1 ` D2 EXPANSION PROGRAM AT WASHINGTON DULLES INTERNATIONAL AIRPORT BY FELIX C. BARTHOLOMEW ABSTRACT Lessons Learned: An examination of the Program Management policies and procedures that contributed to the successes and accomplishments achieved during Phase I Construction of the Capital Construction Program and the application and use of the successful management techniques as part of Phase II. INTRODUCTION In 1987, the Federal Aviation Administration (FAA) turned over control of Ronald Reagan Washington National Airport (Reagan National) and Washington Dulles International Airport (Dulles) to the Metropolitan Washington Airports Authority (Airports Authority), an independent agency created by the Commonwealth of Virginia and the District of Columbia, with the consent of the Congress of the United States. Immediately thereafter, the Airports Authority embarked upon Phase I of the multi-phased Capital Construction Program (CCP) and the Office of Engineering hired Parsons Management Consultants (PMC), a joint venture company 1, to provide Program Management and Support Services in conjunction with the Program. The services include Program Planning, Design/Engineering Management, Construction Management and other technical support services at Reagan National and Dulles Airports. The primary aim of the Capital Construction Program was to build a new 35-gate terminal and related facilities at Reagan National and to expand the existing terminal and facilities at Dulles. The goal at Reagan National was to improve services and customer convenience and at Dulles, the goal was to expand the facilities to meet the anticipated future demand for increased passenger services and cargo facilities. In addition, the existing facilities at both airports had to be maintained and remain fully operational during construction (i.e., construction was to have no impact on passenger service and flight schedules). Phase I, which is approximately 85% complete, consists of the construction of a new terminal (Terminal B/C) and related infrastructure at Reagan National; and the expansion of the Main Terminal facilities and construction of related infrastructure, 1 Parsons Transportation Group; Parsons Brinckerhoff Construction Services, Inc.; DMJM Aviation; and Delon Hampton Associates, Chartered. Copyright 2002 by the Construction Management Association of America Page 1

2 including the new Customs and Immigration facilities at Dulles. With the concurrence of the signatory airlines, the Phase I Construction was expanded to include a number of additional projects, including a new Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control System at National; and a new permanent Midfield Concourse (Tier 1) at Dulles. The Capital Construction Program, nevertheless, continued to proceed in accordance with the Airports Implementation Plan and Program Schedule. Between 1987 and 1999, the number of annual enplanements at Washington Dulles International Airport increased by 86.0 percent, from 10,750,000 passengers to 20,000,000 passengers; and, in the year 1999, Dulles, with a 25.7% increase in the total number of passengers served, was the fastest growing major airport in the world. The industry average growth rate, for the year 1999 was approximately 2.9%. The immediate need for a continuation of the expansion of the facilities and infrastructure at Dulles was therefore apparent, and in October 2000, the Board of Directors of the Metropolitan Washington Airports Authority agreed to pursue Phase II of the Capital Construction Program. The Phase II Program, which is also referred to as the D2 Development Program, will focus primarily on future growth at Dulles. Phase II Construction will include further expansion of the existing Main Terminal and Midfield Concourse (Tier 1), and the construction of a new concourse and related facilities. The major projects include the construction of a second Midfield Concourse (Tier 2); an automated People Mover System and a Maintenance Facility; a high speed Baggage Conveyor System; a fourth Runway with associated Taxiways; and a new Airport Traffic Control Tower. Other major Phase II projects will include the construction of the new South Utility Building; a North Flank Parking Garage and a West Flank Parking Garage; and two underground Pedestrian Tunnels. One tunnel will connect the North Flank Garage to the Main Terminal and the other will connect the Main Terminal to the Midfield Concourses. The construction of additional Aircraft Parking Aprons, a Hydrant Fueling System, Public Parking Lots, Air Cargo Facilities, Utility System Upgrades/Improvements, Roadway System Improvements, Airfield Pavement Panel Replacement, and Airportwide Sign System Improvements are also included in Phase II. Through the present time, the Phase I Construction has been proceeding on schedule and is currently within the approved program budget. Together with Phase II, the total estimated cost of the Capital Construction Program, including several additional projects, is $6.9 billion. The original estimated cost of the Phase II Program is $3.4 billion. The following documents some of the management policies and procedures that contributed to the successes and achievements of the Phase I Construction in three key areas Program Management, Design/Engineering Management and Construction Management. Copyright 2002 by the Construction Management Association of America Page 2

3 PROGRAM MANAGEMENT The Phase II Construction, which is concentrated primarily on airside projects at Dulles, will present many challenges that will require extensive scheduling and greater coordination between projects than was experienced during Phase I Construction. The greatest challenge anticipated during the construction of Phase II was: how to keep the airport and related facilities fully functional, including minimizing any disruption to the movement of aircraft and air traffic, while simultaneously implementing a number of major airside construction projects. The Automated People Mover system (APM), for example, will require the APM tunnel system to be constructed under five existing taxiways. Construction of the APM system will also necessitate retrofit at existing facilities, including the Main Terminal, the International Arrivals Building and the permanent Midfield Concourse (Tier 1). In addition, according to the current Program Implementation Schedule, the second Midfield Concourse (Tier 2) will need to have in place a fully functional APM system and high speed Baggage Conveyor System, associated Taxiways, Aircraft Parking Aprons and a Hydrant Fueling System before it can become fully operational. Program Planning The successes experienced during the Phase I Construction started with the Airports Master Plan that carefully and thoroughly outlined the various projects included in the Construction Program. The Master Plan is complemented by an Implementation Plan and a Program Schedule that carefully identifies each design and construction project with clarity and with precision. The Schedule defined the design and construction periods for each project and established the total estimated cost for the Program in terms of the current dollar value (i.e., cost estimates with no escalation). This is not meant to indicate that the Master Plan and the Implementation Plan and Program Schedule were never revised. It does indicate, however, that the level of effort that was put into the development of the Master Plan has resulted in revisions to the projects that have exhibited no material impact on the Master Plan, the Implementation Plan or the Program Schedule. In addition, the revisions to the Master Plan have caused no major changes to the original scopes of work, or the intent of the Capital Construction Program. Team Building The activity that has contributed to the successes of the Phase I Construction is the concept of team building. Team building was initiated by and between the Authority s Vice President of Engineering and PMC s Program Manager and has resulted in a seamless management organization structure. Team building created a synergistic relationship that has caused the managers and staffs of the Engineering Division and PMC to identify problems during the early stages of planning and development. The relationship has also helped team members to mutually resolve Copyright 2002 by the Construction Management Association of America Page 3

4 differences, thereby eliminating any possible roadblock in the path of progress during the design/engineering phase and the construction phase. Team building, together with a commitment by the managers and staff of both parties to improve performance and the quality of work, has served to build a sense of trust and understanding among team members. Team building has also caused team members to establish priorities, share common goals and objectives and to be proactive in seeking solutions to various problems. In addition, the managers and staff of the Airports Authority and the Management Consultants have expressed a firm commitment to ensuring that the design/engineering and the construction of each project are completed on schedule and within the approved project budget. Partnering Another management activity that has contributed a great deal to the successes of the Phase I Construction has been Partnering. At the onset of construction, the program management realized the need for greater cooperation and communication among the management and staff of the Airports Authority, the Management Consultants, the Architect/Engineering Consultant and the Prime Contractor, and implemented an effective system of Partnering. Partnering has helped to establish a good working relationship among the key staff on each project and has prompted the parties actively engaged in work on the project to mutually develop and communicate goals, streamline procedures and value the differences and priorities that each entity has brought to the project. These activities are also aimed at reducing growth as it relates to cost and schedule, preventing disputes and minimizing claims. Partnering has also created a congenial atmosphere in which the collective efforts and energies of all the parties are focused simultaneously on the successful completion of the respective projects; and these efforts have contributed greatly to the successes of the Construction Program. Partnering among all the parties was primarily responsible for the Airports Authority being able to establish an opening date and plan opening day ceremonies for the new Main Terminal at Reagan National eighteen months in advance of the scheduled/actual project completion date. Risk Management A key management decision that has contributed to the successes of the Phase I Construction has been the implementation of a Risk Management Program by the Airports Authority. The Risk Management Program includes an Owner Controlled Wrapup Insurance Program (OCWIP) that makes available to all eligible contractors and subcontractors that perform job-site construction services - Workers Compensation and Employer s Liability Insurance; Commercial General Liability and Excess Liability Insurance; and Builders Risk Insurance. The OCWIP is a structured insurance program that provides for a high level of protection ($200,000,000 in airport contractors liability Copyright 2002 by the Construction Management Association of America Page 4

