1 Himalayan Small Hydropower Summit (October 12-13, 2006), Dehradun SMALL HYDROPOWER AND HEADWORKS MODELLING Tulsi Prasad Phuyal Research Engineer Hydro Lab, Pulchowk, Lalitpur, Nepal Manohar Shrestha Deputy General Manager Hydro Lab, Pulchowk, Lalitpur, Nepal ABSTRACT It is obvious that headworks (HW) is one of the most decisive components of the Hydropower projects. Headworks structures in hydropower projects are to extract the design discharge properly by minimizing the problem cause by sediments in intake, settling basin and its flushing structures. Generally, the design of the headworks is project specific. Basically, special attention is required on layout and sizing of headworks in Himalayan Rivers from sediment handling point of view. Several existing small scheme ROR hydropower plants in Nepal are facing operational difficulties and loosing significant amount of revenue generation during operation phase due to shortcomings on HW design and layout. The severe chocking of the main river intake, heavy deposition in the gravel hopper, challenges in sediment flushing/handlings are the frequently encountering problems at the HW, as it is bitter fact that the Himalayan Rivers are transporting tremendous amount of sediment load during the monsoon flow. It is common that the HW design layout is carried out based on the conventional formulae as well as experience from the previously implemented projects. In addition to this, a physical model shall be used as a design tool for headworks design. It helps to verify the design. In case of unsatisfactory performance, it is possible to develop the new concept before to switch on construction. In this paper, there will be presenting a case study on physical hydraulic modeling of headworks of Khudi Hydropower Project, 3.8 MW. The authors believe that such information shall be useful for the hydropower developer in the coming future and will be possible to utilize water resources for the maximum benefit, preventing the investment in possible unsatisfactory theoretical design. INTRODUCTION Tough Environmental and Socio-economic concern against high dam is creating new base for the promotion of small hydro world wide, especially for the developing countries. Small hydropower as a renewable energy (suits for developing country) provides the energy for the development of remote areas, creates job opportunities, short time for planning and implementation, low cost, simple to medium technology for construction, small operation and maintenance (O and M) cost, less environmental impacts (Small is beautiful). These facts shall be taken as opportunities for developing the small hydropower projects. But there are numerous challenges as well. Insufficient database on small rivers, technology is still under the research and development phase for developing small hydropower in the mountainous (bed slope >1/100) and Foothill Rivers (bed slope >1/1000). The hydraulic parameters with high velocity, shallow flow depth, high bed load transportation etc are making design more challenging. 84

2 It is obvious that headworks (HW) is one of the most decisive components of the Hydropower projects, as the major function of headworks is to divert the design discharge for power generation by handling sediment load properly so that the sediment exposure to the turbine is minimized. Hydropower projects are classified based on installed capacity, available head (Mosonyi, 1987) and storage. According to installed capacity, the hydropower projects are pico, micro, mini, small, medium and large, which is varying country to country for instance 10 MW capacity plant is small hydropower plant in Nepal but in China up to 50 MW is considered as a small hydropower. If the parameter head is considered as an index for hydropower classification, then the hydropower projects are Low (H<15 m), medium (50>H>15 m), and high head (H>50 m), scheme. Based on storage type, the projects are classified as Run-of- River, Peaking Run-of-River and storage. Most of the hydropower projects under operation and identified for development in the Himalayan region are ROR/PROR projects with high head scheme. The Himalayan Rivers are transporting tremendous amount of sediment load during the monsoon flow. It has significant and direct/immediate influence on headworks arrangement in ROR/PROR small hydropower projects than in bigger reservoirs projects. DESIGN CRITERIA Hydraulic design of headworks for small hydropower plants in steep rivers, have proven to be equally difficult and some times more challenging than for medium and large sized hydropower plants. Generally, the design of the headworks is project specific and mostly depends on diversion scheme and amount of intake discharge, sediment concentration in the rivers, etc. If the project falls under the small scale scheme and ROR/PROR, then HW layout and its component design shall be done so that design criteria met for efficient headworks operation. The design criteria should be; safe to hazardous floods, control of bed build in front of intake, passes of floating debris and proper sediment handling including air entry into the water conveyance system (Prof. Hakon Stole, NTNU, Norway). DESIGN TOOLS To fulfill above mentioned design criteria, a proper location, suitable arrangement and appropriately sized HW components are very much essential. It is required thorough study and understandings on HW layout in beginning of conceptual and design phase. Several existing ROR hydropower plants in Nepal are facing operational difficulties and loosing significant amount of revenue generation during operation phase. Mainly the following design tools shall be used for designing the hydropower projects. Theoretical Mathematical equations and empirical relations Experimental Physical model tests, a short field trip, observations, investigations and measurements 85

3 Professional experience Engineering experience gained from implemented projects (compensate lack of direct observations) It is common practice that the HW design layout is carried out based on the conventional formulae as well as experience from the previously implemented projects. WHY A PHYSICAL MODEL AS A DESIGN TOOL? Super critical flow, high variation in flow throughout the year, unpredictable bed load, high variation of sediment size and complex sediment transport patterns are the most unfavorable phenomena that are common in steep Himalayan Rivers. During dry season, flows in the rivers are very lean and during the wet season the flows are very high and great challenge to manage. In this connection, design of headworks is challenging and satisfactory performance is not guaranteed always. The clear understanding of the river and location specific it is very useful to conduct physical modeling and minimize such unpredictable possibilities before the construction and operation of the power plants. It shall also be used as a reliable tool for finalizing the proposed headworks design and see the hydraulic response by releasing the different possible flow regimes in the river model. In addition to this, it helps In case of, unsatisfactory performance, it is possible to modify or develop totally new headworks arrangement. Or minor changes in headwork structures for satisfactory performance can be done, e.g, changes in angle or radius of guide wall, increase or decrease of intake sill level, dam height etc. The performances of overall hydraulic structures are associating with the different return period. It is very important to check the bed load and trash performance during 2, 5, 10, 20, 50 and say up to 100 years return period. It is not possible to see the flood behavior directly into the river within a limited time. CASE STUDY- KHUDI DESIGN AND MODEL STUDY General Khudi River is located in Lamjung district in the Western Development Region of Nepal and is one of the tributaries of the Marsyangdi River. It is a snow-fed river having an average slope of 1 in 30 with gravels and boulders forming the river bed. It has a high sediment transport capacity. The catchments area of the river at the confluence to the Marsyangdi River is about 127 km2. The mean annual flow in the river is about 9.8 m3/s and the mean dry season flow value is about 2.8 m3/s. Figure 1 Khudi Khola during dry season 86

