LAND OFF PENRHOS ROAD, BANGOR REDROW HOMES NORTH WEST METHOD STATEMENT FOR PROTECTION OF TREES DURING DEVELOPMENT. tba. landscape architects

Size: px
Start display at page:

Download "LAND OFF PENRHOS ROAD, BANGOR REDROW HOMES NORTH WEST METHOD STATEMENT FOR PROTECTION OF TREES DURING DEVELOPMENT. tba. landscape architects"

Transcription

1 LAND OFF PENRHOS ROAD, BANGOR REDROW HOMES NORTH WEST METHOD STATEMENT FOR PROTECTION OF TREES DURING DEVELOPMENT tba landscape architects Landscape Architecture Urban Design Environmental Planning 1 st Floor, Building 2 The Wharf Business Centre Ashton-under-Lyne Lancashire OL6 7PB Tel: Fax: info@trevorbridge.co.uk Copyright reserved Trevor Bridge Associates Limited 2013 The contents of this document must not be copied in whole or in part without the written consent of Trevor Bridge Associates Limited May 2013Ref: DG/4266/MethodStatement

2 1.0 INTRODUCTION 1.1 This Method Statement has been prepared by Trevor Bridge Associates Ltd (TBA) on behalf of Redrow Homes North West, in relation to a proposed housing development at land off Penrhos Road, Bangor. 1.2 It has been prepared to ensure that the existing trees and shrubs are properly protected throughout the development of the site and continue to represent a visual amenity in the future. It instructs all contractors on methods to avoid damage to the trees. 1.3 The Method Statement recommends all development within influencing distance of trees is carried out in accordance with BS5837:2012 Trees in relation to design, demolition and construction - Recommendations. Any development affecting trees must be supervised by an arboricultural consultant. 1.4 The Method Statement outlines the protection of trees prior to the main construction work of the dwellings. This will be undertaken sequentially A) Installation of protective fence B) Main construction works C) Cycleway construction D) Removal of protective fence 2.0 GUIDELINES FOR FILLING IN THE METHOD STATEMENT 2.1 The developer should enforce the methods of protection identified within the statement. All contractors must also agree to them. Any failure to comply with them must be dealt with by the developer e.g. disciplinary action against operatives seen within the protected area. 2.2 The people listed are those with a responsibility for tree protection on the site and from the Local Planning Authority. The relevant people should be contacted in the event of a problem. 3.0 AGREEMENT TO PROTECT TREES 3.1 The developer has agreed to undertake tree protection to the standard advised in the Method Statement. Every contractor on site must receive a copy of the statement and abide by its contents. 4.0 DRAWINGS 4.1 This Method Statement should be read in conjunction with the Tree Survey Reports, The Arboricultural Impact Assessment and the detail TBA98 Protective Barrier.

3 5.0 ROLES AND CONTACT DETAILS Position Name Address Telephone No. Designer/ Contractor Site Manager Neil Arkwright Redrow Homes North West. To be confirmed Redrow House St Davids Park Ewloe Flintshire CH5 3RX Landscape Architect / Arboriculturist Arboricultural Contractor David Griffin / Dan Farnworth To be confirmed TBA Ltd 1 st Floor, Building 2 Wharf Business Centre Lower Wharf St. Ashton under Lyne OL6 7PB Local Authority Tree Officer Adam Daniel Gwynedd Council Caernarfon Gwynedd LL55 1SH

4 6.0 SPECIFICATION FOR PROTECTION TO EXISTING TREES: FENCING AND GENERAL 6.1 The position and acceptability of the protective fencing must be agreed with the local authority prior to site works commencing and shall generally be set at the extent of the root protection areas (RPA) unless agreed otherwise. Fencing must accord with the general requirements of section 6.2 of BS Signs shall be attached to the fencing stating Construction Exclusion Zone No Access. 6.2 Under no circumstances must any materials be stored under the canopy of existing trees, and no cement, diesel or oil stored near to them. 6.3 No fires should be lit within, or near to, the canopy of existing trees. 6.4 No ropes, cables, services, or notice boards shall be fixed to existing trees. 6.5 The levels around existing trees must be neither raised nor reduced. 6.6 Where working space is limited temporary ground protection may be considered appropriate as described in section 6.2 of BS This is only acceptable with prior consent, in writing, from the local authority. 6.7 Under no circumstances must vehicles, plant or machinery enter the Root Protection Areas (RPA)

5 7.0 SPECIFICATION FOR HARD SURFACED AREA CONSTRUCTION WITHIN TREE ROOTING ZONES (CELLWEB / NEOWEB). 7.1 The work as detailed within this Method Statement shall be carried out under the supervision of the Arboriculturist with progress reports issued to the LPA. Full liaison between all parties, comprising the contractor, sub-contractors, the Arboriculturist and the Landscape Architect together with the issuing of progress reports to the LPA, will be undertaken at all stages of the work. 7.2 All excavation works for the purposes of constructing new hard surfaced areas (cycle path) will be undertaken in accordance with section 7.4 of BS No machinery or powered tools are to be used at any stage of excavation works, unless agreed with the local authority. 7.4 Vegetation and small shrubs will be removed by hand there must be no skimming of the soil. 7.5 All construction work shall be undertaken by hand. 7.6 A permeable geotextile membrane (Terram or similar approved) shall be laid over the rooting layer, allowing 300mm overlap on all edges. 7.7 Neoweb or Cellweb 100 shall be laid over the membrane, in accordance with the manufacturer s specification. The infill material shall be lime free, no fines, crushed stone. 7.8 MOT type one or other, locally won, approved stone shall be laid in accordance with the Sustrans Specification over the Neoweb or Cellweb 100. The edge restraint shall be Exceledge Brickedge with galvanized driven stakes or timber edgings, 38mm x 150mm boards, and fixed with 75 x 75 x 750mm posts. 7.9 Levels under the tree canopy shall not be raised. Only the edge restraint shall be blinded over with soil and seeded as required.

