1 Proceedings of Bridge Engineering 2 Conference April 2008, University of Bath, Bath, UK A CRITICAL ANALYSIS OF THE KAP SHUI MUN BRIDGE Benedict Kai Kwan Yung 1 1 Department of Architecture & Civil Engineering, University of Bath Abstract: This article provides a critical analysis of the Kap Shui Mun Bridge which was completed in On completion, the bridge was the world s longest cable-stayed bridge carrying both road and railway traffic (Now it is the 2 nd longest after the Oresund Bridge across Sweden and Denmark was built). This paper examines about the structures and aesthetics of the bridge, as well as providing some calculations in order to prove its stability and serviceability. Further, the Wind and Structural Health Monitoring System (WASHMS) would be briefly introduced to see how the system maintains the safety of the bridge. Keywords: cable-stayed, incremental launching, railway, WASHMS 1 General Introduction The Kap Shui Mun Bridge in Hong Kong was once the longest cable-stayed bridge in the world that transports both road and railway traffic (now it is the 2 nd longest after the Oresund Bridge between Sweden and Denmark was built), with the upper deck for motor vehicles, and the lower deck for both vehicles and the Mass Transit Railway (MTR). The overall length of the bridge is 750 metres and with the main span of 430 metres. The bridge crosses over the main marine channel, Kap Shui Mun, and links between Ma Wan and Lantau Island which forms the Lautau link together with the Tsing Ma Bridge and Ma Wan Viaduct. The bridge is basically not symmetric. The back spans of the bridge behind the towers are 160 metres, while the main span is 430 metres which means 215 metres cut my half. Therefore the length of the bridge in each section would be The 503m Ma Wan Viaduct was connected to one end of the Kap Shui Mun Bridge and it was constructed under the same contract as the Kap Shui Mun Bridge. It connects the Kap Shui Mun Bridge to Tsing Ma Bridge (longest suspension bridge for road and railway traffic), and all these bridges form the Lantau Link that was built to provide access to the new airport. The navigation clearance of the Kap Shui Mun Bridge is 47m to allow large ships passing across, and this is the reason why the H-shaped towers are 150 metre tall. In order to provide balance which usually would be stabilised by symmetry, the bridge has composite cross sections which are relatively more complex compared with other similar cable-stayed bridges. At the central 387 metre of the main span, the deck uses steel composite with concrete with the aim of making the cross section lighter. In fact, this is also easier for the uplifting during construction. The back spans of the two sides and the remaining main span (which is = 43 metres) are concrete cross sections. Using the lighter steel cross section in most of the main span could balance the horizontal forces on the towers and also the bridge. Vierrendeel truss is designed for the lower deck because it has to allow rail and traffic to cross the bridge Hence no diagonal members would be underneath the deck parallel to the bridge and so more considerations have to be included in the design. Figure 1: A top view of Kap Shui Mun Bridge

2 The Kap Shui Mun Bridge contract was in a design and build basis as many other cable-stayed bridge designs with similar spans and construction methods in the world were under this type of contract. The advantage includes giving the tenderers sufficient time to prepare their own designs which usually would be the most cost effective. The Kap Shui Mun Bridge and Ma Wan Viaduct contract was on a fixed price lump sum basis at US$210 million and was started to let in 1992 for a contract period of 4.5 years. Figure 2: Elevation of the Kap Shui Mun Bridge shown with some dimensions Figure 3: The three bridges and major highways of western Hong Kong's Tsing Ma Control Area 2 Aesthetics Although there is no clear cut or straight rules in judging whether a bridge is beautiful, Fritz Leonhardt, the most famous bridge engineer of the 20 th century, claimed that there are several categories of considering as a guideline for bridge design. In this section his guideline would be used as an idea to see how the Kap Shui Mun Bridge is aesthetically. Kap Shui Mun Bridge shows its simplicity and stability through its plain lines. In fact, most of the cablestayed bridges in the world have the same features, which mean it is not hard for cable-stayed bridges to have such simple feelings. The function of the bridge under this circumstance could be revealed clearly and giving a stability feeling for people looking at it. In terms of proportion, Kap Shui Mun Bridge seems to be all right in general. The ratio of span and deck of the bridge looks fine, and although the bridge is asymmetric, people should not have strong feeling about this imbalance as the difference is small. However, the towers of the bridge looks slightly too slim and too straight. To show the feeling of stability, the bottom of the towers should be more massive in size compared to the top. Many of these large span bridges become landmarks of the cities because of their outstanding appearances, therefore they would rarely incorporate to the nature. It is the case for Kap Shui Mun Bridge as well. Before the bridge and other infrastructure were built, the surrounding areas were sparsely populated with full of vegetation. But on the other hand, the bridge could say it is integrated into the existing environment as it forms part of the Lautau link together with Tsing Ma Bridge and Ma Wan Viaduct, and including the Ting Kau Bridge nearby, it looks continuous and all these long span bridges can be treated as a whole. A major problem in aesthetics for many cable-stayed bridges is the criss-crossing of the cables. It also appears in Kap Shui Mun Bridge which can be seen in some of the pictures. Using single-plane system (the Kap Shui Mun Bridge is using double-plane) or harp/semi-harp configuration of the cables could avoid this problem, but these solutions are not efficient structurally. Thus it seems not a good solution for the Kap Shui Mun Bridge to take care about this part of aesthetics as it is a long span bridge with heavy road and railway traffic and have to face with severe wind condition (which would be briefly describe in the later section). The colour of the bridge keeps its original as the deck has no paint on it, so it looks natural in general for the deck, towers and piers. Nevertheless, it still has an outstanding colour for the dark colour cables because they were galvanised. They give a strong accent of the whole bridge. Furthermore, the lighting system of the bridge provides an excellent night view for people to look at. There is not any refurbishment after the construction of the bridge, so it keeps the rough finishing for the concrete part, includes the deck, towers, piers and abutments. In this case it does not have any specific texture and simply keep the natural mood. There was an abnormal issue happened on the beautiful Kap Shui Mun Bridge, which was a fungus had begun to disfigure the appearance few years ago. The fungus was thought to have originated in a concrete mix used at the site. However, this issue should have been solved and back to original again. Figure 4: A close up showing the criss-crossing of cables

3 Figure 5: Night view of the Kap Shui Mun Bridge with the decorative lighting 3 Construction Because this bridge project was in design and build basis, the contractor had their own choices in building the bridge. The contractor decided to construct the side spans by incremental launching method (Figure 6, 7, 8). There are many advantages of using incremental launching, such as no falsework is needed, only require one set of formwork, no transportation costs for precast concrete, high quality compared to concrete that cast insitu, cranes are not required, etc. Nevertheless, the downsides of using this method have to be in consideration as well. It requires large areas behind the abutments to form as a concrete factory in order to harden the concrete deck and push it out. Fortunately, it was not the case that the Kap Shui Mun Bridge project had to worry about because the surrounding was rather remote area before the start of construction. Because the bridge needed to build was straight and with constant cross section, incremental launching was a good choice for construction. The spans were divided into approximately 18 metre long units. After the first unit was cast, a steel launching nose was connected to the first unit and then moved towards the towers by 18m; the next unit was then cast behind the in-situ factory and joined to the first unit. After the two units joined together with the launching nose moved forward again a third unit was cast and connected to the second unit. This process was repeated until the first unit had just passed through the tower leg, which was the length of the complete side span. The launching nose became the first main span unit afterwards. This made the later stage of construction easy over the rugged terrain adjacent to the channel. The abutments supporting the spans in fact are not evenly distributed; it might be due to aesthetic reasons. To achieve this temporary supports were needed within those longer spans (which was longer than 18 metre). Those temporary supports could not be removed until the whole construction finished. The steel launching nose was always tapered near its end because when it was pushed to the next support the nose would deflect downwards due to the self-load, so the tapered nose enabled it to get back to the next support easier without any rising process required. For incremental launching, it is very important that to keep the formwork straight, as it would affect the entire span significantly even if one piece of unit is slightly move apart. For the main span of Kap Shui Mun Bridge, it used steel and concrete composite construction. Steel cross frames and steel plate exterior webs are used inside, while the top and bottom of the slabs forming the carriageways are in concrete. The steel cross Vierendeel frames are at 4.35m intervals. The suspended cantilever construction method (shown at Figure 23) was used at the main span, which means using cable stays to help support the cantilever (which was the segment being lifted up and placed). This method could reduce the enormous hogging moment acting over the pier during cantilever construction, and because the bridge is a cable-stayed bridge originally, these cables became permanent stayed cables and did not need to alter them. Figure 6: Incremental launching of the deck of Kap Shui Mun Bridge (real photo) Figure 7: Picture showing temporary supports and permanent abutments of the bridge

