Evaluation of field compaction of a filtered residue from alumina production K.D. Nery UFMG, Brazil

Size: px
Start display at page:

Download "Evaluation of field compaction of a filtered residue from alumina production K.D. Nery UFMG, Brazil"

Transcription

1 Evaluation of field compaction of a filtered residue from alumina production K.D. Nery UFMG, Brazil L.F.S. Villar UFMG, Brazil R.A. Moreno Companhia Brasileira de Aluminio, Brazil J.P. Freire Neto Pimenta de Ávila Consultoria, Brazil M. Scarmínio Pimenta de Ávila Consultoria, Brazil R.S. Junior Companhia Brasileira de Aluminio, Brazil

2 Introduction TECHNOLOGICAL DEVELOPMENT Growth in ore exploitation; Increasing in generation of tailings and industrial residues; Concern for waste storage systems safety; Stringent environmental laws.

3 Introduction Alumina Industry - Residue disposal solution Envio do rejeito para o filtro prensa Dry Stacking Drum Filter Rejeito após passar pelo filtro prensa Filtered residue Press Filter

4 Introduction Filtered residue Press Filter

5 Introduction Disposal of Filtered Residue: Compact to regain storage volume; To increase shear strength and therefore bearing capacity; To increase stiffness and therefore to reduce future settlement; To decrease voids ratio and hence permeability, which as consequence reduces the infiltration of rainwater.

6 Objective To evaluate the field compactability of a filtered residue from alumina production. Field tests were carried out to collect undisturbed samples for laboratory tests and to obtain the following information: Angle of repose of a stockpile (formed with loose residue); Average density of the stockpile (loose residue); Optimal water content for compaction; Compaction degree of the compacted residue (compacted with a tracked excavator).

7 Methodology Residue from alumina production of CBA Companhia Brasileira de Alumínio. Pilot Filter Press dewater the residue until a solid content of about 75%. Quantity of filtered residue used in the tests: approximately 8 tonnes. Equipments used: Munck truck to transport and lift the bags to perform the stockpile test; JCB backhoe to excavate the ditches; Doosan Solar 255LC V excavator to compact the residue. Equipment Excavator Doosan SOLAR255LC-V Track width (m) 0.60 Track length (m) 3.83 Contact area with ground (m²) 4.60 Equipment weight (kg) 24,600 Contact stress with ground (kg/m²) 5,352

8 Methodology Construction of a residue pile (loose material):

9 Results Simulation of a residue pile formation (material considered loose): Approximately three tonnes of residue was used to construct a pile. Dimension: 3.0 m in diameter and 1.05 m in height. The angle of repose measured was 35. The density of the residue in the pile was measured by two different methods: Method Density (g/cm³) Water Content (%) Crimping the beveled cylinder Membrane Average

10 Methodology Laboratory Tests: Standard Proctor compaction tests > two tests were performed: one with the cake structure, and the other without the cake structure. Determination of gravimetric water content.

11 Dry density (g/cm³) Results Laboratory tests: 1,550 1,530 1,510 1,490 1,470 1,450 1,430 1,410 1,390 1,370 1, Water Content (%) Keeping the structures of 'cake' Not keeping the structures of 'cake'

12 Results Laboratory tests: Material Alumina residue dewatered by Filter Press (keeping the original structure the residue has after being filtered here called "cake" structure) Alumina residue dewatered by Filter Press (not keeping the original structures after the filtering process) γd max (g/cm³) wopt (%) Solids Content (%) γd max = maximum dry density; wopt = optimum water content.

13 Methodology Preparation of the area for field compaction tests: Area: 12 m in width and 50 m in length. Inclination: about 2%, to allow drainage in case of rain. On the sides of the area, ditches and windrows were executed to direct drainage. In the centre of the area, two ditches were excavated: 0.75 m in width, 6 m in length and 0.45 m in depth.

14 Methodology 0.45 m 6 m 0.75 m

15 Methodology Simulation of field compaction:

16 Methodology In situ density:

17 Methodology Sample for laboratory tests:

18 Results Field compaction simulation: Number of passes Total γ in situ top (kn/m³) Total γ in situ bottom (kn/m³) Total γ Point 0 (Lab.) (kn/m³) Max Total γ from SP (kn/m³) E top E bottom w in situ top (%) w in situ bottom (%) SC in situ top (%) SC in situ bottom (%) w optimum (%) Δw top Δw bottom CD (%) top CD (%) bottom

19 Results Field compaction simulation: Relationship between field density and number of passes Relationship between compaction degree and number of passes

20 Conclusions Angle of repose of the residue pile formed after dumping the residue from a 2 m height was about 35, which corresponds to a slope with 1V: 1.43H. In the real scale it can be lower. The density of the pile formed this way was approximately 1.49 g/cm³, with a gravimetric water content equal to 31.5%. The compaction in the field using a Doosan Solar255LC V tracked excavator proved to be quite promising in terms of gain in density, and therefore improvement of the disposal site capacity, since the final volume of the residue is reduced. After 12 excavator passes, a 99.5% compaction degree was reached at the top of the layer. However, it is necessary to perform more tests simulating real operating conditions and the effect of rain.

