1 1. Ability of Professional Personnel: 1A. Describe the qualifications, and relevant experience of the Project Manager, all key staff and all subconsultants key staff that are most likely to be assigned to the project under this RFP. Include resumes for all key staff described. Provide an Organizational Chart for the members of the Proposed Project Team. Points Value: 20 Qualifications and relevant experience of the Project Manager, all key staff for the prime and subconsultants was provided along with resumes and an organizational chart. BEA Architect Inc. key staff: Bruno E. Ramos, AIA, GC, NCARB, LEED AP - Principal-in-Charge John Coloa,, AIA, GC, NCARB - Senior Architect, QA/QC Armando Trujillo, RA, LEED AP BD+C Deputy Project Manager, Adrian Price, RA, NCARB - Senior Project Designer Kyle A. Kincaid, M. Arch. Project Architect Subconsultants: TLC Engineering for Architecture: Structural Engineering, LEED Commissioning and Telecommunications/Data Engineering Keith & Associates, Inc.: Landscape Architecture, Civil Engineering & Land Surveying Hammond & Associates: Mechanical, Electrical & Plumbing (MEP) & Fire Protection Radise International, LC: Qualifications and relevant experience of the Project Manager, all key staff for the prime and subconsultants was provided along with resumes and an organizational chart. SMA s key staff: Charles A. Michelson, AIA, LEED AP - Principal Sheff L. Devier, AIA - Senior Project Manager Maday Gutierrez, RA, Project Architect Subconsultants: Delta G. Engineers, Inc. Mechanical, Electrical & Plumbing (MEP) Fire Protection Johnson Structural Group, Inc. Structural Engineer Chen Moore & Associates Civil Engineer and Landscape Architectural Planning David Plummer & Associates Transportation & Traffic Engineering Key staff, experience and resumes provided for prime and subconsultants. Qualifications and relevant experience of the Project Manager, all key staff for the prime and subconsultants was provided along with resumes and an organizational chart. ACAI s key staff: Adolfo J. Cotilla Jr., AIA, Principal Donald M. Wilkin, Project Manager, Registered Architect, CPTED Betty Loynaz, AIA, Project Manager, Registered Architect, LEED AP Subconsultants: S&F Engineering. Structural Engineer Terracon Consultants, Inc. Geotechnical Engineering Premiere Design Solutions, Inc. Civil Engineer and Surveying Consulting Engineering Services Mechanical, Electrical & Plumbing (MEP) Page 1 of 10

2 Geotechnical Engineering & Construction Material Testing Key staff, experience and resumes provided for prime and subconsultants. For more information see pages *Pages listed are of the PDF, the index has different numbering. Key staff, experience and resumes provided for prime and subconsultants. For more information see pages For more information see pages *Pages listed are of the PDF. *Pages listed are of the PDF. 1B. Provide evidence of knowledge and experience with the Florida Building Code and all other local municipal and jurisdictional agencies. Points Value: 10 BEA provided the team members knowledge and experience with the Florida Building Code as part of their resumes. For more information see pages 4-60, 62, 66, 87, 98, 105 and 153. SMA provided the team members knowledge and experience with the Florida Building Code as part of their resumes. For more information see pages ACAI provided the team members knowledge and experience with the Florida Building Code as part of their resumes. For more information see pages 6-29 and 36 Total Points Value 1A, 1B = 30 Page 2 of 10

3 2. Project Approach: Describe the prime Vendor s approach to the project. Include how the prime Vendor will use subconsultants in the project. BEA submitted the project approach on pages SMA submitted the project approach on pages ACAI submitted the project approach on pages Points Value: 10 Total Points Value = Past Performance: 3A. Describe prime Vendor s experience in the last five years on vertical construction projects up to $10 Million dollars in construction cost. Provide a minimum of five projects with references. Specific examples of seven projects provided for the prime (Project cost and dates vary). For more information see pages Specific examples of five projects provided for the prime. For more information see pages Specific examples of ten recently performed projects provided for the prime with no construction cost mentioned. For more information see pages Points Value: 20 3B. Provide evidence of satisfactory completion, both on time and within budget for the projects submitted above as demonstration of Vendor s experience. Reference name and number provided for seven projects. Evidence of satisfactory completion was provided for all projects mentioned as part of Vendor Verification Forms. Six Vendor Reference Verification Forms provided for prime. Reference name and number provided for four all projects submitted above. Evidence of satisfactory completion provided as part of Vendor Verification Forms. Four Vendor Reference Verification Forms provided for prime. Reference name and number provided for four completed projects. Evidence of satisfactory completion provided as part of Vendor Verification Forms. Four Vendor Reference Verification Forms provided for prime. Points Value: 10 For more information see pages For more information see pages For more information see pages Page 3 of 10

4 3C. Describe prime Vendor s experience on the design of similar Transit-oriented construction projects. BEA provided the prime Vendor s experience on pages SMA provided one similar transit project on page 113 and multiple similar project completed by a subconsultant on page 114. ACAI provided reference form for a similar transit-oriented construction project on pages 4, 6, and 39. Points Value: 5. Total Points Value 3A + 3B +3C = Specialized Experience, Knowledge and Capabilities: 4A. LEED Experience and Knowledge: LEED experience and knowledge provided. LEED AP credentials provided. For more information see pages 27 and 29 and LEED experience and knowledge provided. LEED AP credentials provided. For more information see pages 83, LEED experience and knowledge provided. LEED AP credentials provided. For more information see pages 8-13 and LEED Experience and Knowledge: Describe Leadership in Energy and Environmental Design (LEED) experience and knowledge. List current and past projects including certification level and credentials of your accredited professionals on the Project Team. Points Value: 5 Page 4 of 10

