Rehabilitation of Omar Bin El Khattab, Al Karama, and Saeed Dakka Roads in Jabalia by Using Crushed Material

Size: px
Start display at page:

Download "Rehabilitation of Omar Bin El Khattab, Al Karama, and Saeed Dakka Roads in Jabalia by Using Crushed Material"

Transcription

1

2

3 Rehabilitation of Omar Bin El Khattab, Al Karama, and Saeed Dakka Roads in Jabalia by Using Crushed Material Bill of Quantity of Omar Bin El Khattab Road Item No. 1.1 Description Unit Qty. Clean, excavate and fill carriageway and sidewalks with clean dense sand from natural ground level to the bottom of the sub-base layer design level including watering, compaction not less than 97% & CBR not less than 15%,all according to drawing and technical specifications. m Unit Price Total 1.2 Transport and lay approved crushed stone base coarse 30 cm thick in two layers( each layer 15cm thickness) with CBR > 80% for the carriage way to the levels shown in the drawings. Price includes transporting crushed material, watering and compaction to reach 98 % of maximum dry density. The work includes all tests as per specifications and Engineer s instructions. Grader must be used in spreading and leveling of final layer. Note: Crushed materials to be transported from UNDP crushing site west of Khanyounis (GAN-OR ex-settlement). m Total of Omar Bin El Khattab Road Contractor s signature and stamp Page 7

4 Rehabilitation of Omar Bin El Khattab, Al Karama, and Saeed Dakka Roads in Jabalia by Using Crushed Material PAL Bill of Quantity of Al Karama Road Item No. 2.1 Description Unit Qty. Clean, excavate and fill carriageway and sidewalks with clean dense sand from natural ground level to the bottom of the sub-base layer design level including watering, compaction not less than 97% & CBR not less than 15%,all according to drawing and technical specifications. m Unit Price Total 2.2 Transport and lay approved crushed stone base coarse 30 cm thick in two layers( each layer 15cm thickness) with CBR > 80% for the carriage way to the levels shown in the drawings. Price includes transporting crushed material, watering and compaction to reach 98 % of maximum dry density. The work includes all tests as per specifications and Engineer s instructions. Grader must be used in spreading and leveling of final layer. Note: Crushed materials to be transported from UNDP crushing site west of Khanyonis (GAN-OR ex-settlement). M Contractor s signature and stamp Page 8

5 Item No. 2.3 Description Unit Qty. Modify the path of the high voltage electrical network in Al Karama road. The price include all workmanship, safety precautions, supplying and installing all approved materials, testing, and commissioning of the electrical network according to drawings, GEDCO specifications and engineer s instructions. The price also includes routing out the old poles and handing it to GEDCO. The item includes the following works: - Substitute electrical high voltage steel pole 70/80 with new one 80*90 including hot galvanized base, excavation and installation of the base, casting concrete for the foundation, reconnection of existing network on the pole and all necessary works, cables, arms, and all needed material and accessories. - Ditto but for two electrical high voltage wooden poles to be substituted with two U14. - Ditto but only to relocate one High voltage U14 pole to the new location. LS 1 Unit Price Total Total of Al Karama Road Contractor s signature and stamp Page 9

6 Rehabilitation of Omar Bin El Khattab, Al Karama, and Saeed Dakka Roads in Jabalia by Using Crushed Material PAL Bill of Quantity of Saeed Dakka Road Item No. 3.1 Description Unit Qty. Clean, excavate and fill carriageway and sidewalks with clean dense sand from natural ground level to the bottom of the sub-base layer design level including watering, compaction not less than 97% & CBR not less than 15%,all according to drawing and technical specifications. m Unit Price Total 3.2 Transport and lay approved crushed stone base coarse 30 cm thick in two layers( each layer 15cm thickness) with CBR > 80% for the carriage way to the levels shown in the drawings. Price includes transporting crushed material, watering and compaction to reach 98 % of maximum dry density. The work includes all tests as per specifications and Engineer s instructions. Grader must be used in spreading and leveling of final layer. Note: Crushed materials to be transported from UNDP crushing site west of Khanyonis (GAN-OR ex-settlement). M Total of Saeed Dakka Road Contractor s signature and stamp Page 10

7 Rehabilitation of Omar Bin El Khattab, Al Karama, and Saeed Dakka Roads in Jabalia by Using Crushed Material PAL Summary: SN. Description Total 1. Total of Omar Bin El Khattab Road 2. Total of Al Karama Road 3. Total of Saeed Dakka Road Total Vat (0%) 0.00 Grand Total Grand Total (in letters): Contractor s Name: Signature and Stamp: Date: Contractor s signature and stamp Page 11

8

9

10

11

12

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) United Nation Development Programme Construction Salah El Deen Road Median From Al Zawaida entrance to Al Maghazi Northern entrance PAL 10-00071488 Bill of Quantity (BOQ) PREAMBLE TO BILL OF QUANTITY (BOQ)

