PJM Manual 28: Operating Agreement Accounting Revision: 77 Effective Date: November 1, Prepared by Market Settlements Development Department

Size: px
Start display at page:

Download "PJM Manual 28: Operating Agreement Accounting Revision: 77 Effective Date: November 1, Prepared by Market Settlements Development Department"

Transcription

1 PJM Manual 28: Operating Agreement Accunting Revisin: 77 Effective Date: Nvember 1, 2017 Prepared by Market Settlements Develpment Department PJM 2017

2 PJM Manual 28: Operating Agreement Accunting Table f Cntents Table f Cntents Table f Exhibits...6 Apprval...7 Current Revisin...8 Intrductin... 9 Abut PJM Manuals... 9 Abut This Manual... 9 Using This Manual...10 Sectin 1: Market Overview Market Accunting Overview Accunting Input Data...13 Sectin 2: Interface Pricing Business Rules fr Interface Pricing...14 Sectin 3: Spt Market Energy Accunting Spt Market Accunting Overview Business Rules fr InSchedule and Pwer Meter Data Submissins Calculating Spt Market Interchange Transmissin Lss De-ratin Factrs State-estimated vs. Revenue-metered Energy Quantities Residual Metered Lad Residual Metered Lad Aggregate Definitins Spt Market Energy Charges Recnciliatin fr Spt Market Energy Charges...21 Sectin 4: Regulatin Accunting Regulatin Accunting Overview Regulatin Credits Regulatin Charges Recnciliatin fr Regulatin Charges...27 Sectin 5: Operating Reserve Accunting Operating Reserve Accunting Overview Revisin: 77, Effective Date: 11/01/2017 PJM

3 PJM Manual 28: Operating Agreement Accunting Table f Cntents 5.2 Credit fr Operating Reserve Credits fr Pl-Scheduled Generating Resurces Credits fr Pl-Scheduled Transactins Credits fr Synchrnus Cndensing Credits fr Canceled Pl-Scheduled Resurces Credits fr Resurces prviding Quick Start Reserve Credits fr Resurces Reduced r Suspended due t a Transmissin Cnstraint r fr Other Reliability Reasns Pl-Scheduled Generatrs Self-Scheduled Generatrs Flexible Resurces Wind Generatrs Credits fr Resurces Perfrming Annual Scheduled Black Start Tests Credits fr Resurces Prviding Reactive Services Charges fr Operating Reserve Recnciliatin fr Operating Reserve Charges...46 Sectin 6: Synchrnized Reserve Accunting Synchrnized Reserve Accunting Overview Credits fr Synchrnized Reserve Charges fr Synchrnized Reserve Recnciliatin fr Synchrnized Reserve Charges...53 Sectin 7: Nn-Synchrnized Reserve Accunting Nn-Synchrnized Reserve Accunting Overview Credits fr Nn-Synchrnized Reserve Charges fr Nn-Synchrnized Reserve Recnciliatin fr Nn-Synchrnized Reserve Charges...57 Sectin 8: Transmissin Cngestin Accunting Overview Transmissin Cngestin Accunting Overview Transmissin Cngestin Charges Implicit Transmissin Cngestin Charges Explicit Transmissin Cngestin Charges Recnciliatin fr Transmissin Cngestin Charges Transmissin Cngestin Credits FTRs and FTR Target Allcatins Ttal Day-Ahead Transmissin Cngestin Charges Hurly Allcatin f Ttal Day-Ahead Transmissin Cngestin Charges Mnthly Allcatin f Excess Cngestin Charges Ttal Balancing Transmissin Cngestin Charges Balancing Transmissin Cngestin Credits Recnciliatin fr Balancing Transmissin Cngestin Credits Reassignment f Financial Transmissin Rights (FTRs)...67 Revisin: 77, Effective Date: 11/01/2017 PJM

4 PJM Manual 28: Operating Agreement Accunting Table f Cntents Sectin 9: Transmissin Lsses Accunting Transmissin Lsses Accunting Overview Transmissin Lss Charges Implicit Transmissin Lss Charges Explicit Transmissin Lss Charges Recnciliatin fr Transmissin Lss Charges Transmissin Lss Credits Recnciliatin fr Transmissin Lss Credits Sectin 10: Emergency Energy Accunting Emergency Energy Accunting Overview Emergency Energy Purchases by PJM Emergency Energy Sales by PJM Minimum Generatin Emergency Purchases by PJM Minimum Generatin Emergency Sales by PJM Sectin 11: PJM Lad Respnse Prgrams Accunting PJM Lad Respnse Prgrams Overview PJM Lad Respnse Prgrams Accunting Prcedures Full Emergency and Emergency Energy Only Lad Respnse Prgram Ecnmic Lad Respnse Prgram...80 Sectin 12: Metering Recnciliatin Accunting Meter Errr Crrectin Billing Meter Crrectins between PJM Members Meter Crrectins between Cntrl Areas...86 Sectin 13: Statin Pwer Accunting Statin Pwer Accunting Prcedure Third-Party Supply Remte Self-Supply...90 Sectin 14: Unscheduled Transmissin Service Accunting Unscheduled Transmissin Service Accunting Prcedure...91 Sectin 15: Ramap PAR Facilities Accunting Ramap PAR Facilities Accunting Prcedure...92 Sectin 16: Financial Transmissin Rights Auctins Settlement FTR Auctins Settlement Overview...93 Revisin: 77, Effective Date: 11/01/2017 PJM

5 PJM Manual 28: Operating Agreement Accunting Table f Cntents 16.2 FTR Auctin Buyers Charges FTR Auctin Sellers Credits Allcatin f FTR Auctin Revenues...95 Sectin 17: Auctin Revenue Rights Settlements ARR Settlements Overview Daily Reassignment f ARRs as lad changes Allcatin f Annual and Mnthly FTR Auctin Revenues Sectin 18: Inadvertent Interchange Accunting Inadvertent Interchange Billing Sectin 19: Day Ahead Scheduling Reserve Accunting Day Ahead Scheduling Reserve Accunting Overview Credits fr Day Ahead Scheduling Reserve Charges fr Day Ahead Scheduling Reserve Recnciliatin fr Day-ahead Scheduling Reserve Charges Sectin 20: Billing Billing Prcess Overview Revisin Histry Revisin: 77, Effective Date: 11/01/2017 PJM

6 PJM Manual 28: Operating Agreement Accunting Table f Exhibits Table f Exhibits Exhibit 1: Types f PJM Services Revisin: 77, Effective Date: 11/01/2017 PJM

7 PJM Manual 28: Operating Agreement Accunting Apprval Apprval Apprval Date: 10/25/2017 Effective Date: 11/01/2017 Ray Fernandez, Manager Market Settlements Develpment Revisin: 77, Effective Date: 11/01/2017 PJM

8 PJM Manual 28: Operating Agreement Accunting Current Revisin Revisin 77 (11/01/2017): Current Revisin Revised Sectin 5: Operating Reserve Accunting t reflect Intra-Day Offer changes as apprved by FERC (ER ). Revised Sectin 12: Meter Recnciliatin Accunting t include pseud-tie generatr and dynamic schedule imprts and exprts and define the applicable rate as well as the impacted market participants. Revisin: 77, Effective Date: 11/01/2017 PJM

9 PJM Manual 28: Operating Agreement Accunting Intrductin Intrductin Welcme t the PJM Manual fr Operating Agreement Accunting. In this Intrductin, yu will find infrmatin abut PJM Manuals in general, an verview f this PJM Manual in particular, and infrmatin n hw t use this manual. Abut PJM Manuals The PJM Manuals are the instructins, rules, prcedures, and guidelines established by the PJM fr the peratin, planning, and accunting requirements f PJM and the PJM Energy Market. The manuals are gruped under the fllwing categries: Transmissin PJM Energy Market Generatin and transmissin intercnnectin Reserve Accunting and Billing PJM administrative services Fr a cmplete list f all PJM manuals, g t the Library sectin n PJM.cm. Abut This Manual The PJM Manual fr Operating Agreement Accunting is ne f a series f manuals within the Accunting and Billing set f manuals. This manual fcuses n the accunting fr energy with the PJM Energy Market. It establishes the basis fr the charges and credits fr the purchase and sale f energy and related services. The PJM Manual fr Operating Agreement Accunting cnsists f 21 sectins. The sectins are listed in the table f cntents beginning n page 2. Intended Audience The intended audiences fr this PJM Manual fr Operating Agreement Accunting are: PJM Members and Transmissin Custmers Other Cntrl Areas External auditrs, lawyers, and regulatrs PJM settlements staff and audit staff PJM custmer relatins and training staff References The references t ther dcuments that prvide backgrund r additinal detail directly related t the PJM Manual fr Operating Agreement Accunting are: PJM Manual fr Open Access Transmissin Tariff Accunting (M-27) Revisin: 77, Effective Date: 11/01/2017 PJM

10 PJM Manual 28: Operating Agreement Accunting Intrductin PJM Manual fr Balancing Operatins (M-12) PJM Manual fr Billing (M-29) PJM Manual fr Energy & Ancillary Services Market Operatins (M-11) PJM Manual fr Administrative Services fr the PJM Intercnnectin Agreement (M-33) Operating Agreement f PJM Intercnnectin, L.L.C. PJM Open Access Transmissin Tariff Using This Manual We believe that explaining cncepts is just as imprtant as presenting the prcedures. This philsphy is reflected in the way we rganize the material in this manual. We start each sectin with an verview. Then, we present details, prcedures r references t prcedures fund in ther PJM manuals. What Yu Will Find In This Manual A table f cntents that lists tw levels f subheadings within each f the sectins An apprval page that lists the required apprvals and a brief utline f the current revisin Sectins cntaining the specific guidelines, requirements, r prcedures including PJM actins and PJM Member actins A sectin at the end detailing all previus revisins f this PJM manual Revisin: 77, Effective Date: 11/01/2017 PJM

