1 NuRoof Retrofit Systems Technical/Installation Information
2 INTRODUCTION If your roof is causing problems due to leaks, high maintenance costs and low energy efficiency, the MBCI NuRoof Retrofit System is the remedy. With the NuRoof Retrofit System, you can install a slopped roof which will eliminate leaks and minimize maintenance costs. Energy efficiency may also be increased substantially with additional insulation. The NuRoof Retrofit System allows design flexibility with a choice of roof slopes, hips, valleys, gable endwalls, vertical and trapezoidal standing seam panels, as well as the traditional PBR Panel. These panels are available in a wide range of colors and gauges. So, whether you are retrofitting an old warehouse, manufacturing plant or an office building, the MBCI NuRoof Retrofit System is the answer. RCHITECT/OWNER RESPONSIBILITY The architect/owner using the MBCI NuRoof Retrofit System must recognize that the existing structural roof system most likely was designed based on the roof load being applied uniformly by means of a metal deck or similar substrate. The NuRoof Retrofit System will replace the uniform load with a series of concentrated loads onto the existing roof system which may not be feasible in all applications. lso, as a result of the addition of the retrofit roof, additional weight will be added to the existing roof that must be checked. MBCI highly recommends that a structural engineer conduct an investigation of the entire structure being proposed for a retrofit system to determine the adequacy of the existing roof structure to withstand additional loading. Their investigation should include the condition of the existing structural, existing dead loads, can existing loads be removed, (i.e. rock ballast) and what additional dead loads will the structure accept and at what spacing? RIDGE OF ROOF MEMBERS PRLLEL TO ROOF SLOPE Installation Sequence Begins on Page NR-9 MEMBERS PERPENDICULR TO ROOF SLOPE Installation Sequence Begins on Page NR-15 SLOPE SLOPE SLOPE SLOPE RIDGE OF ROOF NOTE: 1. Some buildings may have structural members in both directions. In this case, each method may be used where required. 2. Hipped NuRoof Systems may require both methods. NR-2 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
3 TBLE OF CONTENTS rchitect/engineer Information NR-5 - NR-6 Design Data Sheet NR-7 Material Properties NR-8 Section Dimensions Section Properties Retrofit Framing over Structural Members Parallel to the Roof Slope Base Channel ttachment nr-9 Column ttachment nr-10 X Bracing ttachment nr-11 Longitudinal Transverse (Recommended every 40 minimum) Purlin ttachment nr-12 Strut ttachment (Every braced column line) nr-13 Panel ttachment nr-14 Retrofit Framing over Structural Members Perpendicular to the Roof Slope Base Zee ttachment nr-15 Column ttachment nr-16 X Bracing ttachment nr-17 Longitudinal Transverse (Recommended every 40 minimum) Purlin ttachment nr-18 Strut ttachment (Every braced column line) nr-19 Panel ttachment nr-20 Gable Endwall Isometric/Cross-section NR-21 Hip Roof Isometric Showing Combination of Base Zee/Base Shoe Utilization and Columns...NR-22 Hip Framing (B-T-B Channels) NR-22 Valley Isometric Showing Combination of Base Zee/Base Shoe Utilization and Columns...NR-23 Valley Framing (B-T-B Channels) NR-23 Peak Framing Isometric/Cross-section NR-24 Details Base Channel/Column Connection (Flange) NR-25 Base Zee/Column Connection (Flange) NR-25 Base Zee/Column Connection (Web) NR-26 Base Zee Lap NR-26 High Strength Base Zee/Column Connection (Flange/Web) NR-27 Purlin to Column Connection (Flange) NR-28 Purlin to Column w/purlin Clip (Flange) NR-28 Purlin Lap to Column Connection (Flange) NR-28 Purlin to Column Connection (Web) NR-29 Purlin to Column w/purlin Clip (Web) NR-29 Purlin Lap to Column Connection (Web) NR-29 ngle Bracing NR-30 - NR-35 Longitudinal Transverse Eave NR-36 Overhang (w/parapet Wall) Eave (w/fascia Wall) Eave (w/ngles) Edge/Corner Zone (For Use In High Wind Conditions) NR-37 rchitect/engineer Information (Optional Method) NR-38 EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-3
4 TBLE OF CONTENTS NuRoof Optional Methods Isometric - Grid System NR-39 Grid System Details NR-40 Isometric - SSR System Over Existing PBR Panel NR-41 Eave Detail NR-42 Clip ttachment Detail NR-42 Rake Detail NR-43 Ridge Detail NR-43 EndLap Detail NR-44 Notes NR-45 - NR-47 Copyright Metal Building Components, L.P ll Rights Reserved /30M Descriptions and specifications contained herein were in effect at the time this publication was approved for printing. In a continuing effort to refine and improve products, MBCI reserves the right to discontinue products at any time or change specifications and/or designs without notice and without incurring obligation. To insure you have the latest information available, please inquire or visit our Web Site at pplication details are for illustration purposes only and may not be appropriate for all environmental conditions, building designs, or panel profiles. Projects should be engineered to conform to applicable building codes, regulations, and accepted industry practices. Insulation is not shown in these details for clarity. If there is a conflict between this manual and the erection drawings, the erection drawings will take precedence. NR-4 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
5 NuRoof DESIGN INFORMTION RCHITECT/ENGINEER INFORMTION 1. The recommended slope range of the retrofit roof is 1/4:12-4:12. For slopes greater than 4:12 please contact MBCI. 2. The maximum recommended height of the retrofit system above the existing roof is 10 feet. This is not due to the capacity of the framing, but to the altered shape of the building and its ability to withstand the new wind loads as well as erection limitations. 3. The NuRoof Retrofit System will add approximately 2 to 4 PSF to the weight of the existing roof. 4. Load transfer may result in concentrated loads occurring on the existing roof. professional structural engineer must investigate the existing roof to be sure that no undesirable effects are created on the existing roof by the NuRoof Retrofit System. 5. Lateral wind forces will be developed at gabled endwalls created by the retrofit roof. These wind forces will be transmitted into the existing roof by the X bracing parallel to the retrofit purlins. MBCI cannot be responsible for the adequacy of the existing building to resist the additional wind forces which develop at these gabled endwalls. 6. The uniform retrofit roof loads will be concentrated through the retrofit columns. These concentrated loads are then transmitted to the existing roof deck above the existing roof structural members. The adequacy of the existing metal deck corrugations to resist web crippling must be investigated during the design phase. It is not recommended to install this system over the existing insulation board due to possible creep over the life of the system (consult the manufacturer of the existing insulation board for allowable static compressive loads). If the existing roof has moisture trapped within the layers from water intrusion, MBCI recommends the removal of the roofing materials (down to the existing deck) at all base channels or roof support zee locations. This will allow trapped moisture to be drawn out by proper ventilation. If the deck is corroded through to the structural framing, consult with your structural engineer for possible deck reinforcement at the column base attachments to maintain the integrity of the metal deck. NOTE: Existing metal decks can provide lateral support (diaphragm action) to the overall structure. Removing the metal deck at the column locations may compromise the integrity of the existing metal deck diaphragm system. Since the NuRoof Retrofit System relies on the existing metal deck to transfer its lateral loads to the existing structural system, the existing metal deck must remain intact. 