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) United Nation Development Programme Rehabilitation of Tunis & Omer Bin Abdel Aziz Sidewalks PAL 10-71488 : UXOs and Rubble Removal From Gaza Strip Bill of Quantity (BOQ) PREAMBLE TO BILL OF QUANTITY (BOQ)

More information

Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL Bill of Quantity : Package2 - Lot 3

Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL Bill of Quantity : Package2 - Lot 3 ITB 2016-279 Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL-10-00098764 Bill of Quantity : Package2 - Lot 3 Package 2 Lot1- Installation, Connection

More information

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES

More information

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES

More information

Jericho Agro Industrial Park

Jericho Agro Industrial Park Bill. 1 Excavation Earth Works and Embankment Work 1 Description Unit QTY Price/ Unit Total USD The Contractor shall when pricing the rates of this bill, take into consideration including and allow for

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) Emergency Removal and Crushing of Rubble and Debris Management PAL 10-92895 Lot # 13: Rubble Removal from Different Locations of Gaza Governorates Bill of Quantity (BOQ) Bill of Quantity (BOQ) PREAMBLE

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) PAL 10-92895 - Emergency Removal and Crushing of Rubble and Debris Management Lot # 10: Site Preparation and Crushing of Concrete Rubble Bill of Quantity (BOQ) Bill of Quantity (BOQ) ITB 2015-039 PREAMBLE

More information

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. Beit Hanoun Emergency Water Supply Project "Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO

More information

UNITED NATIONS DEVELOPMENT PROGRAMME ITB

UNITED NATIONS DEVELOPMENT PROGRAMME ITB UNITED NATIONS DEVELOPMENT PROGRAMME ITB 2017-078 Bill of Quantities Project name: Package 2: External Lighting PAL10-00099398 / Rehabilitate GIE Infrastructure General *All installation works must be

More information

EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS

EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS BILLS OF QUANTITIES - Name of Project CONSULTANT: Name of Office DATE:APR. 2008 External Works EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS page 1 BILLS OF QUANTITIES - Name of Project CONSULTANT:

More information

A Provide for Contractor's Office, Store etc. Sum

A Provide for Contractor's Office, Store etc. Sum BILL NO.1 - PRELIMINARIES AND GENERAL CONDITIONS A Provide for Contractor's Office, Store etc. Sum B C Provide for Insurance in accordance with the Conditions of the Contract. Allow for the provision of

More information

Bill No.1: Preliminaries

Bill No.1: Preliminaries Bill No.1: Preliminaries Item No. Description of Works Qty. 1 Mobilization 1.1 This item should include site office for the use of the Engineer's and Employer's staffs with the necessary facilities, furniture,

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) United Nation Development Programme Programme of Assistance to the Palestinian People UXOs and Rubble Removal from Gaza Strip Removal of Residential and public Debris from North Governorate (Package 7)

More information

Bill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No.

Bill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No. Bill 1: Site Preparatory Works Page No. 1/7 Bill 1 Page 1/1 1.1 Construction of access roads to quarry sites LS 1 including their maintenance throughout the working period 1.2 Construction of deviations

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) United Nation Development Program UXOs and Solid Waste Management PAL 10-71646 Lot # 2 Removal of Solid Waste from Random sites in North Governorate Bill of Quantity (BOQ) Page 1 of 8 PREAMBLE TO BILL

More information

July Bill No.1: Preliminaries

July Bill No.1: Preliminaries Bill No.1: Preliminaries 1 Mobilization 1.1 This item should include site office for the use of the Engineer's and Employer's staffs with the necessary facilities, furniture, computers, printers, photocopier,

More information

PROPOSED COMPLETION OF ROAD INFRASTRUCTURE AND MAINTENANCE WORKS AT EXPORT PROCESSING ZONES AUTHORITY - ATHI RIVER. ITEM NO.

PROPOSED COMPLETION OF ROAD INFRASTRUCTURE AND MAINTENANCE WORKS AT EXPORT PROCESSING ZONES AUTHORITY - ATHI RIVER. ITEM NO. BILL 1 : GENERAL & PRELIMINARIES A B C Allow for preliminaries of mobilization and set up, storage facilities etc,minor preparatory works and compliance with conditions of contract. 1.00 Allow a Prime

More information

DIVISION 1100 TRAFFIC

DIVISION 1100 TRAFFIC SECTION 1102 STREET LIGHTING GENERAL INFORMATION The Idaho State Electrical Board has determined that all street lights are to be provided with an external fuse disconnect, in a junction box between the

More information

SCHEDULE OF QUANTITIES CPUT BELLVILLE JOB NO: SECTION 1 : PRELIMINARY AND GENERAL ITEM PAYMENT DESCRIPTION UNIT QTY RATE AMOUNT

