1 2020 Facilities Plan Treatment Report APPENDIX 4C ISS PUMPOUT ANALYSIS

2 Notes No. Storm Event 1 Average Total ISS Pump 1 Pump 2 Pump 3 (MGD) Average Individual Pumpout Per Storm Event Pumpout 2 1 8/4/ /1/ /6/ /13/ /21/ /27/ /19/ /17/ /31/ /12/ /2/ /5/ /11/ /8/ /11/ /25/ /7/ /12/ /10/ Average ) Data taken from the Storm Event Summary Reports generated for the storms listed, except for 8/4/98 storm data which was developed from metered data. All data is included in Appendix 4B, Storm Event Summary Data. 2) The Average Total ISS Pumpout for an event was determined by determining the average total hourly pumpout of all 3 pumps for the storm event. The total of the average of each of the three pumps does NOT necessarily equal the average total pumpout. 3) ISS Pump Station Construction - Down to 2 pumps operating at one time for most of event. 4) Due to limited capacity for 5/10/04 storm indicated under Note 3, the information provided for that storm was not included in the average. TABLE 4C-1 AVERAGE ISS PUMPOUT ANALYSIS TR_4-A.T4C cdr

3 Maximum Total ISS Maximum Individual Pumpout Per Storm Event Pumpout2 No. Storm Event 1 Pump 1 Pump 2 Pump 3 (MGD) 1 8/4/ /1/ /6/ /13/ /21/ /27/ /19/ /17/ /31/ /12/ /2/ /5/ /11/ /8/ /11/ /25/ /7/ /12/ /10/ Average Maximum Maximum Questionable data, dropped from analysis Notes 1) Data taken from the Storm Event Summary Reports generated for the storms listed, except for 8/4/98 storm data which was developed from metered data. All data is included in Appendix 4B, Storm Event Summary Data 2) The Maximum Total ISS Pumpout for an event was determined by determining the maximum total hourly pumpout of all 3 pumps for the storm event. The total of the three pumps does NOT necessarily equal the total pumpout since the max for each pump could have occurred at different times during the event. 3) ISS Pump Station Construction - Down to 2 pumps operating at one time for most of event 4) Due to limited capacity for 5/10/04 storm indicated under Note 3, the information provided for that storm was not included in the average TABLE 4C-2 MAXIMUM ISS PUMPOUT ANALYSIS TR_4-A.T4C cdr

4 TABLE 4C-3 MAXIMUM ISS PUMPOUT TREND ANALYSIS TR_4-A.T4C cdr

5 Total # Pump 1 Pump 2 Pump 3 All 3 Pumps Running No. Storm Event 1 Hours Per Storm 2 # Hrs/Storm % Total Hrs # Hrs/Storm % Total Hrs # Hrs/Storm % Total Hrs # Hrs/Storm % Total Hrs 1 8/4/ % % % % 2 6/1/ % % % 0 0.0% 3 6/6/ % % % 0 0.0% 4 6/13/ % % % % 5 7/21/ % % % % 6 9/27/ % % % 9 4.9% 7 4/19/ % % % 5 4.7% 8 5/17/ % % % % 9 5/31/ % % % % 10 6/12/ % % % % 11 7/2/ % % % % 12 8/5/ % % % % 13 9/11/ % % % % 14 2/8/ % % % % 15 6/11/ % % % % 16 8/25/ % % % % 17 4/7/ % % % % 18 8/12/ % % % % 19 5/10/ % % % 3 0.8% Average % 89.6% 84.3% 47.1% Notes 1) Data taken from the Storm Event Summary Reports generated for the storms listed, except for 8/4/98 storm data which was developed from metered data. All data is included in Appendix 4B, Storm Event Summary Data 2) The Total # of Hours Per Storm is the total number of hours that at least one pump operated as taken from Appendix 4B, Storm Event Summary Data 3) Data was provided in 8/12/02 storm in 5 minute intervals so hourly operation shown as a fraction 4) ISS Pump Station Construction - Down to 2 pumps operating at one time for most of event 5) Due to limited capacity for 5/10/04 storm indicated under Note 4, the information provided for that storm was not included in the average TABLE 4C-4 INDIVIDUAL ISS PUMP USAGE ANALYSIS TR_4-A.T4C cdr

6 2020 Facilities Plan Treatment Report APPENDIX 4D MMSD/UWS IN-PLANT DIVERSION RECORDS

7 TABLE 4D-1 SHEET 1 OF 2 IN-PLANT DIVERSION EVENTS: 1997 JUNE 2004 TR_4-A.T4D cdr

8 TABLE 4D-1 SHEET 2 OF 2 IN-PLANT DIVERSION EVENTS: 1997 JUNE 2004 TR_4-A.T4D cdr

9 JONES ISLAND SOUTH SHORE YEAR ISS PE PE (MG) (MG) (MG) , TOTAL TOTAL NOTES 1) Original information, which is provided in Table 4-D-3, MMSD Provided Data, Diversion Spreadsheet: In-Plant Reports Data, was through the year Data from 2003 and 2004 was added from information included in MMSD Contract Compliance Office monthly reports 2) Data provided for 2004 only includes blending events through June 2004 TABLE 4D-2 ESTIMATED TOTAL WWTP IN-PLANT DIVERSIONS BY YEAR TR_4-A.T4D cdr