4 The steel and concrete composite main span was erected by cantilevering at the same time with incremental launching of side spans from both towers. The steel units were prefabricated in Sheko in mainland, then each of the 8.7m long 500 tonne segment (approximately 44 segments) was assembled at the Lantau site before being lifted into position from barges in the channel. previously secured. The lifting gantries would hold the unit until the essential connection had been made and stay cables were installed. The bridge also had a section of approach span on both ends of the side span. High-strength friction grip bolts were used for all field joints of the steel structure. Figure 8: Incremental launching of Ma Wan side span Figure 10: Erecting main span deck unit of Kap Shui Mun Bridge (Ma Wan side) Figure 9: Erection of main span All the cables consist of 51 to 102 parallel mono strands. Each of the strands is 15.7mm diameter sheathed 7 wire strands. The tensile strength after galvanising is 1770 N/mm². The entire weight of cables is 2400 tonnes with a total length of 11km. To protect the cables from corrosion, zinc galvanising, grease and 1mm extruded PE sheathing are used. Moreover, each cable is enclosed in an HDPE pipe. Each of the 500 tonne deck unit was floated out on a barge and then lifted into position by a pair of lifting gantries which mounted on the deck that was Figure 11: Extensive temporary works on Kap Shui Mun Bridge

5 other hand, for the same reason, the abutments on Lantau tower side should be sitting on shallow footing because of the existence of rock. Figure 14: Cross-section of main span Figure 15: Cross-section of side span Figure 12: The bridge tower of the Kap Shui Mun Bridge during construction. 5 Loading The following are the most important loadings to be considered: 1. Dead load; 2. Superimposed dead load; 3. Live traffic load; 4. Wind load (discussed in later section); 5. Temperature effect (discussed in later section). According to these loadings, both the ultimate limit state (ULS) and serviceability limit state (SLS) have to be checked to ensure the bridge could be utilised and do not collapse. Figure 13: Railway under the deck during construction 4 Foundation & Geotechnics The two towers of Kap Shui Mun Bridge are founded by different methods. One of them (Lantau tower) is founded on a shallow spread footing on rock, while another one (Ma Wan tower) is founded partly on 4m diameter hand-dug piles and partly resting on rock. For such a long span and using different foundation technique, differential settlement must occurred and therefore monitoring of the settlement before construction was vital.the wind loading considered here is just very basic and the aerodynamic effects are ignored. For the abutments, there is not sufficient information about their foundations, but by prediction from the towers the abutments on Ma Wan side should be in deep foundations using large diameter piles because the soil on that side should have more differential settlement. On the 5.1 Dead Load Since the thicknesses of each support wall within the girders are different, it is relatively hard to estimate the dead load. Therefore, here using the data found from other sources and the dead load is 500 tonnes for 8.7 metres, which is equal to 575 kn/m. By multiplying γ fl = 1.15 the factorised dead load is kn/m. 5.2 Superimposed Dead Load Even though there is lack of information about the superimposed dead load of Kap Shui Mun Bridge, making an assumption of 25 kn/m superimposed dead load for a typical cable-stayed bridge should be fair enough. By multiplying γ fl = 1.75 the factorised superimposed dead load is 43.8 kn/m. 5.3 Live Load In order to calculate the traffic loading on the bridge, notional lanes have to be defined first.

6 The total width of the carriageway of the bridge is 22 metres, which is equal to 6 notional lanes. Thus each lane has a width of 3.67 metre. There are two types of live traffic loading, which are HA and HB loading, and the calculations are as shown below: Table 1: Calculation for HA and HB loading HA uniformly distributed loading (UDL) 9 kn/m (per metre of lane) Knife Edge Load (KEL) 120 kn Partial load factor, γ fl 1.25 Partial load factor, γ f Factorised HA loading 12.4 kn/m (per metre of lane) Factorised KEL 165 kn Full HB loading 450 kn Although live load on a bridge is usually much smaller than dead load, the position of the live load should be carefully considered at the most adverse position. In fact, the live load of Kap Shui Mun Bridge should be greater as the loading of MTR has to be included. 6 Temperature The temperature effect could be determined by the following equation: δ = L ΔT α. (1) Table 2: deflection of the deck due to temperature effect Temperature differences, 25ºC ΔT Coefficient of thermal 12 x 10-6 / ºC expansion, α Length of the span, L 750 m Deflection of the deck, δ 225 mm If there are no expansion joints, the deck would feel a stress of: σ = δ E / L (2) which is then equal to (225)(200x10³)/(750x10³) = 60 N/mm². 7 Wind The wind loading considered here is just very basic and the aerodynamic effects are ignored. = v K S. (3) v c 1 1 S 2 Table 3: Calculation for maximum wind gust Temperature differences, 32 m/s (assumption, v happened once of every ten years in Hong Kong) Temperature differences, 1.59 K1 Coefficient of thermal expansion, S1 1 (assume no funnelling) Gust factor, S Maximum wind gust, vc 67.2 m/s P = q A (4) t 1 C. D Table 4: Calculation for horizontal wind load Dynamic pressure head, N/m² 2 q = 0.613vc Solid horizontal 7.5 x 430 = 3225 m² projected area, A1 b/d ratio 4.67 Drag coefficient, CD 1.8 Horizontal wind load, Pt kn P = q A (5) v 3 C. L Table 5: Calculation for vertical wind load Dynamic pressure head, N/m² 2 q = 0.613vc Plan area, A3 35 x 430 = m² b/d ratio 4.67 Lift coefficient, CL 0.4 Vertical wind load, Pv kn Table 6: Factorising the wind loading Partial load factor, γ fl 1.10 Partial load factor, γ f Factorised horizontal kn wind load, Pt Factorised vertical wind kn load, Pv Although the rough calculations are done, the deck of bridge is actually not fully fit with the standard cases shown at the standard (or fairly speaking, some similar features but not completely look the same). Furthermore, as the bridge has to consider typhoon condition which the wind loading is much stronger (might need to consider up to 95 m/s of the wind speed), therefore wind tunnel tests are required. Kap Shui Mun Bridge was tested by the aerodynamic derivatives to determine the critical wind velocities for bridge decks. 8 Strength As the data found showing that each strand inside the cable has a tensile strength of 1770 N/mm 2, the most severe loading condition could be checked to see whether the cables are strong enough if any one of the cables are not functioning. Each cable consists of at least 51 strands and each of the strand has a diameter of 15.7 mm 2, so the tensile force for each cable is 1770 x (15.7/2) 2 π = kn.