SCHEDULE OF QUANTITIES CPUT BELLVILLE JOB NO: SECTION 1 : PRELIMINARY AND GENERAL ITEM PAYMENT DESCRIPTION UNIT QTY RATE AMOUNT SECTION 1 : PRELIMINARY AND GENERAL ITEM PAYMENT DESCRIPTION UNIT QTY RATE A SECTION 1 : PRELIMINARY AND GENERAL A.1 8.3 FIXED-CHARGE ITEMS A.1.1 8.3.1 Contractual Requirements A.1.2 8.3.2.1 Facilities

More information

Item No. Description Unit Quantity Rate (EUR) Amount (EUR) No 2

Item No. Description Unit Quantity Rate (EUR) Amount (EUR) No 2 BILL NO.1 : PRELIMINARY AND SUPERVISORY SERVICES 1.01 Allow a prime cost sum for material testing to be spent in whole or part as directed by the Resident Engineer. PC Sum 1 1,351.35 1,351.35 1.02 Contractor's

More information

SUM i) Carry out calibration of 100,000 litres day tank. ii) Pipes, valves and other fittings connection to fuel offloading SUM

SUM i) Carry out calibration of 100,000 litres day tank. ii) Pipes, valves and other fittings connection to fuel offloading SUM 31 st July 2017 TENDER FOR RELOCATION OF ONE GE FRAME 6 GAS TURBINE FROM EMBAKASI IN NAIROBI TO MUHORONI NEAR KISUMU: KGN-GT-012-2017 KenGen wishes to make the following clarification and changes through

More information

Table of Contents. Chapter 1 : Introduction 1. Chapter 2 : Structure and design 15

Table of Contents. Chapter 1 : Introduction 1. Chapter 2 : Structure and design 15 Table of Contents Chapter 1 : Introduction 1 1-1 Overview of Japan 1 1-1-1 Topography 1 1-1-2 Climate 1 1-1-3 Population 3 1-1-4 Economy 3 1-2 History and current status of roads in Japan 5 1-2-1 Road

More information

Item No Description Unit Quantity Rate Amount

Item No Description Unit Quantity Rate Amount Bill No 1 Gypsum Boards and False Ceiling Works: Preamble. The contractor shall, when pricing the rates of this bill, take into consideration including and allow for the costs or expenses of all requirements

More information

NEMO TANK INSTALLATION GUIDE INSTALLATION INSTRUCTIONS FOR THE NEMO TANK STAGE

NEMO TANK INSTALLATION GUIDE INSTALLATION INSTRUCTIONS FOR THE NEMO TANK STAGE NEMO TANK INSTALLATION GUIDE INSTALLATION INSTRUCTIONS FOR THE NEMO TANK STAGE 1. Before undertaking the work 2. Receiving the materials 3. Handling and storage 4. Tank layout 5. Installing the tanks STAGE

More information

Chapter 6 Designs for Recreational Uses

Chapter 6 Designs for Recreational Uses Designs for Recreational Use 6-1 Chapter 6 Designs for Recreational Uses ASPHALT PAVEMENTS FOR NON- VEHICULAR USE In addition to highways, streets, and parking lots that carry autos and trucks, many other

More information

Estimate for the construction of water tank24000ltrs (4mx3mx2m) with GCI sheet roofing

Estimate for the construction of water tank24000ltrs (4mx3mx2m) with GCI sheet roofing 1 2 Estimate for the construction of water tank24000ltrs (4mx3mx2m) with GCI sheet roofing Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30

More information

BILL OF QUANTITIES FOR KIPUNGANI SEA WALL

BILL OF QUANTITIES FOR KIPUNGANI SEA WALL BILL NO 17 CONCRETE WORK (All Provisional) 17/1 Clear site of all obstacles and dispose as directed by the Engineer on site. SM 500 200 100,000.00 17/2 Set out works over land and water ITEM 1 50000 50,000.00

More information

Islamic Republic of Afghanistan Ministry of Interior Affairs Central Prison Directorate

Islamic Republic of Afghanistan Ministry of Interior Affairs Central Prison Directorate Islamic Republic of Afghanistan Ministry of Interior Affairs Central Prison Directorate Appendix II: Bill of Quantity for the construction of Boundary wall,guard towers, Check point,guard house, Access

More information

Management of Design and Construction for Civil Works under EPC contract in one Oversea Wind Farm Project

Management of Design and Construction for Civil Works under EPC contract in one Oversea Wind Farm Project ORIGINAL ARTICLE Management of Design and Construction for Civil Works under EPC contract in one Oversea Wind Farm Project Wu Zheng Power China Chengdu Engineering Corporation LTD, Chengdu 610072 Abstract:

More information

SECTION HIGHWAY GRADE CROSSING WARNING SYSTEMS

SECTION HIGHWAY GRADE CROSSING WARNING SYSTEMS SECTION 18700 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for highway grade crossing warning systems. B. Where shown on the Contract Drawings or as required to accommodate associated