11 PJM Manual 28: Operating Agreement Accunting Sectin 1: Market Overview Sectin 1: Market Overview Welcme t the Market Overview sectin f the PJM Manual fr Operating Agreement Accunting. In this sectin, yu will find the fllwing infrmatin: A descriptin f the PJM Energy Market accunting services (see Market Accunting Overview ). A descriptin f PJM Market Settlements Accunting Input Data (see Accunting Input Data ). 1.1 Market Accunting Overview There are several services within the PJM Energy Market fr which PJM calculates charges and credits that are allcated amng the PJM Members. PJM prvides accunting fr the fllwing services that are described in detail in the ther sectins f this manual. Spt Market Energy Energy bught r sld by PJM Members thrugh the PJM Energy Market. Transmissin Cngestin The increased cst f energy delivered when the Transmissin System is perating under cnstrained cnditins. Transmissin Lsses Energy requirements in excess f lad requirements due t the energy cnsumed by the electrical impedance characteristics f the Transmissin System. Regulatin The capability f a specific resurce with apprpriate telecmmunicatins, cntrl, and respnse capability t increase r decrease its utput in respnse t a regulating cntrl signal (see the PJM Manual fr Balancing Operatins). Synchrnized Reserve The capability f a specific resurce with apprpriate telecmmunicatins, cntrl, and respnse capability t increase utput (r reduce cnsumptin) in respnse t a synchrnized reserve event and/r perate at a pint that deviates frm ecnmic dispatch (including cndensing mde) t prvide 10-minute reserve (see the PJM Manual fr Balancing Operatins). Nn-Synchrnized Reserve The capability f a specific nn-emergency generatin resurce with apprpriate telecmmunicatins, cntrl, and respnse capability t increase utput frm an ffline state in respnse t a nn-synchrnized reserve event t prvide 10-minute reserve (see the PJM Manual fr Balancing Operatins). Operating Reserve The amunts f generating Capacity scheduled t be available fr specified perids f an Operating Day t ensure the reliable peratin f PJM. Reactive Services The amunts f generatin altered by PJM t maintain reactive reliability. Synchrnus Cndensing The instructins t generatrs t perate in synchrnus cndensing mde fr reasns ther than reactive supprt r synchrnized reserve t ensure the reliable peratin f PJM. Emergency Energy Energy bught frm ther Cntrl Areas r sld t ther Cntrl Areas by PJM due t Emergencies either within PJM r within the ther Cntrl Areas. Revisin: 77, Effective Date: 11/01/2017 PJM

12 PJM Manual 28: Operating Agreement Accunting Sectin 1: Market Overview PJM Emergency Lad Respnse The Emergency Lad Respnse Prgram is designed t prvide a methd by which end-use custmers may be cmpensated by PJM fr vluntarily reducing lad during an emergency event. PJM Ecnmic Lad Respnse The Ecnmic Lad Respnse Prgram is designed t prvide incentive t end-use custmers r Curtailment Service Prviders ( CSP ) t enhance the ability and pprtunity fr reductin f cnsumptin when PJM Lcatinal Marginal Prices ( LMP ) are high. Metering Recnciliatin Metering errrs and crrectins that are recnciled at the end f each mnth by a meter errr crrectin charge adjustment. Inadvertent Interchange Differences between hurly net actual energy flws and net scheduled energy flw int r ut f the PJM cntrl area. Unscheduled Transmissin Service Service that PJM Members can prvide t r receive frm the New Yrk ISO and are credited r charged accrding t the Operating Agreement. Ramap PAR Facilities Carrying charges cllected frm PJM Mid-Atlantic Cntrl Zne transmissin wners paid t the New Yrk ISO fr the Phase Angle Regulatrs (PARs) at Ramap and charged accrding t the Operating Agreement. Financial Transmissin Rights Auctin market participants may purchase/sell FTRs by participating in the Annual and Mnthly auctins. Auctin Revenue Rights ARRs are the mechanism by which the prceeds frm the FTR auctins are allcated. These services are applicable t the different types f market participatin, as shwn in Exhibit 1. Each service is further brken dwn in the billing statement (see the PJM Manual fr Billing). MARKET BUYERS Spt Market Energy x x Regulatin x x Operating Reserves x x MARKET SELLERS TRANSMISSION CUSTOMERS Transmissin Cngestin x x Transmissin Lsses x x Emergency Energy x x Meter Recnciliatin x x Unscheduled Transmissin Service x x Capacity Credit Market x x Financial Transmissin Rights x x x Revisin: 77, Effective Date: 11/01/2017 PJM

13 PJM Manual 28: Operating Agreement Accunting Sectin 1: Market Overview MARKET BUYERS MARKET SELLERS TRANSMISSION CUSTOMERS Auctin Revenue Rights x x x Exhibit 1: Types f PJM Services The PJM Energy Market accunting is designed t perate n a balanced basis. That is, the ttal amunt f the charges equals the ttal amunt f the credits; there are n residual funds. With certain exceptins, each f the services als perates n a balanced basis. That is, the charges and credits fr a particular service, such as regulatin, ffset each ther exactly. In certain cases, charges in excess f credits, r vice versa, in ne service are used t ffset the csts f prviding anther service. 1.2 Accunting Input Data At the end f each perating hur, PJM cllects infrmatin regarding actual peratins during the hur. This infrmatin is recrded either by the PJM dispatchers r by autmated systems. The market accunting prcesses use this infrmatin as input data. Other accunting input data is prvided frm varius systems and databases. This infrmatin includes data describing PJM Members installed generating resurces, scheduling infrmatin fr PJM Members transactins, and Transmissin System parameters, such as lss factrs determined annually by PJM system planning staff. The market accunting prcesses use this infrmatin as described in the fllwing sectins f this manual Revisin: 77, Effective Date: 11/01/2017 PJM

14 PJM Manual 28: Operating Agreement Accunting Sectin 2: Interface Pricing Sectin 2: Interface Pricing Welcme t the Interface Pricing sectin f the PJM Manual fr Operating Agreement Accunting. In this sectin, yu will find the fllwing infrmatin: An verview f the interface pricing settlements business rules (see Business Rules fr Interface Pricing ). 2.1 Business Rules fr Interface Pricing Market Participants have the ability t transact energy in-t, ut-f r thrugh the PJM RTO (see OASIS Reginal Transmissin and Energy Scheduling Practices fr details n the PJM prcesses fr facilitating the transactin and scheduling prcess). The surce and sink pricing assignments fr these external transactins are determined using mappings that use a cmbinatin f the ExSchedule system surce and sink selectin, the NERC Tag, and the OASIS reservatin. Fr Day-ahead exprt (ut-f PJM RTO) transactins where the surce and sink n the OASIS are the same, the surce and sink price is assigned based n the Exprt Pricing Pint selected by the custmer in the ExSchedule system. Where the surce and sink are nt the same, the surce price is assigned based n the surce f the OASIS reservatin being used, while the sink price is the Exprt Pricing Pint selected by the custmer in the ExSchedule system. Fr Real-time exprt (ut-f PJM RTO) transactins where the surce and sink n the OASIS are the same, the surce and sink price is assigned based n the sink f the NERC Tag and the applicable interface pricing mapping*. Where the surce and sink n the OASIS are nt the same, the surce price is assigned based n the surce f the OASIS reservatin being used, while the sink price is based n the sink f the NERC Tag and the applicable interface pricing mapping*. Fr Day-ahead imprt (in-t PJM RTO) transactins using a Spt-In OASIS reservatin, bth the surce and sink prices are based n the Imprt Pricing Pint selected by the custmer in the ExSchedule system. Fr Day-ahead imprt (in-t PJM RTO) transactins using an OASIS reservatin (ther than a Spt-In OASIS reservatin) where the surce and sink n the OASIS are the same, the surce and sink price is assigned based n the Imprt Pricing Pint selected by the custmer in the ExSchedule system. Where the surce and sink are nt the same, the surce price is based n the Imprt Pricing Pint selected by the custmer in the ExSchedule system, while the sink price is based n the sink f the OASIS reservatin being used. Fr Real-time imprt (in-t PJM RTO) transactins using a Spt-In OASIS reservatin, bth the surce and sink prices are based n the surce f the NERC Tag and the applicable interface pricing mapping*. Fr Real-time imprt (in-t PJM RTO) transactins using an OASIS reservatin (ther than a Spt-In OASIS reservatin) where the surce and sink n the OASIS are the same, the surce and sink price is assigned based n the surce f the NERC tag and the applicable interface pricing mapping*. Where the surce and sink are nt the same, Revisin: 77, Effective Date: 11/01/2017 PJM

15 PJM Manual 28: Operating Agreement Accunting Sectin 2: Interface Pricing the surce price is based n the surce f NERC tag and the applicable interface pricing mapping*, while the sink price is based n the sink f the OASIS reservatin being used. Fr Day-ahead wheel (thrugh PJM RTO) transactins, the surce price is based n the Imprt Pricing Pint selected by the custmer in the ExSchedule system, while the sink price is based n the Exprt Pricing Pint selected by the custmer in the ExSchedule system. Fr Real-time wheel (thrugh PJM RTO) transactins, the surce price is based n the surce f the NERC tag and the applicable interface pricing mapping*, while the sink price is based n the sink f the NERC tag and the applicable interface pricing mapping*. * The Pricing Pint Guide which cntains the cmplete listing f the Mapping f External Balancing Authrities t Interface Pricing Pints can be fund n the PJM website at During any hur in which any entity makes any purchases frm ther external areas utside f such area r sub-area (ther than delivery f external designated Netwrk Resurces r such ther exceptins specifically dcumented fr such area r sub-area) at the same time that energy sales int PJM are being made, pricing will revert t the applicable Imprt r Exprt Pricing Pint that wuld therwise be assigned t such external area r sub-area. There are currently n exceptins t this prcess. During any hur in which any entity purchases energy frm PJM fr delivery int such area r sub-area while sales frm such area t ther external areas are simultaneusly implemented (subject t any exceptins specifically dcumented fr such area r sub-area in the PJM Manuals), pricing will revert t the applicable Imprt r Exprt Pricing Pint that wuld therwise be assigned t such external area r sub-area. There are currently n exceptins t this prcess. Beginning May 3, 2009 the fllwing interface pricing rules fr NERC Tags which surce r sink in the CPLE, DUKE, r NCMPA1 were effective. Real-time transactins between PJM and the CPLE, DUKE, and NCMPA1 cntrl areas are reviewed hurly t determine if the transactins qualify fr the DUK/CPLE/NCMPA1 imprt r exprt price. Each hur, Real-time telemetry frm the CPLE, DUKE, and NCMPA1 cntrl areas is used t validate whether the NERC Tag between the CPLE/DUK/NCMPA1 cntrl areas and PJM cntrl area shuld qualify fr the given CPLE/DUK/NCMPA1 imprt r exprt price. If transactins d nt qualify fr the CPLE/DUK/NCMPA1 imprt r exprt price, the SOUTHIMP r SOUTHEXP prices are used. The interface price definitins fr CPLE, DUKE, and NCMPA1 can be fund n the PJM website at Revisin: 77, Effective Date: 11/01/2017 PJM

