1 Report to Committee of the Whole To: Mayor Linton and Members of Council Prepared By: Adam Dickieson, Engineering Services Coordinator Report: IS Date: 24 Oct 2016 RE: By-law to Restrict the Weight of Vehicles Passing Over Certain Bridges in the Township of Centre Wellington Recommendation: THAT the Council of the Township of Centre Wellington adopt a By-law to Restrict the Weight of Vehicles Passing Over Certain Bridges in the Township of Centre Wellington. Summary: N/A Report: The Bridge Load Restriction Bylaw is presented in Attachment #1. This By-law is in keeping with both the Highway Traffic Act, and O.Reg 103/97 and it will provide a legal load restriction limit on the following structures: 2-WG Third Line between Wellington Rd 18 and Eramosa- Garafraxa Townline 3-E Sixth Line between Sideroad 30 and Wellington Rd 22 4-WG Fifth Line between Wellington Rd 18 and Eramosa - Garafraxa Townline 7-E Third Line between Sideroad 30 and Wellington Rd 22 8-WG Seventh Line between Sideroad 25 and Sideroad tonnes 8 tonnes 5 tonnes 10 tonnes 10 tonnes 9-N Irvine Street between Sideroad 10 tonnes

2 11 and Sideroad WG Fifth Line between Sideroad 15 and Wellington Rd WG First Line between Sideroad 20 and Sideroad WG First Line between Sideroad 15 and Sideroad P First Line W between Wellington Rd 17 and Sideroad 5 32-WG Third Line between Sideroad 25 and Sideroad tonnes 10 tonnes 5 tonnes 15 tonnes Closure Structure A load restriction review was conducted in 2016 on nine Centre Wellington bridges and one culvert. The K. Smart & Associates Load Restriction Reviews are provided in Attachments #2 and #3. This evaluation was conducted because of significant structural concerns identified during the 2014 biannual Ontario Structure Inspection Manual (OSIM) visual inspections. The load restriction review had been implemented as measure to ensure that the public is notified of safe limits of the load caring capacity of the structure. Three of the structures will have vehicle restriction limiters in place to ensure that heavy vehicles respect the tonne restriction limits. These structures will continue to be inspected every six months by a qualified structural engineer to ensure that no major condition changes have occurred. A culvert on the Third Line of the former Township of West Garafraxa is no longer structurally adequate for full loading. This structure is to be closed this fall as a result. The photographs in Attachment #4 illustrates the structural failure is occurring. In order to restrict the large vehicles on the 3 bridges that have less than 10 tonne load limits, height restriction limiting structures are to be constructed. The height restriction limiters will act as physical barriers to prevent over loading of the bridge to continue. A photograph in Attachment #4 illustrates an example of a height limiting structure. The location of all Township structures is presented in Attachment #5. Corporate Strategic Plan: Goal #1 - Reliable Infrastructure - The Township will manage and upgrade the community's infrastructure assets in an environmentally responsible way. Financial Implications: The proposed 2017 Township capital budget has the Bridge replacement/reconstruction Capital levy/ocif program and the timing for all the current load restricted structures by Three height restriction limiting structures are to be constructed at an estimate cost of $12,000. The required Ontario Traffic Manual signage that is required is an estimated $4,000. These items would be funded from the existing Bridge Repairs and

3 Remediation budget. There will be an increase in the snow removal operational budget given that Township's snow plow equipment will be in excess to the load restrictions. A light duty truck will be to be sent to the load restricted bridges. These costs will be monitored and are dependent on the severity on the winter. Consultation: Allan Garnham, P. Eng. and David Harsch, P.Eng. of K. Smart Associates Limited. Attachments: IS ATT1 By-law to Restrict the Weight of Vehicles IS ATT2 Load Restriction Review IS ATT3 Irvine Bridge Report Oct 2016 IS ATT4 Various Photos IS ATT5 Bridge Location Map Approved By: Colin Baker, Managing Director of Infrastructure Services Andy Goldie, Chief Administrative Officer

4 Report No. IS Attachment #1 TOWNSHIP OF CENTRE WELLINGTON BY-LAW NUMBER 2016-XXX A BY-LAW TO RESTRICT THE WEIGHT OF VEHICLES PASSING OVER CERTAIN BRIDGES IN THE TOWNSHIP OF CENTRE WELLINGTON AND TO REPEAL BY-LAW WHEREAS Subsections 123(1) and 123(2) of the Highway Traffic Act, R.S.O. 1990, C.H 8, as amended, provide that: 123(1) The Minister may make regulations limiting the gross vehicle weight of any vehicle or any class thereof passing over a bridge forming part of the King s Highway or a highway in territory without municipal organization and notice of the limit of the weights fixed by such regulation, legible printed, shall be posted up in a conspicuous place at each end of the bridge. 123(2) The municipality or other authority having jurisdiction over a bridge may by By-law limit the gross vehicle weight of any vehicle or any class thereof passing over such bridge, and the requirement of sub-section (1) with respect to the posting up of notice apply thereto. AND WHEREAS the Municipal Council of the Corporation of the Township of Centre Wellington deems it expedient to limit the weight of vehicles passing over certain bridges in the Township of Centre Wellington. NOW THEREFORE THE COUNCIL OF THE CORPORATION OF THE TOWNSHIP OF CENTRE WELLINGTON ENACTS AS FOLLOWS: 1. That no vehicle or combination of vehicles or any class thereof, whether empty or loaded, shall be operated over the bridges as detailed in Schedule A attached to this By-Law. 2. That the penalties provided in Section 125 of the Highway Traffic Act, R.S.O C.H.8, shall apply to offenses against this By-Law. 3. This By-law shall come into force and effect on the date of passage and when a notice of the limit of weight permitted, legibly printed, has been posted in a conspicuous place at each end of the bridge. Read a first, second and third time and finally passed this the XX day of XXXX, 2016 Kelly Linton Mayor Kerri O Kane Clerk

5 2 Report No. IS SCHEDULE A BY-LAW NUMBER 2016-XXX Schedule of Heavy Truck Prohibitions on Bridge Structures Structure ID Road Name Location Posting 3-N Beatty Line between Sideroad 10 (east to Hwy#6) and Sideroad 10 (west to Gerrie Road) tonnes (former Township of Nichol) Previously Adopted: December 15, WG Third Line between Wellington Road 18 and 15 tonnes Eramosa-Garafraxa Townline 3-E Sixth Line between Sideroad 30 and 8 tonnes Wellington Road 22 4-WG Fifth Line between Wellington Road 18 and 5 tonnes Eramosa-Garafraxa Townline 7-E Third Line between Sideroad 30 and 10 tonnes Wellington Road 22 8-WG Seventh Line between Sideroad 25 and 10 tonnes Sideroad 20 9-N Irvine Street between Sideroad 11 and 10 tonnes Sideroad WG Fifth Line between Sideroad 15 and 10 tonnes Wellington Road WG First Line between Sideroad 20 and 10 tonnes Sideroad WG First Line between Sideroad 15 and 5 tonnes Sideroad P First Line West between Wellington Road 17 and 15 tonnes Sideroad 5 32-WG Third Line between Sideroad 25 and close Sideroad 20 structure

6 LOAD RESTRICTION REVIEW MULTIPLE LOCATIONS Prepared For: THE TOWNSHIP OF CENTRE-WELLINGTON by K. SMART ASSOCIATES LIMITED 85 McIntyre Drive Kitchener ON N2R 1H6 September 2016

7 I N D E X Page 1.0 INTRODUCTION EVALUATION METHODOLOGY STRUCTURE 2-WG Description of Structure Evaluation Findings and Recommendations STRUCTURE 3-E Description of Structure Evaluation Findings and Recommendations STRUCTURE 4-WG Description of Structure Evaluation Findings and Recommendations STRUCTURE 7-E Description of Structure Evaluation Findings and Recommendations STRUCTURE 8-WG Description of Structure Evaluation Findings and Recommendations STRUCTURE 16-WG Description of Structure Evaluation Findings and Recommendations STRUCTURE 21-WG Description of Structure Evaluation Findings and Recommendations STRUCTURE 24-WG Description of Structure Evaluation Findings and Recommendations STRUCTURE 26-P Description of Structure Evaluation Findings and Recommendations STRUCTURE 32-WG Description of Structure Evaluation Findings and Recommendations CLOSING 10