More information

UNDP / PAPP OFFICE BUILDING RAMALLAH HVAC WORKS

UNDP / PAPP OFFICE BUILDING RAMALLAH HVAC WORKS UNDP / PAPP OFFICE BUILDING RAMALLAH WORKS Bill of Quantities July 2008 ENGINEERING UNIT Project: system The contractor shall, when pricing the rates of this bill take into consideration including and

More information

Special Specification 6186 Intelligent Transportation System (ITS) Ground Box

Special Specification 6186 Intelligent Transportation System (ITS) Ground Box Special Specification Intelligent Transportation System (ITS) Ground Box 1. DESCRIPTION 2. MATERIALS Construct, furnish, install or remove Intelligent Transportation System (ITS) ground boxes for fiber

More information

LABOR AND MATERIAL PROPOSAL

LABOR AND MATERIAL PROPOSAL LABOR AND MATERIAL PROPOSAL CLIENT: CITY OF KINSTON, NC PROJECT: POD NO. 2 PROJECT NO.: 15-8103-8015 CONTRACTOR: DATE: GROUP DESCRIPTION QTY UNIT 3.1 Structures 1 Lot UNIT PRICING CONTRACTOR- LABOR FURNISHED

More information

STREET LIGHTING GENERAL INFORMATION

STREET LIGHTING GENERAL INFORMATION SECTION 1102 STREET LIGHTING GENERAL INFORMATION These specifications are for street lighting that is to be dedicated to the public and maintained by the City of Meridian. Such installations require a

More information

CATCHMENT STRUCTURE 13M X 15M

CATCHMENT STRUCTURE 13M X 15M BILL OF QUANTITIES AND SPECIFICATIONS CONSTRUCTION OF 100M3 DJABIA ITEM No. DESCRIPTION UNIT QUANTITY RATE AMOUNT KSHS CATCHMENT STRUCTURE 13M X 15M 1.1 Clear catchment site of all bushes, scrubs, undergrowth,

More information

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M. Bill of Quantities Nature of work : Construction of Health Center with 8 rooms (Clinics, Pharmacy, Labs, Fence & Latrines) Location: Shakreen- El Fasher Town- North Darfur State No. Description Qty Unit

More information

Calculation of requirement of Labour. for construction of IAY/CMRHM

Calculation of requirement of Labour. for construction of IAY/CMRHM Calculation of requirement of Labour for construction of IAY/CMRHM Total cost as per 2012 SOR = Rs 7,01,746.00 Deduct 7.5% Contractor s profit = Rs (-) 52,631.00 = Rs 6,49,115.00 Taking 1/3 as the Labour

More information

SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6

SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6 SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO. 18-4501 SOLICITATION NO. CO-00198 ADDENDUM 6 (September 10, 2018) To Respondent of Record: This addendum, applicable to work referenced

More information

Safety Method Statement External Works

Safety Method Statement External Works Description of Work and Location EXTERNAL WORKS A.Generally Preambles for other Sections of work shall apply equally to this section where applicable. B.Weed Killer The weed killer to excavations to be

More information

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL. Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities for SIX CHAMBER VIP LATRINE FACILITY LOCATED AT PRIMARY & SECONDARY SCHOOL YEI RIVER COUNTY South Sudan JUN,

More information

INDIAN INSTITUTE OF TECHNOLOGY GUWAHATI Guwahati , Assam Phone : (0361) , : : Fax : (0361) TENDER DOCUMENT

INDIAN INSTITUTE OF TECHNOLOGY GUWAHATI Guwahati , Assam Phone : (0361) , : : Fax : (0361) TENDER DOCUMENT INDIAN INSTITUTE OF TECHNOLOGY GUWAHATI Guwahati 781 039, Assam Phone : (0361) 2582061, 2582065: : Fax : (0361) 2692771 TENDER DOCUMENT NIT NO: IITG/ENGG/17/NIT/7 Dtd. 10.03.2017 NAME OF WORK Construction

More information

TRUNKING AND ACCESSORIES, CABLE TRAY AND ACCESSORIES, CABLE LADDER & SUPPORT SYSTEMS

TRUNKING AND ACCESSORIES, CABLE TRAY AND ACCESSORIES, CABLE LADDER & SUPPORT SYSTEMS TRUNKING AND ACCESSORIES, CABLE TRAY AND ACCESSORIES, CABLE LADDER & SUPPORT SYSTEMS DISTRIBUTED BY TITAN GROUP OF COMPANIES, UAE Titan Cable Management Solution 1. Cable Trunking Systems... 3 2. Cable

More information

United Nations Development Programme-South Sudan

United Nations Development Programme-South Sudan United Nations Development ProgrammeSouth Sudan PRICED BILLS OF QUANTITIES FOR CONSTRUCTION OF TORIT PRISON PERIMETER SECURITY FENCING Main Summary Currency Item No. 1 Preliminaries Item No. 2 Excavations