6 8.2 OTHER ARBORICULTURAL WORKS 8.2 All site personnel shall be equipped with and make use of personal protective equipment in accordance with current Health and Safety Procedures. 8.2 The carrying out of all arboricultural operations and use of equipment shall be in accordance with BS Recommendations for Tree Works and current Health and Safety Executive and industry codes of practice. 8.3 Damage to retained trees and hedges will not be permitted and if any contractor considers that existing retained vegetation is at risk he shall stop work and inform the supervising Arboriculturist

7 9.0 ORDER OF WORKS (tick if relevant) Works to be Undertaken 1 Method statement received and approved by Local Planning Authority Date Approved Actions By Developer 2 Protective fencing erected Contractor 3 Confirm the fencing is acceptable LPA Arb Officer 4 Development begins Developer 5 Fence monitored and repaired if necessary Contractor 6 Meetings to confirm the site is acceptable, as necessary 7 Relocation of protective fence to allow construction of cycle path Site Manager/ LPA Arb Officer Developer 8 Confirm the relocated protective fences are acceptable LPA Arb Officer 9 Remove protective fencing Contractor 10 Undertake possible remedial pruning. 11 Experts present where problems exist or where special protection measures are required 12 All special protection features supervised by Landscape Architect Arboricultural Contractor LPA Officer/ LPA Arb Officer Landscape Architect

8 10.0 SITE MONITORING 10.1 This is to be undertaken at the following set intervals, where relevant: Erection of protective fence Relocation of protective fence Cycle path construction Date Comments Developer LPA Officer

9 APPENDIX ONE DETAILS TBA98

Site Guidance Note 12: Landscaping in root protection areas

Site Guidance Note 12: Landscaping in root protection areas TREE Site Guidance Note 12: Landscaping in root protection areas This document is only a summary of its subject matter. You should not rely on this general guidance in isolation, and you should always

More information

APPLICATIONS AND NOTICES FOR TREE WORKS - GUIDANCE NOTES

APPLICATIONS AND NOTICES FOR TREE WORKS - GUIDANCE NOTES APPLICATIONS AND NOTICES FOR TREE WORKS - GUIDANCE NOTES When to use this form - You will normally need to contact your local planning authority (LPA) before any work can be carried out on protected trees.

More information

TENDER No. N706/13 ATTACHMENT 15 LANDSCAPE MANAGEMENT PROTECTION PLAN. L-1028 Cover L L L L L L

TENDER No. N706/13 ATTACHMENT 15 LANDSCAPE MANAGEMENT PROTECTION PLAN. L-1028 Cover L L L L L L RFT N706/13 11kV Feeders, Trenching, Directional oring & Conduiting TENDER No. N706/13 ATTACHMENT 15 PROTECTION PLAN Cover 120 121 122 123 124 125 Feeder Installation: Dairy Rd & Newcastle St, Fyshwick

More information

Tree Management Plan

Tree Management Plan Tree Management Plan Project: Parnell Prepared For: By: Newmarket Level Crossing Cowie Street, Opus International Consultants Matthew Paul Date: 4/09/17 1 Contents 1.0 Scope of Tree Management Plan 2 2.0

More information

North York Moors National Park Authority. Director of Planning s Recommendation

North York Moors National Park Authority. Director of Planning s Recommendation 18 June 2015 List Number 6 North York Moors National Park Authority Scarborough Borough Council (South) Parish: Hackness App Num. NYM/2015/0209/FL Proposal: Location: Applicant: Agent: conversion of barn

More information

Notification of Proposed Works to Trees in Conservation Areas (CA)

Notification of Proposed Works to Trees in Conservation Areas (CA) Application for Tree Works: Works to Trees Subject to a Tree Preservation Order (TPO) Town and Country Planning Act 1990 and/or Notification of Proposed Works to Trees in Conservation Areas (CA) Town and

More information

Electronic Communication

Electronic Communication Application for Tree Works: Works to Trees Subject to a Tree Preservation Order (TPO) and/or Notification of Proposed Works to Trees in Conservation Areas (CA) Town and Country Planning Act 1990 Electronic

More information

IM Properties. Blythe Valley Park, Plot F5. Tree Protection Plan and Arboricultural Method Statement

IM Properties. Blythe Valley Park, Plot F5. Tree Protection Plan and Arboricultural Method Statement IM Properties Blythe Valley Park, Plot F5 Tree Protection Plan and Arboricultural Method Statement March 2017 FPCR Environment and Design Ltd Registered Office: Lockington Hall, Lockington, Derby DE74

More information

Main Campus Urban Forest and Landscape Management Policy

Main Campus Urban Forest and Landscape Management Policy Main Campus Urban Forest and Landscape Management Policy Policy Statement: Clemson University is committed to providing a safe, attractive, educational and sustainable campus urban forest that faculty,

More information

CHESHIRE EAST COUNCIL. Highways Service. Abridged Conditions, Requirements and Specification of Workmanship and Materials for the Construction of

CHESHIRE EAST COUNCIL. Highways Service. Abridged Conditions, Requirements and Specification of Workmanship and Materials for the Construction of !"#$!%& '( )*& CHESHIRE EAST COUNCIL Highways Service Abridged Conditions, Requirements and Specification of Workmanship and Materials for the Construction of Highways Act 1980: Section 184. C O N T E

More information

Tree Protection Policy

Tree Protection Policy Appendix F Tree Protection Policy The following is according to the City of Hamilton s special provision SP-97. General Tree Protection shall be in accordance with OPSS 801 as amended by this special provision.

