1 FY2018 CIRP Detailed Summary 1

2 FY 2018 CIRP New Allocations Type of Project Number % Budget Asset Management Renewal ,562,000 Cityshed ,238,000 CSO ,470,000 SSO ,696,000 Treatment Plant ,751,000 Districtwide ,955,000 Stormwater ,500,000 TOTALS: ,172,000

3

4 Asset Management Renewal Projects & Anticipated Results Results: renew 50,000 70,000 feet of sewer, implement repairs on deteriorating infrastructure, provide for sewer system assessments, and reduce frequency of sewer overflows and building backups. Repair/Replacement Projects- 400 small & immediate need projects (under $25,000) and larger infrastructure repair projects as needed CIPP lining of existing sewers Construct repairs/replacement at 6 pump stations locations

5 Curb inlet replacement

6 Cityshed Projects & Anticipated Results Results: Projects will lead to the reduction of building backups and reduction of overland and street flooding. Begin design of four Cityshed projects Calvary Cemetery Storage Basin, Frederick Street, Tillie Baden Newby, and Partridge Avenue Combined Sewer Relief Begin construction of 2 Cityshed projects Complete construction of Harlem Baden Ph IV Improvements from Basin to Hamilton Trunk

7 Harlem Baden Relief Ph IV (Hebert) Detention Basin 7

8 CSO Projects & Anticipated Results Results: reduce and control combined sewer overflows, reduce system surcharging, and reduce building backups in the combined sewer area. Continue construction of the Maline Creek CSO Storage Facility, a 28 foot diameter, 2,700 feet long underground facility with pump station. Continue CSO Volume Reduction Green Infrastructure program. Continue design and easement acquisition for Lower & Middle RDP CSO Controls System Improvements, and planning and design on Upper RDP CSO Storage Tunnel and RDP Tributaries (Deer Creek) CSO Storage Tunnel.

9 Maline Creek Local Storage Facility

10

11 SSO Projects & Anticipated Results Results: remove 4 constructed SSOs, with an additional 1 removal possible after monitoring verification. Reduce building backups & system surcharging. Continue funding construction of 39,000 feet of tunnel, for the Jefferson Barracks and Deer Creek Sanitary tunnel projects, with $91 Million in supplemental funding Construct 38,000 feet of sanitary sewer, and 11,000 feet of storm sewer to facilitate the removal of private I/I, and construct 20 private I/I reduction projects Construct 80,000 to 100,000 feet of CIPP lining of existing sewers Reconstruct two pump stations; provide $5 Million for easement/property acquisition Commence or continue Watershed Design efforts on 39 projects throughout the District

12 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE I

13 BRADFORD WOODS PUMP STATION (P-429) REPLACEMENT

14

15 WWTF Projects & Anticipated Results Results: Make needed repairs at treatment facilities, and design needed facility repairs and improvements. Construct needed repairs and improvements at the Coldwater, Grand Glaize, Lemay and Mo Rivers plants. Construct improvements to lessen the flooding risk at the Fenton and Grand Glaize plants. Design needed improvements and repairs at the Bissell, Lower Meramec, and Lemay Treatment Plants.

16 COLDWATER CREEK WWTF FINAL CLARIFIERS

17 Districtwide Projects & Anticipated Results Results: provide design and construction support for projects throughout the District. General Service Agreements for survey, geotechnical, construction management, facility design, sewer design, & property appraisal. Data acquisition for flow metering, stream flow gauging, water quality sampling, and radar rainfall data. CCTV & Physical Inspection of 700,000 feet of sewers.

