1 Building Regulation consulting & education Building Code of Australia report Proposed early childhood centre at Farnell Ave Carlingford Reference: Farnell Ave Report 31 Mar Introduction Background Compliance with the BCA Purpose of this report Limitations The proposal Fire Resistance Fire Resistance and stability Compartmentation and separation Protection of openings Access and egress general Exits, travel distance and alternative exits Width of exits and paths of travel Construction of exits Access for people with a disability Services and equipment Sprinklers, hydrants, hose reels and extinguishers Smoke Hazard Management and lifts Exit signs, emergency lighting, and sound and intercom systems Fire safety schedule Health, amenity and energy efficiency Damp and weatherproofing Room heights, and sanitary/other facilities Sound transmission, energy efficiency, light and ventilation Alternative Solution Compliance with the BCA Relevant provisions Discussion Conclusion Appendix A (About Michael Wynn Jones) PO Box 8294 Baulkham Hills BC NSW michaelwj@bigpond.com Michael Wynn Jones & Ass P/L ABN Page 1 of 16
2 1 Introduction 1.1 Background This report has been prepared with respect to the proposed building at Farnell Avenue Carlingford as generally depicted in the plans prepared by A & N Design 1. The building comprises an early childhood centre on the upper level and storage on the lower level. 1.2 Compliance with the BCA The NSW Environmental Planning and Assessment Act requires that building work must comply with the Building Code of Australia 2015 (BCA), and that such work must not commence until a complying development certificate or construction certificate is issued for the work Compliance with the BCA can only be achieved by either complying with the deemed to satisfy provisions in the BCA, or by formulating an Alternative Solution which complies with the performance requirements or is at least equivalent to the deemed to satisfy provisions. Deemed to satisfy provisions are prescribed provisions in the BCA that satisfy the performance requirements in the BCA, whilst an Alternative Solution is an alternative method of complying with the BCA A reference to a Section, Part or clause number in this report is a reference to a deemed to satisfy provision in the BCA, except as otherwise noted. A reference to an Alternative Solution is a reference to an Alternative Solution as recognised by the BCA. 1.3 Purpose of this report The purpose of this report is to provide a general overview of the proposal in terms of compliance with the BCA, and an Alternative Solution for the proposed Type of fire resisting construction The report is suitable for submission with the application for the construction certificate for the proposed building. 1.4 Limitations This report is restricted as described in 1.3 of this report and does not include determining strict compliance with the BCA, compliance with Council s policies, or compliance with the Disability Discrimination Act. 1.5 The proposal The proposed building will be partially single and two storeys, with part of the single level Class 9b early childhood centre 2 being located over Class 7b storage to the lower level The early childhood centre will cater for forty (40) children each at least 5 years old. 1 2 Plans by A&N Design, being Pages 1 to 5, A22625 CC Issue B dated 31 March 2016 Early childhood centre as defined in the BCA means a preschool, kindergarten or child minding centre for the care or training of more than 5 children Farnell Ave Report 31 Mar 2016 Page 2 of 16
3 2 Fire Resistance 2.1 Fire Resistance and stability The proposed building would need to be constructed in Type B Fire Resisting Construction (Section C) due to the rise in storeys (2) where compliance with the DTS provisions was proposed To comply with the requirements for Type B construction the external walls would need to achieve a fire resistance level (FRL) and loadbearing internal walls would need to be concrete or masonry. The proposal is that no external walls to the early childhood centre will be fire resisting, and that no loadbearing walls to the early childhood centre will be concrete or masonry The Alternative Solution (in Section 6 of this report) will demonstrate that Type C construction is adequate, subject to the early childhood centre being fire separated from the storage by a floor achieving a FRL of 90/90/90, the walls and columns supporting this floor achieving a FRL of at least 90/90/90 and 90/ / respectively, and openings in the floor being protected (Part C3) to prevent the spread of fire The external walls to the early childhood centre would not need to achieve a FRL and loadbearing internal walls would not need to be concrete or masonry were the proposed building only required to be of Type C construction The early fire hazard indices for materials will comply (C1.10). Details demonstrating compliance should ideally be provided prior to the issue of the construction certificate, or in any event prior to installation. 2.2 Compartmentation and separation The proposed building will comply with the floor area and volume limitations (Part C2) applicable to a similar building of Type B and Type C construction The proposed building is not required to comply with the vertical separation protection requirements (C2.6) Separation of classifications in the same storey (C2.8) does not apply as the same classification applies to each storey, and separation of classifications in different storeys (C2.9) does not apply as the proposed building contains no Class 2, 3 or 4 part. 2.3 Protection of openings Openings in the external walls of the proposed building are more than 3 m from fire source features (e.g. side and rear boundaries) and are not required to be protected (C3.2) Any openings in the floor separating the early childhood centre from the storage will be protected to prevent the spread of fire (Part C3) as part of the Alternative Solution No other openings are required to be protected. Farnell Ave Report 31 Mar 2016 Page 3 of 16
4 3 Access and egress general 3.1 Exits, travel distance and alternative exits The early childhood centre is served by a minimum 2 exits and the storage by one exit as required (D1.2) Travel to exits and the distance between alternative exits generally complies (D1.4 and D1.5 respectively). 3.2 Width of exits and paths of travel The exit stairs and paths of travel to exits will have a clear width of not less than 1 m measured clear of barriers, handrails and obstructions (D1.6) Doorways forming part of a required exit or in a path of travel to an exit will have a minimum clear unobstructed width of 750 mm (D1.6). 3.3 Construction of exits The exits serving the proposed building are not required to be fire isolated (D1.3) The exits discharge to open space as required and discharge to the public road via stairs and ramps that will comply (Section D) The suitability of the synthetic grass proposed to the ramp along the Southeast boundary will need to be addressed to ensure compliance (Section D) The doors to the single exit serving the storage area can swing against the direction of egress (D2.19), subject to the doors being fitted with an approved hold open device Notes on the plans and the specification require that barriers, handrails and window openings comply (D2.16, D2.17 and D2.24 respectively) has not been assessed. Compliance will include ensuring that barriers are of the correct height, gaps are within acceptable sizes, and that climbable zones are not included. Care will be taken where elements are located near, or form part of, the barrier. 3.4 Access for people with a disability The extent to which access for people with a disability complies is not addressed in this report (Part D3) The proposal is for access to be provided to the early childhood centre and to the storage area through the principal main entrance to each (Part D3) Accessible carparking spaces having minimum dimensions of 5.4 m x 2.4 m are allowed pursuant to AS/NZS where there is a shared area. The outdoor accessible carparking spaces will be designed to comply with AS/NZS , and bollards will be provided in the shared area in accordance with AS/NZS No lift is proposed as the early childhood centre and storage are accessed externally without the need for the two levels to be internally connected. The extent to which a lift may be required to address access for people with a disability has not been addressed in this report. Farnell Ave Report 31 Mar 2016 Page 4 of 16
