Session II: Assessing a successful approach towards maintenance of your power plant and how this can reduce long-term costs
|
|
- Jessie Fields
- 6 years ago
- Views:
Transcription
1 ARENA International Power Summit February 2013 Cannes-France Session II: Assessing a successful approach towards of your power plant and how this can reduce long-term costs Led by: Rachid Bouwazra Technical Director-Carthage Power Company-Tunisia
2 Plant Operation and Maintenance (O&M) the primary objective of a power plant owner is to maximize his profit Minimize the investment costs for construction, Minimize the lifecycle costs Maximize performance The life cycle costs are directly influenced by the O&M cost
3 O&M Technical development, complexity Operation (O) Maintenance (M) O&M strategy, cost, investment, refurbishment, upgrades Skills, competencies, qualifications, competent personnel, proactive, high committed, effective, culture Structure, System & Component (SSC) Safety, Environment, Availability, Reliability Sustainable Performance 5S, TPM, QPM, TRACC,
4 O&M Plants Management strive to : Reduce costs Increase Availability, Reliability Ensure sustainable performance for the life-time+ of the plant without compromising HSE which is, as always, a paramount consideration
5 O&M O&M programme have to cover, on time, all measures, both administrative and technical, necessary to: Predict, identify and mitigate degradation of a functioning system, structure or component Restore the design functions of a failed system, structure or component to the acceptable level
6 O&M The need for proven O&M optimization methods and techniques (organizational, Engineering) to perform the right tasks on the right asset at the right time, with the right procedure, parts, consumables & tools by the right high committed qualified resources
7 An O&M assessment provides a systematic look at all aspects of the current O&M activities (including organization, policies, contractual requirements, assets (tangible & intangible), documentation, parts, consumables, tools, archieves (hardware & software), vision, strategy, objectives and future opportunities)
8 The main Goal of an effective O&M assessment is : sustainable performance for all during the life (cycle +) of the plant
9 O&M assessment may include: Auditing the plant environment Interviews with O&M teams, managers, HR, Finance, QHSE, client, shareholders, contractors Review of systems designed conditions Spot tests Trends of O&M critical data Obsolescence Short, middle and long terms improvements, Upgrades & refurbishment needs
10 The analysis of those data will reveal the critical area where special focus will be made for improvements to be proposed, validated and implemented
11 Implementation phases 1. Preparation 2. Planning 3. On site auditing phase 4. Analysis 5. Reporting, discussions and decisions 6. Implementation of the selected most cost effective improvements 7. Feedback (KPI), Lessons learned & recommendations 8. Corrective and preventive actions
12 Main Assessment steps O&M Assessment 1) Gain understandings of: Systems and equipment s designed performance, O&M and environment requirements How equipment s and systems are currently operated and maintained Required skills and competencies Actual skills and competencies
13 2) Identify issues contributing to premature asset failures
14 3) Identify aging mechanism that can act on plant systems, structures and components
15 4) Identify Obsolete assets (systems, Equipment s, Softwares..)
16 5) Develop a planning of recommended improvement ways to ensure the required sustainable performance
17 6) Determine the effective needs on trainings and qualifications (for a better management of the HR budget)
18 7)Help prioritize HR & financial needs (present a clear picture of where, when and what improvements may be most cost effective to implement.
19 Case study 1 : CPC new O&M approach Case study 2 : continuous upgrade process HRSG FAC ST control system Sea water natural filtration system
20 Thank you Rachid Bouwazra Carthage Power Company Tunisia
Vendor Support Agreements: A Competitive Weapon for Optimizing Organizational Assets
998-2095-07-02-15AR0 Vendor Support Agreements: A Competitive Weapon for Optimizing Organizational Assets by Brian Courchesne Executive summary For manufacturers, sustaining operations performance levels
More informationAdvantage Services. Driving outcomes through value-based services.
Advantage Services Driving outcomes through value-based services www.usa.siemens.com/service How do I juggle repairs, compliance issues, and budget constraints while keeping everyone happy? We work hard.