10 Estimated Date Time Date Time Plant Blending Blending Blending Plant Start Start Stop Stop Flow Type Rate Volume (MGD) (MGD) (MG) JI 4/9/1999 3:40 4/10/1999 2: PE JI 4/22/1999 1:15 4/22/1999 2: ISS JI 4/23/ : ISS 55 JI 5/12/1999 5:00 5/12/1999 6: ISS JI 5/17/1999 2:35 5/17/1999 4: ISS JI 5/17/1999 6: PE 15 JI 5/18/ :45 5/18/ : PE JI 6/12/ :30 6/14/1999 2: ISS JI 7/9/1999 1:50 7/9/1999 3: ISS JI 7/21/ :15 7/21/ : ISS JI 2/22/ :10 2/22/ : PE JI 4/20/2000 2:40 4/20/2000 9: PE JI 4/20/ :30 4/20/ : ISS JI 4/20/ :55 4/21/ : ISS JI 4/23/2000 5:30 4/23/2000 9: ISS JI 5/9/2000 5:45 5/9/ : ISS JI 5/17/ :15 5/19/2000 4: ISS JI 6/1/2000 1:30 6/1/2000 7: ISS JI 6/1/ :00 6/2/2000 3: ISS JI 6/12/ :30 6/12/ : PE JI 6/12/ :00 6/12/ : ISS JI 7/2/ :20 7/3/2000 1: ISS JI 9/11/ :45 9/12/ : ISS JI 9/14/2000 4:45 9/14/2000 5: ISS JI 9/14/2000 8:15 9/14/2000 9: ISS JI 9/23/2000 0:20 9/23/ : ISS JI 2/9/2001 0: ISS 40 JI 4/9/2001 4: ISS 80 JI 4/9/2001 7:27 4/9/ : PE JI 4/20/2001 8:15 4/20/ : PE JI 4/21/2001 4:30 4/21/2001 9: PE JI 4/8/ :55 4/9/2002 4: PE 30 JI 4/9/2002 5:50 4/10/2002 6: PE JI 6/4/2002 6:30 6/4/ : ISS JI 8/12/ :20 8/13/2002 6: ISS JI 8/13/ :20 8/14/2002 4: ISS 35 SS 8/13/2002 2:30 8/13/ : PE JI 10/15/ :30 10/16/2002 0:15 85 ISS JI 5/1/2003 2:00 5/1/2003 6: PE JI 5/30/ :00 5/30/ : PE JI 12/10/2003 0:01 12/10/ : PE Notes 1) Estimated Blending for Feb 9, 2001 is an unverified calculation 2) Estimated Blending for Apr 9, 2001 through present is as reported in the UW monthly report Source: MMSD TABLE 4D-3 SHEET 1 OF 2 DIVERSIONS SPREADSHEET: IN-PLANT REPORTS DATA TR_4-A.T4D cdr

11 WASTEWATER TREATMENT PLANT FLOW DIVERSIONS JONES ISLAND SOUTH SHORE YEAR ISS PE PE (MG) (MG) (MG) TOTAL Source: MMSD TABLE 4D-3 SHEET 2 OF 2 DIVERSIONS SPREADSHEET: IN-PLANT REPORTS DATA TR_4-A.T4D cdr

12 TABLE 4D-4 SHEET 1 OF 3 MMSD RECORD OF IN-PLANT DIVERSIONS: TR_4-A.T4D cdr

13 TABLE 4D-4 SHEET 2 OF 3 MMSD RECORD OF IN-PLANT DIVERSIONS: TR_4-A.T4D cdr

14 Primary Treatment Diversions to Disinfection From February 2001 At South Shore Wastewater Treatment Plant (3) Estimated PE Diversion Date To Disinfection in MG (1) 2/19/ /20/ /21/1994 (2) NA 4/27/ /28/ /15/ /16/ /10/1996 NA 6/8/1996 NA 6/17/ /18/ /19/ /21/1996 NA 6/22/1996 NA 2/21/ /22/ /21/ /22/1997 NA 8/24/1997 NA 8/25/1997 NA 3/31/ Notes: 1) PE Diversion: Primary Effluent diverted to Disinfection; all diverted primary effluent receives disinfection before discharge. 2) NA: Volume estimates not available. 3) No diversions were reported by United Water Services for Source [per MMSD]: For diversions during , contemporaneous records of diversions could not be located. Therefore, operator logs were searched for dates when flows were high (>200 MGD), i.e., dates on which diversions after primary treatment would be more likely to occur. The table above lists the dates on which diversions were confirmed. Flow estimates were then made by United Water Services on the basis of duration of the diversion and the diversion channel capacity. Thus, these volume estimates are gross. UWS has reported that no diversions have occurred after March 31, TABLE 4D-4 SHEET 3 OF 3 MMSD RECORD OF IN-PLANT DIVERSIONS: TR_4-A.T4D cdr

15 Diversions, Year: 1998 Amount of diversion MG Plant flow at time of diversion (MGD) Diversion Number Plant Start Date Start Time End Time End Date Type TSS, mg/l BOD, mg/l Criteria for diversion 1 SS 3/31/1998 3:45 PM 7:30 AM 4/1/1998 secondary 10 overloaded secondary clarifiers 2 JI 8/8/1998 Unknown broken gate 3 JI 11/10/1998 ISS Source: MMSD TABLE 4D-5 SHEET 1 OF 4 DIVERSION EVENTS: TR_4-A.T4D cdr

16 Diversions, Year: 1999 Event Number Plant Start Date Start Time End Time End Date Type Diversion Flow (MGD) Duration (Hours) Calculated Quantity (MG) ISS Quantity 12 page report (MG) Effluent TSS mg/l Effluen t BOD mg/l 1 JI 1/22/1999 3:30 AM 9:30 AM 1/22/1999 ISS * Plant flow at time of diversion (MGD) JI 1/23/1999 8:10 AM 8:54 PM 1/23/1999 ISS JI 4/9/1999 3:40 AM 4/9/1999 ISS JI 4/10/1999 2:30 AM 4/10/1999 ISS JI 4/22/1999 1:15 AM 2:10 AM 4/22/1999 ISS JI 4/22/ :30 PM 10:30 PM 4/23/1999 ISS JI 4/23/ :40 PM ISS * JI 5/12/1999 5:00 AM 6:15 AM 5/12/1999 ISS JI 5/17/1999 2:35 AM 4:45 AM 5/17/1999 ISS * JI 5/17/1999 6:10 AM 8:35 AM 5/17/1999 PE JI 5/18/1999 1:45 PM 6:37 PM 5/18/1999 ISS/PE** * JI 6/12/ :30 AM 2:30 AM 6/14/1999 ISS JI 7/7/1999 1:50 AM 3:30 AM 7/799 ISS JI 7/21/ :15 PM 12:30 PM 7/21/1999 ISS JI 7/22/ :45 PM 1:05 PM 7/22/1999 ISS JI 7/23/1999 2:05 PM 3:40 PM 7/23/1999 ISS Notes [per MMSD]: *Earlier and larger diversion could have improved effluent that was degraded by overloaded secondaries ** PE flow estimated at 33 MGD for 4.87 hours, ot a total of 6.6 MGD. ISS diversion quantity is total of ISS pumps metered flow to JI minus the composite ISS flow meter to JI downstream of ISS diversion. Low diversion rates would not be captured as there is a small difference in these meters totals on a daily basis. Criteria for diversion plant plant plant At maximum capacity of secondary plant plant plant plant plant Source: MMSD TABLE 4D-5 SHEET 2 OF 4 DIVERSION EVENTS: TR_4-A.T4D cdr

