1 Armenia Camp Construction Update Photos April 18, 2016 Spring has arrived in Armenia. The snow is melting quickly and the conditions for construction are becoming more favorable each day. The pace is picking up and the transformation is underway. Our primary focus for construction continues with the dorm project. To date the structure for the dorm expansions has been completed. This includes an enclosed stairwell, areas for lounges and a new roof for each of the two dorm buildings. As of last week 28 workers were present on site working in many of the rooms installing electrical wiring, heating equipment and piping, windows, interior plaster and plumbing. The exterior of the dorm building is also being updated with new plaster and stone veneer. Balconies are being installed on the second floor along with several structural improvements that became evident when we began to expose the structural components of the building. Other projects that will begin in mid-may are the Managers House, Maintenance Shop, and improvement of site utilities and infrastructure. The contractor selection process has commenced for this portion of work with a decision to be made in early May. Construction permits have been acquired for the Managers House and Maintenance Shop. We will also demolish a condemned building that is to be the future site of a building which will house the café, store, game room, infirmary and camp office. April 1, Dorms are shown above with the completed expansions located where the buildings meet in the center.
2 April 1, 2016 The west dorm is shown above with the expansion structure in place on the left side of the picture. Concrete forming for the entry stairs is shown as well with wood forms being installed. April 2, 2016 Pictured on the left is the start of the entry stairs mentioned above. Shown on the right is the beginning of the lounges and stairs to the second level.
3 April 1, 2016 Electrical wiring is currently being installed for all the light fixtures shown on the ceiling above. On the first floor shown on the left, plaster is being applied to the walls as the stone is covered along with the wiring. Pictured on the right is the second floor with plaster still to be applied with wiring in place. April 1, 2016 Commercial grade aluminum windows began to be installed the first week of April. The windows are a German product assembled in Armenia. On the right you can see the second floor lounge windows being installed. Tatos, our Armenia Project Manager for Young Life, is discussing installation details with the windows installer. Plaster and tile will be applied to complete the interior wall and floor finishes, along with railings and light fixtures to follow.
4 April 2, 2016 Currently dorm room floors are being leveled. Following the leveling of the floors radiant heat piping will be laid and an additional slab will be constructed and finished with tile. Pictured on the right, the bedroom walls have started to be plastered. Multiple coats of plaster are applied to cover stone walls and electrical wiring. April 2, 2016 Plumbing between floors and into bathrooms is being installed for the future toilets, sinks, and showers.
5 April 1, 2016 Currently, we are focusing our efforts on the west dorm pictured above on the left for completion this summer. Major structural work is near completion on the east dorm on the right as well, with new roofs and structural framing completed for both east and west dorms. The scaffolding shown above is in place to renovate the exterior stucco finish on the rear side of the building. The yellow stucco shown on the east dorm is the original finish to be updated with plaster in the future. April 1, 2016 Partially completed east dorm with newly finished roof, structural improvements and expansion. As we prepare for dorm interior construction to be completed we have selected many finish materials that will soon be applied. Also the bunk beds, storage cubbies and linens are set to arrive in the next couple weeks. The shipping containers have arrived in the Port of Poti, Georgia and are being transported by truck to Yerevan for inspection this week. Once inspection is complete the containers will be transported by truck to the camp. Many thanks go out to the staff and friends of Washington Family Ranch and Frontier Ranch who shared their time, treasure and talent to make this dream a reality.
6 February 24, 2016 Two sea containers were loaded on trucks at Washington Family Ranch bound for Armenia. One of the highlights of this past month was the addition of a flagpole and the raising of an Armenian flag on the property. For a brief time on April 1, 2016 the contractors gathered. Several thoughts and words were shared regarding the future of the camp property. Arman Asatryan, the Young Life Armenian National Director, spoke about events that will take place at camp and how the mission of Young Life will be fulfilled with guests, leaders, and campers. Chris Marshall, the Young Life Project Manager, also spoke about how these craftsmen are a part of creating a place that will minister to future generations of Armenian youth. Also those on site were encouraged with the knowledge that many around the world are holding hands with them to see this project through to completion. Upon completion of raising the flag and the moment together, Arman made the comment That really looks like an Armenian camp. We pray that it will be so for centuries to come. April 1, 2016 Arman, Young Life Armenian National Director, on left and Arsen, Finance and Administrative Manager, on right following the raising of the flag.
