1 RECOMMENDED GUIDELINES FOR DESIGN AND CONSTRUCTION OF INGROUND SWIMMING POOLS IN HOUSTON, TEXAS PRESENTED AT THE FOUNDATION PERFORMANCE ASSOCIATION SEPTEMBER 12, 2007 MEETING BY DAVID A. EASTWOOD, P.E. SEPTEMBER 2007

2 TABLE OF CONTENTS PAGE Introduction...1 Design.1 General...1 Site Conditions...1 Geotechnical Considerations...1 Field Exploration....1 Laboratory Testing...2 Site Conditions...2 Soil Stratigraphy....2 Groundwater Level....2 General Soils Conditions...2 Geotechnical Design Information...3 Structural Consideration in Pool Design...4 Pool Structure Foundations...5 General...5 Subsoil Removal and Replacement with Select Structural Fill...5 Vertical Moisture Barrier...5 Pool Structure on Void Spaces...6 Chemical Stabilization...6 Helical Piles...6 Structural Pool...7 Pool Bottom...7 Pool Wall...8 Buoyancy...8 Flat Work...9 Effect of Trees/Planter Areas on Pools...9 Existing Trees...9 New Trees...9 Planter Areas...9 Construction Considerations...10 Pool Excavation...10 Groundwater Control...10 Fill Characteristics...10 Select Structural Fill Structural Fill...10 General Fill...10 Drilled Footings Installations...10 Helical Pile Installations...11

3 Surface Water Drainage...11 Quality Control...11 Earthwork...11 Drilled Footing Observations...11 Steel Observations...11 Gunite...11 Site Visit...11 Qualifications of the Geotechnical Firm...12 Acknowledgements...12 Distribution...12 References...12

4 GEOTECH ENGINEERING and TESTING Geotechnical, Environmental, Construction Materials, and Forensic Engineering ACCREDITED Introduction RECOMMENDED GUIDELINES FOR DESIGN AND CONSTRUCTION OF INGROUND SWIMMING POOLS IN HOUSTON, TEXAS PRESENTED AT THE FOUNDATION PERFORMANCE ASSOCIATION SEPTEMBER 12, 2007 MEETING By David A. Eastwood, P.E. (1) Many inground swimming pools are built in the Houston area. The author has observed many of these pools experiencing movements, cracking, etc. The purpose of this document is to highlight prudent practices and guidelines for design and construction of pools to protect the public and pool contractors against a faulty pool design and construction. Pool design and construction should always consider the effects of subsoil, groundwater, structural considerations, drainage, trees, slopes, etc. Design General. A design of the pool should consider the geotechnical considerations, groundwater, slopes, environmental conditions such as trees and drainage. In addition, structural issues should also be considered in the design of any pool. Pools should be designed in general accordance with the latest version of American National Standard for Residential Inground Swimming Pools (Ref. 1). The 2003 version of this document states that the structural design and materials used shall be in accordance with generally accepted structural engineering practices and methods. Site Conditions. Site conditions are crucial in designing a pool. Typically, a site which is flat with no slopes provides the most favorable site condition. However, sites on slopes, next to ravines, provide the most arduous design considerations. Trees also affect the performance of pool structures. Pools that are to be placed near slopes should consider the effects of slope geometry as well as erosion considerations. A geotechnical study should be conducted to address the issue of slope stability and erosion for pools designed and constructed on slopes steeper than 5(h):1 (v). Geotechnical Considerations Field Exploration. A geotechnical exploration and report by a geotechnical engineer licensed in the State of Texas should be conducted for design of any pool. The geotechnical exploration will involve drilling soil borings at the location of where the pool is going to be constructed. In general, the depth of the soil borings should be twice the depth of the pool with a minimum depth of 20-ft. A minimum of two borings should be conducted for pools of less than 3000 sq. ft. Additional borings should be performed if pools are larger than 3000 sq. ft. A minimum of one boring should be conducted for any additional 1500 sq. ft. of pool area. The borings should be sampled continuously from the surface to a minimum depth of 10-ft and at five-ft intervals, thereafter. All cohesive soils should be sampled in general accordance with ASTM D1587. The cohesionless soils should be sampled in accordance with ASTM D1586. Root fibers should be obtained in all borings to help evaluate the active zone. (1) Principal Engineer, Geotech Engineering and Testing, 800 Victoria Drive, Houston, Texas 77022, Tel.: , david.eastwood@geotecheng.com 800 Victoria Drive Houston, Texas Tel.: Fax: Texas Louisiana New Mexico Oklahoma Website:

5 Laboratory Testing. Classification and strength tests should be conducted to develop a soils stratigraphy of the subsoil conditions. In general, all laboratory testing should be conducted in accordance with American Society for Testing Materials Standards (ASTM). The tests should include classification and strength tests. All subsoils should be classified in accordance with the unified soil classification system. Site Conditions. The geotechnical engineer representative should observe and photograph the site conditions during the field exploration. He should address the site conditions if there are trees on the site in close proximity to the pool. He should address slopes, ravines, ponds, and other unusual site features that may result in adverse pool performance. Photograph(s) of the project site should be included in the geotechnical report. Soil Stratigraphy. The geotechnical engineer should address the subsoil conditions at the project site. He should define a soils stratigraphy all the way to the bottom of the borings. The soils stratigraphy should also define how expansive the subsoils are as well as their strength and moisture contents. Groundwater Level. The borings should be drilled dry to evaluate the presence of perched water to free water conditions. The level where free water is encountered in open boreholes during field exploration should be noted on the boring logs. Fluctuations in groundwater level generally occur as a function of seasonal variation, temperature, groundwater removal, and future activities near the project site. Therefore, the pool contractor should verify groundwater depth prior to start of construction on any new pool. This is because the time that a geotechnical study was conducted may be different than the time the pool is constructed. A pool designer should assume groundwater level at the surface for design of the pool system. The groundwater levels in the Gulf Coast area vary significantly. The groundwater depth in the Houston area generally ranges from 0- to 25-ft±. The groundwater measurements are usually evaluated by the use of a tape measure and weight at the end of the tape at the completion of drilling and sampling. Some of the groundwater problem areas in Houston include Southside Place, parts of Sugar Land, West University, etc. One should not confuse the perched water table with the groundwater table. A perched water table occurs when insufficient drainage exists in the areas with a surficial sand or silt layer, about two- to four-ft. thick, underlain by impermeable fat and lean clays. During the wet season, water can pond on the clays and create a perched water table. The surficial sands/silts become extremely soft, wet and may lose their load carrying capacity. General Soils Conditions. Variable soil conditions occur in the Houston area. These soils are different in texture, plasticity, compressibility, and strength. It is very important that a pool structure be designed for subsoil conditions that exist at the specific site in order to reduce potential pool distress. Expansive soils can cause major damage to pool structures in the Gulf Coast area. Expansive soils are classified to be soils with liquid limit greater than 40 and plasticity index (PI) of greater than 20. Details of general subsoil conditions at various parts of the Houston area are described below. Significant variations from these descriptions can occur. The general soil conditions are as follows: 2

