1 Name of the SH Construction of boundary wall for CPRI office campus and staff colony at Bangalore Cost Rs.1,55,48, UP-TO-DATE Stone masonry wall work from T&D Gate to DG s residence has been Stone masonry wall work from Ayyappa Swamy Temple towards T&D Gate has been except tree portion Stone masonry wall work from HPL gate towards Ayyappa Swamy Temple has been Stone masonry wall work from HPL gate towards EMI / EMC site has been Coping concrete work from HPL gate towards EMI/EMC and from HPL gate towards Ayyappa Swamy temple has been Grill fixing work from HPL gate up to Ayyappa Swamy Temple and from HPL gate towards EMI / EMC site has been Outer wall pointing work from HPL gate towards EMI / EMC site and from HPL gate up to Ayyappa Swamy Temple has been Internal side wall pointing work from HPL gate up to Ayyappa Swamy Temple and HPL gate towards EMI / EMC site has been Band finishing work from T&D gate up to Ayyappa Swamy Temple, from HPL gate up to Ayyappa Swamy Temple and from HPL gate to EMI / EMC site has been Grill primer and enamel painting work from HPL gate up to Ayyappa Swamy Temple and from HPL gate towards EMI / EMC site has been North side of office compound wall painting work and grill painting work has been Culvert PCC and side stone wall work near HPL gate and near EMI/EMC site has been Colony Internal wall plastering work from Ayyappa Swamy Temple front gate upto Ramaiah Bus Stop has been Coping concrete and grill fixing work from Ayyappa Swamy Temple front gate up to Ramaiah Bus Stop has been External wall plastering work from Ayyappa Swamy Temple - 1 -

2 up to Ramaiah Bus Stop has been Grill primer and enamel painting work from Ayyappa Swamy Temple front gate up to Ramaiah Bus Stop has been Internal side wall plastering work from Ayyappa Swamy Temple front gate up to IISc boundary wall has been Stone masonry wall work from HPL gate towards EMI / EMC site near Ramaiah Bus stop has been Dismantling of wall from DGs residence to Head Office in progress Concreting of plinth beam from DGs residence to CPRI Head Office in progress Stone masonry wall work from DGs residence to CPRI Head Office in progress Pointing, coping, band finishing and grill fixing work from HPL gate to EMI/EMC site has been Colony Outer and inner side wall primer painting work from Type III gate to Ramiah Bus Stop in progress Inner side wall plastering work near community centre at colony in progress External wall plastering from Health centre towards Ayyappa Swamy Temple front gate has been Head of Engineering Officer Gr 4 Engineering Officer Gr 2-2 -

3 Name of the SH Vertical extension of CCAR building, Guest House 1, Guest House 2, CPRI campus Bangalore Cost Rs.2,18,40, CCAR Works UP-TO-DATE All rooms brick masonry wall, lintel beam casing and brick masonry wall work above lintel has been except toilet Slab casting work for rooms has been Suite room s brick masonry wall work, lintel beam casting work and brick wall above lintel beam has been Suite rooms and corridors slab shuttering work has been Column steel binding work above gym room has been Centering and shuttering of roof slab for suite room Plastering of ceiling in corridor and Balcony for rooms at CCAR - CCAR works) Brick masonry and toilet walls of rooms 6,7,8,9,10 Concreting work of toilet beams Ceiling plaster works for rooms, corridors and Balcony in CCAR Brick masonry for parapet wall above and terrace Shuttering of bar bending works in toilet beams Chejja dismantling work near staircase Debris cleaning in rooms 5,6,7,8,9,10,11 Concreting of lintel beams Side shuttering for suit slab Placing of reinforcement for lintel beams in rooms 6,1,8,9,10,11,12 Reinforcement of beams for slabs Brickwork above lintel Concreting of lintel beams Dismantling of floors in room 1 Dismantling of toilet lintel beams room 7,8,9 Reinforcement placed in toilet rooms Shuttering work for toilet beams rooms (1,2,3,4,5) Concreting of toilet beams rooms (15,16) - 3 -

4 GUEST HOUSE 1 & 2 WORKS UP-TO-DATE Guest House 1 No work at Guest House No: 1 Guest House 2 All rooms brick wall work up to lintel level has been except toilet Column cutting work up to lintel level has been No work at Guest House No: 1 No work at Guest House No: 2 Guest House 1 Guest House 2 Head of Engineering Officer Gr 4 Engineering Officer Gr 2-4 -

5 Name of the Cost Setting up of Pre-qualification of Test Facilities on 400 kv XLPE cables at CPRI office campus, Bangalore. Sh : civil works Rs.2,82,84, UP-TO-DATE All columns and tie beam up to level Internal and external plastering and painting of all walls of control room, electrical room, auxiliary rooms, Laboratory, Jointing tunnel coil room Concreting of snaking coil room / slab is RR masonry work Brickwork of parapet wall of snaking coil room is in progress External plastering of snaking coil room Fabrication of structural trusses 1 to 6 Painting of structural trusses with zinc chromate primer is in progress Shuttering & Fabrication of reinforcement of slab in snaking coil room is Painting of outer walls with surface primer coat is Laboratory, main building, jointing tunnel coil room Fabrication of structural truss 5 th and 6 th Plastering of outer wall and chajja of snaking coil rooms Concreting of snaking coil room slab RR masonry work up to 40 metres beyond coil room Painting of structural truss with zinc chromate primer is in progress Brick work for parapet wall in snaking coil room is in progress Head of Engineering Officer Gr 4 Engineering Officer Gr 2-5 -

6 Name of the Cost SH Construction of Approach Road to XLPE Laboratory and hard standing in the laboratory premises at CPRI, Sadashivnagar, Bangalore Rs.36,22, UP-TO-DATE Random Rubble masonry work of the wall Laying, spreading, compacting and rolling (dry and wet) of one layer of 90 45mm and 63 45mm with moorum in road portion, hard standing North side Laying spreading rolling and compacting of one layer of 90-45mm (both wet and dry rolling) and 63-45mm (dry rolling) with one layer of moorum is in hard standing East side 2 nd layer of spreading of moorum over 63 45mm in road portion is in progress Stacking of 63 to 45mm aggregate for Hard standing portion North side, East side and for road portion 1 course of Random Rubble Masonry work on portion (1), (2), (3), (4), (5), (6), and across drain Stacking of 63 to 45mm aggregate for Hard standing portion North side, East side and for road portion 1 course of Random Rubble Masonry work on portion (1), (2), (3), (4), (5), (6), and across drain Head of Engineering Officer Gr 4 Engineering Officer Gr 2-6 -