5 insurance) at a lower premium than that which is available through private insurance programs. Therefore, the OCWIP has eliminated the contractors obligation to purchase the government mandated construction liability insurance from private insurers and has allowed the Authority to institute and enforce strict safety procedures while providing for prompt investigation and notification of settlement of claims. One additional advantage of the OCWIP is that it has eliminated the disparities in the costs of the various private insurance programs that are available to contractors and subcontractors. In addition, the OCWIP has leveled the playing field, by offering contractors and subcontractors affordable insurance and by providing an equitable system that has resulted in a competitive approach to the process of soliciting construction contracts. In accordance with the OCWIP, the Authority is credited for the cost of the insurance coverage prior to the execution of a construction contract. In addition, the OCWIP has resulted in cost savings to the Authority that far outweighs the costs associated with the creation and administration of on-site emergency facilities, first aid programs and other special safety programs. DESIGN/ENGINEERING MANAGEMENT The experience and skills of the Design/Engineering (D/E) Task Managers, the performance of the Architect/Engineering (A/E) Consultant and the level of completeness of the project construction documents are primarily responsible for the successes and accomplishments that are a part of Design/Engineering Management. The allocation of adequate time, that allowed for the performance of complete design reviews by the staff of D/E and the development of a full and complete set of quality construction documents, including plans and specifications and the engineer s estimates of construction cost, was equally important. Managing Design/Engineering At the beginning of the Phase I, a preliminary design and construction schedule and a design-to estimate of construction cost are developed for each project; and design and construction budgets are established based upon the design-to construction estimates. As a result, the D/E Task Managers are challenged to manage the production of a set of quality construction documents that reflect the design intent of the respective project within the established schedule and the approved budget. At the completion of each phase of design development (30%, 60%, 90%, and 100% level of completion) the construction documents are reviewed by the D/E staff. If, at the time of the review, the engineer s estimate of construction cost exceeds the designto construction estimate by more than 2.0%, the A/E Consultant is then required to develop a remedial proposal that would bring the estimated construction cost more inline with the established construction budget. Periodic review submissions and regular on-board review of the construction documents at the various levels of design completion are a means of alleviating the development of final construction documents that are not in-line with the approved construction budget. Copyright 2002 by the Construction Management Association of America Page 5

6 Managing Changes in Design From time to time, during the design development of the Phase I construction documents, the Airports Authority and/or the Airlines have forwarded to the A/E Consultant or the Task Manager, requests for changes to the scope of work or modifications to the project plans and specifications. Before such requests could be accommodated, however, the Task Manager is required to thoroughly assess the potential impact of the proposed change on the project schedule and on the total estimated cost. Based upon this assessment, the Task Manager makes a recommendation to the Project Manager and the Manager of Design/Engineering. The Task Manager is also required to exercise control over requests for changes to the design and/or modifications to the scope of work that are made after the construction documents have attained the level of substantial completion. In almost every instant, a late request for a change to the design and/or a modification to the scope of work has had a significant impact on the project s estimated cost and schedule; and should therefore be avoided at all cost. Transition from Design/Engineering to Construction One noteworthy contribution during the Phase I Construction has been the reassignment of key Design/Engineering professionals to the Construction Management group, to review and coordinate the design/engineering and construction activities on major construction projects. The bridge between the design/engineering and construction phases facilitates the smooth transition of the project responsibilities from design/engineering to the construction phase. The re-assignment of personnel permits the D/E staff to participate in partnering meetings with the prime contractor and subcontractors. It also allows them to utilize their knowledge of the project s design intent while performing services during construction including the review of change requests and change notices; and reviews of as-built construction drawings. It is important to note that, at times, the construction professionals are also re-assigned to the Design/Engineering staff and as such, are able to use their expertise in construction to assist with constructibility reviews during the development of the construction documents. CONSTRUCTION MANAGEMENT The successes achieved at Reagan National and Dulles Airports during Construction Management on Phase I Construction projects are attributable primarily to the teams of dedicated construction professionals that include the Construction Managers, Resident Engineers, Construction Inspectors, Office Engineers and Safety Inspectors. At the time of Contract Award for each construction project, the construction staff, under the leadership of the Resident Engineer has to become fully acquainted with the scope and extent of the work outlined in the project plans and specifications included in the Copyright 2002 by the Construction Management Association of America Page 6

7 construction documents. The construction staff is also required to acquaint himself/herself with the inter-relationship between his or her respective project and any other project and has to become familiar with any constraints that might exist due to the adjacent project(s). The CPM Schedule Based upon the contract requirement, the General Contractor for every construction project is required to develop a cost-loaded CPM Schedule that is used by the Construction Manager to monitor actual progress and to determine the impact of changes to the scope of work and the total estimated construction cost. The Schedule must list every measurable construction activity and must include a corresponding dollar value for each activity so that, when added together the total value of the construction is equal to the Contract Amount. The Schedule, which is approved by the Construction Manager, is updated monthly and is utilized by the Resident Engineer to validate the contractor s monthly payment requests. As a result, the Schedule forces the contractor to maintain the agreed-to schedule for each construction activity. As a management tool, the CPM Schedule has proven to be a very valuable asset in helping to maintain the respective schedule for every construction project. Consequently, the CPM Schedule has also helped to maintain the overall Program Implementation Schedule. Managing Changes Another aspect of the Phase I Construction that remains a key element of the successes in the area of Construction Management has been managing the number of change notices and/or change requests proposed or submitted by the Airports Authority, the airlines and/or the contractors on the various construction projects. As with any major construction project, change is inevitable. However, when the proposed change, especially the ones that are outside of the agreed-to scope of work, affects the total estimated cost of the project, it becomes incumbent upon the Resident Engineer to ascertain the validity of the change notice and/or change request. A report of the RE s findings, together with a recommendation, is then forwarded to the Program Manager and/or the Construction Site Manager for review and concurrence. As a result of this procedure, frivolous proposals are generally rejected and only those changes that are deemed necessary to accomplishing the scope of work or the design intent of the project are approved. Safety Construction safety has also been one of the more important elements of Construction Management and the implementation of an extremely successful Construction Safety Copyright 2002 by the Construction Management Association of America Page 7

