POTENTIAL NEW DECORAH ELEMENTARY SCHOOL. Information and Planning
|
|
- Naomi Barton
- 5 years ago
- Views:
Transcription
1 POTENTIAL NEW DECORAH ELEMENTARY SCHOOL Information and Planning
2 EXTENSIVE PROBLEMS WITH EXISTING ELEMENTARY FACILITIES There are not enough classrooms to accommodate six sections per grade. The classrooms are not suited to 21st century teaching and learning. Interior classrooms create poor educational environments. The buildings have poor ventilation which leads to air quality issues. These buildings do not allow for effective security measures. The lack of air conditioning in these two buildings impacts the entire district. The roof requires extensive repairs.
3 FISCALLY IRRESPONSIBLE TO REMODEL OR EXPAND EXISTING FACILITIES The estimated cost to renovate John Cline and West Side was $9.1 million three years ago. This would have provided us with space for only five sections of each grade level. Estimated cost to provide the necessary electrical upgrade and equipment needed to air condition JCE and WSECC is between $750, ,
4 JOHN CLINE There is no practical way to expand. There is no cost-effective way to remodel the building. The building is of poor structural quality.
5 WEST SIDE EARLY CHILDHOOD CENTER The building was built in 1939, and the roof, mechanical and electrical systems are seriously deficient. The layout of the building is very impractical. It is very inefficient to operating a building for so few students.
6 USING THE NORTH WINNESHIEK BUILDING NOT A VIABLE SOLUTION This building is the same vintage as John Cline, and has all of the same problems. The building is not large enough to accommodate three grades of six sections each. To be utilized even for temporary use, the building would need to be extensively remodeled. The cost of transporting three grades of student to the North Winneshiek building would be high. Based on transportation costs, transporting three grade levels would cost $71, per year. Scheduling district wide would be impacted to accommodate travel time to North Winneshiek building.
7 REBUILDING ON THE JOHN CLINE SITE IS NOT A VIABLE SOLUTION The construction of a new facility would potentially require three grades to be housed in portable classrooms for two to three years. This would cost approximately $1.6 million for the first year, and $1 million for each additional year. This would still not provide for essential services, such as a gym, cafeteria, office, etc.
8 SIGNIFICANT BENEFITS TO BUILDING ON THE PROPERTY IN QUESTION This would avoid wasteful spending on portable classrooms or remodeling a facility for short term use. The construction of a new facility presents an opportunity to improve traffic flow and parking and pedestrian safety around both the elementary school and the high school. Traffic around the elementary school will be considerable wherever it is located. This area is best suited to handle this volume of traffic. The location of a new facility near the existing high school provides many opportunities for savings, including efficient food service operations and staff sharing. Locating the elementary facility near the HS has curricular importance as well. There are many opportunities for interaction between high school and elementary students.
9 THE SALE OF THIS LAND TO THE DISTRICT WOULD PROVIDE SIGNIFICANT BENEFITS TO THE COMMUNITY A new elementary facility would help to attract young families and new businesses to the community. The Park/Rec program would have access to an additional full-size gym located across from their offices. This project would improve the appearance of one of the most visible areas of the community. The money the District would pay to the City could be put toward the construction of the kind of complex that will serve the community s recreational need for the next 50 years.