7 Name of the Cost Setting up of Pre-Qualification Test Facilities on 400 Kv XLPE Cables - SH: Providing Roof over Transformer Bay at CPRI, Sadashivnagar, Bangalore Rs.25,36, UP-TO-DATE All columns concreting F9 to I9 up to 9.55 level All tie beams concreting F9 to I9 at 7.55 level Shuttering and centering work of the tie beam F9 TO 9.55 level is in progress RR masonry work is in progress Shuttering and reinforcement of the beam I9 to F9 at 9.55 level Coursed rubble masonry near control room is in progress Shuttering and reinforcement of the beam I9 to F9 at 9.55 level Coursed rubble masonry near control room is in progress Head of Engineering Officer Gr 4 Engineering Officer Gr 2-7 -

8 Name of the Cost Construction of Building for Additional Test Bay SC Testing Of Transformers At SC Lab Sub Head: Civil Works At Workshop. Rs.35,36,616/- UPTO DATE Brickwork of test bay area has been. Fabrication works of steel roof truss in test bay area is in. Fabrication works for Grills has been Coursed Rubble Masonry for compound wall carried out. Fabrication works of steel roof truss of test bay area has been. Erection of column pipe of test bay area Shuttering and casting of mezzanine floor P.C.C for un-tanking area R.R masonry for retaining wall in south side Placing of Reinforcement, casting of footing and pedestal of untanking area has been Casting of plinth beam over the retaining wall in east side has been Earthwork excavation of outside trench has been Brickwork in test bay area is in progress Erection of structural steel beam for sliding door has been Fabrication works of steel roof truss of test bay area has been. Primer Coating of steels. Earth work excavation of un-tanking area has been. Erection of column pipe of test bay area Shuttering and casting of mezzanine floor slab has been. Placing of Reinforcement, casting of footing and pedestal of untanking area has been Casting of plinth beam over the retaining wall in east side has been Earthwork excavation of outside trench has been Fabrication works of steel roof truss of test bay area has been. Enamel painting for roof truss of test bay area & sliding door has been Erection of steel roof truss has been Dismantling for sunshade of Ex.rolling shutter door

9 Earth work excavation for plinth beam of sliding area carried out P.C.C for sliding door & untanking area carried out Centering/shuttering, Placing of reinforcement, casting of plinth beam of untanking area carried out Centering/shuttering, Placing of reinforcement, casting of slab culvert of untanking area & test bay area carried out Erection for column pipe of untanking area progressing. Brickwork in north side of test bay area carried out. Deshuttering for plinth beam, slab culvert of untanking area & near to test bay area. Head of Joint Director (CED) Engineering Officer Gr 2-9 -

10 Name of the Central Power Research Institute Cost Rs. 70,03,781. Modernization of short circuit test facilities & augmentation of Power transformer test facilities Sub Head: Construction of New Low Voltage Test Cell-Civil Works UPTO DATE Earthwork excavations for all the footings have been. Laying of bed concrete PCC (1:4:8) for all the footings have been Footing of all columns has been Pedestal columns were cast. All columns along grid A,B,C,1 &2 up to 0.45 m(plinth beam) level are casted Plinth beam at 0.45 m along grid A, B, C, 1 &2 has been. All columns along grid A,B,C,1 &2 up to 2.4 m level are cast Backfilling of earth upto plinth level has been Consolidation of the backfilling has been Dressing of the filled up soil has been Ramming of backfilled earth has been Brickwork along grids A, B, C, 1 and 4 are up to a height of 2.85m from the top of plinth beam. Fabrication of steel reinforcement and shuttering for the 1 st tie beam at 3.30 m level for grids A,B,C and 4 has been Shuttering for all columns upto a height of 3.30 m has been Shuttering for chajja along grid A has been Casting of first tie beam along grids A, B, C, 1 and 4 and chajja between columns A1-A2 and A3-A4 has been Fabrication of insert plates for supporting the bushing in between the columns B4 and C4 is in progress Casting of first tie beam along grids A, B, C, 1 and 4 and chajja between columns A1-A2 and A3-A4 has been Fabrication of insert plates for supporting the bushing in between the columns B4 and C4 is in progress Head of Joint Director (CED) Engineering Officer Gr

11 Name of the Construction of a Lab Building for Setting up of Test Facility for LED Lighting System at CPRI, Bangalore. SH: Civil Works Cost Rs. 1,01,12, UPTO DATE The works pertaining to foundation, viz. casting of RCC footings, pedestals, columns up to plinth, and plinth beam have been. Casting of RCC Columns up to Roof beam soffit level has been. Casting of first flight of staircase has been. Fabrication of roof reinforcement is in progress. Earth filling in plinth (excess which was required over the earth excavated for foundation) has been departmentally. Consolidation of the filled earth in plinth has been. Roof concreting works in ground floor and first floor. Brick work above plinth (superstructure) have been up to 80 % in ground and first floor. Casting of lintels and chajjas in ground floor. Leveling of earth for preparing the ground for undertaking flooring works in progress Roof de-shuttering works for the gridsa1-a4 and E1-E4 (Ground floor) and A7-A8 to D7-D8,. Brick work above plinth (superstructure) for the grids E1-A1, E2- A2, A1-A2, E1-E4, A7-D7 at ground floor; and A7-D7 and A8-D8 on first floor have been. Casting of lintels and chajjas for the grids A1 to A4, E1 to E4, Lintels over doors at ground floor. Leveling of earth for preparing the ground for undertaking flooring works in progress. Removal of shuttering and centering of roof on grids A7D7 to A8D8. Preparation and submission of 3 rd running account bill. Head of Joint Director (CED) Engineering Officer Gr

12 Centre for Life cycle management and condition monitoring of substation equipment s. Name of the Cost Rs. 2,16,30, UPTO DATE The framed structure has been. Brickwork for all the three floors (ground, first and second) has been. Plastering for all the floors has. Granite flooring for all the floors has been. Stone cladding works in ground floor has been Levelling course P.C.C in order to conceal the floor electrical conduit has been put for second floor. Outside Plastering around the building has been Skirting and plastering in all floors has been carried out. Vitrified Flooring in all floors has been Internal plastering in lab has been Lab roof is cast using RMC Parapet brickwork over lab roof has been and inside wall plastering has been Internal plastering in lift has been Column concreting for 8 columns in staircase and lift portion has been Brickwork for fins outside the building has been Inside wall plastering and ceiling plastering in toilet in second floor has been Coping of stone cladding around the building is..nosing for granite stones have been done and fixed in sill levels of all floors. Inside plastering in toilets of first floor and second floor has been 75% of applying primer all over the building has been Inside plastering for staircase walls in first floor and second floor has been The lintel beams for seminar hall and lobby of second floor has been casted Plastering of jambs of windows in ground floor has been Formwork for slab in terrace floor for lift, lobby and staircase portion has been Plastering of chajja in ground floor has been Plastering and lime rendering of brickwall and beam in seminar hall and lobby has been Applying putty in Ground floor, first floor has been Plastering of shaft opening in all floors has been Plastering of Pargolas beam(front) in Second floor Portico is 50% of Plastering of pargolas is Outside wall plastering in the west side above the lab roof is in progress

