RL (+) 104m to RL (+) 108m. Ambient Temperature - 4 C to 42 C. Mostly Barren Land. Breakup of ownership:
|
|
- Drusilla Banks
- 5 years ago
- Views:
Transcription
1 Salient Features of Proposed Sites: The plant shall be designed in accordance with Power Purchase Agreement (PPA) for base load operation with the capability for part load operation. A. Paraspani-Godda: Particulars Location Coordinates Site Elevation (Approx)/Topography Details Village Paraspani & adjacent villages, District-Godda, State-Jharkhand, India A ' 30.20"N, 87 19' 46.67"E B ' 13.64"N, 87 19' 39.17"E C ' 19.00"N, 87 18' 46.28"E D ' 28.63"N, 87 18' 24.80"E E ' 03.88"N, 87 17' 29.64"E F ' 57.92"N, 87 18' 08.38"E RL (+) 104m to RL (+) 108m. Rainfall Average rainfall is mm Temperature Ambient Temperature - 4 C to 42 C Approx. Area 830 Acre Mostly Barren Land. Breakup of ownership: Land Type & Ownership Private Land: 700 Acre Government Land: 130 Acre Forest Land: Nil Families Affected 160 (approx.) R&R Policy and Issues As per Govt. of Jharkhand State Policy Proposed plant configuration 1600 MW (2x800 MW) Nearest Town (Road Distance) Godda, approx. 15km from site Railway Connectivity The nearest Railway Station is Barahat on Bhagalpur Mandar Hill Railway Line, which is approx. at a distance of 45 kms from the proposed project site.
2 Approach Road Estimated Coal Consumption Coal Transportation Water Requirement SH 16 (Within 8.5 Km from Site boundary) 8 MMT per year considering average GCV of 3300 kcal/kg, Ash 40% and Sulphur less than 0.5% Domestic coal shall be transported from AEL owned Jitpur mine (approximate 16 km) to proposed site through railways 36MCM per annum Probable Water Source The water requirement shall be met from The Ganges river. Proposed intake from Ganges river is near Rajmahal, Jharkhand, which is at a distance of approx. 85 km. Ash Utilization Fly Ash will be utilized in the nearby cement plants. B. Gunihari-Sahibganj: Particulars Location Coordinates Site Elevation (Approx)/Topography Average Rainfall Details Village-Gunihari & adjacent Villages, District- Sahibganj A. 25 2'21.09"N, 87 47'36.74"E B. 25 2'20.97"N, 87 47'4.47"E C. 25 2'13.14"N, 87 46'50.93"E D. 25 2'33.11"N, 87 46'34.92"E E. 25 2'40.79"N, 87 45'49.50"E F. 25 3'21.98"N, 87 46'18.86"E G. 25 2'53.92"N, 87 46'42.41"E H. 25 2'37.82"N, 87 47'6.68"E I. 25 2'44.99"N, 87 47'23.56"E J. 25 2'38.03"N, 87 47'30.89"E K. 25 2'27.72"N, 87 47'49.80"E RL (+) 28 m to RL (+) 40 m 1500 mm Temperature Ambient Temperature - 4 C to 42 C Approx. Area 900 Acres
3 Single Crop Land. Breakup of ownership: Land Type & Ownership Private Land: 800 Acre Government Land: 100 Acre Forest Land: Nil Families Affected 185 (approx.) R&R Policy and Issues As per Govt. of Jharkhand Policy 2015 Proposed plant configuration Nearby Towns Railway Connectivity 1600 MW (2x800 MW) Rajmahal (Sub-divisional Hq) km by road Sahibganj (Dist. Hq) - 48 Km by road Rajmahal : 5 Km Major Railway Station is Sahibganj about 43 Km Approach Road NH 80 (Within 4.5 Km from Site boundary) Estimated Coal Consumption Coal Transportation Water Requirement Probable Water Source Ash Utilization 8 MMT per year considering average GCV of 3300 kcal/kg, Ash 40% and Sulphur less than 0.5% Domestic coal shall be transported from AEL owned Jitpur mine (approximate 90 km) to proposed site through railways 36MCM per annum River Ganges flows at a distance of 2.5 km from proposed plant location Fly Ash utilization shall be tied up with Cement Plants at Farakka (45 km) and Dhulian (55 km).