18 CCTV Inspection

19 Stormwater Projects & Anticipated Results Results: reduce flooding at 9 structure and 25 yard locations, and address erosion at 10 properties. Construct 7,525 feet of storm sewers and construct 2 bank stabilization projects. Easement acquisition funding to support stormwater projects General service agreement for water quality support services, to aid regulatory development Anticipate 90 work order repair projects, averaging $9,000, and 10+ over $25,000 Stormwater IR projects

20 Hudson Rd. # Bank Stabilization

21 Doane Drive #1719 Storm Sewer

FY 2018 Proposed Capital Improvement Program

FY 2018 Proposed Capital Improvement Program FY 2018 Proposed Capital Improvement Program Metropolitan St. Louis Sewer District FY 2018 Capital Improvement Program Proposed Engineering Services Rich Unverferth, P.E. Director of Engineering January

More information

Storm Water and Sanitary Sewer

Storm Water and Sanitary Sewer Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements

More information

Sewer System Flood Reduction Measures in the Rockcliffe Area

Sewer System Flood Reduction Measures in the Rockcliffe Area PW28.6 REPORT FOR ACTION Sewer System Flood Reduction Measures in the Rockcliffe Area Date: March 26, 2018 To: Public Works and Infrastructure Committee From: General Manager, Toronto Water Wards: Ward

More information

SOS. City of Akron Combined Sewer Overflow (CSO) Long Term Control Plan. Separate Our Sewers Save Our Streams. Ohio OWEA Collection Systems Workshop

SOS. City of Akron Combined Sewer Overflow (CSO) Long Term Control Plan. Separate Our Sewers Save Our Streams. Ohio OWEA Collection Systems Workshop City of Akron Combined Sewer Overflow (CSO) Long Term Control Plan SOS Separate Our Sewers Save Our Streams Ohio OWEA Collection Systems Workshop Patrick Gsellman Genny Hanna Jim Hall Thursday, May 9,

More information

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017 PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017 MSD is delivering Phase 1 is under the original cost estimate Improving Trends in Water Quality MSDGC has completed

More information

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Reducing Flood Risk in Toronto David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Institute for Catastrophic Loss Reduction February 19, 2016 1 Agenda Reducing Flood Risk in Toronto 1) Overview

More information

System Evaluation and Capacity Assurance Plan

System Evaluation and Capacity Assurance Plan City of Cedar Hills System Evaluation and Capacity Assurance Plan The City of Cedar Hills believes that one of the keys to preventing sanitary sewer overflows is to evaluate system capacity and to monitor

More information

Grand River Monitoring

Grand River Monitoring City of Grand Rapids Environmental Services Grand River Monitoring by Mike Lunn Environmental Services Department Manager Grand River Monitoring History 1968 Grand River Monitoring Network Since 1988 Data

More information

Turning a Negative into a Positive Negotiating a Consent Decree to Develop a Reasonable Endpoint

Turning a Negative into a Positive Negotiating a Consent Decree to Develop a Reasonable Endpoint Turning a Negative into a Positive Negotiating a Consent Decree to Develop a Reasonable Endpoint City of Haverhill s Story Mr. James Drake Mr. Robert Ward, Deputy Superintendent of Public Works, Haverhill

More information

Interim Interconnector Sewer Operational Plan

Interim Interconnector Sewer Operational Plan Interim Interconnector Sewer Operational Plan Gary Hickman Plant Manager Jackson Pike Wastewater Treatment Plant Jeff Hall Assistant Plant Manager Southerly Wastewater Treatment Plant Columbus Area Collection

More information

KANSAS CITY S OVERFLOW CONTROL PROGRAM ANNUAL REPORT Reporting Period: January 1 to December 31, 2015

KANSAS CITY S OVERFLOW CONTROL PROGRAM ANNUAL REPORT Reporting Period: January 1 to December 31, 2015 KANSAS CITY S OVERFLOW CONTROL PROGRAM ANNUAL REPORT Reporting Period: January 1 to December 31, 2015 CONTENTS I. ANNUAL REPORT PURPOSE AND SCOPE... 2 II. KANSAS CITY S OVERFLOW CONTROL PROGRAM... 2 III.

