Them Count An Argument for Inclusion of the Impact of Household Rainwater Tanks When Designing an Urban Drainage Network L.Strauch* 1 *Presenting Author Household rainwater tanks are currently an optional

More information

3.5 Hydrology & Hydraulics

3.5 Hydrology & Hydraulics 3.5 Hydrology & Hydraulics 3.5.1 Purpose The purpose of this section is to provide results from the analysis and assessment of the impact of the proposed Carmichael Rail Alignment (Option 11 Revision 1)

More information

Wetland/Retarding Basin Functional Design

Wetland/Retarding Basin Functional Design Hydrological and Environmental Engineering Ryan Road Development Services Scheme Wetland/Retarding Basin Revision C 7 April 2017 Report by: Stormy Water Solutions stormywater@optusnet.com.au Ph (03) 8555

More information

FLOOD PLAIN MANAGEMENT

FLOOD PLAIN MANAGEMENT CITY OF STRATFORD STRATFORD WEST SECONDARY PLAN FLOOD PLAIN AND STORM WATER MANAGEMENT COURT DRAIN AND MCNAMARA DRAIN MCCORMICK RANKIN CORPORATION December 2007 TABLE OF CONTENTS 1.0 INTRODUCTION...2 1.1

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

Taking the pain out of the treatment train: continuous simulation modelling for integrated water management

Taking the pain out of the treatment train: continuous simulation modelling for integrated water management Engineers & Consultants Taking the pain out of the treatment train: continuous simulation modelling for integrated water management Stu Farrant & Reuben Ferguson, Morphum Environmental Limited Abstract

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

The SuDS Manual Frequently asked questions

The SuDS Manual Frequently asked questions The SuDS Manual Frequently asked questions 1. Is source control still a requirement of the new SuDS Manual? Yes. Source control components are fundamental elements of a SuDS scheme. The benefits of source

More information

MUSIC Parameters for use within the City of Greater Geelong

MUSIC Parameters for use within the City of Greater Geelong MUSIC Parameters for use within the City of Greater Geelong Introduction The following MUSIC Guidelines have been developed by Parsons Brinckerhoff (PB) for the City of Greater Geelong for use in modelling

More information

Interim: Developing a local water management strategy

Interim: Developing a local water management strategy Interim: Developing a local water management strategy Department of Water December 2008 Department of Water 168 St Georges Terrace Perth Western Australia 6000 Telephone +61 8 6364 7600 Facsimile +61 8

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

The Process for Designing for Shallow Groundwater. and Small Rainfall Event Management in Urban. Developments

The Process for Designing for Shallow Groundwater. and Small Rainfall Event Management in Urban. Developments The Process for Designing for Shallow Groundwater and Small Rainfall Event Management in Urban Developments Bill Till* and Emma Monk *Presenting Author The Decision process for stormwater management in

More information

Chapter 8 Constructed Wetlands

Chapter 8 Constructed Wetlands Chapter 8 Constructed Wetlands Definition: A constructed wetland is a man-made copy of a natural wetland system used for the treatment of stormwater runoff. Purpose: Removal of fine and coarse sediments.

More information

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1 City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June 2010... Chapter 1 i CITY OF AZLE iswm CRITERIA MANUAL FOR SITE DEVELOPMENT AND CONSTRUCTION Incorporating the Regional NCTCOG Integrated

More information

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part

More information

BUREAU OF CLEAN WATER

BUREAU OF CLEAN WATER COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) STORMWATER DISCHARGES FROM SMALL MUNICIPAL SEPARATE STORM

More information

Insights from editing the ARR Urban Book. Peter J Coombes

Insights from editing the ARR Urban Book. Peter J Coombes Insights from editing the ARR Urban Book Peter J Coombes Motivation for revision of ARR Many practices and data in ARR 1987 are outdated More rainfall and streamflow data Improved understanding of climate

More information

Chapter 3 Dispersion BMPs

Chapter 3 Dispersion BMPs Chapter 3 Dispersion BMPs 3.1 BMP L611 Concentrated Flow Dispersion 3.1.1 Purpose and Definition Dispersion of concentrated flows from driveways or other pavement through a vegetated pervious area attenuates

More information

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management Online ECode Available on Cheltenham Township Website at: http://ecode360.com/14477578 For all regulated

More information

Stormwater untapping the potential. A rapid approach to assessing avoided drainage costs

Stormwater untapping the potential. A rapid approach to assessing avoided drainage costs Stormwater untapping the potential. A rapid approach to assessing avoided drainage costs Sestokas, K* 1, Bishop, E 2, van Raalte, L 3, Watkinson, R 4, Marshall P and Stokes, D 5 As the population of Melbourne

More information

Items in this checklist identify the base requirements that are to be provided by the design professional.

