SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Size: px
Start display at page:

Download "SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)"

Transcription

1 Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$ X18:$ X36:$ EXSTRUCT:$ X18:$ X36:$ The description and location of the project is as follows: for the replacement of the concrete decks on 13 municipally owned bridges, minor approach roadway work, guiderail replacement and other miscellaneous construction all within a length of 3, Linear Feet (0.710 Miles) as indicated on the approved drawings included in the Bid Package for D11 Local Bridge Bundle Phase 1, in BEAVER and LAWRENCE COUNTIES, VARIOUS MUNICIPALITIES, Commonwealth of Pennsylvania. DBE 7%, Anticipated Notice to Proceed , Required Completion ERIE COUNTY SR 4034(00S) # PROPOSAL:$16.44 PLANS:$ X18:$ X36:$62.40 The description and location of the project is as follows: traffic signal upgrades, signing, pavement markings and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 4034, SECTION 00S, in Erie COUNTY, City of Erie in and around the intersection of the Bayfront Parkway and State Street at segment 0060 offset 2167 to approximately segment 0070 offset DBE 3%, Anticipated Notice to Proceed , Required Completion Updated June 15, 2016 CHESTER COUNTY SR 82(HBL) #92311 PROPOSAL:$79.20 PLANS:$ X18:$ X36:$1, EXSTRUCT:$ X18:$ X36:$ This project is for the replacement of six (6) structures across Chester, Bucks, and Delaware Counties; and the rehabilitation/repair of four (4) bridges across Bucks, Montgomery, Chester and Philadelphia counties. Typical work for replacement structures includes rigid frames and culverts within the approximate existing footprint, guiderail updates along the approaches of each structure, and the milling and paving of roadway along either approach to tie the existing roadway grade into the new structure. Work included for the repair/rehabilitation the four structures includes deck replacement, timber superstructure replacement, joint repairs, concrete/deck repair, heat straightening beam repairs and replacements, painting of structural steel, and updates to approach guiderail. Also included is other miscellaneous construction, as indicated on the approved drawings included in the bid package. Anticipated Notice to Proceed , Required Completion Updated June 14, 2016 MONTGOMERY COUNTY SR 2004(HAT) #74807 PROPOSAL:$53.76 PLANS:$ X18:$ X36:$58.50 The description and location of the project is as follows: provide streetscape items such as sidewalk, curbing, landscaping and other miscellaneous construction, as indicated on the approved drawings included in the bid package for Broad Street, State Route 2004, Section HAT, in Montgomery County, Hatfield Township from approximately segment 0030 offset 0700 to approximately Rosenberry Ave. at segment 0030 offset Design activities limited to ADA compliant curb ramps. DBE 3%, Anticipated Notice to Proceed , Required Completion WARREN COUNTY SR 3008(PBR) #

2 PROPOSAL:$13.68 PLANS:$3.00 For the construction or improvement of a certain section of STATE HIGHWAYS in WARREN COUNTY, ELDRED, SPRING CREEK, DEERFIELD AND PITTSFIELD TOWNSHIPS, Commonwealth of Pennsylvania, STATE ROUTE 3008 SECTION PBR. This project being situated as follows: SR From the intersection with SR at Segment 0050 Offset 0000 then east to the intersection with SR at Segment 0170 Offset SR From approximately 2.3 miles north of Scotch Pine Rd. (T-360) at Segment 0080 Offset 0000 then north to the intersection with SR at Segment 0170 Offset SR From the intersection with SR at Segment 0010 Offset 0000 then north to the intersection with SR at Segment 0070 Offset For the bituminous overlay with Warm Mix Superpave Asphalt Mixture Designs 18' in width; also for bituminous milling across bridge decks, undercut section, paved shoulders, drainage, and guiderail all within a project length of miles as indicated on the approved drawings. Anticipated Notice to Proceed , Required Completion FRANKLIN COUNTY SR 75(012) #99180 PROPOSAL:$23.88 PLANS:$ X18:$ X36:$97.50 EXSTRUCT:$ X18:$ X36:$11.70 This project includes preservation work on four (4) bridges BMS # ; BMS # ; BMS # ; and BMS # Traffic during construction will be maintained with short-term single-lane operations. Project also involves approach roadway work, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0075, SECTIONS 012, in FRANKLIN COUNTY, FANNETT TOWNSHIP, from Segment 0700; 0750; 0840, Offset 2902; 0387; 0144 to Segment 0700; 0750; 0840, Offset 3202; 0987; 0444, for an overall project length of linear feet (0.142 mile). Anticipated Notice to Proceed , Required Completion BLAIR COUNTY SR 36(29B) #21952 PROPOSAL:$33.96 PLANS:$ X18:$ X36:$ X-SEC;$7.7012X18:$ X36:$ EXSTRUCT:$ X18:$ X36:$15.60 The description and location of the project is as follows: This project is for the replacement of the existing deteriorated two span concrete encased steel I-beam bridge with a single span spread box beam bridge at approximately the same location. The proposed structure will carry State Route (SR) 0036, Section 29B (Logan Boulevard) over Brush Run. This project includes roadway approach work, waterline, guiderail and drainage upgrades and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0036, SECTION 29B in BLAIR COUNTY, LOGAN TOWNSHIP at the following location: STATION TO STATION SEGMENT 0330, OFFSET 0357 TO SEGMENT 0340, OFFSET 0782 (NB) SEGMENT 0331, OFFSET 0344 TO SEGMENT 0341, OFFSET 0821 (SB). DBE 6%, Anticipated Notice to Proceed , Required Completion SUSQUEHANNA COUNTY SR 858(552) #88613 PROPOSAL:$16.08 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ For the construction of a section of STATE HIGHWAY in SUSQUEHANNA COUNTY, MIDDLETOWN TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0858 SECTION 552. The project being situated as follows: SR from a point approximately 0.98 mile north of intersection with SR 4017 at Segment 0100 Offset 2210 (station 76+50) to a point 1.38 mile south of Middletown Center at Segment 0110 Offset 0245 (station 83+90) For the removal of existing twin 60 inch pipes and bridge abutments and replacing with a one span P/S concrete spread box Beam Bridge; full depth pavement consisting of superpave WMA wearing course 1-1/2 depth, superpave WMA binder course 2-1/2" depth, superpave base course 3 depth and subbase 6 depth. Also rock lined slopes and swales, temporary stream crossing, guiderail, drainage and pavement markings all contained within an overall project length of 748 linear feet as indicated on the approved drawings included in the bid package. Anticipated Notice to Proceed , Required Completion BUCKS COUNTY SR 0000(LSR) #