4 The Khudi Hydropower Project (KHP) is a run of the river project. The design flow is 4.9 m 3 /s. Since the average flow in dry periods is 2.8 m 3 /s, the plant can only have full capacity during the rainy season. The initial design of headworks of the KHP was proposed by consulting engineer Gestion Conseil SCP Inc, Canada and LEDCO Engineers. Before tendering the project for construction, the LEDCO decided to review the initial design by the experts of the BPCH (BPCHydroconsult the Engineering Department of Butwal Power Company) hydropower project owner, developer and designer; and later on reviewed by Dr. H. Stole, Professor at Norwegian University of Science and Technology (NTNU)/Hydro Lab for the proposed design. Based on Review by BPCH and Hydro Lab/NTNU felt the necessity of physical modeling of Khudi Hydropower Project and so physical hydraulic model was built in laboratory in 2002 to review the design. The tests on the model were carried out in Hydro Lab Pvt. Ltd., and the detailed of the report is available in Hydro Lab. Hydrology The flows presented in the table below were used during the model tests for headworks performance. It was important to observe the general headworks performance with respect to sediment transport, bed load passage, sediment control at the intake and floating debris transport patterns in different flooding scenario. Test situation Flow (m 3 /s) Low flow 5 Average flow in June and October 10 Normal monsoon flow 30 Normal monsoon flood 80 Flood with a return period of 2 years 105 Flood with a return period of 10 years 178 Flood with a return period of 20 years 208 Flood with a return period of 100 years 330 Design flood 330 To observe the different flood response of each headworks structure, the flows were gradually increased from 30m 3 /s to the design flood of 330 m 3 /s and then gradually reduced in steps in reverse order and finally stopped. During the test run the model was constantly fed with sediments and gravels of various sizes to represent the bed load transport in the river. As there was not sufficient sediment transport data available in Khudi river, sediment into the model was supplied based on the experience of sediment transport in similar rivers. The information on the hydrology was supplied by the Client Lamjung Electricity Development Company (LEDCO). PHYSICAL MODEL OF INITIAL ARRANGEMENT AND TEST In this arrangement, diversion structure consisting a 20 meter long free overflow weir with a one meter wide crest at elevation masl, sloping 1:6 at the upstream face and 1:4 at the down stream face was built. A side intake furnished with a bed load hopper to draw the water. 87

5 There were two sluices for sediment handling, which were bed load sluice and gravel sluice. The 117 meters long, partly covered intake canal, where the downstream 33 metres were furnished with a side spillway is linking the intake gate with the settling basins. The sediments that settled at the bottom of the bed load hopper, will be flushed out to the river through the bed load flushing culvert of approximately the same length of intake canal, reference is made to Figure 2. Figure 2 Initial HW layout and its model in laboratory Several tests were carried out to verify the proposed design in different flow situations. Tests revealed that it was not possible to draw a desired flow rough the intake canal. When the river discharge was 5m 3 /s only 2.9 m 3 /s was abstracted from the river, but 96% of it was drawn through the bed load sluice rather than the intake canal (Heier, 2002). This observation revealed that the main problem was not to draw water from the river, but to get the water into the intake canal. Next, there was a problem on sediment exclusion at the headworks. The reason of the sediment clogging was due to low transport capacity in the flushing culvert. The transport capacity is dependent on the available energy head, which is a function of velocity, elevation difference, frictional loss in culvert and depth. Figure 3 Deposition in front of intake 88

6 MODIFICATION ON INITIAL ARRANGEMENT To solve the hydraulic problem and sediment exclusion within the existing design, the weir crest was raised by 0.5 m and 1.0 m in two stages. A higher weir crest made it difficult for transport of sediments over the weir, unless the bed in front of the weir is raised. A huge amount of sediment was deposited in front of the intake. A modification on the flushing culvert was carried out by shortening its length by about 50% and the outlet released into the river directly. There was some improvement in bed load flushing after this modification. ed load culve shortened Figure 4 Bed load culvert shortened Figure 5 Weir crest raised by 1 m and test RESULTS AND ITS CONSEQUENCES Ultimately, based on the model study results, the reviewer concluded that the proposed headworks arrangement would not function satisfactorily. Due to the lack of financial closure for KHP at that time it was not possible to continue further study as a contract research. Further, Hydro Lab on its own initiatives continued research on Khudi headworks to find a feasible headworks layout and its hydraulic design. The result of the research was planned to be sold to the potential developer in future. Further, two alternatives were developed to find satisfactory headworks arrangement, which are described in the following sections. The location as well as initial arrangement was discarded and the new location has been chosen at about 80 m upstream from the initially proposed location. Alternative 1: Headworks arrangement with frontal intake In this arrangement, a 20 meter long free overflow weir with a one meter wide crest at elevation masl, sloping 1:4 at the upstream face and 1:10 at the downstream face was proposed for water diversion. Bed load sluicing channel and intake orifice are almost perpendicular to the river flow. An orifice type intake of size 5 m wide and 1.5 m high was designed to abstract the water. For bed load handling, there was a 3 m wide bed load sluicing channel was proposed adjacent to the intake. The invert level of bed load sluice and intake sill level difference was limited to 0.5 m only. There was a vertical drop of 1.5 m immediately 89

7 after the bed load sluice gate in bed load flushing channel. The left bank sidewall from intake was extended 36 m downstream from the weir as a flood control wall. Slab infront of intake Figure 6 Frontal intake and bed load deposition Figure 7 Modification on frontal intake, slab introduced After having several tests run in different flow situations, the sediment deposition in front of intake was observed significant and significant amount of sediment particles entered into the gravel hopper, reference is made in figure 6. Further the frontal intake converted into the semi frontal intake by introducing inlet head wall. Meanwhile the bed load sluice was also lowered by about 2 m and introduced a slab at the intake sill level to check the entry of sediment through the intake; reference is made in figure 7. With this modification, test was carried out. A rotational turbulent flow was observed in front of intake orifice, reference is made in figure 6. The test runs with the sediment revealed sediment deposition under and over the slab and had entered through the intake. It was realized that the sediment deposition under the slab may pose quite serious problem during the operation of headworks. The velocity observed along the left bank wall upstream of the intake was low resulting in difficulty for floating debris passes. It was realized that a comprehensive modification may be needed. Based on the observations of Alternative 1, headworks arrangement with semi-frontal intake was developed and tested further. Alternative 2: Headworks arrangement with semi frontal intake The weir crest of 20 m long was kept at same crest level of masl. The intake structure together with bed load sluice and gravel excluder was modified. The intake orifice size was changed from 5 m to 4 m and the invert level and top level of the intake opening was kept at and masl respectively. Two open channels were proposed for flushing the bed load. The right bank side channel is 3.0 m wide and the left bank side channel is 2.0 m wide and length of each channel is about 36.0 m. Both channels had a bed slope of 1 in

