1 Woodbury - Aurora Metro Station Master Utility Report Aurora, Colorado E. Centrepoint Dr. and E. Alameda Dr. Prepared By: Galloway 6162 S. Willow Drive, Suite 32 Greenwood Village, CO POC: Randy Smith RandySmith@GallowayUS.com Job no. WOC2.1 Date: February 19, 216

2 2/19/16 Page 3 of 16 Project Location and Description Water Design Criteria Water Demand Calculations Sanitary Sewer Design Criteria Sanitary Sewer Flow Calculations Conclusion Appendix 1 Water & Sanitary Demand Calculations Appendix 2 Water Model Output Appendix 3 Utility Maps

3 2/19/16 Page 4 of 16 Project Location and Description The proposed Aurora Metro Station development consists of approximately 69-acres of the overall 8 acres of the master Centrepoint development and located in the Northwest Quarter of Section 18, Township 4 South, Range 66 West of the 6 th P.M., in the City of Aurora, Arapahoe County, State of Colorado. The site is bound by East Alameda Parkway on the north, East Center Avenue on the south, South Sable Boulevard on the west and South Chambers Road on the east. The property to be developed is vacant and covered by native grasses. There are four existing developments located within the overall master development. The existing Kaiser Hospital and Village at City Center are adjacent to the site along the south side of East Center Avenue. Arapahoe County site is located at the southeast corner of Alameda Parkway and Alameda Drive. Finally, the RTD Park-n-Ride is located at the northeast corner of South Sable Boulevard and East Centrepointe Drive. Other onsite existing improvements includes a utility corridor in the northwest corner of the site. The utility corridor contains the Sable City Center storm sewer system which is a 96 /18 RCP that crosses under Alameda Pkwy and discharges into City Center Park Detention Pond. There is also an additional 96 CMP that parallels the 96 /18 RCP that conveys on and offsite flows to the City Center Park water quality pond. The utility corridor also contains a 15 sanitary sewer and a 36 waterline. The proposed site is approximately 69 acres in size. Approximately 33-acres of the development will be commercial. Approximately 18-acres will be high density residential and the remainder roadway and landscape tracts.

4 2/19/16 Page 5 of 16 Figure 1 - VICINITY MAP Water Design Criteria All water lines were designed according to City of Aurora and Aurora Water Water, Sanitary Sewer and Storm Drainage Infrastructure as noted below: 1. Water mains will be located a minimum of 1 feet from sanitary and storm sewer pipes. 2. Water lines will be kept a minimum of four feet from the lip of curb except for short distances. 3. Where the road is too narrow for the water line to be 1 feet from the sewer line and 4 feet from the curb, the water line will be located 5 feet east or north of the road center line. The road may be too narrow only at bump outs or similar traffic control devices. 4. The pipe velocity will be between 2 and 1 feet per second during max day demand plus fire flow for 12 mains. 5. The pipe velocity will be between 2 and 15 feet per second during max day demand plus fire flow for 8 mains.

5 2/19/16 Page 6 of Water valves will be located in the main on L-1 of the legs at any tee or cross except fire hydrant laterals. 7. Water valves will be located a minimum of every 75 feet. 8. The maximum day demand plus fire flow results in a residual pressure is greater or equal to 2 psi. 9. The maximum demand residual pressure is greater or equal to 5 psi. 1. Final locations of main line and service stubs, fire hydrants, valves will be determined with the final development plan for each parcel. Water flow peaking factors and infiltration calculations were determined from section 5 of the City of Aurora and Aurora Water Water, Sanitary Sewer and Storm Drainage Infrastructure. Water Demand Calculations Water demand is based off of City of Aurora Standards and Specifications section 1734 Water, Sanitary and Storm Drainage Infrastructure paragraph 5.2. Average Daily Flow was determined using the demand rate table in Paragraph Residential based on 16 Gallons per capita per day Zoning Average Day (gpm/acre) Max Day (gpm/acre) Max Hour (gpm/acre) People per Unit Units Per Acre MH Table 1 RESIDENTIAL WATER DEMAND The above residential table was used Multi-family and Senior Living. The maximum number of units was used when a range of the number of units was provided. Then the number of units was converted to acres based on 4 DU per acre to calculate the specific load. I.e. If a parcel is zoned for 2 to 35 Sr. Units. We used 35 units divided for 4 du / acre to get 8.75 acres. Then 8.75 acres was multiplied by the factors in the above table to calculate the water load. Hotel Water demand was based on the number of rooms times a 1.5 person per room occupancy rate times 16 gal / day / capita. I.e. 112 room hotel times 1.5 person per room 16 gal / day / capita equals and average day flow of 26,88 gal per day.. Commercial Zoning Average Day (gpm/acre-building) Max Day (gpm/acre-building) Max Hour (gpm/acre-building) A/B-* (office / retail) Table 2 COMMERCIAL WATER DEMAND

6 2/19/16 Page 7 of 16 The above commercial table was used for retail and office demand calculations. The office and retail square footages were converted to acres to use the table. Restaurant Restaurant service water demand is based on a conservative estimate of 7 gallons water per seat per day. It was assumed that in a restaurant that there would be one seat per 25 SF of restaurant. This results in a restaurant service water demand rate of 2.8 gallon per SF per day. Peak flow will be based off of 4.5 times the average daily flow. At the time of this report the estimated uses for the development are: Multi Family Senior Living Parcel Retail Office Restaurant Hotel Units Area land Units Area land SF SF SF Rooms AC AC 1 8, 24, , , 18, , 45, 5, , 7 175, 15, Table 3 RESTAURANT WATER DEMAND The resultant domestic flows for each parcel are as follows; Total Water Demand Parcel Avg Max Load Hr gpm gpm Table 4 DOMESTIC WATER DEMAND PER PARCEL

7 2/19/16 Page 8 of 16 Fire Flow Fire flow was calculated based current IFC flow rates. The square footages of each use for each parcel were used to calculate the fire flow required for each parcel. It was assumed all buildings are Type IV or better. We assumed we would only fight one fire at a time. We assumed that each parcel would contain one building with all the uses for the parcel in that one building. This is conservative. When more detailed plans are available some uses may be more decentralized creating more building that in turn could have less fire flow demand. The calculations are included in the two tables below. Restaurant Retail Office Hotel 1 Multifamily 2 Sr. Living 3 Parcel SF SF SF Rooms SF Units SF Units SF 1 8, 24, ,6 2 1, 6 72, 3 11, 18, 25 3, 4 5, 45, 5, 17 24, , , 6 5, 7 175, 15, Total 29, 128, 29, , ,26, , Average Sq. footage Table 5 SQUARE FOOTAGE PER USE PER PARCEL Notes 1. Hotel square footage was estimated at 8 sf per room 2. Multifamily square footage was estimated at 12 sf per room 3. Sr. Living square footage was estimated at 9 sf per room

