1 AGRICULTURAL WATER MANAGEMENT AND SAFEGUARDS Implications for Implementation The Mexico Experience IRRIGATION AND DRAINAGE MODERNIZATION PROJECT (PMIR) Michael Carroll, Task Manager, LCSER, Water Week
2 PMIR - OVERVIEW Objective: To assist GOM in the adoption of a new model to improve the competitiveness of irrigated agriculture and the efficiency of irrigation water use [Irrigation Districts and Units, (ID, IU)] through: Demand driven Integrated Irrigation Investment Plans (IIIPs) through: modernization of existing irrigation infrastructure increased productivity of irrigated agriculture and diversification into high-value crops consolidation of the transfer of irrigation infrastructure to water users institutional strengthening of water users organizations consolidating the current cost recovery system for both operating and capital costs establishment of a comprehensive monitoring and evaluation system 2
3 Beneficiaries: PMIR OVERVIEW (Cont..1) Water User Associations (WUAs), small and communal farmers at a module level District Organizations (SRLs) Project potential target population: 1.1 Million irrigation farmers in both (ID: IU: producers) Direct assistance to ~ farmers Equal access to project benefits by small and large farmers Institutional and implementation arrangements: Comision Nacional del Agua (CNA) and Secretaria de Agricultura, Ganaderia, Desarrollo Rural, Pesca y Alimentacion (SAGARPA) Total costs: US$ M Borrower: US$ M IBRD: US$ M 3
4 PMIR OVERVIEW (Cont 2) Project components: 1. Modernization and rehabilitation of irrigation infrastructure in IDs, and IUs through IIIPs. 2. Diversification and intensification of irrigated agricultural production (technical and financial assistance) 3. Training and institutional development 4. Project management (project coordination and M&E system) 4
5 PROJECT PREPARATION Environmental specialist on team; consultation of Task Team with Bank s social and environmental specialists Sectoral Environmental Assessment (SEA) Vs Environmental Assessments (EAs) Social Assessment PHRD: US$ 560,000 (SEA + four IIIPs) 5
6 6 PROJECT PREPARATION (Cont..2) PUBLIC CONSULTATION Preparation of SEA included public consultation events with stakeholders: WUAs, representatives of public and private sector institutions, (academia, environmental agencies, NGOs) CNA existing procedures include an active consultation process with all users and concerned parties Consultation process led to incorporate additional environmental indicators (efficiency, health and sustainability, water quality, toxicological statistics) SEA recommended mechanisms for public consultation in design and review of irrigation subprojects-specific
7 ENVIRONMENTAL ISSUES IN IRRIGATION AND DRAINAGE IN MEXICO Inter-sectoral conflicts over scarce water supplies Threats to freshwater wetlands and their endangered biodiversity Nutrient pollution of groundwater and surface water supplies Health and environmental risks from pesticides contamination Overexploited aquifers 7
8 8 PMIR ENVIRONMENTAL IMPACTS PMIR Environmental classification: B Overall: positive in net terms (reducing aggregate water abstraction) Attention to mitigate specific adverse environmental impacts of subprojects (and to enhance positive ones) Project finances rehabilitation not expansion into new areas
9 ENVIRONMENTAL ASSESSMENT REQUIREMENTS Two levels: SEA and EAs 1. SEA: Key environmental management issues for the irrigation and drainage sector: Main irrigation related environmental issues and mitigation strategies Major regional hotspots of water use conflicts (rivers, wetlands) 9
10 ENVIRONMENTAL ASSESSMENT REQUIREMENTS (Cont.. 2) Environmental Management Plan (EMP): Pest Management Plan Environmental procedures for civil works Environmental guidelines for the operation of irrigation systems Project eligibility criteria and procedures for environmental review of subprojects Standards TORs for subproject s specific EAs 10
11 OVERLAPPING MAPS: IRRIGATION DISTRICTS NATURAL PROTECTED AREAS CRITICAL AREAS GOGORRON (S.L.P.) SIERRA GORDA LOS MARMOLES N 085 LA BEGOÑA SIERRA GORDA N 087 ROSARIO MEZQUITE (MICHOACÁN Y JALISCO) N 020 MORELIA (MICHOACÁN) N 011 ALTO RÍO LERMA SANTUARIO DE LA MARIPOSA MONARCA SYMBOLS IRRIGATION DISTRICTS NATURAL PROTECTED AREAS GUANAJUATO CRITICAL AREAS 11