17 Diversions, Year: 2000 Event Number Plant Start Date Start Time End Time End Date Type Effluent TSS Efflue nt BOD Est diversion flow rate (MGD) Duration (hrs) Calculated Quantity (MG) ISS Quantity 12 page report (MG) Plant flow at time of diversion (MGD) 1 JI 2/22/2000 2:10 PM 5:00 PM 2/22/2000 PE MGD 2 JI 4/20/2000 2:40 AM 9:30 AM 4/20/2000 PE MGD JI 7:30 AM 1:30 PM 4/20/2000 ISS MGD 3 JI 4/20/2000 6:55 PM 7:30 PM 4/21/2000 ISS MGD 4 JI 4/23/2000 5:30 AM 9:30 AM 4/23/2000 ISS MGD 5 JI 5/9/2000 5:45 PM 7:55 PM 5/9/2000 ISS 74* MGD 6 JI 5/17/ :15 PM 4:45 AM 5/19/2000 ISS MGD 7 JI 6/1/2000 1:30 AM 7:30 AM 6/1/2000 ISS MGD 8 JI 8:00 PM 3:00 AM 6/2/2000 ISS MGD 9 JI 6/12/2000 1:30 PM 6:45 PM 6/12/2000 PE MGD JI 4:00 PM 9:00 PM 6/12/2000 ISS MGD 10 JI 7/2/2000 9:45 PM 1:20 AM 7/3/2000 ISS 59* MGD 11 JI 9/11/2000 7:45 PM 4:05 PM 9/12/2000 ISS MGD 12 JI 9/14/2000 4:45 AM 5:15 AM 9/14/2000 ISS MGD JI 9/14/2000 8:15 AM 9:15 AM 9/14/2000 ISS MGD 13 JI 9/23/ :20 AM 8:00 PM 9/23/2000 ISS MGD Criteria for diversion At maximum capacity of secondary plant At maximum capacity of secondary plant and nearing At maximum capacity of secondary plant and nearing At maximum capacity of secondary plant and nearing At maximum capacity of secondary plant At maximum capacity of secondary plant Notes [per MMSD]: *Earlier and larger diversion could have improved effluent that was degraded by overloaded secondaries ISS diversion quantity on 12 page report is total of ISS pumps metered flow to JI minus the composite ISS flow meter to JI downstream of ISS diversion. Low diversion rates would not be captured as there is a small difference in these meters totals on a daily basis. Source: MMSD TABLE 4D-5 SHEET 3 OF 4 DIVERSION EVENTS: TR_4-A.T4D cdr

18 Diversions, Year: 2001 Event Number Plant Start Date 1 JI Start Time End Time End Date Type Effluent TSS Effluent BOD Est diversion flow rate (MGD) Duration (hrs) Calculate d Quantity (MG) Quantity 12 page report (MG) Plant flow at time of diversion (MGD) Criteria for diversion Source: MMSD TABLE 4D-5 SHEET 4 OF 4 DIVERSION EVENTS: TR_4-A.T4D cdr

19 2020 Facilities Plan Treatment Report APPENDIX 4E JIWWTP AND SSWWTP WET WEATHER PEAK HOURLY FLOW ANALYSIS

20 TABLE 4E-1 NUMBER OF HOURS FLOW DATA AVAILABLE TR_4-A.T4E cdr

21 TABLE 4E-2 SHEET 1 OF 4 JIWWTP PEAK HOURLY FLOWS FROM AVAILABLE STORM EVENT DATA TR_4-A.T4E cdr

22 TABLE 4E-2 SHEET 2 OF 4 JIWWTP PEAK HOURLY FLOWS FROM AVAILABLE STORM EVENT DATA TR_4-A.T4E cdr

23 TABLE 4E-2 SHEET 3 OF 4 JIWWTP PEAK HOURLY FLOWS FROM AVAILABLE STORM EVENT DATA TR_4-A.T4E cdr

24 TABLE 4E-2 SHEET 4 OF 4 JIWWTP PEAK HOURLY FLOWS FROM AVAILABLE STORM EVENT DATA TR_4-A.T4E cdr

25 TABLE 4E-3 SHEET 1 OF 3 SSWWTP PEAK HOURLY FLOWS FROM AVAILABLE STORM EVENT DATA TR_4-A.T4E cdr

26 TABLE 4E-3 SHEET 2 OF 3 SSWWTP PEAK HOURLY FLOWS FROM AVAILABLE STORM EVENT DATA TR_4-A.T4E cdr

27 Notes: 1) Blending data from Appendix 4D, MMSD/UWS In-Plant Diversion Records 2) Blending is not allowed at SSWWTP per the current WPDES permit, effective as of April 1, 2003 TABLE 4E-3 SHEET 3 OF 3 SSWWTP PEAK HOURLY FLOWS FROM AVAILABLE STORM EVENT DATA TR_4-A.T4E cdr

Chapter 5: Treatment Assessment Future Condition

Chapter 5: Treatment Assessment Future Condition 2020 Facilities Plan Treatment Report 5.1 Introduction Chapter 5: Treatment Assessment Future Condition The future performance of the Milwaukee Metropolitan Sewerage District (MMSD) wastewater treatment