8 Figure 8 Double bed sluice channel Figure 9 Modification on bed load hopper wall The river flow characteristics at upstream part of the weir were observed. The big boulder located at the upstream of the weir had an influence on the hydraulics of the approach flow to the intake. The boulder influenced the flow to concentrate on the right bank. As a result, low velocity was observed along the left bank resulting in difficulty of passing floating trashes and debris. While the riverside bed load flushing channel was in operation, a rolled flow was observed in front of intake orifice, which created problem for debris passing over the weir. While the hillside bed load flushing channel was in operation, less rolled flow was observed. The deposition of bed load in the river training upstream of the weir was considered to be fairly high during moderate flood in the river. The sediment control at the intake was good. Although there is sediment deposit in front of intake it was observed that sediment did not enter into the gravel hopper through intake orifice. Based on the above mentioned observations, minor modifications on the model were carried out and then tested for documentation. MODIFICATIONS In this arrangement, the river bed upstream of the weir was raised to elevation masl. Boulder armouring was continued for approximately 60 m upstream of the weir. The existing big boulders at upstream of the weir were removed. The right bed load-flushing channel was permanently removed. The length of the weir crest was extended to about 23 m by the removal of right flushing channel. A depression of 0.3 m in 2 m length from the left bank sidewall was kept in the weir crest to minimize the rolled flow observed in intake and to allow floating materials near intake to pass during moderate flood in the river. The upstream slope from the weir was unchanged while the downstream slope was maintained at 1:10. The top level of intake was lowered by 0.3 m for submergence and accordingly the opening height is maintained at 1.2 m. The pier (size 0.6 m width and 1.5 m long) was introduced at the centre of intake orifice to minimize the stoplog span in operation phase. After this modification, there were two orifice openings of 1.2 m X 1.7 m on intake head wall. The bed load hopper was modified. Reference is made to Figure 9. The hopper wall was changed in convex shape with radius 7.0 m, which helped to minimize the circulating flow into the hopper to some extent. 91

9 Spillway Figure 10 Intake canal furnished with spillway A modification was made in intake canal. The first 18 m length was kept as a closed rectangular culvert of size 1.5 X1.5 m. Immediately, after closed culvert a 10.0 m long spillway was furnished, reference is made to Figure 10. The spillway at this location didn t function properly due to shooting flow at the end of closed culvert, reference is made to Figure 10. So the spillway was shifted further downstream and length limited to 8 m, reference is made to Figure 11. The open canal of size 2 m wide and 1.4 m depth was kept in between spillway and closed culvert. The culvert and canal bed slope was kept 1 in 500. Spillway End of culvert Figure 11 HW layout Initial and New 92

10 PERFORMANCE The boulder lining and the bed level raised at the upstream part of the weir provided a good uniform approach flow to the weir and intake at monsoon flood situations. Removal of the upstream boulders improved the approach flow towards the intake. The bed load was observed to pass over the weir at flows higher than the normal monsoon flows. The floating debris coming along the centre and right bank of the river passed over the weir without difficulty, but floats along the left bank are found to remain around intake head wall. Due to the introduction of depression on the left part of the weir, a rolling effect in front of the intake was minimized and depression assisted in providing an access to some of the floats. The proposed general layout (geometry) of the weir had a fairly satisfactory hydraulic performance. The intake was abstracting required water from the river without difficulty. The increment of submergence improved the flow condition through the intake orifice. Suction effect had been reduced to some extent. There was a bed load deposition in front of the intake in different flows. The bed load entering the bed load hopper was sluiced through the bed load flushing channel. A very negligible amount of sediment particles entered into the gravel hopper. An intermittent opening of gravel flushing gate sluiced all deposited sediment in the gravel hopper within a short interval of operation. The water surface profiles for selected discharges along the weir axis are presented in Figure 12. A rating curve for weir discharging capacity was developed, which is presented in Figure Level (masl) Chainage (m) (Weir axis) CL bed level 30 m3/sec 80 m3/sec 105 m3/sec 178 m3/sec 208 m3/sec 10 m3/sec Figure 12 Water surface profiles upstream and downstream of the weir for selected discharges. 93

11 Observed water level, masl Discharge over the weir, m3/sec Figure 13 Clean water capacity curve for the weir. CONCLUSIONS AND RECOMMENDATIONS The Alternative 2 headworks arrangement furnished with semi-frontal intake had been concluded as an appropriate headworks layout and this adopted new headworks was shifted by 80m u/s from the initially designed headworks location. The new arrangement is capable to abstract the design flow through the intake and smooth passage of floating debris as well as bed load through bed sluice structure. It was observed that the Alternative 2 arrangement not only improved the hydraulic performance of headworks structures but also improved the river bed stability and approach flow towards the intake. The physical modeling of Khudi Hydropower project proved that physical model test is a design tool when headworks are required to design for small scheme hydropower project in steep rivers. Usually, the assumptions made on design while using the conventional formulae may not suit and expected performance will not be achieved. Model study- prevented from the investment disaster of the Khudi Small Hydropower Project It is possible to look after several options for Headworks design layouts within the selected river reach. It helps for designer as well as developer to understand the flood behavior and its impact when the designed structures are placed /constructed in the River. From this study, the physical model study shall be recommended as a design tool to finalize the headworks design and layout during the feasibility study of small hydropower project. Generally, the developers are reluctant to carry out the physical hydraulic model study for 94

12 small scheme hydropower. Based on the prevailing labor and material cost in Nepal, such model study in Hydro Lab costs about 30,000 to 60,000 US $. In this connection, if the generation revenue from 5 MW plant is calculated for a week that is about 35,000 US $ (prevailing per unit cost is US 5 cents). The model test cost is incomparable with its benefits in long run of the power plant. Now, this project is constructing by the Butwal Power Company and LEDCO and almost complete. However flows were tested and Headworks (intake) operation showed as result revealed during physical modeling and recommended by Hydro Lab. Based on first year operation (Testing) it is good result in operation. REFERENCES Pradhan, P.M.S., P.N. Joshi and T.P. Phuyal, 2004, Report on Khudi Model Study - July Hydro Lab. Ernest Razvan, River intakes and diversion dams, Elsevier,1989 Guidelines for design of intakes for Hydroelectric plants, ASCE, 1995 Lecture materials, Hydropower Development Course, Norwegian University of Science and Technology (NTNU) 95

Performance improvement of headworks: a case of Kalignadaki A Hydropweor Project through physical hydraulic modelling

Performance improvement of headworks: a case of Kalignadaki A Hydropweor Project through physical hydraulic modelling Performance improvement of headworks: a case of Kalignadaki A Hydropweor Project through physical hydraulic modelling Dr. Ing. Meg B. Bishwakarma General Manager, Hydro Lab Pvt. Ltd., Nepal ABSTRACT: The

More information

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Created by Simpo PDF Creator Pro (unregistered version)  Asst.Prof.Dr. Jaafar S. Maatooq Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure

More information

Irrigation Structures 2. Dr. M. R. Kabir

Irrigation Structures 2. Dr. M. R. Kabir CHAPTER 9 Irrigation Structures 2 Dr. M. R. Kabir Professor and Head, Department of Civil Engineering University of Asia Pacific (UAP), Dhaka LECTURE 22 What is Cross Drainage Works? In an irrigation project,

More information

Hydrosuction Sediment Removal System

Hydrosuction Sediment Removal System Application of Hydrosuction Sediment Removal System (HSRS) on Peaking Ponds H. S. Shrestha H. S. Shrestha Abstract: The value of the peaking hour energy is very high in Nepal where people are facing more

