Evaluation of field compaction of a filtered residue from alumina production K.D. Nery UFMG, Brazil
|
|
- Moses Tate
- 6 years ago
- Views:
Transcription
1 Evaluation of field compaction of a filtered residue from alumina production K.D. Nery UFMG, Brazil L.F.S. Villar UFMG, Brazil R.A. Moreno Companhia Brasileira de Aluminio, Brazil J.P. Freire Neto Pimenta de Ávila Consultoria, Brazil M. Scarmínio Pimenta de Ávila Consultoria, Brazil R.S. Junior Companhia Brasileira de Aluminio, Brazil
2 Introduction TECHNOLOGICAL DEVELOPMENT Growth in ore exploitation; Increasing in generation of tailings and industrial residues; Concern for waste storage systems safety; Stringent environmental laws.
3 Introduction Alumina Industry - Residue disposal solution Envio do rejeito para o filtro prensa Dry Stacking Drum Filter Rejeito após passar pelo filtro prensa Filtered residue Press Filter
4 Introduction Filtered residue Press Filter
5 Introduction Disposal of Filtered Residue: Compact to regain storage volume; To increase shear strength and therefore bearing capacity; To increase stiffness and therefore to reduce future settlement; To decrease voids ratio and hence permeability, which as consequence reduces the infiltration of rainwater.
6 Objective To evaluate the field compactability of a filtered residue from alumina production. Field tests were carried out to collect undisturbed samples for laboratory tests and to obtain the following information: Angle of repose of a stockpile (formed with loose residue); Average density of the stockpile (loose residue); Optimal water content for compaction; Compaction degree of the compacted residue (compacted with a tracked excavator).
7 Methodology Residue from alumina production of CBA Companhia Brasileira de Alumínio. Pilot Filter Press dewater the residue until a solid content of about 75%. Quantity of filtered residue used in the tests: approximately 8 tonnes. Equipments used: Munck truck to transport and lift the bags to perform the stockpile test; JCB backhoe to excavate the ditches; Doosan Solar 255LC V excavator to compact the residue. Equipment Excavator Doosan SOLAR255LC-V Track width (m) 0.60 Track length (m) 3.83 Contact area with ground (m²) 4.60 Equipment weight (kg) 24,600 Contact stress with ground (kg/m²) 5,352
8 Methodology Construction of a residue pile (loose material):
9 Results Simulation of a residue pile formation (material considered loose): Approximately three tonnes of residue was used to construct a pile. Dimension: 3.0 m in diameter and 1.05 m in height. The angle of repose measured was 35. The density of the residue in the pile was measured by two different methods: Method Density (g/cm³) Water Content (%) Crimping the beveled cylinder Membrane Average
10 Methodology Laboratory Tests: Standard Proctor compaction tests > two tests were performed: one with the cake structure, and the other without the cake structure. Determination of gravimetric water content.
11 Dry density (g/cm³) Results Laboratory tests: 1,550 1,530 1,510 1,490 1,470 1,450 1,430 1,410 1,390 1,370 1, Water Content (%) Keeping the structures of 'cake' Not keeping the structures of 'cake'
12 Results Laboratory tests: Material Alumina residue dewatered by Filter Press (keeping the original structure the residue has after being filtered here called "cake" structure) Alumina residue dewatered by Filter Press (not keeping the original structures after the filtering process) γd max (g/cm³) wopt (%) Solids Content (%) γd max = maximum dry density; wopt = optimum water content.
13 Methodology Preparation of the area for field compaction tests: Area: 12 m in width and 50 m in length. Inclination: about 2%, to allow drainage in case of rain. On the sides of the area, ditches and windrows were executed to direct drainage. In the centre of the area, two ditches were excavated: 0.75 m in width, 6 m in length and 0.45 m in depth.
14 Methodology 0.45 m 6 m 0.75 m
15 Methodology Simulation of field compaction:
16 Methodology In situ density:
17 Methodology Sample for laboratory tests:
18 Results Field compaction simulation: Number of passes Total γ in situ top (kn/m³) Total γ in situ bottom (kn/m³) Total γ Point 0 (Lab.) (kn/m³) Max Total γ from SP (kn/m³) E top E bottom w in situ top (%) w in situ bottom (%) SC in situ top (%) SC in situ bottom (%) w optimum (%) Δw top Δw bottom CD (%) top CD (%) bottom
19 Results Field compaction simulation: Relationship between field density and number of passes Relationship between compaction degree and number of passes
20 Conclusions Angle of repose of the residue pile formed after dumping the residue from a 2 m height was about 35, which corresponds to a slope with 1V: 1.43H. In the real scale it can be lower. The density of the pile formed this way was approximately 1.49 g/cm³, with a gravimetric water content equal to 31.5%. The compaction in the field using a Doosan Solar255LC V tracked excavator proved to be quite promising in terms of gain in density, and therefore improvement of the disposal site capacity, since the final volume of the residue is reduced. After 12 excavator passes, a 99.5% compaction degree was reached at the top of the layer. However, it is necessary to perform more tests simulating real operating conditions and the effect of rain.
