BUILDING FOR OUR FUTURE
|
|
- Russell Eaton
- 6 years ago
- Views:
Transcription
1 MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE
2 ADDRESSING THE DISTRICT S CRITICAL FACILITY AND SITE NEEDS CURRENTLY THE BAND-AID APPROACH COSTS MONEY AND DISRUPTS THE EDUCATION PROCESS. REFERENDUM AVOIDS IMPACTS TO BUDGET/CURRICULUM FUNDING. REPLACE HVAC AND ELECTRICAL SYSTEMS -- END OF USEFUL LIFE. REPLACE ROOF AND WINDOW SYSTEMS END OF USEFUL LIFE. ADDRESS SITE DRAINAGE CONCERNS. REPAIR BUILDING ENVELOPE TO AVOID WATER INFILTRATION. EXISTING PRE-KINDERGARTEN BUILDING OVERCROWDED
3 REFERENDUM QUESTION 1 COST: $21,320,000 - *10% FUNDED BY STATE DEBT SERVICE AID *THE DISTRICT CAN ONLY CLAIM 10% STATE FUNDING IF THE REFERENDUM PASSES, THE STATE S OFFER EXPIRES DECEMBER 2016 ELEMENTARY SCHOOL 1 New Pre-kindergarten Addition with 7 new classrooms, including inclusion classrooms and Pre-K court New Gymnasium Addition and renovated storage and toilet facilities New Health Office and OT/PT Addition with renovated Conference Room Parking Lot Expansion Upgraded electrical service Replacement of existing sidewalks Brick repointing New drainage and retaining walls at utility access MIDDLE SCHOOL Electrical upgrades throughout the school Restoration of existing exterior canopies Extend side entry canopy to parent pick up / drop off
4 REFERENDUM QUESTION 1 COST: $21,320,000 - *10% FUNDED BY STATE DEBT SERVICE AID *THE DISTRICT CAN ONLY CLAIM 10% STATE FUNDING IF THE REFERENDUM PASSES, THE STATE S OFFER EXPIRES DECEMBER 2016 ELEMENTARY SCHOOL 2 New Transportation Building New bus parking drop off Additional parking throughout the site Redesign storm water drainage system Replace all existing skylights Replace existing asphalt shingle and membrane roofing Replace windows in Cafetorium, Band and Music Rooms, Administration Offices Remove existing berms and regrade for proper drainage Replace existing Exterior Insulation Finish System (E.I.F.S.) in its entirety HIGH SCHOOL Replace existing heating/ventilation systems and controls in Auxiliary Gymnasium Replace existing glass block windows in Gymnasium
5 ELEMENTARY SCHOOL NO. 1 Remove existing Pre-K temporary buildings Brick repointing New drainage and retaining walls at utility access Replacement of existing sidewalks
6 ELEMENTARY SCHOOL NO. 1 New Health Office and OT/PT Addition with renovated Conference Room New Pre-kindergarten Addition with 7 new classrooms, including inclusion classrooms and Pre-K court New Gymnasium Addition and renovated storage and toilet facilities
7 MIDDLE SCHOOL Electrical upgrades throughout the school Restoration of existing canopies Extend side entry canopy to parent pick-up / drop-off
8 HIGH SCHOOL Replace existing heating and ventilation systems and controls in Auxiliary Gymnasium Replace existing glass block windows in Gymnasium
9 ELEMENTARY SCHOOL NO. 2 Redesign storm water drainage system Replace windows in Cafetorium, Band and Music Rooms, Administration Offices New bus parking drop off Replace all existing skylights Replace existing asphalt shingle and membrane roofing Building envelope improvements
10 ELEMENTARY SCHOOL NO. 2 New Transportation Building Additional parking throughout the site
11 REFERENDUM QUESTION 2 COST: $3,320,000 - *0% FUNDED BY STATE DEBT SERVICE AID *REFERENDUM QUESTION 1 MUST BE APPROVED FOR THE DISTRICT TO MOVE FORWARD WITH QUESTION 2. Two new athletic fields New playground New building with concessions stand, storage and toilets Parking NEW PLAYGROUND