More information

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION 1.1 General The Lower Erkhuwa hydropower Project is located in Kulung and Chauki Danda VDCs of Bhojpur District, in East Nepal. It is located

More information

CASE STUDY JHIMRUK, NEPAL

CASE STUDY JHIMRUK, NEPAL SEDIMENT MANAGEMENT CASE STUDY JHIMRUK, NEPAL Key project features Name: Jhimruk Country: Nepal Category: modifying operating rule (focus or redistribute sediment); adaptive strategies Reservoir volume

More information

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08 (b) Discuss in brief shaft spillway with neat sketches. Marks 04 OR Q (2) Explain in brief USBR stilling basin. Marks 08 Stilling Basins The basins are usually provided with special appurtenances including

More information

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Monthly Progress Report Prepared by : Sano Milti Khola Hydropower Limited www.smi.com.np smi.investment.limited@gmail.com Date : August,

More information

Hydropower retrofitted onto existing water infrastructure assets

Hydropower retrofitted onto existing water infrastructure assets Hydropower retrofitted onto existing water infrastructure assets Marco van Dijk Lecturer and Principal Researcher University of Pretoria / Water Research Commission South Africa Presentation Layout How

More information

Xayaburi Hydroelectric Power Project

Xayaburi Hydroelectric Power Project The MRC Regional Workshop on Discharge and Sediment Monitoring and Geomorphological Tool for the Lower- Mekong Basin, 21-22 22 October 2008 Xayaburi Hydroelectric Power Project TEAM Consulting Engineering

More information

Environmental Impacts of Khudi Small Hydropower Project on the Fishery of the Khudi River during Operation Phase

Environmental Impacts of Khudi Small Hydropower Project on the Fishery of the Khudi River during Operation Phase Environmental Impacts of Khudi Small Hydropower Project on the Fishery of the Khudi River during Operation Phase Mohan Prasad Devkota Amrit Science Campus, PO Box-102, Tribhuvan University, Kathmandu,

More information

Modeling and Simulation of Irrigation Canals with Hydro Turbines

Modeling and Simulation of Irrigation Canals with Hydro Turbines Modeling and Simulation of Irrigation Canals with Hydro Turbines S Mohan Kumar Scientist, Department of Research, ABB Global Industries and Services Ltd Bangalore, India * mohan.s.kumar@in.abb.com (corresponding

More information

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Monthly Progress Report Prepared by : Sano Milti Khola Hydropower Limited www.smi.com.np smi.investment.limited@gmail.com Date : August,

More information

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA S. Masood Husain Nitya Nand Rai Director Assistant Director Foundation Engineering & Special Analysis Directorate Central

More information

Types of Hydropower Facilities

Types of Hydropower Facilities Types of Hydropower Facilities 1 Impoundment Hydropower- uses a dam to store water. Water may be released either to meet changing electricity needs or to maintain a constant water level. 2 Run-of-River

More information

A Study on Physical Model Test for Cheongpyeong Dam Discharge Recalculation

A Study on Physical Model Test for Cheongpyeong Dam Discharge Recalculation Engineering, 014, 6, 731-74 Published Online October 014 in SciRes. http://www.scirp.org/journal/eng http://dx.doi.org/10.436/eng.014.611071 A Study on Physical Model Test for Cheongpyeong Dam Discharge

More information

Development of Design Tool for Low-Head Francis Turbine. * Corresponding author

Development of Design Tool for Low-Head Francis Turbine. * Corresponding author Proceedings of the International Symposium on Current Research in Hydraulic Turbines CRHT VI March 14, 2016, Turbine Testing Lab, Kathmandu University, Dhulikhel, Nepal Paper no. CRHT2016-20 Development

More information

THE CONSTRUCTION PHASES OF THE NEW NAGA HAMMADI BARRAGE COFFERDAMS

THE CONSTRUCTION PHASES OF THE NEW NAGA HAMMADI BARRAGE COFFERDAMS Ninth International Water Technology Conference, IWTC9 2005, Sharm El-Sheikh, Egypt 355 THE CONSTRUCTION PHASES OF THE NEW NAGA HAMMADI BARRAGE COFFERDAMS Yasser Shawky ( 1), Hala Badawy ( 2) (1) Researcher,

More information

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Monthly Progress Report Prepared by : Sano Milti Khola Hydropower Limited www.smi.com.np smi.investment.limited@gmail.com Date : January,

More information

DIVERSION CHANNEL OF BELO MONTE HPP

DIVERSION CHANNEL OF BELO MONTE HPP DIVERSION CHANNEL OF BELO MONTE HPP INTRODUCTION The diversion channel of Belo Monte HPP is an important engineering work which required the engagement of several specialties to be able to address all

More information

Brief Introduction of SH/MH Components and Civil Engineering aspects of SH/MH

Brief Introduction of SH/MH Components and Civil Engineering aspects of SH/MH Brief Introduction of SH/MH Components and Civil Engineering aspects of SH/MH Janak Das Koirala Treasurer - Nepal Micro Hydro Power Development Association (NMHDA) Executive Director - AG Power Company

More information

Effect of the Entrance Zone on the Trapping Efficiency of Desilting Tanks in Run-of-River Hydropower Plants

Effect of the Entrance Zone on the Trapping Efficiency of Desilting Tanks in Run-of-River Hydropower Plants Effect of the Entrance Zone on the Trapping Efficiency of Desilting Tanks in Run-of-River Hydropower Plants S. B. Weerakoon and U. S. Rathnayake Department of Civil Engineering, University of Peradeniya,

More information

DESIGN OF CHANNEL FLOW DIVERSION FACILITIES

DESIGN OF CHANNEL FLOW DIVERSION FACILITIES DESIGN OF CHANNEL FLOW DIVERSION FACILITIES FOR RIPARIAN HABITAT IRRIGATION BRUCE M. PHILLIPS, M.S., P.E. ABSTRACT Increased awareness and concern regarding environmental degradation has resulted in protection

More information

PRE FEASIBILITY REPORT NUKULOA MICRO HYDRO POWER PROJECT

PRE FEASIBILITY REPORT NUKULOA MICRO HYDRO POWER PROJECT Ministry of Infrastructure and Transport PRE FEASIBILITY REPORT NUKULOA MICRO HYDRO POWER PROJECT Prepared by : Department of Energy August, 2013 [DOE] 1 Table of Contents Summary... 3 1. Geographical

More information

Annex 5 - Hydropower Model Vakhsh

Annex 5 - Hydropower Model Vakhsh Annex 5 - Hydropower Model Vakhsh 1. The Vakhsh Cascade The construction of dams on the Vakhsh River started in the late 1950s with the construction of the Perepadnaya diversion and power station. Until