TULANE PLAN ,486 SQ.FT.
PLAN 1486-1,486 SQ.FT. From the mid $200s FIRST FLOOR SECOND FLOOR PLAN 1498-1,498 SQ.FT. From the mid $200s FIRST FLOOR SECOND FLOOR PLAN 1499-1,499 SQ.FT. FIRST FLOOR SECOND FLOOR FEATURES & SPECIFICATIONS
More informationGRAND AT ALICE THE HERMANN - 1,402 SQ.FT. UNIT 1 FIRST FLOOR SECOND FLOOR FIRST FLOOR PLAN 1/4"=1'-0"
GRAND AT ALICE THE HERMANN - 1,402 SQ.FT. POWDER BEDROOM 2 10'-4"x10'-2" BEDROOM 3 10'-9"x10'-2" BATH 8'-0"x10'-6" 12'-0"x12'-3" BATH 2 8'-10"x5'-0" UTILITY 5'-0"x8'-10" KITCHEN 15'-2"x8'-6" 4'-6"x10'-4"
More informationWorld Inspection Network
64725 Acanto Dr Guest house Carriage garage Exterior pool Interior pool Cracked tiles in the Master bath Sauna Page 1 of 16 Moisture damage on the West gym wall outside the Sauna Improper plumbing connection
More informationSouthampton. Our cottage/retirement home: The house construction phase -- rough-in work!
Southampton Our cottage/retirement home: The house construction phase -- rough-in work! With the completion of the frost wall in July 2004, construction began in earnest! Top left: Sue and I spread 70
More informationEADO SQUARE STARTING AT $294,900. Contact: Maggie Houston at
STARTING AT $294,900 SITE PLAN N O RT H EV E RTON ST RE ET CANAL STRE ET 114 1 116 2 118 3 120 4 122 5 124 6 112 7 110 8 108 9 106 10 104 11 102 12 86 13 88 14 90 15 92 16 94 17 96 18 84 19 82 20 80 21
More informationEADO SQUARE. Contact: Maggie Houston at
SITE PLAN N O RT H EV E RTON ST RE ET CANAL STRE ET 114 1 116 2 118 3 120 4 122 5 124 6 112 7 110 8 108 9 106 10 104 11 102 12 86 13 88 14 90 15 92 16 94 17 96 18 84 19 82 20 80 21 78 22 76 23 74 24 25
More informationPrice, plans and specifications are subject to change without notice. Revised 01/2018
CEDARPOST SQUARE THE OAK 2,1 2 5 SQ.FT. FIRST FLOOR SECOND FLOOR THIRD FLOOR OAK - 2,125 SQ.FT. Starting at $364,900 ARBOR 2,241 SQ.FT. 3 BEDROOMS 2.5 BATHS 2 STORIES FIRST FLOOR SECOND FLOOR ASPEN 2,327
More informationPATTAYA POSH. A chance to own the best location in North Pattaya. North Pattaya Road, Pattaya, Thailand
PATTAYA POSH A chance to own the best location in North Pattaya North Pattaya Road, Pattaya, Thailand Pattaya Posh is a prestigious high-rise condominium development, occupying the best location in the
More informationKENSINGTON GREEN THE ELLIE - 2,038 SQ.FT.