10 ARCHITECTURAL CONCEPT DRAWING
Coos Bay Best Bond Cost Breakdowns
Coos Bay Best Bond Cost Breakdowns Overview [For itemized breakdown by school, see following pages.] Harding: New 7 th /8 th grade school on Harding site, including second gym: $18,440,000 Demotion of
More informationST. BENEDICT ELEMENTARY SCHOOL CALGARY, ALBERTA
ST. BENEDICT ELEMENTARY SCHOOL CALGARY, ALBERTA School Facility Evaluation Project Calgary Roman Catholic Separate School South Region, District #1 Prepared For Alberta Infrastructure March 2000 Prepared
More informationST CECELIA ELEMENTARY SCHOOL CALGARY, ALBERTA
ST CECELIA ELEMENTARY SCHOOL CALGARY, ALBERTA School Facility Evaluation Project Calgary Roman Catholic Separate School South Region, District #1 Prepared For Alberta Infrastructure March 2000 Prepared
More informationPigeon Lake Regional High School Falun, Alberta
Pigeon Lake Regional High School School Facilities Evaluation Project Pigeon Lake High Wetaskiwin Regional District No.11 Pigeon Lake High EXECUTIVE SUMMARY In November 1999 Alberta Infrastructure engaged
More informationMCER Study for Little Powder K-8
MCER Study for Little Powder K-8 CCSD #1 Little Powder K-8 Weston, WY Wyoming School Facilities Department Cheyenne, WY TSP, Inc. Sheridan, WY May 16, 2016 Table of Contents Introduction 3 Goals and Objectives
More informationRevised Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Three Story Academic Additi
Original Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 75% Three Story Academic Addition with CTE Gymnasium Addition: Multi-court gym 3 courts
More informationST PAUL ELEMENTARY SCHOOL CALGARY, ALBERTA
ST PAUL ELEMENTARY SCHOOL CALGARY, ALBERTA School Facility Evaluation Project Calgary Roman Catholic Separate School South Region, District #1 Prepared For Alberta Infrastructure March 2000 Prepared By
More informationDarien Public Schools. Master Plan Discussion Review of Elementary Schools Board of Education Meeting March 14, 2018
Darien Public Schools Master Plan Discussion Review of Elementary Schools Board of Education Meeting March 14, 2018 BACKGROUND MASTER PLAN REPORT SUBMITTED DECEMBER 2016 DOCUMENTED DISTRICT-WIDE INFRASTRUCTURE
More informationSt. Helens Middle School Facts
St. Helens Middle School Facts Information related to Ballot Measure 5-194 Did You Know. Outdated facilities have a direct impact on modern education. The accordion-style classroom partitions allow more
More informationDAT MEETING NOTES # 3
DAT MEETING NOTES # 3 MOA ARCHITECTURE Design Advisory Team 821 17 th Street, Suite 400 Denver, Colorado 80202 303.308.1190 Phone 303.308.1197 Fax Project: Superior Elementary School Date: 16 December
More informationST CLEMENT ELEMENTARY SCHOOL CALGARY, ALBERTA
ST CLEMENT ELEMENTARY SCHOOL CALGARY, ALBERTA School Facility Evaluation Project Calgary Roman Catholic Separate School South Region, District #1 Prepared For Alberta Infrastructure March 2000 Prepared
More informationPeter Kirk Elementary School Modernization vs. New-in-lieu of Modernization Report
Peter Kirk Elementary School Modernization vs. New-in-lieu of Modernization Report January 2016 Summary In consideration for a potential 2016 Bond measure for the Capital Facilities Program, Kirk Elementary
More informationBond Referendum: Proposed Capital Project
BRONXVILLE UNION FREE SCHOOL DISTRICT Building for the next 100 years Bond Referendum: Proposed Capital Project Overview Process started several years ago Review of 100 year old building needs: Five Year
More informationMadison School District. Strategic Five-Year Facility Maintenance Plan
Madison School District Strategic Five-Year Facility Maintenance Plan 2016 2020 Dear Madison Stakeholder, Throughout the past twenty years, Madison School District has experienced tremendous growth. Since
More information*Additional Projects were not part of the voter-approved 2006 Bond. They were able to be completed due to savings from other projects.
