AGRICULTURAL WATER MANAGEMENT AND SAFEGUARDS

Size: px
Start display at page:

Download "AGRICULTURAL WATER MANAGEMENT AND SAFEGUARDS"

Transcription

1 AGRICULTURAL WATER MANAGEMENT AND SAFEGUARDS Implications for Implementation The Mexico Experience IRRIGATION AND DRAINAGE MODERNIZATION PROJECT (PMIR) Michael Carroll, Task Manager, LCSER, Water Week

2 PMIR - OVERVIEW Objective: To assist GOM in the adoption of a new model to improve the competitiveness of irrigated agriculture and the efficiency of irrigation water use [Irrigation Districts and Units, (ID, IU)] through: Demand driven Integrated Irrigation Investment Plans (IIIPs) through: modernization of existing irrigation infrastructure increased productivity of irrigated agriculture and diversification into high-value crops consolidation of the transfer of irrigation infrastructure to water users institutional strengthening of water users organizations consolidating the current cost recovery system for both operating and capital costs establishment of a comprehensive monitoring and evaluation system 2

3 Beneficiaries: PMIR OVERVIEW (Cont..1) Water User Associations (WUAs), small and communal farmers at a module level District Organizations (SRLs) Project potential target population: 1.1 Million irrigation farmers in both (ID: IU: producers) Direct assistance to ~ farmers Equal access to project benefits by small and large farmers Institutional and implementation arrangements: Comision Nacional del Agua (CNA) and Secretaria de Agricultura, Ganaderia, Desarrollo Rural, Pesca y Alimentacion (SAGARPA) Total costs: US$ M Borrower: US$ M IBRD: US$ M 3

4 PMIR OVERVIEW (Cont 2) Project components: 1. Modernization and rehabilitation of irrigation infrastructure in IDs, and IUs through IIIPs. 2. Diversification and intensification of irrigated agricultural production (technical and financial assistance) 3. Training and institutional development 4. Project management (project coordination and M&E system) 4

5 PROJECT PREPARATION Environmental specialist on team; consultation of Task Team with Bank s social and environmental specialists Sectoral Environmental Assessment (SEA) Vs Environmental Assessments (EAs) Social Assessment PHRD: US$ 560,000 (SEA + four IIIPs) 5

6 6 PROJECT PREPARATION (Cont..2) PUBLIC CONSULTATION Preparation of SEA included public consultation events with stakeholders: WUAs, representatives of public and private sector institutions, (academia, environmental agencies, NGOs) CNA existing procedures include an active consultation process with all users and concerned parties Consultation process led to incorporate additional environmental indicators (efficiency, health and sustainability, water quality, toxicological statistics) SEA recommended mechanisms for public consultation in design and review of irrigation subprojects-specific

7 ENVIRONMENTAL ISSUES IN IRRIGATION AND DRAINAGE IN MEXICO Inter-sectoral conflicts over scarce water supplies Threats to freshwater wetlands and their endangered biodiversity Nutrient pollution of groundwater and surface water supplies Health and environmental risks from pesticides contamination Overexploited aquifers 7

8 8 PMIR ENVIRONMENTAL IMPACTS PMIR Environmental classification: B Overall: positive in net terms (reducing aggregate water abstraction) Attention to mitigate specific adverse environmental impacts of subprojects (and to enhance positive ones) Project finances rehabilitation not expansion into new areas

9 ENVIRONMENTAL ASSESSMENT REQUIREMENTS Two levels: SEA and EAs 1. SEA: Key environmental management issues for the irrigation and drainage sector: Main irrigation related environmental issues and mitigation strategies Major regional hotspots of water use conflicts (rivers, wetlands) 9

10 ENVIRONMENTAL ASSESSMENT REQUIREMENTS (Cont.. 2) Environmental Management Plan (EMP): Pest Management Plan Environmental procedures for civil works Environmental guidelines for the operation of irrigation systems Project eligibility criteria and procedures for environmental review of subprojects Standards TORs for subproject s specific EAs 10