6 Location Soil Conditions Northwest and Northeast Houston, including The Woodlands, Cypresswood, Copperfield, Atascocita area, Fairfield, Worthom, and Oaks of Devonshire South, Southwest, Southeast, and part of West Houston including, Kirbywoods, parts of the South Shore Harbour, Seinna Plantation, Clear Lake area, New Territory, Shadow Creek, Greatwood, River Park, Telfare, First Colony, Brightwater, Vicksburg, Pecan Grove, Woods Edge, Cinco Ranch, Lake Olympia, Kingwood, Walden and April Sound on Lake Conroe, etc. Central Houston, including Bellaire, Memorial, Tanglewood, West University. Heights, Spring Branch, Hunter s Creek, Bunker Hill, Piney Point, Hedwig Village, and River Oaks. Weston Lakes, Oyster Creek. Sugar Mill, Sugar Creek, Quail Valley, Sweetwater. Generally sandy surficial soils occur in these areas. The sands are generally loose and are underlain by relatively impermeable clays and sandy clays. This condition promotes perched water table formation which results in the loss of bearing capacity of the shallow soils. Generally highly plastic clays and sandy clays are present in these areas. These clays can experience significant shrink and swell movements. The pools must be designed for this condition. Parts of Cinco Ranch has a surficial layer of sands, underlain by expansive clays. Highly expansive clays. These soils can cause pool failure. Soft soils are observed in some sites. Moderately expansive lean clays, clays, and sands. Special pool foundations must be used for structures near ravines. Very sandy soils in some areas, variable soil conditions. Highly expansive soils at other areas. Highly expansive clays on top of loose silts and sands. Variable soil conditions. Shallow water table. Geotechnical Design Information The geotechnical report for the pool should provide the following information: o Site conditions, photos, existing structures, trees, slopes, etc. o Plan of borings. o Soils stratigraphy. o Groundwater depth. o Whether or not subsoils are expansive. o Lateral earth pressures against pool walls. 3

7 o OSHA soil classification system. o Results of laboratory tests, including soil suction, if conducted. o Skin friction along pool walls to resist buoyancy forces. o Recommendations on compressive and uplift capacity of drilled footings or helical piles, if used. o Dewatering recommendations. o Potential Vertical Rise (PVR) at both deep end and shallow end. o Edge moisture distance. o Depth of active zone. o Depth of root fibers. o Are there trees at or near the pool (within 50-ft.)? o Tree trunk diameters and species (if known or recognized by the field exploration staff). o Recommendations on uplift resistance techniques. o Whether the excavated soils can be used as fill. o Maintenance programs, trees, drainage. o Construction considerations. Structural Consideration in Pool Design A pool structure should be designed by a structural engineer licensed in the State of Texas. The structural engineer will review the geotechnical report for the pool structure and design a wall system and bottom that will resist the prescribed active earth pressures, buoyancy and effects of expansive soils on the pools. The structural engineer should also consider the effects of trees on the pool design. The structural engineer will design adequate steel reinforcement in the pool shell as well as, the proper gunite thickness. The structural engineer should also specify the required gunite compressive strength for the pool structure. The pool structure should be designed to resist buoyancy due to groundwater and expansive soils. The structural engineer should also develop plans and specifications for the construction of the pool. This should include earthwork, gunite, drainage and steel reinforcing specifications. Geotechnical Engineer will provide the Structural Engineer with alternative pool foundations and estimated pool movements. The Structural Engineer will consult with the owner to decide the acceptable level of movements and various pool foundations and their corresponding risks. 4

8 Pool Structure Foundations General. Pool structure systems generally consist of a gunite shell. In case of presence of expansive soils, the pool structure should be isolated from the expansive soils to resist potential pool movements. In addition, in the areas where pools are built near the bayous or on slopes, a structural pool system should be designed. In areas of shallow groundwater, uplift of pool structure may occur as a result of buoyancy forces on the pool shell. Due to heavy rainfall in the Gulf Coast area and corresponding cyclical shallow groundwater, all pools should be designed assuming groundwater at grade to resist uplift loads. Alternatively, weep holes should be placed at pool bottom and along the pool walls to relieve hydrostatic pressures. The weep holes will be covered when the pool is full. The weep holes should be opened when the pool is empty. It should be noted that the use of weep holes will create a pool maintenance issue. Some pool builders punch holes at the bottom of pools when they are emptied to relieve hydrostatic pressures. In the areas where expansive soils are present, the pool plumbing connections should be designed to allow for movements. Furthermore, alternative measures should be implemented to reduce pool movements. As a result of expansive soils, these alternatives in terms of increasing risk of pool movement are discussed in the following sections. Subsoil Removal and Replacement with Select Structural Fill. In the areas where expansive soils are present, the subsoils around the pool and on the bottom of the pool should be removed and replaced with select structural fill. As part of a geotechnical exploration, the geotechnical engineer should determine the depth of active zone at a specific site. Active zone is defined as the depth above which soils experience seasonal changes in moisture conditions and corresponding vertical movements. Root fibers logged in the boring logs help to determine this depth. For example, if the pool is about six-ft, and the active zone is 10-ft, the soils to the bottom of the active zone depth (about 4-ft.) should be removed and be replaced with select structural fill. In addition, the soils around the perimeter of the pool to a distance of edge moisture variation distance from the perimeter of the pool should be removed to the active zone depth and replaced with select structural fill. Edge moisture variation is the distance from the edge of the pool outward when significant changes in moisture content of soil can occur. These soils can experience significant heave. Maximum edge moisture variation distance in Houston is about nine-ft. The select structural fill consists of lean clays with liquid limit of less than 40 and plasticity index between 12 and 20. All the select structural fill in the pool area should be compacted to a minimum of 95% standard proctor density (ASTM D698) at ±2% of optimum moisture. All the compaction work should be tested to assure proper compaction of the soils around the pool. Vertical Moisture Barrier. The subsoils under and around pool can be isolated from change in soil suction and corresponding movements. Soil suction quantifies the energy level in the soil moisture system. An imbalance of total soil suction between the soil at the pool site and adjacent soil tends to drive moisture toward the high value of soil suction. A vertical moisture barrier can be placed next to pool coping. It should extend deep enough to reduce soil suction changes. This depth may be about six- to seven-ft deep. The moisture barrier should totally isolate the pool shell and subsoils under it, and should be placed all around the pool. 5