SECONDARY SCHOOLS Kirby Middle School Demolish 300, 400, and 500 buildings partial Change in total rebuild design New academic building - 33 classrooms *Rent portables for temporary classrooms partial
More informationBronx Community College. Five-Year Capital Plan FY through FY
Five-Year Capital Plan FY 2019-20 through FY 2023-24 Projects in priority order / costs in $ thousands Project Name FY 19-20 FY 20-21 FY 21-22 FY 22-23 FY 23-24 (B) Campus-Wide Fire Alarm Replacement DC
More informationBoard Meeting Presentation FEASIBILITY STUDY South Montgomery Community School Corporation. June 13, 2016
Board Meeting Presentation FEASIBILITY STUDY South Montgomery Community School Corporation June 13, 2016 Schedule/Major Milestones 2015 November December Data Collection Board Meeting- Update 2016 January
More informationBLIND BROOK-RYE PUBLIC SCHOOLS
BLIND BROOK-RYE PUBLIC SCHOOLS PROPOSED FACILITIES IMPROVEMENT PLAN Frequently Asked Questions with Answers 1. Why are we proposing a renovation of this scope in the District? The District s five-year
More informationIssue Paper # 7: Modernization Replacement Projects
Issue Paper # 7: Modernization Replacement Projects 1. Background BSD s student population has grown since the last capital bond in 2006 and facilities have experienced normal wear and aging leading to
More informationWOODBINE ELEMENTARY SCHOOL CALGARY, ALBERTA
WOODBINE ELEMENTARY SCHOOL CALGARY, ALBERTA School Facility Evaluation Project Calgary School Board, District 19 Prepared For Alberta Infrastructure March 2000 Prepared By Bernbaum Architect Ltd. Rae Mclean
More informationMidland Public Schools
Midland Public Schools Facility Renewal Proposal A 12-15 Year Plan February 24, 2015 Bond Proposal Why is this needed? Age of facilities Energy inefficiency School safety and security issues Aging bus
More informationCompleted. Project. Melbourne High School. Comprehensive Additions and Renovations
Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project
More informationCORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting
CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan Community Information Meeting October 2017 AGENDA Meeting Objectives Draft Plan Overview School Improvements for specific site Feedback/Listening
More informationFacility Improvements
AL-SI-02 ASPHALT PLAY AREA UPGRADE AL-SI-09 CURB RAMP ADDITIONS Asphalt improvements needed around building and playshed to provide a safe play area. Curb ramps needed to provide wheelchair access and
More informationEdmonton Public School District No. 7
EXECUTIVE SUMMARY 1. Overall Impressions Sherwood Elementary School resides in a quiet residential neighborhood with a shared parking area adjacent to the community league on the north and a generous play
More informationBUILDING FOR OUR FUTURE
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE ADDRESSING THE DISTRICT S CRITICAL FACILITY AND SITE NEEDS CURRENTLY THE BAND-AID APPROACH COSTS MONEY
More information2016 BOND INFORMATION
2016 BOND INFORMATION This publication is provided as a public service by the offices of Operations and Maintenance, Communications and Financial Services. www.svvsd.org @svvsd 395 South Pratt Parkway,
More informationFrost Technical Center
Frost Technical Center 1955 Greenhouses Addition Various other additions and renovations Provide site security improvements Provide improved Admin area field of view to site entrance Provide security camera
More informationGoverning Board Capital Construction Program Annual Workshop September 10, 2013 Agenda
Governing Board Capital Construction Program Annual Workshop September 10, 2013 Agenda Prop R Status Projects Completed Status of Facilities Master Plans Prop R 5-Year Construction Plan Summary; IPP s
More informationBend La Pine Schools 2016 Sites and Facilities Project Needs List
New Elementary 33,155,940 Construct new elementary school 33,155,940 New High School 129,028,000 Construct new high school 129,028,000 Bear Creek Elementary 4,028,138 Add instructional multi use space
More informationCHADWICK ELEMENTARY SCHOOL PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent
PRELIMINARY DESIGN PRESENTATION The Board of Education of Baltimore County Verletta White, Interim Superintendent Agenda 2 Project Information Project Goals Site Conditions Building Organization Renderings
More information2007 Projects: MEDFORD SCHOOL DISTRICT 549C Bond Funded Construction Projects Updated: September 4, North Medford High School:
MEDFORD SCHOOL DISTRICT 549C Bond Funded Construction Projects Updated: September 4, 2007 North Medford High School: Project Summary: Renovate and add new addition based on facility evaluation and design.