More information

Mill Creek/Peaks Branch/State- Thomas Drainage Relief Tunnel

Mill Creek/Peaks Branch/State- Thomas Drainage Relief Tunnel Mill Creek/Peaks Branch/State- Thomas Drainage Relief Tunnel Mobility Solutions, Infrastructure & Sustainability Committee January 22, 2018 Sarah Standifer, Director Trinity Watershed Management Overview

More information

Engineering Department

Engineering Department Engineering Department Stormwater Mission: To provide for the efficient and effective cleaning and repair of the stormwater collection system and implement the federally mandated Stormwater Pollution Prevention

More information

Streamlining I/I Repairs in Berlin Charter Township

Streamlining I/I Repairs in Berlin Charter Township Case Study: Streamlining I/I Repairs in Berlin Charter Township Presented by: Rich Grant, PE Agenda Discussion of the problems & the SAW I/I Evaluation & SSES = Asset Management Groundtruthing of Results

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by Milwaukee Metropolitan Sewerage District Conveyance and Treatment System MACRO made available by Eric Loucks,, CDM MMSD Collection System Operations MMSD operates an extensive system of sanitary sewers

More information

Index. Composition and Order of Plan Set. Utility Plan... 5

Index. Composition and Order of Plan Set. Utility Plan... 5 City of Des Plaines Public Works and Engineering Department Revised-October 5, 2012 Index Composition and Order of Plan Set Title Page Number Cover Sheet... 1 Requirements for Site Development... 2 Grading

More information

Village of Winnetka Flood Risk Reduction Assessment. Christopher B. Burke Engineering, Ltd. (CBBEL) October 11, 2011

Village of Winnetka Flood Risk Reduction Assessment. Christopher B. Burke Engineering, Ltd. (CBBEL) October 11, 2011 Village of Winnetka Flood Risk Reduction Assessment October 11, 2011 Christopher B. Burke Engineering, Ltd. (CBBEL) Thomas T. Burke, Jr., PhD, PE David Buckley, PE, CFM Introduction The September 2008

More information

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1 CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1

More information

Infiltration and Inflow. Michael Sassaman Phone

Infiltration and Inflow. Michael Sassaman Phone Infiltration and Inflow Michael Sassaman msassaman@entecheng.com Phone 610-373-3345 Inflow and Infiltration PA DEP Learning Objectives Do you have Excessive I/I? Sources of Inflow and Infiltration I/I

More information

Agenda. Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques

Agenda. Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques MWEA Collections System Seminar September 2012 Presented by: Elaine Venema, PE Rich Grant, PE Agenda Discussion of the problems

More information

Task Order Authorization

Task Order Authorization Task Order Authorization Task Order Number: 6 Task Order Name: 2017 Small Drainage Program Hourly Rate: See attached Exhibit B Budget Not To Exceed: $79,795.00 This Task Order pertains to the On-Call Agreement

More information

Figure 2 shows the monthly SSO Volumes within the system from 2007 through 2008 reported in million gallons (MG).

Figure 2 shows the monthly SSO Volumes within the system from 2007 through 2008 reported in million gallons (MG). 28 Annual Report January 27, 29 As required by Section XIX.B., of the pending Consent Decree, the Metropolitan Government of Nashville and Davidson County, Tennessee (Metro) has prepared the enclosed Annual

More information

City of Grand Rapids Environmental Services Grand River Monitoring

City of Grand Rapids Environmental Services Grand River Monitoring City of Grand Rapids Environmental Services Grand River Monitoring by Mike Lunn Environmental Services Department Manager A Glimpse into the Future: 2005 A.D. Sewer Once a River New Year s Day prophecy

More information

Metropolitan St. Louis Sewer District PRIVATE INFILTRATION and INFLOW REDUCTION PROGRAM

Metropolitan St. Louis Sewer District PRIVATE INFILTRATION and INFLOW REDUCTION PROGRAM PRIVATE INFILTRATION and INFLOW REDUCTION PROGRAM October 27, 2012 TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PROPOSED REMEDIAL ACTION PLAN... 1 3.0 IDENTIFICATION AND CORRECTION OF PRIVATE LATERAL SOURCES...