KENSINGTON GREEN THE ELLIE - 2,038 SQ.FT. 3 BATH 3 5'-0"x9'-11" BEDROOM 3 12'-1"x9'-11" KITCHEN 15'-5"x12'-7" PANTRY POWDER GARAGE 19'-2"x19'-7" CONCRETE FOYER 6'-4"x14'-3" /STONE LIVING 19'-2"x18'-6"
More informationCivic Center Renovation News
Civic Center Renovation News February 15, 2015 Virginia Avery of Wells, ME was the first guest to enter the newly renovated Civic Center at the Maine Home, Remodeling and Garden Show! She was presented
More informationGRAND AT ALICE THE HERMANN - 1,402 SQ.FT. UNIT 1 FIRST FLOOR SECOND FLOOR FIRST FLOOR PLAN 1/4"=1'-0"
THE HERMANN - 1,402 SQ.FT. POWDER BEDROOM 2 10'-4"x10'-2" BEDROOM 3 10'-9"x10'-2" BATH 8'-0"x10'-6" 12'-0"x12'-3" BATH 2 8'-10"x5'-0" UTILITY 5'-0"x8'-10" KITCHEN 15'-2"x8'-6" 4'-6"x10'-4" /STONE 17'-9"x19'-6"
More informationTimber Trail Plan LOT BEDROOMS 4.5 BATHROOMS 2,974 FT 2 Land/Home Package OFFERED BY: SUNRIVER REALTY LINDA DORR, BROKER
LOT 308 Timber Trail Plan 4 BEDROOMS 4.5 BATHROOMS 2,974 FT 2 Land/Home Package OFFERED BY: SUNRIVER REALTY 541-593-3000 LINDA DORR, BROKER LICENSED IN THE STATE OF OREGON WWW.CALDERASPRINGS.COM BUILT
More informationCity of Del Mar Planning Department 1050 Camino del Mar Del Mar, CA Phone: (858) Fax: (858)
City of Del Mar Planning Department 1050 Camino del Mar Del Mar, CA 92014 Phone: (858) 755-9313 Fax: (858) 755-2794 BUILDING VALUATION FOR PROJECTS INVOLVING STRUCTURAL NON-CONFORMITIES An applicant s
More informationPrice, plans, and specifications are subject to change without notice. MAPLE 2,081 SQ.FT. 3 BEDROOMS 3.5 BATHROOMS 2 STORIES
MAPLE 2,081 SQ.FT. 3 BEDROOMS 3.5 BATHROOMS 2 STORIES OAKWOOD 2,094 SQ.FT. 3 BEDROOMS 3.5 BATHROOMS 2 STORIES B RO O K 1,985 SQ.FT. 3 BEDROOMS 3.5 BATHROOMS 2 STORIES ELM 1,929 SQ.FT. 3 BEDROOMS 3 BATHROOMS
More informationCOOPERSMITH COURT. For more information, contact: Maggie Houston
COOPERSMITH COURT MAPLE 2,081 SQ.FT. 3 BEDROOMS 3.5 BATHROOMS 2 STORIES OAKWOOD 2,094 SQ.FT. 3 BEDROOMS 3.5 BATHROOMS 2 STORIES B RO O K 1,985 SQ.FT. 3 BEDROOMS 3.5 BATHROOMS 2 STORIES ELM 1,929 SQ.FT.
More informationCOOPERSMITH COURT. For more information, contact: Maggie Houston
COOPERSMITH COURT MAPLE 2,081 SQ.FT. 3 BEDROOMS 3.5 BATHROOMS 2 STORIES OAKWOOD 2,094 SQ.FT. 3 BEDROOMS 3.5 BATHROOMS 2 STORIES B RO O K 1,985 SQ.FT. 3 BEDROOMS 3.5 BATHROOMS 2 STORIES ELM 1,929 SQ.FT.
More information1. FOUNDATIONS AND STRUCTURE
1. FOUNDATIONS AND STRUCTURE A. Foundations to engineers design and specification. B. Concrete surface beds to engineers design and specification. C. Suspended concrete slabs to engineers design and specifications.
