3.4 BUTT FUSION WELDING

Size: px
Start display at page:

Download "3.4 BUTT FUSION WELDING"

Transcription

1 3.4 BUTT FUSION INTRODUCTION The butt welding proce conit of the joining of two component (pipe and/or fitting) of equal diameter and thickne in which the urface to be welded are heated until melting by contact with a heating element and then, after it removal, are axially (butt) joined by preure welding. Like Polyfuion and Electrofuion, with butt fuion welding there i no additional contribution or ue of filler material (i.e. welding rod or flux) required to complete the weld. The intruction below are for guidance only. Unlike ocket fuion, butt fuion welding implie that the operator are uitably trained on the ue of pecific welding machine to be ued and have a thorough knowledge of the procedure to be performed. Training i machine-pecific, a many detail will vary baed on pecific machine ued. ATTENTION! Each manufacturer of BUTT FUSION equipment publih hi/her own reference literature baed on the working parameter of the equipment produced. The uer SHALL REFER to thi pecific literature for every detail not exprely tated and for any reference information regarding the equipment RECOMMENDATIONS AND WARNINGS To perform a proper fuion procedure and enure a reliable joint, it i neceary to remember the following tep: The working temperature of the heating element hall be checked uing a calibrated contact thermometer. Thi meaurement hall be done after about 10 minute after the nominal temperature i reached, allowing the heating element to heat up evenly over the entire ection. Check the urface of the heating element (integrity of the non-tick layer) and properly clean it by uing oft paper or cloth, free of fiber. Check for the proper functioning of the welding machine. Check the efficiency of the clamp upport of the welding machine o that the correct alignment of the piece to be welded and the parallelim of the urface touching each other are enured. Check the drag force of the movable trolley, both a friction and in relation to the load being handled (pipe and/or fitting). Check the efficiency of the meauring equipment (preure gauge and timer). Check that the pipe and/or fitting to be welded are of the ame diameter and the ame thickne (SDR). The planing tool provided with the welding machine hall plane and align the pipe and fitting frontally and alo aborb the preure developed during the welding proce without deforming the welding point irreveribly. The welding machine hould be prepared for ue according to the manufacturer intruction. PP-RCT Piping Sytem 65

2 3.4.3 BUTT FUSION PROCEDURE PREPARATION FOR Cleaning the urface Before poitioning the part to be welded, clean the welding area to remove any dut, greae or dirt. Locking the end The pipe and/or fitting mut be locked in the clamp of the welding machine o that the contact urface to be welded are aligned between them. The poibility of axial movement without ignificant friction hall be enured by uing roller or ocillating upenion to allow the pipe liding to remove any mechanical tre from the clamp reulting from the weight of the locked pipe. The pipe and/or fitting hall be poitioned o a to contain the mialignment within 10%. To obtain thi reult, rotate at leat one of the element until the mot favorable coupling condition i reached and/or the locking force exerted on the fatening ytem of the clamp i not exceive a it could damage the urface of the component. 66 PP-RCT Piping Sytem

3 Milling the edge to be welded The end of the two component to be welded hall be planed to enure adequate plane parallelim and to remove any trace of oxide. The planing operation hall be carried out by bringing the part cloe to each other only when the milling cutter inerted between them i working and by exerting gradual preure uch a not to top the tool and prevent exceive heating of the urface in contact. The planing chip mut be formed continuouly on both edge to be welded: otherwie, invetigate the caue and repeat the proce until the required reult i reached. The planer mut be turned off only after the removal of the end to be welded. After the planing procedure i finihed, planing chip hall be removed from the inner urface and the urrounding area of the element to be welded, by uing a bruh or a clean cloth, free of fiber, fluff and lint and not ynthetic, oaked in a uitable cleaning liquid (e.g. iopropyl alcohol, trichloroethane chlorothene). Do not ue any olvent uch a gaoline, denatured alcohol or trichlorethylene. The planed urface hall not be touched or otherwie contaminated. At the end of thi phae, by bringing the two end into contact, the pace between the two edge mut not exceed the value of 0.02 inche (0.5 mm), a value that i half way between 1/64th of an inch and 1/32nd of an inch (which i difficult to meaure, but can be etimated by checking uing the width of a heet of tandard thin 20 pound paper). The value referenced above i lightly le than the thickne of tandard 20 pound paper). PP-RCT Piping Sytem 67

4 PROCEDURE Welding procedure by mean of contact heating element The butt fuion welding of pipe and/or fitting by mean of contact heating element hall be carried out following the different tep of the welding procedure hown in the Figure below. In particular: Phae 1 : Approaching and preheating Phae 2 : Heating Phae 3 : Removing the heating element Phae 4 : Reaching the welding preure Phae 5 : Welding Phae 6 : Cooling Preure Legend 1 Phae 1 : Approaching and preheating 2 Phae 2 : Heating 3 Phae 3 : Removing the heating element 4 Phae 4 : Reaching the welding preure 5 Phae 5 : Welding 6 Phae 6 : Cooling Time PHASES Phae 1: Approaching and preheating Place the heating element on the welding machine, taking care to inert it properly in order to enure it tability on the upport of the machine bae. Place the edge cloe to the heating element and apply the initial welding force [preure (P1 + Pt)] for a time t1 and wait until the bead ha reached height h on both welding edge, a hown in Table 2 (page 70, 71). 68 PP-RCT Piping Sytem

5 Phae 2: Heating Once the bead ha reached height h, the contact preure between the edge and the heating element i reduced to a low enough preure to inure contact with the heating element during the heating phae. Keep the part in contact with the heating element for the time t2 (Table 2). Phae 3: Removing the heating element Remove the heating element, making ure not to damage the edge of the two part to be welded. The removal mut be rapid to avoid exceive cooling of the heated edge. The Changeover Time t3, i reported in econd, i the amount of time from the removal of the heating element to the contact with the edge (phae 4). The maximum allowable changeover time varie according to wall thickne a hown in Table 2. Phae 4: Reaching the welding preure Once the heating element ha been removed, bring the edge into contact. Gradually increae preure until the value (P5 + Pt) (phae 5) i reached o a to prevent exceive leakage of melted material from the edge in contact. Reaching the final welding force [welding preure (P5 + Pt)] mut take the amount of time t4 hown in Table 2. Phae 5: Welding Keep the edge in contact under preure (P5 + Pt) for a time t5, expreed in minute, a hown in table 2, unle the welding i performed in-line (e.g. on a pipe rack, on pipe hanger, performed on a vertical line, etc.) in which cae the full welding time t6 mut be oberved while the pipe are clamped. Phae 6: Cooling Once the welding time i over (phae 5), the welded joint can be removed from the welding machine, without being ubjected to ignificant tre. Allow the welded joint to completely cool to ambient temperature. PP-RCT Piping Sytem 69

