1 DRAINAGE

2 TAB Do the column headings match the SEQ? S CATCH BASIN 15" GS 15" CS CL III SAFETY RANDOM RIP RAP CLASS II GEOTEXT -TILE FABRIC TYPE III GUIDE POSTS TYPE B CONN TO EXIST. STORM SEWER STRUCTURE NO. FROM TO ALIGN. STATION STRUCTURE LOCATION OFFSET CENTERLINE CROSS S DRAINAGE TABULATION TOP OF CASTING INLET OUTLET S CATCH BASIN DRAINAGE STRUCTURE TYPE DESIGN F PAY HEIGHT STEPS REQUIRED CASTING ASSEMBLY 15" GS 15" CS CL III SAFETY RANDOM RIP RAP CLASS II GEOTEXT -TILE FABRIC TYPE III CONN GUIDE TO POSTS EXIST. TYPE B STORM SEWER EACH LIN FT EACH LIN FT EACH EACH EACH LIN FT LIN FT EACH CU YDS SQ YD EACH EACH EB LT TO RT EB LT TO RT EB ' LT TO 22.0' RT CB 6.4 YES A EB ' RT WB ' RT TO 34.0' LT WB ' RT TO 35.0' LT SP SUBTOTAL SHEET 4 OF ALL CONCRETE SEWER IS DESIGN 3006 GASKET JOINT

3 TAB Do the column headings match the SEQ? Pipe material 15" GS 15" CS CL III SAFETY STRUCTURE NO. FROM TO ALIGN. STATION STRUCTURE LOCATION OFFSET CENTERLINE CROSS S DRAINAGE TABULATION TOP OF CASTING INLET OUTLET S CATCH BASIN DRAINAGE STRUCTURE TYPE DESIGN F PAY HEIGHT STEPS REQUIRED CASTING ASSEMBLY 15" GS 15" CS CL III SAFETY RANDOM RIP RAP CLASS II GEOTEXT -TILE FABRIC TYPE III CONN GUIDE TO POSTS EXIST. TYPE B STORM SEWER EACH LIN FT EACH LIN FT EACH EACH EACH LIN FT LIN FT EACH CU YDS SQ YD EACH EACH EB LT TO RT EB LT TO RT EB ' LT TO 22.0' RT CB 6.4 YES A EB ' RT WB ' RT TO 34.0' LT WB ' RT TO 35.0' LT SP SUBTOTAL SHEET 4 OF ALL CONCRETE SEWER IS DESIGN 3006 GASKET JOINT

4 TAB Do the column headings match the SEQ? Pipe material Class of Pipe CL III STRUCTURE NO. FROM TO ALIGN. STATION STRUCTURE LOCATION OFFSET CENTERLINE CROSS S DRAINAGE TABULATION TOP OF CASTING INLET OUTLET S CATCH BASIN DRAINAGE STRUCTURE TYPE DESIGN F PAY HEIGHT STEPS REQUIRED CASTING ASSEMBLY 15" GS 15" CS CL III SAFETY RANDOM RIP RAP CLASS II GEOTEXT -TILE FABRIC TYPE III CONN GUIDE TO POSTS EXIST. TYPE B STORM SEWER EACH LIN FT EACH LIN FT EACH EACH EACH LIN FT LIN FT EACH CU YDS SQ YD EACH EACH EB LT TO RT EB LT TO RT EB ' LT TO 22.0' RT CB 6.4 YES A EB ' RT WB ' RT TO 34.0' LT WB ' RT TO 35.0' LT SP SUBTOTAL SHEET 4 OF ALL CONCRETE SEWER IS DESIGN 3006 GASKET JOINT

5 TAB Do the column headings match the SEQ? Pipe material Class of Pipe Design 3006, if applicable STRUCTURE NO. FROM TO ALIGN. STATION STRUCTURE LOCATION OFFSET CENTERLINE CROSS S DRAINAGE TABULATION TOP OF CASTING INLET OUTLET S CATCH BASIN DRAINAGE STRUCTURE TYPE DESIGN F PAY HEIGHT STEPS REQUIRED CASTING ASSEMBLY 15" GS 15" CS CL III SAFETY RANDOM RIP RAP CLASS II GEOTEXT -TILE FABRIC TYPE III CONN GUIDE TO POSTS EXIST. TYPE B STORM SEWER EACH LIN FT EACH LIN FT EACH EACH EACH LIN FT LIN FT EACH CU YDS SQ YD EACH EACH EB LT TO RT EB LT TO RT EB ' LT TO 22.0' RT CB 6.4 YES A EB ' RT WB ' RT TO 34.0' LT WB ' RT TO 35.0' LT SP SUBTOTAL SHEET 4 OF ALL CONCRETE SEWER IS DESIGN 3006 GASKET JOINT