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

Project Need and Evaluation

Project Need and Evaluation City of Brooklyn Center 2011 Palmer Lake East Street and Utility Reconstruction Project Public Hearings February 14, 2011 Public Improvement Hearing: Special Assessments Local public improvements to the

More information

What is a stormwater utility fee?

What is a stormwater utility fee? What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL () September 2017 Page Chapter 1 Acronyms and Definitions 1.01 Purpose 1 1.02 Acronyms 1 1.03 Definitions 3 Chapter 2 Introduction 2.01 Purpose 1 2.02 Applicability

More information

GOALS, OBJECTIVES, & POLICIES

GOALS, OBJECTIVES, & POLICIES ELEMENT 9 INFRASTRUCTURE ELEMENT STORM WATER MANAGEMENT SUB-ELEMENT Goal 1 To provide adequate stormwater management facilities and services to meet the present and future needs of the University and to

More information

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE PLAN SUMMARY AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE The Pennsylvania Sewage Facilities Act (Act 537) was enacted by the Pennsylvania

More information

Handout 5: Stormwater Cost of Service

Handout 5: Stormwater Cost of Service Handout 5: Stormwater Cost of Service Introduction The purpose of this handout is to describe the current cost allocation methodology for the stormwater program. The existing Stormwater Management Service

More information

Mill Creek / Peaks Branch / State Thomas Drainage Relief Tunnel. Pre-Bid Meeting July 25, 2017

Mill Creek / Peaks Branch / State Thomas Drainage Relief Tunnel. Pre-Bid Meeting July 25, 2017 Mill Creek / Peaks Branch / State Thomas Drainage Relief Tunnel Pre-Bid Meeting July 25, 2017 Pre-Bid Meeting Agenda Introductions Overview Project Summary Stormwater Management Business Diversity Plan

More information

Public Utilities - Sewer

Public Utilities - Sewer County of Henrico, Virginia Capital Improvement Program FY 2017-18 through FY 2021-22 Fund 51 Enterprise Fund - W&S Request Request Request Request Request Project/Work Phase Priority FY 17-18 FY18-19

More information

Project Drainage Report

Project Drainage Report Design Manual Chapter 2 - Stormwater 2A - General Information 2A-4 Project Drainage Report A. Purpose The purpose of the project drainage report is to identify and propose specific solutions to stormwater

More information

NOVATO WATERSHED PROGRAM

NOVATO WATERSHED PROGRAM NOVATO WATERSHED PROGRAM NOVATO CITY COUNCIL Photo Credit: Sue Lattanzio AGENDA OVERVIEW OF TONIGHT S TALK Slide 2 Context what is a watershed? Process how did we implement the watershed approach? Content

More information

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions City Utilities operates the largest municipally-owned wastewater collection and treatment system in Indiana. The system serves 161 square miles and includes 1,014 miles of sanitary sewer lines, 365 miles

More information

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 Phasing of Meetings April Meeting May Meeting October Review of Tax Day Storm Event and Immediate Actions Taken By City Review of Coordination

More information

Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual. for: Located at: Prepared for: Prepared by:

Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual. for: Located at: Prepared for: Prepared by: Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual for: Insert Development Name Located at: Insert Address Prepared for: Insert Property Owner Name, Address, and Phone Number

More information

The Metropolitan District. Stormwater & I/I Reduction Presentation March 16, 2017

The Metropolitan District. Stormwater & I/I Reduction Presentation March 16, 2017 The Metropolitan District Stormwater & I/I Reduction Presentation March 16, 2017 AGENDA Introductions/MDC Background CWP Background Consent Decree/SSO Program Discussion Private Inflow Discussion Program

More information

Review Zone Application for D&R Canal Commission Decision

Review Zone Application for D&R Canal Commission Decision Review Zone Application for D&R Canal Commission Decision MEETING DATE: December 21, 2016 DRCC #: 16-4345 Latest Submission Received: December 7, 2016 Applicant: Robert McCarthy, PE PSE&G 4000 Hadley Road,