5 3.4.5 The circulation spaces, doorways, and door/gate latches will need to comply. One of the multiple leaves to any doorways on each accessway will have a clear opening width of not less than 850 mm Required barriers, handrails and tactile surface indicators will be provided (Part D3). Handrails and grab rails will comply (Clauses 12 and 17 of AS respectively). The minimum unobstructed height of a continuous accessible path of travel will be 2 m, reducing to not less than mm only at doorways The proposed stairs and ramps will be designed to comply (Part D3) Any required letterboxes will be on a hard standing area connected to the accessible pathway Braille and tactile signage will comply (Specification D3.6) and will incorporate the international symbols as appropriate will identify each sanitary facility and all accessible entrances where an entrance is not accessible Tactile ground surface indicators will be provided: (a) (c) To stairways, and to ramps other than step or kerb ramps Where overhead obstructions are less than 2 m above the floor beneath Where an accessway meets a vehicular way All frameless or fully glazed doors, sidelights and any glazing on an accessway and capable of being mistaken for a doorway or opening will be clearly marked as required (AS ), except where there is a chair rail, handrail or transom that provides the required visual marking Details demonstrating compliance with Part D3 should ideally be provided prior to the issue of the construction certificate Hearing augmentation (D3.7) will be provided where an inbuilt amplification system, other than one used only for emergency warning, is installed. Farnell Ave Report 31 Mar 2016 Page 5 of 16
6 4 Services and equipment 4.1 Sprinklers, hydrants, hose reels and extinguishers The proposed building is not required to be served by sprinklers (E1.5) The proposed building is required to be served by hydrants as the total floor area is more than 500 m² (E1.3). The proposal is to rely on existing and/or new external hydrants located at least 10 m from the proposed building to ensure compliance (E1.3). Details demonstrating compliance should ideally be provided prior to the issue of the construction certificate The storage and early childhood centre are each considered a separate fire compartment 3. Hose reels are not required to serve the proposed building as no fire compartment has a floor more than 500 m² (E1.4) The proposed building will be provided with portable fire extinguishers (E1.6 and AS ). 4.2 Smoke Hazard Management and lifts The proposed building is not required to be served by a smoke hazard management system As stated in of this report, no lift is proposed as the early childhood centre and storage are accessed externally without the need for the two levels to be internally connected. The extent to which a lift may be required to address access for people with a disability has not been addressed in this report. 4.3 Exit signs, emergency lighting, and sound and intercom systems The proposed building will be provided with exit signs and emergency lighting as required (Part E4 and AS ) A sound system and intercom system for emergency purposes is not required or proposed (E4.9). 4.4 Fire safety schedule I provide a proposed fire safety schedule in Table 1 of this report, being a schedule containing the proposed fire safety measures, and the minimum standard of performance for each measure The standard of performance will be as specified in the version of the BCA in force when the application for the relevant construction certificate is lodged. 3 A fire compartment as recognised by the BCA means a part of a building separated from the remainder by walls and/or floors each having an FRL not less than that required for a fire wall for that type of construction and where all openings in the separating construction are protected in accordance with the Deemed to Satisfy Provisions of the relevant Part Farnell Ave Report 31 Mar 2016 Page 6 of 16
7 Table 1 Proposed Fire Safety Schedule Fire Safety measure Standard of performance 4 Emergency lighting AS Emergency escape lighting and exit signs for buildings System design, installation and operation, Amendments 1 and 2 E4.2, E4.3, E4.4 of the BCA 5 Exit signs AS Emergency escape lighting and exit signs for buildings System design, installation and operation, Amendments 1 and 2 E4.5, E4.6, E4.7 and E4.8 of the BCA Fire hydrant systems AS Fire hydrant installations; system design, installation and commissioning; Amendment 1 C2.12, E1.3 of the BCA Portable fire extinguishers AS Portable fire extinguishers and fire blankets selection and location E1.6 of the BCA Type of fire resisting construction As detailed in the report by Michael Wynn Jones dated 31 March 2016 The proposed building is constructed in Type C construction, subject to: o The floor separating the storeys achieving a FRL of not less than 90/90/90; o Openings in the separating floor being protected to prevent fire spread (Part C3); o Walls supporting the separating floor achieving a FRL of not less than 90/90/90; and o Columns supporting the separating floor achieving a FRL of not less than 90/ /. 4 5 The version of the Australian Standard nominated in this Schedule is the version recognised by the BCA2015, being the version in force when this report was prepared. The relevant version of the Australian Standard to be nominated in the Schedule is the version recognised by the version of the BCA in force when the application for the construction certificate is lodged Being the version of the BCA in force when the application for the construction certificate is lodged Farnell Ave Report 31 Mar 2016 Page 7 of 16
8 5 Health, amenity and energy efficiency 5.1 Damp and weatherproofing The proposal if for damp and weatherproofing to comply (Section F), including: (a) (c) (d) (e) (f) Stormwater drainage (F1.1) and external above ground membranes (F1.4); Roof coverings (F1.5) and sarking (F1.6); Waterproofing of wet areas (F1.7) and damp proofing (F1.9 and F1.10); Provision of floor wastes (F1.11); Sub floor ventilation (F1.12); and Glazed assemblies (F1.13) Details demonstrating compliance should ideally be provided prior to the issue of the construction certificate, or in any event prior to installation. 5.2 Room heights, and sanitary/other facilities The minimum internal height of 2.5 m proposed in the early childhood centre complies (Section F) as not more than 100 persons will be accommodated The minimum internal height of 2.5 m proposed in the storage complies Sufficient sanitary facilities as required (F2.3) will be provided for the forty (40) children (each at least 5 years old), and for staff and visitors Accessible facilities (F2.4) will be provided, and the adjoining sanitary facility will be designed to ensure it is suitable for a person with an ambulant disability (AS ) Construction of sanitary compartments, urinals and washbasins will comply (F2.5 and F2.6 respectively). 5.3 Sound transmission, energy efficiency, light and ventilation The sound transmission and insulation requirements (Part F5) do not apply The energy efficiency provisions have not been assessed in this report and the proposal is to comply (Section J) Natural and artificial light complying will be provided to the storage (Part F4). Natural light (F4.1) will be provided to all playrooms or the like for the use of children (in the early childhood centre). Natural and artificial light (Part F4) will be provided as required to the other areas in the early childhood centre The intent of the requirement (F4.2) for the sills of 50% of the windows 6 in the children's rooms (in the early childhood centre) to be located not more than 500 mm above the floor level has been satisfied, as windows located at floor level comply Ventilation will be provided as required to the proposed building (Part F4). 6 Window as defined in the BCA includes a roof light, glass panel, glass block or brick, glass louvre, glazed sash, glazed door, or other device which transmits natural light directly from outside a building to the room concerned when in the closed position. Farnell Ave Report 31 Mar 2016 Page 8 of 16