More information

Chapter 2: Description of Treatment Facilities

Chapter 2: Description of Treatment Facilities 2020 Facilities Plan Treatment Report 2.1 Introduction Chapter 2: Description of Treatment Facilities This chapter defines the Milwaukee Metropolitan Sewerage District (MMSD) service area. It also describes

More information

Wet Weather Planning for Wastewater Treatment Plants

Wet Weather Planning for Wastewater Treatment Plants Wet Weather Planning for Wastewater Treatment Plants June 23, 217 Peak Flow Management: Collection vs. Treatment Collection System Peak Flow Management Single 24 hour design storm I/I reduction SSO elimination

More information

Chapter 9: Alternative Analysis

Chapter 9: Alternative Analysis Chapter 9: Alternative Analysis 9.1 Introduction The development and evaluation of alternatives are key elements in the facilities planning process. The purpose of this chapter is to evaluate alternatives

More information

CHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS

CHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS CHAPTER 4 WASTEWATER CHARACTERISTICS Wastewater collection, treatment, and disposal facilities are designed to handle specific hydraulic and pollutant loads for 20 or more years after they are constructed.

More information

SMCSD Headworks, Primary and Secondary Treatment Pre-Design

SMCSD Headworks, Primary and Secondary Treatment Pre-Design Technical Memorandum SMCSD Headworks, Primary and Secondary Treatment Pre-Design Water andenvironment Subject: Prepared For: Prepared by: Reviewed by: SMCSD Mark Takemoto, Dennis Gellerman Steve Clary

More information

Actual Value: Monthly average amount of Flow, COD, and TSS contributed to the SROG system by each SROG city

Actual Value: Monthly average amount of Flow, COD, and TSS contributed to the SROG system by each SROG city Achieved Actual Demand: Actual demand for each city, provided that the city had less than three days below actual demand during the month. If a city has three or more days below actual demand, the achieved

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 PREPARED: January 2019 2018 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by Milwaukee Metropolitan Sewerage District Conveyance and Treatment System MACRO made available by Eric Loucks,, CDM MMSD Collection System Operations MMSD operates an extensive system of sanitary sewers

More information

75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT

75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT 75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT Basis of Design Memorandum Design Memo No.: DM-1 Date: August 26, 24 Project/Task: 24487.41 Subject: Prepared by: Reviewed by: Design Flows and

More information

Baltimore City Department of Public Works

Baltimore City Department of Public Works Baltimore City Department of Public Works Back River WWTP Process and Construction Overview Michael F. Gallagher, Chief Wastewater Facilities Division Wastewater Treatment Chesapeake Bay Restoration Water

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012 PREPARED: January 2013 2012 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

HIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE

HIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE City of Newark, Ohio HIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE 22, 2011 High Rate Treatment Tanks/UV Wet Weather Screen Building JC2/Wet Weather Pump Station Wet Weather Control

More information

Dundalk Wastewater Treatment Plant

Dundalk Wastewater Treatment Plant Township of Southgate Dundalk Wastewater Treatment Plant 2017 Annual Report Staff Report PW2018-010 - Dundalk Wastewater Treatment Plant 2017 Annual Report Moved by Councillor Pallister, Seconded by Councillor

More information

Treatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E.

Treatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E. Treatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E. Topics Covered Background Challenges and Priorities UV and Filters High Flows Evaluation Aeration Evaluation Aeration Basins

More information

A H. Marcela Velázquez-Carrillo Consultant to Mountain Systems Inc. on the application of Proficy for Water Treatment

A H. Marcela Velázquez-Carrillo Consultant to Mountain Systems Inc. on the application of Proficy for Water Treatment WASTEWATER TREATMENT IINORMATIION TECHNOLOGY SUEZ, parent company of United Water ONDEO, is one of the largest water and wastewater treatment firms in the world. On January 5 th, 1998, United Water Milwaukee

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Ardfert Licence Register No. D0282-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section

More information

Environmental Improvements Associated with Springfield WWTP EHRT. Using the Compressed Media Filter Technology

Environmental Improvements Associated with Springfield WWTP EHRT. Using the Compressed Media Filter Technology Environmental Improvements Associated with Springfield WWTP EHRT Tuesday, June 23 9:30 am Using the Compressed Media Filter Technology WWETCO WWETCO FlexFilter ENGINEERS CLUB OF ST. LOUIS Performance Testing

More information

Combined Sewer Overflows July 2012-December 2013

Combined Sewer Overflows July 2012-December 2013 CSO Facilities Summary Report 213 Combined Sewer Overflows July 212-December 213 Overview MWRA monitored four CSO facilities in the North System during the period covered in this report (July 212 December

More information

The Development of Operational Tools for City-Wide Implementation of BNR in New York City. Sarah Galst, P.E. Hazen and Sawyer, P.C.

The Development of Operational Tools for City-Wide Implementation of BNR in New York City. Sarah Galst, P.E. Hazen and Sawyer, P.C. The Development of Operational Tools for City-Wide Implementation of BNR in New York City Sarah Galst, P.E. Hazen and Sawyer, P.C. January 27, 2015 Outline Background to NYC Nitrogen Programs - East River

More information

Eco-efficient Solids Separation Using Salsnes Filter Technology. Jonathan Leech Trojan Technologies Nov 2013

Eco-efficient Solids Separation Using Salsnes Filter Technology. Jonathan Leech Trojan Technologies Nov 2013 Eco-efficient Solids Separation Using Salsnes Filter Technology Jonathan Leech Trojan Technologies Nov 2013 Outline Process Description Technology Overview Primary Filtration Applications Full-scale application:

More information

Biological Phosphorus Removal Technology. Presented by: Eugene Laschinger, P.E.