11 OVERLAPPING MAPS: IRRIGATION DISTRICTS NATURAL PROTECTED AREAS CRITICAL AREAS GOGORRON (S.L.P.) SIERRA GORDA LOS MARMOLES N 085 LA BEGOÑA SIERRA GORDA N 087 ROSARIO MEZQUITE (MICHOACÁN Y JALISCO) N 020 MORELIA (MICHOACÁN) N 011 ALTO RÍO LERMA SANTUARIO DE LA MARIPOSA MONARCA SYMBOLS IRRIGATION DISTRICTS NATURAL PROTECTED AREAS GUANAJUATO CRITICAL AREAS 11

12 OVERLAPPING MAPS: IRRIGATION DISTRICTS NATURAL PROTECTED AREAS CRITICAL AREAS N 014 RÍO COLORADO (SON. Y B.C.) EL PINACATE Y GRAN DESIERTO DE ALTAR ALTO GOLFO DE CALIFORNIA Y DELTA DEL RÍO COLORADO PITIQUITO HERMOSILLO N 051 COSTA HERMOSILLO ISLAS DEL GOLFO DE CALIFORNIA N 037 RÍOS ALTAR, PITIQUITO Y CABORCA MAVAVI BENJAMIN HILL BAVISPE SIERRA DE LOS AJOS / BAVISPE HUACHINERA TUTUACA YECORA CAJÓN DEL DIABLO TOMOCHIC-BASSASEACHIC SYMBOLS IRRIGATION DISTRICTS N 084 GUAYMAS N 018 COLONIAS YAQUIS ALAMOS SIERRA DE ALAMOS-RÍO CUCHUJAQUI NATURAL PROTECTED AREAS CRITICAL AREAS N 038 RÍO MAYO SONORA 12

13 13 ENVIRONMENTAL ASSESSMENT REQUIREMENTS (Cont.. 3) 2. Environmental Assessment for specific subproject during project implementation at ID, IU, or subproject module level. EA part of the process for subproject formulation and approval Subproject EA will: a. Assess specific potential environmental impacts b. Describe mitigation or enhancement measures

14 14 ADRESSING ENVIRONMENTAL REQUIREMENTS Consultation with ESSD-QAT and good interaction between ESSD-QAT and Task Team facilitated cost-effective and timely implementation of safeguards SEA addressed QAT recommendations Currently SEA in Infoshop and available Field office involvement Local environmental consultant (SEA) Active client participation in SEA Operational Manual: approved at negotiations

15 SAFEGUARDS MANAGEMENT IN PMIR SAFEGUARD POTENTIALLY TRIGGERED BY FINDINGS FROM SEA ACTION IN EA/SAFEGUARD MONITORING Natural Habitats policy (OP 4.04) Local increased water abstraction or changed drainage flows (wetlands, natural habitats) Identified main geographical areas of Mexico (wetlands), i.e. Rio Lerma Basin EA will: screen for possible impacts or other natural habitats; incorporate mitigation measures within subproject design Pest management (OP 4.09) Intensification of irrigated agriculture; pesticide application equipment might be procured Included Pest Management Plan The project would not finance purchase of pesticides. TOR of IIIPs would provide for training and TA in pest management (subprojects changes in crops or cultivation methods) 15

16 SAFEGUARDS MANAGEMENT (Cont..2) SAFEGUARD POTENTIALLY TRIGGERED BY FINDINGS FROM SEA ACTION IN EA/SAFEGUARD MONITORING Dam safety (OP. 4.37) Safety of existing dams under existing or planned conditions Recommended documentation of dam safety Subprojects which use water from existing dams would include evidence of updated inspection of the safety of those dams (information available from CNA) Cultural Property (OPN ) Excavation of earth for rehabilitating or improving irrigation works might uncover items archeological, paleontological Included guidelines for chance find procedures All civil works bidding documents, contracts and work orders would follow standard environmental rules for contractors (including chance find procedures for cultural property) 16

17 17 SAFEGUARDS MANAGEMENT (Cont..3) SAFEGUARD POTENTIALLY TRIGGERED BY FINDINGS FROM SEA ACTION IN EA/SAFEGUARD MONITORING International waterways (OP. 7.50) If project affects the use of water from the Rio Grande along the US border Presented a diagnosis of the Mexican International and National Water Law. International Boundary and Water Comission (IBWC) Through existent commitments the US government has been notified by CNA (according to OP/BP 7.50)

18 INSTITUTIONAL CAPACITY (QAT RECOMMENDATION) Implementation agency will designate an environmental expert for the review of subprojects The SEA included a environmental training proposal for relevant CNA, SAGARPA staffs, and WUAs representatives, technical assistance providers, etc. 18