More information

Enabling Works Fox Primary School, Kensignton, London. Presentation for Drop-in Session for Fox Primary School Staff & Parents

Enabling Works Fox Primary School, Kensignton, London. Presentation for Drop-in Session for Fox Primary School Staff & Parents Enabling Works Fox Primary School, Kensignton, London Presentation for Drop-in Session for Fox Primary School Staff & Parents Presentation Contents 1. Who s Who 2. Where are the works to be undertaken

More information

DIEMERSFONTEIN WINE & COUNTRY ESTATE BUILDING CONTRACTORS CODE OF CONDUCT

DIEMERSFONTEIN WINE & COUNTRY ESTATE BUILDING CONTRACTORS CODE OF CONDUCT DIEMERSFONTEIN WINE & COUNTRY ESTATE BUILDING CONTRACTORS CODE OF CONDUCT 1. CODE OF CONDUCT AGREEMENT The building contractor is a builder/contractor ( the contractor ) appointed by the owner ( the employer

More information

Arborist Report & Tree Preservation Plan. 231 Cobourg Street Ottawa, ON K1N 8J2

Arborist Report & Tree Preservation Plan. 231 Cobourg Street Ottawa, ON K1N 8J2 Arborist Report & Tree Preservation Plan 231 Cobourg Street Ottawa, ON K1N 8J2 Prepared for: Mr. Judah Mulalu Ten 2 Four Architecture Inc. 55 Eglinton Avenue East, Suite 606C Toronto, ON. M4P 1G8 Judah@ten24architecture.com

More information

C D M R e g u l a t i o n s

C D M R e g u l a t i o n s C D M R e g u l a t i o n s 2 0 1 5 CDM Consultancy - Support for Client - Principal Designer - Principal Contractor c l a r i t y t h r o u g h s i m p l i c i t y Reducing the risk to health and safety

More information

CITY OF NAPERVILLE, ILLINOIS TREE REMOVAL PERMIT APPLICATION LOCATION: PROJECT CONTACT: VARIETY NUMBER SIZE CONDITION

CITY OF NAPERVILLE, ILLINOIS TREE REMOVAL PERMIT APPLICATION LOCATION: PROJECT CONTACT: VARIETY NUMBER SIZE CONDITION CITY OF NAPERVILLE, ILLINOIS TREE REMOVAL PERMIT APPLICATION NAME ADDRESS _ CITY ZIP PHONE Residence Business Fax Please indicate all trees to be removed: DATE PROJECT: LOCATION: PROJECT CONTACT: VARIETY

More information

Arboricultural Assessment

Arboricultural Assessment 1 Arboricultural Assessment Site Address: Prepared for: Purpose of Report: 285G Manawaora Road, Russell Owen Burn Green Group cc: Peter Thornton Assessment of the Proposed Jetty Construction, Waipohutukawa

More information

Landscaping and Fencing

Landscaping and Fencing Landscaping and Fencing Fences, driveways, paving, retaining walls, landscaping & other garden features To be read in conjunction with General Requirements: A guide to building on properties containing

More information

APPENDIX A: AT: CRICKLEWOOD SIDINGS, LAND REAR OF BRENT TERRACE (SOUTH) CRICKLEWOOD LONDON NW2 1BX DRAFT PLANNING CONDITIONS

APPENDIX A: AT: CRICKLEWOOD SIDINGS, LAND REAR OF BRENT TERRACE (SOUTH) CRICKLEWOOD LONDON NW2 1BX DRAFT PLANNING CONDITIONS APPENDIX A: THE CONSTRUCTION OF A COMPOUND FOR USE BY RAILWAY STAFF AND TRAIN DRIVERS, INCLUDING THE ERECTION OF A TWO STOREY OFFICE AND WELFARE BLOCK WITH ASSOCIATED YARDS, SITE LEVELLING, EXTERNAL LIGHTING,

More information

Electronic Communication. 1/2. Applicant s And Agent s Names And Addresses. 3. Tree Location. 4. Tree Ownership

Electronic Communication. 1/2. Applicant s And Agent s Names And Addresses. 3. Tree Location. 4. Tree Ownership Application for Tree Works: Works to Trees Subject to a Tree Preservation Order (TPO) and/or Notification of Proposed Works to Trees in Conservation Areas (CA) Town and Country Planning Act 1990 Electronic

More information

Tree Survey Report to BS5837:2012

Tree Survey Report to BS5837:2012 Tree Survey Report to BS5837:2012 Proposed Development at Papplewick Pumping Station, Nottingham March 2013 Revision A - 13.03.13 Prepared by A2063 Encon Associates Limited Kestrel Business Centre Colwick

More information

E16. Trees in open space zones

E16. Trees in open space zones E16. Trees in open space zones E16.1. Background Trees in the open space zones are an important public asset and need to be managed appropriately. As urban areas intensify, open space zones will be relied

More information

TREE PROTECTION/PRESERVATION POLICY

TREE PROTECTION/PRESERVATION POLICY TREE PROTECTION/PRESERVATION POLICY THE CORPORATION OF THE TOWN OF AURORA PARKS AND RECREATION SERVICES 100 John West Way, Aurora, Ontario, L4G-6J1 T.905-727-3123 F.905-727-3903 www.aurora.ca JUNE 2015

More information

Architecture Compliance Guidelines Dunlop Farms Association, Inc.

Architecture Compliance Guidelines Dunlop Farms Association, Inc. Architecture Compliance Guidelines Dunlop Farms Association, Inc. Mission The mission of the Architecture Committee of the Dunlop Farms Association, Inc. is to promote a superior living environment of

More information

surfacing in root protection areas Site Guidance Note 9: Installing/upgrading surfacing in root protection areas

surfacing in root protection areas Site Guidance Note 9: Installing/upgrading surfacing in root protection areas TREE Site Guidance Note 9: Installing/upgrading surfacing in root protection areas This document is only a summary of its subject matter. You should not rely on this general guidance in isolation, and

More information

Developer Services. Building over or near a sewer. DEV 005G Guidance notes and procedure. What is a public sewer?

