IAEA Workshop on Construction Technologies for Nuclear Power Plants: A Comprehensive Approach
|
|
- Abigail Ball
- 5 years ago
- Views:
Transcription
1 IAEA Workshop on Construction Technologies for Nuclear Power Plants: A Comprehensive Approach Paris, France, December 2011 Workshop Director: Bismark.Tyobeka Local Counterpart: Michel Debes DRAFT AGENDA Day 1 Monday 12 December Meeting Location: EDF Tower, La Défense 8:30 9:00 AM Registration 9:00 9:30 AM Official Opening Introduction and General Issues 9:30-10:15 AM IAEA Role and mission Guides and Milestones related to nuclear construction and development infrastructure Objectives of the workshop 10:15-11:00 AM Nuclear Construction Overview: EDF s role 11:00-11:15 AM Coffee break 11:15 AM - 12:00 PM Nuclear Construction Overview: Areva s role 12:00 12:30 PM French Atomic Energy Commission (CEA), Nuclear Energy Division: Support to nuclear development 12:30-2:00 PM Lunch 1
2 Regulatory Aspects 2:00-2:45 PM French Safety Authority (ASN) / French Institute for Radioprotection and Nuclear Safety (IRSN): Roles, responsibilities, missions, regulatory framework, etc. Project management 2:45-3:30 PM Flamanville-3 Project management experience: EDF 3:30-4:15 PM Coffee Break 4:15-5:00 PM IAEA invitation (tbc) Presentation of other construction experiences (India, China, etc.) 5:00-6:40 PM IAEA invitation (tbc) Presentations of other nuclear energy programs (3-5 presentations, 20mn each) Discussion 8:00-9:30 PM Welcome Cocktail/Dinner - hosted by EDF 2
3 Day 2 Tuesday 13 December Meeting Location: Hotel Pullman Paris La Défense (tbc) Project Management (continued) 8:30-9:15 AM EPR Project Olkiluoto-3 - Project management experience: Areva 9:15-10:00 AM Case study OL3: Assystem 10:00-10:45 AM IAEA invitation Presentation of construction experience from China (Taishan EPR) 10:45 AM - 11:00 AM Coffee Break 11:00-11:45 AM Construction oversight by safety authority - Case study of Flamanville-3: ASN 11:45 AM - 12:30 PM Safety analysis methodology for the EPR: IRSN Examples of applications: Material qualification (concrete, welding, etc.) 12:30-2:00 PM Lunch 2:00-2:45 PM Construction experience feedback and standardization: EDF/Areva 2:45-3:30 PM Codes and norms for construction and manufacturing / experience feedback: EDF/Areva/ AFCEN 3:30-4:30 PM Preparation for long-term operation: EDF (Periodic safety reassessments, etc.) Methodology for operational safety monitoring, experience feedback and continuous improvement processes: IRSN 4:30-4:45 PM Coffee break 4:45 5:30 PM IAEA invitation (tbc): Presentation of other construction experience: RosEnergoAtom (Russia), AES 2006 construction work 5:30-6:15 PM Jules Horowitz Reactor construction experience / Earthquake-proof pads / R&D in support of vessel qualification: CEA 3
4 Day 3 Wednesday 14 December Meeting Location: Areva Tower, La Défense Key factors Siting Issues 8:30-9:15 AM Methodology for siting safety analysis, natural disasters and safety analysis (cliff effect, post Fukushima, etc.): IRSN 9:15-10:00 AM Siting studies: preparation of work, heat sink and reliable cooling capacities, geological studies, seismic characterization, natural disasters - Case study: Flamanville-3 EDF / Areva 10:00-10:15 AM Coffee break Supply Chain Issues 10:15-11:00 AM Qualification of contractors and products, capacity building, training Manufacturing and construction: specifications, quality assurance, control, owner oversight and safety responsibility Local participation (localization of nuclear construction and supply chain): EDF / Areva Site Work and Specific Construction Technologies 11:00-11:45 AM The ATMEA Project: Areva 11:45 AM - 12:30 PM IAEA invitation (tbc) Presentation of other construction experiences: (China AP1000, Korea OPR tbc) 12:30 2:00 PM Lunch Construction Technologies and Work during Operation 2:45 3:30 PM Steam generators replacement work and other examples: Areva 3:30 4:15 PM Long-term operation and plant improvements / Implementation of modifications during ten years outages (e.g. VD3 900): EDF 4:15 4:30 PM Coffee break 4:30-6:00 PM Panel discussion: Specificity of construction technologies in a nuclear framework Level and evolutions of requirements in the current framework Competences and capacity building: anticipation, preparation, monitoring Transfer by train and/or bus to Cherbourg (Normandy) and to the EPR construction site Flamanville-3 (tbc) 4