More informationProject Status Update & Progress Report
UCSD Board of Education Project Status Update & Progress Report March 27, 2018 Capital Project Presentation March 2018 1. Kernan Elementary School Addition & Renovations Part 1 Construction Progress Update
More informationReliance House Investors Report. IR11 September 2018
Reliance House Investors Report IR11 September 2018 Extension & Conversion of Reliance House to Create 139 Luxury Apartments The 3 storey extension, refurbishment, adaptation and the sub-division works
More information160.F1 PROPERTY INSPECTION REPORT 6 Vitoria St, Sebastopol, 3356 INSPECTION DETAILS Registered Practitioners Signature:
www.sherspec.com 6 Vitoria St, Sebastopol, 3356 160.F1 PROPERTY INSPECTION REPORT INSPECTION DETAILS Registered Practitioners Name: Rudolf Venema Registered Practitioners Signature: Practitioners Registration
More informationExhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates
Exhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates Spokane County, Washington For All Property Owners The following Development and Design Standards shall be
More informationEstimating & Scope. Additional Lessons Tools / Measuring / Masonry / Framing/
Estimating Video Class A 1 of 2 Estimating & Scope Estimating Video Class A 2 of 2 Additional Lessons Tools / Measuring / Masonry / Framing/ Tools / Measuring Lessons Developing An Accurate Property Estimate
More informationCATAMARAN TOWER - 1 Seef Area Plot 19, 20
STATUS REPORT NO 18 [As on September 30, 2017] This report is intended as a status report and covers only the activities completed till date, non-completed works and work-in-progress. A. Project Details
More informationRenovation Progress. May 12 18, Week 32
Renovation Progress May 12 18, 2012 Week 32 May 12 Furring strips along back wall of Sisters new Dining Area completed; projection room holes to be covered up when sheetrock is installed May 12 Another
More information--*6 S CONSTRUCTION GROUP, INC SW 87 Avenue Miami, FL Phone:
--*6 S,.- CONSTRUCTION GROUP, INC. FLORIDA STATE CERTIFIED GENERAL CONTRACTOR CGC 1 508637 9505 SW 87 Avenue Miami, FL 33176 Phone: 305-219-6046 Email: jrossel@rosselconstruction.com PRELINIARY ESTIMATE
More informationOconomowoc Area School District Facility Construction Update July 27, 2018
Oconomowoc Area School District Facility Construction Update July 27, 2018 IXONIA ELEMENTARY SCHOOL The exterior of Ixonia Elementary School looks more complete every day! Concrete work for the exterior
More informationPremier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017
Premier Inn, Wilson Street, Middlesbrough, TS1 1AE Site progress report February 2017 Site set up Currently 4 weeks in to the build the site has been cleared and hoardings have been erected. Welfare cabins
More informationINFORMATIONAL HANDOUT FOR FINISHING A BASEMENT
7100 147 th Street West Telephone (952) 953-2588 Apple Valley, MN 55124-9016 Fax (952) 953-2515 www.cityofapplevalley.org INFORMATIONAL HANDOUT FOR FINISHING A BASEMENT 1. Submit plan showing the proposed
More informationThe Fleming Update. Getting Your 2016 Repair & Maintenance House in Order. First Quarter Aaron Wolf, President. Articles Inside.
The Fleming Update From Your Friends at Fleming Companies Welcome to The Fleming Update, a publication of Fleming Complete and Fleming West. We are your one company, one call partners for full building
More informationTOWER-1A: TERRACE FLOOR SLAB
TOWER-1A: TERRACE FLOOR SLAB TOWER NO: 1A (Overall completion 70.10%) Total Floors: - Stilt + 12 Upper floors Total Flats: - 24 (Duplex Type-A1) 1. Structural works up to terrace floor slab completed.
More informationCITY OF VINE GROVE BUILDING PERMIT APPLICATION
CITY OF VINE GROVE BUILDING PERMIT APPLICATION DATE PERMIT NUMBER NAME of OWNER LAST FIRST MI STREET CITY STATE ZIP CODE PHONE NUMBER CELL PHONE NUMBER PROJECT LOCATION: SUBDIVISION LOT NO. SECTION STREET
More informationCHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC
CHARTRES COURT 713-868 - 7226 5023 Washington Avenue Houston, Texas 77007 ChartresCourtHouston.com CHARTRES COURT LLC Features Open floor concept living/dining with spacious island kitchen Great master
More informationOconomowoc Area School District Facility Construction Update June 29, 2018
Oconomowoc Area School District Facility Construction Update June 29, 2018 IXONIA ELEMENTARY SCHOOL Finishing touches and final cleaning has begun inside the new addition at Ixonia Elementary, and major
More information43. CONSERVATORY. Conservatory. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle
Classification: Cluster: Location: Total Area: No. of Stories Acreage Owned: Acquired: 1904 Most Recent Improvements: THE CONSERVATORY Conservatory Close to junction of Inselrhue and Loiter Way, Belle
More informationCity of Rohnert Park Building Department Inspection Descriptions
200 SITE REVIEW: Prior to a permit being issued the Fire / Building Department is authorized to examine existing buildings, structures, and site for which an application has been filed. 201 PRECONSTRUCTION
More informationRIVERSIDE TERRACE. For more information, contact: Maggie Houston, ,
RIVERSIDE TERRACE FLOORPLAN B - LOT 10 FIRST FLOOR SECOND FLOOR Price, plans and specifications are subject to change without notice. Revised 02/2018 FLOORPLAN C - LOT 9 FIRST FLOOR SECOND FLOOR Price,
More informationEquine Barn LLC 213 Crescent Moon Way Canton, Ga Proposal
Equine Barn LLC 213 Crescent Moon Way Canton, Ga 30114 Proposal 2014 We hereby propose to provide all the materials and labor necessary to build a custom barn located in, Ga for. What is included in the
More informationFOREST PLACE 59 UNITS ERF 5586 PARKLANDS
ANNEXURE "C" MATERIAL AND FINISHES SPECIFICATION FOREST PLACE 59 UNITS ERF 5586 PARKLANDS 1. FOUNDATIONS AND STRUCTURE Foundation walls are to be built in strict accordance with the municipal building
More informationProposal. Lexington, MA. Price Work Description
PROPOSAL Assumptions Sample Client Lexington, MA The is based on plans dated 3/3/15, with Sally's list of adjustments The price assumes the owners will be living in the house The owners will be responsible
More informationMoonlight Architecture, Inc. Architecture Interior Design Site Planning
Moonlight Architecture, Inc. Architecture Interior Design Site Planning 22 May 2018 18057 Mr. Michael J. Petit de Mange, County Administrator Kent County Levy Court 555 Bay Road Dover, DE 19901 RE: Facilities
More informationTHE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS
THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE II RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING
More informationSouthwest Health System Construction Newsletter October 21, 2017
Southwest Health System A Week in Review Patient Wing Asphalt Base was completed this week in the north section of the parking lot Sheetrock is substantially complete and everything should be ready for
More informationSubject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3
MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape
More informationARCHITECTURE DARK HORSE GOLF CLUB CLUBHOUSE A4 EXTERIOR ELEVATIONS FRONT PERSPECTIVE / EAST ELEVATION REAR DECK PERSPECTIVE / WEST ELEVATION
WALL SCONCE, TYP. CEMENT PLASTER FINISH, PAINTED WOOD SOFFIT CLADDING WOOD V COLUMN, TYP. STONE VENEER CLADDING WOOD SIDING, TYP. SOFFIT MOUNTED CAN LIGHT, TYP FRONT PERSPECTIVE / EAST ELEVATION CEMENT
More information1065 N Canyon St, Ste. 8, Hildale, UT Cell: (435) S Pioneer
1065 N Canyon St, Ste. 8, Hildale, UT 84784-0283 Cell: (435) 819-0128 125 S Pioneer 1065 N Canyon St, Ste. 8, Hildale, UT 84784-0283 Cell: (435) 819-0128 CRITICAL IMPROVEMENTS Framing Demo Tin Fence Exterior
More informationRESIDENTIAL BASEMENT ALTERATIONS GUIDE
RESIDENTIAL BASEMENT ALTERATIONS GUIDE THIS IS A GUIDE ONLY! FOR DETAILED INFORMATION, CONTACT THE BUILDING INSPECTOR OR TOWNSHIP AS ADDITIONAL REQUIREMENTS MAY PERTAIN TO YOUR PROJECT. November 2018 WHITEHALL
More informationMaterial Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5
Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey 01-2320 sqft.spf] Page 1 of 5 PREPARATION PRELIM PERMITS & FEES Building Permit 1 each 2200.00 _ 2200.00
More informationRenovation Progress. July 2-6, Week 39
Renovation Progress July 2-6, 2012 Week 39 Jul 2 Plaster mud applied to upper section of walls along 1 st Ottilia hallway Jul 2 Markings indicate the location of kitchen fire extinguisher boxes Jul 2 Plumbers
More informationHOT SPRINGS FIRE DEPARTMENT EVALUATION OF DOWNTOWN LEGACY STRUCTURES Savoy Hotel Thompson Building Dugan Stewart Building May 16, 2012
HOT SPRINGS FIRE DEPARTMENT EVALUATION OF DOWNTOWN LEGACY STRUCTURES Savoy Hotel Thompson Building Dugan Stewart Building May 16, 2012 0 On May 16,, 2012 Hot Springs Firefighters conducted an evaluation
More informationTOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION
TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION Town of Hague Building Inspector: Dale Wagner Home #: 306-225-2265 Cell #: 306-241-4741 Fill all part of the permit application including the date and signature.
