XPM 2. Reflow Soldering / Curing Systems. Site Preparation & Installation

Size: px
Start display at page:

Download "XPM 2. Reflow Soldering / Curing Systems. Site Preparation & Installation"

Transcription

1 XPM 2 Reflow Soldering / Curing Systems Site Preparation & Installation Site Preparation & Installation 1 Revision Date: May 2004

2 Table of Contents SITE PREPARATION CHECKLIST 3 ROOM PLANNING 4 Oven Clearances 4 XPM 2 Installation Drawing 5 FACILITY SERVICES & CONNECTIONS 6 Exhaust Specifications 6 Electrical Power 8 Nitrogen Supply (optional) 10 Compressed Air Supply 11 External Coolant Supply 11 OVEN RECEIPT & HANDLING 12 Receiving Inspection 12 Unpacking the Oven 13 Positioning & Pre-Leveling the Oven 14 Connect the Hood Interlock Switch 14 Connecting The Computer System 15 Site Preparation & Installation 2 Revision Date: May 2004

3 SITE PREPARATION CHECKLIST Prior to Vitronics Soltec installing / commissioning the solder reflow system (oven), the oven must be placed in line, pre-leveled, and connected to the required facilities by the customer. The checklist below should be reviewed and completed prior to requesting a site visit by a Vitronics Soltec Service Engineer. Reference the XPM 2 Installation Drawing and additional requirements herein for details. Exhaust system correctly sized and located? * Electrical power and main circuit breaker switch properly rated, installed and provided to the oven? * Nitrogen source correctly sized, located and plumbed to the oven? Compressed air supply correctly sized, located and plumbed to the oven? * External coolant supply available with proper hose lines and connections? Oven placed in position and pre-leveled? * Configuration dependent, consult purchase order and equipment specifications for details. Site Preparation & Installation 3 Revision Date: May 2004

4 ROOM PLANNING XPM 2 MODEL / / LENGTH (in/cm) 139 / / / / 630 WIDTH (in/cm) 52 / / / / 132 HEIGHT (in/cm) 57 / / / / 144 WEIGHT (lb/kg) 2800 / / / / 2770 Oven And Skid LENGTH (in/cm) 172 / / / / 617 WIDTH (in/cm) 67 / / / / 171 HEIGHT (in/cm) 65 / / / / 165 WEIGHT (lb/kg) 3000 / / / / 2885 Oven And Crate LENGTH (in/cm) 177 / / / / 724 WIDTH (in/cm) 67 / / / / 171 HEIGHT (in/cm) 76 / / / / 193 WEIGHT (lb/kg) 3425 / / / / 3125 Oven Clearances A full 36 clearance space should be provided around front and rear of the oven to allow for a safe working area. All applicable Codes and Regulations should be considered when providing service space. Oven Height listed is with the Hood down and does not include ductwork. Access Doors and other openings should be large enough to accommodate the personnel and equipment involved in moving and placing the oven. Allow approximately 6" (15 CM) of clearance above the oven for lifting. Floor The oven must be located on a level, dust free concrete floor not subject to vibration from other equipment or passing fork trucks. Vibration in the floor may cause problems with the oven 's conveyors and the printed circuit boards being processed. Air Conditioning Air Conditioning Load for all oven Models is not more than 35,000 BTU/ hour. The system is designed to operate within the following environmental conditions: Temperature: 55 to 90 o F (13 to 32 o C) Humidity: 20 to 90% Non Condensing Site Preparation & Installation 4 Revision Date: May 2004

5 Site Preparation & Installation 5 Revision Date: May 2004

6 FACILITY SERVICES & CONNECTIONS Exhaust Specifications Number of Connections per Oven 2 Oven Exhaust Duct Size 8 Facility Duct Material High Temperature Flexible Hose Rated For C Minimum Onload Stack ( Entrance ) Offload Stack ( Exit ) CFM IWC CFM IWC Standard Air or N to to With Polar Cooling or Controlled Cooling With Integrated Exhaust Stack Filter to to to to CFM = Cubic Feet Per Minute IWC = Inches of Water Column Note: On ovens equipped with the Exhaust Sensing System option, insufficient exhaust flow will cause an oven alarm condition if the exhaust flow is below the minimum setpoint. Exhaust Measurement Detail End View - Service Position Shown Site Preparation & Installation 6 Revision Date: May 2004

7 Exhaust Specifications (continued) The oven requires one main facility exhaust connection branched into two sections and connected to the exhaust ducts/ vents on the oven. The main facility drop should be offset to the rear of the oven by approximately two feet. The connecting hose must be flexible and durable enough to allow for the opening and closing of the Hood / upper heat zone for servicing. The installation of adjustable dampers (as shown below) in the exhaust connection is required to allow flow adjustments as necessary. Flow dampers must be installed 40 inches above the top of the oven duct / vent. The Customer is responsible for supplying the main exhaust drop, the two branch sections, flow dampers and hose clamps to connect to the oven ducts/vents. Adjustable dampers located approximately 40 (102 cm) above the oven duct / vent in each branch. Examples of Acceptable Exhaust Configurations Site Preparation & Installation 7 Revision Date: May 2004

8 Electrical Power Vitronics Soltec electrical wiring design is based on the USA National Electrical Code (NFPA-70 & 79) from the National Fire Protection Association guidelines and European Standard EN Vitronics Soltec makes no claims or warranties for compliance to any other standard or any local, state, federal or country codes, expressed or implied. Unless purchased as an option, XPM 2 ovens are not equipped with a main circuit breaker disconnect switch. A properly rated fused disconnect or main circuit breaker switch, facility power cable and connection to the oven switch must be supplied by the customer and installed by a qualified electrician in accordance with applicable regulations and codes. Estimating Power Requirements Refer to the Electrical Configuration on the Purchase Order for the oven or the oven s Nameplate Data to determine the voltage. CAUTION: Incorrect voltage can result in extensive damage to the oven. The Electrical values in the data tables are based on Vitronics Standard Factory Settings for power management. Modification to the power management settings in the Oven Control Software may render these numbers invalid XPM 2 Current Draw at Start-up in Amperes (kva) MODEL / / vac, 3 ph 110 (38) 120 (42) 120 (42) 120 (42) 208 vac, 3 ph 120 (43) 120 (43) 120 (43) 120 (45) 220 vac, 3 ph 120 (46) 125 (48) 125 (48) 130 (50) 240 vac, 3 ph 125 (52) 130 (54) 135 (56) 140 (58) 380 vac, 3 ph 55 (36) 60 (39) 60 (39) 65 (43) 400 vac, 3 ph 60 (42) 65 (45) 65 (45) 65 (45) 415 vac, 3 ph 60 (43) 65 (47) 65 (47) 70 (50) 440 vac, 3 ph 60 (46) 65 (50) 65 (50) 70 (53) 480 vac, 3 ph 65 (54) 70 (58) 70 (58) 70 (58) Power Connections Connect the power and ground cables from the dedicated service (fused disconnect or circuit breaker) to the power connectors located inside equipment access door located at the front-right corner of the oven. Connect and secure the cables to the power and ground blocks. A hex wrench for socket head screws will be needed to tighten the power connections after inserting the supply conductors. The Circuit Breaker also uses socket head screws for securing the conductors. Site Preparation & Installation 8 Revision Date: May 2004