19 CONCLUSIONS The project ensured adequate resources for the assessment of safeguard policies (PHRD, early) Task Team developed an effective communication and understanding of the Bank safeguards Good interaction between ESSD-QAT, Task Team and client facilitated cost-effective and timely analysis of safeguards implications Demand driven approach with comprehensive project operational manual can significantly reduce the institutional risk of supporting investments in irrigation 19

Integrated Safeguards Data Sheet (Initial)

Integrated Safeguards Data Sheet (Initial) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Initial) Report No: AC124 Section I - Basic Information

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 29-Sep-2015 Report No.: ISDSC14538 Date ISDS Approved/Disclosed: 15-Oct-2015 Public Disclosure Authorized

More information

Progress and Perspectives in Mexico - US Join Cooperative Actions on the Colorado River, with Drought and Climate Change

Progress and Perspectives in Mexico - US Join Cooperative Actions on the Colorado River, with Drought and Climate Change Navigating the Future of the Colorado River Progress and Perspectives in Mexico - US Join Cooperative Actions on the Colorado River, with Drought and Climate Change Ing. Mario López Pérez Comisión Nacional

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 05-Mar-2014

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/15/2015 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: June 10, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Brazil Project Name: Brasilia Environmentally Sustainable Pro

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 12/27/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

EA Frameworks Case Study

EA Frameworks Case Study EA Frameworks Case Study Tajikistan Community Agriculture & Watershed Management The World Bank Europe & Central Asia Region Biskek,Tblisi March/April 2008 Project Safeguard Policy Process Integrated Safeguards

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA14823 Project Name

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/27/2011 1. Basic Project Data Original

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 14-Apr-2014

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Parent Project

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Peru Second Rural Electrification

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Peru Second Rural Electrification Project Name Region Sector Project ID GEF Focal Area Global Supplemental ID Borrower(s) Implementing Agency PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Peru Second Rural Electrification Latin America

More information

Large Marine Ecosystem Management Activities (US$5.62)

Large Marine Ecosystem Management Activities (US$5.62) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No: I048795

More information

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name Balochistan Small Scale Irrigation Project Region SOUTH ASIA

More information

I Managing Unit: EASRE

I Managing Unit: EASRE Date ISDS PreparedNpdated: 08/06/07 I. BASIC INFORMATION INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE A. Basic Project Data I Country: Indonesia I Project ID: PI04022 Project Name: Makassar Landfill

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/24/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/14/2011 1. Basic Project Data Original

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/18/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 11/14/2009 Report.: AC4826 1. Basic Project Data Country: Sudan Project ID: P111061 Project Name: Southern Sudan

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/21/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

CERTIFICATION AND FINANCING PROPOSAL

CERTIFICATION AND FINANCING PROPOSAL CERTIFICATION AND FINANCING PROPOSAL INFRASTRUCTURE PROGRAM FOR THE STATE OF NUEVO LEON: MODERNIZATION AND IMPROVEMENTS TO DON MARTIN IRRIGATION DISTRICT 004 IN Published: September 19, 2014 CERTIFICATION

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974. Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974. Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974 Country: Africa Project ID: P094916 Project Name: WAPP

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6042. Date ISDS Prepared/Updated: 01/26/2011 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6042. Date ISDS Prepared/Updated: 01/26/2011 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 01/26/2011 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6042 Country: South Asia Project ID: P115767 Project Name:

More information

ADAPTATION TO CLIMATE CHANGE IN THE RIO GRANDE/RIO BRAVO AND COLORADO RIVERS

ADAPTATION TO CLIMATE CHANGE IN THE RIO GRANDE/RIO BRAVO AND COLORADO RIVERS INTERNATIONAL BOUNDARY AND WATER COMISSION COMMISSION COMISIÓN INTERNACIONAL DE LÍMITES Y AGUAS ADAPTATION TO CLIMATE CHANGE IN THE RIO GRANDE/RIO BRAVO AND COLORADO RIVERS Commissioners Edward Drusina

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 23-Mar-2015 Report No.: ISDSC 12226 Date ISDS Approved/Disclosed: 06-Apr-2015 Public Disclosure Authorized

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE CO National Urban Transport

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1145 Project Name. Sindh Water Sector Improvement Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1145 Project Name. Sindh Water Sector Improvement Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1145 Project Name Sindh