Developer Services. Building over or near a sewer. DEV 005G Guidance notes and procedure. What is a public sewer? Developer Services DEV 005G Guidance notes and procedure Building over or near a sewer If you are thinking of building a structure (for example, a new building, extension, conservatory, garage etc.) you

More information

REFERENCE: TPF/00399/15 Received: 10 July 2015 WARD: Childs Hill Expiry: 4 September 2015 CONSERVATION AREA None

REFERENCE: TPF/00399/15 Received: 10 July 2015 WARD: Childs Hill Expiry: 4 September 2015 CONSERVATION AREA None LOCATION: 1 Eden Close, London NW3 7UL REFERENCE: TPF/00399/15 Received: 10 July 2015 WARD: Childs Hill Expiry: 4 September 2015 CONSERVATION AREA None APPLICANT: AGENT: PROPOSAL: Mr S Katz Bartlett Tree

More information

Corporate Policy and Procedure

Corporate Policy and Procedure Corporate Policy and Procedure POLICY CATEGORY AUTHORITY RELATED POLICIES APPROVED BY Safety Management When Outside Contractors are Retained (Contractor Safety Management Program) (the Policy ) Health

More information

APPLICATION GUIDANCE NOTES

APPLICATION GUIDANCE NOTES APPLICATION FOR A RELAXATION OF BYELAW 10 (for any development including buildings, walls, driveways, hardstanding, land tile outfalls, services, trees, fences and landscaping across, into or within 9

More information

PLANNING DECISION NOTICE

PLANNING DECISION NOTICE ] SPACEukONE Limited C/O Kember Loudon Williams LLP F.A.O. Martin Hull Ridgers Barn, Bunny Lane Eridge Tunbridge Wells Kent TN3 9HA 13 October 2017 PLANNING DECISION NOTICE APPLICANT: DEVELOPMENT TYPE:

More information

Architectural Review Board Application Information & Criteria

Architectural Review Board Application Information & Criteria DALTON FARM HOMEOWNERS ASSOCIATION C/O J & J Management Services, LLC 1961 Route 6 Carmel, NY 10512 (914) 646-5108 ext. 103 Fax (914) 610-4755 Email: lcarola@jjmanagementservices.com Architectural Review

More information

TREE PRESERVATION SUMMARY

TREE PRESERVATION SUMMARY Froggers Creek Tree Consultants Ltd. 7763 McGregor Avenue Burnaby BC, V5J4H4 Telephone: 604-721-6002 glenn_murray@shaw.ca City of Vancouver May 19, 2016 Community Services 453 W. 12th Avenue Vancouver,

More information

Manningham Works Code of Practice

Manningham Works Code of Practice Manningham Works Code of Practice June 2017 Manningham City Council 699 Doncaster Road (PO Box 1) Doncaster Vic 3108 t 9840 9333 f 9848 3110 e manningham@manningham.vic.gov.au www.manningham.vic.gov.au

More information

RPC Contracts is committed to innovative product development and manufacture. T o help you obtain maximum enjoyment and long service from any RPC

RPC Contracts is committed to innovative product development and manufacture. T o help you obtain maximum enjoyment and long service from any RPC RPC Contracts is committed to innovative product development and manufacture. T o help you obtain maximum enjoyment and long service from any RPC Contracts product, we would be pleased to make you aware

More information

Building Guidelines. No development is to be commenced on any lot without the plans having been approved in writing as set out above.

Building Guidelines. No development is to be commenced on any lot without the plans having been approved in writing as set out above. Building Guidelines INTRODUCTION In order to encourage the attainment of a consistent building standard and to encourage home design excellence at Lakeside Success Private Estate, these Building Guidelines

More information

Practice Notes For Construction Managers PNCM 7: Timber Formwork First Issue, January 2006

Practice Notes For Construction Managers PNCM 7: Timber Formwork First Issue, January 2006 Practice Notes For Construction Managers PNCM 7: Timber Formwork First Issue, January 2006 (Index under: Temporary Works) Contents Page 1. Scope of this Practice Note...1 2. Statutory Ordinance, Regulations

More information

17th OCTOBER 2017 PLANNING COMMITTEE. 5e 17/0877 Reg d: Expires: Ward: c. Number of Weeks on Cttee Day:

17th OCTOBER 2017 PLANNING COMMITTEE. 5e 17/0877 Reg d: Expires: Ward: c. Number of Weeks on Cttee Day: 5e 17/0877 Reg d: 08.03.2016 Expires: 26.09.17 Ward: c Nei. Con. Exp: 01.09.17 BVPI Target Number of Weeks on Cttee Day: 11/8 On Target? Yes LOCATION: PROPOSAL: TYPE: Buckinghams, Albert House, Albert

More information

#2 Report replaces report #1 Revised plans received March 25, 2009 Report completed April 15, 2009

#2 Report replaces report #1 Revised plans received March 25, 2009 Report completed April 15, 2009 Community Development Department City of Saratoga 13777 Fruitvale Avenue Saratoga, California 95070 ARBORIST REPORT It is the responsibility of the owner, architect and contractor to be familiar with the

More information

REFERENCE: TPF/00310/15 Received: 2 June 2015 WARD: Childs Hill Expiry: 28 July 2015 CONSERVATION AREA None

