1 Proceeding of the 2014 International Conference on Indutrial Engineering and Operation Management Bali, Indoneia, January 7 9, 2014 Model of Integrated Production and Delivery Batch Scheduling Under JIT Environment to Minimize Inventory Cot Endang Praetyaningih, Suprayogi, TMA Ari Samadhi and Abdul Hakim Halim Bandung Intitut of Technology Bandung, 40132, Indoneia Abtract Thi paper conider a batch cheduling problem of a JIT upplier and integrate production and delivery deciion. Part that have been equenced are to be proceed on a ingle machine, collected in a container, and ent to a cutomer in order to be received at a common due date. Scheduling involve the number of batche, batch ize, cheduling of the reulting batche, and the number of vehicle delivering the batche.the objective i to minimize inventory cot wherein the holding cot of in-proce part and completed part are ditinguihed. The holding cot i derived from the o-called actual flow time, defined a an interval time of part pent in the hop ince the tarting time for proceing a batch until it due date. The propoed problem i formulated a a non-linier programming olved by relaxing the variable of the number of batche to be a parameter. An algorithm i propoed to olve the model and teted by numerical experience. Thi reearch how that there i a ratio between in-proce part and completed part holding cot which affect the deciion of the number of batche and their ize. In addition, thi reearch how that the lower the in-proce part holding cot, the more advantageouly to tore part a WIP than a finihed product, and vie vera. The number of vehicle i determined from the number of the reulting batche. Keyword Integrated production and delivery, batch cheduling, actual flow time, ditinguihed holding cot of WIP and finihed product. 1. Introduction In the cae of a company that produce part on a production facility and then deliver the part to cutomer on a delivery facility, production and delivery are two ucceive function and interrelated. However, many companie manage thee both function eparately. Thi eparation could bring to a olution with a local optimum. In order to achieve the global optimum, thee two function need to be integrated (Chen, 2010b). Integration of production and delivery deciion can be een in the cae of production of the part that have been equenced, o-called equenced part (junbiki), by a JIT upplier. In the JIT environment, the product mut be received by the cutomer at the right time in the right quantitie. Thi equenced part will be aemblied to the cutomer' aembly line directly, and the product mut be received at the time will be aemblied in the right quantitie. Lead time between the order received by the upplier and product received by the cutomer i too hort to provide inventorie (Iyer, et al., 2009). In order to provide 100 percent ervice level with minimum cot, the deciion of production and delivery mut be integrated. In thi reearch, the equenced part proceed on a ingle machine, collected in a container, and ent to a cutomer in order to be received by the cutomer at a common due date. For the next dicuion, the term part will be ued to refer to the equenced part. Conidering each container a one production batch, then many production batche that are delivered together in one vehicle are conidered a a delivery batch, and the product are ent by a number of vehicle imultaneouly at a common due date. The combined chedule involve determining the number of batche and their ize, tarting time of proceing the reulting batche, and the number of vehicle. Reearch on integrated production and delivery ha been developed in recent decade. Chen (2010b) named it a IPODS (Integrated Production and Outbound Ditribution Scheduling). Typical model of IPODS combine machine cheduling (to proce the order) and vehicle cheduling (to end the order). The IPODS model i a problem of optimizing one or combination of time-baed, cot-baed and revenue-baed performance (Chen, 2010b). 2109

2 Many IPODS reearch with time-baed performance ha been conducted by Geimar et al. (2008) and Chen (2010a), while the cot-baed performance ha been addreed by Hall and Pott (2003 and 2005), Stecke and Zhao (2007), Zhong et al (2010), Chen and Pundoor (2009), Lee and Yoon (2010 ) and Armentano (2011), Yan et al. (2011). The IPODS reearch that combine cot-baed and time-baed performance ha been carried out by Chen and Vairaktaraki (2005), and Gharehyakheh and Tavakkoli-Moghaddam (2012). Much of cot-baed performance of IPODS reearch doe not ditinguih the WIP holding cot and the finihed product holding cot, but in practice thee two holding cot are different. The reearch on integration of production and delivery and ditinguihing between WIP holding cot and finihed product holding cot wa done by Lee and Yoon (2010). The holding cot are computed by multiplication of the holding cot per unit time and the flow time. Lee and Yoon (2010) aumed that all part available in the hop at the beginning time of the cheduling period imultaneouly. The reulting chedule i a combination of job cheduling in a production tage and batch cheduling in a delivery tage, without conidering the due date. Thi reearch develop Lee and Yoon (2010) model, and involve the deciion of combining production and delivery batch cheduling under JIT environment. The performance ued i the actual flow time propoed by Halim et. al. (1994) intead of the traditional flow time (ee Dobon et. al., 1987, and Dobon et. al., 1989). By thi performance, the arrival of batche in the hop hould not be at the beginning time of the cheduling period, but could be controlled to be at the tarting time of proceing the batch preciely. The objective i to minimize the total relevant cot. 2. The Actual Flow Time of Integrated Production and Delivery. The batch cheduling model dicued in thi paper i developed from the batch cheduling problem that have been dealt in Halim et al. (1994). To enure the due date i achieved, Halim et al. (1994) adopted backward cheduling by putting the firt cheduled batch i cloet to the due date and ue the actual flow time a a performance meaure. Halim et al. (1994) model did for the production tage only and conidered the delivery time be zero. 2.1 The actual flow time of production batch cheduling Halim et al. (1994) define the actual flow time, F a, a the time pent by material/job in the hop from tarting time of procee part (B) until it due date (d). The actual flow time, F a, of each part can be formulated a: F i a = d B i, i = 1,2,, (1) In the batch cheduling, the batch proceing time i calculated by multiplication of part proceing time and the batch ize. Figure 1 how the actual flow time for each batch in a chedule. If t, and Q, repectively, tand for the part proceing time, etup time per batch, and the batch ize, then the actual flow time per batch, can be formulated a follow: The total actual flow time for batche can be written a follow: i FL a i = ( + tq j ), i = 1,2,, (2) j=1 i F a = [ ( + tq j ) ] Q i j=1 (3) d B [] F a [] F a [2] --- B F a [2] [1] B [1] tq [] tq [2] tq [1] Figure 1. The actual flow time (Source: Halim et. al., 1994) 2110

3 Batch cheduling model that ditinguih in-proce part and completed part have been developed in Halim and Ohta (1994). In-proce part are waiting in the batch until all part of the batch have been proceed, while completed part are tored in the delivery tage until the tarting time of delivery. The actual flow time of part in both tage are hown in Figure 2, and can be formulated a below: i 1 F a 2 = { tq i } + [ { ( + tq j )} Q i ] (4) i=2 j=1 Actual flow time of inproce part in batch 2 tq[2] Actual flow time of completed part in batch 2 tq[1] d tq[] --- tq[2] tq[1] B B2 B1 F a 1 F a 2 F a Figure 2. The actual flow time of in-proce part and completed part for the production batch (Source: Halim and Ohta, 1994) 2.2 Actual flow time of integrated production and delivery batch cheduling Figure 3 how the actual flow time of integrated production and delivery. The due date i defined a the time when the product arrive at the cutomer location. Let b i the departure time of vehicle, and v 01 i the travel time. The total actual flow time of part in both tage i an addition of the actual flow time in production tage and in the delivery tage. The actual flow time in the production tage i equal to the Equation (3), while the actual flow time in the delivery tage i equal to the travel time. For a imultaneou delivery problem, the total actual flow time of batche can be formulated a: i F a = [ ( + tq j ) ] Q i + v 01 Q i j=1 (5) F a b d B [] F a [] F a [2] F a v B [2] F a [1] B [1] --- tq [] tq [2] tq [1] v 01 Production Delivery Figure 3. The actual flow time of integrated production and delivery The actual flow time of integrated production and delivery batch cheduling and ditinguihing between in-proce part and completed part i adopted from Equation (4), and hown in Figure 4. In a common due date problem, all vehicle departure imultaneouly. The departure time i equal to the completed time of the firt batch. Hence, all part of the firt batch available a in-proce part only. However, the availability of the other batche are differ from the firt batch. Let take the econd batch a an example (ee Figure 4). The actual flow time of in-proce part in the econd batch i an interval time between the arrival time of the batch until all part of the batch have proceed. After proceing, all part in the econd batch i tored a completed part and wait until the delivery 2111