13 Fixing of Granite for staircase for 6 flights has been Inside plastering for shaft near lift has been Fabrication of reinforcement for slab and beams in third floor has been. Designer paver tiles work in Lobby of Second floor has been Fixing of granite for window sides in Ground floor has been Plastering of Pargolas beam(front) in Second floor Portico is 50% of Plastering of pargolas is Outside wall plastering in the west side above the lab roof is in progress Fixing of sill level granite in all the floors has been Fixing of granite for window sides in Ground floor has been Fixing of Granite for staircase for 6 flights has been Flooring and Skirting in second floor has been Inside plastering for shaft near lift has been. Applying primer in the ceilings of all rooms in Ground floor, first floor and in corridor ceiling of Second floor has been Laying of vitrified tiles and grouting for tiles in Library, Data acquisition room And HOD room has been Fabrication of reinforcement for slab and beams in third floor has been. Designer paver tiles work in Lobby of Second floor has been Head of Joint Director (CED) Engineering Officer Gr

14 Name of the Central Power Research Institute Cost Rs. 3,42,91, Construction of Building for Establishment of Comprehensive EMI/EMC Test (Radiated Immunity & Radiated Emission) facility Sub Head: Civil Works UPTO DATE Earthwork excavation for all the footings have been. Laying of bed concrete PCC (1:4:8) for all the footings have been The works pertaining to foundation, viz. casting of RCC footings, has been. Total reinforcement steel required for the structure has been procured by the contractor. Additional column rods, as per the directions of the structural consultants have been provided in columns. Casting of pedestals and columns up to plinth level have been. Construction of Random Rubble Masonry beneath plinth beam has been. Filling of earth up to plinth level and consolidation with water has been in the portion between grids G1G8 H1H8. Casting of plinth beam including tying of reinforcement steel and centering works have been. CVO inspection of EMI-EMC works. Casting of columns three lifts up to first tie-beam level have been 95 %. Preparation of flooring base in the lab area where roof covering at 5 m level is there earth dressing and water consolidation. Receipt of clearance from M/s. Frankonia for chamber wall foundation (flooring) details submitted by structural consultants. Casting of PCC (1:4:8) for flooring base of lab area. Centering shuttering works for the tie-beam at 5m level initiated. Centering shuttering works for the roof at 5m level initiated Casting of columns (three lifts) up to first tie-beam level have been 95 %. Casting of PCC (1:4:8) for flooring base of lab area. Centering shuttering works for the tie-beam at 5m level initiated. Centering shuttering works for the roof at 5m level initiated. Head of Joint Director (CED) Engineering Officer Gr

Monthly Progress Report for the month of NOVEMBER 2013

Monthly Progress Report for the month of NOVEMBER 2013 Name of the Cost Physical SH Construction of boundary wall for CPRI office campus and staff colony at Bangalore Rs.1,55,48,700.00 Campus works: Stone masonry wall work from EMI / EMC site to HPL gate to

More information

PROGRESS JAIPUR PH-II AS ON 30 NOV 18

PROGRESS JAIPUR PH-II AS ON 30 NOV 18 S MILESTONE DESCRIPTION STATUS No 1. MS 01 (D+120 Days) (a) Work commence for all Towers (b) Slab casting for 20 DU (c) Brick work for 25 DU (d) Internal electrical 15 DU (e) Internal Plumbing & Sewage

More information

Scanned by CamScanner

Scanned by CamScanner JODHPUR MUNICIPAL CORPORATION G-SCHDULE NIT No. Date Sr No. Last Date of Sale :- Earnest Money : Rs... Date of Receipt :- CR No. Dated.. Copy issued to M/s STORM WATER DRAINAGE MASTER PLAN FOR THE CITY

More information

1 Site Preparation & marking L.S 1, brickwork in basement in cm 1: cft 19,975.00

1 Site Preparation & marking L.S 1, brickwork in basement in cm 1: cft 19,975.00 GURUKULAM' TRUST CHILDREN SCHOOL KOVALAM - CHENNAI ESTIMATE FOR CONSTRUCTION OF THREE CLASS ROOMS - GROUND + TWO FLOORS BUILDING - INCLUDING STAIR-CASE Plinth area : Class Room - 28.50 x 23.25 = 662.625

More information

PROGRESS JAIPUR PH-II AS ON 20 DEC 18

PROGRESS JAIPUR PH-II AS ON 20 DEC 18 S No 1. MILESTONE DESCRIPTION STATUS MS 01 (D+120 Days) 2. MS 02 (D+210 Days) (a) Work commence for all Towers (b) Slab casting for 20 DU (c) Brick work for 25 DU (d) Internal electrical 15 DU (e) Internal

More information

Tender Schedule for the Work "Construction of Staff qtrs. at Tainda S/S (1no.)

Tender Schedule for the Work Construction of Staff qtrs. at Tainda S/S (1no.) 1.Amount put to Tender:- Rs 7,48,024/- 2.E.M.D. Required: - R 8,000/- 3. Class of contractor :- "D" & "C" 4. Cost of Tender Paper:- R 4,200/- Sl- No Tender Schedule for the Work "Construction of Staff

More information

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD TENDER FOR Construction of Stone Masonry Compound Wall for NIAB Campus at Survey No.37, Serlingampally, Hyderabad VOLUME V January 2013 HSCC

More information

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI. SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST RAIGARH, MUMBAI. Tender Reference No. BL/LI/CC/TCWMUM/BOUNDARY WALL/1617/04

More information

Estimate FOR THE SEPTIC TANK

Estimate FOR THE SEPTIC TANK Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks

More information

Construction of Shopping Complex at MNIT campus.

Construction of Shopping Complex at MNIT campus. Name of work:- Construction of Shopping Complex at MNIT campus. G-Schedule S.No Qty Items Unit Rate Amount 1 253 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation

More information

Calculation of requirement of Labour. for construction of IAY/CMRHM

Calculation of requirement of Labour. for construction of IAY/CMRHM Calculation of requirement of Labour for construction of IAY/CMRHM Total cost as per 2012 SOR = Rs 7,01,746.00 Deduct 7.5% Contractor s profit = Rs (-) 52,631.00 = Rs 6,49,115.00 Taking 1/3 as the Labour

More information

TOWER-1A: TERRACE FLOOR SLAB

TOWER-1A: TERRACE FLOOR SLAB TOWER-1A: TERRACE FLOOR SLAB TOWER NO: 1A (Overall completion 70.10%) Total Floors: - Stilt + 12 Upper floors Total Flats: - 24 (Duplex Type-A1) 1. Structural works up to terrace floor slab completed.