More information

ROAD STRECH FROM Golbazar Circle(723m), Golbazar to Ranital chowk(195m) LENGTH METERS SUMMARY SHEET

ROAD STRECH FROM Golbazar Circle(723m), Golbazar to Ranital chowk(195m) LENGTH METERS SUMMARY SHEET ROAD STRECH FROM Golbazar Circle(723m), Golbazar to Ranital chowk(195m) LENGTH - 918 METERS SUMMARY SHEET Sr No. Item Description Amount (In Rs.) 1 ROAD 44445103.80 2 UTILITY DUCT 39514269.91 3 STORM WATER

More information

SECURING A CONNECTION ANYWHERE RAPID DEPLOYMENT SOLUTIONS RAPID DEPLOYMENT TOWER (RDT)

SECURING A CONNECTION ANYWHERE RAPID DEPLOYMENT SOLUTIONS RAPID DEPLOYMENT TOWER (RDT) SECURING A CONNECTION ANYWHERE RAPID DEPLOYMENT SOLUTIONS RAPID DEPLOYMENT TOWER (RDT) RAPID DEPLOYMENT SOLUTIONS RAPID DEPLOYMENT TOWER (RDT) Rapid Deployment Tower (RDT) is a compact Greenfield site

More information

FULL DEPTH RECLAMATION

FULL DEPTH RECLAMATION FULL DEPTH RECLAMATION PART 1 - GENERAL 1.01 SECTION INCLUDES Full depth reclamation of asphalt roadways 1.02 DESCRIPTION OF WORK Includes pulverizing and mixing of existing asphalt and underlying materials;

More information

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines. SECTION 15.0 PIPE TRENCHES 15.01 Clearing and Grubbing The developer/contractor shall be responsible for the clearing and grubbing of the entire right-of-way. See Sections 13.01 and 14.01. Clearing and

More information

Thank you for your response to our Request for Bid submissions. The following is a summary of the submitted bids for this project.

Thank you for your response to our Request for Bid submissions. The following is a summary of the submitted bids for this project. Thank you for your response to our Request for Bid submissions. The following is a summary of the submitted bids for this project. 1. PARKING LOT PHASE (PLP) PL - 1 Obtain Building Permit (including permit

More information

Tabulation of Bids 8 September 2017 MILL CREEK / PEAKS BRANCH / STATE THOMAS DRAINAGE RELIEF PROJECT

Tabulation of Bids 8 September 2017 MILL CREEK / PEAKS BRANCH / STATE THOMAS DRAINAGE RELIEF PROJECT SCHEDULE 1 BASE BID: PROJECT-WIDE ITEMS All work exclusive of Items listed separately, including tunnel between Station 8+00 and 1 1 LS Station 271+85 $191,675,695.00 $191,675,695.00 $190,592,000.00 $190,592,000.00

More information

COUNTY GOVERNMENT OF BUSIA DEPARTMENT OF WATER, ENVIRONMENT AND NATURAL RESOURCES P.O BOX BUSIA (K)

COUNTY GOVERNMENT OF BUSIA DEPARTMENT OF WATER, ENVIRONMENT AND NATURAL RESOURCES P.O BOX BUSIA (K) COUNTY GOVERNMENT OF BUSIA DEPARTMENT OF WATER, ENVIRONMENT AND NATURAL RESOURCES P.O BOX 392-50400 BUSIA (K) DRILLING, DEVELOPMENT, TEST PUMPING, AND WATER QUALITY ANALYSIS FOR: BOREHOLE NAME: KAMUNA

More information

SECTION 10.0 PIPE TRENCHES Excavation and Preparation of Trench

SECTION 10.0 PIPE TRENCHES Excavation and Preparation of Trench SECTION 10.0 PIPE TRENCHES 10.01 Excavation and Preparation of Trench The trench shall be excavated to the proper depth to permit installation of the pipe along the lines and grades shown on the Plans.

More information

Fabrication and Installation Table of Contents

Fabrication and Installation Table of Contents Fabrication and Installation Table of Contents HDPE AQUASHIELD PRODUCTS 2 Fabrication and Installation 2 System Fabrication 3 Aqua-Swirl Installation 4 Step 1 Excavation and Bedding 4 Step 2 Pipe Connection

More information

PRELIMINARY ROADWORKS COST ESTIMATE

PRELIMINARY ROADWORKS COST ESTIMATE PRELIMINARY ROADWORKS COST ESTIMATE Project Title : Glounthaune Village Improvement Scheme Client : O Mahony Developments Ltd Date : February 208 From O' Mahony Development Ltd Entrance to Glounthaune