Biological Phosphorus Removal Technology. Presented by: Eugene Laschinger, P.E. Biological Phosphorus Removal Technology Presented by: Eugene Laschinger, P.E. Overview What is phosphorus and why do we care? How can you remove phosphorus? Biological phosphorus removal Biological phosphorus

More information

BOD Performance Correlation at Georgia s WWTPs

BOD Performance Correlation at Georgia s WWTPs BOD Performance Correlation at Georgia s WWTPs Richard O. Mines, Jr., Laura W. Lackey Jennifer C. Sheppard Mercer University Glen Behrend Georgia EPD 1 Acknowledgement This project was primarily performed

More information

UPDATED CAPACITY ANALYSIS REPORT FOR. Hontoon Island State Park. Wastewater Treatment Plant

UPDATED CAPACITY ANALYSIS REPORT FOR. Hontoon Island State Park. Wastewater Treatment Plant UPDATED CAPACITY ANALYSIS REPORT FOR Hontoon Island State Park Wastewater Treatment Plant Volusia County, Florida Facility ID: FLA011276 Permit No.: FLA011276 Expires: 2/28/2015 Prepared For: FDEP Division

More information

Chapter 5: Conveyance Assessment 2020 Baseline Conditions

Chapter 5: Conveyance Assessment 2020 Baseline Conditions Chapter 5: Conveyance Assessment 2020 Baseline Conditions 5.1 Introduction The performance of the conveyance system for 2020 Baseline conditions is assessed in this chapter using the hydraulic models.

More information

Dundalk Wastewater Treatment Plant

Dundalk Wastewater Treatment Plant Township of Southgate Dundalk Wastewater Treatment Plant 2016 Annual Report Jim Ellis Public Works Manager Dundalk Wastewater Treatment Plant 2016 Annual Report Table of Contents Wastewater Treatment Plant

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 PREPARED: January 2015 2014 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Licence Register No. D0302-01 Dromahane and Environs Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on

More information

75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT

75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT 75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT Basis of Design Memorandum Design Memo No.: DM-7 (REVISED) Date: February 2005 Project/Task: 124487.001.420 Subject: Prepared by: Reviewed by: Hydraulic

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Borris Licence Register No. D0248-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section 2.

More information

RE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System

RE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System 14 th, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Wardsville Wastewater Treatment Plant and Collection System The Ontario Clean Water Agency

More information

Water Quality Permitting Program Monitoring Matrix 1,2,3

Water Quality Permitting Program Monitoring Matrix 1,2,3 State of Oregon Department of Environmental Quality Water Quality Permitting Program Monitoring Matrix 1,2,3 ITEM OR PARAMETER Total Flow (influent and/or effluent) 4 Flow Meter Calibration 5 (influent

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Ballybay Licence Register. D0207-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section 2.

More information

Brightwater: The Design Challenges of a 39 mgd (150 MLD) Membrane Bioreactor

Brightwater: The Design Challenges of a 39 mgd (150 MLD) Membrane Bioreactor Brightwater: The Design Challenges of a 39 mgd (150 MLD) Membrane Bioreactor J. Komorita 1, P. Burke 2, B. Youker 2, and G. Crawford 2 1 King County, 2 CH2M HILL ABSTRACT Many Membrane Bioreactor (MBR)

More information

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred

More information

Georgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017

Georgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017 Georgia Power Plant Bowen NPDES Permit No. GA0001449 Revised December 2017 Purpose This (Plan) describes the additional procedures, safeguards and enhanced wastewater treatment measures that Georgia Power

More information

Full Scale Testing to Demonstrate Anaerobic Selector Effect for Low Strength Wastewater

Full Scale Testing to Demonstrate Anaerobic Selector Effect for Low Strength Wastewater OWEA State Conference June 20, 2012 Full Scale Testing to Demonstrate Anaerobic Selector Effect for Low Strength Wastewater Presenters Bill Donohue NEORSD Bob Hrusovsky MWH Don Esping BC Easterly Plant

More information

ISAM SBR with Blower Assisted Jet Aeration Design Calculations For Lyons, CO WWTP Upgrade

ISAM SBR with Blower Assisted Jet Aeration Design Calculations For Lyons, CO WWTP Upgrade ISAM SBR with Blower Assisted Jet Aeration Design Calculations For Lyons, CO WWTP Upgrade May. 28, 2013 A. Site Conditions 1. Site elevation = 5,322 ft MSL 2. Average barometric pressure = 12.07 psia 3.

More information

Technical Memorandum No. 1

Technical Memorandum No. 1 To: From: Steve McGowan, P.E., BCEE Project Manager, Malcolm Pirnie, Inc. Eric Wang, P.E. Project Engineer, Malcolm Pirnie, Inc. Date: Subject: August 11, 28 (Final) Madison MSD Project No. 84251 Malcolm

More information

Chapter 10: Conveyance Recommended Plan

Chapter 10: Conveyance Recommended Plan 2020 Facilities Plan Conveyance Report Chapter 10: Conveyance Recommended Plan 10.1 Introduction and Plan Summary 10.1.1 Background As a regional governmental agency providing wastewater treatment and

More information

Optimization of an Aeration System at an Industrial Wastewater Treatment Plant

Optimization of an Aeration System at an Industrial Wastewater Treatment Plant Optimization of an Aeration System at an Industrial Wastewater Treatment Plant Philip L. Schwartz, P.E Keystone Engineering Group, Inc., Exton, PA and Lawrence R. Sandeen, P.E Rohm and Haas Company, Bristol,

More information

MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT

MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT SUBMITTED BY: TREATMENT FACILITY: NPDES #: MUNICIPALITY: COUNTY: CONTACT PERSON: Responsible Official Title Telephone #: Fax #: Email Address:

More information

6.2.1 Intermediate Pumping Overview

6.2.1 Intermediate Pumping Overview 6.2.1 Intermediate Pumping Overview The intermediate pumps are the feed pumps to the MBR system. The pumps take flow from the primary effluent channel and pump it to the channel in front of the fine screens.