More information

CIVIL WORKS Mahesh G. Nair

CIVIL WORKS Mahesh G. Nair MEASUREMENT BOOK SUNIL Date Work Order Contractor : : EARTH WORKS CIVIL WORKS Mahesh G. Nair GROUND FLOOR 1 EARTH WORKS EXCAVATION : Earth work excavation for foundation trenches in all classes of soil

More information

Approximate estimate of renovation and extension work of faculty room in JIST, Jorhat-10 Estimate is prepared as per PWD SOR

Approximate estimate of renovation and extension work of faculty room in JIST, Jorhat-10 Estimate is prepared as per PWD SOR Approximate estimate of renovation extension work of faculty room in JIST, Jorhat-10 Estimate is prepared as per PWD SOR 2013-14 SL Description of the work No 1 DISMANTLING Unit quantity Rate Amount 1.1

More information

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

Drainage, Road Drainage and Collection Pit A - EXCAVATION: 57 Drainage, Road Drainage and Collection Pit SCHEDULE OF QUANTITY Sl.N o. 1 Particulars Qty Unit Rate Amount A - EXCAVATION: Earth work in EXCAVATION IN FOUNDATION TRENCHES IN ALL KIND OF SOIL including

More information

PROGRESS MEERUT PROJECT AS ON 15 MAY 2017

PROGRESS MEERUT PROJECT AS ON 15 MAY 2017 REPAIRING OF TILES INSTALLATION OF FEEDER PILLAR TOWER-1 (TYPE A-1) (Overall completion 91.85 %) Total Floor Stilt + 10 Total flat = 60 Progress Fixing of false ceiling in toilets, Glass fixing in Aluminum

More information

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL. Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities for SIX CHAMBER VIP LATRINE FACILITY LOCATED AT PRIMARY & SECONDARY SCHOOL YEI RIVER COUNTY South Sudan JUN,

More information

Good Construction Practices Part I

Good Construction Practices Part I Good Construction Practices Part I This report is solely for the internal use. No part of it may be circulated, quoted, or reproduced for distribution outside the company organization without prior written

More information

PROGRESS JAIPUR PH-II AS ON 20 JULY 2018

PROGRESS JAIPUR PH-II AS ON 20 JULY 2018 1. Mobilisation of manpower and material is progressively improving at site. The present labour strength is 345 and will progressively increased to 400 plus by end Jul 18. 2. Progress of Work:- The following

More information

Sub: - Construction of RPI office and M.T. building for S. P. Headquarter, Hingoli, District Hingoli

Sub: - Construction of RPI office and M.T. building for S. P. Headquarter, Hingoli, District Hingoli For uploading No. PHC/TB/EE (KAN)/RPI Hingoli/1226/2013 Date: - 05/04/2013 To, Contractors / Bidders Sub: - Construction of RPI office and M.T. building for S. P. Headquarter, Hingoli, District Hingoli

More information

THE DALAI LAMA INSTITUTE FOR HIGHER EDUCATION CONSTRUCTION PROGRESS REPORT (PHASE II) Brief description on the current work status of each block:

THE DALAI LAMA INSTITUTE FOR HIGHER EDUCATION CONSTRUCTION PROGRESS REPORT (PHASE II) Brief description on the current work status of each block: THE DALAI LAMA INSTITUTE FOR HIGHER EDUCATION (An undertaking of the Tibetan Children s Village in India) CONSTRUCTION PROGRESS REPORT (PHASE II) The following is the brief progress report on the Phase

More information

SCHEDULE OF ITEMS & QUANTITIES FOR CIVIL WORKS OF PROPOSED GIRLS/ BOYS TOILET BLOCK

SCHEDULE OF ITEMS & QUANTITIES FOR CIVIL WORKS OF PROPOSED GIRLS/ BOYS TOILET BLOCK Schedule-I: Civil Works EARTH WORK Section-A : DSR Items 1 2.8 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in

More information

STATUS OF PARTIAL OCCUPANCY. Plan revalidation from MDA obtained, Application for partial OC submitted to MDA.

STATUS OF PARTIAL OCCUPANCY. Plan revalidation from MDA obtained, Application for partial OC submitted to MDA. 1. PROGRESS IN TOWERS. Satisfactory progress has been achieved in finishing internal works.progress is being monitored closely by the AFNHB, contractor chased for expediting the pace 18 of work to complete

More information

BRIEF SPECIFICATION OF SCHOOL BUILDING. 1.1 Foundation Isolated and combined foundation as per structure design for G+1 story.

BRIEF SPECIFICATION OF SCHOOL BUILDING. 1.1 Foundation Isolated and combined foundation as per structure design for G+1 story. BRIEF SPECIFICATION OF SCHOOL BUILDING S.No. ITEM Specification 1 Foundation 1.1 Foundation Isolated and combined foundation as per structure design for G+1 story. 2 Superstructure 2.1 Superstructure RCC

More information

TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA

TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA AT PLOT NO. IIA/35, ACTION AREA IIA, NEW TOWN, KOLKATA, WEST BENGAL 700 157 Pages (1 5)

More information

PRICED BILL OF QUANTITIES

PRICED BILL OF QUANTITIES Engineering Projects (dia) Limited (A Govt of dia Enterprise) Words 1 EARTH WORK 1.1 Earth work in excavation by mechanical means (Hydraulic Excavator) / Manual means over areas (exceeding 30 cm in depth,

More information

PRM/KA/RERA/1251/446/PR/171230/002141

PRM/KA/RERA/1251/446/PR/171230/002141 PRM/KA/RERA/1251/446/PR/171230/002141 Strategically located near the Embassy Golf Links Business Park, Bangalore over looking the KGA Golf Course. Centrally located and easily accessible from all parts

More information

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15.