7. n attic space will be created by the NuRoof Retrofit System. MBCI recommends proper venting of this attic space in accordance with applicable codes, to be determined by a mechanical engineer, allowing any trapped moisture to escape. MBCI also recommends that attic space be reviewed by other building, fire, or insurance related officials for possible sprinkling or extension of existing fire walls to the bottom of the new roof system. Use a minimum of 3 vinyl faced roll insulation between the retrofit panels and the retrofit purlins to help prevent condensation and roof noise. If the use of retrofit framing in New Construction will result in the installation of HVC equipment and ductwork in the attic space to conflict with the extensive bracing system required by the NuRoof Retrofit System, please consult with MBCI s sales engineering staff during the desig n phase to reso lve these issues. 8. The NuRoof framework is equally effective over existing roof decks made of metal, Tongue and Groove wood and concrete decks. However, each existing roof system must be evaluated independently on its ability to accept multiple point loading from the retrofit system. 9. The NuRoof framework will be supplied in unpunched 20-0 lengths. Field cutting of material will be required. EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-5
6 DESIGN INFORMTION NuRoof RCHITECT/ENGINEER INFORMTION (Continued) 10. For MBCI to properly design the retrofit framing, the following information is required: Retrofit roof live/wind load, collateral load, snow load, seismic zone, existing building size and location, existing structural orientation (parallel or perpendicular to retrofit roof slope) and spacing, type of existing substrate members, governing code, retrofit roof pitch, retrofit roof panel desired, and the use of hipped or gable ends. MBCI is not responsible for the ability of the existing building to accept the loads imposed upon it by the retrofit framework. The MBCI engineering department can conduct an engineering study of the proposed retrofit framing and provide column reactions based on the above information that may be used by your structural engineer to do their study of the existing structure. Following this page is a design data sheet. This sheet can be filled out and sent to MBCI for our Project Service Department to perform estimates, designs, drawings or a combination of all three. CUTION In certain cases the retrofit roof panel selected may require additional retrofit purlins at the perimeter of the roof to ensure that the panel is capable of resisting the additional wind/snow load in this area. NR-6 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
7 NuRoof DESIGN INFORMTION DESIGN DT SHEET PROJECT INFORMTION From: Live Load: psf STM E1592 Date: Dead Load: psf UL90 Project Name: Collateral Load: psf Factory Mutual Project Location: Snow Load: psf SREF (City, State, County): Wind Speed: mph Building Code: Importance Factor: Deflection Rqmts.: Exposure Category: ROOF GEOMETRY Length: ft Eave Height: ft Width: ft Overhang: ft Slope: :12 Parapet Height: ft (Please provide drawings of existing building - Including structural drawings) ROOF TYPE Built Up Shingle Other - Specify - Modified Bitumen Trocal Single Ply PVC ROOF SUBSTRTE Insulation Type: in. Tectum Thickness: in. Insulation Thickness: in. Concrete Thickness: in. Plywood Thickness: in. Lightweight Wood Thickness: in. Structural Metal Deck Thickness: in. Precast Metal Deck Gauge: Other - Specify MEMBERS Bar " o.c. Wood " o.c. "Hot Rolled" " o.c. Concrete " o.c. Wood " o.c. Other - " o.c. Has the existing structure been analyzed by a professional engineer? yes Engineer's name: no Engineer's phone #: NUROOF GEOMETRY Length: ft Ridge Condition: Width: ft Gable Slope: :12 Hip Eave Height: ft Roof Panels: (Profile, Width, Gauge) Overhang: ft Wall Panels: (Profile, Width, Gauge) Eave Condition: Eave Trim Fascia: (Profile, Width, Gauge) Box Gutter Structural Members: Red Oxide Sculptured Gutter Galvanized Snow Gutter (Please provide drawings of new proposed roof plan) NOTES EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-7
8 DESIGN INFORMTION NuRoof SECTION PROPERTIES D 50 B1 X B2 X L XIS X-X D x B1 x B2 (in.) Section Ga. Weight (PLF) Ix (in.4/ft.) Sx (in.3/ft.) Rx (in.) Ma (in.-kips) 4 x 2 x 2 Zee x x Zee x 1.5 x 1.5 Zee x x Zee x x Zee D B X X L XIS X-X D x B (in.) Section Ga. Weight (PLF) Ix (in.4/ft.) Sx (in.3/ft.) Rx (in.) Ma (in.-kips) 4 x 2.5 Cee x 2.5 Cee x 2.5 Cee x 2.5 Cee CS-1 Cee XIS X-X D x B (in.) Section Ga. Weight (PLF) Ix (in.4/ft.) Sx (in.3/ft.) Rx (in.) Ma (in.-kips) HS-1 Hat D X B X XIS X-X D x B (in.) Section Ga. Weight (PLF) Ix (in.4/ft.) Sx (in.3/ft.) Rx (in.) Ma (in.-kips) x 2 Channel x 2 Channel x 2 Channel D X B X XIS X-X D x B (in.) Section Ga. Weight (PLF) Ix (in.4/ft.) Sx (in.3/ft.) Rx (in.) Ma (in.-kips) 2 x 2 ngle x 1.5 ngle Notes: 1) ll calculations for the properties of cees and zees are calculated in accordance w ith the 2001 North merican Specification for the Design of Cold-Formed Steel Structural Members published by the merican Iron and Steel Institute (.I.S.I). 2) Ix is for deflection determination. 3) Sx is for bending. 4) Ma is allow able bending moment. 5) The allow able bending moment (Ma) assumes that the compressive flange is laterally braced so as to provide the full moment capacity of the section. The Engineering data contained herein is for the expressed use of customers and design professionals. long w ith this data, it is recommended that the design professional have a copy of the most current version of the North merican Specification for the Design of Cold-Formed Steel Structural Members published by the merican Iron and Steel Institute to facilitate design. This Specification contains the design criteria for cold-formed steel components. long w ith the Specification, the designer should reference the most current building code applicable to the project jobsite in order to determine enviromental loads. If further information or guidance regarding coldformed design practices is desired, please contact the manufacturer. NR-8 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
9 NuRoof DESIGN INFORMTION FRMING OVER MEMBERS PRLLEL TO THE ROOF SLOPE (Base Channel ttachment) BSE CHNNEL FRMEWORK SPCING DETERMINED BY SPCING SPCING DETIL 1 FSTENER TO (NOT BY MBCI) BSE CHNNEL PLN VIEW BSE CHNNEL TTCHMENT BSE CHNNEL DETIL 1 CROSS SECTION - BSE CHNNEL TTCHMENT FSTENER TO (NOT BY MBCI) EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-9