8 2/19/16 Page 9 of 16 Total Fire Flow Parcel SF Required⁴ w/ Sprinkler Required⁵ 1 122, , , , , , , Total 1,483,717 Table 6 FIRE FLOW PER PARCEL Notes 4. Fire Flows were estimated for Type IV buildings 5. It is assumed that each building will have automatic sprinklers, based on sprinklers the fire flow was reduced to 25% The domestic and fire flows were entered into a Bentley water cad v8i model. For each run of the model one fire flow was activated for each parcel. The resultant flows, velocities and pressures resulted in the pipe sizes indicated in the table below and on the provided utility sheets in appendix 3. Parcel Spine Road Water Pipe Dia (") Table 7 WATER MAIN SIZE Additional water model output is available in appendix 2.

9 2/19/16 Page 1 of 16 Sanitary Sewer Design Criteria All sanitary sewer lines were designed according to City of Aurora and Aurora Water Water, Sanitary Sewer and Storm Drainage Infrastructure as noted below: 1. There are no horizontal or vertical curves on sanitary sewers. 2. Sanitary sewer lines will be located along the road center line. 3. It there is a median the sewer line will be located in the center of the lane closest to the median on the south or west side of the median. 4. Where the road is too narrow for the water line to be 1 feet from the sewer line and 4 feet from the curb, the sewer line will be located 5 feet west or south of the road center line. The road may be too narrow only at bump outs or similar traffic control devices. 5. A Manning s n value of.11 was used for new PVC pipe per Water, Sanitary Sewer and Storm Drainage Infrastructure. 6. A minimum slope of.4% was observed in the design. 7. Minimum slopes were also determined as the greater of.4% or the slope required to achieve a minimum velocity of 2. feet per second. 8. The flow velocity does not exceed 1. feet per second for the full-pipe and halffull-pipe conditions. 9. A minimum of.2 feet drop through the manhole for straight-trough and near straight-through manholes. 1. A minimum of.3 feet drop through the manhole for 45 degree bend or greater manholes. 11. The depth of flow in pipes does not exceed 75% of capacity pipes 12 and smaller and does not exceed 9% for pipes larger than All service line taps will be a minimum of 5 from the outside of the nearest manhole and not in the manholes. 13. Direct service line taps will not be allowed on sewer mains 24 in diameter and larger. 14. Sanitary sewer loading rates are based on the type and density of development. 15. Final locations of main line and service stubs, manholes will be determined with the final development plan for each parcel. Sanitary Sewer flow peaking factors and infiltration calculations were determined from section 5 of the City of Aurora and Aurora Water Water, Sanitary Sewer and Storm Drainage Infrastructure.

10 2/19/16 Page 11 of 16 Sanitary Sewer Design Calculations Sanitary sewer flows are calculated at 5% of water demand flows. Peak flow will be based off of 4.5 times the average daily flow. Based off the water demand calculations the sewer flows for each parcel will be; Total Sanitary Sewer Flow Parcel Avg Max Load Hr gpm gpm Table 8 SANITARY SEWER FLOWS PER PARCEL Pipes were modeled using Bentley stand-alone sewer cad v8i. The max hour flow rate was entered into the pipe model as appropriate. Each flow was increased by 1% for I & I. Parcel 2 and 3 were entered into one outfall together. Parcel 6 and 7 were also entered into one outfall. Because Parcel 5 has two outfalls the flow was increased by 25% and divided into two halves. The resultant flow was entered into each outfall. All pipes were sized to 8 for the initial calculation. All pipes had velocities less than 1 FPS at the 8 diameter. The maximum velocity is 5.1 FPS. The maximum depth of flow is.32 feet. The maximum percent flow capacity is 35.1%. Detailed results are available in the appendix. Conclusion The water and sanitary sewer system design will meet the City of Aurora design standards.

11 2/19/16 Page 12 of 16 Appendix 1 - Water & Sanitary Demand Calculations Retail Water Demand Parcel SF Demand Avg Load Peak Day Max Hr Avg Day gpm/sf gpm gpm gpm gpd 1 8, 4.13E , 4.13E , 4.13E , 4.13E E E , 4.13E ,413 Total 29, 4.13E-5 Based on SF Office Water Demand Parcel SF Demand Avg Load Peak Day Max Hr Avg Day gpm/sf gpm gpm gpm gpd E E , 4.13E , , 4.13E , E , 4.13E , , 4.13E Total 128, 4.13E-5 Based on SF Restaurant Service Water Demand Parcel SF Demand Avg Load Peak Day Max Hr Avg Day gpm/sf gpm gpm gpm gpd 1 24,8 1.94E , E E , 1.94E , E E E Total 29,8.194 Based on SF

12 2/19/16 Page 13 of 16 Hotel Water Demand Parcel Rooms Demand Avg Load Peak Day Max Hr Avg Day gpm/sf gpm gpm gpm gpd , Total Based on Rooms Multi Family Parcel units Demand Avg Load Peak Day Max Hr Avg Day gpm/ac gpm gpm gpm gpd , , , , Total Based on area Sr Living Parcel Units Demand Avg Load Peak Day Max Hr Avg Day gpm/ac gpm gpm gpm gpd , Total Based on area

13 2/19/16 Page 14 of 16 Parcel Total Water Demand Parcel Total Sanitary demand Parcel Avg Load Peak Day Max Hr Avg Day Avg Load Peak Day Max Hr Avg Day gpm gpm gpm gpd gpm gpm gpm gpd , , , , , , , , , , , , , ,653 Total 466, ,329

14 2/19/16 Page 15 of 16 Appendix 2 - Water Model Output

15 ALAMEDA AVE SABLE BLVD ALAMEDA AVE CHAMBERS RD CENTREPOINT DR CENTER AVE Aurora Metro Station 216. Galloway & Company, Inc. All rights reserved. SCALE : 1" = 5'-"

16 Fire Flow Node FlexTable: Fire Flow Report J-11 J4 J2&3 J5 J6 J7 Label Fire Flow (Needed) (gpm) 2, 3,313 2, 1, 1,938 Flow (Total Needed) (gpm) 2,198 3,651 2,617 1,9 1,973 Flow (Total Available) (gpm) 3,5 3,698 3,839 4,117 3,59 3,535 Pressure (Calculated Residual) (psi) Pressure (Calculated System Lower Limit) (psi) Junction w/ Minimum Pressure (System) J5 J5 J5 J6 J5 J5 Velocity of Maximum Pipe (ft/s) Pipe w/ Maximum Velocity P-11 P-14 P-22 P-33 P-35 P-38 WOC2.1_P_UTIL WaterCAD Water.wtg 2/19/216 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 2 W Watertown, CT 6795 USA Bentley WaterCAD V8i (SELECTseries 5) [ ] Page 1 of 1