More informationMaster Plan, January 16, 2012 Roesling Nakamura Terada Architects
L a C o s t a C a n y o n H i g h S c h o o l Master Plan, January 16, 2012 Roesling Nakamura Terada Architects I n t r o d u c t i o n 1.0 INTRODUCTION -Programming -Site and Facilities Development upgrades
More informationBLIND BROOK-RYE UFSD SCHOOL FACILITIES PLANNING SECOND UPDATE ON RECOMMENDED PROJECTS
BLIND BROOK-RYE UFSD SCHOOL FACILITIES PLANNING SECOND UPDATE ON RECOMMENDED PROJECTS January 9, 2017 SUMMARY OF OCTOBER 17 TH PRESENTATION 1. Five-Year Capital Facilities Plans & 15-year History 2. 2016-2020
More information/ Policy Number: Policy Name: Capital Planning and Development Processes Definitions
Page 1 7-101 Definition A. Alternative Construction Delivery Methods: Building Delivery Processes that vary from the more standard Design-Bid-Build model. These may include Construction Manager-At-Risk
More informationWELD COUNTY SCHOOL DISTRICT RE-1 04/12/2016 BUILDING ASSESSMENT INTRODUCTION
PURPOSE OF THIS REPORT: Relationship to the Master Plan: These Building Assessments are part of a Strategic Facilities Master Plan (SFMP). H+L Architecture was hired to assist the District in creating
More informationNOYES EDUCATION CAMPUS
INITIAL YEAR BUILT 1930 BUILDING AREA 49,700 SF CURRENT PROGRAM CAPACITY 321 ENROLLMENT 2008 337 WARD 5 PROPOSED PROGRAM CAPACITY 450 Site Plan NOYES - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-8
More informationAZUSA UNIFIED SCHOOL DISTRICT
AZUSA UNIFIED SCHOOL DISTRICT BOARD STUDY SESSION June 9, 2014 EVALUATION OF STATUS OF FACILITES AND FUTURE NEEDS NEEDS vs. FUNDING SETTING PRIORITIES 5) OTHER ADDITIONAL IMPROVEMENTS 4) OTHER ARCHITECTURAL
More informationMOORESTOWN HIGH SCHOOL REFERENDUM PROJECTS
MOORESTOWN HIGH SCHOOL 06/22/15 08/28/15 Security vestibule at main entrance and transportation office; replacement of selected exterior doors; access controls at exterior doors 06/22/15 12/31/15 Upgrade
More informationSuperintendent Proposed Capital Improvements Program. Fiscal Years
Superintendent Proposed Capital Improvements Program Fiscal Years 2016-2025 TABLE OF CONTENTS Summary Page 1 Capital Projects Pages 2-7 Capital Projects Description Pages 8-16 SUPERINTENDENT PROPOSED CAPITAL
More informationDesign Advisory Committee Meeting #5. December 19, 2017
Design Advisory Committee Meeting #5 December 19, 2017 1 Meeting Agenda 1. Agenda / Attendance Sheet 5 minutes 2. BEST Grant Recap 3. Review Funding Options additional information 4. Master Plan Summary
More informationSTRUCTURAL EVALUATION OF DOVER ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD)
STRUCTURAL EVALUATION OF DOVER ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD) For WLC Architects Kaiser Building 1300 Potrero Avenue Richmond, CA 94804 By DASSE Design, Inc. 33 New
More informationOconomowoc Area School District Facility Construction Update June 29, 2018
Oconomowoc Area School District Facility Construction Update June 29, 2018 IXONIA ELEMENTARY SCHOOL Finishing touches and final cleaning has begun inside the new addition at Ixonia Elementary, and major
More informationSTRUCTURAL/SEISMIC REPORT Roosevelt Elementary School. Report prepared by DCI Engineers. For. Medford School District. Completed By: DCI Engineers
J. Mark D Amato Guy A. Conversano Elizabeth A. Jensen Roger L. Heeringa Mark D. Aden Harry Jones II Troy E. Bean Tom C. Xia, Ph.D. Richard L. Hemmen Grant C. Buckingham Wade W. Younie STRUCTURAL/SEISMIC
More informationLisbon School Department. 5 Year Plan-Buildings, Grounds, Equipment, & Technology. April 2016
April 2016 Following is a list of items that the Lisbon School Department deems necessary for Capital Improvements for the next 5 years. Capital Improvements shall mean any construction project exceeding
More informationDEL MAR UNION SCHOOL DISTRICT BOND PROJECT DESCRIPTION
DEL MAR UNION SCHOOL DISTRICT TECHNOLOGY & 21 ST -CENTURY LEARNING INITIATIVE BOND PROJECT DESCRIPTION The Board of Trustees of Del Mar Union School District ("District") has evaluated the need to acquire,
More informationTEMPLATE A P S S I T E M A S T E R P L A N N I N G
TEMPLATE A P S S I T E M A S T E R P L A N N I N G Albuquerque Public Schools Department of Facilities Design + Construction January 1, 2017 1 INTRODUCTION & OVERVIEW Albuquerque Public Schools develops
More informationOur Students. Our Schools. Our Future.