10 DESIGN INFORMTION NuRoof FRMING OVER MEMBERS PRLLEL TO THE ROOF SLOPE (Column ttachment) BSE CHNNEL FRMEWORK SPCING DETERMINED BY SPCING DETIL 1 SPCING FSTENER TO (NOT BY MBCI) DETIL 1 BSE CHNNEL PLN VIEW TTCHMENT CROSS SECTION - TTCHMENT BSE CHNNEL FSTENER TO (NOT BY MBCI) NR-10 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
11 NuRoof DESIGN INFORMTION FRMING OVER MEMBERS PRLLEL TO THE ROOF SLOPE ( X Bracing ttachment) LONGITUDINL NGLE BRCING BSE CHNNEL TRNSVERSE NGLE BRCING (EVERY 40 MIN.) FRMEWORK SPCING DETERMINED BY SPCING DETIL 1 SPCING NGLE BRCING FIELD NOTCH NGLE BRCE NGLE BRCING BSE CHNNEL NGLE BRCING NGLE BRCING BSE CHNNEL DETIL 1 FSTENER TO (NOT BY MBCI) CROSS SECTION - NGLE BRCE TTCHMENT EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-11
12 DESIGN INFORMTION NuRoof FRMING OVER MEMBERS PRLLEL TO THE ROOF SLOPE (Purlin ttachment) NOTE: LPS MUST OCCUR T LOCTION 6 BSE CHNNEL SPCING DETERMINED BY SPCING LONGITUDINL NGLE BRCING NGLE BRCING BSE CHNNEL DETIL 1 NGLE BRCING SPCING NGLE BRCING FRMEWORK 4:12 3:12 2:12 1:12 FLNGE CN BE ROLL FORMED TO MXIMUM SLOPE OF 4:12 TRNSVERSE NGLE BRCING (EVERY 40 MIN.) BSE CHNNEL DETIL 1 CROSS SECTION - TTCHMENT FSTENER TO (NOT BY MBCI) NR-12 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
13 NuRoof DESIGN INFORMTION FRMING OVER MEMBERS PRLLEL TO THE ROOF SLOPE (Strut ttachment) CONTINUOUS CHNNEL SECTION (EVERY BRCED LINE) BSE CHNNEL SPCING DETERMINED BY SPCING NGLE BRCING LONGITUDINL NGLE BRCING CONTINUOUS CHNNEL SECTION (EVERY BRCED LINE) BSE CHNNEL DETIL 1 NGLE BRCING NGLE BRCING SPCING TRNSVERSE NGLE BRCING (EVERY 40 MIN.) FRMEWORK CONTINUOUS CHNNEL SECTION (EVERY BRCED LINE) BSE CHNNEL DETIL 1 CROSS SECTION - STRUT TTCHMENT FSTENER TO (NOT BY MBCI) EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-13
14 DESIGN INFORMTION NuRoof FRMING OVER MEMBERS PRLLEL TO THE ROOF SLOPE (Panel ttachment) ROOF PNEL BSE CHNNEL SPCING DETERMINED BY SPCING NGLE BRCING ROOF PNEL LONGITUDINL NGLE BRCING BSE CHNNEL DETIL 1 ROOF CONTINUOUS PNEL CHNNEL SECTION (EVERY BRCED LINE) SPCING ROOF PNEL CLIP NGLE BRCING NGLE BRCING FRMEWORK TRNSVERSE NGLE BRCING (EVERY 40 MIN.) CONTINUOUS CHNNEL SECTION (EVERY BRCED LINE) CONTINUOUS CHNNEL SECTION (EVERY BRCED LINE) BSE CHNNEL DETIL 1 CROSS SECTION - PNEL TTCHMENT FSTENER TO (NOT BY MBCI) NR-14 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
15 NuRoof DESIGN INFORMTION NOTE: LPS MUST OCCUR OVER SUPPORT 6 FRMING OVER MEMBERS PERPENDICULR TO THE ROOF SLOPE (Base Zee ttachment) SPCING SPCING DETIL 1 FRMEWORK PLN VIEW TTCHMENT FSTENER TO (NOT BY MBCI) FSTENER TO (NOT BY MBCI) DETIL 1 FSTENER TO (NOT BY MBCI) CROSS SECTION - TTCHMENT EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-15
16 DESIGN INFORMTION NuRoof FRMING OVER MEMBERS PERPENDICULR TO THE ROOF SLOPE (Column ttachment) SPCING SPCING FSTENER TO (NOT BY MBCI) DETIL 1 (4) REQ D. DETIL 1 PLN VIEW TTCHMENT FRMEWORK SPCING (4) REQ D. FSTENER TO (NOT BY MBCI) (4) REQ D. FSTENER TO (NOT BY MBCI) CROSS SECTION - TTCHMENT NR-16 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
17 NuRoof DESIGN INFORMTION FRMING OVER MEMBERS PERPENDICULR TO THE ROOF SLOPE ( X Bracing ttachment) LONGITUDINL NGLE BRCING SPCING TRNSVERSE NGLE BRCING (EVERY 40 MIN.) SPCING DETIL 1 SPCING FRMEWORK NGLE BRCING FSTENER TO (NOT BY MBCI) EFFECTIVE NOVEMBER 4, 2005 DETIL 1 NGLE BRCING (4) REQ D. SEE FOR CURRENT INFORMTION NGLE BRCING (FIELD NOTCH) SUBJECT TO CHNGE WITHOUT NOTICE NGLE BRCING (4) REQ D. FSTENER TO (NOT BY MBCI) CROSS SECTION - NGLE BRCE TTCHMENT NR-17
18 DESIGN INFORMTION NuRoof FRMING OVER MEMBERS PERPENDICULR TO THE ROOF SLOPE (Purlin ttachment) NOTE: LPS MUST OCCUR T LOCTION 6 SPCING TRNSVERSE NGLE BRCING (EVERY 40 MIN.) SPCING LONGITUDINL NGLE BRCING DETIL 1 FRMEWORK SPCING 4:12 3:12 2:12 1:12 FLNGE CN BE ROLL FORMED TO MXIMUM SLOPE OF 4:12 NGLE BRCING FSTENER TO (NOT BY MBCI) DETIL 1 (4) REQ D. NGLE BRCING (4) REQ D. FSTENER TO (NOT BY MBCI) CROSS SECTION - TTCHMENT NR-18 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
19 NuRoof DESIGN INFORMTION FRMING OVER MEMBERS PERPENDICULR TO THE ROOF SLOPE (Strut ttachment) SPCING TRNSVERSE NGLE BRCING (EVERY 40 MIN.) CONTINUOUS CHNNEL SECTION (EVERY BRCED LINE) NGLE BRCING SPCING FSTENER TO (NOT BY MBCI) LONGITUDINL NGLE BRCING DETIL 1 CONTINUOUS CHNNEL SECTION (EVERY BRCED LINE) (4) REQ D. DETIL 1 NGLE BRCING FRMEWORK CONTINUOUS CHNNEL SECTION (EVERY BRCED LINE) SPCING (4) REQ D. CROSS SECTION - STRUT TTCHMENT FSTENER TO (NOT BY MBCI) EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-19
20 DESIGN INFORMTION NuRoof FRMING OVER MEMBERS PERPENDICULR TO THE ROOF SLOPE (Panel ttachment) ROOF PNEL TRNSVERSE NGLE BRCING (EVERY 40 MIN.) CONTINUOUS CHNNEL SECTION (EVERY BRCED LINE) NGLE BRCING SPCING ROOF PNEL LONGITUDINL NGLE BRCING DETIL 1 CONTINUOUS CHNNEL SECTION (EVERY BRCED LINE) (4) REQ D. FRMEWORK ROOF PNEL NGLE BRCING (4) REQ D. SPCING CONTINUOUS CHNNEL SECTION (EVERY BRCED LINE) FSTENER FSTENER TO (NOT BY MBCI) DETIL 1 FSTENER TO (NOT BY MBCI) CROSS SECTION - PNEL TTCHMENT NR-20 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
21 NuRoof DESIGN INFORMTION FRMING OVER MEMBERS (Gable Endwall Girt ttachment) ENDWLL GIRT HT SECTION RKE NGLE ISOMETRIC VIEW OF ENDWLL BSE CHNNEL PNCKE HED SELF DRILLERS (2 PER CONN.) RKE NGLE (2) REQ D. BSE CHNNEL ENDWLL GIRT HT SECTION CROSS SECTION - ENDWLL TTCHMENT FSTENER TO (NOT BY MBCI) EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-21
22 DESIGN INFORMTION NuRoof FRMING FOR ROOF HIP (Back-to-Back Hip Channel ttachment) LONGITUDINL NGLE BRCING TRNSVERSE NGLE BRCING (EVERY 40 MIN.) 4¹ ₈ x 2 HIP CHNNEL (BCK TO BCK) CONTINUOUS CHNNEL SECTION (EVERY BRCED LINE) BSE CHNNEL FRMEWORK DETIL 1 4¹ ₈ x 2 HIP CHNNEL (BCK TO BCK) 4¹ ₈ x 2 HIP CHNNEL (BCK TO BCK 12 O.C.) (2) PNCKE HED SELF DRILLERS 12 O.C. STGGERED HIP CHNNEL BCK TO BCK (2) PNCKE HED SELF DRILLERS DETIL 1 NR-22 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
23 NuRoof DESIGN INFORMTION FRMING FOR ROOF VLLEY (Back-to-Back Valley Channel ttachment) 4¹ ₈ x 2 VLLEY CHNNEL (BCK TO BCK) LONGITUDINL NGLE BRCING TRNSVERSE NGLE BRCING (EVERY 40 MIN.) DETIL 1 CONTINUOUS CHNNEL SECTION (EVERY BRCED LINE) FRMEWORK BSE CHNNEL 4¹ ₈ x 2 VLLEY CHNNEL (BCK TO BCK) 12 O.C. 4¹ ₈ x 2 VLLEY CHNNEL (BCK TO BCK 12 O.C.) (2) PNCKE HED SELF DRILLERS STGGERED VLLEY CHNNEL BCK TO BCK (2) PNCKE HED SELF DRILLERS DETIL 1 EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-23
24 DESIGN INFORMTION NuRoof FRMING FOR ROOF RIDGE (Peak Framing ttachment) CONTINUOUS CHNNEL SECTION BSE CHNNEL RIDGE SUPPORT CHNNEL SECTION ISOMETRIC VIEW OF ENDWLL CONTINUOUS CHNNEL SECTION RIDGE SUPPORT CHNNEL SECTION BSE CHNNEL CROSS SECTION - STRUT TTCHMENT FSTENER TO (NOT BY MBCI) NR-24 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
25 NuRoof DETILS BSE CHNNEL CONNECTION WITH TTCHMENT (Flange Connection) 4 CEE 4¹ ₈ x 2 CHNNEL x 1-0 (BSE SHOE) 2 x 2 NGLE (SEE PLN (2) PER SIDE, (4) TOTL 4 CEE 4¹ ₈ x 2 CHNNEL x 1-0 (BSE SHOE) 2 x 2 NGLE (SEE PLN (2) PER SIDE, (4) TOTL ROOF SYSTEM BSE SHOE FSTENER (MIN. QTY. 4, NOT BY MBCI) ROOF SYSTEM BSE SHOE FSTENER (MIN. QTY. 4, NOT BY MBCI) 8 MX. CONNECTION WITH TTCHMENT (Flange Connection) 4 CEE (4) TOTL 2 x 2 NGLE (SEE PLN 4 CEE 2 x 2 NGLE (SEE PLN [FSTENER #1B] (4) TOTL ROOF SYSTEM FSTENER (MIN. QTY. 2, NOT BY MBCI) FSTENER (MIN. QTY. 2, NOT BY MBCI) ROOF SYSTEM EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-25