12 ASSESSING CRITICAL NEEDS AFTER A THOROUGH FACILITY ASSESMENT AN INITIAL BUDGET WAS DEVELOPED. THIS BUDGET WAS THOROUGHLY REVIEWED WITH THE BOARD AND PARED DOWN TO INCLUDE ONLY THE MOST CRITICAL AND ESSENTIAL NEEDS OF THE SCHOOL ORIGINAL FACILITY ASSEMENT BUDGET $34,880,000 AFTER REVIEW PROCESS Referendum Question 1: Referendum Question 2: $21,320,000 (10% state funded*) $3,320,000 (0% state funded*) * State funding can only be claimed if referendum passes
13 SUMMARY OF FUNDING REFERENDUM QUESTION 1: (ZERO TAX IMPACT) TOTAL BUDGET TOTAL PROJECT COSTS $21,320,000 of which 10% will be state funded* ESTIMATED TAX IMPACT OF $0.00 TOTAL PER MONTH BASED ON AVERAGE ASSESED HOME VALUE OF $241,000 AND 4.30% INTEREST RATE REFERENDUM QUESTION 2 TOTAL BUDGET TOTAL PROJECT COSTS $3,320,000 of which 0% will be state funded* ESTIMATED TAX IMPACT OF $1.70 TOTAL PER MONTH BASED ON AVERAGE ASSESED HOME VALUE OF $241,000 AND 4.30% INTEREST RATE ADVANTAGE TO LOCAL TAXPAYERS 10% OF TOTAL COSTS FUNDED BY STATE IF BOTH QUESTIONS PASS* *State money CAN ONLY be claimed if the referendum passes
14 SCHEDULE
15 WHY PURSUE A REFERENDUM NOW? Question 1 will have Zero Tax Impact. Construction costs & interest rates remain low. More cost-effective than repair-as-we-go approach. Returns State taxes to Middle Township residents. If Middle Township does not use the state funding, the funding will be lost. Debt Service Aid funding was made available 2 years ago - no guarantee how long it will be available. Work completed in referendum will reduce the impact on the annual maintenance budget; allowing more funds for curriculum & programs. Local costs reduced by 10% through Debt Service Aid. Expected energy savings and potential rebates.
Cherry Hill School District Building Project Summary. August 8, 2018
Cherry Hill School District Building Project Summary August 8, 2018 Progress Update: Bond Referendum 2018 As of August 8, 2018, the Cherry Hill Public School District has not yet received approval from
More informationCazenovia Central Schools Proposed Building Project Information Session December 17, 2013
Cazenovia Central Schools Proposed Building Project Information Session December 17, 2013 Information Session Agenda Background. Scope of work and why these renovations are important. Project cost. How
More informationMadison School District. Strategic Five-Year Facility Maintenance Plan
Madison School District Strategic Five-Year Facility Maintenance Plan 2016 2020 Dear Madison Stakeholder, Throughout the past twenty years, Madison School District has experienced tremendous growth. Since
More informationDENNIS TOWNSHIP FEASIBILITY STUDY
DENNIS TOWNSHIP FEASIBILITY STUDY October 29, 2015 TABLE OF CONTENTS I. INTRODUCTION II. EXECUTIVE SUMMARY III. GENERAL FACILITY DATA A. Primary School B. Elementary / Middle School IV. FACILITIES ASSESSMENT
More informationBiddeford School Department
Biddeford School Department 5 Plan Buildings, Grounds & Equipment Table of Contents: John F Kennedy Memorial School Page: 1-2 Biddeford Primary School Page: 3-4 Biddeford Intermediate School Page: 5-6
More informationBLIND BROOK-RYE UFSD SCHOOL FACILITIES PLANNING SECOND UPDATE ON RECOMMENDED PROJECTS
BLIND BROOK-RYE UFSD SCHOOL FACILITIES PLANNING SECOND UPDATE ON RECOMMENDED PROJECTS January 9, 2017 SUMMARY OF OCTOBER 17 TH PRESENTATION 1. Five-Year Capital Facilities Plans & 15-year History 2. 2016-2020
More informationFACILITY ASSESSMENT PRESENTATION 11 October SCHRADERGROUP architecture
FACILITY ASSESSMENT PRESENTATION 11 October 2017 SCHRADERGROUP architecture AGENDA 1. 1 Facility Assessment Review 2. 2 Prioritizing the Scope of Work with Associated Costs 3 Timeline of Work 3. 4 Procurement
More informationCORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting
CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan Community Information Meeting October 2017 AGENDA Meeting Objectives Draft Plan Overview School Improvements for specific site Feedback/Listening
More informationChenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017
Chenango Bridge Elementary School Phase 1 Asphalt Pavement Reconstruction Reconstruct asphalt parking located on west side of building including access drive. Sidewalk Replacement Replace cracked sections
More informationLOVEJOY Independent School District
Long-Range Facilities Planning Projected Bond Sale Project Series 2014 Series 2018 Series 2023 Total (2013 Cost) (with 6% Yearly Inflation) 1. Hart Elementary $ 6,716,424 $ 6,168,802 $ 1,200,121 $ - $
More informationReferendum Implementation
SPACE Net Gain (new) Classrooms Claremont = +47 Hillcrest & Elizabeth = +20 Utilization Gain SGS = +25 at 6-8 MS level SAFETY Annex Connection To Franklin Park Repair Parking Lots, Sidewalks & Outdoor
More informationA Report to the Board of Education: Ten-Year Health/Life Safety Review. February 12, 2018
A Report to the Board of Education: Ten-Year Health/Life Safety Review February 12, 2018 1 Overview of the Ten Year Health Life Safety Survey Process Every ten years, each local school board is required
More informationBethlehem Central School District
Five Year Capital Facilities Plan June 2011 Bethlehem Central School District Bethlehem High School Bethlehem Middle School Clarksville Elementary School Eagle Elementary School Elsmere Elementary School
More informationWARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE M a y
WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE M a y 2 0 1 8 Agenda Overview of the Bond 2018 Work 2 Agenda Overview of the Bond 2018 Work 3 Overview of Bond Why Now? Interest rates remain at historic
More informationBoard Work Session Feasibility Study. January 9, 2017
Board Work Session Feasibility Study January 9, 2017 1 Process Staff Input Sessions at all schools What can you tell us about your building, your site, your space? Group collaboration exercise looking
More informationPLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationRAYMOND EDUCATION CAMPUS
INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationa collaborative process
2017 Referendum Belleville Public Schools July 26, 2017 a collaborative process Introduction Di Cara Rubino Architects Jerry Rubino, AIA Firm Principal Allen Barnett, AIA, LEED AP Senior Project Manager
More informationEASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923
INITIAL YEAR BUILT 1923 BUILDING AREA 288,800 SF CURRENT PROGRAM CAPACITY 1,425 ENROLLMENT 2008 565 WARD 6 PROPOSED PROGRAM CAPACITY 1,100 Site Plan EASTERN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationDAVIS ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1943 BUILDING AREA 71,100 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 227 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan DAVIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-
More information2016 BOND INFORMATION
2016 BOND INFORMATION This publication is provided as a public service by the offices of Operations and Maintenance, Communications and Financial Services. www.svvsd.org @svvsd 395 South Pratt Parkway,
More informationLisbon School Department. 5 Year Plan-Buildings, Grounds, Equipment, & Technology. April 2016
April 2016 Following is a list of items that the Lisbon School Department deems necessary for Capital Improvements for the next 5 years. Capital Improvements shall mean any construction project exceeding
More informationREPAIR FWCS PHASE 2 FORT WAYNE COMMUNITY SCHOOLS. PROGRAM STATUS UPDATE August 27, 2018