9 6 Alternative Solution 6.1 Compliance with the BCA Demonstrating that the Type of fire resisting construction complies with the BCA can be achieved by developing an Alternative Solution to demonstrate that the fire resisting construction will comply with the relevant performance requirements in the BCA without the need to require that the proposed building is Type B construction A0.5 of the BCA states that compliance with the Performance Requirements can only be achieved by: (a) (c) complying with the DTS provisions; or formulating an Alternative Solution which complies with the Performance Requirements or is shown to be at least equivalent to the DTS provisions or a combination of (a) and The BCA states that an Alternative Solution must be assessed according to one or more of the Assessment Methods in A0.9. The BCA states that the Alternative Solution will only comply with the BCA if the Assessment Methods used to determine compliance with the Performance Requirements have been satisfied A0.9 of the BCA states that the following Assessment Methods, or any combination of them, can be used to determine that a Building Solution complies with the Performance Requirements: (a) (c) (d) Evidence to support that the use of a material, form of construction or design meets a Performance Requirement or a deemed to satisfy provision as described in A2.2 Verification Methods in the BCA or such other Verification Methods as the appropriate authority accepts for determining compliance with the Performance Requirements Comparison with the DTS provisions Expert Judgement This report will rely on comparison with the DTS provisions and expert judgement to demonstrate that the Alternative Solution is at least equivalent to the relevant DTS provisions for a low rise building of Type C construction that is fire separated into multiple fire compartments The Alternative Solution will demonstrate that the proposed building will comply with the relevant performance requirements for fire resisting construction without the need to comply with the external and loadbearing wall requirements for Type B construction that would otherwise apply. Farnell Ave Report 31 Mar 2016 Page 9 of 16
10 6.2 Relevant provisions Pursuant to A0.10 (a) the relevant DTS provisions are C1.1 and Table C C1.1 (Type of construction required) in part requires that: (a) The minimum Type of fire resisting construction of a building must be that specified in Table C1.1 and Specification C Table C1.1 requires that a Class 9b building having a rise in storeys of two (2) must be in Type B fire resisting construction. The proposed building has a rise in storeys of two (2) Pursuant to A0.10 the performance requirements directly relevant to C1.1 and Table C1.1 are CP1 and CP CP1: CP1 A building must have elements which will, to the degree necessary, maintain structural stability during a fire appropriate to (a) (c) (d) (e) (f) (g) (h) (i) (j) (k) CP2: the function or use of the building; and the fire load; and the potential fire intensity; and the fire hazard; and the height of the building; and its proximity to other property; and any active fire safety systems installed in the building; and the size of any fire compartment; and fire brigade intervention; and other elements they support; and the evacuation time. (a) A building must have elements which will, to the degree necessary, avoid the spread of fire (i) (ii) to exits; and to sole occupancy units and public corridors; and (iii) (iv) Application: CP2(a)(ii) only applies to a Class 2 or 3 building or Class 4 part of a building. between buildings; and in a building. Farnell Ave Report 31 Mar 2016 Page 10 of 16
11 Avoidance of the spread of fire referred to in (a) must be appropriate to (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) 6.3 Discussion the function or use of the building; and the fire load; and the potential fire intensity; and the fire hazard; and the number of storeys in the building; and its proximity to other property; and any active fire safety systems installed in the building; and the size of any fire compartment; and fire brigade intervention; and other elements they support; and the evacuation time CP1 and CP2 address structural stability and fire spread during a fire respectively The proposal is to separate the storage from the early childhood centre by a floor achieving a FRL of at least 90/90/90 as shown in Figure 1 of this report. Figure 1 (Section showing fire separation) One of the requirements for Type B construction is that the total floor area and volume of the proposed building is limited to between m² m² and m³ m³ respectively (Table C2.2 7 ). The total floor area and volume of each fire compartment will be less than 500 m² and m³, which is less than the maximum allowed for Type C construction m²/ m³ (Class 7b) and m²/ m³ (Class 9b), with the actual limitations determined based on the percentage of floor area and volume for each class m² and m³ for a Class 9b of Type C construction Farnell Ave Report 31 Mar 2016 Page 11 of 16
12 6.3.4 The fire separation of the early childhood centre from the storage (as shown in Figure 1 of this report) is superior to the fire resisting floor required were the proposed building required to comply with Type B and Type C construction 9. The walls and columns supporting this floor will also achieve a minimum FRL of 90/90/90 or 90/ / respectively It is my opinion that the proposed fire separation (as shown in Figure 1 of this report) creates two separate fire compartments (C2.7) such that a fire in the storage will not impact on the fire resistance of, or egress from, the early childhood centre It is my opinion that fire separation and egress from upper levels are the key considerations in the requirement for a Class 9b early childhood centre having a rise in storeys of two (2) to be Type B construction. I rely on the simple section through Building 1, Building 2 and the proposed building as shown in Figure 2 of this report to support my opinion. Figure 2 (Section showing egress and fire separation) Building 1 Type C Building 2 Type C Proposed building Type C G.L. Class 2/3/9c Class 2/3/9c Class 2/3/9c Class 9b Class 7b G.L. Class 2/3/9c Legend: Egress to open space Minimal fire resistance 90/90/ Building 1 (in Figure 2 of this report) is only required to be Type C construction as the lowest storey is not counted in the rise in storeys, and egress is directly to open space Building 2 is only required to be Type C construction (concession in C1.5) as it is served by an enhanced egress system consistent with but less safe than the egress system for the proposed building. 9 The floor separating storeys in Building 1 and 2 need only be lined on the underside with a fireprotective covering (clause 4.1 in Specification C1.1), including beams incorporated in it, if the floor is combustible or of metal Farnell Ave Report 31 Mar 2016 Page 12 of 16