7 Maximum sagging moment at centre 9430 knm Similarly, the maximum hogging moment at simplest state could be found as below: Figure 18: Loading for maximum sagging moment (twosupport case) Figure 16: A sketch showing the geometry of the tower and the outermost cable The most acute angle for the cable is tan -1 (83/215) = 21.1º. The vertical force could be taken by that cable is 17475(sin21.1º) = 6291 kn. The loadings considered are as follows: Table 7: most severe loading for calculating tensile strength of cable Factorised dead load 5750 kn Factorised KEL (6 lanes) 990 kn HB loading (1.5 x full 4050 kn load per lane for 6 lanes) Factorised HA UDL 647 kn The sum of all loading is kn, and because it is a two-plane system bridge, the cable would take half of the loading which is 5719 kn. By comparing the numbers it is clear that the cables are strong enough to carry the most severe loading. To consider about bending moment of the deck, the simplest was to consider a two-support case: Figure 17: Loading for maximum sagging moment (twosupport case) Table 9: Calculation of maximum hogging moment Factorised dead load kn/m Factorised superimposed 43.8 kn/m dead load Factorised live load 64.1 kn/m (assume uniformly distributed) Maximum hogging 3346 knm moment at centre However, to consider the sagging and hogging moment for the whole span of the deck, calculation should be manipulated like the below cases: Figure 19: Loading for maximum sagging moment (multi-support case) Figure 20: Loading for maximum hogging moment (multi-support case) By using the numbers calculated above, the maximum sagging moment at centre could be evaluated. Table 8: Calculation of maximum sagging moment Factorised dead load kn/m Factorised superimposed 43.8 kn/m dead load Factorised KEL 990 kn Factorised live load 64.1 kn/m (assume uniformly distributed) where these can be simply done by computer analysis. In reality, the accuracy of these moment analysis would be affected by whether the cables (the supports) have been adequately prestressed or not. If the cables do not prestress sufficiently, the bending moment would become greater especially towards the mid-span of the bridge. Besides the two cases described above, other cases such as considering the combined load with temperature effects and wind load, with temporary loads (including erection loads) are also vital and must be checked beforehand.

8 9 Natural Frequency To find the natural frequency of the bridge, a simplified approach could be used for calculation. However, this method is only a rough calculation and the result is an upper boundary, therefore it could only be used for initial design. Further analysis of frequency of the bridge must be taken. 4 ω = ( ) EI / ml (6) n β n l Table 10: Calculation for natural frequency (βnl) ² Young s Modulus, E 150 GPa (assumption for mixture of steel and concrete) Length of the span, l 430 m mass density per metre 57 tonne Second moment of area, 740 (m²)² I Natural frequency, ωn 5.33 Hz Because the calculated natural frequency = 5.33 Hz > 5 Hz, it is said to be acceptable. However, this is a very rough calculation and some values above (e.g. Young s modulus, second moment of area) are simply by guessing which might not be the actual case. 10 Creep As concrete is the main body of the bridge, creep would be an issue to consider at the stage of designing and before the start of construction. However, even though for such a long span concrete composite bridge creep recovery would only last for about a year and usually recover during the construction period. Therefore, as the bridge has already being used for roughly ten years it should not be an issue to worry about. 11 Durability The bridge is expected to last for 120 years in accordance to BS As the bridge belongs to the Highways Department in Hong Kong, the department has implemented a monitoring system in order to ensure the bridge functions well in all aspects. More detail explanation about the system would be discussed in section Serviceability Because the bridge needs to allow the MTR crossing it, little deflections of the bridge would affect the railway; the design must have to be carefully considered and hence monitoring system is important (discussed in next section). 13 Wind and Structural Health Monitoring System (WASHMS) Long-span bridges in the world now being aware of the health monitoring under proper operation as it would directly affect the bridges lifetime and also influence the transportation network system in the whole area. Therefore, the Highways Department in Hong Kong has introduced a bridge health monitoring system called the WASHMS (wind and structural health monitoring system), which they use the system to monitor three main long-span bridges in Hong Kong including Kap Shui Mun Bridge, Tsing Ma Bridge and Ting Kau Bridge. The major purpose of installing this health monitoring system is to check and identify if there are any problems in operation, and also to check every parts of the bridge are in good condition so that the bridge could be perfectly functioned under ultimate state loading and serviceability state loading. Therefore, durability and serviceability of this bridge would increase significantly because of this detailed monitoring system. The system of WASHMS includes six integrating modules: the sensory system (SS); data acquisition and transmission system (DA&TS); data processing and control system (DP&SC); structural health evaluation system (SHES); portable data acquisition system (PDAS); and portable inspection and maintenance system (PIMS). Each of them is capable to stand-alone to operate even if abnormal conditions occurs which induce part of the system does not function properly. It is important because this would greatly reduce the risk of the whole system not working to monitor the bridge and therefore increase the reliability of the system. The WASHMS has been divided into four levels of operation. The first level is the collection and delivery of signals from SS to DA&TS. The second level is to converse the collected signals into digital data and transmits the data to DP&S through fibre optic cabling network. The third level refers to the computer system which carries overall control of post-processing, archiving, display and data storage. The fourth level is about the high-performance computer system which takes bridge health evaluation works and generates the monitoring reports. Any part of the hardware failure would not affect the whole system as mentioned before, so even if one level stops working the hardware at other levels will continue their operation. The power failure in any individual unit would also not affect to the other parts of the function. The buffer memory of each data acquisition unit in DA&TS is able to collect data continuously at least last for 12 hours. On power restoration, the WASHMS is able to arrange staging up of each lower level unit, and obtain status reports from each data acquisition unit such that no data overloading will occur. The monitoring items are divided into three categories, (i) the loading sources (or input parameters) which include wind, temperature, traffic (highway and railway) and seismic loadings; (ii) system characteristics (or system parameters) which include static influence coefficients and global dynamic characteristics; and (iii) bridge responses (or output parameters) which include variation in geometric configuration (or displacements of the bridges), stress/strain distribution, cable forces and fatigue stress estimation. The design and operation of a bridge health monitoring system requires the input of experiences and technologies in four aspects: (i) design, construction, operation and maintenance of long-span bridges; (ii) instrumentation technologies for collection and processing of data; (iii) graphical CAD and numerical

9 analytical technologies for modelling and analysis; and (iv) information technologies for transmission, processing and visualization of data. Therefore, the Highways Department in Hong Kong should not ignore this change and ought to do some further researches about the geological changes in the coming future. Figure 22: Section of the bridge showing the traffic flow Figure 23: Cross-section of the bridge during construction Figure 21: Fundamental mode shapes and frequencies of Kap Shui Mun Bridge analysed by WASHMS Figure 24: Suspended cantilever construction 14 Suggested Improvements The bridge has an expected 120 years life, so to make sure the bridge could withstand such a long time, detailed monitoring must be keep going. Although the WASHMS functions well after the opening of the bridge, regular maintenances and the software updating of the monitoring system are still necessary in order to cope with the expected increased traffic in the future due to the rapid development of Lautau Island. On the other hand, earthquake did not affect Hong Kong for hundreds of years before. However, in the recent years, it was slightly suffered from earthquakes nearby, though it was only in low magnitude. This has to be taken into account as for long span bridges such as Kap Shui Mun Bridge would be hugely affected by the earthquakes. Figure 25: Tower construction showing from ground