REFERENCE: TPF/00310/15 Received: 2 June 2015 WARD: Childs Hill Expiry: 28 July 2015 CONSERVATION AREA None LOCATION: 1 Eden Close, London NW3 7UL REFERENCE: TPF/00310/15 Received: 2 June 2015 WARD: Childs Hill Expiry: 28 July 2015 CONSERVATION AREA None APPLICANT: AGENT: PROPOSAL: Stuart Mr Alex Mcgauley 1

More information

Requirements for Measuring and Pricing of Site Clearance

Requirements for Measuring and Pricing of Site Clearance Requirements for Measuring and Pricing of Site Clearance October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing and

More information

Muhlenberg College Tree Plan

Muhlenberg College Tree Plan Muhlenberg College Tree Plan 2014 1) Purpose: The purpose of the Muhlenberg College Tree Care Plan is to identify the policies, procedures, and practices that are to be used in establishing, protecting,

More information

Tree Preservation and Protection (Effective May 1, 2003)

Tree Preservation and Protection (Effective May 1, 2003) Tree Preservation and Protection (Effective May 1, 2003) Village of Northfield 361 Happ Road Northfield, IL 60093 Phone: (847) 446-9200 Fax: (847) 446-4670 Section 10-13. Tree Preservation and Protection.

More information

Stage 6. Annexure 3. October 2015 Development Conditions and Building Guidelines

Stage 6. Annexure 3. October 2015 Development Conditions and Building Guidelines Stage 6 Annexure 3 October 2015 Development Conditions and Building Guidelines INTRODUCTION In order to encourage the attainment of a consistent building standard and to encourage home design excellence

More information

Tree Protection and Development. Colin Hawke, Principal Forestry Officer Simon Proctor, Forestry Officer

Tree Protection and Development. Colin Hawke, Principal Forestry Officer Simon Proctor, Forestry Officer Tree Protection and Development Colin Hawke, Principal Forestry Officer Simon Proctor, Forestry Officer Trees and Development Legal duty to consider trees Principal Tree Officer considerations: Amenity

More information

Design Guidelines. 1. INTRODUCTION 2. SECTION SPECIFICATIONS 3. HOUSE DESIGN RULES

Design Guidelines. 1. INTRODUCTION 2. SECTION SPECIFICATIONS 3. HOUSE DESIGN RULES Design Guidelines. 1. INTRODUCTION Waimakariri District Council (WDC) and Ravenswood Developments Ltd (Ravenswood) have in place a number of rules and covenants that effect the development of sections

More information

Application Number: 12/00858/FUL Other Change of use from agricultural barn to dwelling

Application Number: 12/00858/FUL Other Change of use from agricultural barn to dwelling APP 01 Application Number: 12/00858/FUL Other Change of use from agricultural barn to dwelling AT Barn In The Shoulder of Mutton Field, Gun Lane, Sherington FOR Mr Bernard Soul Target: 21st June 2012 Ward:

More information

CHAPTER 7: TREE PROTECTION DURING CONSTRUCTION 7.1 TREE PROTECTION AREAS

CHAPTER 7: TREE PROTECTION DURING CONSTRUCTION 7.1 TREE PROTECTION AREAS CHAPTER 7: TREE PROTECTION DURING CONSTRUCTION Urban trees need to be protected from damage to maximize their health, safety, benefits and functionality. Mature, young and newly transplanted trees need

More information

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5B Access Tracks, Hardstanding Areas, Electrical Compounds, Borrow Pit And Cable Laying Construction Method Statement Copyright ESB International

More information

Meyer, Meyer, LaCroix & Hixson

Meyer, Meyer, LaCroix & Hixson NORTH BOLTON AVENUE (LA. HIGHWAY 1) NORTH BOUND LANE NOTICE! 1. NEITHER THE ENGINEER NOR THE OWNER WARRANTS OR GUARANTEES THE PLANS TO BE COMPLETE OR ACCURATE WITH RESPECT TO THE LOCATION OR EXISTENCE

More information

European Tree Technician

European Tree Technician European Tree Technician 1. Definition A European Tree Technician is defined as a person employed in, or aspiring to, junior or middle management, or taking a supervisory role in arboriculture. European

More information

CONSTRUCTION SPECIFICATION

CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C212 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C212 ISSUE: NO:3 July 2018 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL... 2 C212.01

More information

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements. SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction

More information

Arboricultural Impact Assessment

Arboricultural Impact Assessment Planning Application for the Aylesbury Estate Regeneration Plot 18 Reserved Matters Application Arboricultural Impact Assessment Tamla Trees v1 BS5837 Arboricultural Impact Assessment Aylesbury Estate,

More information

NATIONAL BUILDING REGULATIONS AND BUILDING STANDARDS ACT, 1977 (Act No. 103 of 1977)

NATIONAL BUILDING REGULATIONS AND BUILDING STANDARDS ACT, 1977 (Act No. 103 of 1977) FORM 1 To: NATIONAL BUILDING REGULATIONS AND BUILDING STANDARDS ACT, 1977 (Act No. 103 of 1977) DECLARATION BY PERSON RESPONSIBLE FOR PREPARING AN APPLICATION FOR APPROVAL OF THE ERECTION OF THE BUILDING

More information

National Highways Sector Schemes for Quality Management in Highway Works

National Highways Sector Schemes for Quality Management in Highway Works National Highways Sector Schemes for Quality Management in Highway Works SCHEME 0 GUIDE TO THE IDENTIFICATION, DEVELOPMENT, MANAGEMENT AND CERTIFICATION OF NATIONAL HIGHWAY SECTOR SCHEMES PART 1 INTRODUCTION

More information

Installation Information 2016

Installation Information 2016 Installation Information 2016 DENDRO-SCOTT Root Barrier... why use anything else? DENDRO-SCOTT Root Barrier, recognised by the Environment Agency, is known for its quality and reliability. It is flexible