16 PJM Manual 28: Operating Agreement Accunting Sectin 3: Spt Market Energy Accunting Sectin 3: Spt Market Energy Accunting Welcme t the Spt Market Energy Accunting sectin f the PJM Manual fr Operating Agreement Accunting. In this sectin, yu will find the fllwing infrmatin: An verview f the spt market accunting (see Spt Market Accunting Overview ). Hw PJM determines spt market net interchange fr each PJM Member (see Calculating Spt Market Interchange ). Hw charges fr spt market energy are calculated fr market buyers and sellers (see Interchange Market Buyers Charges ). Hw spt market energy charge recnciliatins are calculated (see Recnciliatin fr Spt Market Charges ). 3.1 Spt Market Accunting Overview The PJM Energy Market is the reginal cmpetitive market that is administered by PJM fr the purchase and sale f Spt Market energy. PJM Members buy and sell energy frm the spt market based n metered and scheduled use. PJM schedules and dispatches generatin n the basis f least-cst, security cnstrained dispatch and the bids and perating characteristics ffered by the sellers int PJM. PJM dispatches generatin t meet the PJM Member buyers requirements, as well as the requirements fr Ancillary Services. PJM is respnsible fr administering the Day-ahead and Balancing PJM Energy Markets, including, perfrming the fllwing accunting-related functins: accunting fr transactins rendering bills t buyers and sellers receiving payments frm and dispersing payments t buyers and sellers The Spt Market facilitates the trading f energy by PJM Members. The Spt Market clears hurly at the apprpriate day-ahead and real-time System Energy Price cmpnent f LMP. PJM calculates a day-ahead and a real-time System Energy Price each hur fr the entire PJM RTO, as specified in Sectin 2 f this PJM Manual. Energy delivered t the Spt Market is cmpensated at the System Energy Price fr that hur. Energy purchased frm the Spt Market is charged at the System Energy Price fr that hur. 3.2 Business Rules fr InSchedule and Pwer Meter Data Submissins Unilateral Crrectins t InSchedule Lad Respnsibility Data Fr lad respnsibility InSchedule data submitted by the LSE (as ppsed t the typical EDC submittal), EDCs need mre certainty f accurate and final data prir t the PJM InSchedule data submissin deadline in rder fr them t accurately calculate lad respnsibilities fr all ther LSEs in their territry by the InSchedule deadline. These LSEs must submit their data tw hurs prir t the established PJM InSchedule data submissin deadlines. Revisin: 77, Effective Date: 11/01/2017 PJM

17 PJM Manual 28: Operating Agreement Accunting Sectin 3: Spt Market Energy Accunting If this des nt ccur, EDCs shall be allwed t PJM with the LSE's lad respnsibility data (with a cpy prvided t the applicable LSE) s that PJM can enter that EDC-calculated data prir t the InSchedule data submissin deadline as the fficial data t be used fr settlements. Any discrepancies remaining after the InSchedule deadline may be reslved via the EDC lad recnciliatin data submissins. Unilateral Crrectins t Pwer Meter Generatin Data Fr generatin MWh data submitted by the generatin wner (as ppsed t the EDC submittal), EDCs need mre certainty f accurate and final Pwer Meter data prir t the PJM InSchedule data submissin deadline in rder fr them t accurately calculate lad respnsibilities fr all ther LSEs in their territry by the InSchedule deadline. If grss data errrs in the submitted data are identified by the EDC (and PJM cncurs with the findings), EDCs shall be allwed t PJM with the crrect generatr data (with a cpy prvided t the applicable generatin wner) s that PJM can enter that data prir t the Pwer Meter data submissin deadline as the fficial data t be used fr settlements. Any discrepancies remaining after the Pwer Meter deadline may be reslved via mnthly Meter Errr Crrectin data submissins. 3.3 Calculating Spt Market Interchange Net interchange fr PJM Members is the difference between a participant s ttal energy resurces (including bth generatin and purchased energy) and its energy demand (including bth lad and energy sale bligatins). Fr each hur, PJM calculates each market participant s hurly day-ahead and real-time net spt market energy interchange. Day-ahead net interchange equals the sum f a market participant s demand and decrement bids cleared in the day-ahead market, less any accepted generatin and increment ffers cleared in the day-ahead market, and is adjusted fr all day-ahead energy transactins in which the custmer accunt is invlved. Real-time net interchange cnsists f a market participant s hurly metered tie line flws (if applicable),less any wnership f metered generatin, and is adjusted fr all real-time energy transactins (including any lad bligatins [de-rated fr transmissin lsses] r generatin mdeled by InSchedule transactins, and including any InSchedule transactins that were priced day-ahead) in which the custmer accunt is invlved. 3.4 Transmissin Lss De-ratin Factrs Because PJM emplys a Marginal Lss methdlgy, energy market-related settlements need t use lad respnsibilities de-rated fr transmissin lsses. This is due t the fact that the LMPs include a lss price cmpnent. In rder t remve all transmissin lsses, as represented in PJM s netwrk system mdel, hurly EDC lss de-ratin factrs are applied t the ttal EDC lad and t individual LSE lad respnsibilities. In general, these lss deratin factrs represent ttal transmissin lsses divided by ttal lad including lsses. (Nte Revisin: 77, Effective Date: 11/01/2017 PJM

18 PJM Manual 28: Operating Agreement Accunting Sectin 3: Spt Market Energy Accunting that these are different frm traditinal lss factrs which reflect ttal lsses divided by lad excluding lsses.) Each hur, PJM calculates a lss de-ratin factr fr each EDC that has their tie lines fully metered directly t PJM. Fr nn-pjm Mid-Atlantic EDCs (that d nt receive an allcatin f the jintly-wned PJM 500 kv transmissin system lsses), the calculatin is as fllws: EDC ttal state-estimated Lss MWh / EDC ttal revenue-metered lad MWh including all lsses Fr PJM Mid-Atlantic EDCs (that d receive an allcatin f the jintly-wned PJM 500 kv transmissin system lsses), the calculatin is as fllws: (EDC ttal state-estimated nn-500kv Lss MWh + EDC revenue-metered 500kV Lss Allcatin MWh) / (EDC ttal revenue-metered lad MWh including all nn-500kv lsses + EDC revenue-metered 500kV Lss Allcatin MWh) These EDC hurly lss de-ratin factrs are applied t the LSE lad respnsibility InSchedule MWh quantities (which are inclusive f all lsses) that are carved-ut f the applicable EDC s ttal lad, as well as applied t any residual lad respnsibility remaining with the EDCs, as fllws: Lss De-rated Lad MWh = (1 EDC Lss De-ratin Factr) x InScheduled, r Revenue- Metered, Lad Respnsibility MWh 3.5 State-estimated vs. Revenue-metered Energy Quantities Real-time generatin MWh are initially determined by the PJM State Estimatr, hwever, they are replaced by revenue meter data, if the equivalent revenue meter values are available via PJM Pwer Meter. The ttal lad actually served at each lad bus is initially determined by the State Estimatr. Fr each Electric Distributin Cmpany (EDC) that reprts hurly net energy flws frm all metered tie lines t PJM via Pwer Meter and revenue meter data fr the hurly net energy delivered by all generatrs within that EDC s territry via Pwer Meter, fr the purpse f energy market accunting the EDC is classified as a fully metered EDC. The ttal fully metered EDC revenue-metered lad is calculated as the sum f the net imprt energy flws reprted by their tie revenue meters plus the net generatin reprted by the generatr revenue meters. The amunt f lad at each f such fully metered EDC s lad buses calculated by the PJM State Estimatr is then adjusted, in prprtin t its share f the ttal lad f that fully metered EDC, in rder that the ttal amunt f lad acrss all f the fully metered EDC s lad buses matches its ttal revenue meter calculated lad. PJM will assess and trend quarterly the degree f net energy injectins at lad buses mdeled in the PJM netwrk system mdel (i.e., reverse pwer flws) in rder t detect and crrect and mdeling issues and t identify any generatin in excess f lad that appears at a lad bus. PJM will determine and use a relevant net energy injectin threshld at a lad bus that may impact LMP and/r lad accuracy. Fr lad buses with persistent negative MWh, PJM will wrk with the applicable EDC t determine if the cause is subptimal mdeling r actual reverse pwer flws frm distributin-level system(s) t the PJM transmissin system, r simply nrmal results due t state estimatin. Prperly mdeled lad buses with cnsistent excess energy Revisin: 77, Effective Date: 11/01/2017 PJM

19 PJM Manual 28: Operating Agreement Accunting Sectin 3: Spt Market Energy Accunting injectins due t distributin-level reverse pwer flws shuld be mdeled as generatin buses in the PJM netwrk system mdel at the lad bus lcatin in rder t minimize the amunt f negative MWh bserved at thse lad buses. 3.6 Residual Metered Lad Fr settlements purpses, lad within a fully metered EDC s territry is assigned t nn-metered entities by submitting hurly lad bligatin data in the InSchedule system. Data submitted in the InSchedule system includes the names f the LSE respnsible fr serving the lad and the EDC in whse territry the lad is lcated, the number f megawatts f lad assigned t the LSE fr each hur, the aggregate at which lad is t be priced, and the start and end dates fr the lad cntract. During the settlements prcess, lad assigned t an LSE at a specified aggregate is further assigned t individual lad buses based n the aggregate definitin, which specifies the percentage f the verall aggregate that each bus represents, t identify the LSE s hurly megawatts f lad at each bus. Ndal priced lad is defined as any hurly lad submitted under an InSchedule cntract that is priced at an aggregate cmprised f a single identifiable bus r set f identifiable buses at which the lad is lcated. A detailed descriptin f the ndal pricing settlements business rules can be fund in Manual 27 Sectin 5.6. The hurly ndal lad amunts submitted in InSchedule are multiplied by the ndal aggregates definitins t calculate the ndal priced lad at each bus. Residual metered lad at each bus is defined as the bus lad (adjusted revenue meter calculated lad as calculated in Sectin 3.5) less the ndal priced lad at each bus. 3.7 Residual Metered Lad Aggregate Definitins Residual Metered Lad aggregates mre accurately reflect the cmpsitin f nn-ndal priced lad in fully metered EDC territries. Effective June , Residual Metered Lad aggregates are the default fr which real-time lad is settled if it has nt elected t settle at a ndal lad aggregate. Upn implementatin f residual metered lad pricing n June , physical zne pricing fr real-time lad will n lnger be available. Residual Metered Lad aggregate distributin factrs are determined by dividing the residual metered lad fr each bus in the fully metered EDC territry by the ttal residual metered lad fr the fully metered EDC territry. Residual Metered Lad aggregate prices are defined by weighting each lad bus LMP by that bus residual metered lad aggregate distributin factr. Fr the majrity f PJM transmissin znes, the EDC territry is the same as the physical transmissin zne. In cases where the fully metered EDC s territry differs frm the physical transmissin zne, residual metered lad aggregates exist fr each fully metered EDC territry within the transmissin zne. Residual Metered Lad aggregate cngestin prices, lss prices, and ttal LMPs are calculated using the Residual Metered Lad aggregate distributin factrs. Factrs fr each Residual Metered Lad aggregate sum t exactly 100%. Residual Metered Lad aggregate definitins used fr the calculatin f Day-ahead LMPs, preliminary and final Real-time LMPs, and FTRs/ARRs are defined as fllws: Day-ahead Residual Metered Lad aggregate distributin factrs default t the final real-time distributin factrs fr the Residual Metered Lad aggregate at 8:00 a.m. ne week prir t the Operating Day (i.e., if next Operating Day is Mnday, the default Revisin: 77, Effective Date: 11/01/2017 PJM