4 C. Punsia-Dumka: Particulars Location Coordinates Site Elevation (Approx)/Topography Average Rainfall Details Village- Punsia & adjacent Villages, District- Dumka A '29.10"N, 87 20'33.24"E B '46.75"N, 87 20'39.45"E C '6.42"N, 87 20'10.40"E D '8.25"N, 87 19'35.50"E E '59.28"N, 87 19'25.60"E F '51.79"N, 87 19'8.58"E G '9.78"N, 87 19'9.92"E H '22.23"N, 87 19'35.49"E I '44.09"N, 87 20'2.62"E RL (+) 211 m to RL (+) 142 m 1500 mm Temperature Ambient Temperature 4 C to 42 C Approx. Area 880 Acres Single Crop Land. Breakup of ownership: Land Type & Ownership Families Affected Private Land: 660 Acre Government Land: 220 Acre Forest Land: Nil 195 (approx.) R&R Policy and Issues As per Govt. of Jharkhand Policy 2015 Proposed plant configuration Nearby Towns Railway Connectivity Approach Road Estimated Coal Consumption 1600 MW (2x800 MW) Dumka (Sub-divisional Hq) - 45 km by road Hansdiha : 40 Km Major Railway Station is Dumka about 45 Km SH 18: 37 Km NH 133: 18 Km 8 MMT per year considering average GCV of 3300 kcal/kg, Ash 40% and Sulphur less than 0.5%
5 Coal Transportation Water Requirement Probable Water Source Ash Utilization Domestic coal shall be transported from AEL owned Jitpur mine (approximate 69 km) to proposed site through railways 36MCM per year River Ganges flows at a distance of 65 km from proposed plant location Fly Ash utilization shall be tied up with Cement Plants at Farakka (115 km). Site Location Finalization Major considerations for selection of the site for setting the proposed 2x800 MW Super Critical TPS: 1) Proximity to Coal Mine Paraspani site location is found nearest to Jitpur Coal mine in comparison to other two locations. 2) Type of Land Barren /Agricultural Land at Paraspani is predominantly barren land in comparison to other two locations. 3) Project Affected Persons/Families In case of Paraspani, lesser numbers of families will get affected. In view of above consideration, Paraspani site is found most suitable for setting up proposed Thermal Power Plant.
6 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT RP
7 Proposed Site Location at Dumka
Proposed Water Pipeline Route
A Detail on Proposed Water Pipeline Route of 1600 (2 x 800) MW GODDA THERMAL POWER PROJECT GODDA, JHARKHAND ADANI POWER (JHARKHAND) LTD. Village - Motia, Tehsil Godda, District Godda, Jharkhand 1 Contents
More informationPRE FEASIBILITY REPORT
TATA CONSULTING ENGINEERS LIMITED PRE FEASIBILITY REPORT FOR 4000 MW COAL BASED ULTRA MEGA POWER PLANT AT HUSAINABAD, DEOGHAR DISTRICT, JHARKHAND, INDIA Project Proponent: Deoghar Mega Power Limited A
More informationGOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT
GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT SUTHALIYA PROJECT PRE FEASIBILITY REPORT ( PFR ) 2018 CHIEF ENGINEER CHAMBAL BETWA BASIN WATER RESOURCES DEPARTMENT BHOPAL (M.P) SUTHALIYA PROJECT
More informationTable 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others
1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines
More informationPre- Feasibility RepoRt
Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY
More informationGeneral Information. How to apply:
General Information Adani Power Maharashtra Limited s (APML) Thermal Power Plant of 3300 MW Capacity (5 x 660 MW) is located in the state of Maharashtra at Tirora near Gondia. All units are with Supercritical
More informationGOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT
GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT PARBATI(RINSI)MAJOR IRRIGATION PROJECT PROJECT FEASIBILITY REPORT (PFR) 2017 CHIEF ENGINEER CHAMBAL BETWA BASIN WATER RESOURCES DEPARTMENT BHOPAL
More informationGOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT
GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT TEM MEDIUM IRRIGATION PROJECT EXECUTIVE SUMMARY 2016 CHIEF ENGINEER CHAMBAL BETWA BASIN WATER RESOURCES DEPARTMENT BHOPAL (M.P) TEM MEDIUM IRRIGATION
More information4x150 MW Surguja Thermal Power Project Near Parsa Village, Udaypur Tehsil, Surguja Dist. Chhattisgarh By Surguja Power Private Limited.