17 FlexTable: Junction Table J-11 J4 J2&3 J5 J6 J7 Label Elevation (ft) 5, , , , ,51.5 5,481.9 Demand (gpm) Hydraulic Grade (ft) 5, , , , , , Pressure (psi) Pressure (Calculated Total Flow Needed) (psi) Velocity of Maximum Pipe (ft/s) WOC2.1_P_UTIL WaterCAD Water.wtg 2/19/216 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 2 W Watertown, CT 6795 USA Bentley WaterCAD V8i (SELECTseries 5) [ ] Page 1 of 1

18 FlexTable: Pipe Table P-11 P-13 P-14 P-21 P-22 P-33 P-34 P-35 P-36 P-37 P-38 Label Length (Scaled) (ft) Diameter (in) PVC PVC PVC PVC PVC PVC PVC PVC PVC PVC PVC Material Start Node R-1 J-11 J4 J-11 J2&3 R-2 J5 R-3 J6 R-5 J7 Stop Node J-11 J4 R-7 J2&3 R-2 J5 R-3 J6 R-4 J7 R-6 Flow (gpm) Velocity (Maximum) (ft/s) Headloss (ft) WOC2.1_P_UTIL WaterCAD Water.wtg 2/19/216 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 2 W Watertown, CT 6795 USA Bentley WaterCAD V8i (SELECTseries 5) [ ] Page 1 of 1

19 Project Inventory: WOC2.1_P_UTIL WaterCAD Water.wtg Title Engineer Company Date Notes Scenario Summary ID Label Notes Active Topology Physical Demand Initial Settings Operational Age Constituent Trace Fire Flow Energy Cost Transient Pressure Dependent Demand Failure History SCADA User Data Extensions Calculation Options Label Calculation Options Label 2/17/ Fire Flow Base Active Topology Base Physical Base Demand Base Initial Settings Base Operational Base Age Base Constituent Base Trace Base Fire Flow Base Energy Cost Base Transient Base Pressure Dependent Demand Base Failure History Base SCADA Base User Data Extensions New Steady State/EPS Solver - 1 Base Calculation Options Network Inventory Pipes 11 Variable Speed Pump Batteries Junctions 6 PRV's Hydrants PSV's Tanks PBV's Reservoirs 7 FCV's WOC2.1_P_UTIL WaterCAD Water.wtg 2/19/216 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 2 W Watertown, CT 6795 USA Bentley WaterCAD V8i (SELECTseries 5) [ ] Page 1 of 2

20 Project Inventory: WOC2.1_P_UTIL WaterCAD Water.wtg Network Inventory Customer Meters 6 TCV's SCADA Elements GPV's Pumps Isolation Valves Pump Stations Spot Elevations Transient Network Inventory Turbines Rupture Disks Periodic Head-Flows Discharges to Atmosphere Air Valves Orifices Between Pipes Hydropneumatic Tanks Valves With Linear Area Change Surge Valves Surge Tanks Check Valves Pressure Pipes Inventory 8. (in) 1,524 ft All Diameters 4,523 ft 12. (in) 2,999 ft WOC2.1_P_UTIL WaterCAD Water.wtg 2/19/216 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 2 W Watertown, CT 6795 USA Bentley WaterCAD V8i (SELECTseries 5) [ ] Page 2 of 2

21 FlexTable: Reservoir Table R-1 R-2 R-3 R-4 R-5 R-6 R-7 Label Flow (Out net) (gpm) Hydraulic Grade (ft) 5, , , , , , ,712.4 WOC2.1_P_UTIL WaterCAD Water.wtg 2/19/216 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 2 W Watertown, CT 6795 USA Bentley WaterCAD V8i (SELECTseries 5) [ ] Page 1 of 1

22 2/19/16 Page 16 of 16 Appendix 3 Utility Maps

23 W WM WM C 214. Galloway & Company, Inc. All Rights Reserved PARCEL SCALE: 1"=1' UT-1 PARCEL 4 NOT FOR CONSTRUCTION PARCEL 2 PARCEL 3 COPYRIGHT THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF THE ARCHITECT, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. UT-2 12" DIP PARCEL 7A PARCEL 7B UT-4 SA PARCEL 5A UT-3 PARCEL 7C # PARCEL 6 PARCEL 5B

24 C 214. Galloway & Company, Inc. All Rights Reserved SCALE: 1"=4' PROPOSED 12" COPYRIGHT NOT FOR CONSTRUCTION THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF THE ARCHITECT, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED MATCHLINE STA SEE SHEET UT-2 PROPOSED 12" #

25 C 214. Galloway & Company, Inc. All Rights Reserved W SEE SHEET UT-1 MATCHLINE STA MATCHLINE SEE SHEET UT-3 PROPOSED 12" PROPOSED 12" " DIP SCALE: 1"=4' COPYRIGHT # NOT FOR CONSTRUCTION THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF THE ARCHITECT, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED.

26 SEE SHEET UT-2 MATCHLINE PROPOSED 12" PROPOSED 12" SEE SHEET UT-4 MATCHLINE STA SCALE: 1"=4' 196+ C 214. Galloway & Company, Inc. All Rights Reserved COPYRIGHT NOT FOR CONSTRUCTION THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF THE ARCHITECT, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. #

27 C 214. Galloway & Company, Inc. All Rights Reserved SCALE: 1"=4' NOT FOR CONSTRUCTION COPYRIGHT THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF THE ARCHITECT, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED MATCHLINE STA SEE SHEET UT # 193+

KUM & GO 300 SUBDIVISION THORNTON, COLORADO

KUM & GO 300 SUBDIVISION THORNTON, COLORADO FINAL UTILITY STUDY KUM & GO 300 SUBDIVISION THORNTON, COLORADO PREPARED FOR: KUM & GO, L.C. 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 PH: (515) 457-6232 CONTACT: RYAN J. HALDER PREPARED BY: OLSSON

More information

Plaza Mexico Residences 3000 E Imperial Highway Lynwood, CA KPFF Job #

Plaza Mexico Residences 3000 E Imperial Highway Lynwood, CA KPFF Job # WATER AND SANITARY SEWER STUDY Plaza Mexico Residences 3000 E Imperial Highway Lynwood, CA KPFF Job # 1600800 October 16, 2017 PREPARED BY: KPFF Consulting Engineers 700 S Flower Street, Suite 2100 Los