12 OVERLAPPING MAPS: IRRIGATION DISTRICTS NATURAL PROTECTED AREAS CRITICAL AREAS N 014 RÍO COLORADO (SON. Y B.C.) EL PINACATE Y GRAN DESIERTO DE ALTAR ALTO GOLFO DE CALIFORNIA Y DELTA DEL RÍO COLORADO PITIQUITO HERMOSILLO N 051 COSTA HERMOSILLO ISLAS DEL GOLFO DE CALIFORNIA N 037 RÍOS ALTAR, PITIQUITO Y CABORCA MAVAVI BENJAMIN HILL BAVISPE SIERRA DE LOS AJOS / BAVISPE HUACHINERA TUTUACA YECORA CAJÓN DEL DIABLO TOMOCHIC-BASSASEACHIC SYMBOLS IRRIGATION DISTRICTS N 084 GUAYMAS N 018 COLONIAS YAQUIS ALAMOS SIERRA DE ALAMOS-RÍO CUCHUJAQUI NATURAL PROTECTED AREAS CRITICAL AREAS N 038 RÍO MAYO SONORA 12
13 13 ENVIRONMENTAL ASSESSMENT REQUIREMENTS (Cont.. 3) 2. Environmental Assessment for specific subproject during project implementation at ID, IU, or subproject module level. EA part of the process for subproject formulation and approval Subproject EA will: a. Assess specific potential environmental impacts b. Describe mitigation or enhancement measures
14 14 ADRESSING ENVIRONMENTAL REQUIREMENTS Consultation with ESSD-QAT and good interaction between ESSD-QAT and Task Team facilitated cost-effective and timely implementation of safeguards SEA addressed QAT recommendations Currently SEA in Infoshop and available Field office involvement Local environmental consultant (SEA) Active client participation in SEA Operational Manual: approved at negotiations
15 SAFEGUARDS MANAGEMENT IN PMIR SAFEGUARD POTENTIALLY TRIGGERED BY FINDINGS FROM SEA ACTION IN EA/SAFEGUARD MONITORING Natural Habitats policy (OP 4.04) Local increased water abstraction or changed drainage flows (wetlands, natural habitats) Identified main geographical areas of Mexico (wetlands), i.e. Rio Lerma Basin EA will: screen for possible impacts or other natural habitats; incorporate mitigation measures within subproject design Pest management (OP 4.09) Intensification of irrigated agriculture; pesticide application equipment might be procured Included Pest Management Plan The project would not finance purchase of pesticides. TOR of IIIPs would provide for training and TA in pest management (subprojects changes in crops or cultivation methods) 15
16 SAFEGUARDS MANAGEMENT (Cont..2) SAFEGUARD POTENTIALLY TRIGGERED BY FINDINGS FROM SEA ACTION IN EA/SAFEGUARD MONITORING Dam safety (OP. 4.37) Safety of existing dams under existing or planned conditions Recommended documentation of dam safety Subprojects which use water from existing dams would include evidence of updated inspection of the safety of those dams (information available from CNA) Cultural Property (OPN ) Excavation of earth for rehabilitating or improving irrigation works might uncover items archeological, paleontological Included guidelines for chance find procedures All civil works bidding documents, contracts and work orders would follow standard environmental rules for contractors (including chance find procedures for cultural property) 16
17 17 SAFEGUARDS MANAGEMENT (Cont..3) SAFEGUARD POTENTIALLY TRIGGERED BY FINDINGS FROM SEA ACTION IN EA/SAFEGUARD MONITORING International waterways (OP. 7.50) If project affects the use of water from the Rio Grande along the US border Presented a diagnosis of the Mexican International and National Water Law. International Boundary and Water Comission (IBWC) Through existent commitments the US government has been notified by CNA (according to OP/BP 7.50)
18 INSTITUTIONAL CAPACITY (QAT RECOMMENDATION) Implementation agency will designate an environmental expert for the review of subprojects The SEA included a environmental training proposal for relevant CNA, SAGARPA staffs, and WUAs representatives, technical assistance providers, etc. 18
19 CONCLUSIONS The project ensured adequate resources for the assessment of safeguard policies (PHRD, early) Task Team developed an effective communication and understanding of the Bank safeguards Good interaction between ESSD-QAT, Task Team and client facilitated cost-effective and timely analysis of safeguards implications Demand driven approach with comprehensive project operational manual can significantly reduce the institutional risk of supporting investments in irrigation 19
Integrated Safeguards Data Sheet (Initial)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Initial) Report No: AC124 Section I - Basic Information
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 29-Sep-2015 Report No.: ISDSC14538 Date ISDS Approved/Disclosed: 15-Oct-2015 Public Disclosure Authorized