4 time. Thu, the actual flow time of completed part of the econd batch i defined a an interval time between completion time of the econd batch and the delivery time, which i equal to the actual flow time of the firt batch plu etup time. The total actual flow time of batche in the production tage and the delivery tage can be written a: i 1 F a 2 = { tq i } + [ { ( + tq j )} Q i ] + v 01 Q i i=2 j=1 The firt term and the econd term of Equation (6) how the actual flow time of in-proce part and completed part, while the third term how the actual flow time of delivered part that indicate the number of delivery. (6) Actual flow time of inproce part in batch 2 tq[2] Actual flow time of completed part in batch 2 tq[1] b d tq[] --- tq[2] tq[1] v 01 Production Delivery B B2 B1 F a 2 F a 1 F a k F a F a Figure 4. The actual flow time of in-proce part and completed part of integrated production and delivery 3. Problem definition Let there be n part of ingle item that are requeted at a common due date, d, and proceed on a ingle machine. The total number of part proceed i equal to demand rate. The part are moved in the container that called a batch. Conequently, the batch ize are limited by container capacity, c. Let aume that the etup activity doe not require material, o that the arrival time of the batche in the hop are enured at the ame with tarting time for proceing the batch, B i. It i alo aumed that the etup time of a batch, i, i not affected by the batch equence and the batch ize, Q i. All product mut be received by the cutomer at the due date, imultaneouly. Deliverie are done by a number of homogeneou vehicle, n v, which are able to carry k production batche. The availability of vehicle i not a contraint, becaue it i held by a third party. Travel time from upplier to cutomer, v 01, i aumed contant. The problem are how to batche all the requeted part o a minimize the total relevant cot, how to chedule the reulting batche, and how many vehicle are needed to deliver all batche. To enure that the due date i not violated, a backward cheduling i choen, i.e. cheduling by putting the firt cheduled batch cloet to the due date and move toward zero. The propoed problem i called the ingle machine-ufficient vehicle-common due date (SMSVCD). Figure 5 illutrate the SMSVCD problem. PRODUCTIO DELIVERY Batch-r Batch-2 Batch-1 Machine Batch Batch-k delivery-batch Cutomer production-batch Batch-r Figure 5. Illutration of SMSVCD problem 2112

5 The total relevant cot of SMSVCD problem i conit of the inventory cot in the production tage and in the delivery tage, and the delivery cot. The inventory cot i multiplication of the holding cot per unit time and the actual flow time. The delivery cot i proportional to the number of vehicle delivering the batche. There i a cot that i not effected by the actual flow time but mut be accounted in the relevant cot, that i the cot for procuring container. Let c f, c w, c c, c d and n c a the holding cot per unit time completed part, the holding cot per unit time in-proce part, the procurement cot per unit container, the delivery cot and the number of container, repectively. Suppoe that F i aw and F i af are the actual flow time of in-proce part and the actual flow time of completed part, repectively. The total relevant cot, TC, for SMSVCD problem can be formulated a: aw af TC = c w F i + c f F i + c c n c + c v n v (7) 4. Model Formulation and Solution 4.1 Model Formulation The following aumption are adopted in formulating SMSVCD problem: Part moved in container, and a container aumed a a batch Batch ize i real poitive value, Vehicle capacity i expreed in term of container, The number of container in each hipment i alway an integer, Completed time of the firt batch i the ame with the departure time of delivery, Travel time include the activity of loading and unloading, Vehicle availability i ufficient. Refering to Equation (6) and Equation (7), the SMSVCD problem can be preented a a non-linier programming a follow: Minimize Subject to: i 1 2 TC = c w { tq i } + c f [ { ( + tq j )} Q i ] + x i c c + c v k (8) i=2 j=1 ( 1) + tq i + v 01 d Q i = n (10) Q i c, i = 1, 2,, (11) i d v 01 B i (i 1) tq i = 0, i = 1, 2,, (12) k=1 0 if Q i = 0, i = 1,2,, x i = { (13) 1 if Q i > 0, i = 1,2,, 1, = integer (14) Q i, B i 0, i = 1, 2,, (15) (9) 2113

6 Contraint (9) how that all batche are proceed and hipped from time zero to the due date. Contraint (10) tate a material balance in the hop. Contraint (11) implie that the batch ize doe not exceed the container capacity. Contraint (12) enure that all batche will be arrived at the cutomer location at the due date. Contraint (13) i a binary variable, that i 0 if the batch ize i zero, and 1 otherwie. Contraint (14) how that the number of batche mut be an integer which greater than or equal to one. Contraint (15) how the non-negative contraint. 4.2 Solution Method The SMSVCD problem i olved by relaxing the deciion variable to be a parameter. Uing Mathcad 14, we can find Q i for certain value of uing Equation (8) to (15). Propoition 1. In the batch cheduling problem with batch ize i limited by the container capacity, c, the batch ize, Q i, are Q i c, and the number of batche,, i n c n, where n i the total proceed part. Proof. The container can not tore part exceeded it capacity, c. If the container i full of part, the requirement of container will be minimum. The minimum requirement of container i computed by dividing the total number of part proceed (n) and the container capacity (c). However, the number of container i an integer, o the minimum requirement of the container i rounding up of ( n c). Converely, if each container contain one part, the requirement of container will be maximum, o that the maximum of occur when = n. If one container i conidered a one batch, then the maximum batch ize (Q i ) i c, the minimum number of batche i n c and the maximum number of batche i n. Determining of the optimal olution of SMSVCD problem i tarted at minimum according to Propoition 1 to find the total cot and the batch ize a the initial olution. Computation followed by increaing by 1 and it olution were compared with the previou olution. Thi proce i topped when the olution of TC at the lat larger than the previou, or the value of exceeded maximum. Propoition 2. In the integration of production and delivery problem and the vehicle capacity i expreed by k production batche, the minimum requirement of the vehicle delivering the batche for production batche are /k. Proof. The vehicle can not load the production batche exceeded it capacity, i.e. k batche. If the vehicle i loaded at the full capacity, the requirement of vehicle will be minimum. Thu, the minimum requirement of vehicle i computed by dividing the number of batche and the vehicle capacity, or (/k). However, the number of vehicle i an integer, o the minimum requirement of vehicle i rounding up of (/k), and tated a /k. Refering to Propoition 1 and Propoition 2, an algorithm i propoed to olve the SMSVCD problem. Algorithm SMSVCD Step 1. Set predetermined value of parameter n,, t, v 01, d, c w, c f, c c, c v, c, and k, Step 2. Uing Propoition 1, compute minimum, Step 3. Solve Equation (8) to (15) with minimum to determine TC and optimal batch ize (Q i ). Set the current olution TC a the bet olution (Z ) and batch ize a (Q i ). Step 4. Increae the number of batch, = + 1, then olve Equation (8) to (15) with to find TC and batch ize (Q i ). Set the value of the total cot a Z' and the batch ize a Q i. Step 5. If Z < Z, then et Z = Z, and Q i * = Q i, go to Step 6. Otherwie, et optimum =, go to Step 7. Step 6. If > makimum, then optimum =, go to Step 7. Otherwie, et optimum =, go to Step 4. Step 7. Uing Equation (12), compute B i, and according to Propoitoon 2, compute the number of vehicle, n v. Step 8. Stop 2114