5 Day 4 Thursday 15 December Technical Tour: Flamanville-3 Construction Site Information Center Flamanville-3 site work and organization: EDF Responsibilities of supervision teams on site and interaction with builders Progress follow-up, quality monitoring, control and owner oversight, planning, etc. Organization of site work, prefabrication, logistical organization and support, etc. Lunch at the power plant Industrial safety on construction site, responsibilities, organization: EDF / Areva Case studies: Presentation of construction - Bouygues, Alstom Visit of the construction site Dinner and overnight in Cherbourg Day 5 Friday 16 December - Meeting Location (tbc) Preparation of commissioning tests: objectives, safety criteria, carrying out, controls and analyses, report to ASN and IRSN: EDF Preparation of operation, on-site training: EDF Public Information and stakeholder engagement: debates, public acceptance, Local Information Commissions, local and social and economic impacts, integration in local communities, Large Project Procedure, Environmental impact studies: EDF Discussion and Conclusions of the Workshop: IAEA, EDF, Areva, Assystem, ASN Visit of nuclear simulator on site Lunch break 5:00 PM Cherbourg to Paris by train 7:46 PM Arrival in Paris and transfer to hotel 5
EDF & the nuclear renewal : the Flamanville 3 model. Jean-Claude Prenez Director for International Projects EDF Nuclear Engineering Division
EDF & the nuclear renewal : the Flamanville 3 model Jean-Claude Prenez Director for International Projects EDF Nuclear Engineering Division Varna, 27-29 May 2009 Contents 1.The french context and EDF nuclear
More informationEffective planning and engagement: mitigating construction risk of the UK s first EPR. Samarth Sharma Strategy Manager Thursday 30th January 2014
Effective planning and engagement: mitigating construction risk of the UK s first EPR Samarth Sharma Strategy Manager Thursday 30th January 2014 The value of experience: 4 EPR Reactor Units Under Construction
More informationResponsibilities of the operating organization during construction and how to discharge them
Responsibilities of the operating organization during construction and how to discharge them Importance of an early, defined & strong involvement of the Owner/Operator in a New Build Project IAEA TM on
More informationMultinational Design Evaluation Programme MDEP
Multinational Design Evaluation Programme MDEP Mr. Ho Nieh Head of the Division of Nuclear Safety Technology and Regulation OECD Nuclear Energy Agency International Framework for Nuclear Energy Cooperation
More informationFRENCH NUCLEAR EXPERTISE
HIGH-TECH INDUSTRIES FRENCH NUCLEAR EXPERTISE KEY INFO IN 10 POINTS 1 A MAJOR INDUSTRY France has expertise in all stages of nuclear energy production, from fuel extraction to reprocessing. With 220,000
More informationPRESS CONFERENCE. 3 September Jean-Bernard LÉVY Chairman and CEO. Xavier URSAT Group Senior Executive VP - New Nuclear Projects and Engineering
PRESS CONFERENCE 3 September 2015 Jean-Bernard LÉVY Chairman and CEO Xavier URSAT Group Senior Executive VP - New Nuclear Projects and Engineering EDF, A RESPONSIBLE ELECTRICITY COMPANY, A CHAMPION OF
More informationJOINT PROGRAMME OFFICE
JOINT PROGRAMME OFFICE REPORT ON THE JOINT REGULATORS TEAM INSPECTION OF EDF/AREVA s ARRANGEMENTS AS PART OF GENERIC DESIGN ASSESSMENT (QUALITY MANAGEMENT ARRANGEMENTS) DECEMBER 2007 Page 1 of 8 REQUESTING
More informationWENRA. Recommendation in. in French reactors.