More information

PRELIMINARY DRAINAGE STUDY REPORT ARBOR VILLAS

PRELIMINARY DRAINAGE STUDY REPORT ARBOR VILLAS PRELIMINARY DRAINAGE STUDY REPORT FOR CARSON CITY, NEVADA Prepared for: Capstone Communities 9441 Double Diamond Pkwy #14 Reno, Nevada 89521 Prepared by: Manhard Consulting Ltd. 985 Double R Boulevard

More information

DR DRAINAGEWAY THORNTON VALLEY SUBDIVISION OVERALL DEVELOPMENT PLAN & CONCEPTUAL SITE PLAN SWC OF COLO BLVD & THORNTON PKWY THORNTON, CO

DR DRAINAGEWAY THORNTON VALLEY SUBDIVISION OVERALL DEVELOPMENT PLAN & CONCEPTUAL SITE PLAN SWC OF COLO BLVD & THORNTON PKWY THORNTON, CO /CONCEPTUAL SITE PLAN TRACT A, THORNTON VALLEY FILING NO. 1 LOCATED IN THE NE 1/4 OF SEC. 24, T. 2 S., R. 68 W., OF THE 6TH P.M., CITY OF UNTY OF ADAMS, STATE OF COLORADO Planning. Architecture. Engineering.

More information

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016 April 12, 2016 Mr. Craig Perl, P.E. Senior Engineer City of Aurora Public Works Department 15151 E. Alameda Parkway Aurora, CO 80012 RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

More information

100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals

100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals PROPOSED DEVELOPMENT The drainage for this site has been designed to be less than the maximum allowable runoff from each basin as stated in the Overall Rigden Farm drainage plan. Table 1 compares the actual

More information

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

ENGINEERING REVIEW CHECKLIST City of Mount Clemens (To be completed by the Developer s & Submitted with ing Plans) DATE: PROJECT NAME: Site Plan Approved: Date DESIGN ENGINEERING COMPANY: ing Company Contact Information: Name: Phone: Email: Owner Contact

More information

Section 7 Hydraulic Model Development and Evaluation Criteria

Section 7 Hydraulic Model Development and Evaluation Criteria Section 7 Hydraulic Model Development and Evaluation Criteria The hydraulic evaluation conducted to develop this master plan was performed using a computer model of the reclaimed water distribution system.

More information

January 20, Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO (303)

January 20, Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO (303) January 20, 2017 Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7694 RE: Riverdale Five Retail Drainage Conformance Letter

More information

City of Fort Collins. Spring Creek Place (2105 South College Avenue) Preliminary Drainage Report

City of Fort Collins. Spring Creek Place (2105 South College Avenue) Preliminary Drainage Report City of Fort Collins Spring Creek Place (2105 South College Avenue) Preliminary Drainage Report OCTOBER 2016 VERSION 3 Prepared By: 4582 South Ulster Street, Suite 1500 Denver, CO 80237 Daniel L. Skeehan,

More information

CITY OF ANAHEIM SEWER DESIGN MANUAL

CITY OF ANAHEIM SEWER DESIGN MANUAL CITY OF ANAHEIM CITY OF ANAHEIM DEPARTMENT OF PUBLIC WORKS SUBDIVISION SECTION SEWER DESIGN MANUAL TABLE OF CONTENTS 1. SIZING... 2 Design flows:... 2 Roughness coefficient (n):... 2 Velocity (Average

More information

MENIFEE VALLEY CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT. Appendices

MENIFEE VALLEY CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT. Appendices MENIFEE VALLEY CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendices Appendix J Utility Systems Data February 2017 MENIFEE VALLEY CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO

More information

Section 9 Distribution System Analysis

Section 9 Distribution System Analysis Section 9 Distribution System Analysis This section presents the analysis of the City of Sunnyside s (City) distribution system. Hydraulic modeling was performed to evaluate the adequacy of existing facilities

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

APPENDIX P WATER SUPPLY CONCEPT REPORT

APPENDIX P WATER SUPPLY CONCEPT REPORT APPENDIX P WATER SUPPLY CONCEPT REPORT Engineer s Report Sewage Water Supply Collection Concept & Treatment Report Blue Point Overlay Conservation District 191-0 Blue Point Road Development District Town

More information

Project: Developer/Designer: Reviewer:

Project: Developer/Designer: Reviewer: City of Charlottesville, Virginia Engineering Plan Review Checklist (Site Plans, Site Plan Amendments, and Major Subdivisions) 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182;

More information

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System INSTRUCTIONS: This form shall be completed and submitted (in duplicate)

More information

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS DESIGN STANDARDS SECTION 2 INDEX ITEM DESCRIPTION 2.00 GENERAL STATEMENT 2.01 WATER DISTRIBUTION

More information

APPENDIX B. WSSC Design Criteria for Water Distribution Systems

APPENDIX B. WSSC Design Criteria for Water Distribution Systems a. System Requirements ) Pressure Requirements APPENDIX B WSSC Design Criteria for Water Distribution Systems a) The water distribution system shall have adequate capacity to supply domestic demand to

More information

Contents. Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek

Contents. Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek Contents SITE LOCATION / DESCRIPTION... 3 WESTPOINTE STORMWATER MANAGEMENT PLAN... 3 THE ENCLAVE AT WESTPOINTE DETENTION POND... 3 Table

More information

ADDENDUM # 3 DATE: February 16, 2018

ADDENDUM # 3 DATE: February 16, 2018 ADDENDUM # 3 DATE: February 16, 2018 REFERENCE: Invitation for Bid No.: S-LB-18607 IFB Issue Date: January 25, 2018 Title: Stonewall Middle School Addition and Renovations Architect/Engineer: Architecture

More information

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations. COACHELLA VALLEY WATER DISTRICT DOMESTIC WATER CHECKLIST Tract/Parcel No: Project Common Name: Developer: Engineer: Engineer Signature: Date: Phone: Phone: Print: This is only a general checklist; please

More information

COMPUTER APPLICATIONS HYDRAULIC ENGINEERING

COMPUTER APPLICATIONS HYDRAULIC ENGINEERING - 7535 COMPUTER APPLICATIONS IN HYDRAULIC ENGINEERING Connecting Theory to Practice Fifth Edition HAESTAD PRESS Table of Contents Revision History Foreword CHAPTER 1 BASIC HYDRAULIC PRINCIPLES 1 1.1 General

More information

The site slopes generally from the southwest to northeast at approximately 3.7 percent.