5 4B. BIM Capabilities and Experience: BIM Capabilities and Experience: Describe your firm s experience in utilization of Building Information Modeling (BIM) software during all phases of design and construction including: visualization, scheduling, clash detection, interference management and COBie software. Identify your offices predominating software platform and supporting software BIM capabilities and experience referenced and provided on Also, BIM capabilities and experience referenced for subconsultants provided on pages and BIM capabilities and experience referenced and provided on pages 109, ACAI provided the BIM experience as part of the team s resumes and also in details on pages Points Value: 10 Total Points Value = Workload of the Firm: For the prime Vendor only, list all completed and active projects that Vendor has managed within the past five years. In addition, list all projected projects that Vendor will be working on in the near future. Projected projects will be defined as a project(s) that Vendor is awarded a contract but the Notice to Proceed has not been issued. Identify any projects that BEA provided list of 7 current projects to identify key personal availability. For more information see pages 144. Firm provided list of completed within the past five years. For more information see pages Vendor s management approach provided. For more information see pages SMA provided a list of 40 current, active and future projects. For more information see page 138. Firm provided list of completed projects within the past five years. For more information see page 140 and 162. Vendor s management approach provided. For more information see page 109. ACAI provided information on 10 current, active and future projects. For more information see page Vendor s management approach provided. For more information see page 36. Page 5 of 10

6 Vendor worked on concurrently. Describe Vendor s approach in managing these projects. Were there or will there be any challenges for any of the listed projects? If so, describe how Vendor dealt or will deal with the projects challenges. Points Value: 5 Total Points Value = 5 6. Willingness to Meet Time and Budget Requirements: Yes Yes Yes. Points Value: 2 Total Points Value = 2 7. Volume of Previous Work: Refer to Volume of Previous Work Attestation Form and the Volume of Previous Work Attestation Joint Venture Form and submit as instructed. BEA submitted a list of five projects along with the required forms on page 148. SMA submitted a list of 24 projects along with the required forms on pages 140,141&162 ACAI submitted information on 10 projects along with the required forms on pages Points Value: 3 Total Points Value = 3 Page 6 of 10

7 VENDOR QUESTIONNAIRE: (Q&A: 1-20) VENDOR QUESTIONNAIRE: (Q&A: 1-20) VENDOR QUESTIONNAIRE: (Q&A: 1-20) VENDOR QUESTIONNAIRE: (Q&A: 18-20) 1. Legal business name: BEA Architects, Inc. Saltz Michelson Architects, Inc. ACAI Associates, Inc. 2. Federal Employer I.D. no. (FEIN): Dun and Bradstreet No.: Doing Business As/Fictitious name (if applicable): Saltz Michelson Architects 5. Website address (if applicable): Principal place of business address: 3075 NW South River Drive Miami, Florida Griffin Road Ft. Lauderdale, FL W Cypress Creek Road, Suite 200, Fort Lauderdale, FL Office location responsible for this project: 3075 NW South River Drive Miami, Florida Griffin Road Ft. Lauderdale, FL W Cypress Creek Road, Suite 200, Fort Lauderdale, FL Telephone no.: Fax No.: (305) (305) (954) (954) (954) (954) Type of business: State of Incorporation: Corporation Florida Corporation Florida Corporation Florida 10. List Florida Department of State, Division of Corporations document number: P P CC Page 7 of 10

8 11. List name and title of each principal, owner, officer, and major shareholder: Bruno E. Ramos, President Maritza F. Ramos, President Mark L. Saltz, President, AIA, LEED AP Charles A. Michelson, Secretary/Treasurer, AIA, LEED AP Adolfo Cotilla, President 12. Authorized Contact(s) for your firm: Name: Bruno E. Ramos Title: President Tel: Name: Armando Trujillo Title: Deputy Project Manager Tel: Fax: Name: Mark L. Saltz Title:, Chairman Tel: Fax: Name: Charles Michelson Title: President Tel: Fax: Name: Adolfo Cotilla Title: President Tel: Has your firm ever failed to complete any services and/or delivery of products during the last three (3) years? If yes, specify details in an attached written response. 14. Is your firm or any of its principals or officers currently principals or officers of another organization? If yes, specify details in an attached written response. Page 8 of 10

9 15. Have any voluntary or involuntary bankruptcy petitions been filed by or against your firm, its parent or subsidiaries or predecessor organizations during the last three years? If yes, specify details in an attached written response. 16. Has your firm, its principals, officers or predecessor organization(s) been debarred or suspended by any government entity within the last three years? If yes, specify details in an attached written response. 17. Has your firm s surety ever intervened to assist in the completion of a contract or have Performance and/or Payment Bond claims been made to your firm or its predecessor s sureties during the last three years? If yes, specify details in an attached written response, including contact information for owner and surety. 18. Has your firm ever failed to complete any work awarded to you, services and/or delivery of products Page 9 of 10

10 during the last three (3) years? If yes, specify details in an attached written response. 19. Has your firm ever been terminated from a contract within the last three years? If yes, specify details in an attached written response. 20. Living Wage solicitations only: In determining what, if any, fiscal impacts(s) are a result of the Ordinance for this solicitation, provide the following for informational purposes only. Response is not considered in determining the award of this contract. Living Wage had an effect on the pricing. Yes No N/A If yes, Living Wage increased the pricing by % or decreased. N/A N/A N/A Page 10 of 10

Job Order Contract (JOC) Program Consultant RFP No. PNC P1

Job Order Contract (JOC) Program Consultant RFP No. PNC P1 1. Ability of Professional Personnel: Describe the qualifications and relevant experience of all key personnel that are most likely to be assigned to this proposed project, including their knowledge and

More information

Solicitation Number. R P1 BROWARD COUNTY NEW TRANSIT CENTER. Architectural and Engineering Services for Lauderhill Mall New Transit Center

Solicitation Number. R P1 BROWARD COUNTY NEW TRANSIT CENTER. Architectural and Engineering Services for Lauderhill Mall New Transit Center Solicitation Number. R2114326P1 BROWARD COUNTY NEW TRANSIT CENTER Architectural and Engineering Services for Lauderhill Mall New Transit Center Agenda Interview Team Introduction & Company Overview & History

More information

Vendor Evaluation Criteria Response Matrix

Vendor Evaluation Criteria Response Matrix Vendor Evaluation Criteria Response Matrix Vendor Address 3501 Griffin RoadFort Lauderdale, FL 33312 1900 NW Corporate Blvd, Suite E102Boca Raton, Florida 33431 Evaluation Criteria Vendor Response 1. Ability

More information

Vendor Evaluation Criteria Response Matrix

Vendor Evaluation Criteria Response Matrix Vendor Evaluation Criteria Response Matrix RFP/RLI/RFQ Number and Title Vendor Address *Required Evaluation Criteria 2937 W Cypress Creek Road, Suite 200, Fort Lauderdale, FL 33309 Vendor Response 3075