WENRA Recommendation in connection with macrosegregation anomalies found in French reactors. 1 01 Background 01.1 The findings in France In late 2014, mechanical tests performed on a Reactor Pressure Vessel
More informationExpected roles of nuclear energy in France s energy policy
Expected roles of nuclear energy in France s energy policy Pierre-Yves CORDIER Nuclear Counselor Ambassade de France, Tokyo Pierre-Yves CORDIER AESJ meeting July 2011, Tokyo 1 Outline Nuclear energy in
More informationRevenue and data for the first nine months of 2008
Paris, October 23, 2008 Revenue and data for the first nine months of 2008 9-month revenue for 2008 up sharply to 9.103B, for a +12.9% increase (+13.9% like-for-like 1 ) The group cleared revenue of 9.1
More informationAREVA Training 2012 AREVA Training September
AREVA Training 2012 2 AREVA Training Division Our stakes Develop competencies Emphasize AREVA culture Favor links with customers and partners 3 Nuclear industry context Educate engineers, experts & technicians
More informationSECURITY: FRENCH SUPPORT FOR IAEA ACTIVITIES
Nuclear SECURITY: FRENCH SUPPORT FOR IAEA ACTIVITIES The IAEA plays a central role in coordinating the international community s efforts, strengthening nuclear security and protecting against nuclear and
More informationIAEA Workshop - Research Reactors. Implementation of the post-fukushima Daiichi accident Enhancement Programme for RRs. Sydney - December 2017
IAEA Workshop - Research Reactors Implementation of the post-fukushima Daiichi accident Enhancement Programme for RRs Sydney - December 2017 French Nuclear Safety Authority mickael.gandolin@asn.fr Presentation
More informationFrom the Safety Approach of a Nuclear Power Plant, to the Manufacturing and Welding of Mechanical Components in line with RCC-M Code
From the Safety Approach of a Nuclear Power Plant, to the Manufacturing and Welding of Mechanical Components in line with RCC-M Code Philippe Malouines AREVA RCC-M Sub-Committee Chairman Presented by Marcello
More informationSaint-Petersburg Conference. Session 4. Drivers for Deployment of Sustainable and Innovative Technology
Saint-Petersburg Conference Session 4. Drivers for Deployment of Sustainable and Innovative Technology Speech by Christophe Behar, Director of the Nuclear Energy Division of the CEA Chairman, Ministers,
More informationASSYSTEM NUCLEAR 2020 POSITION & PERSPECTIVE
ASSYSTEM NUCLEAR 2020 POSITION & PERSPECTIVE STEPHANE AUBARBIER. DECEMBER 10, 2014 45 YEARS EXPERIENCE, A RENEWED POSITION 2 ROAD MAP 1 WORLDWIDE NUCLEAR OUTLOOK 2 ASSYSTEM 4th NUCLEAR ENGINEERING FIRM
More informationJavier Reig Head, Nuclear Safety Division
Javier Reig Head, Nuclear Safety Division Regulatory Authorities An initiative taken by national safety authorities to leverage their resources and knowledge for new reactor design reviews. Canada China
More informationFRANCE LWR activities
FRANCE LWR activities Norbert NICAISE with contributions from AREVA-NP ASN French Nuclear Safety Authority, IRSN French Institute for Radiation Protection and Nuclear Safety (TSO of ASN), CEA French Atomic
More informationFrench Radioactive Waste Disposal Programme : Main advances since 1991 Way forward to 2015
French Radioactive Waste Disposal Programme : Main advances since 1991 Way forward to 2015 Thibaud LABALETTE (ANDRA) 1 Radioactive HLW management in France French National Agency for Radioactive Waste
More informationOpportunities and limits of enhanced co-operation from MDEP experience. Lennart Carlsson Senior Advisor SSM
Opportunities and limits of enhanced co-operation from MDEP experience Lennart Carlsson Senior Advisor SSM MDEP Basics What is MDEP? And why A unique multinational initiative undertaken by national regulatory
More informationAn Industry View on Harmonization of Codes & Standards
An Industry View on Harmonization of Codes & Standards Dr. Andrew Wasylyk Project Manager - CORDEL 12 th April 2017 OECD NEA Workshop Paris, France IEA 2degree scenario: Nuclear is required to provide
More informationNuclear Energy in France : Status, prospects and R&D strategy
International Workshop for Asian Nuclear Prospect Kobe, October 2008 Nuclear Energy in France : Status, prospects and R&D strategy Pierre-Yves CORDIER Nuclear Counsellor Embassy of France in Japan International
More informationIAEA Workshop. Implementation of lessons learned from the Fukushima Dai-ichi accident Research Reactors. Sydney - December 2017
IAEA Workshop Implementation of lessons learned from the Fukushima Dai-ichi accident Research Reactors Sydney - December 2017 mickael.gandolin@asn.fr ASN immediate actions Campaign of targeted inspections
More informationThe Stress Test Process in France (CSA*) Its impact on Research Facilities
BgNS International Conference NUCLEAR POWER FOR THE PEOPLE 10 13 October 2012, AUGUSTA SPA Hotel, Hissar, Bulgaria The Stress Test Process in France (CSA*) ---- Its impact on Research Facilities G. Cognet
More informationSixth French report under the CNS July
Sixth French report under the CNS July 2013-1 - Sixth French report under the CNS July 2013-2 - Table of contents A - Introduction... 17 1. General remarks... 17 1.1 Purpose of the report... 17 1.2 Installation
More informationAlliance for success IN THE NUCLEAR INDUSTRY
Alliance for success IN THE NUCLEAR INDUSTRY Boccard nuclear For half a century, we have been helping you throughout the industrial life cycle of your nuclear facilities from New build to Maintenance.