9 A vertical moisture barrier will not work if (a) the pool shell has a crack in the gunite with corresponding pool leak or (b) there is a plumbing leak inside moisture barriers. All plumbing for the pool should be placed outside the moisture barrier. Vertical moisture barriers consist of impermeable geo-fabrics that are resistant to puncture and ultraviolet light. They can be placed by digging a vertical ditch around the pool. On-site clayey soils can be used to backfill the moisture barrier trench. Do not use sand or silt as backfill materials. All planter areas should be outside the vertical moisture barrier. Pool Structure on Void Spaces. In areas where expansive soils are present, pool structures can also be constructed on void spaces. The design concept is as follows: o Support the pool structure on drilled footings or helical piles. o Place degradeable and collapsible void spaces under the pool bottom. The size of void spaces should be determined by estimating the maximum Potential Vertical Rise (PVR) at pool bottom. o Since expansive soils shrink and swell in three dimensions, place degradable void space against pool walls. In addition, place geosynthetics in between the void space and the pool walls to provide additional slippage plane between the void spaces and pool walls. o Use select structural fill for a minimum of 18-inches around the pool (on the top) to reduce potential water infiltration into the void spaces. This fill should extend a distance equal to edge moisture distance variation away from the pool. o The geotechnical engineer should provide recommendations on both compressive and uplift capacity of drilled footings or helical piles. Chemical Stabilization. Subsoils within and around the pool can be chemically stabilized to reduce the potential pool movement. In general, the subsoils at the bottom and sides of the pool should be stabilized. The bottom chemical stabilization should extend to the depth of active zone. The pool perimeter to a distance of edge moisture variation (a maximum of about 9-ft) from the edge of the pool should also be chemically stabilized. The chemical stabilization may consist of lime-slurry pressure injection or ion exchange chemical injections. The lime-slurry injection should be conducted in the summer time when there are more cracks in the soil mass; otherwise, it may be ineffective. Ion exchange chemicals can be injected anytime of the year. In addition, contractor qualifications and project specifications should be developed for implementation of this technique. The project specification should be developed by the geotechnical engineer of record. The pool owner should be informed that chemical stabilization may kill some vegetation. Helical Piles. The pool structure can also can also be supported on a helical pile system founded below a depth of 15-ft. The helical pile system should be designed on the basis of design procedure, outlined in the Basic Helical Screw Pile Design, (Refs. 2 and 3). The pile should resist uplift loads due to expansive soils and hydrostatic pressures acting on the bottom and the walls of the pool. 6

10 In general, the cost of Helical Pile System will be less than the cost of drilled footings, that are installed using casing or slurry method of construction. Furthermore, the construction time is significantly reduced. Additional information on design of helical pile system can be obtained from Geotech Engineering and Testing web site ( under Publications, Guidelines. The ultimate helical pile compressive and uplift (Ref. 4) capacity can be computed from the following: P = ΣA H (9c) P = ΣA H (qn q ) Piles in Clays Piles in Sands Where: P = Ultimate Pile Capacity, lbs ΣA H = Sum of Helical Plate Areas, ft 2 c = Cohesion of Soil, psf N q = Bearing Capacity Factors for Sands q = Effective Soil Overburden Pressure from Ground Surface to Mid-Plate Depth, psf (An estimate of q equal to 60H psf is recommended, where H is the mid-plate depth in feet.) Helical plates found in clay should use the clay equation. Helical plates in sand, should use the sand equation. We recommend that the helical plates be separated at a distance of three plate diameters. Furthermore, the structural engineer should also check for buckling, using a soil modulus of subgrade reaction (k). Buckling can usually be a problem in soft soils. One way to reduce the potential for buckling is to install the helical shafts through a 12-inch diameter, 10-ft deep hole which is backfilled with concrete after helical pile installation. The helical pile should be placed at a distance of at least five largest plate diameters between each other to reduce group action. Pile spacing that is closer than 5 largest plate diameters will result in axial capacity reduction. The helical pile should be designed to resist the punch-through failure in areas where soft soils occur below strong soils. We recommend a distance of greater than five times the diameter of the lowest helical plate exists from the soft soils to prevent the helical piles from puncturing through into the soft soil stratum. Structural Pool. Pools built near bayous, soft soils, or on slopes may be constructed as structural pools. This means that the pool structure is totally supported on drilled footings. The depth of the drilled footings should be below the active zone as determined by the geotechnical engineer. For pools on slopes, the pier depth should extend below the potential failure surface to resist lateral movements due to potential slope failure. This depth should be determined by modeling the pool and the slope using computer software. Alternatively, a retaining wall should be placed on the side of the pool which is facing the slope. The retaining wall should be designed to prevent slope failure as well as pool movements. In the event that a retaining wall is used to prevent slope movements, the pool can be designed as if it is on a flat ground. Reinforcing steel should be placed in the drilled footings to resist uplift loads due to expansive soils and sliding movements due to unstable slopes. A slopestability analysis should be conducted by the geotechnical engineer to evaluate the global stability of pools on slopes. Pool Bottom. The soils supporting the pool bottom should be inspected for any weak and compressible zones. These areas should be compacted to at least 95% standard proctor density (ASTM D698). 7

11 Pool Walls. Pool walls should be designed using a lateral earth pressure corresponding to active earth pressures and any surcharge load. At rest earth pressure coefficients should be used to evaluate the active earth pressure. Walls should be constructed to prevent moisture migration, since seepage can occur through backfill soil. Backfill soils behind the walls should consist of inorganic lean clays with a liquid limit of less than 40 and plasticity indices between 12 and 20. Other types of select structural fill available locally, and acceptable to the geotechnical engineer, can also be used. These soils should be compacted to at least 95% standard proctor density (ASTM D 698). Groundwater should be assumed to be at the surface when designing the pool walls. Buoyancy. A pool structure can experience uplift loads from the groundwater during flood conditions. The pool structure should perform satisfactorily if a design factor of safety against uplift of 2.0 is used. Furthermore, the structure should be assumed to be empty for the purpose of these calculations, unless the design includes a means of relieving the external hydro-static forces during pool maintenance. The pool structure can resist the uplift loads due to buoyancy by using one of the following alternative measures: o Extend the bottom pool foundation beyond the pool wall to create a toe extension and to provide sufficient weight of overburden soil to resist hydrostatic uplift at the bottom of the pool. Only the submerged weight of the soils mass directly above the toe extension and the dead weight of structure should be considered when calculating the uplift resistance due to unbalance piezometric pressures. o Increase the mass of the pool structure by using a thick gunite foundation. o In the event that a drilled footing or helical pile foundation is used, uplift resistance from these foundations can be considered as reaction forces. The submerged soil unit weight of 60 pound per cubic foot (pcf) can be used to compute the soil resistance to uplift loads. A dry unit weight of 150 pcf should be used for gunite and reinforcing. The pool decking should be keyed and doweled into the coping beams. That is its weight may also be used to prevent pool uplift. The structural engineer can disregard buoyancy forces if he can relieve groundwater uplift loads during the life of the pool. This may be accomplished by using properly installed weep holes. However, weep holes may result in a water leak maintenance issue. Some pool builders punch holes at the bottom of the pool, when the pool is emptied for maintenance or repair purposes to relieve hydrostatic pressures. Again, this may result in pool leak and corresponding uplift due to expansive soils if the pool is located in areas where expansive soils are present. The pool owner should be made aware of the risks involved with these alternatives. A french drain or similar system can also be placed around the bottom of the pool to relieve external hydrostatic pressures. The french drain should be connected to a sump-pump system and water should be pumped out. French drains must be properly designed so that they would not be clogged up. Furthermore, the sump-pump area should be always maintained for the system to work. 8