HARRISON CENTRAL SCHOOL DISTRICT PROPOSED CAPITAL IMPROVEMENTS Our Students. Our Schools. Our Future. VOTE OCTOBER 18, 2016 At your local elementary school WHAT IS THE NEED FOR A BOND REFERENDUM? Bonding
More informationFRIDLEY SCHOOL DISTRICT West Moore Lake Drive Fridley, MN REVIEW AND COMMENT DOCUMENT
FRIDLEY SCHOOL DISTRICT 14 6000 West Moore Lake Drive Fridley, MN 55432 REVIEW AND COMMENT DOCUMENT For submission to Minnesota Department of Education June 20, 2012 SUMMARY The Fridley Public Schools
More informationSchool Board Proposed Capital Improvements Program. Fiscal Years
School Board Proposed Capital Improvements Program Fiscal Years 2017-2026 TABLE OF CONTENTS Summary Page 1 Capital Projects Pages 2-8 Capital Projects Description Pages 9-14 SCHOOL BOARD PROPOSED CAPITAL
More informationNEW HAVEN UNIFIED SCHOOL DISTRICT BOND PROJECT LIST
NEW HAVEN UNIFIED SCHOOL DISTRICT BOND PROJECT LIST The New Haven Unified School District will use bonds funds to provide up to date classrooms, renovate athletic fields and related facilities, replace
More informationBecker Morgan Group, Inc. (architectural and site systems) Gipe Associates, Inc. (mech./elec./plumbing systems) Morabito Associates, Inc.
AGENDA REVIEW PROJECT BACKGROUND & PURPOSE REVIEW PROJECT FINDINGS REVIEW THE 4 OPTIONS DEVELOPED OPTION COMPARISONS REVIEW PROJECT SCHEDULE COMMUNITY COMMENTS / QUESTIONS TEAM Becker Morgan Group, Inc.
More informationTABLE OF CONTENTS Page
TABLE OF CONTENTS Page Executive Summary i Facility Profile and Summary 1 Section 1 Site Conditions 4 Section 2 Building Exterior 7 Section 3 Building Interior 11 Section 4 Mechanical Systems 14 Section
More informationGREENVILLE ISD BID PACKAGES AND UPDATES 2014 Bond Program OCTOBER 2015
GREENVILLE ISD BID PACKAGES AND UPDATES 2014 Bond Program OCTOBER 2015 TABLE OF CONTENTS Bid Package 1 Crockett Elementary School Additions and Renovations 3 L.P. Waters Early Childhood Center Renovations
More informationNAGLE HARTRAY ARCHITECTURE GILBANE BUILDING. MANAGEMENT BOE Business Meeting September 15, Comprehensive Study. North Shore School District 112
NAGLE HARTRAY ARCHITECTURE GILBANE BUILDING C O M P A N Y P R O J E C T MANAGEMENT A D V I S O R S BOE Business Meeting September 15, 2015 Comprehensive Study North Shore School District 112 2 Middle School
More informationFUTURE BOND PROGRAM PROPOSED PROJECTS Summary Report. September 2013
Project Summary and Total Project Cost NEW CONSTRUCTION PROJECTS A. Campus Center Replacement $ 29,474,691 B. East Campus Classroom and Office Building(s) $ 34,674,804 C. Wake Center Replacement $ 40,051,128
More informationBALLOU SENIOR HIGH SCHOOL
INITIAL YEAR BUILT 1960 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1565 ENROLLMENT 2008 9-12 (1,252) STAY (753) WARD 8 PROPOSED PROGRAM CAPACITY 1200 Site Plan BALLOU - 1 PROPOSED PROGRAM PROFILE
More informationAndover Schools Facilities Update
Town Facilitlies Garage Andover Schools Facilities Update Andover High School Finance Committee May 9, 2018 West Middle School Collins Center Andover High School Facility Study Committee and Andover School
More informationBiddeford School Department
Biddeford School Department 5 Plan Buildings, Grounds & Equipment Table of Contents: John F Kennedy Memorial School Page: 1-2 Biddeford Primary School Page: 3-4 Biddeford Intermediate School Page: 5-6
More informationMeasure T Project List 2014 Santa Maria-Bonita School District Prop 39 School Bond November 4, 2014
Measure T Project List 2014 Santa Maria-Bonita School District Prop 39 School Bond November 4, 2014 Measure T DEFINED: Measure T is a local ballot measure on the November 2014 ballot seeking voter authorization
More informationCheldelin Middle School
Facility Information Address: 987 NE Conifer Blvd Corvallis Site Size: Building Area: Construction Date: Improved Parking: Grade Levels Served: Regular Classrooms: Portable Classrooms: Sept. 2007 Enrollment:
More informationCENTRAL ELEMENTARY SCHOOL
all images courtesy of www.gettyimages.com Renovation vs. Rebuild Analysis SCHLENKER & McKITTRICK ARCHITECTS, P.C. www.gettyimages.com RENOVATION VS. REBUILD ANALYSIS Central School Site Advantages Project
More informationCrockett Elementary School Renovations
We are your future. We are EPISD. August 7, 07 August 9, 07 Existing Conditions August 9, 07 Existing Conditions SITE PLAN 7 7 7 EXISTING DROP-OFF AREA CREATES CONGESTION AND BUS DROP-OFF IS NOT DEFINED.