Items in this checklist identify the base requirements that are to be provided by the design professional. The Project Manager or other Owner designee will serve as the Plan Reviewer. This checklist is to be completed by the Plan Reviewer on behalf of the Owner. The Plan Reviewer s role is to review the submitted

More information

The MASMA and Sustainable Drainage Systems

The MASMA and Sustainable Drainage Systems RLD 512 LANDSCAPE HYDROLOGY The MASMA and Sustainable Drainage Systems Dr Naser Ghani PhD, P.Eng, MIEM, MASCE, MACEM anaser@usm.my www.hbp.usm.my/naser ROOM 104 E49 MASMA The main focus of Urban Storm

More information

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Hydrology Study Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Prepared for San Mateo Real Estate & Construction March 9, 21 Rev. 1 11-8-211 Rev.

More information

Modelling a Combined Sewage and Stormwater Flood Detention Basin

Modelling a Combined Sewage and Stormwater Flood Detention Basin Modelling a Combined Sewage and Stormwater Flood Detention Basin A. Pugh B.E. (Hons), Member A.W.A. Sales and Support Manager, Wallingford Software Pty Ltd, Australia S. Ratcliffe B.Sc(Hons), Grad Dip

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 HUFFAKER ROAD (PLANT HAMMOND) PRIVATE INDUSTRIAL LANDFILL (HUFFAKER ROAD LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion

More information

Modelling and sizing evapotranspiration fields to manage urban. stormwater excess: reducing surface runoff volume

Modelling and sizing evapotranspiration fields to manage urban. stormwater excess: reducing surface runoff volume Modelling and sizing evapotranspiration fields to manage urban stormwater excess: reducing surface runoff volume Emma James* 1, Peter Breen 2, Sara Lloyd 3 and Courtney Henderson 4 *Presenting Author Surface

More information

USING WSUD TO RESOLVE COMPETING OBJECTIVES: A CASE STUDY OF A SUSTAINABLE INDUSTRIAL DEVELOPMENT. Abstract

USING WSUD TO RESOLVE COMPETING OBJECTIVES: A CASE STUDY OF A SUSTAINABLE INDUSTRIAL DEVELOPMENT. Abstract USING WSUD TO RESOLVE COMPETING OBJECTIVES: A CASE STUDY OF A SUSTAINABLE INDUSTRIAL DEVELOPMENT R Wiese 1 M Brown 1,M Liebman 1 1 STORM_CONSULTING, rod@stormconsulting.com.au Abstract Located within the

More information

A Pictorial Overview of the Queensland Urban Drainage Manual. Version 3, June 2013

A Pictorial Overview of the Queensland Urban Drainage Manual. Version 3, June 2013 Version 3, 2013 A Pictorial Overview of the Queensland Urban Drainage Manual Version 3, June 2013 Prepared by: Published by: Diagrams by: Photos by: Grant Witheridge, Catchments & Creeks Pty Ltd Catchments

More information

BEST PRACTICE GUIDELINE G1 STORMWATER MANAGEMENT

BEST PRACTICE GUIDELINE G1 STORMWATER MANAGEMENT BEST PRACTICE GUIDELINE G1 STORMWATER MANAGEMENT William Pulles Structure of BPG G1 Chapter 1 Introduction to guideline Chapter 2 - The principles and objectives to be incorporated in the storm water management

More information

Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan

Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Pennsylvania State Section American Water Resources Association Fall 2011

More information

Public Information Centre No. 2 June 15, :00 8:00 pm. Valley Park Community Centre (GYM B) 970 Paramount Drive Stoney Creek