6 3.4.4 BUTT FUSION PARAMETERS TABLE 2: BUTT PARAMETERS FOR NIRON PP-RCT PIPING SIZE OF PIPE SDR BEAD SIZE INCHES, h HEAT SOAK SECONDS, t2 MAX CHANGE OVER, t3 REACH FULL WELD PRESSURE, t4 NORMAL t5 2" (63 mm) / ½" (75 mm) / " (90 mm) / " (110 mm) / " (125mm) / " (160 mm) / " (200 mm) /16-3/ " (250 mm) /16-3/ " (315 mm) / " (355 mm) / IN-LINE t6 2" (63 mm) / ½" (75 mm) / " (90 mm) / " (110 mm) / " (125mm) / " (160 mm) / " (200 mm) / " (250 mm) /16-3/ " (315 mm) /16-3/ " (355 mm) / " (63 mm) / ½" (75 mm) / " (90 mm) / " (110 mm) / " (125mm) / " (160 mm) / " (200 mm) / " (250 mm) / PP-RCT Piping Sytem

7 TABLE 2: BUTT PARAMETERS FOR NIRON PP-RCT PIPING SIZE OF PIPE SDR BEAD SIZE INCHES HEAT SOAK SECONDS, t2 MAX CHANGE OVER, t3 REACH WELD PRESSURE, t4 NORMAL t5 12" (315 mm) /16-3/ " (355 mm) /16-3/ " (400 mm) /16-3/ " (450 mm) / " (500 mm) / " (560 mm) /32-1/ IN-LINE t6 24" (630 mm) /32-1/ " (63 mm) / ½" (75 mm) / " (90 mm) / " (110 mm) / " (125mm) / " (160 mm) / " (200 mm) / " (250 mm) / " (315 mm) / " (355 mm) / " (400 mm) / " (450 mm) /16-3/ " (500 mm) /16-3/ " (560 mm) /16-3/ " (630 mm) /16-3/ Note: 1. Butt Welding of Niron PP-RCT i to be performed at a heating element temp of 410 o F ± 18 o F. 2. Cooling time repreent the time the pipe and/or fi tting mut be held clamped in the machine under preure after joining. 3. When welding i performed in a bench type etting, normal cooling time can be oberved. When welding i performed in place (e.g. up in the air or on pipe rack, then the full cooling time hown in the lat column titled In-Line Cooling mut be ued. 4. Inline refere to welding pipe while it i on hanger, on a pipe rack, or in a vertical poition. 5. In all cae, ubtantial preure or bending tre mut be avoided on the welded aembly until the full cooling time in the lat column i oberved. 6. The information in the chart above i for manual butt fuion machine. When uing a hydraulic machine, the welding preure to be ued (in place of the welding force) will depend on the pecifi c machine ued and the drag force required. Thi will vary by pecifi c hydraulic machine type. PP-RCT Piping Sytem 71

3 JOINING PROCEDURES

3 JOINING PROCEDURES 3 JOINING PROCEDURES 3.1 WELDING EQUIPMENT Suitable equipment complying with guidelines DVS2207 shall be used for a fast and efficient installation of PPR PIPING SYSTEM: 1) Welder 800 W - 220V AC 50 Hz

More information

Releasing Compounds Presses Lubrication Grooves Sealing

Releasing Compounds Presses Lubrication Grooves Sealing Acceorie Acceorie Releaing Compound Pree Lubrication Groove Sealing E2.00 29 Acceorie Releaing Compound Releaing Compound SKC C 15 Releaing Compound The releaing compound SKC 15 i a diperion of waxe in

More information

Notes on the GoldSim Plume Function

Notes on the GoldSim Plume Function NAC-0036_R1 Note on the GoldSim Plume Function Augut 014 Prepared by John auxe NEPUNE AND COMPANY, INC. 1505 15 th St, Suite B, o Alamo, NM 87544 itle: Decription: hi document calculation detail of the

More information

buttfusion jointing compatibility ambient conditions welding operations 0,2-1,4 g/10 min (190 C 5 Kg) -5 C and +40 C

buttfusion jointing compatibility ambient conditions welding operations 0,2-1,4 g/10 min (190 C 5 Kg) -5 C and +40 C 30 buttfusion jointing UNI 10520 is the correct reference standard for the carrying out of the buttfusion jointing. With this process the surfaces to be welded are heated by contact with an heating element

More information

Indicative simplified baseline and monitoring methodologies for selected small-scale CDM project activity categories

Indicative simplified baseline and monitoring methodologies for selected small-scale CDM project activity categories III.AU./Verion 01 TYPE III - OTHER PROJECT ACTIVITIES Project participant hall apply the general guideline to SSC CDM methodologie, information on additionality (attachment A to Appendix B) and general

More information

Keywords: ILSS, Flexural Strength, Hybrid Polymer Composite, Curing, Epoxy Resin 5052, Vacuum Bagging.

Keywords: ILSS, Flexural Strength, Hybrid Polymer Composite, Curing, Epoxy Resin 5052, Vacuum Bagging. American International Journal Reearch in Science, Technology, Engineering & Mathematic Available online at http://www.iair.net ISSN (Print): 2328-3491, ISSN (Online): 2328-3580, ISSN (CD-ROM): 2328-3629

More information

FINITE ELEMENT INVESTIGATION ON THE INTERACTION BETWEEN SHALLOW AND DEEP EXCAVATED TWIN TUNNELS

FINITE ELEMENT INVESTIGATION ON THE INTERACTION BETWEEN SHALLOW AND DEEP EXCAVATED TWIN TUNNELS VOL. 13, NO. 1, JANUARY 18 ISSN 1819-668 6-18 Aian Reearch Publihing Network (ARPN). All right reerved. FINITE ELEMENT INVESTIGATION ON THE INTERACTION BETWEEN SHALLOW AND DEEP EXCAVATED TWIN TUNNELS Adel

More information

PRECIPITATION CALIBRATION TESTS August 12, 2009

PRECIPITATION CALIBRATION TESTS August 12, 2009 BISHOP PAIUTE TRIBE ENVIRONMENTAL MANAGEMENT OFFICE PRECIPITATION CALIBRATION TESTS Augut 12, 2009 Thi report decribe the reult of everal precipitation calibration tet carried out in July 2009, following