More informationGenIII/III+ Nuclear Reactors
OL1&2 GenII GenIII OL3 TVO s Olkiluoto Nuclear Power Plant in Finland GenIII/III+ Nuclear Reactors RESEARCH NEEDES AND CHALLENGES FISA 2009, Prague Contents What are the GenIII features Evolutionary development
More informationExtension to 60 years lifetime
SFEN Conference Atoms for the future October 22 nd -25 th 2012 Extension to 60 years lifetime J.M.Moroni EDF Nuclear Engineering Division PLIM 2012-14-18 May 2012 - Salt Lake City, USA. Summary Elements
More informationConsiderations on the performance and reliability of passive safety systems for nuclear reactors
January 2016 Considerations on the performance and reliability of passive safety systems for nuclear reactors I. Background Pressurized water reactors currently operating in France are equipped with safety
More informationAREVA Reactors & Services experience in design and construction
AREVA Reactors & Services experience in design and construction AREVA s Reactors & Services experience in design and construction Organization Reactor models Main aspects to be considered to establish
More informationFrom the Accident at the Fukushima Daiichi NPS: Efforts to Improve Safety
From the Accident at the Fukushima Daiichi NPS: Efforts to Improve Safety Luc OURSEL President and CEO, AREVA Tokyo, April 19, 2012 Agenda Safety assessments in the EU and in France AREVA Safety of our
More informationA National Energy Perspective
Olkiluoto-3, Finland (Source: TVO) Olkiluoto-3, Finland (Source: Google) A National Energy Perspective Prof. Dr. Attila ASZÓDI Director Budapest University of Technology and Economics Institute of Nuclear
More informationAREVA NP INAC October 23 rd André Salgado Brazil and South America
INAC 2017 October 23 rd 2017 André Salgado Brazil and South America Agenda 1 business 2 Nuclear: answering new electricity market challenges From Areva Group to Areva NP New Areva Installed Base Components
More informationFukushima Lessons Learnt and Follow-up Activities of Rostechnadzor
FEDERAL ENVIRONMENTAL, INDUSTRIAL AND NUCLEAR SUPERVISION SERVICE OF RUSSIA Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear
More informationSTEP 3 MANAGEMENT OF SAFETY AND QUALITY ASSURANCE ASSESSMENT OF THE EDF AND AREVA UK EPR DIVISION 6 ASSESSMENT REPORT NO.
Health and Safety Executive NUCLEAR DIRECTORATE GENERIC DESIGN ASSESSMENT NEW CIVIL REACTOR BUILD STEP 3 MANAGEMENT OF SAFETY AND QUALITY ASSURANCE ASSESSMENT OF THE EDF AND AREVA UK EPR DIVISION 6 ASSESSMENT
More informationFRENCH R&D PROGRAM ON SFR AND THE ASTRID PROTOTYPE
FRENCH R&D PROGRAM ON SFR AND THE ASTRID PROTOTYPE FR13 Conference Christophe Béhar MARCH 4 th, 2012 CEA March 4th, 2012 French R&D program on SFR and the ASTRID prototype PAGE 1 WHY TO CHOOSE A FAST NEUTRON
More informationNuclear Power in France
1 Nuclear Power in France Dr Sunil Félix, Nuclear Counsellor, French Embassy in Tokyo Seminar on WNE and Overseas Nuclear Industry February 9, 2016 2 AGENDA Energy Context and Key Trends Nuclear Power
More informationExperiences with the construction of EPR at Flamanville and Taishan
Experiences with the construction of EPR at Flamanville and Taishan OECD/ Nuclear Energy Agency Workshop : Project and Logistics Management in Nuclear New Build NEA Headquarters, Issy-les-Moulineaux March
More informationESSENCE AND CHARACTERISTICS OF THE ATMEA TECHNOLOGY: THE ATMEA1 REACTOR
ESSENCE AND CHARACTERISTICS OF THE ATMEA TECHNOLOGY: THE ATMEA1 REACTOR Antoine VERDIER Business Development Manager BULATOM Varna / June 4 th, 2014 An AREVA and MHI Company Introduction ATMEA Company
More informationTHE FRENCH FAST REACTOR PROGRAM - INNOVATIONS IN SUPPORT TO HIGHER STANDARDS
INTERNATIONAL CONFERENCE ON FAST REACTORS AND RELATED FUEL CYCLES: SAFE TECHNOLOGIES AND SUSTAINABLE SCENARIOS (FR13) THE FRENCH FAST REACTOR PROGRAM - INNOVATIONS IN SUPPORT TO HIGHER STANDARDS François
More informationNew Plants Update November 2008
New Plants Update November 2008 Teresa Weinmeister Communications, New Plants Deployment Send comments & suggestions to: This month: Tel: 434.832.3776 > DCA Progress Report Teresa.Weinmeister@areva.com
More informationSeventh French Report under the CNS August