3 PROPOSAL:$24.12 The description and location of the project is as follows: the repair and replacement of Type A, and Type E signs as well as Overhead signs and other miscellaneous construction, as needed, for Various STATE ROUTES in BUCKS, CHESTER, DELAWARE, MONTGOMERY, AND PHILADELPHIA COUNTIES. Anticipated Notice to Proceed , Required Completion LANCASTER COUNTY SR 7213(BRG) #19799 PROPOSAL:$23.28 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$39.00 This project consists of the construction of a two-span Continuous Composite Prestressed Concrete Spread Box Beam Bridge and approach work as indicated on the approved drawings included in the Bid Package for T-848 (Conestoga Creek Road) in LANCASTER COUNTY, EAST EARL TOWNSHIP, from Sta to Sta , for an overall project length of linear feet (0.170 mile). DBE 5%, Anticipated Notice to Proceed , Required Completion CRAWFORD COUNTY SR 1032(PBR) # PROPOSAL:$14.64 PLANS:$2.76 For the bituminous resurfacing of various state routes throughout CRAWFORD and WARREN COUNTIES, Commonwealth of Pennsylvania, STATE ROUTE 1032 SECTION PBR with Warm Mix Asphalt Mixture (WMA) designs. Also for bituminous milling, drainage, concrete curb, and guiderail update as indicated on the approved drawings. Anticipated Notice to Proceed , Required Completion Updated June 13, 2016 LANCASTER COUNTY SR 72(054) #96212 PROPOSAL:$16.32 PLANS x18:$ x36:$78.00 This project includes concrete patching, spall repair, minor drainage updates, signs & pavement markings, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0072, SECTION 054, in LANCASTER COUNTY, MANHEIM TOWNSHIP, from just north of Calder Road at Segment 0130/0131 Offset 0110/0110 to Granite Run Drive at Segment 0140/0141 Offset 2037/2026, for an overall project length of linear feet (0.99 mile). Anticipated Notice to Proceed , Required Completion BUCKS COUNTY SR 0000(SSR) # PROPOSAL:$30.12 The description and location of the project is as follows: for the furnishing and installation of state approved signs, Type B posts, removal of existing signs and posts and other miscellaneous operations for various STATE ROADS described herein, in various BUCKS, CHESTER, DELAWARE, MONTGOMERY, and PHILADELPHIA COUNTIES and TOWNSHIPS within the Commonwealth of Pennsylvania. Anticipated Notice to Proceed , Required Completion ADAMS COUNTY SR 116(042) #90866 PROPOSAL:$18.96 PLANS:$ X18:$ X36:$74.10 This project consists of minor drainage updates, base repair, ADA ramps, milling, resurfacing, signing & pavement markings, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0116, SECTION 042, in ADAMS COUNTY, FAIRFIELD BOROUGH and HAMILTONBAN TOWNSHIP, from just east of Iron Springs Road at Segment 0060 Offset 2856 to Carroll's Tract Road at Segment 0090 Offset 0856, a length of 5, linear feet (1.00 mile). Also included is SR from Segment 0070 Offset 0758 to Segment 0070 Offset 1493, a length of linear feet (0.13 mile). Overall project length is linear feet (1.13 mile). Anticipated Notice to Proceed , Required Completion BERKS COUNTY SR 176(06M) #