9 Grounding A dedicated equipment ground from the facility distribution panel for the oven is required to comply with Article 250 of the National Electrical Code. The equipment ground is necessary for the safety of personnel as well for safe and reliable oven operation. All grounding and service wiring should be installed and tested by a qualified licensed electrician. Power Quality The oven control systems do not condition the facility supplied power to the oven. For proper operation, the power must be maintained at a "cleanliness level" of less than 10% of High frequency (200V rise / microsecond) noise on the input voltage. The AC voltage supplied to the oven must be + 10% of the stated voltage. (For example 220 VAC must be between 198VAC and 242 VAC). The voltage frequency must be within + 1% limit of the stated frequency. For 3 Phase power, any line to neutral voltage must be within + 5% of the arithmetic mean of the three line to neutral voltages. Any and all damage, service and costs resulting from poorly conditioned facility power is solely the responsibility of the customer. Power Distribution A dedicated facility electrical distribution panel is recommended. Avoid powering heavy duty, electrically noisy equipment from the same panel as the oven; such as: Heavy air conditioners Elevators Heaters Office equipment Fluorescent lights Air ionizers High current motors such as electric drills or water pumps Welders Placement equipment Electromagnetic Fields As with all electronically controlled equipment, the oven should be installed in an area not affected by electromagnetic fields generated by other pieces of equipment. Uninterruptable Power Supply Systems Vitronics Soltec offers as and option, a UPS system for the oven which operates the oven conveyor, computer / control system and hood lifts for approximately five minutes after loss of facilities operating power. Consult the purchase order for configuration. It is important to note that neither UPS option will operate the oven heaters or cell fans. Site Preparation & Installation 9 Revision Date: May 2004

10 Nitrogen Supply (optional) Oven Model / / N 2 Process volume [low] CFH (M 3 /hr) 400 (12) 600 (17) 800 (23) 1000 (28) N 2 Process volume [high] CFH (M 3 /hr) 1400 (40) 1600 (45) 1800 (51) 2000 (57) N 2 volume [w/quick atmosphere purge] 2500 CFH (71 M 3 /hr) Pressure regulated to PSI ( Bar) Fitting size 1/2" Female National Pipe Thread (FNPT) Supply pipe size 1/2" Nitrogen purity [typical] * % Moisture content Oxygen content [typical] * < 1 Volume Parts per Million 70 o C < 5 Parts per Million (PPM) * Multiple grades of Nitrogen are available. The following table is provided for reference to the incoming Nitrogen supply. The actual atmosphere within the tunnel will vary depending on oven configuration and process parameters. Typical atmosphere performance will yield O 2 levels greater than the source N 2 purity. %N2 Purity N 2 PPM O 2 PPM % % % % % % % % % The oven is equipped with a pressure regulator and gauge for control of the nitrogen supply. Site Preparation & Installation 10 Revision Date: May 2004

11 Compressed Air Supply Pressure [Basic] regulated to PSI ( Bar) Pressure [N 2 /Air Switching option] regulated to PSI ( Bar) Volume CFH, ( M 3 /hr ) Fitting size 1/2" National Pipe Thread (NPT) Supply pipe size 1/2" The oven is equipped with a pressure regulator and gauge for control of the compressed air supply. External Coolant Supply For N2 ovens not equipped with Polar Cooling or Controlled Cooling options, must have a facility coolant supply to the oven. Temperature Flow rate Pressure (minimum) sensor trips at 50 psig Fitting size / type Coolant medium Alternative Coolant medium PH Particulate 20 C +/- 5 C gpm ( liter/min) minimum flow sensor trips at 0.5 gpm 2 Cooling zones 20 PSI (1.4 Bar) 3 Cooling zones 30 PSI (2.1 Bar) 4 Cooling zones 40 PSI (2.8 Bar) 3/8 FPT (Supply must be 3/8 MPT) Supercool (Inhibited Propylene Glycol and distilled water mixture) Pure distilled water Note: flushing frequency increases 2-6X that of Supercool. Caution: De-ionized water is NOT to be used (attacks brass and copper) Neutral Filtered to at least 100microns Site Preparation & Installation 11 Revision Date: May 2004

12 OVEN RECEIPT & HANDLING Receiving Inspection A complete inspection of the oven should be conducted and any discrepancies noted. Shipping indicators, (see examples below), are mounted to the inside of the oven before shipping from the factory. These indicators should be checked and the as received condition recorded as part of the receiving inspection process. If the oven shipping crate/packaging shows any signs of damage or rough handling, a notice should be filed with the shipper at the time of receipt. Tip Indicator Example Shock Indicator Example Site Preparation & Installation 12 Revision Date: May 2004