26 DETILS NuRoof CONNECTION WITH TTCHMENT (Web Connection) 4 CEE [FSTENER #1B] (4) TOTL 2 x 2 NGLE (SEE PLN 4 CEE 2 x 2 NGLE (SEE PLN [FSTENER #1B] (4) TOTL ROOF SYSTEM FSTENER (MIN. QTY. 2, NOT BY MBCI) FSTENER (MIN. QTY. 2, NOT BY MBCI) ROOF SYSTEM CONNECTION (Lap Connection) 6 (4) TOTL (4) TOTL ROOF SYSTEM FSTENER (MIN. QTY. 2, NOT BY MBCI) FSTENER (MIN. QTY. 2, NOT BY MBCI) C L ROOF SYSTEM NR-26 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
27 NuRoof DETILS HIGH STRENGTH -CLIP NGLE CONNECTION WITH TTCHMENT (Flange Connection) 4 CEE [FSTENER #1B] (4) TOTL 2 x 2 NGLE (SEE PLN CLIP NGLE CLIP NGLE 4 CEE [FSTENER #1B] [FSTENER #1B] (4) TOTL 2 x 2 NGLE (SEE PLN FOR EXCT LOCTION) [FSTENER #1B] (4) TOTL ROOF SYSTEM NGLE CLIP FSTENER (MIN. QTY. 2, NOT BY MBCI) FSTENER (MIN. QTY. 2, NOT BY MBCI) NGLE CLIP FSTENER (MIN. QTY. 2, NOT BY MBCI) ROOF SYSTEM HIGH STRENGTH -CLIP NGLE CONNECTION WITH TTCHMENT (Web Connection) 4 CEE [FSTENER #1B] (4) TOTL 2 x 2 NGLE (SEE PLN CLIP NGLE CLIP NGLE 4 CEE [FSTENER #1B] [FSTENER #1B] (4) TOTL 2 x 2 NGLE (SEE PLN FOR EXCT LOCTION) [FSTENER #1B] (4) TOTL ROOF SYSTEM NGLE CLIP FSTENER (MIN. QTY. 2, NOT BY MBCI) FSTENER (MIN. QTY. 2, NOT BY MBCI) NGLE CLIP FSTENER (MIN. QTY. 2, NOT BY MBCI) ROOF SYSTEM EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-27
28 DETILS NuRoof TO TTCHMENT (Flange Connection) ZEE (4) TOTL (4) TOTL ZEE [FSTENER #1B] 4 CEE 2 x 2 NGLE (SEE PLN 4 CEE 2 x 2 NGLE (SEE PLN TO TTCHMENT (Flange Connection With Purlin Clip) ZEE 3 x 3 CLIP NGLE (4) TOTL [FSTENER #1B] (4) TOTL 3 x 3 CLIP NGLE ZEE [FSTENER #1B] 4 CEE 2 x 2 NGLE (SEE PLN 4 CEE 2 x 2 NGLE (SEE PLN TO TTCHMENT (Flange Connection at Purlin Lap) 6 ZEE 3 C L 3 [FSTENER #1B] (8) TOTL [FSTENER #1B] (8) TOTL ZEE [FSTENER #1B] 4 CEE 2 x 2 NGLE (SEE PLN [FSTENER #1B] [FSTENER #1B] 4 CEE 2 x 2 NGLE (SEE PLN NR-28 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
29 NuRoof DETILS TO TTCHMENT (Web Connection) ZEE (4) TOTL [FSTENER #1B] (4) TOTL [FSTENER #1B] ZEE [FSTENER #1B] 4 CEE 2 x 2 NGLE (SEE PLN [FSTENER #1B] 4 CEE 2 x 2 NGLE (SEE PLN FOR EXCT LOCTION) TO TTCHMENT (Web Connection With Purlin Clip) ZEE 3 x 3 CLIP NGLE (4) TOTL [FSTENER #1B] (4) TOTL 3 x 3 CLIP NGLE [FSTENER #1B] ZEE [FSTENER #1B] 4 CEE 2 x 2 NGLE (SEE PLN [FSTENER #1B] 4 CEE 2 x 2 NGLE (SEE PLN FOR EXCT LOCTION) TO TTCHMENT (Web Connection at Purlin Lap) ZEE 3 6 CL 3 (8) TOTL [FSTENER #1B] (8) TOTL ¹ ₄ -14 x 1¹ ₄ S.D [FSTENER #1B] ZEE [FSTENER #1B] 4 CEE 2 x 2 NGLE (SEE PLN [FSTENER #1B] 4 CEE 2 x 2 NGLE (SEE PLN FOR EXCT LOCTION) EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-29
30 DETILS NuRoof LONGITUDINL NGLE BRCING (Parallel to Purlins) (4) PER CONN. ZEE FIELD NOTCH NGLE S REQUIRED 2 x 2 NGLE (SEE PLN 4 CEE 4¹ ₈ x 2 CHNNEL x 1-0 (BSE SHOE) (2) PER SIDE, (4) TOTL FIELD NOTCH NGLE S REQUIRED ROOF SYSTEM BSE SHOE FSTENER (MIN. QTY. 4, NOT BY MBCI) (4) PER CONN. ZEE 2 x 2 NGLE (SEE PLN 4 CEE (4) PER CONN. ROOF SYSTEM FSTENER (MIN. QTY. 2, NOT BY MBCI) NR-30 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
31 NuRoof DETILS TRNSVERSE NGLE BRCING (Perpendicular to Purlins) ZEE (4) PER CONN. ZEE 4 CEE 2 x 2 NGLE (SEE PLN (2) PER SIDE, (4) TOTL 4¹ ₈ x 2 CHNNEL x 1-0 (BSE SHOE) ROOF SYSTEM BSE SHOE FSTENER (MIN. QTY. 4, NOT BY MBCI) ZEE ZEE (4) PER CONN. 4 CEE FIELD NOTCH NGLE S REQUIRED 2 x 2 NGLE (SEE PLN (4) PER CONN. FIELD NOTCH NGLE S REQUIRED ROOF SYSTEM FSTENER (MIN. QTY. 2, NOT BY MBCI) EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-31
32 DETILS NuRoof DOUBLE LONGITUDINL NGLE BRCING (Parallel to Purlins With Base Shoe) (4) PER CONN. ZEE FIELD NOTCH NGLE S REQUIRED 2 x 2 NGLE (SEE PLN 4 CEE FIELD NOTCH NGLE S REQUIRED 2 x 2 NGLE (SEE PLN FIELD NOTCH NGLE S REQUIRED 4¹ ₈ x 2 CHNNEL x 1-0 (BSE SHOE) (2) PER SIDE, (4) TOTL FIELD NOTCH NGLE S REQUIRED ROOF SYSTEM BSE SHOE FSTENER (MIN. QTY. 4, NOT BY MBCI) NR-32 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
33 NuRoof DETILS DOUBLE LONGITUDINL NGLE BRCING (Parallel to Purlins With Base Zee) (4) PER CONN. ZEE 2 x 2 NGLE (SEE PLN 4 CEE 2 x 2 NGLE (SEE PLN ROOF SYSTEM FSTENER (MIN. QTY. 2, NOT BY MBCI) (4) PER CONN. EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-33
34 DETILS NuRoof DOUBLE TRNSVERSE NGLE BRCING (Perpendicular to Purlins With Base Shoe) ZEE (4) PER CONN. ZEE 4 CEE 2 x 2 NGLE (SEE PLN 2 x 2 NGLE (SEE PLN (2) PER SIDE, (4) TOTL 4¹ ₈ x 2 CHNNEL x 1-0 (BSE SHOE) ROOF SYSTEM BSE SHOE FSTENER (MIN. QTY. 4, NOT BY MBCI) NR-34 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
35 NuRoof DETILS DOUBLE TRNSVERSE NGLE BRCING (Perpendicular to Purlins With Base Zee) ZEE ZEE (4) PER CONN. 4 CEE FIELD NOTCH NGLE S REQUIRED 2 x 2 NGLE (SEE PLN FIELD NOTCH NGLE S REQUIRED FIELD NOTCH NGLE S REQUIRED 2 x 2 NGLE (SEE PLN (4) PER CONN. FIELD NOTCH NGLE S REQUIRED ROOF SYSTEM FSTENER (MIN. QTY. 2, NOT BY MBCI) EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-35
36 DETILS NuRoof EVE OVERHNG (With Parapet Wall) ZEE [FSTENER #1B] (4) PER CONN. [FSTENER #1B] (4) PER CONN. EVE STRUT CLIP 4 CEE OUTRIGGER 4 CEE EVE STRUT HT SECTION (2) PER SIDE, (4) TOTL (4) PER CONN. 4¹ ₈ x 2 CHNNEL x 1-0 (BSE SHOE) PRPET WLL ROOF SYSTEM BSE SHOE FSTENER (MIN. QTY. 4, NOT BY MBCI) EVE DETILS EVE CHNNEL 4 CEE HT SECTION (4) PER CONN. EVE NGLE 4 12 x 1 PNCKE SELF-DRILLER [FSTENER 12 O.C. EVE NGLE ROOF SYSTEM FSTENER (MIN. QTY. 2, NOT BY MBCI) BSE NGLE 12 O.C. (NOT BY MBCI) ROOF SYSTEM EVE WITH FSCI WLL EVE WITH NGLES NR-36 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
37 NuRoof DETILS EDGE/CORNER ZONE (For Use in High Wind Condition) ZEE ZEE [FSTENER #1B] (4) PER CONN. 4 CEE BRIDGING (4) PER CONN. 4 CEE (2) PER SIDE, (4) TOTL 4¹ ₈ x 2 CHNNEL x 1-0 (BSE SHOE) ROOF SYSTEM BSE SHOE FSTENER (MIN. QTY. 4, NOT BY MBCI) EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-37
38 DESIGN INFORMTION NuRoof RCHITECT/ENGINEER INFORMTION (Optional Method) 1. The optional NuRoof Retrofit Systems are designed to go directly over existing sloped roof systems. 2. The optional NuRoof Grid System allows for additional purlins to be installed when the existing purlin spacing does not meet the current code requirements. 3. The optional NuRoof Retrofit System over existing PBR requires the use of the MBCI Ultra-Dek or Double-Lok roof systems. The high clips used with these systems elevate the roof system 1³ ₈ over the existing structure, allowing the panels to pass over a standard 1¹ ₄ PBR panel. If the existing roof system has a rib height of 1¹ ₂ a non-compressible ¹ ₄ shim can be used. 4. Care must be taken when cutting back the eave of the existing roof system to make sure no shavings land on adjacent or stored new roofing materials. Hot shavings landing on new material can cause premature rusting of the material surface. 5. When installing the optional NuRoof Retrofit System over a PBR system the module of the existing roof system must be checked. The MBCI Ultra-Dek /Double-Lok roof systems hold a 24 module and if the existing roof was stretched ahead or shrunk back the clips will eventually foul into an existing major rib. n 18 panel can be installed in lieu of a 24 panel to allow the new roof system to stay on the module created by the existing roof panels. INSTLLTION GUIDELINES 1. Pre-Order a. Prior to ordering panels, all dimensions should be confirmed by field measurements. 2. Jobsite Storage and Handling a. Check the shipment against the shipping list. b. Damaged material must be noted on Bill of Lading. c. Materials should be handled carefully. spreader bar of appropriate length is recommended for hoisting. 3. pplication Checklist a. Check substrate for proper alignment and uniformity. b. Periodic check of panel alignment is crucial to proper panel installation. c. Material should be cut on the ground to minimize cut fillings on new materials. NR-38 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