8 September 2016 File No LOAD RESTRICTION REVIEW MULTIPLE LOCATIONS TOWNSHIP OF CENTRE WELLINGTON 1.0 INTRODUCTION K. Smart Associates Limited (KSA) was retained by the Township of Centre Wellington to complete a structural evaluation and provide recommendations for gross weight limits on each of the following bridges: 1. Structure 2-WG 2. Structure 3-E 3. Structure 4-WG 4. Structure 7-E 5. Structure 8-WG 6. Structure 16-WG 7. Structure 21-WG 8. Structure 24-WG 9. Structure 26-P 10. Structure 32-WG Field measurements and visual inspection of structural members were carried out on the ten (10) structures on April 27, 2016 by Allan Garnham, P. Eng. and Darryl Schwartzentruber, C. Tech. Recommendations for load postings were made in accordance with Section 14 of the Canadian Highway Bridge Design Code EVALUATION METHODOLOGY Reference is made to Section 14 of the Canadian Highway Bridge Design Code 2014 (CHBDC) to establish the load rating and subsequent load posting for each structure. It is important to note that a full structural analysis for the structures identified in this report is not possible as no drawings were made available to identify the size, quantity and grade of the reinforcing steel. Should drawings become available for the structures identified above, a complete structural evaluation could be undertaken to determine the specific load carrying capacity for a given structure. Reference is made to Clause of CHBDC which allows an engineer to assign a single posting load based on engineering judgement and experience. Clause C14.17 of the Canadian Highway Bridge Design Code Commentary further clarifies that a single posting based solely on engineering judgement and experience should not exceed 18 tonnes.

9 It should be noted that when engineering judgement and experience is used to assign a single posting load such an evaluation should only be used for short periods of time (less than 2 years) and inspections must continue on a regular basis. Concrete structures which have been carrying normal traffic without signs of excessive material cracking, deformation, or degradation need not be posted as per Section of CHBDC. 3.0 STRUCTURE 2-WG 3.1 Description of Structure The structure is located on Third Line between Wellington County Road 18 and Eramosa- Garafraxa Townline. The structure was constructed in approximately The structure consists of an 11.6m± single span cast-in-place concrete beam bridge with a gravel wearing surface. This style of bridge uses the barrier walls as the main structural support. The overall structure width is 6.4m±. Visual inspection of the structure noted the following: - There is no approach guide rail - Approach barriers are severely spalled and delaminated - Barriers on top of structure are in good to fair condition; small isolated spalls and some abrasion from vehicles are evident. - Abutments are in fair condition; small isolated spalls; scour is significant at north abutment along waterline; possible undermining at the southwest abutment - Soffit exhibits isolated spalls and delaminations with exposed corroded reinforcement - Floor beams are in fair condition with isolated small spalls and delaminations. - Bottom of girders are in poor condition; bottom 100mm ± of concrete is gone and bottom row of reinforcing is completely exposed The structure is currently load posted for 15 tonnes 3.2 Evaluation Findings and Recommendations The structure is not adequate to support full Ontario Highway Truck Loading. The load-carrying capacity is limited by the condition of the girders. We recommend that the existing 15 tonne single posting remain in place. Although removal of fill overtop the structure will increase the load carrying capacity of this structure, we recommend against increasing the existing load posting due to the poor condition of the load carrying components of this bridge. The frequency of inspections should remain at 6 month intervals until this structure is replaced. Complete replacement of this structure is recommended. 4.0 STRUCTURE 3-E 4.1 Description of Structure The structure is located on Sixth Line between Sideroad 30 and Wellington County Road 22. The bridge was constructed in approximately The structure consists of a 14.5m± single span concrete bow string arch bridge with an exposed concrete deck. The overall width of the structure is 5.8m±.

10 Visual inspection of the structure noted the following: - Approach barriers have been removed from south. One missing post and 2 rails at northwest - Railing panels are generally in poor condition; numerous spalls and exposed corroded reinforcement bars throughout - Concrete arches are in good condition; there is a spalled area at the northwest which could have been caused by impact in the past. There is no exposed reinforcement bar as a result of the spall. - Concrete arches show evidence of numerous abrasions, likely from snow plow. - Hangers are in general poor condition; several spalls with exposed corroded reinforcement bar but no section loss evident. - Fascias are in good to fair condition; one isolated spall and delaminated location at southwest. - Floor beams are in fair condition; evidence of previous rehabilitation/repairs to concrete. Most patches are cracked and delaminated. Second floor beam from north is externally post tensioned. - Soffit is in fair condition; numerous isolated spalls and exposed corroded reinforcement throughout. - Deck is in poor condition; severe scaling with numerous spalls and potholes, some with exposed reinforcement bar. Outsides of deck were covered in sand and gravel. The structure is presently load posted for 10 tonnes. 4.2 Evaluation Findings and Recommendations The structure is not adequate to support full Ontario Highway Truck Loading. The load-carrying capacity is limited by the condition of the hangers. We recommend that this structure be load posted for 8 tonnes. The frequency of inspections should remain at 6 month intervals until this structure is replaced. Complete replacement of this structure is recommended. 5.0 STRUCTURE 4-WG 5.1 Description of Structure The structure is located on Fifth Line between Wellington County Road 18 and Eramosa-Garafraxa Townline. The bridge was constructed in approximately The structure consists of a 7.3m± single span concrete bow string arch bridge with an asphalt wearing surface. The overall width of the structure is 5.3m±. Visual inspection of the structure noted the following: - No approach guide rail - Approach barriers and structure barriers exhibit numerous spalls and delaminations with exposed corroded reinforcement; missing rail at northeast approach barrier - Concrete arches exhibit numerous abrasion scars and some spalls; long, wide crack on inside face of east arch - Floor beam at east end exhibits large crack with spall and exposed corroded reinforcement; rest of beam is in fair condition - Soffit exhibits numerous cracks and spalls with exposed corroded reinforcement. - Severe cracking and deep spalls at southeast wingwall - Wide crack in both abutments from top to bottom; displacement along each crack is minimal.

11 - Overall observations indicate that there might be an issue with founding soils at this structure, specifically at the east; the east side seems to have settled more when compared to the west side of the structure. The structure is presently load posted for 14, 22 and 32 tonnes. 5.2 Evaluation Findings and Recommendations The structure is not adequate to support full Ontario Highway Truck Loading. The load-carrying capacity is limited by the geotechnical bearing capacity of the founding soils. We recommend that this structure be load posted for 5 tonnes. The frequency of inspections should remain at 6 month intervals until this structure is replaced. Complete replacement of this structure is recommended. 6.0 STRUCTURE 7-E 6.1 Description of Structure This structure is located on Third Line between Sideroad 30 and Wellington County Road 22. The bridge was constructed in approximately The structure consists of an 10.0m± single span cast-in-place concrete beam bridge with a gravel wearing surface. This style of bridge uses the barrier walls as the main structural support. The overall structure width is 5.8m±. Visual inspection of the structure noted the following: - The east concrete girder has lost at least 10 inches of its top concrete throughout, more at the ends. Reinforcement bars are exposed and corroded; one longitudinal bar has completely detached from the concrete beam - The west concrete girder is severely spalled and scaled with exposed corroded reinforcement bar. - There is a very large and deep delaminated area in the soffit at the first bay from the south that is completely separated from the deck. Reinforcement bar is exposed and corroded. - There are cracks with efflorescence at other areas of the soffit; typically at all four corners of the bridge. - Southeast corner of bridge is bearing only on remains of deteriorated concrete (rocks with no cement remaining). - Disintegration of bearing seat at northeast corner of bridge. - The floor beams are in fair to poor condition, with cracking and spalling. - Bottom two feet of abutments have been refaced several years ago. - Bottom of exterior concrete barriers are severely spalled with exposed corroded reinforcement. - Severe erosion of the embankments at all four corners of the structure. - Granular shoulders are higher than the roadway itself, therefore water cannot drain off of the roadway The structure is currently load posted for 15 tonnes.