More information

Synergy: Addressing Combined Sewer Overflows and Nitrogen

Synergy: Addressing Combined Sewer Overflows and Nitrogen District of Columbia Water and Sewer Authority Briefing on Synergy: Addressing Combined Sewer Overflows and Nitrogen to Anacostia Steering Committee August 27, 2009 1 Introduction Background Addressing

More information

CITY OF SAFETY HARBOR ENGINEERING

CITY OF SAFETY HARBOR ENGINEERING CITY OF SAFETY HARBOR ENGINEERING The Engineering Department provides the city with technical services including design of construction and maintenance projects, review of development plans, field surveys,

More information

Wastewater System Master Plan and SSO Initiative

Wastewater System Master Plan and SSO Initiative Wastewater System Master Plan and SSO Initiative Project Drivers Rapid Population Growth in Fort Worth 800000 700000 46% Increase in Population Over the Last 10-Years 702,850 600000 Population 500000 400000

More information

Project Activity Description Water Plan Category Primary Activity Resource of Concern Priority. known)

Project Activity Description Water Plan Category Primary Activity Resource of Concern Priority. known) Board of Water and Soil s Water of Concern Targeting Projects and Activities (A) (B) (C) (D) (E) (F) (G) (H) (I) (J) (K) Conventional Subwatershed: 12- Water Quality Water Quality Scale of Activity Watershed:

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

AS A COURTESY, PLEASE TURN OFF CELL PHONES AND PAGERS WHILE MEETING IS IN PROGRESS.

AS A COURTESY, PLEASE TURN OFF CELL PHONES AND PAGERS WHILE MEETING IS IN PROGRESS. Table of Contents Agenda 2 Wastewater Treatment Plant (WWTP) Hydraulic Capacity Update Staff Report 3 WWTP Capacity Outline 5 WWTP Capacity Charts 6 Drainage Concerns on Oak Hill Drive and Quail Drive

More information

PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN. o Execution of New and Expanded Flood Control Projects o Program Options

PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN. o Execution of New and Expanded Flood Control Projects o Program Options PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN o Execution of New and Expanded Flood Control Projects o Program Options PHILLIP A. DAVENPORT DIRECTOR OF PUBLIC WORKS APRIL 25, 2017 FLOOD CONTROL PROJECTS

More information

PUBLIC WORKS. Public Works

PUBLIC WORKS. Public Works PUBLIC WORKS Department includes CIP and Production, Operations, Transportation, and Finance divisions Overall, 66 positions eliminated in FY2010 Details on the two largest divisions follow; representative

More information

Appendix G Preliminary Hydrology Study

Appendix G Preliminary Hydrology Study Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014

More information

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517) Date Issued Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI 48854 PH. (517) 676-8395 FAX (517) 676-8364 APPLICATION FOR SOIL EROSION AND SEDIMENTATION POLLUTION

More information

RAINWATER HARVESTING. Ward Ling- Watershed Coordinator

RAINWATER HARVESTING. Ward Ling- Watershed Coordinator RAINWATER HARVESTING Ward Ling- Watershed Coordinator WHAT ARE YOU DOING WITH YOUR RAIN WATER? RAINWATER HARVESTING Rainwater harvesting is the capture, diversion, and storage of rainwater for use in landscaping,

More information

Storm Water & Drainage Projects 2011 Program Update

Storm Water & Drainage Projects 2011 Program Update Storm Water & Drainage Projects 2011 Program Update Calf Run Montgomery Woods Owls Nest New Castle County Department of Special Services County Storm Water & Drainage Programs Waterway maintenance NPDES

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds News Release Contact: Al Sanders 206-477-1016 August 31, 2015 Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds The Flood Control District

More information

FINDINGS: Olsson used a three-step analysis strategy to develop a benefit cost ratio that would indicate the relative feasibility of this project.