More informationOracle Systems Optimization Support
Oracle Systems Optimization Support Oracle Systems Optimization Support offerings provide customers with welldefined packaged services. Let Oracle Advanced Customer Support help you make the most of your
More informationOracle Systems Optimization Support
Oracle Systems Optimization Support Oracle Systems Optimization Support offering provides customers with welldefined packaged services. Let Oracle Advanced Customer Services help you make the most of your
More informationOptimized Maintenance, a Roadmap to Excellence
Optimized Maintenance, a Roadmap to Excellence Roop Lutchman, P.Eng Vice President, Utility Management Solutions CH2M HILL 255 Consumers Road Suite 300 Toronto, Ontario M2J 5B6 Canada rlutchma@ch2m.com
More informationODFJELL DRILLING QHSE PROGRAMS Safety will never be compromised
ODFJELL DRILLING QHSE PROGRAMS 2017 Safety will never be compromised Zero failures and incidents Despite the challenging economic climate, Odfjell Drilling delivered strong QHSE results for 2016. In 2017,
More informationBreakout Session A. Asset Management Best Practices and What Trends You Should Know (ISO 55000: Asset Management)
Breakout Session A Asset Management Best Practices and What Trends You Should Know (ISO 55000: Asset Management) Life Science Leader magazine February 2014 Where is the time/energy of FDA? Inspections
More informationSYSTEMS INTEGRATION / REPAIR AND OVERHAUL
SYSTEMS INTEGRATION / REPAIR AND OVERHAUL WE CARE FOR YOUR COMPONENTS THE SAME CARE AND ATTENTION IS GIVEN TO ALL OF OUR PROJECTS REGARDLESS OF SIZE. ASL serves some of the most innovative, technology
More informationSuccess is not the idea; success is the execution.
Success is not the idea; success is the execution. At Clarite, we believe the reason many companies fail to achieve operational excellence is not the result of a lack of management vision, or employee
More informationIntegral Plant Maintenance
Industry Services Integral Plant Maintenance Maximum performance from your assets www.siemens.com/ipm Aligning asset management strategies with business targets is key to improving profitability International
More informationEHQMS Manual & Policy Document
Quality management input comprises the standard requirements from ISO 9001:2015 which are strategically deployed by our organization to achieve customer satisfaction through process control. Environmental
More informationJob Description Assistant HR Business Partner Document Owner: Head of Human Resources & Organisational Development
Job Description Version No Revision Date Reason for Revision 004 3 June 2016 Company wide restructure Directorate: Corporate Services Division Human Resources Reports To: Grade: Band E Job Evaluation Number
More informationParts Management Implementation Spring LMI. PSMC Spring
Parts Management Implementation Spring 2016 - LMI 1 PM Implementation Goal Develop and define processes and training for the implementation of the Parts Management requirements in MIL-STD-3018 Initial
More informationFahud NGL Extraction Plant & Pipeline Job Description
1. ROLE DETAILS Position title HSES Team Leader Grade D - C Reports to Department NGL Plant Manager Health, Safety, Environment, & Security (HSES) Issued on 31 st January 2018 2. ROLE PURPOSE Under general
More informationIntegral Plant Maintenance
Industry Services Integral Plant Maintenance Maximum performance from your assets www.siemens.com/ipm Aligning asset management strategies with business targets is key to improving profitability International
More informationCMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide
processlabs CMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide CMMI-DEV V1.3 Process Areas Alphabetically by Process Area Acronym processlabs CAR - Causal Analysis and Resolution...
More informationQuality Sign off for Internal Audit Engagement. Name of Audit
This is a sample of a quality sign off form for an internal audit engagement and is intended as a practical example. It should be reviewed and modified to suit the operations of your Internal Audit function.