8 Program remains the hallmark the Airports Authority s Capital Construction Program. The Safety Program was established to minimize the personal injury, to limit property damage and to reduce and control hazards and risks associated with construction. In general, the Program is aimed at achieving an accident-free construction environment. Safety has therefore been a very important and an integral part of every construction project. In order to address safety issues a Construction Safety Advisory Committee was formed. The Committee, which is comprised of management personnel from the Airports Authority, the Management Consultants and the Insurance Safety Consultant, is endowed with three primary functions: 1. Leadership: Provide coordination, leadership and direction for the Construction Safety Program. 2. Enforcement: Monitor the management of the Construction Program to ensure the program is maintained and enforced by all personnel responsible. 3. Recommendations: Recommend resolutions to safety issues not routinely resolvable by the Program Safety Manager, Insurance Safety Consultant, or Contractor s safety staff. The Safety Program consists of a Safety Manual that provides detailed information on the Airports Authority s safety requirements to all contractors and sub-contractors. The manual outlines the policies and procedure for accident prevention including the reporting requirements; and also includes Federal regulations, state and local governmental ordinances, industry standards and the Airports Authority s safety regulations and requirements. The Safety Program also consists of an educational element that uses safety videos that highlight the importance of a safe working environment. The Safety Manual further outlines the role and responsibilities of each employee and details the importance for participation in safety programs and meetings. It also outlines the need for the cooperation and support of all personnel working at the construction site. The manual includes provisions for the securing projects within or contiguous to airport property and is incorporated an integral part of the Contract Documents for each construction project. In addition, the Airports Authority has authorized the Program Safety Manager to stop the construction of any project where, in his judgment, an action or some activity constitutes an immediate or imminent danger. Through December 31, 2001, the Capital Construction Program has produced approximately 19,800,000 man-hours of labor, or the equivalent of $2.50 billion in heavy construction. Through that time, the implementation of a comprehensive Construction Safety Program has resulted in a total recorded accident frequency or lost time Copyright 2002 by the Construction Management Association of America Page 8

9 injury rate (i.e., the Number of Lost Time Injuries x 200,000/Employee-hours), of 0.63%. By comparison the national average, as compiled and recorded by the Office of the U.S. Bureau of Labor Statistics, for similar construction projects during the same period was 4.9%. Quality Assurance/Quality Control The strict adherence to the Construction Quality Assurance (QA) program and Quality Control (QC) procedures has been a contributing factor to the successes and achievements of the Phase I Construction. The Quality Assurance program focused primarily on two areas: 1. Assurance that the construction, including the materials testing and inspection, is being performed in accordance with the quality and standards defined in the Contract Documents. 2. Assurance that the internal operations, including the recording, maintaining, distributing and retention of documentation meet the standard of quality and the requirements established by the Airports Authority. Quality Control, a function performed by the general contractor, is incorporated into the construction documents and, as a result, it has become an integral part of the terms and conditions of the construction contract. The Contractor s Quality Control program consists of three elements: 1. Administrative: Maintenance of records and files, and the securing and scheduling of appropriate personnel/organizations to perform the required inspections and tests. 2. Inspection: Qualified individuals and/or specialists with expertise in the areas of concrete, structural steel, electrical, plumbing, mechanical and finish work to perform the required inspections. 3. Testing: Independent materials testing agencies certified to perform the required tests in the areas of soils, concrete, structural steel and electrical. Although not a test, any required survey will also be performed by an independent agency. During the performance of Construction Management on the Phase I Construction at Reagan National and Dulles Airports, the construction staff, including the Resident Engineers, Construction Inspectors, Office Engineers and Safety Inspectors, has been responsible for over-seeing the construction practices and procedures of the general contractor. The oversight responsibilities also include performing code inspections, validating field tests and verifying adherence to the established quality control procedures. By performing these functions in a conscientious manner and by enforcing Copyright 2002 by the Construction Management Association of America Page 9

10 the terms and conditions of the construction contract, the construction staff is able to exercise enormous control over the quality of the construction. Through this effort, the QA/QC staff has also been able to contribute effectively to the successes of the Capital Construction Program. PROJECT CONTROLS The mission of Project Controls remains the same for the Phase II Construction as it has been for the Phase I Construction: To provide the Airports Authority and the Program Manager with timely and accurate information that would serve as the basis for making rational decisions relative to the project scope of work, the estimated cost and the schedule/date of completion. The Functions of Project Controls The primary functions of Project Controls during Phase I Construction were: 1. To establish the project budgets and cash flow requirements and to review the total estimated cost and/or the forecast amount for the respective design/ engineering and construction projects. 2. To monitor technical performance, to review and update the project schedules and cost estimates and to identify exceptions to the approved project budget and schedule. 3. To compare actual progress to scheduled or planned activities and to prepare monthly reports that document the status of the active design/engineering and construction projects. To successfully perform these functions, the Project Controls staff is required to be uniquely familiar with the various scopes of work and the schedules for the design/engineering and construction projects; to fully understand the inter-relationship between the project scope, schedule, budget and the total estimated cost; and also to be aware of any constraints that might surface due to adjacent projects. The staff, which includes Cost Engineers, Schedulers and Cost Estimators, is also structured to provide direct technical support to the projects Task Manager and Resident Engineer. Lessons Learned in Project Controls Lessons learned in Project Controls including Cost Control, Schedule Control and Cost Estimating include the following: Copyright 2002 by the Construction Management Association of America Page 10

11 1. Cost Control: Annual Budget/Cost Adjustments due to Inflation: The Phase I Construction had been scheduled over an extended period of time. As a result, the original cost estimates and the budgeted amounts that were established for the various design/ engineering and construction projects are required to be escalated annually to account for inflation. The annual inflation factor (IF) is based upon 3rd Quarter Economic Indicators that are developed by the Council of Economic Advisors for the Joint Economic Committee of the Congress of the United States. This method of adjusting the budgetary and cost estimates to accommodate the annual increase in cost due to inflation is believed to be more accurate than estimates that are based upon some anticipated inflation amounts, which are then applied through the mid-point of the project. 2. Schedule Control: Updating Project Schedules: Maintaining the date or schedule established for major critical project milestones remains paramount to the timely completion of the Phase I Construction. Each month, the respective A/E Consultant and/or General Contractor is required to submit an updated schedule that reflects the current status of design/ engineering and/or construction activities and include all approved and/or proposed changes to the project scope of work. The updated schedule is used to access the impact of the proposed changes on the respective project and on affiliated projects, including the possibility of a delay or an extension to the project completion date and/or the possibility of an increase in the total estimated cost. 3. Cost Estimating: Current Market Value: The Engineer s Estimate of Construction is generally based upon the prevailing rates reported by the industry. At times, however, due to current market conditions the total estimated construction amount proposed by the general contractors might exceed the total amount of the Engineer s Estimate. If a situation like this occurs, the Airports Authority would invite the general contractors to submit a best and final proposal. Because the project budget is usually based upon the Engineer s Estimate, the award of a construction contract for an amount that is greater than the Engineer s Estimate normally results in budgeting problems and/or schedule delays. To alleviate this type of problem, the Cost Estimators have added to the design-to construction estimate for each project, a risk factor which is designed to accommodate such risks as the availability of qualified contractors, the contractor s experience and the availability of skilled workers. A NEW CHALLENGE The initial planning, design/engineering and construction efforts in conjunction with the D2 Development Program were initiated in the fall 2000 and had been proceeding in accordance with the Phase II Implementation Plan and Schedule. The preliminary construction phasing and sequencing had been worked-out for a number of critical projects and several contracts for A/E design services on the major construction packages had either been awarded, or were in the design procurement phase. However, like the rest of the United States of America, the tragic events that occurred Copyright 2002 by the Construction Management Association of America Page 11