More information

Vendor Evaluation Criteria Response Matrix

Vendor Evaluation Criteria Response Matrix Vendor Evaluation Criteria Response Matrix Vendor Name Sharp Marketing LLC Flagrant International Solutions, Inc. Wizard Creations, Inc. Vendor Address 655 West Prospect RoadFort Lauderdale, FL 33309 6210

More information

UNIVERSITY OF VIRGINIA STANDARD FORM FOR CONTRACTOR'S STATEMENT OF QUALIFICATIONS. Contractor s Name:

UNIVERSITY OF VIRGINIA STANDARD FORM FOR CONTRACTOR'S STATEMENT OF QUALIFICATIONS. Contractor s Name: (Rev. 8-12-15) HECO-16 Academic On-Demand Construction Program RFP # 17-107 University of Virginia Charlottesville, VA SOQ Due Date: June 20, 2018 UNIVERSITY OF VIRGINIA STANDARD FORM FOR CONTRACTOR'S

More information

STEP TWO, Tradewinds Park North Equestrian Farm Site Improvements R P2

STEP TWO, Tradewinds Park North Equestrian Farm Site Improvements R P2 1- Project Team Design Solution: A) Provide a DESIGN SOLUTION that addresses the vision OVERALL CONCEPT PLANNING AND BASE PROGRAM SCOPE OF WORK for the Project. Specifically describe how the Proposal addresses

More information

UNIVERSITY OF VIRGINIA STANDARD FORM FOR CONTRACTOR'S STATEMENT OF QUALIFICATIONS. Contractor s Name:

UNIVERSITY OF VIRGINIA STANDARD FORM FOR CONTRACTOR'S STATEMENT OF QUALIFICATIONS. Contractor s Name: (Rev. 8-12-15) HECO-16 Two Step IFB Project: East Chiller Plant, Chiller #5 WM111217 University of Virginia Charlottesville, VA SOQ Due Date: December 13, 2017 UNIVERSITY OF VIRGINIA STANDARD FORM FOR

More information

New York City Transit (NYCT) DATE: July 19, 2018 CONSTRUCTION/ARCHITECTURAL & ENGINEERING CONTRACT SOLICITATION NOTICE/PROJECT OVERVIEW MTA-NYCT IS NOW ADVERTISING FOR THE FOLLOWING: SSE #: 0000226381

More information

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Bishop Woods Landscape Restoration Response

More information

PREQUALIFICATION APPLICATION

PREQUALIFICATION APPLICATION COMPANY INFORMATION BUSINESS INFORMATION Company Name: Parent Company: Previous Company Name(s): Type of Company: Corporation Partnership Sole Proprietor Joint Venture Other If Other, please specify: State

More information

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA 95132 408-923-1871 OFC 408-926-8329 FAX PREQUALIFICATION PACKAGE INSTRUCTIONS FOR PROSPECTIVE MEP SUBCONTRACTORS FEBRUARY

More information

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Agency Project Name Stadium Project Response Deadline 1/9/14 12 pm local time

More information

SUBCONTRACTOR/SUPPLIER PRE-QUALIFICATION QUESTIONNAIRE

SUBCONTRACTOR/SUPPLIER PRE-QUALIFICATION QUESTIONNAIRE SUBCONTRACTOR/SUPPLIER PRE-QUALIFICATION QUESTIONNAIRE PLEASE SUBMIT FORM BY E-MAIL OR FAX TO: Trish Greene tgreene@hannigconstruction.com e-mail@hannigconstruction.com Fax 812.235.1218 INFORMATION DATE:

More information

Broward County, Florida. Solicitation PNC P1 Consulting Services for Consolidated Facilities Maintenance Building at PEV September 11, 2018

Broward County, Florida. Solicitation PNC P1 Consulting Services for Consolidated Facilities Maintenance Building at PEV September 11, 2018 Broward County, Florida Solicitation PNC2116532P1 Consulting Services for Consolidated Facilities Maintenance Building at PEV September 11, 2018 IN MEMORIUM Our advantage WE KNOW SOUTH FLORIDA South Florida-

More information

Document A305. The Undersigned certifies under oath that the information provided herein is true and sufficiently complete so as not to be misleading.

Document A305. The Undersigned certifies under oath that the information provided herein is true and sufficiently complete so as not to be misleading. TM Document A305 Contractor s Qualification Statement 1986 The Undersigned certifies under oath that the information provided herein is true and sufficiently complete so as not to be misleading. SUBMITTED

More information

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Olscamp Central Chiller Plant CCP-3 Response

More information

ADDITIONAL TYPES OF WORK REQUIRING PRE-QUALIFICATION:

ADDITIONAL TYPES OF WORK REQUIRING PRE-QUALIFICATION: CENTRAL FLORIDA EXPRESSWAY AUTHORITY NOTICE TO PROFESSIONAL ENGINEERING CONSULTANTS REQUEST FOR LETTERS OF INTEREST FOR GENERAL ENGINEERING CONSULTANT SERVICES CONTRACT NO. 001145 The Central Florida Expressway

More information

University of Washington. Request for Qualifications ARCHITECTURAL DESIGN SERVICES FOR. UW Fluke Hall Labs and Building Renewal Project Number:

University of Washington. Request for Qualifications ARCHITECTURAL DESIGN SERVICES FOR. UW Fluke Hall Labs and Building Renewal Project Number: Capital Projects Office Request For Qualifications for Architectural Design Services University of Washington Request for Qualifications ARCHITECTURAL DESIGN SERVICES FOR UW Fluke Hall Labs and Building

More information

Sub-Contractor/Supplier Pre-Qualification Questionnaire

Sub-Contractor/Supplier Pre-Qualification Questionnaire CURRENT DATE: *Please submit form by Fax or E-Mail to: 317.846.3113 info@allieddiversified.com COMPANY NAME: CONTACT: ADDRESS: STREET: CITY: STATE: ZIP: PHONE: FAX: E-MAIL: WEBSITE: 1. ORGANIZATION 1.1

More information

AIA Document A305 - Electronic Format CONTRACTOR S QUALIFICATION STATEMENT

AIA Document A305 - Electronic Format CONTRACTOR S QUALIFICATION STATEMENT AIA Document A305 - Electronic Format CONTRACTOR S QUALIFICATION STATEMENT THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES: CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO IT'S COMPLETION OR