20 PJM Manual 28: Operating Agreement Accunting Sectin 3: Spt Market Energy Accunting distributin is frm 8:00 a.m. n Mnday f the previus week). Cnsistent with physical transmissin znes, the definitin applies t all hurs in the day. Preliminary 5 minute real-time Residual Metered Lad aggregate LMPs are calculated using the same Residual Metered Lad aggregate distributin factrs as used in the Day-ahead market fr the Operating Day. Final hurly real-time Residual Metered Lad aggregate distributin factrs are calculated using InSchedule-submitted ndal lad MWh. Residual Metered Lad aggregate distributin factrs fr ARR/FTR purpses are fixed fr the planning perid (June 1st May 31st). Cnsistent with physical transmissin znes, the residual metered lad aggregate distributins fr FTRs/ARRs are initially determined using the hurly individual residual lad bus cntributin t the ttal residual lad at the time f the previus year s PJM annual peak. In cases where there are new ndal lad requests pursuant t the ndal pricing rules in Manual 27, the initial residual metered lad aggregate definitin fr FTRs/ARRs are adjusted by the LSE s ndal lad peak distributin. LSEs mving t ndal lad settlement fr the upcming PJM planning year will be required t submit a peak lad at the time f the PJM annual peak frm the previus year per the ndal pricing rules in Manual 27. This value in cnjunctin with the distributin percentages currently required accrding t the ndal pricing rules in Manual 27 will be used t determine the final residual metered lad aggregate distributin. 3.8 Spt Market Energy Charges Market participant custmer accunts incur +/- charges fr Day-ahead Spt Market Energy based n their day-ahead net interchange. If a market participant s day-ahead net interchange is a net purchase f day-ahead spt market energy in an hur (a psitive value), they are charged fr purchasing their net interchange fr that hur at the hur s day-ahead System Energy Price. If a market participant s day-ahead net interchange is a net sale f day-ahead spt market energy in an hur (a negative value), they are prvided with a negative charge fr selling their net interchange fr that hur at the hur s day-ahead System Energy Price. Market participant custmer accunts incur +/- charges fr Balancing Spt Market Energy based n the deviatin between their real-time net interchange and their day-ahead net interchange. Hurly balancing spt market deviatins are calculated by subtracting the hur s day-ahead net interchange frm the hur s real-time net interchange. If a market participant s balancing spt market deviatin is a net purchase f real-time spt market energy in an hur (a psitive value), they are charged fr purchasing their balancing deviatin fr that hur at the hur s real-time System Energy Price. If a market participant s balancing spt market deviatin is a net sale f real-time spt market energy in an hur (a negative value), they are prvided with a negative charge fr selling their balancing deviatin fr that hur at the hur s real-time System Energy Price. PJM Actins PJM accunting prcess retrieves the fllwing infrmatin: Each market participant s hurly day-ahead and real-time net interchange (MWh) The hurly RTO system-wide System Energy Price ($/MWh) Revisin: 77, Effective Date: 11/01/2017 PJM

21 PJM Manual 28: Operating Agreement Accunting Sectin 3: Spt Market Energy Accunting PJM calculates the Day-ahead Spt Market Energy charge (psitive r negative) fr each hur fr each Market Participant as: PJM calculates the Balancing Spt Market Energy charge (psitive r negative) fr each hur fr each Market Participant as: 3.9 Recnciliatin fr Spt Market Energy Charges PJM will calculate recnciled Spt Market Energy charges fr EDCs and Retail Lad Aggregatrs (a.k.a. Electric Generatin Suppliers) fr past mnthly billings n a tw mnth lag. The recnciliatin kwh data must be supplied t PJM by the EDCs n later than the last day f the billing mnth that is tw mnths after the riginal billing mnth. Fr example, all recnciliatin data fr January must be submitted by March 31 at 23:59. The recnciliatin kwh data represents the difference between the scheduled Retail Lad Respnsibility r Whlesale Lad Respnsibility InSchedule (in MWh) and the actual usage based n metered data. This hurly kwh data must be reprted separately fr each applicable InSchedule cntract. PJM calculates the Spt Market Energy charge recnciliatins by multiplying the kwh data (derated fr transmissin lsses) by the real-time PJM System Energy Price fr that hur. These charge recnciliatins are then ttaled fr the mnth fr each EDC r Retail Lad Aggregatr. Nte that the recnciliatin fr Spt Market charges fr a mnth may be either a psitive r a negative value, and may even be such that the recnciled lad respnsibility MWh results in a negative lad quantity. Revisin: 77, Effective Date: 11/01/2017 PJM

22 PJM Manual 28: Operating Agreement Accunting Sectin 4: Regulatin Accunting Sectin 4: Regulatin Accunting Welcme t the Regulatin Accunting sectin f the PJM Manual fr Operating Agreement Accunting. In this sectin, yu will find the fllwing infrmatin: A descriptin f hw Regulatin is prvided and accunted fr in the PJM Regulatin Markets (see Regulatin Accunting Overview ). Hw credits are calculated fr prviders f Regulatin (see Regulatin Credits ). Hw charges are calculated fr users f Regulatin (see Regulatin Charges ). Hw regulatin charge recnciliatins are calculated (see Recnciliatin fr Regulatin Charges ). 4.1 Regulatin Accunting Overview Regulatin is necessary t prvide fr the cntinuus balancing f resurces (generatin and interchange) with lad and fr maintaining scheduled Intercnnectin frequency at 60 cycles per secnd (60 Hz). PJM cmmits n-line resurces whse utput is raised r lwered as necessary t fllw mment-t-mment changes in lad. Regulatin is predminantly achieved using autmatic generatin cntrl equipment. Regulating resurces include bth generatrs and demand side respnse resurces. PJM perates the Regulatin Market where the Regulatin Market Clearing Prices are determined based n Regulatin ffers and pprtunity csts. PJM assigns the mst ecnmically efficient set f regulating resurces available in real-time t separately meet the applicable NERC regins regulatin zne requirements. Fr mre detailed infrmatin abut hw regulating requirements are develped and hw Regulatin is assigned, see the PJM Manual fr Balancing Operatins (M-12). Fr an verview f the Regulatin Market, see the PJM Manual fr Energy & Ancillary Services Market Operatins (M-11). Each PJM lad serving entity has an hurly Regulatin bligatin equal t their regulatin zne real-time lad rati share f the applicable Regulatin requirement fr the hur, prrated t reflect the ttal amunt f Regulatin actually supplied. A market participant s Regulatin bligatin can be satisfied frm their wn resurces capable f prviding Regulatin, by cntractual arrangements with ther Market Participants capable f prviding Regulatin, and/r by purchases f Regulatin frm the PJM Regulatin Market. Resurce wners supplying self-scheduled Regulatin are credited based n the hurly Regulatin Market Capability Clearing Price (RMCCP) and Regulatin Market Perfrmance Clearing Price (RMPCP) fr each MW f Regulatin supplied, with cnsideratin f the resurce s Regulatin perfrmance, and where applicable, the rati between the requested mileage fr the regulatin dispatch signal assigned t the resurce and the mileage fr the traditinal regulatin signal (mileage rati). Resurce wners supplying pl-scheduled Regulatin are credited fr each Regulatin MW at the higher f the hurly Regulatin Market Perfrmance and Capability Clearing Prices, with cnsideratin f the resurce s Regulatin perfrmance, and where applicable the mileage rati, r their Regulatin ffer price (plus real-time pprtunity cst including shulder hurs lst pprtunity csts, fr generating resurces). Regulatin buyers are charged the hurly Regulatin Market Capability Clearing Price (RMCCP) and Regulatin Market Perfrmance Clearing Price (RMPCP) plus their Revisin: 77, Effective Date: 11/01/2017 PJM

23 PJM Manual 28: Operating Agreement Accunting Sectin 4: Regulatin Accunting percentage share f any Regulatin prvider s unrecvered csts ver and abve their ttal Regulatin Clearing Price credits. 4.2 Regulatin Credits Each resurce supplying pl-scheduled Regulatin is credited at the higher f the hurly RMCCP and RMPCP with cnsideratin f the resurce s Regulatin perfrmance, and where applicable, the mileage rati r its Regulatin ffer price (plus real-time pprtunity cst including shulder hurs lst pprtunity csts, fr generating resurces). A resurce supplying self-scheduled Regulatin is credited based n the hurly RMCCP and RMPCP with cnsideratin f the resurce s Regulatin perfrmance, and where applicable, the mileage rati. Regulatin credits fr jint-wned generatrs supplying Regulatin are allcated t the wners based n their wnership shares. Any resurce with an hurly perfrmance scre belw the applicable threshld fr minimum hurly perfrmance in Manual 11 Sectin will receive zer regulatin credits fr that market hur. PJM Actins Frm the Regulatin lg, PJM identifies each resurce that supplied Regulatin (bth pl-scheduled and self-scheduled) with an hurly perfrmance scre greater than r equal t the applicable threshld fr minimum hurly perfrmance in Manual 11 Sectin during an hur. PJM calculates the hurly Regulatin RMCCP Credit fr each applicable regulating resurce by multiplying each increment f such Regulatin in megawatts during the hur by the Regulatin Market Capability Clearing Price (RMCCP) and the resurce s actual perfrmance scre fr that hur. PJM calculates the hurly Regulatin RMPCP Credit fr each applicable regulating resurce by multiplying each increment f such Regulatin in megawatts during the hur by the Regulatin Market Perfrmance Clearing Price (RMPCP) fr that hur, the applicable mileage rati, and the resurce s actual perfrmance scre fr that hur. PJM calculates the ttal Regulatin Clearing Price Credit as the Regulatin RMCCP Credit plus the Regulatin RMPCP Credit fr that hur. The lst pprtunity csts calculated as part f the real-time pricing algrithm as adjusted by the applicable perfrmance scre and unit-specific benefits factr will be used in the settlement calculatin fr intra-hur lst pprtunity csts. PJM calculates shulder hurs lst pprtunity csts incurred by each generatr prviding pl-scheduled Regulatin fr the preceding and fllwing hur. Nte that the Revisin: 77, Effective Date: 11/01/2017 PJM