More information

CERTIFICATION AND FINANCING PROPOSAL

CERTIFICATION AND FINANCING PROPOSAL CERTIFICATION AND FINANCING PROPOSAL INFRASTRUCTURE PROGRAM FOR THE STATE OF NUEVO LEON: MODERNIZATION AND IMPROVEMENTS TO DON MARTIN IRRIGATION DISTRICT 004 IN ANAHUAC, NUEVO LEON STATE OF NUEVO LEON

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291 Project Name

More information

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles Operational Manual - Table A1 - Environmental and Social Safeguard Policies Policy and Staff Connections- World Bank Intranet WB External Site WBG Directory Help Site Map Feedback Home News & Events Countries

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Jun ,367,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Jun ,367,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020787 Public Disclosure Authorized Public Disclosure Authorized Project ID P118090 Country Egypt, Arab

More information

( ) Page: 1/10 NOTIFICATION

( ) Page: 1/10 NOTIFICATION 20 September 2016 (16-4994) Page: 1/10 Committee on Agriculture Original: Spanish NOTIFICATION The following submission, dated 12 September 2016, is being circulated at the request of the delegation of

More information

InfoShop. Integrated Safeguards Data Sheet (Initial) Date ISDS Prepared/Updated: 10/21/2002. Section I - Basic Information

InfoShop. Integrated Safeguards Data Sheet (Initial) Date ISDS Prepared/Updated: 10/21/2002. Section I - Basic Information Public Disclosure Authorized THE WORLD BANK GROUP InfoShop Integrated Safeguards Data Sheet (Initial) 25030 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date Prepared/Updated:

More information

Conservation Planning

Conservation Planning Conservation Planning Good Conservation Planning vs Good Conservation Plan Good Planning = Following the 9 step planning process with proper documentation(including CPA-52 Environmental Worksheet and CPA-15

More information

Cofinancing (US$M): b.were the project objectives/key associated outcome targets revised during implementation? No

Cofinancing (US$M): b.were the project objectives/key associated outcome targets revised during implementation? No Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14682 1. Project Data: Date Posted: 03/23/2015 Public Disclosure Authorized Public Disclosure Authorized Public

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Lahendong II Geothermal

More information

BOSNIA AND HERZEGOVINA

BOSNIA AND HERZEGOVINA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Adriatic Sea Environmental Pollution Control Project (I) Croatia and Bosnia and Herzegovina

More information

NAMA SUPPORT PROJECT MEXICO: IMPLEMENTATION OF NEW HOUSING NAMA TECHNICAL COMPONENT. October 2016

NAMA SUPPORT PROJECT MEXICO: IMPLEMENTATION OF NEW HOUSING NAMA TECHNICAL COMPONENT. October 2016 NAMA SUPPORT PROJECT MEXICO: IMPLEMENTATION OF NEW HOUSING NAMA TECHNICAL COMPONENT October 2016 THE MEXICAN HOUSING SECTOR Facts Population growth around 1.7 Mio. per year Urbanisation rate approx. 79%

More information

ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5416 Project Name

ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5416 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL

More information

MINISTÈRE DES AFFAIRES ÉTRANGÈRES ET EUROPÉENNES 20 December /5 6th World Water Forum Ministerial Process Draft document

MINISTÈRE DES AFFAIRES ÉTRANGÈRES ET EUROPÉENNES 20 December /5 6th World Water Forum Ministerial Process Draft document MINISTÈRE DES AFFAIRES ÉTRANGÈRES ET EUROPÉENNES 20 December 2011 1/5 6th World Water Forum Ministerial Process Draft document 1. We the Ministers and Heads of Delegations assembled in Marseille, France,

More information

Peru, Guarantee Facility Project

Peru, Guarantee Facility Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Peru, Guarantee Facility Project Environmental and Social Management Framework (ESMF)

More information

The North American Experience with Environmentally Sustainable Agriculture Water Policies

The North American Experience with Environmentally Sustainable Agriculture Water Policies The North American Experience with Environmentally Sustainable Agriculture Water Policies Marc Ribaudo 1, Louise Bissonnette 2, Roberto Ismael Vázquez Ochoa 3, Jorge Argueta Spínola 4, Kari Cohen 5, Tim