10 15 Acknowledgements The guideline notes on the writing styles and methods of this paper provided by Professor Tim Ibell were clear and informative. The lectures and tutorials that ran alongside with this paper including Bridge Engineering 1 and the drop-in sessions for Bridge Engineering 2 were essential in order to complete this paper. Furthermore, all the authors of the papers, journals and other sources used for references in this paper were sincerely appreciated. 16 References [1] Highways Department Hong Kong, Structures Design Manual for Highways and Railways. Hong Kong. [2] Hull, P., Highway Headaches, International Construction, Vol. 39, Issue 3, pp [3] Lau, C.K. The Development of Cable-Supported Bridges in Hong Kong [online]. Available from: [Access ] [4] Saul, R., Leonhardt, Anra und Partnet GmbH, Aesthetics vs. Economics or Must Economical Bridges Necessarily Be Ugly? 5 th International Symposium on Steel Bridges Barcelona, No [5] WIKIPEDIA, n.d., Kap Shui Mun Bridge. In: Wikipedia: the free encyclopedia [online]. Available from: [Access ] [6] WIKIPEDIA, n.d., Wind and Structural Health Monitoring System. In: Wikipedia: the free encyclopedia [online]. Available from: ealth_monitoring_system [Access ] [7] Wong, K.Y., Instrumentation and Health Monitoring of Cable-Supported Bridges. Structural Control and Health Monitoring, Vol. 11, Issue 2, pp [8] Wong, K.Y., Design of a Structural Health Monitoring System for Long-Span Bridges, Structure and Infrastructure Engineering, Vol. 3, Issue 2, pp [9] Wong, Raymond W.M. Large-Scaled Bridge Projects in Recent Hong Kong [online]. Available from: [Access ]

LARGE-SCALED BRIDGE PROJECTS IN RECENT HONG KONG. Raymond W M Wong, Division of Building Science & Technology, City University of Hong Kong

LARGE-SCALED BRIDGE PROJECTS IN RECENT HONG KONG. Raymond W M Wong, Division of Building Science & Technology, City University of Hong Kong LARGE-SCALED BRIDGE PROJECTS IN RECENT HONG KONG Raymond W M Wong, Division of Building Science & Technology, City University of Hong Kong 1. ABSTRACT Accompanying with the construction of the new Hong

More information

ANALYSIS OF FRANCIS SCOTT KEY BRIDGE (BALTIMORE)

ANALYSIS OF FRANCIS SCOTT KEY BRIDGE (BALTIMORE) Proceedings of Bridge Engineering 2 Conference 2009 April 2009, University of Bath, Bath, UK ANALYSIS OF FRANCIS SCOTT KEY BRIDGE (BALTIMORE) Derrick T H Kwok 1 1 University of Bath, Department of Architecture

More information

THE EUROPE BRIDGE, IN PORTUGAL: THE CONCEPT AND STRUCTURAL DESIGN

THE EUROPE BRIDGE, IN PORTUGAL: THE CONCEPT AND STRUCTURAL DESIGN THE EUROPE BRIDGE, IN PORTUGAL: THE CONCEPT AND STRUCTURAL DESIGN A.J.Reis 1,J.J.Oliveira Pedro 2 ABSTRACT The Europe bridge is a cable stayed bridge with a main span of 186m. A 3D stay cable arrangement

More information

Bridge articulation No. 1.04

Bridge articulation No. 1.04 Bridge articulation Scope This Guidance Note gives advice on the selection of the articulation arrangements, the choice of bearing types and dispositions of bearings, for bridges where relative movement

More information

Bonner Bridge Replacement Update:

Bonner Bridge Replacement Update: Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner

More information

A CRITICAL ANALYSIS OF THE SUTONG BRIDGE ACROSS THE YANGTZE RIVER IN CHINA

A CRITICAL ANALYSIS OF THE SUTONG BRIDGE ACROSS THE YANGTZE RIVER IN CHINA Proceedings of Bridge Engineering 2 Conference 2009 April 2009, University of Bath, Bath, UK A CRITICAL ANALYSIS OF THE SUTONG BRIDGE ACROSS THE YANGTZE RIVER IN CHINA Adnan Al-Ammaren 1 1 Undergraduate

More information

A CRITICAL ANALYSIS OF THE ROYAL GORGE BRIDGE, COLERADO

A CRITICAL ANALYSIS OF THE ROYAL GORGE BRIDGE, COLERADO Proceedings of Bridge Engineering 2 Conference 2008 16/04/2008, University of Bath, Bath, UK A CRITICAL ANALYSIS OF THE ROYAL GORGE BRIDGE, COLERADO S P I Cope 1 1 Department of Architecture and Civil

More information

CHAPTER 11: PRESTRESSED CONCRETE

CHAPTER 11: PRESTRESSED CONCRETE CHAPTER 11: PRESTRESSED CONCRETE 11.1 GENERAL (1) This chapter gives general guidelines required for the design of prestressed concrete structures or members with CFRM tendons or CFRM tendons in conjunction

More information

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico Roberto Gómez, Raul Sánchez-García, J.A. Escobar and Luis M. Arenas-García Abstract In this paper we study the

More information

The Europe Bridge in Portugal: concept and structural design

The Europe Bridge in Portugal: concept and structural design Journal of Constructional Steel Research 60 (2004) 363 372 www.elsevier.com/locate/jcsr The Europe Bridge in Portugal: concept and structural design A.J. Reis a,b,, J.J. Oliveira Pedro a,b a GRID-Consulting

More information

Construction of the Superstructure of Major Sea Crossings

Construction of the Superstructure of Major Sea Crossings Construction of the Superstructure of Major Sea Crossings Matt Carter Associate Director 2 nd International Seminar on Design & Construction of Second Penang Bridge 2 Second Penang Bridge Donghai Bridge

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

A Critical Analysis of Kylesku Bridge

A Critical Analysis of Kylesku Bridge Proceedings of Bridge Engineering 2 Conference 2011 April 2011, University of Bath, Bath, UK A Critical Analysis of Kylesku Bridge D K L Miles University of Bath Abstract: The aim of this paper is to perform

More information

Behavior of a multiple spans cable-stayed bridge

Behavior of a multiple spans cable-stayed bridge Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Behavior of a multiple spans cable-stayed bridge S. Arnaud, N. Matsunaga, S. Nagano

More information

Example. Monday, October 19, 2015

Example. Monday, October 19, 2015 Example Monday, October 19, 2015 11:26 AM Using a prestressed Y4 beam with reinforced concrete deck slab as the deck example as shown in Fig.1; the deck having a 10 skew, a span of 20m and carrying a 7.3m

More information

Design studies of the Castle Bridge over Wislok River in Rzeszow with application of CAD System

Design studies of the Castle Bridge over Wislok River in Rzeszow with application of CAD System Design studies of the Castle Bridge over Wislok River in Rzeszow with application of CAD System Author: Dariusz Alterman Superviser: Dr. Tomasz Siwowski, Civ. Eng. Chairman of the examination committee:

More information

A CRITICAL ANALYSIS OF THE CLYDE ARC BRIDGE, GLASGOW, UK

A CRITICAL ANALYSIS OF THE CLYDE ARC BRIDGE, GLASGOW, UK Proceedings of Bridge Engineering 2 Conference 2011 April 2011, University of Bath, Bath, UK A CRITICAL ANALYSIS OF THE CLYDE ARC BRIDGE, GLASGOW, UK C. Apostolidis 1 1 Undergraduate Student University

More information

THE RION ANTIRION BRIDGE DESIGN AND CONSTRUCTION

THE RION ANTIRION BRIDGE DESIGN AND CONSTRUCTION THE RION ANTIRION BRIDGE DESIGN AND CONSTRUCTION Jean-Paul TEYSSANDIER 1, Jacques COMBAULT 2 And Pierre MORAND 3 SUMMARY The RION-ANTIRION Bridge (Greece) is located in a zone of difficult environmental