21 Acknowledgements The authors thank: for the resources used to prepare this paper.

22 References Ávila, J.P. (2012) Disposal methods for fine tailings, in Proceedings 19th International Symposium of ICSOBA International Committee for Study of Bauxite, Alumina & Aluminium, October 29 November 2, 2012, Belém, PA, Brazil. Ávila, J.P., Nery, K.D., Freire Neto, J.P. and Pantoja, R. (2012) Dry storage technology Strength and pore pressure development and compactability of tailings, in Proceedings 19th International Symposium of ICSOBA International Committee for Study of Bauxite, Alumina & Aluminium, October 2012, Belém, Brazil. Bánvölgyi, G. and Huan, T.M. (2009) De watering, disposal and utilisation of red mud: State of the art and emerging technologies. Davies, M. (2011) Filtered dry stacked tailings The fundamentals, in Proceedings Tailings and Mine Waste 2011, November 6 9, 2011, Vancouver, BC, Canada.

23 Evaluation of field compaction of a filtered residue from alumina production K.D. Nery UFMG, Brazil; L.F.S. Villar UFMG, Brazil; R.A. Moreno Companhia Brasileira de Aluminio, Brazil; J.P. Freire Neto Pimenta de Ávila Consultoria, Brazil; M. Scarmínio Pimenta de Ávila Consultoria, Brazil; R.S. Junior Companhia Brasileira de Aluminio, Brazil

PRACTICAL COURSE III CLASSIFICATION & COMPACTION. Res. Assist. İREM KALIPCILAR

PRACTICAL COURSE III CLASSIFICATION & COMPACTION. Res. Assist. İREM KALIPCILAR PRACTICAL COURSE III CLASSIFICATION & COMPACTION Res. Assist. İREM KALIPCILAR Group index REMINDER GI = (F 200-35)[0.2 + 0.005 (LL-40)]+0.01(F 200-15)(PI-10) FOR GROUP A-2-6 and A-2-7 GI = 0.01(F 200-15)(PI-10)

More information

LIFE Project Number LIFE03 ENV/GR/ Layman s Report

LIFE Project Number LIFE03 ENV/GR/ Layman s Report LIFE Project Number LIFE03 ENV/GR/000213 LIFE PROJECT NAME Rehabilitation of abandoned bauxite surface mines using alumina red mud as filler (REFILL) Reporting Date 30-11-2006 The large open pit areas

More information

Code No: RR Set No. 1

Code No: RR Set No. 1 Code No: RR320101 Set No. 1 III B.Tech Supplimentary Examinations, Aug/Sep 2008 GEOTECHNICAL ENGINEERING (Civil Engineering) Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions carry equal

More information

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment rotary drill hydro-mill backhoe Clamshell + Kelly bar VERTICAL BARRIERS SLURRY

More information

Value engineering study for bauxite reject disposal

Value engineering study for bauxite reject disposal Value engineering study for bauxite reject disposal Caio van Deursen 1, Roberto Seno Jr. 2, Rodrigo Moreno 3 and Thiago Franco 4 1. Process Engineer 2. Bauxite and Alumina Technology Development Manager

More information

Filter-Pressed Dry Stacking: Design Considerations Based on Practical Experience

Filter-Pressed Dry Stacking: Design Considerations Based on Practical Experience Filter-Pressed Dry Stacking: Design Considerations Based on Practical Experience C. Crystal and C. Hore SRK Consulting, Vancouver, British Columbia, Canada I. Ezama SRK Consulting, Salta, Salta, Argentina

More information

Classification of bauxite residue

Classification of bauxite residue Classification of bauxite residue Antti Häkkinen, D.Sc.(Tech) Professor (Solid/Liquid Separation Technology) Research Group of Solid-Liquid Separation Technology Competence Area of Separation Technology

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

Dry Stacking of Cycloned Tailings

Dry Stacking of Cycloned Tailings Dry Stacking of Cycloned Tailings W. Lugão - VOGBR, Brazil M. Almeida - VOGBR, Brazil A. Guimarães - VOGBR, Brazil F. Magalhães - VOGBR, Brazil S. Mohallem - ARCELORMITTAL, Brazil Introduction Tailings

More information

SOIL ENGINEERING (EENV 4300)

SOIL ENGINEERING (EENV 4300) SOIL ENGINEERING (EENV 4300) Chapter 6 Soil Compaction Introduction In the construction of highways, embankments, earth dams, and many other engineering structures, loose soils must be compacted to increase

More information

2012 Soil Mechanics I and Exercises Final Examination

2012 Soil Mechanics I and Exercises Final Examination 2012 Soil Mechanics I and Exercises Final Examination 2013/1/22 (Tue) 13:00-15:00 Kyotsu 155 Kyotsu 1 Kyotsu 3 W2 Lecture room Attention: There are four questions and four answer sheets. Write down your

More information

Soil Compaction. Chapter (6) Instructor : Dr. Jehad Hamad

Soil Compaction. Chapter (6) Instructor : Dr. Jehad Hamad Soil Compaction Chapter (6) Instructor : Dr. Jehad Hamad 1 2017-2016 What is Compaction? In most instances in civil engineering and/or construction practice, whenever soils are imported or excavated and

More information

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary

More information

Converting slurry tailings facilities to filtered dry stacks a case history. John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant

Converting slurry tailings facilities to filtered dry stacks a case history. John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant Converting slurry tailings facilities to filtered dry stacks a case history John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant Objectives General discussion on the geotechnical issues. Case