13 Unpacking the Oven The XPM2 is a piece of large industrial equipment. Only qualified fork lift operators or riggers should unpack, move, and position the oven. Keep fingers, hands and feet clear at all times while lifting and positioning the oven. CAUTION: Failure to follow the sequence described may result in injury or damage to the oven. Ovens are shipped secured to a wooden pallet (skid) and plastic wrapped. Where required the oven may be crated and foil bagged. If crated, remove the top section of the crate first, the shorter end panels next and the longer side sections last. Cut open and remove the barrier bag and plastic wrapping material. Remove the auxiliary equipment boxes from the skid - be sure to save the original packing material and boxes in the event a return shipment may be necessary for any reason. Unbolt and remove the shipping brackets (as shown), located at the each end the skid/ oven before lifting the oven Once the shipping brackets are unbolted and removed from the oven and the area is cleared of shipping material the oven may be lifted with a fork truck and placed on movable wheeled dollies capable of supporting the oven's weight. Make sure the lifting forks are at least 6 feet (1.8 cm) long and enter from the rear of the oven only. Forks should be positioned to lift from the measured center of the oven. Raise the oven high enough to allow the skid to be removed from under the oven. Make sure the oven is balanced properly on the dollies before removing the fork truck. On 7 and 10 zones oven s use two dollies, one under each end. On 13 and 16 zone ovens use three dollies, one under each end and one under a middle crossmember to evenly support the oven weight. Site Preparation & Installation 13 Revision Date: May 2004

14 Positioning & Pre-Leveling the Oven Once the oven has been lifted from the shipping skid and placed securely on wheeled dollies, it may be moved to the designated location. The leveling feet are not casters or wheels and may be damaged if the oven is pushed or slid along the floor. The oven must be lifted and placed in position. Once in place, adjust all of the feet down to an equal setting before the oven is removed from the dollies. This preliminary adjustment assumes that the oven will be placed on a level floor surface. The oven may then be lifted with a fork truck and set carefully in place. Make sure to position the lifting forks at the measured center of the oven. For pre-leveling, the oven does not need to be lifted to adjust the height. The adjustable leveling feet are designed and should be used as a jacking mechanism. The locking nut on each foot can be loosened and the foot turned clockwise or counter-clockwise to raise or lower the oven. The preliminary or pre-leveling operation requires a 2 foot level and tape measure. 1. Measure the transport height of the up / down stream conveyors. 2. Start at the Onload (in-feed) end, adjust the oven leveling foot at the front corner legs until the conveyor height agrees with the transport height of the up / down stream conveyors. 3. Place the level across the conveyor at the Onload end of the oven and adjust the leveling feet to level the conveyor across the Onload end. 4. Do the same for the Offload (out-feed) end of the oven. 5. Once the Onload and Offload ends of the aligned and leveled to the up / down stream conveyors, adjust the center leveling feet until pressure is felt with the floor surface. When finished, all leveling feet must be firmly placed against the floor equally supporting the oven weight. 6. The Vitronics Soltec Service Engineer will perform a final leveling procedure to ensure that the oven is straight, flat, and free of twist Connect the Hood Interlock Switch The switch which detects if the hood position is down is removed from its mounting location to avoid damage during shipping. This switch is located behind the corner door located below the post for the monitor. Remove the tape from the switch, remove the locking nut and insert the switch through the hold shown. Replace the locking nut on top of the cabinet to hold the switch into position. The switch is already pre-wired. Site Preparation & Installation 14 Revision Date: May 2004

15 Connecting The Computer System The computer system must be set up and connected to the oven. Unpack the computer, monitor, and keyboard and place them on the tower as shown. A B C A. The computer case is installed behind the corner door located below the post for the monitor. All of the cables to be connected to the rear of the computer are pre-wired to that location. B. Connect the cables for the power, monitor, data connection, keyboard and mouse. Be sure cables are secured and will not come in contact with any chains or belts inside of the oven. C. Install the monitor and keyboard tray as shown. There is a cover included for the bottom of the keyboard tray to enclose the wiring. D. The cables needed are prewired to the post. Make all connections as shown. If a light tower was ordered (as an option) install and connect it to the top of the post at this time. D This completes the setup of the oven. You are now ready for a site visit by a Vitronics Soltec Service Engineer to start up the equipment. Site Preparation & Installation 15 Revision Date: May 2004

Gerber. Scientific Products. Dear Gerber Sabre Customer:

Gerber. Scientific Products. Dear Gerber Sabre Customer: Gerber Scientific Products 151 Batson Drive, Manchester, CT 06040 (860) 643-1515 Dear Gerber Sabre Customer: Thank you for purchasing the Sabre, Gerber Scientific Products advanced, high-speed, three-dimensional

More information

Gerber M Series Site Requirements

Gerber M Series Site Requirements Gerber M Series Site Requirements Preparing for the arrival of your new machine. P rior to the arrival of your Gerber M Series Cutting System there are certain things you can prepare to facilitate a quick

More information

CRON HDI-920 Site Planning. Customer Responsibilities

CRON HDI-920 Site Planning. Customer Responsibilities Customer Responsibilities CRON HDI-920 Site Planning You are responsible for providing the following items below to help ensure a trouble free installation. Adequate delivery access (i.e. Company Loading

More information

Gerber Scientific Products

Gerber Scientific Products Page 1 of 9 Sabre Series Router Pre-Installation Checklist Gerber FastFact # 5003 Supplied by: Gerber Service Last Modified: June 28, 2012 Summary: This document provides the Pre-Installation for your

More information

E-Series Installing E-Series U Cabinet

E-Series Installing E-Series U Cabinet E-Series Installing E-Series 3040 40U Cabinet September 2018 215-13048_A0 doccomments@netapp.com Table of Contents 3 Contents Overview and specifications... 4 Cabinet features... 4 Power requirements

More information

Pre-installation Manual. Plate Processor 68/85 Thermal

Pre-installation Manual. Plate Processor 68/85 Thermal Pre-installation Manual Plate Processor 68/85 Thermal Pre-installation Manual Plate Processor 68/85 Thermal T1965 Edition DC, October 2011 Part No 51280 68/85 PLATE PROCESSOR INTRODUCTION RESERVATIONS

More information

B. Provide equipment complying with this specification and manufactured by one of the following:

B. Provide equipment complying with this specification and manufactured by one of the following: SECTION 230910 PAINT SPRAY BOOTH PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide Paint Spray Booth, Prep Booth and Paint Mix Room, and associated ventilation equipment, complying with the

More information

SYSTEM 600 BILL CHANGER INSTALLATION INSTRUCTIONS Congratulations...