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15. Tender ref no: SBIIMS/BHU/AO/08-9/ Date: 0.0.09 Sl. No. ITEM SPECIFICATION UNIT QTY RATES AMOUNT PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING Earth work in excavation of recharge

More information

PROGRESS MEERUT PROJECT AS ON 22 OCT 2018 SSSEPTEMBERSEPTEMBER. in finishing internal works. Progress is being monitored closely by the Board JUNE 18

PROGRESS MEERUT PROJECT AS ON 22 OCT 2018 SSSEPTEMBERSEPTEMBER. in finishing internal works. Progress is being monitored closely by the Board JUNE 18 1. PROGRESS IN TOWERS. Satisfactory progress has been achieved in finishing internal works. Progress is being monitored closely by the Board and contractor chased for expeditingaugust the pace 18 of work

More information

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt:

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt: Amendment -1 Date: 17.02.2017 NIT No. RECPDCL/CSR/CWC/2016-17/3368 dt: 20.01.2017 Notice Inviting Tender (Bid Invited through e Tendering mode only) From Implementing Agencies for Turnkey execution of

More information

KANPUR SMART CITY LIMITED

KANPUR SMART CITY LIMITED Nagar Nigam Mukhyalay, 3 rd Floor, Moti Jheel, Kanpur - 208002 Tel.: +91 512 2541258, 2546194 Email:ksclkanpur@gmail.com KANPUR SMART CTY LMTED No.: KSCL/PMC/Open Gym/01/2 Date: 17/02/2018 Reply to queries

More information

THE TREASURE TOWER PROGRESS REPORT

THE TREASURE TOWER PROGRESS REPORT THE TREASURE TOWER PROGRESS REPORT About the Project: Project Developer Title of Project Project Reference Design & Supervision Consultant Interior Design Consultant Main Contractor Bin Faqeeh Real Estate

More information

½% % ATM 1 E.P.F. 3 UBN No.

½% % ATM 1 E.P.F. 3   UBN No. ½% % 1. ATM 03.46 02 1 E.P.F. 2 3 WWW.SPPP.Raj.nic.in UBN No. OFFICE OF THE MUNICIPAL CORPORATION, UDAIPUR TENDER"G" SCHEDULE Estimated Cost Earnest Money ½% Earnest Money 2% Tender Fee Period Date of

More information

IIM RAIPUR. Development of Phase I Campus including building for IIM Raipur at Naya Raipur

IIM RAIPUR. Development of Phase I Campus including building for IIM Raipur at Naya Raipur MONTHLY PROGRESS REPORT IIM RAIPUR Development of Phase I Campus including building for IIM Raipur at Naya Raipur (PMC by Naya Raipur Development Authority) MONTHLY PROGRESS REPORT AS ON 31 st MAY -2017

More information

Saraswathi. Floor Plans

Saraswathi. Floor Plans 1 / 15 Saraswathi Saraswathi is situated in a posh yet serene locality in Besant Nagar, a stone s throw away from Elliots Beach. The property covers 3 grounds and houses 8 apartments in a spacious 3 BHK

More information

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M. Bill of Quantities Nature of work : Construction of Health Center with 8 rooms (Clinics, Pharmacy, Labs, Fence & Latrines) Location: Shakreen- El Fasher Town- North Darfur State No. Description Qty Unit

More information

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: EPI/WRO/CON/757/0119 FOR Construction of Boundary Wall and allied works for DHH & MCH Hospital at Kendrapara at Odisha state VOLUME III PRICE BID

More information

ARCHITECTURAL DRAWINGS

ARCHITECTURAL DRAWINGS PROJECT DETAILS Implementation Partner: Project title: Grant No.: KIS062 Content : ARCHITECTURAL DRAWINGS SHEET NO. REHABILITATION OF GRANT NO.: - KIS062 COVER SHEET INDEX SHEET CONTENTS 01 02 03 04 05

More information

BILL OF QUANTITIES. S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of

BILL OF QUANTITIES. S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of BILL OF QUANTITIES Name of Work: Beautification of Adalatganj Talab, Patna, Bihar S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of specified

More information

MILESTONES : JAIPUR PROJECT

MILESTONES : JAIPUR PROJECT MILE STONE Date Due to be completed MILESTONES : JAIPUR PROJECT Activities to be under taken/ Completed in /buildings mentioned in Col 2 Penalty in case of failure to achieve Milestone 1 1 2 3 4 st 12.06.18

More information

PROGRESS BHUBANESWAR AS ON 15 SEP 2017 AVERAGE DAILY LABOUR IN AUG-SEP: 319

PROGRESS BHUBANESWAR AS ON 15 SEP 2017 AVERAGE DAILY LABOUR IN AUG-SEP: 319 AVERAGE DAILY LABOUR IN AUG-SEP: 319 TOWER NO: A1 OFFICERS (Overall completion-92.44%) Total floors: S1+S2+8 Total Flats: 32 PROGRESS: STRUCTURAL WORK (Terrace structure completed) BRICK WORK (Except lower

More information

HIDD HEIGHTS PROGRESS REPORT

HIDD HEIGHTS PROGRESS REPORT HIDD HEIGHTS PROGRESS REPORT About the Project: Project Developer Title of Project Project Reference Design & Supervision Consultant Interior Design Consultant Main Contractor Bin Faqeeh Real Estate Investment

More information

FOR. RCC Structural Works for Construction of Infectious Block Building at Kendrapara, Odisha state VOLUME III PRICE BID/BILL OF QUANTITIES

FOR. RCC Structural Works for Construction of Infectious Block Building at Kendrapara, Odisha state VOLUME III PRICE BID/BILL OF QUANTITIES AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: WRO/CON/757/0188 FOR RCC Structural Works for Construction of Infectious Block Building at Kendrapara, Odisha state VOLUME III PRICE BID/BILL OF QUANTITIES

More information

( B ) CEMENT CONCRETE ( PLAIN & REINFORCED ) RS. ( F ) DOORS, WINDOWS AND VENTILATORS RS. ( J ) STRUCTURAL STEEL WORK & ROOFING RS.

( B ) CEMENT CONCRETE ( PLAIN & REINFORCED ) RS. ( F ) DOORS, WINDOWS AND VENTILATORS RS. ( J ) STRUCTURAL STEEL WORK & ROOFING RS. PROJECT : CONSTRUCTION OF ISOLATION SHED AT G.NO 314 TILEKARWADI OWNER : BAIF DEVELOPMENT RESEARCH FOUNDATION SCHEDULE OF QUANTITIES AND RATES * SUMMARY STATEMENT :- ( A ) EXCAVATION, FILLING AND SOLING

More information

BILL OF QUANTITIES (BOQ) ADMIN OFFICE - FIRST FLOOR - KALABURAGI

BILL OF QUANTITIES (BOQ) ADMIN OFFICE - FIRST FLOOR - KALABURAGI Item No. Civil Works:- BILL OF QUANTITIES (BOQ) ADMIN OFFICE - FIRST FLOOR - KALABURAGI Description Qty. Unit Rate Amount 1 Granite Cladding near entrance. Providing and fixing to the 110 wall after preparing

More information

Study: Construction Process at Plot 22, Shivaji Nagar, Govandi, Mumbai

Study: Construction Process at Plot 22, Shivaji Nagar, Govandi, Mumbai -Work in Progress- Study: Construction Process at Plot 22, Shivaji Nagar, Govandi, Mumbai Date: July-August 2012 Researcher: Masoom Moitra Contractor: Wasim Khan Updates: contact@urbanology.org Web: www.urbanology.org

More information

Providing and laying hammer dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding the cost of bedding). 40mm 22.