1 REPAIR FWCS PHASE 2 FORT WAYNE COMMUNITY SCHOOLS PROGRAM STATUS UPDATE August 27, 2018 TABLE OF CONTENTS 2 Program Summary 3 Program Overview 3 Financial Overview 4 Project Status Overview 4 Strategic
More informationNALLE ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1950 BUILDING AREA 83,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 372 WARD 7 PROPOSED PROGRAM CAPACITY 400 Site Plan NALLE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationSEATON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1969 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 428 ENROLLMENT 2008 280 WARD 2 PROPOSED PROGRAM CAPACITY 325 Site Plan SEATON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015
ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015 TABLE OF CONTENTS PROGRAM SUMMARY DESIGN EXPLORATION EXISTING SITE PLAN - ANALYSIS DEMOLITION SITE PLAN PROPOSED SITE PLAN PROPOSED FLOOR PLANS DEMOLITION
More informationHealth Life Safety Survey and Master Facilities Plan
Health Life Safety Survey and Master Facilities Plan Community Presentation Board Meeting June 22, 2015 June 22, 2014 Board Presentation Overview and Summary of the Health Life Safety Survey and Master
More informationMAURY ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1886 BUILDING AREA 46,800 SF CURRENT PROGRAM CAPACITY 276 ENROLLMENT 2008 238 WARD 6 PROPOSED PROGRAM CAPACITY 325 Site Plan MAURY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationCAPITAL IMPROVEMENT PLAN
Williamsburg-James City County Public Schools CAPITAL IMPROVEMENT PLAN Fiscal Years 2017 through 2026 School Board Approved WILLIAMSBURG-JAMES CITY COUNTY PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLAN: CIP BUDGET
More informationFrost Technical Center
Frost Technical Center 1955 Greenhouses Addition Various other additions and renovations Provide site security improvements Provide improved Admin area field of view to site entrance Provide security camera
More informationCrockett Elementary School Renovations
We are your future. We are EPISD. August 7, 07 August 9, 07 Existing Conditions August 9, 07 Existing Conditions SITE PLAN 7 7 7 EXISTING DROP-OFF AREA CREATES CONGESTION AND BUS DROP-OFF IS NOT DEFINED.
More information3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000
1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades $300,000 C. Tilden Entrance Upgrades $50,000 D. Door and Glass Improvements $500,000 E. Alert Systems $800,000
More information*Additional Projects were not part of the voter-approved 2006 Bond. They were able to be completed due to savings from other projects.
SECONDARY SCHOOLS Kirby Middle School Demolish 300, 400, and 500 buildings partial Change in total rebuild design New academic building - 33 classrooms *Rent portables for temporary classrooms partial
More informationLASALLE - BACKUS EDUCATION CAMPUS
INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationCollins Middle School
Contents Collins Middle School...2 General comments, campus capacity, and student demographics:...2 1.0 School Site...4 2.0 Building Systems and Components...5 3.0 Building Safety and Security...19 4.0
More informationBond Referendum: Proposed Capital Project
BRONXVILLE UNION FREE SCHOOL DISTRICT Building for the next 100 years Bond Referendum: Proposed Capital Project Overview Process started several years ago Review of 100 year old building needs: Five Year
More informationSHEPHERD ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1932 BUILDING AREA 79,700 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 355 WARD 4 PROPOSED PROGRAM CAPACITY 400 Site Plan SHEPHERD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationOur Students. Our Schools. Our Future.