4 PROPOSAL:$14.28 PLANS:$0.96 The description and location of the project is as follows: Milling, Base Repair, Overlay, RPM's, and Line Painting & Legends as indicated on the approved drawings included in the bid package for State Route 176, Section 06M, in Berks County, Caernarvon, Robeson and Exeter Townships from approximately segment 0018/0019 offset 1938/1926 to approximately segment 0040/0035 offset 0280/1378, approximately 21,246 feet or 4.02 miles and other miscellaneous construction. DBE 4%, Anticipated Notice to Proceed , Required Completion FRANKLIN COUNTY SR 16(037) #74889 PROPOSAL:$28.20 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$70.20 EXSTRUCT:$ X18:$ X326:$7.80 Construction consists of the replacement of the PA-16 Memorial Bridge over the west branch of Antietam Creek. Traffic control is phased construction. Phase 1 will maintain onelane of traffic on the existing structure using a temporary signal. Phase 2 will maintain both lanes of traffic on the over-widened portion of the new bridge. The existing 2-span bridge will be replaced with a two-span composite box beam bridge. Accelerated bridge construction components are part of the as-design bridge and A+Bx bidding is specified. Other work includes: 12 waterline relocation, approach reconstruction; Superpave asphalt; milling; guide rail; drainage; curb; sidewalk; signing; pavement markings; and other miscellaneous items, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0016, SECTION 037, in FRANKLIN COUNTY, WAYNESBORO BOROUGH and WASHINGTON TOWNSHIP, from Segment 0520 Offset 1776 to Segment 0530 Offset 0613, a length of linear feet (0.162 mile). Anticipated Notice to Proceed , Required Completion Updated June 9, 2016 GREENE COUNTY SR 2011(PBE) # PROPOSAL:$13.68 PLANS:$ X18:$ X36:$42.90 The description and location of the project is as follows: The scope of work involves resurfacing and updating the guide rail, pavement markings, minor drainage upgrades, and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 2011, SECTION PBE, in GREENE COUNTY, Dunkard Township and Monongahela Township, beginning approximately 500' north of S.R (Bobtown Hill Road) and ending approximately at Creek Road (T-411). (Segment 0070 offset 0417 to segment 0150 offset 0100). Anticipated Notice to Proceed , Required Completion ECMS ADVANCED INFORMATION JULY 14, 2016 Updated June 8, 2016 LYCOMING COUNTY SR 2016(017) # PROPOSAL:$17.28 PLANS:$ X18:$ X36:$46.80 The description and location of the project are as follows: This work is for intersection improvements including traffic signal installation, pavement markings, signs, plain cement concrete curb, cement concrete sidewalk, detectable warning surface, excavation, flexible base replacement, Superpave Asphalt Mixture Design WMA scratch and wearing courses, milling, and other miscellaneous construction all within an overall length of linear feet (0.138 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 2016, SECTION 017 in LOYALSOCK TOWNSHIP, LYCOMING COUNTY from approximately 0.29 miles east of the intersection with Almond Street at Segment 0140 Offset 0016 to approximately 0.20 miles west of the intersection with State Route 2056 at Segment 0140 Offset DBE 2%, Anticipated Notice to Proceed , Required Completion

5 Update June 6, 2016 WASHINGTON COUNTY SR 88(127) #47432 PROPOSAL:$60.60 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$97.50 The description and location of the project is as follows: Improvements at the intersection of SR 0088, SR 0837, and the Fisher Heights Giant Eagle store, including the installation of left turn lanes, a new traffic signal, new drainage and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0088, SECTION 127, in WASHINGTON COUNTY, CARROLL TOWNSHIP, from segment 0560 offset 3005 to segment 0560 offset Anticipated Notice to Proceed , Required Completion ECMS ADVANCED INFORMATION JULY 14, 2016 LYCOMING COUNTY SR 2016(017) # PROPOSAL:$17.28 PLANS:$ X18:$ X36:$46.80 The description and location of the project are as follows: This work is for intersection improvements including traffic signal installation, pavement markings, signs, plain cement concrete curb, cement concrete sidewalk, detectable warning surface, excavation, flexible base replacement, Superpave Asphalt Mixture Design WMA scratch and wearing courses, milling, and other miscellaneous construction all within an overall length of linear feet (0.138 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 2016, SECTION 017 in LOYALSOCK TOWNSHIP, LYCOMING COUNTY from approximately 0.29 miles east of the intersection with Almond Street at Segment 0140 Offset 0016 to approximately 0.20 miles west of the intersection with State Route 2056 at Segment 0140 Offset DBE 2%, Anticipated Notice to Proceed , Required Completion INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION 5

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated May 4, 2018 FULTON COUNTY SR 0000(FMC) #109343 PROPOSAL:$21.36 PLANS:$9.02 12X18:$11.07 24X36:$159.90 X-SEC:$7.48 12X18:$9.18 24X36:$132.60 This project involves

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 22, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 22, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 22, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated December 5, 2016 SCHUYLKILL COUNTY SR 4027(M89) #99482 PROPOSAL:$21.60 PLANS:$1.68

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) As of February14, 2018 SNYDER COUNTY SR 2007(012) #93607 PROPOSAL:$16.56 PLANS:$4.40 12X18:$5.40 24X36:$78.00 The description and location of the project are as follows: The work is the furnishing and

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 Updated June 30, 2014 LUZERNE COUNTY SR 309(W02) #102354 PROPOSAL:$25.20 PLANS:$6.24 The description and location

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION AUGUST 10, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION AUGUST 10, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated July 21, 2017 ALLEGHENY COUNTY SR 0000 #109397 PROPOSAL:$28.56 The description and location of the project is as follows: This work is the 3-year term maintenance if intelligent transportation

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JUNE 5, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JUNE 5, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated on May 19, 2014 VENANGO COUNTY SR 308(DOI) #96906 PROPOSAL:$13.44 PLANS:$3.96 For the bituminous milling and resurfacing of various state routes throughout VENANGO COUNTY, Commonwealth of Pennsylvania,