12 Flat Work. The concrete flat work should be placed around pools, especially in the areas where expansive soils are present. The flat work should be crowned such that it would slope about 2% away from the pool structure. Control joints should be placed at generally no more than eight-ft spacing. Isolation joins should be placed between the coping and flat work. The flat work should be reinforced with at least No. 3 bars at 18-inch spacing. Chairs should be placed directly underneath the steel. The steel should be in the middle of the flat work. Furthermore, concrete should have a minimum compressive strength of 2100 psi at seven days. The subgrade underneath the flat work should be compacted to a minimum of 95% standard proctor density (ASMT D698). All compactions should be verified by all field density tests. A set of concrete cylinders should be made for each pour or every 25 yards of flat work. The flat work should be designed and constructed in general accordance with Portland Cement Association document Building Concrete Walks, Driveways, Patios, and Steps (Ref. 5). Effect of Trees/Planter Areas on Pools Existing Trees. Tree roots tend to desiccate the soils. In the event that a tree has been removed prior to pool construction, or if a tree dies, subsoil swelling may occur in the expansive soil areas for several years. Studies (Ref. 6) have shown that this process can take as much as 20 years in the area where highly expansive clays are present. In this case, the pool structure should be designed for the anticipated maximum heave. One way that pool movement is reduced is by removal and replacement of expansive soils as discussed in the previous section. In addition, the area within the tree root zone may have to be chemically stabilized to reduce the potential movements. Alternatively, the site should be left alone for several years so that the moisture regime in the desiccated areas of the soils (where tree roots used to be) becomes equal/stabilized to the surrounding subsoil moisture conditions. It should be noted that the upheaval in the expansive clays (where trees have been removed or trees have died) occurs predominantly faster in the areas that have poor drainage, excessive irrigation or when a plumbing/sewer leak is occurring. New Trees. Shallow pools of less than 3-ft can experience potential settlement (shrinkage of soils) due to trees sucking water from soils underneath the pools. We recommend trees not be planted or left in place (existing trees) closer than half the canopy diameter of mature trees from the grade beams, typically a minimum of 20-ft. Alternatively, root systems from some tree species can go under the shallow portion of a pool and cause uplift in the area. Vertical root barriers can be placed near the coping to minimize the effects of tree root movements under the pool shell. These retardants can reduce possible pool movements as a result of tree root systems. Planter Areas. Planter areas should be placed away from pools where expansive soils are present. In the event planter areas are built near pools, design approaches should be implemented to reduce potential pool movements due to wetting caused by planter areas. These design concepts may include using moisture barriers, etc. 9

13 Construction Considerations Pool Excavation. Typically, temporary (less than 24 hours), open trenched, non-surcharged and unsupported excavations for a pool can be built on vertical slopes. Flatter slopes may be required in the areas where soft soils or a large amount of sands are encountered. Vertical cuts can be constructed for shallow pools or where shoring and bracing is used for excavation wall stability. In all cases, excavation construction should conform to OSHA (Occupational Safety and Health Administration) guidelines. In general, the subsoils in the pool area are classified as Type C soils in accordance with the OSHA Soil Classification System. Specification should require that water not be allowed to pond in excavations. If gunite is not placed the same day that the excavations are completed, place a thin layer of gunite (flash) over the base and the walls of the pool. Groundwater Control. The geotechnical report should address groundwater control during pool construction. In the event that groundwater is encountered during construction, where cohesive soils are present, the groundwater should be removed using a sump-pump system. In the areas where cohesionless soils are present with shallow groundwater, dewatering may have to be conducted, using a wellpoint system. The groundwater should be removed to a minimum depth of 3-ft below the pool bottom. The pool excavation dewatering and retention techniques are the responsibility of the general contractor. Fill Characteristics Select Structural Fill. This is the type of fill that can be used around and at the bottom of the pool. These soils should consist of lean clays, free of root organics, with liquid limit less than 40 and plasticity indices between 12 and 20. Structural Fill. This type does not meet the Atterberg limit requirements for select structural fill. This fill should consist of lean clays or fat clays. These soils should not be used under or around a pool. General Fill. This type of fill consists of sands and silts. These soils are moisture sensitive and are difficult to compact in a wet condition (they may pump). Their use is not recommended under or around the pool. They can be used in the planter areas at least 5-ft away from the pool. They can also be used for site grading outside the buildings and pavement areas. Drilled Footings Installations Where structural pool is used, the drilled footings installations shall be done in accordance with the American Concrete Institute (ACI) Reference Specifications (Ref. 7) for the construction of drilled piers (ACI 336.1) and commentary (ACI 336.1R-98). Furthermore, it should comply with U.S. Department of Transportation, drilled shafts construction procedures and design methods (Ref. 8). The drilled footing excavations should be free of loose materials and water prior to concrete placements, and concrete should be placed immediately after drilling the holes. 10