More information

Iroquois Wastewater Treatment Plant 2016 Annual Performance Report

Iroquois Wastewater Treatment Plant 2016 Annual Performance Report Iroquois Wastewater Treatment Plant 2016 Annual Performance Report The Iroquois WWTP is a Class II wastewater treatment facility owned and operated by the Municipality of South Dundas. Raw sewage is conveyed

More information

11.0 EFFLUENT DISINFECTION

11.0 EFFLUENT DISINFECTION SEWPCC Upgrading/Expansion Conceptual Design Report SECTION 11 - Table of Contents 11.0 EFFLUENT DISINFECTION...11.1 11.1 PURPOSE OF UNIT PROCESS...11.1 11.2 EXISTING DISINFECTION FACILITY...11.2 11.2.1

More information

2017 Annual Performance Report

2017 Annual Performance Report 2017 Annual Performance Report Thornbury Wastewater Treatment Plant and Associated Collection System Prepared by: Wastewater Operations Staff Reporting Period: January 1 December 31, 2017 1 P age Executive

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Bantry Licence Register No. D0168-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section 2.

More information

2020 Facilities Plan State of the Art Report. Table of Contents. Chapter 1: Introduction Appendix 1A: Production Theory...

2020 Facilities Plan State of the Art Report. Table of Contents. Chapter 1: Introduction Appendix 1A: Production Theory... Table of Contents Chapter 1: Introduction... 1-1 1.1 Background... 1-1 1.2 Objectives of the Production Theory Analysis... 1-5 Chapter 1 Figures 1-1 RWQMPU Study Area and MMSD 2020 Planning Boundary...

More information

ATTACHMENT E: MONITORING-KIRIKEE LOWER

ATTACHMENT E: MONITORING-KIRIKEE LOWER ATTACHMENT E: MONITORING-KIRIKEE LOWER E.1 Waste Water Discharge Frequency and Quantities Existing & Proposed SEE TABLE E.1(i) There are no pumping stations nor are there storm water overflows on the collection

More information

Managing the Largest Extended Wet Weather Event on Record at TRA CRWS

Managing the Largest Extended Wet Weather Event on Record at TRA CRWS Managing the Largest Extended Wet Weather Event on Record at TRA CRWS April 21, 2016 Julia J. Hunt Trinity River Authority of Texas David R. Jackson, P.E., BCEE Freese and Nichols, Inc. TRA CRWS Treatment

More information

SEWER USER RATE CHARGE STUDY

SEWER USER RATE CHARGE STUDY SEWER USER RATE CHARGE STUDY CITY OF PRESCOTT SEWER DEPARTMENT JULY 2018 604 WILSON AVENUE MENOMONIE, WI 54751 CONTENTS CONTENTS...i 1 INTRODUCTION...3 1.1 PURPOSE...3 1.2 EXISTING SEWER USER CHARGE BASIS...3

More information

Utilization of Dynamic Modeling to Evaluate and Design Secondary Clarifiers for the Muddy Creek WWTP

Utilization of Dynamic Modeling to Evaluate and Design Secondary Clarifiers for the Muddy Creek WWTP Utilization of Dynamic Modeling to Evaluate and Design Secondary Clarifiers for the Muddy Creek WWTP Michael D. Parker, PE Co-Authors: Joe Rohrbacher, PE Alonso Griborio, PE PhD Presented by Joe Rohrbacher,

More information

2015 Spring Conference

2015 Spring Conference 2015 Spring Conference Meeting Strict Summer Permit Requirements on Day One: Start-up of the Western Wake Regional Water Reclamation Facility Chris White, PE April 13, 2015 Acknowledgements Town of Cary

More information

MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT

MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT 214 ANNUAL REPORT uary 1 to ember 31, 214 Environmental Compliance Approval # 3-871-88-949 Prepared by: Table of Contents Section 1: Overview...

More information

MEETING COLUMBUS S TREATMENT LIMITS

MEETING COLUMBUS S TREATMENT LIMITS MEETING COLUMBUS S TREATMENT LIMITS EVEN WHEN WET WEATHER CHANGES THEM Improving Quality of Life AGENDA CEPT Background CEPT Preliminary Testing CEPT Design and Construction CEPT NPDES Permit Modification

More information

The NEORSD Demonstration of a Cost-Effective Solution

The NEORSD Demonstration of a Cost-Effective Solution 2015 OWEA Technical Conference Advancing Wet Weather Treatment The NEORSD Demonstration of a Cost-Effective Solution June 24, 2015 Advancing Wet Weather Treatment The NEORSD Demonstration of a Cost-Effective

More information

CITY OF LINCOLN NON-POTABLE WATER USE PLANNING AND IMPLEMENTATION. Got Questions? Get Answers

CITY OF LINCOLN NON-POTABLE WATER USE PLANNING AND IMPLEMENTATION. Got Questions? Get Answers CITY OF LINCOLN NON-POTABLE WATER USE PLANNING AND IMPLEMENTATION Got Questions? Get Answers By: Matthew J. Wheeler, P.E. Lincoln Community Development Director Matthew.Wheeler@lincolnca.gov CITY OF LINCOLN

More information

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Richard W. Gullick, Ph.D. Director of Operations Timothy Castillo Wastewater Manager Presented to the Albemarle County

More information

Appendix A EVALUATION OF CAPTURING AND TREATING ADDITIONAL COMBINED SEWER OVERFLOW AT THE NEWPCP. And. PADEP Response

Appendix A EVALUATION OF CAPTURING AND TREATING ADDITIONAL COMBINED SEWER OVERFLOW AT THE NEWPCP. And. PADEP Response Appendix A EVALUATION OF CAPTURING AND TREATING ADDITIONAL COMBINED SEWER OVERFLOW AT THE NEWPCP And PADEP Response NORTHEAST WATER POLLUTION CONTROL PLANT (NEWPCP) COMPLIANCE WITH NPDES PERMIT NO. PA0026689,

More information

<1ppm Phosphorus A BNR With No Chemical Addition Case Study

<1ppm Phosphorus A BNR With No Chemical Addition Case Study WWOA 51 st Annual Conference October 2017 Arn Johnson Walker Process Equipment Div. of McNish Corp. arn.johnson@walker-process.com 1 Todd Toelle, Superintendent City of Phillips, WI WWTP Chris Kaempfer,

More information

The Wastewater Tsunami is Coming

The Wastewater Tsunami is Coming The Wastewater Tsunami is Coming How do we stop it? Trooper Smith, PE, Freese and Nichols, Inc. Jennifer Baldwin, Ph.D., PE, Jacobs Outline Project Background Central Basin Rilling Road Storage 30% Design

More information

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be: Andelina Farms Wastewater Treatment Plant Preliminary Basis of Design May 2018 Andelina Farms is a proposed Planned Unit Development in Saline Township located along US-12 just west of the City of Saline.