24 PJM Manual 28: Operating Agreement Accunting Sectin 4: Regulatin Accunting energy ffer referred t belw is the generatr`s incremental energy ffer curve that is assciated with the price-based r cst-based schedule used in the real-time dispatch f the unit. CT 1 and hydr generatrs are nt eligible fr shulder hur lst pprtunity csts. A generatr is eligible fr preceding shulder hur lst pprtunity csts when: it is nline the hur prir t regulating; the Regulatin assignment starts at the tp f the hur; it is nt regulating during the preceding hur; and the LMP Desired frm the prir hur is nt already within the regulatin hur regulatin limits. A generatr is eligible fr fllwing shulder hur lst pprtunity csts when: it is nline the hur fllwing regulating; the Regulatin assignment ends at the tp f the fllwing hur; it is nt regulating during the fllwing hur; and the LMP Desired frm the fllwing hur is nt already within the regulatin hur regulatin limits. In the preceding hur f regulatin, if a generatr must reduce its utput t prvide regulatin and freges revenues, its shulder hur lst pprtunity cst equals the amunt f its energy ffer at the preceding hur ecnmically desired level in excess f its energy ffer at its Regulatin setpint at the start f the regulatin hur adjusted by the percentage f the shulder hur during which the reductin in utput ccurred. In the preceding hur f regulatin, if a generatr must increase its utput t prvide regulatin and incurs additinal csts, its shulder hur lst pprtunity cst equals the amunt f its energy ffer at its Regulatin setpint at the start f the regulating hur in excess f its energy ffer at the preceding hur ecnmically desired level adjusted by the percentage f the shulder hur during which the increase in utput ccurred. In the fllwing hur f regulatin, if a generatr increased its utput t prvide regulatin and incurs additinal csts, its shulder hur lst pprtunity cst equals the amunt f its energy ffer at its Regulatin setpint at the end f the regulating hur in excess f its energy ffer at the fllwing hur ecnmically desired level adjusted by the percentage f the shulder hur during which the decrease in utput ccurred. In the fllwing hur f regulatin, if a generatr reduced its utput t prvide regulatin and freges revenues, its shulder hur lst pprtunity cst equals the amunt f its energy ffer at the fllwing hur ecnmically desired level in excess f its energy ffer at its Regulatin setpint at the end f the regulating hur adjusted by the percentage f the shulder hur during which the increase in utput ccurred The percentage f the shulder hur in which the resurce wuld have t perate unecnmically is determined by dividing the reductin r increase in utput by the resurce s submitted ramp rate. If the ecnmically desired level, LMP desired MW, is less than r equal t the regulatin lw limit in the hur the unit regulated, the regulatin set pint equals the regulatin lw limit plus the regulatin assigned MW in the hur the unit regulated. If the LMP desired MW is greater than r equal t the regulatin high limit in the hur the unit regulated, the regulatin set pint equals the regulatin high limit minus the regulatin assigned MW 1 Unless therwise specified, diesel unit types are treated as CTs in settlements based n their similar perating characteristics. Revisin: 77, Effective Date: 11/01/2017 PJM

25 PJM Manual 28: Operating Agreement Accunting Sectin 4: Regulatin Accunting in the hur the unit regulated. The regulatin MW at the beginning f the hur is used when calculating shulder hur lst pprtunity csts in the preceding shulder hur while the regulatin MW at the end f the hur is used when calculating shulder hur lst pprtunity csts in the fllwing shulder hur. Since hydr units perate n a schedule and d nt have an energy bid, lst pprtunity csts fr these units are calculated using the average f the real-time LMP at the hydr unit bus fr the apprpriate n peak ( ) r ff-peak ( , ) perid, excluding thse hurs during which all available units at the hydr plant were perating. During thse hurs when a hydr unit is in spill, the average f the real-time LMP value is set t zer such that the lst pprtunity cst is equal t (i) the regulatin setpint (biased t reflect the actual regulatin signal and adjusted by the applicable perfrmance scre and benefits factr) multiplied by (ii) the full value f the real-time LMP at the generatr bus. If a hydr unit is cmmitted day-ahead with MW greater than zer, the lst pprtunity cst is equal t (i) the regulatin setpint (biased t reflect the actual regulatin signal and adjusted by the applicable perfrmance scre and benefits factr) multiplied by (ii) the difference between the real-time LMP at the generatr bus and the average real-time LMP (calculated as stated abve). If this average real-time LMP value is higher than the real-time LMP at the generatr bus, the lst pprtunity cst is zer. If a hydr unit is nt cmmitted day-ahead with MW greater than zer, the lst pprtunity cst is equal t (i) the regulatin setpint (biased t reflect the actual regulatin signal and adjusted by the applicable perfrmance scre and benefits factr) multiplied by (ii) the difference between the average real-time LMP (calculated as stated abve) minus the real-time LMP at the generatr bus. If the actual real-time LMP is higher than the average real-time LMP, the lst pprtunity cst is zer. Additinal details n hydr units in the Regulatin Market can be fund in Manual 11: Energy and Ancillary Services Market Operatins. Fr each resurce prviding Regulatin at the directin f PJM, the sum f its Regulatin ffer price (and lst pprtunity csts, including shulder hurs lst pprtunity csts, fr generatrs) is cmpared t its hurly Regulatin Clearing Price credits. If the resurce s pl-scheduled Regulatin ffer price (plus lst pprtunity csts, including shulder hurs lst pprtunity csts, fr generatrs) is greater than its Regulatin Clearing Price credit fr that hur, then the resurce receives an additinal credit equal t the amunt that its Regulatin ffer price (plus lst pprtunity csts, including shulder hurs lst pprtunity csts, fr generatrs) is in excess f its Regulatin Clearing Price credit: Lst Opprtunity Cst Credit = (Regulatin Offer + Lst Opprtunity Cst, including Shulder Hurs Lst Opprtunity Cst, if applicable) Regulatin Clearing Price Credit, nly if quantity is psitive Revisin: 77, Effective Date: 11/01/2017 PJM

Operating Agreement Accounting

Operating Agreement Accounting PJM Manual 28: Operating Agreement Accunting Revisin: 754 Effective Date: July 01, 2016 Prepared by: Market Settlements Develpment Department PJM 2016 PJM Manual 28: Manual 28: Operating Agreement Accunting

More information

PJM Manual 28: Operating Agreement Accounting Revision: 79 Effective Date: April 1, Prepared by Market Settlements Development Department

PJM Manual 28: Operating Agreement Accounting Revision: 79 Effective Date: April 1, Prepared by Market Settlements Development Department PJM Manual 28: Operating Agreement Accunting Revisin: 79 Effective Date: April 1, 2018 Prepared by Market Settlements Develpment Department PJM 2018 PJM Manual 28: Operating Agreement Accunting Table f

More information

PJM Manual 28: Operating Agreement Accounting Revision: 80 Effective Date: June 1, Prepared by Market Settlements Development Department

PJM Manual 28: Operating Agreement Accounting Revision: 80 Effective Date: June 1, Prepared by Market Settlements Development Department PJM Manual 28: Operating Agreement Accunting Revisin: 80 Effective Date: June 1, 2018 Prepared by Market Settlements Develpment Department PJM 2018 PJM Manual 28: Operating Agreement Accunting Table f

More information

Operating Agreement Accounting

Operating Agreement Accounting PJM Manual 28: Operating Agreement Accunting Revisin: 56 Effective Date: Octber 1, 2012 Prepared by Market Cmpliance Department PJM 2012 PJM Manual 28: Manual 28: Operating Agreement Accunting Table f

More information

PJM Manual 11: Energy & Ancillary Services Market Operations Revision: 95 Effective Date: June 1, 2018

PJM Manual 11: Energy & Ancillary Services Market Operations Revision: 95 Effective Date: June 1, 2018 PJM Manual 11: Energy & Ancillary Services Market Operatins Revisin: 95 Effective Date: June 1, 2018 Prepared by Day-Ahead and Real-Time Market Operatins PJM 2018 PJM Manual 11: Energy & Ancillary Services

More information

PJM Manual 11: Energy & Ancillary Services Market Operations Revision: 92 Effective Date: November 1, 2017

PJM Manual 11: Energy & Ancillary Services Market Operations Revision: 92 Effective Date: November 1, 2017 PJM Manual 11: Energy & Ancillary Services Market Operatins Revisin: 92 Effective Date: Nvember 1, 2017 Prepared by Day-Ahead and Real-Time Market Operatins PJM 2017 PJM Manual 11: Energy & Ancillary Services

More information

Revision: 53. Prepared by

Revision: 53. Prepared by PJM Manual 11: Energy & Ancillary Services Market Operatins Revisin: 53 Effective Date: Octber 1, 2012 Prepared by Frward Market Operatins PJM 2012 i Table f Cntents Table f Cntents Table f Cntents...

More information

PJM Manual 11: Energy & Ancillary Services Market Operations. Revision: 46. Effective Date: June 1, Prepared by. Forward Market Operations

PJM Manual 11: Energy & Ancillary Services Market Operations. Revision: 46. Effective Date: June 1, Prepared by. Forward Market Operations PJM Manual 11: Energy & Ancillary Services Market Operatins Revisin: 46 Effective Date: June 1, 2011 Prepared by Frward Market Operatins PJM 2011 i PJM 2007 Revisin 28, Effective Date: 03/15/2007 Manual

More information

Resource Tracker User Guide

Resource Tracker User Guide Revisin: 05 Effective Date: 02/22/2019 Prepared By: PJM Client Management [Type text] PJM User Guide: Resurce Tracker Table f Cntents Apprval... 2 Current Revisin... Errr! Bkmark nt defined. Intrductin...

More information

Manual 11: Energy & Ancillary Services Market Operations Revision History

Manual 11: Energy & Ancillary Services Market Operations Revision History 2.3.4 Minimum Generatr Operating Parameters Parameter Limited Schedules Belw is the list f business rules t require units t submit schedules that meet minimum accepted parameters. Market Sellers are required

More information

5.2 RPM Auction Timeline

5.2 RPM Auction Timeline 5.2 RPM Auctin Timeline The fllwing Auctin timeline prvides the deadline fr key RPM activities: RPM Activity Submittal f preliminary request t remve resurce frm Capacity Resurce status and preliminary

More information

5.2 RPM Auction Timeline

5.2 RPM Auction Timeline 5.2 RPM Auctin Timeline The fllwing Auctin timeline prvides the deadline fr key RPM activities: RPM Activity Submittal f preliminary request t remve resurce frm Capacity Resurce status and preliminary

More information

PJM Manual 12: Balancing Operations Revision: 38 Effective Date: April 20, Prepared by Dispatch

PJM Manual 12: Balancing Operations Revision: 38 Effective Date: April 20, Prepared by Dispatch PJM Manual 12: Balancing Operatins Revisin: 38 Effective Date: April 20, 2018 Prepared by Dispatch PJM 2018 Table f Cntents Table f Cntents Table f Exhibits...6 Apprval...7 Current Revisin...8 Intrductin...