FINDINGS: Olsson used a three-step analysis strategy to develop a benefit cost ratio that would indicate the relative feasibility of this project. EXECUTIVE SUMMARY FINDINGS: Based on the results of this feasibility study, the Platte Republican Diversion Project would be cost-effective. With minimal improvements to the channel, and the existing bridge

More information

Chapter 21 Stormwater Management Bylaw

Chapter 21 Stormwater Management Bylaw Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm

More information

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station City of St. Joseph, Missouri Hydraulic Analysis and Effluent Pump Station By Work Order No. 09-001 B&V Project 163509 May 20, 2010 Table of Contents 1.0 Executive Summary...1 2.0 Purpose of Study...2 3.0

More information

SFPUC Flooding Workshop Tuesday, February 9, 2016

SFPUC Flooding Workshop Tuesday, February 9, 2016 Presenters: SFPUC Flooding Workshop Tuesday, February 9, 2016 Tommy Moala, Assistant General Manager, Wastewater Enterprise Stefani Harrison, Project Manager Photo: Dec 3, 2014 End of Cayuga Street 25-year

More information

THUNDER BAY AREA DRAINAGE MASTER PLAN

THUNDER BAY AREA DRAINAGE MASTER PLAN THUNDER BAY AREA DRAINAGE MASTER PLAN Overall problem Vs. local solutions There are several areas with local flooding problems A review of the situation showed that the problem is not local, but that the

More information

FY 2015 Project Rollout

FY 2015 Project Rollout CAPITAL IMPROVEMENTS PROGRAM FY 2015 Project Rollout FEBRUARY 18, 2014 Welcome. TERRY LEEDS, DIRECTOR OF WATER SERVICES Agenda About Kansas City Water Services FY 2014 Highlights Water Services 5 Year

More information

Blueprint Columbus. Clean Streams. Strong Neighborhoods.

Blueprint Columbus. Clean Streams. Strong Neighborhoods. Blueprint Columbus Clean Streams. Strong Neighborhoods. Columbus Plan to Eliminate Sewer Overflows Blueprint Columbus is born Pilot projects Community Outreach Plan Development (prioritization) Columbus

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

Rainwater Harvesting:

Rainwater Harvesting: Rainwater Harvesting: Using and Reducing the Water that Goes to Waste. By Steve Williams 2012 An Answer to Urban Water Quantity and Quality Problems Urban Ecosystem Analysis The City of Atlanta Tree loss

More information

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report Prepared for: Cameron McCarthy Landscape Architects LLP

More information

1 Metro Vancouver Case Study Vancouver Sewage Area Infrastructure Vulnerability to Climate Change

1 Metro Vancouver Case Study Vancouver Sewage Area Infrastructure Vulnerability to Climate Change 1 Metro Vancouver Case Study Vancouver Sewage Area Infrastructure Vulnerability to Climate Change 1.1 Background Within the First National Engineering Vulnerability Assessment, the Public Infrastructure

More information

DIVISION 5 STORM DRAINAGE CRITERIA

DIVISION 5 STORM DRAINAGE CRITERIA DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the

More information

MEETING NOTICE & AGENDA VILLAGE BOARD COMMITTEE OF THE WHOLE. September 25, :10 p.m. Village Hall Council Chambers

MEETING NOTICE & AGENDA VILLAGE BOARD COMMITTEE OF THE WHOLE. September 25, :10 p.m. Village Hall Council Chambers 1200 Wilmette Avenue WILMETTE, ILLINOIS 60091 MEETING NOTICE & AGENDA VILLAGE BOARD COMMITTEE OF THE WHOLE September 25, 2017 7:10 p.m. Village Hall Council Chambers 1) Call to Order 2) Stantec Presentation

More information

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements 4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for

More information

WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: WATER SUPPLY AND DISTRIBUTION INTRODUCTION

WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: WATER SUPPLY AND DISTRIBUTION INTRODUCTION WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: Greenway Connections Protect and enhance drainage corridors Compact Development Continue efficient,