More informationCONSTRUCTION UPDATE NOVEMBER 2015 THIS IS AUBURN.
CONSTRUCTION UPDATE NOVEMBER THIS IS AUBURN. PEBBLE HILL RENOVATIONS AND ADDITION COLLEGE OF LIBERAL ARTS DAVIS ARCHITECTS RUSSELL CONSTRUCTION OF ALABAMA View of Pebble Hill from Debardeleben Street.
More informationEasthampton High School Building Project. Public Information Forum #3
Building Project Public Information Forum #3 May 4, 2010 CAOLO & BIENIEK ASSOCIATES, INC. Architecture Planning Interior Design Presentation Agenda Introduction - Michael Buehrle, Chair EHS Building Committee
More informationReferendum Implementation
SPACE Net Gain (new) Classrooms Claremont = +47 Hillcrest & Elizabeth = +20 Utilization Gain SGS = +25 at 6-8 MS level SAFETY Annex Connection To Franklin Park Repair Parking Lots, Sidewalks & Outdoor
More informationJuanita High School Modernization vs. New-in-lieu of Modernization Report
Juanita High School Modernization vs. New-in-lieu of Modernization Report January 2016 Summary In consideration for a potential 2016 Bond measure for the Capital Facilities Program, Juanita High School
More informationLANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent
RENOVATION PRELIMINARY DESIGN PRESENTATION The Board of Education of Baltimore County Verletta White, Interim Superintendent AGENDA 2 Project Location General Information Existing Conditions Structural
More informationHealth Life Safety Survey and Master Facilities Plan
Health Life Safety Survey and Master Facilities Plan Community Presentation Board Meeting June 22, 2015 June 22, 2014 Board Presentation Overview and Summary of the Health Life Safety Survey and Master
More information(Continued on next page)
FULL TEXT OF BALLOT MEASURE E LONG BEACH UNIFIED SCHOOL DISTRICT REPAIR AND SAFETY MEASURE. To improve outdated classrooms/neighborhood schools by: improving technology/labs/career education classrooms/electrical
More informationBond Referendum Information. Sebeka School District #820 Vote on August 8, 2017
Bond Referendum Information Sebeka School District #820 Vote on August 8, 2017 Sebeka Student Enrollment Projection to 2024/25 Factors Considered in Projection Pattern of student enrollment change within
More informationTime Item Notes: Presenter. 7:15-7:45 Washington Elementary Design Updates JJ Henri
WOODBURN SCHOOL DISTRICT 103 Bond Advisory & Accountability Committee Agenda Woodburn School District Office 1390 Meridian Drive May 17, 2017 6:30-8:30 pm Time Item Notes: Presenter 6:30-6:35 6:35-6:40
More informationFranklin Pierce School District Capital Construction Bond Candidate Projects
Franklin Pierce School District 2016 Capital Construction Bond Candidate Projects 2016 Capital Construction Bond The following projects have been selected to be offered to 2030 Committee for consideration
More informationSTRUCTURAL EVALUATION OF TARA HILLS ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD)
STRUCTURAL EVALUATION OF TARA HILLS ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD) For WLC Architects Kaiser Building 1300 Potrero Avenue Richmond, CA 94804 By DASSE Design, Inc.