Providing and laying hammer dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding the cost of bedding). 40mm 22. 1 CG0001 Clearing grass including removal of rubbish within 50m of site 91.00 m² 2 EW0001 Surface dressing of ground, including removal of vegetation and inequalities < 150mm deep, disposal of rubbish

More information

Sl No. Sqm Sqm Sqm Cum Cum 0.73

Sl No. Sqm Sqm Sqm Cum Cum 0.73 BOQ Name of Work: Repairing & repainting works at the adjunct room between Old block and New Extension Building in Second floor of Chemistry Department. Sl No 1 2 3 4 Desription of Item Unit Qnty Rate

More information

# 150

# 150 COURSE NAME COURSE CODE : Civil Engineering Group : CE/CR/CV/CS SEMESTER/YEAR : Fifth for CE/CS/CR and Sixth for CV SUBJECT TITLE SUBJECT CODE : : Estimating and Costing Teaching and Examination Scheme:

More information

GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT. Construction of Culvert on Sunamudi Nalla (2 Span RCC slab)

GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT. Construction of Culvert on Sunamudi Nalla (2 Span RCC slab) BID IDENTIFICATION NO. DRDA, SBP- 10/2013-14 GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT PRICE BID DOCUMENTS FOR THE WORK (Civil works) Construction of Culvert on Sunamudi Nalla (2 Span RCC slab) ESTIMATED

More information

SINAR AHS BILL OF QUANTITIES Cost code Description Unit Qty 1 SINAR AHS Contractors General Conditions Site Works Setting out works: Rates

SINAR AHS BILL OF QUANTITIES Cost code Description Unit Qty 1 SINAR AHS Contractors General Conditions Site Works Setting out works: Rates SINAR AHS BILL OF QUANTITIES Cost code Description Unit Qty 1 SINAR AHS 01000 Contractors General Conditions 02000 Site Works Setting out works: Rates shall include but not limited to all necessary equipments,

More information

GEE GE STRUCTURALS PRIVATE LIMITED PROJECT NAME: GEE GE PLATINA

GEE GE STRUCTURALS PRIVATE LIMITED PROJECT NAME: GEE GE PLATINA GEE GE STRUCTURALS PRIVATE LIMITED PROJECT NAME: GEE GE PLATINA GEE GE STRUCTURALS PRIVATE LIMITED We introduce our selves as Builders and Flat Promoters, doing Civil and allied works in and around Chennai

More information

footings are provided with a concrete grade of M20. The maximum axial load 1600 KN as arrived from design is taken for the design of the footing.

footings are provided with a concrete grade of M20. The maximum axial load 1600 KN as arrived from design is taken for the design of the footing. ISSN XXXX XXXX 2017 IJESC Research Article Volume 7 Issue No.8 Planning, Designing and Estimation of a Bank Building D.Gangasekhar 1, B.Ramakrishna 2 M.Tech, (Structural Engineering) 1, Assistant Professor

More information

Description Unit Quantity Rate Kshs. Amount Kshs.

Description Unit Quantity Rate Kshs. Amount Kshs. BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove

More information

NATIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPLLI ESTATE MAINTENANCE DEPARTMANT NAME OF THE CONTRACTOR / FIRM :

NATIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPLLI ESTATE MAINTENANCE DEPARTMANT NAME OF THE CONTRACTOR / FIRM : NATIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPLLI- 620015 ESTATE MAINTENANCE DEPARTMANT SCHDULE OF WORK Name of Work :Renovation of Geotechnical Lab and Environmental lab in Civil Engineering Departemnt

More information

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE S.NO Description Unit Total Qty EARTH WORK EXCAVATION : Earthwork in excavation at all depths for foundation, pile cap,drain, ramp,pits, etc.,

More information

GEE GE STRUCTURALS PRIVATE LIMITED PROJECT NAME: GEE GE GEM

GEE GE STRUCTURALS PRIVATE LIMITED PROJECT NAME: GEE GE GEM GEE GE STRUCTURALS PRIVATE LIMITED PROJECT NAME: GEE GE GEM GEE GE STRUCTURALS PRIVATE LIMITED We introduce our selves as Builders and Flat Promoters, doing Civil and allied works in and around Chennai

More information

Name of work : Special Repairs to North West Mugamandapam of 1000 Pillar Mandapam of A/m. Aranganathaswamy temple, Srirangam.

Name of work : Special Repairs to North West Mugamandapam of 1000 Pillar Mandapam of A/m. Aranganathaswamy temple, Srirangam. Value of Contract Rs. 30,46,963.00/- EMD : Rs. 30,500/- 1 2 3 4 5 Probable Quantity 99.00 26.40 26.40 Dismantling of weathering course and disposing the same to outside the temple premises etc, Dismantling

More information

contractor has assured that these blocks would be ready for handing over to allottees as soon as the Occupancy Certificate

contractor has assured that these blocks would be ready for handing over to allottees as soon as the Occupancy Certificate 1. PROGRESS IN TOWERS. The towers A, F, G, H and J for which partial occupancy has been requested, are being brought for 100% completion. The contractor has assured that these blocks would be ready for

More information

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017 Premier Inn, Wilson Street, Middlesbrough, TS1 1AE Site progress report February 2017 Site set up Currently 4 weeks in to the build the site has been cleared and hoardings have been erected. Welfare cabins

More information

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI 620 015 ESTATE MAINTENANCE DEPARTMENT NOTICE INVITING TENDERS NO: NITT/EMD//Civil works / 2015 TENDER NOTIFICATION Ref: NITT/EMD/ CoW/Civil Works /15-16

More information

CONCRETE BLOCK MASONRY

CONCRETE BLOCK MASONRY CONCRETE BLOCK MASONRY CONTENT Introduction Types Manufacturing process Properties Advantages Introduction These are the concrete blocks either hollow or solid. A hollow unit is that unit which has core

More information

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali FINANCIAL BID DOCUMENT Miscellaneous Civil Work in Low Lying Area at

More information

WALNUT CREEK - DETAILS OF TECHNICAL SPECIFICATIONS SPECS FOR VASWANI PORTION. 200 mm solid concrete blocks. Reinforced Cement Concrete - Flat Roof