Public Information Centre No. 2 June 15, :00 8:00 pm. Valley Park Community Centre (GYM B) 970 Paramount Drive Stoney Creek Public Information Centre No. 2 June 15, 2017 6:00 8:00 pm Valley Park Community Centre (GYM B) 970 Paramount Drive Stoney Creek Please complete the sign-in sheet and review display materials. The project

More information

4. Present Activities and Roles

4. Present Activities and Roles 4. Present Activities and Roles The present missions, authorities, activities and roles of the various agencies involved with flood protection, floodplain management and flood-damage reduction are identified

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL () September 2017 Page Chapter 1 Acronyms and Definitions 1.01 Purpose 1 1.02 Acronyms 1 1.03 Definitions 3 Chapter 2 Introduction 2.01 Purpose 1 2.02 Applicability

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 9 GRADING 9.1 GRADING REQUIREMENTS FOR VARIOUS SITUATIONS... 1 9.1.1 Subdivisions... 1 9.1.2 Site Plans... 1 9.1.3. Severances, Lifting of Part Lot Control & Infill Lots... 1 9.1.4 Blocks... 1 9.1.5 Capital

More information

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E Ambassador Bridge Enhancement Project CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX E DRAFT EROSION AND SEDIMENT

More information

Model Riparian Buffer Ordinance.

Model Riparian Buffer Ordinance. Model Riparian Buffer Ordinance. This is a sample riparian buffer ordinance written as an amendment to an existing zoning ordinance. This ordinance complies with the state minimum standards for river corridor

More information

Temporary Watercourse Crossing: Fords

Temporary Watercourse Crossing: Fords Temporary Watercourse Crossing: Fords DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts 1.0 INTRODUCTION The proposed hydromodification base strategy (Base Strategy)

More information

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts 1.0 INTRODUCTION The proposed hydromodification base strategy (Base Strategy)

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

Wetlands Design Manual. Part D: Design tools, resources and glossary

Wetlands Design Manual. Part D: Design tools, resources and glossary Wetlands Design Manual Part D: Design tools, resources and glossary Table of contents Introduction 5 Design tools 5 Hydrological modelling... 5 Continuous simulation modelling... 11 Inundation frequency

More information

Wetland Design Manual. Part A3: Design considerations for wetlands

Wetland Design Manual. Part A3: Design considerations for wetlands Wetland Design Manual Part A3: Design considerations for wetlands Table of contents Introduction 5 Design Considerations 5 Innovation in design... 5 Open water, landscape design and amenity... 5 Hydrodynamic

More information

Southeast Policy Area Drainage Study

Southeast Policy Area Drainage Study Southeast Policy Area Drainage Study Prepared for City of Elk Grove January 2014 448-00-12-03 Table of Contents 1.0 Introduction... 1 2.0 Watershed Description... 1 3.0 Drainage Plan Concept... 1 4.0

More information

RETENTION BASIN EXAMPLE

RETENTION BASIN EXAMPLE -7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary

More information

Middle Tennessee State University (MTSU) Stormwater Plan Review Checklist

Middle Tennessee State University (MTSU) Stormwater Plan Review Checklist For Middle Tennessee State University (MTSU) projects, the Project Manager or other MTSU designee will serve as the Plan Reviewer. This checklist is to be completed by the Plan Reviewer on behalf of MTSU.

More information

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview Chapter 5: Hydrology Standards Contents 1.0 Overview... 1 1.1 Storm Runoff Determination... 1 1.2 Design Storm Frequencies... 1 1.3 Water Quality Storm Provisions... 2 1.4 Design Storm Return Periods...

More information

Infrastructure Services Report. Lara West Growth Area. September ELL

Infrastructure Services Report. Lara West Growth Area. September ELL Lara West Growth Area Infrastructure Services Report September 2012 3440359ELL urban design planning engineering surveying landscape architecture project management Contents 1 Introduction 2 2 Urban Structure

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228 Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA 30534 (706) 344-3500 x 42228 DAWSON COUNTY STORM WATER REVIEW CHECKLIST Project Name: Property Address: Engineer: Fax #/Email: Date:

More information