More information

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated November 17, 2008 PHILADELPHIA COUNTY SR 30(ADA) PROPOSAL:$14.40 The description and location of the project is as follows: For the design and construction of ADA compliant concrete curb ramps

More information

CENTRE COUNTY SR 26(ST1) # PROPOSAL:$21.00 PLANS:$ X18:$ X36:$70.20

CENTRE COUNTY SR 26(ST1) # PROPOSAL:$21.00 PLANS:$ X18:$ X36:$70.20 Updated January 25, 2016 CENTRE COUNTY SR 26(ST1) #104647 PROPOSAL:$21.00 PLANS:$3.96 12X18:$4.86 24X36:$70.20 The description and location of the project is as follows: For the improvement of certain

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 1, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 1, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated November 15, 2016 BEAVER COUNTY SR 588(B18) #91922 PROPOSAL:$22.80 PLANS:$18.04 12X18:$22.14 24X36:$319.80 X-SEC:$3.52 12X18:$4.32 24X36:$62.40 The description and location of the project is as

More information

BEAVER COUNTY SR 68(B38) # PROPOSAL:$26.64 PLANS:$ X18:$ X36:$222.30

BEAVER COUNTY SR 68(B38) # PROPOSAL:$26.64 PLANS:$ X18:$ X36:$222.30 ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 29, 2018 Update March 13, 2018 CHESTER COUNTY SR 23(ELV) #107680 PROPOSAL:$22.80 PLANS:$32.56 12X18:$39.96 24X36:$577.20

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION APRIL 6, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION APRIL 6, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated March 20, 2017 ALLEGHENY COUNTY SR 3088(05) #106380 PROPOSAL:$23.40 PLANS:$11.88 12X18:$14.58 24X36:$210.60 EXSTRUCT:$3.08 12X18:$3.78 24X36:$54.60 The description and location of the project is

More information

3, 2018 LACKAWANNA COUNTY SR 8031(WWR)

3, 2018 LACKAWANNA COUNTY SR 8031(WWR) SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING AUGUST 9, 2018 Updated August 3, 2018 LACKAWANNA COUNTY SR 8031(WWR) #109012 Moved to 8/9/18 from 7/26/18, orig 7/12/18 PROPOSAL:$14.40 PLANS 8.5x11:$4.80

More information

SCHUYLKILL COUNTY SR 125(JFR) # PROPOSAL:$20.76 PLANS 8.5X11:$1.20

SCHUYLKILL COUNTY SR 125(JFR) # PROPOSAL:$20.76 PLANS 8.5X11:$1.20 SCHUYLKILL COUNTY SR 125(JFR) #111844 PROPOSAL:$20.76 PLANS 8.5X11:$1.20 The emergency project consists of rock protection and underpinning of the piers to prevent future scouring and other miscellaneous

More information

11, 2019 MONTOUR COUNTY SR 2006(026) # PROPOSAL:$16.56 PLANS:$ X18:$ X36:$19.50

11, 2019 MONTOUR COUNTY SR 2006(026) # PROPOSAL:$16.56 PLANS:$ X18:$ X36:$19.50 Updated February 11, 2019 MONTOUR COUNTY SR 2006(026) #112211 PROPOSAL:$16.56 PLANS:$1.10 12X18:$1.35 24X36:$19.50 The description and location of the project are as follows: Emergency repairs due to flood

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 12, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 12, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated July 9, 2018 BUCKS COUNTY SR 1017(SC1) #15341 PROPOSAL:$22.80 This project is for the applying of seal coat to existing bituminous roadway on various state routes (32.33 segment miles) in Bucks

More information

14, 2019 MERCER COUNTY SR 173(491) # PROPOSAL:$11.40 PLANS:$5.40 X-SEC:$ X18:$ X36:$39.00

14, 2019 MERCER COUNTY SR 173(491) # PROPOSAL:$11.40 PLANS:$5.40 X-SEC:$ X18:$ X36:$39.00 Updated January 14, 2019 MERCER COUNTY SR 173(491) #100019 PROPOSAL:$11.40 PLANS:$5.40 X-SEC:$2.20 12X18:$2.70 24X36:$39.00 For the construction or Improvement of a certain section of STATE HIGHWAY in

More information

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated April 13, 2018 ALLEGHENY COUNTY SR 376(A65) #110880 PROPOSAL:$15.96 PLANS 8.5x11:$2.04 The description and location of the project is as follows: For the milling, resurfacing, pavement marking,

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION SEPTEMBER 11, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION SEPTEMBER 11, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated August 27, 2014 LEHIGH COUNTY SR 78(GSR) #91957 PROPOSAL:$22.56 PLANS:$24.20 12X18:$29.70 24X36:$429.00 The description and location of the project is as follows: This project is the replacement

More information

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10 ASSOCIATED PENNSYLVANIA CONSTRUCTORS Update January 3, 2018 GREENE COUNTY - SR 221(J10) #105392 PROPOSAL:$11.76 PLANS:$4.18 12X18:$5.13 24X36:$47.10 The description and location of the project is as follows:

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION MAY 24, 2012 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION MAY 24, 2012 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Update May 8, 2012 ALLEGHENY COUNTY SR 3048(A16) #74333 PROPOSAL:$44.88 PLANS:$7.26 12X18:$8.91 24X6:$128.70 X-SEC:$0.66 12X18:$0.81 24X36:$11.70 The description and location of the project is as follows:

More information

BEAVER COUNTY SR 2012(EMP) #97889 PROPOSAL:$17.04 PLANS:$ X18:$ X36:$179.40

BEAVER COUNTY SR 2012(EMP) #97889 PROPOSAL:$17.04 PLANS:$ X18:$ X36:$179.40 Updated on April 28, 2014 BEAVER COUNTY SR 2012(EMP) #97889 PROPOSAL:$17.04 PLANS:$10.12 12X18:$12.42 24X36:$179.40 The description and location of the project is as follows: For milling, resurfacing,

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 26, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 26, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated July 23, 2018 LACKAWANNA COUNTY SR 8031(WWR) #109012 Moved to 7/26/18 from 7/12/18 PROPOSAL:$14.40 PLANS 8.5x11:$4.80 For the rehabilitation and improvement of certain sections of Varies STATE

More information

DELAWARE COUNTY - SR 13(DD9) # PROPOSAL:$28.80

DELAWARE COUNTY - SR 13(DD9) # PROPOSAL:$28.80 ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING DECEMBER 21, 2017 Updated December 8, 2017 DELAWARE COUNTY - SR 13(DD9) #109039 PROPOSAL:$28.80 The description and location

More information

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated January 30, 2018 ALLEGHENY COUNTY SR 1037(A03) #107983 PROPOSAL:$23.28 PLANS:$4.84 12X18:$5.94 24X36:$85.80 X-SEC:$4.40 12X18:$5.40 24X36:$78.00 24x36:$81.90 The description and location of the

More information

4, 2011 VENANGO COUNTY SR 428(SLD) #92815 PROPOSAL:$17.40 PLANS;$ X18:$ X36:$31.20 X-SEC:$ X18:$ X36:$50.

4, 2011 VENANGO COUNTY SR 428(SLD) #92815 PROPOSAL:$17.40 PLANS;$ X18:$ X36:$31.20 X-SEC:$ X18:$ X36:$50. ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated May 4, 2011 VENANGO COUNTY SR 428(SLD) #92815 PROPOSAL:$17.40 PLANS;$1.76 12X18:$2.16 24X36:$31.20 X-SEC:$2.86 12X18:$3.51 24X36:$50.70 For the construction

More information

21, 2010 ALLEGHENY COUNTY SR 910(A24) #82614 PROPOSAL:$14.88 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$62.

21, 2010 ALLEGHENY COUNTY SR 910(A24) #82614 PROPOSAL:$14.88 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$62. Updated May 21, 2010 ALLEGHENY COUNTY SR 910(A24) #82614 PROPOSAL:$14.88 PLANS:$6.82 12X18:$8.37 24X36:$120.90 X-SEC:$3.52 12X18:$4.32 24X36:$62.40 The description and location of the project is as follows:

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 7, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 7, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated November 21, 2017 BEDFORD COUNTY - SR 000071 #106779 PROPOSAL:$13.92 PLANS:$6.82 12X18:$8.37 24X36:$120.90 The description and location of the project is as follows: This project is for the construction

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JUNE 22, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JUNE 22, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 6, 2017 LEHIGH COUNTY SR 1025(POC) #109335 PROPOSAL:$16.80 PLANS:$0.96 Project includes bituminous overlay, pavement markings, and other miscellaneous construction, as indicated on the approved

More information

$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000

$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000 $600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000 $- Other Programs Highway Program $800,000,000 $700,000,000 $600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000

More information

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities PCL Definitions for the Local Program Projects that are administered by the Central Bureau of Local Roads. Engineering, utilities and land acquisition are coded with the PCL for the type of construction

More information

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees CR 9 (Bradt Hollow Road) Over Fox Creek Bridge Replacement Project Replacement of a 156 ft. long x 32ft. wide, 3 span pre stressed concrete box beam bridge over Fox Creek in the Town of Berne. The bridge

More information

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016 Rehabilitation of West Main Street Culvert and Shirley Street Bridge Town of Ayer November 22, 2016 Agenda Outline Introductions Project Goals and Objectives Existing Conditions Review Design Considerations

More information

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure. Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE

More information

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN 2016 STRUCTURE INSPECTION APPRAISAL REPORT Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN by K. SMART ASSOCIATES LIMITED 8 McIntyre Drive Kitchener ON N2R 1H6 August 2016

More information

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) 10/16/2014 Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) July 2002 Prepared by Construction Cost Estimating Unit Program Support Services 10/16/2014 Table of Contents

More information

Lehigh Valley Transportation Study

Lehigh Valley Transportation Study ITEM: IV-A Lehigh Valley Transportation Study SUBJECT: PA 33 Preservation SR 22-Belfast COUNTY... Northampton FED.-AID SYSTEM... On-NHS S.R./SEC.... 33/07M DECADE OF INVESTMENT... No A.D.T.... 25,463 CAPITAL

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could

More information

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA 2008/09 $52.0 M 85% SELF-PERFORMED Widen 12 miles of Interstate 10 to six lanes including the reconstruction

More information

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 2004 Specifications CSJ: 0932-01-076 SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 1.0 Description of Project 1.1. General. This project provides for the widening of