The site slopes generally from the southwest to northeast at approximately 3.7 percent. March 3, 2017 Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7694 RE: Riverdale Five Retail Drainage Conformance Letter Dear

More information

PRELIMINARY WASTEWATER CAPACITY STUDY

PRELIMINARY WASTEWATER CAPACITY STUDY PRELIMINARY WASTEWATER CAPACITY STUDY Tentative Tract Map No. 18955 CITY OF HESPERIA Prepared for: HESPERIA VENTURES I, LLC 10410 Roberts Road Calimesa, CA 92320 Tel (714) 785 2381 Mr. John Ohanian Prepared

More information

APPENDIX M VANDEN MEADOWS PROJECT WATER MODELING STUDY AND TECHNICAL MEMORANDUM

APPENDIX M VANDEN MEADOWS PROJECT WATER MODELING STUDY AND TECHNICAL MEMORANDUM APPENDIX M VANDEN MEADOWS PROJECT WATER MODELING STUDY AND TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Date: March 16, 2011 FROM: Victor M. Alaniz, P.E. Nolte Associates, Inc. 2495 Natomas Park Drive, Fourth

More information

FREELAND WATER & SEWER DISTRICT BERCOT ROAD INTERTIE STUDY

FREELAND WATER & SEWER DISTRICT BERCOT ROAD INTERTIE STUDY FREELAND WATER & SEWER DISTRICT ISLAND COUNTY WASHINGTON BERCOT ROAD INTERTIE STUDY G&O #13507 NOVEMBER 2013 FREELAND WATER & SEWER DISTRICT ISLAND COUNTY WASHINGTON BERCOT ROAD INTERTIE STUDY G&O #13507

More information

EPANET. Ivan Solinas

EPANET. Ivan Solinas EPANET Ivan Solinas agronomi@gmail.com The Irrigation Questions How to irrigate How much to irrigate When to Irrigate Pressurized pipe network What is EPANET EPANET is a computer program that performs

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

M E M O R A N D U M. Date: January 31, Bjorn Schrader, Abramson Teiger Architects. Kimley-Horn and Associates, Inc.

M E M O R A N D U M. Date: January 31, Bjorn Schrader, Abramson Teiger Architects. Kimley-Horn and Associates, Inc. M E M O R A N D U M Date: January 31, 2017 To: From: Subject: Bjorn Schrader, Abramson Teiger Architects Kimley-Horn and Associates, Inc. 8888 Washington - Utility Memorandum Introduction Kimley-Horn and

More information

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES 4.1 GENERAL REQUIREMENTS 4.1.1 Water and fire protection distribution facilities are to be provided solely for the purpose of supplying potable

More information

I - 15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT. Appendices

I - 15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT. Appendices I - 15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendices Appendix J Utility Systems Data August 2017 I - 15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO

More information

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES A. GENERAL 1. The following water system design guidelines are based on Federal, State and local health requirements and the Hilton Head No. 1 Public

More information

OVERALL UTILITY PLANS 1. Provide a typical section depicting the roadway (proposed/future), utility locations, and separation for

OVERALL UTILITY PLANS 1. Provide a typical section depicting the roadway (proposed/future), utility locations, and separation for OVERALL UTILITY PLANS 1. Provide a typical section depicting the roadway (proposed/future), utility locations, and separation for all roadways. Identify utility locations/separations from gutter lip and

More information

1.1 Purpose of Study Project Description Related Studies Sewage Flows Gravity Sewers...

1.1 Purpose of Study Project Description Related Studies Sewage Flows Gravity Sewers... Preliminary Wastewater Facilities Plan for Alberhill Villages April 2015 TABLE OF CONTENTS Section Name Page Number Section 1 - Introduction 1.1 Purpose of Study... 1-1 1.2 Project Description... 1-1 1.3

More information

Table of Contents. 3.1 Source Capacity Analysis

Table of Contents. 3.1 Source Capacity Analysis Table of Contents 3.1 Source Capacity Analysis... 3-1 3.1.1. Design Criteria... 3-1 3.1.2. Source Capacity Evaluation... 3-1 3.1.2.1 Plateau Zone... 3-1 3.1.2.2 Cascade View Zone... 3-4 3.2 Storage Capacity

More information

SUBDIVISION IMPROVEMENT PLANS FORM

SUBDIVISION IMPROVEMENT PLANS FORM Page 1 of 9 CITY OF CONROE SUBDIVISION IMPROVEMENT PLANS CHECKLIST SUBMIT THREE FINAL SETS OF PLANS (maximum size 24 X36 ), OTHER ITEMS LISTED, AND THIS COMPLETED, CERTIFIED CHECKLIST TO THE ENGINEERING

More information

ENGINEERING REPORT WATER SUPPLY

ENGINEERING REPORT WATER SUPPLY PROPOSED RESIDENTIAL DEVELOPMENT, CORAL SPRINGS TRELAWNY FCS #: 1124/76/C ENGINEERING REPORT WATER SUPPLY PREPARED FOR Gore Developments Limited 2c Braemar Ave, Kingston 10 FEBRUARY 2012 1 TABLE OF CONTENTS

More information

Introduction to Storm Sewer Design

Introduction to Storm Sewer Design A SunCam online continuing education course Introduction to Storm Sewer Design by David F. Carter Introduction Storm sewer systems are vital in collection and conveyance of stormwater from the upstream

More information

SITE SERVICING PRELIMINARY DESIGN BRIEF

SITE SERVICING PRELIMINARY DESIGN BRIEF 855 Carling Avenue Proposed Redevelopment SITE SERVICING PRELIMINARY DESIGN BRIEF March 2010 March 23, 2010 RVA 081785 Arnon Corporation 1801 Woodward Dr. Ottawa, ON K2C 0R3 Attention: Mike Casey Re: 855

More information

CITY OF MELISSA MANUAL FOR THE DESIGN OF WATER AND SANITARY SEWER LINES

CITY OF MELISSA MANUAL FOR THE DESIGN OF WATER AND SANITARY SEWER LINES CITY OF MELISSA MANUAL FOR THE DESIGN OF WATER AND SANITARY SEWER LINES SECTION A NOTES TO ENGINEERS This manual is intended to aid and assist private engineers in the layout and design of sanitary sewers

More information

CHAPTER 4 HYDRAULIC ANALYSIS

CHAPTER 4 HYDRAULIC ANALYSIS CHAPTER 4 HYDRAULIC ANALYSIS This chapter presents information on the computer hydraulic model of the City s water system and the results of hydraulic analyses. The purpose of the hydraulic analysis is