More information

SPECIFICATION FOR ENGINEERED FILLS

SPECIFICATION FOR ENGINEERED FILLS SPECIFICATION FOR ENGINEERED FILLS This specification is intended to be used for the engineered fill. The specification is suitable for most purposes but there may be special conditions existing at some

More information

Comparison of the results of load test done on stone columns and rammed aggregate piers using numerical modeling

Comparison of the results of load test done on stone columns and rammed aggregate piers using numerical modeling Comparison of the results of load test done on stone columns and rammed aggregate piers using numerical modeling Ece Kurt Civil Eng., M.Sc.& Geoph. Eng., Istanbul, Turkey Berrak Teymur Asst. Prof. Dr.,

More information

LABORATORY EVALUATION OF CO-MIXED TAILINGS WASTE ROCK AND SLAG FOR THE CONSTRUCTION OF BARRIER COVER SYSTEMS AT COPPER CLIFF

LABORATORY EVALUATION OF CO-MIXED TAILINGS WASTE ROCK AND SLAG FOR THE CONSTRUCTION OF BARRIER COVER SYSTEMS AT COPPER CLIFF LABORATORY EVALUATION OF CO-MIXED TAILINGS WASTE ROCK AND SLAG FOR THE CONSTRUCTION OF BARRIER COVER SYSTEMS AT COPPER CLIFF Prepared By: Ms. Pamela Fines and Dr. G. Ward Wilson In Conjunction with Golder

More information

Material properties of Tailings from Swedish mines

Material properties of Tailings from Swedish mines Material properties of Tailings from Swedish mines I. Jantzer Luleå University of Technology, Sweden, Isabel.Jantzer@ltu.se A. Bjelkevik Sweco AB, Sweden, Annika.Bjelkevik@sweco.se K. Pousette Luleå University

More information

Redi Rock Specification and Installation Manual

Redi Rock Specification and Installation Manual Redi Rock Specification and Installation Manual 1.0 General Scope This Specification covers the Design, Materials and Installation of Redi Rock modular block Retaining and Freestanding Wall systems as

More information

This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations and the Ontario Building code.

This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations and the Ontario Building code. 1/6 1.0 PURPOSE This specification describes the minimum requirements for filling depressions and for backfilling excavations for structural footings, slabs, floors, buildings, trestles, and the like..

More information

Geotechnical properties of zinc/lead mine tailings from Tara Mines, Ireland

Geotechnical properties of zinc/lead mine tailings from Tara Mines, Ireland Quille M.E. and O'Kelly B.C., Geotechnical properties of zinc/lead mine tailings from Tara Mines, Ireland, Proceedings ASCE GeoShanghai 21 Geoenvironmental Engineering and Geotechnics: Progress in Modeling

More information

Paste Thickeners. Advanced Thickening Technology

Paste Thickeners. Advanced Thickening Technology Paste Thickeners Advanced Thickening Technology Paste Thickening What is Paste? Paste thickening technology is a long-term solution for many challenges facing the minerals industry. Thickening a stream

More information

BEARING CAPACITY IMPROVEMENT USING MICROPILES A CASE STUDY

BEARING CAPACITY IMPROVEMENT USING MICROPILES A CASE STUDY BEARING CAPACITY IMPROVEMENT USING MICROPILES A CASE STUDY G.L. Sivakumar Babu 1, B. R.Srinivasa Murthy 2, D.S. N. Murthy 3, M.S. Nataraj 4 ABSTRACT Micropiles have been used effectively in many applications

More information

Dry Stacking Operation at Pogo Mine, Alaska June 12, Sumitomo Metal Mining Pogo LLC

Dry Stacking Operation at Pogo Mine, Alaska June 12, Sumitomo Metal Mining Pogo LLC Dry Stacking Operation at Pogo Mine, Alaska June 12, 2014 Sumitomo Metal Mining Pogo LLC Contents 1. About Pogo Mine Geology Mining and paste backfill Process 2. Dry Stacking Operation About Dry Stack

More information

Atterberg limits Clay A Clay B. Liquid limit 44 % 55% Plastic limit 29% 35% Natural water content 30% 50%

Atterberg limits Clay A Clay B. Liquid limit 44 % 55% Plastic limit 29% 35% Natural water content 30% 50% CE 6405 SOIL MECHANICS UNIT I INTRODUCTION Part A 1. Distinguish between Residual and Transported soil. 2. Give the relation between γ sat, G, γ w and e 3. A compacted sample of soil with a bulk unit weight

More information

Gravel Road Building Myth versus Science

Gravel Road Building Myth versus Science Local Government Supervisors Association of Western Australia Gravel Road Building Myth versus Science Brendan Scott Brendan Lecturer in Geotechnical Engineering, School of Civil, Environmental and Mining

More information

Study of the behavior of materials with fines content in heap leaching processes

Study of the behavior of materials with fines content in heap leaching processes Proceedings of Heap Leach Mining Solutions, 2016 October 18-20, 2016, Lima, Peru Published by InfoMine, 2016 InfoMine, ISBN: 978-1-988185-03-3 Study of the behavior of materials with fines content in heap

More information

Compaction. Densification of soil by removal of air using mechanical energy

Compaction. Densification of soil by removal of air using mechanical energy Compaction Densification of soil by removal of air using mechanical energy Compaction vs. Consolidation CONSOLIDATION: REDUCTION OF SOIL VOLUME UNDER STRESS/LOADING. STRESS OR LOADING CAUSES 1) DEFORMATION