39 NuRoof DETILS NuRoof GRID SYSTEM (Optional Method) MIN SPCING EDGE ZONE SPCING EQUL EQUL SUPPORT FRMMING EQUL EQUL EQUL EQUL EQUL EQUL ROOF PNEL HT SECTION [HS-1] TTCH TO FRMING WITH (2) PER CONN. FRMING HT SECTION [HS-1] TTCH TO SECONDRY FRMING WITH (2) PER CONN. WLL PNEL EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-39
40 DETILS NuRoof NuRoof GRID SYSTEM (Optional Method Details) HT SECTION [HS-1] HT SECTION [HS-1] HT SECTION [HS-1] HT SECTION [HS-1] ROOF PNEL ROOF PNEL CONNECTION OF HT SECTIONS TO (SIDE VIEW) CONNECTION OF HT SECTIONS TO (FRONT VIEW) 9 4¹ ₂ 4¹ ₂ 2 HT SECTION [HS-1] 12 x 1 TPER SHNK S.D. (4 ECH SIDE) CHNNEL SECTION [CS-1] SPLICE DETIL NOTE: MUST OCCUR OVER SUPPORT MEMBER. NR-40 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
41 NuRoof DETILS SSR SYSTEM OVER PBR PNEL (Optional Method) REMOVE SIDE-LP FSTENER ND TTCH ONE PNCKE HED SELF-DRILLER NEXT TO REMOVED FSTENER PBR PNEL HIGH FLOTING CLIP [HW-2120] FIELD CUT PNEL T EVE (ROOF PNEL CNNOT EXTEND BEYOND HIGH RIB OF WLL PNEL) ULTR-DEK PNEL DOUBLE-LOK PNEL MINOR RIB TPE SELER [HW-512] FRMING WLL PNEL ¹ ₄-14 x 1 ¹ ₄ LONG-LIFE S.D. W/WSHER [FSTENER #1E] (8 PER PNEL) 2 x 4 RKE NGLE x 3 DECK SCREW [FSTENER E. HIGH RIB OF PBR PNEL 3 x 3 EVE NGLE (14 G. GLVNIZED) HIGH FLOTING RKE SUPPORT NGLE [HW-7720] TRI-BED TPE SELER [HW-504] METL INSIDE CLOSURE [HW-426] NOTE: MJOR RIB OF ROOF PNEL CNNOT EXCEED 1¹ ₄ IN HEIGHT. EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-41
42 DETILS NuRoof SSR SYSTEM OVER PBR PNEL (Eave Detail) GUTTER STRP [FL-246] ¹ ₄-14 x ⁷ ₈ LONG-LIFE LPTEK W/WSHER [FSTENER #4] (2 PER STRP) TRI-BED TPE TOP OF CLOSURE [HW-504] ¹ ₄-14 x ⁷ ₈ LONG-LIFE LPTEK W/WSHER [FSTENER #4] (2 PER STRP) 3 1/2 WLL PNEL THICKNESS ¹ ₄-14 x 1 ¹ ₄ LONG-LIFE S.D. W/WSHER [FSTENER #1E] (8 PER PNEL) 2 LONG TRI-BED TPE SELER PNEL RIBS OVER INSIDE CLOSURE GUTTER STRP 48 O.C. (MX.) METL INSIDE CLOSURE [HW-426] 3 x 3 EVE NGLE INSTLLTION NOTE: 1. PPLY TRI-BED TPE SELER CONTINUOUS LONG EVE NGLE. 2. TTCH INSIDE METL CLOSURE WITH ¹ ₄-14 x 1 S.D.S. W/WSHER [FSTENER #1]. 3. PPLY 10 LONG PIECE OF TRI-BED TPE SELER UP ND OVER THE INSIDE METL CLOSURE. 4. PPLY 2 LONG PIECE OF TRI-BED TPE SELER IN VERTICL LEG OF PNEL SEM. 5. IF THE PNELS HVE MINOR RIBS, PPLY MINOR RIB TPE SEL BETWEEN PNEL ND EVE TRIM OR GUTTER. 6. TTCH PNEL WITH ¹ ₄-14 x 1¹ ₄ LONG-LIFE W/WSHER IN THE FLT PNEL ND ONE ECH SIDE OF THE INSIDE METL CLOSURE (8) TOTL [FSTENER #1E]. ULTR-DEK PNEL DOUBLE-LOK PNEL MINOR RIB TPE SELER T LL MINOR RIBS [HW-512] PREPUNCHED HOLES IN PNEL ¹ ₄-14 x ⁷ ₈ LONG-LIFE LPTEK W/WSHER [FSTENER 12 O.C. SCULPTURED GUTTER PBR PNEL (FIELD CUT PNEL T EVE) x 2 ⁷ ₈ DECK SCREW [FSTENER E. HIGH RIB OF PBR PNEL TRI-BED TPE SELER [HW-504] ¹ ₄-14 x 1 SELF-DRILLER W/WSHER [FSTENER #1] (2 PER INSIDE CLOSURE) 1 3/8 WLL PNEL EVE STRUT SSR SYSTEM OVER PBR PNEL (Clip ttachment Detail) HIGH FLOTING CLIP [HW-2120] ULTR-DEK PNEL DOUBLE-LOK PNEL PBR PNEL ¹ ₄-14 x 1 SELF-DRILLER W/WSHER [FSTENER #1] (2 PER CLIP) 1 3/8 NR-42 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
43 NuRoof DETILS SSR SYSTEM OVER PBR PNEL (Rake Detail) BUILDING DIM. 6 TRI-BED TPE SELER [HW-504] SCULPTURED RKE TRIM HIGH RKE SUPPORT NGLE [HW-7720] ¹ ₄-14 x 1 ¹ ₄ LONG-LIFE S.D. W/WSHER [FSTENER 24 O.C. ¹ ₄-14 x 1 ¹ ₄ SHOULDER TEK 2 SELF-DRILLER [FSTENER 24 O.C. (CENTER IN SLOT) ULTR-DEK PNEL DOUBLE-LOK PNEL PBR PNEL 1 3/8 RKE SLIDE [FL-115] 2 x 4 RKE NGLE ¹ ₄-14 x 1 SELF-DRILLER W/WSHER [FSTENER #1] E. ) ¹ ₄-14 x ⁷ ₈ LONG-LIFE LPTEK W/WSHER [FSTENER 12 O.C. FOM CLOSURE WLL PNEL SSR SYSTEM OVER PBR PNEL (Vented Ridge Detail) ROOF PITCH TRI-BED TPE SELER [HW-504] HIGH FLOTING CLIP [HW-2120] ULTR-DEK PNEL DOUBLE-LOK PNEL MX. 2 5 RIDGE FLSHING PERFORTED VENT DRIP [FL-254] DIE-FORMED RIDGE CP ¹ ₄-14 x 1 ¹ ₄ LONG-LIFE S.D. W/WSHER [FSTENER #1E] (3 PER PNEL) ¹ ₄-14 x ⁷ ₈ LONG-LIFE LPTEK W/WSHER [FSTENER 6 O.C. ¹ ₄-14 x ⁷ ₈ LONG-LIFE LPTEK W/WSHER [FSTENER 24 O.C. 12 ROOF PITCH ULTR-DEK PNEL DOUBLE-LOK PNEL MODIFIED BCKUP PLTE [HW-7760] 24 PNEL 1 3/8 ¹ ₄-14 x 1 SELF-DRILLER W/WSHER [FSTENER #1] (2 PER CLIP) TRI-BED TPE SELER CONT. CROSS PNEL [HW-504] ¹ ₄-14 x ⁵ ₈ LONG-LIFE TYPE B W/WSHER [FSTENER #46] (6 PER PNEL LOCTED IN PREPUNCHED HOLES IN PN OF PNEL) OUTSIDE CLOSURE [HW-430] 24 PNEL PBR PNEL EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-43
44 DETILS NuRoof SSR SYSTEM OVER PBR PNEL (EndLap Detail) ¹ ₄-14 x 1 ¹ ₄ LONG-LIFE S.D. W/WSHER [FSTENER #1E] (2 PER ENDLP) 3/4 7 8 ¹ ₄-14 x ⁵ ₈ LONG-LIFE TYPE B W/WSHER [FSTENER #46] (6 PER PNEL LOCTED IN PREPUNCHED HOLES IN PN OF PNEL) FSTENER ENDLP ROOF PITCH ¹ ₄-14 x ⁵ ₈ LONG-LIFE TYPE B W/WSHER [FSTENER #46] (6 PER PNEL LOCTED IN PREPUNCHED HOLES IN PN OF PNEL) ULTR-DEK PNEL DOUBLE-LOK PNEL (PREPUNCHED) ULTR-DEK PNEL DOUBLE-LOK PNEL (PREPUNCHED) HIGH FLOTING CLIP [HW-2120] TRI-BED TPE SELER CONT. CROSS PNEL [HW-504] MODIFIED BCKUP PLTE [HW-7760] 24 PNEL 1 3/8 PBR PNEL ¹ ₄-14 x 1 SELF-DRILLER W/WSHER [FSTENER #1] (2 PER CLIP) NR-44 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
45 NOTES EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-45
46 NOTES NR-46 SUBJECT TO CHNGE WITHOUT NOTICE SEE FOR CURRENT INFORMTION EFFECTIVE NOVEMBER 4, 2005
47 NOTES EFFECTIVE NOVEMBER 4, 2005 SEE FOR CURRENT INFORMTION SUBJECT TO CHNGE WITHOUT NOTICE NR-47
48 Houston, TX del, G tlanta, G twater, C Dallas, TX West Hardy 1601 Rogers Road 2280 Monier venue 550 Industry Way 1804 Jack Mc Kay Blvd. P.O. Box P.O. Box 653 P.O. Box P.O. Box 793 P.O. Box 1210 Houston, TX del, G tlanta, G twater, C Ennis, TX / / / / / Indianapolis, IN Lubbock, TX Memphis, TN Oklahoma City, OK Omaha, NE 1780 McCall Drive 5711 East FM Highway 51 North 7000 S. Eastern venue 1011 Ellison venue P.O. Box 657 P.O. Box P.O. Box 366 P.O. Box P.O. Box Shelbyville, IN Lubbock, TX Hernando, MS Oklahoma City, OK Omaha, NE / / / / / Phoenix, Z Richmond, V Rome, NY Salt Lake City, UT San ntonio, TX Tampa, FL (Sales Office) 660 South 91st venue 801 South venue 6168 State Route West 2300 North 8677 I-10 East 402 N. Frontage Road P.O. Box 739 P.O. Box 239 P.O. Box 4141 P.O. Box P.O. Box 69 P.O. Box 2418 Tolleson, Z Colonial Heights, V Rome, NY Salt Lake City, UT Converse, TX Plant City, FL / / / / / / Litho in U.S /30M
NuRoof Retrofit Systems. Technical/Installation Information
Retrofit Systems Technical/Installation Information INTRODUCTION If your roof is causing problems due to leaks, high maintenance costs and low energy efficiency, the MBCI NuRoof Retrofit System is the
More informationPBR & PBU Panels. Technical/Installation Information
PBR & PBU Panels Technical/Installation Information TABLE OF CONTENTS A. PBR Panel 1. General Description..................................................................... 2 2. Architect/Engineer Information............................................................