More informationStevens High School Pre Bond Presentation Claremont, NH
Stevens High School Pre Bond Presentation Claremont, NH Existing Conditions Existing Conditions Existing Conditions Existing Conditions Proposed site features New main entry that is ADA accessible New
More informationWATKINS ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 69,300 SF CURRENT PROGRAM CAPACITY 578 ENROLLMENT 2008 550 WARD 6 PROPOSED PROGRAM CAPACITY 550 Site Plan WATKINS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationEdmonton Public School District No. 7
EXECUTIVE SUMMARY 1. Overall Impressions The 1966 non-core school has actively pursued an ongoing maintenance and upgrade program to improve a number of past problem areas within the school. Extensive
More informationPaulsboro Public Schools
BOND REFERENDUM PRESENTATION January 27, 2015 713 Creek Road Bellmawr, NJ 08031 Telephone (856) 396-6200 Facsimile (856) 396-6205 Please visit us on the web at www.garrisonarch.com 1 05-12-14 AGENDA NJDOE
More informationWhitnall School District. Citizens Advisory Committee. Final Report. July 25, 2016
1 Whitnall School District Citizens Advisory Committee Final Report July 25, 2016 Mission 2 The Citizens Advisory Committee will: Review options and identify solutions as well as financing alternatives
More informationRebuilding our schools for health, safety, and cutting edge 21 st century learning
Rebuilding our schools for health, safety, and cutting edge 21 st century learning The problem The state of our schools: aging infrastructure The plan The Sustainable Built Environment Strategy: deep retrofits
More informationSchool Board Approved Capital Improvements Program. Fiscal Years
School Board Approved Capital Improvements Program Fiscal Years 2017-2022 Date Approved - June 17, 2016 HVAC REPAIR/WINDOW REPLACEMENT/ ENERGY MANAGEMENT Mt. Vernon Elementary - Replace HVAC equipment
More informationSCHOOL DISTRICT OF OKALOOSA COUNTY TECHNICAL ASSISTANCE MEMORANDUM PURCHASING
SCHOOL DISTRICT OF OKALOOSA COUNTY TECHNICAL ASSISTANCE MEMORANDUM PURCHASING FINANCE TAM: CONTACT: TELEPHONE: 2013-026 Vince Windham Program Director - Purchasing 833-7668 TO: FROM: DATE: SUBJECT: School
More informationCHAPTER 4 PROJECT ALTERNATIVES
CHAPTER 4 PROJECT ALTERNATIVES Introduction Alternatives Rejected as Infeasible Description of Project Alternatives Environmental Impacts from the Project Alternatives Conclusion [This page intentionally
More informationJanuary 2017 Project Update
January 2017 Project Update Overall Referendum Project Status: ON SCHEDULE/ON BUDGET All elements of the project completed to date have been completed on or ahead of schedule and final costs were under
More informationC. of O. / P.A. Program bonded. Energy Conservation bonded Science Lab Upgrades bonded Minor Repairs hard dollar
Section Contents Five-Year Capital Plan FY 2018-19 through FY 2022-23 Project Funding Type Five - Year Plan Total ( $ 000 s ) State match to existing City funding bonded $79,200 Critical Maintenance for
More informationSANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 18, 2016
FACILITIES COMMITTEE MEETING OCTOBER 18, 2016 1 ACTIVE PROJECTS Santa Ana College Central Plant, Infrastructure and Mechanical Upgrades 2 COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements
More informationCreative Performing Media Arts Middle School
Dawne St Kilkee St Enelra Pl Creative Performing Media Arts Middle School 5050 Conrad Ave. San Diego, CA 92117 Sub-district: A Cluster: Madison Year School Opened: 2002 Grades: 6-8 Arlene Pl 3 2 Conrad
More informationTo: Andrew Leonard, P.Eng. From: Neal Cormack, P.Eng. BC Hydro, 333 Dunsmuir Street, Vancouver, BC File: Date: March 8, 2017
Memo To: Andrew Leonard, P.Eng. From: Neal Cormack, P.Eng. BC Hydro, 333 Dunsmuir Street, Vancouver, BC File: 123220785-01 Date: March 8, 2017 Stantec, 1100-111 Dunsmuir Street, Vancouver, BC Reference:
More informationFULL TEXT BALLOT PROPOSITION OF THE AMADOR COUNTY UNIFIED SCHOOL DISTRICT BOND MEASURE ELECTION NOVEMBER 6, 2018
FULL TEXT BALLOT PROPOSITION OF THE AMADOR COUNTY UNIFIED SCHOOL DISTRICT BOND MEASURE ELECTION NOVEMBER 6, 2018 The following is the full proposition presented to the voters by the Amador County Unified
More informationArchitect and Engineer: Friar Associates inc.