Seventh French Report under the CNS August 2016-1 - Photo credits of cover page from left to right: EDF Marc Didier EDF Francis Chanteloup EDF Antoine Soubigou Seventh French Report under the CNS August
More informationFlamanville 3 EPR Safety assessment and on-site inspections
Corine PIEDAGNEL - François TARALLO Bernard MONNOT Institut de Radioprotection et de Sûreté Nucléaire Flamanville 3 EPR Safety assessment and on-site inspections Flamanville 3 EPR Safety assessment and
More informationAREVA Forward-looking Nuclear Energy. Karl-Heinz Poets AREVA South America
AREVA Forward-looking Nuclear Energy Karl-Heinz Poets AREVA South America Energy market: continued growth announced tep Macroeconomics Energy demand multiplied by 2 by 2050 1990 2010 2030 BUSINESS AS USUAL
More informationPost-Fukushima Nuclear Safety in France: Analysis of the Complementary Safety Assessments (CSAs) Prepared About French Nuclear Facilities
INSTITUTE FOR ENERGY AND ENVIRONMENTAL RESEARCH 6935 Laurel Avenue, Suite 201 Takoma Park, MD 20912-4413 USA Tél. : (301) 270-5500 Fax : (301) 270-3029 e-mail : ieer@ieer.org http://www.ieer.org WORLD
More informationEDF Training in Support of a New Nuclear Project
EDF Training in Support of a New Nuclear Project Jean-Luc His EDF Engineering and Generation Training Unit IAEA TM on Human Resources Roadmaps and Capacity Building for New and Expanding Nuclear Power
More informationFrance s Nuclear Energy : Status and Prospects
AESJ Foreign Professional Societies Coordinating Committee July 15, 2008 France s Nuclear Energy : Status and Prospects Pierre-Yves CORDIER Nuclear Counsellor Embassy of France in Japan Atomic Energy Society
More informationGeneration III+ technology: What has gone wrong?
Generation III+ technology: What has gone wrong? Steve Thomas & Paul Dorfman Steve Thomas (stephen.thomas@gre.ac.uk) Professor of Energy Policy, PSIRU (www.psiru.org), Business School University of Greenwich
More informationAREVA AND ATMEA NEW PROJECTS
AREVA AND ATMEA NEW PROJECTS LAS/ANS SYMPOSIUM July 23rd, 2014 Karl-Heinz POETS AREVA South America THE VOICE OF WISDOM DEFENDS NUCLEAR ENERGY Alternative sources of energy such as wind or solar are too
More informationROLE OF NEPIO IN DEVELOPING A NATIONAL ROADMAP
ROLE OF NEPIO IN DEVELOPING A NATIONAL ROADMAP IAEA Technical Meeting on Topical Issues in the Development of Nuclear Power Infrastructure 2 5 February 2016; IAEA Vienna, Austria OVERVIEW NUCLEAR ROADMAP
More informationANTICIPATED ANALYSIS OF FLAMANVILLE 3 EPR OPERATING LICENSE - STATUS AND INSIGHTS FROM LEVEL 1 PSA REVIEW
ANTICIPATED ANALYSIS OF FLAMANVILLE 3 EPR OPERATING LICENSE - STATUS AND INSIGHTS FROM LEVEL 1 PSA REVIEW Gabriel Georgescu, Patricia Dupuy and Francois Corenwinder Institute for Radiological Protection
More informationSafe and Green Energy for Mediterranean Countries: Areva Perspectives
Safe and Green Energy for Mediterranean Countries: Areva Perspectives Martha Heitzmann, PhD Senior Executive Vice President, Research & Development AREVA Sharing Knowledge Across the Miditerranean Conference
More informationFrançois HEDIN, Deputy Director of the Basic Design Department, EDF, France
François HEDIN, Deputy Director of the Basic Design Department, EDF, France Graduated from Advanced Technics University Level College and from Naval Engineering, Previously Director for Maintenance of
More informationTHE ASTRID PROJECT STATUS, COLLABORATIONS, LESSONS FROM FUKUSHIMA ACCIDENT ADVANCED SODIUM TECHNOLOGICAL REACTOR FOR INDUSTRIAL DEMONSTRATION
ADVANCED SODIUM TECHNOLOGICAL REACTOR FOR INDUSTRIAL DEMONSTRATION THE ASTRID PROJECT STATUS, COLLABORATIONS, LESSONS FROM FUKUSHIMA ACCIDENT International Workshop on Prevention and Mitigation of Severe
More informationDATE 08 / 06 / 2015 F4E. Market Survey for the F4E Diagnostics Team EFINOR. General Presentation EFINOR C. LEGRAS
DATE 08 / 06 / 2015 F4E EFINOR General Presentation Market Survey for the F4E Diagnostics Team EFINOR C. LEGRAS EFINOR EFINOR Group was founded in 1988 Core Business : Metalworking Turnover : 62 M 3 Business
More informationFlamanville 3 EPR Safety assessment and on-site inspections
Corine PIEDAGNEL - François TARALLO Bernard MONNOT Institut de Radioprotection et de Sûreté Nucléaire Flamanville 3 EPR Safety assessment and on-site inspections Flamanville 3 EPR Safety assessment and