12 6.2 Evaluation Findings and Recommendations The structure is not adequate to support full Ontario Highway Truck Loading. The load-carrying capacity is limited by the overall poor condition of the structure. We recommend that this structure be load posted for 10 tonnes. The frequency of inspections should remain at 6 month intervals until this structure is replaced. Complete replacement of this structure is recommended. 7.0 STRUCTURE 8-WG 7.1 Description of Structure The structure is located on Seventh Line between Sideroad 25 and Sideroad 20. The bridge was constructed in approximately The structure consists of a 14.2m± single span cast-in-place concrete beam bridge with a gravel wearing surface. This style of bridge uses the barrier walls as the main structural support. The overall structure width is 6.4m±. Visual inspection of the structure noted the following: - Above the structure, the girders (barriers) are in good to fair condition. - The underside of the girders are in poor condition. There are numerous areas of large spalls with exposed corroded reinforcement bar. - The barriers on the wingwalls have been removed at the east. - There are no approach barriers. - The wearing surface is in good condition except for the pothole at the north end of the deck. - Floor beams are in fair to poor condition; numerous spalls and delaminations with exposed corroded reinforcement bar. - Soffit is in fair to poor condition; numerous isolated spalls and delaminations with exposed corroded reinforcement bar. - Abutments and wingwalls have been refaced in the past 20± years; good condition overall The bridge is currently load posted for 15 tonnes. 7.2 Evaluation Findings and Recommendations The structure is not adequate to support full Ontario Highway Truck Loading. The load-carrying capacity is limited by the exposed corroded reinforcement bar in key structural members. We recommend that this structure be load posted for 10 tonnes. Although removal of fill overtop the structure will increase the load carrying capacity of this structure, increasing the load posting is not recommended due to the poor condition of the load carrying components of this bridge. The frequency of inspections should remain at 6 month intervals until this structure is replaced. A superstructure replacement or replacement of the entire structure is recommended.

13 8.0 STRUCTURE 16-WG 8.1 Description of Structure This structure is located on Fifth Line between Wellington County Road 19 and Sideroad 15. The bridge was constructed in approximately The structure consists of a 16.1m single cell concrete spandrel arch with a granular wearing surface. The overall width of the structure is 5.3m±. Visual inspection of the structure noted the following - There are a few spalls on the spandrel arch and as a result reinforcement bar has been exposed and is corroded. - The guiderail posts are bolted onto the barrier walls of the bridge; curve in the guiderail posts at the north end indicates that the wingwalls are moving away from each other. - One guiderail post is now twisted as a bolt has separated from concrete. - Deterioration of the west fascia is severe, almost exposing the road backfill. No reinforcing steel is visible that would connect the arch to the wingwall. - Erosion of soil and concrete occurring at corners; very severe at the northeast. - Erosion at the northeast quadrant has left the footing exposed - Concrete at the bottom of the spandrel arch/abutments is severely scaled. - There is a wide vertical crack at the northeast abutment approximately 600mm long, and a wide vertical crack at the southeast abutment full height. - There is an excess amount of granular material on the bridge deck. Granular material is approximately 150mm higher than the curb at the south end, and approximately 300mm higher than the curb at the north end. The structure is currently load posted for 15 tonnes. 8.2 Evaluation Findings and Recommendations The structure is not adequate to support full Ontario Highway Truck Loading. The load-carrying capacity is limited by the deterioration of the connection between the headwalls and the arch. We recommend that this structure be load posted for 10 tonnes. Although removal of fill overtop the structure will increase the load carrying capacity of this structure, we recommend against increasing the existing load posting due to the poor condition of the load carrying components of this bridge. The frequency of inspections should remain at 6 month intervals until this structure is replaced. Replacement of the entire structure is recommended. 9.0 STRUCTURE 21-WG 9.1 Description of Structure The structure is located on First Line between Sideroad 20 and Sideroad 15. The bridge was constructed in approximately The structure consists of a 19.2m± single span concrete bow string arch bridge with an exposed concrete deck. The overall width of the structure is 5.7m±. Visual inspection of the structure noted the following

14 - There are no approach barriers - Deck is in fair condition; no major spalls observed - Concrete arches are in good condition; some cracking with efflorescence on the east arch. Abrasion from snow plow on both arches is evident. - Hangers are in good to fair condition; some verticals have spalled concrete with exposed corroded reinforcement bar. - Overhead brace connecting the tops of the arches together has been replaced in the recent past; minimal surface rust evident. - Most floor beam ends are spalled with exposed corroded reinforcement bars; rest of each beam is in fair condition - Soffit exhibits isolated cracks and delaminations with exposed corroded reinforcement bars; overall fair condition - Tension tie at east exhibits large spall near mid span with exposed corroded reinforcement - Tension tie at west exhibits two large spalls near mid span with exposed corroded reinforcement; rest of member exhibits cracking and delamination. - Compared to the north abutment, the south abutment appears to be rotating about the toe of the footing (i.e. movement of the top of the abutment towards the river). The structure is currently load posted for 10 tonnes 9.2 Evaluation Findings and Recommendations The structure is not adequate to support full Ontario Highway Truck Loading. The load-carrying capacity is limited due to exposed corroded reinforcement bar in key structural members. Previous correspondence with the Township recommended the following: Option 1: Close the bridge to all traffic and schedule a replacement structure as soon as possible. Option 2: Load post the structure for 10 Tonnes and increase the frequency of inspections to 3 month intervals. A monitoring program to determine the extent of movement of the south abutment should also be started. We recommend the monitoring program include both digital tilt meters and manual measurements. If further movement is found, the structure must be closed immediately to all traffic. Option 2 is the recommended alternative and should be pursued by the Township as soon as possible. Complete replacement of this structure is also recommended STRUCTURE 24-WG 10.1 Description of Structure The structure is located on First Line between Sideroad 15 and Sideroad 10. The bridge was constructed in approximately The structure consists of a 24.3m± single span concrete bow string arch bridge with an exposed concrete deck. The overall width of the structure is 5.5m±. Visual inspection of the structure noted the following

15 - No approach guide rail - Broken post and two missing rails at northwest approach barrier - Missing post leaving two exposed rails at southwest approach barrier - One steel beam guide rail element at southeast approach barrier, however not attached to structure - Cementitious compound has been applied to the concrete deck and provides a rough riding surface. Compound remains adhered to the concrete deck with no delaminations observed. - Some concrete barrier rails are missing; remaining rails exhibit spalls and delaminations with exposed corroded reinforcement bars. - Concrete arches are in overall good condition; abrasion from snow plow is evident; some small isolated spalls on underside of arches - Hangers exhibit large spalls with exposed corroded reinforcement and are in fair to poor condition. - Floor beams are in fair to poor condition; beam ends have spalls with exposed corroded reinforcement, rest of beams exhibit cracking and delaminations throughout. - Soffit is in fair to poor condition; spalls and delaminations with exposed corroded reinforcement throughout - Tension tie and fascia at west is in poor condition; large area at north end consists of deep disintegration with exposed corroded reinforcement with section loss. - Tension tie and fascia at east is in fair condition; some spalled areas. - Erosion/scour of the northwest streambed. The structure is currently load posted for 15 tonnes 10.2 Evaluation Findings and Recommendations The structure is not adequate to support full Ontario Highway Truck Loading. The load-carrying capacity is limited due to overall deterioration of the key structural elements. We recommend that this structure be load posted for 5 tonnes. The frequency of inspections should remain at 6 month intervals until this structure is replaced. Complete replacement of this structure is recommended STRUCTURE 26-P 11.1 Description of Structure The structure is located on First Line West between Sideroad 5 and Sideroad 11. The bridge was constructed in approximately The structure consists of a 10.2m± single span concrete slab on concrete t girder bridge with a gravel wearing surface. The overall width of the structure is 6.3m±. Visual inspection of the structure noted the following - Bridge is in overall good to fair condition. - Current barrier does not conform to current safety standards but is functional. - No approach guide rail. - Some isolated spalls with exposed rebar throughout structure - Abrasion damage of the concrete curb. - New mass concrete placed at all four abutment corners is in excellent condition The structure is currently load posted for 15 tonnes

16 11.2 Evaluation Findings and Recommendations The structure is not adequate to support full Ontario Highway Truck Loading. The load-carrying capacity is limited due to the age of the structure itself. We recommend that the existing load posting of 15 tonnes remain in place. The frequency of inspections can be increased to 2 year intervals STRUCTURE 32-WG 12.1 Description of Structure The structure is located on Third Line between Sideroad 25 and Sideroad 20. The bridge was constructed in approximately The structure consists of a 3.73 x 2.29m single cell multi-plate CSP culvert with a gravel wearing surface. The overall length of the culvert barrel is 22m±. Visual inspection of the structure noted the following: - There is no barrier at this structure. - Embankment at west above culvert is unstable, however road surface is not compromised - Some erosion at northwest corner of culvert - Fatigue cracks are evident along bolt line at south side of culvert; near center of culvert, these cracks are almost continuous. The structure is currently load posted for 15 tonnes 12.2 Evaluation Findings and Recommendations The structure is not adequate to support full Ontario Highway Truck Loading. The load-carrying capacity is limited due to the fatigue cracking along the bolt line at the south side of the culvert. In previous correspondence, we advised the Township of 2 alternatives which could be pursued. Alternative 1 would be to reinforce the structure by welding rebar dowels across the fatigue cracks at regular spacings. If this alternative were followed, the structure could remain load posted for 15 tonnes. Alternative 2 is to replace the structure with an equivalent size multi-plate culvert. If this alternative were followed, the structure would not require load posting. Either Alternative 1 or 2 should be implemented in summer If Alternative 1 is implemented, the structure should continue to be inspected every six months. The frequency of inspections could be reduced to every 2 years if the structure is replaced.