More information

Construction works for Establishment of School in Al-Najaf M 2 2,600 M 2 750

Construction works for Establishment of School in Al-Najaf M 2 2,600 M 2 750 1 Preparation of a 18-Classroom School BoQ for constructing a 18-Classroom School - Najaf Site Preparation:Works for leveling the site and remove the garbage to authorized location according to supervisor

More information

Clarification of ITB Amendment No. 1 Pre-Bid meeting Minutes. Excavation and leveling of the Jericho Agro Industrial Park

Clarification of ITB Amendment No. 1 Pre-Bid meeting Minutes. Excavation and leveling of the Jericho Agro Industrial Park Clarification of ITB Amendment No. 1 Pre-Bid meeting Minutes Excavation and leveling of the Jericho Agro Industrial Park Date & Time Location Contractors 04 October 2010 @ 11:30hrs Jericho Municipality

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI 620 015 ESTATE MAINTENANCE DEPARTMENT NOTICE INVITING TENDERS NO: NITT/EMD//Civil works / 2015 TENDER NOTIFICATION Ref: NITT/EMD/ CoW/Civil Works /15-16

More information

SECTION BITUMINOUS CONCRETE PAVING

SECTION BITUMINOUS CONCRETE PAVING PART 1 GENERAL 1.1 SECTION INCLUDES: SECTION 02400 BITUMINOUS CONCRETE PAVING A. The intent of this specification section is to provide requirements for materials, equipment, and methods for constructing

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3 CITY OF TORONTO TS 3.70 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS 3.70.01 SCOPE...3 TS

More information

If a new residence s electrical service is not located within 200 feet of existing

If a new residence s electrical service is not located within 200 feet of existing Primary Line Extensions CHAPTER 4 If a new residence s electrical service is not located within 200 feet of existing primary electrical facilities, a primary line extension is required to place a close

More information

Application for Permit for Installation of Utilities or Placing Underground Construction

Application for Permit for Installation of Utilities or Placing Underground Construction Application for Permit for Installation of Utilities or Placing Underground Construction City of Hanover, MN / cityhall@ci.hanover.mn.us City of Hanover Permit No. Applicant is responsible for all locations

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3 CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3

More information

Construction works for Establishment of School in Al-Latifiyah. Al-Latifiyah BoQ for constructing a 6-pre-fab Classroom School

Construction works for Establishment of School in Al-Latifiyah. Al-Latifiyah BoQ for constructing a 6-pre-fab Classroom School 1 Al-Latifiyah BoQ for constructing a 6-pre-fab Classroom School Preparation of a 6-Classroom School Site Preparation:Works for leveling the site and remove the garbage to authorized location according

More information

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810 STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS 3 East Pulteney Square Bath, New York 14810 County Route 22 over Canisteo River Bridge Replacement Project BIN 3333290 D035511 PIN 6755.06 ADDENDUM #1 October

More information

Construction Specification for Concrete Unit Pavers

Construction Specification for Concrete Unit Pavers Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS

More information

8.01. SUB TOTAL 1 1,168, ADD 16% VAT 187, TOTAL 1,356, Total Carried Forward to Form of Tender:

8.01. SUB TOTAL 1 1,168, ADD 16% VAT 187, TOTAL 1,356, Total Carried Forward to Form of Tender: Contract No WARD NAM AINAMOI WARD ROAD NAME 3.30 KM SUMMARY Bill No. Description Amount Preliminary and General Items 1.01 Allow a prime cost sum of Ksh.20,000 for Engineer's miscellaneous account and

More information

CAMINO REAL REGIONAL MOBILITY AUTHORITY BOARD RESOLUTION

CAMINO REAL REGIONAL MOBILITY AUTHORITY BOARD RESOLUTION CAMINO REAL REGIONAL MOBILITY AUTHORITY BOARD RESOLUTION WHEREAS, the Camino Real Regional Mobility Authority (CRRMA) entered into a construction contract dated October 24, 2016 (Contract) with International

More information

Demarcation Points. Example 1

Demarcation Points. Example 1 Example 1 control of distribution equipment including connection assets, ending at the customer. REVISION 03 14/04/10 Example 2 ROAD The transformer is normally at the property line. If the transformer

More information

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL This section covers the restoration of roadways and sidewalks, in whole or in part, with bituminous concrete paving. WITHIN 4 DAYS OF BACKFILLING IN AREAS

More information

Special Provisions for Pavement Open Cuts

Special Provisions for Pavement Open Cuts 1. All patches are to be replaced in accordance with the following requirements and as shown in Figure 1. 2. All Excavations or Open Cuts shall comply with OSHA Technical Manual, Chapter 2, Title Excavation:

More information

1.1 Related Work.1 Electrical Pathway Lighting Design Spec.: Section 16010

1.1 Related Work.1 Electrical Pathway Lighting Design Spec.: Section 16010 Subdivision Requirements Manual Page 1 of 7 PART I - GENERAL 1.1 Related Work.1 Electrical Pathway Lighting Design Spec.: Section 16010 1.2 Scope of Work.1 Work under this section, in coordination with