More information

TREMLOCK SL INSTALLATION MANUAL

TREMLOCK SL INSTALLATION MANUAL TREMLOCK SL INSTALLATION MANUAL TREMLOCK SL TremLock SL i a concealed fatener architectural tanding eam roof panel. The TremLock SL panel are eaily intalled over decking, utilizing metal clip. TremLock

More information

P _扉_ストレーナー :30 PM ページ 1 Strainer 139 資料-00

P _扉_ストレーナー :30 PM ページ 1 Strainer 139 資料-00 139 Selection 1.0 1.3 2.0 3.0 220 1 220 260 220 220 1 260 260 3 1.0 60 80 152 154 154 156 156 162 1 149 153 153 151 151 162 162 162 163 152 162 158 158 161 161 158 163 160 163 160 157 157 163 1 162 162

More information

CONSTRUCTION SPECIFICATION FOR COMPACTING

CONSTRUCTION SPECIFICATION FOR COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 501 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR COMPACTING TABLE OF CONTENTS 501.01 SCOPE 501.02 REFERENCES 501.03 DEFINITIONS 501.0 DESIGN AND SUBMISSION

More information

SLAB-030 to SLAB-300. Energy absorption in pad format. Damping Pads

SLAB-030 to SLAB-300. Energy absorption in pad format. Damping Pads 8 Damping Pad SL-3 to SL-3 Energy aborption in pad format Energy capacity 3. Nm/ycle to 2 Nm/ycle 6 mm to 2 mm Tailor made damping material in pad format: SL damping pad are made of a vicoelatic PUR-material.

More information

Level control of small intake reservoir in hydraulic system with long and complex penstock - Implemented level control at Toro 3 HPP

Level control of small intake reservoir in hydraulic system with long and complex penstock - Implemented level control at Toro 3 HPP September 013 Page 1 Level control of mall intake reervoir in hydraulic ytem with long and complex pentock - Implemented level control at Toro 3 PP Damir Dolenc, Mitja Klopčar, Jernej Mazij Litotroj Power,

More information

KIN-TEK. The Calibration Specialists

KIN-TEK. The Calibration Specialists KIN-TEK The Calibration Specialit 491M Ga Standard Generator Modular Sytem Thi modular ytem i for multipoint, multicomponent calibration of mot type of ga analyzer uch a GC, GC-MS, FTIR & Ion Mobility

More information

ULTRASENSITIVE MAGNETOMETERS BASED ON ROTATIONAL MAGNETIC EXCITATION. Evangelos Hristoforou 1, Peter Svec Sr. 2

ULTRASENSITIVE MAGNETOMETERS BASED ON ROTATIONAL MAGNETIC EXCITATION. Evangelos Hristoforou 1, Peter Svec Sr. 2 ULTRASENSITIVE MAGNETOMETERS BASED ON ROTATIONAL MAGNETIC EXCITATION Evangelo Hritoforou, Peter Svec Sr. National TU of Athen, Greece, Slovak Academy of Science, Bratilava Received 7 April 04; accepted

More information

aquatherm greenpipe climatherm aquatherm lilac

aquatherm greenpipe climatherm aquatherm lilac Technical Information for aquatherm greenpipe pressure pipe system for potable water, food processing, and hygienically sensitive applications climatherm pressure pipe system for hydronic, compressed air,

More information

Fatigue Crack Repair Using Drilled Holes and Externally Bonded CFRP Strips

Fatigue Crack Repair Using Drilled Holes and Externally Bonded CFRP Strips Bridge Maintenance, Safety, Management, Reilience and Sutainability Biondini & Frangopol (Ed) 212 Taylor & Franci Group, London, ISBN 978--415-62124-3 Fatigue Crack Repair Uing Drilled Hole and Externally

More information

Modeling Liquid Phase Sintering of Hard metal powder compacts

Modeling Liquid Phase Sintering of Hard metal powder compacts ing Liquid Phae Sintering of Hard metal powder compact Shama Shamaundar *, Maheha Siddegowda*, Pavanachand Chigurupati**, Rengarajan Raghavan***, Rameh Rao. S. *** * ProSIM AFTC # 326, 8th Main, III Stage,

More information

CONTENTS Of the ROVELD P 315 B MANUAL 1. Introduction 2. Introduction for the welding process 3. Drawings and part lists of single machine parts of th

CONTENTS Of the ROVELD P 315 B MANUAL 1. Introduction 2. Introduction for the welding process 3. Drawings and part lists of single machine parts of th CONTENTS Of the ROVELD P 315 B MANUAL 1. Introduction 2. Introduction for the welding process 3. Drawings and part lists of single machine parts of the Roweld P 315 B a) Basic Machine b) Milling Equipment

More information

MARINE SAFETY, QUALITY AND ENVIRONMENTAL MANAGEMENT

MARINE SAFETY, QUALITY AND ENVIRONMENTAL MANAGEMENT GUIDE FOR MARINE SAFETY, QUALITY AND ENVIRONMENTAL MANAGEMENT JULY 2002 American Bureau of Shipping Incorporated by the Legilature of the State of New York 1862 Copyright 2002 American Bureau of Shipping

More information

MARINE HEALTH, SAFETY, QUALITY, AND ENVIRONMENTAL MANAGEMENT

MARINE HEALTH, SAFETY, QUALITY, AND ENVIRONMENTAL MANAGEMENT Guide for Marine Health, Safety, Quality and Environmental Management GUIDE FOR MARINE HEALTH, SAFETY, QUALITY, AND ENVIRONMENTAL MANAGEMENT AUGUST 2009 (Updated November 2010 ee next page) American Bureau

More information

Challenges of Developing ISO Sampling Standards

Challenges of Developing ISO Sampling Standards Challenge of Developing ISO Sampling Standard Ralph Holme CSIRO Mineral Down Under Flaghip Chair ISO/TC 10/SC 1 Sampling Iron Ore Chair ISO/TC 7/SC 4 Sampling Coal and Coke Convenor ISO/TC 183/WG 9 Sampling

More information

M A S O N R Y. Revised Spring Engineering Notes For Design With Concrete Block Masonry

M A S O N R Y. Revised Spring Engineering Notes For Design With Concrete Block Masonry A S O N R Y Revied Spring 007 Engineering Note For Deign With Concrete Block aonry C H R O N I C L E S To rectify the ituation, the Spring 007 article i being reiued. We apologize for any inconvenience