17

18

19 32- WG Third Line Culvert Structural Failure Photos Structural Bolt Tears 2013 Structural Bolt Tears 2016 Height Limiting Structure Example Vehicle Height Limiting Structure (Woolwich Township)

20 Wellington Rd 29 Second Line Third Line Fourth Line Third Line Third Line Wellington Rd 16 Fourth Line Fifth Line Fifth Line Fifth Line Sixth Line Sixth Line Seventh Line East-west Garafraxa Tl Weisenberg Rd 36-P " 32-P Sr 5 Sr 11 Noah Rd " 5-P 4-P 23-P 33-P Eighth Line W 20-P Eighth Line E 21-P 22-P 19-P 38-P Sr 12 3-P Sr 14 " Wellington Rd 17 " Sr 10 6-P 1-P 28-P 18-P " Grand Inverhaugh 8-P 7-P Sixth Line E Third Line W Sr 5 Middlebrook Rd 9-P 31-P Wellington Rd P 34-P 10-P 24-P " 11-P Wellington Rd 18 Fourth Line E 25-P 15-P 39-P 12-P 2-P Second Line E î í First Line W 29-P 17-P 37-P 35-P 13-P 26-P(15) Salem 16-P Alma 30-P " 1-EL Sr 4 Wellington Rd 7 7-N " 4-N 2016 Rehab 12-N " Elora 13-N Irvine St Ponsonby Sr 5 Gerrie Rd 8-N 6-N 2-EL # Fourth Line 18-N 21-N 9-N(10) 10-N 11-N 20-N Sr 6 N Wellington Rd 17 5-N Sr 10 Fergus Ennotville Cumnock 3-N( ) Sr 15 Highway 6 Beatty Line N South River Rd Second Line Sixth Line 19-N 17-N Beatty Line N Guelph St 2-N Sr 18 Highway 6 4-F 1-F 14-N 16-N 15-N 1-N 22-N Jones Baseline 25-WG Sr 10 2-F 3-F Scotland St Jones Baseline 21-WG(10) Sr 10 First Line 24-WG(15) Living Springs 22-WG 23-WG 29-WG River 9-E 31-WG 6-E 7-E(15) G Speedside Sr WG Metz Sr 20 Sr 15 1-WG 8-E î í Sr 30 " 26-WG 32-WG(15) 28-WG 2-WG(15) Belwood Lake 5-E 3-WG 4-E Oustic 19-WG 18-WG 17-WG 16-WG(15) G 3-E(10) " 27-WG 30-WG " Shiloh Sixth Line Wellington Rd 19 5-WG 4-WG( ) 12-WG 15-WG 14-WG Sr 9 î í " Wellington Rd 18 Eramosa-garafraxa Tl 2-E 13-WG 1-E Seventh Line Belwood 6-WG 6B-WG Wellington Rd WG 8-WG 9-WG SR 10 Mimosa East-west Garafraxa Tl 7-WG 10-WG Bridge Condition Open (91) " 12-WG Closed (14) G Potential Closures 2016 Centre Wellington Structure Locations & Condition Updated: January, 2016 # Designated Heritage î í Bridge ID Former Municipality Code Bridge Number Narrow Structure Narrow Structure With One Lane Only Environmental Assessment Complete Proposed Repairs 2014 The Township of Centre Wellington 1:85, km (3) (10) Load Restricted (1) (10) Recommended Tonne Limit (10)

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN 2016 STRUCTURE INSPECTION APPRAISAL REPORT Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN by K. SMART ASSOCIATES LIMITED 8 McIntyre Drive Kitchener ON N2R 1H6 August 2016

More information

MISENER DAM. Site Number LYNN STREET, PORT DOVER km N of Highway 6

MISENER DAM. Site Number LYNN STREET, PORT DOVER km N of Highway 6 NORFOLK COUNTY MISENER DAM Site Number 980501 LYNN STREET, PORT DOVER 0.65 km N of Highway 6 Ontario Structure Inspection Manual - Inspection Form Site Number: 980501 Inventory Structure Name Misener Dam

More information

LYNNVILLE ROAD BRIDGE. Site Number D00027 LYNNVILLE ROAD, CONCESSION 11, WINDHAM. 2.3km W of Highway 24

LYNNVILLE ROAD BRIDGE. Site Number D00027 LYNNVILLE ROAD, CONCESSION 11, WINDHAM. 2.3km W of Highway 24 LYNNVILLE ROAD BRIDGE Site Number LYNNVILLE ROAD, CONCESSION 11, WINDHAM 2.3km W of Highway 24 Ontario Structure Inspection Manual - Inspection Form Site Number: Inventory Structure Name Lynnville Road

More information

Ontario Structure Inspection Manual Inspection Form Structure Number: 12

Ontario Structure Inspection Manual Inspection Form Structure Number: 12 Inventory Data: Structure Name Gailbraith Road Bridge 1 Main Hwy/Road # On Under Crossing Navig. Water Non-Navig. Water Rail Type: Road Ped. Other Hwy/Road Name Structure Location Latitude Owner(s) Galbraith

More information

DECOU ROAD BRIDGE. Municipal Structure Inspection Form NORFOLK COUNTY. Site Number DECOU ROAD, SIMCOE. 1.Okm E of Willow Drive

DECOU ROAD BRIDGE. Municipal Structure Inspection Form NORFOLK COUNTY. Site Number DECOU ROAD, SIMCOE. 1.Okm E of Willow Drive NORFOLK COUNTY DECOU ROAD BRIDGE Site Number 000003 DECOU ROAD, SIMCOE 1.Okm E of Willow Drive Ontario Structure Inspection Manual - Inspection Form Site Number: 000003 Inventory Data: Structure Name Decou

More information

RENTON CONCESSION CULVERT. Site Number COUNTY ROAD 5, WOODHOUSE. 0.4 km S of Highway #3

RENTON CONCESSION CULVERT. Site Number COUNTY ROAD 5, WOODHOUSE. 0.4 km S of Highway #3 NORFOLK COUNTY RENTON CONCESSION CULVERT Site Number 970504 COUNTY ROAD 5, WOODHOUSE 0.4 km S of Highway #3 Ontario Structure Inspection Manual - Inspection Form Site Number: 970504 Inventory Data: Structure

More information

NORWICH ROAD BRIDGE. Site Number D00016 NORWICH ROAD, DELHI. 1.0 km N of King Street Delhi

NORWICH ROAD BRIDGE. Site Number D00016 NORWICH ROAD, DELHI. 1.0 km N of King Street Delhi NORWICH ROAD BRIDGE Site Number NORWICH ROAD, DELHI 1.0 km N of King Street Delhi Ontario Structure Inspection Manual - Inspection Form Site Number: Inventory Structure Name Norwich Road Bridge On Crossing

More information

Town of South Bruce Peninsula Bridge and Culvert Inspections OSIM Inspection Report

Town of South Bruce Peninsula Bridge and Culvert Inspections OSIM Inspection Report Town of South Bruce Peninsula OSIM Inspection Report Prepared By: R.J. Burnside and Associates Limited 3 Ronell Crescent, Collingwood L9Y 4J6 Prepared for: Town of South Bruce Peninsula January 2015 File