12 at the World Trade Center and the Pentagon on September 11, 2001, have had an immediate and a profound impact on the Airports Master Plan and on the Phase II Program Implementation Plan and Schedule. The tragedies of September 11 resulted in the complete shut down of Reagan National Airport and a temporary shut down of Dulles Airport and other airports around the country. Based upon the calamity inflicted upon the USA and the world by those events, the Federal Aviation Administration (FAA) has imposed upon the nation s airports and on the airline industry a new set of security guidelines and safety procedures. The new security guidelines and safety procedures, including the use of computer assisted pre-screening devices and the fortification of cockpit doors, include a list of mandatory requirements that necessitates a comprehensive review of the existing layout and operations of terminal facilities at both Reagan National and Dulles. As a result of the new requirements, the Airports Authority has initiated a complete reexamination of the Airports Master Plan and the Phase II Program Implementation Plan and Schedule. In addition to the new FAA requirements, the recent airport security legislation that was enacted by the Congress of the United States will result in changes in security procedures that will have a significant impact on the layouts and operations, and on the costs of new airport facilities. In accordance with the new regulations, a high priority will be placed on all airport security procedures, including the processing and screening of passengers, inspection of carry-on luggage and on baggage handling. The immediate impact of the new regulations has resulted in airport terminals and landside operations areas that have to be reconfigured, queuing areas for ticketing and security screening that must be revised and hold-rooms and concession areas that must be modified. The use(s) of surface parking lots and structured parking garages, including the vehicular access to and from many of the nation s airport facilities, will also be reassessed. In order to accommodate the new security guidelines and safety procedures and the associated changes in airport operations, security enhancement studies and analyses are now being conducted at both Reagan National and Dulles. The Airports Authority has already concluded that greater emphasis must be placed on safety and security as a part of the planning and design of the second Midfield Concourse (Tier 2) and on all future terminal facilities at Dulles. One unique concept that would be worthy of consideration during the planning and design of new terminals at Dulles and at other airports is the possibility of installing explosive detection system (EDS) devices along the perimeter of the terminal, or in some location that is detached from the terminal structure. The EDS devices will accommodate the screening of checked luggage prior to passenger check-in, and/or prior to the issuance of a passenger boarding-pass. As a result, a passenger will not be allowed to board an airline if his or her luggage has not cleared the screening procedure. The new security regulations and the revised procedure for processing and screening passengers and checked luggage would certainly address the mandated security requirements for 100% screening. The new regulations would also increase the efficiency of other elements of passenger and baggage processing, including hold- Copyright 2002 by the Construction Management Association of America Page 12

13 room baggage screening (HBS) and would certainly go a long way towards restoring the public s confidence in the airline industry. CONCLUSION To the Program Management Consultants team, the Capital Construction Program, Phase I Construction has been, in more ways than one, a challenging and a rewarding assignment. The greatest challenge to date, however, has been keeping the existing facilities, including the runways, taxiways, aircraft parking aprons and the terminal areas at Reagan National and Dulles fully functional during the construction of major design/engineering projects. During the design/engineering and construction phases the needs and safety of the traveling public had to be continually recognized at every level of completion. In addition, throughout the Program, the convenience and satisfaction of the traveling public remained paramount in the minds of the Airports Authority and the Airlines. During the Phase I Construction, which was focused primarily on the construction of a new Main Terminal at Reagan National and expansion of the existing Main Terminal at Dulles, another formidable challenge posed to management was the need to maintain all land-side operations during the construction phase. This effort included the maintenance of encumbrance-free public accesses throughout the terminals and similar vehicular access roadways to and from the terminals and airports facilities. The lessons that were learned during the Phase I Construction that have had the greatest of impact have resulted in a complete re-organization of the Program Management functions relative to the Phase II Construction. The Phase II Construction at Dulles is double the size of the Phase I Construction; and to better manage the various projects the Design/ Engineering and Construction Management staffs of the Airports Authority Engineering Division and the Program Management Consultants have been reorganized into functional groups. The functional groups include the following: Design/Engineering: Buildings, Tunnels, Airfield Civil, Landside Civil, Utilities and Major Services, and Communications. Construction: Buildings, Tunnels, Airfield Civil and Landside Civil. As a result of the re-organization, the Site Manager and the respective Project Managers at Dulles are now tasked with managing multiple project responsibilities, compared to the linear type of project responsibility that was established during the Phase I Construction. The re-organization into functional groups provides the Site Manager and Project Manager with a global perspective of the entire D2 Expansion Program; and affords the respective manager the opportunity to engage in more encompassing and program-wide coordination of project activities. The lessons learned while providing Program Management and Support Services during the Phase I Construction have been an invaluable experience and are applicable to Copyright 2002 by the Construction Management Association of America Page 13

14 similar major capital construction programs. The experiences have clearly demonstrated that a sound management philosophy is directly proportional to the level of success achieved on the job and that proper management oversight will produce, at all times, an outstanding record of accomplishment. About the Author: Felix C. Bartholomew is a Professional Associate and Senior Principal Technical Specialist with Parsons Brinckerhoff Construction Services. He currently serves as a Project Controls Engineer on the Metropolitan Washington Airports Authority Capital Construction Program at Ronald Reagan Washington National Airport and Washington Dulles International Airport. ACKNOWLEDGEMENTS A special thanks to the following key staff at the Parsons Management Consultants, J.V. Without their kind assistance and support this paper would not have been possible: Design/Engineering Robert Kleinman, Mary Hibler Construction Management Ed Husson, Ken Lueth Gil Jones, Chuck Niemi Project Controls DeLon Sargent My thanks and appreciation are also extended to the following members of the staff of the Metropolitan Washington Airports Authority s Engineering Division: Rick McLaughin, Construction Branch Jim Needham, Construction Branch Copyright 2002 by the Construction Management Association of America Page 14

15 Copyright 2002 by the Construction Management Association of America Page 15

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services Request for Qualifications Information Architectural / Engineering Task Contract Design Services At Ronald Reagan Washington National Airport Washington Dulles International Airport Dulles Toll Road System

More information

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS Professional Construction Management Services Harrisburg International Airport Rehabilitate Runway 13-31 Susquehanna Area Regional

More information

Dallas/Fort Worth International Airport ASCE Presentation. Terminal Development Program. November, 2009

Dallas/Fort Worth International Airport ASCE Presentation. Terminal Development Program. November, 2009 Dallas/Fort Worth International Airport ASCE Presentation Terminal Development Program November, 2009 ASCE PRESENTATION, NOVEMBER 2009 Background Objective The objective of today s presentation 1. Review

More information

Seattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices

Seattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices Seattle Public Schools Office of Internal Audit Issue Date: December 5, 2017 Introduction and Background In accordance with the fiscal year 2018 capital audit plan, we have completed an audit of the district

More information

Appropriate Role of Contractors Supporting the Government Working Group: Presentation of Recommendations 12/16/2005

Appropriate Role of Contractors Supporting the Government Working Group: Presentation of Recommendations 12/16/2005 PRELIMINARY WORKING GROUP DRAFT For Discussion Purposes Only Not Reviewed or Approved by the Acquisition Advisory Panel Appropriate Role of Contractors Supporting the Government Working Group: Presentation

More information

Aviation Capital Construction Program Update

Aviation Capital Construction Program Update Aviation Capital Construction Program Update 2012 Completed Projects 2013 Active Projects Bern Seals Program Manager Parsons Management Consultants April 2013 0 Discussion Agenda Program Safety Performance

More information

POSITION DESCRIPTION June 16, 2017

POSITION DESCRIPTION June 16, 2017 POSITION DESCRIPTION June 16, 2017 Common Name: Classification: Team / Section: Bureau / Division: ROOFING / BUILDING ENVELOPE PROJECT MANAGER ENGINEERING SPECIALIST MANAGEMENT Project Delivery Services

More information

STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC

STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC PREPARED BY: Metropolitan Washington Airports Authority Washington Dulles International Airport Engineering