More informationCORROSION MANAGEMENT MATURITY MODEL
CORROSION MANAGEMENT MATURITY MODEL CMMM Model Definition AUTHOR Jeff Varney Executive Director APQC Page 1 of 35 TABLE OF CONTENTS OVERVIEW... 5 I. INTRODUCTION... 6 1.1 The Need... 6 1.2 The Corrosion
More informationManagement Excluded Job Description
Management Excluded Job Description 1. Position Identification Position Number 993234 Position Title Department Reports to (title) Associate Director, Supply Management Purchasing Services Director, Purchasing
More informationCITIBANK N.A JORDAN. Governance and Management of Information and Related Technologies Guide
CITIBANK N.A JORDAN Governance and Management of Information and Related Technologies Guide 2018 Table of Contents 1. OVERVIEW... 2 2. Governance of Enterprise IT... 3 3. Principles of Governance of Enterprise
More informationThe Umicore Way is supplemented by detailed company codes including the Code of Conduct and the Corporate Governance Charter.
The Umicore Way The Umicore Way is the cornerstone of everything we do at Umicore. Our strategy Vision 2015 sets out our business goals and growth ambitions for the coming years, as well as our sustainable
More informationTotal Productive Maintenance. Peter Willmott-OMAINTEC 2016 Jeddah December 2016
Total Productive Maintenance Peter Willmott-OMAINTEC 2016 Jeddah 11-13 December 2016 Which environment would you prefer to work in.. This one...? Which environment would you prefer to work in.. This one...?
More informationRSA Solution for egrc. A holistic strategy for managing risk and compliance across functional domains and lines of business.
RSA Solution for egrc A holistic strategy for managing risk and compliance across functional domains and lines of business Solution Brief Enterprise Governance, Risk and Compliance or egrc is an umbrella
More informationCitizens Property Insurance Corporation Business Continuity Framework
Citizens Property Insurance Corporation Framework Dated September 2015 Approvals: Risk Committee: September 17, 2015 (via email) Adopted by the Audit Committee: Page 1 of 12 Table of Contents 1 INTRODUCTION...
More informationNGL Extraction Plant & Pipeline Job Description
1. ROLE DETAILS Position title Reports to Department Maintenance Superintendent Plant Manager Maintenance 2. ROLE PURPOSE Under general direction of, and with delegated authority from, the Plant Manager,
More informationArea Services Manager Lifeskills (North Metropolitan Area - Balcatta)
Area Services Manager Lifeskills (North Metropolitan Area - Balcatta) Full time Permanent Thank you for your interest in this position. A current position description and selection criteria follows. If
More information[Type text] QUALITY MANUAL. ISO 9001:2015 Quality Management System QMS1 ISSUE 1 12/09/16
[Type text] QUALITY MANUAL ISO 9001:2015 Quality Management System APPROVAL The signatures below certify that this management system manual has been reviewed and accepted, and demonstrates that the signatories
More informationIAEA-TECDOC-1383 Guidance for optimizing nuclear power plant maintenance programmes
IAEA-TECDOC-1383 Guidance for optimizing nuclear power plant maintenance programmes Report prepared within the framework of the Technical Working Group on Life Management of Nuclear Power Plants December
More informationLOCAL SERVICE. NATIONWIDE NETWORK.
LOCAL SERVICE. NATIONWIDE NETWORK. Local Service. Nationwide Network. Bringing Lifetime Value through Comprehensive Service Solutions SupportPro is a nationwide service organization specializing in supporting
More informationReady to help lead a dynamic team that is reshaping health care shared services and how they re delivered?