More information

IMPROVING I 81 IN MARYLAND

IMPROVING I 81 IN MARYLAND IMPROVING I 81 IN MARYLAND April 25, 2017 Stephen A. Bucy, P.E. Improving I 81 in Maryland Overview: Facts SHA s Comprehensive I 81 Strategy Current Phase 1 Widening Project Update Closing Improving I

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List October 2018 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

Construction Cost Estimation Preparation Manual (Metric Units)

Construction Cost Estimation Preparation Manual (Metric Units) 07/25/2001 Construction Cost Estimation Preparation Manual (Metric Units) July 2001 Prepared by Cost Estimating Unit Program Support Services 07/25/2001 Table of Contents Section Page 1.0 Introduction

More information

PennDOT District 11. Constructors Association of Western Pennsylvania March 5, Cheryl L. Moon-Sirianni, P.E. District Executive

PennDOT District 11. Constructors Association of Western Pennsylvania March 5, Cheryl L. Moon-Sirianni, P.E. District Executive PennDOT District 11 Constructors Association of Western Pennsylvania March 5, 2018 Cheryl L. Moon-Sirianni, P.E. District Executive Anticipated 2018 Lettings 118 Projects anticipated to be let in 2018

More information

Information for File # RJH

Information for File # RJH Information for File #2011-01629-RJH Applicant: Matthew Ternes Corps Contact: Ryan Huber, U. S. Army Corps of Engineers, 211 North Broadway, Suite 221, Green Bay, Wisconsin 54303; ryan.j.huber@usace.army.mil;

More information

Bridge Asset Management City of Battle Creek Planning and Projects

Bridge Asset Management City of Battle Creek Planning and Projects Bridge Asset Management City of Battle Creek Planning and Projects Michigan Bridge Conference, March 20, 2013 Gregory B. Rickmar P.E., Public Works Department, City of Battle Creek Alan Halbeisen, P.E.

More information

District 2 System Preservation Projects for FY 17 and FY 18

District 2 System Preservation Projects for FY 17 and FY 18 District 2 System Preservation Projects for FY 17 and FY 18 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer Project Development Bret Hadzimichalis Assistant District

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

Annual CSAH Needs Update for 2018

Annual CSAH Needs Update for 2018 Annual CSAH Needs Update for 2018 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segment and project data using the SANeeds system.

More information

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199)) 11060 White Rock Road, Suite 200 Rancho Cordova, CA 95670 Phone: (916) 363-4210 Fax: (916) 363-4230 M e m o r a n d u m To: Reena Gohil, Environmental Planner Date: May 30, 2017 California Department of

More information

Town of South Bruce Peninsula Bridge and Culvert Inspections OSIM Inspection Report

Town of South Bruce Peninsula Bridge and Culvert Inspections OSIM Inspection Report Town of South Bruce Peninsula OSIM Inspection Report Prepared By: R.J. Burnside and Associates Limited 3 Ronell Crescent, Collingwood L9Y 4J6 Prepared for: Town of South Bruce Peninsula January 2015 File

More information

PUBLIC INFORMATION MEETING June 24, 2015

PUBLIC INFORMATION MEETING June 24, 2015 Gallows Road (RTE. 650) over Arlington Boulevard (RTE. 50) Fairfax County Bridge Rehabilitation, Preventive Maintenance and Pier Repairs Phase 1 - Project No. 0650-029-235; UPC 106956, Pier Repair Phase

More information

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement B510-5 OPSS 510 510-5.1 GENERAL This section is for Pavement Work removal tender items. The work covered by these tender items includes the removal and disposal of materials. 510-5.2 REFERENCES CDED B510-0

More information

PennDOT Pub. 170 Highway Occupancy Permit (HOP) Manual Page 56

PennDOT Pub. 170 Highway Occupancy Permit (HOP) Manual Page 56 PennDOT Pub. 170 Highway Occupancy Permit (HOP) Manual Page 56 Additional Fees Additional fees may be charged by PennDOT consistent with Sections 411 and 420 of the State Highway Law and Regulations 441.4(d)

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 3, Route 46, Valley Road and Notch/Rifle Camp Road Interchange, Contract B DBNUM: 059B / UPC: 123020 From Notch/Rifle Camp Road to just east of the Valley Road Intersection, Route 46 will be widened

More information

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P401: ITEM 254 - PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P402: ITEM 254 - PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER PLAN P403: ITEM 304 - AGGREGATE BASE, AS PER PLAN P404: DELETED P405:

More information

CONSTRUCTION INSPECTION APPLICATION AND QUALIFICATION FORM

CONSTRUCTION INSPECTION APPLICATION AND QUALIFICATION FORM Construction Inspection 3500 Winchester Road Suite 300 Allentown, PA 18104 610.841.2700 Fax: 610.841.2709 1500 Sycamore Road Suite 320 Montoursville, PA 17754 570.368.3040 Fax: 570.368.3166 400 Penn Center

More information

Annual CSAH Needs Update for 2017

Annual CSAH Needs Update for 2017 Annual CSAH Needs Update for 2017 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segments and project data using the SANeeds system.