13 6.3.9 It is my opinion that the fire resistance of the proposed building (as depicted in Figure 2 of this report) is superior to that for Building 1 and 2, as the early childhood centre is fire separated from the storage by construction achieving a FRL of at least 90/90/90, with all openings in the floor being protected to prevent the spread of fire (Part C3) The fire resistance of Building 1 and Building 2 (Type C construction) as shown in Figure 2 of this report satisfies CP1 and CP2 to the degree necessary even though the fire separation between storeys is minimal, and there is no requirement for vertical separation (C2.6) Travel distance to an exit serving the early childhood centre is allowed to be 40 m (D1.4) as at least two exits will serve the early childhood centre. The proposed egress system is excellent as multiple exits are proposed around the early childhood centre, and the actual travel distance to a single exit serving the early childhood centre is less than 20 m It is my opinion that egress from the early childhood centre in the proposed building is superior to the egress from the topmost storey of Building 1, as the early childhood centre is fire separated from the storey below by construction achieving a FRL of at least 90/90/90, and the maximum travel distance of less than 20 m is safer than the maximum 40 m allowed (D1.4) It is my opinion that egress from the early childhood centre in the proposed building is superior to the egress from the topmost storey of Building 2, as the early childhood centre is fire separated from the storey below by construction achieving a FRL of at least 90/90/90, egress is directly to open space and does not involve traveling down stairs, and the maximum travel distance of less than 20 m is safer than the maximum 40 m allowed (D1.4) Pursuant to A0.5 of the BCA compliance with the Performance Requirements can only be achieved by: (a) (c) complying with the DTS provisions; or formulating an Alternative Solution which: (i) (ii) complies with the Performance Requirements; or is shown to be at least equivalent to the DTS provisions; or a combination of (a) and It is my opinion that the fire resistance of the proposed building is consistent with the intent of Type B construction (which is based on the risk associated with the rise in storeys of a building and the egress system from the upper level), superior to Type C construction, and in any event superior to the fire resistance of Building 1 and The fire resistance of and egress from the early childhood centre will not be affected by a fire in the storage, as the proposed building will withstand the burnout of the storage in the event of fire, and egress from the early childhood centre is not reliant on egressing through the storage. Farnell Ave Report 31 Mar 2016 Page 13 of 16
14 Where the proposed building is considered consistent with a building of Type C construction there is no requirement for the external walls to the early childhood centre to achieve a FRL, or for the loadbearing walls and columns to the early childhood centre to be concrete or masonry The early childhood centre is at least equivalent to a single storey building of Type C construction having a rise in storeys of one (1), and it is my opinion that the proposal to allow the proposed building to be Type C construction will comply with CP1 and CP2 to the degree necessary, subject to: (a) The floor separating the storeys achieving a FRL of not less than 90/90/90; Openings in the separating floor being protected to prevent fire spread (Part C3); (c) Walls supporting the separating floor achieving a FRL of not less than 90/90/90; and (d) Columns supporting the separating floor achieving a FRL of not less than 90/ /. Farnell Ave Report 31 Mar 2016 Page 14 of 16
15 7 Conclusion This report has been prepared with respect to the proposed early child hood centre and storage at Farnell Avenue, Carlingford The purpose of this report is to provide a general overview of the proposal in terms of compliance with the BCA, and an Alternative Solution for the proposed Type of fire resisting construction The report is suitable for submission with the application for the construction certificate for the proposed building The report demonstrates that the proposal is capable of complying with the BCA, that some technical BCA matters will need to be addressed at the construction certificate stage, and that the proposal to allow the proposed building to be Type C construction will comply with CP1 and CP2 to the degree necessary, subject to: (a) The floor separating the storeys achieving a FRL of not less than 90/90/90; Openings in the separating floor being protected to prevent fire spread (Part C3); (c) Walls supporting the separating floor achieving a FRL of not less than 90/90/90; and (d) Columns supporting the separating floor achieving a FRL of not less than 90/ /. Michael Wynn Jones B App Sc (Bld Surv)(Hons), M App Sc (Fire Safety Design) Accredited certifier (Building) Grade 1 (BPB0448) for Farnell Ave Report 31 Mar 2016 Page 15 of 16
16 8 Appendix A (About Michael Wynn Jones) After 13 years as a Local Government Building Surveyor Michael established a Building Regulations consulting company and became a permanent part time academic at Western Sydney University Over the next 15 years he helped develop, lectured in, and was eventually the Head of Program for, separate Post Graduate courses in Building Surveying, Fire Engineering and bushfire prone areas. He has delivered Building Regulations courses through the UTS Centre for Local Government for over 20 years, and is a former conjoint Professor at the University of Newcastle In addition to his academic pursuits Michael has personally provided consulting and education services for over 20 years to the private sector and over a dozen Councils through Michael Wynn Jones and Associates. This includes working as a Building Regulations expert and consultant rather than as a certifier Michael has also worked as a consultant to the NSW Department of Planning on various projects associated with the built environment, including the Commercial Complying Development Code and the Federal Premises Standards, and assisted the Department with the introduction of private certification in He is a co author of one of the original accreditation schemes recognised by the State Government for private certifiers, is accredited at the highest level as a private certifier, and assisted the Department on the 2013 White Paper A new planning system for NSW Michael is actively involved with several State Government committees and professional bodies that deal with certification of building work, and the impact of Building and Planning legislation on the built environment Michael s relevant qualifications, accreditations and details are as follows: (a) M App Sc. (Fire Safety Design), Western Sydney University (UWS), 1996 B App Sc. (Building Surveying) hons, University of Technology Sydney (UTS), 1986 (c) Ass Dip App Sc. (Health & Building), Technical Further Education, Sydney (1988) (d) (e) A1 Accredited Certifier Building Surveying Grade 1 (NSW BPB Act) Qualified Fire Engineer and Qualified Principal Building Surveyor (f) Conjoint Professor, Sch. Architecture/Built Env., Newcastle Uni ( ) (g) Associate, Centre for Local Govt, University of Technology, Sydney (Since 2005) (h) Board member/preeminent person, Centre for Best Practice (Since 2013) (i) Building Professionals Board member (2008 to June 2013) (j) Deputy President of the Building Professionals Board (2011 to June 2013) (k) Fellow, Australian Institute of Building (Since 2011; member since 2011) (l) Fellow, Australian Institute of Building Surv. (Since 2012; member since 1980). Farnell Ave Report 31 Mar 2016 Page 16 of 16