More information

USE OF SPECIALIZED SOFTWARE TOOLS FOR MODERN BRIDGE DESIGN

USE OF SPECIALIZED SOFTWARE TOOLS FOR MODERN BRIDGE DESIGN USE OF SPECIALIZED SOFTWARE TOOLS FOR MODERN BRIDGE DESIGN J. Stampler *, H. Bokan **, D. Janjic ***, M. Heiden **** * Senior Consulting Engineer, TDV GmbH, Graz, Austria ** Manager Project Centre, TDV

More information

Geoguide 6 The New Guide to Reinforced Fill Structure and Slope Design in Hong Kong

Geoguide 6 The New Guide to Reinforced Fill Structure and Slope Design in Hong Kong Geoguide 6 The New Guide to Reinforced Fill Structure and Slope Design in Hong Kong Geotechnical Engineering Office Civil Engineering Department The Government of the Hong Kong Special Administrative Region

More information

Construction Techniques of The 3 rd Bosphorus Bridge in Istanbul, Turkey

Construction Techniques of The 3 rd Bosphorus Bridge in Istanbul, Turkey International Symposium on Industrial Chimneys and Cooling Towers, Prague, Oct 8-11, 2014 Construction Techniques of The 3 rd Bosphorus Bridge in Istanbul, Turkey M. Orçun TOKUÇ 1 and Tamer TUNCA 2 1 Engineer

More information

OPTIMIZED ALTERNATIVE STRUCTURAL FORMS FOR STANDARD HIGHWAY BRIDGE BEAMS WITH HIGHER STRENGTH CONCRETES

OPTIMIZED ALTERNATIVE STRUCTURAL FORMS FOR STANDARD HIGHWAY BRIDGE BEAMS WITH HIGHER STRENGTH CONCRETES OPTIMIZED ALTERNATIVE STRUCTURAL FORMS FOR STANDARD HIGHWAY BRIDGE BEAMS WITH HIGHER STRENGTH CONCRETES Abstract K S M Silva, Department of Civil Engineering, University of Moratuwa. Email: mangala_xp@yahoo.com

More information

SLENDER STEEL ARCHES WITH PARTICULAR HANGER ARRANGEMENT FOR MODERNISING CONCRETE BRIDGES (ARCH 04)

SLENDER STEEL ARCHES WITH PARTICULAR HANGER ARRANGEMENT FOR MODERNISING CONCRETE BRIDGES (ARCH 04) Arch Bridges ARCH 04 P. Roca and E. Oñate (Eds) CIMNE, Barcelona, 2004 SLENDER STEEL ARCHES WITH PARTICULAR HANGER ARRANGEMENT FOR MODERNISING CONCRETE BRIDGES (ARCH 04) Ph. Van Bogaert *, W. De Corte

More information

Damage Investigation and the Preliminary Analyses of Bridge Damage caused by the 2004 Indian Ocean Tsunami. Shigeki Unjoh 1 and Kazuo Endoh 2

Damage Investigation and the Preliminary Analyses of Bridge Damage caused by the 2004 Indian Ocean Tsunami. Shigeki Unjoh 1 and Kazuo Endoh 2 Damage Investigation and the Preliminary Analyses of Bridge Damage caused by the 2004 Indian Ocean Tsunami by Shigeki Unjoh 1 and Kazuo Endoh 2 ABSTRACT At 08:07 a.m. local time on December 26, 2004, a

More information

Principal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE

Principal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE Design of continuity slabs and the 020 Gajanan Chaudhari Principal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE Anand Panpate Senior Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE

More information

A CRITICAL ANALYSIS OF THE RAMA VIII BRIDGE, BANGKOK

A CRITICAL ANALYSIS OF THE RAMA VIII BRIDGE, BANGKOK unfactored dead load = 186 knm -1 the Proceedings of Bridge Engineering 2 Conference 2009 April 2009, University of Bath, Bath, UK A CRITICAL ANALYSIS OF THE RAMA VIII BRIDGE, BANGKOK J.S. Lee 1 1 Undergraduate

More information

Structural behaviour and failure mechanisms of concrete monoblock railway sleepers

Structural behaviour and failure mechanisms of concrete monoblock railway sleepers Structural behaviour and failure mechanisms of concrete monoblock railway sleepers Olli Kerokoski, Antti Nurmikolu and Tommi Rantala Department of Civil Engineering, Tampere University of Technology, P.O.

More information

A CRITICAL ANALYSIS OF THE DESIGN AND CONSTRUCTION OF BOYNE BRIDGE, IRELAND

A CRITICAL ANALYSIS OF THE DESIGN AND CONSTRUCTION OF BOYNE BRIDGE, IRELAND Proceedings of Bridge Engineering Conference 009 April 009, University of Bath, Bath, UK A CRITICAL ANALYSIS OF THE DESIGN AND CONSTRUCTION OF BOYNE BRIDGE, IRELAND Danny Dwyer UNIVERSITY OF BATH Civil

More information

CRITICAL ANALYSIS OF THE MANHATTAN BRIDGE

CRITICAL ANALYSIS OF THE MANHATTAN BRIDGE Proceedings of Bridge Engineering Conference 007 7 April 007, University of Bath, Bath, UK CRITICAL ANALYSIS OF THE MANHATTAN BRIDGE Julian Staden 1 1 Departement of Civil and Architectural Engineering,

More information

Design, fabrication and construction of Railway Bridge over Södertälje canal

Design, fabrication and construction of Railway Bridge over Södertälje canal NSCC2009 Design, fabrication and construction of Railway Bridge over Södertälje canal Michael B. Thulstrup 1, Mattias Nilsson 2, Robert Hällmark 3 & Jens P. Nielsen 4 1 Project Manager, MT Højgaard a/s,

More information

Homework 3 Perspectives on the Evolution of Structures (Analysis 2 and GWB Study) George Washington Bridge Structural Study and Analysis

Homework 3 Perspectives on the Evolution of Structures (Analysis 2 and GWB Study) George Washington Bridge Structural Study and Analysis Homework 3 Perspectives on the Evolution of Structures (Analysis 2 and GWB Study) George Washington Bridge Structural Study and Analysis In this assignment you will learn how to calculate the force and

More information

The New Colorado River Arch Bridge at Hoover Dam An Innovative Hybrid of Concrete and Steel

The New Colorado River Arch Bridge at Hoover Dam An Innovative Hybrid of Concrete and Steel Concrete Structures: the Challenge of Creativity The New Colorado River Arch Bridge at Hoover Dam An Innovative Hybrid of Concrete and Steel David Goodyear, PE SE Sr. Vice President T.Y. Lin International

More information

BRIDGE OVER THE RIVER JARAMA AT TITULCIA (MADRID)

BRIDGE OVER THE RIVER JARAMA AT TITULCIA (MADRID) Arch Bridges ARCH 004 J.A. Llombart, J. Revoltós and S. Couto CIMNE, Barcelona, 2004 BRIDGE OVER THE RIVER JARAMA AT TITULCIA (MADRID) José Antonio Llombart, Jordi Revoltós, Sergio Couto Estudio de Ingeniería

More information

A CRITICAL ANALYSIS OF BANDRA-WORLI CABLE STAYED BRIDGE, MUMBAI

A CRITICAL ANALYSIS OF BANDRA-WORLI CABLE STAYED BRIDGE, MUMBAI Proceedings of Bridge Engineering 2 Conference 2009 April 2009, University of Bath, Bath, UK A CRITICAL ANALYSIS OF BANDRA-WORLI CABLE STAYED BRIDGE, MUMBAI C.S.W. DAVIES1 1 Undergraduate Student - University