More information

Maine Turnpike Authority

Maine Turnpike Authority PAVEMENT REHABILITATION & CLEAR ZONE IMPROVEMENTS MM 80.7 TO MM 88.6 202.121 Removing Existing Concrete (6CY) 1.00 LS 202.127 Removing of Existing Bituminous Pavement (470 SY) 1.00 LS 202.202 Removing

More information

Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL

Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL TECHNICAL SUPPORTIVE SERVICES IN IDOT DISTRICTS 2 & 3 FOR CERTIFIED

More information

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement B510-5 OPSS 510 510-5.1 GENERAL This section is for Pavement Work removal tender items. The work covered by these tender items includes the removal and disposal of materials. 510-5.2 REFERENCES CDED B510-0

More information

Future Programmatic Beyond 01/06/2020 Sorted By District (Subject to Departmental Changes)

Future Programmatic Beyond 01/06/2020 Sorted By District (Subject to Departmental Changes) Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 1/25/2019 1 09/08/20 101082 D01 UBI FY21 Use a consultant to perform underwater bridge inspections. Consultant to perform

More information

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL This section covers the restoration of roadways and sidewalks, in whole or in part, with bituminous concrete paving. WITHIN 4 DAYS OF BACKFILLING IN AREAS

More information

2019 PAPA REGIONAL TECHNICAL MEETINGS. PAPA REGIONAL MEETING TOPICS 6.3 mm Thin Asphalt Overlay Tack Coat Long Life Asphalt Pavements

2019 PAPA REGIONAL TECHNICAL MEETINGS. PAPA REGIONAL MEETING TOPICS 6.3 mm Thin Asphalt Overlay Tack Coat Long Life Asphalt Pavements 2019 PAPA REGIONAL TECHNICAL MEETINGS PAPA REGIONAL MEETING TOPICS 6.3 mm Thin Asphalt Overlay Tack Coat Long Life Asphalt Pavements Neal Fannin P.E. Pavement Materials Engineer CMD Topics 6.3mm Thin-Lift

More information

CHAPTER 11 PAVEMENT TYPE DETERMINATION

CHAPTER 11 PAVEMENT TYPE DETERMINATION CHAPTER 11 PAVEMENT TYPE DETERMINATION 11.1 PAVEMENT TYPE SELECTION FACTORS A highway system designation shall not determine the choice of pavement type. The following factors should be considered when

More information

DESIGN PUBLIC HEARING APRIL 3, 2017 THE LEE MEMORIAL (TOWN) HALL LEE, MASSACHUSETTS :00 PM FOR THE PROPOSED

DESIGN PUBLIC HEARING APRIL 3, 2017 THE LEE MEMORIAL (TOWN) HALL LEE, MASSACHUSETTS :00 PM FOR THE PROPOSED DESIGN PUBLIC HEARING APRIL 3, 2017 AT THE LEE MEMORIAL (TOWN) HALL LEE, MASSACHUSETTS 01238 7:00 PM FOR THE PROPOSED SUPERSTRUCTURE REPLACEMENT PROJECT CHAPEL STREET OVER GREENWATER BROOK Project No.

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Comment Form Date: To: From:

More information

Berkshire Region TIP Project Data Form

Berkshire Region TIP Project Data Form BASIC INFORMATION: 1. TIP ID #: 2. MUNICIPALITY: 3. ROUTE# AND/OR NAME: Berkshire Region TIP Project Data Form 4. PROJECT TYPE (CHECK BEST DEFINITION OF PROJECT): Intersection Improvement Road Resurfacing

More information

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INSTALL MANHOLE LIDS FLUSH WITH EXISTING GROUND SURFACE.

More information

PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION

PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION SECTION DESCRIPTION PAGE 1 General Quantities 3-1 2 Maintenance of Roadway and Drives 3-1 3 Liquid Asphalt Binder in Paving Mixture

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

SHRP2 SOLUTONS. Innovative Bridge Designs for Rapid Renewal. Peer-to-Peer Exchange Workshop Atlanta, GA November 2015

SHRP2 SOLUTONS. Innovative Bridge Designs for Rapid Renewal. Peer-to-Peer Exchange Workshop Atlanta, GA November 2015 SHRP2 SOLUTONS Innovative Bridge Designs for Rapid Renewal Peer-to-Peer Exchange Workshop Atlanta, GA November 2015 VIJAYKUMAR THAKER, PE HARDEV DAVÉ INTRODUCTION VIJAYKUMAR THAKER, PE EXECUTIVE MANAGER

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 1 DBNUM: 15417 / UPC: 154170 This contract will bring projects into compliance with current ADA design requirements that could

More information

Life Cycle Cost Analysis Pavement Options May 2002 Materials Division / Virginia Transportation Research Council TABLE OF CONTENTS

Life Cycle Cost Analysis Pavement Options May 2002 Materials Division / Virginia Transportation Research Council TABLE OF CONTENTS Life Cycle Cost Analysis Pavement Options May 2002 Materials Division / Virginia Transportation Research Council TABLE OF CONTENTS I. INTRODUCTION...1 II. III. Purpose...1 What Is LCCA?...1 History of

More information

PAVEMENT DESIGN MEMORANDUM

PAVEMENT DESIGN MEMORANDUM PAVEMENT DESIGN MEMORANDUM FOR SR 70 (15TH STREET EAST) ROUNDABOUT MANATEE COUNTY FINAL SUBMITTAL FPID 435090-1-52-01 PREPARED FOR: FLORIDA DEPT. OF TRANSPORTATION DISTRICT 1 FEBRUARY 16, 2018 PREPARED