More informationThe Experts in Retrofit Design. Retrofit Solutions. Retro-R SSR NuRoof NuWall
The Experts in Retrofit Design Retrofit Solutions Retro-R SSR NuRoof NuWall Retrofit Solutions by MBCI MBCI has experience in retrofitting existing buildings proven with millions of square feet of successfully
More informationSuperior Structural Standing Seam Roof Systems
07 61 00/MBC BuyLine 3903 Superior Structural Standing Seam Roof Systems OUR PANELS MAKE THE difference www.mbci.com Superior Structural Standing Seam Roof Systems Illustrious Standing Seam Roof Systems
More informationSuperior Structural Standing Seam Roof Systems
07 61 00/MBC BuyLine 386 Superior Structural Standing Seam Roof Systems OUR PANELS MAKE THE difference www.mbci.com Superior Structural Standing Seam Roof Systems The Strongest Standing Seam Roof System
More information5V Crimp DESIGN/INSTALLATION INFORMATION
5V Crimp DESIGN/INSTALLATION INFORMATION IMPORTANT NOTICE READ THIS MANUAL COMPLETELY PRIOR TO BEGINNING THE INSTALLATION OF THE SYSTEM. METAL DEPOTS DETAILS MUST BE FOLLOWED AS A MINIMUM TO INSURE APPROPRIATE
More informationPBR & PBU PANELS. Technical/Installation Information
PBR & PBU PANELS Technical/Installation Information IMPORTANT NOTICE READ THIS MANUAL COMPLETELY PRIOR TO BEGINNING THE INSTALLATION OF THE PANEL S. THE MANUFACTURER DETAILS MUST BE FOLLOWED AS A MINIMUM
More informationPBR & PBU PANELS. Technical/Installation Information
PBR & PBU PANELS Technical/Installation Information IMPORTANT NOTICE READ THIS MANUAL COMPLETELY PRIOR TO BEGINNING THE INSTALLATION OF THE Retro-R PANELS. THE MANUFACTURER DETAILS MUST BE FOLLOWED AS
More informationResidential Pricing Guide
Guide TABLE OF CONTENTS Panels 5V Crimp Slimline 2 4 Accessories Flat Sheets Coils V-Groove Soffit Ridge Caps Roof Jacks Touch-up Paint Insulation Slimline Rib Cover Closure Strips Tube Sealant 6 6 7
More informationSTARTRAC BUILDING ORDER BUILDING INFORMATION
Page 2 BUILDING: Geometry Width: 60'-0" Dist to Ridge: 30'-0" Length: 200'-0" Bay Spacing: 10@20'-0" Eave Height : Eave Height C: 24'-0" 24'-0" Roof Slope : Roof Slope C: 2.00 2.00 :12 :12 Col Location
More informationSECTION PRE-ENGINEERED METAL BUILDING
SECTION 13121 PRE-ENGINEERED METAL BUILDING PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required to design, fabricate, deliver to project site, and erect
More informationEVERSEAM 20 APPLICATION GUIDE
EVERSEAM 20 APPLICATION GUIDE Panel Overview Our Name Says It All!"#$%#&'()*+,!"#$%#&'(-.( Applications: The EverSeam panel is an architectural panel that is ideal for residential and light commercial
More informationLokSeam. Design/Installation Information
Design/Installation Information IMPORTANT NOTICE READ THIS MANUAL COMPLETELY PRIOR TO BEGINNING THE INSTALLATION OF THE ROOFING SYSTEM. MBCI DETAILS MUST BE FOLLOWED AS A MINIMUM TO INSURE APPROPRIATE
More informationTYPICAL ROOF CONDITION LAYOUT
FIXED POINTS TYPICAL ROOF CONDITION LAYOUT 15 17 9 16 29 12 14 11 3 7 35 20 6 23 30 31 24 13 18 Typical Roof Condition Layout... 1 Low Eave Isometric View - Fixed/ Floating... 2 Low Eave Section - Fixed/
More informationTrusted Tested Tough Kalaeloa Blvd, Kapolei, Hawaii Phone (808) Fax (808) Neighbor Islands (800)
MAC 200 STRUCTURAL STANDING SEAM METAL ROOF SYSTEM Trusted Tested Tough 91-104 Kalaeloa Blvd, Kapolei, Hawaii 96707 Phone (808) 682-3000 Fax (808) 682-3636 Neighbor Islands (800) 352-3920 www.kloecknermetals.com
More informationWarranties
MBCI Weathertightness Warranties www.mbci.com Weathertightness Warranties MBCI believes if the building owner has to file a claim against the roof manufacturer s Weathertightness Warranty, then someone
More informationSECTION STRUCTURAL RETROFIT ROOF SUB-FRAMING SYSTEM
SECTION 13 34 21 - STRUCTURAL RETROFIT ROOF SUB-FRAMING SYSTEM PART 1 - GENERAL 1.1 DESCRIPTION A. The structural retrofit roof sub-framing system will provide support for a new metal roofing system constructed
More informationR PANEL / PBR PANEL. Installation, Flashings & Shop Drawing Detail Guide.
R PANEL / PBR PANEL Installation, Flashings & Shop Drawing Detail Guide 901 W. Watkins Street Phoenix, AZ 85007 Phone: (877) 787-5467 (855) 426-7836 Email: sales@cortenroofing.com sales@metalforroofing.com
More informationRichmond, VA 800/ Rome, NY 800/ Salt Lake City, UT 800/ San Antonio, TX 800/ COMMERCIAL / INDUSTRIAL PRICING
TABLE OF CONTENTS A. Panels 1. PBR.........................................................................CP-2-3 2. PBU.........................................................................CP-2-3 3.
More informationWESTERN RIB. Installation, Flashings & Shop Drawing Detail Guide.
WESTERN RIB Installation, Flashings & Shop Drawing Detail Guide 901 W. Watkins Street Phoenix, AZ 85007 Phone: (877) 787-5467 (855) 426-7836 Email: sales@cortenroofing.com sales@metalforroofing.com For
More informationDetail Conditions. Panel Information. Flashing Profiles. Notes. Accessory Profiles. Testing Information. Design/Installation Considerations PEF-1
Table of ontents Product Page No. Product Page No. Panel Information T3 Panel Profiles... PEF-2 T3 Panel Overview... PEF-2 T6- Panel Profiles... PEF-3 T6- Panel Overview... PEF-3 T- Panel Profiles... PEF-4
More informationPreformed Metal Roof And Wall Systems
07 40 00/MBC BuyLine 3861 Preformed Metal Roof And Wall Systems OUR PANELS MAKE THE difference www.mbci.com MBCI has earned its reputation as one of the nation s leading suppliers of preformed metal for
More informationPROLOK EAVE PROLOK ROOFING PANEL ROOFING NAIL
EAVE ROOFING NOTE: ROOF PITCH IS REQUIRED FOR FABRICATION LOW SLOPE ADD SEALER TAPE ROOFING NAIL 2x4 SUB- 2x8 EAVE TRIM 1. Install the eave trim using roofing nails. 2. If sealer tape is being used, install
More informationLokSeam. Design/Installation Information. This booklet includes: Trims and Accessories Design and Installation Information
LokSeam Design/Installation Information This booklet includes: Trims and Accessories Design and Installation Information IMPORTANT NOTICE READ THIS MANUAL COMPLETELY PRIOR TO BEGINNING THE INSTALLATION
More informationNUCOR VR 16 II STANDING SEAM ROOF SYSTEM TABLE OF CONTENTS
NUCOR VR 16 II STANDING SEAM ROOF SYSTEM TABLE OF CONTENTS Nucor VR16 II Vertical Rib Standing Seam Roof System...2 Nucor VR16 II Property and Span Tables...3 Standard Details...5 ED3010PE - Gutter...5
More informationMBCI Weathertightness WARRANTIES
MBCI Weathertightness WARRANTIES WEATHERTIGHTNESS WARRANTIES MBCI believes if the building owner has to file a claim against the roof manufacturer s Weathertightness Warranty, then someone has not done
More informationWestern States 7/8 Corrugated
Western States 7/8 Corrugated Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer / Installers..1 Fastener Placement and Selection.2-3 Key
More informationa division of NCI Standing Seam Roof Systems
a division of NCI Standing Seam Roof Systems Building Benefits You Can Expect From A&S Materials Standing Seam roof panels weigh a relatively modest 11/2 pounds per square foot. When long life is required
More information900 SERIES PANEL SHEET INDEX ENDLAP INSTALLATION SEQUENCE L.E. W/ GUTTER VAPOR BARRIER CS-RK-01B-900
CS-PJ-01-900 CS-DS-01-900 CS-PJ-02-900 CS-EL-01-900 CS-EL-02-900 CS-EL-03-900 CS-EL-04-900 CS-RD-01-900 CS-RD-02-900 CS-RD-03-900 CS-EV-01A-900 CS-EV-01B-900 CS-EV-02A-900 CS-EV-02B-900 CS-EV-03A-900 CS-EV-03B-900
More information* Other widths available upon request. 24 Gauge Galvalume - Standard Surface. Other gauges and aluminium available upon request.
is a concealed fastener architectural standing seam roof panel. The panels are easily installed over decking, utilizing metal clips. panels are ideally suited for decorative mansard, fascia and roofs.
More informationIMPORTANT NOTICE READ THIS MANUAL COMPLETELY PRIOR TO BEGINNING THE INSTALLATION OF THE WEATHER GUARD PANEL.