WALNUT CREEK - DETAILS OF TECHNICAL SPECIFICATIONS SPECS FOR VASWANI PORTION. 200 mm solid concrete blocks. Reinforced Cement Concrete - Flat Roof WALNUT CREEK - DETAILS OF TECHNICAL SPECIFICATIONS DESCRIPTION BASIC STRUCTURE Foundation Super Structure Internal Walls External Walls Roof RCC footing Framed Structure 200 & 100 mm Solid Concrete Blocks

More information

HIDD HEIGHTS PROGRESS REPORT

HIDD HEIGHTS PROGRESS REPORT HIDD HEIGHTS PROGRESS REPORT About the Project: Project Developer Title of Project Project Reference Design & Supervision Consultant Interior Design Consultant Main Contractor Bin Faqeeh Real Estate Investment

More information

WEB UPDATE AS ON 20 JUL 18 AFNHB MYSORE PROJECT

WEB UPDATE AS ON 20 JUL 18 AFNHB MYSORE PROJECT WEB UPDATE AS ON 20 JUL 18 AFNHB MYSORE PROJECT 1. The contractor is progressively mobilising the requisite manpower and machineries at site. Labour strength has reached 300 plus as on date. 2. Progress

More information

PROGRESS BHUBANESWAR AS ON 15 FEB 2018 AVERAGE DAILY LABOUR IN JAN FEB 2018: 245

PROGRESS BHUBANESWAR AS ON 15 FEB 2018 AVERAGE DAILY LABOUR IN JAN FEB 2018: 245 AVERAGE DAILY LABOUR IN JAN 2017- FEB 2018: 245 TOWER NO: A1 OFFICERS (Overall completion-95.45%) Total floors: S1+S2+8 Total Flats: 32 PROGRESS: STRUCTURAL WORK (Terrace structure completed) BRICK WORK

More information

PRE-CAST HOUSE CONSTRUCTION

PRE-CAST HOUSE CONSTRUCTION PRE-CAST HOUSE CONSTRUCTION BDA is a Planning and Development Authority Jurisdictional Area is 1370 sq.km. Developed 64 Layouts Distributed 1,40,000 of sites Developed Infrastructure Works like Ring Roads

More information

nominal mix cement concrete with crushed stone aggregate using concrete mixer in foundation, plinth and at ground level excluding cost of form work.

nominal mix cement concrete with crushed stone aggregate using concrete mixer in foundation, plinth and at ground level excluding cost of form work. DETAILED ESTIMATE Name of Work : DETAILED ESTIMATE OF PROPOSED RAW MATERIAL & FINISHED GOODS STORAGES, CASSIA TORRA SEED CLEANING UNIT, CASSIA TORRA POWDER & GUM MANUFACTURING PLANT AT IIDC NAYANPUR GIRWARGANJ

More information

Chapter 9 ALTERNATIVE TECHNOLOGIES

Chapter 9 ALTERNATIVE TECHNOLOGIES Chapter 9 ALTERNATIVE TECHNOLOGIES 9.1 INTRODUCTION In the current scenario of pollution caused by construction Industry in India, a need arises to cater the market demand with energy efficient materials

More information

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI ` INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI-110068 NOTICE INVITING QUOTATION IG/CMD/NIQ-civil/2014 Dated: - 26/06/2014 Name of work:- Construction

More information

BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I

BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I S.No. Description Unit Qty RATE Amount PART-I CIVIL WORKS B-PLAIN AND REINFORCED CEMENT CONCRETE : Notes : ( the following

More information

Compiled by: Civil Works Department, SSA Punjab.

Compiled by: Civil Works Department, SSA Punjab. 45 Compiled by: Civil Works Department, SSA Punjab. TIPS FOR CIVIL CONSTRUCTION WORKS 1. ISI marked 43 Grade cement of major manufacture must be used. 2. ISI mark Steel must be used. 3. Clean & Fine Sand

More information

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount EXTERNAL WORKS DEMOLITION AND ALTERATIONS EXTERNALLY Pulling down to ground level; removing debris from Site a 200 mm thick masonry wall finished both sides with plaster and paint; net total area 158 square

More information

0331 Brick and block construction

0331 Brick and block construction 0331 BRICK AND BLOCK CONSTRUCTION 1 GENERAL 1.1 STANDARDS Materials and construction: To AS 4773.1 and AS 4773.2. 2 PRODUCTS 2.1 DURABILITY Exposure environment: [complete/delete] Exposure locations: To

More information

SUB: TENDER FOR BUILDERS WORK, WATER SUPPLY, SANITARY INSTALLATION, ELECTRICAL INSTALLATION, LIFTS, INTERIOR FURNISHING WORK AND OTHER ANCILLARY WORKS FOR PROPOSED CONSTRUCTION OF SALES TRAINING CENTRE

More information

GMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh ( , ) 22 March 2014

GMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh ( , ) 22 March 2014 GMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh (23.968661, 90.296963) 22 March 2014 1 2 Observations 3 Highly stressed columns Cursory calculations indicate that the working stresses of columns

More information

BUILDING SKILLS. Building Skills : Basic Painting. Building Skills : Plaster & Tiler. Course Content : Course Content : Duration : 10 Days

BUILDING SKILLS. Building Skills : Basic Painting. Building Skills : Plaster & Tiler. Course Content : Course Content : Duration : 10 Days Building Skills : Basic Painting Use and maintain hand tools Prepare new wall surfaces Prepare old wall surfaces Coat new wall surface with P. V. A Prepare wooden & metal surface (Door & Frame) for enamel

More information

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SCHEDULE OF RATES SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT 1 Excavation for foundation in earth all types of soils like clay,

More information

City of Westerville Guide to Commercial Inspections

City of Westerville Guide to Commercial Inspections City of Westerville Guide to Commercial Inspections FOOTINGS - After the excavation, with the form work and any required reinforcing steel in place. All footings shall have loose soil removed, reinforcing

More information

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (Autonomous) (ISO/IEC certified)

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (Autonomous) (ISO/IEC certified) Important Instructions to Examiners: MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (Autonomous) (ISO/IEC -270001 2005 certified) 1) The answer should be examined by keywords and not as word-to-word as

More information

ABSTRACT SHEET Name of Work : Main Building Proposed Construction of RSETI Building On Plot No. 7/1 & 9 At-Babupeth, Chandrapur

ABSTRACT SHEET Name of Work : Main Building Proposed Construction of RSETI Building On Plot No. 7/1 & 9 At-Babupeth, Chandrapur ABSTRACT SHEET Name of Work : Main Building Proposed Construction of RSETI Building On Plot No. 7/1 & 9 At-Babupeth, Chandrapur Sr.No. Particulars Unit Qty. Rate Amount 1 Excavation for foundation in earth,

More information

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.)