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/07/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify) PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION Interested Organization Name: Project Location: Projected amount of required project funding ($ /USD): TOTAL: Project Sector or Similar:

More information

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK (ESMF)

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK (ESMF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E2425 MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT FEDERAL REPUBLIC OF ETHIOPIA AGRICULTURAL

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. GZ-Gaza II Emergency Water Project MIDDLE EAST AND NORTH AFRICA PLO FOR THE BENEFIT OF THE PA

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. GZ-Gaza II Emergency Water Project MIDDLE EAST AND NORTH AFRICA PLO FOR THE BENEFIT OF THE PA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE GZ-Gaza II Emergency

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No.: 38582 Date ISDS Prepared/Updated: 16 January 2007 I. BASIC INFORMATION A.

More information

Renewable Energy: The Future of Biofuels

Renewable Energy: The Future of Biofuels Renewable Energy: The Future of Biofuels Biofuels/Solar/Wind Mexico January 20, 2017 Robert J. Downing downingr@gtlaw.com (305) 579-0637 G R E E N B E R G T R A U R I G, L L P A T T O R N E Y S A T L A

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: ISDSC8244 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Country: Mauritania

More information

Environmental and Social Management Framework (ESMF)

Environmental and Social Management Framework (ESMF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic Of Yemen Presidency of the Council of Ministers Social Fund for Development

More information

TAJIKISTAN PUBLIC EMPLOYMENT FOR SUSTAINABLE AGRICULTURE AND WATER MANAGEMENT PROJECT (PAMP)

TAJIKISTAN PUBLIC EMPLOYMENT FOR SUSTAINABLE AGRICULTURE AND WATER MANAGEMENT PROJECT (PAMP) TAJIKISTAN PUBLIC EMPLOYMENT FOR SUSTAINABLE AGRICULTURE AND WATER MANAGEMENT PROJECT (PAMP) Non-traditional Approaches to Addressing Risk and Vulnerability in Agriculture Europe and Central Asia Region

More information

4 foshop ThtWd ILj^ ik

4 foshop ThtWd ILj^ ik Public Disclosure Authorized THE WORLD BANK GROUP 4 foshop ThtWd ILj^ ik Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

More information

APES- Water Diversions Name: Brandon Tran

APES- Water Diversions Name: Brandon Tran APES- Water Diversions Name: Brandon Tran Purpose: Conduct research to analyze the effects of water diversions on surrounding ecosystems and human communities. Compare and contrast the problems and successes

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/06/2011 INTEGRATED SAFEGUARDS DATASHEET

More information

The World Bank s Safeguards Policies in Context of Hydropower Projects International Conference on Sustainable Hydropower in the Dinaric Arc

The World Bank s Safeguards Policies in Context of Hydropower Projects International Conference on Sustainable Hydropower in the Dinaric Arc The World Bank s Safeguards Policies in Context of Hydropower Projects International Conference on Sustainable Hydropower in the Dinaric Arc Dubrovnik, 07 October 2009 Structure of Presentation 1. A Bit

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name CBF Sidi Daoud Wind Farm

More information

Environmental and Social Impact Assessment and Strategic Environmental and Social Assessment at the World Bank

Environmental and Social Impact Assessment and Strategic Environmental and Social Assessment at the World Bank Environmental and Social Impact Assessment and Strategic Environmental and Social Assessment at the World Bank Agi Kiss Regional Safeguards Advisor, Europe and Central Asia Region The World Bank Economic

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Date prepared/updated: 09/10/2013 / 10/05/2013

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared/ Updated

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 01/19/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

Understanding Flows Through the Remnant Colorado River Delta

Understanding Flows Through the Remnant Colorado River Delta Research for People and the Planet Understanding Flows Through the Remnant Colorado River Delta Recommendations for Streamgage Sites and Data Collection November 4, 2005 for more information, contact:

More information

Provincial Policy Statement 2014

Provincial Policy Statement 2014 Natural Heritage Provincial Policy Statement 2014 NATURAL HERITAGE Nature is bountiful. It is also fragile and finite. Provincial Natural Heritage 0 Interest: Ontario s natural heritage resources are valuable

More information

7/20/2011 TECHNICAL FEEDBACK GROUP OBJECTIVES. Seepage and Conveyance Technical Feedback Group. April 29, H Street Los Banos, CA.