SYSTEM 600 BILL CHANGER INSTALLATION INSTRUCTIONS Congratulations... www.standardchange.com 1-800-968-6955 Technical Phone Support is from 8:00AM to 7:30PM E.S.T., Monday-Friday Walk-in Service is from 8:00AM to 4:30PM E.S.T., Monday-Friday Parts Department is from 8:00AM

More information

Power Distribution Center. Model: SUDC208V42P

Power Distribution Center. Model: SUDC208V42P Warranty Registration: register online today for a chance to win a FREE Tripp Lite product www.tripplite.com/warranty Owner s Manual Power Distribution Center Model: SUDC208V42P Note: This product requires

More information

EXIRA EXPOSED PIPE SHOWER INSTALLATION

EXIRA EXPOSED PIPE SHOWER INSTALLATION SKU(s): 923583 EXIRA EXPOSED PIPE SHOWER INSTALLATION BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing plumbing fixtures. Signature Hardware accepts no liability

More information

! CAUTION: Read and follow these instructions.

! CAUTION: Read and follow these instructions. OmniLog SAFETY AND INSTALLATION INSTRUCTIONS! CAUTION: Read and follow these instructions. Avoid Contact with Hazardous Live Parts WARNING: Risk of electrical shock. Refer servicing to qualified personnel.

More information

Installation and Operation Manual

Installation and Operation Manual Installation and Operation Manual Maintenance Bypass Panel Model: SU2030KMBP Tripp Lite follows a policy of continuous improvement. Product specifications are subject to change without notice. 1111 West

More information

Pre-installation Manual CONCEPT 301 D/401 D/501 D

Pre-installation Manual CONCEPT 301 D/401 D/501 D Pre-installation Manual CONCEPT 301 D/401 D/501 D Pre-installation Manual CONCEPT 301 D/401 D/501 D Concept 301 D T11416 Edition BA, January 2015 This book has part No 10077155 0-2 This manual is published

More information

DO NOT INSTALL, OPERATE OR SERVICE PRODUCT WITHOUT HAVING READ AND FULLY UNDERSTAND ALL SAFETY PROCEDURES, WARNINGS, INSTALLATION AND OPERATING

DO NOT INSTALL, OPERATE OR SERVICE PRODUCT WITHOUT HAVING READ AND FULLY UNDERSTAND ALL SAFETY PROCEDURES, WARNINGS, INSTALLATION AND OPERATING DO NOT INSTALL, OPERATE OR SERVICE PRODUCT WITHOUT HAVING READ AND FULLY UNDERSTAND ALL SAFETY PROCEDURES, WARNINGS, INSTALLATION AND OPERATING INSTRUCTIONS ENCLOSED IN THIS OWNER S MANUAL. 2 SAFETY PROCEDURES

More information

SPECIAL SPECIFICATION 6499 Environmentally controlled Communications Building

SPECIAL SPECIFICATION 6499 Environmentally controlled Communications Building 2004 Specifications CSJ 0720-03-095 SPECIAL SPECIFICATION 6499 Environmentally controlled Communications Building 1. Description. Furnish and install Environmentally Controlled Communications Building

More information

TRS100 Rapid Assay System Pre-Installation Guide

TRS100 Rapid Assay System Pre-Installation Guide TRS100 Rapid Assay System Pre-Installation Guide NOTICE: This document contains references to Cobalt or Cobalt Light Systems. Please note that Cobalt Light Systems was purchased by Agilent in July 2017.

More information

INSTALLATION GUIDE. 4-Post Lift. Model United States. United Arab Emirates. Egypt.

INSTALLATION GUIDE. 4-Post Lift. Model United States. United Arab Emirates. Egypt. 4-Post Lift INSTALLATION GUIDE United States 17779 Main Street Suite C Irvine, CA 92614 USA Tel: +1(949) 333-3800 Fax: +1(949) 333-3804 United Arab Emirates Model 46614 P.O. Box 121971 Saif Zone A2-032

More information

RENA XPS-3000 Base. User Guide. SC2000 Media Transport System

RENA XPS-3000 Base. User Guide. SC2000 Media Transport System SC2000 Media Transport System User Guide Please refer to your PS-2000 User Guide for information on the print system that may be attached to this base. NOTE: The SC2000 is also available in a stand-alone

More information

NEUTRAL GROUNDING TRANSFORMERS INSTALLATION AND MAINTENANCE INSTRUCTIONS

NEUTRAL GROUNDING TRANSFORMERS INSTALLATION AND MAINTENANCE INSTRUCTIONS 1 Table of Contents SECTION 1 Unpacking... 3 1.1 Shipping... 3 1.2 Receiving... 3 SECTION 2 Installation... 3 SECTION 3 Inspection... 4 SECTION 4 Connection... 4 4.1 Neutral Lead... 5 4.2 Ground Lead...

More information

Instructions for the use of the Link 4 Pallet Rack Lifter (PRL) model 5000

Instructions for the use of the Link 4 Pallet Rack Lifter (PRL) model 5000 Instructions for the use of the Link 4 Pallet Rack Lifter (PRL) model 5000 (How to move your pallet racking using the Link 4 Pallet Rack Lifter) This process is for a typical rack move and reset. Each

More information

BINAR Quick-Lift System

BINAR Quick-Lift System BINAR Quick-Lift System Install and Training Original Document - July 1, 2015 1 What to expect The installation, set-up, and training process takes an average of 1.5 days (12 hours) per unit. On the first

More information

XAP Series Busduct Storage, Installation, and Maintenance

XAP Series Busduct Storage, Installation, and Maintenance Instruction Booklet IB Joint cover Tap-off Units Contents Description Introduction............................................................... Receiving...............................................................

More information

You will probably need to perform this procedure in the loading dock area of the building. A fork lift or chain hoist may be needed.