21 Acknowledgements The authors thank: for the resources used to prepare this paper.
22 References Ávila, J.P. (2012) Disposal methods for fine tailings, in Proceedings 19th International Symposium of ICSOBA International Committee for Study of Bauxite, Alumina & Aluminium, October 29 November 2, 2012, Belém, PA, Brazil. Ávila, J.P., Nery, K.D., Freire Neto, J.P. and Pantoja, R. (2012) Dry storage technology Strength and pore pressure development and compactability of tailings, in Proceedings 19th International Symposium of ICSOBA International Committee for Study of Bauxite, Alumina & Aluminium, October 2012, Belém, Brazil. Bánvölgyi, G. and Huan, T.M. (2009) De watering, disposal and utilisation of red mud: State of the art and emerging technologies. Davies, M. (2011) Filtered dry stacked tailings The fundamentals, in Proceedings Tailings and Mine Waste 2011, November 6 9, 2011, Vancouver, BC, Canada.
23 Evaluation of field compaction of a filtered residue from alumina production K.D. Nery UFMG, Brazil; L.F.S. Villar UFMG, Brazil; R.A. Moreno Companhia Brasileira de Aluminio, Brazil; J.P. Freire Neto Pimenta de Ávila Consultoria, Brazil; M. Scarmínio Pimenta de Ávila Consultoria, Brazil; R.S. Junior Companhia Brasileira de Aluminio, Brazil
PRACTICAL COURSE III CLASSIFICATION & COMPACTION. Res. Assist. İREM KALIPCILAR
PRACTICAL COURSE III CLASSIFICATION & COMPACTION Res. Assist. İREM KALIPCILAR Group index REMINDER GI = (F 200-35)[0.2 + 0.005 (LL-40)]+0.01(F 200-15)(PI-10) FOR GROUP A-2-6 and A-2-7 GI = 0.01(F 200-15)(PI-10)
More informationLIFE Project Number LIFE03 ENV/GR/ Layman s Report
LIFE Project Number LIFE03 ENV/GR/000213 LIFE PROJECT NAME Rehabilitation of abandoned bauxite surface mines using alumina red mud as filler (REFILL) Reporting Date 30-11-2006 The large open pit areas
More informationCode No: RR Set No. 1
Code No: RR320101 Set No. 1 III B.Tech Supplimentary Examinations, Aug/Sep 2008 GEOTECHNICAL ENGINEERING (Civil Engineering) Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions carry equal
More informationVERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment
VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment rotary drill hydro-mill backhoe Clamshell + Kelly bar VERTICAL BARRIERS SLURRY
More informationValue engineering study for bauxite reject disposal
Value engineering study for bauxite reject disposal Caio van Deursen 1, Roberto Seno Jr. 2, Rodrigo Moreno 3 and Thiago Franco 4 1. Process Engineer 2. Bauxite and Alumina Technology Development Manager
More informationFilter-Pressed Dry Stacking: Design Considerations Based on Practical Experience
Filter-Pressed Dry Stacking: Design Considerations Based on Practical Experience C. Crystal and C. Hore SRK Consulting, Vancouver, British Columbia, Canada I. Ezama SRK Consulting, Salta, Salta, Argentina
More informationClassification of bauxite residue
Classification of bauxite residue Antti Häkkinen, D.Sc.(Tech) Professor (Solid/Liquid Separation Technology) Research Group of Solid-Liquid Separation Technology Competence Area of Separation Technology
More informationSECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING
PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels
More informationDry Stacking of Cycloned Tailings
Dry Stacking of Cycloned Tailings W. Lugão - VOGBR, Brazil M. Almeida - VOGBR, Brazil A. Guimarães - VOGBR, Brazil F. Magalhães - VOGBR, Brazil S. Mohallem - ARCELORMITTAL, Brazil Introduction Tailings
More informationSOIL ENGINEERING (EENV 4300)
SOIL ENGINEERING (EENV 4300) Chapter 6 Soil Compaction Introduction In the construction of highways, embankments, earth dams, and many other engineering structures, loose soils must be compacted to increase
More information2012 Soil Mechanics I and Exercises Final Examination
2012 Soil Mechanics I and Exercises Final Examination 2013/1/22 (Tue) 13:00-15:00 Kyotsu 155 Kyotsu 1 Kyotsu 3 W2 Lecture room Attention: There are four questions and four answer sheets. Write down your
More informationSoil Compaction. Chapter (6) Instructor : Dr. Jehad Hamad
Soil Compaction Chapter (6) Instructor : Dr. Jehad Hamad 1 2017-2016 What is Compaction? In most instances in civil engineering and/or construction practice, whenever soils are imported or excavated and
More informationEXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013
GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary
More informationConverting slurry tailings facilities to filtered dry stacks a case history. John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant
Converting slurry tailings facilities to filtered dry stacks a case history John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant Objectives General discussion on the geotechnical issues. Case
More informationSPECIFICATION FOR ENGINEERED FILLS
SPECIFICATION FOR ENGINEERED FILLS This specification is intended to be used for the engineered fill. The specification is suitable for most purposes but there may be special conditions existing at some
More informationComparison of the results of load test done on stone columns and rammed aggregate piers using numerical modeling
Comparison of the results of load test done on stone columns and rammed aggregate piers using numerical modeling Ece Kurt Civil Eng., M.Sc.& Geoph. Eng., Istanbul, Turkey Berrak Teymur Asst. Prof. Dr.,
More informationLABORATORY EVALUATION OF CO-MIXED TAILINGS WASTE ROCK AND SLAG FOR THE CONSTRUCTION OF BARRIER COVER SYSTEMS AT COPPER CLIFF
LABORATORY EVALUATION OF CO-MIXED TAILINGS WASTE ROCK AND SLAG FOR THE CONSTRUCTION OF BARRIER COVER SYSTEMS AT COPPER CLIFF Prepared By: Ms. Pamela Fines and Dr. G. Ward Wilson In Conjunction with Golder
More informationMaterial properties of Tailings from Swedish mines
Material properties of Tailings from Swedish mines I. Jantzer Luleå University of Technology, Sweden, Isabel.Jantzer@ltu.se A. Bjelkevik Sweco AB, Sweden, Annika.Bjelkevik@sweco.se K. Pousette Luleå University
More informationRedi Rock Specification and Installation Manual
Redi Rock Specification and Installation Manual 1.0 General Scope This Specification covers the Design, Materials and Installation of Redi Rock modular block Retaining and Freestanding Wall systems as
More informationThis specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations and the Ontario Building code.
1/6 1.0 PURPOSE This specification describes the minimum requirements for filling depressions and for backfilling excavations for structural footings, slabs, floors, buildings, trestles, and the like..
More informationGeotechnical properties of zinc/lead mine tailings from Tara Mines, Ireland
Quille M.E. and O'Kelly B.C., Geotechnical properties of zinc/lead mine tailings from Tara Mines, Ireland, Proceedings ASCE GeoShanghai 21 Geoenvironmental Engineering and Geotechnics: Progress in Modeling
More informationPaste Thickeners. Advanced Thickening Technology
Paste Thickeners Advanced Thickening Technology Paste Thickening What is Paste? Paste thickening technology is a long-term solution for many challenges facing the minerals industry. Thickening a stream
More informationBEARING CAPACITY IMPROVEMENT USING MICROPILES A CASE STUDY
BEARING CAPACITY IMPROVEMENT USING MICROPILES A CASE STUDY G.L. Sivakumar Babu 1, B. R.Srinivasa Murthy 2, D.S. N. Murthy 3, M.S. Nataraj 4 ABSTRACT Micropiles have been used effectively in many applications
More informationDry Stacking Operation at Pogo Mine, Alaska June 12, Sumitomo Metal Mining Pogo LLC
Dry Stacking Operation at Pogo Mine, Alaska June 12, 2014 Sumitomo Metal Mining Pogo LLC Contents 1. About Pogo Mine Geology Mining and paste backfill Process 2. Dry Stacking Operation About Dry Stack
More informationAtterberg limits Clay A Clay B. Liquid limit 44 % 55% Plastic limit 29% 35% Natural water content 30% 50%
CE 6405 SOIL MECHANICS UNIT I INTRODUCTION Part A 1. Distinguish between Residual and Transported soil. 2. Give the relation between γ sat, G, γ w and e 3. A compacted sample of soil with a bulk unit weight
More informationGravel Road Building Myth versus Science
Local Government Supervisors Association of Western Australia Gravel Road Building Myth versus Science Brendan Scott Brendan Lecturer in Geotechnical Engineering, School of Civil, Environmental and Mining
More informationStudy of the behavior of materials with fines content in heap leaching processes
Proceedings of Heap Leach Mining Solutions, 2016 October 18-20, 2016, Lima, Peru Published by InfoMine, 2016 InfoMine, ISBN: 978-1-988185-03-3 Study of the behavior of materials with fines content in heap