More information

ARCHITECTUS FEBRUARY 2010

ARCHITECTUS FEBRUARY 2010 ARCHITECTUS PEDESTRIAN AND TRAFFIC MANAGEMENT PLAN FOR DEMOLITION, EXCAVATION AND CONSTRUCTION OF COLLEGE OF FINE ARTS CAMPUS, PADDINGTON FEBRUARY 2010 COLSTON BUDD HUNT & KAFES PTY LTD ACN 002 334 296

More information

Outline Construction and Environmental Management Plan

Outline Construction and Environmental Management Plan 1.1.1 Gwent Farmers Community Solar Scheme January 2018 Outline Construction and Environmental Management Plan www.savills.co.uk Project: Client: Gwent Levels Community Solar Scheme Partnership Ltd Job

More information

Demolition Permit Application

Demolition Permit Application Demolition Permit Application 2012 Michigan Building Code 2015 Michigan Residential Code City of Jackson 161 W. Michigan Avenue Jackson, MI 49201 (517) 788-4012 www.cityofjackson.org Project Information

More information

Plan Review Application Form

Plan Review Application Form Plan Review Application Form Application date: Date of ARC Meeting: Type of Review: (circle one) Concept Plan / Schematic Plan / Design Plan / Construction Plan / Modification / Miscellaneous 1. Application

More information

SUBCHAPTER TREE PRESERVATION AND PROTECTION

SUBCHAPTER TREE PRESERVATION AND PROTECTION SUBCHAPTER 153.165 TREE PRESERVATION AND PROTECTION Section Contents: 153.165.010 Purpose and Intent 153.165.020 Applicability 153.165.030 Tree Advisory Board Establishment and Responsibilities 153.165.040

More information

RECOMMENDED Outline Application - Approval recommended. That Planning Permission be granted subject to completing a S106 agreement the following:

RECOMMENDED Outline Application - Approval recommended. That Planning Permission be granted subject to completing a S106 agreement the following: Item No. 10 APPLICATION NUMBER CB/16/03885/OUT LOCATION Land at East Lodge, Hitchin Road, Stotfold, Hitchin, SG5 4AA PROPOSAL Outline Application: 18 No. 2 storey family houses on area of open land, former

More information

TOWN OF ATHERTON. Tree Preservation Guidelines. Standards and Specifications

TOWN OF ATHERTON. Tree Preservation Guidelines. Standards and Specifications TOWN OF ATHERTON Tree Preservation Guidelines Standards and Specifications February 2004 TOWN OF ATHERTON TREE PRESERVATION GUIDELINES STANDARDS AND SPECIFICATIONS SECTION 1.00 DEFINITIONS For the purpose

More information

ANNEXURE 3. CASSIA GLADES Stage 2A DEVELOPMENT CONDITIONS AND BUILDING GUIDELINES LOT

ANNEXURE 3. CASSIA GLADES Stage 2A DEVELOPMENT CONDITIONS AND BUILDING GUIDELINES LOT ANNEXURE 3 CASSIA GLADES Stage 2A DEVELOPMENT CONDITIONS AND BUILDING GUIDELINES LOT The Buyer acknowledges and agrees with the Seller that: 1. Introduction In order to encourage the attainment of a consistent

More information

ULDA Decision Notice

ULDA Decision Notice ULDA Decision Notice Site Address Bowen St, Roma Real property description Lot 142 SP250497 Type of approval UDA development approval subject to conditions Aspects of development Reconfiguring a Lot with

More information

BENTLETTS FARM SCRAPYARD, CLAYGATE ROAD, COLLIER STREET

BENTLETTS FARM SCRAPYARD, CLAYGATE ROAD, COLLIER STREET BENTLETTS FARM SCRAPYARD, CLAYGATE ROAD, COLLIER STREET TREE SURVEY ISSUE 1 SEPTEMBER 2014 Landscape Architects Ecology & Environment Masterplanning Arboriculture Historic Landscapes ISSUE NO. AUTHOR CHECKED

More information

Commencement Date. This section applies to all land under Newcastle Local Environmental Plan 2012.

Commencement Date. This section applies to all land under Newcastle Local Environmental Plan 2012. 5.03 Tree Management Amendment history Version Number Date Adopted by Council Commencement Date 1 15/11/2011 15/06/2012 New Amendment Details Savings provisions Any development application lodged but not

More information

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON. REQUEST FOR TENDER - SERVICES 1. PURPOSE AND SCOPE This specification is intended to govern the supply of all labour, materials and equipment for the dismantling, demolition of a single dwelling on the

More information

Management of the risk from falling trees SIM 01/2007/05. Target Audience: FOD Inspectors Local Authority Enforcement Officers

Management of the risk from falling trees SIM 01/2007/05. Target Audience: FOD Inspectors Local Authority Enforcement Officers Management of the risk from falling trees SIM 01/2007/05 Target Audience: FOD Inspectors Local Authority Enforcement Officers Date issued: 2007-07-03 Review date: 2011-07-03 OG Status: Fully open Author

More information

SECTION 16: GROUND ASSETS CONTENTS

SECTION 16: GROUND ASSETS CONTENTS SECTION 16: GROUND ASSETS CONTENTS 16.1 INTRODUCTION 2 16.2 LANDSCAPING 2 16.2.1 Paving 2 16.2.2 Site Conditions 4 16.2.3 Protection of Trees, Shrubs and Grounds During Construction 4 16.2.4 Protection

More information

COMPLYING DEVELOPMENT & OCCUPATION CERTIFICATE APPLICATION Made under the Environmental Planning and Assessment Act 1979 Sections 85, 85A Class 1-10