More information

EAST ¼ LINE BRIDGE, CONCESSION 2

EAST ¼ LINE BRIDGE, CONCESSION 2 NORFOLK COUNTY EAST ¼ LINE BRIDGE, CONCESSION 2 Site Number 010055 VILLA NOVA ROAD, TOWNSEND 1.13 km S of County Road 20 Ontario Structure Inspection Manual - Inspection Form Site Number: 010055 Inventory

More information

Municipal Structure Inspection Form Structure Number: 5

Municipal Structure Inspection Form Structure Number: 5 Inventory Data: Structure Name Keating Rd. Bridge Main Hwy/Road # On Under Crossing Type Non-navig water Road Name Keating Rd Structure Location 0.25 km west of Regional Rd 46 Latitude N 44 29.27 Longitude

More information

Mn/DOT BRIDGE INSPECTION REPORT

Mn/DOT BRIDGE INSPECTION REPORT 08/13/2007 Page 1 of 5 County: City: Township: WINONA DRESBACH Section: 33 Township: 105N Range: 04W Span Type: NBI Deck: 5 Super: 6 Sub: 6 Chan: 8 Culv: N Location: Route: Control Section: AT MINN/WISC

More information

TALBOT STREET BRIDGE

TALBOT STREET BRIDGE NORFOLK COUNTY TALBOT STREET BRIDGE Site Number 000016 TALBOT STREET, SIMCOE 0.10 km S of Windham Street Ontario Structure Inspection Manual - Inspection Form Site Number: 000016 Inventory Structure Name

More information

HUNT STREET BRIDGE. Site Number HUNT STREET, SIMCOE. 0.2 km North of Highway 3

HUNT STREET BRIDGE. Site Number HUNT STREET, SIMCOE. 0.2 km North of Highway 3 NORFOLK COUNTY HUNT STREET BRIDGE Site Number 983502 HUNT STREET, SIMCOE 0.2 km North of Highway 3 Ontario Structure Inspection Manual - Inspection Form Site Number: 983502 Inventory Data: Structure Name

More information

VENISON CREEK BRIDGE

VENISON CREEK BRIDGE Municipal Structure Inspection Form NORFOLK COUNTY VENISON CREEK BRIDGE Site Number 000103 TROYER ROAD, SOUTH WALSINGHAM 0.35km N of County Road 60 Inventory Structure Name Venison Creek Bridge On Crossing

More information

Cast in place concrete parapet and Ministry standard sidewalk railing.

Cast in place concrete parapet and Ministry standard sidewalk railing. BRIDGE INSPECTION BRIDGE NO./NAME 62-003A: Farwell Canyon FSR (21.00 KM) Inspection Date: September 12 th 2012 Inspected By: D. Chen, J. Rupar Gilliatt Year Built: 2007 Number of Spans: 3 Span Lengths:

More information

THE CORPORATION OF TAY VALLEY TOWNSHIP REQUEST FOR PROPOSAL

THE CORPORATION OF TAY VALLEY TOWNSHIP REQUEST FOR PROPOSAL THE CORPORATION OF TAY VALLEY TOWNSHIP REQUEST FOR PROPOSAL ENGINEERING SERVICES TO REHABILITATE TWO (2) BRIDGES AND RECONSTRUCT ONE (1) STRUCTURAL CULVERT CONTRACT #218-PW-7 ADDENDUM NO. 2 THIS ADDENDUM

More information

Executive Summary RPT-SPE December 21. Old Spences Bridge No Inspection Report

Executive Summary RPT-SPE December 21. Old Spences Bridge No Inspection Report Executive Summary The Old Spences Bridge was constructed in 1931 and crosses the Thompson River providing a link between Highway 8 and Highway 1 in the Community of Spences Bridge, BC. In 1962, a new bridge

More information

NORFOLK STREET BRIDGE

NORFOLK STREET BRIDGE Municipal Structure Inspection Form NORFOLK COUNTY NORFOLK STREET BRIDGE Site Number 000022 NORFOLK STREET NORTH, SIMCOE 0.09km N of Windham Concession 14 Road Ontario Structure Inspection Manual - Inspection

More information

HEAD STREET BRIDGE (SIMCOE)

HEAD STREET BRIDGE (SIMCOE) NORFOLK COUNTY HEAD STREET BRIDGE (SIMCOE) Site Number 000009 HEAD STREET, SIMCOE 0.3km S of Windham Street Ontario Structure Inspection Manual - Inspection Form Site Number: 000009 Inventory Structure

More information

LOT 4 CONCESSION 11-12, N. WALSINGHAM

LOT 4 CONCESSION 11-12, N. WALSINGHAM NORFOLK COUNTY LOT 4 CONCESSION 11-12, N. WALSINGHAM 002303 12 TH CONCESSION ROAD, NORTH WALSINGHAM 2.5km E of County Road 23 Ontario Structure Inspection Manual - Inspection Form Site Number: 002303 Inventory

More information

August 13, 2018 NORFOLK COUNTY 2018 OSIM INSPECTIONS SUMMARY REPORT

August 13, 2018 NORFOLK COUNTY 2018 OSIM INSPECTIONS SUMMARY REPORT August 13, 2018 NORFOLK COUNTY 2018 OSIM INSPECTIONS SUMMARY REPORT EXECUTIVE SUMMARY Over the spring of 2018, G. Douglas Vallee Limited staff completed field inspections on 239 known bridges and culverts

More information

BRANT - NORFOLK TOWNLINE ROAD

BRANT - NORFOLK TOWNLINE ROAD Municipal Structure Inspection Form NORFOLK COUNTY TOWNLINE BRIDGE Site Number 010057 BRANT - NORFOLK TOWNLINE ROAD 0.3 km W of County Road 5 Inventory Structure Name Townline Bridge On Crossing Rail Road

More information

YOUNG S CREEK TWIN CULVERTS. Site Number D00026 CHARLOTTEVILLE EAST QUARTERLINE ROAD, CHARLOTTEVILLE. 0.3 km South of Charlotteville Road 5

YOUNG S CREEK TWIN CULVERTS. Site Number D00026 CHARLOTTEVILLE EAST QUARTERLINE ROAD, CHARLOTTEVILLE. 0.3 km South of Charlotteville Road 5 YOUNG S CREEK TWIN CULVERTS Site Number CHARLOTTEVILLE EAST QUARTERLINE ROAD, CHARLOTTEVILLE 0.3 km South of Charlotteville Road 5 Ontario Structure Inspection Manual - Inspection Form Site Number: Inventory

More information

LOT 1 CONCESSION 3 HOUGHTON

LOT 1 CONCESSION 3 HOUGHTON NORFOLK COUNTY LOT 1 CONCESSION 3 HOUGHTON Site Number 002024 LOWER SIDE ROAD, HOUGHTON 1.3km E of County Rd. 28 Ontario Structure Inspection Manual - Inspection Form Site Number: 002024 Inventory Data:

More information

Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects. Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School

Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects. Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School Presented By: County of El Dorado Community Development Agency Transportation

More information

Neilson Road Bridge Bridge No. 817 Detailed Deck Condition Survey & Evaluation Report. City of Toronto Engineering & Construction Services

Neilson Road Bridge Bridge No. 817 Detailed Deck Condition Survey & Evaluation Report. City of Toronto Engineering & Construction Services Neilson Road Bridge Bridge No. 817 Detailed Deck Condition Survey & Evaluation Report Prepared for: City of Toronto Engineering & Construction Services 1 of 265 October 2015 TABLE OF CONTENTS APPENDICES...