More informationAND SITE LICENSING OF THE EPR FOR THE HINKLEY POINT C PROJECT
DESIGN ASSESSMENT AND SITE LICENSING OF THE EPR FOR THE HINKLEY POINT C PROJECT 10/2016 Stephen J Walls, EDF Energy Nuclear New Build 1 Olivier Bard, EDF HINKLEY POINT C (HPC) 2 HPC Financial Investment
More informationHuman and organizational factors (HOF) in nuclear safety - ASN s point of view and oversights
Human and organizational factors (HOF) in nuclear safety - ASN s point of view and oversights Thomas Houdré ASN, Nuclear power plants department AIEA Effective Nuclear Regulatory Systems Ottawa April 2013
More informationSafety enhancement of NPPs in China after Fukushima Accident
Safety enhancement of NPPs in China after Fukushima Accident CHAI Guohan 29 June 2015, Brussels National Nuclear Safety Administration, P. R. China Current Development of Nuclear Power Mid of year 2015
More informationA canter around the nuclear jumps..
A canter around the nuclear jumps.. Robert Davies Vice President New Build, AREVA UK Cambridge MPhil 8 th February 2012 Who are we? World leader in CO 2 -free power generation 9.1Bn in Annual Revenues
More informationATMEA1 THE PROVEN TECHNOLOGY READY FOR LICENSING AND CONSTRUCTION
ATMEA1 THE PROVEN TECHNOLOGY READY FOR LICENSING AND CONSTRUCTION Andreas Goebel ATMEA President and CEO An 1 AREVA and MHI Company ATMEA INAC 2013 November 25 th, 2013 - Recife 1 Summary 1. ATMEA The
More informationPoland Nuclear Program EPR Flamanville 3
Poland Nuclear Program EPR Flamanville 3 Project Organization Design & Manufacturing activities On Site activities What We Are Learning from New Construction Experience September 29 th, 2010 Gilles Zask
More informationFRENCH NUCLEAR KNOWLEDGE MANAGEMENT EXPERIENCE. EDF SA. All rights reserved. EDF Nuclear Performance Model
FRENCH NUCLEAR KNOWLEDGE MANAGEMENT EXPERIENCE Summary Introduction Building personal knowledge Building collective knowledge Long term Knowledge Management Beyond one s own entity An example of success
More information14th CANDU Owners Group (COG) IAEA Technical Meeting on the Exchange of Operational Safety Experience of Pressurized Heavy Water Reactors
14th CANDU Owners Group (COG) IAEA Technical Meeting on the Exchange of Operational Safety Experience of Pressurized Heavy Water Reactors Hosted by the Government of Argentina through Nucleoeléctrica Argentina
More informationNew Nuclear Build in Hungary
New Nuclear Build in Hungary European Nuclear Forum Prague, 12-13 March 2013 Sándor NAGY CEO, MVM Paks II. Ltd. Structure of the MVM Group MVM Ltd. Holding Centre Trading Generation ITO Services Investments
More informationJOINT RF/WPDD WORKSHOP ON REGULATION OF DECOMMISSIONING. Registration and reception: 19 June 2018 Workshop:20-21 June 2018 PROVISIONAL AGENDA
JOINT RF/WPDD WORKSHOP ON REGULATION OF DECOMMISSIONING Registration and reception: 19 June 2018 Workshop:20-21 June 2018 PROVISIONAL AGENDA Practical Information The Meeting will be taking place at the
More informationNuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level
Nuclear Power Plant Safety Basics Construction Principles and Safety Features on the Nuclear Power Plant Level Safety of Nuclear Power Plants Overview of the Nuclear Safety Features on the Power Plant
More informationNuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level
Nuclear Power Plant Safety Basics Construction Principles and Safety Features on the Nuclear Power Plant Level Safety of Nuclear Power Plants Overview of the Nuclear Safety Features on the Power Plant
More informationJoin the inner circle of nuclear engineers
NUCLEAR INSTITUTE Join the inner circle of nuclear engineers A NEW PATH TO GROWTH TRANSMIT our knowledge TRAIN a new generation of engineers CREATE a community of experts DESIGN more reliable energy solutions
More informationIAEA International Atomic Energy Agency. Technical Meeting on Remediation Techniques and Strategies in Post-Accident Situations
IAEA International Atomic Energy Agency Technical Meeting on Remediation Techniques and Strategies in Post-Accident Situations 13-17 June 2016 Press Room Conference Building M, IAEA Headquarters, Vienna,
More informationGroupe INTRA : Activities and Organization in France