More informationProgress and Perspectives in Mexico - US Join Cooperative Actions on the Colorado River, with Drought and Climate Change
Navigating the Future of the Colorado River Progress and Perspectives in Mexico - US Join Cooperative Actions on the Colorado River, with Drought and Climate Change Ing. Mario López Pérez Comisión Nacional
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 05-Mar-2014
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/15/2015 INTEGRATED SAFEGUARDS DATASHEET
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: June 10, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Brazil Project Name: Brasilia Environmentally Sustainable Pro
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 12/27/2010 INTEGRATED SAFEGUARDS DATASHEET
More informationEA Frameworks Case Study
EA Frameworks Case Study Tajikistan Community Agriculture & Watershed Management The World Bank Europe & Central Asia Region Biskek,Tblisi March/April 2008 Project Safeguard Policy Process Integrated Safeguards
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA14823 Project Name
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/27/2011 1. Basic Project Data Original
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 14-Apr-2014
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Parent Project
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Peru Second Rural Electrification
Project Name Region Sector Project ID GEF Focal Area Global Supplemental ID Borrower(s) Implementing Agency PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Peru Second Rural Electrification Latin America
More informationLarge Marine Ecosystem Management Activities (US$5.62)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No: I048795
More informationPAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name
PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name Balochistan Small Scale Irrigation Project Region SOUTH ASIA
More informationI Managing Unit: EASRE
Date ISDS PreparedNpdated: 08/06/07 I. BASIC INFORMATION INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE A. Basic Project Data I Country: Indonesia I Project ID: PI04022 Project Name: Makassar Landfill
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/24/2007 INTEGRATED SAFEGUARDS DATASHEET
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/14/2011 1. Basic Project Data Original
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/18/2006 INTEGRATED SAFEGUARDS DATASHEET
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 11/14/2009 Report.: AC4826 1. Basic Project Data Country: Sudan Project ID: P111061 Project Name: Southern Sudan
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/21/2009 INTEGRATED SAFEGUARDS DATASHEET
More informationCERTIFICATION AND FINANCING PROPOSAL
CERTIFICATION AND FINANCING PROPOSAL INFRASTRUCTURE PROGRAM FOR THE STATE OF NUEVO LEON: MODERNIZATION AND IMPROVEMENTS TO DON MARTIN IRRIGATION DISTRICT 004 IN Published: September 19, 2014 CERTIFICATION
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974. Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION. A. Basic Project Data
Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974 Country: Africa Project ID: P094916 Project Name: WAPP
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6042. Date ISDS Prepared/Updated: 01/26/2011 I. BASIC INFORMATION. A. Basic Project Data
Date ISDS Prepared/Updated: 01/26/2011 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6042 Country: South Asia Project ID: P115767 Project Name:
More informationADAPTATION TO CLIMATE CHANGE IN THE RIO GRANDE/RIO BRAVO AND COLORADO RIVERS
INTERNATIONAL BOUNDARY AND WATER COMISSION COMMISSION COMISIÓN INTERNACIONAL DE LÍMITES Y AGUAS ADAPTATION TO CLIMATE CHANGE IN THE RIO GRANDE/RIO BRAVO AND COLORADO RIVERS Commissioners Edward Drusina
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 23-Mar-2015 Report No.: ISDSC 12226 Date ISDS Approved/Disclosed: 06-Apr-2015 Public Disclosure Authorized
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE CO National Urban Transport
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1145 Project Name. Sindh Water Sector Improvement Project Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1145 Project Name Sindh
More informationCERTIFICATION AND FINANCING PROPOSAL