7 5. umerical Experience and Analyi In order to how the behavior of the olution, everal numerical problem are preented here. The firt numerical experience i done to demontrate how the propoed algorithm olve the problem in one value of the parameter. The reult of the experience hown in Table 1. Table 1 how that the propoed algorithm able to olve the SMSVCD problem. By taking one value for all parameter hown in Table 1, it i found that the minimum total cot occur when the number of batche i 5, or optimum i 5, the number of vehicle i 2 with imultaneou departure at 90. Figure 6 how the Gantt Chart of SMSVCD problem. Table 1: The batch ize in everal number of batche () n = 90; = 2; t = 0,5; d = 100 ; v 01 = 10; c f = 20; c w = 15; c c = 25; c v = 100; k = 3; c = 20 Q i TC B i b n v 5 {20; 20; 20; 19; 11} 51,470 {80; 68; 56; 44.5; 37} {90} 2 6 {20; 20; 20; 18; 10; 2} 51,480 {80; 68; 56; 45; 38; 35} {90} 2 Produki Pengiriman Q[5] = 11 tq[5] = 5.5 Q [4] = 19 tq [4] = 9.5 Q [3] = 20 tq [3] = 10 Q [2] = 20 tq [2] = 10 Q [1] = 20 tq [1] = 10 v 01 = 10 B [5] = 37 B [4] = 44.5 B [3] = 56 B [2] = 68 B [1] = d=100 Actual Flow Time Figure 6. Gantt Chart of SMSVCD problem The econd numerical experience i intended to find how the change of in-proce part holding cot will affect the deciion of the number of batche and their ize. The change of in-proce part holding cot i expreed by the ratio of (c w c f ), wherea the other parameter were not change. Computation are conducted for everal value of, and the reult of the experience are hown in Table 2. Table 2: The batch ize in everal number of batche () and (c w c f ) n = 90; = 2; t = 0,5; d = 100 ; v 01 = 10; c c = 25; c v = 100; k = 1; c = 20 c w = 5 = 6 =7 c f Q i TC Q i TC TC 0,6 {20; 20; 20; 20; 10} 48,930 {20; 20; 20; 20; 10; 0} 48,930 0,65 {20; 20; 20; 20; 10} 49,780 {20; 20; 20; 20; 10; 0} 49,780 0,7 {20; 20; 20; 20; 10} 50,620 {20; 20; 20; 20; 10; 0} 50,620 0,75 {20; 20; 20; 19; 11} 51,470 {20; 20; 20; 18; 10; 2} 51,480 51,580 0,8 {20; 20; 20; 18.3; 11.7} 52,310 {20; 20; 20; 16.7; 10; 3.3} 52,280 52,380 0,85 {20; 20; 20; 17.9; 12.1} 53,140 {20; 20; 20; 15.7; 10; 4.3} 53,070 53,170 Table 2 how that for = 5 and = 6 and the value of (c w c f ) le than or equal to 0,7, the batch ize for the batch number 1 until number (-1) are equal with the container capacity, while the lat batch i equal with the remaining part. However, if (c w c f ) greater than or equal to 0.75, the minimum total cot will be achieved when the lat everal batche will hare the remaining part. It mean that in the in-proce part holding cot much lower than 2115

8 the completed part holding cot, there i a tendency to tore part a in-proce part than a completed part, and vice vera. The reaoning can be decribed a follow: the bigger the batch ize, the longer the actual flow time of in-proce part in it batch. Refering to the objective function a hown by Equation (8), the longer of actual flow time of inproce part will increae the inventory cot of in-proce part. Thi numerical experience how that there i a raio of (c w c f ) affecting the deciion of the number of batche and their ize. Thi value i called a changing point. If (c w c f ) le than the changing point, the batch ize of the firt batch until the batch number (-1) will be maximum, and the batch ize of the the lat batch i equal to the remaining part. Howefer, if (c w c f ) i greater than the changing point, the deciion of batch ize will tend to avoid fulfillment in the lat everal batche. 6. Concluion The integrated production and delivery batch cheduling problem ditinguihing the holding cot of the in-proce part and the completed part i affected by everal variable deciion, e.g. the number of batche (), the batch ize (Q), cheduling of the reulting batche and the number of vehicle delivering the batche (n v ). The problem can be formulated a a non-linier programming model. Refering to the numerical experience, it can be concluded that there i a ratio between the holding cot of in-proce part and completed part which affect the deciion of the number of batche and their ize. In addition, the lower the in-proce part holding cot, the more advantageouly to tore part a a WIP than a a finihed product, and vie vera. The number of vehicle i determined from the number of reulting batche. Reference Armentano, V.A., Shiguemoto, A.L., and Lokketangen, A Tabu earch with path relinking for an integrated production-ditribution problem, Computer and Operation Reearch, 38 (8), Chen, J-S., Integration of job cheduling with delivery vehicle routing, Information Technology Journal, 9 (6), , 2010a. Chen, Z-L., Integrated production and outbound ditribution cheduling: Review and Extention, Operation Reearch, 58 (1), , 2010b. Chen, Z-L, and Vairaktaraki, G.L., Integrated cheduling of production and ditribution operation, Management Science, 51 (4), , Chen, Z-L and Pundoor, G., Integrated order cheduling and packing, Production and Operation Management, 18 (6), , Dobon, G., Karmarkar., U.S., and Rummel., J., L., Batching to minimize flow time on one machine, Management Science, 33 (6), , 1987 Dobon, G., Karmarkar., U.S., and Rummel., J., L., Batching to minimize flow time on parallel heterogeneou machine, Management Science, 35 (5), , Ertogral, K., Wu, S.D., and Burke, L.I., Coordination production and tranportation cheduling in the upply chain, Technical Report #98T-010, Department of Indutrial and Manufacturing Sytem Engineering, Lehigh Univerity, Geimar, H.., Laporte, G., Lei, L., and Srikandarajah, C., The integrated production and tranportation cheduling problem for a product with a hort lifepan, Inform Journal on Computing, 20(1), 21-33, Gharehyakheh, A. and Tavakkoli-Moghaddam, R., A fuzzy olution approach for a multi-objective integrated production-ditribution model with multi product and multi period under uncertainty, Management Science Letter, 2, pp , 2012 Halim, A.H., Miyazaki, S., and Ohta, H., Batch-cheduling problem to minimize actual flow time of part through the hop under JIT environment, European Journal of Operational Reearch, 72, pp , Halim, A.H. and Ohta, H., Batch-cheduling problem to minimize inventory cot in the hop with both receiving and delivery jut in time, International Journal Production Economic, 33, , Hall,.G., and Pott, C.., Supply chain cheduling: batching and delivery, Operation Reearch, 51(4), , Hall,.G., and Pott, C.., The coordination of cheduling and batch cheduling deliverie, Annal of Operation Reearch, 135, 41-64,

9 Pan, J.C.H, Wu, C.l, Huang, H.C., and Su, C.S., Coordinating cheduling with batch deliverie in a two-machine flow hop, Int. J. Adv. Manuf. Tech., 40, , Iyer, A.V., Sehadri, S., and Vaher, R., Toyota Supply Chain Management, A Strategic Approach to the Principle of Toyota Renowned Sytem, Mc Graw Hill, ew York, Lee, I.S. and Yoon, S.H., Coordinated cheduling of production and delivery tage with tage-dependent inventory holding cot, Omega, 38, , Stecke, K.E. and Zhao, X., Production and tranportation integration for a make-to-order manufacturing company with a commit-to-delivery buine model, Manufacturing & Service Operation Management, 9 (2), , Yan, C., Banerjee, A., and Yang, L., An integrated production-ditribution model for a deteriorating inventory item, International Journal of Production Economic, 133, , Zhong, W., Chen, Z.L., and Chen, M., Integrated production and ditribution cheduling with committed delivery date, Operation Reearch Letter, 38, , Biography Endang Praetyaningih i currently completing her Doctorate degree in Indutrial Engineering at the Graduate Program on Indutrial Engineering and Management, Faculty of Indutrial Technology, Intitut Teknologi Bandung (ITB), Bandung, Indoneia. She i a lecturer in Univerita Ilam Bandung, Bandung, Indoneia. She recieved her BS degree from the Chemical Engineering Department, Univerita Gadjah Mada (UGM), Yogyakarta, Indoneia, and her MS degree from Indutrial Engineering, ITB. Her reearch interet are in Production Scheduling, JIT Sytem, and Production Sytem. Her addre i endangpra@gmail.com. Suprayogi i an Aociate Profeor in Faculty of Indutrial Technology, Intitut Teknologi Bandung (ITB), Bandung, Indoneia. He received hi BS and MS degree in Indutrial Engineering from ITB and hi Ph.D degree in Ocean and Environmental Engineering from the Univerity of Tokyo. Hi reearch interet are in operation reearch, maritime logitic, and tranportation and ditribution ytem. Hi addre i <yogi@mail.ti.itb.ac.id> TMA Ari Samadhi i an Aociate Profeor in Faculty of Indutrial Technology, Intitut Teknologi Bandung (ITB), Bandung, Indoneia. He received hi BS degree in Indutrial Engineering from ITB and hi MS and Ph.D degree in Manufacturing Engineering, from Univerity of ew South Wale, Sydney, Autralia. Hi reearch interet are in Production etwork, Lean Manufacturing, and Knowledge Management. He publihed hi paper in International Journal of Production and Operation Management and International Journal of Computer Integrated Manufacturing Sytem. Hi addre i aamadhi@mail.ti.itb.ac.id. Abdul Hakim Halim i a Profeor of Indutrial Engineering at Indutrial Engineering Department, Intitut Teknologi Bandung (ITB), Bandung, Indoneia. He received hi BS and MS degree in Indutrial Engineering from ITB and hi PhD from the Indutrial Engineering Department, Oaka Perfecture Univerity, Oaka, Japan. Hi reearch interet are in production cheduling, inventory control, FMS and JIT ytem. He publihed hi paper in International Journal of Production Reearch, International Journal of Production Economic, European Journal of Operational Reearch, and Production Planning and Control, a well a in Journal of Japan Indutrial Management Aociation (JIMA) written in Japanee and everal national journal on production ytem written in Indoneia. Hi addre i ahakimhalim@ti.itb.ac.id. 2117