More information

SECTION AGGREGATES

SECTION AGGREGATES SECTION 32 05 00 AGGREGATES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Aggregate base 2. Engineered fill 3. Backfill 4. Fine filter aggregate (non-frost susceptible fill) 5. Riprap 6. Recreational

More information

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5B Access Tracks, Hardstanding Areas, Electrical Compounds, Borrow Pit And Cable Laying Construction Method Statement Copyright ESB International

More information

CRUSHED AGGREGATE BLENDED WITH GRANITECRETE ADMIXTURE SURFACING

CRUSHED AGGREGATE BLENDED WITH GRANITECRETE ADMIXTURE SURFACING Guide Specification CRUSHED AGGREGATE BLENDED WITH GRANITECRETE ADMIXTURE SURFACING COORDINATE WITH DRAWINGS: Show location and extent of stabilized aggregate surfacing. Show details required at adjoining

More information

SECTION PORTLAND CEMENT CONCRETE PAVEMENT. All subsurface utilities must be inspected, tested, and accepted prior to any paving.

SECTION PORTLAND CEMENT CONCRETE PAVEMENT. All subsurface utilities must be inspected, tested, and accepted prior to any paving. SECTION PORTLAND CEMENT CONCRETE PAVEMENT 1. DESCRIPTION This specification shall govern for the construction of Portland cement concrete pavement on a prepared subgrade or base course, in accordance with

More information

0.75 " transparent hose w/ valve for head measurements fixed to screws 20 MIL PVC liner. 6" gate valve

0.75  transparent hose w/ valve for head measurements fixed to screws 20 MIL PVC liner. 6 gate valve 0.75 " transparent hose w/ valve for head measurements fixed to screws 250x1000 RC beam 6" gate valve Foundation preparation in accordance with technical specifications and as approved by engineer 25 cm

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

Sl No. Rate. Hct By manual means In area of light jungle

Sl No. Rate. Hct By manual means In area of light jungle BILL OF QUANTITIES Name of Work : Extension of NH 37 from its dead end near Saikhowaghat in Assam ending near Roing in Arunachal Pradesh under Trans Arunachal Highway programme. SH: Strengthening of Shantipur

More information

PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER

PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER COMMUNICATIONS LIGHTING Street Lighting Plan 710 Riser... 287 730 Collar for street light pole... 289 731 Pull box... 291 732 Trench for street light

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

TENDER FOR INSTALLATION OF WIND MEASURING INSTRUMENTS AND REHABILITATION OF WIND MASTS KGN-BDD

TENDER FOR INSTALLATION OF WIND MEASURING INSTRUMENTS AND REHABILITATION OF WIND MASTS KGN-BDD TENDER NO. KGN-BDD-02-208 DATE: 07/2/208 KENYA ELECTRICITY GENERATING COMPANY PLC TENDER FOR INSTALLATION OF WIND MEASURING INSTRUMENTS AND REHABILITATION OF WIND MASTS KGN-BDD-02-208 CLARIFICATIONS NO.2

More information

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP INFRASTRUCTURE SERVICES Page 1 of 7 1.0 GRANULAR BASE AND SUB-BASE 1.1 DESCRIPTION.1 This section specifies requirements for supplying, producing, hauling placing and compacting processed gravel or quarried

More information

Sign & Post Installation. Standard Specifications and Standard Drawings. July 2017 Edition

Sign & Post Installation. Standard Specifications and Standard Drawings. July 2017 Edition Standard Specifications Sign & Post Installation Utility Services Department 500 George Street North, Peterborough, Ontario, K9H 3R9 Transportation Division Telephone: 705-742-7771 Fax: 705-876-4621 Sign

More information

All RED text must be removed from the special provisions prior to the special provisions being submitted for project letting.

All RED text must be removed from the special provisions prior to the special provisions being submitted for project letting. This set of special provisions is put together as a standalone project where the District wants to construct a standalone temporary lighting system. If the District wants to construct a temporary lighting

More information

TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE

TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE GETCO/E/TS LUC058/R1

More information

COUNTY GOVERNMENT OF BUSIA DEPARTMENT OF WATER, ENVIRONMENT AND NATURAL RESOURCES P.O BOX BUSIA (K)

COUNTY GOVERNMENT OF BUSIA DEPARTMENT OF WATER, ENVIRONMENT AND NATURAL RESOURCES P.O BOX BUSIA (K) COUNTY GOVERNMENT OF BUSIA DEPARTMENT OF WATER, ENVIRONMENT AND NATURAL RESOURCES P.O BOX 392-50400 BUSIA (K) BILL OF QUANTITIES DRILLING OF SHALLOW WELLS AND HANDPUMP INSTALLATION ANGURAI NORTH WARD TENDER

More information

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road Sl.Pg.No.193 Name of Work : Construction of 20.0 m. wide road in Sector 16 under 12.5% scheme around Shelghar Village at Ulwe Node, Navi Mumbai. SCHEDULE A BILL OF QUANTITIES Part - I : Construction of

More information

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.)