6 TAB Do the column headings match the SEQ? Pipe material Class of Pipe Design 3006, if applicable All notes accounted for and make sense SP/Funding splits shown STRUCTURE NO. FROM TO ALIGN. STATION STRUCTURE LOCATION OFFSET CENTERLINE CROSS S DRAINAGE TABULATION TOP OF CASTING INLET OUTLET S CATCH BASIN DRAINAGE STRUCTURE TYPE DESIGN F PAY HEIGHT STEPS REQUIRED CASTING ASSEMBLY 15" GS 15" CS CL III SAFETY RANDOM RIP RAP CLASS II GEOTEXT -TILE FABRIC TYPE III CONN GUIDE TO POSTS EXIST. TYPE B STORM SEWER EACH LIN FT EACH LIN FT EACH EACH EACH LIN FT LIN FT EACH CU YDS SQ YD EACH EACH EB LT TO RT EB LT TO RT EB ' LT TO 22.0' RT CB 6.4 YES A EB ' RT WB ' RT TO 34.0' LT WB ' RT TO 35.0' LT SP SUBTOTAL SHEET 4 OF ALL CONCRETE SEWER IS DESIGN 3006 GASKET JOINT

7 PROFILE Do the profiles agree with the tabs? Pipe material

8 PROFILE Do the profiles agree with the tabs? Pipe material Pipe size

9 PROFILE Do the profiles agree with the tabs? Pipe material Pipe size Pipe class

10 PROFILE Do the profiles agree with the tabs? Pipe material Pipe size Pipe class Pipe length CENTERLINE CROSS S STRUCTURE NO. FROM TO STRUCTURE LOCATION ALIGN. STATION LIN FT EACH EB EB EB EB EB EB SUBTOTAL SHEET 1 OF 5 SAFETY

11 PROFILE Do the profiles agree with the tabs? Pipe material Pipe size Pipe class Pipe length Stationing CENTERLINE CROSS S STRUCTURE NO. FROM TO STRUCTURE LOCATION ALIGN. STATION LIN FT EACH EB EB EB EB EB EB SUBTOTAL SHEET 1 OF 5 SAFETY

12 PROFILE Do the profiles agree with the tabs? Pipe material Pipe size Pipe class Pipe length Stationing Apron CENTERLINE CROSS S STRUCTURE NO. FROM TO STRUCTURE LOCATION ALIGN. STATION LIN FT EACH EB EB EB EB EB EB SUBTOTAL SHEET 1 OF 5 SAFETY

13 STORM SEWER PROFILE Same as culvert plus Top of casting STRUCTURE NO. FROM DRAINAGE TABULATION (THIS SHEET ONLY) TO STRUCTURE LOCATION TOP OF OUTLET INLET ALIGN. STATION CASTING ELEV WB WB WB WB WB WB

14 DRAINAGE SUMMARY TAB ITEM DESCRIPTION DRAINAGE SUMMARY UNIT SHEET NO HPP 80% FED 20% STATE HSIP 90% FED 10% STATE TOTALS 18" CS LIN FT " RC PIPIE SEWER DES 3006 LIN FT " SEWER DES 3006 LIN FT " RC PIPIE SEWER DES 3006 LIN FT " CS SAFETY EACH " RC EACH " RC EACH " RC EACH All pay items covered and match SEQ description

15 DRAINAGE SUMMARY TAB ITEM DESCRIPTION DRAINAGE SUMMARY UNIT SHEET NO HPP 80% FED 20% STATE HSIP 90% FED 10% STATE TOTALS 18" CS LIN FT " RC PIPIE SEWER DES 3006 LIN FT " SEWER DES 3006 LIN FT " RC PIPIE SEWER DES 3006 LIN FT " CS SAFETY EACH " RC EACH " RC EACH " RC EACH All pay items covered and match SEQ description SP/Funding splits shown

16 DRAINAGE SUMMARY TAB ITEM DESCRIPTION DRAINAGE SUMMARY UNIT SHEET NO HPP 80% FED 20% STATE HSIP 90% FED 10% STATE TOTALS 18" CS LIN FT " RC PIPIE SEWER DES 3006 LIN FT " SEWER DES 3006 LIN FT " RC PIPIE SEWER DES 3006 LIN FT " CS SAFETY EACH " RC EACH " RC EACH " RC EACH All pay items covered and match SEQ description SP/Funding splits shown Total column

17 DRAINAGE PLAN VIEW 2501, 2503, 2506 Do the plan views agree with the tabs? Pipe material, if shown Pipe size, if shown Pipe class, if shown Pipe length, if shown Stationing & offset Apron, type, number, grate (if applicable) Work type (i.e. remove, salvage, F & I, clean, etc.)

18 ENTRANCE S Is it in the clear zone? No flared apron, no grate Yes Entrance Culvert apron Recommend it be a safety apron Grate is required when safety apron. > 24 Span > 24 There are multiple aprons This information can be found in the Road Design Manual and the Design Scene

19 CENTERLINE S Is it in the clear zone? No flared apron, no grate Yes Centerline Culvert apron, grate is required when Safety Apron is > 36 Multiple aprons > 30 Span safety aprons > 36 Multiple span aprons > 28 Flared Apron is > 15 All span apron All multiple aprons This information can be found in the Road Design Manual and the Design Scene

20 PARALLEL MEDIAN Must be at a 1:10 Must be a metal safety apron Must have a safety grate Must have a detail Details found under ProjectWise OTS\DesignStandards\DesignDetails SafeAprn1_10b_dd.dgn and SafeAprn1_10sm_dd.dgn Standard plate 3128 shows the connection to concrete pipe This information can be found in the Design Scene

21 GENERIC S Generic culverts are generally used for entrance pipes. If generic pipes are not used then a documented reason needs to be placed in the project file. It must be a good reason too. When giving the plastic pipe option they must use the generic items X SAFETY by the EACH with the note Apron material shall be the same as pipe material except that the apron for CP pipe shall be CS X by the EACH with the note Apron material shall be the same as pipe material except that the apron for CP and CS pipe shall be GS X by the LIN FT with the note CS, CP, RC may be used as acceptable pipe options. CS was used to determine the pipe lengths.