You will probably need to perform this procedure in the loading dock area of the building. A fork lift or chain hoist may be needed. This chapter contains the following sections: Unpacking a Cisco R-Series Rack, page Remove the Packaging, page Accessories, page 3 Safety Guidelines, page 4 Removing the Cisco Cisco R4262 Rack from the

More information

Ground Fault Protection. Medium Voltage Artificial Neutrals

Ground Fault Protection. Medium Voltage Artificial Neutrals Ground Fault Protection Medium Voltage Artificial Neutrals Installation and Maintenance Instruction Manual 7615 Kimbel Street, Mississauga, Ontario Canada L5S 1A8 Tel: (905)673-1553 Fax: (905)673-8472

More information

Truck and Large Equipment. Galvanized Spray Booths. Global Finishing Solutions

Truck and Large Equipment. Galvanized Spray Booths. Global Finishing Solutions Global Finishing Solutions Truck and Large Equipment Galvanized Spray Booths > Heavy-Duty Construction > Inside Accessible Energy Efficient Light Fixtures > and - Models > Expandable Modular Designs GFS

More information

Maintenance Bypass Breaker Cabinet Series Configuration 5. Installation and Operation Manual

Maintenance Bypass Breaker Cabinet Series Configuration 5. Installation and Operation Manual Maintenance Bypass Breaker Cabinet 90881 Series Configuration 5 Installation and Operation Manual 03/13/2012 2 755-00084-C5 R03 Copyright 2012 C&C Power, Inc. All rights reserved. C&C Power, Inc. 395 Mission

More information

Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment.

Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment. RM140A-R3 RM140A-M-R3 RM145A-R3 RM145A-M-R3 Small Office/Home Office (SOHO) Cabinets Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment. Fit under most desktops in the

More information

Maintenance Bypass Breaker Cabinet Series Configuration 2. Installation and Operation Manual

Maintenance Bypass Breaker Cabinet Series Configuration 2. Installation and Operation Manual Maintenance Bypass Breaker Cabinet 90881 Series Configuration 2 Installation and Operation Manual 03/13/2012 2 755-00084-C2 R03 Copyright 2012 C&C Power, Inc. All rights reserved. C&C Power, Inc. 395 Mission

More information

SECTION SECONDARY UNIT SUBSTATIONS

SECTION SECONDARY UNIT SUBSTATIONS SECTION 26 12 16 SECONDARY UNIT SUBSTATIONS PART 1 GENERAL 1.1 SUMMARY This section describes metal-clad, indoor or outdoor, secondary unit substations with integral primary fused disconnect switches,

More information

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein.

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein. 16470 PANELBOARDS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 16 An optional keynote to

More information

EXPRESS5800/1080Xd. Installation Procedures

EXPRESS5800/1080Xd. Installation Procedures EXPRESS5800/1080Xd () Installation Procedures Proprietary Notice and Liability Disclaimer The information disclosed in this document, including all designs and related materials, is the valuable property

More information

KM-201BAH KM-260BAH KM-201BWH KM-260BWH SELF-CONTAINED CRESCENT CUBER INSTRUCTION MANUAL L1F (100109)

KM-201BAH KM-260BAH KM-201BWH KM-260BWH SELF-CONTAINED CRESCENT CUBER INSTRUCTION MANUAL L1F (100109) SELF-CONTAINED CRESCENT CUBER KM-201BAH KM-260BAH KM-201BWH KM-260BWH INSTRUCTION MANUAL L1F015102 (100109) IMPORTANT Only qualified service technicians should install, service and maintain the product.

More information

KM-61BAH KM-101BAH KM-151BAH KM-151BWH SELF-CONTAINED CRESCENT CUBER INSTRUCTION MANUAL L1M (100109)

KM-61BAH KM-101BAH KM-151BAH KM-151BWH SELF-CONTAINED CRESCENT CUBER INSTRUCTION MANUAL L1M (100109) SELF-CONTAINED CRESCENT CUBER KM-61BAH KM-101BAH KM-151BAH KM-151BWH INSTRUCTION MANUAL L1M006102 (100109) IMPORTANT Only qualified service technicians should install, service and maintain the product.

More information

V 2.0 ASSEMBLY GUIDE. TS Platform Scale Series 2

V 2.0 ASSEMBLY GUIDE. TS Platform Scale Series 2 V 2.0 ASSEMBLY GUIDE Series 2 TABLE OF CONTENTS OVERVIEW General Specifications...1 Cautions and Disclaimers...1 Contents of Kit...1 Tools Required For Assembly...2 Time Required to Assemble...2 ASSEMBLING

More information

XN24 for Package Production. Site Preparation Guide XN24

XN24 for Package Production. Site Preparation Guide XN24 Site Preparation Guide 10-2014 XN24 Contents 1. Preface... 4 2. Change record...5 3. Introduction...6 3.1 Welcome...6 3.2 About Installation...6 4. Responsibilities... 4.1 Esko Responsibilities... 4.2

More information

Operating & Maintenance Manual JEC JCP Series. Centrifugal Pumps

Operating & Maintenance Manual JEC JCP Series. Centrifugal Pumps Operating & Maintenance Manual JEC JCP Series Centrifugal Pumps JEC LTD. 408, Cheongyo-ri, Bibong-myun, Hwaseong-si, Gyeonggi-do, South Korea Tel: +82 31 355 0316 Fax: +82 31 355 0319 www.jecpump.com E-mail:

More information

Powerware 9390 Integrated Accessory Cabinet IAC-D Configuration Installation and Operation Manual. For use with kva and kva UPS Models

Powerware 9390 Integrated Accessory Cabinet IAC-D Configuration Installation and Operation Manual. For use with kva and kva UPS Models Powerware 9390 Integrated Accessory Cabinet IAC-D Configuration Installation and Operation Manual For use with 40 80 kva and 100 160 kva UPS Models IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS

More information

BRILLIANT WONDERS LED WATERFALL INSTALLATION INSTRUCTIONS CMP SERIES. Brilliant Wonders LED WATERFALLS

BRILLIANT WONDERS LED WATERFALL INSTALLATION INSTRUCTIONS CMP SERIES. Brilliant Wonders LED WATERFALLS R BRILLIANT WONDERS LED WATERFALL INSTALLATION INSTRUCTIONS CMP 25677 SERIES Brilliant Wonders LED WATERFALLS TABLE OF CONTENTS 1 Product Overview....2 1.1. Packing List...2 2 Safety.3 3 Installation Guide.....4

More information

INSTALLATION INSTRUCTIONS FOR ELECTRICAL CONTRACTORS

INSTALLATION INSTRUCTIONS FOR ELECTRICAL CONTRACTORS INSTALLATION INSTRUCTIONS FOR ELECTRICAL CONTRACTORS Rev. 1.5 1.10.13 Toll free (800) 288-6000 or www.hubbell-wiring.com P a g e 0 IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS WARNING- When using