14 Helical Pile Installations Experience indicates that torque required to install a helical pile can be used to estimate its compressive capacity (Ref. 9). The contractor should screw the pile into ground to desired torque. Do not overtorque. Furthermore, grout can be placed if specified in the design and brackets can also be installed. In general, the ultimate compressive capacity of helical pile can be estimated in the field, using a value of 9 to 10 times the value of the torque, for square base products. The ultimate compressive capacity will be 6 to 9 times of the field torque, if tubular products are used. The structural engineer should consult with the helical pile manufacturers for piles that can resist corrosion. Surface Water Drainage To minimize ponding of surface water, proper site drainage should be established early in project construction so that this condition will be controlled. Water should not be allowed to pond next to the pool structure. Quality Control Earthwork. The earthwork testing around the pool should be conducted by the geotechnical engineer. Select structural fill should be compacted as described in the design section of this document. Fill materials should be placed in loose lifts not exceeding eight-inches in thickness and compacted to 95% of the maximum dry density determined by ASTM D698 (standard proctor). The moisture content of the fill soils at the time of compaction should be within ±2% of optimum value. We recommend that the degree of compaction and moisture of the fill soils be verified by fill density tests at the time of construction. The frequency of testing be a minimum of four field density tests per lift. Drilled Footing Observations. Detailed observations of pier construction should be required by a qualified geotechnical engineering technician so that the piers are (a) founded in the proper bearing Stratum, (b) have the proper depth, (c) have the correct size, and (d) that all loose materials have been removed prior to concrete placement. Steel Observations. Pool construction requires care in the spacing and arrangement of reinforcing, as heavy concentrations of steel interfere with proper gunite placement. Reinforcements should be free from oil, loose rust, mill scale or after surface deposits that may affect bonding to gunite. Reinforcement should be constructed in general accordance with ACI 506. Steel placement, chair placement, steel grade, steel size and spacing should be observed by a geotechnical or structural engineer prior to gunite placement. Gunite. The gunite should be mixed and placed per ACI 506. All the gunite equipment and procedures should meet the ACI requirements. In addition, grout samples of the gunite should be made and tested for compressive strength in accordance with ASTM C42. Obtain a minimum of four grout samples from each 400 sq. ft. of pool foot print or 50 cubic yards placed, whichever results in more grout samples. Site Visit. After the pool has been constructed, the geotechnical engineer should be consulted to conduct a site visit and discuss placement of landscaping around the pool structure. Landscaping should be placed in such a way that it will not cause pool movements due to expansive soils. All drainage in the landscaping should be away from the pool structure. In the event that sprinkler systems are used for landscaping, they should be placed around the pool to provide a uniform moisture condition. 11

15 Qualifications of the Geotechnical Firm The geotechnical firm who is developing design recommendations for the pool structure should be familiar with design and construction of pools. They should develop recommendations that are site specific to the project. Furthermore, the firm should be accredited by American Association of Laboratory Accreditation (A2LA) in geotechnical engineering. This way the firm has proper personal and quality assurance procedure to handle the project properly. In addition, the geotechnical firm should have errors and omissions insurance with a minimum coverage of $500,000 annual claims made. Acknowledgements The author thanks the following individuals for reviewing this document and making comments: Name Karl Breckon, P.E John Clark, P.E. Eric Green, P.E. Ron Kelm, P.E. Michael Turner Company BEC Engineering Clark Engineers, Inc. Walter P. Moore & Associates, Inc. Forensic Engineers, Inc. SureVoid Products, Inc. Distribution No parts of this document may be reproduced or distributed in any form or by any means or stored in a data base or retrieval system, without prior written permission from Geotech Engineering and Testing. References 1. American National Standard for Residential Inground Swimming Pools, American National Standards Institute, Publication ANSI/NSPI Basic Helical Screw Pile Design, Donald J. Clayton, P.E., Earth Contac Products, February Basic Guidelines for Design Helical Piers for Underpinning, A.B. Chance Company, January 1993 (Bulletin ). 4. Uplift Capacity of Helical Anchors in Soil, A.B. Chance Company, Building Concrete Walks, Driveways, Patios and Steps, Portland Cement Association Eastwood, et. al., Design of Foundations with Trees in Mind, Presented at the ASCE Texas Section Meeting, Reference Specifications for the Construction of Drilled Piers (ACI 336.1) and Commentary (ACI 336.1R), American Concrete Institute, Farmington Hills, Michigan. 8. Drilled Shafts: Construction Procedures and Design Methods, U.S. Department of Transportation, Federal Highway Administration, Volumes I and II, August

16 9. Repairing Existing Structures, Using Steel Piers or Helical Piles, Donald J. Clayton, P.E., Earth Contact Products, February

FOR. by The Structural Committee of The Foundation Performance Association Houston, Texas. Document # FPA-SC-04-0

FOR. by The Structural Committee of The Foundation Performance Association Houston, Texas. Document # FPA-SC-04-0 Issued for Website Publishing Foundation Performance Association Structural Committee Page 1 of 9 RECOMMENDED PRACTICE FOR GEOTECHNICAL EXPLORATIONS AND REPORTS by The Structural Committee of The Foundation

More information

Subsurface Exploration and Foundation Analysis Proposed New Weight Room / Fieldhouse Building 429 N Highway 83 Leakey, Texas

Subsurface Exploration and Foundation Analysis Proposed New Weight Room / Fieldhouse Building 429 N Highway 83 Leakey, Texas Subsurface Exploration and Foundation Analysis Proposed New Weight Room / Fieldhouse Building 429 N Highway 83 Leakey, Texas InTEC Project No. S161639 April 18, 2016 Leakey ISD P.O. Box 1129 Leakey, Texas

More information

geotechnical and construction materials consultants

geotechnical and construction materials consultants geotechnical and construction materials consultants City of Dallas Public Works and Transportation Department 320 E. Jefferson Blvd, Room 307 Dallas, Texas 75203 ATTN: Mr. Vincent Lewis, P.E. Email: Vincent.lewis@dallascityhall.com

More information

RETAINING WALL LEVEL BACKFILL

RETAINING WALL LEVEL BACKFILL City of Poway Development Services Department Building Division (858) 668-4645 (858) 668-4646 (Inspection Line) building@poway.org RETAINING WALL LEVEL BACKFILL Construction of retaining walls, except

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Table of Contents 1. Title 2. Designation 3. List of Figures 4. Scope 5. Referenced

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

Temporary Structures. Excavations and Excavation Supports

Temporary Structures. Excavations and Excavation Supports UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Temporary Structures Excavations and Excavation Supports CM 420

More information

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink. JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT

More information

DISCUSSION ON UNDERPINNING (28/3/12)

DISCUSSION ON UNDERPINNING (28/3/12) DISCUSSION ON UNDERPINNING (28/3/12) The following are opinions of the writer related to various forms of underpinning and foundation stabilization. It should be noted that every situation requires an

More information

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014 1 0 1 0 1 0 1 SECTION 1. TRENCHING BASED ON DFD MASTER SPECIFICATION DATED // P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all work, materials, labor, equipment,

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES PART 1 GENERAL 1.01 SCOPE A. This work shall consist of the underground construction of a pipeline across the state right-ofway, or other facility as indicated on the plans and as

More information

EXCAVATION AND TRENCHING SAFETY REQUIREMENTS

EXCAVATION AND TRENCHING SAFETY REQUIREMENTS 1.0 PURPOSE The purpose of this standard is to outline OSHA requirements as they apply to ecavations for Sierra Pacific Power Company s underground facilities. Facilitiy installation will not be accepted

More information

Municipality of Waterville Public Sidewalk Repair Policy

Municipality of Waterville Public Sidewalk Repair Policy Municipality of Waterville Public Sidewalk Repair Policy Purpose - The purpose of this policy is to protect the public health, safety and welfare of the citizens and inhabitants of the Municipality by

More information

See the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals.