More information

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY REPORT ON STAGE 3C CONSTRUCTION (REF.NO. VA-101-1/5-1) Rev. No. Revision Date Approved 0 Issued in Final September 23, 2005 AMEC010485_0001

More information

StormTech Construction Guide

StormTech Construction Guide A division of StormTech solid end caps and pre-cored end caps StormTech chambers StormTech manifolds and fittings Acceptable fill materials per Table 1 Woven and non-woven geotextiles 80-7 DC REQUIRED

More information

Surface Disposal of Past Tailings at the Bulyanhulu Gold Mine, Tanzania

Surface Disposal of Past Tailings at the Bulyanhulu Gold Mine, Tanzania Surface Disposal of Past Tailings at the Bulyanhulu Gold Mine, Tanzania James A. Theriault 1, John Frostiak 2, Don Welch 1, 1 Golder Associates Ltd., Mississauga, Ontario, Canada 2 Barrick Gold Corporation,

More information

Mechanical and Environmental Properties of Plastics-included Landfills with Elastic Behavior

Mechanical and Environmental Properties of Plastics-included Landfills with Elastic Behavior December 21, 2016 3K133011 Mechanical and Environmental Properties of Plastics-included Landfills with Elastic Behavior (Resilient) Atsushi YAMAWAKI 1 Japan Industrial Waste Management Foundation Period

More information

Back to Basics (plus a little extra) on Geotechnical Engineering: Ground Compaction

Back to Basics (plus a little extra) on Geotechnical Engineering: Ground Compaction Back to Basics (plus a little extra) on Geotechnical Engineering: Ground Compaction Alan Parrock 1971 - First exposed to soil mechanics at university 1973 Natal Roads Department 1976 Professional engineer

More information

Topic #4 Soil Compaction

Topic #4 Soil Compaction Topic #4 Soil Compaction What is Compaction? A simple ground improvement technique, where the soil is densified through external compactive effort. Compactive Effort + Water = 2 Compaction and Phase Diagram

More information

t ghi yr Cop

t ghi yr Cop In many situations, soil itself is used as a construction material Highway embankments Railway embankments Earth dams Highway / Airfield pavements Backfilled trenches Landfills When soil is used as foundation

More information

REPORT STATUS: DATE: Report n :

REPORT STATUS: DATE: Report n : REPORT: Expanded clay LWA in CEA Lightweight fill and thermal insulation products for civil engineering applications. Installation and structural quality control on site. STATUS: Technical report DATE:

More information

Karara Iron Ore TSF design considerations for a unique large scale dry stack facility

Karara Iron Ore TSF design considerations for a unique large scale dry stack facility Page 1 Karara Iron Ore TSF design considerations for a unique large scale dry stack facility C. Hore SRK Consulting, Perth, Western Australia, Australia D. Luppnow SRK Consulting, Perth, Western Australia,

More information

EXPERIMENTAL PROGRAMME

EXPERIMENTAL PROGRAMME CHAPTER 3 EXPERIMENTAL PROGRAMME 3.1 INTRODUCTION The critical review of the literature presented in the previous chapter reveals the limitations of the experimental studies carried out so far in the field

More information

Modified Centreline Construction of Tailings Embankn1ents

Modified Centreline Construction of Tailings Embankn1ents Modified Centreline Construction of Tailings Embankn1ents J.P. Haile & K.J. Brouwer Knight Piesold Ltd. Consulting Engineers Suite 1400-750 West Pender Street Vancouver, B.C., Canada V6C 2T8 Abstract:

More information

THE CONSTRUCTION TECHNOLOGY AND QUALITY CONTROL METHOD OF MEROVE EARTH CORE ROCKFILL DAM

THE CONSTRUCTION TECHNOLOGY AND QUALITY CONTROL METHOD OF MEROVE EARTH CORE ROCKFILL DAM THE CONSTRUCTION TECHNOLOGY AND QUALITY CONTROL METHOD OF MEROVE EARTH CORE ROCKFILL DAM WANG Yong-wang 1, DONG Jing-yan 2 1, Oversea Cause Department, Sinohydro Bureau Seven, Pixian, Sichuan, 611730,

More information

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP INFRASTRUCTURE SERVICES Page 1 of 7 1.0 GRANULAR BASE AND SUB-BASE 1.1 DESCRIPTION.1 This section specifies requirements for supplying, producing, hauling placing and compacting processed gravel or quarried

More information

BAP or BAT? A review of some dramatic changes in tailings management in the recent past and potential changes in the future

BAP or BAT? A review of some dramatic changes in tailings management in the recent past and potential changes in the future BAP or BAT? A review of some dramatic changes in tailings management in the recent past and potential changes in the future Andy Fourie School of Civil, Environmental & Mining Engineering 1 BAP or BAT?