More information

Georgia Power Plant McManus NPDES Permit No. GA Ash Pond Dewatering Plan. Revised April 2018

Georgia Power Plant McManus NPDES Permit No. GA Ash Pond Dewatering Plan. Revised April 2018 Georgia Power Plant McManus NPDES Permit No. GA0003794 Revised April 2018 Purpose This (Plan) describes the procedures, safeguards and enhanced wastewater treatment measures that Georgia Power Company

More information

volumes 11 days from 6 days from volumes are in small gaps Over the

volumes 11 days from 6 days from volumes are in small gaps Over the Greytown Wastewater Treatment Plant Effluent Quantity and Quality Review Wastewater flow volumes The existing discharge consent allows for an average discharge volume of 1,350 m 3 per day ( annual mean)

More information

EPA Waste Water Discharge Licence Application

EPA Waste Water Discharge Licence Application Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update

More information

Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation. J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc.

Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation. J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc. Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc. Facultative Lagoon System Designed for 1.5 MGD Discharging 1.15-1.35

More information

Appendix F. MOECC meeting summaries

Appendix F. MOECC meeting summaries Appendix F MOECC meeting summaries MEETING SUMMARY Progress Meeting with MOECC Duffin Creek WPCP Phosphorus Reduction Action Plan Study ATTENDEES: York Region: Wayne Green Mukund Padhye Durham Region:

More information

Eco-efficient Solids Separation Using Salsnes Technology. Wayne Lem Trojan Technologies July

Eco-efficient Solids Separation Using Salsnes Technology. Wayne Lem Trojan Technologies July Eco-efficient Solids Separation Using Salsnes Technology Wayne Lem Trojan Technologies July 18 2013 TROJAN TODAY INNOVATIVE WATER TREATMENT SOLUTIONS > 800 associates, operating from 25 locations in 12

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Kanturk Licence Register No. D0203-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section

More information

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100 MEMO To: Jeff Pelz (West Yost) Kathryn Gies (West Yost) Copies: Mark Hildebrand (NCA) ARCADIS U.S., Inc. 200 Harvard Mills Square Suite 430 Wakefield Massachusetts 01880 Tel 781 224 4488 Fax 781 224 3033

More information

Measure Twice, Cut Once Using Flow Monitoring Data to Re-evaluate Wet Weather Improvement Alternatives

Measure Twice, Cut Once Using Flow Monitoring Data to Re-evaluate Wet Weather Improvement Alternatives Measure Twice, Cut Once Using Flow Monitoring Data to Re-evaluate Wet Weather Improvement Alternatives Barbara Moranta, PE CDM Smith Multi-Million Dollar Upgrades Planned for Crooked Creek Basin Planning

More information

Springfield, MO SSO Control Program: Using Big Data to Chart Progress

Springfield, MO SSO Control Program: Using Big Data to Chart Progress Springfield, MO SSO Control Program: Using Big Data to Chart Progress 30 August 2017 Richard Hayslett & Josh Tedder Springfield s Overflow Control Plan 10 year, $200 Million Phase 1 Foundation Projects

More information

Water and Energy in Maryland: What Next?

Water and Energy in Maryland: What Next? Water and Energy in Maryland: What Next? Opportunities, Knowledge Gaps and Research Needs Bob Beringer, PE Vice President, Water /Wastewater Johnson, Mirmiran & Thompson 1 BACKGROUND ON ENERGY CONSUMPTION

More information

Annual Environmental Report 2015

Annual Environmental Report 2015 Annual Environmental Report 2015 Agglomeration Name: Licence Register. D0063-01 Blessington Table of Contents Section 1. Executive Summary and Introduction to the 2015 AER 1 1.1 Summary report on 1 Section

More information

Monthly Operating Report

Monthly Operating Report Executive Summary Wastewater Treatment Plant Operations staff is working with partners to evaluate 1) a system to automate control of the solids balance aspect of the treatment plant s activated sludge

More information

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

WEFTEC.06. **Cobb County Water System, Marietta, Georgia CHEMICALLY ENHANCED PRIMARY TREATMENT FOR A LARGE WATER RECLAMATION FACILITY ON A CONSTRICTED SITE - CONSIDERATIONS FOR DESIGN, START-UP, AND OPERATION ABSTRACT Jeffrey A. Mills, P.E., BCEE,* Roderick

More information

ADDENDUM NO. 5. Project Book Updates, Specifications Updates, Drawing Updates, Questions and Answers and Bid Receipt Date and Opening Date Change

ADDENDUM NO. 5. Project Book Updates, Specifications Updates, Drawing Updates, Questions and Answers and Bid Receipt Date and Opening Date Change ADDENDUM NO. 5 DATE: December 29, 2017 INVITATION FOR BID: IFB H180004821 CSO Control Program Special Order 14 Division 46 - Wet Weather Disinfection Facility And Other Improvements DATED: October 26,

More information

Index Number District II Primary Clarifier #2 and #3 Rehabilitation Project Definition FINAL

Index Number District II Primary Clarifier #2 and #3 Rehabilitation Project Definition FINAL T E C H N I C A L M E M O R A N D U M DISTRICT II PRIMARY CLARIFIER #2 AND #3 REHABILITATION PROJECT DEFINITION Index Number 129-15 and #3 Rehabilitation Project Definition FINAL PREPARED FOR: JEA Capital