More informationBuilding Systems and Design Elements included in SliDeRulE
Building Systems and Design Elements included in SliDeRulE No. System Subsystem Design Element 1.1.1 Foundation Deep Foundation Steel H-pile 1.1.2 Foundation Deep Foundation Steel pipe pile 1.1.3 Foundation
More informationNew Main Hospital, Site Park, and Underground Garage Construction Progress Update #16
New Main Hospital, Site Park, and Underground Garage Construction Progress Update #16 Date: March 1, 2010 From: Gary Claar Engineering Services 355-1660 Gary.Claar@NationwideChildrens.org More and more
More informationMONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #07. Latrobe Elementary School. Greater Latrobe School District
MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #07 Latrobe Elementary School Greater Latrobe School District 08 January 2018 PROJECT SUMMARY Work Completed to date: Ductwork sealed off. Slab Prep in Main
More informationTHE STRATA UNIT May 25, 2008
THE STRATA UNIT May 25, 2008 Over the years, we have been asked time and time again from our experience as a cost consultant and a project manager from both a restoration and renovation point of view What
More informationRESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS
RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS New Construction, Addition, or Alteration All plans submitted must be prepared, sealed, and signed by a Registered Nebraska Design Professional
More informationFleet Elementary School
Fleet Elementary School Community Newsletter (August 2018) This is the August update on the status and progress of construction for the project. All monthly updates will also be posted to the project website
More informationTown of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:
S FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE: Included Costs: Items that must be included in the costs of improvement or costs to repair are those that are directly associated with the
More information1065 N Canyon St, Ste. 8, Hildale, UT Cell: (435) N Richard
385 N Richard CRITICAL IMPROVEMENTS Windows, Doors, Cabinets Replace Crtitically Broken Windows Recommended to Finish Windows, Doors, Cabinets Replace Broken Windows 1065 N Canyon St, Ste. 8, Hildale,
More informationRutland Center Church Renovation Town of Rutland Dane County, Wisconsin
Rutland Center Church Renovation Town of Rutland Dane County, Wisconsin The Rutland Center Church as it looked when a local group of citizens and the Town Board decided it needed renovation. July 2003
More informationTHE WORLD S GREENEST. Internal, External Cladding & Lining Products PANELISED BUILDING SYSTEM
THE WORLD S GREENEST Internal, External Cladding & Lining Products PANELISED BUILDING SYSTE Invest in Innovation to Lower Your Costs The Innova Building Kit Whether you build one home or one thousand homes
More informationAlvan Tsarik Educational Centre, Armenia
Alvan Tsarik Educational Centre, Armenia Visit to the project of alvan tsarik in Armenia: July 24 th to August 6 th 2017. The project at Mayakowski Street in Gyumri, Armenia was visited by Cor van den
More informationWorker camp sample. In this presentation Geiger International shows two kinds of building structures, for 200 worker.