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

Installation, Operation & Maintenance Manual

Installation, Operation & Maintenance Manual Original Instructions Installation, Operation & Maintenance Manual Sentry IC Indexing Cabinet Automatic Sampling Accessories S-AS-IOM-00462-2 11-17 Do not install, maintain, or operate this equipment without

More information

GEK B Instructions. Test Cabinet. for Power/Vac Vacuum Circuit Breakers

GEK B Instructions. Test Cabinet. for Power/Vac Vacuum Circuit Breakers g GEK 105263B Instructions Test Cabinet for Power/Vac Vacuum Circuit Breakers Power/Vac Test Cabinet Table of Contents Section 1. Introduction 1-1 Safety... 3 1-2 Maintenance... 3 Section 2. Receiving,

More information

RYLE THERMOSTATIC SHOWER SET INSTALLATION

RYLE THERMOSTATIC SHOWER SET INSTALLATION SKU(s): 934430 RYLE THERMOSTATIC SHOWER SET INSTALLATION BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing plumbing fixtures. Signature Hardware accepts no liability

More information

H50. DYNAMIC BARRIER Bench Fume Hood. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

H50. DYNAMIC BARRIER Bench Fume Hood. Fume Hoods. Installation Instructions. 48- 60- 72- 96 long Installation Instructions Supreme Air DYNAMIC BARRIER Bench Fume Hood H50 S T Y L E Fume Hoods 48"- 60"- 72"- 96" long Publication No. IIH50-SA 06/01 Part Number: IMAN-H50 Kewaunee Scientific Corporation

More information

Pre Delivery & Installation Guide GX 480 GX 480 DT GX 480 APC GX 480 DT APC GX 600 GX 800 GX 1000

Pre Delivery & Installation Guide GX 480 GX 480 DT GX 480 APC GX 480 DT APC GX 600 GX 800 GX 1000 Pre Delivery & Installation Guide GX 480 GX 480 DT GX 480 APC GX 480 DT APC GX 600 GX 800 GX 1000 Document number 1902494 Issue B November 2006 Page 1 CONTENTS Page INTRODUCTION 3 MACHINE DELIVERY 4 INSTALLATION

More information

Site Preparation... 2

Site Preparation... 2 TRUFIREWALLS INSTALLATION MANUAL This Installation Manual is intended to assist in the preparation and installation of TruFireWalls products manufactured by Oldcastle Enclosure Solutions. The TruFireWalls

More information

Power Distribution Module Replacement Instructions

Power Distribution Module Replacement Instructions Power Distribution Module Replacement Instructions Introduction This publication describes the replacement procedure for the power distribution module (PDM) in 4100U and 4100ES Fire Alarm Control Panels

More information

INSTALLATION MANUAL. FOOTWALL/SINKWALL (floor mount)

INSTALLATION MANUAL. FOOTWALL/SINKWALL (floor mount) INSTALLATION MANUAL FOOTWALL/SINKWALL (floor mount) OVERVIEW The Form is a UL-listed configurable footwall/sinkwall system. This system can include any combination of base cabinets, upper cabinets, wardrobes,

More information

FORM FOOTWALL. FORM FOOTWALL (floating) (floating) Installation Manual

FORM FOOTWALL. FORM FOOTWALL (floating) (floating) Installation Manual FORM FOOTWALL (floating) Installation Manual FORM FOOTWALL (floating) OVERVIEW The Form is a UL-listed configurable footwall system. This system can include any combination of base cabinets, upper cabinets,

More information

2200-Lb. Semi-Electric Stacker OWNER S MANUAL

2200-Lb. Semi-Electric Stacker OWNER S MANUAL 2200-Lb. Semi-Electric Stacker OWNER S MANUAL WARNING: Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety

More information

Repackaging the Router

Repackaging the Router APPENDIXA Revised: March 16, 29, Introduction This appendix describes two separate but related router repackaging tasks: How to remove the router from the equipment rack and repackage the router for shipment

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 Page 1 of 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES SECTION 262500 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions Tools and Supplies: C.R. LAURENCE CO., INC. Intelli-Track SPS Phase One - Installation Instructions Ratchet Wrench with 4" Extension 9/16" Open-End Wrench (two required for suspension mounting) 9/16" Hex

More information

H07 H09. BENCH FUME HOOD with Combination Sash. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

H07 H09. BENCH FUME HOOD with Combination Sash. Fume Hoods. Installation Instructions. 48- 60- 72- 96 long Installation Instructions Supreme Air BENCH FUME HOOD with Combination Sash H07 H09 S T Y L E Fume Hoods 48"- 60"- 72"- 96" long Publication No. IIH07-SA 07/06 Part Number: IMAN-H07 FUME HOOD END PANEL

More information

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SCP Series Modular Reverse Osmosis System. January 2012 Version

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SCP Series Modular Reverse Osmosis System.  January 2012 Version MASTER Water Conditioning Corp. www.masterwater.com OPERATION MANUAL PURO PRO 1200 SCP Series Modular Reverse Osmosis System January 2012 Version Table of Contents Model Number... 1 Shipping Description

More information

AP5K-C Precision AC Double-Pulse Spot Welding Machine User s Manual Shenzhen Will-Best Electronics Co., Ltd

AP5K-C Precision AC Double-Pulse Spot Welding Machine User s Manual Shenzhen Will-Best Electronics Co., Ltd AP5K-C Precision AC Double-Pulse Spot Welding Machine User s Manual Shenzhen Will-Best Electronics Co., Ltd 1 Content 1. Introduction...3 1.1 Functions...3 1.2 Units of AP5K-C...4 2. The Initial Installation

More information

V-STACK36 Vertical Stacker

V-STACK36 Vertical Stacker V-STACK36 Vertical Stacker 11/2013 OPERATOR MANUAL FIRST EDITION TABLE OF CONTENTS TOPIC PAGE Description 1 Specifications 1 Unpacking 1 Configurations 2 Setup and Operation 3 Description The V-Stack36

More information

MiT. MOVING image TECHNOLOGIES INSTRUCTIONS FOR INSTALLATION, OPERATION, AND MAINTENANCE. MPL Digital Pedestal. Manual Version 0.2