More information

Computer Analysis of In-plane Behavior of Masonry Walls Strengthened by FRP Strips

Computer Analysis of In-plane Behavior of Masonry Walls Strengthened by FRP Strips , 22-24 October, 2014, San Francico, USA Computer Analyi of In-plane Behavior of Maonry Wall Strengthened by FRP Strip J. Szolomicki Abtract The paper concern the trengthening uing FRP compoite of maonry

More information

Modeling Suspended Sediments in Dez Basin (Case Study: The Tale Zang Hydrometric Station)

Modeling Suspended Sediments in Dez Basin (Case Study: The Tale Zang Hydrometric Station) International Reearch Journal of Applied and Baic Science. Vol., 3 (2), 402-407, 2012 Available online at http://www.irjab.com ISSN 2251-838X 2012 Modeling Supended Sediment in Dez Bain (Cae Study: The

More information

United States Patent (19) Smith

United States Patent (19) Smith United State Patent (19) Smith (54 CONTROL FOR A POWER PLANT COAL MILL PULVERIZER HAVING FEEDFORWARD DAMPER POSITONING 75 Inventor: 73) Aignee: William J. Smith, Verona, Pa. Wetinghoue Electric Corp.,

More information

The Use of Swimmer Bars as Shear Reinforcement in Reinforced Concrete Beam

The Use of Swimmer Bars as Shear Reinforcement in Reinforced Concrete Beam American Journal of Engineering and Applied Science, 6 (1): 87-94, 2013 ISSN: 1941-7020 2014 M. Al-Nara et al., Thi open acce article i ditributed under a Creative Common Attribution (CC-BY) 3.0 licene

More information

AGRON 183: Photosynthesis

AGRON 183: Photosynthesis AGRON 183: Photoynthei Dr. Brian Hornbuckle December 1, 2016 Introduction I think I can afely ay that every agronomit i aware of the proce of photoynthei, a decribed by the following chemical equation.

More information

INFLUENCE OF MATERIAL PROPERTIES AND VERTICAL PRE-COMPRESSION ON THE SHEAR BEHAVIOUR OF MORTAR JOINTS. Miklós Molnár 1

INFLUENCE OF MATERIAL PROPERTIES AND VERTICAL PRE-COMPRESSION ON THE SHEAR BEHAVIOUR OF MORTAR JOINTS. Miklós Molnár 1 INFLUENCE OF MATERIAL PROPERTIES AND VERTICAL PRE-COMPRESSION ON THE SHEAR BEHAVIOUR OF MORTAR JOINTS ABSTRACT Mikló Molnár 1 The influence of mortar type on the hear behaviour of bed joint ubjected to

More information

The research of simplified method of calculating wind and rain loads and its validation

The research of simplified method of calculating wind and rain loads and its validation The reearch of implified method of calculating wind and rain load and it validation Xing FU 1) and Hong-Nan LI 2) 1), 2) Faculty of Infratructure Engineering, Dalian Univerity of Technology, Dalian 116024,

More information

Land-Surface Models, Page 1

Land-Surface Models, Page 1 Land-Surface Model Introduction A land-urface model mut be able to accurately depict the interaction of the atmophere with the underlying urface land a well a the interaction of the ub-urface, or ubtrate,

More information

Purchasing Specification Guidelines for Marking Polyethylene Gas System Components

Purchasing Specification Guidelines for Marking Polyethylene Gas System Components Purchaing pecification Guideine for Marking Poyethyene Ga ytem Component 1.0 Genera 1.1 The purpoe of thi document i to provide operator with guidance on purchaing pecification anguage to communicate with

More information

FEDERAL SPECIFICATION NICKEL-COPPER-ALUMINUM ALLOY, WROUGHT (UNS N05500)

FEDERAL SPECIFICATION NICKEL-COPPER-ALUMINUM ALLOY, WROUGHT (UNS N05500) INCH-POUND 07 December 2000 SUPERSEDING QQ-N-00286F(SH) 29 November 1990 QQ-N-286E 02 Augut 1985 FEDERAL SPECIFICATION NICKEL-COPPER-ALUMINUM ALLOY, WROUGHT (UNS N05500) The General Service Adminitration

More information

Narrow Gap Welding, Electrogas - and. Electroslag Welding

Narrow Gap Welding, Electrogas - and. Electroslag Welding 6. Narrow Gap Welding, Electroga - and Electrolag Welding 6. Narrow Gap Welding, Electroga- and Electrolag Welding 77 Up to thi day, there i no univeral agreement about the definition of the term Narrow

More information

SANITARY SEWER SYSTEM MODIFICATION

SANITARY SEWER SYSTEM MODIFICATION FL. P.E. NO. 0 Mar 0, 0 K & L BELANGER HOLDING LLC 99 BAYHORE ROAD NORTH FT. MYER, FLORIDA 9 CPH, INC. ALTAMONT AVE. FT. MYER, FLORIDA 90 ATTN.: (9) -99 J H McCARRIER LAND URVEYING, INC. 0 UNRIE BOULEVARD

More information

Modeling and Simulation of A Laser Deposition Process

Modeling and Simulation of A Laser Deposition Process Modeling and Simulation of A Laer Depoition Proce rank Liou*, Zhiqiang an*, Heng Pan*, Kevin Slattery**, Mary Kinella+, Joeph Newkirk*, and Hin-Nan Chou** *Univerity of Miouri Rolla, Rolla, MO, 65409 **

More information

Effectiveness and Exergy Destruction Analysis of Evaporator in Organic Rankine Cycle

Effectiveness and Exergy Destruction Analysis of Evaporator in Organic Rankine Cycle Effectivene and Exergy Detruction Analyi of Evaporator in Organic Rankine Cycle Kyoung Hoon Kim, and Chul Ho Han Abtract---Thi paper carrie out a performance analyi baed on the firt and econd law of thermodynamic

More information

Project Summary. Multiple Water Reuse in Poultry Processing: Case Study in Egypt

Project Summary. Multiple Water Reuse in Poultry Processing: Case Study in Egypt United tate Indutrial Environmental Reearch Environmental Protection Laboratory Agency Cincinnati OH 45268 Reearch and Development EPA-600/2-83-005 Apr. 1983 Project ummary Multiple Water Reue in Poultry