Architect and Engineer: Friar Associates inc. BACKGROUND In June, after soliciting and interviewing several professional firms, Friar Associates was hired to perform an Existing Conditions Survey and Facilities
More informationSTRUCTURAL EVALUATION OF WASHINGTON ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD)
STRUCTURAL EVALUATION OF WASHINGTON ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD) For WLC Architects Kaiser Building 1300 Potrero Avenue Richmond, CA 94804 By DASSE Design, Inc.
More informationLa Conner School District
hoarch.com La Conner School District Capital Bond Planning Meeting 4 - Master Plan Options / Budget Estimates July 18th, 2012 4010 Lake Washington Blvd, NE, Suite 320 Kirkland, Wa 425 828 8948 Agenda Meeting
More informationRECOMMENDED CONCEPT COLLEGE COMMUNITY CAMPUS IMPROVEMENTS INTERNAL ROADWAY COST ANALYSIS MAY 9, 2014
8"' PCC CURB AND GUTTER KIRKWOOD BLVD SW 76TH AVENUE SW 76TH AVENUE SW PRAIRIE CREST ELEMENTARY 6' PRAIRIE PERFORMING ARTS CENTER PRAIRIE HIGH SCHOOL TIE INTO FROM PRAIRIE HILL FUTURE SITE OF PRAIRIE HILL
More informationBoard Work Session Feasibility Study. January 9, 2017
Board Work Session Feasibility Study January 9, 2017 1 Process Staff Input Sessions at all schools What can you tell us about your building, your site, your space? Group collaboration exercise looking
More informationUpper Adams School District Facility Study Presentation Part 2 November 17, 2016
Upper Adams School District Facility Study Presentation Part 2 November 17, 2016 Providing a Client Oriented Approach to Architecture Crabtree, Rohrbaugh & Associates, Architects Agenda Part 1 Current
More informationSuperintendent Proposed Capital Improvements Program. Fiscal Years
Superintendent Proposed Capital Improvements Program Fiscal Years 2019-2024 TABLE OF CONTENTS Summary Page 1 Capital Projects Pages 2-7 Capital Projects Description Pages 8-12 SUPERINTENDENT PROPOSED CAPITAL
More informationHorseheads 2030: Project Planning Update: 5/30/17
Horseheads 2030: Project Planning Update: 5/30/17 Agenda Survey Results Scope & Estimate Highlights: Horseheads High School Scope & Estimate Highlights: Middle School/Intermediate School Priority Scope
More informationTWIN RIVERS UNIFIED SCHOOL DISTRICT 2015 LONG-RANGE FACILITY MASTER PLAN Steering Committee Meeting No. 4 \\ April 13, 2015
2015 LONG-RANGE FACILITY MASTER PLAN Steering Committee Meeting No. 4 \\ April 13, 2015 AGENDA I. LRFMP BRANDING UPDATE II. LRFMP FOCUS GROUP UPDATE III. ENROLLMENT PROJECTIONS / DEMOGRAPHICS IV. FINALIZE
More informationNEIDIG ELEMENTARY SCHOOL ADDITION & RENOVATION PHASING. Neidig Community Meeting July 2018
NEIDIG ELEMENTARY SCHOOL ADDITION & RENOVATION PHASING Neidig Community Meeting July 2018 PROPOSED NEIDIG ELEMENTARY SCHOOL Expanded parking Separate bus loop Gymnasium Addition 2 story classroom wing
More informationPRESENTATION JANUARY 24, 2017
4918 HOVENKAMP DRIVE DALLAS, TEXAS 75227 PRESENTATION JANUARY 24, 2017 RGM ARCHITECTS OCTOBER 25, 2016 1 2 COMMUNITY INPUT DESIGN DOCUMENT PROCUREMENT CONSTRUCTION PD SD DD CD BD CA PROJECT PROCESS 3 Construction
More information