7/20/2011 TECHNICAL FEEDBACK GROUP OBJECTIVES. Seepage and Conveyance Technical Feedback Group. April 29, H Street Los Banos, CA. Seepage and Conveyance Technical Feedback Group April 29, 2011 541 H Street Los Banos, CA Agenda Introductions and Technical Feedback Group (TFG) Purpose Action Item Review and Update 2011 Interim Flows

More information

CEQA and its Role in Historic Preservation. Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA

CEQA and its Role in Historic Preservation. Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA CEQA and its Role in Historic Preservation Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA General CEQA Requirements and Limitations Mitigation Measures

More information

Notes for NEPA for Generic Terms of Reference

Notes for NEPA for Generic Terms of Reference TERMS OF REFERENCE IIRRIIGATIION AND WATER MANAGEMENT Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to the construction and/or the development of Irrigation

More information

MANAGING FRESHWATER INFLOWS TO ESTUARIES

MANAGING FRESHWATER INFLOWS TO ESTUARIES MANAGING FRESHWATER INFLOWS TO ESTUARIES Human Dimensions of the Yuna Watershed and Samana Bay Estuary James Tobey Presented to The Influence of the Yuna Watershed on Samana Bay September 21, 2004. Santo

More information

Cost-Sharing of Improved Irrigation Technologies to Reduce Nonpoint-Source Pollution

Cost-Sharing of Improved Irrigation Technologies to Reduce Nonpoint-Source Pollution Cost-Sharing of Improved Irrigation Technologies to Reduce Nonpoint-Source Pollution Glenn D. Schaible, C. S. Kim, and Stan G. Daberkow Economic Research Service, U.S. Dept. of Agriculture, 1800 M Street,

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/29/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

Executive Summary Sri Lanka Strategic Cities Development Project (SCDP)

Executive Summary Sri Lanka Strategic Cities Development Project (SCDP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Executive Summary Sri Lanka Strategic Cities Development Project (SCDP) Executive Summary

More information

Hashemite kingdom of Jordan Ministry of Environment Environment in Jordan: The challenges, achievements and trends

Hashemite kingdom of Jordan Ministry of Environment Environment in Jordan: The challenges, achievements and trends Hashemite kingdom of Jordan Ministry of Environment Environment in Jordan: The challenges, achievements and trends Eng. Haitham Al-Adaileh 18 20 June, 2012. Amman - Jordan 1 Our Vision The Ministry of

More information

Japanese ODA Loan. Ex-Ante Evaluation

Japanese ODA Loan. Ex-Ante Evaluation Japanese ODA Loan Ex-Ante Evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Haor Flood Management and Livelihood Improvement Project Loan Agreement: June 16, 2014 Loan

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) te to Task Teams: The following sections are system generated and can only be edited online in the Portal. Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated:

More information

Addressing Key Environmental Hazards after an Earthquake

Addressing Key Environmental Hazards after an Earthquake Addressing Key Environmental Hazards after an Earthquake A. International Experience 1. Environmental management is not a well-recognized priority issue in an emergency situation. So rather than confine

More information

National cases in LAC: Costa Rica & Brazil. 1st Executive Committee Meeting (29-30 March 2017, Bonn, Germany)

National cases in LAC: Costa Rica & Brazil. 1st Executive Committee Meeting (29-30 March 2017, Bonn, Germany) National cases in LAC: Costa Rica & Brazil 1st Executive Committee Meeting (29-30 March 2017, Bonn, Germany) 1. National case study in Costa Rica Objective: Description of the relevant WEF interrelations

More information

Performance Standard 6 V2

Performance Standard 6 V2 Introduction 1. Performance Standard 6 recognizes that protecting and conserving biodiversity, maintaining ecosystem services, and sustainably managing living natural resources are fundamental to sustainable

More information

Regional Experiences on Irrigation Modernization. Joop Stoutjesdijk Lead Irrigation Engineer, World Bank

Regional Experiences on Irrigation Modernization. Joop Stoutjesdijk Lead Irrigation Engineer, World Bank Regional Experiences on Irrigation Modernization Joop Stoutjesdijk Lead Irrigation Engineer, World Bank Why Modernize Few main reasons why to modernize: Rapidly increasing competing uses for water. Irrigation