More informationCompaction. Densification of soil by removal of air using mechanical energy
Compaction Densification of soil by removal of air using mechanical energy Compaction vs. Consolidation CONSOLIDATION: REDUCTION OF SOIL VOLUME UNDER STRESS/LOADING. STRESS OR LOADING CAUSES 1) DEFORMATION
More informationMOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY
MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY REPORT ON STAGE 3C CONSTRUCTION (REF.NO. VA-101-1/5-1) Rev. No. Revision Date Approved 0 Issued in Final September 23, 2005 AMEC010485_0001
More informationStormTech Construction Guide
A division of StormTech solid end caps and pre-cored end caps StormTech chambers StormTech manifolds and fittings Acceptable fill materials per Table 1 Woven and non-woven geotextiles 80-7 DC REQUIRED
More informationSurface Disposal of Past Tailings at the Bulyanhulu Gold Mine, Tanzania
Surface Disposal of Past Tailings at the Bulyanhulu Gold Mine, Tanzania James A. Theriault 1, John Frostiak 2, Don Welch 1, 1 Golder Associates Ltd., Mississauga, Ontario, Canada 2 Barrick Gold Corporation,
More informationMechanical and Environmental Properties of Plastics-included Landfills with Elastic Behavior
December 21, 2016 3K133011 Mechanical and Environmental Properties of Plastics-included Landfills with Elastic Behavior (Resilient) Atsushi YAMAWAKI 1 Japan Industrial Waste Management Foundation Period
More informationBack to Basics (plus a little extra) on Geotechnical Engineering: Ground Compaction
Back to Basics (plus a little extra) on Geotechnical Engineering: Ground Compaction Alan Parrock 1971 - First exposed to soil mechanics at university 1973 Natal Roads Department 1976 Professional engineer
More informationTopic #4 Soil Compaction
Topic #4 Soil Compaction What is Compaction? A simple ground improvement technique, where the soil is densified through external compactive effort. Compactive Effort + Water = 2 Compaction and Phase Diagram
More informationt ghi yr Cop
In many situations, soil itself is used as a construction material Highway embankments Railway embankments Earth dams Highway / Airfield pavements Backfilled trenches Landfills When soil is used as foundation
More informationREPORT STATUS: DATE: Report n :
REPORT: Expanded clay LWA in CEA Lightweight fill and thermal insulation products for civil engineering applications. Installation and structural quality control on site. STATUS: Technical report DATE:
More informationKarara Iron Ore TSF design considerations for a unique large scale dry stack facility
Page 1 Karara Iron Ore TSF design considerations for a unique large scale dry stack facility C. Hore SRK Consulting, Perth, Western Australia, Australia D. Luppnow SRK Consulting, Perth, Western Australia,
More informationEXPERIMENTAL PROGRAMME
CHAPTER 3 EXPERIMENTAL PROGRAMME 3.1 INTRODUCTION The critical review of the literature presented in the previous chapter reveals the limitations of the experimental studies carried out so far in the field
More informationModified Centreline Construction of Tailings Embankn1ents
Modified Centreline Construction of Tailings Embankn1ents J.P. Haile & K.J. Brouwer Knight Piesold Ltd. Consulting Engineers Suite 1400-750 West Pender Street Vancouver, B.C., Canada V6C 2T8 Abstract:
More informationTHE CONSTRUCTION TECHNOLOGY AND QUALITY CONTROL METHOD OF MEROVE EARTH CORE ROCKFILL DAM
THE CONSTRUCTION TECHNOLOGY AND QUALITY CONTROL METHOD OF MEROVE EARTH CORE ROCKFILL DAM WANG Yong-wang 1, DONG Jing-yan 2 1, Oversea Cause Department, Sinohydro Bureau Seven, Pixian, Sichuan, 611730,
More informationCITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP
INFRASTRUCTURE SERVICES Page 1 of 7 1.0 GRANULAR BASE AND SUB-BASE 1.1 DESCRIPTION.1 This section specifies requirements for supplying, producing, hauling placing and compacting processed gravel or quarried
More informationBAP or BAT? A review of some dramatic changes in tailings management in the recent past and potential changes in the future
BAP or BAT? A review of some dramatic changes in tailings management in the recent past and potential changes in the future Andy Fourie School of Civil, Environmental & Mining Engineering 1 BAP or BAT?