More information

Verti-Block Design Manual Section 1 - Gravity Wall (Standard)

Verti-Block Design Manual Section 1 - Gravity Wall (Standard) Canadian Version Release 2.0 Verti-Block Design Manual Section 1 - Gravity Wall (Standard) Native gravelly soil, edge of excavation Native soil compacted in place as each course is set Geotextile Filter

More information

Geotechnical aspects of sewage sludge monofills

Geotechnical aspects of sewage sludge monofills Proceedings of the Institution of Civil Engineers Municipal Engineer 157 September 2004 Issue ME3 Pages 193 197 Paper 13569 Received 13 November 2003 Accepted 4 March 2004 Keywords: Landfill/sewage treatment

More information

Importance of tailings properties for closure

Importance of tailings properties for closure Proceedings of Mine Closure Solutions, 2014 April 26 30, 2014, Ouro Preto, Minas Gerais, Brazil Published by InfoMine, 2014 InfoMine, ISBN: 978-0-9917905-4-8 Importance of tailings properties for closure

More information

A H M 531 The Civil Engineering Center

A H M 531 The Civil Engineering Center Compaction test By: Ahmed Essam Mansour Objective: To measure the optimum water content at which maximum unit weight of a soil occurs at standard compaction energy. General discussion: General approach

More information

NOVEMBER 2016 GRANDWALL. retaining walls installation guide

NOVEMBER 2016 GRANDWALL. retaining walls installation guide NOVEMBER 2016 GRANDWALL retaining walls installation guide RETAINING WALL INSTALLATION GUIDE RETAINING WALL information Austral Masonry Grandwall retaining wall blocks are an ideal choice for retaining

More information

CEX6230 GEOTECHNICS Dear Student:

CEX6230 GEOTECHNICS Dear Student: CEX6230 GEOTECHNICS 31.05.2010 Dear Student: Geotechnics (CEX6230) discusses design and construction aspects of Geotechnical Engineering. Even though this course requires a pass in CEX4230, I find that

More information

Hydraulic Excavators

Hydraulic Excavators Chapter 8 Hydraulic Excavators Hydraulic excavators are designed to excavate below the ground surface on which the machine rests. These machines have good mobility and are excellent for general-purpose

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

STABILIZATION OF EXPANSIVE SOIL USING GROUND GRANULATED BLAST FURNACE SLAG Sharmila.S 1

STABILIZATION OF EXPANSIVE SOIL USING GROUND GRANULATED BLAST FURNACE SLAG Sharmila.S 1 STABILIZATION OF EXPANSIVE SOIL USING GROUND GRANULATED BLAST FURNACE SLAG Sharmila.S 1 1 Assistant Professor, Department of Civil Engineering,Kongu Engineering College,Perundurai - 638052 Abstract Expansive

More information

Bauxite beneficiation modifying factors

Bauxite beneficiation modifying factors Bauxite beneficiation modifying factors Caio van Deursen 1, Roberto Seno Jr. 2, Rodrigo Moreno 3 and Thiago Franco 4 1. Process Engineer 2. Bauxite and Alumina Technology Development Manager 3. Process

More information

Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria

Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria Terry Eldridge Golder Associates S.A., Chile Ben Wickland Golder Associates Ltd., Canada Adrian Goldstone Dundee Precious Metals

More information

Craig Dufficy U.S. EPA Office of Resource Conservation and Recovery

Craig Dufficy U.S. EPA Office of Resource Conservation and Recovery Craig Dufficy U.S. EPA Office of Resource Conservation and Recovery Overview What is a Landfill? Basic waste properties. Area and Volume calculations. What is allowed in a landfill and what is not. How

More information

CE 240 Soil Mechanics & Foundations Lecture 3.3. Soil Compaction (Das, Ch. 5)

CE 240 Soil Mechanics & Foundations Lecture 3.3. Soil Compaction (Das, Ch. 5) CE 240 Soil Mechanics & Foundations Lecture 3.3 Soil Compaction (Das, Ch. 5) Class Outlines Soil compaction introduction Standard Proctor Compaction Test Effect of Compaction Energy Modified Proctor Compaction

More information

ASSESSMENT OF PASTE ROCK AS A COVER MATERIAL IN MINE RECLAMATION AT THE CANADIAN MALARTIC MINE

ASSESSMENT OF PASTE ROCK AS A COVER MATERIAL IN MINE RECLAMATION AT THE CANADIAN MALARTIC MINE A UNIQUE RESEARCH PROGRAM ASSESSMENT OF PASTE ROCK AS A COVER MATERIAL IN MINE RECLAMATION AT THE CANADIAN MALARTIC MINE Bruno Bussière 1, Sandra Pouliot 2, Emma Charbonneau 1 and Ward G. Wilson 3 1 Research

More information

SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE SEMBODAI BACHELOR OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING QUESTION BANK

SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE SEMBODAI BACHELOR OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING QUESTION BANK SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE SEMBODAI - 614809 BACHELOR OF ENGINEERING Sub.Code: CE6405 DEPARTMENT OF CIVIL ENGINEERING QUESTION BANK Branch/Year/SEM: CIVIL/II/ IV Sub.Name: Soil Mechanics

More information

CONSTRUCTION SPECIFICATION FOR GRADING

CONSTRUCTION SPECIFICATION FOR GRADING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 206 DECEMBER 1993 CONSTRUCTION SPECIFICATION FOR GRADING 206.01 SCOPE 206.02 REFERENCES 206.03 DEFINITIONS 206.04 Not Used 206.05 Not Used 206.06 Not

More information

Effective stress testing of peat

Effective stress testing of peat Cite this manuscript as: O Kelly, B.C., and Zhang, L., 2013. Effective stress testing of peat, E.T. Hanrahan Memorial Symposium, Department of Civil, Structural and Environmental Engineering, University