More information

Use and Management of Hydrologic Resources in New Mexico

Use and Management of Hydrologic Resources in New Mexico Use and Management of Hydrologic Resources in New Mexico Water Work Table Mesa de Trabajo Sobre Agua NEW MEXICO REPORT August, 2006 Utton Transboundary Resources Center University of New Mexico School

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47960) ON A LOAN TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47960) ON A LOAN TO THE Public Disclosure Authorized Document of The World Bank Report No: ICR00001350 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47960) ON A LOAN IN THE AMOUNT OF US$325 MILLION

More information

Conventional vs. Sustainable: A Matrix for Decision Making. APWA National Sustainability Conference Pittsburg, PA June 26, 2012

Conventional vs. Sustainable: A Matrix for Decision Making. APWA National Sustainability Conference Pittsburg, PA June 26, 2012 Conventional vs. Sustainable: A Matrix for Decision Making APWA National Sustainability Conference Pittsburg, PA June 26, 2012 Introduction Larry Stevens, PE Project Director, HR Green, Inc., Johnston,

More information

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India Review: Definition of EIA Environmental Impact Assessment

More information

Update on the Arizona-Sonora portion of the United States-Mexico Transboundary Aquifer Assessment Program

Update on the Arizona-Sonora portion of the United States-Mexico Transboundary Aquifer Assessment Program College of Agriculture and Life Sciences Update on the Arizona-Sonora portion of the United States-Mexico Transboundary Aquifer Assessment Program Water Committee of the Arizona-Sonora Commission June

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3028 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3028 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3028 Project Name BR Santos

More information

Geomorphologic Condition and Shallow Aquifers

Geomorphologic Condition and Shallow Aquifers Geomorphologic Condition and Shallow Aquifers Shann Stringer Center for Ecological Sciences Geomorphology Fluvial geomorphology is the study of the physics of water, sediment, riparian area, and floodplain

More information

& Watershed Management Practices. 4 Sustainable Watershed Management

& Watershed Management Practices. 4 Sustainable Watershed Management Module 2 (L4) Sustainable Watershed Approach & Watershed Management Practices 4 Sustainable Watershed Management 1 1 L4 Sustainable Watershed Management Topics Covered Introduction to the concept of sustainable

More information

ZERO DEFORESTATION SOME COMMENTS AND OBSERVATIONS

ZERO DEFORESTATION SOME COMMENTS AND OBSERVATIONS ZERO DEFORESTATION SOME COMMENTS AND OBSERVATIONS WRI-Chatham House Transatlantic Dialogue October 23-24, 2014 Tuukka Castrén/World Bank World Bank Safeguard Policies The World Bank Group Framework and

More information

E830 November 10, 2003

E830 November 10, 2003 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E830 November 10, 2003 SRI LANKA: COMMUNITY DEVELOPMENT AND LIVELIHOOD IMPROVEMENT PROJECT

More information

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

Fresh Water Treaty. International Setting and Issues in Water, Environment and Development

Fresh Water Treaty. International Setting and Issues in Water, Environment and Development Fresh Water Treaty Preamble International Setting and Issues in Water, Environment and Development 1. In recent years most countries have faced a grave economic crisis which generated a great decrease

More information

URBAN SYSTEMS IN AREAS OF EXTREME ARIDITY. PROPOSALS FOR SUSTAINABLE WATER MANAGEMENT

URBAN SYSTEMS IN AREAS OF EXTREME ARIDITY. PROPOSALS FOR SUSTAINABLE WATER MANAGEMENT URBAN SYSTEMS IN AREAS OF EXTREME ARIDITY. PROPOSALS FOR SUSTAINABLE WATER MANAGEMENT Mario Molina Center Abstract The objective of this study was to identify the most appropriate actions, from an environmental,

More information

MINISTRY OF AGRICULTURE, IRRIGATION AND WATER DEVELOPMENT MALAWI SHIRE RIVER BASIN MANAGEMENT PROJECT - P117617

MINISTRY OF AGRICULTURE, IRRIGATION AND WATER DEVELOPMENT MALAWI SHIRE RIVER BASIN MANAGEMENT PROJECT - P117617 Public Disclosure Authorized MINISTRY OF AGRICULTURE, IRRIGATION AND WATER DEVELOPMENT MALAWI SHIRE RIVER BASIN MANAGEMENT PROJECT - P117617 1 st STEP ANNUAL PROCUREMENT PLAN BASED ON THE FEBRUARY 2017

More information