22 STORM SEWER OPTION Must have a plastic pipe option. If an option is NOT use then a documented reason needs to be placed in the project file. Use standard concrete pipe pay items Must add note Plastic pipe may be used as an option for xx lin ft, see tab for locations.

23 LINING LINING Must state the size of pipe to be lined LINING CULVET (X ) by the LIN FT, when using this pay item they also need to include either CLSM LOW DENSITY by the CU YD or CLSM HIGH DENSITY by the CU YD or A note stating the use of cured in place pipe. STORM SEWER LINING Must state size. Grout is incidental unless otherwise noted.

CHAPTER 12: DRAINAGE

CHAPTER 12: DRAINAGE CHAPTER 12: DRAINAGE CHINOOK WINDS AND WINTER SNOWS A combination which frequently results in hazardous winter conditions on shaded portions of roadways under bridges. Icing conditions are a danger in

More information

CHAPTER 12: DRAINAGE

CHAPTER 12: DRAINAGE CHAPTER 12: DRAINAGE Inplace Drainage Structures On projects where inplace manholes or catch basins are likely to be either adjusted or reconstructed, the following additional information is necessary

More information

OVERALL PLAN CHECKLIST

OVERALL PLAN CHECKLIST OVERALL PLAN CHECKLIST The following list of items is a good place to start for reviewing your plans. This is not all inclusive and some things may not apply to each plan. ALL SHEETS Readability If you

More information

July Page 1. Chapter SPEC BOOK The 2018 Spec Book is expected to be published (electronically) by the end of August 2017.

July Page 1. Chapter SPEC BOOK The 2018 Spec Book is expected to be published (electronically) by the end of August 2017. July 2017 - Page 1 Chapter 2 2018 SPEC BOOK The 2018 Spec Book is expected to be published (electronically) by the end of August 2017. The effective date for the 2018 Spec Book is the January 26, 2018

More information

October Page 1

October Page 1 October 2017 - Page 1 Chapter 2 2018 SPEC BOOK CHANGES The new 2018 Spec Book was published online on August 24, 2017. See the section in the Design Scene Chapter 2 titled 2018 SPEC BOOK for specifics

More information

Page 1 of 7 Contract No.: 0216 OCPW Schedule Of Prices Addendum Date Created 1 07/11/2016 9:28 AM Project Number: SP 055-609-018 Project Title or Road Number: CSAH 9 Mill, Grade, Overlay Work Type: Grading,

More information

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BID TABULATION SUMMARY JOB 940094 PAGE 1 STATE PROJECT NO. 162-080-04 BIDS RECEIVED UNTIL 11:00 A.M. ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BETWEEN 2ND STREET NORTH AND 15 STREET NORTH IN ST.

More information

February Page 1

February Page 1 February 2017 - Page 1 CHAPTER 1 LOCATED ON. This section is revised as shown in the highlight below The description of the project location should reflect the beginning and ending location of the project.

More information

SPECIAL SPECIFICATION 4653 Polypropylene Pipe

SPECIAL SPECIFICATION 4653 Polypropylene Pipe 2004 Specifications CSJ 2158-01-013, Etc. SPECIAL SPECIFICATION 4653 Polypropylene Pipe 1. Description. Furnish and install polypropylene pipe for constructing polypropylene pipe culverts or polypropylene

More information

CHAPTER 3: DETAILS and ADA

CHAPTER 3: DETAILS and ADA CHAPTER 3: DETAILS and ADA ADA PLAN REVIEW CHECKLISTS When there is ADA work in a project the ADA Plan Review Checklists NEED to be filled out and submitted. The ADA Plan Review Checklist #1 Shall be submitted

More information

Appendix J: Storm Conveyance Design Parameters

Appendix J: Storm Conveyance Design Parameters Appendix J: Storm Conveyance Design Parameters Drain Commissioner 39 February 2005 STORM DRAINAGE DESIGN CRITERIA A. STORM SEWERS 1. The required discharge capacity shall be determined by the Rational

More information

FOR HISTORICAL REFERENCE ONLY

FOR HISTORICAL REFERENCE ONLY To: From: Subject: Electronic Distribution Recipients MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 12-01-B-01 February 7, 2012 Jon M. Chiglo, P.E. Division

More information

Section 401. PIPE CULVERTS

Section 401. PIPE CULVERTS 401.02 Section 401. PIPE CULVERTS 401.01. Description. This work consists of constructing pipe culverts of the size and class required, including excavation and backfill. 401.02. Materials. Provide materials

More information

Improvement Plan Cost Estimate

Improvement Plan Cost Estimate Building and Engineering Division Development Services Department 214 S. C Street, Oxnard CA 93030 ph: 805.385.7925 fax 805.385.7854 Improvement Plan Cost Estimate Land Development Permit No. (Tract or