CERTIFICATION AND FINANCING PROPOSAL INFRASTRUCTURE PROGRAM FOR THE STATE OF NUEVO LEON: MODERNIZATION AND IMPROVEMENTS TO DON MARTIN IRRIGATION DISTRICT 004 IN ANAHUAC, NUEVO LEON STATE OF NUEVO LEON
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291 Project Name
More informationTable A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles
Operational Manual - Table A1 - Environmental and Social Safeguard Policies Policy and Staff Connections- World Bank Intranet WB External Site WBG Directory Help Site Map Feedback Home News & Events Countries
More informationL/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Jun ,367,000.00
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020787 Public Disclosure Authorized Public Disclosure Authorized Project ID P118090 Country Egypt, Arab
More information( ) Page: 1/10 NOTIFICATION
20 September 2016 (16-4994) Page: 1/10 Committee on Agriculture Original: Spanish NOTIFICATION The following submission, dated 12 September 2016, is being circulated at the request of the delegation of
More informationInfoShop. Integrated Safeguards Data Sheet (Initial) Date ISDS Prepared/Updated: 10/21/2002. Section I - Basic Information
Public Disclosure Authorized THE WORLD BANK GROUP InfoShop Integrated Safeguards Data Sheet (Initial) 25030 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date Prepared/Updated:
More informationConservation Planning
Conservation Planning Good Conservation Planning vs Good Conservation Plan Good Planning = Following the 9 step planning process with proper documentation(including CPA-52 Environmental Worksheet and CPA-15
More informationCofinancing (US$M): b.were the project objectives/key associated outcome targets revised during implementation? No
Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14682 1. Project Data: Date Posted: 03/23/2015 Public Disclosure Authorized Public Disclosure Authorized Public
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Lahendong II Geothermal
More informationBOSNIA AND HERZEGOVINA
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Adriatic Sea Environmental Pollution Control Project (I) Croatia and Bosnia and Herzegovina
More informationNAMA SUPPORT PROJECT MEXICO: IMPLEMENTATION OF NEW HOUSING NAMA TECHNICAL COMPONENT. October 2016
NAMA SUPPORT PROJECT MEXICO: IMPLEMENTATION OF NEW HOUSING NAMA TECHNICAL COMPONENT October 2016 THE MEXICAN HOUSING SECTOR Facts Population growth around 1.7 Mio. per year Urbanisation rate approx. 79%
More informationETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5416 Project Name
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL
More informationMINISTÈRE DES AFFAIRES ÉTRANGÈRES ET EUROPÉENNES 20 December /5 6th World Water Forum Ministerial Process Draft document
MINISTÈRE DES AFFAIRES ÉTRANGÈRES ET EUROPÉENNES 20 December 2011 1/5 6th World Water Forum Ministerial Process Draft document 1. We the Ministers and Heads of Delegations assembled in Marseille, France,
More informationPeru, Guarantee Facility Project
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Peru, Guarantee Facility Project Environmental and Social Management Framework (ESMF)
More informationThe North American Experience with Environmentally Sustainable Agriculture Water Policies
The North American Experience with Environmentally Sustainable Agriculture Water Policies Marc Ribaudo 1, Louise Bissonnette 2, Roberto Ismael Vázquez Ochoa 3, Jorge Argueta Spínola 4, Kari Cohen 5, Tim
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/07/2006 INTEGRATED SAFEGUARDS DATASHEET
More informationPROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)
PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION Interested Organization Name: Project Location: Projected amount of required project funding ($ /USD): TOTAL: Project Sector or Similar:
More informationENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK (ESMF)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E2425 MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT FEDERAL REPUBLIC OF ETHIOPIA AGRICULTURAL
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. GZ-Gaza II Emergency Water Project MIDDLE EAST AND NORTH AFRICA PLO FOR THE BENEFIT OF THE PA
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE GZ-Gaza II Emergency
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No.: 38582 Date ISDS Prepared/Updated: 16 January 2007 I. BASIC INFORMATION A.