More information

Maintenance and Operations 1302 Service Road Tustin, California (714) CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

Maintenance and Operations 1302 Service Road Tustin, California (714) CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 Maintenance and Operations 1302 Service Road Tustin, California 92780 (714) 730-7515 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 The Tustin Unified School District ( District ) has determined that

More information

Albany Unified School District Contractor Prequalification

Albany Unified School District Contractor Prequalification Albany Unified School District Contractor Prequalification The Albany Unified School District ( District ) has determined that contractors providing construction services ( Contractor(s) or Firm(s) ) must

More information

Prequalification Statement 11.16

Prequalification Statement 11.16 COMPANY INFORMATION Prequalification Statement 11.16 It is recommended that you have the Adobe Acrobat Reader version 8 or newer installed on your computer to complete this Fillable Adobe PDF form. Adobe

More information

Pennsylvania Turnpike Commission Harrisburg, Pennsylvania

Pennsylvania Turnpike Commission Harrisburg, Pennsylvania Pennsylvania Turnpike Commission Harrisburg, Pennsylvania NOTICE TO CONTRACTORS REQUEST FOR PREQUALIFICATION PLYMOUTH MEETING MAINTENANCE FACILITY RELOCATION AND CONSTRUCTION PLYMOUTH TOWNSHIP, MONTGOMERY

More information

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Harshman Demolition Response Deadline 3/28/18

More information

CM AT RISK RFQ INTEREST FORM (For Submission to Cambridge Housing Authority Immediately) Revitalization of Frank J. Manning Apartments

CM AT RISK RFQ INTEREST FORM (For Submission to Cambridge Housing Authority Immediately) Revitalization of Frank J. Manning Apartments CM AT RISK RFQ INTEREST FORM (For Submission to Cambridge Housing Authority Immediately) Instructions: If your firm is interested in responding to this RFQ for Prequalification of CM at Risk firms for

More information

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION May 19, 2015 The Addison Public Library invites you to submit a reply to this Request for

More information

CONSTRUCTION MANAGEMENT SERVICES

CONSTRUCTION MANAGEMENT SERVICES DrAFTDRAFTdd EXHIBIT 1 CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR QUALIFICATIONS () SELECTION PROCESS School District of Lee County, Florida TABLE OF CONTENTS 1. INTRODUCTION 1 Lobbying 2 2. REQUEST

More information

RFQ /ME - ADDENDUM 3

RFQ /ME - ADDENDUM 3 RFQ 150855/ME - ADDENDUM 3 RFQ Closing: November 3, 2015 at 2:00 PM (Local Time) Page 1 of 5_ RFQ Number: 150855/ME Date: October 26, 2015 RETURN SUBMITTALS AS SHOWN BELOW Copies of submittal required:

More information

Florida Department of Transportation 719 S. Woodland Boulevard DeLand, Florida Addendum 2

Florida Department of Transportation 719 S. Woodland Boulevard DeLand, Florida Addendum 2 RICK SCOTT GOVERNOR Florida Department of Transportation 719 S. Woodland Boulevard DeLand, Florida 32720-6834 Rachel D. Cone INTERIM SECRETARY Addendum 2 ADVERTISEMENT NUMBER: ITN-DOT-16-17-5004-ICMS DESCRIPTION:

More information

Addendum No. 2 February 19, 2014 City University Construction Fund Engineering Design Services Requirements Contracts RFQ Project No.

Addendum No. 2 February 19, 2014 City University Construction Fund Engineering Design Services Requirements Contracts RFQ Project No. Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 16 th Floor New York, NY 10019 Tel: 646-664-2700 Addendum No. 2 February 19,

More information

February 15, Each bidder also submitted Bidder Responsibility Criteria information which was required as part of this project.

February 15, Each bidder also submitted Bidder Responsibility Criteria information which was required as part of this project. February 15, 2019 Mr. Mohsin Dada, Assistant Superintendent of Business and Operations Community Consolidated School District 181 115 West 55 th Street Clarendon Hills, Illinois 60514 Re: 2019 Flooring

More information

PREQUALIFICATION PACKAGE FOR MECHANICAL, ELECTRICAL OR PLUMBING CONTRACTORS WARM SPRINGS/ SOUTH FREMONT COMMUNITY NEW ELEMENTARY SCHOOL PROJECT

PREQUALIFICATION PACKAGE FOR MECHANICAL, ELECTRICAL OR PLUMBING CONTRACTORS WARM SPRINGS/ SOUTH FREMONT COMMUNITY NEW ELEMENTARY SCHOOL PROJECT PREQUALIFICATION PACKAGE FOR MECHANICAL, ELECTRICAL OR PLUMBING CONTRACTORS WARM SPRINGS/ SOUTH FREMONT COMMUNITY NEW ELEMENTARY SCHOOL PROJECT JUNE 23, 2016 NOTICE TO CONTRACTORS TO PREQUALIFY FOR MECHANICAL,

More information

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report Facility Attachment F Campus Capital Needs Sales Surtax Funded Detail Report Facilities Services 2700 Judge Fran Jamieson Way Viera, Florida 32940-6601 Condition Code Estimate Rockledge High 1.18 $5,548,952

More information

Department of Public Works Division of Engineering. Nassau County, New York

Department of Public Works Division of Engineering. Nassau County, New York TOWN OF OYSTER BAY Department of Public Works Division of Engineering Nassau County, New York REQUEST FOR PROPOSALS FOR CONSULTANT SERVICES SOLICITATION NO. 2017-12 NOTES: 1. ISSUANCE DATE: Thursday, October

More information

Facility Basics for Bond Project Communications

Facility Basics for Bond Project Communications Facility Basics for Bond Project Communications TSPRA Annual Conference February 19, 2013 Presented by: Cathy Brandewie O Connell Robertson Architectural Teams can help with Evaluating / Assessing Facilities

More information

SANTA PAULA UNIFIED SCHOOL DISTRICT 201 S. Steckel Drive Santa Paula, California (805)