Groupe INTRA : Activities and Organization in France March, 2014 Groupe INTRA Pascal IZYDORCZYK Deputy Manager Pascal.izydorczyk@groupe-intra.com 1 1 9 8 8 Groupe I N T R A creation Groupe INTRA was created
More informationComplementary Safety Assessments. of French nuclear installations
Complementary Safety Assessments of French nuclear installations 15 September 2011 Summary France considers that the accident on March, 11 2011 at the Fukushima Daiichi nuclear power plant in Japan, is
More informationBuilding forest landscapes resilient. to global changes in drylands: the guidelines. Second International Workshop
Tentative agenda Building forest landscapes resilient to global changes in drylands: the guidelines Second International Workshop Hotel King Fahd, Dakar, Senegal, 25-28 February 2013 Organisers Languages
More informationFrench nuclear issues
French nuclear issues A focus on some recent developments Yves Marignac Director of WISE-Paris NIRS Meeting Washington DC 11 May 2015 WISE-Paris 1 Introduction WISE-Paris: committed to independent expertise
More informationNRC Perspectives on Quality Assurance ASQ 35 th Annual Energy & Environmental Training and Education Conference Raleigh/Durham, North Carolina
NRC Perspectives on Quality Assurance ASQ 35 th Annual Energy & Environmental Training and Education Conference Raleigh/Durham, North Carolina Glenn M. Tracy, Director Division of Construction Inspection
More informationTechnology, performance, project delivery
AREVA EPR reactor Technology, performance, project delivery Jean DHERS R&D Vice President of AREVA s Nuclear Equipment Business Unit, NAMRC R&D Board member, Visiting Professor at the University of Manchester
More informationChallenges on the Road to the 1 st National NPP A Countdown
Zoran V. STOŠIĆ Director R&D Installed Base Engineering Director Sales & Marketing Ex Yugoslavia Peter SCHIMANN Installed Base Engineering VGB Projects Challenges on the Road to the 1 st National NPP A
More informationSponsor & Exhibit Opportunities MSC User Meeting D-A-CH May 13-14, Berlin, Germany
D-A-CH http://pages.mscsoftware.com/50years-homegermany.html A Unique Opportunity to Connect with MSC Software Users in Aerospace & Defense, Automotive, and a Multitude of Other Industries In February
More informationThe Nuclear Landscape A Snapshot of the Global Issues and Players
American Association for the Advancement of Science Annual Meeting February 12th 16th, 2009, Chicago Keeping the Lights on the Revival of Nuclear Energy for our Future The Nuclear Landscape A Snapshot
More informationnuclear Taking up your major challenges High performance solutions
nuclear Taking up your major challenges High performance solutions High Safety Solutions High Safety Nuclear Handling Solutions Combining strong expertise in electromechanical engineering & control command
More informationSubject: Invitation to the 12th Global Summit of National Ethics/Bioethics Committees
18/01/2018 Ref.: CL/4230 Subject: Invitation to the 12th Global Summit of National Ethics/Bioethics Committees Sir/Madam, I have the honour to invite your Government to nominate a participant to attend
More informationNuclear Construction Summit Developing the recipe for commercial success &
Nuclear Construction Summit Developing the recipe for commercial success & risk assessment Dan Magnarelli Manager, Construction Management Group New Plants Deployment Developing the recipe for commercial
More informationHow to face higher quality expectations for the global nuclear supply chain
Nuclear Science and Technology Symposium How to face higher quality expectations for the global nuclear supply chain Helsinki, 3 November 2016 Stephane GALOPIN stephane.galopin@fr.bureauveritas.com Nuclear
More informationNew Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident
FEDERAL ENVIRONMENTAL, INDUSTRIAL AND NUCLEAR SUPERVISION SERVICE (ROSTECHNADZOR) New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident Alexander Sapozhnikov Department for Safety
More informationHow to fast track nuclear new build projects through strategic partnership and localization
How to fast track nuclear new build projects through strategic partnership and localization African Utility Week Cape Town, 13 May 2015 Mr Jean-Paul Chatry Nuclear Project Development Director Dr Fawzi