More information

RunnerStone, LLC. Page1 M E M O R A N D U M

RunnerStone, LLC. Page1 M E M O R A N D U M RunnerStne, LLC 3709 N. High Street, Suite 100, Clumbus, OH 43214 M E M O R A N D U M Date: Octber 13, 2017 T: Ohi Manufacturers Assciatin Energy Grup Frm: Jhn Seryak, PE (RunnerStne, LLC) Kim Bjk, Energy

More information

CDM Plan Submission and Review Criteria Rules

CDM Plan Submission and Review Criteria Rules Cnservatin First Framewrk LDC Tl Kit Final v4.0 January 17, 2018 CDM Plan Submissin and Review Rules 1) Purpse and definitins 1.1 These Rules set ut: a) the rles, respnsibilities and timing fr CDM Plan

More information

Pre-Scheduling Operations

Pre-Scheduling Operations PJM Manual 10: Pre-Scheduling Operatins Revisin: 23 Effective Date: January 2, 2008 Prepared by System Operatin Divisin Revisin 23, Effective Date: 01/2/2008 i Manual 10: Pre-Scheduling Operatins Table

More information

Company Policy Buying Additional Annual Leave

Company Policy Buying Additional Annual Leave Cmpany Plicy Buying Additinal Annual Leave Dcument Cntrl Table Dcument title: Buying Additinal Annual Leave Versin number: 2.3 Date apprved: 22.11.17 Apprved by: D Wythe Date f last review: 22.11.17 Departments

More information

PJM Manual 14A: New Services Request Process Revision: 22 Effective Date: April 26, Prepared by Interconnection Planning Department

PJM Manual 14A: New Services Request Process Revision: 22 Effective Date: April 26, Prepared by Interconnection Planning Department PJM Manual 14A: New Services Request Prcess Revisin: 22 Effective Date: April 26, 2018 Prepared by Intercnnectin Planning Department PJM 2018 Table f Cntents Table f Cntents Table f Exhibits...7 Apprval...8

More information

How it works. The following pages provide step by step instructions on the main stages of the MYOB Integration Module.

How it works. The following pages provide step by step instructions on the main stages of the MYOB Integration Module. Integrating MYOB with TimePr With TimePr s MYOB Integratin Mdule, yu can imprt TimePr time recrds int MYOB fr invice prcessing r payrll integratin. These recrds are then used t generate: Sales Invices,

More information

PJM MISO Pseudo-Tied Units Operating Procedure RTO-PTU-OP1-r1 Effective Date: 08/14/2017 Review Date: 09/01/ Purpose. 2.

PJM MISO Pseudo-Tied Units Operating Procedure RTO-PTU-OP1-r1 Effective Date: 08/14/2017 Review Date: 09/01/ Purpose. 2. 1. Purpse The purpse f this prcedure is t address peratinal cncerns due t multiple generating units that have pseud-tied ut f ne Balancing Authrity (BA) and int anther BA yet physically reside in the Reliability

More information

JOINT REPORT ON THE CASE FOR A SECOND NORTH SOUTH INTERCONNECTOR

JOINT REPORT ON THE CASE FOR A SECOND NORTH SOUTH INTERCONNECTOR Reprt n the Case fr Cnstructin f a Secnd Nrth-Suth intercnnectr. JOINT REPORT ON THE CASE FOR A SECOND NORTH SOUTH INTERCONNECTOR EXECUTIVE SUMMARY This reprt prvides the assessment and evaluatin carried

More information

Pre-Scheduling Operations

Pre-Scheduling Operations PJM Manual 10: Pre-Scheduling Operatins Revisin: 25 Effective Date: January 1, 2010 Prepared by System Operatin Divisin PJM 2010 i Table f Cntents PJM Manual 10: Pre-Scheduling Operatins Table f Cntents

More information

ICP Linking and Fusing Service Enquiry Procedure

ICP Linking and Fusing Service Enquiry Procedure UK Pwer Netwrks ICP Linking and Fusing Service Enquiry Prcedure Owner Name Title Neil Clarke Head f Highway Services Signature Date 03 April 2018 Authriser Name Title Kevin Newnham Majr Prgrammes & ICP

More information

PJM Manual 01: Control Center and Data Exchange Requirements Revision: 36 Effective Date: January 2, Prepared by System Operations Division

PJM Manual 01: Control Center and Data Exchange Requirements Revision: 36 Effective Date: January 2, Prepared by System Operations Division PJM Manual 01: Cntrl Center and Data Exchange Requirements Revisin: 36 Effective Date: January 2, 2018 Prepared by System Operatins Divisin PJM 2018 Table f Cntents Table f Cntents Table f Exhibits...6

More information

PJM Manual 36: System Restoration Revision: 24 Effective Date: June 9, Prepared by System Operations Division

PJM Manual 36: System Restoration Revision: 24 Effective Date: June 9, Prepared by System Operations Division PJM Manual 36: System Restratin Revisin: 24 Effective Date: June 9, 2017 Prepared by System Operatins Divisin PJM 2017 Table f Cntents Table f Cntents Table f Exhibits...6 Apprval...7 Current Revisin...8

More information

PJM Manual 14C: Generation and Transmission Interconnection Facility Construction Revision: 12 Effective Date: June 22, 2017

PJM Manual 14C: Generation and Transmission Interconnection Facility Construction Revision: 12 Effective Date: June 22, 2017 PJM Manual 14C: Generatin and Transmissin Intercnnectin Facility Cnstructin Revisin: 12 Effective Date: June 22, 2017 Prepared by System Planning Divisin PJM 2017 PJM Manual 14C: Generatin and Transmissin

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specificatin Cngestin Revenue Rights Auctin Efficiency Track 1A Dc ID: GNFDMDEHU6BB-46-53 Page 1 f 15 Disclaimer All infrmatin cntained in this draft Business Requirements Specificatin

More information

PROCEDURE. Part 4.3: Real-Time Scheduling of the Physical Markets PUBLIC. Market Manual 4: Market Operations. Issue 54.

PROCEDURE. Part 4.3: Real-Time Scheduling of the Physical Markets PUBLIC. Market Manual 4: Market Operations. Issue 54. PUBLIC IMP_PRO_0034 PROCEDURE Market Manual 4: Market Operatins Part 4.3: Real-Time Scheduling f the Physical Markets Issue 54.0 This prcedure prvides guidance t Market Participants n the Real-time scheduling

More information

Facilities Study Report

Facilities Study Report Wellhead Pwer Cltn, LLC Facilities Study Reprt Revised May 15, 2014 Prepared by: Edgar Ramirez Rger Salas, P.E. Distributin Field Engineering Apprved by: Rger Salas Distributin Field Engineering Manager

More information

In this fact sheet we answer the four most common questions new clients ask:

In this fact sheet we answer the four most common questions new clients ask: Wrking With Federal Prpsals Intrductin In this fact sheet we answer the fur mst cmmn questins new clients ask: What tasks d yu perfrm and what d yu need frm us? Hw d we use the Virtual War Rms? Hw much

More information

Control Center and Data Exchange Requirements

Control Center and Data Exchange Requirements PJM Manual 01 Cntrl Center and Data Exchange Requirements Revisin: 23 Effective Date: June 1, 2013 Prepared by System Operatins Divisin PJM 2013 PJM 2013 1 PJM Manual 01 Manual 01: Cntrl Center Requirements

More information

PJM Manual 13: Emergency Operations Revision: 65 Effective Date: January 1, Prepared by System Operations Division

PJM Manual 13: Emergency Operations Revision: 65 Effective Date: January 1, Prepared by System Operations Division PJM Manual 13: Emergency Operatins Revisin: 65 Effective Date: January 1, 2018 Prepared by System Operatins Divisin PJM 2018 PJM Manual 13: Emergency Operatins Table f Cntents Table f Cntents Table f Exhibits...5

More information

UNC 0594R: Meter Reading Submission for Advanced & Smart Metering. UNC Request Workgroup Report

UNC 0594R: Meter Reading Submission for Advanced & Smart Metering. UNC Request Workgroup Report UNC Request Wrkgrup Reprt At what stage is this dcument in the prcess? UNC 0594R: Meter Reading Submissin fr Advanced & Smart Metering The rllut f Advanced and Smart Metering delivers the pprtunity t utilise

More information

PJM Manual 36. System Restoration. Revision: 21 Effective Date: December 5, Prepared by: System Operations Division PJM 2014

PJM Manual 36. System Restoration. Revision: 21 Effective Date: December 5, Prepared by: System Operations Division PJM 2014 PJM Manual 36 System Restratin Revisin: 21 Effective Date: December 5, 2014 Prepared by: System Operatins Divisin PJM 2014 PJM 2014 i Manual 36: System Restratin Table f Cntents Manual 36: System Restratin

More information

0XXX: Meter Reading Submission for Advanced & Smart Metering. Stage 01: Request

0XXX: Meter Reading Submission for Advanced & Smart Metering. Stage 01: Request Stage 01: Request 0XXX: Meter Reading Submissin fr Advanced & Smart Metering At what stage is this dcument in the prcess? The rllut f Advanced and Smart Metering delivers the pprtunity t utilise mre frequent

More information

Trading Region Upgrade (TRU) - Service Description Pilot Phase 2017/18

Trading Region Upgrade (TRU) - Service Description Pilot Phase 2017/18 Trading Regin Upgrade (TRU) - Service Descriptin Pilt Phase 2017/18 1. General Descriptin TRU in General, Runtime & Ttal Quantity TRU is a specially designed service t facilitate market integratin and

More information

MEDICAID SERVICES UPDATE: August 8, 2014

MEDICAID SERVICES UPDATE: August 8, 2014 OKLAHOMA DEPARTMENT OF HUMAN SERVICES Aging Services, Medicaid Services Unit ADvantage Administratin PO Bx 50550 Tulsa, Oklahma 74150-0550 (918) 933-4900 www.kdhs.rg MEDICAID SERVICES UPDATE: August 8,

More information

Getting Started with General Ledger

Getting Started with General Ledger Getting Started with General Ledger Welcme t Infrm General Ledger and Accunting! Yur Accunting Cnsultant will have already prvided yu with a Training Overview t familiarize yu with the tasks and timeline.

More information

How to Work with Production in SAP Business One 9.3

How to Work with Production in SAP Business One 9.3 Hw-t Guide Dcument Versin: 4.0 2017-08-18 Hw t Wrk with Prductin in SAP Business One 9.3 Typgraphic Cnventins Type Style Example Descriptin Wrds r characters quted frm the screen. These include field names,

More information

Generation and Transmission Interconnection Facility Construction

Generation and Transmission Interconnection Facility Construction PJM Manual 14C Generatin and Transmissin Intercnnectin Facility Cnstructin Revisin: 05 Effective Date: 04/01/2008 Prepared by Pwer System Crdinatin Department Reliability Integratin Divisin PJM 2008 Revisin

More information

End of Year Planning and Checklists

End of Year Planning and Checklists TechnlgyOne Financials End f Year Planning End f Year Planning and Checklists This dcument prvides checklists and discussin pints fr sme f the main Technlgy One mdules. The TechnlgyOne Supprt Centre knwledge

More information

Network Services and Their Distributors Data Synchronization Initiative Frequently Asked Questions for Suppliers

Network Services and Their Distributors Data Synchronization Initiative Frequently Asked Questions for Suppliers Netwrk Services and Their Distributrs Data Synchrnizatin Initiative Frequently Asked Questins fr Suppliers June 2012 Cpyright 2011. All Rights Reserved. FAQs fr Netwrk Services Suppliers REVISION HISTORY

More information

Nomination for Merit Award or Contribution Points

Nomination for Merit Award or Contribution Points Nminatin fr Merit Award r Cntributin Pints Wh is this dcument fr? Line Managers can submit individuals and/r teams fr cnsideratin fr a merit award r cntributin pints using ne f the frms included here.