SANTA PAULA UNIFIED SCHOOL DISTRICT 201 S. Steckel Drive Santa Paula, California (805) SANTA PAULA UNIFIED SCHOOL DISTRICT 201 S. Steckel Drive Santa Paula, California 93060 (805) 933-3908 Annual Pre-Qualification for MEP Contractors per Public Contract Code 20111.6 License Classifications:

More information

Request for Qualifications for Architectural Services

Request for Qualifications for Architectural Services Page 1 of 11 Capital Projects Office Request for Qualifications for Architectural Services University of Washington Request for Qualifications ARCHITECTURAL SERVICES FOR Computer Science & Engineering

More information

IRVINE UNIFIED SCHOOL DISTRICT CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

IRVINE UNIFIED SCHOOL DISTRICT CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 The Irvine Unified School District ( District ) has determined that bidders on an annual basis must be prequalified prior to submitting a bid on a project

More information

Pre-construction and Construction services for the construction of the Grand Street Settlement

Pre-construction and Construction services for the construction of the Grand Street Settlement Pre-construction and Construction services for the construction of the Grand Street Settlement Table of Contents Part A I. Introduction and Background II. Owner Goals and Objectives III. Key Dates, Contract

More information

University of Washington. Request for Qualifications. Commissioning Authority Services for

University of Washington. Request for Qualifications. Commissioning Authority Services for University of Washington Request for Qualifications Commissioning Authority Services for University of Washington Fluke Hall Renovation Project Project Number: 203880 Submittal Date: July 18, 2013 at 3:00

More information

PREQUALIFICATION AND ADVERTISEMENT FOR BIDS

PREQUALIFICATION AND ADVERTISEMENT FOR BIDS PREQUALIFICATION AND ADVERTISEMENT FOR BIDS Sealed Bid Proposals for UAB Project No. 170177 Honors College Building located at 1321 10th Avenue South, Birmingham AL 35205 will be received by The Facilities

More information

A101 Standard form of agreement between Owner and Contractor-Stipulated sum with instruction sheet wrapped (2017) $55.98

A101 Standard form of agreement between Owner and Contractor-Stipulated sum with instruction sheet wrapped (2017) $55.98 Please note new address! 310 SE 1 Street Miami, Fl 33131 QUESTIONS ABOUT AIA DOCUMENT CONTENT docinfo@aia.org 202.626.7526 Contact: Marilyn Lugo 305.448.7488 WEB: www.aia.org/contractdocs/reference A SERIES

More information

APPENDIX 3 PASSHE FORM 150 ASP APPLICATION FOR SPECIFIC PROJECT

APPENDIX 3 PASSHE FORM 150 ASP APPLICATION FOR SPECIFIC PROJECT APPENDIX 3 PASSHE FORM 150 ASP APPLICATION FOR SPECIFIC PROJECT Appendix 3 PASSHE Form 150 ASP Appendix 3 PASSHE Form 150 ASP This Page Blank PROJECT NUMBER REQUEST FOR PROPOSAL RFP PASSHE-PROF-2010-1

More information

Request for Qualifications (Criteria Architect/Engineer, Architect/Engineer) State of Ohio Standard Forms and Documents

Request for Qualifications (Criteria Architect/Engineer, Architect/Engineer) State of Ohio Standard Forms and Documents Request for Qualifications (Criteria Architect/Engineer, Architect/Engineer) State of Ohio Standard Forms and Documents Administration of Project: School District Board + OFCC Project Name West Clermont

More information

2. Provide a revised bid form which includes revised language in Section II, Bidder Responsiveness Section. (attached to this Addendum 1)

2. Provide a revised bid form which includes revised language in Section II, Bidder Responsiveness Section. (attached to this Addendum 1) Philadelphia Regional Port Authority 3460 North Delaware Ave. 2 nd Floor Philadelphia, PA 19134 October 30, 2018 To: All Bidders From: Kate Bailey Director of Procurement Re: ADDENDUM NO. 1 Project 18-110.1

More information

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES J 1 7 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)

More information

Morgan Hill Unified SCHOOL DISTRICT SEMI-ANNUAL PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS

Morgan Hill Unified SCHOOL DISTRICT SEMI-ANNUAL PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS Morgan Hill Unified SCHOOL DISTRICT SEMI-ANNUAL PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS The Morgan Hill Unified School District ( District ) has determined that contractors on future projects

More information

Document A305 TM. Contractor's Qualification Statement

Document A305 TM. Contractor's Qualification Statement Contractor's Qualification Statement Document A305 TM 1986 The Undersigned certifies under oath that the information provided herein is true and sufficiently complete so as not to be misleading. SUBMITTED

More information

FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS. June 1, 2013

FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS. June 1, 2013 FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS June 1, 2013 For general guidance the following information is provided as an aid to those preparing submittals in response to Design-Build solicitations.

More information

Consulting Services for a Consolidated Maintenance and Operations Facility at Port Everglades

Consulting Services for a Consolidated Maintenance and Operations Facility at Port Everglades 1. Ability of Professional Personnel: Max Total - 30 Points A. Describe the qualifications and relevant experience of the Prime Vendor s (Consultant) Principal in Charge, Project Manager and all key staff,

More information

Request for Qualifications Information (RFQI) No C146. Mechanical, Electrical, Plumbing and Fire Protection Engineering Design Services

Request for Qualifications Information (RFQI) No C146. Mechanical, Electrical, Plumbing and Fire Protection Engineering Design Services Request for Qualifications Information (RFQI) No. Mechanical, Electrical, Plumbing and Fire Protection Engineering Design Services At Ronald Reagan Washington National Airport and Washington Dulles International

More information

OAKLAND UNIFIED SCHOOL DISTRICT FOR NON-LOCAL PRIME CONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY QUALIFIED FIRMS RENEWAL

OAKLAND UNIFIED SCHOOL DISTRICT FOR NON-LOCAL PRIME CONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY QUALIFIED FIRMS RENEWAL OAKLAND UNIFIED SCHOOL DISTRICT FOR N-LOCAL PRIME CONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY QUALIFIED FIRMS RENEWAL OAKLAND UNIFIED SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY

More information

PROJECT DESIGN GUIDE A00.1 COMPETENCE STATEMENT AND ASSESSMENT

PROJECT DESIGN GUIDE A00.1 COMPETENCE STATEMENT AND ASSESSMENT PDG PROJECT DESIGN A00.1 GUIDES PROJECT DESIGN GUIDE A00.1 COMPETENCE STATEMENT AND ASSESSMENT Project Name: Name Project No.: Number Date: Date Document No.: PDG-PDG-PRO-A00.1 Date Created: 30 th Mar

More information

October 19, 2017 Shailendra G. Patel, PE, DBIA Division Administrator, Alternative Project Delivery

October 19, 2017 Shailendra G. Patel, PE, DBIA Division Administrator, Alternative Project Delivery General Engineering Consultant Services for I-64 Hampton Roads Bridge-Tunnel Expansion Project Hampton Roads District RFP No. HRD-20171013 Optional Pre-Proposal Conference October 19, 2017 Shailendra G.