More information

Metropolitan Washington Airports Authority. Request for Qualifications Information (RFQI) RFQI No C084. for

Metropolitan Washington Airports Authority. Request for Qualifications Information (RFQI) RFQI No C084. for Request for Qualifications Information (RFQI) RFQI No. for Project Controls Task Contract for Project Support & Management at Washington Dulles International Airport and Ronald Reagan Washington National

More information

Airport Construction Project Risk Management. Presented by: Mindy Price- Direct Effect Solutions

Airport Construction Project Risk Management. Presented by: Mindy Price- Direct Effect Solutions Airport Construction Project Risk Management Presented by: Mindy Price- Direct Effect Solutions Topics ACRP 01-22 Research Background Research Findings and Conclusions Project Risk Management Recommendations

More information

TEAMING, SUBCONTRACTING, AND JOINT VENTURES

TEAMING, SUBCONTRACTING, AND JOINT VENTURES 888 17 th Street, NW, 11 th Floor Washington, DC 20006 Tel: (202) 857-1000 Fax: (202) 857-0200 TEAMING, SUBCONTRACTING, AND JOINT VENTURES 2013 NATIONAL HUBZONE CONFERENCE SEPTEMBER 10, 2013 Presented

More information

6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES

6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES 6.0 TERMINAL REQUIREMENTS AND ALTERNATIVES The projected activity levels at Sacramento International Airport as described in Chapter 3 are the basis for determining the terminal facilities that will be

More information

Hong Kong International Airport Medium & Long Term Development Plans. The British Chamber of Commerce 18 July 2012

Hong Kong International Airport Medium & Long Term Development Plans. The British Chamber of Commerce 18 July 2012 Hong Kong International Airport Medium & Long Term Development Plans The British Chamber of Commerce 18 July 2012 Connecting HK with the World More than 100 airlines serving 160 destinations worldwide

More information

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements JUNE 2016 RONALD REAGAN WASHINGTON NATIONAL AIRPORT Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements PREPARED BY: Ricondo & Associates, Inc. IN

More information

IPMA-CANADA INTERNATIONAL CERTIFICATION PROGRAM IPMA-CP (IN TRAINING) IPMA-CP IPMA-ACP IPMA-EX IPMA-CE

IPMA-CANADA INTERNATIONAL CERTIFICATION PROGRAM IPMA-CP (IN TRAINING) IPMA-CP IPMA-ACP IPMA-EX IPMA-CE IPMA- Canada INTERNATIONAL PROGRAM IPMA-CP (IN TRAINING) IPMA-CP IPMA-ACP IPMA-EX IPMA-CE INTERNATIONAL PROGRAM is a national human resource management association whose mission is to promote excellence

More information

Mid-America Intergovernmental Audit Forum. Selecting an External Auditor. Guide for Making a Sound Decision

Mid-America Intergovernmental Audit Forum. Selecting an External Auditor. Guide for Making a Sound Decision Mid-America Intergovernmental Audit Forum Selecting an External Auditor Guide for Making a Sound Decision May 2007 Foreword The benefits of having a high-quality audit of a government's financial statements

More information

Corporate Governance Principles. As Amended June 7, 2017

Corporate Governance Principles. As Amended June 7, 2017 Corporate Governance Principles As Amended June 7, 2017 These Corporate Governance Principles have been adopted by the Board of Directors of ABM Industries Incorporated ( ABM or the Company ). The principles,

More information

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk

More information

City of Kansas City AIRPORT COMMITTEE BRIEFING. New Terminal Evaluation for Kansas City International Airport. March 15, 2016

City of Kansas City AIRPORT COMMITTEE BRIEFING. New Terminal Evaluation for Kansas City International Airport. March 15, 2016 City of Kansas City AIRPORT COMMITTEE BRIEFING New Terminal Evaluation for Kansas City International Airport March 15, 2016 1 Agenda Process Overview Establishing Requirements & Identifying Issues Forecast

More information

Document Bid Form (General Contract) State of Ohio Standard Requirements for Public Facility Construction

Document Bid Form (General Contract) State of Ohio Standard Requirements for Public Facility Construction Document 00 41 13 - Bid Form (General Contract) State of Ohio Standard Requirements for Public Facility Construction Sealed bids will be received by Miami University at 181 Cole Service Building, Oxford,

More information

BOARD GUIDELINES ON SIGNIFICANT CORPORATE GOVERNANCE ISSUES

BOARD GUIDELINES ON SIGNIFICANT CORPORATE GOVERNANCE ISSUES BOARD GUIDELINES ON SIGNIFICANT CORPORATE GOVERNANCE ISSUES Management and the Board of Directors ( Board ) of Nabors Industries Ltd. (the Company ) are committed to conducting business consistent with

More information

Executive Board of the United Nations Development Programme and of the United Nations Population Fund

Executive Board of the United Nations Development Programme and of the United Nations Population Fund United Nations DP/2001/14/Add.2 Executive Board of the United Nations Development Programme and of the United Nations Population Fund Distr.: General 20 April 2001 Original: English Annual session 2001

More information

Shutdown Requests. Gian Catano Contract Administrator December 17, 2014

Shutdown Requests. Gian Catano Contract Administrator December 17, 2014 Shutdown Requests Gian Catano Contract Administrator December 17, 2014 1 Topics - Two types of Shutdown Requests: - Airside Shutdown Requests - System Shutdown Requests - What is required from the Contractor

More information

KPMG s Major Projects Advisory Project Leadership Series: Stakeholder Management and Communication

KPMG s Major Projects Advisory Project Leadership Series: Stakeholder Management and Communication KPMG Global Energy Institute KPMG International KPMG s Major Projects Advisory Project Leadership Series: Stakeholder Management and Communication Stakeholder management and communication is critical to

More information

Planned Procurement Opportunities Report. December 2017

Planned Procurement Opportunities Report. December 2017 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

Ethical leadership and corporate citizenship. Applied. Applied. Applied. Company s ethics are managed effectively.

Ethical leadership and corporate citizenship. Applied. Applied. Applied. Company s ethics are managed effectively. CORPORATE GOVERNANCE- KING III COMPLIANCE Analysis of the application as at 24 June 2015 by Master Drilling Group Limited (the Company) of the 75 corporate governance principles as recommended by the King

More information

Kosovo s PPP Policy, Legal, & Institutional Framework

Kosovo s PPP Policy, Legal, & Institutional Framework MODULI 1 Kosovo s PPP Policy, Legal, & Institutional Framework Case study PIA concesssion 02, November 2016 Arton Ahmeti Central Public-Private Partnership Department Ministry of Finance 2 Overview Investment

More information

REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017

REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017 REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES Issuance Date November 27, 2017 Submittal Deadline January 8, 2018 Page Is Blank For Photocopying MARIN LAFCO 2 TABLE OF CONTENTS Section Page Number I.