More information

Kast Distributors Data Synchronization Initiative

Kast Distributors Data Synchronization Initiative Kast Distributrs Data Synchrnizatin Initiative Frequently Asked Questins fr Kast Distributrs Suppliers Versin 1 Cpyright 2015. All Rights Reserved. Kast Distributrs FAQs fr Suppliers REVISION HISTORY Date

More information

Oracle Project Portfolio Management Integration Pack for Primavera P6 and Oracle E-Business Suite Release Notes

Oracle Project Portfolio Management Integration Pack for Primavera P6 and Oracle E-Business Suite Release Notes Oracle Prject Prtfli Management Integratin Pack fr Primavera P6 and Oracle E-Business Suite 3.1 - Release Ntes Release 3.1 Part N. E20583-03 January 2012 Oracle Prject Prtfli Management Integratin Pack

More information

Comments of Powerex Corp. on Intertie Deviation Draft Final Proposal. Submitted by Company Date Submitted

Comments of Powerex Corp. on Intertie Deviation Draft Final Proposal. Submitted by Company Date Submitted Cmments f Pwerex Crp. n Intertie Deviatin Draft Final Prpsal Submitted by Cmpany Date Submitted Mike Benn 604.891.6074 Pwerex Crp. January 8, 2019 Pwerex appreciates the pprtunity t submit cmments n CAISO

More information

ECNG Energy Group. Performance Review Plan

ECNG Energy Group. Performance Review Plan ECNG Energy Grup Perfrmance Review Plan Cntents Overview 3 Summary 3 Purpse 3 Key Phases and Timelines 4 1) Perfrmance Planning: Start f Q1 4 Setting Individual Objectives 5 2) Onging Caching and Mid-year

More information

Real Time Scarcity Pricing

Real Time Scarcity Pricing Real Time Scarcity Pricing 719 TF Hward J. Haas February 2-3, 2009 The Independent Market Mnitr fr PJM Scarcity Pricing Scarcity related revenues can be cllected in the energy market r in the capacity

More information

Country profiles: Iceland

Country profiles: Iceland Cuntry prfiles: Iceland Last updated: 26/06/2015 1 Implementatin f Tracking Systems 1.1 Electricity Disclsure Electricity disclsure in Iceland is implemented by Regulatin number 757/2012, Regulatin n disclsure

More information

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap Digital Advisry Services Prfessinal Service Descriptin Sftware Defined Netwrking Strategy and Radmap 1. Descriptin f Services. 1.1 Sftware Defined Netwrking Strategy and Radmap. Verizn will prvide Sftware

More information

Epicor Commerce Connect (ECC) Services Specification

Epicor Commerce Connect (ECC) Services Specification Epicr Cmmerce Cnnect (ECC) Services Specificatin This Epicr Cmmerce Cnnect Services Specificatin ( Specificatin ) utlines the services and services levels assciated with Epicr s delivery f its Epicr Cmmerce

More information

Design Alternatives Sheet: The Objective Function in Capacity Market Clearing

Design Alternatives Sheet: The Objective Function in Capacity Market Clearing Design Alternatives Sheet: The Objective Functin in Capacity Market Clearing 1.1 What is the bjective functin when ptimizing the auctin clearing? Maximizing Scial Surplus Typically, the market clearing

More information

Procurement Gateway & I Want Doc User Guide https://gateway.procurement.cornell.edu/

Procurement Gateway & I Want Doc User Guide https://gateway.procurement.cornell.edu/ Prcurement Gateway & I Want Dc User Guide https://gateway.prcurement.crnell.edu/ Prcurement Gateway Once yu lg int the Prcurement Gateway, the system will identify wh yu are and yur primary FTC/BSC yu

More information

Procedure for Approval, Purchase, Payment and Inventory of Wireless Communication Devices (WCD*) and Services

Procedure for Approval, Purchase, Payment and Inventory of Wireless Communication Devices (WCD*) and Services Prcedure fr Apprval, Purchase, Payment and Inventry f Wireless Cmmunicatin Devices (WCD*) and Services Backgrund: In rder t cmply with the Gergia Office f Planning and Budget Plicy Memrandum N. 4 (Revisin

More information

Market Design for High Penetrations of Wind and Solar

Market Design for High Penetrations of Wind and Solar Market Design fr High Penetratins f Wind and Slar Natinal Cnference f State Legislatrs May 29, 2014 Aarn Blm Aarn.blm@nrel.gv NREL is a natinal labratry f the U.S. Department f Energy, Office f Energy

More information

Generation and Transmission Interconnection Facility Construction

Generation and Transmission Interconnection Facility Construction PJM Manual 14C Generatin and Transmissin Intercnnectin Facility Cnstructin Revisin: 07 Effective Date: May 23, 2012 Prepared by Pwer System Crdinatin Department Reliability Integratin Divisin PJM 2012

More information

B&B Food Distributors Data Synchronization Initiative

B&B Food Distributors Data Synchronization Initiative B&B Fd Distributrs Data Synchrnizatin Initiative Frequently Asked Questins fr B&B Fd Distributrs Suppliers Versin 1 Cpyright 2012. All Rights Reserved. FAQs fr B&B Fds Distributrs Suppliers REVISION HISTORY

More information

Chapter 1: Purchasing & Supply Management January :10 PM

Chapter 1: Purchasing & Supply Management January :10 PM Chapter 1: Purchasing & Supply Management January-10-13 1:10 PM Crprate Supply Challenges Opprtunities Increased utsurcing --> suppliers need t respnd t end-custmer's needs Dependence n supplier's respnsibility

More information

Report on Inspection of Grant Thornton LLP (Headquartered in Chicago, Illinois) Public Company Accounting Oversight Board

Report on Inspection of Grant Thornton LLP (Headquartered in Chicago, Illinois) Public Company Accounting Oversight Board 1666 K Street, N.W. Washingtn, DC 20006 Telephne: (202) 207-9100 Facsimile: (202) 862-8433 www.pcabus.rg Reprt n 2013 (Headquartered in Chicag, Illinis) Issued by the Public Cmpany Accunting Oversight

More information

Personal Computing Services FAQ s

Personal Computing Services FAQ s What s cvered under the PCS cntract? PCS will generally cver all f the Break/Fix services n the Cre Hardware that is lcated at the schls. Cre Hardware cnsists f: DESKTOPS, LAPTOPS, SERVERS, and PRINTERS.

More information

Energy Storage Ontario Submission to the Standing Committee on General Government Bill 172, Climate Change Mitigation and Low-Carbon Economy Act

Energy Storage Ontario Submission to the Standing Committee on General Government Bill 172, Climate Change Mitigation and Low-Carbon Economy Act April 4, 2016 Energy Strage Ontari Submissin t the Standing Cmmittee n General Gvernment Bill 172, Climate Change Mitigatin and Lw-Carbn Ecnmy Act Intrductin Gd afternn members f the Standing Cmmittee

More information

PJM Manual 14D: Generator Operational Requirements Revision: 44 Effective Date: June 1, Prepared by Operations Planning Division

PJM Manual 14D: Generator Operational Requirements Revision: 44 Effective Date: June 1, Prepared by Operations Planning Division PJM Manual 14D: Generatr Operatinal Requirements Revisin: 44 Effective Date: June 1, 2018 Prepared by Operatins Planning Divisin PJM 2018 Table f Cntents Table f Cntents Table f Exhibits...8 Apprval...9

More information

Office for Capital Facilities

Office for Capital Facilities Office fr Capital Facilities Guidance Dcument February 20, 2015 Phtvltaic Slar Prjects A resurce cntaining infrmatin related t the acquisitin f phtvltaic slar panels by state-perated campuses. Phtvltaic

More information

Large Building Energy and Water Reporting and Benchmarking. LEED Breakfast Meeting

Large Building Energy and Water Reporting and Benchmarking. LEED Breakfast Meeting MINISTRY OF ENERGY Large Building Energy and Water Reprting and Benchmarking LEED Breakfast Meeting April 2016 Prepared by: Cnservatin and Renewable Energy Divisin Recgnizing Great Wrk 2 Ontari Electricity

More information

PJM Manual 14D: Generator Operational Requirements Revision: 42 Effective Date: December 22, Prepared by Operations Planning Division

PJM Manual 14D: Generator Operational Requirements Revision: 42 Effective Date: December 22, Prepared by Operations Planning Division PJM Manual 14D: Generatr Operatinal Requirements Revisin: 42 Effective Date: December 22, 2017 Prepared by Operatins Planning Divisin PJM 2017 Table f Cntents Table f Cntents Table f Exhibits...8 Apprval...9

More information

Guidance notes for completing the International Start-up Form

Guidance notes for completing the International Start-up Form Guidance ntes fr cmpleting the Internatinal Start-up Frm These guidance ntes are designed t supprt yu in cmpleting the Internatinal start-up frm. Yu will als need t refer t a) yur Stage 2 applicatin frm

More information

Quality Hotel View is a full-service conference hotel located in Malmö, Sweden, and is a part of the hotel chain Nordic Choice Hotels.