More information

CHAPTER 3: DETAILS and ADA

CHAPTER 3: DETAILS and ADA CHAPTER 3: DETAILS and ADA ADA PLAN REVIEW CHECKLISTS When there is ADA work in a project the ADA Plan Review Checklists NEED to be filled out and submitted. The ADA Plan Review Checklist #1 Shall be submitted

More information

Plan Unit Description

Plan Unit Description CHAPTER 2: QUANTITIES and TABULATIONS 2018 SPEC BOOK The effective date for the 2018 Spec Book is the January 26, 2018 letting. All project documents submitted for the January 26, 2018 letting, or later

More information

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe 2004 Specifications CSJ 0264-07-028 SPECIAL SPECIFICATION 4425 Thermoplastic Pipe 1. Description. Furnish and install thermoplastic pipe for constructing thermoplastic pipe culverts or thermoplastic storm

More information

NOTICE TO BIDDERS ADDENDUM NO. 3. Dated: March 25, 2019 SAP

NOTICE TO BIDDERS ADDENDUM NO. 3. Dated: March 25, 2019 SAP Public Works Department Donald J. Theisen, P.E. Director NOTICE TO BIDDERS Wayne H. Sandberg, P.E. Deputy Director/County Engineer Type of Work: ADDENDUM NO. 3 Dated: March 25, 209 SAP 082-68-022 Removing

More information

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B. EROSION CONTROL GENERAL NOTES EC - 000 EROSION CONTROL GENERAL NOTES EC - 001 INSTALL TEMPORARY DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT EXISTING PAVEMENT OR APPROVED ACCESS POINT OR AS PRACTICABLE

More information

(SIZE) MANHOLES CATCH BASINS AND DITCH INLETS -Item No. ADJUSTING AND REBUILDING MANHOLES, CATCH BASINS AND DITCH INLETS - Item No.

(SIZE) MANHOLES CATCH BASINS AND DITCH INLETS -Item No. ADJUSTING AND REBUILDING MANHOLES, CATCH BASINS AND DITCH INLETS - Item No. (SIZE) MANHOLES CATCH BASINS AND DITCH INLETS -Item No. ADJUSTING AND REBUILDING MANHOLES, CATCH BASINS AND DITCH INLETS - Item No. Special Provision No. 407S06 July 2010 Aggregate Requirements, Lift Rings,

More information

CITY OF CARLSBAD 101 N. HALAGUENO STREET CARLSBAD, NEW MEXICO

CITY OF CARLSBAD 101 N. HALAGUENO STREET CARLSBAD, NEW MEXICO I N D E X O F D R A W I N G S CITY OF CARLSBAD 101 N. HALAGUENO STREET CARLSBAD, NEW MEXICO MARCH 2016 Molzen Corbin Bohannan-Huston Bohannan-Huston PROJECT LOCATION VICINITY MAP 1155 Commerce Dr., Suite

More information

STANDARD SPECIFICATION FOR OIL GRIT SEPARATOR (OGS) STORMWATER QUALITY TREAMENT DEVICE

STANDARD SPECIFICATION FOR OIL GRIT SEPARATOR (OGS) STORMWATER QUALITY TREAMENT DEVICE STANDARD SPECIFICATION FOR OIL GRIT SEPARATOR (OGS) STORMWATER QUALITY TREAMENT DEVICE PART 1 GENERAL 1.1 WORK INCLUDED This section specifies requirements for constructing underground stormwater treatment

More information

19 May Provide profiles for all storm sewer going into the ground with the grading permit showing 5 and 100yr HGLs.

19 May Provide profiles for all storm sewer going into the ground with the grading permit showing 5 and 100yr HGLs. 19 May 2017 City of Thornton Attn: Nate Hatleback 9500 Civic Center Drive Thornton, CO 80229 Re: Initial Review Response to 05/16/17 Letter Dear Mr. Hatleback: This letter is in response to technical comments

More information

TABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (1 OF 2)

TABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (1 OF 2) TABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (1 OF 2) CONTRACT ITEM NO. CONTRACT ITEM UNIT BUCKHORN ROAD UPPER SECTION BUCKHORN ROAD LOWER SECTION PROJECT TOTALS PLAN AS CONST. PLAN AS CONST.

More information

BID TABULATION ( BIDS OPENED MONDAY, APRIL 24, 1:00 P.M. ) CONSTRUCT PARALLEL TAXIWAY - PHASE 3 HABERSHAM COUNTY AIRPORT, CORNELIA, GEORGIA

BID TABULATION ( BIDS OPENED MONDAY, APRIL 24, 1:00 P.M. ) CONSTRUCT PARALLEL TAXIWAY - PHASE 3 HABERSHAM COUNTY AIRPORT, CORNELIA, GEORGIA BASE BID 1 01000 MOBILIZATION 1.00 L. SUM $799,945.96 $799,945.96 $1,150,000.00 $1,150,000.00 2 01510 FIELD ENGINEER'S OFFICE 1.00 L. SUM $40,000.00 $40,000.00 $5,000.00 $5,000.00 3 ALL-1 4 ALL-2 5 MISC-1

More information

Plan Unit Description

Plan Unit Description CHAPTER 2: QUANTITIES and TABULATIONS 2018 SPEC BOOK The effective date for the 2018 Spec Book is the January 26, 2018 letting. All project documents submitted for the January 26, 2018 letting, or later