MiT. MOVING image TECHNOLOGIES INSTRUCTIONS FOR INSTALLATION, OPERATION, AND MAINTENANCE. MPL Digital Pedestal. Manual Version 0.2 MiT MOVING image TECHNOLOGIES INSTRUCTIONS FOR INSTALLATION, OPERATION, AND MAINTENANCE OF MPL Digital Pedestal Manual Version 0.2 MOVING image TECHNOLOGIES, LLC. 17760 Newhope St. Fountain Valley, CA

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

Section 7: Specifications

Section 7: Specifications Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required

More information

Table of contents. 1. Introduction

Table of contents. 1. Introduction 2 Year Warranty Table of contents 1. Introduction 1-1. Transportation 1-2. Preliminary steps 1-3. Initial setup 1-4. Important safety instructions 1-5. Maintenance, service and faults 2. Operation 2.1

More information

TYPICAL INSTALLATION INSTRUCTIONS

TYPICAL INSTALLATION INSTRUCTIONS TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect

More information

This document provides the Pre-Installation Checklist for the ADVANTAGE Router 600.

This document provides the Pre-Installation Checklist for the ADVANTAGE Router 600. Page 1 of 13 ADVANTAGE Router TM 600 Pre-Installation Checklist Gerber FastFact # 5008 Supplied by: Gerber Service Last Modified: October 29, 2001 Summary: This document provides the Pre-Installation Checklist

More information

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard PART 1 GENERAL 1.1 Scope A. The intent of this specification is to provide power control for the parallel operation of generator

More information

INSTALLATION MANUAL. All Types F Series Rev G

INSTALLATION MANUAL. All Types F Series Rev G INSTALLATION MANUAL All Types - 1570 F Series Page 1 of 16 TABLE OF CONTENTS DESCRIPTION PAGE GENERAL INFORMATION & ADVISORIES 2 PRODUCT INFORMATION 3 GET TO KNOW YOUR CBU 4 HARDWARE AND COMPONENTS 5 CONCRETE

More information

Installation, Operating and Maintenance Instructions Incognito Series Air Curtain

Installation, Operating and Maintenance Instructions Incognito Series Air Curtain Installation, Operating and Maintenance Instructions Incognito Series Air Curtain Models: INC10036, INC10042, INC10048, INC10064, INC10072, INC10084, INC10096, INC10108, INC10120, INC10144. READ THIS OWNER

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES... DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements

More information

Horizontal Belt Stacker

Horizontal Belt Stacker Shipping & Mailing Inserter Horizontal Belt Stacker TM for Relay Systems Operator Guide International English Edition August 1, 2015 Note: This equipment has been tested and found to comply with the limits

More information

Mounting Screw. Channel Filler. Light Angle Adjustable Screw. LED Board Vertical stud and blocking Locking Nose. Driver.

Mounting Screw. Channel Filler. Light Angle Adjustable Screw. LED Board Vertical stud and blocking Locking Nose. Driver. The Knife Edge Cove is a modular lighting system consisting of two parts: 1- An aluminum fixture housing extrusion 2- Drop-in lighting modules The fixture will provide a continuous knife edge architectural

More information

Operating Instructions

Operating Instructions 028028 Operating Instructions Monarch 928 Stacker 23456 78901 Fishing Tackle $40.00 23456 78901 Fishing Tackle $40.00 23456 78901 Fishing Tackle $40.00 23456 78901 Fishing Tackle $40.00 TC0928OI Rev. AJ

More information

Precision Range (All Models)

Precision Range (All Models) Precision Range (All Models) Site Preparation Guide SP-Precision-1 12/01/16 Contents Site Preparation Guide 1 Contents 2 Change History 3 How to use this Manual 3 Customer Responsibilities 4 Safety Notices

More information

Quick Adjustable Height Stands

Quick Adjustable Height Stands Quick Adjustable Height Stands Installation, Maintenance & Parts Manual DORNER MFG. CORP. INSIDE THE USA OUTSIDE THE USA P.O. Box 0 975 Cottonwood Ave. TEL: -800-397-8664 TEL: 6-367-7600 Hartland, WI 5309-000

More information

Wood Casework Acid Storage

Wood Casework Acid Storage ACID STORAGE CABINETS Acid Storage Units (18 Deep) Acid Storage Units (22 Deep) 15 1931011W 1931211W 1 18 1131011W 1131211W 1 24 1231011W 1231211W 1 30 1331011W - 2 36 1431011W - 2 42 1831011W - 2 48 1531011W

More information

ISSUED: OCT. 11, 2005 REVISED: JAN. 1, 2007 HOSHIZAKI REFRIGERATED GLASS MERCHANDISER KD-90D MODEL INSTRUCTION MANUAL

ISSUED: OCT. 11, 2005 REVISED: JAN. 1, 2007 HOSHIZAKI REFRIGERATED GLASS MERCHANDISER KD-90D MODEL INSTRUCTION MANUAL ISSUED: OCT. 11, 2005 REVISED: JAN. 1, 2007 HOSHIZAKI REFRIGERATED GLASS MERCHANDISER MODEL KD-90D INSTRUCTION MANUAL IMPORTANT 1. This booklet is an integral and essential part of the product and should

More information

Site Preparation Guide. Scodix Ultra Press and Scodix Ultra-Pro Press and Scodix Ultra Foil Station

Site Preparation Guide. Scodix Ultra Press and Scodix Ultra-Pro Press and Scodix Ultra Foil Station Site Preparation Guide Scodix Ultra Press and Scodix Ultra-Pro Press and Scodix Ultra Foil Station Important Notice Copyright 2012-2015 Scodix Ltd. All rights reserved. All product names are trademarks

More information

TABLE OF CONTENTS. Vacuum Cleaner. Model No. MC-CG Bagless Canister Red North America

TABLE OF CONTENTS. Vacuum Cleaner. Model No. MC-CG Bagless Canister Red North America Order No.: MAC1412002CE Vacuum Cleaner Model No. MC-CG902-02 Bagless Canister Red North America TABLE OF CONTENTS PAGE 1 Specifications ----------------------------------------------------- 2 2 Disassembly

More information

Stack Parking Surface Mounted Stackers

Stack Parking Surface Mounted Stackers 1 / 6 Stack Parking Surface Mounted Stackers swiss-park V-2 Comfort The V-2 is designed to park cars of any size thanks to its vertical adjustability. It will accommodate cars as tall as the garage ceiling