Quality Hotel View is a full-service conference hotel located in Malmö, Sweden, and is a part of the hotel chain Nordic Choice Hotels. Privacy Plicy - Quality Htel View Quality Htel View is a full-service cnference htel lcated in Malmö, Sweden, and is a part f the htel chain Nrdic Chice Htels. This privacy plicy explains which persnal

More information

Corporate Value Chain (Scope 3) Accounting & Reporting Standard. Summary of Changes

Corporate Value Chain (Scope 3) Accounting & Reporting Standard. Summary of Changes Nvember 2010 Wrld Business Cuncil fr Sustainable Develpment Crprate Value Chain (Scpe 3) Accunting & Reprting Standard Summary f Changes 1. Intrductin This dcument summarizes the changes made t the GHG

More information

UDI Compliance Service

UDI Compliance Service UDI Cmpliance Service What is UDI? The US Fd and Drug Administratin (FDA) has issued a ruling that medical devices must cnfrm t a Unique Device Identificatin (UDI) standard. The UK Department f Health

More information

Disaster Recovery Planning Guide

Disaster Recovery Planning Guide Disaster Recvery Planning Guide Disaster Recvery Planning Guide A Business Cntinuity Plan (BCP) is a written strategy which ensures that persnnel and assets are prtected and able t functin in the event

More information

Release Notes for SAP ERP Financial Accounting and Operations 2.0

Release Notes for SAP ERP Financial Accounting and Operations 2.0 Release Ntes fr SAP ERP Financial Accunting and Operatins 2.0 What's New? Release Ntes Cpyright 2013 SAP AG r an SAP affiliate cmpany. All rights reserved. N part f this publicatin may be reprduced r transmitted

More information

EDS - Land Status Check Manual

EDS - Land Status Check Manual EDS - EDS - Revisin Histry Versin Date Authr/Organizatin Descriptin V1.00 2011-06-09 Mnarch Delumen First Draft 2012 Gvernment f Alberta Page 2 f 13 EDS - Disclaimer In this disclaimer prvisin: Crwn means

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directrate B Grwth and Innvatin Circular Ecnmy and Industrial Leadership Seville, 6 th April 2018 Level(s) testing phase Guidance and rules

More information

ABC Business Magazines Reporting Standards (UK)

ABC Business Magazines Reporting Standards (UK) September 2016 ABC Business Magazines Reprting Standards (UK) Changes have been agreed t the ABC Business Magazine and Multi-Platfrm Reprting Standards. We have updated the latest Reprting Standards t

More information

BROKER SELECTION AND ASSESSMENT POLICY

BROKER SELECTION AND ASSESSMENT POLICY BROKER SELECTION AND ASSESSMENT POLICY Date created: 1 Nvember 2007 Last updated: 19 Nvember 2012 Departments affected: Management departments, senir management, CICD Subject: Definitin f brker selectin

More information

Family Support Service Provider Quick Reference Guide to CYBER

Family Support Service Provider Quick Reference Guide to CYBER Welcme Page: Family Supprt Service Prvider Quick Reference Guide t CYBER Links t Mnitr Regularly: Authrizatin Current: Will list all currently pen authrizatins; shuld include nly thse yuth currently receiving

More information

Target Data Synchronization Initiative

Target Data Synchronization Initiative Target Data Synchrnizatin Initiative Frequently Asked Questins fr Suppliers Versin 1.1 April 2013 Cpyright 2010. All Rights Reserved. REVISION HISTORY FAQs fr Target Suppliers Date Ver # Descriptin f Change

More information

Selling and Purchasing Items

Selling and Purchasing Items Selling and Purchasing Items Selling t custmers invlves the fllwing dcuments: Dcument Qute Invice Custmer Credit Ntes Definitin Qutes are ptinal. A qute is an ffer t sell ne r mre items t a custmer at

More information

Getting Started. With Exact for Manufacturing, Standard. Exact US LLC 3600 American Blvd W Bloomington, MN United States

Getting Started. With Exact for Manufacturing, Standard. Exact US LLC 3600 American Blvd W Bloomington, MN United States Getting Started With Exact fr Manufacturing, Standard Exact US LLC 3600 American Blvd W Blmingtn, MN 55431 United States T all deliveries, transactins, services and licensing the Exact General Terms and

More information

Lecture # 15 Long Run Equilibrium

Lecture # 15 Long Run Equilibrium I. Lng Run Equilibrium Lecture # 15 Lng Run Equilibrium We began class reviewing the cncept f lng run equilibrium. Nte that, t d the analysis, we typically use tw graphs: an industry supply and demand

More information

EID POLICY MANUAL. ADMIN Increases in Irrigation Acres, Criteria and Guidelines Revised Feb [supersedes Jan ]

EID POLICY MANUAL. ADMIN Increases in Irrigation Acres, Criteria and Guidelines Revised Feb [supersedes Jan ] Plicy Guidelines: The District has established criteria and guidelines t assist staff in evaluating and administering, and the directrs in apprving and/r rejecting, applicatins fr increases in irrigatin

More information

PJM Manual 03: Transmission Operations Revision: 53 Effective Date: June 1, Prepared by Transmission Operations

PJM Manual 03: Transmission Operations Revision: 53 Effective Date: June 1, Prepared by Transmission Operations PJM Manual 03: Transmissin Operatins Revisin: 53 Effective Date: June 1, 2018 Prepared by Transmissin Operatins PJM 2018 Table f Cntents Table f Cntents Table f Exhibits...5 Apprval...6 Current Revisin...7

More information

JOB DESCRIPTION. Senior Project Manager Proposed band

JOB DESCRIPTION. Senior Project Manager Proposed band Jb title Jb family Senir Prject Manager Prject Management Prpsed band D Jb purpse T deliver a prject, r multiple prjects and expected utcmes, t stakehlder expectatins, within the agreed brief, and within

More information

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority Request fr Prpsals t Develp a New Persnnel Plicy Manual fr the Red Wing Husing and Redevelpment Authrity March 20, 2015 Red Wing Husing and Redevelpment Authrity 428 West Fifth Street Red Wing, MN 55066

More information

CPA P2 Audit Practice & Assurance Services

CPA P2 Audit Practice & Assurance Services TOPIC 28 MATERIALITY ISA 320 Materiality in Planning and Perfrming an Audit prvides guidance t auditrs in this area and states the bjective f the auditr is t apply the cncept f materiality apprpriately

More information

Working Families Success Network in Community Colleges Definitions and Expected Design Elements

Working Families Success Network in Community Colleges Definitions and Expected Design Elements Wrking Families Success Netwrk in Cmmunity Clleges Definitins and Expected Design Elements Cre Prgram and Service Delivery Elements Clleges shuld prvide services in each f the three WFSNCC cre pillars:

More information

Week 1 Introduction to Management Accounting:

Week 1 Introduction to Management Accounting: Week 1 Intrductin t Management Accunting: Objective #1: What is management accunting?! Accunting Infrmatin System: the prcess f gathering, rganising and cmmunicating financial infrmatin.! Management Accunting:

More information

PJM Manual 03: Transmission Operations Revision: 52 Effective Date: December 22, Prepared by Transmission Operations

PJM Manual 03: Transmission Operations Revision: 52 Effective Date: December 22, Prepared by Transmission Operations PJM Manual 03: Transmissin Operatins Revisin: 52 Effective Date: December 22, 2017 Prepared by Transmissin Operatins PJM 2017 Table f Cntents Table f Cntents Table f Exhibits...5 Apprval...6 Current Revisin...7

More information

CONTRACT OPPORTUNITY ANNOUNCEMENT Professional Service Contract Construction Contract Service Contract Material Requirement Other

CONTRACT OPPORTUNITY ANNOUNCEMENT Professional Service Contract Construction Contract Service Contract Material Requirement Other Purchasing Plicy N. 3 Exhibit 1, Page 1 f 2 X CONTRACT OPPORTUNITY ANNOUNCEMENT Prfessinal Service Cntract Cnstructin Cntract Service Cntract Material Requirement Other Cntract Opprtunity Title: Overall

More information

IMI2 PROPOSAL TEMPLATE FIRST STAGE PROPOSAL

IMI2 PROPOSAL TEMPLATE FIRST STAGE PROPOSAL IMI2 PROPOSAL TEMPLATE FIRST STAGE PROPOSAL IN TWO-STAGE PROCEDURE (TECHNICAL ANNEX) RESEARCH AND INNOVATION ACTIONS & INNOVATION ACTIONS Nte: This is fr infrmatin nly. The definitive template fr yur call

More information

Shipper asset details reconciliation

Shipper asset details reconciliation UNC Wrkgrup Reprt UNC 0632S: At what stage is this dcument in the prcess? 01 Mdificatin 02 Wrkgrup Reprt Shipper asset details recnciliatin 03 04 Draft Mdificatin Reprt Final Mdificatin Reprt Purpse f

More information

PROACTIS Integration Framework

PROACTIS Integration Framework PROACTIS Integratin Framewrk Overview T: +44 (0)20 7121 4704 e: inf@tuchstnespendmanagement.c.uk w: tuchstnespendmanagement.c.uk Table f Cntents Intrductin 3 Integratin Overview 3 Typical Infrmatin Flws

More information

SAP standard PS: issues with project lifecycle management

SAP standard PS: issues with project lifecycle management Intrductin Prject System is the mst integrated mdule in SAP ECC. It is seamlessly and in real-time cnnected t almst every SAP mdule: Financial Accunting, Cst Cntrlling, Materials Management and Prcurement,

More information

Mersham Sports Club Flood Street, Mersham, Ashford, Kent, TN25 6NX

Mersham Sports Club Flood Street, Mersham, Ashford, Kent, TN25 6NX Mersham Sprts Club Fld Street, Mersham, Ashfrd, Kent, TN25 6NX www.mershamsprtsclub.cm PRIVACY NOTICE FOR VOLUNTEERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal

More information

1 The types of personal information we collect

1 The types of personal information we collect ICBC (LONDON) PLC NEW CANDIDATE PRIVACY NOTICE As part f ur recruitment prcess, the Industrial and Cmmercial Bank f China (ICBC) cllects and prcesses persnal data relating t jb applicants. The Bank is

More information

Guidelines to Freight Billing valid from

Guidelines to Freight Billing valid from Page 1 frm 5 G-FFS/PF C106 Freight Calculatin & Accunting Guidelines t Freight Billing valid frm 01.07.2016 (Invicing issuing and distributin fr transprt services fr the accunt f BASF SE r all ther Eurpean

More information

PJM Manual 38: Operations Planning Revision: 11 Effective Date: February 1, Prepared by Operations Planning Division

PJM Manual 38: Operations Planning Revision: 11 Effective Date: February 1, Prepared by Operations Planning Division PJM Manual 38: Operatins Planning Revisin: 11 Effective Date: February 1, 2018 Prepared by Operatins Planning Divisin PJM 2018 PJM Manual 38: Operatins Planning Table f Cntents Table f Cntents Apprval...3

More information

IBM Global Services. Server Optimization ... Trends and Value Proposition That Can Drive Efficiencies and Help Businesses Gain A Competitive Edge

IBM Global Services. Server Optimization ... Trends and Value Proposition That Can Drive Efficiencies and Help Businesses Gain A Competitive Edge IBM Glbal Services Server Optimizatin.......... Trends and Value Prpsitin That Can Drive Efficiencies and Help Businesses Gain A Cmpetitive Edge Intrductin A typical rganizatin s success and ability t

More information

MEVION SOURCING STRATEGY SUPPLIER CODE OF CONDUCT

MEVION SOURCING STRATEGY SUPPLIER CODE OF CONDUCT MEVION SOURCING STRATEGY The MEVION S250, while being the mst cmpact prtn therapy system in the wrld, is still a relatively large and cmplex prduct. As such, ur supply chain utilizes a high-mix, lw vlume

More information

VENDOR DISPLAY SERVICE LEVEL AGREEMENT

VENDOR DISPLAY SERVICE LEVEL AGREEMENT OBJECTIVE: T ensure Vendr prvided displays are maintained in a fully functinal state by the Vendr fr life f display in Best Buy retail stres. It is in the best interest f bth Vendrs and Best Buy t ensure

More information