IMPORTANT NOTICE READ THIS MANUAL COMPLETELY PRIOR TO BEGINNING THE INSTALLATION OF THE WEATHER GUARD PANEL. IF THERE IS A CONFLICT BETWEEN PROJECT ERECTION DRAWINGS PROVIDED OR APPROVED BY WHIRLWIND BUILDING
More informationSECTION PRE - ENGINEERED METAL BUILDING MATERIALS
1. GENERAL: 1.01 DESCRIPTION: This supplier shall furnish materials for a Pre - Engineered Steel Structural System, for a new Cafetorium, Gymnasium, Science Labs and Classroom Building, complete with roof
More informationTable of Contents. 3. Standing Seam Panels
Table of Contents 895 North Parkway 3. Standing Seam Panels Standing Seam Panels Table of Contents... PS1-2 Double-Lok... PS3-8 Ultra-Dek... PS9-14 BattenLok HS... PS15-18 Curved BattenLok HS... PS19-20
More informationTABLE OF CONTENTS PRODUCT CATALOGUE fax OVERVIEW PBR 7.2 LONGSPAN ECONORIB
PRODUCT CATALOGUE www.metroll.us sales@fontana.metroll.com ph. 909.823.7663 fax 909.693.5153 TABLE OF CONTENTS OVERVIEW PBR Product Overview and Color Charts Panel Information and Trim 7.2 LONGSPAN ECONORIB
More informationTable of Contents. Notes to Designer/User Map of Typical Roof Conditions...3 Fastener Placement...4 Fastener Selection...5
Table of Contents Section Page Notes to Designer/User...................1-2 Map of Typical Roof Conditions..............3 Fastener Placement........................4 Fastener Selection.........................5
More informationSECTION PLATE CONNECTED WOOD TRUSSES
SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:
More informationSTEEL DECK INSTITUTE Industry Standard Terms & Definitions
s Industry Standard Terms & Definitions November 2016 Industry Standard Terms & Definitions A specialized set of jargon to describe common terms used by manufacturers and other professionals associated
More informationIndustry Standard Terms & Definitions Of The Steel Deck Institute
Industry Standard Terms & Definitions Of The Steel Deck Institute A specialized set of jargon to describe common terms used by manufacturers and other professionals associated with the usage of Steel Deck
More informationRESIDENTIAL LIGHT GAUGE APPLICATION GUIDE
Our Name Says It All RESIDENTIAL LIGHT GAUGE APPLICATION GUIDE Lebanon, PA 888.339.0059 Bridgton, ME 800.677.2060 Howe, IN 866.562.3782 www.everlastroofing.com Residential Light Gauge Table of Contents
More informationCorru-Fit Design Guide
Corru-Fit Design Guide Exclusively for Existing Corrugated Metal Roofs The Most Recognized and Tested Metal-over-Metal Retrofit Re-roofing Solutions Copyright 2017 Roof Hugger, LLC P: 1-800-771-1711 Version
More informationYour Rehab and Retrofit Partner
Fabri Steel West Inc. Your Rehab and Retrofit Partner Provide value added tools for your clients in this difficult real estate market. Objectives Examine market opportunity. Discuss benefits of retrofit
More informationCovering Design Regions
Covering Covering Design Regions Roof Covering Roof Covering (SSR) 24 coverage w/ 3 seam height Machine seamed, in-place Attached to roof secondary (purlins, widebay truss purlin or bar joist) w/ a concealed
More informationTRIAD CORRUGATED METAL, INC.
TRIAD CORRUGATED METAL, INC. COMMERCIAL RESIDENTIAL AGRICULTURAL MS-216 MS-218 Panel Guide This guide describes the design and performance characteristics of the MS-216 and MS-218 Roof panel system. The
More informationRetro-R DESIGN/INSTALLATION INFORMATION
Retro-R DESIGN/INSTALLATION INFORMATION IMPORTANT NOTICE READ THIS MANUAL COMPLETELY PRIOR TO BEGINNING THE INSTALLATION OF THE Retro-R PANELS. THE MANUFACTURER DETAILS MUST BE FOLLOWED AS A MINIMUM TO
More informationAIA PRESENTATION. Retrofit Roof Systems NURF-1 (1 credit hour)
AIA PRESENTATION Retrofit Roof Systems NURF-1 (1 credit hour) Best Practice Slide MBCI is a Registered Proider with the American Institute of Architects Continuing Education Systems. Credit earned on completion
More information5V CRIMP. Technical/Installation Information
5V CRIMP Technical/Installation Information IMPORTANT NOTICE READ THIS MANUAL OCMPLETELY PRIOR TO BEGINNING THE INSTALLATION OF THE SYSTEM. ALWAYS INSPECT EACH AND EVERY PANEL AND ALL ACCESSORIES BEFORE
More informationBattenLok HS. Technical/Installation Information
BattenLok HS Technical/Installation Information IMPORTANT NOTICE READ THIS MANUAL COMPLETELY PRIOR TO BEGINNING THE INSTALLATION OF THE ROOFING SYSTEM. THE MANUFACTURER DETAILS MUST BE FOLLOWED AS A MINIMUM
More informationPrior to ordering and installing materials, all dimensions should be verified by field measurements.
Important Information The application and detail drawings in this manual are strictly for illustration purposes and may not be applicable to all building designs or product installations. All projects
More informationVP ROOF SYSTEMS SSR ROOF SYSTEM. WEATHERTIGHT PERFORMANCE FOR low-slope ROOF APPLICATIONS
VP ROOF SYSTEMS style SSR ROOF SYSTEM INTERLOCKING PANELS provide LONG TERM WEATHERTIGHT PERFORMANCE FOR low-slope ROOF APPLICATIONS 3 high ribs and 24 panel width allow for positive water drainage Available
More informationCentral Seam Plus. Central-Loc
Central Seam Plus Central-Loc Product Guide HELPFUL INFORMATION ON PANELS, TRIMS, GUTTERS AND ACCESSORIES 3" 3" " or 18" COVERAGE " or 18" COVERAGE Central Seam Plus Field seamed Central-Loc Snaps together
More informationINSTALLATION INSTRUCTIONS for MP-RC1 TWO PIECE CONSTRUCTION TO BE INSTALLED ON COMPLETED ROOF DECK
INSTALLATION INSTRUCTIONS for MP-RC1 TWO PIECE CONSTRUCTION TO BE INSTALLED ON COMPLETED ROOF DECK A. 1. Using curb ribs as a guide, layout and mark roof openings on completed roof deck as outside curb
More informationPRE-ENGINEERED METAL BUILDING SYSTEM
PRE-ENGINEERED METAL BUILDING SYSTEM PART 1 GENERAL 1.1 SUMMARY A. The building shall include all primary and secondary structural framing members, connection bolts, roof and wall covering, flashing, gutter,
More informationCUSTOM STEEL BUILDINGS
CUSTOM STEEL BUILDINGS Table of Contents Why American Building Components? ABC is a national manufacturer of high-quality steel products established to serve do-it-yourselfers, homeowners, suburban farmers
More informationABSeam Panel Overview and Installation Instructions
82 Garden Spot Road Ephrata, PA 17522 717-445-6885 35 Ridge Road Newville, PA 17241 717-776-5951 ABSeam Panel Overview and Installation Instructions Applications: The ABSeam panel is an architectural panel
More informationBUILDING COMPONENTS.
07 40 00/WHI BuyLine 5907 Over 10 Energy Star Rated Colors 40-Yr. warranty available on SMP paint systems and 35-Yr. for KYNAR paint systems Cool Metal Roofing Credit Opportunities Under USGBC LEED-NC
More informationDRAWING SCHEDULE DWG NO. C1 E1 E2 E3 E4 E5 ISSUE DATE DESCRIPTION COVER SHEET
PPROVL NOTES ERECTION NOTES 1. pproval of Whirlwind drawings and/or calculations indicate that Whirlwind has correctly interpreted the contract requirements. This approval constitutes the customer acceptance
More informationProfessional Engineering Services. The Brand of Choice
The Brand of Choice Nucor Building Systems, a division of Nucor Corporation, is one of the most flexible and diverse building manufacturers in operation today. Nucor Corporation is a Fortune 500 Company,
More informationABS Pre-Fab Building S ystem
INTRODUCTION Accumech Building System P. Ltd. provides best quality profiled Roofing, Ceiling and Pre-engineered Building System. The demand in the market and due to our services and goodwill in the market,
More informationDugout Covers Specifications
Section 1 - General Dugout Covers Specifications 1.01 Work Included Metal building systems, complete with structural framing (Columns, rafters, struts, purlins, girts, bracing), and optional prefinished
More informationChapter 53: Endwall Overhang(s) Only - Enclosed
Chapter 53: Endwall Overhang(s) Only - Enclosed Most Common Mistakes: 1. Incorrect eave height. 2. Placing standard heel end trusses at same height as interior trusses. 3. Fascia board top edges not bevel
More informationTechnical Information
SECTION 05165 - SPECIFICATIONS FOR RETROFIT ROOF FRAMING SYSTEMS PART 1 GENERAL 1.01 DESCRIPTION 1. General 1. The retrofit framing system shall provide support for a new metal roof panel system over the
More informationPonderay Newsprint-TMP Waterlock + Usk, Washington. Maximum Building Value
Ponderay Newsprint-TMP Waterlock + Usk, Washington Maximum Building Value A-Frame + 608 tons of steel + 101,136 sq. ft. If you re going to build something, it ought to last. Cemex-Clinker Storage Building
More informationw w w. s a q u l i t y m e ta l s. c o m
san antonio branch 210 W. Peden San Antonio TX 78204 P. (210) 227-7276 F. (210) 227-0329 MCALLEN branch 2221 Austin Ave McAllen TX 78501 P. (956) 627-2966 F. (956) 627-0918 w w w. s a q u l i t y m e ta
More informationBlack s Metals Installation Guide
Storage Black s Metals Installation Guide If metal is not to be used immediately, store inside in a well ventilated, dry location. Condensation or other moisture can form between the sheets during storage
More informationUltraLok Roof System Product Application Guide INDEX
Page 1 INDEX 1.0 General...4 1.1 Purpose of the Application Guide...4 1.2 Product Contract Type...4 A. UltraLok Standard Roof System...5 B. UltraLok Component Roof...5 1.3 Responsibilities of the Parties...6
More information238T and 138T Panel and Accessories Price List 9/29/2017 (price good for shipments through 11/31/2017) Customer Job Date Sales Rep 238T PANEL ITEM #
238T and 138T Panel and Accessories Price List 9/29/2017 (price good for shipments through 11/31/2017) Customer Job Date Sales Rep 238T PANEL ITEM # DESCRIPTION SELLING PRICE UOM 238T 238T Seam Cap 24
More informationMasonry and Cold-Formed Steel Requirements
PC UFC Briefing September 21-22, 2004 Masonry and Cold-Formed Steel Requirements David Stevens, ARA Masonry Requirements Composite Construction Masonry is often used in composite construction, such as
More information1 1/2" SSR. FABRAL The pursuit of excellence since 1967
1 1/2" SSR Detail Manual and Estimate Guide 16" 1 1 2" PROPER STORAGE When moisture remains in contact with Galvanized panels in the absence of freely circulating air, white, black or dark gray corrosion
More informationDesign & Installation Guide
Design & Installation Guide Roof Hugger, Inc P: 1-800-771-1711 Design and Installation Guide To Metal-over-Metal Retrofit Roof Systems Version 1.01 Roof Hugger, Inc. 2009 Corporate Office P.O. Box 1027
More informationCentral Snap. Condition Details C SNAPDETAILS
Central Snap Condition Details D C SNAPDETAILS150612.2 The men and women at Central States Manufacturing, Inc. would like to welcome you. OUR MISSION Central States Manufacturing, Inc. is a 100% employee-owned
More informationTRIAD CORRUGATED METAL, INC.