HARRISON CENTRAL SCHOOL DISTRICT PROPOSED CAPITAL IMPROVEMENTS Our Students. Our Schools. Our Future. VOTE OCTOBER 18, 2016 At your local elementary school WHAT IS THE NEED FOR A BOND REFERENDUM? Bonding
More informationGFW Schools Task Force Meeting 1/23/19 R.A. MORTON & ASSOCIATES GLT ARCHITECTS 1
GFW Schools Task Force Meeting 1/23/19 1 AGENDA 1. Introductions 2. Review of building tours Primary Needs 3. Review Space Programs 4. Review Concept Options District and Facility needs 5. Review Concept
More informationAl Behrman Elementary School
Mulberry Street Al Behrman Elementary School Relocate reception and principal s office to be adjacent to main entrance doors; provide secure entrance sequence and increase transparency to the exterior
More informationTable of Contents Hampton Dumont Community School District November 5, 2013
Table of Contents Hampton Dumont Community School District November 5, 2013 Facility Assessment Overview & Proposed Design Options 1. Option 1 Alleviate Congestion at South Side Elementary Existing Facility
More informationBoard Meeting Presentation FEASIBILITY STUDY South Montgomery Community School Corporation. June 13, 2016
Board Meeting Presentation FEASIBILITY STUDY South Montgomery Community School Corporation June 13, 2016 Schedule/Major Milestones 2015 November December Data Collection Board Meeting- Update 2016 January
More informationDesign Advisory Committee Meeting #5. December 19, 2017
Design Advisory Committee Meeting #5 December 19, 2017 1 Meeting Agenda 1. Agenda / Attendance Sheet 5 minutes 2. BEST Grant Recap 3. Review Funding Options additional information 4. Master Plan Summary
More informationRevised Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Three Story Academic Additi
Original Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 75% Three Story Academic Addition with CTE Gymnasium Addition: Multi-court gym 3 courts
More informationSOUTH COLONIE CENTRAL SCHOOL DISTRICT FACILITY ESTIMATED EXPENSES FORM UPDATED
SOUTH COLONIE CENTRAL SCHOOL DISTRICT FACILITY ESTIMATED EPENSES FORM UPDATED 12-14-18 This information is a summary of multiple reports which assist District Leadership in maintaining a to do list for
More informationMidland Public Schools
Midland Public Schools Facility Renewal Proposal A 12-15 Year Plan February 24, 2015 Bond Proposal Why is this needed? Age of facilities Energy inefficiency School safety and security issues Aging bus
More informationBALLOU SENIOR HIGH SCHOOL
INITIAL YEAR BUILT 1960 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1565 ENROLLMENT 2008 9-12 (1,252) STAY (753) WARD 8 PROPOSED PROGRAM CAPACITY 1200 Site Plan BALLOU - 1 PROPOSED PROGRAM PROFILE
More informationROD Grant Round 4 Presentation June 9, 2014
ROD rant Round 4 Presentation June 9, 2014 713 Creek Road Bellmawr, NJ 08031 Telephone (856) 396-6200 Facsimile (856) 396-6205 Please visit us on the web at www.garrisonarch.com 2 Agenda NJDOE Application
More informationDEL MAR UNION SCHOOL DISTRICT BOND PROJECT DESCRIPTION
DEL MAR UNION SCHOOL DISTRICT TECHNOLOGY & 21 ST -CENTURY LEARNING INITIATIVE BOND PROJECT DESCRIPTION The Board of Trustees of Del Mar Union School District ("District") has evaluated the need to acquire,
More informationBARNARD ELEMENTARY SCHOOL
INITIAL YEAR BUILT 2002 BUILDING AREA 67,000 SF CURRENT PROGRAM CAPACITY 520 ENROLLMENT 2008 329 WARD 4 PROPOSED PROGRAM CAPACITY 450 Site Plan BARNARD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationNOYES EDUCATION CAMPUS
INITIAL YEAR BUILT 1930 BUILDING AREA 49,700 SF CURRENT PROGRAM CAPACITY 321 ENROLLMENT 2008 337 WARD 5 PROPOSED PROGRAM CAPACITY 450 Site Plan NOYES - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-8
More informationFEASIBILITY STUDY SEPTEMBER 1 8,
FEASIBILITY STUDY SEPTEMBER 1 8, 2 0 1 2 OVERVIEW PAUL SWARTZ, AIA, PP PRINCIPAL-IN-CHARGE JIM PETRO, AIA PROJECT ARCHITECT STUART J. HEISEY, PE MECHANICAL ENGINEER LEED AP BD+C The last feasibility study