More information

UNIVERSITY OF BOLTON WESTERN INTERNATIONAL CENTRE FZE. BEng (HONS) CIVIL ENGINEERING SEMESTER ONE EXAMINATION 2015/2016

UNIVERSITY OF BOLTON WESTERN INTERNATIONAL CENTRE FZE. BEng (HONS) CIVIL ENGINEERING SEMESTER ONE EXAMINATION 2015/2016 OCD59 UNIVERSITY OF BOLTON WESTERN INTERNATIONAL CENTRE FZE BEng (HONS) CIVIL ENGINEERING SEMESTER ONE EXAMINATION 2015/2016 ADVANCED STRUCTURAL ANALYSIS AND DESIGN MODULE NO: CIE6001 Date: Tuesday 12

More information

Homework 3 Perspectives on the Evolution of Structures (Analysis 2 and GWB Study) George Washington Bridge Structural Study and Analysis

Homework 3 Perspectives on the Evolution of Structures (Analysis 2 and GWB Study) George Washington Bridge Structural Study and Analysis Homework 3 Perspectives on the Evolution of Structures (Analysis 2 and GWB Study) George Washington Bridge Structural Study and Analysis In this assignment you will learn how to calculate the force in

More information

MIDAS Training Series

MIDAS Training Series MIDAS midas Civil Title: All-In-One Super and Sub Structure Design NAME Edgar De Los Santos / MIDAS IT United States 2016 Substructure Session 1: 3D substructure analysis and design midas Civil Session

More information

3.0 Design loading. In this section Section Page. 3.1 Introduction Traffic loads - gravity effects 3 2

3.0 Design loading. In this section Section Page. 3.1 Introduction Traffic loads - gravity effects 3 2 Page 3 1 3.0 Design loading In this section Section Page 3.1 Introduction 3 2 3.2 Traffic loads gravity effects 3 2 3.3 Traffic loads horizontal effects 3 6 3.4 Loads other than traffic 3 7 3.5 Combination

More information

DESIGN OF FLYOVER TRANSVERSE VERTICALLY BY USING HYDRAULIC JACK

DESIGN OF FLYOVER TRANSVERSE VERTICALLY BY USING HYDRAULIC JACK DESIGN OF FLYOVER TRANSVERSE VERTICALLY BY USING HYDRAULIC JACK M. Hari Sathish Kumar 1, K. S. Binitha 2, K. Balaji 3 1,2Assistant Professor, Department of Civil Engineering, PERI Institute of Technology,

More information

David Goodyear, PE SE. Chief Bridge Engineer, T. Y. Lin International

David Goodyear, PE SE. Chief Bridge Engineer, T. Y. Lin International The New Colorado River Bridge at Hoover Dam David Goodyear, PE SE Chief Bridge Engineer, T. Y. Lin International Summary A dramatic new concrete arch joins the setting of the historic Hoover Dam, spanning

More information

Bridging Your Innovations to Realities

Bridging Your Innovations to Realities Tutorial 2 Prestressed Concrete Bridge Bridging Your Innovations to Realities 1 Contents 2 1. Project Information 2. Definition of materials 3. Definition of Sections 4. Definition of Time dependent Materials

More information

Comparative Study of R.C.C and Steel Concrete Composite Structures

Comparative Study of R.C.C and Steel Concrete Composite Structures RESEARCH ARTICLE OPEN ACCESS Comparative Study of R.C.C and Steel Concrete Composite Structures Shweta A. Wagh*, Dr. U. P. Waghe** *(Post Graduate Student in Structural Engineering, Y.C.C.E, Nagpur 441

More information

EARTHQUAKE-RESISTANT BRIDGE COMPETITION STUDENT GUIDELINES

EARTHQUAKE-RESISTANT BRIDGE COMPETITION STUDENT GUIDELINES EARTHQUAKE-RESISTANT BRIDGE COMPETITION STUDENT GUIDELINES A PROJECT DEVELOPED FOR THE UNIVERSITY CONSORTIUM ON INSTRUCTIONAL SHAKE TABLES Developed by: Kurt McMullin Assistant Professor Department of

More information

CROWN-WALL WITH EXTENDED BASE SLAB

CROWN-WALL WITH EXTENDED BASE SLAB CROWN-WALL WITH EXTENDED BASE SLAB Ing. Ineke Vos-Rovers MSc (Eng.) 1, Ir. Bas Reedijk 1, Ing. Sjaak Ekelmans 2 This paper presents the design philosophy and the construction stages of a n6n-standard crown-wall

More information

Tagus Crossing at Carregado (Portugal): A project respectful of its sensitive environment

Tagus Crossing at Carregado (Portugal): A project respectful of its sensitive environment Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Tagus Crossing at Carregado (Portugal): A project respectful of its sensitive environment

More information

ULTIMATE LOAD-CARRYING CAPACITY OF SELF-ANCHORED CONCRETE SUSPENSION BRIDGE

ULTIMATE LOAD-CARRYING CAPACITY OF SELF-ANCHORED CONCRETE SUSPENSION BRIDGE ULTIMATE LOAD-CARRYING CAPACITY OF SELF-ANCHORED CONCRETE SUSPENSION BRIDGE Meng Jiang*, University of Technology Dalian, P. R. China Wenliang Qiu, University of Technology Dalian, P. R. China Lihua Han,

More information

Field Load Testing of the First Vehicular Timber Bridge in Korea

Field Load Testing of the First Vehicular Timber Bridge in Korea Field Load Testing of the First Vehicular Timber Bridge in Korea Ji-Woon Yi Ph.D. Student Department of Civil & Environmental Engineering Seoul National University Seoul, Korea jwyi@sel.snu.ac.kr Wonsuk

More information

Application of Tensioned CFRP Strip Method to an Existing Bridge

Application of Tensioned CFRP Strip Method to an Existing Bridge SP-230 66 Application of Tensioned CFRP Strip Method to an Existing Bridge by A. Tateishi, A. Kobayashi, Y. Hamada, T. Takahashi, and H. Yasumori Synop nopsis: s: Tensioned carbon fiber reinforced polymer

More information

COMPARATIVE STUDY ON NORMAL AND SKEW BRIDGE OF PSC BOX GIRDER

COMPARATIVE STUDY ON NORMAL AND SKEW BRIDGE OF PSC BOX GIRDER IJRET: International Journal of Research in Engineering and Technology eissn: 2319-1163 pissn: 2321-738 COMPARATIVE STUDY ON NORMAL AND SKEW BRIDGE OF PSC BOX GIRDER Pranathi Reddy 1, Karuna S 2 1 Post

More information

EURO CODES FOR DESIGN OF PRE-STRESSED CONCRETE HIGHWAY BRIDGES-A REVIEW FOR HIGHWAY LOADINGS

EURO CODES FOR DESIGN OF PRE-STRESSED CONCRETE HIGHWAY BRIDGES-A REVIEW FOR HIGHWAY LOADINGS Special Session on Sustainable Design, 4 th International Conference on Structural Engineering and Construction Management 2013, Kandy, Sri Lanka, 13 th, 14 th & 15 th December 2013 SECM/13/264 Abstract

More information

BRIDGE GIRDERS TECHNICAL GUIDE

BRIDGE GIRDERS TECHNICAL GUIDE ARMTEC.COM BRIDGE MATERIALS / / TECHNICAL GUIDE REGIONal SPECIFICATIONS / AB / MB / SK PRECAST CONCRETE GIRDERS AND BEAMS DESIGNED TO SUPPORT BRIDGE DECKS AND TRAFFIC LOADS Proven strength In-house engineering