More information

Address for Correspondence

Address for Correspondence Reearch Paper ENERGY CONSERVATION IN MUD HOUSE AS COMPARED TO BRICK WALL BUILDING IN INDIA Subhah Mihra 1, Dr. J A Umani 2 Addre for Correpondence 1 Ph.d Scholar, 2 Profeor, Department of Mechanical Engineering,

More information

INVESTIGATION OF THERMOSTAT-SET CONTROL AS A NEW DIRECT LOAD CONTROL METHOD

INVESTIGATION OF THERMOSTAT-SET CONTROL AS A NEW DIRECT LOAD CONTROL METHOD INVESTIGATION OF THERMOSTAT-SET CONTROL AS A NEW DIRECT LOAD CONTROL METHOD Canbolat Uçak canbolat@elk.itu.edu.tr Gökçe Dokuyucu gokce776@uperonline.com Department of Electrical Engineering Electrical

More information

Value intensity of water used for electrical energy generation in the Western U.S.; an application of embedded resource accounting

Value intensity of water used for electrical energy generation in the Western U.S.; an application of embedded resource accounting Value intenity of water ued for electrical energy generation in the Wetern U.S.; an application of embedded reource accounting Elizabeth A. Martin and Benjamin L. Ruddell Abtract Thi tudy evaluate the

More information

Calculation of crack width and crack spacing

Calculation of crack width and crack spacing Preented at Nordic Mini-eminar: Fibre reinforced concrete, Trondheim, November 5 th 2007. Calculation of crack width and crack pacing Ingemar Löfgren Thoma Concrete Group E-mail: ingemar.lofgren@tcg.nu

More information

A Morphing Extrusion Die for Manufacturing of Thermoplastic Hoses THESIS

A Morphing Extrusion Die for Manufacturing of Thermoplastic Hoses THESIS A Morphing Extruion Die for Manufacturing of Thermoplatic Hoe THESIS Preented in Partial Fulfillment of the Requirement for the Degree Mater of Science in the raduate School of The Ohio State Univerity

More information

VISHWAKARMA Trading Corporation

VISHWAKARMA Trading Corporation VISHWAKARMA Trading Corporation A unit of :VISHAVKARMA MECHANICAL WORKS PVT. LTD. AN ISO 9001-008 CERTIFIED COMPANY FIRST CHOICE OF PROGRESSIVE BUILDERS & CONTRACTORS VISHWAKARMA TRADING CORPORATION Welcome

More information

MoST - Business Finland Joint Funding Call

MoST - Business Finland Joint Funding Call MoST - Buine Finland Joint Funding Call I. AGREEMENT Memorandum of Undertanding for China-Finland Science & Technology Innovation Cooperation between the Department of International Cooperation of the

More information

CITY OF CASSELBERRY FLORIDA

CITY OF CASSELBERRY FLORIDA GENERAL NOTE. THE BENCH MARK DATUM I NORTH AMERICAN VERTICAL DATUM OF 988 (NAVD 88). 2. ALL PUBLIC LAND CORNER AND MONUMENT ITHIN THE LIMIT OF CONTRUCTION ARE TO BE PROTECTED BY CONTRACTOR A FOLLO: CORNER

More information

Corpo. Data Facts. thanks to its sliding seat and two different backrest heights, the chair s settings can be adjusted to ideally suit every user.

Corpo. Data Facts. thanks to its sliding seat and two different backrest heights, the chair s settings can be adjusted to ideally suit every user. Corpo Data Fact Corpo ditinguihing feature i the tretched network of elatic band of it backret. The generou dimenion of the network give the chair it ditinctive look and, at the ame time, an unadorned

More information

August 2, P.O. Box 7069 AFIN: ARR00A WR-5. Dear Mr. Lichty: Sincerely, Water Division. Page 1 of 7

August 2, P.O. Box 7069 AFIN: ARR00A WR-5. Dear Mr. Lichty: Sincerely, Water Division. Page 1 of 7 August 2, 2016 Craig Lichty, Plant Manager Evergreen Packaging Pine Bluff P.O. Box 7069 Pine Bluff, AR 71611-7069 RE: Evergreen Packaging Pine Bluff Inspections (Jefferson Co) AFIN: 35-00016 Permit No.:

More information

Inadequate certification and calibration of laboratory thermometers. The last certification documentation available was dated April 25, 2006.

Inadequate certification and calibration of laboratory thermometers. The last certification documentation available was dated April 25, 2006. December 28, 2007 Ken Johnson, Manager Pine Bluff Wastewater Utility 1520 outh Ohio treet Pine Bluff, Arkansas 71601-6055 RE: Wastewater Treatment ystem AFIN: 35-00149 NPDE Permit No.: AR0033316 Dear Mr.

More information

Maintaining ISO Compliance in Automated Procedures

Maintaining ISO Compliance in Automated Procedures Maintaining ISO 1705 Compliance in Automated Procedure Preenter & Author: Jorge Martin Fluke Corporation PO 9090 M/S 6-30 Everett, WA, USA 9806 Phone: (45) 446 6477; Fax: (45) 446 6390 Email: jmartin@flukecom

More information

RESILIENT INFRASTRUCTURE June 1 4, 2016

RESILIENT INFRASTRUCTURE June 1 4, 2016 RESILIENT INFRASTRUCTURE June 1 4, 2016 EXPERIMENTAL STUDY ON THE CAPACITY OF BARRIER DECK ANCHORAGE IN MTQ PL-3 BARRIER REINFORCED WITH HM-GFRP BARS WITH HEADED ENDS Michael Rotami Department of Civil

More information

Eutectic Gallium-Indium (EGaIn): A Liquid Metal Alloy for the Formation of Stable Structures in Microchannels at Room Temperature

Eutectic Gallium-Indium (EGaIn): A Liquid Metal Alloy for the Formation of Stable Structures in Microchannels at Room Temperature Advanced Functional Material Supporting Information for: Eutectic Gallium-Indium (EGaIn): A Liquid Metal Alloy for the Formation of Stable Structure in Microchannel at Room Temperature Michael D. Dickey,

More information

A. ASTM F Standard Specification for Pressure-rated Polypropylene (PP) Piping Systems.

A. ASTM F Standard Specification for Pressure-rated Polypropylene (PP) Piping Systems. SECTION 221114 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the water distribution piping system, including potable cold, hot and hot water piping including associated fittings, and specialities

More information

TD 1 BASIC CONCEPTS AND ENERGY ANALYSIS

TD 1 BASIC CONCEPTS AND ENERGY ANALYSIS TD 1 BASIC CONCEPTS AND ENERGY ANALYSIS TD 1.1 Denity of liquid water i r = _ 1008 - T 2 i / m with T in c C. If the temperature increae 10c C, how much will be the change in per meter depth of water?