More information

FE Review-Geotechnical 1. An undisturbed sample of clay has a wet mass of 100 kg. a dry mass of 93 kg, and a total volume of m'\ The solids

FE Review-Geotechnical 1. An undisturbed sample of clay has a wet mass of 100 kg. a dry mass of 93 kg, and a total volume of m'\ The solids 1. An undisturbed sample of clay has a wet mass of 100 kg. a dry mass of 93 kg, and a total volume of 0.0491 m'\ The solids have a specific gravity of 2.65. The void ratio is most nearly (A) 0.31 (B) 0.40

More information

FOR MINERAL AND MINING SLURRIES WITH HIGH SOLIDS CONCENTRATION

FOR MINERAL AND MINING SLURRIES WITH HIGH SOLIDS CONCENTRATION CDF VACUUM DISC FILTERS FOR MINERAL AND MINING SLURRIES WITH HIGH SOLIDS CONCENTRATION HIGH RATE FILTRATION LOW FINAL CAKE MOISTURE LOW ENERGY CONSUMPTION CONTINUOUS OPERATION HIGH AVAILABILITY WITH MINIMAL

More information

Section Fill Placement Tender No. [ ] Page 1

Section Fill Placement Tender No. [ ] Page 1 Tender No. [ ] Page 1 1.0 GENERAL 1.1 GENERAL.1 This section specifies placement requirements for fill materials specified in Section 02330 Earthwork Materials, except for [Waste Fill, Gravel Armour, Riprap,

More information

Tailings mobilization estimates for dam breach studies

Tailings mobilization estimates for dam breach studies Tailings mobilization estimates for dam breach studies Daniel Fontaine, P.Eng, Violeta Martin, Ph.D., P.Eng, Knight Piésold Ltd., Vancouver, BC, Canada ABSTRACT Quantitative assessment of potential consequences

More information

Reinhard Bott; Thomas Langeloh; Jurgen Hahn BOKELA GmbH, Karlsruhe, Germany. 1. Introduction

Reinhard Bott; Thomas Langeloh; Jurgen Hahn BOKELA GmbH, Karlsruhe, Germany. 1. Introduction FILTRATION MAP OF BAUXITE RESIDUES FILTERABILITY OF RED MUD FROM SEVERAL BAUXITES AND POSSIBLE USE OF CONTINUOUS PRESSURE FILTRATION LIKE HI-BAR FILTRATION Reinhard Bott; Thomas Langeloh; Jurgen Hahn BOKELA

More information

Slope Stability of Solid Waste Layers in Japan and Asia

Slope Stability of Solid Waste Layers in Japan and Asia Modern Environmental Science and Engineering (ISSN 2333-2581) January 2016, Volume 2, No. 1, pp. 23-30 Doi: 10.15341/mese(2333-2581)/01.02.2016/003 Academic Star Publishing Company, 2016 www.academicstar.us

More information

StormTech Construction Guide

StormTech Construction Guide Stormtech MC-3500 Construction Guide 12/31/14 11:18 AM Page 1 M /M 00 35 C- A division of REQUIRED MATERIALS AND EQUIPMENT LIST 00 45 C- StormTech Construction Guide Detention Retention Water Quality Acceptable

More information

Assessment of Water Removal from Oil Sands Tailings by Evaporation and Under-drainage, and the Impact on Tailings Consolidation

Assessment of Water Removal from Oil Sands Tailings by Evaporation and Under-drainage, and the Impact on Tailings Consolidation Assessment of Water Removal from Oil Sands Tailings by Evaporation and Under-drainage, and the Impact on Tailings Consolidation Fernando F. Junqueira Golder Associates Ltd, Vancouver, Canada Maria Victoria

More information

GLOBAL JOURNAL OF ENGINEERING SCIENCE AND RESEARCHES STABILIZATION OF FLYASH WITH RED MUD & CEMENT Nukaraju Bharathi *1 & Amulya Gundla 2

GLOBAL JOURNAL OF ENGINEERING SCIENCE AND RESEARCHES STABILIZATION OF FLYASH WITH RED MUD & CEMENT Nukaraju Bharathi *1 & Amulya Gundla 2 GLOBAL JOURNAL OF ENGINEERING SCIENCE AND RESEARCHES STABILIZATION OF FLYASH WITH RED MUD & CEMENT Nukaraju Bharathi *1 & Amulya Gundla 2 *1&2 Department Civil Engineering, Kakatiya Institute of Technology

More information

Instructions for installation the GRAF EcoBloc Inspect flex

Instructions for installation the GRAF EcoBloc Inspect flex Instructions for installation the GRAF EcoBloc Inspect flex GRAF EcoBloc Inspect flex Order-Nr. 402005 The points described in these instructions must be observed under all circumstances. All warranty

More information

Hydraulic performance of permanent heap leach with intermediate drainage system

Hydraulic performance of permanent heap leach with intermediate drainage system Proceedings of Heap Leach Solutions, 2015 September 14-16, 2015, Reno, USA Published by InfoMine, 2015 InfoMine, ISBN: 978-0-9917905-8-6 Hydraulic performance of permanent heap leach with intermediate

More information

LONG TERM ACID ROCK DRAINAGE (ARD) MANAGEMENT AT PT FREEPORT INDONESIA 1

LONG TERM ACID ROCK DRAINAGE (ARD) MANAGEMENT AT PT FREEPORT INDONESIA 1 LONG TERM ACID ROCK DRAINAGE (ARD) MANAGEMENT AT PT FREEPORT INDONESIA 1 Yuni Rusdinar 2 Abstract. Freeport Indonesia currently operates a 760,000 t/d open pit mine that will operate until 2015, with the

More information

Management of Radioactive Residues & Wastes Generated During Remediation of Uranium Production Legacy Sites in Germany

Management of Radioactive Residues & Wastes Generated During Remediation of Uranium Production Legacy Sites in Germany Management of Radioactive Residues & Wastes Generated During Remediation of Uranium Production Legacy Sites in Germany Peter Schmidt, Wismut GmbH Chemnitz, Germany Head of Department of Environmental Monitoring

More information

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving. SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.