4x150 MW Surguja Thermal Power Project Near Parsa Village, Udaypur Tehsil, Surguja Dist. Chhattisgarh By Surguja Power Private Limited. Project Category Project Proponent Location Proposed 600 (4x150)
More informationDheeru Powergen Private Limited.
Executive Summary Of The Proposed 2 x 300 MW Dhanras Thermal Power Station At Dhanras Village Katgora Taluk, Korba District, Chhattisgarh. Implemented By Dheeru Powergen Private Limited. Submitted to CHHATTISGARH
More informationBishunpur Small Hydro Power Project
1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall
More informationPREFEASIBILITY REPORT
(B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY
More informationEIA-EMP REPORT GRAVEL QUARRY (Category-B2)
EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar
More information(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF
(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY
More informationEXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,
More informationEXISTING PROJECT FOR ORDINARY SAND MINING
(C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY
More informationINTRODUCTION ENVIRONMENTAL STATEMENT
INTRODUCTION MB Power (Madhya Pradesh) Limited (MBPMPL) is a 100% owned subsidiary of Moser Baer Power & Infrastructure Limited (MBPIL). Moser Baer group headquartered in New Delhi, is leading global technology
More informationPRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND
EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone
More informationSugabandh Small Hydro Power Project
1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall
More informationENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.
ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920
More informationINSPIRE INDUSTRIES PVT. LTD.
For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory
More informationReport on. Industrial Visit to. Reliance Thermal Power Plant, Dahanu
Report on Industrial Visit to Reliance Thermal Power Plant, Dahanu Submitted by: Dr.Ajoy Kumar(Principal) Bhavesh Kumar Pasi(HOD) Mayuri Chawan Neeta Gawde B.E. Mechanical Abstract: After being briefed
More informationPRE FEASIBILITY REPORT
Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT
More informationEXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E
EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at
More informationPre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of KATIKELA RIVER SAND BED OVER 15.00 ACRES OR 6.070 HA IN VILLAGE KATIKELA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20)
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-
More informationSummary of DPR. ETPS Expansion Thermal Power Project 1x660 MW
Summary of DPR ETPS Expansion Thermal Power Project 1x660 MW 1 X 660 MW SUPERCRITICAL ENNORE TPS EXPANSION PROJECT Sheet - 1 PROJECT HIGHLIGHTS 1. Project : 1x660 MW Supercritical Ennore Thermal Power
More informationPRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2
PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya
More informationNOTICE INVITING BIDS (NIB) (International Competitive Bidding)
NOTICE INVITING BIDS (NIB) (International Competitive Bidding) SECTION-1 1.0 INTRODUCTION NOTICE INVITING BIDS (NIB) (International Competitive Bidding) Gujarat State Electricity Corporation Limited (GSECL)
More informationCOAL. REQUIREMENT vis-à-vis PROCUREMENT
COAL REQUIREMENT vis-à-vis PROCUREMENT Calculation for Coal Requirement We have to answer two questions to calculate how much coal we will need to generate our target units. Question 1: How much heat energy
More informationENVIRONMENTAL STATEMENT
ENVIRONMENTAL STATEMENT 2015-16 MAGADH OPENCAST PROJECT M-A AREA, DAKRA SEPTEMBER 15 CENTRAL COALFIELDS LIMITED ENVIRONMENT DIVISION Ranchi EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries
More informationThethaitangar Small Hydro Power Project
1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall
More informationPRE-FEASIBILITY REPORT
M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,
More informationENVIRONMENTAL IMPACT ASSESSMENT AND YOU
ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity
More informationppt on Ash Management By :J.N. Dave (G.M.-Power) & D.S.Makwana (I/c. G.M.-PP)
ppt on Ash Management By :J.N. Dave (G.M.-Power) & D.S.Makwana (I/c. G.M.-PP) Salient Features of Lignite Project Panandhro Village Panandhro, Fulra & Khanot Total Meter age of Exploration 10,757 m Total
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT Page 0 of 14 EXECUTIVE SUMMARY The proposed project of 24.0 Ha or 59.28 Acre area is of stream bed sand mining and falls under Category- B1 as per EIA Notification 2006 amended till