Ready to help lead a dynamic team that is reshaping health care shared services and how they re delivered? Mohawk Medbuy is a national not for profit shared service organization trusted by Canadian hospitals
More informationAPPENDIX B Corrosion Management System Framework and Guidance
APPENDIX B Corrosion Management System Framework and B.1 INTRODUCTION A framework for a Corrosion Management System (CMS) for assets is described in this Appendix. The CMS developed shall include and document
More informationGuardian Support and Guardian Support + Repair for Portable Analyzers and Online Systems
Guardian Support and Guardian Support + Repair for Portable Analyzers and Online Systems Risk management Lifecycle management Incident management Service Data Sheet Offering extended value and flexibility
More informationContractor Safety Performance -
Contractor Safety Performance - Maximizing Your Influence Insert then choose Picture select your picture. Right click your picture and Send to back. Copyright 2018 by ERM Worldwide Group Limited and/or
More informationMEMORANDUM. Purpose: Background:
MEMORANDUM To: MCWD Board of Managers From: Becky Christopher, Lead Planner CC: James Wisker, Director of Planning Date: January 11, 2016 Re: Mission, Vision, Values, Goals Purpose: At the January 14,
More informationItalo Freitas, CEO, AES Tiete Energia
AES Asset Management System Italo Freitas, CEO, AES Tiete Energia MATERIAL CONFIDENCIAL MATERIAL CONFIDENCIAL Parque Gerador AES Tietê Typ e Nº UGs COD (MW) Água Vermelha UHE 6 1978 1.396 Nova Avanhandava
More informationSIMAIN Business Based Maintenance. Maximum performance from your assets. Industrial Technologies
SIMAIN Business Based Maintenance Maximum performance from your assets Industrial Technologies Aligning maintenance strategy with business targets is key to generating value for your company International
More informationWORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B
1. Work Plan & IV&V Methodology 1.1 Compass Solutions IV&V Approach The Compass Solutions Independent Verification and Validation approach is based on the Enterprise Performance Life Cycle (EPLC) framework
More informationVFA SAMPLE RFP (DETAILED FACILITY CONDITION ASSESSMENT)
VFA SAMPLE RFP (DETAILED FACILITY CONDITION ASSESSMENT) I. Purpose As part of a strategic planning directive, the has decided to undertake a comprehensive condition audit and plant capital renewal
More informationHSE s AGEING & LIFE EXTENSION KEY PROGRAMME (KP4) Andy Duncan, CEng KP4 Manager. Health and Safety Executive
Health and Safety Executive WEDNESDAY 8 TH MAY 2013 12:10 TO 12:25 SCIS AECC HSE s AGEING & LIFE EXTENSION KEY PROGRAMME (KP4) Andy Duncan, CEng KP4 Manager WHAT IS AGEING? AGEING It s about deterioration
More informationHammersmith & Fulham borough of opportunity
Hammersmith & Fulham borough of opportunity PRINCIPAL MANAGER (BUSINESS INTELLIGENCE) HOUSING AND REGENERATION Job Pack Information for applicants Job Description Person Specification JOB DESCRIPTION Job
More informationSMS Elements Veriforce, LLC. All rights reserved.
1. Leadership and Management Commitment 2. Stakeholder Engagement 3. Risk Management 4. Operational Controls 5. Incident Investigation, Evaluation, and Lessons Learned 6. Safety Assurance 7. Management
More informationLifecycle Extension & Migrations We Give You Notice and We Give You Options
Lifecycle Extension & Migrations We Give You Notice and We Give You Options Lonnie Morris & Scott Anthony Automation Fair November 2012 Agenda Defining Automation Obsolescence & Lifecycle Planning Justification
More informationSIMATIC PCS 7 Lifecycle Services
Industry Services SIMATIC PCS 7 Lifecycle Services Technology-based services for a greater competitive edge Minimum downtime and the optimum use of staff and resources are key to sustainable success in
More informationTechnical Asset Manager Downing
Technical Asset Manager Downing About us Downing is a fast growing, entrepreneurial investment manager based in the City of London. Our passion is finding and funding great entrepreneurs, helping them
More informationInformation Technology. Classification Band 5. Position Objective
Team Information Technology Classification Band 5 Position Objective Key Responsibilities Provide support in a predominately Microsoft Windows environment, working to agreed service targets. Proactively
More informationUNITED NATIONS DEVELOPMENT PROGRAMME GENERIC JOB DESCRIPTION
UNITED NATIONS DEVELOPMENT PROGRAMME GENERIC JOB DESCRIPTION I. Position Information Job code title: Classified Grade: Supervisor: Common Premises Coordinator (CPC) ICS7 UNDP OM II. Organizational Context
More informationDigital Transformation Blueprint. The Dawn of the Digital Industrial