More information

DESIGN SCENE SUBJECT INDEX

DESIGN SCENE SUBJECT INDEX DESIGN SCENE SUBJECT INDEX CHAPTER 1: () TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY BRIDGE & APPROACH PLANS CONSTRUCTION PLAN FOR EXCEPTIONS EXCEPTION CLARIFICATION GOVERNING SPECIFICATIONS

More information

Amendments to the January 2016 Design Criteria Manual & Supplementary Master Municipal Construction Documents

Amendments to the January 2016 Design Criteria Manual & Supplementary Master Municipal Construction Documents General Figure 2.3.1 16 Revise Revised Figure 2.3.1: New Development Areas where Secondary Suites Apply to include two new areas (#4 and 5). Water 3.3.2 Watermains 31 Add Added wording in Section 3.3.2.3

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation

More information

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? 102.10 Minimum Rate of Wage Scale Typo. Several paragraphs were repeated. 105.5 Inspection of Work Clarified that the contractor

More information

EATON COUNTY DRAIN COMMISSIONER BURNS DRAIN

EATON COUNTY DRAIN COMMISSIONER BURNS DRAIN EATON COUNTY DRAIN COMMISSIONER NOTICE OF LETTING AND DAY OF REVIEW OF APPORTIONMENTS NOTICE OF LETTING DATE: Tuesday, February 21, 2017 TIME: 10:00 a.m. LOCATION: Office of the Eaton County Drain Commissioner

More information

Subject: Use of Plastic Pipe for Storm Sewer and Culverts on Trunk Highways

Subject: Use of Plastic Pipe for Storm Sewer and Culverts on Trunk Highways Minnesota Department of Transportation Engineering Services Division Technical Memorandum No. 17-05-B-02 April 11, 2017 Technical Memorandum To: Electronic Distribution Recipients From: Nancy T. Daubenberger,

More information

CHAPTER 2: QUANTITIES

CHAPTER 2: QUANTITIES CHAPTER 2: QUANTITIES Estimated Quantities The quantities put on the estimate sheet should normally be rounded to the nearest whole number. We should avoid using decimals, if possible. Only in cases of

More information

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form 2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form Project Information (\aen i vake.. F;) N0.3-7114117 Project Name Section 1 - Grading and Erosion Control BMPs Quantity Units Price Earthwork

More information

SHOULDER DETAIL CONCRETE CURB SHOULDER DETAIL ASPHALT CURB SHOULDER DETAIL PAVEMENT JOINT DETAIL PAVEMENT JOINT DETAIL NORMAL SECTION COMMON AND ASPHALT ALTERNATE NOTES ITEM LEGEND EX. ITEM LEGEND CONCRETE

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (6-03) MANUAL: Standard

More information

406 - PIPE SEWERS - MTC FORM 406

406 - PIPE SEWERS - MTC FORM 406 406 - - MTC FORM 406 INDEX 406.1 GENERAL Types of Pipe Pipe Strength, Rigid Pipes Polyethylene Pipe Strength - Rigid or Flexible Pipe Strength and Treatment, Flexible Pipes Selection of Type, Strength

More information

6 STORMWATER IMPROVEMENTS

6 STORMWATER IMPROVEMENTS 6 STORMWATER IMPROVEMENTS 6.01 General Requirements a. In addition to the standards contained in this, the design of stormwater systems is also governed by several ordinances and regulations. (1) Projects

More information

This drawing. is preliminary. and not for. construction or. implementation. purposes. project number 170 END VIEW DESIGN STRENGTHS: PLAN

This drawing. is preliminary. and not for. construction or. implementation. purposes. project number 170 END VIEW DESIGN STRENGTHS: PLAN project number 70 Reference Line 2-0" Reference 3 -" 6-0" 6-0" 3 -" Line Box Culvert Roadway Finished Channel -0" -0" E VIEW 20-0" Riprap 0-0" Riprap Outlet Invert El 87.0 Sta 233+00.00 Inlet Invert El

More information

TYPE "A" CATCH BASIN

TYPE A CATCH BASIN 27" 1.67' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3250-BV OR APPROVED EQUAL. "INFI SHIELD" SEAL OR APPROVED EQUAL RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR). PLASTER OUTSIDE,

More information

CUYAHOGA COUNTY ENGINEER

CUYAHOGA COUNTY ENGINEER CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 May 28, 2010 Revisions to the July 29, 2009 edition are noted

More information

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

COST ESTIMATE STREET IMPROVEMENTS (Off Site)

COST ESTIMATE STREET IMPROVEMENTS (Off Site) STREET IMPROVEMENTS (Off Site) Developer: Planning Case # Engineer: TM No./PM No.: Phone No: Date: ITEM QUANTITY UNIT UNIT COST () AMOUNT 6" Curb and Gutter LF 13. 6" Curb only LF 1.5 8" Curb and Gutter

More information

SPECIAL SPECIFICATION 4xxx Thermoplastic Pipe

SPECIAL SPECIFICATION 4xxx Thermoplastic Pipe 2004 Specifications SPECIAL SPECIFICATION 4xxx Thermoplastic Pipe 1. Description. Furnish and install thermoplastic pipe for constructing thermoplastic pipe culverts or thermoplastic storm sewer mains,