More information

Job Order Contracting (JOC) ITB JE Overview August 2016

Job Order Contracting (JOC) ITB JE Overview August 2016 Job Order Contracting (JOC) ITB 16-14204-JE Overview August 2016 Job Order Contracting (JOC) What is JOC? Using general and specialty trade contractors to perform a series of projects on an as-needed basis.

More information

WELCOME LOS ANGELES CONVENTION CENTER (LACC) EXPANSION AND RENOVATION PLAN B PROJECT

WELCOME LOS ANGELES CONVENTION CENTER (LACC) EXPANSION AND RENOVATION PLAN B PROJECT WELCOME LOS ANGELES CONVENTION CENTER (LACC) EXPANSION AND RENOVATION PLAN B PROJECT JUNE 23, 2014 9:30 A.M SITE MAP SOUTH HALL STAPLES CENTER COMMITMENT TO PLAN-A Presently, there is a Implementation

More information

SEVEN GENERATIONS ARCHITECTURE & ENGINEERING JANUARY 26, Request for Qualifications from. Potential Teaming Partners

SEVEN GENERATIONS ARCHITECTURE & ENGINEERING JANUARY 26, Request for Qualifications from. Potential Teaming Partners SEVEN GENERATIONS ARCHITECTURE & ENGINEERING JANUARY 26, 2018 Request for Qualifications from Potential Teaming Partners GENERAL FIRM INFORMATION Where tradition fuels innovation Seven Generations Architecture

More information

DoES-QW1 Suitability Assessment Questionnaire and Declaration

DoES-QW1 Suitability Assessment Questionnaire and Declaration SECTION 1: PROJECT PARTICULARS: Project Title as EU/eTenders Contract Notice: Description as EU/eTenders Contract Notice: Address: Form of Contract: Contractor s Role: Project Category: Areas of work involving

More information

L-1A and L-1B Transferee TRANSFERING FOREIGN EMPLOYEES TO WORK IN THE UNITED STATES

L-1A and L-1B Transferee TRANSFERING FOREIGN EMPLOYEES TO WORK IN THE UNITED STATES 11900 Biscayne Boulevard Suite 700 Miami, Florida 33181 Phone (305) 895-0300 Fax (305) 895-0306 www.visaattorneys.com L-1A and L-1B Transferee TRANSFERING FOREIGN EMPLOYEES TO WORK IN THE UNITED STATES

More information

ADDENDUM #3. GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4

ADDENDUM #3. GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4 ADDENDUM #3 GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4 Please address inquiries to: Aaron R. Nickerson GRW, Inc. anickerson@grwinc.com TO ALL PROSPECTIVE BIDDERS:

More information

WILLIE L. BROWN JR. MIDDLE SCHOOL May 24, Willie L. Brown. Jr. Middle School. Design/Build Pre-Qualification Conference. Insert project image

WILLIE L. BROWN JR. MIDDLE SCHOOL May 24, Willie L. Brown. Jr. Middle School. Design/Build Pre-Qualification Conference. Insert project image WILLIE L. BROWN JR. MIDDLE SCHOOL May 24, 2012 Insert project image Agenda Call to Order Introduction of Project Team Members: SFUSD Consultants CM: Swinerton Management & Consulting John Baker Bridging

More information

NOTICE INVITING GENERAL CONTRACTOR PREQUALIFICATION

NOTICE INVITING GENERAL CONTRACTOR PREQUALIFICATION University of California, Irvine 2016-17 State Funded Reroof Multiple Buildings Project No. 5110248 NOTICE INVITING GENERAL CONTRACTOR PREQUALIFICATION The University of California, Irvine (UCI) requests

More information

MAHASKA COUNTY, IOWA PUBLIC SAFETY RADIO SYSTEM ANALYSIS PROPOSAL

MAHASKA COUNTY, IOWA PUBLIC SAFETY RADIO SYSTEM ANALYSIS PROPOSAL MAHASKA COUNTY, IOWA REQUEST FOR PROPOSALS PUBLIC SAFETY RADIO SYSTEM ANALYSIS PROPOSAL THE MAHASKA COUNTY BOARD OF SUPERVISORS & THE MAHASKA COUNTY EMERGENCY MANAGEMENT AGENCY Contact: Jamey A Robinson

More information

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services Request for Qualifications Information Architectural / Engineering Task Contract Design Services At Ronald Reagan Washington National Airport Washington Dulles International Airport Dulles Toll Road System

More information

REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF CLAIMS LITIGATION INVOICE REVIEW SERVICES GSMJIF. ISSUE DATE: October 2, 2017

REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF CLAIMS LITIGATION INVOICE REVIEW SERVICES GSMJIF. ISSUE DATE: October 2, 2017 NOTE: The GSMJIF will consider qualifications only from firms or organizations that have demonstrated the capability and willingness to provide high quality services in the manner described in this Request

More information

Maricopa Integrated Health System Vendor Questionnaire

Maricopa Integrated Health System Vendor Questionnaire Page 1 of 6 Maricopa Integrated Health System Vendor Questionnaire Please have an officer or person who is legally eligible to represent the Vendor firm fill out this form. Submittal of this Vendor Questionnaire

More information

SUBCONTRACTOR / SUPPLIER (Circle one) PRE-QUALIFICATION FORM

SUBCONTRACTOR / SUPPLIER (Circle one) PRE-QUALIFICATION FORM SUBCONTRACTOR / SUPPLIER (Circle one) PRE-QUALIFICATION FORM Company Legal Name: Street Address: City, State, Zip Code: Mailing Address): (if different from above) City, State, Zip: Phone: Fax: Website

More information

CITY OF DEERFIELD BEACH Request for City Commission Agenda

CITY OF DEERFIELD BEACH Request for City Commission Agenda Item: CITY OF DEERFIELD BEACH Request for City Commission Agenda Agenda Date Requested: June 5, 2012 Contact Person: David Santucci, Purchasing Manager Description: EI Technologies, LLC Protest of RFQ

More information

ACKNOWLEDGMENT OF RECEIPT OF ADDENDUM NO.