More information

Design of the Eldorado Gold Efemçukuru Filtered Tailings Facility

Design of the Eldorado Gold Efemçukuru Filtered Tailings Facility Design of the Eldorado Gold Efemçukuru Filtered Tailings Facility Karvin Kwan Norwest Corporation, Vancouver, Canada Richard Dawson Norwest Corporation, Vancouver, Canada Calvin Boese Norwest Corporation,

More information

Tailings filtration: risk reduction through understanding and designing for variability

Tailings filtration: risk reduction through understanding and designing for variability Paste 2018 RJ Jewell and AB Fourie (eds) 2018 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-8-7 https://papers.acg.uwa.edu.au/p/1805_05_de_kretser/ Tailings filtration: risk reduction through

More information

EARTHQUAKE EFFECT ON SINGLE PILE BEHAVIOR WITH VARIOUS FACTOR OF SAFETY AND DEPTH TO DIAMETER RATIO IN LIQUEFIABLE SAND

EARTHQUAKE EFFECT ON SINGLE PILE BEHAVIOR WITH VARIOUS FACTOR OF SAFETY AND DEPTH TO DIAMETER RATIO IN LIQUEFIABLE SAND International Journal of Civil Engineering and Technology (IJCIET) Volume 9, Issue 4, April 218, pp. 1253 1262, Article ID: IJCIET_9_4_14 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=9&itype=4

More information

Mining Technology and Sustainable Development. Water and the Environment

Mining Technology and Sustainable Development. Water and the Environment Mining Technology and Sustainable Development Water and the Environment Capital Market Day 2017 21 June 2017 1 About us FLSmidth is a leading supplier of equipment and services to the global minerals and

More information

EXCAVATION & BACKFILL SPECIFICATION

EXCAVATION & BACKFILL SPECIFICATION REVISION DATE DESCRIPTION BY REVIEWER 0 12/14/2009 ISSUED FOR CONSTRUCTION MJS TDJ SECTION 1 EARTHWORK 1.1 GENERAL. This section covers general earthwork and includes preparation of the construction areas;

More information

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG.

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG. MEMORANDUM Levelton Consultants Ltd. 150-12791 Clarke Place Richmond, BC V6V 2H9 Canada Tel: 604 278-1411 Fax: 604 278-1042 E-Mail: rhillaby@levelton.com Web Site: www.levelton.com TO: STUART OLSON DOMINION

More information

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS AFTER FEBRUARY 1, 2011 ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS 481.1 Description. This specification shall govern for the construction of monolithic, reinforced concrete box sewers of the size,

More information

[ [GEOTECHNICAL ENGG-1] SOLVED QUESTION PAPER]

[ [GEOTECHNICAL ENGG-1] SOLVED QUESTION PAPER] 1 a) With the help of three phase diagram, define the terms bulk density, dry density, void ratio and water content. Bulk Density-It is defined as the ratio of total weight to total volume of soil mass.

More information

1. Publishable summary Second Period

1. Publishable summary Second Period 1. Publishable summary Second Period Contact information Mr. Dimitrios Boufounos, Aluminion S.A. Tel: (+30) 2267049150 www.labmet.ntua.gr/enexal e-mail: dimitri.boufounos@alhellas.gr 1.1 Introduction The

More information

ARMOR-BLOCK. Installation guide. Installation Manual: ARMOR-BLOCK Retaining Wall System. Cap Block. Exposed void for planting.

ARMOR-BLOCK. Installation guide. Installation Manual: ARMOR-BLOCK Retaining Wall System. Cap Block. Exposed void for planting. ARMOR-BLOCK Installation guide Cap Block Exposed void for planting In situ soil Engineered backfill Compacted and prepared base Setback Lip Ph 0800 655 00 or visit www.csppacific.co.nz 19 February 08 /

More information

This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations.