More informationVerti-Block Design Manual Section 1 - Gravity Wall (Standard)
Canadian Version Release 2.0 Verti-Block Design Manual Section 1 - Gravity Wall (Standard) Native gravelly soil, edge of excavation Native soil compacted in place as each course is set Geotextile Filter
More informationGeotechnical aspects of sewage sludge monofills
Proceedings of the Institution of Civil Engineers Municipal Engineer 157 September 2004 Issue ME3 Pages 193 197 Paper 13569 Received 13 November 2003 Accepted 4 March 2004 Keywords: Landfill/sewage treatment
More informationImportance of tailings properties for closure
Proceedings of Mine Closure Solutions, 2014 April 26 30, 2014, Ouro Preto, Minas Gerais, Brazil Published by InfoMine, 2014 InfoMine, ISBN: 978-0-9917905-4-8 Importance of tailings properties for closure
More informationA H M 531 The Civil Engineering Center
Compaction test By: Ahmed Essam Mansour Objective: To measure the optimum water content at which maximum unit weight of a soil occurs at standard compaction energy. General discussion: General approach
More informationNOVEMBER 2016 GRANDWALL. retaining walls installation guide
NOVEMBER 2016 GRANDWALL retaining walls installation guide RETAINING WALL INSTALLATION GUIDE RETAINING WALL information Austral Masonry Grandwall retaining wall blocks are an ideal choice for retaining
More informationCEX6230 GEOTECHNICS Dear Student:
CEX6230 GEOTECHNICS 31.05.2010 Dear Student: Geotechnics (CEX6230) discusses design and construction aspects of Geotechnical Engineering. Even though this course requires a pass in CEX4230, I find that
More informationHydraulic Excavators
Chapter 8 Hydraulic Excavators Hydraulic excavators are designed to excavate below the ground surface on which the machine rests. These machines have good mobility and are excellent for general-purpose
More informationSECTION TRENCHING
SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.
More informationSTABILIZATION OF EXPANSIVE SOIL USING GROUND GRANULATED BLAST FURNACE SLAG Sharmila.S 1
STABILIZATION OF EXPANSIVE SOIL USING GROUND GRANULATED BLAST FURNACE SLAG Sharmila.S 1 1 Assistant Professor, Department of Civil Engineering,Kongu Engineering College,Perundurai - 638052 Abstract Expansive
More informationBauxite beneficiation modifying factors
Bauxite beneficiation modifying factors Caio van Deursen 1, Roberto Seno Jr. 2, Rodrigo Moreno 3 and Thiago Franco 4 1. Process Engineer 2. Bauxite and Alumina Technology Development Manager 3. Process
More informationIntegrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria
Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria Terry Eldridge Golder Associates S.A., Chile Ben Wickland Golder Associates Ltd., Canada Adrian Goldstone Dundee Precious Metals
More informationCraig Dufficy U.S. EPA Office of Resource Conservation and Recovery
Craig Dufficy U.S. EPA Office of Resource Conservation and Recovery Overview What is a Landfill? Basic waste properties. Area and Volume calculations. What is allowed in a landfill and what is not. How
More informationCE 240 Soil Mechanics & Foundations Lecture 3.3. Soil Compaction (Das, Ch. 5)
CE 240 Soil Mechanics & Foundations Lecture 3.3 Soil Compaction (Das, Ch. 5) Class Outlines Soil compaction introduction Standard Proctor Compaction Test Effect of Compaction Energy Modified Proctor Compaction
More informationASSESSMENT OF PASTE ROCK AS A COVER MATERIAL IN MINE RECLAMATION AT THE CANADIAN MALARTIC MINE
A UNIQUE RESEARCH PROGRAM ASSESSMENT OF PASTE ROCK AS A COVER MATERIAL IN MINE RECLAMATION AT THE CANADIAN MALARTIC MINE Bruno Bussière 1, Sandra Pouliot 2, Emma Charbonneau 1 and Ward G. Wilson 3 1 Research
More informationSEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE SEMBODAI BACHELOR OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING QUESTION BANK
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE SEMBODAI - 614809 BACHELOR OF ENGINEERING Sub.Code: CE6405 DEPARTMENT OF CIVIL ENGINEERING QUESTION BANK Branch/Year/SEM: CIVIL/II/ IV Sub.Name: Soil Mechanics
More informationCONSTRUCTION SPECIFICATION FOR GRADING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 206 DECEMBER 1993 CONSTRUCTION SPECIFICATION FOR GRADING 206.01 SCOPE 206.02 REFERENCES 206.03 DEFINITIONS 206.04 Not Used 206.05 Not Used 206.06 Not