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 01/22/02 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 01/22/02 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : GRADING, BIT MILL & SURFACING, LIGHTING AND UTILITIES CONTRACT LOCATION: LOCATED ON TH 210 FROM 100 FT WEST OF GRAND AVE TO SIXTH STREET IN CARLTON RECOMMENDATION: AWARD

More information

ITEM 706 PIPE SLOPE DRAIN

ITEM 706 PIPE SLOPE DRAIN AFTER NOVEMBER 1, 2008 ITEM 706 PIPE SLOPE DRAIN 706.1 Description. This work shall consist of the installation of temporary erosion protection and sediment control pipe slope drains, utilized during construction

More information

ELLIOTT WAY IMPROVEMENTS

ELLIOTT WAY IMPROVEMENTS OWNER: THE VILLAGE OF CROTON-ON-HUDSON CROTON-ON-HUDSON TOWN HALL 1 VAN WYCK STREET CROTON-ON-HUDSON, NY 1050 ACTING VILLAGE MANAGER: JANINE KING LOCATION MAP SITE * COMMISSIONER OF PUBLIC WORKS: MARCO

More information

CHAPTER 10: PAVING. Refer to page 548 of the 2016 Spec book or page 573 of the 2018 Spec book for material specifications under G.

CHAPTER 10: PAVING. Refer to page 548 of the 2016 Spec book or page 573 of the 2018 Spec book for material specifications under G. CHAPTER 10: PAVING AGGREGATE Aggregate has become more specific on how it is paid for. Therefore, make sure the plan specifies they type of aggregate to use. Spec 2118 Aggregate Surfacing - Aggregate placed

More information

STANDARD SPECIFICATION FOR OIL GRIT SEPARATOR (OGS) STORMWATER QUALITY TREAMENT DEVICE

STANDARD SPECIFICATION FOR OIL GRIT SEPARATOR (OGS) STORMWATER QUALITY TREAMENT DEVICE STANDARD SPECIFICATION FOR OIL GRIT SEPARATOR (OGS) STORMWATER QUALITY TREAMENT DEVICE PART 1 GENERAL 1.1 WORK INCLUDED This section specifies requirements for constructing underground stormwater treatment

More information

BID TABULATION Page 1 of 10. CMES, Inc. (L) E. R. Snell Contractor, Inc. (L) Est. Bid Quantity

BID TABULATION Page 1 of 10. CMES, Inc. (L) E. R. Snell Contractor, Inc. (L) Est. Bid Quantity BID TABULATION Page 1 of 10 CMES, Inc. C. W. Matthews Contracting Co., Inc. E. R. Snell Contractor, Inc. Units Unit Price Total Price Unit Price Total Price Unit Price Total Price 001 Aerial Photograph

More information

Appendix B Sample Plan Notes

Appendix B Sample Plan Notes The Sample plan notes included in this Appendix are the most frequently used. Each note is accompanied by a Designer Note in an attempt to give some guidance as to when the note should be used and how

More information

MINNEHAHA COUNTY HIGHWAY DEPARTMENT CULVERT REPLACEMENT REQUEST FORM

MINNEHAHA COUNTY HIGHWAY DEPARTMENT CULVERT REPLACEMENT REQUEST FORM MINNEHAHA COUNTY HIGHWAY DEPARTMENT CULVERT REPLACEMENT REQUEST FORM Instructions & Background Information (This page to be completed by Township personnel) The purpose of this form is to provide a means

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

Sediment Control Practices

Sediment Control Practices Sediment Control Practices SMP-05 Temporary Diversions, Berms or Ditches Symbol TD Description These temporary drains offer features such as conveyance for runoff down cut or fill slopes, subsurface drains

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 July 29, 2011 Revisions

More information

New Market Township. Driveway/Approach Permit

New Market Township. Driveway/Approach Permit Permit Number Address: New Market Township Driveway/Approach Permit No person may construct or reconstruct any Driveway/Approach to a Township road without first obtaining a permit and the initial approval

More information

Figure Inlet protection (Source: Minnesota DOT)

Figure Inlet protection (Source: Minnesota DOT) 3.9 INLET PROTECTION Figure 3.14. Inlet protection (Source: Minnesota DOT) Overview Description: A manufactured protective device or barrier used to trap sediment at a storm drain surface or curb inlet.

More information

Location Drainage Study

Location Drainage Study Location Drainage Study PROJECT ROUTE: LIMITS: MUNICIPALITY/COUNTY: JOB NUMBER: IL 47 at Burlington Road 750ft NW to 750ft SE of IL 47(Burlington), & 1000ft S to 1000ft N of Burlington (IL47) Kane County

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 November 18, 2013

More information

Hydraulic Updates. History of 603/604

Hydraulic Updates. History of 603/604 Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Hydraulic Updates SS 802 Constructing and Inspecting Pipe Culverts, Sewers, Drains and Drainage Structures AND SS 902 Conduit

More information

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete.