See the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals. As a customer service initiative, the Kansas City, Missouri, City Planning and Development Department/Development Services, in cooperation with the Greater Kansas City Home Builders Association, has developed

More information

SPECIFICATION FOR ENGINEERED FILLS

SPECIFICATION FOR ENGINEERED FILLS SPECIFICATION FOR ENGINEERED FILLS This specification is intended to be used for the engineered fill. The specification is suitable for most purposes but there may be special conditions existing at some

More information

UNDERPINNING A CRANE FOUNDATION

UNDERPINNING A CRANE FOUNDATION UNDERPINNING A CRANE FOUNDATION Donald R. McMahon, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New York, USA Andrew J. Nichols, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 2 SPECIAL BENCHING AND SIDEHILL EMBANKMENT FILLS Geotechnical Bulletin GB2

More information

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT): SECTION 31 32 13.16 CEMENT STABILIZATION PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section pertains to the specifications for cement stabilization of sandy or silty soil and consists of pulverizing, addition

More information

Foundation/Site Work Code Requirements

Foundation/Site Work Code Requirements Q: What is a Foundation Only permit and why did I receive one when I filed for a full Building Permit? All Building Permits for new construction and additions are reviewed for zoning compliance. This review

More information

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

VERTI-BLOCK - DESIGN MANUAL

VERTI-BLOCK - DESIGN MANUAL Company Information General Information Verti-Block is the latest innovative forming system from Verti-Crete, LLC. Recognized worldwide for outstanding aesthetics and performance, Verti-Crete s proprietary

More information

Design Manual: Gravity Wall. Section 1

Design Manual: Gravity Wall. Section 1 Design Manual: Gravity Wall Section 1 A Design Manual: Gravity Wall General Information Company Information Verti-Block is the latest innovative forming system from Verti-Crete, LLC. Recognized worldwide

More information

1. ADD the attached test hole reports for Well Nos. 19 & 20 to the specifications.

1. ADD the attached test hole reports for Well Nos. 19 & 20 to the specifications. 1700 East Iron Ave. Salina, KS 67401 785-827-0433 phone 785-827-5949 fax Arizona California Colorado Kansas Missouri Nebraska New Mexico Oklahoma Texas Utah 1 December 2017 ADDENDUM NO. 2 RE: City of Conway

More information

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: GEOTECH ENTERPRISES, INC.

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: GEOTECH ENTERPRISES, INC. 0 Most Widely Accepted and Trusted ICC ES Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3623 Reissued 04/2017 This report is subject to renewal 04/2018. DIVISION: 31 00 00 EARTHWORK

More information

4 EXTREME FOUNDATION PANELS

4 EXTREME FOUNDATION PANELS 4 EXTREME FOUNDATION PANELS For House Crawl Space On Concrete Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions.

More information

Redi Rock Specification and Installation Manual

Redi Rock Specification and Installation Manual Redi Rock Specification and Installation Manual 1.0 General Scope This Specification covers the Design, Materials and Installation of Redi Rock modular block Retaining and Freestanding Wall systems as

More information

SPECIFICATION : BORING AND JACKING

SPECIFICATION : BORING AND JACKING SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in

More information

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 JANUARY 2010 TABLE OF CONTENTS SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 APPENDIX ROADWAY DESIGN DRAINAGE

More information

GEOTECHNICAL ENGINEERING STUDY. For

GEOTECHNICAL ENGINEERING STUDY. For GEOTECHNICAL ENGINEERING STUDY For PROPOSED RESIDENCE INN BY MARRIOTT ALONG THE SOUTH SIDE OF SPUR 54 JUST NORTH OF THE EXISTING BASS PRO SHOPS HARLINGEN, CAMERON COUNTY, TEXAS Prepared for KRISHNA HARLINGEN

More information

Dewatering & Foundations. Water. Low tech

Dewatering & Foundations. Water. Low tech Dewatering & Foundations Water It seems every time we dig a hole it fills up with rainwater, or groundwater.if we re lucky we hit an underground river or spring that keeps the hole nice and wet. But a

More information

SOILS AND FOUNDATIONS

SOILS AND FOUNDATIONS CHAPTER 1 SOILS AND FOUNDATIONS This chapter has been revised in its entirety; there will be no marginal markings. SECTION 101 GENERAL 101.1 Scope. The provisions of this chapter shall apply to building

More information

***************************************************************************************************************

*************************************************************************************************************** 03365 POST-TENSIONED CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 38 00. ***************************************************************************************************************

More information

CTP STITCH-TIE AGAIN! Quick and easy way to re-anchor existing veneers to back-up structures.

CTP STITCH-TIE AGAIN! Quick and easy way to re-anchor existing veneers to back-up structures. Helical Wall Tie System for Stabilizing Veneers and Structural Repair AGAIN! ANOTHER CTP SOLUTION! CTP STITCH-TIE Quick and easy way to re-anchor existing veneers to back-up structures. Brick to Concrete

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19-1 19-1.01 Exploratory Excavation... 19-1 19-1.02 Trench... 19-1 19-1.02.AStorm Drain Pipe...

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

Report of Geotechnical Engineering Investigation OIA SOUTH CELL LOT (W340) AID Project No. GOA16001 Orange County, Florida GEC Project No.

Report of Geotechnical Engineering Investigation OIA SOUTH CELL LOT (W340) AID Project No. GOA16001 Orange County, Florida GEC Project No. Report of Geotechnical Engineering Investigation OIA SOUTH CELL LOT (W40) AID Project No. GOA16001 Orange County, Florida GEC Project No. 956G July 6, 2017 American Infrastructure Development, Inc. 7 North

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

DESIGN, MANUFACTURE, AND INSTALLATION GUIDELINES PRECAST CONCRETE SEGMENTED PILES FOUNDATION UNDERPINNING FOR

DESIGN, MANUFACTURE, AND INSTALLATION GUIDELINES PRECAST CONCRETE SEGMENTED PILES FOUNDATION UNDERPINNING FOR Issued for Website Publishing Foundation Performance Association - Structural Committee Page 1 of 18 DESIGN, MANUFACTURE, AND INSTALLATION GUIDELINES OF PRECAST CONCRETE SEGMENTED PILES FOR FOUNDATION

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: EMPIRE PIERS 2656 EAST HWY 47 WINFIELD, MO EVALUATION SUBJECT:

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: EMPIRE PIERS 2656 EAST HWY 47 WINFIELD, MO EVALUATION SUBJECT: 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-4050 Issued 12/2017 This report is subject to renewal 12/2018. DIVISION: 31 00 00

More information

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission

More information

DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM

DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM Istanbul Bridge Conference August 11-13, 2014 Istanbul, Turkey DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM T. C. NEEL and K.BOZKURT ABSTRACT This work shall consist of the design, manufacture

More information

Subsurface Investigation Report

Subsurface Investigation Report AGI Project No. 17-154 Subsurface Investigation Report For the Proposed New One-Story Building Addition 7030 West 111 th Street Worth, Illinois Prepared for T63 Development LLC 11052 Mayflow er Lane Orland

More information

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES NORTH SHORE SCHOOL DISTRICT 11 HIGHLAND PARK, ILLINOIS ECS PROJECT NO. 1:8 FOR NORTH SHORE SCHOOL DISTRICT 11 SEPTEMBER, 1 REPORT

More information

Table of Contents. July

Table of Contents. July Table of Contents 36.1 General... 3 36.1.1 Bridge or Culvert... 3 36.1.2 Box Culvert Size Restrictions... 4 36.1.3 Stage Construction for Box Culverts... 4 36.2 Dead Loads and Earth Pressure... 5 36.3

More information

COMBINED CONCRETE SIDEWALK AND RETAINING WALL. Comply with Division 1 - General Provisions and Covenants, as well as the following:

COMBINED CONCRETE SIDEWALK AND RETAINING WALL. Comply with Division 1 - General Provisions and Covenants, as well as the following: SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9072 - Combined Concrete Sidewalk and Retaining Wall PART 1 - GENERAL 1.01 SECTION INCLUDES COMBINED CONCRETE SIDEWALK AND RETAINING

More information

RIGID INCLUSIONS. Rigid Inclusions offer an economical approach for building on sites underlain by soft soil.

RIGID INCLUSIONS. Rigid Inclusions offer an economical approach for building on sites underlain by soft soil. H A Y W A R D B A K E R I N C. RIGID INCLUSIONS Rigid Inclusions offer an economical approach for building on sites underlain by soft soil. Above: HBI installed Rigid Inclusions on a congested downtown

More information

ICC-ES Evaluation Report Issued July 1, 2011 This report is subject to renewal in one year.

ICC-ES Evaluation Report Issued July 1, 2011 This report is subject to renewal in one year. ICC-ES Evaluation Report ESR-1959 Issued July 1, 2011 This report is subject to renewal in one year. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council DIVISION:

More information

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 ADDENDUM No. 6 ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 Due: June 9, 2016 at 2:00 p.m. (local time) The following changes, additions, and/or deletions

More information

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS COASTAL COMMUNITY CREDIT UNION NEAR I-45 AND FM 1764 LA MARQUE, TEXAS FOR

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS COASTAL COMMUNITY CREDIT UNION NEAR I-45 AND FM 1764 LA MARQUE, TEXAS FOR REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS COAAL COMMUNITY CREDIT UNION NEAR I-45 AND FM 1764 LA MARQUE, TEXAS FOR SLI GROUP, INC. AUGU 10, 2016 August 10, 2016 Ms. Johanna

More information

MOA Project # Golden View Drive Intersection & Safety Upgrades

MOA Project # Golden View Drive Intersection & Safety Upgrades Appropriate transitions can include extending the insulation beyond the roadway improvements, reducing the insulation thickness, or angling the insulation downward. Use of a frost tolerant section, an

More information

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT

Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT CHAPTER Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT Sixth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering 19 By Dr. Ibrahim

More information

Excavation Safety Program

Excavation Safety Program Excavation Safety Program Excavation, Trenching & Shoring Safety I. Purpose The purpose of this policy is to establish safe operating procedures for any earthwork or underground work that is done on a

More information

BLEINC. August 17, Black & Veatch Corporation 201 Brookfield Parkway, Suite 150 Greenville, SC 29607

BLEINC. August 17, Black & Veatch Corporation 201 Brookfield Parkway, Suite 150 Greenville, SC 29607 BLEINC. BUNNELL-LAMMONS ENGINEERING, INC. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS August 17, 2017 Black & Veatch Corporation 201 Brookfield Parkway, Suite 150 Greenville, SC

More information

CIVIL BREADTH Exam Specifications

CIVIL BREADTH Exam Specifications NCEES Principles and Practice of Engineering Examination CIVIL BREADTH and STRUCTURAL DEPTH Exam Specifications Effective Beginning with the April 2015 Examinations The civil exam is a breadth and depth

More information

A Design Review of Waterproofing Codes

A Design Review of Waterproofing Codes A Design Review of Waterproofing Codes Section 1807 of Chapter 18 of the International Building Code addresses waterproofing under the section title of Dampproofing and Waterproofing. The section defines

More information

Surface Repair Using Form-and- Pour Techniques

Surface Repair Using Form-and- Pour Techniques ACI RAP Bulletin 4 American Concrete Institute Advancing concrete knowledge FIELD GUIDE TO CONCRETE REPAIR APPLICATION PROCEDURES Surface Repair Using Form-and- Pour Techniques Surface Repair Using Form-and-Pour

More information

Lecture Retaining Wall Week 12

Lecture Retaining Wall Week 12 Lecture Retaining Wall Week 12 Retaining walls which provide lateral support to earth fill embankment or any other form of material which they retain them in vertical position. These walls are also usually

More information

HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS

HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS PART 1 - GENERAL WORK INCLUDED A. Provide all equipment and materials, and do all work necessary to construct a HydroGrid subsurface irrigated fastdry

More information

SECTION MONITORING WELL ABANDONMENT

SECTION MONITORING WELL ABANDONMENT SECTION 027300 MONITORING WELL ABANDONMENT PART I GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 1 - GENERAL REQUIREMENTS,

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two.

2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two. Design Manual Chapter 6 - Geotechnical 6C - Pavement Systems 6C-1 Pavement Systems A. General Information This section addresses the importance of pavement foundations and the potential for pavement problems

More information

STRUCTURAL MASONRY SPECIAL INSPECTOR. Study Guide

STRUCTURAL MASONRY SPECIAL INSPECTOR. Study Guide STRUCTURAL MASONRY SPECIAL INSPECTOR Study Guide May 2017 Examination: The Structural Masonry Inspector Examination is based on the references cited in this document. It is 3 hours in length, is an open-book

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

November 2, Job Number: Mr. Bob Gibson Warrior Golf Assets 151 Clubhouse Drive New Castle, CO Dear Mr.