More informationTorpa Small Hydro Power Project
1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall
More informationCapacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB)
Brief Note Prakash Industries Limited (PIL) is existing Integrated Steel Plant located at Hathneora, Champa Villages, Janjgir-Champa District, Chhattisgarh. Existing plant has obtained Environment Clearance
More informationPre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]
Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Project Proposal: Expansion of Cement Plant capacity from 1.5 to 2.20 MTPA of Clinker and
More informationPre-Feasibility Report For Khargone STPP Stage-I (2X660 MW) District- Khargone, Madhya Pradesh
1.0 Executive Summary Name of Project: Name of Project Proponent: Location of the Project: Capacity & Unit Configurations: Land Requirement, Current Land Use and Availability: Water Requirement and Availability:
More informationPre-Feasibility Report
Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &
More informationParticulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd
Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd MADHYA PRADESH POWER GENERATING Co. Ltd. INTRODUCTION Satpura Thermal Power Station is an oldest running plant
More informationEnergy and Exergy Analysis of a 250 mw Coal Thermal Power Plant at Design Load Conditions
Energy and Exergy Analysis of a 50 mw Coal Thermal Power Plant at Design oad Conditions Rakesh Kumar, Ajay Berry, Dr. Mahesh Kumar 3, Himanshu Manchanda 4, 3, 4 Assistant Professor, Mechanical Engineering
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY Star Cement Ltd. (formerly Cement Manufacturing Company Ltd.), has an existing Cement Plant having Clinker/Cement production capacity of 0.792 MTPA as per EC
More informationWater. List of Tables
Water List of Tables 6.1: Details of Inland Fishery Water Resources of various types in Uttarakhand 6.2: Installation of Off-Grid/Decentralized Renewable Energy Systems/Devices 6.3: Installed Capacity
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure
More informationEnvironmental Impacts of Fly Ash Generated from a Coal Fired Power Plant in Indian Sub-continent Somesh Jena
Environmental Impacts of Fly Ash Generated from a Coal Fired Power Plant in Indian Sub-continent Somesh Jena Department of Civil Engineering National Institute of Technology, Rourkela, Orissa, INDIA INTRODUCTION
More informationThe following were present to supervise the proceedings:- 1. Sh. Varun Roojam, IAS. Additional Deputy Commissioner. Muktsar. 2. Er. G.S.
Proceeding of the Public Hearing conducted on 27.01.2009 for grant of environmental clearance to M/s Universal Bio-Mass Energy Pvt. Ltd. for setting up of 14.5 MW capacity Biomass based Independent power
More informationTable 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha
1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted
More informationCONTENTS CHAPTER : ONE. 1-9 CHAPTER : TWO.10-16
CONTENTS LIST OF TABLES Page No. CHAPTER : ONE. 1-9 ENVIRONMENT STATISTICS: FRAME WORK AND INDICATORS. 1 1.3.1 Framework for Development of Environment Statistics (FDES) Information categories 3 1.3.2
More informationADDRESSING BARRIERS TO RICE SEEDS TRADE BETWEEN INDIA AND BANGLADESH (RISTE) A study conducted by IGS promoted By CUTS International
ADDRESSING BARRIERS TO RICE SEEDS TRADE BETWEEN INDIA AND BANGLADESH (RISTE) 1 A study conducted by IGS promoted By CUTS International GOAL OF THE PROJECT To develop a strong case for initiating a feasible
More informationM/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA
1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which
More informationPramod S. Kambli. Page 1
PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major
More informationPRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location
1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease
More informationM/s.NEERAJ KUMAR JAIN
EXECUTIVE SUMMARY OF DARSHANI LATERITE AND RED OCHRE DEPOSIT Area : 15.00 Ha. Village Budhanwara, Tahsil Bohriband, Dist. Katni MADHYA PRADESH For M/s.NEERAJ KUMAR JAIN KATNI 1 BUDHANWARA LATERITE AND
More informationACTION PLAN FOR ABATEMENT OF POLLUTION IN CRITICALLY POLLUTED INDUSTRIAL CLUSTERS (IB VALLEY-JHARSUGUDA AREA)
ACTION PLAN FOR ABATEMENT OF POLLUTION IN CRITICALLY POLLUTED INDUSTRIAL CLUSTERS (IB VALLEY-JHARSUGUDA AREA) ORISSA POLLUTION CONTROL BOARD BHUBANESWAR JUNE 2010 CONTENTS 1.0 Background. 01 2.0 Objective.