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete. SECTION 02720 STORM DRAINAGE SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-in-place Concrete. 1.02 REFERENCES

More information

Section 403. DRAINAGE STRUCTURES

Section 403. DRAINAGE STRUCTURES 403.01 Section 403. DRAINAGE STRUCTURES 403.01. Description. This work consists of adjusting, constructing, or temporarily lowering drainage structures and cleaning existing drainage structures and leads

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 04/03/17 Comp. Dt: 10/06/17

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 04/03/17 Comp. Dt: 10/06/17 Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 6216-127 Contract ID: Contract Description: Contract Location: Recommendation: 170023 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

BAYFILTER SPECIFICATIONS

BAYFILTER SPECIFICATIONS PART 1.00 GENERAL 1.1 DESCRIPTION BAYFILTER SPECIFICATIONS A. The BayFilter system s internal components manufacturer selected by the Contractor and approved by the Engineer, shall furnish all labor, materials,

More information

SECTION CONSTRUCTION SERVICES

SECTION CONSTRUCTION SERVICES SECTION 01100 CONSTRUCTION SERVICES PART 1 GENERAL 1.01 - Section Includes A. Mobilization. B. Construction Surveys. C. Record Documents. 1.02 Description Of Work A. Mobilization: includes the preparatory

More information

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, April 6, 2018 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 36 CONFIRMATION

More information

SECTION A-A NTS. Figure 4.1 Alternative Flow Dispersal Trench NOTES:

SECTION A-A NTS. Figure 4.1 Alternative Flow Dispersal Trench NOTES: Figure 4.1 Alternative Flow Dispersal Trench NOTES: galvanized bolts 2" x 12" pressure treated grade board 2" x 2" notches 18" O.C. *20% max 12" min. 36" max 1' - 6" min *20% max 4" x 4" support post clean

More information

SECTION UTILITY MANHOLES AND STRUCTURES

SECTION UTILITY MANHOLES AND STRUCTURES SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition

More information

WATER AND DRAINAGE. Drainage Around Walls Water Applications Drainage Structures Water and Drainage Q & A

WATER AND DRAINAGE. Drainage Around Walls Water Applications Drainage Structures Water and Drainage Q & A WATER AND DRAINAGE Drainage Around Walls Water Applications Drainage Structures Water and Drainage Q & A H CONSTRUCTION H-1 W A T E R A N D D R A I N A G E DRAINAGE AROUND WALLS Poor drainage is a leading

More information

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION 601.00 RIPRAP 600.00 GENERAL CONSTRUCTION 601.01 DESCRIPTION. This work shall consist of furnishing and placing riprap protection of the type specified at the locations and in reasonably close conformity

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

SECTION STORM SEWER COLLECTION SYSTEM

SECTION STORM SEWER COLLECTION SYSTEM SECTION 02722 STORM SEWER COLLECTION SYSTEM PART 1 GENERAL 1.01 SUMMARY A. This section addresses the installation of storm sewer collection mains and includes the acceptable products, materials, and construction

More information

6 STORMWATER IMPROVEMENTS

6 STORMWATER IMPROVEMENTS 6 STORMWATER IMPROVEMENTS 6.01 General Requirements a. In addition to the standards contained in this, the design of stormwater systems is also governed by several ordinances and regulations. (1) Projects

More information

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018:

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018: ADDENDUM NO. 3 PROJECT NO. 43805 (PART A & B) PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 PM ON MAY 24, 208: Q#32 Addendum # answered Question #7 indicating that an average depth of 3 feet for the

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL Page 312 VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS-12-01 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the IL ROUTE

More information

A New Municipal Building for Limerick Township

A New Municipal Building for Limerick Township A New Municipal Building for Limerick Township DOCUMENT 00 9001 - ADDENDUM NUMBER 01 December 9, 2016 Re: A New Municipal Building for Limerick Township From: Kelly Clough Bucher & Associates, Inc. 8 East

More information

ADVERTISEMENT SET DECEMBER 2013

ADVERTISEMENT SET DECEMBER 2013 Sheet List Table GREELEY CANAL #2 WCR 21 PROJECT AREA N SH-392 ADVERTISEMENT SET DECEMBER 2013 LINE DESCRIPTION PROPOSED LINE POWER / COMMUNICATIONS EXISTING LINE LINE DESCRIPTION PROPOSED LINE BOUNDARY

More information

SECTION 300 STORM SEWER TABLE OF CONTENTS

SECTION 300 STORM SEWER TABLE OF CONTENTS SECTION 300 STORM SEWER TABLE OF CONTENTS Starts on Page 300 GENERAL... 2 301 MATERIALS... 2 302 CONSTRUCTION PROCEDURES... 5 303 TESTING... 5 304 ABANDONMENT OF EXISTING STORM SEWER FACILITIES... 6 305

More information

STORM DRAINAGE DESIGN MANUAL

STORM DRAINAGE DESIGN MANUAL Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated

More information

1. Division 01 Section General Requirements - Temporary Facilities and Controls. 2. Division 31 Section Earthwork.

1. Division 01 Section General Requirements - Temporary Facilities and Controls. 2. Division 31 Section Earthwork. PAGE 334000-1 SECTION 334000 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection PERMITS & INSPECTIONS 750 17th Street West Vancouver BC V7V 3T3 westvancouver.ca/permits t: 604-925-7040 f: 604-925-7234

More information

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Specification Guidelines: Allan Block Modular Retaining Wall Systems Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's