More information

SYSTEM ID: KY 10 NARRATIVE DESCRIPTION

SYSTEM ID: KY 10 NARRATIVE DESCRIPTION SYSTEM ID: KY 10 NARRATIVE DESCRIPTION KY 10 is primarily a branched system in Kentucky with the following assets: 13 Tanks, 13 Pumps, 1 Water Treatment Plant, and approximately 1353879 feet of pipe. KY

More information

Chapter 9 Sanitary Sewers

Chapter 9 Sanitary Sewers Chapter 9 Sanitary Sewers I:\AD\030\U30\U30009.docx 4-8-16 Section 9.1 Topic General Requirements Chapter 9 Sanitary Sewers Page 9-1 9.2 Plan Submittals 9-1 9.3 Determination of Flow 9-1 9.4 Facility Design

More information

KEYSTONE EMPLOYMENT AND ECONOMIC PLAN STUDY

KEYSTONE EMPLOYMENT AND ECONOMIC PLAN STUDY SUPPLEMENTAL NARRATIVE For the KEYSTONE EMPLOYMENT AND ECONOMIC PLAN STUDY Borough of Pottstown & West Pottsgrove Township Montgomery County, PA Prepared for: Pottstown Area Industrial Authority 152 East

More information

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves

More information

SYSTEM ID: KY 3 NARRATIVE DESCRIPTION

SYSTEM ID: KY 3 NARRATIVE DESCRIPTION SYSTEM ID: KY 3 NARRATIVE DESCRIPTION KY 3 is primarily a grid system in Kentucky with the following assets: 3 Tanks, 5 Pumps, 1 Water Treatment Plant, and approximately 277,022 feet of pipe. KY 3 provides

More information

INSTRUCTIONS FOR FILLING OUT APPLICATION FOR CONCURRENCY ANALYSIS, POTABLE WATER, RECLAIMED WATER AND / OR WASTEWATER SERVICE

INSTRUCTIONS FOR FILLING OUT APPLICATION FOR CONCURRENCY ANALYSIS, POTABLE WATER, RECLAIMED WATER AND / OR WASTEWATER SERVICE INSTRUCTIONS FOR FILLING OUT APPLICATION FOR CONCURRENCY ANALYSIS, POTABLE WATER, RECLAIMED WATER AND / OR WASTEWATER SERVICE APPLICATION MUST BE TYPED OR HAND LETTERED IN INK AND SUBMITTED WITH A REVIEW

More information

SEWER SYSTEM DESIGN GUIDELINES

SEWER SYSTEM DESIGN GUIDELINES SEWER SYSTEM DESIGN GUIDELINES PART 1 GENERAL 1.1 GENERAL GUIDELINES A. The following sewer system design guidelines are based on Federal, State and Local health requirements, and the Berkeley County Water

More information

Haestad Solutions. Bentley Systems Incorporated Haestad Solution Center Watertown, CT Toll-free: Fax:

Haestad Solutions. Bentley Systems Incorporated Haestad Solution Center Watertown, CT Toll-free: Fax: 1 Haestad Solutions Bentley Systems Incorporated Haestad Solution Center Watertown, CT 06795 Toll-free: 1-800-727-6555 Fax: 203-597-1488 www.bentley.com/www.haestad.com Who was Haestad Methods? World Leader

More information

Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge. Presentation to Board April 21, 2011

Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge. Presentation to Board April 21, 2011 Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge Presentation to Board April 21, 2011 PRESENTATION OUTLINE Master Plan Overview Purpose and Approach Supply and Demand

More information

TABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 115 WATER DISTRIBUTION SYSTEM GENERAL SIZING LINES 115.

TABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 115 WATER DISTRIBUTION SYSTEM GENERAL SIZING LINES 115. TABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 115 WATER DISTRIBUTION SYSTEM SECTION TITLE PAGE 115.1 GENERAL 115.1 115.2 SIZING LINES 115.1 115.3 DISTRIBUTION SYSTEM 115.2 115.3.1 Layout

More information

December 6, Nate Hatleback Project Manager City of Thornton 9500 Civic Center Drive Thornton, CO 80229

December 6, Nate Hatleback Project Manager City of Thornton 9500 Civic Center Drive Thornton, CO 80229 December 6, 2016 Nate Hatleback Project Manager City of Thornton 9500 Civic Center Drive Thornton, CO 80229 RE: Drainage Conformance Letter Hilton Garden Inn @ The Grove The Grove Filing No 1, lot 5E Thornton,

More information

PRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc.

PRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc. PRELIMINARY MUNICIPAL SERVICING REPORT SUBDIVISION Prepared for: North Grassie Properties Inc. Prepared by: Stantec Consulting Ltd. 905 Waverley St. Winnipeg, MB R3T 5P4 July 2012 File: 116808030 SUBDIVISION

More information

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA SERVICEABILITY REPORT

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA SERVICEABILITY REPORT PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M 62 667 BANK STREET CITY OF OTTAWA SERVICEABILITY REPORT REPORT R 816 41A (Rev. 2) MARCH 2017 T.L. MAK ENGINEERING CONSULTANTS LTD.

More information

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART. January 2016

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART. January 2016 The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG

More information

UTILITIES CHECKLIST CITY OF CHESAPEAKE DEPARTMENT OF PUBLIC WORKS SUBDIVISION NAME: A/C & TAX MAP PARCEL NOS (13 DIGITS) DEVELOPER:

UTILITIES CHECKLIST CITY OF CHESAPEAKE DEPARTMENT OF PUBLIC WORKS SUBDIVISION NAME: A/C & TAX MAP PARCEL NOS (13 DIGITS) DEVELOPER: UTILITIES CHECKLIST CITY OF CHESAPEAKE DEPARTMENT OF PUBLIC WORKS SUBDIVISION NAME: A/C & TAX MAP PARCEL NOS (13 DIGITS) DEVELOPER: REVIEWING ENGINEER: WATERSHED (INCLUDE SUBSCRIPT) I. PRELIMINARY ITEMS

More information

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,

More information

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

Summary of Detention Pond Calculation Canyon Estates American Canyon, California July 15, 2015 Bellecci & Associates, Inc Summary of Detention Pond Calculation Canyon Estates American Canyon, California 1. Methodology: Method: Unit Hydrograph Software: Bentley Pond Pack Version 8i

More information

Appendix 13. Haymeadow Raw Water irrigation System Basis of Design

Appendix 13. Haymeadow Raw Water irrigation System Basis of Design Appendix 13 Haymeadow Raw Water irrigation System Basis of Design 28 MEMORANDUM TO: FROM: Brandon Cohen, Scott Schlosser Brendon Langenhuizen, PE & David M. Kotz, PE DATE: September 13, 2018 RE: Haymeadow

More information

Appendix J Conceptual Design of Watermain and Sanitary Sewer

Appendix J Conceptual Design of Watermain and Sanitary Sewer City of Barrie - Hewitt's Secondary Plan Class Environmental Assessment (Phase 3 and 4) Study Environmental Study Report Appendix J Conceptual Design of Watermain and Sanitary Sewer Hatch 2017 All rights

More information

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL INTRODUCTION The District developed a hydraulic model of the sanitary sewer system as part the 2000 Wastewater Comprehensive Plan. The output from this model

More information

In general, the City will not approve a development which cannot be served by extensions to the City s wastewater collection system.