More information

APPENDIX B ABC STRUCTURES DESIGN GUIDE

APPENDIX B ABC STRUCTURES DESIGN GUIDE APPENDIX B ABC STRUCTURES DESIGN GUIDE The Cohos Evamy Partners TABLE OF CONTENTS Page No. DISCLAIMER... I 1. STRUCTURAL DESIGN GUIDELINES... 1 2. GENERAL REQUIREMENTS (FIGURE B.2, STEP 1)... 1 3. GENERAL

More information

NYSDOT Culvert Inspection Field Guide

NYSDOT Culvert Inspection Field Guide NYSDOT Culvert Inspection Field Guide This guide is a supplement to the Culvert Inventory and Inspection Manual. It is designed to promote uniformity of culvert item ratings by providing culvert inspectors

More information

BRIDGE INSPECTION REPORT

BRIDGE INSPECTION REPORT NC DEPARTMENT OF TRANSPORTATION ATTENTION DIVISION OF HIGHWAYS BRIDGE MANAGEMENT UNIT BRIDGE INSPECTION REPORT INSPECTION TYPE: Routine Inspection COUNTY IREDELL BRIDGE NUMBER 480596 INSPECTION CYCLE 2

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 5 (FRANKLIN AVENUE) OVER THE MISSISSIPPI RIVER HENNEPIN COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 5 (FRANKLIN AVENUE) OVER THE MISSISSIPPI RIVER HENNEPIN COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 2441 CSAH NO. 5 (FRANKLIN AVENUE) OVER THE MISSISSIPPI RIVER HENNEPIN COUNTY OCTOBER 29, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION NBI INSPECTION DWCJ Inspector Name Agency / Company Name Insp. Freq. Insp. Date Evan Currie Great Lakes Engineering Group 12 07/31/2017 GENERAL NOTES Posting Signs in Place DECK 1. Surface (SIA-58A) 2.

More information

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges. STANDARD BRIDGE & CULVERT COMPONENTS Alberta Bridge Inventory In Alberta there are about 13,300 bridges. Types of bridges in Alberta: Standard bridges 3521 (26%) Bridge size culverts 8348 (63%) Major bridges

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 15 OVER THE ARCOLA CHANNEL HENNEPIN COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 15 OVER THE ARCOLA CHANNEL HENNEPIN COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 27510 CSAH NO. 15 OVER THE ARCOLA CHANNEL HENNEPIN COUNTY MAY 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC.

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS NO. 119 OVER THE RED LAKE RIVER DISTRICT 2 - POLK COUNTY, CITY OF EAST GRAND FORKS

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS NO. 119 OVER THE RED LAKE RIVER DISTRICT 2 - POLK COUNTY, CITY OF EAST GRAND FORKS UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 60019 MSAS NO. 119 OVER THE RED LAKE RIVER DISTRICT 2 - POLK COUNTY, CITY OF EAST GRAND FORKS AUGUST 29, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF

More information

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY State of ew Jersey EW JERSEY DEPARTMET OF TRASPORTATIO 103 PARKWAY AVEUE P.O. Box 00 TRETO, EW JERSEY 082-000 STRUCTURE O. 0910-13 J ROUTE 7 (BELLEVILLE TURPIKE) OVER CORAIL (EWARK BRACH) TOW OF KEARY

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CR 958 OVER A STREAM ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CR 958 OVER A STREAM ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 88631 CR 958 OVER A STREAM ST. LOUIS COUNTY SEPTEMBER 18, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.

More information

Two glulam slab girders, 365 mm x 1825 mm spaced at 3065 mm c/c.

Two glulam slab girders, 365 mm x 1825 mm spaced at 3065 mm c/c. BRIDGE INSPECTION BRIDGE NO. N2-038: Findlay-Lavington FSR (12.60 KM) Inspection Date: September 25, 2012 Inspected By: R. Veitch, M. Hanson Year Built: 1982 Number of Spans: 1 Span Lengths: Superstructure

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 6 - RICE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 6 - RICE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 66532 227 th STREET (TWP 45) OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY SEPTEMBER 12, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

3. INSPECTION FINDINGS

3. INSPECTION FINDINGS 3. INSPECTION FINDINGS Pier 40 is in overall Poor condition with 22% of the H-piles rated Major and 35% of the H-piles rated Severe, primarily due to severe corrosion within the splash zone at the top

More information

HOAN BRIDGE REHABILITATION

HOAN BRIDGE REHABILITATION 5/11/2013 HOAN BRIDGE REHABILITATION Presentation Overview Project Overview History Project Background In-Depth Inspection Structural Design Elements WSPE Discovery Conference 2013 PROJECT OVERVIEW Project

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CR 27 OVER THE RED LAKE RIVER DISTRICT 2 PENNINGTON COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CR 27 OVER THE RED LAKE RIVER DISTRICT 2 PENNINGTON COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 57521 CR 27 OVER THE RED LAKE RIVER DISTRICT 2 PENNINGTON COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO TRUNK HIGHWAY NO. 3 rd Avenue/Central Avenue OVER THE MISSISSIPPI RIVER

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO TRUNK HIGHWAY NO. 3 rd Avenue/Central Avenue OVER THE MISSISSIPPI RIVER UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 2440 TRUNK HIGHWAY NO. 3 rd Avenue/Central Avenue OVER THE MISSISSIPPI RIVER DISTRICT M HENNEPIN COUNTY OCTOBER 23, 2008 PREPARED FOR THE MINNESOTA DEPARTMENT

More information

Crossing Type: Heritage Designation:

Crossing Type: Heritage Designation: Inventory Data: City Site Number 81 Structure Name Old Mill Road Bridge Main Hwy/Road On Under Crossing Type: Navig. Water Non-Navig. Water Rail Road Ped. Other Hwy/Road Name Structure Location Old Mill

More information

Arnold Mill Rd (SR 140) Over Little River

Arnold Mill Rd (SR 140) Over Little River Arnold Mill Rd (SR 140) Over Little River Bridge ID 057-0029-0 General Road: Arnold Mill Rd (SR 140) Over: Little River Between Old Arnold Mill Rd And Hickory Flat Hwy Structure Type: Simply Supported

More information

The Norwich Street Bridge

The Norwich Street Bridge The Norwich Street Bridge Class Environmental Assessment Open House May 17, 2017 6:30-8 p.m. Guelph City Hall Phase 1 Phase 2 Project File Our Study Process: This study is being undertaken as a Schedule

More information

CONDITION SURVEY AND OPTIONS REPORT FRASIER ROAD BRIDGE WSP NO.: NOVEMBER, WSP 2611 Queensview Drive, Suite 300 Ottawa, ON K2B 8K2

CONDITION SURVEY AND OPTIONS REPORT FRASIER ROAD BRIDGE WSP NO.: NOVEMBER, WSP 2611 Queensview Drive, Suite 300 Ottawa, ON K2B 8K2 Prepared for: The Corporation of the Township of North Glengarry CONDITION SURVEY AND OPTIONS REPORT FRASIER ROAD BRIDGE WSP NO.: 161-09722-00 NOVEMBER, 2016 WSP 2611 Queensview Drive, Suite 300 Ottawa,

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO COUNTY STATE AID HIGHWAY 10 OVER THE POMME DE TERRE RIVER DISTRICT 4 STEVENS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO COUNTY STATE AID HIGHWAY 10 OVER THE POMME DE TERRE RIVER DISTRICT 4 STEVENS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 75501 COUNTY STATE AID HIGHWAY 10 OVER THE POMME DE TERRE RIVER DISTRICT 4 STEVENS COUNTY SEPTEMBER 24, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199)) 11060 White Rock Road, Suite 200 Rancho Cordova, CA 95670 Phone: (916) 363-4210 Fax: (916) 363-4230 M e m o r a n d u m To: Reena Gohil, Environmental Planner Date: May 30, 2017 California Department of

More information

May 17, Mr. Fred Preuss Oak Park River Forest High School 201 North Scoville Avenue Oak Park, IL 60302

May 17, Mr. Fred Preuss Oak Park River Forest High School 201 North Scoville Avenue Oak Park, IL 60302 Larson Engineering, Inc. 118 S. Clinton Street, Suite 250 Chicago, IL 60661-5775 312.345.0540 Fax: 312.332.1484 www.larsonengr.com May 17, 2016 Mr. Fred Preuss Oak Park River Forest High School 201 North

More information

ATTACHMENT 50-1: PERFORMANCE AND MEASUREMENT TABLE

ATTACHMENT 50-1: PERFORMANCE AND MEASUREMENT TABLE 1) PAVEMENT 1.1 Ride quality All roadways have a smooth surface course (including bridge deck approaches, covers, gratings, frames and boxes). 24 hours 28 days 6 months a. Measurement of International

More information

Table of Contents. List of Drawings

Table of Contents. List of Drawings SCOPE OF WORK Hastings Stadium Exhibition Park, 81 London Road, Guelph, Ontario Structural and Maintenance Remedial Work Prepared For City of Guelph City Hall, 1 Carden Street, Guelph, ON N1H 3A1 Prepared