More information

Hydraulics of Jinnah Barrage; Existing Structure and Rehabilitation Alternatives

Hydraulics of Jinnah Barrage; Existing Structure and Rehabilitation Alternatives Pak. J. Engg. & Appl. Sci. Vol. 4, Jan 2009 (p. 66-73) Hydraulics of Jinnah Barrage; Existing Structure and Rehabilitation Alternatives Z. A. Chaudhry 1 1 Professor, Civil Engineering Department, University

More information

Physical models application of flow analysis in regulated reservoir dams

Physical models application of flow analysis in regulated reservoir dams River Basin Management III 15 Physical models application of flow analysis in regulated reservoir dams M. R. M. Tabatabai 1, S. Faghihirad 2 & M. Kolahdoozan 3 1 Water Engineering Department, Power and

More information

Water intake structures for hydropower

Water intake structures for hydropower Water intake structures for hydropower Dritan Bratko1, Alban Doko 1 Department of Hydraulic and Hydrotechnic, Universiteti Politeknik i Tiranes, Albania Department of Hydraulic and Hydrotechnic, Universiteti

More information

Module 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur

Module 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur Module 3 Irrigation Engineering Principles Lesson 8 Conveyance Structures for Canal Flows Instructional objectives On completion of this lesson, the student shall learn the following: 1. The need for structures

More information

Siphon Pipeline Resistance Characteristic Research

Siphon Pipeline Resistance Characteristic Research Available online at www.sciencedirect.com Procedia Engineering 28 (2012) 99 104 2012 International Conference on Modern Hydraulic Engineering Siphon Pipeline Resistance Characteristic Research Yan tao,

More information

Water Balance Assessment of the Roseires Reservoir

Water Balance Assessment of the Roseires Reservoir Kamalddin E. Bashar 1 and Mohanad O. Mustafa 2 1 UNESCO-Chair in Water Resources, Khartoum, Sudan 2 Ministry of Irrigation and Water Resources, Sudan Abstract Roseires Reservoir on the Blue Nile River

More information

Overview of BPC, its hydropower projects and Opportunities for further Development

Overview of BPC, its hydropower projects and Opportunities for further Development Overview of BPC, its hydropower projects and Opportunities for further Development Pratik Pradhan, Vice President BPC Nepal Power Investment Summit 2016 Kathmandu 1 June 2016 Content Overview of BPC Generation

More information

Irrigation Structures 1

Irrigation Structures 1 CHAPTER 8 Irrigation Structures 1 Dr. M. R. Kabir Professor and Head, Department of Civil Engineering University of Asia Pacific (UAP), Dhaka LECTURE 20 Diversion Head Works Definition: The works, which

More information

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp Geneva Dam Design of a Steep, Temporary, Riprap Ramp A Run-of of-river Dam Analysis for Geneva Dam Credit to: Yu-Chun Su, Ph.D., P.E., CFM David T. Williams. Ph.D., P.E, CFM Presentation Purpose History

More information

PROJECT INFORMATION AND SHORTLISTING CRITERIA FOR SCREENING OF CONSULTING FIRM. Tamakoshi V Hydroelectric Project

PROJECT INFORMATION AND SHORTLISTING CRITERIA FOR SCREENING OF CONSULTING FIRM. Tamakoshi V Hydroelectric Project PROJECT INFORMATION AND SHORTLISTING CRITERIA FOR SCREENING OF CONSULTING FIRM 1. PROJECT INFORMATION Intoduction: Tamakoshi V Hydroelectric Project The Tamakoshi-V Hydropower Project is a cascade development

More information

UNIT I: UNIFORM FLOW PART B

UNIT I: UNIFORM FLOW PART B UNIT I: UNIFORM FLOW PART-A 1 Define open channel flow with example BT-1-1 2 Distinguish between open channel flow and pipe flow. BT-4-1 3 Compute the hydraulic mean depth of a small channel 1m wide, 0.5m

More information

SEES 503 SUSTAINABLE WATER RESOURCES HYDROELECTRIC POWER. Assist. Prof. Dr. Bertuğ Akıntuğ

SEES 503 SUSTAINABLE WATER RESOURCES HYDROELECTRIC POWER. Assist. Prof. Dr. Bertuğ Akıntuğ SEES 503 SUSTAINABLE WATER RESOURCES HYDROELECTRIC POWER Assist. Prof. Dr. Bertuğ Akıntuğ Civil Engineering Program Middle East Technical University Northern Cyprus Campus SEES 503 Sustainable Water Resources

More information

Fig Micro-hydro s economy of scale ( based on data in 1985)

Fig Micro-hydro s economy of scale ( based on data in 1985) CHAPTER 1 INTRODUCTION 1.1 Purpose of the Manual for Micro-Hydro Development Micro-Hydroelectric Power, called as a Micro-Hydro, usually does not supply electricity to the national grid. They are used

More information

CASE STUDY OKUYOSHINO, JAPAN

CASE STUDY OKUYOSHINO, JAPAN SEDIMENT MANAGEMENT CASE STUDY OKUYOSHINO, JAPAN Key project features Name: Okuyoshino Country: Japan Category: bypass channel/tunnel Reservoir volume (original): 15.47 Mm 3 Installed capacity: 1,206 MW

More information

Glenfarg Hydropower Development. Hydro-potential in the Glenfarg area

Glenfarg Hydropower Development. Hydro-potential in the Glenfarg area Client: Glenfarg Renewable Energy Association Contract Start Date: May 2014 Report Reference: Contributors: Checked by: MNV/GF001/2011 Dr R C Johnson Rita Day Document Revisions: Status Version Date Final

More information

IMPACT AND PUNCTURING OF JARI TUNNEL AND ENLARGEMENT OF EXISTING TAPPINGS FOR ADDITIONAL WATER SUPPLY AND POWER GENERATION

IMPACT AND PUNCTURING OF JARI TUNNEL AND ENLARGEMENT OF EXISTING TAPPINGS FOR ADDITIONAL WATER SUPPLY AND POWER GENERATION 117 Paper No. 738 IMPACT AND PUNCTURING OF JARI TUNNEL AND ENLARGEMENT OF EXISTING TAPPINGS FOR ADDITIONAL WATER SUPPLY AND POWER GENERATION JAVED MUNIR, SYED ABBAS ALI, IRFAN MAHMOOD 118 Javed Munir,

More information

Address for Correspondence

Address for Correspondence Research Paper DYNAMIC FLOOD ROUTING AND UNSTEADY FLOW MODELLING: A CASE STUDY OF UPPER KRISHNA RIVER 1 Doiphode Sanjay L* 2 Oak Ravindra A. Address for Correspondence 1 M tech Student, Bharati Vidyapeeth

More information

Client: Budhi Gandaki Hydroelectric Project Development Committee. General Presentation

Client: Budhi Gandaki Hydroelectric Project Development Committee. General Presentation Client: Budhi Gandaki Hydroelectric Project Development Committee General Presentation 1. Background and objectives 2. Project location 3. Project information/features 4. Project performances 5. Environmental