ACKNOWLEDGMENT OF RECEIPT OF ADDENDUM NO. Philadelphia Regional Port Authority 3460 North Delaware Ave. 2 nd Floor Philadelphia, PA 19134 February 19, 2019 To: All Bidders From: Kate Bailey Director of Procurement Re: ADDENDUM NO. 4 Project 19-011.3

More information

Instructions for Submission of Contractor's State, ment of Qualifications (SOQ) UF Bid Number ITB17KO-107 Whitney Research Village

Instructions for Submission of Contractor's State, ment of Qualifications (SOQ) UF Bid Number ITB17KO-107 Whitney Research Village Instructions for Submission of Contractor's State, ment of Qualifications (SOQ) UF Bid Number ITB17KO-107 Whitney Research Village SCOPE OF WORK New work shall include all Labor, Material Supervision and

More information

PENNSYLVANIA TURNPIKE COMMISSION

PENNSYLVANIA TURNPIKE COMMISSION PENNSYLVANIA TURNPIKE COMMISSION RETENTION OF AN ENGINEERING FIRM General Consulting Engineer Services Reference No. 3-214 The Pennsylvania Turnpike Commission (PTC) intends to issue a Request for Proposals

More information

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: August 10, DUE DATE: August 23, 2017.

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: August 10, DUE DATE: August 23, 2017. REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF LEGAL SERVICES General Counsel ISSUE DATE: August 10, 2017 DUE DATE: August 23, 2017 Issued by: Trenton Parking Authority NOTE: In the event an interested

More information

PENNSYLVANIA TURNPIKE COMMISSION

PENNSYLVANIA TURNPIKE COMMISSION PENNSYLVANIA TURNPIKE COMMISSION RETENTION OF AN ENGINEERING or PROJECT MANAGEMENT FIRM Program Management Services for All Electronic Toll (AET) Conversion Project Reference No. 3-233 The Pennsylvania

More information

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Campus Wide HVAC Upgrades - Steam Lines Response

More information

As a state agency, the College administration is required to develop procedures for Construction Manager selection.

As a state agency, the College administration is required to develop procedures for Construction Manager selection. COLLEGE of CENTRAL FLORIDA ADMINISTRATIVE PROCEDURE Title: Construction Management Selection Process Page 1 of 2 Implementing Procedure For F.S. 1013.45 Date Approved: 09/11/02 Division: Administration

More information

MTA - NEW YORK CITY TRANSIT 2 BROADWAY NEW YORK, NY DIVISION OF MATERIEL web.mta.info/nyct/procure/nyctproc.htm

MTA - NEW YORK CITY TRANSIT 2 BROADWAY NEW YORK, NY DIVISION OF MATERIEL web.mta.info/nyct/procure/nyctproc.htm MTA - NEW YORK CITY TRANSIT 2 BROADWAY NEW YORK, NY 10004 DIVISION OF MATERIEL web.mta.info/nyct/procure/nyctproc.htm Vreplies@nyct.com 0000149475 Contract #CM-1058 NOTICE -OF ADDENDUM ADDENDUM #1 INCLUDES

More information

Bidders Pre-Qualification Questionnaire For ONSHORE/OFFSHORE EPCI HOKCHI PROJECT

Bidders Pre-Qualification Questionnaire For ONSHORE/OFFSHORE EPCI HOKCHI PROJECT Bidders Pre-Qualification Questionnaire For ONSHORE/OFFSHORE EPCI HOKCHI PROJECT Table of Contents 1. General Information... 4 1A. Company Information... 4 1B. Ethics... 4 1C. Sustainable Development...

More information

Mr. Tony Robyn Assistant Director of Planning, Development & Neighborhood Services City of Joplin 602 S. Main Joplin, MO 64801

Mr. Tony Robyn Assistant Director of Planning, Development & Neighborhood Services City of Joplin 602 S. Main Joplin, MO 64801 June 7, 2016 Mr. Tony Robyn Assistant Director of Planning, Development & Neighborhood Services City of Joplin 602 S. Main Joplin, MO 64801 Re: Professional Services City of Joplin Senior Citizen Center

More information

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents Request for Qualifications (Architect / Engineer) Administration of Project: Local Higher Education Project Name Technolgy Building Related Infrastructure Response Deadline Oct. 5, 2018 11:00 am local

More information

INITIAL ASSESSMENT QUESTIONNAIRE

INITIAL ASSESSMENT QUESTIONNAIRE INITIAL ASSESSMENT QUESTIONNAIRE In order to achieve the objectives of the Disadvantaged Business Enterprise Supportive Services Program (DBESS), the New York State Department of Transportation (NYSDOT),

More information

GENERAL INFORMATION. Yrs. Yrs. Yrs. How many years has your organization been in business under your present firm name:

GENERAL INFORMATION. Yrs. Yrs. Yrs. How many years has your organization been in business under your present firm name: SUBCONTRACTOR / SUPPLIER PREQUALIFICATION FORM Complete all portions of this form and return to AlliedCook Construction Corp. with a copy of your Certificate of Insurance indicating current limits. This

More information

Contractor Qualification Questionnaire

Contractor Qualification Questionnaire Purchasing Department 1903 W. Mich. Ave. Kalamazoo, MI. 49008-5342 Contractor Qualification Questionnaire Dear Sir/Madam, As part of Western Michigan University s qualification procedure, please provide

More information

Thomas B. Fordham Foundation Sponsorship Application Organizational Plan Organizational Plan: B.1. B.1. Governing Body

Thomas B. Fordham Foundation Sponsorship Application Organizational Plan Organizational Plan: B.1. B.1. Governing Body : B.1. B.1. Governing Body Provide a brief description of the governing board, its history, current operation. Provide the governing board s view of the relationship between itself and the school leader