Worker camp sample Geiger International is capable to provide worker camps for all costumers desires. In this presentation Geiger International shows two kinds of building structures, for 200 worker. Our
More informationCONSTRUCTION COST BREAKDOWN THIS IS FORM CCB
CONSTRUCTION COST BREAKDOWN Property Owner s Name or Borrowers Name Brief Description of Project John Homeowner Build single family residence Property Address Property City Property Zip Code 4625 Jillbarr
More informationPeachStone Capital, Inc. Atlanta s Hard Money Lender When timing is everything, we close! Hard Money Loan Property Worksheet Checklist
Hard Money Loan Property Worksheet Checklist Please complete ALL requested information. Incomplete applications will NOT be reviewed! Fully executed purchase and sale agreement including all exhibits,
More informationFEATURES & SPECIFICATIONS
FEATURES & SPECIFICATIONS : Engineered Wood Floors and/or Travertine on First Floor **See Sales Counselor Quartz Countertops 42 Shaker Style Cabinets with Brass Hardware Pulls White Subway Tile Backsplash
More informationAdolfson & Peterson Construction, Megan Bond; ; CATEGORY 3: Meeting the Challenge of a Difficult Job General Contractor
Vanguard Classical School K-12 Adolfson & Peterson Construction, Megan Bond; 303-326-5842; mbond@a-p.com CATEGORY 3: Meeting the Challenge of a Difficult Job General Contractor Overview Statement: Every
More informationCAREERS. in the Construction TRADES
CAREERS in the Construction TRADES Electrical Modern life would not be possible without electricians. If you like to know how electric currents make things work, then this is the trade for you. Qualified
More informationSTATE PREFERENTIAL PROPERTY TAX ASSESSMENT PROGRAM
GEORGIA DEPARTMENT OF NATURAL RESOURCES (DNR) - HISTORIC PRESERVATION DIVISION (HPD) PART A PRELIMINARY CERTIFICATION Section I Property and Owner Information STATE PREFERENTIAL PROPERTY TAX ASSESSMENT
More informationHILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District
HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District Facilities and School Safety Committee Meeting October 25, 2018 Progress Update PROGRESS UPDATE Rien Construction (General
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationSPACE TYPE: OUTSIDE PARKING (STRUCTURE)
SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.
More informationMUNSON HEALTHCARE MANISTEE HOSPITAL JOB DESCRIPTION
MUNSON HEALTHCARE MANISTEE HOSPITAL JOB DESCRIPTION TITLE: Certified Healthcare Mechanic FLSA: Non-Exempt Job Code: 005351 Grade: Union 1 Work Comp Code: Date: 6/88, 3/98, 2/01, 3/01, 4/01, 2/03, 8/06,
More informationNew Ringgold Middle School. Project Slideshow August 26, 2017
New Ringgold Middle School Project Slideshow August 26, 2017 Aerial Photo from West Provided by Hudson Group Taken 8.16.2017 Aerial Photo from North Provided by Hudson Group Taken 8.16.2017 Aerial Photo
More informationCAREERS. in the Construction TRADES
CAREERS in the Construction TRADES Electrical Modern life would not be possible without electricians. If you like to know how electric currents make things work, then this is the trade for you. Qualified
More information1200 Oakman Blvd INDUSTRIAL INVESTMENT/ USER OPPORTUNITY. Building A 85,999 SF. Building D. Building C 11,495 SF 15,046 SF.
1200 Oakman Blvd A 85,999 SF Detroit, MI 48238 C D 15,046 SF A C Below (4) Grade Level Replacement Cost Doors Shop Floor Height: Zoning M4-Intensive 18 3 Industrial District Immediate HVAC - 6 Ton Unit
More informationSECTION 6. Residential Warranty Corporation 10 Year, Limited Structural Warranty. Year One
SECTION 6 Residential Warranty Corporation 10 Year, Limited Structural Warranty Year One Foundations basement, crawl space, slab on grade. Framing ceiling, floor, roof, wall. Exterior structurally attached
More informationSteps To Building A Log Home
Many of us dream of owning a house some day. Building a house is a complex task requiring a lot of time and money. Many people are afraid of undertaking such a project without having experience in the
More informationEdmonton Public School District No. 7
EXECUTIVE SUMMARY 1. Overall Impressions The 1966 non-core school has actively pursued an ongoing maintenance and upgrade program to improve a number of past problem areas within the school. Extensive
More informationCompleted. Project. Melbourne High School. Comprehensive Additions and Renovations
Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project
More informationRenovation Progress. Jan. 14 Feb. 3, Weeks 15-17
Renovation Progress Jan. 14 Feb. 3, 2012 Weeks 15-17 Jan. 14 Three work crews make use of a sunny Saturday to catch up after rainy-day delays: Ottilia copper crew, Chapel flat roof crew, plumbers dig trenches
More informationACCESSORY BUILDING. Building Permit Requirements: (must be completed before submitting application)
ACCESSORY BUILDING Before your application can be deemed complete and ready for processing you will need the following: (Please hand in entire application package including this cover sheet) Zoning- check
More informationaccess INCLUSIONS With our Access range of inclusions, you can move in and just enjoy living.
access INCLUSIONS access INCLUSIONS Here at BOLD, we know all about creating utmost liveability on any budget. We believe in providing more for less, packing in space and style at budget friendly prices.