Digital Transformation Blueprint The Dawn of the Digital Industrial The age of the Industrial Internet of Things is upon us Let GE Digital help get you get started. Build your Digital Transformation Blueprint
More informationJoint Operations (JO) Contactor Health Environment and Safety Management (CHESM) Standardized Operational Excellence (OE) Process
Joint Operations (JO) Contactor Health Environment and Safety Management (CHESM) Standardized Operational Excellence (OE) Process Approved 23 May 2007 Reviewed 1 May 2010 Version 1.1 Version 11. Revised
More informationLOCAL SERVICE, NATIONWIDE NETWORK
LOCAL SERVICE, NATIONWIDE NETWORK Local Service, Nationwide Network Bringing Lifetime Value through Comprehensive Service Solutions SupportPro is a nationwide service organization specializing in supporting
More informationFacilities Controller Job Description
Job Title: Employer: Location: Responsible to: Responsible for: Facilities Controller Torus 62 Ltd St Helens and Warrington Compliance & Assurance Manager (Facilities and Energy) Operation and coordination
More informationManaging Successful Programmes 2011 Glossary of Terms and Definitions
Version 2, November 2011 This glossary: is subject to terms and conditions agreed to by downloading the glossary, uses international English which has been adopted to reflect and facilitate the international
More informationKey Risks and Risk Based Management Update
Key Risks and Risk Based Management Update Recommendation That the Standing Policy Committee on Finance recommend to City Council: 1. That the information be received; and 2. That the proposed Key Corporate
More information2013 Honeywell Users Group Americas. Protect your Software Investment with New Advanced Software Services
2013 Honeywell Users Group Americas Protect your Software Investment with New Advanced Software Services 1 Agenda 1. Challenges of supporting Advanced Software Applications and sustaining their benefits
More informationHealth, Safety and Environmental Management Systems Audit Report
Health, Safety and Environmental Management Systems Audit Report SMART Group of Companies Jaunuary 2016 Page 1 of 18 1.0 Executive Summary A review of SMART Technical Services workplace health and safety
More informationE-Procurement on large tenders: advantages and disadvantages for European contractors. April 2015
E-Procurement on large tenders: advantages and disadvantages for European contractors April 2015 Agenda Background Tendering truths Advantages of etendering Example of etendering in practice etendering
More informationWIPRO HCM APPLICATION SERVICES ENGINEERING A COMPLETE ORACLE SOLUTION DO BUSINESS BETTER
www.wipro.com WIPRO HCM APPLICATION SERVICES ENGINEERING A COMPLETE ORACLE SOLUTION DO BUSINESS BETTER Overview Today, historical sources of advantage have diminished in value to the point where they are
More informationIT Audit at Brown. A collaboration between the Information Technology and Internal Audit Teams
IT Audit at Brown A collaboration between the Information Technology and Internal Audit Teams Page 1 Agenda Objective Risk Management Overview Internal Audit at Brown IT Audit at Brown Frequently Asked
More informationASSET MANAGEMENT SERVICES
ASSET MANAGEMENT SERVICES Petrofac Engineering & Production Services 02 ASSET MANAGEMENT SERVICES ASSET MANAGEMENT SERVICES 03 Introducing Petrofac Asset Management Services Petrofac is an international
More informationIt s 10pm Do You Know Where Your Institution's PII Is? Reducing Risk by Understanding the How, Where, and Why of your PII
It s 10pm Do You Know Where Your Institution's PII Is? Reducing Risk by Understanding the How, Where, and Why of your PII Chris Oswald, Assistant Director, IT Audit Jerome Park, Director, IT Audit Princeton
More informationUse of a virtual collaboration work place 23 October IAEA PLIM Conference, Lyon, France. Ph. D Haeyer G. Backaert E. Kastelijn
Use of a virtual collaboration work place 23 October IAEA PLIM Conference, Lyon, France Ph. D Haeyer G. Backaert E. Kastelijn Understanding the Belgian Context Regulatory context Level of safety, reliability
More informationABERDEEN CITY COUNCIL
ABERDEEN CITY COUNCIL 1 Job Details Job Title: Chief Officer - Capital Job Profile No: Function: Resources Grade: CO SCP 34 Version Date: November 2017 Salary 81,504 2 Job Purpose This role is responsible
More informationDoes your organization need an Head Count Estimate? Detecon s Value Proposition July 2016
Does your organization need an Head Count Estimate? Detecon s Value Proposition July 2016 Planning Summary Head Count () planning and revision is mainly required during or after designing a new organization.