CONCEPT DESIGN BCA REPORT
CONCEPT DESIGN BCA REPORT CONCEPT DESIGN DOCUMENTATION PROPOSED ZUCCOLI PRIMARY SCHOOL 13/4/17 CONCEPT DESIGN Project: Zuccoli Primary School Location: Centre Road Zuccoli NT 0382 Prepared For: MKE Architects
More informationSFS Form: 4 PROJECT NAME ADDRESS FIRE SAFETY ENGINEERING DESIGN REPORT. Date. 1.0 Introduction
PROJECT NAME ADDRESS FIRE SAFETY ENGINEERING DESIGN REPORT Date 1.0 Introduction 1.01 This report describes the fire safety requirements and the provisions for this project. This fire safety report has
More informationProject Number SJ Sydney CityGrid Project. Appendix J. BCA report. Blackett Maguire + Goldsmith
Project Number SJ-06087 Sydney CityGrid Project Appendix J BCA report Blackett Maguire + Goldsmith 21 February 2012 Preliminary BCA Report 33 BLIGH STREET, SYDNEY Office Tower & CEZS Investa Property Group
More informationD & C Ferguson Building Inspection Services Pty Ltd ABN
DON FERGUSON Building Surveyor Member AIBS No. 2325 Member HIA No. 884008 Building Consultant No. 117 Private Certifier No. BPB0117 D & C Ferguson Building Inspection Services Pty Ltd ABN 30 085 812 942
More informationBuilding Code of Australia Compliance Report
Building Code of Australia Compliance Report For: Shree Swaminarayan Temple Premises: 33 Nelson Road Nelson Reference No: P-08-054 Dated: 11 th February 2009 accredited building certifiers ~ building regulation
More informationAppraisal Report for. Building Product Accreditation. For the. NuCLAD. polystyrene exterior insulation and finishing system
Appraisal Report for Building Product Accreditation For the NuCLAD polystyrene exterior insulation and finishing system (an external wall cladding system for Class 1a & 10 buildings) Report prepared by
More informationFire Safety and Performance of Wood in Multi-Residential and Commercial Buildings. Boris Iskra Forest & Wood Products Australia
Fire Safety and Performance of Wood in Multi-Residential and Commercial Buildings Boris Iskra Forest & Wood Products Australia This Presentation 1. Fire Hazard Properties Building Code of Australia Volume
More informationMagnesium Oxide Board Corporation CodeMark Certificate of Conformity (CMA-CM40009 (Rev2)) Building Code of Australia Classification Summary
Magnesium Oxide Board Corporation CodeMark Certificate of Conformity (CMA-CM40009 (Rev2)) Building Code of Australia Classification Summary BCA Volume 1 2014: Section C Fire Resistance (inclusive of all
More informationCertificate number: CM40087 Rev3
Certification Body: ABN: 80 111 217 568 JAS-ANZ Accreditation No. Z4450210AK PO Box 7144, Sippy Downs Qld 4556 +61 (07) 5445 2199 www.certmark.org Certificate Holder: ABN: 22 750 783 065 19 Lowermill Rd,
More informationFire Safety Design Report
Fire Safety Design Report Extension to Existing Church 25 Mana Avenue Titahi Bay Reference Revision Date Comment 15166R01-11 th April 2016 - Extension to Existing Church, 25 Mana Avenue, Titahi Bay Page
More informationMarch BCA 2014 Section J Amendments
March 2014 BCA 2014 Section J Amendments Introduction BCA 2013 Amendments - Recap BCA 2014 Amendments Section J DTS(prescriptive) vs JV3(performance) Cost implications of DTS Building Envelope and Glazing
More informationBrisbane 24 th Feb, 2015
Alternative solutions Brisbane 24 th Feb, 2015 Evidence based design and the approach to alternative solutions Ken Thomson, Associate ESD, Erbas & Associates Engineers for Building services 1 Agenda Quick
More informationPlan Check No. A. ELEVATORS
Elevators, Egress and Areas of Refuge, Platform Lifts Plan Check No. A. ELEVATORS NOTE: In buildings two or more stories in height, served by an elevator, or a building served by an elevator required by
More informationSUPPLEMENTAL ACCESSIBILITY NO. 5 PLAN REVIEW CHECKLIST
GEORGE CHAVEZ, City Building Official DAVID YELTON, Building Inspection Manager NESTOR OTAZU, Community Preservation Manager BUILDING & SAFETY DIVISION 455 North Rexford Drive, 1 st Floor Beverly Hills,
More informationFire Engineering, the BCA (NCC) & Bushfire Calculator. Keith Nicholls - Manager Product Testing and Assessments (Australia) Exova Group Limited
Fire Engineering, the BCA (NCC) & Bushfire Calculator Keith Nicholls - Manager Product Testing and Assessments (Australia) Exova Group Limited Presentation Topics Current Building Code (fire safety) design
More informationDesign Approach for Performance- Based Building Codes. Scott Beverly, PE PMSFPE Fire Protection Engineer Fire & Life Safety November 2017
Design Approach for Performance- Based Building Codes Scott Beverly, PE PMSFPE Fire Protection Engineer Fire & Life Safety November 2017 Outline Objective Review Design Approaches Overview Australian performance
More informationTimber-framed Construction for Commercial Buildings Class 5, 6, 9a & 9b
03 Seaford Life Saving Club, Robert Simeoni Pty Ltd Architects Timber-framed Construction for Commercial Buildings Class 5, 6, 9a & 9b Design and construction guide for BCA compliant sound and fire-rated
More information2012 IBC Exit Systems
Accreditation Based on the 2012 International Building Code The International Code Council has been accredited as an Authorized Provider by the International Association for Continuing Education and Training
More informationy Message The Building Code of Australia (BCA) has always Key Message Prevention of Falls from Windows DEEMED TO SATISFY PROVISIONS
The Building Code of Australia (BCA) has always contained measures to prevent falls from heights. Until relatively recently, there were no specific requirements for windows, designers and certifiers would
More informationThe Building Codes A.R.E. Building Design and Construction Exam Prep
Know Thy Codes! The Building Codes Building Codes The Code of Hammurabi 4000bc Developed 19 th and 20 th c. Codes define what you can and can t do Allowable area and height based on degree of danger Fire
More informationApplying the Building Code During Design
Applying the Building Code During Design A Step-By-Step Process AIA Learning Units The Salt Lake City CSI Chapter is a Registered Provider with The American Institute of Architects Continuing Education
More informationCHECKSHEET: MULTI RESIDENTIAL, INDUSTRIAL OR COMMERCIAL BUILDINGS
CHECKSHEET: MULTI RESIDENTIAL, INDUSTRIAL OR COMMERCIAL BUILDINGS Kapiti Coast District Council, 175 Rimu Road, Paraparaumu 5032 Private Bag 60601, Paraparaumu 5254 For enquiries, phone 04 296 4700 Address
More information2015 IBC Exit Systems
Objectives 2015 IBC Exit Systems Based on the 2015 International Building Code Upon completion, participants will be better able to: Determine those means of egress components that are defined as exits
More informationGeneral Building Information
Software Module s Description Page 1 General Building Information BUILDING AREA AND HEIGHT - This module designed to determine the height and area of buildings on the basis of occupancy group classification
More information2007 Title 24 Accessibility Code Updates and ADA Issues
2007 Title 24 Accessibility Code Updates and ADA Issues C.A.S.H. Workshop June 2007 Introduction Update on ADA Certification of the California Building Code Overview of significant changes to accessibility
More informationNCC 2016 CONSOLIDATED PERFORMANCE REQUIREMENTS
2016.-- NCC 2016 CONSOLIDATED PERFORMANCE REQUIREMENTS Copyright and licence notice 2016 Commonwealth of Australia and States and Territories of Australia Ownership of intellectual property rights Unless
More informationHOUSING CONVERSION Guidelines for the conversion of a house to commercial use.
PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT HOUSING CONVERSION Guidelines for the conversion of a house to commercial use. HAIR 105 January 2017 contents General Information 3 Zoning Information 4 Building
More informationSOUTH AFRICAN NATIONAL STANDARD
ISBN 978-0-626-25219-9 SOUTH AFRICAN NATIONAL STANDARD The application of the National Building Regulations Part S: Facilities for persons with disabilities Published by SABS Standards Division 1 Dr Lategan
More informationBUILDING CODE COMMISSION
Ruling No. 05-07-1021 Application No. 2005-02 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 3.2.2.67.,
More informationFaçade Fire Safety Design Practice Guide
Façade Fire Safety Design Practice Guide Chris Chennell GHD Fire Image placeholder Scope The following itemises the scope of this Guide: Providing an industry recognised fire risk assessment methodology
More informationCHARTERED PROFESSIONAL FIRE SAFETY ENGINEERS
CHARTERED PROFESSIONAL FIRE SAFETY ENGINEERS t: (02) 6100 3900 mail@ignissolutions.com.au ABN: 24 160 047 325 Suite 16 / 14 Lonsdale Street Braddon, ACT 2612 PO Box 5174 Braddon ACT 2612 Issued: 02-12-2017
More informationGeneral Requirements for Access
General Requirements for Access AS1428 Series 2009 Edition COPYRIGHT GRIMBOS BUILDING SURVEYORS ACCESSIBLE TOILET General Requirements for Access (AS1428 Series 2009 Edition) > ACCESSIBLE TOILET MINIMUM
More informationInternational Code INTERPRETATIONS
2015 International Code INTERPRETATIONS 2015 International Code Interpretations First Printing: June 2016 ISBN#978-1-60983-666.5 Copyright 2016 by International Code Council ALL RIGHTS RESERVED. This 2015
More informationProject: MOE FLS Reference Designs for Standard Classroom Upgrade 2-storey Nelson Block
Project: MOE FLS Reference Designs for Standard Classroom Upgrade 2-storey Nelson Block Accessibility Report Reference: 246313 Prepared for: Ministry of Education Revision: D 2 September 2016 Document
More informationMultiProof -design compliance with Building Code clauses
MultiProof -design compliance with Building Code clauses Applicants and designers should use this table as a starting point for MultiProof. It lists the Building Code clauses, summarises what you need
More informationCALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3%
CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE EXAM ID: I6 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 3 % 0101. Project Administration 3% Verify that plans,
More informationINTERNATIONAL CODE INTERPRETATIONS
2012 INTERNATIONAL CODE INTERPRETATIONS PREFACE The 2012 International Codes promulgated by the International Code Council (ICC ) comprise a comprehensive set of model regulations for the construction
More informationComplying Development
Complying Development Development Control Plan PART 1 - INTRODUCTION PREAMBLE This Development Control Plan (DCP) applies to complying development on lands zoned: For Residential Development: Residential
More informationCode Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)
Code Requirements for Existing Buildings R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS) was established in 1945 and currently
More informationTHE UNIVERSITY OF HONG KONG LIBRARIES. Hong Kong Collection gift from Faculty of Architecture The University of Hong Kong
Ml THE UNIVERSITY OF HONG KONG LIBRARIES Hong Kong Collection gift from Faculty of Architecture The University of Hong Kong CODE OF PRACTICE FOR FIRE RESISTING CONSTRUCTION 1989 BUILDING AUTHORITY HONGKONG
More information&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and &
&01 GENERAL To be developed. All of the exceptions have to be coordinated. &02 SPECIAL USE AND OCCUPANCY &02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections &02.1.1 and &02.1.2.
More informationVelux Sun Tunnels TWR & TWF
Certification Body: Global-Mark Pty Ltd, Suite 4.07, 32 Delhi Road, North Ryde NSW 2113, Australia Tel: +61 (0)2 9886 0222 - www.global- Mark.com.au Certificate Holder: Velux Australia Pty Ltd 78 Henderson
More informationVelux Roof Windows GGL & GPL, incorporating EDW Flashing Kits
Certification Body: Global-Mark Pty Ltd Suite 4.07 32 Delhi Road North Ryde NSW 2113 Australia Tel: +61 2 9886 0222 www.global- Mark.com.au Certificate Holder: Velux Australia Pty Ltd 78 Henderson Road
More informationAccess/Egress Statement
ACCESS STATEMENTS People are very different in their needs, and in the way they use the built environment. Recent changes to Building Regulations Part M go a long way towards promoting the idea of an inclusive
More informationHIA Guide to the Building Code of Australia - Housing Provisions
HIA Guide to the Building Code of Australia - Housing Provisions Here is an extract from the HIA Guide to the Building Code Of Australia relating to staircases. This handy guide, published by HIA is designed
More informationPossible Format for the layout of a DAC application. - Part M
Possible Format for the layout of a DAC application - Part M 2010 - This document should only be used with the clear understanding of the following: a. The aim of this document is to illustrate one possible
More information4/24/2015. Context: Codes ONTARIO BUILDING CODE CONCEPTS AND CODE ANALYSIS
ONTARIO BUILDING CODE CONCEPTS AND CODE ANALYSIS Deborah Levine Farrow, Architect, OAA, FRAIC James Farrow, Architect, OAA, OAQ, FRAIC Get the habit of analysis analysis will in time enable synthesis to
More informationVelux Skylights FS, VS, VSE & VSS with EDW Flashing Kits plus Skylights FCM, VCM, VCE & VCS with custom Flashing
Certification Body: Global-Mark Pty Ltd, Suite 4.07 32 Delhi Road North Ryde NSW 2113 Australia Tel: +61 2 9886 0222 www.global- Mark.com.au Certificate Holder: Velux Australia Pty Ltd 78 Henderson Road
More informationCity of South Pasadena COMMUNITY IMPROVEMENT