More information

Asst.Prof.Dr. Jaafar S. Maatooq. 1 st Semester HYDRAULIC STRUCTUER, KINDS & FUNCTIONS 1 of 26

Asst.Prof.Dr. Jaafar S. Maatooq. 1 st Semester HYDRAULIC STRUCTUER, KINDS & FUNCTIONS 1 of 26 1 st Semester HYDRAULIC STRUCTUER, KINDS & FUNCTIONS 1 of 26 1 st Semester HYDRAULIC STRUCTUER, KINDS & FUNCTIONS 2 of 26 Water is often more useful to people when it is properly controlled, conveyed,

More information

Module 4. Hydraulic structures for flow diversion and storage. Version 2 CE IIT, Kharagpur

Module 4. Hydraulic structures for flow diversion and storage. Version 2 CE IIT, Kharagpur Module 4 Hydraulic structures for flow diversion and storage Lesson 1 Structures for Flow Diversion Investigation Planning and Layout Instructional objectives On completion of this lesson, the student

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

DEPARTMENT OF CIVIL ENGINEERING CE6403/ APPLIED HYDRAULIC ENGINEERING QUESTION BANK TWO MARKS UNIT I UNIFORM FLOW 1. Differentiate open channel flow from pipe flow. 2. What is specific energy and is the

More information

Solution for Irrigation Engineering

Solution for Irrigation Engineering Solution for Irrigation Engineering December 2015 Index Q.1) a). 2-3 b).3-5 c).5-6 d).6-8 e).9-10 Q.2) a).10-11 b). 12-14 c). 14-15 Q.3) a). 15-16 b). 17 c). 18 Q.4) a). N.A b). N.A c). N.A Q.5) a).20-22

More information

Small Hydro based energy generation

Small Hydro based energy generation Workshop on Capacity Development Program for Afghan Women (Clean Energy Access) Small Hydro based energy generation G Anil Head Small Hydro Power Dn., Energy Management Centre, Trivandrum 695017, Kerala,

More information

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016 SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri September 21, 2016 CONTENT Introduction Potential in Southeast Asia Challenges in Small Hydro Main Design Steps (Bad) Examples

More information

Design Modification of Sedimentation Tank Ashutosh Kumar Mall 1, Dr. ShriRam 2

Design Modification of Sedimentation Tank Ashutosh Kumar Mall 1, Dr. ShriRam 2 IJSRD - International Journal for Scientific Research & Development Vol. 2, Issue 09, 2014 ISSN (online): 2321-0613 Design Modification of Sedimentation Tank Ashutosh Kumar Mall 1, Dr. ShriRam 2 1 Post

More information

Outlet Flow Velocity in Circular Culvert

Outlet Flow Velocity in Circular Culvert Archives of Hydro-Engineering and Environmental Mechanics Vol. 61 (2014), No. 3 4, pp. 193 203 DOI: 10.1515/heem-2015-0013 IBW PAN, ISSN 1231 3726 Outlet Flow Velocity in Circular Culvert Wojciech Szpakowski

More information

4.2 Discharge measurement by Velocity Area Method (Chitale, 1974)

4.2 Discharge measurement by Velocity Area Method (Chitale, 1974) 4.2 Discharge measurement by Velocity Area Method (Chitale, 1974) This method comprises measuring the mean velocity V and the flow area 'A' and computing the discharge Q from the continuity equation. The

More information

of the Crump weir Modelling of composite type variation

of the Crump weir Modelling of composite type variation Modelling of composite type variation of the Crump weir Ashley Maritz BEng Honours Student Department of Civil Engineering University of Pretoria aamaritz9@gmail.com Dr Pieter Wessels Specialist Engineer

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: CULVERT DESIGN SPECIFIC SUBJECT: COUNTERSINKING AND LOW FLOW CONSIDERATIONS

More information

Flood control and safety evaluation of Banqiao reservoir

Flood control and safety evaluation of Banqiao reservoir Available online at www.sciencedirect.com Procedia Engineering 8 (01) 368 375 01 International Conference on Modern Hydraulic Engineering Flood control and safety evaluation of Banqiao reservoir GUAN Tie-sheng

More information

Abstract. 1. Main features of the Cua Dat scheme. Hong Giang VNCOLD. Hanoi Vietnam. the Northern Central The reservoir storage purposes: - water

Abstract. 1. Main features of the Cua Dat scheme. Hong Giang VNCOLD. Hanoi Vietnam. the Northern Central The reservoir storage purposes: - water The diversion works for the Cua Dat CFRD in Vietnam Michel Ho Ta Khanh, Dinh Sy Quat, Prof Pham Hong Giang VNCOLD No 95/10 Chua Boc Street Dong Da District Hanoi Vietnam Abstract The Cua Dat CFRD is constructed

More information

Analysis of Side Sluice in Trapezoidal Channel

Analysis of Side Sluice in Trapezoidal Channel Analysis of Side Sluice in Trapezoidal Channel Dr. L. G. Patil 1, Amol M. Kode 2 1 Associate Professor, Department of Civil Engineering, SGGSIE&T, Nanded 2 M. Tech Student, Department of Civil Engineering,

More information

Reservoir on the Rio Boba

Reservoir on the Rio Boba Reservoir on the Rio Boba Michael J. Burns II Guillermo Bustamante J. James Peterson Executive Summary The National Institute of Water Resources in the Dominican Republic (INDRHI) plans to construct a

More information

Water Control Structures Selected Design Guidelines Alberta Environment Page 13-1

Water Control Structures Selected Design Guidelines Alberta Environment Page 13-1 Alberta Environment Page 13-1 13.0 DROP INLET SPILLWAYS 13.1 General The drop inlet spillway is commonly used for providing flood protection for earth dams which have smaller reservoirs and/or smaller

More information

Elko Project Water Use Plan. Revised for Acceptance by the Comptroller of Water Rights

Elko Project Water Use Plan. Revised for Acceptance by the Comptroller of Water Rights Elko Project Water Use Plan Revised for Acceptance by the Comptroller of Water Rights 7 April 2005 B Elko Project Water Use Plan Revised for Acceptance by the Comptroller of Water Rights Elko Project

More information

Dam Safety and Low Cost Spillway Designs

Dam Safety and Low Cost Spillway Designs Dam Safety and Low Cost Spillway Designs By F. Lempérière & J.P. Vigny (Hydrocoop France) THE CHALLENGE 5 th International Conference on Dam Engineering Lisbon 14-16 February 2007 Increasing dams safety

More information

Tender Call No.: Likhu/GVN/Pkg-03/2012 OLUME III A 1 TABLE OF CONTENTS SALIENT FEATURES 1.0 SCOPE SALIENT FEATURES... 1

Tender Call No.: Likhu/GVN/Pkg-03/2012 OLUME III A 1 TABLE OF CONTENTS SALIENT FEATURES 1.0 SCOPE SALIENT FEATURES... 1 Table of contents OLUME III A 1 TABLE OF CONTENTS SALIENT FEATURES 1.0 SCOPE... 1 1.1 SALIENT FEATURES... 1 1.2 TRANSPORT LIMITATIONS... 8 1.3 DEVIATIONS FROM SPECIFICATIONS... 9 1.4 APPROVAL OF DRAWINGS...