More informationOur Contribution to the Forum
Our Contribution to the Forum General presentation of the EPR TM Reactor CR1.1.1 Robustness PART 1 Margins - Simplicity PART 2 Quality of design and construction Quality of materials Redundancy PART 3
More informationWORKSHOP: SYNTHETIC METHODS FOR GLYCAN ASSEMBLING
WORKSHOP: SYNTHETIC METHODS FOR GLYCAN ASSEMBLING Monday 6 th November 2017 08.30-09.00 Arrival and registration 09.00-09.15 Welcome Session 09.15-10.15 Fundamentals of Synthetic Carbohydrate Chemistry
More information3 RD WESTMINSTER WORKSHOP, THE PUBLIC ACCOUNTS COMMITTEE JUNE 2013 AIM
3 RD WESTMINSTER WORKSHOP, THE PUBLIC ACCOUNTS COMMITTEE 24-27 JUNE 2013 AIM 1. The aim of the four day Westminster Workshop programme is to explore the key features of an effective Public Accounts Committee
More informationSAFETY REQUIREMENTS IN FRANCE FOR THE PROTECTION AGAINST EXTREME EARTHQUAKES
SAFETY REQUIREMENTS IN FRANCE FOR THE PROTECTION AGAINST EXTREME EARTHQUAKES French Safety Authority Nuclear Power Plants Department Radioprotection and Nuclear Safety Institute IRSN/PRP-DGE/SCAN/BERSSIN
More informationMilestones for Nuclear Power Infrastructure Development
Milestones for Nuclear Power Infrastructure Development Vienna, IAEA 5 9 November 2007 The French General Feeling Marc Ponchet French Atomic Energy Commission, International Affairs Division In charge
More informationVision for the Reims conference (15-17 December 2010)
Vision for the Reims conference (15-17 December 2010) Title: Reversibility and Retrievability A Conference and Dialogue in Planning for Geological Repositories of Radioactive Wastes Under the Aegis of:
More informationGeneration III of nuclear reactors
Generation III of nuclear reactors Generation III The nuclear reactors technology Summary of the generation III of nuclear reactors technology Actual status of realization Ing. Martin Titka,, Bratislava
More informationAPEC Expert Group on New and Renewable Energy Technologies. Welcome to EGNRET 48 EGNRET
APEC Expert Group on New and Renewable Energy Technologies Welcome to EGNRET 48 EGNRET EGNRET EWG 48 40 Brunei Darussalam Jeju, Republic 22-26 of November, Korea, Mar. 29-30, 2010 2017 Introduction & Adoption
More informationFrench Nuclear Reactors Reaching 40 Years
French Nuclear Reactors Reaching 40 Years Decision process, reinforcement options and related costs of a life extension of EDF nuclear reactors beyond their designed lifetime Based on a report commissioned
More informationIRSN role, organisation, methodology and means as the French TSO for Emergency Preparedness and Response
IRSN role, organisation, methodology and means as the French TSO for Emergency Preparedness and Response O. Isnard Emergency Response Department IRSN International Conference on Challenges Faced by Technical
More informationAssistance to Newcomer Countries Regulators. Russian Approach.
FEDERAL ENVIRONMENTAL, INDUSTRIAL AND NUCLEAR SUPERVISION SERVICE OF RUSSIA (ROSTECHNADZOR) Assistance to Newcomer Countries Regulators. Russian Approach. Alexey Utenkov Deputy Head of International Relations
More informationPROJECT OVERVIEW M. Forni, S. De Grandis SILER Training Course, Verona, May 21-24, 2012
PROJECT OVERVIEW PROJECT AIM SILER Seismic-Initiated events risk mitigation in LEad-cooled Reactors is a Project aimed at evaluating the risk associated to seismic initiated events in Generation IV Heavy
More informationHOW TO REDUCE THE COSTS OF NEW NUCLEAR?
HOW TO REDUCE THE COSTS OF NEW NUCLEAR? Dr. Michel BERTHELEMY CEA/I-tésé & Chair, OECD/NEA Expert Group on the reduction of nuclear construction costs PSL ENERGY ECONOMICS SEMINAR PARIS 2 DECEMBER 2018
More informationIntroduction to Asia-Pacific Forestry Week 2016
Meeting of APFW Stream Leaders 12-13 November 2015, Bangkok, Thailand Introduction to Asia-Pacific Forestry Week 2016 Patrick B. Durst Senior Forestry Officer FAO Regional Office for Asia and the Pacific
More informationANTARES The AREVA HTR-VHTR Design PL A N TS
PL A N TS ANTARES The AREVA HTR-VHTR Design The world leader in nuclear power plant design and construction powers the development of a new generation of nuclear plant German Test facility for HTR Materials
More information