Production and Delivery Batch Scheduling with Multiple Due Dates to Minimize Total Cost

Production and Delivery Batch Scheduling with Multiple Due Dates to Minimize Total Cost 16 J. Eng. Technol. Sci., Vol. 49, No. 1, 2017, 16-36 Production and Delivery Batch Scheduling with Multiple Due Dates to Minimize Total Cost Endang Prasetyaningsih*, Suprayogi, T.M.A. Ari Samadhi & Abdul

More information

Coordinating a Supply Chain Consisted of One Supplier and One Retailer When Demand Disruption Happens

Coordinating a Supply Chain Consisted of One Supplier and One Retailer When Demand Disruption Happens Management Science and Engineering Vol., No., 07, pp. 9-3 DOI:0.3968/947 ISSN 93-034 [Print] ISSN 93-035X [Online] www.ccanada.net www.ccanada.org Coordinating a Supply Chain Conited of One Supplier and

More information

International Journal of Mathematical Archive-8(6), 2017, Available online through ISSN

International Journal of Mathematical Archive-8(6), 2017, Available online through   ISSN International Journal of Mathematical Archive-8(6), 27, 33-38 Available online through www.ijma.info ISSN 2229 546 BAYESIAN SPECIAL TYPE DOUBLE SAMPLING PLAN WITH BETA PRIOR DISTRIBTUTION Dr. S. JEYABHARATHI*

More information

A model for grain growth based on the novel description of dendrite shape

A model for grain growth based on the novel description of dendrite shape ARCHIVES of FOUNDRY ENGINEERING Publihed quarterly a the organ of the Foundry Commiion of the Polih Academy of Science ISSN (1897-3310) Volume 7 Iue 4/2007 183 188 36/4 A model for grain growth baed on

More information

INVESTIGATION OF THERMOSTAT-SET CONTROL AS A NEW DIRECT LOAD CONTROL METHOD

INVESTIGATION OF THERMOSTAT-SET CONTROL AS A NEW DIRECT LOAD CONTROL METHOD INVESTIGATION OF THERMOSTAT-SET CONTROL AS A NEW DIRECT LOAD CONTROL METHOD Canbolat Uçak canbolat@elk.itu.edu.tr Gökçe Dokuyucu gokce776@uperonline.com Department of Electrical Engineering Electrical

More information

The Process-Value Model: A Systems View of the IST Value Chain

The Process-Value Model: A Systems View of the IST Value Chain Aociation for Information Sytem AIS Electronic Library (AISeL) SAIS 2007 Proceeding Southern (SAIS) 3-1-2007 The Proce-Value Model: A Sytem View of the IST Value Chain William L. Lomeron lomeronw@nula.edu

More information

Simultaneous Synthesis of Multi-Period Heat Exchanger Networks for Multi-Plant Heat Integration

Simultaneous Synthesis of Multi-Period Heat Exchanger Networks for Multi-Plant Heat Integration 757 A publication of CHEMICAL ENGINEERINGTRANSACTIONS VOL. 61 2017 Guet Editor:PetarSVarbanov Rongxin Su Hon Loong Lam Xia Liu Jiří J Klemeš Copyright 2017 AIDIC ServiziS.r.l. ISBN978-88-95608-51-8; ISSN

More information

Big Data computation for workshop-based planning support

Big Data computation for workshop-based planning support Big Data computation for worhop-baed planning upport Jianguang Tu International School of Software Wuhan Univerity Wuhan, P.R.China Tujg1973@gmail.com Jianquan Cheng * School of Science and the Environment

More information

JOURNAL OF THE. Agricultural Economics Council. L Northeastern 0,/IA-<- '-'-". ~. ' ) VOLUME Ill, NUMBER 2 OCTOBER 1974 NOV

JOURNAL OF THE. Agricultural Economics Council. L Northeastern 0,/IA-<- '-'-. ~. ' ) VOLUME Ill, NUMBER 2 OCTOBER 1974 NOV C i.; ' I FOUNDI.\T!ON OF AGRICULTURAL ECONOMICS LIBRARY NOV 6 974 JOURNAL OF THE - L Northeatern Agricultural Economic Council ~ 0,/IA-

More information

Logistics Service Level Improvement Research and Demonstration Based on Queuing Theory

Logistics Service Level Improvement Research and Demonstration Based on Queuing Theory Management cience and Engineering Vol. 5, No. 3,, pp. -54 DOI:.36/j.me.335X53.z44 IN 3-34[Print] IN 3-35X[Online] www.ccanada.net www.ccanada.org Logitic ervice Level Improvement Reearch and Demontration

More information

AN INTEGRATED SIMULATION AND OPTIMIZATION APPROACH FOR SEASIDE TERMINAL OPERATIONS

AN INTEGRATED SIMULATION AND OPTIMIZATION APPROACH FOR SEASIDE TERMINAL OPERATIONS AN INTEGRATED IMULATION AND OTIMIZATION AROACH FOR EAIDE TERMINAL OERATION Daniela Ambroino Elena Tànfani Department of Economic and Quantitative Method (DIEM) Univerity of Genova Via Vivaldi 5, 16126,

More information

Heterogeneity in Producer s Marketing Strategy

Heterogeneity in Producer s Marketing Strategy Heterogeneity in Producer Marketing Strategy Tong Zhang Reearch Aitant Department of Agricultural Economic Oklahoma State Univerity 42C Ag Hall Phone no. 405-744-9797 Email: tong.zhang0@oktate.edu Wade

More information

Equilibrium Sediment Transport and Evolution Trend Simulation of the Lower Yellow River

Equilibrium Sediment Transport and Evolution Trend Simulation of the Lower Yellow River Senor & Tranducer, Vol. 21, Special Iue, May 213, pp. 135-141 Senor & Tranducer 213 by IFSA http://www.enorportal.com Equilibrium Sediment Tranport and Evolution Trend Simulation of the Lower Yellow River

More information

75th MORSS CD Cover Page UNCLASSIFIED DISCLOSURE FORM CD Presentation

75th MORSS CD Cover Page UNCLASSIFIED DISCLOSURE FORM CD Presentation 75th MORSS CD Cover Page UNCLASSIFIED DISCLOSURE FORM CD Preentation 712CD For office ue only 41205 12-14 June 2007, at US Naval Academy, Annapoli, MD Pleae complete thi form 712CD a your cover page to

More information

IJSOM November 2015, Volume 2, Issue 3, pp

IJSOM November 2015, Volume 2, Issue 3, pp International Journal of Supply and Operation Management IJSOM November 2015, Volume 2, Iue 3, pp. 925-946 ISSN-Print: 2383-1359 ISSN-Online: 2383-2525 www.ijom.com A tochatic programming approach for

More information

Available online at ScienceDirect. Energy Procedia 48 (2014 )

Available online at   ScienceDirect. Energy Procedia 48 (2014 ) Available online at www.ciencedirect.com ScienceDirect Energy Procedia 48 (2014 ) 806 812 SHC 2013, International Conference on Solar Heating and Cooling for Building and Indutry September 23-25, 2013,