More informationEffective stress testing of peat
Cite this manuscript as: O Kelly, B.C., and Zhang, L., 2013. Effective stress testing of peat, E.T. Hanrahan Memorial Symposium, Department of Civil, Structural and Environmental Engineering, University
More informationFE Review-Geotechnical 1. An undisturbed sample of clay has a wet mass of 100 kg. a dry mass of 93 kg, and a total volume of m'\ The solids
1. An undisturbed sample of clay has a wet mass of 100 kg. a dry mass of 93 kg, and a total volume of 0.0491 m'\ The solids have a specific gravity of 2.65. The void ratio is most nearly (A) 0.31 (B) 0.40
More informationFOR MINERAL AND MINING SLURRIES WITH HIGH SOLIDS CONCENTRATION
CDF VACUUM DISC FILTERS FOR MINERAL AND MINING SLURRIES WITH HIGH SOLIDS CONCENTRATION HIGH RATE FILTRATION LOW FINAL CAKE MOISTURE LOW ENERGY CONSUMPTION CONTINUOUS OPERATION HIGH AVAILABILITY WITH MINIMAL
More informationSection Fill Placement Tender No. [ ] Page 1
Tender No. [ ] Page 1 1.0 GENERAL 1.1 GENERAL.1 This section specifies placement requirements for fill materials specified in Section 02330 Earthwork Materials, except for [Waste Fill, Gravel Armour, Riprap,
More informationTailings mobilization estimates for dam breach studies
Tailings mobilization estimates for dam breach studies Daniel Fontaine, P.Eng, Violeta Martin, Ph.D., P.Eng, Knight Piésold Ltd., Vancouver, BC, Canada ABSTRACT Quantitative assessment of potential consequences
More informationReinhard Bott; Thomas Langeloh; Jurgen Hahn BOKELA GmbH, Karlsruhe, Germany. 1. Introduction
FILTRATION MAP OF BAUXITE RESIDUES FILTERABILITY OF RED MUD FROM SEVERAL BAUXITES AND POSSIBLE USE OF CONTINUOUS PRESSURE FILTRATION LIKE HI-BAR FILTRATION Reinhard Bott; Thomas Langeloh; Jurgen Hahn BOKELA
More informationSlope Stability of Solid Waste Layers in Japan and Asia
Modern Environmental Science and Engineering (ISSN 2333-2581) January 2016, Volume 2, No. 1, pp. 23-30 Doi: 10.15341/mese(2333-2581)/01.02.2016/003 Academic Star Publishing Company, 2016 www.academicstar.us
More informationStormTech Construction Guide
Stormtech MC-3500 Construction Guide 12/31/14 11:18 AM Page 1 M /M 00 35 C- A division of REQUIRED MATERIALS AND EQUIPMENT LIST 00 45 C- StormTech Construction Guide Detention Retention Water Quality Acceptable
More informationAssessment of Water Removal from Oil Sands Tailings by Evaporation and Under-drainage, and the Impact on Tailings Consolidation
Assessment of Water Removal from Oil Sands Tailings by Evaporation and Under-drainage, and the Impact on Tailings Consolidation Fernando F. Junqueira Golder Associates Ltd, Vancouver, Canada Maria Victoria
More informationGLOBAL JOURNAL OF ENGINEERING SCIENCE AND RESEARCHES STABILIZATION OF FLYASH WITH RED MUD & CEMENT Nukaraju Bharathi *1 & Amulya Gundla 2
GLOBAL JOURNAL OF ENGINEERING SCIENCE AND RESEARCHES STABILIZATION OF FLYASH WITH RED MUD & CEMENT Nukaraju Bharathi *1 & Amulya Gundla 2 *1&2 Department Civil Engineering, Kakatiya Institute of Technology
More informationInstructions for installation the GRAF EcoBloc Inspect flex
Instructions for installation the GRAF EcoBloc Inspect flex GRAF EcoBloc Inspect flex Order-Nr. 402005 The points described in these instructions must be observed under all circumstances. All warranty
More informationHydraulic performance of permanent heap leach with intermediate drainage system
Proceedings of Heap Leach Solutions, 2015 September 14-16, 2015, Reno, USA Published by InfoMine, 2015 InfoMine, ISBN: 978-0-9917905-8-6 Hydraulic performance of permanent heap leach with intermediate
More informationLONG TERM ACID ROCK DRAINAGE (ARD) MANAGEMENT AT PT FREEPORT INDONESIA 1
LONG TERM ACID ROCK DRAINAGE (ARD) MANAGEMENT AT PT FREEPORT INDONESIA 1 Yuni Rusdinar 2 Abstract. Freeport Indonesia currently operates a 760,000 t/d open pit mine that will operate until 2015, with the
More informationManagement of Radioactive Residues & Wastes Generated During Remediation of Uranium Production Legacy Sites in Germany
Management of Radioactive Residues & Wastes Generated During Remediation of Uranium Production Legacy Sites in Germany Peter Schmidt, Wismut GmbH Chemnitz, Germany Head of Department of Environmental Monitoring
More informationB. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.
SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.
More informationDesign of the Eldorado Gold Efemçukuru Filtered Tailings Facility
Design of the Eldorado Gold Efemçukuru Filtered Tailings Facility Karvin Kwan Norwest Corporation, Vancouver, Canada Richard Dawson Norwest Corporation, Vancouver, Canada Calvin Boese Norwest Corporation,
More informationTailings filtration: risk reduction through understanding and designing for variability
Paste 2018 RJ Jewell and AB Fourie (eds) 2018 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-8-7 https://papers.acg.uwa.edu.au/p/1805_05_de_kretser/ Tailings filtration: risk reduction through
More informationEARTHQUAKE EFFECT ON SINGLE PILE BEHAVIOR WITH VARIOUS FACTOR OF SAFETY AND DEPTH TO DIAMETER RATIO IN LIQUEFIABLE SAND
International Journal of Civil Engineering and Technology (IJCIET) Volume 9, Issue 4, April 218, pp. 1253 1262, Article ID: IJCIET_9_4_14 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=9&itype=4
More informationMining Technology and Sustainable Development. Water and the Environment
Mining Technology and Sustainable Development Water and the Environment Capital Market Day 2017 21 June 2017 1 About us FLSmidth is a leading supplier of equipment and services to the global minerals and
More informationEXCAVATION & BACKFILL SPECIFICATION
REVISION DATE DESCRIPTION BY REVIEWER 0 12/14/2009 ISSUED FOR CONSTRUCTION MJS TDJ SECTION 1 EARTHWORK 1.1 GENERAL. This section covers general earthwork and includes preparation of the construction areas;
More informationMEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG.
MEMORANDUM Levelton Consultants Ltd. 150-12791 Clarke Place Richmond, BC V6V 2H9 Canada Tel: 604 278-1411 Fax: 604 278-1042 E-Mail: rhillaby@levelton.com Web Site: www.levelton.com TO: STUART OLSON DOMINION
More informationITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS
AFTER FEBRUARY 1, 2011 ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS 481.1 Description. This specification shall govern for the construction of monolithic, reinforced concrete box sewers of the size,
More information[ [GEOTECHNICAL ENGG-1] SOLVED QUESTION PAPER]
1 a) With the help of three phase diagram, define the terms bulk density, dry density, void ratio and water content. Bulk Density-It is defined as the ratio of total weight to total volume of soil mass.
More information1. Publishable summary Second Period
1. Publishable summary Second Period Contact information Mr. Dimitrios Boufounos, Aluminion S.A. Tel: (+30) 2267049150 www.labmet.ntua.gr/enexal e-mail: dimitri.boufounos@alhellas.gr 1.1 Introduction The
More informationARMOR-BLOCK. Installation guide. Installation Manual: ARMOR-BLOCK Retaining Wall System. Cap Block. Exposed void for planting.
ARMOR-BLOCK Installation guide Cap Block Exposed void for planting In situ soil Engineered backfill Compacted and prepared base Setback Lip Ph 0800 655 00 or visit www.csppacific.co.nz 19 February 08 /
More informationThis specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations.