More information

ELVORON LU/LA ELEVATOR

ELVORON LU/LA ELEVATOR Creating An Accessible World ELVORON LU/LA ELEVATOR DESIGN AND PLANNING GUIDE www.garaventalift.com Please note: Dimensions provided in this Guide are for REFERENCE ONLY and should not be used for site

More information

Zehnder Carboline Radiant Heating and Cooling Ceiling Panels. Installation, Operation and Maintenance. Cooling Fresh Air Clean Air

Zehnder Carboline Radiant Heating and Cooling Ceiling Panels. Installation, Operation and Maintenance. Cooling Fresh Air Clean Air Zehnder Carboline Radiant Heating and Cooling Ceiling Panels Installation, Operation and Maintenance Heating Cooling Fresh Air Clean Air ii General information 1 Safety considerations 1 Unpacking and preparation

More information

INSTALLATION INSTRUCTIONS MODEL THE CONTRACTOR SUMP BUDDY

INSTALLATION INSTRUCTIONS MODEL THE CONTRACTOR SUMP BUDDY www.burcam.com 2190 Dagenais Blvd. West TEL: 514.337.4415 LAVAL (QUEBEC) FAX: 514.337.4029 CANADA H7L 5X9 info@burcam.com Your pump has been carefully packaged at the factory to prevent damage during shipping.

More information

PICTORA HIGH SPEED DIGITAL BOARD REPRODUCTION

PICTORA HIGH SPEED DIGITAL BOARD REPRODUCTION PICTORA HIGH SPEED DIGITAL BOARD REPRODUCTION SITE PREPARATION GUIDE The information contained herein is subject to change without notice. The only warranties for Novus Imaging products and services are

More information

Agilent Technologies 7620-AS Sample Changer Site Preparation Checklist Hardware Site Preparation Specification

Agilent Technologies 7620-AS Sample Changer Site Preparation Checklist Hardware Site Preparation Specification Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation

More information

July P Wide Format Stacker User Guide

July P Wide Format Stacker User Guide July 2009 701P49768 Wide Format Stacker User Guide 2009 Xerox Corporation. All rights reserved. Xerox and the sphere of connectivity design are trademarks of Xerox Corporation in the United States and/or

More information

SITE PREPARATION GUIDE

SITE PREPARATION GUIDE DEDICATED 5 x10 UV LED FLATBED PRINTER SITE PREPARATION GUIDE The information contained herein is subject to change without notice. The only warranties for Novus Imaging products and services are set forth

More information

WARNING ELECTRIC PALLET TRUCK EPT Revised A company dedicated to solving ergonomic and material handling problems since 1955.

WARNING ELECTRIC PALLET TRUCK EPT Revised A company dedicated to solving ergonomic and material handling problems since 1955. VESTIL MANUFACTURING CORPORATION 2999 North Wayne Street, P.O. Box 507 Angola, Indiana 46703 USA Phone (260) 665-7586 Fax (260) 665-1339 sales@vestil.com www.vestil.com SAFETY INSTRUCTIONS & OPERATING

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

VWR Zero Air Generator Models , Installation, Operation, and Maintenance Manual. Bulletin TI-ZAG3500-L1466

VWR Zero Air Generator Models , Installation, Operation, and Maintenance Manual. Bulletin TI-ZAG3500-L1466 VWR Zero Air Generator Models 26000-020, 26000-022 Bulletin TI-ZAG3500-L1466 Installation, Operation, and Maintenance Manual Bulletin TI-ZAG3500-L1466 VWR Model 26000 Zero Air Generators Warranty United

More information

AirBench EX Operation and Maintenance

AirBench EX Operation and Maintenance AIRBENCH LTD AirBench EX Operation and Maintenance This Edition: 10 February 2016 AirBench Ltd, 14 Grange Farm Road, Colchester CO2 8JW www.airbench.com +44 (0) 1206 791191 Copyright AirBench Ltd 2016

More information

Symmetra PX kw 208 V. Receiving and Unpacking 08/2015.

Symmetra PX kw 208 V. Receiving and Unpacking 08/2015. Symmetra PX 10 40 kw 208 V Receiving and Unpacking 08/2015 www.schneider-electric.com Legal Information The Schneider Electric brand and any registered trademarks of Schneider Electric Industries SAS referred

More information

Revision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd

Revision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd RAM ELEVATORS Elevator Electrical Planning Guide This guide is intended for people with an understanding of electricity. If you are not, please consult a licensed electrician as errors in application of

More information

Calibrate Accessory Actuators Instructions

Calibrate Accessory Actuators Instructions Instruction Manual Table of Contents Conditions of Sales and Product Warranty 3 Copyright Notice & Disclaimer 4 1.0 Technical Specifications 5 1.1 Features 6 2.0 Description 7 2.1 Components 8 3.0 Receiving

More information

Aegis Heavy Capacity 20K Floor Scale. MODEL: 6200 Series. Installation Manual

Aegis Heavy Capacity 20K Floor Scale. MODEL: 6200 Series. Installation Manual Installation Manual Aegis Heavy Capacity 20K Floor Scale MODEL: 6200 Series Copyright 1997-2014 Fairbanks Scales, Inc. Revision 3 50637 All Rights Reserved 07/14 Aegis Heavy Capacity 20K Floor Scale Model:

More information

Pointers on Packaging for Computer Shipments

Pointers on Packaging for Computer Shipments Pointers on Packaging for Computer Shipments At FedEx Express, we understand the importance of your computer shipment and strive to make sure that it will arrive on time and in good condition. Computers

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS **When your shipment arrives please:** check for damage check for the correct number of parts according to your bill of lading. Inform the trucking company of any damage or incorrect

More information

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 ) SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 ) WARNING - When unpacking SpaVault, DO NOT discard styrofoam pieces, these are not packaging materials. Step 1 Excavation Important:

More information

SQ-1 ROOF TRUSS WEG-IT TABLE

SQ-1 ROOF TRUSS WEG-IT TABLE WEG-IT Steel Top Table SQ1 Service SQ-1 ROOF TRUSS WEG-IT TABLE Operators Manual FOREWORD This manual explains the proper maintenance of Square 1 Design Roof Truss WEG-IT Table as well as periodic inspection

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information