COMPLYING DEVELOPMENT & OCCUPATION CERTIFICATE APPLICATION Made under the Environmental Planning and Assessment Act 1979 Sections 85, 85A Class 1-10 COMPLYING DEVELOPMENT & OCCUPATION CERTIFICATE APPLICATION Made under the Environmental Planning and Assessment Act 1979 Sections 85, 85A Class 1-10 IDENTIFICATION OF BUILDING Lot, DP/MPS etc Address Suburb/Town

More information

MOUNTAIN VIEW COMMUNITY ASSOCIATION

MOUNTAIN VIEW COMMUNITY ASSOCIATION March 26, 2010 Dear Owners: APPROVED RULES/GUIDELINES FOR (1) ARTIFICIAL TURF RULES AND GUIDELINES (2) SITE DEVELOPMENT GUIDELINES (3) FINE POLICY The Board of Directors ( Board ) of the Mountain View

More information

TORONTO MUNICIPAL CODE CHAPTER 813, TREES. Chapter 813 TREES. ARTICLE I Inspection; Removal of Infested Trees

TORONTO MUNICIPAL CODE CHAPTER 813, TREES. Chapter 813 TREES. ARTICLE I Inspection; Removal of Infested Trees Chapter 813 TREES ARTICLE I Inspection; Removal of Infested Trees 813-1. Inspection for presence of Asian Long-Horned Beetles and other pests; removal of infested trees. 813-2. Right to enter private property.

More information

City of Bellingham Policies

City of Bellingham Policies City of Bellingham Policies Title: STREET TREE PLANTING, REMOVAL AND MAINTENANCE POLICY Code: PAR 06.00.01 Chapter: Parks, Recreation and Cemetery Type of Policy: Departmental Date Developed: June 1, 1979

More information

TAURANGA CITY COUNCIL

TAURANGA CITY COUNCIL TAURANGA CITY COUNCIL CONDITIONS FOR SOUTHERN PIPELINE APPLICATION (RC13559) 1. The proposal shall proceed in accordance with the application submitted including: - The Assessment of Effects on the Environment

More information

Base Course Design and Construction

Base Course Design and Construction Part I General A. This information is to be used as a guideline in construction a dynamic aggregate base and drainage system. Project conditions may vary based on overall scope of work and location. Any

More information

CITY OF BURNABY BYLAW NO *******

CITY OF BURNABY BYLAW NO ******* Burnaby Tree Bylaw Page 1 CITY OF BURNABY BYLAW NO. 10482 (Consolidated for convenience with Bylaw No. 10759, 10891, 10917, 10963, 10968, 11189, 11331, 11485, 11670, 11846, 12035, 12191, 12298, 12377,

More information

D13. Notable Trees Overlay

D13. Notable Trees Overlay D13. Notable Trees Overlay D13.1. Background The purpose of the Notable Trees Overlay is to protect notable trees and notable groups of trees from danger or destruction resulting from development. Individual

More information

Application to Injure or Destroy Trees

Application to Injure or Destroy Trees Community Council area: (Check appropriate box) to Injure or Destroy Trees North York Toronto / East York Scarborough Etobicoke /York Address Street Number Street Name Suite/Unit Number Ward Property subject

More information

Request for consent to Discretionary Actions over Crown Pastoral Land

Request for consent to Discretionary Actions over Crown Pastoral Land Request for consent to Discretionary Actions over Crown Pastoral Land Land Act 1948 & Crown Pastoral Land Act 1998 ONLY SUBMIT THE PAGES RELEVANT TO YOUR REQUEST/S A map showing the location of the activity/ies

More information

Molson Coors Brewing Company

Molson Coors Brewing Company January 2014 CBA7466 v3 Molson Coors Brewing Company Site: Alton Sports Ground, Anstey Road, Alton ARBORICULTURAL DEVELOPMENT STATEMENT Arboricultural Implications Assessment and Method Statement Guided

More information

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX:

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX: MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA 16801 TELEPHONE: 814-231-3021 FAX: 814-231-3020 Checklist for Submission of APPLICATION for DEMOLITION PERMIT To obtain a permit for demolition

More information

Noise Abatement Guidelines. Regional Official Plan Guidelines

Noise Abatement Guidelines. Regional Official Plan Guidelines Noise Abatement Guidelines Regional Official Plan Guidelines Halton Region Official Plan Guidelines The Regional Official Plan (ROP) is Halton s guiding document for land use planning. It contains policies

More information

Asbestos in Grounds, Asbestos Management Plan, Sydney Secondary College Balmain Campus, Balmain, NSW 2041

Asbestos in Grounds, Asbestos Management Plan, Sydney Secondary College Balmain Campus, Balmain, NSW 2041 Asbestos in Grounds, Asbestos Management Plan, Sydney Secondary College Balmain Campus, Balmain, NSW 2041 March 2014 NSW Public Works Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 Level

More information

Cavity Drain Systems.

Cavity Drain Systems. Grommet & Nail Platon Sealing Rope Sheet Piling Platon P8 Platon P8 Platon Cornerstrip Platon P20 Membrane Reinforced Concrete incorporating: Triton TT Super Admix @ 1.2Kg/100Kg OPC Sheet Piling PLATON

More information

SECTION TREE & PLANTING PROTECTION

SECTION TREE & PLANTING PROTECTION SECTION 32 0193 PART 1 - GENERAL 4.1 SUMMARY A. The work includes labor, equipment, and materials necessary for existing tree & plant protection, tree trimming and protection of the Critical Root Zone

More information

SANKO GEOTHERMAL POWER PROJECT TRAFFIC MANAGEMENT PLAN

SANKO GEOTHERMAL POWER PROJECT TRAFFIC MANAGEMENT PLAN Draft A.0 January 10, 2018 Version Revision Date SANKO GEOTHERMAL POWER PROJECT Prepared by Checked by Approved by Muhsin Dervişoğulları Environmental Manager Project Manager General Manager of Geothermal