More information

Kane County Natural Hazards Mitigation Committee

Kane County Natural Hazards Mitigation Committee Kane County Natural Hazards Mitigation Committee Annual Report For 2004 TO: Members of the Kane County Board FROM: Kane County Natural Hazards Mitigation Committee SUBJECT: Annual Report for 2004 Date:

More information

SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL

SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL Greg Diehl DFW Region Office Wastewater Work Leader QUALITY OVERVIEW: The TCEQ s SSO Initiative What is it and how does it work? The data

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities

MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities MaryLynn Lodor MSD of Greater Cincinnati Sharon Jean-Baptiste CH2M HILL April 4, 2013 Overview MSD s Environmental

More information

Table of Contents. Page Title Sheet and Index Project History and Summary Work Summary Overview 3-7

Table of Contents. Page Title Sheet and Index Project History and Summary Work Summary Overview 3-7 Summary Final Report EPA Assistance ID Number: XP-00E59701-2 : Excess Flow Reduction Efforts Evergreen Farmington Sewage System Manhole Rehab and Sewer Lining Table of Contents Page Title Sheet and Index

More information

Springfield Water and Sewer Commission. Fiscal Year 2017 Budget and Capital Plan Public Hearing June 7, 2016

Springfield Water and Sewer Commission. Fiscal Year 2017 Budget and Capital Plan Public Hearing June 7, 2016 Springfield Water and Sewer Commission Fiscal Year 2017 Budget and Capital Plan Public Hearing June 7, 2016 Joshua Schimmel Executive Director Introduction Overview of System Presentation Summary Commission

More information

Wastewater Treatment Systems, Wastewater Issues and Permits

Wastewater Treatment Systems, Wastewater Issues and Permits Wastewater Treatment Systems, Wastewater Issues and Permits Lucas Gregory Texas Water Resources Institute November 29, 2017 Debbie Magin Guadalupe Blanco River Authority Ryan Gerlich Texas A&M AgriLife

More information

S.O.P. No. HMD

S.O.P. No. HMD Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT

More information

The Don River and Central Waterfront are among the most degraded waterways in the City of Toronto.

The Don River and Central Waterfront are among the most degraded waterways in the City of Toronto. This document was put together following the fourth round of public consultation for the Class Environmental Assessment study for this Project. In June 2011, the Project Team consulted with stakeholders

More information

Management of Aging Wastewater Infrastructure -- Challenges and Strategies --

Management of Aging Wastewater Infrastructure -- Challenges and Strategies -- Management of Aging Wastewater Infrastructure -- Challenges and Strategies -- Jerry N. Johnson, General Manager District of Columbia Water and Sewer Authority Washington, D.C. Overview of the Aging Situation

More information

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project IAFSM 2010 Annual Conference City of Rockford Keith Creek Greenway Flood Mitigation Project March 10, 2010 Introduction Problem Overview 1890 s Building of homes along Keith Creek 1920 s Home construction

More information

Deep Tunnel, Shallow Pipe - How the City of Hamilton, OH plans to save millions on SSO control. Glenn Weist, P.E.

Deep Tunnel, Shallow Pipe - How the City of Hamilton, OH plans to save millions on SSO control. Glenn Weist, P.E. Deep Tunnel, Shallow Pipe - How the City of Hamilton, OH plans to save millions on SSO control Glenn Weist, P.E. Columbus, Ohio May 10, 2012 Agenda Background Project Description Regulatory Synopsis Stakeholder

More information

Model Results Operation and Maintenance (O& M) Results Cost-Benefit Analysis Results Conclusions

Model Results Operation and Maintenance (O& M) Results Cost-Benefit Analysis Results Conclusions BMP Performance and Outline Background Model Results Operation and Maintenance (O& M) Results Results Conclusions Melissa Baker, Water Resource Technician Capitol Region Watershed District, St. Paul, MN