More information

The Role of Skills Development in Competitiveness in Asia

The Role of Skills Development in Competitiveness in Asia The Role of Skill Development in Competitivene in Aia Profeor Michael J. Enright Univerity of Hong Kong Hong Kong Intitute for Economic and Buine Strategy Enright, Scott & Aociate ADB Copyright Michael

More information

Aggregate Supply. MPL i = Y i / L i

Aggregate Supply. MPL i = Y i / L i Aggregate Supply The upply of output depend on the behavior of producer. roducer' chooe the quantity of input to employ. Thee input produce output and we aume that producer chooe their input to maximize

More information

Adaptive prediction model accuracy in the control of residential energy resources

Adaptive prediction model accuracy in the control of residential energy resources Delft Univerity of Technology Delft Center for Sytem and Control Technical report 08-013 Adaptive prediction model accuracy in the control of reidential energy reource R.R. Negenborn, M. Houwing, B. De

More information

6/6/2012. HR Training and Development. Content. Training: concept. Training: concept. Training: concept. Training and Development: Concept

6/6/2012. HR Training and Development. Content. Training: concept. Training: concept. Training: concept. Training and Development: Concept HR Training and Development UNIT 5 Content Concept and need of HR training and development Training need aement HR training: objective and method (on-the-job and off-the-job). Evaluation of training program

More information

As companies outsource more product design and manufacturing activities to other members of the supply

As companies outsource more product design and manufacturing activities to other members of the supply MANAGEMEN SCIENCE Vol. 55, No. 7, July 2009, pp. 1122 1138 in 0025-1909 ein 1526-5501 09 5507 1122 inform doi 10.1287/mnc.1090.1008 2009 INFORMS Quality Improvement Incentive and Product Recall Cot Sharing

More information

INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN ICED 03 STOCKHOLM, AUGUST 19-21, 2003 EVALUATION OF SOFT REQUIREMENTS DURING PRODUCT DESIGN

INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN ICED 03 STOCKHOLM, AUGUST 19-21, 2003 EVALUATION OF SOFT REQUIREMENTS DURING PRODUCT DESIGN INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN ICED 3 STOCKHOLM, AUGUST 9-, 3 EVALUATION OF SOFT REQUIREMENTS DURING PRODUCT DESIGN Kjell Anderon Abtract Ti paper preent an approac to improve current metod

More information

LED IP PRIMER. One World LED 1026 South Road, Edwardstown, SA, 5039 p: (08) e:

LED IP PRIMER. One World LED 1026 South Road, Edwardstown, SA, 5039 p: (08) e: LED IP PRIMER Thi brochure provide a quick overview of the patented innovation by and our partner around the world. The ytem and method invented by patent granted to One World LED how our commitment to

More information

KNOWLEDGE MAPPING IN THAI WEAVING INDUSTRY

KNOWLEDGE MAPPING IN THAI WEAVING INDUSTRY KNOWLEDGE MAPPING IN THAI WEAVING INDUSTRY Anyanitha Ditanont College of Innovation, Thammaat Univerity, Thailand anyanitha@yahoo.com Abtract: Knowledge i a valuable aet to any organiation epecially, the

More information

GMACE Pilot #4: Adjusting the National Reliability Input Data

GMACE Pilot #4: Adjusting the National Reliability Input Data INTERBULL BULLETIN NO. 48. Berlin, Germany, May 20 21, 2014 GMACE Pilot #4: Adjuting the National Reliability Input Data P. G. Sullivan 1 and J. H. Jakoben 2 1 Canadian Dairy Network, Guelph, ON, Canada

More information

Design a Sustainable Supply Chain under Uncertainty using Life Cycle Optimisation and Stochastic Programming

Design a Sustainable Supply Chain under Uncertainty using Life Cycle Optimisation and Stochastic Programming 151 A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 61, 2017 Guet Editor: Petar S Varbanov, Rongxin Su, Hon Loong Lam, Xia Liu, Jiří J Klemeš Copyright 2017, AIDIC Servizi S.r.l. ISBN 978-88-95608-51-8;

More information

Value intensity of water used for electrical energy generation in the Western U.S.; an application of embedded resource accounting

Value intensity of water used for electrical energy generation in the Western U.S.; an application of embedded resource accounting Value intenity of water ued for electrical energy generation in the Wetern U.S.; an application of embedded reource accounting Elizabeth A. Martin and Benjamin L. Ruddell Abtract Thi tudy evaluate the

More information

Abstract. 1 Introduction

Abstract. 1 Introduction Automatic conflict detection and reolution in metrorail ytem: evaluation approach for MARCO EU project G.F. D'Addio, M. Mazzucchelli, S. Savio Dipartimento di Ingegneria Elettrica, Univerita di Genova,

More information

Course Evaluation Validation using Data Envelopment Analysis. Joseph Sarkis Clark University. Inshik Seol Clark University

Course Evaluation Validation using Data Envelopment Analysis. Joseph Sarkis Clark University. Inshik Seol Clark University THE ACCOUNTING EDUCATORS JOURNAL Volume XX 2010 pp. 21-32 Coure Evaluation Validation uing Data Envelopment Analyi Joeph Sarki Clark Univerity Inhik Seol Clark Univerity Abtract In thi paper we detail

More information

Business-driven decision support for change management: planning and scheduling of changes

Business-driven decision support for change management: planning and scheduling of changes Buine-driven deciion upport for change management: planning and cheduling of change Jacque Sauvé 1, Rodrigo Rebouça 1, Antão Moura 1, Claudio Bartolini 2, Abdel Boulmakoul 3, David Tratour 3 1 Departamento

More information

Management Science Letters

Management Science Letters Management Science Letter 2 (202) 247 252 Content lit available at GrowingScience Management Science Letter homepage: www.growingscience.com/ml An empirical tudy to meaure the impact of loan aignment for

More information

Gas Processing Expander

Gas Processing Expander Expander Operated Ga Proceing April, 2015 Ga Proceing Expander Colder Proce Temperature and Maximized Compreor Uptime with Helidyne Expander Skid. Specification: Flowrate 1-10 mmcfd Max. Preure 1,440 pi

More information

Management Science Letters

Management Science Letters Management Science Letter 2 (2012) 3049 3054 Content lit available at GrowingScience Management Science Letter homepage: www.growingscience.com/ml Identification and prioritization of hazardou material

More information

An Optimal Real-time Pricing Algorithm for the Smart Grid: A Bi-level Programming Approach

An Optimal Real-time Pricing Algorithm for the Smart Grid: A Bi-level Programming Approach An Optimal Real-time Pricing Algorithm for the Smart Grid: A Bi-level Programming Approach Fan-Lin Meng and Xiao-Jun Zeng School of Computer Science, Univerity of Mancheter Mancheter, United Kingdom mengf@c.man.ac.uk,

More information

Department of Production Engineering, Birla Institute of Technology, Mesra, Ranchi, Jharkhand, India.

Department of Production Engineering, Birla Institute of Technology, Mesra, Ranchi, Jharkhand, India. International Journal of Baic and Applied Science Vol. 4. No. 3 2015. Pp. 118-129 Copyright by CRDEEP. All Right Reerved. Full ength Reearch Paper Supply Chain Optimization Model under Uncertainty Anurag

More information

PRECIPITATION CALIBRATION TESTS August 12, 2009

PRECIPITATION CALIBRATION TESTS August 12, 2009 BISHOP PAIUTE TRIBE ENVIRONMENTAL MANAGEMENT OFFICE PRECIPITATION CALIBRATION TESTS Augut 12, 2009 Thi report decribe the reult of everal precipitation calibration tet carried out in July 2009, following

More information

The research of simplified method of calculating wind and rain loads and its validation

The research of simplified method of calculating wind and rain loads and its validation The reearch of implified method of calculating wind and rain load and it validation Xing FU 1) and Hong-Nan LI 2) 1), 2) Faculty of Infratructure Engineering, Dalian Univerity of Technology, Dalian 116024,

More information

The Use of Swimmer Bars as Shear Reinforcement in Reinforced Concrete Beam

The Use of Swimmer Bars as Shear Reinforcement in Reinforced Concrete Beam American Journal of Engineering and Applied Science, 6 (1): 87-94, 2013 ISSN: 1941-7020 2014 M. Al-Nara et al., Thi open acce article i ditributed under a Creative Common Attribution (CC-BY) 3.0 licene