More informationRenewable Energy: The Future of Biofuels
Renewable Energy: The Future of Biofuels Biofuels/Solar/Wind Mexico January 20, 2017 Robert J. Downing downingr@gtlaw.com (305) 579-0637 G R E E N B E R G T R A U R I G, L L P A T T O R N E Y S A T L A
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: ISDSC8244 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Country: Mauritania
More informationEnvironmental and Social Management Framework (ESMF)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic Of Yemen Presidency of the Council of Ministers Social Fund for Development
More informationTAJIKISTAN PUBLIC EMPLOYMENT FOR SUSTAINABLE AGRICULTURE AND WATER MANAGEMENT PROJECT (PAMP)
TAJIKISTAN PUBLIC EMPLOYMENT FOR SUSTAINABLE AGRICULTURE AND WATER MANAGEMENT PROJECT (PAMP) Non-traditional Approaches to Addressing Risk and Vulnerability in Agriculture Europe and Central Asia Region
More information4 foshop ThtWd ILj^ ik
Public Disclosure Authorized THE WORLD BANK GROUP 4 foshop ThtWd ILj^ ik Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
More informationAPES- Water Diversions Name: Brandon Tran
APES- Water Diversions Name: Brandon Tran Purpose: Conduct research to analyze the effects of water diversions on surrounding ecosystems and human communities. Compare and contrast the problems and successes
More informationINTEGRATED SAFEGUARDS DATA SHEET
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/06/2011 INTEGRATED SAFEGUARDS DATASHEET
More informationThe World Bank s Safeguards Policies in Context of Hydropower Projects International Conference on Sustainable Hydropower in the Dinaric Arc
The World Bank s Safeguards Policies in Context of Hydropower Projects International Conference on Sustainable Hydropower in the Dinaric Arc Dubrovnik, 07 October 2009 Structure of Presentation 1. A Bit
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name CBF Sidi Daoud Wind Farm
More informationEnvironmental and Social Impact Assessment and Strategic Environmental and Social Assessment at the World Bank
Environmental and Social Impact Assessment and Strategic Environmental and Social Assessment at the World Bank Agi Kiss Regional Safeguards Advisor, Europe and Central Asia Region The World Bank Economic
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Date prepared/updated: 09/10/2013 / 10/05/2013
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared/ Updated
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 01/19/2010 INTEGRATED SAFEGUARDS DATASHEET
More informationUnderstanding Flows Through the Remnant Colorado River Delta
Research for People and the Planet Understanding Flows Through the Remnant Colorado River Delta Recommendations for Streamgage Sites and Data Collection November 4, 2005 for more information, contact:
More informationProvincial Policy Statement 2014
Natural Heritage Provincial Policy Statement 2014 NATURAL HERITAGE Nature is bountiful. It is also fragile and finite. Provincial Natural Heritage 0 Interest: Ontario s natural heritage resources are valuable
More information7/20/2011 TECHNICAL FEEDBACK GROUP OBJECTIVES. Seepage and Conveyance Technical Feedback Group. April 29, H Street Los Banos, CA.
Seepage and Conveyance Technical Feedback Group April 29, 2011 541 H Street Los Banos, CA Agenda Introductions and Technical Feedback Group (TFG) Purpose Action Item Review and Update 2011 Interim Flows
More informationCEQA and its Role in Historic Preservation. Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA
CEQA and its Role in Historic Preservation Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA General CEQA Requirements and Limitations Mitigation Measures
More informationNotes for NEPA for Generic Terms of Reference
TERMS OF REFERENCE IIRRIIGATIION AND WATER MANAGEMENT Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to the construction and/or the development of Irrigation
More informationMANAGING FRESHWATER INFLOWS TO ESTUARIES
MANAGING FRESHWATER INFLOWS TO ESTUARIES Human Dimensions of the Yuna Watershed and Samana Bay Estuary James Tobey Presented to The Influence of the Yuna Watershed on Samana Bay September 21, 2004. Santo
More informationCost-Sharing of Improved Irrigation Technologies to Reduce Nonpoint-Source Pollution
Cost-Sharing of Improved Irrigation Technologies to Reduce Nonpoint-Source Pollution Glenn D. Schaible, C. S. Kim, and Stan G. Daberkow Economic Research Service, U.S. Dept. of Agriculture, 1800 M Street,
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/29/2007 INTEGRATED SAFEGUARDS DATASHEET
More informationExecutive Summary Sri Lanka Strategic Cities Development Project (SCDP)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Executive Summary Sri Lanka Strategic Cities Development Project (SCDP) Executive Summary
More informationHashemite kingdom of Jordan Ministry of Environment Environment in Jordan: The challenges, achievements and trends
Hashemite kingdom of Jordan Ministry of Environment Environment in Jordan: The challenges, achievements and trends Eng. Haitham Al-Adaileh 18 20 June, 2012. Amman - Jordan 1 Our Vision The Ministry of
More informationJapanese ODA Loan. Ex-Ante Evaluation