This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations. SPEC-1100 1/9 1.0 PURPOSE This specification describes the minimum requirements for general grading, excavation of earth, rock and solid slag, embankment construction, ditching, use of explosives, and

More information

StormTech Construction Guide

StormTech Construction Guide REQUIRED MATERIALS AND EQUIPMENT LIST An 80-7 DC 0/ 74 C/S 10-3 SC StormTech Construction Guide company ~ Bc^a\CTRW b^[xs T]S RP_b P]S _at R^aTS T]S RP_b ~ Bc^a\CTRW RWP\QTab ~ Bc^a\CTRW \P]XU^[Sb P]S

More information

EKS Technology Introduction Process developed for in situ FFT densification Uses unique electrical field management [EKS IP] orders of magnitude lower electrical energy than previous electrophoresis methods

More information

StormTech Construction Guide An company

StormTech Construction Guide An company SC-160LP StormTech Construction Guide An company REQUIRED MATERIALS AND EQUIPMENT LIST IMPORTANT NOTES: A. This installation guide provides minimum requirements for proper installation of chambers. Non-adherence

More information

AUGUST 2017 HASTINGS. retaining walls installation guide

AUGUST 2017 HASTINGS. retaining walls installation guide AUGUST 2017 HASTINGS retaining walls installation guide RETAINING WALL INSTALLATION GUIDE RETAINING WALL information Austral Masonry retaining wall blocks are an ideal choice for retaining walls in gardens,

More information

SITE INVESTIGATION. Foundation Engineering

SITE INVESTIGATION. Foundation Engineering SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface

More information

IGC. 50 th INDIAN GEOTECHNICAL CONFERENCE BEHAVIOUR OF GEOTEXTILE ENCASED QUARRY WASTE COLUMN SUBJECTED TO SHEAR LOADING IN SOFT CLAY

IGC. 50 th INDIAN GEOTECHNICAL CONFERENCE BEHAVIOUR OF GEOTEXTILE ENCASED QUARRY WASTE COLUMN SUBJECTED TO SHEAR LOADING IN SOFT CLAY th th INDIAN GEOTECHNICAL CONFERENCE 17 th 19 th DECEMBER, Pune, Maharashtra, India Venue: College of Engineering (Estd. 184), Pune, India BEHAVIOUR OF GEOTEXTILE ENCASED QUARRY WASTE COLUMN SUBJECTED

More information

Unsaturated Seepage Modeling Made Easy

Unsaturated Seepage Modeling Made Easy Seepage Modeling Made Easy Murray D. Fredlund Department of Civil Engineering University of Saskatchewan, Saskatoon, Sask., Canada Introduction Fresh out of university, one of the first challenges I was

More information

GEOTECHNICAL ENGINEERING CHALLENGES ON SOFT GROUND. For Myanmar Engineering Society 2012 CONTENTS

GEOTECHNICAL ENGINEERING CHALLENGES ON SOFT GROUND. For Myanmar Engineering Society 2012 CONTENTS GEOTECHNICAL ENGINEERING CHALLENGES ON SOFT GROUND For Myanmar Engineering Society 2012 G&P Professional Sdn Bhd (www.gnpgroup.com.my) By Engr. Dr. Gue See Sew (P.Eng) Engr. Dr. Wong Shiao Yun (G.Eng)

More information

Beneficiation and Sinter Amenability Study of Iron Ore Slime of Bolani Mines

Beneficiation and Sinter Amenability Study of Iron Ore Slime of Bolani Mines Proceedings of the International Seminar on Mineral Processing Technology - 26, Chennai, India. pp. 464-468. Beneficiation and Sinter Amenability Study of Iron Ore Slime of Bolani Mines S.K. Mukherjee,

More information

COMPLEX ADDITIVES ON THE BASIS OF BAUXITE RESIDUE FOR INTENSIFICATION OF IRON-ORE SINTERING AND PELLETIZING

COMPLEX ADDITIVES ON THE BASIS OF BAUXITE RESIDUE FOR INTENSIFICATION OF IRON-ORE SINTERING AND PELLETIZING COMPLEX ADDITIVES ON THE BASIS OF BAUXITE RESIDUE FOR INTENSIFICATION OF IRON-ORE SINTERING AND PELLETIZING Sergey Gorbachev Andrey Panov, Gennadiy Podgorodetskiy, Vladislav Gorbunov RUSAL ETC and Moscow

More information

WATER USE AND TAILINGS MANAGEMENT IN SURFACE MINED OIL SANDS. Randy J. Mikula Kalium Research

WATER USE AND TAILINGS MANAGEMENT IN SURFACE MINED OIL SANDS. Randy J. Mikula Kalium Research WATER USE AND TAILINGS MANAGEMENT IN SURFACE MINED OIL SANDS Randy J. Mikula Kalium Research Reserves and Production Summary 2005 (billions of barrels) EUB NR2006-024 Bitumen Total Resource 1,694 Reserve

More information

Technical Documentation

Technical Documentation Technical Documentation Underground Container F-Line 1.500L, 3.000L, 5.000L, 7.500L, 10.000L 1. Location 1.1. Position to buildings The excavation space must not be within the minimum distance to buildings,

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01

More information

Applying landforming to reclamation: A case study in Central Appalachia

Applying landforming to reclamation: A case study in Central Appalachia Applying landforming to reclamation: A case study in Central Appalachia Leslie Hopkinson, John Quaranta April 12, 2017 Department of Civil and Environmental Engineering West Virginia University WEST VIRGINIA

More information

Chapter 6. Soil Compaction

Chapter 6. Soil Compaction Chapter 6. Soil Compaction Increase Density - increase strength characteristics - increase bearing capacity and stability of slopes - decrease settlement Roller, vibroflot 6.1 Compaction-General Principles

More information

Notes for Erection of Evergreen Maxi Wall Retaining Walls

Notes for Erection of Evergreen Maxi Wall Retaining Walls Notes for Erection of Evergreen Maxi Wall Retaining Walls 1. Evergreen Maxi General Notes A. Project drawings - See project drawings for complete layout of utilities, railroad tracks, existing and proposed

More information