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) Based on. I to IV w.e.f. 10 May 2012 Length of the Road =250 m, ROW 18 m Abstract Estimate S.No. Description of Item SOR Item Cost 1

More information

General Technical Specification

General Technical Specification GENERAL For calculating the requirements of cement in various items of work the following standards will be adopted. Over the above theoretical quantity of cement, additional allowance upto plus or minus

More information

PROJECT: PROPOSED MIGRANTS RESOURCE CENTER - MOGADISHU - IMPLEMENTED BY: CLIENT.

PROJECT: PROPOSED MIGRANTS RESOURCE CENTER - MOGADISHU - IMPLEMENTED BY: CLIENT. PROJECT: PROPOSED MIGRANTS RESOURCE CENTER IMPLEMENTED BY: CLIENT. MIGRANTS RESOURCE CENTER RESOURCE CENTER IOM : FEBRUARY 2018 DRAWING INDEX SHEET N O 01. 01/24 02. 02/24 03. 03/24 04. 04/24 05. 05/24

More information

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT TENDER NOTIFICATION

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT TENDER NOTIFICATION NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI 620 015 ESTATE MAINTENANCE DEPARTMENT NOTICE INVITING TENDERS NO: NITT/EMD//Civil / 2014 TENDER NOTIFICATION Ref: NIT-T/EMD/ COW/Civil Works / 2015 Date.14.05.2015

More information

WELCOME. to the Presentation on. Guest Lecture for Course CE- 401 at Department of Civil Engineering (Seminar Room) BUET, Dhaka

WELCOME. to the Presentation on. Guest Lecture for Course CE- 401 at Department of Civil Engineering (Seminar Room) BUET, Dhaka WELCOME to the Presentation on Guest Lecture for Course CE- 401 at Department of Civil Engineering (Seminar Room) BUET, Dhaka Prepared by Dr. Toufiq M. Seraj Engineer-Planner Managing Director, Sheltech

More information

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI GROUND FLOOR COMPLETION OF WORKS TO GROUND FLOOR SITE WORKS DEMOLITIONS AND ALTERATIONS Ground floor Removing a polythene damp proof membranes, complete with mesh fabric reference A 252, hacking edges

More information

PND Training Hall Conex Building, Kabul ABSTRACT OF COST

PND Training Hall Conex Building, Kabul ABSTRACT OF COST PND Training Hall Conex Building, Kabul ABSTRACT OF COST A Civil Works All work items shall be carried as per drawing, specification and instruction of the Engineer. 1 Sub-structure Works Earthwork in

More information

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00 Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type

More information

INSPECT DIRECT Pty Ltd

INSPECT DIRECT Pty Ltd Web Page: www.inspectdirect.com.au INSPECT DIRECT Pty Ltd Property Address: Sample.Dilapidation.Report Victoria Building Status / Dilapidation Report This is not a Pest Inspection The Building Status /

More information

PRECAST CEMENT PRODUCTS

PRECAST CEMENT PRODUCTS Profile No.: 30 NIC Code: 23959 PRECAST CEMENT PRODUCTS 1. INTRODCUTION: Reinforced cement concrete products are becoming popular as modular house and apartment buildings are based on standard designs.

More information

AFD: Civil: Inq: April 23, 2016

AFD: Civil: Inq: April 23, 2016 AFD: Civil: Inq: 20160402 April 23, 2016 To, Sub: - Inquiry for Civil work for Granite flooring and miscellaneous repairs work at ADMN Corridor at Amulfed Dairy, Gandhinagar. We invite your most competitive

More information

TERRACE FACTORY - TYPE A1

TERRACE FACTORY - TYPE A1 TERRACE FACTORY - TYPE A1 Total Built-up Size: 3,401 sq ft No. of Units: 24 TERRACE FACTORY - TYPE A1 Total Built-up Size: 3,401 sq ft No. of Units: 24 SPECIFICATION FACTORY HEIGHT Approximately 6.6 meters

More information

ANISO9001&14001COMPANY TENDER DOCUMENT. TENDER No: NERO/CON/TU/659/325 dated FOR

ANISO9001&14001COMPANY TENDER DOCUMENT. TENDER No: NERO/CON/TU/659/325 dated FOR ANISO9001&14001COMPANY TENDER DOCUMENT TENDER No: NERO/CON/TU/659/325 dated 20.09.2018 FOR TENDER FOR CONSTRUCTION OF UPGRADATION OF CENTRAL ROAD INCLUDING LANDSCAPE LIGHTING BY MUSHROOM TYPE LED BOLLARD

More information

Sl No. Rate. Hct By manual means In area of light jungle

Sl No. Rate. Hct By manual means In area of light jungle BILL OF QUANTITIES Name of Work : Extension of NH 37 from its dead end near Saikhowaghat in Assam ending near Roing in Arunachal Pradesh under Trans Arunachal Highway programme. SH: Strengthening of Shantipur

More information

BoQ for Flat No.B 39/4, Bank's Nerul complex, Nerul, Navi Mumbai S.no Description Qnty. Rate Unit Amount

BoQ for Flat No.B 39/4, Bank's Nerul complex, Nerul, Navi Mumbai S.no Description Qnty. Rate Unit Amount BoQ for Flat No.B 39/4, Bank's Nerul complex, Nerul, Navi Mumbai S.no Description Qnty. Rate Unit Amount 1 2 3 4 5 Providing & laying double charge vitrified flooring tiles make Kajaria, Johnson, or equivalent

More information

Contract Rates & Specifications for your Home Construction - From the Makers of India s Finest Designer Homes

Contract Rates & Specifications for your Home Construction - From the Makers of India s Finest Designer Homes Quality isn't something that can be argued into a document or promised into it It must be put there on the structure If it isn't put there, even the finest sales talk in the world won't act as a substitute,

More information

BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION.

BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION. ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION. Clearing of site, site office/work shed, Toilet, etc. A provisional cost to be allocated in South African Rands.

More information

Floor Plans. Availability. Construction Specifications. Sri Chakra. Planning Permit : B / Spl. Bldg / 334 / 2013 dated

Floor Plans. Availability. Construction Specifications. Sri Chakra. Planning Permit : B / Spl. Bldg / 334 / 2013 dated 1 / 34 Sri Chakra Sri Chakra Planning Permit : B / Spl. Bldg / 334 / 2013 dated 26.09.2013 Building Permit : CEBA/ WDCN09 / 369 /2013 dated 20.11.13 Floor Plans Empty section. Edit page to add content

More information