Japanese ODA Loan Ex-Ante Evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Haor Flood Management and Livelihood Improvement Project Loan Agreement: June 16, 2014 Loan
More informationSummary of Preparatory Study
Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic
More informationProject Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)
te to Task Teams: The following sections are system generated and can only be edited online in the Portal. Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated:
More informationAddressing Key Environmental Hazards after an Earthquake
Addressing Key Environmental Hazards after an Earthquake A. International Experience 1. Environmental management is not a well-recognized priority issue in an emergency situation. So rather than confine
More informationNational cases in LAC: Costa Rica & Brazil. 1st Executive Committee Meeting (29-30 March 2017, Bonn, Germany)
National cases in LAC: Costa Rica & Brazil 1st Executive Committee Meeting (29-30 March 2017, Bonn, Germany) 1. National case study in Costa Rica Objective: Description of the relevant WEF interrelations
More informationPerformance Standard 6 V2
Introduction 1. Performance Standard 6 recognizes that protecting and conserving biodiversity, maintaining ecosystem services, and sustainably managing living natural resources are fundamental to sustainable
More informationRegional Experiences on Irrigation Modernization. Joop Stoutjesdijk Lead Irrigation Engineer, World Bank
Regional Experiences on Irrigation Modernization Joop Stoutjesdijk Lead Irrigation Engineer, World Bank Why Modernize Few main reasons why to modernize: Rapidly increasing competing uses for water. Irrigation
More informationUse and Management of Hydrologic Resources in New Mexico
Use and Management of Hydrologic Resources in New Mexico Water Work Table Mesa de Trabajo Sobre Agua NEW MEXICO REPORT August, 2006 Utton Transboundary Resources Center University of New Mexico School
More informationIMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47960) ON A LOAN TO THE
Public Disclosure Authorized Document of The World Bank Report No: ICR00001350 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47960) ON A LOAN IN THE AMOUNT OF US$325 MILLION
More informationConventional vs. Sustainable: A Matrix for Decision Making. APWA National Sustainability Conference Pittsburg, PA June 26, 2012
Conventional vs. Sustainable: A Matrix for Decision Making APWA National Sustainability Conference Pittsburg, PA June 26, 2012 Introduction Larry Stevens, PE Project Director, HR Green, Inc., Johnston,
More informationENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India Review: Definition of EIA Environmental Impact Assessment
More informationUpdate on the Arizona-Sonora portion of the United States-Mexico Transboundary Aquifer Assessment Program
College of Agriculture and Life Sciences Update on the Arizona-Sonora portion of the United States-Mexico Transboundary Aquifer Assessment Program Water Committee of the Arizona-Sonora Commission June
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3028 Project Name
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3028 Project Name BR Santos
More informationGeomorphologic Condition and Shallow Aquifers
Geomorphologic Condition and Shallow Aquifers Shann Stringer Center for Ecological Sciences Geomorphology Fluvial geomorphology is the study of the physics of water, sediment, riparian area, and floodplain
More information& Watershed Management Practices. 4 Sustainable Watershed Management
Module 2 (L4) Sustainable Watershed Approach & Watershed Management Practices 4 Sustainable Watershed Management 1 1 L4 Sustainable Watershed Management Topics Covered Introduction to the concept of sustainable
More informationZERO DEFORESTATION SOME COMMENTS AND OBSERVATIONS
ZERO DEFORESTATION SOME COMMENTS AND OBSERVATIONS WRI-Chatham House Transatlantic Dialogue October 23-24, 2014 Tuukka Castrén/World Bank World Bank Safeguard Policies The World Bank Group Framework and
More informationE830 November 10, 2003
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E830 November 10, 2003 SRI LANKA: COMMUNITY DEVELOPMENT AND LIVELIHOOD IMPROVEMENT PROJECT
More informationProject Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)
More informationFresh Water Treaty. International Setting and Issues in Water, Environment and Development
Fresh Water Treaty Preamble International Setting and Issues in Water, Environment and Development 1. In recent years most countries have faced a grave economic crisis which generated a great decrease
More informationURBAN SYSTEMS IN AREAS OF EXTREME ARIDITY. PROPOSALS FOR SUSTAINABLE WATER MANAGEMENT
URBAN SYSTEMS IN AREAS OF EXTREME ARIDITY. PROPOSALS FOR SUSTAINABLE WATER MANAGEMENT Mario Molina Center Abstract The objective of this study was to identify the most appropriate actions, from an environmental,
More informationMINISTRY OF AGRICULTURE, IRRIGATION AND WATER DEVELOPMENT MALAWI SHIRE RIVER BASIN MANAGEMENT PROJECT - P117617
Public Disclosure Authorized MINISTRY OF AGRICULTURE, IRRIGATION AND WATER DEVELOPMENT MALAWI SHIRE RIVER BASIN MANAGEMENT PROJECT - P117617 1 st STEP ANNUAL PROCUREMENT PLAN BASED ON THE FEBRUARY 2017
More information