More information

Unit Commitment in Smart Grid Considering Demand Response and Stochastic Wind Generation

Unit Commitment in Smart Grid Considering Demand Response and Stochastic Wind Generation J. Energy Power Source Vol. 1, No. 6, 2014, pp. 314-320 Received: September 8, 2014, Publihed: December 30, 2014 Journal of Energy and Power Source www.ethanpublihing.com Unit Commitment in Smart Grid

More information

Examining the tradeoff between fixed pay and performance-related pay: A choice experiment approach

Examining the tradeoff between fixed pay and performance-related pay: A choice experiment approach Examining the tradeoff between fixed pay and performance-related pay: A choice experiment approach JUNYI SHEN * Reearch Intitute for Economic and Buine Adminitration, Kobe Univerity KAZUHITO OGAWA Faculty

More information

Project Summary. Multiple Water Reuse in Poultry Processing: Case Study in Egypt

Project Summary. Multiple Water Reuse in Poultry Processing: Case Study in Egypt United tate Indutrial Environmental Reearch Environmental Protection Laboratory Agency Cincinnati OH 45268 Reearch and Development EPA-600/2-83-005 Apr. 1983 Project ummary Multiple Water Reue in Poultry

More information

Notes on the GoldSim Plume Function

Notes on the GoldSim Plume Function NAC-0036_R1 Note on the GoldSim Plume Function Augut 014 Prepared by John auxe NEPUNE AND COMPANY, INC. 1505 15 th St, Suite B, o Alamo, NM 87544 itle: Decription: hi document calculation detail of the

More information

ScienceDirect. Optimization active and reactive power flow for PV connected to grid system using Newton Raphson method

ScienceDirect. Optimization active and reactive power flow for PV connected to grid system using Newton Raphson method Available online at www.ciencedirect.com ScienceDirect Energy Procedia 68 (2015 ) 77 86 2nd International Conference on Sutainable Energy Engineering and Application, ICSEEA 2014 Optimization active and

More information

International Journal of Scientific & Engineering Research, Volume 5, Issue 8,August ISSN

International Journal of Scientific & Engineering Research, Volume 5, Issue 8,August ISSN International Journal of Scientific & Engineering Reearch, Volume 5, Iue 8,Augut-2014 310 Seimic Behavior of Concrete Column and Beam Reinforced with Interlocking Spiral Ioanni A. Tego, Theodoro A. Chryanidi,

More information

Up or Out? Economic-Engineering Theory of Flood Levee Height and Setback

Up or Out? Economic-Engineering Theory of Flood Levee Height and Setback Up or Out? Economic-Engineering Theory of Flood Levee Height and Setback Tingju Zhu 1 and Jay R. Lund 2 Abtract: Levee etback location and height are important iue in flood levee ytem deign and modification.

More information

Effect of HFTID Controller on the Stability of Thermal Power Generator

Effect of HFTID Controller on the Stability of Thermal Power Generator Effect of HFTID Controller on the Stability of Thermal Power Generator Anhuman Sehgal, Japreet Kaur, Parveen Lehana 2 Department of Electrical Engineering, Baba Banda Singh Bahadur Engineering College,

More information

Land-Surface Models, Page 1

Land-Surface Models, Page 1 Land-Surface Model Introduction A land-urface model mut be able to accurately depict the interaction of the atmophere with the underlying urface land a well a the interaction of the ub-urface, or ubtrate,

More information

Experimental Investigation of Sediment Trap Efficiency in Reservoirs

Experimental Investigation of Sediment Trap Efficiency in Reservoirs ENGINEER - Vol. XLVII, No. 0, pp. [1-8], 014 The Intitution of Engineer, Sri Lanka Experimental Invetigation of Sediment Trap Efficiency in Reervoir N.M.T.K. Revel, L.P.G.R. Ranairi, R.M.C.R.K. Rathnayake

More information

Bachelor End Project: Characterization of the constitutive behavior of polymer foams

Bachelor End Project: Characterization of the constitutive behavior of polymer foams Bachelor End Project: Characterization of the contitutive behavior of polymer foam R. van Eijden MT 05.27 Coach: Dr. ir. J.A.W. van Dommelen Eindhoven, April 21t 2005 Content Content Abtract Lit of ymbol

More information

European Advertising Consumer Research Report 2015

European Advertising Consumer Research Report 2015 RESEARCH REPORT European Advertiing Conumer Reearch Report 2015 Conumer Awarene & Impact of European Self-Regulatory Programme for OBA Independent reearch conducted by Ipo MORI on behalf of TRUSTe and

More information

Working Party on Agricultural Policies and Markets

Working Party on Agricultural Policies and Markets Unclaified AGR/CA/APM(2001)24/FINAL AGR/CA/APM(2001)24/FINAL Unclaified Organiation de Coopération et de Développement Economique Organiation for Economic Co-operation and Development 22-Jul-2002 Englih

More information

AGRON 183: Photosynthesis

AGRON 183: Photosynthesis AGRON 183: Photoynthei Dr. Brian Hornbuckle December 1, 2016 Introduction I think I can afely ay that every agronomit i aware of the proce of photoynthei, a decribed by the following chemical equation.

More information

FINITE ELEMENT INVESTIGATION ON THE INTERACTION BETWEEN SHALLOW AND DEEP EXCAVATED TWIN TUNNELS

FINITE ELEMENT INVESTIGATION ON THE INTERACTION BETWEEN SHALLOW AND DEEP EXCAVATED TWIN TUNNELS VOL. 13, NO. 1, JANUARY 18 ISSN 1819-668 6-18 Aian Reearch Publihing Network (ARPN). All right reerved. FINITE ELEMENT INVESTIGATION ON THE INTERACTION BETWEEN SHALLOW AND DEEP EXCAVATED TWIN TUNNELS Adel

More information

VEHICLE DISPATCHING PROBLEM AT THE CONTAINER TERMINAL WITH TANDEM LIFT QUAY CRANES. A Dissertation YAO XING

VEHICLE DISPATCHING PROBLEM AT THE CONTAINER TERMINAL WITH TANDEM LIFT QUAY CRANES. A Dissertation YAO XING VEHICLE DISPATCHING PROBLEM AT THE CONTAINER TERMINAL WITH TANDEM LIFT QUAY CRANES A Diertation by YAO XING Submitted to the Office of Graduate Studie of Texa A&M Univerity in partial fulfillment of the

More information

Reactive Power Management of a Wind Farm to Prevent Voltage Collapse of an Electric Power System

Reactive Power Management of a Wind Farm to Prevent Voltage Collapse of an Electric Power System Reactive Power Management of a Wind Farm to Prevent Voltage Collape of an Electric Power Sytem R. M. Monteiro Pereira Intituto Superior Engenharia de Coimbra, Portugal rmfm@iec.pt C. M. Machado Ferreira

More information

Afforestation Subsidy under Asymmetric Information and Transaction Cost in Developing Countries: Does rural capital market imperfection matter?

Afforestation Subsidy under Asymmetric Information and Transaction Cost in Developing Countries: Does rural capital market imperfection matter? Afforetation Subidy under Aymmetric Information and Tranaction Cot in Developing Countrie: Doe rural capital market imperfection matter? Dambala Gelo, Steven Koch 2 Abtract Thi paper deal with the deign

More information

Study on Mechanical Behavior of Thin-walled Member during Precision Straightening Process

Study on Mechanical Behavior of Thin-walled Member during Precision Straightening Process 2014 by IFSA Publihing, S. L. http://www.enorportal.com Study on Mechanical Behavior of Thin-walled Member during Preciion Straightening Proce Ben Guan, Yong Zang, Diping Wu, Qin Qin School of Mechanical

More information

Working Paper Wage Bargaining and Turnover Costs with Heterogeneous Labour: The No-screening Case

Working Paper Wage Bargaining and Turnover Costs with Heterogeneous Labour: The No-screening Case econtor www.econtor.eu Der Open-Acce-Publikationerver der ZBW Leibniz-Informationzentrum Wirtchaft The Open Acce Publication Server of the ZBW Leibniz Information Centre for Economic Strand, J. Working