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

POLLUTION PREVENTION AFTER CONSTRUCTION

POLLUTION PREVENTION AFTER CONSTRUCTION POLLUTION PREVENTION AFTER CONSTRUCTION..CHAPTER.. 10 This chapter describes the pollution prevention measures to be taken once the site has been permanently and finally stabilized and no additional construction

More information

STORM DRAINAGE DESIGN CRITERIA

STORM DRAINAGE DESIGN CRITERIA BWM Orig. 01/01/05 Revised 01/01/10 LUCAS COUNTY ENGINEERS OFFICE STORM DRAINAGE DESIGN CRITERIA Drainage The design of storm sewer systems will be based upon the Rational Method using the equation Q=CiA

More information

Catch Basin Inserts: Method to Determine CB Inserts Act as Full Capture Devices

Catch Basin Inserts: Method to Determine CB Inserts Act as Full Capture Devices WATERSHED PROTECTION DIVISION DEPARTMENT OF PUBLIC WORKS BUREAU OF SANITATION CITY OF LOS ANGELES Catch Basin Inserts: Method to Determine CB Inserts Act as Full Capture Devices Catch Basin Inserts: Method

More information

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 Project Name: Central WWTP Capacity Improvements and CSO Reduction Project MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 BACKGROUND / PURPOSE Metro Water Services (MWS), in order to comply with

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

Development in the City of Toronto

Development in the City of Toronto Development in the City of Toronto Water Infrastructure Challenges and Opportunities Graham Harding, P.Eng. Toronto Water, City of Toronto Urban Land Institute Leadership Program February 16, 2017 Toronto

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

719 Griswold, Suite 820 Detroit, MI DANVERS POND DAM REMOVAL AND STREAM RESTORATION PROJECT

719 Griswold, Suite 820 Detroit, MI DANVERS POND DAM REMOVAL AND STREAM RESTORATION PROJECT Great Lakes Restoration Initiative Grant Final Report US EPA Grant GL 00E006 43 October, 2013 Valley Woods Wetland Southfield Lola Valley Grow Zone Wayne County Parks Venoy Park Grow Zone Wayne County

More information

MSDGC MODELING GUIDELINES AND STANDARDS VOLUME I SYSTEM WIDE MODEL

MSDGC MODELING GUIDELINES AND STANDARDS VOLUME I SYSTEM WIDE MODEL MSDGC MODELING GUIDELINES AND STANDARDS VOLUME I SYSTEM WIDE MODEL REVISION 3 February 2013 Prepared for: METROPOLITAN SEWER DISTRICT OF GREATER CINCINNATI Project & Business Development Division 1600

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

Inflow & Infiltration Reduction: A System-Wide Sewer Rehabilitation Program

Inflow & Infiltration Reduction: A System-Wide Sewer Rehabilitation Program Inflow & Infiltration Reduction: A System-Wide Sewer Rehabilitation Program January 1, 2013 History Beginning in the 1980 s, the wastewater collection system serving Greenville County, South Carolina and

More information

Buffalo Sewer Authority. David P. Comerford General Manager

Buffalo Sewer Authority. David P. Comerford General Manager Buffalo Sewer Authority David P. Comerford General Manager Introduction Like it has since its inception in 1938, the Buffalo Sewer Authority has successfully safeguarded the public health and protected

More information

10.0 Storm Sewer Systems

10.0 Storm Sewer Systems October 2003 Chapter 10.0, Storm Sewer Systems Page 1 10.0 Storm Sewer Systems 10.1 Introduction A storm sewer system consists of a system of inlets, pipes, manholes, junctions, cleanouts, outlets, and

More information

STORMWATER DEVELOPMENT GUIDELINES

STORMWATER DEVELOPMENT GUIDELINES 1600 Battle Creek Road, Morrow, Georgia 30260 STORMWATER DEVELOPMENT GUIDELINES Second Edition November 2006 Program Management & Engineering Department Office: (770) 961-2130 Fax: (770) 960-5229 STORMWATER

More information