More informationSpringfield High School Master Plan Presentation Town Hal Meeting 2 Existing Building / Right-Sizing/ Education Model
1 2.1 Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Presentation Town Hall Meeting 2 Existing Building / Right-Sizing/ Education Model November 13th, 2014
More informationWATKINS ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 69,300 SF CURRENT PROGRAM CAPACITY 578 ENROLLMENT 2008 550 WARD 6 PROPOSED PROGRAM CAPACITY 550 Site Plan WATKINS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationLECKIE ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationMeasure T Project List 2014 Santa Maria-Bonita School District Prop 39 School Bond November 4, 2014
Measure T Project List 2014 Santa Maria-Bonita School District Prop 39 School Bond November 4, 2014 Measure T DEFINED: Measure T is a local ballot measure on the November 2014 ballot seeking voter authorization
More informationBend La Pine Schools 2016 Sites and Facilities Project Needs List
New Elementary 33,155,940 Construct new elementary school 33,155,940 New High School 129,028,000 Construct new high school 129,028,000 Bear Creek Elementary 4,028,138 Add instructional multi use space
More informationPATTERSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationSchool Without Walls
INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationN o v e m b e r
WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE N o v e m b e r 2 0 1 7 Agenda Overview of the Bond 2017 Update 2018 Work 2 Agenda Overview of the Bond 2017 Update 2018 Work 3 Overview of Bond Why
More informationEvansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data
Evansville Public Schools Facility Assessment Report January 28, 2, 2013 SGN/Wendel Architects, Design Tree Engineering and R.A. Morton Construction Managers were retained by the Evansville Public School
More informationLEWIS ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 49,500 SF CURRENT PROGRAM CAPACITY 550 ENROLLMENT 2008 288 WARD 1 PROPOSED PROGRAM CAPACITY 450 Site Plan LEWIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationFranklin Pierce School District Capital Construction Bond Candidate Projects
Franklin Pierce School District 2016 Capital Construction Bond Candidate Projects 2016 Capital Construction Bond The following projects have been selected to be offered to 2030 Committee for consideration
More informationPeter Kirk Elementary School Modernization vs. New-in-lieu of Modernization Report
Peter Kirk Elementary School Modernization vs. New-in-lieu of Modernization Report January 2016 Summary In consideration for a potential 2016 Bond measure for the Capital Facilities Program, Kirk Elementary
More informationHorseheads 2030: Project Planning Update: 5/30/17
Horseheads 2030: Project Planning Update: 5/30/17 Agenda Survey Results Scope & Estimate Highlights: Horseheads High School Scope & Estimate Highlights: Middle School/Intermediate School Priority Scope
More informationHinsdale Township High School District 86 Referendum Project Listing April 2, Approved
Hinsdale Township High School District 86 Referendum Project Listing April 2, 2019 - Approved 1-12-2019 Project Category and Description Central South Total Security Replace Intercom System Install a completely
More informationCoos Bay Best Bond Cost Breakdowns
Coos Bay Best Bond Cost Breakdowns Overview [For itemized breakdown by school, see following pages.] Harding: New 7 th /8 th grade school on Harding site, including second gym: $18,440,000 Demotion of
More informationWELD COUNTY SCHOOL DISTRICT RE-1 04/12/2016 BUILDING ASSESSMENT INTRODUCTION
PURPOSE OF THIS REPORT: Relationship to the Master Plan: These Building Assessments are part of a Strategic Facilities Master Plan (SFMP). H+L Architecture was hired to assist the District in creating
More informationFACILITY COMPONENTS - ELEMENTARY SCHOOL
SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls
More informationNorth Tonawanda City School District
N.T. CAPIT AL I MPROVE MENT PROJECT North Tonawanda City School District Vincent J. Vecchiarella Superintendent of Schools Special Edition April 2008 $48 Million Capital Project at NO COST to the Taxpayers
More informationPaulsboro Public Schools
BOND REFERENDUM PRESENTATION January 27, 2015 713 Creek Road Bellmawr, NJ 08031 Telephone (856) 396-6200 Facsimile (856) 396-6205 Please visit us on the web at www.garrisonarch.com 1 05-12-14 AGENDA NJDOE
More informationGARFIELD ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1910 BUILDING AREA 58,908 SF CURRENT PROGRAM CAPACITY 446 ENROLLMENT 2008 278 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan GARFIELD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationFACILITY COMPONENTS - ELEMENTARY SCHOOL
SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking
More informationPOSSIBLE TREATMENT STRATEGIES 1/3 From Archibald Johnston Mansion Stabilization Study - Recommendations
POSSIBLE TREATMENT STRATEGIES 1/3 Minimal short-term stabilization The plan for minimal short-term stabilization represents all of the recommended items to be completed if the Township only wishes to buy
More informationLincoln Public Schools
Lincoln Public Schools School Building Committee Meeting July 11, 2018 Today s Agenda Floor Plan Update Sustainable Design Features, NZE Systems & Exterior Building Envelope Project Schedule Construction
More informationWELCOME BY 2/1/2016. Master Planning. Continued. Mike Condon, Inspec Inc. Field Representative
WELCOME BY Mike Condon, Inspec Inc. Field Representative Paul Bourgeois, Minnetonka Public Schools, Executive Director of Finance and Operations Kerry Leider, Duluth Public Schools, Property and Risk Manager
More informationPOWELL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1925 BUILDING AREA 38,500 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 319 WARD 4 PROPOSED PROGRAM CAPACITY 325 Site Plan POWELL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-3
More informationST. BENEDICT ELEMENTARY SCHOOL CALGARY, ALBERTA
ST. BENEDICT ELEMENTARY SCHOOL CALGARY, ALBERTA School Facility Evaluation Project Calgary Roman Catholic Separate School South Region, District #1 Prepared For Alberta Infrastructure March 2000 Prepared
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope
More informationSCARSDALE PUBLIC SCHOOLS Bond Project Planning
SCARSDALE PUBLIC SCHOOLS 2017 Bond Project Planning October 23, 2017 2017 Bond Project Planning - Overview 1) December 2014 Bond (2013-2014) Work in this bond included for Heathcote, Edgewood, Middle School,
More informationUpdate on FCPS Construction/Renovation Projects. July 2016
Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000
More information2006 FUSD Bond Information Guide
Message from Superintendent Hickman On behalf of the Flagstaff Unified School District (FUSD) staff and members of the Governing Board, I extend my appreciation to the voters of our community, who have
More informationCEFPI Monthly Meeting
CEFPI Monthly Meeting LISD School Construction Cost Information Background Information School Cost Information How Does LISD Compare? Other District Comparisons Background Information Cost Discussion Type
More informationCONSTRUCTION REPORT. Zionsville Community Schools Zionsville, Indiana. October 2014 TSC NO
CONSTRUCTION REPORT TSC NO. 21319.1 October 2014 Zionsville Community Schools Zionsville, Indiana The SKILLMAN Corporation Project Administration Construction Management Zionsville Community Schools 2005
More informationMANASQUAN PUBLIC SCHOOL DISTRICT PROPOSED JANUARY 24, 2017 BOND REFERENDUM PROGRAM
PROPOSED JANUARY 24, 2017 BOND REFERENDUM PROGRAM 713 Creek Road Bellmawr, NJ 08031 Telephone (856) 396-6200 Facsimile (856) 396-6205 Please visit us on the web at www.garrisonarch.com AGENDA 1. NJDOE
More informationProposition E Independent Citizens Oversight Committee. Report to the Board of Education June 21, 2017