More information

Narrow Gap Welding, Electrogas - and. Electroslag Welding

Narrow Gap Welding, Electrogas - and. Electroslag Welding 6. Narrow Gap Welding, Electroga - and Electrolag Welding 00 6. Narrow Gap Welding, Electroga- and Electrolag Welding 7 Up to thi day, there i no univeral agreement about the definition of the term Narrow

More information

Butt Fusion Joining Procedure for Field Joining of Polyamide-11 (PA-11) Pipe TR-45/2016

Butt Fusion Joining Procedure for Field Joining of Polyamide-11 (PA-11) Pipe TR-45/2016 Butt Fusion Joining Procedure for Field Joining of Polyamide-11 (PA-11) Pipe TR-45/2016 i TABLE OF CONTENTS Foreword...iv 1.0 Introduction... 1 2.0 Scope... 1 3.0 Testing Program... 2 3.1 Introduction...

More information

Significant Changes in the 2005 ACI Code Including Changes Affecting Precast/Prestressed Concrete Part 1

Significant Changes in the 2005 ACI Code Including Changes Affecting Precast/Prestressed Concrete Part 1 Significant Change in the 2005 ACI Code Including Change Affecting Precat/Pretreed Concrete Part 1 S. K. Ghoh, Ph.D., FPCI Preident S. K. Ghoh Aociate, Inc. Palatine, Illinoi Significant change made ince

More information

Research and Development of Condensate Water Fined Processing Control System Based on FCS

Research and Development of Condensate Water Fined Processing Control System Based on FCS Journal of Energy and Power Engineering 9 (2015) 673-678 doi: 10.17265/1934-8975/2015.07.009 D DAVID PUBLISHING Reearch and Development of Condenate Water Fined Proceing Control Sytem Baed on FCS Cheng

More information

Study on Mechanical Behavior of Thin-walled Member during Precision Straightening Process

Study on Mechanical Behavior of Thin-walled Member during Precision Straightening Process 2014 by IFSA Publihing, S. L. http://www.enorportal.com Study on Mechanical Behavior of Thin-walled Member during Preciion Straightening Proce Ben Guan, Yong Zang, Diping Wu, Qin Qin School of Mechanical

More information

B.O.Q FOR INTERIOR FURNISHING WORK FOR BANK OF INDIA AT KABISURYANAGAR.

B.O.Q FOR INTERIOR FURNISHING WORK FOR BANK OF INDIA AT KABISURYANAGAR. B.O.Q FOR INTERIOR FURNISHING WORK FOR BANK OF INDIA AT KABISURYANAGAR. Sl. Particular 1 FULL HEIGHT PARTITION ( including partly glazed door) Providing and fixing in poition partly glazed full Height

More information

TENDER DOCUMENTS FURNITURE FOR PMO NUTECH/SCM/PMO Furniture-2018/TD-019

TENDER DOCUMENTS FURNITURE FOR PMO NUTECH/SCM/PMO Furniture-2018/TD-019 TENDER DOCUMENTS FURNITURE FOR PMO NUTECH/SCM/PMO Furniture-2018/TD-019 NATIONAL UNIVERSITY OF TECHNOLOGY TENDER NOTICE National Univerity of Technology (NUTECH) NUTECH/SCM/PMO Furniture-2018/TD-019 Sealed

More information

Air-Pro Compressed Air Piping System

Air-Pro Compressed Air Piping System TM Air-Pro Compreed Air Piping Sytem www.aahi-america.com www.aahi-america.com TM Air-Pro Compreed Air Piping Sytem Table of Content Material Propertie Page 3 Chemical Reitance Page 4 Intallation Tip Page

More information

Proweld Equipment Owner & Maintenance Manual FIELD 12 TRENCH (Widos 4900)

Proweld Equipment Owner & Maintenance Manual FIELD 12 TRENCH (Widos 4900) Proweld Equipment Owner & Maintenance Manual FIELD 12 TRENCH (Widos 4900) 35 Green Street, PO Box 653, Malden, MA 02148 Tel: (781) 321-5409 - Fax (781) 321-4421 - Toll Free: (800) 343-3618 www.asahi-america.com

More information

Available online at ScienceDirect. Energy Procedia 48 (2014 )

Available online at   ScienceDirect. Energy Procedia 48 (2014 ) Available online at www.ciencedirect.com ScienceDirect Energy Procedia 48 (2014 ) 806 812 SHC 2013, International Conference on Solar Heating and Cooling for Building and Indutry September 23-25, 2013,

More information

Modeling Available Soil Moisture Application Note

Modeling Available Soil Moisture Application Note Modeling Availale Soil Moiture Application Note Gaylon Campell, Ph.D METER Group, Inc. (Formerly Decagon Device, Inc.) Pullman, WA Both the amount and the availaility of water in oil i important to plant

More information

The Process-Value Model: A Systems View of the IST Value Chain

The Process-Value Model: A Systems View of the IST Value Chain Aociation for Information Sytem AIS Electronic Library (AISeL) SAIS 2007 Proceeding Southern (SAIS) 3-1-2007 The Proce-Value Model: A Sytem View of the IST Value Chain William L. Lomeron lomeronw@nula.edu

More information

Butt Fusion Joining Procedure for Field Joining of Polyamide-11 (PA-11) Pipe TR-45/2008

Butt Fusion Joining Procedure for Field Joining of Polyamide-11 (PA-11) Pipe TR-45/2008 for Field Joining of Polyamide-11 (PA-11) Pipe TR-45/2008 105 Decker Court, Suite 825; Irvine, TX 75062 P: +1 (469) 499-1052 F: +1 (469) 499-1063, www.plasticpipe.org i Table of Contents FOREWORD iii INTRODUCTION

More information

A new method for shear bond strength measurement

A new method for shear bond strength measurement A new method for hear bond trength meaurement KAUSTUBH JOSHI 1, WARREN BATCHELOR, IAN PARKER, LOI NGUYEN 4 1 RESEARCH STUDENT, SENIOR LECTURER, ASSOCIATE PROFESSOR, 4 SENIOR LECTURER Autralian Pulp and