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

Planned Procurement Opportunities Report. January 2018

Planned Procurement Opportunities Report. January 2018 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

Planned Procurement Opportunities Report. November 2017

Planned Procurement Opportunities Report. November 2017 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

Airport FAP Application Guide v18.0

Airport FAP Application Guide v18.0 v18.0 1 P age Current Edition: February 2018 Copyright Information 2018 Greater Toronto Airports Authority. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system,

More information

OCI Mitigation Plan SAMPLE for IDIQ contract

OCI Mitigation Plan SAMPLE for IDIQ contract OCI Mitigation Plan SAMPLE for IDIQ contract Company (Authorized Signatory) Company Vice President (or equivalent level) i TABLE OF CONTENTS Section Description Page I. Organizational Conflict of Interest

More information

LAX INTERNATIONAL AIRPORT

LAX INTERNATIONAL AIRPORT LAX INTERNATIONAL AIRPORT ACHIEVING OPERATIONAL EXCELLENCE Dominic Nessi Deputy Executive Director/CIO 06.24.2015 WELCOME/INTRODUCTION Los Angeles International Airport 5 th busiest airport in the world

More information

Planned Procurement Opportunities Report. February 2018

Planned Procurement Opportunities Report. February 2018 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES Appendix A RFP No. 894-2014 Page 1 of 1 Template Version: SrC120131129 - Consulting Services RFP APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES Revision: 2014-09-22 DEFINITION OF

More information

Transbay Transit Center Program

Transbay Transit Center Program Transbay Transit Center Program Quality Management System Manual Revision 1 September 2013 Quality Management System Manual Revision 1 September 2013 Prepared for the Transbay Joint Powers Authority

More information

Careers List Professional Careers in Construction

Careers List Professional Careers in Construction Careers List Professional Careers in Construction Architect Designs buildings, including the preparation of detailed construction drawings and specifications, and advises on their construction. May specialize

More information

Environmental Scientist Series Specification (Established July 22, 1981)

Environmental Scientist Series Specification (Established July 22, 1981) California State Personnel Board Specification Environmental Scientist Series Specification (Established July 22, 1981) Scope This series specification describes three Environmental Scientist and three

More information

NCDOT Project Delivery Study

NCDOT Project Delivery Study NCDOT Project Delivery Study Final Report July 19, 2004 i NCDOT Project Delivery Study: Final Report Table of Contents Executive Summary...ES-1 A. Introduction and Overview...ES-1 B. Overall Findings and

More information

Sarbanes-Oxley Act of 2002 Can private businesses benefit from it?

Sarbanes-Oxley Act of 2002 Can private businesses benefit from it? Sarbanes-Oxley Act of 2002 Can private businesses benefit from it? As used in this document, Deloitte means Deloitte Tax LLP, which provides tax services; Deloitte & Touche LLP, which provides assurance

More information

The Board of Finance of Baltimore City Department of Finance Bureau of Treasury Management

The Board of Finance of Baltimore City Department of Finance Bureau of Treasury Management The Board of Finance of Baltimore City Department of Finance Bureau of Treasury Management Tax Increment Financing Policy and Project Submission Requirements January 23, 2012 PART I: TAX INCREMENT FINANCING

More information

COUNTY OF SAN JOAQUIN

COUNTY OF SAN JOAQUIN August 1, 2012 COUNTY OF SAN JOAQUIN General Services Department 44 North San Joaquin Street, Suite 590 Stockton, California 95202-2778 (209) 468-3357, Fax (209) 468-2186 GABRIEL E. KARAM Director Capital

More information

Airport Development Plan Update

Airport Development Plan Update Airport Development Plan Update Prepared by: SAN DIEGO COUNTY REGIONAL AIRPORT AUTHORITY SDIA Planning Timeline 2 Where Is SDIA Today? The Airport is implementing the recommendations from the 2008 master

More information

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction 9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE 9.1.1 Introduction This chapter is the provisional Environmental Management Plan (EMP) for the Jubilee Phase 1 Development project. The elements of

More information

BHG Operational Awareness Program May 8, 1998 Hazard Identification, Analysis, Control and Abatement Revision 0 Page 1 of 10

BHG Operational Awareness Program May 8, 1998 Hazard Identification, Analysis, Control and Abatement Revision 0 Page 1 of 10 Page 1 of 10 HAZARD IDENTIFICATION, ANALYSIS, CONTROL, AND ABATEMENT 1.0 SCOPE This Performance Assessment Guide for Hazard Identification, Analysis, Control, and Abatement will be used to carry out the

More information

AICPA STANDARDS FOR PERFORMING AND REPORTING ON PEER REVIEWS. Effective for Peer Reviews Commencing on or After January 1, 2009

AICPA STANDARDS FOR PERFORMING AND REPORTING ON PEER REVIEWS. Effective for Peer Reviews Commencing on or After January 1, 2009 AICPA STANDARDS FOR PERFORMING AND REPORTING ON PEER REVIEWS Effective for Peer Reviews Commencing on or After January 1, 2009 Guidance for Performing and Reporting on Peer Reviews Copyright 2008 by American

More information

Adelaide Airport Limited

Adelaide Airport Limited Induction Pack for Contractors Site Rules and Conditions for Contractors Revision: 7 November 2015 Site Rules and Conditions-Adelaide:Legal 42723757_1 1. GENERAL 1 2. BUILDING CONSENT AND APPROVAL 1 3.

More information

Request for Qualifications. Career Pathways for English Language Learners. April 21, 2014

Request for Qualifications. Career Pathways for English Language Learners. April 21, 2014 Request for Qualifications Career Pathways for English Language Learners April 21, 2014 To organizations, businesses, and community colleges in the Seattle area working with English language learner populations:

More information

City of Los Angeles Los Angeles World Airports CHIEF INFORMATION OFFICER Annual Salary: $158,667 to $225,755

City of Los Angeles Los Angeles World Airports CHIEF INFORMATION OFFICER Annual Salary: $158,667 to $225,755 City of Los Angeles Los Angeles World Airports CHIEF INFORMATION OFFICER Annual Salary: $158,667 to $225,755 Organizational Overview Los Angeles World Airports (LAWA) currently operates two airports: Los

More information

Guidance Note: Corporate Governance - Audit Committee. March Ce document est aussi disponible en français.

Guidance Note: Corporate Governance - Audit Committee. March Ce document est aussi disponible en français. Guidance Note: Corporate Governance - Audit Committee March 2015 Ce document est aussi disponible en français. Applicability The Guidance Note: Corporate Governance Audit Committee (the Guidance Note )

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

Case Report from Audit Firm Inspection Results

Case Report from Audit Firm Inspection Results Case Report from Audit Firm Inspection Results July 2014 Certified Public Accountants and Auditing Oversight Board Table of Contents Expectations for Audit Firms... 1 Important Points for Users of this

More information

Version 1.0. The Contract Management Standard Final Edition. Version 1.0

Version 1.0. The Contract Management Standard Final Edition. Version 1.0 The Management Standard Final Edition 1 Purpose of the Management Standard The purpose of the Management Standard is to describe the nature of contract management in terms of the contract management processes

More information

Gulfstream Flight Test Safety Management System. Evaluation Tool Guidance

Gulfstream Flight Test Safety Management System. Evaluation Tool Guidance Gulfstream Flight Test Safety Management System Evaluation Tool Guidance Flight test presents unique hazards and elevated risk levels during the development and certification of aircraft and new systems.

More information

Professional Practice 544

Professional Practice 544 February 22, 2016 February 29, 2016 Professional Practice 544 AIA-B101 Owner - Architect Agreement Michael J. Hanahan Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com

More information

PERFORMANCE STANDARDS FOR SELF-INSURED EMPLOYERS

PERFORMANCE STANDARDS FOR SELF-INSURED EMPLOYERS ANNEXURE A: Performance standards for self-insured employers WorkCoverSA PERFORMANCE STANDARDS FOR SELF-INSURED EMPLOYERS WorkCover Corporation of South Australia, 2014 Page 74 of 104 Contents PERFORMANCE

More information

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL SECTION 01310 COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL 1.01 SCOPE: A. COST LOADED CONSTRUCTION SCHEDULE (Construction Schedule): The WORK under this Contract shall be planned, scheduled, executed,

More information

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 1997 to 2015

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 1997 to 2015 for Inspecting and Certifying Buildings and Works Building Control Regulations 1997 to 2015 September, 2016 Table of Contents 1. Introduction 1 1.1 Status and Purpose of Code 1 1.2 Overview of Code 1

More information

CONSTRUCTION MANAGEMENT

CONSTRUCTION MANAGEMENT CONSTRUCTION MANAGEMENT Construction Management is not a new idea. The function of the Construction Manager is to work on behalf of the owner to complete a project within the plans and specifications provided.