SPEC-1100 1/9 1.0 PURPOSE This specification describes the minimum requirements for general grading, excavation of earth, rock and solid slag, embankment construction, ditching, use of explosives, and
More informationStormTech Construction Guide
REQUIRED MATERIALS AND EQUIPMENT LIST An 80-7 DC 0/ 74 C/S 10-3 SC StormTech Construction Guide company ~ Bc^a\CTRW b^[xs T]S RP_b P]S _at R^aTS T]S RP_b ~ Bc^a\CTRW RWP\QTab ~ Bc^a\CTRW \P]XU^[Sb P]S
More informationEKS Technology Introduction Process developed for in situ FFT densification Uses unique electrical field management [EKS IP] orders of magnitude lower electrical energy than previous electrophoresis methods
More informationStormTech Construction Guide An company
SC-160LP StormTech Construction Guide An company REQUIRED MATERIALS AND EQUIPMENT LIST IMPORTANT NOTES: A. This installation guide provides minimum requirements for proper installation of chambers. Non-adherence
More informationAUGUST 2017 HASTINGS. retaining walls installation guide
AUGUST 2017 HASTINGS retaining walls installation guide RETAINING WALL INSTALLATION GUIDE RETAINING WALL information Austral Masonry retaining wall blocks are an ideal choice for retaining walls in gardens,
More informationSITE INVESTIGATION. Foundation Engineering
SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface
More informationIGC. 50 th INDIAN GEOTECHNICAL CONFERENCE BEHAVIOUR OF GEOTEXTILE ENCASED QUARRY WASTE COLUMN SUBJECTED TO SHEAR LOADING IN SOFT CLAY
th th INDIAN GEOTECHNICAL CONFERENCE 17 th 19 th DECEMBER, Pune, Maharashtra, India Venue: College of Engineering (Estd. 184), Pune, India BEHAVIOUR OF GEOTEXTILE ENCASED QUARRY WASTE COLUMN SUBJECTED
More informationUnsaturated Seepage Modeling Made Easy
Seepage Modeling Made Easy Murray D. Fredlund Department of Civil Engineering University of Saskatchewan, Saskatoon, Sask., Canada Introduction Fresh out of university, one of the first challenges I was
More informationGEOTECHNICAL ENGINEERING CHALLENGES ON SOFT GROUND. For Myanmar Engineering Society 2012 CONTENTS
GEOTECHNICAL ENGINEERING CHALLENGES ON SOFT GROUND For Myanmar Engineering Society 2012 G&P Professional Sdn Bhd (www.gnpgroup.com.my) By Engr. Dr. Gue See Sew (P.Eng) Engr. Dr. Wong Shiao Yun (G.Eng)
More informationBeneficiation and Sinter Amenability Study of Iron Ore Slime of Bolani Mines
Proceedings of the International Seminar on Mineral Processing Technology - 26, Chennai, India. pp. 464-468. Beneficiation and Sinter Amenability Study of Iron Ore Slime of Bolani Mines S.K. Mukherjee,
More informationCOMPLEX ADDITIVES ON THE BASIS OF BAUXITE RESIDUE FOR INTENSIFICATION OF IRON-ORE SINTERING AND PELLETIZING
COMPLEX ADDITIVES ON THE BASIS OF BAUXITE RESIDUE FOR INTENSIFICATION OF IRON-ORE SINTERING AND PELLETIZING Sergey Gorbachev Andrey Panov, Gennadiy Podgorodetskiy, Vladislav Gorbunov RUSAL ETC and Moscow
More informationWATER USE AND TAILINGS MANAGEMENT IN SURFACE MINED OIL SANDS. Randy J. Mikula Kalium Research
WATER USE AND TAILINGS MANAGEMENT IN SURFACE MINED OIL SANDS Randy J. Mikula Kalium Research Reserves and Production Summary 2005 (billions of barrels) EUB NR2006-024 Bitumen Total Resource 1,694 Reserve
More informationTechnical Documentation
Technical Documentation Underground Container F-Line 1.500L, 3.000L, 5.000L, 7.500L, 10.000L 1. Location 1.1. Position to buildings The excavation space must not be within the minimum distance to buildings,
More informationCity of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING
January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01
More informationApplying landforming to reclamation: A case study in Central Appalachia
Applying landforming to reclamation: A case study in Central Appalachia Leslie Hopkinson, John Quaranta April 12, 2017 Department of Civil and Environmental Engineering West Virginia University WEST VIRGINIA
More informationChapter 6. Soil Compaction
Chapter 6. Soil Compaction Increase Density - increase strength characteristics - increase bearing capacity and stability of slopes - decrease settlement Roller, vibroflot 6.1 Compaction-General Principles
More informationNotes for Erection of Evergreen Maxi Wall Retaining Walls
Notes for Erection of Evergreen Maxi Wall Retaining Walls 1. Evergreen Maxi General Notes A. Project drawings - See project drawings for complete layout of utilities, railroad tracks, existing and proposed
More information