More information

Polyfusion - Butt welding. Flexalen PB Polybutene pipes

Polyfusion - Butt welding. Flexalen PB Polybutene pipes Polyfusion - Butt welding Flexalen PB Polybutene pipes POLYFUSION BUTT WELDING PROCESS This technique is reserved to specially trained welders, since utmost precision and considerable experience are indispensable

More information

Concept of Heat Recovery from Exhaust Gases

Concept of Heat Recovery from Exhaust Gases IOP Conference Serie: Material Science and Engineering PAPER OPEN ACCESS Concept of Heat Recovery from Exhaut Gae To cite thi article: Maria Bukowka et al 2017 IOP Conf. Ser.: Mater. Sci. Eng. 245 052057

More information

The Open Civil Engineering Journal

The Open Civil Engineering Journal Send Order for Reprint to reprint@benthamcience.ae The Open Civil Engineering Journal, 206, 0, 83-825 83 The Open Civil Engineering Journal Content lit available at: www.benthamopen.com/tociej/ DOI: 0.274/8744950600083

More information

LAFAYETTE PARK APARTMENTS

LAFAYETTE PARK APARTMENTS CONTRUCTION DOCUMENT FOR APARTMENT CHEDULE OF PECIAL INPECTION CHEDULE OF PECIAL INPECTION IT-4 MODULAR (NCBC ECTION 1704 AND 1807.2.5) IT-5 CAT IN PLACE (NCBC ECTION 1704.4 AND CHAPTER 19) ITEM ITEM MATERIAL

More information

Enhanced Biofilter Treatment of Urban Stormwater by Optimizing the Hydraulic Residence Time in the Media

Enhanced Biofilter Treatment of Urban Stormwater by Optimizing the Hydraulic Residence Time in the Media Enhanced Biofilter Treatment of Urban Stormwater by Optimizing the Hydraulic Reidence Time in the Media Redahegn Silehi 1, Robert Pitt 2 and Shirley Clark 3 1 Graduate tudent, Dept. of Civil, Contruction,

More information

Dynamic compressive and splitting tensile tests on mortar using split Hopkinson pressure bar technique

Dynamic compressive and splitting tensile tests on mortar using split Hopkinson pressure bar technique 730 Dynamic compreive and plitting tenile tet on mortar uing plit Hopkinon preure bar technique Abtract Dynamic compreive and tenile propertie of mortar under impact loading were invetigated experimentally

More information

Indicative simplified baseline and monitoring methodologies for selected small-scale CDM project activity categories

Indicative simplified baseline and monitoring methodologies for selected small-scale CDM project activity categories TYPE III - OTHER PROJECT ACTIVITIES Project participant hall appl the general guideline to mall-cale (SSC) clean development mechanim (CDM) SSC CDM methodologie, information on additionalit (attachment

More information

Prelir Note on Current Use in the United States (l9l)

Prelir Note on Current Use in the United States (l9l) i, uuur FOT6T PROOUCTS LABOR.4TORY. LIBRARY SUPPLEMENTARY flfori1ation ON BRAZILIkN kruckripl ("PARANA PINE")) Prelir Note on Current Ue in the United State (l9l) By ELOISEGERRY and MAXON Y. PILLOW Foret

More information

Selected Properties of Wool Treated by Low-Temperature Plasma

Selected Properties of Wool Treated by Low-Temperature Plasma Dorota Biniaś, Andrzej Włochowicz, Włodzimierz Biniaś Univerity of Bielko-Biała Faculty of Textile Engineering and Environmental Protection Intitute of Textile Engineering and Polymer Material ul. Willowa

More information

September 15, Phillip Foot, Water Utilities Manager City of Hazen P.O. Box 564 Hazen, Arkansas RE: Waste Water Treatment Facility

September 15, Phillip Foot, Water Utilities Manager City of Hazen P.O. Box 564 Hazen, Arkansas RE: Waste Water Treatment Facility eptember 15, 2008 Phillip Foot, Water Utilities Manager City of Hazen P.O. Box 564 Hazen, Arkansas 72064 RE: Waste Water Treatment Facility AFIN: 59-00029 NPDE Permit No.: AR0022411 Dear Mr. Foot: On August

More information

Effect of HFTID Controller on the Stability of Thermal Power Generator

Effect of HFTID Controller on the Stability of Thermal Power Generator Effect of HFTID Controller on the Stability of Thermal Power Generator Anhuman Sehgal, Japreet Kaur, Parveen Lehana 2 Department of Electrical Engineering, Baba Banda Singh Bahadur Engineering College,

More information

CLT rib panel by Stora Enso. English

CLT rib panel by Stora Enso. English CLT rib panel by Stora Eno Englih Stora Eno The renewable material company Part of the bioeconomy, Stora Eno i a leading provider of renewable olution in packaging, biomaterial, wooden contruction and

More information

SEISMIC STRENGTHENING OF COLUMNS BY ADDING NEW CONCRETE. Stephanos E. Dritsos 1

SEISMIC STRENGTHENING OF COLUMNS BY ADDING NEW CONCRETE. Stephanos E. Dritsos 1 49 SEISMIC STRENGTHENING OF COLUMNS BY ADDING NEW CONCRETE Stephano E. Drito 1 ABSTRACT Placing reinforced concrete jacket or layer to trengthen or repair and trengthen concrete column i a normal contruction

More information

Experimental Study of Vibration Frequency-Domain Properties of Aluminum and Nylon Turning Materials

Experimental Study of Vibration Frequency-Domain Properties of Aluminum and Nylon Turning Materials 217 Aia-Pacific Engineering and Technology Conference (APETC 217) ISBN: 978-1-6595-443-1 Experimental Study of Vibration Frequency-Domain Propertie of Aluminum and Nylon Turning Material Shi-Chuang Zhuo

More information

Discovering Transcription Factor Binding Motif Sequences

Discovering Transcription Factor Binding Motif Sequences Dicovering Trancription Factor Binding Motif Sequence I Department of Biology, Stanford Univerity, CA, 94305 Introduction In biology, equence motif are hort equence pattern, uually with fixed length, that

More information

Intel Non-CPU Component Products IEEE (EPEAT) Declaration

Intel Non-CPU Component Products IEEE (EPEAT) Declaration Intel Non-CPU Component Product IEEE 1680-2009 (EPEAT) Declaration Supplier Information Company Name Intel Corporation Contact Title Product Ecology Engineer epone Document ID Contact Phone 480-554-7647

More information

Thermoplastic Striping Compounds

Thermoplastic Striping Compounds 49 Thermoplatic Striping Compound C. J. KEE, Reearch Aitant, and FRED J. BENSON, Reearch Engineer, Texa Engineering Experiment Station SYNOPSIS IN 1949, the Texa Engineerlog Experiment Station inaugurated