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) Based on. I to IV w.e.f. 10 May 2012 Length of the Road =250 m, ROW 18 m Abstract Estimate S.No. Description of Item SOR Item Cost 1

More information

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase.

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase. SECTION 20.22 LEVELING COURSE Article 22.1 General The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase. Article

More information

Town of Milton Halton Paramedic Services Station No. 17 and Milton Fire Station No. 5 Tender No and

Town of Milton Halton Paramedic Services Station No. 17 and Milton Fire Station No. 5 Tender No and Town of Milton No. 17 and Milton Fire Station No. 5 Tender No. 19-500-1 and 19-500-2 BID SUBMISSION 19-500-2 Part Two In accordance with Tender No. 19-500-2, Tender Form Part Two must be submitted electronically

More information

CW 3235 RENEWAL OF EXISTING MISCELLANEOUS CONCRETE SLABS TABLE OF CONTENTS

CW 3235 RENEWAL OF EXISTING MISCELLANEOUS CONCRETE SLABS TABLE OF CONTENTS December 2011 CW 3235 RENEWAL OF EXISTING MISCELLANEOUS CONCRETE SLABS TABLE OF CONTENTS 1. DESCRIPTION...1 1.1 General...1 1.2 Definitions...1 1.3 Referenced Standard Construction Specifications...1 1.4

More information

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service. CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation

More information

MADHYA PRADESH CRICKET ASSOCIATION TENDER DOCUMENT FOR CONSTRUCTION OF UG WATER TANK CAPACITY OF LTRS FOR CRICKET GROUND AT SAGAR

MADHYA PRADESH CRICKET ASSOCIATION TENDER DOCUMENT FOR CONSTRUCTION OF UG WATER TANK CAPACITY OF LTRS FOR CRICKET GROUND AT SAGAR TENDER DOCUMENT FOR CONSTRUCTION OF UG WATER TANK CAPACITY OF 75000 LTRS FOR CRICKET GROUND AT SAGAR SPECIFICATIONS, TENDER DETAILS & BILL OF QUANTITY ISSUED BY HON. SECRETARY MADHYA PRADESH CRICKET ASSOCIATION

More information

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali FINANCIAL BID DOCUMENT Miscellaneous Civil Work in Low Lying Area at

More information

REQUEST FOR QUOTATION (RFQ) (Works)

REQUEST FOR QUOTATION (RFQ) (Works) REQUEST FOR QUOTATION (RFQ) (Works) DESCRIPTION: Rehabilitation of 1. Al Qalaa School; 2. Al Hasan Ebn Al Haitham School; 3. Omar Al Mokhtar School in Tajoura Municipality, Tripoli, Libya DATE: May 15,

More information

A. Division 01 Specification Sections, Drawings, General Conditions, Supplementary General Conditions, and Special Conditions apply to this section.

A. Division 01 Specification Sections, Drawings, General Conditions, Supplementary General Conditions, and Special Conditions apply to this section. Note: This guide specification for U.S. applications is for concrete grid units placed on a sand bedding course over a compacted dense-graded aggregate base. The text allows an option of topsoil and grass

More information

From To document 8. Last date and time of receipt On or Before by 3.00 PM

From To document 8. Last date and time of receipt On or Before by 3.00 PM STATE BANK STAFF COLLEGE 6-3-1188; BEGUMPET ROAD, HYDERABAD Ph No 23403130 NOTICE INVITING TENDER NIT NO: 03/2017-18 SBSC invites sealed tenders for the electrical works for miscellaneous electrical works

More information

TERMS OF SERVICE Strasburg Telephone Company Section 8 d/b/a TDS Telecom First Revised Sheet 1 Colorado Cancels Original Sheet 1 CONSTRUCTION CHARGES

TERMS OF SERVICE Strasburg Telephone Company Section 8 d/b/a TDS Telecom First Revised Sheet 1 Colorado Cancels Original Sheet 1 CONSTRUCTION CHARGES d/b/a TDS Telecom First Revised Sheet 1 Colorado Cancels Original Sheet 1 A. GENERAL Construction charges are non-recurring charges applicable under certain conditions or for extending company facilities

More information

NADEP COMPOST TANK TO ENHANCE FERTILITY OF FARM LAND

NADEP COMPOST TANK TO ENHANCE FERTILITY OF FARM LAND NADEP COMPOST TANK TO ENHANCE FERTILITY OF FARM LAND COMPOSTING: Composting is the process of reducing vegetable and animal refuses to quickly utilisable condition for maintaining soil fertility. NADEP

More information