More information

CONSTRUCTION SPECIFICATION FOR STRUCTURE REHABILITATION - CONCRETE REMOVAL

CONSTRUCTION SPECIFICATION FOR STRUCTURE REHABILITATION - CONCRETE REMOVAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 928 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR STRUCTURE REHABILITATION - CONCRETE REMOVAL TABLE OF CONTENTS 928.01 SCOPE 928.02 REFERENCES 928.03

More information

High Bridge Re-Deck Project

High Bridge Re-Deck Project High Bridge Re-Deck Project MnDOT Contract No. 1000532 Presented to: Minnesota Department of Transportation Bridge Repair Recommendations - September 22, 2016 Bridge Overview 11 Total Spans, 2755-0 Long

More information

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY 08625-0600 BRIDGE RE-EVALUATION SURVEY REPORT STRUCTURE NO. 3XXX-XXX ROUTE I-287 SB OVER

More information

Road M3 Chisinau Giurgiulesti/ Romanian Border Extension and Rehabilitation Project Draft Feasibility Study (December 2008)

Road M3 Chisinau Giurgiulesti/ Romanian Border Extension and Rehabilitation Project Draft Feasibility Study (December 2008) BRIDGE INSPECTION MANUAL Preface The aim of the bridge inspection is to produce a report of the structure which gives a clear and accurate description of its condition at the time for comparison with earlier

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 3 - MORRISON COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 3 - MORRISON COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 49528 CSAH NO. 26 OVER THE MISSISSIPPI RIVER DISTRICT 3 - MORRISON COUNTY OCTOBER 25, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS

More information

Municipality of Chatham-Kent. Infrastructure and Engineering Services. Engineering and Transportation Division

Municipality of Chatham-Kent. Infrastructure and Engineering Services. Engineering and Transportation Division Municipality of Chatham-Kent Infrastructure and Engineering Services Engineering and Transportation Division To: From: Mayor and Members of Council Jason Cikatricis, C.E.T., Engineering Technologist Date:

More information

PLANNING AND DESIGN PARAMETERS BRIDGE STRUCTURES. Engr. Ericson Mammag Feasibility Study Preparation CHARM2 Project

PLANNING AND DESIGN PARAMETERS BRIDGE STRUCTURES. Engr. Ericson Mammag Feasibility Study Preparation CHARM2 Project PLANNING AND DESIGN PARAMETERS BRIDGE STRUCTURES Engr. Ericson Mammag Feasibility Study Preparation CHARM2 Project KEY ELEMENTS IN RURAL INFRA Planning & Design Bridges Potable Communal Small Water Roads

More information

P20 Crack (generally 4mm width) to northeast corner of south leg corbel of pier SP-2 (ref. SC3)

P20 Crack (generally 4mm width) to northeast corner of south leg corbel of pier SP-2 (ref. SC3) Concrete loss to mouth of crack P20 Crack (generally 4mm width) to northeast corner of south leg corbel of pier SP-2 (ref. SC3) Page 24 P21 Spalling/section loss to South parapet plinth upstand beam over

More information

UNDERWATER BRIDGE INSPECTION REPORT RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY

UNDERWATER BRIDGE INSPECTION REPORT RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 6646 CSAH NO. 36 OVER THE RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016 Rehabilitation of West Main Street Culvert and Shirley Street Bridge Town of Ayer November 22, 2016 Agenda Outline Introductions Project Goals and Objectives Existing Conditions Review Design Considerations

More information

Chapter 4 Bridge Program Drawings

Chapter 4 Bridge Program Drawings Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles

More information

East Lyme Middle School EAST LYME MIDDLE SCHOOL

East Lyme Middle School EAST LYME MIDDLE SCHOOL Description: N EAST LYME MIDDLE SCHOOL The school consists of a multi story building with lower, main and upper level floors. The typical floor framing for the main and upper levels is wide flange steel

More information

Cochran Mill Road Bridge over Tuscarora Creek

Cochran Mill Road Bridge over Tuscarora Creek Cochran Mill Road Bridge over Tuscarora Creek July 15, 2014 Brian Morrison, P.E. NOVA District Senior Structural Engineer (703) 259-2606 brian.morrison@vdot.virginia.gov Purpose & Need Purpose Update project

More information

COUNTY ENGINEERS ASSOCIATION OF MARYLAND SPRING 2016 CONFERENCE. Conference Center at the Maritime Institute Anne Arundel County, Maryland

COUNTY ENGINEERS ASSOCIATION OF MARYLAND SPRING 2016 CONFERENCE. Conference Center at the Maritime Institute Anne Arundel County, Maryland COUNTY ENGINEERS ASSOCIATION OF MARYLAND SPRING 2016 CONFERENCE Conference Center at the Maritime Institute Anne Arundel County, Maryland Thursday, April 28, 2016 Two bridges in Two Months - Accelerated

More information

Element Condition Values

Element Condition Values Element Condition Values Bridge Number I 837 Bridge Location I 15 Over SR589 SAHARA AV Inspection Date Elem/Env Element Description Quantity UOM Qty1 Qty2 Qty3 Qty4 012- / 2 Reinforced Concrete Deck/Slab

More information

BRIDGE NO Inspection Type: Routine and Special STONINGTON STILLMAN AVENUE over PAWCATUCK RIVER

BRIDGE NO Inspection Type: Routine and Special STONINGTON STILLMAN AVENUE over PAWCATUCK RIVER Inspection Type: Routine and Special BRIDGE NO. 04158 73770 - STONINGTON STILLMAN AVENUE over PAWCATUCK RIVER Routine and Special Inspection 5/06/2016 TABLE OF CONTENTS Section Page Number Location Map

More information

Chapter 13 Bridge Load Rating

Chapter 13 Bridge Load Rating Chapter 13 Bridge Load Rating Contents 13.1 General 13.1-1 13.1.1 WSDOT Rating (LRFR) 13.1-2 13.1.2 NBI Rating (LFR) 13.1-8 13.2 Special Rating Criteria 13.2-1 13.2.1 Dead Loads 13.2-1 13.2.2 Live Load

More information

Civil and Structural Engineering CONSTRUCTION OF BRIDGE STRUCTURES SHALL BE IN ACCORDANCE WITH THE FOLLOWING SPECIFICATIONS, LISTED IN ORDER OF PRECEDENCE: 1. CDOT STANDARD SPECIFICATIONS FOR ROAD AND

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 3 OVER THE RED LAKE RIVER DISTRICT 2 - PENNINGTON COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 3 OVER THE RED LAKE RIVER DISTRICT 2 - PENNINGTON COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 57518 CSAH NO. 3 OVER THE RED LAKE RIVER DISTRICT 2 - PENNINGTON COUNTY AUGUST 27, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY AYRES

More information

Element Condition Values

Element Condition Values Element Condition Values Bridge Number Bridge Location H1042R RMP 15N TO CHRLSTN Over WALL ST Inspection Date Elem/Env Element Description Quantity UOM Qty1 Qty2 Qty3 Qty4 012- / 2 Reinforced Concrete

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - WILKIN COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - WILKIN COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 84505 CSAH NO. 14 OVER THE OTTER TAIL RIVER DISTRICT 4 - WILKIN COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC.

More information

Guidelines for Checking Final Design Bridge Plans

Guidelines for Checking Final Design Bridge Plans MNDOT BRIDGE OFFICE Guidelines for Checking Final Design Bridge Plans Edited by the MnDOT Bridge Office ES ESS Committee February 2018 Disclaimer: This document is meant to be used as a checklist for the

More information

BRIDGE INSPECTION FIELD MANUAL FOR OKLAHOMA BRIDGES

BRIDGE INSPECTION FIELD MANUAL FOR OKLAHOMA BRIDGES BrM BRIDGE INSPECTION FIELD MANUAL FOR OKLAHOMA BRIDGES OKLAHOMA DEPARTMENT OF TRANSPORTATION BRIDGE DIVISION MAY 2018 EDITION DECKS OR SLABS TABLE OF CONTENTS Unit Reinforced Concrete (pg. 6) Reinforced

More information

Preserva on Assessment

Preserva on Assessment Preserva on Assessment For Bardo Road Over Li le Fishing Creek BMS # 19 7209 0536 0089 Columbia County PennDOT Engineering District 3 0 Prepared by TranSystems Final Report Dec 2017 for the Pennsylvania

More information

Concrete Parking Garage Degradation

Concrete Parking Garage Degradation Concrete Parking Garage Degradation Concrete Parking Garage Degradation With proper care and maintenance, the life of a concrete parking garage can span several decades. The integrity and strength of structural

More information

PONTIS BRIDGE INSPECTION FIELD MANUAL FOR OKLAHOMA BRIDGES

PONTIS BRIDGE INSPECTION FIELD MANUAL FOR OKLAHOMA BRIDGES PONTIS BRIDGE INSPECTION FIELD MANUAL FOR OKLAHOMA BRIDGES OKLAHOMA DEPARTMENT OF TRANSPORTATION BRIDGE DIVISION DECEMBER 2012 EDITION TABLE OF CONTENTS DECKS OR SLABS Unit Concrete (pg. 2) Steel (pg.