More information

Belmont Water Department s Report Card on Water Quality 2014 Consumer Confidence Report

Belmont Water Department s Report Card on Water Quality 2014 Consumer Confidence Report Belmont Water Department Report Card on Water Quality 2014 Conumer Confidence Report Spanih (Epanol) Ete informe contiene informacion muy importante obre la calidad de u agua potable. Por favor lea ete

More information

Application of the standard porosimetry method for nanomaterials. Y.M. Volfkovich and A.V. Sakars*

Application of the standard porosimetry method for nanomaterials. Y.M. Volfkovich and A.V. Sakars* 292 Int. J. Nanotechnology, Vol. 2, No. 3, 2005 Application of the tandard poroimetry method for nanomaterial Y.M. Volfkovich and A.V. Sakar* Porotech Ltd., 100 Cater Avenue, Vaughan, L4L 5Y9 Ontario,

More information

FIRE RESISTANCE RATINGS OF CONCRETE MASONRY ASSEMBLIES. TEK 7-1C Fire Resistance (2009) Related TEK: 2-6, 5-8B, 7-6A

FIRE RESISTANCE RATINGS OF CONCRETE MASONRY ASSEMBLIES. TEK 7-1C Fire Resistance (2009) Related TEK: 2-6, 5-8B, 7-6A n information erie from the national authority on concrete maonry technology FIRE RESISTNCE RTINGS OF CONCRETE MSONRY SSEMBLIES TEK 7-C Fire Reitance (009) INTRODUCTION Concrete maonry i widely pecifi

More information

COMPLETE REVISION October Process Industry Practices Piping. PIP PNSC0036 High Density Polyethylene (HDPE) Piping Installation Specification

COMPLETE REVISION October Process Industry Practices Piping. PIP PNSC0036 High Density Polyethylene (HDPE) Piping Installation Specification Piping High Density Polyethylene (HDPE) Piping Installation Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has

More information

CRITERIA FOR RMC PRODUCTION CONTROL

CRITERIA FOR RMC PRODUCTION CONTROL CRITERIA FOR RMC PRODUCTION CONTROL BASIC LEVEL CERTIFICATION FOR PRODUCTION CONTROL OF READY MIXED CONCRETE Rev.01; June 2013 Page 1 SECTION A (REQUIREMENTS FOR PRODUCTION CONTROL OF READY MIXED CONCRETE)

More information

Fuzzy Sliding Mode Control with Constant Power Control for a Proton Exchange Membrane Fuel Cell

Fuzzy Sliding Mode Control with Constant Power Control for a Proton Exchange Membrane Fuel Cell Reearch Journal of Applied Science, Engineering and Technology 5(3): 1059-1063, 013 ISSN: 040-7459; E-ISSN: 040-7467 Maxwell Scientific Organization, 013 Submitted: June 9, 01 Accepted: July 4, 01 Publihed:

More information

MELIA HOTELS INTERNATIONAL S.A.

MELIA HOTELS INTERNATIONAL S.A. EXHIBIT I ANNUAL REPORT ON DIRECTORS REMUNERATION AT LISTED COMPANIES DATA IDENTIFYING THE ISSUER FINANCIAL YEAR END: 12/31/2017 TAX ID A78304516 COMPANY NAME MELIA HOTELS INTERNATIONAL S.A. REGISTERED

More information

CITY OF THOUSAND OAKS

CITY OF THOUSAND OAKS (T HW 23) A FR EE W RD UNET HILL EN D AVENIDA DE LO ROAD LE ARBO FR EE LNN WA D BLV ERB E ND E EE RD OA K (T H W 2 3 ) FR R AK WETL DR BORCHARD U A TH O VENTURA D RD MOORPA RK LNN U BLV D NT RD R BO EE

More information

Trilax. Data Facts. and all individual requirements. 1/5

Trilax. Data Facts. and all individual requirements. 1/5 Trilax Data Fact The ignificant dicovery embodied in thi chair concept i that three pivot point are needed in order to correctly upport the body ergonomically in every poition. Trilax relaxe and move with

More information

Typical Albedo ALBEDO 1/14/13. Albedo. Disposition of Solar Radiation at Earth s Surface

Typical Albedo ALBEDO 1/14/13. Albedo. Disposition of Solar Radiation at Earth s Surface Introduction to Climatology GEOGAPHY 300 Dipoition of Solar adiation at Earth Surface Tom Giambelluca Univerity of Hawai i at Mānoa eflection: Albedo i a key property of urface controlling the urface energy

More information

Numerical simulation of the seismic behavior of steel storage pallet racking systems

Numerical simulation of the seismic behavior of steel storage pallet racking systems 1 Numerical imulation of the eimic behavior of teel torage pallet racking ytem Gonçalo E. Novai Ribeiro Coutinho a a Intituto Superior Técnico, Liboa, Portugal 1. Introduction 1.1. Overview Depite their

More information

INTERNATIONAL STANDARD ISO 12176-1 Third edition 2012-10-01 Plastics pipes and fittings Equipment for fusion jointing polyethylene systems Part 1: Butt fusion Tubes et raccords en matières plastiques Appareillage

More information

Online Monitoring of Exhaust Gas Emissions of a Boiler with Diesel/Biodiesel Fuel Blends

Online Monitoring of Exhaust Gas Emissions of a Boiler with Diesel/Biodiesel Fuel Blends Online Monitoring of Exhaut Ga Emiion of a Boiler with Dieel/Biodieel Fuel Blend Andrea Valdman *1, Maurício Bezerra de Souza Jr. 1, Roana Folly 1, Belki Valdman 1 1 School of Chemitry, Chemical Engineering

More information

Gas Processing Expander

Gas Processing Expander Expander Operated Ga Proceing April, 2015 Ga Proceing Expander Colder Proce Temperature and Maximized Compreor Uptime with Helidyne Expander Skid. Specification: Flowrate 1-10 mmcfd Max. Preure 1,440 pi

More information

S T A N D A R D. ASAE EP496.3 FEB2006 Agricultural Machinery Management

S T A N D A R D. ASAE EP496.3 FEB2006 Agricultural Machinery Management SE EP496.3 FEB2006 gricultural Machinery Management S T N D R D SBE i a profeional and technical organization, of member worldwide, who are dedicated to advancement of engineering applicable to agricultural,

More information