More informationCorporate Quality, Health, Safety and Environment Plan
Corporate Quality, Health, Safety and Environment Plan 2015 Document No: Revision: 1 Issue Date: 12 January 2015 Controlled Document Information Document Information Revision 1 Current Revision Approvals
More informationAmeriquest Data Service (ADS) Project Background
Ameriquest Data Service (ADS) Project Background In February, 2004, the OD Director and HR VP of Ameriquest Home Mortgage contacted CPC for Appreciative Inquiry support. It was before the crash of the
More informationContents An Introductory Overview of ITIL Service Lifecycle: concept and overview...3 I. Service strategy...6 The 4 P's of ITIL Service
ITIL 2011 Notes Contents An Introductory Overview of ITIL 2011...3 Service Lifecycle: concept and overview...3 I. Service strategy...6 II. The 4 P's of ITIL Service Strategy...6 Key processes and activities...7
More informationISO 28002: RESILIENCE IN THE SUPPLY CHAIN: REQUIREMENTS WITH GUIDANCE FOR USE
Version 1b: September 5, 2009 ISO 28002: RESILIENCE IN THE SUPPLY CHAIN: REQUIREMENTS WITH GUIDANCE FOR USE Draft Version 1b: September 5, 2009 Abstract A comprehensive management systems approach to prevent,
More informationQuality Manual. Print Name Title Date Prepared by L Naughton QA Consultant 9 th April 09. Reviewed by Bernard Lennon Fire and Safety Officer
Quality Manual Print Name Title Date Prepared by L Naughton QA Consultant 9 th April 09 Reviewed by Bernard Lennon Fire and Safety Officer 9 th April 09 Corporate Authorisation Joe Hoare Estates Officer
More informationGW Human Resources Strategic Plan
GW Human Resources Strategic Plan 2017-2021 OUR VISION We aspire to develop a diverse and engaged workforce to lead GW to excellence. OUR MISSION The mission of Human Resources is: to serve as an effective
More informationBusiness Resilience: Proactive measures for forward-looking enterprises
IBM Global Services Business Resilience: Proactive measures for forward-looking enterprises protect deflect predict adapt Working with IBM, you can develop and implement a flexible business resilience
More informationISMS AUDIT CHECKLIST
4.1 REQUIREMENT REFER TO BS ISO / IEC 27001 : 2005 Has the organisation developed a documented ISMS based on the PDCA model? Checked at Stage 1 for development and Stage 2/surveillance for implementation,
More informationUsing historical data for asset management decision making Craig Knox, ISE Solution Engineering. October 10, 2017
Using historical data for asset management decision making Craig Knox, ISE Solution Engineering October 10, 2017 How is asset management different from work management? Process based work management build
More informationREQUIRED DOCUMENT FROM HIRING UNIT
Terms of reference GENERAL INFORMATION Title: Asset Management Advisor Consultant for the Global Fund Principal Recipients (National Consultant) Project Name: Health Governance Initiative (HGI) Reports
More informationSafeWells. Custom built, ISO compliant total well integrity management software
SafeWells Custom built, ISO compliant total well integrity management software Leveraging software systems to support well integrity Well integrity refers to maintaining full control of fluids within a
More informationDISTRIBUTION SYSTEM ASSET MANAGEMENT APPROACH
EB-0-0 Exhibit D Schedule Page of DISTRIBUTION SYSTEM ASSET MANAGEMENT APPROACH This document provides a summary of THESL s asset management approach. The first two sections introduce the scope of asset
More informationProject and Claim Management at a Glance