More information

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION CECIL COUNTY 2018 TRANSPORTATION IMPROVEMENT PROGRAM AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION DESCRIPTION: On-going program to provide major upgrades to state owned bridges that are structurally

More information

PENNSYLVANIA TURNPIKE COMMISSION

PENNSYLVANIA TURNPIKE COMMISSION PENNSYLVANIA TURNPIKE COMMISSION RETENTION OF AN ENGINEERING OR CONSTRUCTION MANAGEMENT FIRM Construction Management Services for Roadway and Bridge Reconstruction Northeast Extension, I-476, MP A-031.73

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures Cumberland Viaduct Rehabilitation Project Contract No. AL4095180R Presenter Bob Bofinger MDSHA Office of Structures Project Justification & Improvements Condition State The deck, superstructure and substructure

More information

NJTPA Transportation Improvement Program Fiscal Years

NJTPA Transportation Improvement Program Fiscal Years Routes Name: CR 571 Mileposts: 4.85 DBNUM: N1127 County Route 571/County Route 527, Reconstruction, Toms River Township This project is for intersection improvements at CR 571 and CR 527 in Tom s River

More information

Rehabilitation of Highway Pavements an Engineering Challenge

Rehabilitation of Highway Pavements an Engineering Challenge Rehabilitation of Highway Pavements an Engineering Challenge G eorge W. M ca lpin Transportation Consultant Rye, New Hampshire IN T R O D U C T IO N There is no question that our country is currently confronted

More information

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your

More information

Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax

Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax Engineering Sales Tax Projects Bridges $ 43.4 m (27) Roads (Resurfacing) $ 77.6 m (121) Roads (Restriping) $

More information

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : 012777.00 PROJECTS ------------------------------ STP-1277(700)S COUNTY : ANDROSCOGGIN CONTRACT ID : 012777.00 MAINE

More information

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, Bridge over Branch Lopatcong Creek DBNUM: 16345 / UPC: 163450 Problem Statement submitted by BMS for Tier 1 Screening. It is recommended for

More information

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013 ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME

More information

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT AUGUST Resurfacing of Aldrich Road West Contract # 11-06

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT AUGUST Resurfacing of Aldrich Road West Contract # 11-06 TOWNSHIP OF HOWELL DEPARTMENT OF COMMUNITY DEVELOPMENT & LAND USE DIVISION OF ENGINEERING 251 Preventorium Road Phone: (732) 938-4500 x2300 Post Office Box 580 Fax: (732) 919-1080 Howell, NJ 07731-0580

More information

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway. Last Revision by CO Special Provisions: 09/14/18 Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2018-143 ((2360) PLANT MIXED ASPHALT PAVEMENT (MSCR)) when using this writeup.

More information

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810 STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS 3 East Pulteney Square Bath, New York 14810 County Route 22 over Canisteo River Bridge Replacement Project BIN 3333290 D035511 PIN 6755.06 ADDENDUM #1 October

More information

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2 MERCED COUNTY BID LIST CAMPUS PARKWAY SEGMENT 2 CONTRACT 2017191 The bidder must provide unit prices for each bid item listed below, based on the specified unit of measure. The unit price for each item

More information

APPENDIX I APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY

APPENDIX I APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY May 7, 2002 This page left blank intentionally. May 7, 2002 Preliminary Cost Estimate Summary ESTIMATE TYPE A ABC Consulting Hwy 99:06 ABC Project No. 1234-01-56789

More information

SECTION ASPHALT PAVING AND SURFACING

SECTION ASPHALT PAVING AND SURFACING SECTION 02500 ASPHALT PAVING AND SURFACING PART 1 - GENERAL 1.01 WORK INCLUDED A. Traffic control as required to divert vehicular and pedestrian traffic around construction. B. Spreading and compacting

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Foreword This manual contains

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION STR 6947 MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY INSPECTION REPORT Facility Latitude / Longitude MDOT Structure ID Structure Condition 9 MILE ROAD 43.5362 / -84.4294 56200055000B010 Fair Condition(6)

More information

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

TABLE OF DRAWINGS. Pierce County Public Works & Utilities Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 05/10/2018 PC.A1.2 Arterial with Cement

More information

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH) City of St. Catharines Standard Drawings SEPTEMBER 2018 Revised September 6, 2018 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 2 Monolithic Curb-Faced Sidewalk 110-2002 3 Sidewalk

More information

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH CHAPTER 2 201 ROADS 201.1 General This section is to assist the designer in determining what is needed for the design of roads in public rights-of-way. For these standards, the terms used are: Restricted

More information

B HOT MIX, HOT LAID ASPHALTIC CONCRETE OPSS 313

B HOT MIX, HOT LAID ASPHALTIC CONCRETE OPSS 313 B 313-1 OPSS 313 313-1.1 GENERAL HL,, Mixture, and/or Mix, is hot mixed, hot laid asphaltic concrete, used for pavement construction and other uses. 1. HL 1 This dense graded surface course mix is used

More information

JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018

JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018 JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018 On Maintenance of Traffic Details Sheet No. 46 there is a note that states I-49 Stage Construction is to be Completed Prior to Beginning Work on Hwy.

More information