More informationEOI/SASAN/2017/01 Date: SASAN POWER LTD (A Wholly owned subsidiary of Reliance Power Limited) INVITATION FOR EXPRESSION OF INTEREST (EOI)
SASAN POWER LIMITED Registered Office: H Block, 1 st floor, Dhirubhai Ambani Knowledge City, Navi Mumbai 400 710 EOI/SASAN/2017/01 Date: 18.02.2017 SASAN POWER LTD (A Wholly owned subsidiary of Reliance
More informationPRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD
PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD Presentation By N.K.Srivastava General Manager (Engg. Services & R&M) 20.04.2012 PROJECT DEVELOPMENT AT NTPC PROJECT IS DEVELOPED
More informationSHRI.LAKSHMAN NAMDEV KOLI
PRE-FEASIBILITY REPORT (PFR) FOR PROPOSED STONE QUARRY BY SHRI.LAKSHMAN NAMDEV KOLI AREA. 1.00 HA., GAT. NO. 811/2 PART, VILLAGE BASTAWADE, TAL.: TASGAON, DIST.: SANGLI PREPARED BY EQUINOX ENVIRONMENTS
More informationHINDUJA NATIONAL POWER CORPORATION LIMITED. HNPCL, (2X520 MW). VIZAG Technical Enquiry Specification for PU Coated Pipe For Ash Water Recovery System
HNPCL, (2X520 MW). VIZAG THERMAL POWER PROJECT TECHNICAL ENQUIRY SPECIFICATION FOR MS ERW 45O NB POLYURETHANE COATED PIPE FOR ASH WATER RECOVERY SYSTEM Prepared By Checked by Approved by Ashok Kumar Ashok
More informationMODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.
MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT
More informationInformation Memorandum
Integrated Development of No Frill Airstrip & Provision of Airline Connectivity at Chikkamagaluru on Design, Finance, Build, Operate and Transfer (DFBOT) Framework June 2018 Information CONTENTS CONTENTS...
More informationPRE- FEASIBILITY REPORT
PRE- FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 Executive Summary The Mining lease was granted in favour of Shri Mukesh Kumar S/o Shri Harish Chandra, R/o Tatol vaya Bagra, Tehsil - Bhinmal, Dist.-Jalore
More informationR&D needs for future clean utilisation of coal in India. Anuradda Ganesh, IIT Bombay, India
R&D needs for future clean utilisation of coal in India Anuradda Ganesh, IIT Bombay, India Why is coal important for India? Installed power generation (as of June 2010) 162,366 MW 78,000 MW of additional
More informationPROJECT FEASIBILITY REPORT
PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,
More informationO&M CONFERENCE IPS 2013
O&M CONFERENCE IPS 2013 NTPC Limited KAHALGAON SUPER THERMALPOWER PLANT Capacity :Stage I (4 X 210 MW) Stage- II (3 X 500 MW) Achieving Zero Water Discharge from Main Plant 1 NTPC Kahalgaon Overview Location
More informationLimestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report
Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER
More informationPRE-FEASIBILITY REPORT FOR ORDINARY SAND
PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS
More informationMinistry of Environment, Forests & Climate Change Northern Regional Office Dehradun
Dr. Mahesh K. Verma Arki Limestone Project 1 Name and address of the project In-charge along with their telephone, fax, mobile and email address ARKI, Distt. Solan 173208 (H.P.) Mob. 0945 942 9428 Tel:0177-2674052
More informationJAYPEE NIGRIE SUPER THERMAL POWER PROJECT
JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)
More informationOptimal exploitation of coal resources
Optimal exploitation of coal resources through Coal to Chemicals Industry February 2015 New Delhi Coverage Indian context Global context Adani Proposal Support from Govt. 2 India has significant shortfall
More informationJAYPEE NIGRIE SUPER THERMAL POWER PLANT
JAYPEE NIGRIE SUPER THERMAL POWER PLANT (A Division of M/s Jaiprakash Power Ventures Limited) Village: Nigrie, Tehsil: Sarai District: Singrauli 2015 2016 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL
More information1.1 Name of the Project : 1.2 Proposed Installed Capacity of the Project : MW
1.0 GENERAL FORM NO.APP/P/PTB-2/1 PART B SECTOR SPECIFIC INFORMATION SMALL HYDRO POWER PROJECT 1.1 Name of the Project _ 1.2 Proposed Installed Capacity of the Project MW 1.3 Proposed location of the Project
More informationCOAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India
SUMMARY: Coal will be transported to the power plant by belt conveyors in case of pit head power plants. In case of power plants located far away from the mines, coal will be transported by rail. In some
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT FOR EXPANSION OF ALUMINA REFINERY (FROM 1.5 TO 3.0 MTPA) & CAPTIVE CO-GENERATION POWER PLANT (FROM 90 TO 150 MW) OF UTKAL ALUMINA INTERNATIONAL LIMITED AT DORAGUDA, RAYAGADA DIST,
More informationTECHNICAL SPECIFICATIONS NTPC LIMITED
TECHNICAL SPECIFICATIONS FOR ENVIRONMENTAL IMPACT ASSESSMENT (EIA) STUDY FOR LARA SUPER THERMAL POWER PROJECT, STAGE-II (2X800MW) NTPC LIMITED (A Government of India Enterprise) Engineering Office Complex
More informationM/s Tiffin s Barytes Asbestos and Paints Ltd (VIGNESHWARA BARYTES MINE) Near Ramalayam, Velpula (V&P) Y.S.R. Disrict.
PRE FEASIBILITY REPORT FOR Proposed Barytes Mine over an Extent of 49.46 Ha, In Sy. No. 1021/15, 1021/3, 1021/5 of Vemula Village, Vemula Mandal, Y.S.R.Kadapa District, Andhra Pradesh. Submitted To Ministry
More informationb. Develop urban roads/states highways and National highways for the development of tourism, trade and commerce.
4. INFRASTRUCTURE a. Improve rural roads and bridges vital for the marketing of agriculture products and transport of agriculture inputs. b. Develop urban roads/states highways and National highways for
More informationSUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at
SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT for 380 MW Gas Based Combined Cycle Power Plant at Vijaipur, District: Guna MADHYA PRADESH NOVEMBER 2011 1 CONTENTS 1.0 Project Description Page 3 2.0 Description
More informationINVITING EXPRESSION OF INTEREST
INVITING EXPRESSION OF INTEREST Tender Specification No. CGM/E&S/1x800MW/Umred Project/SIA/EOI-1 2018-19 Name of work: Mahagenco's proposed 1x800 MW Ultra Supercritical Thermal Power Project at Umred WCL
More informationSTONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)
Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL
More informationAnalysis of the Draft EIA/EMP Report for Durgapur II Taraimar Coal Block. For. M/S Bharat Aluminium Company Limited
Analysis of the Draft EIA/EMP Report for Durgapur II Taraimar Coal Block For M/S Bharat Aluminium Company Limited Background of the technical report Bharat Aluminium Company (BALCO) is planning to set
More informationOptimization of Coal Blend proportions for sustained improvements in generation & efficiency
Optimization of Coal Blend proportions for sustained improvements in generation & efficiency A.K. Arora & D.Banerjee CenPEEP NTPC LTD Coal Blending in Power Sector Coal Blending is a compulsion for some
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT 3000 MW (3x1000 MW) MUNDRA THERMAL POWER PROJECT DIST. KUTCHH, GUJARAT Developer: ADANI POWER LIMITED TABLE OF CONTENTS SR.NO. DESCRIPTION PAGE No. 1 EXECUTIVE SUMMARY 7-13 1.1 Introduction
More informationIntroduction. Forest Cover. Land Use Pattern Of The State. Recorded forest Area in Jharkhand (Area in km 2 )