More information

Date: March 18, 2016 Meeting Date: March 29, 2016

Date: March 18, 2016 Meeting Date: March 29, 2016 To: From: Mayor Skeels and Council Emma Chow, Island Community Planner 1, Planning Date: March 18, 2016 Meeting Date: March 29, 2016 Subject: 1881 Hood Point Rd Sarah Bell & Manny Trinca Lot 16, Block

More information

Urban Design Manual 13.0 LANDSCAPE AND NATURAL FEATURES TREE MANAGEMENT POLICY. Definitions. Air Photo: Standards General Vegetation Overview:

Urban Design Manual 13.0 LANDSCAPE AND NATURAL FEATURES TREE MANAGEMENT POLICY. Definitions. Air Photo: Standards General Vegetation Overview: 4242424242421 13.0 LANDSCAPE AND NATURAL FEATURES TREE MANAGEMENT POLICY The complete City of Kitchener Tree Management Policy may be obtained from the Community Services Department. The following is a

More information

The Magnolias of Ocala Homeowners Association

The Magnolias of Ocala Homeowners Association The Magnolias of Ocala Homeowners Association ARCHITECTURAL REVIEW BOARD STANDARDS AND GUIDELINES HANDBOOK FOR THE MAGNOLIAS OF OCALA HOMEOWNERS ASSOCIATION VERSION 1.1 Revised 01/02/16 Page 1 of 7 PURPOSE

More information

Avoiding Tree Damage During Construction

Avoiding Tree Damage During Construction Avoiding Tree Damage During Construction As cities and suburbs expand, wooded lands are being developed into commercial and residential sites. Homes are constructed in the midst of trees to take advantage

More information

TO ALL PROSPECTIVE BIDDERS: The original specifications for the project noted above are hereby modified as described below:

TO ALL PROSPECTIVE BIDDERS: The original specifications for the project noted above are hereby modified as described below: ADDENDUM 1 February 28, 2018 CONTRACT DOCUMENTS FOR Lincoln Avenue Sidewalk Construction CITY OF TAKOMA PARK IFB PW-20180208 State Contract No. MO4665112 TO ALL PROSPECTIVE BIDDERS: The original specifications

More information

ADOPTION OF CHAPTER 120 (TREE CONSERVATION ORDINANCE) OF THE 1976 CODE OF THE COUNTY OF FAIRFAX, VIRGINIA

ADOPTION OF CHAPTER 120 (TREE CONSERVATION ORDINANCE) OF THE 1976 CODE OF THE COUNTY OF FAIRFAX, VIRGINIA ADOPTION OF CHAPTER 120 (TREE CONSERVATION ORDINANCE) 36-07-120 (Also see Heritage, Specimen, Memorial and Street Trees Ordinances 37-07-N adopted simultaneously on October 15, 2007) OF THE 1976 CODE OF

More information

Permit with introductory note

Permit with introductory note Permit with introductory note The Environmental Permitting (England & Wales) Regulations 2010 Glazewing Limited Saxon Pit Peterborough Road Whittlesey Peterborough Cambridgeshire PE7 1LQ Permit number

More information

CI/SfB. Common Arrangement R12 Uniclass JQ24/L8141. Golpla. Engineered Solution for Grass Reinforcement and Gravel Retention.

CI/SfB. Common Arrangement R12 Uniclass JQ24/L8141. Golpla. Engineered Solution for Grass Reinforcement and Gravel Retention. CI/SfB Common Arrangement R12 Uniclass JQ24/L8141 Engineered Solution for Grass Reinforcement and Gravel Retention www.geosyn.co.uk High Quality Plastic Grass Reinforcement The System is a rigid, high

More information

Section Re-employment in the Construction Industry

Section Re-employment in the Construction Industry Construction employers are required to offer to re-employ their injured construction workers who have been unable to work due to a work-related injury/disease. A construction employer's obligation to re-employ

More information

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment 1993 Specifications CSJ'S 0912-71-554 & 0912-71-555 SPECIAL SPECIFICATION ITEM 1016 Tree Preservation and Treatment 1. Description. This section specifies the requirements for protecting trees and related

More information

REQUIREMENTS TO BE COMPLIED WITH BY EARTHWORKS CONTRACTORS FOR THE PREVENTION OF DAMAGE TO TELECOMMUNICATION CABLES

REQUIREMENTS TO BE COMPLIED WITH BY EARTHWORKS CONTRACTORS FOR THE PREVENTION OF DAMAGE TO TELECOMMUNICATION CABLES APPENDIX 1 IMPORTANT NOTICE: REQUIREMENTS IN THIS DOCUMENT MUST BE STRICTLY COMPLIED WITH. REQUIREMENTS TO BE COMPLIED WITH BY EARTHWORKS CONTRACTORS FOR THE PREVENTION OF DAMAGE TO TELECOMMUNICATION CABLES

More information

HEALTH & SAFETY MANUAL Legislated Duties and Responsibilities

HEALTH & SAFETY MANUAL Legislated Duties and Responsibilities CONTRACTOR SAFETY PROGRAM PURPOSE: The Contractor Safety Program (CSP) establishes that contractors are required to work in compliance with legislation, regulations and the Town of Caledon health and safety

More information

DIVISION 9 TRAM TECHNICAL

DIVISION 9 TRAM TECHNICAL Revision 0 Specification: Division 9 DIVISION 9 TRAM TECHNICAL Contents: Part 910 Tramway Provisions Part 920 Tram Track Part 930 Overhead Catenary Part 940 Tram Platforms DTEI XXCxxx Page 1 PART 910 TRAMWAY

More information