More information

SAFETY MANAGEMENT SYSTEMS IMPLEMENTATION EVALUATION GUIDE

SAFETY MANAGEMENT SYSTEMS IMPLEMENTATION EVALUATION GUIDE Appendix 8 to Chapter 3 Form 100-12/59 AIRCRAFT OPERATIONS DIVISION CAA OF LATVIA SAFETY MANAGEMENT IMPLEMENTATION EVALUATION GUIDE PROCEDURES SPECIFICATIONS PS 024 AIR OPERATOR CERTIFICATION APP 3.8-1

More information

Project Manager Regional Projects Manager Department Division/Region Community Location

Project Manager Regional Projects Manager Department Division/Region Community Location 1. IDENTIFICATION Position No. Job Title Supervisor s Fin. Code Position 14-01693 Project Manager Regional Projects Manager 14-03406 14740-01-02-210- 1406000-01 Department Division/Region Community Location

More information

International Airport Expansion Project. Terms of Reference for Legal Advisor

International Airport Expansion Project. Terms of Reference for Legal Advisor A. Background International Airport Expansion Project Terms of Reference for Legal Advisor 1. [ ] International Airport (IA) is a medium size airport with a total passenger per year volume of [ ]. IA has

More information

Self Assessment Workbook

Self Assessment Workbook Self Assessment Workbook Corporate Governance Audit Committee January 2018 Ce document est aussi disponible en français. Applicability The Self Assessment Workbook: Corporate Governance Audit Committee

More information

University Business Classification Scheme

University Business Classification Scheme University Business Classification Scheme Introduction The University Business Classification Scheme is a conceptual representation of an organisation s business. It describes an organisation s business

More information

L 96/26 EN Official Journal of the European Union. REGULATION (EC) No 552/2004 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL.

L 96/26 EN Official Journal of the European Union. REGULATION (EC) No 552/2004 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. L 96/26 EN Official Journal of the European Union REGULATION (EC) No 552/2004 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 10 March 2004 on the interoperability of the European Air Traffic Management

More information

DCMA INSTRUCTION 2501 CONTRACT MAINTENANCE

DCMA INSTRUCTION 2501 CONTRACT MAINTENANCE DCMA INSTRUCTION 2501 CONTRACT MAINTENANCE Office of Primary Responsibility: Contract Maintenance Capability Effective: August 14, 2017 Releasability: Cleared for public release New Issuance Incorporates:

More information

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO. Request for Proposals (RFP) Information Technology Independent Verification and Validation ADDENDUM NO. 2 Questions and Answers RFP Amendments September 2015 Contained herein are the responses to the questions

More information

U.S. DEPARTMENT OF LABOR SCA RESOURCE BOOK 11/2002 SCA WAGE DETERMINATIONS SERVICE CONTRACT ACT WAGE DETERMINATIONS

U.S. DEPARTMENT OF LABOR SCA RESOURCE BOOK 11/2002 SCA WAGE DETERMINATIONS SERVICE CONTRACT ACT WAGE DETERMINATIONS SERVICE CONTRACT ACT WAGE DETERMINATIONS SERVICE CONTRACT ACT, as amended (excerpt) SERVICE CONTRACT ACT WAGE DETERMINATIONS REQUESTING SCA WAGE DETERMINATIONS GUIDE TO COMPLETING AN INDIVIDUAL SF-98 REQUEST

More information

Sawdey Solution Services

Sawdey Solution Services Sawdey Solution Services I n c o r p o r a t e d COMMERCIAL PRICE LIST 2016 1430 Oak Court, Suite 304 Beavercreek, OH 45430 Office Phone: (937) 490-4060 Fax: (937) 490-4086 www.sawdeysolut ionservices.com

More information

Workforce Florida, Inc.

Workforce Florida, Inc. Workforce Florida, Inc. Invitation to Negotiate for Customer Relationship Management (CRM) Solution--Technical Assistance Services December 13, 2013 PURPOSE. The purpose of this Invitation to Negotiate

More information

Qualifications Based Selection of Contractors

Qualifications Based Selection of Contractors Qualifications Based Selection of Contractors AGC of America Project Delivery Committee QBS Working Group 1 Table of Contents QBS & The Industry: An Introduction Pages 3-4 Selection Criteria for QBS Page

More information

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower DOCUMENT 001153 - REQUEST FOR QUALIFICATIONS 1.1 PURPOSE, LAWS, AND REGULATIONS A. The purpose of the Prequalification Procedure described in this Document is to provide Owner with a mechanism to evaluate

More information

Design-Builder Peformance Evaluation (DBPE)

Design-Builder Peformance Evaluation (DBPE) Design-Builder Peformance Evaluation (DBPE) There are five (5) major components of the DBPE document. Each component has multiple categories to facilitate performance evaluation for the Design-Builder,

More information

REQUEST FOR PROPOSAL CONSULTING SERVICES DEVELOPING A CORPORATE STRATEGIC PLAN

REQUEST FOR PROPOSAL CONSULTING SERVICES DEVELOPING A CORPORATE STRATEGIC PLAN THE CORPORATION OF THE REQUEST FOR PROPOSAL CONSULTING SERVICES DEVELOPING A CORPORATE STRATEGIC PLAN Proposals will be received prior to 2:00pm on Friday May 29, 2015. All inquiries related to this Request

More information

CHARTER OF THE AUDIT COMMITTEE NATIONWIDE MUTUAL INSURANCE COMPANY NATIONWIDE MUTUAL FIRE INSURANCE COMPANY NATIONWIDE CORPORATION

CHARTER OF THE AUDIT COMMITTEE NATIONWIDE MUTUAL INSURANCE COMPANY NATIONWIDE MUTUAL FIRE INSURANCE COMPANY NATIONWIDE CORPORATION CHARTER OF THE AUDIT COMMITTEE NATIONWIDE MUTUAL INSURANCE COMPANY NATIONWIDE MUTUAL FIRE INSURANCE COMPANY NATIONWIDE CORPORATION ESTABLISHMENT The Audit Committees are committees of the Board of Directors

More information

IMMUNOGEN, INC. CORPORATE GOVERNANCE GUIDELINES OF THE BOARD OF DIRECTORS

IMMUNOGEN, INC. CORPORATE GOVERNANCE GUIDELINES OF THE BOARD OF DIRECTORS IMMUNOGEN, INC. CORPORATE GOVERNANCE GUIDELINES OF THE BOARD OF DIRECTORS Introduction As part of the corporate governance policies, processes and procedures of ImmunoGen, Inc. ( ImmunoGen or the Company

More information

Earthquake-Prone Buildings Policy

Earthquake-Prone Buildings Policy Earthquake-Prone Buildings Policy Introduction and Purpose The purpose of this Policy is to balance out the need to address earthquake risk and other priorities, taking account of the social, cultural

More information

GOVERNANCE GUIDELINES OF THE NATIONAL ASSOCIATION OF CORPORATE DIRECTORS

GOVERNANCE GUIDELINES OF THE NATIONAL ASSOCIATION OF CORPORATE DIRECTORS GOVERNANCE GUIDELINES OF THE NATIONAL ASSOCIATION OF CORPORATE DIRECTORS TABLE OF CONTENTS Title Page 1. History 3 2. Foreword 4 3. Mission and Vision Statement 5 4. Board Membership 5 Size of Board Mix