More information

Hydro Electric Power (Hydel Power)

Hydro Electric Power (Hydel Power) Operating Principle Hydro Electric Power (Hydel Power) Hydro-electric power is generated by the flow of water through turbine, turning the blades of the turbine. A generator shaft connected to this turbine

More information

Outlet Structure Modeling

Outlet Structure Modeling Watershed Modeling using HEC-RAS Outlet Structure Modeling Jeff Wickenkamp, P.E., CFM, D.WRE Patrick Lach, P.E. Hey and Associates, Inc. Water Resources, Wetlands and Ecology Outline of Presentation Why

More information

3- Hydropower. Energy conversion and hydropower principles

3- Hydropower. Energy conversion and hydropower principles 3- Hydropower The hydraulic power is one of the oldest energy sources of the mankind, namely for irrigation and industry. Nowadays, small hydro is one of the most valuable answers to the question of how

More information

Irrigation System. BWCDD Zanjero Training 2/13/2008

Irrigation System. BWCDD Zanjero Training 2/13/2008 Irrigation System BWCDD Zanjero Training Session #7 2/13/2008 Irrigation System The (main) intake structure t directs water from the source of supply, such as a reservoir or a river, into the irrigation

More information

Final Drainage Report

Final Drainage Report Thornton Electric Substation Project Final Drainage Report December 14, 2016 DRAFT Prepared for: Xcel Energy, 1800 Larimer Street, Suite 400, Denver, Colorado 80202 Prepared by: 350 Indiana Street, Suite

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Energy Dissipaters DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] The design of permanent

More information

3.11 Sand Filter Basin

3.11 Sand Filter Basin 3.11 Sand Filter Basin Type of BMP Priority Level Treatment Mechanisms Maximum Drainage Area Flow-Through Treatment Priority 3 Treatment Control BMP Filtration 25 acres Description The Sand Filter Basin

More information

Mijo River Project. Steve Hall, Spencer Taylor, Jennie Purcell Brigham Young University 4/11/2012

Mijo River Project. Steve Hall, Spencer Taylor, Jennie Purcell Brigham Young University 4/11/2012 2012 Mijo River Project Steve Hall, Spencer Taylor, Jennie Purcell Brigham Young University 4/11/2012 Mijo River Project Steve Hall, Spencer Taylor, Jennie Purcell Winter 2012 Executive Summary The Mijo

More information

Level 6 Graduate Diploma in Engineering Hydraulics and hydrology

Level 6 Graduate Diploma in Engineering Hydraulics and hydrology 910-103 Level 6 Graduate Diploma in Engineering Hydraulics and hydrology Sample Paper You should have the following for this examination one answer book ordinary graph paper pen, pencil, ruler Work sheet

More information

Temporary Watercourse Crossing: Fords

Temporary Watercourse Crossing: Fords Temporary Watercourse Crossing: Fords DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

WASTEWATER TREATMENT (1)

WASTEWATER TREATMENT (1) Wastewater Engineering (MSc program) WASTEWATER TREATMENT (1) Prepared by Dr.Khaled Zaher Assistant Professor, Public Works Engineering Department, Faculty of Engineering, Cairo University Wastewater Flow

More information

STUDY 7.0 FISH PASSAGE

STUDY 7.0 FISH PASSAGE STUDY 7.0 FISH PASSAGE STUDY 7.0 FISH PASSAGE... 7-1 1. GOALS AND OBJECTIVES OF STUDY... 7-1 2. RELEVANT RESOURCE MANAGEMENT GOALS... 7-2 3. BACKGROUND AND EXISTING INFORMATION... 7-2 4. PROJECT NEXUS...

More information

PRELIMINARY DESIGN OF THE HYDRAULIC STRUCTURES DAM IN THE PISÃO RIVER

PRELIMINARY DESIGN OF THE HYDRAULIC STRUCTURES DAM IN THE PISÃO RIVER PRELIMINARY DESIGN OF THE HYDRAULIC STRUCTURES DAM IN THE PISÃO RIVER Margarida Isabel Godinho Sobral Department of Civil Engineering and Architecture, Instituto Superior Técnico - Lisbon, Portugal SUMMARY

More information

MCKAYS CREEK HYDRO-ELECTRIC POWER SCHEME ENHANCEMENT FEASIBILITY AND SCOPING REPORT PREPARED FOR SCHEME RECONSENTING

MCKAYS CREEK HYDRO-ELECTRIC POWER SCHEME ENHANCEMENT FEASIBILITY AND SCOPING REPORT PREPARED FOR SCHEME RECONSENTING i MCKAYS CREEK HYDRO-ELECTRIC POWER SCHEME ENHANCEMENT FEASIBILITY AND SCOPING REPORT PREPARED FOR SCHEME RECONSENTING ii Table of contents 1 Enhancement Scope of Work 1 1.1 Introduction 1 2 McKays Intake

More information

Sanitary and Environmental Engineering I (4 th Year Civil)

Sanitary and Environmental Engineering I (4 th Year Civil) Sanitary and Environmental Engineering I (4 th Year Civil) Prepared by Dr.Khaled Zaher Assistant Professor, Public Works Engineering Department, Faculty of Engineering, Cairo University Wastewater Flow

More information

2. Andhikhola Hydro Electric & Rural Electrification Project (5.1MW):

2. Andhikhola Hydro Electric & Rural Electrification Project (5.1MW): 1. Tinau Hydro Power Project (1MW): Undertook the design of dam and intake rehabilitation works as well as supervision of construction for the project. Client: Nepal Electricity Authority Place of Work:

More information

DETERMINATION OF DISCHARGE COEFFICIENT AND HEAD-DISCHARGE RELATIONSHIPS OF DIFFERENT HYDRAULIC STRUCTURES

DETERMINATION OF DISCHARGE COEFFICIENT AND HEAD-DISCHARGE RELATIONSHIPS OF DIFFERENT HYDRAULIC STRUCTURES Journal of Indian Water Resources Society, Vol 34, No.1, January, 2014 DETERMINATION OF DISCHARGE COEFFICIENT AND HEAD-DISCHARGE RELATIONSHIPS OF DIFFERENT HYDRAULIC STRUCTURES P. P. Dabral 1, P. K. Pandey

More information

APPLICATION FORM AF-50: CONSENT UNDER SECTION 50, ARTERIAL DRAINAGE ACT, 1945

APPLICATION FORM AF-50: CONSENT UNDER SECTION 50, ARTERIAL DRAINAGE ACT, 1945 APPLICATION FORM AF-50: CONSENT UNDER SECTION 50, ARTERIAL DRAINAGE ACT, 1945 APPLICATION DETAILS Name of Applicant: Company / authority: Address: Date of Application: Client (if appropriate): BRIDGE DETAILS