More informationSUMMARY 1234 Main St.Loudon TN Buyer Name 08/28/2018 9:00AM
SUMMARY 1234 Main St.Loudon TN 37774 Buyer Name 08/28/2018 9:00AM Dusty Jameson TN Home Inspector License #00123, TN WDI License #104158 Inspector Cluseau's Home Inspection Service 865-691-6158 dustyjameson@gmail.com
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationDECONSTRUCTION PROJECT TO EVALUATE THE RECYCLABILITY/REUSABILITY OF THE COMPONENTS AND MATERIALS IN WOODEN HOUSES
02-020 DECONSTRUCTION PROJECT TO EVALUATE THE RECYCLABILITY/REUSABILITY OF THE COMPONENTS AND MATERIALS IN WOODEN HOUSES PART1. THE STATE OF DEMOLITION OF WOODEN HOUSES IN JAPAN AND OUTLINE OF THE PROJECT
More informationBUILDING REPORT. 123 Anywhere Street Suburb City. Prepared for: Client NON INVASIVE
0 NON INVASIVE BUILDING REPORT 123 Anywhere Street Suburb City Prepared for: Client 1 Following your instructions we visited the above property on the 11/06/12 to carry out a non-invasive building inspection
More informationDining Room. 13'-0" x 14'-6" Kitchen. 2x6 Plumbing Wall 5'-1" Bench & Hooks 8'-2 1/2" 5'-4" Rear Entry. Laundry Room. 5'-3" x 9'-2" 7'-0" x 9'-0"
Main Floor Plan Main Floor: All Exterior Dimensions Are From Outside Of Framing To Outside of Framing. All Interior Dimensions Are From Edge Of Framing To Edge Of Framing. Door Labels Are Specified By
More informationOwner Builder Inspection Report
www.sherspec.com Owner Builder Inspection Report PREPARED FOR USE IN ASSESSING A PROPOSAL FOR WARRANTY INSURANCE TO BE ISSUED UNDER SECTION 137B (2)(a) OF THE BUILDING ACT 1993 INSPECTION DETAILS Registered
More informationBurlington Model at Country Hills Estates
Prospect, CT Burlington Model at Country Hills Estates Burlington Model at Country Hills Estates First Floor First Floor 1,143 Sq. Ft. Second Floor 1,410 Sq. Ft. Total 2,553 Sq. Ft. Second Floor All dimensions
More informationRCT Webinar-Updated 03/18/12
RCT Webinar-Updated 03/18/12 This instructional write up/guide is for the RCT Form that is found on the Main Information screen. When do we do the RCT? The RCT is done when a full exterior or full interior
More informationThe Devil is in the Details Renovating Your Bathroom
The Devil is in the Details Renovating Your Bathroom with Sarah Kidder Sarah Kidder Certified Interior Decorator 22 Antares Dr. Unit L (inside Custom Home Interiors) 613-355-4889 www.sarahkidderdesign.com
More informationFleet Elementary School
Fleet Elementary School Community Newsletter (January 2019) This is the January update on the status and progress of construction for the project. All monthly updates will also be posted to the project
More informationUpland Lakes Largest Geothermal Community in the U.S.
Upland Lakes Largest Geothermal Community in the U.S. 1843 Upland Lakes Price range: $400s-725s GeoThermal HVAC systems Stratford HS in prestigious Spring Branch ISD Future 24 Hr Manned Gate 3 Beautifully
More informationExecutive Summary Project Details and Building Progress report
Monthly Progress Report of February 2017 Executive Summary Project Details and Building Progress report Completed 20th to pool deck floor toilet floor tile work False ceiling work in toilet 20th floor
More informationGramercy Place Condo Association, Inc.
E-Mail to fiona@ymginc.com Print Document Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) ````````````````````````` (Cell) E-Mail
More informationLECKIE ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More information