In general, the City will not approve a development which cannot be served by extensions to the City s wastewater collection system. 6. WASTEWATER SYSTEM 6.1 General: The design and construction of the wastewater collection system to serve the development shall be in accordance with good engineering principles, these Standards of Design,

More information

CONSTRUCTION PLANS FOR ENTERPRISE RENTAL CAR

CONSTRUCTION PLANS FOR ENTERPRISE RENTAL CAR CONSTRUCTION PLANS FOR VICINITY MAP (NOT TO SCALE) DEVELOPER/OWNER: CHRISTOPHER SLOVAN ENTERPRISE HOLDINGS, INC. 284 MALLORY STATION RD, SUITE 120 FRANKLIN, TN 37067 PH: 615-309-9621 DAVIDSON CO., TENNESSSEE

More information

Report. Lake Water Supply Hydraulic Modeling. Village of. Lindenhurst, IL. April 2012

Report. Lake Water Supply Hydraulic Modeling. Village of. Lindenhurst, IL. April 2012 Lake Water Supply Hydraulic Modeling Report Village of Lindenhurst, IL April 2012 R:\MAD\Documents\Reports\Archive\2012\Lindenhurst, IL\Lake Water Supply.HM.1290.039.mjf.jan\Report\!Front Cover (Blue=Water)

More information

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN PRESSURIZED IRRIGATION SYSTEM MASTER PLAN (HAL Project No.: 314.04.100) FINAL REPORT January 2009 ACKNOWLEDGMENTS Successful completion of this study was made possible by the cooperation and assistance

More information

November 21, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

November 21, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report November 21, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report

More information

RETAIL UNITS GUELPH. November Prepared For: File No Engineering Report.docx F: (905) P: (905) BURLINGTON, ONTARIO

RETAIL UNITS GUELPH. November Prepared For: File No Engineering Report.docx F: (905) P: (905) BURLINGTON, ONTARIO The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED COMMERCIAL RETAIL UNITS GUELPH LINE AND UPPER MIDDLE

More information

DESIGN CRITERIA AND STANDARD DRAWINGS FOR WATER AND SEWER FACILITIES

DESIGN CRITERIA AND STANDARD DRAWINGS FOR WATER AND SEWER FACILITIES SANTA MARGARITA WATER DISTRICT DESIGN CRITERIA AND STANDARD DRAWINGS FOR WATER AND SEWER FACILITIES SANTA MARGARITA WATER DISTRICT 26111 Antonio Parkway Rancho Santa Margarita, California 92688 (949) 459-6655

More information

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES 3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES All sanitary sewers shall be designed in accordance with these Design Standards, LBWD Rules and Regulations, and to accepted engineering principles. In

More information

CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FOUR WATER DISTRIBUTION SYSTEM

CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FOUR WATER DISTRIBUTION SYSTEM CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FOUR WATER DISTRIBUTION SYSTEM 2018 TABLE OF CONTENTS Section Four Water Distribution System SECTION PAGE NUMBER 1. Objective...1 2. Submissions

More information

INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN

INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN FINAL REPORT INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN Prepared for: City of Modesto Prepared by: Willdan Financial Services Approved by Modesto City Council on July 9, 2013 Resolution

More information

Section 7 Design Criteria Irrigation and Drainage Facilities

Section 7 Design Criteria Irrigation and Drainage Facilities Section 7 Design Criteria Irrigation and Drainage Facilities 7.1 Background The Irrigation and Drainage system is comprised of the Coachella Branch of the All-American Canal (Coachella Canal), Protective

More information

SAWS WATER PROJECTS MODELING CRITERIA GUIDELINES

SAWS WATER PROJECTS MODELING CRITERIA GUIDELINES SAWS WATER PROJECTS MODELING CRITERIA GUIDELINES July 2016 2800 U.S. Highway 281 North San Antonio, Texas 78212 Modeling Criteria Guidelines, July 2016 TABLE OF CONTENTS MODELING CRITERIA GUIDELINES FOR

More information

SECTION 2 - DESIGN STANDARDS FOR GRAVITY SANITARY SEWERS

SECTION 2 - DESIGN STANDARDS FOR GRAVITY SANITARY SEWERS SECTION 2 - DESIGN STANDARDS FOR GRAVITY SANITARY SEWERS 2.1. General Requirements Sanitary sewers are to be provided solely for the removal of sanitary waste. Under no circumstances shall any roof drains,

More information

Appendix One MASTER DRAINAGE REPORT

Appendix One MASTER DRAINAGE REPORT Appendix Appendix One. Master Drainage Report Two. Master Utility Report Three. FAA Forecast Approval Letter Four. Study Committee Notes MASTER PLAN UPDATE REGIONAL AIRPORT Appendix One MASTER DRAINAGE

More information

Presentation Summary. What, Why, and How. Building the Model. Facility Data Acquisition. Model Calibration. Real World Applications/Case Studies

Presentation Summary. What, Why, and How. Building the Model. Facility Data Acquisition. Model Calibration. Real World Applications/Case Studies Uday Khambhammettu Randolph Rostas VA AWWA Presentation Summary What, Why, and How Building the Model Facility Data Acquisition Model Calibration Real World Applications/Case Studies Model Maintenance

More information

SECTION WATER MAINS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

SECTION WATER MAINS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA SECTION 6900 - WATER MAINS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA 6901 DESIGN CRITERIA A. General 1. The design standards presented in the City of Lee's Summit Design Criteria are the minimum standards

More information

COLLIER COUNTY Growth Management Department

COLLIER COUNTY Growth Management Department COLLIER COUNTY Growth Management Department July 07, 2015 Josh Fruth Davidson Engineering, Inc Suite 201 4365 Radio Rd Naples, FL 34104 EMAIL - Josh@DavidsonEngineering.Com; jessica@davidsonengineering.com