More information

Lecture Retaining Wall Week 12

Lecture Retaining Wall Week 12 Lecture Retaining Wall Week 12 Retaining walls which provide lateral support to earth fill embankment or any other form of material which they retain them in vertical position. These walls are also usually

More information

Dynamic Analysis of Transmission Tower

Dynamic Analysis of Transmission Tower Dynamic Analysis of Transmission Tower Sk.Musthafa Department of Civil Engineering, Amara Institute of Engineering and Technology. Sk.Yusuf Basha Department of Civil Engineering, Amara Institute of Engineering

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Recent Developments in Stay Cable Systems

Recent Developments in Stay Cable Systems Recent Developments in Stay Cable Systems PTI Technical Conference, Reno- 2006 Khaled Shawwaf, Technical Director (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED Page 1 of 45 * Cable Stayed

More information

Introduction to Structural Analysis TYPES OF STRUCTURES LOADS AND

Introduction to Structural Analysis TYPES OF STRUCTURES LOADS AND AND Introduction to Structural Analysis TYPES OF STRUCTURES LOADS INTRODUCTION What is the role of structural analysis in structural engineering projects? Structural engineering is the science and art

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014

More information

Unit 48: Structural Behaviour and Detailing for Construction. Limit State Design

Unit 48: Structural Behaviour and Detailing for Construction. Limit State Design 2.1 Introduction Limit State Design Limit state design of an engineering structure must ensure that (1) under the worst loadings the structure is safe, and (2) during normal working conditions the deformation

More information

CIVIL BREADTH Exam Specifications

CIVIL BREADTH Exam Specifications NCEES Principles and Practice of Engineering Examination CIVIL BREADTH and STRUCTURAL DEPTH Exam Specifications Effective Beginning with the April 2015 Examinations The civil exam is a breadth and depth

More information

The Aizhai Suspension Bridge is

The Aizhai Suspension Bridge is INTERNATIONAL DESIGN & CONSTRUCTION: BRIDGES Mountain grown Hilly terrain contributes mightily to China bridge By Yinbo Liu, Ph.D., P.E., Guoping Chen, Shulong He and Yongjian Zhang, Ph.D. Contributing

More information

Hyperstatic (Secondary) Actions In Prestressing and Their Computation

Hyperstatic (Secondary) Actions In Prestressing and Their Computation 5.5 Hyperstatic (Secondary) Actions In Prestressing and Their Computation Bijan O Aalami 1 SYNOPSIS This Technical Note describes the definition, computation, and the significance of hyperstatic (secondary)

More information

JAPANESE CONCRETE BRIDGES. Alan Burden 1

JAPANESE CONCRETE BRIDGES. Alan Burden 1 JAPANESE CONCRETE BRIDGES Alan Burden 1 INTRODUCTION Although less popular than steel, concrete is used extensively in Japanese bridge projects. The seismic loading condition has encouraged designers to

More information

HOLLOW CORE FLOORS SPEED AND STRENGTH

HOLLOW CORE FLOORS SPEED AND STRENGTH HOLLOW CORE FLOORS SPEED AND STRENGTH CONTENTS 2 3 4 5 7 8 9 10 12 13 14 INTRODUCTION PRECAST CONCRETE FLOORS T HE A DVANTAGES BISON HOLLOW CORE FLOORS BEARINGS FALSE CEILINGS AND SOFFIT FIXINGS BISON

More information

ENGINEERING DIRECTIVE

ENGINEERING DIRECTIVE Number: E-95-001 Date: 2/2/95 ENGINEERING DIRECTIVE Ross B. Dindio (Signature on Original) CHIEF ENGINEER The purpose of this engineering directive is to formally notify ALL Department engineering personnel

More information

STUDENT DESIGN COMPETITION - BRIDGES For further information visit: SteelConstruction.info/Student_awards

STUDENT DESIGN COMPETITION - BRIDGES For further information visit: SteelConstruction.info/Student_awards STUDENT DESIGN COMPETITION - BRIDGES 2014 For further information visit: SteelConstruction.info/Student_awards Foreword The Tata Steel / BCSA Students Awards - Bridge Design has been organised by The Steel

More information

EARTHQUAKE DESIGN AND CONSTRUCTION OF TAL COMPOSITE BRIDGE PIERS

EARTHQUAKE DESIGN AND CONSTRUCTION OF TAL COMPOSITE BRIDGE PIERS EARTHQUAKE DESIGN AND CONSTRUCTION OF TAL COMPOSITE BRIDGE PIERS T KATO 1 And Y TAKAHASHI 2 SUMMARY The recent lessons of structural damages occurred to a number of bridges during 1995 Hyogo-ken Nanbu

More information

Hollow Core Slabs Applications

Hollow Core Slabs Applications NORDIMPIANTI P R O D U C T S APPLICATIONS T U R N K E Y S E R V I C E G L O B A L Hollow Core Slabs Applications Hollow Core Slabs Technology for the Precast and Prestressed Concrete Industry HOLLOW RESIDENTIAL,

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014

More information

I-94/I-69 Interchange Bridge Construction

I-94/I-69 Interchange Bridge Construction I-94/I-69 Interchange Bridge Construction General Project Information Let in August 2013 Cost of $76 million Prime Contractor Walter Toebe Construction Company Reconstruction of I-94 from Griswold to Lapeer

More information

Demidec. cornish concrete products Demidec Flooring and Permanent Formwork

Demidec. cornish concrete products Demidec Flooring and Permanent Formwork Demidec cornish concrete products Demidec Flooring and Permanent Formwork Demidec What is Demidec? Demidec is a thin precast concrete plate, typically 60mm deep, although this can vary depending on the

More information

MOH AND ASSOCIATES, INC., TAIWAN Design of Taiwan Friendship Bridge River Tempisque, Costa Rica

MOH AND ASSOCIATES, INC., TAIWAN Design of Taiwan Friendship Bridge River Tempisque, Costa Rica Design of Taiwan Friendship Bridge River Tempisque, Costa Rica Huat-Yoo Chua Moh And Associates, Inc. Taiwan Jack Chang RSEA Engineering Corporation Taiwan 1. Introduction Taiwan Friendship Bridge spans

More information

BEHAVIOUR AND DESIGN OF ANCHORS FOR LIFTING AND HANDLING IN PRECAST CONCRETE ELEMENTS

BEHAVIOUR AND DESIGN OF ANCHORS FOR LIFTING AND HANDLING IN PRECAST CONCRETE ELEMENTS BEHAVIOUR AND DESIGN O ANCHORS OR LITING AND HANDLING IN PRECAST CONCRETE ELEMENTS Dieter Lotze Halfen GmbH & Co. KG, Wiernsheim, Germany Abstract Lifting anchors are widely used in the precast concrete

More information

ENGINEERED POWER SOLUTIONS

ENGINEERED POWER SOLUTIONS Date: May 2, 2017 Subject: To: From: Structural Overview of Earth Anchors For PV Ground Mounted Arrays Brian Boguess Nuance Energy Group, Inc. Matthew Gilliss Engineered Power Solutions (EPS) INTRODUCTION

More information

one structural behavior, systems and design Course Description Course Description Syllabus & Student Understandings statics mechanics of materials

one structural behavior, systems and design Course Description Course Description Syllabus & Student Understandings statics mechanics of materials ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SUMMER 2014 lecture one Syllabus & Student Understandings structural behavior, systems and design Introduction 1 Architectural Structures

More information

North Mountain IMS Medical Office Building

North Mountain IMS Medical Office Building North Mountain IMS Medical Office Building Phoenix, Arizona Michael Hopple Technical Assignment 1 October 5 th, 2007 AE 481W-Senior Thesis The Pennsylvania State University Faculty Adviser: Dr. Ali Memari,