City of South Pasadena COMMUNITY IMPROVEMENT Office Address: Mailing Address: 6940 Hibiscus Ave S 7047 Sunset Dr S South Pasadena, FL 33707 South Pasadena, FL 33707 *PHONE: (727) 343-4192 * FAX: (727)
More informationSection Topic Pages. Section 4 Design for horizontal escape Section 5 Design for vertical escape Section 6 General provisions 83-94
Auditing simple premises Module: Means of escape Support Note Extracts: Approved Document B (Fire safety), Volume 2 Section Topic Pages Section 4 Design for horizontal escape 48-65 Section 5 Design for
More informationA GUIDE TO WINDOW AND DOOR SELECTION
Australian window association guide series A GUIDE TO WINDOW AND DOOR SELECTION An industry guide to the selection and certification of windows and doors Background Foreword As part of its commitment to
More informationComplying Development Checklist for Alterations (not Additions) to Dwellings & Ancillary Development. under the NSW Housing Alterations Code
ABN 26 807 194 868 Suite 1 146 Oak Road KIRRAWEE NSW Phone 8880 4480 Email: info@mybuildingcertifier.com.au Complying Development Checklist for Alterations (not Additions) to Dwellings & Ancillary Development
More informationTimber-framed Construction. Sacrificial Timber Construction Joint. Technical Design Guide issued by Forest and Wood Products Australia
06 Timber-framed Construction Sacrificial Timber Construction Joint Technical Design Guide issued by Forest and Wood Products Australia Technical Design Guide issued by Forest and Wood Products Australia
More informationTechnical Justification for
ECOGLO INTERNATIONAL LIMITED Technical Justification for To meet the Exit Signage Requirements of NCC 2016 EP4.2 For the most current solution documents refer to: www.ecoglo.com.au (from the Home Page
More informationBUILDING CODE COMMISSION
Ruling No. 02-22-877 Application No. 2002-19 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentences 3.3.1.2.(3),
More informationCERTMARK INTERNATIONAL APPRAISAL
1 Product Information 1.1 MgO Corp ResCom Is an environmentally friendly all natural magnesium oxide cold ceramic sheeting available in the following dimensions: 1.2 4mm to 50mm thickness 1.3 FRL solutions
More informationCHAPTER 34 EXISTING BUILDINGS
CHAPTER 34 EXISTING BUILDINGS SECTION 3401 GENERAL 3401.1 Scope. Provisions of this chapter shall govern the application of this code to existing buildings. Exception: Buildings and structures located
More informationDescription Accessibility Standards. AODA OBC 2015 Ramps
Ramps OBC Ammendments are related to the following accessibility standards: The ramp must have a minimum clear width of 900 mm. The ramp must have a clear height that provides a minimum Tactile Attention
More informationFire protecting windows close to boundaries
Fire protecting windows close to boundaries product solutions Q1 Queensland Hyundai Head Office Sydney Digital Life Labs Melbourne ANZ Head Office Melbourne Stockhome, Stocklands HQ Sydney T: 1300 655
More informationNational Construction Code 2016 (NCC2016 / BCA2016) Presented by: Stuart Boyce
National Construction Code 2016 (NCC2016 / BCA2016) Presented by: Stuart Boyce Presentation Content PURPOSE OF REVISION IMPORTANT CHANGES Focus on NCC Volume 1 and AIRAH Issues only PURPOSE OF REVISION
More informationTimber in Bushfire Prone Areas
In many parts of Australia, the construction of new buildings and additions to existing buildings will be assessed as being in a Bushfire-prone Area. The relevant Australian Standard AS 959 provides six
More informationSOUTH AFRICAN NATIONAL STANDARD
ISBN 978-0-626-24057-8 SOUTH AFRICAN NATIONAL STANDARD The application of the National Building Regulations Part M: Stairways Published by SABS Standards Division 1 Dr Lategan Road Groenkloof Private Bag
More informationEGRESS AZMIR SULTANA NICOLAS MIMU SAKUMA EDWIN VEGA CHAMORRO
EGRESS AZMIR SULTANA NICOLAS CHAMORRO MIMU SAKUMA EDWIN VEGA DEFINITIONS NC ACCESSIBLE MEANS OF EGRESS. A continuous and unobstructed way of egress travel from any accessible point in a building or facility
More informationCOUNCIL ORDER No
SAFETY CODES COUNCIL #1000, 10665 Jasper Avenue N.W., Edmonton, Alberta, Canada, T5J 389 Tel: 780-413-0099 I 1-888-413-0099 Fax: 780-424-5134 I 1-888-424-5134 www.safetycodes.ab.ca COUNCIL ORDER No. 0015437
More informationProject: MOE Nationwide FLS - Avalon Block Accessibility Report
Project: MOE Nationwide FLS - Avalon Block Accessibility Report Reference: 246313 Prepared for: Ministry of Education Revision: A 28 September 2015 Document Control Record Document prepared by: Aurecon
More informationEQUIVALENT INITIAL FIRE SAFETY ASSESSMENT
EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Factory 191-192 Baizid Bostami Road, Nasirabad Industrial Area, Chittagong 24 May 2014 The Alliance for Bangladesh Worker Safety Page 1/13 24 May 2014 Introduction
More informationSite Accessibility Survey & Transition Plan
Site Accessibility Survey & Transition Plan Organization Name: Person Completing Form: Site Name: Site Address: Date Completed: Instructions: 1. Please circle the appropriate response for each question.
More informationPRESCRIPTIVE COMPLIANCE METHOD
CHAPTER PRESCRIPTIVE COMPLIANCE METHOD 3 SECTION 301 GENERAL 301.2 Building materials. Building materials shall comply with the requirements of this section. 301.2.1 Existing materials. Materials already
More informationNCC 2016, Vol One, Amendment 1. Submission to Australian Building Codes Board
NCC 2016, Vol One, Amendment 1 Submission to Australian Building Codes Board September 2017 11 National Circuit, Barton ACT 2600 Tel: 02 6270 6555 Email: publicaffairs@engineersaustralia.org.au www.engineersaustralia.org.au
More informationSchedule A. a representative appointed from among persons nominated by the Nova Scotia Accessibility Advisory Board.