Proposition E Independent Citizens Oversight Committee Report to the Board of Education June 21, 2017 Ballot Proposition November 6, 2012 Repair, renovate, construct, and upgrade classrooms and school
More informationTotal Schools/Projects in 2017 in 2017 Escalation in 2019 in 2020
Construction Project Project Project Schools/Projects in 2017 in 2017 Escalation in 2019 in 2020 Arlington High School 8,752,608 12,545,469 Building Additions 5,975,000 8,695,418 12.4% 9,773,649 1,198,608
More informationFULL TEXT BALLOT PROPOSITION OF THE AMADOR COUNTY UNIFIED SCHOOL DISTRICT BOND MEASURE ELECTION NOVEMBER 6, 2018
FULL TEXT BALLOT PROPOSITION OF THE AMADOR COUNTY UNIFIED SCHOOL DISTRICT BOND MEASURE ELECTION NOVEMBER 6, 2018 The following is the full proposition presented to the voters by the Amador County Unified
More information2014 MASTER PLANNING PORT ARTHUR INDEPENDENT SCHOOL DISTRICT Revised, August 5, 2014
2014 MASTER PLANNING PORT ARTHUR INDEPENDENT SCHOOL DISTRICT Revised, August 5, 2014 PROPOSED IMPROVEMENTS A. Replace Sam Houston Elementary School with a new facility to house 750 students. (Included
More informationSTUART-HOBSON MIDDLE SCHOOL
INITIAL YEAR BUILT 1927 BUILDING AREA 105,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 399 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan STUART-HOBSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationSchool Assessment Report
School Assessment Report School: KIPP Vision Report: Dec 15, 14 Condition Assessment: Suitability Assessment: Generated: 12/15/14 12:33:33 PM Final School Assessment Report - Charter Schools, KIPP Vision
More informationFACILITY COMPONENTS - MIDDLE SCHOOL
SITE AREAS Parking and Access - Buses 2.0 2.0 0.30 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 1.0 3.0 0.22 Four fewer stalls
More informationBond Referendum Information. Sebeka School District #820 Vote on August 8, 2017
Bond Referendum Information Sebeka School District #820 Vote on August 8, 2017 Sebeka Student Enrollment Projection to 2024/25 Factors Considered in Projection Pattern of student enrollment change within
More informationDesign Advisory Committee Meeting #1. December 6, 2016
Design Advisory Committee Meeting #1 December 6, 2016 1 Meeting Agenda 1. Agenda / Attendance Sheet 5 minutes 2. Introductions - 10 minutes 3. Meeting Norms 5 minutes 4. Project Schedule 5 minutes 5. Buildings
More informationWhat is a Master Plan
What is a Master Plan Master planning A long-term, comprehensive approach to facilities planning (10-12 years) Align facilities plan with mission, vision, strategic goals and community values Recognizes
More informationMOORESTOWN HIGH SCHOOL REFERENDUM PROJECTS
MOORESTOWN HIGH SCHOOL 06/22/15 08/28/15 Security vestibule at main entrance and transportation office; replacement of selected exterior doors; access controls at exterior doors 06/22/15 12/31/15 Upgrade
More informationWILKINSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationfacilities plan community input session Transylvania County Schools
facilities plan community input session Transylvania County Schools Facilities Plan community input session Where We ve Been Are Transylvania County Schools Facilities Plan community input session Where
More information1. Replace Elmira Elementary School on the Same Site $12,600, Enclose the Libraries at Fern Ridge Middle School and Veneta Elementary
2013 Proposed Capital Improvement Plan Presented October 21, 2013 Prepared By Fern Ridge School District Long Range Facility Planning Committee DLR Group The Fern Ridge Long Range Facility Planning Committee
More information2007 Projects: MEDFORD SCHOOL DISTRICT 549C Bond Funded Construction Projects Updated: September 4, North Medford High School:
MEDFORD SCHOOL DISTRICT 549C Bond Funded Construction Projects Updated: September 4, 2007 North Medford High School: Project Summary: Renovate and add new addition based on facility evaluation and design.
More information