More information

STRESS RIBBON BRIDGE

STRESS RIBBON BRIDGE A Seminar report On STRESS RIBBON BRIDGE Submitted in partial fulfillment of the requirement for the award of degree Of Civil SUBMITTED TO: SUBMITTED BY: www.studymafia.org www.studymafia.org Acknowledgement

More information

Design of Semi gravity Retaining Walls

Design of Semi gravity Retaining Walls Design of Semi gravity Retaining Walls Example 13.1 A semi gravity retaining wall consisting of plain concrete (weight = 145 lb/ft³) is shown in Figure 13.9. The bank of supported earth is assumed to weigh

More information

SECTION PLATE CONNECTED WOOD TRUSSES

SECTION PLATE CONNECTED WOOD TRUSSES SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:

More information

Possible solution to past CM exam question. Question 2 July New city centre office block. by Rajavel Inbarajan

Possible solution to past CM exam question. Question 2 July New city centre office block. by Rajavel Inbarajan Possible solution to past CM exam question Question 2 July 2015 New city centre office block by Rajavel Inbarajan The information provided should be seen as an interpretation of the brief and a possible

More information

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan

More information

Design and Rating of Steel Bridges

Design and Rating of Steel Bridges 2014 Bentley Systems, Incorporated Parametric and Integrated Bridge Design LEAP Bridge Steel Steve Willoughby Design and Rating of Steel Bridges 2 WWW.BENTLEY.COM 2014 Bentley Systems, Incorporated 1 Discussion

More information

Dan Carrier Parsons Brinckerhoff Project Manager Cooper River Bridge Charleston, South Carolina

Dan Carrier Parsons Brinckerhoff Project Manager Cooper River Bridge Charleston, South Carolina OTEC 2004 Dan Carrier Parsons Brinckerhoff Project Manager Charleston, South Carolina Dan Carrier Background! Hazelet & Erdal 1966-1984 (Cincinnati, Ohio Office) Bridge Designer! Parsons Brinckerhoff 1984-2004

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2013 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866)

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866) TECHNICAL NOTE On Cold-Formed Steel Construction $5.00 Light Gauge Steel Engineers Association Washington, D.C. 20005 Toll Free (866) 465-4732 www.lgsea.com DESIGN OF BY-PASS SLIP CONNECTORS IN COLD-FORMED

More information

Structural Technical Report #2 Pro/Con Study of Alternate Floor Systems

Structural Technical Report #2 Pro/Con Study of Alternate Floor Systems Christopher McCune Structural Option Eight Tower Bridge Faculty Advisor: Dr. Hanagan October 31 st, 2005 Structural Technical Report #2 Pro/Con Study of Alternate Floor Systems Executive Summary This technical

More information

The designer shall also submit additional information required by the University as described and underlined below.

The designer shall also submit additional information required by the University as described and underlined below. I. Structural Engineering Submissions The designer shall submit all information required by the State Construction Office (SCO) as described in the State Construction Manual Chapter 300 - Project Design

More information

A Study on Analysis of Transmission Line Tower and Design of Foundation

A Study on Analysis of Transmission Line Tower and Design of Foundation A Study on Analysis of Transmission Line Tower and Design of Foundation 1 B. Bharath Kumar Reddy, 2 K. Rasagnya, 3 V. Sanjay Gokul 1,2 Under Graduates, 3 Assistant Professor Abstract - The Transmission

More information

Hybrid prestressed concrete bridges with steel truss webs-sarutagawa bridge and Tomoegawa bridge

Hybrid prestressed concrete bridges with steel truss webs-sarutagawa bridge and Tomoegawa bridge IABSE-JSCE Joint Conference on Advances in Bridge Engineering-III, August 21-22, 2015, Dhaka, Bangladesh. ISBN: 978-984-33-9313-5 Amin, Okui, Bhuiyan, Ueda (eds.) www.iabse-bd.org Hybrid prestressed concrete

More information

Real-Time Hybrid Testing of Laminated Rubber Dampers for Seismic Retrofit of Bridges

Real-Time Hybrid Testing of Laminated Rubber Dampers for Seismic Retrofit of Bridges Real-Time Hybrid Testing of Laminated Rubber Dampers for Seismic Retrofit of Bridges Akira Igarashi, Fernando Sanchez, Kenta Fujii Kyoto University Hirokazu Iemura Kinki Polytechnic College and Akihiro

More information

NUMERICAL MODEL FOR PREDICTION OF CRACKS IN CONCRETE STRUCTURES

NUMERICAL MODEL FOR PREDICTION OF CRACKS IN CONCRETE STRUCTURES NUMERICAL MODEL FOR PREDICTION OF CRACKS IN CONCRETE STRUCTURES A. van Beek FEMMASSE B.V., Geldermalsen, The Netherlands B.E.J. Baetens INTRON B.V., Geldermalsen, The Netherlands E. Schlangen INTRON B.V.,

More information

Expansion joints for ever longer, lighter bridges

Expansion joints for ever longer, lighter bridges Expansion joints for ever longer, lighter bridges Thomas SPULER Civil Engineer Mageba SA Bülach, Switzerland tspuler@mageba.ch Thomas Spuler, born in 1956, received his civil engineering degree from the

More information

VTU EDUSAT PROGRAMME Lecture Notes on Design of Stair cases

VTU EDUSAT PROGRAMME Lecture Notes on Design of Stair cases VTU EDUSAT PROGRAMME 17 2012 Lecture Notes on Design of Stair cases DESIGN OF RCC STRUCTURAL ELEMENTS - 10CV52 (PART B, UNIT 8) Dr. M. C. Nataraja Professor, Civil Engineering Department, Sri Jayachamarajendra

More information

Bridge Beams. Product brochure

Bridge Beams. Product brochure Bridge Beams Product brochure Bridge Beams Stahlton offers economic bridge systems to suit a variety of spans, loadings and site conditions. Our Super Tee and Single or Double Hollowcore elements are manufactured

More information

Griffith University Cable Stayed Pedestrian Bridge

Griffith University Cable Stayed Pedestrian Bridge Griffith University Cable Stayed Pedestrian Bridge John Steele BE (Hons 1) M Eng SC, Associate SKM Sydney Laura Chong BE (Hons) Project Engineer SKM Sydney Eugene Newman BE (Civil) Project Manager Abigroup

More information

Uniclass L151:P7113 EPIC A41:X724. CI/SfB (17.1) Hn6. Plastic Piling

Uniclass L151:P7113 EPIC A41:X724. CI/SfB (17.1) Hn6. Plastic Piling Uniclass L151:P7113 EPIC A41:X724 CI/SfB (17.1) Hn6 Plastic Piling Introduction HL Plastics began manufacturing Plastic Piling in 1994 in Derbyshire and has consistently and constantly increased its share

More information

Sabah Shawkat Cabinet of Structural Engineering 2017

Sabah Shawkat Cabinet of Structural Engineering 2017 3.1-1 Continuous beams Every building, whether it is large or small, must have a structural system capable of carrying all kinds of loads - vertical, horizontal, temperature, etc. In principle, the entire

More information

xiii Preface to the Fifth Edition Preface to the Second Edition Factors for Conversion to SI Units of

xiii Preface to the Fifth Edition Preface to the Second Edition Factors for Conversion to SI Units of Structural Steel Designer's Handbook Table Of Contents: Contributors xiii Preface to the Fifth Edition xv Preface to the Second Edition xvii Factors for Conversion to SI Units of xix Measurement Chapter

More information