More information

Sewer Modeling of Near- Term Development Technical Memorandum

Sewer Modeling of Near- Term Development Technical Memorandum Sewer Modeling of Near- Term Development City of Reedley, CA March 8, 2018 Page Intentionally Blank The City of Reedley (City) is anticipating near-term developments to the north of the City s currently

More information

CONSTRUCTION PLAN REVIEW CHECKLIST FOR PRIVATE DEVELOPMENT

CONSTRUCTION PLAN REVIEW CHECKLIST FOR PRIVATE DEVELOPMENT ADDITION NAME: City of Grapevine, Texas CONSTRUCTION PLAN REVIEW CHECKLIST FOR PRIVATE DEVELOPMENT Updated April 16, 2018 Public Works Department Engineering Division 200 South Main Street Grapevine, Texas

More information

CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413

CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413 Page: 1 of 5 CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413 COMMERCIAL/RESIDENTIAL UTILITY PLAN COMPLETENESS CHECK LIST Updated

More information

Utilities are constantly striving to

Utilities are constantly striving to Comprehensive Approach to Increase Effectiveness & Efficiency of Flushing Programs Using Latest Hydraulic & Water Quality Monitoring Tools Kelcia D. Mazana, Edward H. Talton Jr., and C. Robert Reiss Utilities

More information

El Margarita Development Analysis

El Margarita Development Analysis 303 Second Street, Suite 300 South San Francisco, California 94107 415-243-2150 FAX: 415-896-0999 El Margarita Development Analysis 28 January 2015 Prepared for City of Yuba City 1201 Civic Center Boulevard

More information

PART V - STORM DRAIN DESIGN CRITERIA

PART V - STORM DRAIN DESIGN CRITERIA PART V - STORM DRAIN DESIGN CRITERIA A. Hydrology Studies and Hydraulic Analyses 1. Drainage area master plans and calculations are to be submitted with all subdivision improvement plans, permit improvement

More information

PART V - STORM DRAIN DESIGN CRITERIA

PART V - STORM DRAIN DESIGN CRITERIA PART V - STORM DRAIN DESIGN CRITERIA A. Hydrology Studies and Hydraulic Analyses 1. Drainage area master plans and calculations are to be submitted with all subdivision improvement plans, permit improvement

More information

DRAINAGE STUDY PHASE 2 REPORT HORRY COUNTY STORMWATER DEPARTMENT HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: APRIL 07, 2016 J

DRAINAGE STUDY PHASE 2 REPORT HORRY COUNTY STORMWATER DEPARTMENT HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: APRIL 07, 2016 J DRAINAGE STUDY PHASE 2 REPORT FOR: HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: HORRY COUNTY STORMWATER DEPARTMENT APRIL 07, 2016 Prepared by: Savannah, GA Charleston, SC Myrtle Beach, SC Brunswick, GA

More information

Section 5 - Planning Criteria. Section 5

Section 5 - Planning Criteria. Section 5 Section 5 - Planning Criteria Section 5 SECTION 5 PLANNING CRITERIA This section presents the design criteria and methodologies for analysis used to evaluate the existing distribution system and its facilities

More information

10.0 Storm Sewer Systems

10.0 Storm Sewer Systems October 2003 Chapter 10.0, Storm Sewer Systems Page 1 10.0 Storm Sewer Systems 10.1 Introduction A storm sewer system consists of a system of inlets, pipes, manholes, junctions, cleanouts, outlets, and

More information

Site Utility Study. Prepared By: Rodolfo Ibarra, PE, PA SW 117 th Avenue Unit #3 Miami, Florida 33177

Site Utility Study. Prepared By: Rodolfo Ibarra, PE, PA SW 117 th Avenue Unit #3 Miami, Florida 33177 WEST BRICKELL CENTRE Major Use Special Permit 290 SW 10 th Street, 245 SW 11 th Street,240-270 SW 10 th Street, 251-253 SW 11 th Street, 255 SW 11 th Street, and 267 SW 11 th Street Site Utility Study

More information

Appendix A Stormwater Site Plan Report Short Form

Appendix A Stormwater Site Plan Report Short Form Appendix A Stormwater Site Plan Report Short Form The Stormwater Site Plan Report Short Form may be used for projects that trigger only Minimum Requirements #1-#5. These projects typically fall within

More information

Page Intentionally Left Blank

Page Intentionally Left Blank Page Intentionally Left Blank Julie Avenue and Hoeschler Drive Lift Stations Evaluation City of Sparta TABLE OF CONTENTS Page CHAPTER 1 GENERAL INFORMATION... 1 1.1 Scope of Lift Station Evaluation...

More information

Water and Wastewater Impact Fee Analysis Capital Improvement Plan City of Lockhart February 2017

Water and Wastewater Impact Fee Analysis Capital Improvement Plan City of Lockhart February 2017 TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 ANALYSIS OF WATER & WASTEWATER SYSTEMS... 1 2.1 Present Water Demands... 1 2.2 Water Supply... 3 2.3 Water Treatment Plant... 4 2.4 Storage, High-Service Pumps,

More information

APPENDIX G HYDRAULIC GRADE LINE

APPENDIX G HYDRAULIC GRADE LINE Storm Drainage 13-G-1 APPENDIX G HYDRAULIC GRADE LINE 1.0 Introduction The hydraulic grade line is used to aid the designer in determining the acceptability of a proposed or evaluation of an existing storm

More information

Appendix D Irrigation Standards

Appendix D Irrigation Standards I. Irrigation Design Standards Appendix D Irrigation Standards (a) Purpose. To conserve water resources and promote the efficient use of water resources by establishing requirements for design, installation

More information

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M 2 7 BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R 81 41 (REV. 2) MARCH 2017 T.L. MAK ENGINEERING CONSULTANTS LTD. JULY

More information

Introduction. Purpose

Introduction. Purpose Introduction This Master Plan update includes updating the text of the Utilities Section of the current Master Plan and adding a report concerning telecommunications. Each element examines the existing

More information

City of Crosby, ND Municipal Infrastructure Needs Assessment September 2012

City of Crosby, ND Municipal Infrastructure Needs Assessment September 2012 City of Crosby, ND Municipal Infrastructure Needs Assessment September 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and

More information

Hydraulic Modeling, PUDs & Managing Water System Growth

Hydraulic Modeling, PUDs & Managing Water System Growth Hydraulic Modeling, PUDs & Managing Water System Growth American Water Resources Association Intermountain Section October 9, 2013 Utah Division of Drinking Water Ying-Ying Macauley Presentation Topics

More information

Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT

Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT Prepared by: Stantec Consulting Ltd. 1505 Laperriere Avenue Ottawa, ON K1Z 7T1 File: 160401004/83 January 17,

More information