More information

Fuzzy Decision Approach Based on QFD and FWA for Selection of Medical Suppliers

Fuzzy Decision Approach Based on QFD and FWA for Selection of Medical Suppliers , July 1-3, 2015, ondon,.k. Fuzzy Deciion Approach Baed on QFD and FWA for Selection of Medical Supplier Mehtap Durun and E. Ertugrul Karak Abtract The objective of thi paper i to develop a fuzzy multi-criteria

More information

Infor CloudSuite Industrial (SyteLine) for Life Sciences

Infor CloudSuite Industrial (SyteLine) for Life Sciences Life Science Infor CloudSuite Indutrial (SyteLine) for Life Science Stay current with the hifting tandard of FDA compliance For life cience manufacturer, advancing and maintaining information management

More information

Infor CloudSuite Industrial (SyteLine) for Life Sciences

Infor CloudSuite Industrial (SyteLine) for Life Sciences Life Science Infor CloudSuite Indutrial (SyteLine) for Life Science Stay current with the hifting tandard of FDA compliance For life cience manufacturer, advancing and maintaining information management

More information

Incentivizing the Use of Bike Trailers for Dynamic Repositioning in Bike Sharing Systems

Incentivizing the Use of Bike Trailers for Dynamic Repositioning in Bike Sharing Systems Incentivizing the Ue of Bike for Dynamic Repoitioning in Bike Sharing Sytem Supriyo Ghoh School of Information Sytem Singapore Management Univerity upriyog.2013@phdi.mu.edu.g Pradeep Varakantham School

More information

Performance evaluation of a ground source heat pump system based on ANN. and ANFIS models

Performance evaluation of a ground source heat pump system based on ANN. and ANFIS models Performance evaluation of a ground ource heat pump ytem baed on ANN and ANFIS model eijuan SUN a Pingfang HU a * Fei Lei a Na Zhu a Jiangning Zhang a a Huazhong Univerity of Science and echnology uhan

More information

Indicative simplified baseline and monitoring methodologies for selected small-scale CDM project activity categories

Indicative simplified baseline and monitoring methodologies for selected small-scale CDM project activity categories III.AU./Verion 01 TYPE III - OTHER PROJECT ACTIVITIES Project participant hall apply the general guideline to SSC CDM methodologie, information on additionality (attachment A to Appendix B) and general

More information

CONSTRUCTION SPECIFICATION FOR COMPACTING

CONSTRUCTION SPECIFICATION FOR COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 501 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR COMPACTING TABLE OF CONTENTS 501.01 SCOPE 501.02 REFERENCES 501.03 DEFINITIONS 501.0 DESIGN AND SUBMISSION

More information

Modeling Suspended Sediments in Dez Basin (Case Study: The Tale Zang Hydrometric Station)

Modeling Suspended Sediments in Dez Basin (Case Study: The Tale Zang Hydrometric Station) International Reearch Journal of Applied and Baic Science. Vol., 3 (2), 402-407, 2012 Available online at http://www.irjab.com ISSN 2251-838X 2012 Modeling Supended Sediment in Dez Bain (Cae Study: The

More information

Incorporating word-of-mouth effects in estimating customer lifetime value Received (in revised form): 13th September, 2006

Incorporating word-of-mouth effects in estimating customer lifetime value Received (in revised form): 13th September, 2006 Incorporating word-of-mouth effect in etimating cutomer lifetime value Received (in revied form): 13th September, 2006 Jonathan Lee i Aociate Profeor of Marketing in College of Buine Adminitration at California

More information

Challenges of Developing ISO Sampling Standards

Challenges of Developing ISO Sampling Standards Challenge of Developing ISO Sampling Standard Ralph Holme CSIRO Mineral Down Under Flaghip Chair ISO/TC 10/SC 1 Sampling Iron Ore Chair ISO/TC 7/SC 4 Sampling Coal and Coke Convenor ISO/TC 183/WG 9 Sampling

More information

ULTRASENSITIVE MAGNETOMETERS BASED ON ROTATIONAL MAGNETIC EXCITATION. Evangelos Hristoforou 1, Peter Svec Sr. 2

ULTRASENSITIVE MAGNETOMETERS BASED ON ROTATIONAL MAGNETIC EXCITATION. Evangelos Hristoforou 1, Peter Svec Sr. 2 ULTRASENSITIVE MAGNETOMETERS BASED ON ROTATIONAL MAGNETIC EXCITATION Evangelo Hritoforou, Peter Svec Sr. National TU of Athen, Greece, Slovak Academy of Science, Bratilava Received 7 April 04; accepted

More information

Minimization of exergy losses in combustion processes with an illustration of a membrane combustion

Minimization of exergy losses in combustion processes with an illustration of a membrane combustion Minimization of exergy loe in combution procee with an illutration of a membrane combution Markku J. Lampinen*, Ralf Wikten, Arto Sarvi, Kari Saari and Marjut Penttinen Aalto Univerity, Department of Energy

More information

An adaptive design approach for a geothermal plant with changing resource characteristics

An adaptive design approach for a geothermal plant with changing resource characteristics An adaptive deign approach for a geothermal plant with changing reource characteritic M. Imroz Sohel 1,*, Mathieu Sellier 2, Suan Krumdieck 2 1 Scion, e Papa ipu Innovation Park, 49 Sala Street, Rotorua,

More information

Modeling Available Soil Moisture Application Note

Modeling Available Soil Moisture Application Note Modeling Availale Soil Moiture Application Note Gaylon Campell, Ph.D METER Group, Inc. (Formerly Decagon Device, Inc.) Pullman, WA Both the amount and the availaility of water in oil i important to plant

More information

Improvement of Inventory Control for Defective Goods Supply Chain with Imperfect Quality of Commodity Components in Uncertain State

Improvement of Inventory Control for Defective Goods Supply Chain with Imperfect Quality of Commodity Components in Uncertain State Reearch Journal of Applied Science, Engineering and Technology 6(): 920-927, 203 SSN: 2040-7459; e-ssn: 2040-7467 Maxwell Scientific Organization, 203 Submitted: October 22, 202 Accepted: February 0, 203

More information

Tom-Reiel Heggedal and Karl Jacobsen

Tom-Reiel Heggedal and Karl Jacobsen Dicuion Paper No. 536, April 2008 Statitic Norway, Reearch Department Tom-Reiel eggedal and Karl Jacoben Timing of innovation policie when carbon emiion are retricted: an applied general equilibrium analyi

More information

Accommodating Transit in TRANSYT

Accommodating Transit in TRANSYT 68 TRANSPORTATON RESEARCH RECORD 1181 Accommodating Tranit in TRANSYT SAM YAGAR Although the TRANSYT traffic model imulate tranit vehicle in mixed traffic operation, it doe not adequately conider the effect

More information

Advanced solutions for virtual process modelling: application to steel ingot manufacturing from casting to open-die forging

Advanced solutions for virtual process modelling: application to steel ingot manufacturing from casting to open-die forging Advanced olution for virtual proce modelling: application to teel ingot manufacturing from cating to open-die forging JAOUEN Olivier 1,a, COSTES Frédéric 1,b, SAAD Ali 1,c and LASNE Patrice 1,d DUCLOUX

More information

Quality Competition and Social Welfare in Markets with Partial Coverage: New Results

Quality Competition and Social Welfare in Markets with Partial Coverage: New Results Feruary, 00 Quality Cometition and Social Welfare in Market with Partial Coverage: New Reult Gregory S. Amacher 1 Erkki Kokela Markku Ollikainen 1 Deartment of Foretry, Virginia Commonwealth Univerity,

More information

Does Bait and Switch Really Benefit Consumers?