Project and Claim Management at a Glance Matthias Lichtenthaler Accenture GmbH Munich Keywords Primavera Claim Management Contract Management Project Management Mobile Application Contract Lifecycle Management
More informationBLUEPRINT BI Business Intelligence Justification
BLUEPRINT BI Business Intelligence Justification 1. Business process documentation what s the big deal? Good process documentation provides a clear and consistent explanation of what to do, how to do it,
More informationPOSITION DETAILS. ORGANOGRAM (Adjust as necessary. Include line manager, line manager s manager, all subordinates and colleagues. Include job grades)
HR191 JOB DESCRIPTION NOTES Forms must be downloaded from the UCT website: http://www.uct.ac.za/depts/sapweb/forms/forms.htm This form serves as a template for the writing of job descriptions. A copy of
More informationCustomer Solutions Guide
Customer Solutions Guide Exploring the reasons why financing is used to acquire new IT solutions; and how Dell Financial Services offers an IT management tool that adds value throughout the technology
More informationInnovative Improvement Driven Foundation for Denver s Transit Expansion Program
Innovative Improvement Driven Foundation for Denver s Transit Expansion Program Timothy Stokes, PE Delcan Corp. Denver, CO INTRODUCTION The Denver Regional Transportation District (RTD) has embraced managerial
More informationGROUP ENVIRONMENT POLICY
GROUP ENVIRONMENT POLICY Conducting business the right way Stewards of our Environment Our Values & CSR Essentials Version 1 [August 2016] CONDUCTING BUSINESS THE RIGHT WAY Our Values, Doing the Right
More informationMAINTENANCE PLANNING, SCHEDULING, AUDITING & BENCHMARKING NON-TECHNICAL & CERTIFIED TRAINING COURSE SECTOR / MAINTENANCE ENGINEERING & RELIABILITY
MAINTENANCE PLANNING, SCHEDULING, AUDITING & BENCHMARKING SECTOR / MAINTENANCE ENGINEERING & RELIABILITY NON-TECHNICAL & CERTIFIED TRAINING COURSE This program is intended to introduce participants to
More informationA Model for CAS Self Assessment
Introduction An effective Contractor Assurance System integrates contractor management, supports corporate parent governance and facilitates government oversight systems. The purpose of a CAS is threefold:
More informationSTEVE OLSON MODERATOR. Franchise Update Media
STEVE OLSON MODERATOR Franchise Update Media LANA DALEY DIRECTOR OF OPERATIONS FAST START PROCESS INTEGRATED FRANCHISE SUPPORT FOCUS: UNIT LEVEL ECONOMICS Operations Outside Sales & Sales Management Training
More informationQHSE program.
2016 QHSE program www.odfjelldrilling.com 3 Preface 4 policy 4 HSE policy 4 Environmental principles 5 Security Policy 6 Corporate 7 Mobile Offshore Drilling Units 8 Odfjell Well Services 9 Platform Drilling
More informationJOB DESCRIPTION JOB DETAILS. Senior Operations Manager. REF NUMBER Senior Operations Manager: Pretoria and Bloemfontein
JOB DESCRIPTION JOB DETAILS JOB TITLE REPORTS TO DEPARTMENT Senior Operations Manager Managing Director Operations REF NUMBER Senior Operations Manager: 0003 LOCATION EMAIL ADDRESS Pretoria and Bloemfontein
More informationThis resource is associated with the following paper: Assessing the maturity of software testing services using CMMI-SVC: an industrial case study
RESOURCE: MATURITY LEVELS OF THE CUSTOMIZED CMMI-SVC FOR TESTING SERVICES AND THEIR PROCESS AREAS This resource is associated with the following paper: Assessing the maturity of software testing services
More informationThis policy applies to the procurement of all Goods and Services required by the City.