More information

ANDHIKHOLA HYDRO ELECTRIC & RURAL ELECTRIFICATION PROJECT (5.LMW):

ANDHIKHOLA HYDRO ELECTRIC & RURAL ELECTRIFICATION PROJECT (5.LMW): TINAU HYDRO POWER PROJECT (L MW): Undertook the design of dam and intake rehabilitation works as well as supervision of construction for the project. Client: Nepal Electricity Authority Place of Work:

More information

Water Budget III: Stream Flow P = Q + ET + G + ΔS

Water Budget III: Stream Flow P = Q + ET + G + ΔS Water Budget III: Stream Flow P = Q + ET + G + ΔS Why Measure Streamflow? Water supply planning How much water can we take out (without harming ecosystems we want to protect) Flood protection How much

More information

APPLICATION OF 1-D HEC-RAS MODEL IN DESIGN OF CHANNELS

APPLICATION OF 1-D HEC-RAS MODEL IN DESIGN OF CHANNELS APPLICATION OF 1-D HEC-RAS MODEL IN DESIGN OF CHANNELS Darshan J. Mehta * Mr. Manthan Ramani Mr. Maulik Joshi Asst. Prof., CED, S.S.A.S.I.T, Surat U.G, Student, CED, S.S.A.S.I.T, Surat U.G, Student, CED,

More information

Measuring flow in open channels (weirs)

Measuring flow in open channels (weirs) The 20 th week Measuring flow in open channels (weirs) Broad-Crested and Sharp-Crested Weirs Weirs are overflow structures that alter the flow so that: 1. Volumetric flow rate can be calculated, 2. Flooding

More information

Lab #3 Conservation Equations and the Hydraulic Jump CEE 331 Fall 2004

Lab #3 Conservation Equations and the Hydraulic Jump CEE 331 Fall 2004 CEE 33 Lab 3 Page of 8 Lab #3 Conservation Equations and the Hydraulic Jump CEE 33 Fall 004 Safety The major safety hazard in this laboratory is a shock hazard. Given that you will be working with water

More information

Water Budget III: Stream Flow P = Q + ET + G + ΔS

Water Budget III: Stream Flow P = Q + ET + G + ΔS Water Budget III: Stream Flow P = Q + ET + G + ΔS Why Measure Streamflow? Water supply planning How much water can we take out (without harming ecosystems we want to protect) Flood protection How much

More information

Mathematical Modelling in the Process of Operating the Channel Hydropower Plants

Mathematical Modelling in the Process of Operating the Channel Hydropower Plants Peter Dušička, Radomil Květon Mathematical ling in the Process of Operating the Channel Hydropower Plants Several channel power plants are established in Slovakia. Most of them are located on river Vah

More information

Wetted Perimeter Assessment Shoal Harbour River Shoal Harbour, Clarenville Newfoundland. Submitted by: Submitted to: January 8, 2003 TF05205

Wetted Perimeter Assessment Shoal Harbour River Shoal Harbour, Clarenville Newfoundland. Submitted by: Submitted to: January 8, 2003 TF05205 Shoal Harbour, Clarenville Newfoundland Submitted by: James H. McCarthy AMEC Earth & Environmental Limited 95 Bonaventure Ave. St. John s, NL A1C 5R6 Submitted to: Mr. Kirk Peddle SGE-Acres 45 Marine Drive

More information

Water Budget III: Stream Flow P = Q + ET + G + ΔS

Water Budget III: Stream Flow P = Q + ET + G + ΔS Water Budget III: Stream Flow P = Q + ET + G + ΔS Why Measure Streamflow? Water supply planning How much water can we take out (without harming ecosystems we want to protect) Flood protection How much

More information

COMMENTS BY LAO PDR ON THE MRCS TECHNICAL REVIEW REPORT OF THE PROPOSED XAYABURI DAM PROJECT

COMMENTS BY LAO PDR ON THE MRCS TECHNICAL REVIEW REPORT OF THE PROPOSED XAYABURI DAM PROJECT COMMENTS BY LAO PDR ON THE MRCS TECHNICAL REVIEW REPORT OF THE PROPOSED XAYABURI DAM PROJECT 4. Technical Review 4.1 Xayaburi Hydropower Dam Design and Operation 4.1.1 Basic information on project layout,

More information

Open Channel Flow. Ch 10 Young, Handouts

Open Channel Flow. Ch 10 Young, Handouts Open Channel Flow Ch 10 Young, Handouts Introduction Many Civil & Environmental engineering flows have a free surface open to the atmosphere Rivers, streams and reservoirs Flow in partially filled pipes

More information

A techno-economical view on energy losses at hydropower dams (case study of Karun III Dam and Hydropower Plant)

A techno-economical view on energy losses at hydropower dams (case study of Karun III Dam and Hydropower Plant) Computational Methods in Multiphase Flow VI 253 A techno-economical view on energy losses at hydropower dams (case study of Karun III Dam and Hydropower Plant) M. Jorabloo 1, M. Abdolahpour 2, R. Roshan

More information

Afon Claerwen Hydropower Project. Flood Risk Assessment. February 2018

Afon Claerwen Hydropower Project. Flood Risk Assessment. February 2018 Afon Claerwen Hydropower Project Flood Risk Assessment February 2018 Hydropower Consultancy & Development Document Control Scheme Name: Client Name: Client Address: Afon Claerwen Hydropower Project Elan

More information

Basic Design of Replogle Flumes

Basic Design of Replogle Flumes ITRC Report No. R 02-010 IRRIGATION TRAINING AND RESEARCH CENTER California Polytechnic State University San Luis Obispo, California 93407 www.itrc.org Basic Design of Replogle Flumes Replogle flumes are

More information

Some aspects of the sediment transit on the Mekong river in relation with hydropower development

Some aspects of the sediment transit on the Mekong river in relation with hydropower development Some aspects of the sediment transit on the Mekong river in relation with hydropower development Daniel Loudière Société Hydrotechnique de France A presentation in three parts - the situation when starting

More information

Water Budget III: Stream Flow P = Q + ET + G + ΔS

Water Budget III: Stream Flow P = Q + ET + G + ΔS Water Budget III: Stream Flow P = Q + ET + G + ΔS Why Measure Streamflow? Water supply planning How much water can we take out (without harming ecosystems we want to protect) Flood protection How much

More information

Numerical unsteady flow model simulation during the sluice closure of Caruachi Dam

Numerical unsteady flow model simulation during the sluice closure of Caruachi Dam Hydraulics of Dams and River Structures Yazdandoost & Attari (eds) 2004 Taylor & Francis Group, London, ISBN 90 5809 632 7 Numerical unsteady flow model simulation during the sluice closure of Caruachi

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information

Irrigation Crossing Structures

Irrigation Crossing Structures Irrigation Crossing Structures Road Open channel H.R. Open Irrigation Canal Tail escape Water way + Road way Culvert Bridge Water way + Water way Syphon Aqueduct Retaining walls Lining ١ 1- FUNCTION AND

More information