More information

CORPORATE GOVERNANCE GUIDELINES

CORPORATE GOVERNANCE GUIDELINES CORPORATE GOVERNANCE GUIDELINES OF Ed. Nov.2016 TABLE OF CONTENTS A. DIRECTOR RESPONSIBILITIES 4 B. DIRECTOR QUALIFICATION STANDARDS 4 (1) Board Membership Criteria 4 (a) Independence 4 (b) Limits on Number

More information

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document B101 TM. Standard Form of Agreement Between Owner and Architect Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Architect s client identified

More information

CIRCULAR GENERAL PROVISIONS

CIRCULAR GENERAL PROVISIONS MINISTRY OF CONSTRUCTION -------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No. 10/2013/TT-BXD Hanoi, July 25, 2013 CIRCULAR ON CONSTRUCTION QUALITY MANAGEMENT Pursuant

More information

Project Brief. Royal Columbian Hospital Redevelopment Project Phase One

Project Brief. Royal Columbian Hospital Redevelopment Project Phase One Royal Columbian Hospital Redevelopment Project Phase One Page i TABLE OF CONTENTS 1 INTRODUCTION... 1 1.1 Purpose of this... 1 2 THE BUSINESS OPPORTUNITY... 2 3 FRASER HEALTH AUTHORITY... 4 4 THE PROJECT...

More information

4-Part Series. Schedule Delay Analysis: Forensic Methods and Practical Applications. Register Today! Owes. Who. What?

4-Part Series. Schedule Delay Analysis: Forensic Methods and Practical Applications. Register Today! Owes. Who. What? Who EARN Owes 10.5 CEU Who CREDITS Schedule Delay Analysis: Forensic Methods and Practical Applications What? Starts Wednesday, September 13, 2017 4-Part Series Who Should Attend? Agenda at a Glance Construction

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS NOTE: The City of New Brunswick Parking Authority will consider proposals only from firms or organizations that have demonstrated the capability and willingness to provide high quality services in the

More information

CHAPTER 11 PERSONNEL MANAGEMENT EVALUATION SECTION 1 - GENERAL

CHAPTER 11 PERSONNEL MANAGEMENT EVALUATION SECTION 1 - GENERAL CHAPTER 11 PERSONNEL MANAGEMENT EVALUATION SECTION 1 - GENERAL 11-1. Purpose of Personnel Management Evaluation. Evaluation is an essential component in the personnel management process. Its purpose is

More information

What is the Department of Public Works Project Labor Agreement (DPW-PLA)?

What is the Department of Public Works Project Labor Agreement (DPW-PLA)? City of Los Angeles Department of Public Works PLA / Public Works Infrastructure Stabilization Policy Frequently Asked Questions for Project Labor Agreement 2015-2020 Please note: This document is meant

More information

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows:

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows: SECTION 9. COMMERCIAL WIND ENERGY FACILITIES 9.1 Purpose. The purpose of this Section 9 of the Zoning Bylaw is to provide by special permit for the construction and operation of commercial wind facilities

More information

Definition of Terms **Non-capitalized references to a state refer to a state other than the State of Michigan.

Definition of Terms **Non-capitalized references to a state refer to a state other than the State of Michigan. Definition of Terms **Non-capitalized references to a state refer to a state other than the State of Michigan. Addenda - Documents used by the Owner to incorporate interpretations or clarifications, modifications,

More information

4/7/09 I. PURPOSE OF AGREEMENT

4/7/09 I. PURPOSE OF AGREEMENT 4/7/09 HEART OF TEXAS PARTNERSHIP AGREEMENT Between The Heart of Texas Workforce Development Board, Inc. and Chief Elected Officials For The Heart of Texas Workforce Development Area WHEREAS, the Heart

More information

Introduction to FIDIC Conditions of contract OUTLINE. What is FIDIC? Dr. Mirosław J. Skibniewski, A.J. Clark Chair Professor

Introduction to FIDIC Conditions of contract OUTLINE. What is FIDIC? Dr. Mirosław J. Skibniewski, A.J. Clark Chair Professor New tendency in contracts worldwide Introduction to FIDIC Conditions of contract Dr. Mirosław J. Skibniewski, A.J. Clark Chair Professor 1 2 OUTLINE 1. What is FIDIC? 2. Characteristics of FIDIC Conditions

More information

The Columbus Regional Airport Authority (CRAA) hereby issues addenda to the subject solicitation:

The Columbus Regional Airport Authority (CRAA) hereby issues addenda to the subject solicitation: February 13, 2015 NOTICE OF ADDENDUM ADDENDUM #4 Subject: Date Due: Wireless System Design and Replacement; Request For Proposals (RFP) # FIT-2015-001 February 23, 2015 at 2:00 PM EDT Dear Sir or Madam:

More information

DIRECTOR OF COUNSELLING STUDENT WELLNESS CENTRE

DIRECTOR OF COUNSELLING STUDENT WELLNESS CENTRE DIRECTOR OF COUNSELLING STUDENT WELLNESS CENTRE JOB SUMMARY: Queen s is committed to promoting optimal student wellness across the physical, mental and social dimensions of health to the university s increasingly

More information

SEMPRA ENERGY. Corporate Governance Guidelines. As adopted by the Board of Directors of Sempra Energy and amended through December 15, 2017

SEMPRA ENERGY. Corporate Governance Guidelines. As adopted by the Board of Directors of Sempra Energy and amended through December 15, 2017 SEMPRA ENERGY Corporate Governance Guidelines As adopted by the Board of Directors of Sempra Energy and amended through December 15, 2017 I Role of the Board and Management 1.1 Board Oversight Sempra Energy

More information

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application Good for 90 days from the Date Issued This permit is only required if the work location is owned or controlled by the City of Homestead and

More information

Guidance for Rating Each Performance Category on Contractor Performance Evaluation

Guidance for Rating Each Performance Category on Contractor Performance Evaluation Guidance for Rating Each Performance Category on Contractor Performance Evaluation Section 1: KNOWLEDGE Knowledge of WSSC Standards (Details/Specifications) Extremely knowledgeable of WSSC standards. Contractor

More information

IT PROJECT ANALYST/MANAGER

IT PROJECT ANALYST/MANAGER IT PROJECT ANALYST/MANAGER I. DESCRIPTION OF WORK Positions in this banded class are responsible for project management work involving planning and coordination of information technology projects. To ensure

More information

The EARLY ACTION COMPACT. The Roanoke Metropolitan Statistical Area (MSA) in the Commonwealth of Virginia

The EARLY ACTION COMPACT. The Roanoke Metropolitan Statistical Area (MSA) in the Commonwealth of Virginia The EARLY ACTION COMPACT for The Roanoke Metropolitan Statistical Area (MSA) in the Commonwealth of Virginia (Cities of Roanoke and Salem, Counties of Roanoke and Botetourt, and Town of Vinton) Submitted

More information

Richard J. Long, P.E.

Richard J. Long, P.E. Richard J. Long, P.E. LONG INTERNATIONAL Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax: (303) 200-7180 www.long-intl.com Construction Contract

More information

Maine Turnpike Authority Construction Resident Engineer/Inspector SCOPE OF WORK July 14, 2014

Maine Turnpike Authority Construction Resident Engineer/Inspector SCOPE OF WORK July 14, 2014 Maine Turnpike Authority Construction Resident Engineer/Inspector SCOPE OF WORK July 14, 2014 A. GENERAL DESCRIPTION The Consultant, acting as an independent contractor will serve to supplement the Authority

More information