Schedule A Amendment to the Nova Scotia Building Code Regulations made by the Minister of Municipal Affairs under Section 4 of Chapter 46 of the Revised Statutes of Nova Scotia, 1989, the Building Code
More informationLoss Prevention Standard
Loss Prevention Standard LPS 1208: Issue 2.2 This Loss Prevention Standard is the property of BRE Global Ltd. and is made publicly available for information purposes only. Its use for testing, assessment,
More informationVehicle Impact Barriers for Elevated Structures
technical notes CAR IMPACT BARRIERS FOR ELEVATED STRUCTURES Wheel stops should not be relied upon to prevent cars falling off elevated structures. Impact barriers must be provided. Impact barriers must
More informationGuarding to openable windows with low cill heights
BCA Technical Guidance Note 16 Rev 1 Sept 2016 Guarding to openable windows with low cill heights Purpose BCA technical guidance notes are for the benefit of its members and the construction industry,
More informationFIRE AND SOUND RESISTANCE OF BLOCK MASONRY
FIRE AND SOUND RESISTANCE OF BLOCK MASONRY 1 INDEX 2. Introduction 3. Table 1 Properties 4. Design for fire 5. Table 2 FRL requirements (spans two pages) 7. Some other requirements 7. Some concessions
More informationE?? , , , , , , , , , , , , Table ,
CTC to BCAC Unenclosed Exits 2015 Group A Code Change Cycle Copyright 2014 International Code Council, Inc. IBC 10-31 E?? 15 202, 1005.3.2, 1009.3, 1009.4, 1019.3, 1029.6, 1029.6.3, 1029.7, 1029.8, 1029.8.1,
More informationCONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist
CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist
More informationTimber-framed Construction for Multi-residential Buildings Class 2 & 3
02 Timber-framed Construction for Multi-residential Buildings Class 2 & 3 Design and construction guide for BCA compliant sound and fire-rated construction Technical Design Guide issued by Forest and Wood
More informationTHE UNIVERSITY OF HONG KONG LIBRARIES. Hong Kong Collection. gift from Hong Kong. Buildings Dept,
THE UNIVERSIT OF HONG KONG LIBRARIES Hong Kong Collection gift from Hong Kong. Buildings Dept, CODE OF PRACTICE FOR FIRE RESISTING CONSTRUCTION 1996 BUILDING AUTHORIT HONG KONG Addendum This Code (Code
More informationTechnical Booklet Date of Issue Page. D Structure June 1994 ii. E Fire safety June 1994 iii. G Sound June 1990 iv
Introduction This document contains corrections, clarifications and revisions to Technical Booklets D, E, G, H, L, N and R. These Technical Booklets were prepared by the Department of the Environment for
More informationSAFEGUARDS DURING CONSTRUCTION
CHAPTER 14 SAFEGUARDS DURING CONSTRUCTION SECTION 1401 GENERAL [B] 1401.1 Scope. The provisions of this chapter shall govern safety during construction that is under the jurisdiction of this code and the
More informationINTERNATIONAL EXISTING BUILDING CODE
INTERNATIONAL EXISTING BUILDING CODE EB10-09/10, Part I IEBC 605.1, 705.2, 706.1, 805.4 (New), 805.4.1 (New), 912.4.1, 912.4.2, 912.8.2, 1004.1(New), 1005.1, 1103.3, 1105.6; IBC 3411.4, 3411.4.1, 3411.4.2,
More informationDetermination 2012/033
Determination 2012/033 Provision of lift access in the alterations to an existing two-storey administration building at the National Training Centre for the New Zealand Fire Service at 77 Te Huaki Crescent,
More informationRS-5 District Schedule
District Schedule 1 Intent The intent of this Schedule is generally to maintain the existing single-family residential character of the District by encouraging new development that is compatible with the
More information1 Product. 2 Scope of Use. IGNIS PERFORMANCE SOLUTION No I01R01. Ritek XL Thermal Wall System
IGNIS PERFORMANCE SOLUTION Evaluation No.4214 [2016] 1 Product Ignis Solutions has been engaged by Ritek Building Solutions to evaluate compliance of their Ritek XL Thermal Wall System against the Building
More informationRS-1 District Schedule
District Schedule 1 Intent The intent of this Schedule is generally to maintain the single-family residential character of the District, but also to permit conditionally one-family dwellings with secondary
More informationSection 10 Residential Zone
231 Section 10 Residential Zone Proposed Draft Amendments to Section 10: Residential Note: new text to be added to the District Plan is shown as coloured underlined and text to be removed is shown in coloured
More informationONTARIO BUILDING CODE CONCEPTS AND CODE ANALYSIS
ONTARIO BUILDING CODE CONCEPTS AND CODE ANALYSIS Deborah Levine Farrow, Architect, OAA, FRAIC James Farrow, Architect, OAA, OAQ, FRAIC Get the habit of analysis analysis will in time enable synthesis to
More informationRS-1 District Schedule
District Schedule 1 Intent The intent of this Schedule is generally to maintain the single-family residential character of the District, but also to permit conditionally one-family dwellings with secondary
More informationIntroduction. Products conforming with a European Council Directive. CE marked construction products. Other regulations
Introduction This Technical Booklet has been prepared by the Department of Finance and Personnel and provides for certain methods and standards of building which, if followed, will satisfy the requirements
More informationDEPARTMENT OF ARCHITECTURE ABUBAKAR TAFAWA BALEWA UNIVERSITY, BAUCHI ARC 624: ADVANCED BUILDING SERVICES LESSON 2: CONVEYANCE SYSTEMS IN BUILDINGS
DEPARTMENT OF ARCHITECTURE ABUBAKAR TAFAWA BALEWA UNIVERSITY, BAUCHI ARC 624: ADVANCED BUILDING SERVICES LESSON 2: CONVEYANCE SYSTEMS IN BUILDINGS 2.1 Introduction 2.1.1 Definitions 2.1 Introduction 2.2
More information2015 IBC Accessible Means of Egress
2015 IBC Accessible Means of Egress Based on the 2015 International Building Code Description Upon completion, the participant will be able to apply the accessible means of egress provisions of Section
More informationONTARIO REGULATION 350/06 BUILDING CODE
ONTARIO REGULATION 350/06 BUILDING CODE Consolidation Period: From August 12, 2010 http://www.e-laws.gov.on.ca/html/regs/english/elaws_regs_060350_e.htm Section 9.36. Cottages 9.36.1. Scope 9.36.1.1. Application
More informationPERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL
PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL Permit Application #: Date: mm/dd/yy Project Address Applicant s Name NOTE TO PERMIT APPLICANTS: All permit applications must
More information1 P a g e. Development Control Code for Best Practice Waste Management in the ACT 2019
1 P a g e Document Information Review and Approval Date approved: [insert date approved] Date effective: 1 January 2019 Approved by: Review period: Document Details Content owner: Contact: [insert approval
More informationDisability Standards for Accessible Public Transport 2002
Disability Standards for Accessible Public Transport 2002 as amended made under subsection 31 (1) of the Disability Discrimination Act 1992 This compilation was prepared on 11 May 2005 taking into account
More informationWHO IS THIS COURSE FOR?
INTRODUCTION INSTRUCTIONS - READ ME FIRST BEFORE THE COURSE STARTS, WORK ON YOUR OWN AND COMPLETE ALL OF THE EXERCISES. If you come unprepared, you will have a difficult time to keep up with the pace of
More informationCentennial Hills Skilled Nursing Facility Fire Protection Report July 13, 2016 Revised September 15, 2016 JBA Project No
We Bring Buildings to Life www.jbace.com Centennial Hills Skilled Nursing Facility Fire Protection Report July 13, 2016 Revised September 15, 2016 JBA Project No. 16.0667.000 At the request of Yihong Liu
More informationAGED CARE FACILITIES AGED CARE SOLUTIONS MAXIMISE EFFICIENCY & COMFORT / 1
1 AGED CARE FACILITIES AGED CARE SOLUTIONS // MAXIMISE EFFICIENCY & COMFORT / 1 2 AWS AGED CARE FACILITIES AUSTRALIA HAS SEEN AN INCREASED DEMAND FOR AGED CARE FACILITIES DUE TO RISING AGEING POPULATION
More informationINFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS
INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS November 2018 Contents 1. Introduction... 1 2. Ontario Building Code and Second Dwelling Units... 1 3. How Do I Make My Secondary Dwelling Unit