TRIAD CORRUGATED METAL, INC. C O M M E R C I A L R E S I D E N T I A L A G R I C U L T U R A L Snap Loc Panel Guide Snap Loc metal panels are a perfect fit for residential, architectural and commercial
More informationTECHNICAL ERECTION MANUAL SUPER SEAM II
8234 Hansen Road Houston, TX 77075 (800) 324 9992 Toll Free (713) 946 7140 (832) 553 4992 Fax www.whirlwindsteel.com Subject to change without notice IMPORTANT NOTICE PLEASE READ THIS MANUAL COMPLETELY
More informationresearch report Cold-Formed Steel Gable End Wall Design Using the Prescriptive Method for One and Two Family Dwellings RESEARCH REPORT RP05-2
research report Cold-Formed Steel Gable End Wall Design Using the Prescriptive Method for One and Two Family Dwellings RESEARCH REPORT RP05-005 REVISION 006 American Iron and Steel Institute Cold-Formed
More informationPROJECT IDEA CATALOG. FREE! Take one. Get inspired! 84LUMBER.COM
PROJECT IDEA CATALOG FREE! Take one. Get inspired! 84LUMBER.COM Gambrel Barns These oversized barns maximize your storage space. They re easy to build, using our engineered truss brackets, providing a
More informationFABRAL The pursuit of excellence since 1967
1 1/2" SSR Detail Manual and Estimate Guide 16" 1 1 2 " PROPER STORAGE When moisture remains in contact with Galvanized panels in the absence of freely circulating air, white, black, or gray corrosion
More informationLight-Metal Roof Edge, Raised
NAIL WOOD CANT TO BLOCKING 2 ROWS STAGGERED EACH ROW 24 O.C. 1/2 MIN. 10 0 MAX. FASTEN 18 O.C. WITH NEOPRENE GASKETED FASTENERS 3-1/2 MIN. 4 6 JOINT COVER PLATE SET IN TWO BEADS OF SEALANT 4 MIN. SPECIFIED
More informationSECTION STEEL DECKING
SECTION 05 31 00 STEEL DECKING SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Refer to Section 05 36 00, COMPOSITE METAL DECKING for floor
More informationPro Lok Roof System Product Application Guide INDEX
Page 1 INDEX 1.0 General...4 1.1 Purpose of the Application Guide...4 1.2 Product Contract Type...5 A. Pro Lok Standard Roof System...5 B. Pro Lok Component Roof...5 1.3 Responsibilities of the Parties...6
More informationSECTION NON-STRUCTURAL METAL FRAMING
SECTION 09 22 16 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories
More informationSL-16. Design/Installation Information
SL-16 Design/Installation Information IMPORTANT NOTICE READ THIS MANUAL COMPLETELY PRIOR TO BEGINNING THE INSTALLATION OF THE SL Series ROOFING SYSTEM. ALWAYS INSPECT EACH AND EVERY PANEL AND ALL ACCESSORIES
More informationTECHNICAL ERECTION MANUAL SUPER SEAM PLUS
8234 Hansen Road Houston, TX 77075 (800) 324 9992 Toll Free (713) 946 7140 Phone (832) 553 4992 Fax www.whirlwindsteel.com Subject to change without notice IMPORTANT NOTICE PLEASE READ THIS MANUAL COMPLETELY
More informationMETAL ROOFING With more panel options in metal roofing, ABC has you covered.
American Buildings Company METAL ROOFING With more panel options in metal roofing, ABC has you covered. Standing Seam II Standing Seam 360 1 American Buildings Company Excellent Performance. Superior Aesthetics.
More informationIMAGE II. Panel Information. Detail Conditions. Flashing Profiles. Accessory Profiles. Testing Information. Design/Installation Considerations PIM-1
Table of ontents Product Page No. Product Page No. Panel Information Profiles... PIM-2 Panel Overview...PIM-2 Flashing Profiles Eave...PIM-3 Extended Eave...PIM-3 leat...pim-3 Offset leat...pim-3 5K Gutter...PIM-3
More informationCONTINUOUS VENTILATORS
CONTINUOUS VENTILATORS used on metal roofing systems roofs conform to high standards and specifications which have been developed, tested and proven over many years. They provide an excellent value for
More informationHansen Pole Buildings Planning Guide. Toll Free / Toll Free FAX
Hansen Pole Buildings Planning Guide Toll Free 866-200-9657 / Toll Free FAX 866-200-9658 While we strive to earn your business, whether you purchase from us or not, we would hope you would utilize this
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationSL175 Panel Technical Data Guide
Description SL175 is a integral snap-lock standing seam roofing panel used on commercial and residential applications. The panel is factory formed in continuous lengths up to 60-0 long. Attachment to either
More informationLPI 56 Technical Guide
LPI 56 Technical Guide Floor & Roof Applications Product Specifications & Design Values 2 Floor Tables 3 Uniform Floor Load (PLF) Tables: Simple s 4 Uniform Floor Load (PLF) Tables: Continuous s 5 Uniform
More informationDesigner Series. Technical/Installation Information
Technical/Installation Information IMPORTANT NOTICE READ THIS MANUAL COMPLETELY PRIOR TO BEGINNING THE INSTALLATION OF THE Designer Series WALL SYSTEM. MBCI MUST BE FOLLOWED AS A MINIMUM TO INSURE APPROPRIATE
More informationStructural Inspection
General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized
More information1 Exam Prep. Roofing Practice Exam 5
1 Exam Prep Roofing Practice Exam 5 1. Mineral surfaced cap sheets should be unrolled and allowed to relax for how long? Eight hours Until soft and pliable Four hours Until flat 2. Roll roofing material
More information2120 SW Poma Drive; Palm City, Florida Phone Fax
2120 SW Poma Drive; Palm City, Florida 34990 772-223-4055 Phone 772-781-7492 Fax www.sunlastmetal.com sales@sunlastmetal.com IMPORTANT NOTICE READ THIS MANUAL COMPLETELY BEFORE BEGINNING INSTALLATION OF
More informationDL-200. Specifications
DL-200 Specifications Everlast Metals 10 Enterprise Court Lebanon, PA 17042 Phone: (717) 270-6554 Fax: (717) 270-6569 www.everlastmetals.com 7410 Structural Preformed Metal Roofing PART 1: GENERAL 1.01
More informationHeel Blocking Requirements and Capacity Analysis. Overview Revised 3/22/2017
Heel Blocking Requirements and Capacity Analysis Overview Revised 3/22/2017 SBCA has been the voice of the structural building components industry since 1983, providing educational programs and technical
More informationNRDCA GUIDELINE FOR APPLICATION of CEMENTITIOUS WOOD FIBER ROOF DECK SYSTEMS
NRDCA 600 - GUIDELINE FOR APPLICATION of CEMENTITIOUS WOOD FIBER ROOF DECK SYSTEMS The National Roof Deck Contractors Association (NRDCA) has prepared this document to provide, customers and installers,
More informationPLYCEM SX20/20 MODULAR BUILDING INDUSTRY FLOOR SYSTEM PLYCEM SX20/20 MODULAR BUILDING INDUSTRY FLOOR SYSTEM
A fiber cement subfloor panel that can be combined with other non-combustible materials to create modular building industry floor systems. Strong, durable fiber cement panel. Dimensionally stable, factory
More informationClassic Rib Roofing Panels DETAIL MANUAL
Metal Roofing Wholesalers Classic Rib Roofing Panels DETAIL MANUAL www.metalroofingwholesalers.com 1170 Topside Rd Louisville, TN 37777 The Classic Rib Roofing Panel Figure 1 House With Classic Rib Metal
More informationThe Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.
SECTION 05 31 33 - STEEL FORM DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification
More informationThe Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.
SECTION 05 31 33 - STEEL FORM DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification
More informationArchitectural Roof and Wall Products Guide Specifications
Architectural Roof and Wall Products Guide Specifications 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL ROOF AND WALL PANELS This Guide Specification is to be used
More information