More information

207 TEMPORARY SEDIMENT AND EROSION CONTROLS

207 TEMPORARY SEDIMENT AND EROSION CONTROLS 2013 Construction and Material Specifications Hydraulics and Environmental Summary Ron Trivisonno, Office of Construction Administration 207 TEMPORARY SEDIMENT AND EROSION CONTROLS This item has been removed

More information

Storm Drainage Structures

Storm Drainage Structures Storm Drainage Structures Tomorrow s Drainage System Today A DIVISION OF ADVANCED DRAINAGE SYSTEMS, INC. ADVANCED DRAINAGE SYSTEMS, INC. The Preferred Solution for Storm Drainage Applications. About Nyloplast-ADS

More information

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Specification Guidelines: Allan Block Modular Retaining Wall Systems Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's

More information

Testing. Test drainage products according to the applicable AASHTO or ASTM specification, except as otherwise noted.

Testing. Test drainage products according to the applicable AASHTO or ASTM specification, except as otherwise noted. 909.01 Section 909. DRAINAGE PRODUCTS 909.01 General Requirements. If only the size and class are specified for a culvert or sewer, use the pipe materials as shown in Table 401-1 and 402-1 respectively.

More information

Appendix K: Soil Erosion and Sedimentation Control Plan Check List

Appendix K: Soil Erosion and Sedimentation Control Plan Check List Appendix K: Soil Erosion and Sedimentation Control Plan Check List Drain Commissioner 46 February 2005 SOIL EROSION AND SEDIMENTATION CONTROL PLAN CHECK LIST Items listed below must be clearly depicted

More information

50.20 Drainage Structure Design

50.20 Drainage Structure Design 50.20 Drainage Structure Design All drainage structures, with the exception of bridges, culvert bridges and, in some cases, culverts, shall be designed for HS20-44 loading. Refer to Section 50.22 for design

More information

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM SECTION 32 32 23 SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM PART 1: GENERAL 1.01 Scope Work includes furnishing all materials, labor, equipment, and supervision to install a Stonebridge segmental

More information

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

ENGINEERING REVIEW CHECKLIST City of Mount Clemens (To be completed by the Developer s & Submitted with ing Plans) DATE: PROJECT NAME: Site Plan Approved: Date DESIGN ENGINEERING COMPANY: ing Company Contact Information: Name: Phone: Email: Owner Contact

More information

SECTION 500 STORM DRAINAGE

SECTION 500 STORM DRAINAGE SECTION 500 STORM DRAINAGE 501 Design A. General B. Location C. Easements D. Depth of Cover 502 Materials Storm Drainage Pipe A. General B. Reinforced Concrete Pipe (RCP) C. Corrugated Polypropylene Pipe

More information

cc: K. Sandefur B. Greene TO: Mark Hite, P.E. R. Powell Division of Structural Design P. Sanders FROM: Bart Asher, P.E. V.

cc: K. Sandefur B. Greene TO: Mark Hite, P.E. R. Powell Division of Structural Design P. Sanders FROM: Bart Asher, P.E. V. M E M O R A N D U M (SA-007-2011) cc: K. Sandefur B. Greene TO: Mark Hite, P.E. R. Powell Division of Structural Design J. Moore P. Sanders FROM: Bart Asher, P.E. V. Forsythe TEBM, Geotechnical Branch

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 33 40 00 Storm Drainage 1. Introduction A. Duke University is divided into the main areas of the Medical Center, West Campus, Central Campus, and East Campus. The University also includes the Washington

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/05/17 Comp. Dt: 08/20/20

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/05/17 Comp. Dt: 08/20/20 Letting: 17030800 Letting Dt: March 08, 2017 9:30 A.M. State Proj.: 2515-21 Contract ID: Contract Description: Contract Location: Recommendation: 170019 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

FOR CRITICAL AREAS ADJACENT TO WETLANDS OR BELOW LONG AND/OR STEEP SLOPES, STEEL POSTS ARE NECESSARY AS INDICATED ON THE PLANS.

FOR CRITICAL AREAS ADJACENT TO WETLANDS OR BELOW LONG AND/OR STEEP SLOPES, STEEL POSTS ARE NECESSARY AS INDICATED ON THE PLANS. WOOD OR STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. STEEL POSTS: POST NOTCHES TO FACE AWAY FROM FABRIC. WOOD POSTS: ATTACH FABRIC TO POSTS WITH WOOD LATH A MINIMUM 1/4" THICK x 9" LONG

More information

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows. 403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage

More information

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1 TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SECTION TITLE PAGE 105.1. SPECIFICATIONS AND SCOPE 105.1 105.2. METHODS OF ANALYSIS 105.1 105.2.1. Rational Method

More information

CITY OF DELRAY BEACH LAKE IDA DRAINAGE IMPROVEMENTS

CITY OF DELRAY BEACH LAKE IDA DRAINAGE IMPROVEMENTS LAKE IDA DRAINAGE IMPROVEMENTS = LIMITS OF PROJECT AREA 1760G01.DWG SURVEY LEGEND: SURVEY SYMBOL LEGEND: PLAT LEGEND: STATEMENT OF PURPOSE: SURVEY TREE LEGEND: SITE BENCHMARKS: SURVEY PREPARED BY: DENNIS

More information