More information

Lincoln City Visitor and Convention Bureau. City of Lincoln City REQUEST FOR QUALIFICATIONS

Lincoln City Visitor and Convention Bureau. City of Lincoln City REQUEST FOR QUALIFICATIONS Lincoln City Visitor and Convention Bureau City of Lincoln City REQUEST FOR QUALIFICATIONS Visitor Center Concept Development and Designs Architectural Services Lincoln City, Oregon April 20, 2018 RFQ

More information

Procedures for the Selection of Architectural/Engineering Projects Consultants (A/EPC) and Special Projects Consultants (SPC)

Procedures for the Selection of Architectural/Engineering Projects Consultants (A/EPC) and Special Projects Consultants (SPC) Excellence in School Design & Construction Procedures for the Selection of Architectural/Engineering Projects Consultants (A/EPC) and Special Projects Consultants (SPC) A/E Selection & Negotiations Facilities

More information

1. Provide a revised bid form that reflects revisions to Bidder Responsiveness Section(attached)

1. Provide a revised bid form that reflects revisions to Bidder Responsiveness Section(attached) Philadelphia Regional Port Authority 3460 North Delaware Ave. 2 nd Floor Philadelphia, PA 19134 October 17, 2018 To: All Bidders From: Kate Bailey Director of Procurement Re: ADDENDUM NO. 1 Project 18-074.1

More information

CONTRACTOR PRE-QUALIFICATION DOCUMENTS. For Construction of the. Baxley WWTP Solar Array

CONTRACTOR PRE-QUALIFICATION DOCUMENTS. For Construction of the. Baxley WWTP Solar Array CONTRACTOR PRE-QUALIFICATION DOCUMENTS For Construction of the Baxley WWTP Solar Array April 29, 2016 OWNER The City of Baxley - Waste Water Treatment Plant 1 Brannen Road, Baxley, GA 31513 ENGINEER &

More information

Metropolitan Washington Airports Authority. Request for Qualifications Information. On-Call Consultant for Construction Claims Analysis Services.

Metropolitan Washington Airports Authority. Request for Qualifications Information. On-Call Consultant for Construction Claims Analysis Services. Request for Qualifications Information On-Call Consultant for Construction Claims Analysis Services For Dulles Corridor Metrorail Project Revised December 2, 2010 Revision Key: Additions Deletions METROPOLITAN

More information

STATEMENT OF QUALIFICATIONS. Pre-qualification Submissions For. Environmental Consulting Services On. Alberta Transportation Projects

STATEMENT OF QUALIFICATIONS. Pre-qualification Submissions For. Environmental Consulting Services On. Alberta Transportation Projects STATEMENT OF QUALIFICATIONS Pre-qualification Submissions For Environmental Consulting Services On Alberta Transportation Projects INTRODUCTION Alberta Transportation is accepting submissions from Environmental

More information

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 20, DUE DATE: January 11, 2019.

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 20, DUE DATE: January 11, 2019. NOTE: In the event an interested firm has downloaded these specifications from the TPA website, you are responsible for providing the TPA via email at Trentonparkingph@aol.com your contact information,

More information

CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE

CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE AZUSA UNIFIED SCHOOL DISTRICT 1 TABLE OF CONTENTS Filing of PreQualifications Submittals 3 PREQUALIFICATION QUESTIONNAIRE 6 Page Part I:

More information

M55 Architect-Engineer And Related Services Questionnaire for Specific Project

M55 Architect-Engineer And Related Services Questionnaire for Specific Project M55 Architect-Engineer And Related Services Questionnaire for Specific Project 1. Project Name/Location for which Firm is Filing: 2a. 2b. Project Identification Number, if any: 5. Firm (or Joint Venture)

More information

ADDENDUM NO. 1. Re: Expression of Interest for RFP CB-18

ADDENDUM NO. 1. Re: Expression of Interest for RFP CB-18 2 Broadway Cedrick T. Fulton New York, NY 10004 President 646 252-7000 Tel 646 252-7902 TTY Bridges and Tunnels February 22, 2017 ADDENDUM NO. 1 Re: Expression of Interest for RFP CB-18 Design/Build Services

More information

Questions received on Creedmoor PC Major Renovation for Outpatient Residence, Building 70 and DASNY s responses:

Questions received on Creedmoor PC Major Renovation for Outpatient Residence, Building 70 and DASNY s responses: Questions received on Creedmoor PC Major Renovation for Outpatient Residence, Building 70 and DASNY s responses: 1. Will Building 70 be an Article 28 DOH compliant facility? 2. Are the clients/patients

More information

RENEWAL/MODERNIZATION FACILITIES REYNOLDS BUILDING #1 COLLEGE OF DESIGN

RENEWAL/MODERNIZATION FACILITIES REYNOLDS BUILDING #1 COLLEGE OF DESIGN Prime DESIGN PHASE SERVICES FOR RENEWAL/MODERNIZATION FACILITIES REYNOLDS BUILDING #1 COLLEGE OF DESIGN Project Scope: $34,000,000 INTRODUCTION The is requesting the services of an ARCHITECTURAL FIRM to

More information

Invitation for Bids for Armed and Unarmed Security Guard Services ADDENDUM NO. 1 ACKNOWLEDGEMENT NOTICE

Invitation for Bids for Armed and Unarmed Security Guard Services ADDENDUM NO. 1 ACKNOWLEDGEMENT NOTICE Dear Firm Representative: Invitation for Bids for Armed and Unarmed Security Guard Services ADDENDUM NO. 1 ACKNOWLEDGEMENT NOTICE Included with this cover page please find Addendum No. 1 Modification to

More information

The City of Madison requests statements of qualifications for architectural and engineering design services for the PINNEY LIBRARY project.

The City of Madison requests statements of qualifications for architectural and engineering design services for the PINNEY LIBRARY project. Department of Public Works Engineering Division Robert F. Phillips, P.E., City Engineer City-County Building, Room 115 210 Martin Luther King, Jr. Boulevard Madison, Wisconsin 53703 Phone: (608) 266-4751

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK FOR THE NEW

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK FOR THE NEW REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK FOR THE NEW Fire Station No. 1, Fire Administration, Training/Emergency Operations, and Public Works Service Center DUE April 17, 2017 BY 4:00

More information