November 2, Job Number: Mr. Bob Gibson Warrior Golf Assets 151 Clubhouse Drive New Castle, CO Dear Mr. November 2, 2015 Subject: Interim Materials Testing Summary, Lakota Canyon Ranch Golf Course Clubhouse - Materials Testing Special Inspections, Garfield County, Colorado Job Number: 15-6582 Mr. Bob Gibson

More information

Tabulated Data Waler Rails

Tabulated Data Waler Rails Tabulated Data Waler Rails Revised June 1, 1999 Copyright, U.S.A.,Griswold Machine & Eng., Inc., 1998 594 West Highway M-60, Union City, MI 49094 (800) 248-2054 Fax: (517) 741-7483 CAUTION EXCAVATION PROCEDURES

More information

16. Design of Pipeline Structures.

16. Design of Pipeline Structures. 16. Design of Pipeline Structures. a. General. 1) The following guidelines are for the design of structures for water and sewer pipelines including structural concrete and miscellaneous metals design.

More information

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE BE IT ORDAINED by the Town Council of the Town of Plainville: SECTION 1. SUBDIVISIONS. All subdivisions hereinafter developed within

More information

GRAY WATER RECYCLING SYSTEMS

GRAY WATER RECYCLING SYSTEMS GRAY WATER RECYCLING SYSTEMS Note: Section P2601.2 of the International Residential Code requires all plumbing fixtures that receive water or waste to discharge to the sanitary drainage system of the structure.

More information

ENGINEERING DIRECTIVE

ENGINEERING DIRECTIVE Number: E-95-001 Date: 2/2/95 ENGINEERING DIRECTIVE Ross B. Dindio (Signature on Original) CHIEF ENGINEER The purpose of this engineering directive is to formally notify ALL Department engineering personnel

More information

R-TANK SPECIFICATIONS

R-TANK SPECIFICATIONS TECHNICAL STORMWATER MANAGEMENT R-TANK SPECIFICATIONS PART 1 GENERAL 1.01 Related Documents A. Drawings, technical specification and general provisions of the Contract as modified herein apply to this

More information

DESIGN AND INSTALLATION OF THE SHORING AND DECKING FOR TTC YONGE STATION

DESIGN AND INSTALLATION OF THE SHORING AND DECKING FOR TTC YONGE STATION DESIGN AND INSTALLATION OF THE SHORING AND DECKING FOR TTC YONGE STATION INTRODUCTION By Dawn Tattle, P. Eng. Anchor Shoring & Caissons Ltd. TTC Yonge Station is the largest and most complicated of the

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 11 DESIGN-A-SPEC GUIDELINES FIVE STAR RS ANCHOR GEL CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS PART

More information

GENERAL SOILS EVALUATION REPORT. For

GENERAL SOILS EVALUATION REPORT. For GENERAL SOILS EVALUATION REPORT For EL PASO WATER UTILITIES (EPWU) PROPOSED AUSTIN STORMWATER POND IMPROVEMENTS NE OF ALTURA AVE. & LACKLAND ST. EL PASO, EL PASO COUNTY, TEXAS Prepared For MORENO CARDENAS

More information

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating

More information

One and Two Family Additions

One and Two Family Additions One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri

More information

Ulrich Engineers 2901 Wilcrest Suite 200 Houston, TX [V] SOIL [F] [C]

Ulrich Engineers 2901 Wilcrest Suite 200 Houston, TX [V] SOIL [F] [C] 2901 Wilcrest Suite 200 Houston, TX 77042 [V] 713.780.SOIL [F] 713.706.3686 [C] 281.635.5040 www.ulrichengineers.com edward.ulrich@ulrichengineers.com Report No. 2016-013-02 March 24, 2016 Free Range SB,

More information

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: GOLIATHTECH INCORPORATED 175B RUE PELADEAU MAGOG, QUEBEC J1X 5G9 CANADA

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: GOLIATHTECH INCORPORATED 175B RUE PELADEAU MAGOG, QUEBEC J1X 5G9 CANADA 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3726 Issued 10/2017 This report is subject to renewal 10/2018. DIVISION: 31 00 00

More information

REINFORCING TABLES INSTALLATION MANUAL

REINFORCING TABLES INSTALLATION MANUAL REINFORCING TABLES 201 REINFORCING TABLES Design Limitations Introduction The structural wall reinforcing and lintel design tables contained within the Appendix of NUDURA s Installation Manual have been

More information

Preview of LEAME Computer Software

Preview of LEAME Computer Software Appendix Preview of LEAME Computer Software Thus far, this book has focused on the fundamental principles and methods for analyzing slope stability using the limit equilibrium method. The computer software

More information

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE - 268-5161 Residential Accessory Structures This information has been compiled for the benefit of any person

More information

NPTEL Course GROUND IMPROVEMENT USING MICROPILES

NPTEL Course GROUND IMPROVEMENT USING MICROPILES Lecture 22 NPTEL Course GROUND IMPROVEMENT USING MICROPILES Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Email: gls@civil.iisc.ernet.in Contents

More information

BACKGROUND: SUBSURFACE CONDITIONS:

BACKGROUND: SUBSURFACE CONDITIONS: 2 BACKGROUND: The planned project consists of a prefabricated modular apartment building with underground parking, located on the site bounded by Dexter Avenue N. to the east, multi-story residential/commercial

More information

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights 1 Exam Prep Placing Reinforcing Bars Tabs and s These 1 Exam Prep Tabs are based on the CRSI Placing Reinforcing Bars Recommended Practices, 9 th Edition. Each 1 Exam Prep tabs sheet has five rows of tabs.

More information

TRENCHING AND EXCAVATION

TRENCHING AND EXCAVATION TRENCHING AND EXCAVATION The following guide is an aid intended for students who have completed the ClickSafety training course or module associated with Trenching and Excavation. This guide is a resource

More information

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage. DELTA -DRAIN Section 07 10 00 Dampproofing and Waterproofing PART 1 GENERAL 1.1 SECTION INCLUDES A. Below grade drainage sheets. B. Plaza deck and planter drainage sheets. 1.2 RELATED SECTIONS A. Section

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

The designer shall also submit additional information required by the University as described and underlined below.

The designer shall also submit additional information required by the University as described and underlined below. I. Structural Engineering Submissions The designer shall submit all information required by the State Construction Office (SCO) as described in the State Construction Manual Chapter 300 - Project Design

More information

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE September 1, 2003 CONCRETE MANUAL 5-694.800 5-694.810 GENERAL SPECIAL TYPES OF CONCRETE 5-694.800 In the general use of the word concrete, the idea implied is the conventional placement of the material

More information

SECTION PLATE CONNECTED WOOD TRUSSES

SECTION PLATE CONNECTED WOOD TRUSSES SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information