Does Bait and Switch Really Benefit Consumers? Doe Bait and Switch Really Benefit Conumer? William L. Wilkie Carl F. Mela Gregory T. Gundlach Univerity of Notre Dame, Notre Dame, Indiana 46556 william.l.wilkie.1@nd.edu Abtract While the field of marketing

More information

CHOSEN PROBLEMS OF EFFECTIVE SUPPLY CHAIN MANAGEMENT OF COMPANIES

CHOSEN PROBLEMS OF EFFECTIVE SUPPLY CHAIN MANAGEMENT OF COMPANIES Journal of KONES Powertrain and Tranport, Vol. 22, No. 2 2015 CHOSEN PROBLEMS OF EFFECTIVE SUPPLY CHAIN MANAGEMENT OF COMPANIES Ilona Jacyna-Gołda Waraw Univerity of Technology Faculty of Production Engineering

More information

Pollution prevention with chemical process simulators: the generalized waste reduction (WAR) algorithm full version

Pollution prevention with chemical process simulators: the generalized waste reduction (WAR) algorithm full version Computer and Chemical Engineering 23 (1999) 623 634 Pollution prevention with chemical proce imulator: the generalized wate reduction (WAR) algorithm full verion Heriberto Cabeza *, Jane C. Bare, Subir

More information

MoST - Business Finland Joint Funding Call

MoST - Business Finland Joint Funding Call MoST - Buine Finland Joint Funding Call I. AGREEMENT Memorandum of Undertanding for China-Finland Science & Technology Innovation Cooperation between the Department of International Cooperation of the

More information

VISHWAKARMA Trading Corporation

VISHWAKARMA Trading Corporation VISHWAKARMA Trading Corporation A unit of :VISHAVKARMA MECHANICAL WORKS PVT. LTD. AN ISO 9001-008 CERTIFIED COMPANY FIRST CHOICE OF PROGRESSIVE BUILDERS & CONTRACTORS VISHWAKARMA TRADING CORPORATION Welcome

More information

R&D Cost Allocation and Income Sharing for Industry-University Cooperation in Open Innovation Context

R&D Cost Allocation and Income Sharing for Industry-University Cooperation in Open Innovation Context [016] Vol.5 NTUT J. of Intell. Prop. L. & Mgmt. R&D Cot Allocation and Income Sharing for Indutry-Univerity Cooperation in Open Innovation Context Bao xinzhong, Dong yuhuan & Wang yan ABSTRACT Open innovation

More information

Enabling Collaborative Data Sharing in Google+

Enabling Collaborative Data Sharing in Google+ Enabling Collaborative Data Sharing in Google+ Hongxin Hu Delaware State Univerity, Dover, Delaware, 19901 hxhu@au.edu Gail-Joon Ahn and Jan Jorgenen Arizona State Univerity, Tempe, Arizona, 85287 {gahn,jan.jorgenen}@au.edu

More information

CACHE Modules on Energy in the Curriculum: Fuel Cells

CACHE Modules on Energy in the Curriculum: Fuel Cells Abtract CACHE Module on Energy in the Curriculum: Fuel Cell In thi paper we demontrate how new technologie, in thi cae fuel cell, can be rapidly infued into the chemical engineering curriculum. Coure pecific

More information

A Morphing Extrusion Die for Manufacturing of Thermoplastic Hoses THESIS

A Morphing Extrusion Die for Manufacturing of Thermoplastic Hoses THESIS A Morphing Extruion Die for Manufacturing of Thermoplatic Hoe THESIS Preented in Partial Fulfillment of the Requirement for the Degree Mater of Science in the raduate School of The Ohio State Univerity

More information

M A S O N R Y. Revised Spring Engineering Notes For Design With Concrete Block Masonry

M A S O N R Y. Revised Spring Engineering Notes For Design With Concrete Block Masonry A S O N R Y Revied Spring 007 Engineering Note For Deign With Concrete Block aonry C H R O N I C L E S To rectify the ituation, the Spring 007 article i being reiued. We apologize for any inconvenience

More information

Modeling Liquid Phase Sintering of Hard metal powder compacts

Modeling Liquid Phase Sintering of Hard metal powder compacts ing Liquid Phae Sintering of Hard metal powder compact Shama Shamaundar *, Maheha Siddegowda*, Pavanachand Chigurupati**, Rengarajan Raghavan***, Rameh Rao. S. *** * ProSIM AFTC # 326, 8th Main, III Stage,

More information

Int. J. Production Economics

Int. J. Production Economics Int. J. Production Economic 139 (212) 351 358 Content lit available at SciVere ScienceDirect Int. J. Production Economic journal homepage: www.elevier.com/locate/ijpe Dynamic inventory rationing for ytem

More information

environment of the Poyang Lake of the department of Education, Nanchang University, Nanchang330031, China

environment of the Poyang Lake of the department of Education, Nanchang University, Nanchang330031, China doi:10.21311/002.31.10.20 Cot - Benefit Analyi of Green Building Baed on Input - Output Theory Liu Wei 1, 2, 3, Wu zhijiang 1 1 Eat China Jiaotong Univerity, Nanchang330013, China 2 The School of economic

More information

3.4 BUTT FUSION WELDING

3.4 BUTT FUSION WELDING 3.4 BUTT FUSION 3.4.1 INTRODUCTION The butt welding proce conit of the joining of two component (pipe and/or fitting) of equal diameter and thickne in which the urface to be welded are heated until melting

More information

Opportunity Costs and Non-Scale Free Capabilities: Profit Maximization, Corporate Scope, and Profit Margins

Opportunity Costs and Non-Scale Free Capabilities: Profit Maximization, Corporate Scope, and Profit Margins Opportunity Cot and on-scale Free Capabilitie: Profit Maximization, Corporate Scope, and Profit Margin Daniel A. Levinthal* Reginald H. Jone Profeor of Corporate Strategy 309 Steinberg-Dietrich Hall Wharton

More information

Towards Planning and Execution for Information Retrieval

Towards Planning and Execution for Information Retrieval Toward Planning and Execution for Information Retrieval Laurie S. Hiyakumoto and Manuela M. Veloo Computer Science Department Carnegie Mellon Univerity Pittburgh, PA, USA 523 hyaku, mmv @c.cmu.edu Abtract

More information

Alternate wetting and dry in Rice Cultivation

Alternate wetting and dry in Rice Cultivation Alternate wetting and dry in Rice Cultivation AP SERIES - 8-2014 Adaptation through Innovation Rice i one of the mot important taple food for more than half of the world population. Mot of the world rice

More information

Consumers often purchase goods that are hard to find to conspicuously display their exclusivity and social

Consumers often purchase goods that are hard to find to conspicuously display their exclusivity and social Publihed online ahead of print July 3, 212 MANAGEMENT SCIENCE Article in Advance, pp. 1 22 ISSN 25-199 (print ISSN 1526-551 (online http://dx.doi.org/1.1287/mnc.112.1545 212 INFORMS Selling to Conpicuou

More information

UNIT 2 PROCESS AND FUNCTIONS OF HUMAN RESOURCE PLANNING (HRP)

UNIT 2 PROCESS AND FUNCTIONS OF HUMAN RESOURCE PLANNING (HRP) Baic of Human Reource Planning UNIT 2 PROCESS AND FUNCTIONS OF HUMAN RESOURCE PLANNING (HRP) Objective After reading thi unit, you hould be able to: l the concept and proce of HRP, l the determination

More information

Microgrid Load Management Control Application

Microgrid Load Management Control Application Microgrid Load Management Control Application T. Madiba Dept. Electrical, Electronic and Computer Engineering Univerity of Pretoria Pretoria, Republic of South Africa ymphomadiba@gmail.com Abtract Thi

More information

CO 2 emissions trading planning in combined heat and power production via multi-period stochastic optimization

CO 2 emissions trading planning in combined heat and power production via multi-period stochastic optimization European Journal of Operational Reearch 176 (2007) 1874 1895 O.R. Application CO 2 emiion trading planning in combined heat and power production via multi-period tochatic optimization Aiying Rong *, Rito

More information

RESILIENT INFRASTRUCTURE June 1 4, 2016

RESILIENT INFRASTRUCTURE June 1 4, 2016 RESILIENT INFRASTRUCTURE June 1 4, 2016 EXPERIMENTAL STUDY ON THE CAPACITY OF BARRIER DECK ANCHORAGE IN MTQ PL-3 BARRIER REINFORCED WITH HM-GFRP BARS WITH HEADED ENDS Michael Rotami Department of Civil

More information

Transportation of Hazardous Wastes in Arizona: Development of a Data Base Management System for Basic Analysis

Transportation of Hazardous Wastes in Arizona: Development of a Data Base Management System for Basic Analysis Tranportation Reearch Record Tranportation of Hazardou Wate in Arizona: Development of a Data Bae Management Sytem for Baic Analyi A. ESSAM RADWAN, K. DAVD PJAWKA, ANDY SOESLO, and FURE-YOW SHEH ABSTRACT

More information