More information

PARKING LOT AND ROADWAY MAINTENANCE

PARKING LOT AND ROADWAY MAINTENANCE Village of Vernon Hills Community Development Engineering Division Phone 847-367-3704 Fax 847-367-2541 PERMIT APPLICATION PROCESS PARKING LOT AND ROADWAY MAINTENANCE Removal and replacement, concrete and

More information

UNDERWATER BRIDGE INSPECTION REPORT RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY, CITY OF MOORHEAD

UNDERWATER BRIDGE INSPECTION REPORT RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY, CITY OF MOORHEAD UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 14511 MSAS NO. 115 OVER THE RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY, CITY OF MOORHEAD PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY

More information

Preserva on Assessment

Preserva on Assessment Preserva on Assessment For Seidersville Road Bridge over Saucon Creek BMS # 48 7301 0000 9019 Northampton County PennDOT Engineering District 5 0 Final Report June 2016 Prepared by TranSystems for the

More information

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA ASHE NATIONAL PROJECT OF THE YEAR SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA For the PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Engineering District 12-0 Submitted By: January 29, 2018 AMERICAN

More information

TOWN OF SHELBURNE Shelburne Marine Terminal 2016 Condition Assessment Final Report

TOWN OF SHELBURNE Shelburne Marine Terminal 2016 Condition Assessment Final Report TOWN OF SHELBURNE Shelburne Marine Terminal 2016 Condition Assessment Final Report October 04, 2016 www.consultpinto.com Town of Shelburne Shelburne Marine Terminal 2016 Condition Assessment TABLE OF CONTENTS

More information

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B401: DELETED B402: DELETED B403: DELETED B404: STRUCTURE/CULVERT IDENTIFICATION SIGNS B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B406: ITEM 514 - FIELD PAINTING, MISC.; REPAIR PAINTING

More information

Element Condition Values

Element Condition Values Element Condition Values Bridge Number I 937 Bridge Location I 15 Over US 95 Inspection Date Elem/Env Element Description Quantity UOM Qty1 Qty2 Qty3 Qty4 001 / 2 General Notes - Pier 2 not accessible

More information

Appendix III. A. Classification of Concrete Bridge Components

Appendix III. A. Classification of Concrete Bridge Components Appendix III A. Classification of Concrete Bridge Components 1. Concrete beam/girder Concrete beam-type bridges normally can be classified into two types. One is the T beam bridge which is generally a

More information

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 108 over PALEFACE RIVER. Date of Inspection: Equipment Used: 06/18/2016. County Highway Agency

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 108 over PALEFACE RIVER. Date of Inspection: Equipment Used: 06/18/2016. County Highway Agency 2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 7766 CSAH 108 over PALEFACE RIVER DISTRICT: District 1 COUNTY: St. Louis CITY/TOWNSHIP: COLVIN STATE: Minnesota Date of Inspection: Equipment Used: 06/18/2016

More information

Bridge Barrier Development Presentation to the MFLNRO April John Deenihan Ph.D., EIT Julien Henley M.A.Sc., P.Eng

Bridge Barrier Development Presentation to the MFLNRO April John Deenihan Ph.D., EIT Julien Henley M.A.Sc., P.Eng Bridge Barrier Development Presentation to the MFLNRO April 2014 John Deenihan Ph.D., EIT Julien Henley M.A.Sc., P.Eng Contents Introduction Contents Introduction Background Information / Synopsis Contents

More information

Element Condition Values

Element Condition Values Element Condition Values Bridge Number I2139R Bridge Location RAMP MLK TO I 15S Over MLK BLVD Inspection Date Elem/Env Element Description Quantity UOM Qty1 Qty2 Qty3 Qty4 001 / 2 General Notes 1 1 - The

More information

INSPECTION AND REPAIR OF THE DETERIORATED RT.72 MANAHAWKIN BAY BRIDGE

INSPECTION AND REPAIR OF THE DETERIORATED RT.72 MANAHAWKIN BAY BRIDGE INSPECTION AND REPAIR OF THE DETERIORATED RT.72 MANAHAWKIN BAY BRIDGE Xiaohua H. Cheng 1, Gregory Renman 1 and Richard Dunne 1 Abstract The superstructure of Rt.72 over Manakawkin Bay Bridge consists of

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014

More information

Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation SCI Project Number:

Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation SCI Project Number: 27 June 2016 Mr. Shane Chism, AIA Breckenridge Group 4625 E. Fort Lowell Road Tucson, Arizona 85712 Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is

More information

Strathcona County Functional Planning Study Highway 15:06 From Range Road 220 to Highway 830 A P P E N D I X G BRIDGE ASSESSMENT E00311A

Strathcona County Functional Planning Study Highway 15:06 From Range Road 220 to Highway 830 A P P E N D I X G BRIDGE ASSESSMENT E00311A Strathcona County Functional Planning Study Highway 15:06 From Range Road 220 to Highway 830 A P P E N D I X G BRIDGE ASSESSMENT E00311A BF 73649 E/W Bridge Culverts Highway 15 Crossing Astotin Creek Bridge

More information

TOWN OF AMHERSTBURG BUILDING DEPARTMENT 271 Sandwich Street S. Amherstburg ON N9V 2A5 Ph Fax

TOWN OF AMHERSTBURG BUILDING DEPARTMENT 271 Sandwich Street S. Amherstburg ON N9V 2A5 Ph Fax TOWN OF AMHERSTBURG BUILDING DEPARTMENT 271 Sandwich Street S. Amherstburg ON N9V 2A5 Ph. 519-736-5408 Fax 519-736-9859 www.amherstburg.ca BUILDING PERMIT GENERAL INFORMATION FOR ACCESSORY STRUCTURES (SHEDS,

More information

Preserva on Assessment

Preserva on Assessment Preserva on Assessment For Sheep Hole Road over Tinicum Creek BMS # 09 7009 0432 0361 Bucks County PennDOT Engineering District 6 0 Final Report Dec 2017 Prepared by TranSystems for the Pennsylvania Department

More information

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures Cumberland Viaduct Rehabilitation Project Contract No. AL4095180R Presenter Bob Bofinger MDSHA Office of Structures Project Justification & Improvements Condition State The deck, superstructure and substructure

More information

Safety Documents > Safety Manual > Scaffolds

Safety Documents > Safety Manual > Scaffolds Safety Documents > Safety Manual > Scaffolds D. Scaffolds 1. General Requirements for All Scaffolds a. Scaffolds shall be furnished and erected in accordance with this standard for persons engaged in work

More information

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION Vireak Hinh, P.Eng. R.V. Anderson Associates Ltd., Toronto, Canada Jennifer Trimble Region of Halton, Oakville, Canada

More information

PONTIS ELEMENT DATA COLLECTION MANUAL OFFICE OF BRIDGE DEVELOPMENT

PONTIS ELEMENT DATA COLLECTION MANUAL OFFICE OF BRIDGE DEVELOPMENT PONTIS ELEMENT DATA COLLECTION MANUAL OFFICE OF BRIDGE DEVELOPMENT For comments or questions regarding this coding guide contact the Senior Bridge Management Engineer at (410) 545-8311 Date Issued: April

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION STR 7004 MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY INSPECTION REPORT Facility Latitude / Longitude MDOT Structure ID Structure Condition 4 3/4 MILE RD 43.5688 / -84.3455 56314H00009B010 Good

More information