More information

Water and Wastewater Capital Improvement Plan Options and Revenue Requirements

Water and Wastewater Capital Improvement Plan Options and Revenue Requirements Water and Wastewater Capital Improvement Plan Options and Revenue Requirements The Master Plan s objectives are to assess our needs and recommend Capital Improvement Plans that address the following: Infrastructure

More information

Maximizing Secondary Wet Weather Capacity at the Columbia Boulevard Wastewater Treatment Plant

Maximizing Secondary Wet Weather Capacity at the Columbia Boulevard Wastewater Treatment Plant Maximizing Secondary Wet Weather Capacity at the Columbia Boulevard Wastewater Treatment Plant Adrienne Menniti1, Bruce Johnson1, Glen Daigger1, Samuel Jeyanayagam1, Lynne Chicoine1, Paul Suto2, Vu Han2,

More information

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati Taylor Creek Treatment Plant Metropolitan Sewer District of Greater Cincinnati Who is this guy and what is he talking about? Brad Blankenship Taylor Creek Operator 3.5 years MSD Operator 5.5 years (total)

More information

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works This document can be made available in other accessible formats as soon as practicable and upon request Staff Report Infrastructure & Public Works Report To: Committee of the Whole Meeting Date: March

More information

This page is blank to facilitate double-sided printing.

This page is blank to facilitate double-sided printing. Supplement No. 2 September 2013 This page is blank to facilitate double-sided printing. Introduction and Purpose The Metropolitan St. Louis Sewer District (MSD) prepared an update to its Combined Sewer

More information

Kansas Case Study Kanopolis Reservoir and Salina, KS

Kansas Case Study Kanopolis Reservoir and Salina, KS Kansas Case Study Kanopolis Reservoir and Salina, KS Western State Water Council Water Quantity/Quality Workshop October 6, 2015 Mike Tate, P.E. Kansas Department of Health and Environment Kanopolis Reservoir

More information

POTW s As An Emergency Option For Dairy Manure Disposal

POTW s As An Emergency Option For Dairy Manure Disposal POTW s As An Emergency Option For Dairy Manure Disposal A POTW s Perspective 2011 Manure Summit February 15 & 16, 2011 Lambeau Field Atrium Chris Stempa, Deputy Utilities Director City of Appleton Wastewater

More information

Efficient Design Configurations for Biological Nutrient Removal

Efficient Design Configurations for Biological Nutrient Removal Efficient Design Configurations for Biological Nutrient Removal A Case Study: Upper Blackstone Water Pollution Abatement District Jane E. Madden, P.E., BCEE August 30, 2017 UBWPAD Wastewater Treatment

More information

AS-H Iso-Disc Cloth Media Filter

AS-H Iso-Disc Cloth Media Filter AS-H Iso-Disc Cloth Media Filter Tertiary filtration and final polishing of wastewaters in municipal and industrial applications Toby.Sedgwick@AlfaLaval.com Slide 2 Typical Performance Range Influent Average

More information

Delvin Wastewater Treatment Plant

Delvin Wastewater Treatment Plant Delvin Wastewater Treatment Plant WWDL No. D0267-01 ANNUAL ENVIRONMENTAL REPORT 2011 County Buildings Mullingar Co. Westmeath Phone: 04493-32000 Fax: 04493-42330 Delvin Waste Water Discharge Licence (EPA

More information

Hydrogen Sulfide (H 2 S) Control Cost Savings in a Municipal Sewer Collection System and Treatment Plant

Hydrogen Sulfide (H 2 S) Control Cost Savings in a Municipal Sewer Collection System and Treatment Plant ISO 9001:2008 Hydrogen Sulfide (H 2 S) Control Cost Savings in a Municipal Sewer Collection System and Treatment Plant Odor and Corrosion Control in Pump Stations Using Microcat - ANL BioBlend - BSE 124

More information

Evaluation of Cost and Benefits of CSO Treatment and Supplemental Aeration to Improve Water Quality in the Chicago Area Waterways

Evaluation of Cost and Benefits of CSO Treatment and Supplemental Aeration to Improve Water Quality in the Chicago Area Waterways Evaluation of Cost and Benefits of CSO Treatment and Supplemental Aeration to Improve Water Quality in the Chicago Area Waterways Metropolitan Water Reclamation District of Greater Chicago Research and

More information

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES A range of potential ammonia limits were identified for alternatives evaluation, as discussed in Section 2.2.5. This chapter

More information

MUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT

MUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT MUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT 214 ANNUAL REPORT uary 1 to ember 31, 214 Environmental Compliance Approval # 3-442-9-938 Prepared by: Table of Contents Section 1: Overview...

More information

Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility

Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility Michael Sanders, P.E., Kleinfelder Collection Systems Specialty Conference NEWEA September 12, 2016 Presentation

More information

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS: FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:

More information

Newtown Creek Superfund Site Point Sources Sampling CAG Meeting March 22, 2016

Newtown Creek Superfund Site Point Sources Sampling CAG Meeting March 22, 2016 Newtown Creek Superfund Site Point Sources Sampling CAG Meeting March 22, 2016 CSTAG Meeting May 19-20, 2014 May 19, 2015 1 Objectives Define point source discharge for the study area Discuss the purpose

More information

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT FEBRUARY 2014 SUMMARY This annual report is in response

More information

Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA Ash Pond Dewatering Plan. Revised May 2018

Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA Ash Pond Dewatering Plan. Revised May 2018 Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA0001431 Revised May 2018 Purpose This updated (Plan) describes the additional procedures, safeguards and enhanced wastewater treatment measures

More information

Watertown Wastewater Facility Plan. August 11, 2015

Watertown Wastewater Facility Plan. August 11, 2015 Watertown Wastewater Facility Plan August 11, 2015 Watertown Wastewater Wastewater Treatment Facility History Comprehensive Planning Wastewater Concerns Capacity Condition Permitting Requirements Watertown

More information

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Presented by: Jim