Policy Title: Sustainable Procurement Policy Number: 03-06-09 Section: Corporate Administration Subsection: Acquisition/Disposal of Good and Services Effective Date: January 1, 2018 Last Review Date: [Last
More informationMining Field Services. Making the big difference for our customers
Mining Field Services Making the big difference for our customers We understand our customers real issues and that success comes from helping you reach your operational and financial goals. Combining our
More informationLogistics and Material Handling
Logistics and Material Handling Change how your distribution center operates with a trusted partner. Make the most of your energy SM Fundamentally change how your distribution center operates with expertise
More informationSIMATIC PCS 7 Lifecycle Services
SIMATIC PCS 7 Lifecycle Industry Frei verwendbar Siemens AG 2014. Alle Rechte vorbehalten. Answers for industry. SIMATIC PCS 7 Lifecycle Ensuring serviceability and optimizing plant availabiliy Optimizing
More informationAsset Performance Management from GE Digital. Enabling intelligent asset strategies to optimize performance
Asset Performance Management from GE Digital Enabling intelligent asset strategies to optimize performance How can you make your operation safer and more reliable while helping to ensure optimal performance
More informationP&O MARITIME Limassol, Cyprus Position Description
POSITION TITLE Marine Manager DIVISION P&O Maritime Limassol REPORTS TO Reports to the Board with dotted lines reporting to Head of Group Marine P&OM Direct Reports 5+ PRIMARY LOCATION Limassol Port -
More informationProject Management Consultancy Services. Ensuring safe and successful execution of your projects
Project Management Consultancy Services Ensuring safe and successful execution of your projects Deep expertise in Project Management Consultancy TechnipFMC s Project Management Consultancy business unit
More informationImpediments for Implementing a Sound Asset Management System State of Good Repair Summit March 27, 2013
Impediments for Implementing a Sound Asset Management System State of Good Repair Summit March 27, 2013 by Robert Prieto, Fluor Center for Advanced Infrastructure and Transportation 2010 Fluor. All Rights
More informationFGFOA 2017 Focus on the Future
IT Modernization: Bringing Government from Obsolete to Cutting Edge FGFOA 2017 Focus on the Future Christine Horrocks, CPA/CFF, CGMA Brent Pruim, CPA Topics Covered State of the industry with respect to
More informationLicensee Design Authority Capability
Title of document ONR GUIDE Licensee Design Authority Capability Document Type: Unique Document ID and Revision No: Nuclear Safety Technical Assessment Guide NS-TAST-GD-079 Revision 3 Date Issued: April
More informationITIL: Operational Support & Analysis (OSA) (Revision 1.6)
ITIL: Operational Support & Analysis (OSA) (Revision 1.6) Course Overview This program leads to a Certificate in ITIL Service Capability Management - Operational Support and Analysis. The Service Capability
More informationOverview on ROI (Return on Investment) From SAP
Overview on ROI (Return on Investment) From SAP Applies to: SAP Consulting Professionals Summary There is no standard method of measuring the ROI however It is possible to measure ROI from SAP Implementation
More informationTerminal Benchmarking Wipro Thought Leadership
By Goutam Mangaraj EXECUTIVE SUMMARY This paper showcases Wipro s thought leadership around the enterprise-wide fuel Terminal Benchmarking area, which is an industry trend that has emerged over the past
More informationGuidelines for Investor and Company Engagement (Draft)
Provisional translation Appendix 2 Guidelines for Investor and Company Engagement (Draft) Guidelines for Investor and Company Engagement The Guidelines herein provide agenda items for engagement that institutional
More information