Introduction The geographical area of the state is 79,714 Km2 which accounts for 2.42% of the country s area. The state falls between 22000 N 24037 N latitude and 83015 E 87001 E longitude. The important
More informationState at a Glance: Arunachal Pradesh, Vol. 1(2), Water
Water 6.1: Details of Inland Fishery Water Resources of Various Types in Arunachal Pradesh (A.P.) 6.2: Installation of off-grid/decentralized Renewable Energy Systems/Devices 6.3: Source wise Installed
More informationEnergy - Water Nexus INDIA
COAL power PLANTS IN INDIA Energy - Water Nexus INDIA An Insight Into Water & Coal Power Linkages in India Coal Power Plants are water intensive and require water for various processes. Between 2012 &
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,
More informationLeading PCI coal producer with significant reserves and resources
1 Leading PCI coal producer with significant reserves and resources Overview T he deposit was founded in 2009 for mining and export of high quality PCI coal that goes into coking mix It owns 224 hectares
More informationPRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU
PRE-FEASIBILTY REPORT OF SUNATHAR STONE QUARRY VILLAGE: Sunathar TAHASIL: Purushottampur DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU Vill/Po- Gandala, P.S.- Hinjili, Dist.-Ganjam Odisha. CONTENTS CHAPTER
More informationGasification India th 30 th Nov. 2018
Gasification India 2018 29 th 30 th Nov. 2018 Coal Gasification based Urea plant of Talcher Fertilizers Ltd. Gasification Project Demonstration J S SAINI Chief Executive Officer Game Changer for India
More informationPRE FEASIBILITY REPORT. Sipat Advanced Ultra Super Critical. Technology Demonstration Project, Stage-III. (1x800 MW)
Page 1 of 29 PRE FEASIBILITY REPORT FOR Sipat Advanced Ultra Super Critical Technology Demonstration Project, Stage-III (1x800 MW) NTPC Limited (A Government of India Enterprise) Engineering Office Complex
More information1.1 SALIENT FEATURES OF THE PROJECT Pipeline extension from VVSPL Vijayawada to the proposed Dharmapuri Storage Terminal
1.0 EXECUTIVE SUMMARY Hindustan Petroleum Corporation Limited (HPCL) is one of the major Public Sector Navratna Oil Company engaged in refining, marketing and distribution of Petroleum Products in India.
More informationSTATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA
OPERATING GUIDELINES FOR PROCESSING OF CONSENT TO ESTABLISH APPLICATION FOR ESTABLISHMENT OF COAL WASHERIES IN THE STATE OF ORISSA STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII,
More informationRiverbed Sand/Morrum Mining at Gata No. 747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P. Area: 22 Acres (8.
PRE-FEASIBILITY EXECUTIVE SUMMARY Shri Vishwas Parmani S/o Shri H. Parmani is the lessee for the RBM (River Betwa) for an area of 22 Acres (8.90 Ha) in Gata No. 747/16,Village- Patharehta, Tehsil- Kalpi,
More informationS. No Parameter Details 1 Name & Address of the Applicant
1. EXECUTIVE SUMMARY S. No Parameter Details 1 Name & Address of the Applicant M/s AMULYA GRANITES Prop: Smt CH.SARALA H. No. FLAT NO.207 Roja Kishore Residency, Chenchupet, Tenali, AP-522 202 Guntur District,
More informationPRE-FEASIBILIY REPORT
BENDRI LIMESTONE QUARRY NO. - 4 3 (Quarry No. 1) (Quarry No. 1)MINERALS - DOLOMITE (LEASE PERIOD 20.05.2002 TO 19. 05.2022) LEASE AREA - 42.754 HECTARES MINING PROJECT - CATEGORY- B PRE-FEASIBILIY REPORT
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name
More informationENERGY OPTIONS & COAL
ENERGY OPTIONS & COAL Amitabha Ray CGM(QC),CIL Coal Connect :: 19 th November 2007, Kolkata Key factors for consideration.. Energy security depends on availability of secure and reliable energy at affordable
More information