4 MINIMUM SPATIAL/FUNCTIONAL REQUIREMENTS SPACE NUMBER OF OCCUPANTS USE TYPE Activity Room Assembly Meeting Rooms (5) Referenced at Room Descriptions Business Storage 0 Accessory Toilet Rooms Fixtures per Building Code NYS & Plumbing Code NYS Accessory Kitchen 0 Accessory Entrance Foyer Proportional to Exit Capacity and Discharge required by Building Code NYS and Fire Code NYS Accessory

5

6 MEETING ROOM 15 Persons 30 Persons Space Allocation for the Function: Provisions should be made for audio-visual presentations and small group discussions. Allow 20 SF per occupant. Furniture and Equipment (to be provided by the Owner): A modular table arrangement is suggested that can function as a central table for a large group or be divided into smaller study tables. Conference chairs, preferably with arms are suggested. Locked storage is required for projection or audiovisual equipment. Adjacency Relationships: The Meeting Room should be directly accessible to the Activity Room or created using foldable partitions in the Activity Room. Spatial Definition and Openness: Minimum ceiling height is 9-0. It is desirable the Meeting Roof have an exterior view. Sound Control: Sound integrity is required from adjacent areas. Finish Materials: Painted drywall, carpet, and acoustic tile ceilings Signage: None is required. Storage: Use furniture and equipment to provide storage. Plumbing: None is required. Electrical: Low-level illuminations of 10 fc are required for media presentations, and 50fc for all other activities. Provide outlets per NFPA 70 National Electric Code.

7

8 SERVICE LIFE AND REPLACEMENT CYCLES a. DEFINITIONS a. Service Life. The average time during which a particular system or component remains in it original service application and when it should be replaced. Replacement may occur for any reason, including, but not limited to failure, general obsolescence, reduced reliability, excessive maintenance cost, and changed system requirements due to such influences as changed functional programs or energy prices. b. Critical Component. Major system without which the facility could not provide it s primary function c. Major Component. Building System that is 10% or more of the cost of the facility. b. SERVICE LIFE: Design the structure and exterior skin, respectively, to support specific loads and to provide a weather tight enclosure so that the critical building systems inside the building have a finite service life. Recommended service life of the building's critical individual components are identified below, assuring appropriate maintenance: CRITICAL BUILDING COMPONENT SERVICE LIFE Structural (foundation, sub-structure, & superstructure) Exterior Skin Roofs Interior Construction/Equipment Mechanical Systems Electrical Systems Indefinite Indefinite 20 Years 10 Years 25 Years 20 Years

9 A 10 FOUNDATIONS Slab on Grade 1. Reinforced slab-on-grade, design in conformance with Building Code of NYS. Provide minimum of 3500 psi concrete with steel reinforcement, and stem walls to support exterior enclosure. 2. Provide joints in all concrete slabs on grade. a. Locate construction joints under partitions or on column lines. b. Provide contraction joints on all column lines and at 20-0 maximum spacing each way in between B 10 SUPERSTRUCTURE Pre-Engineered Steel Structure 1. All structural steel sections and welded plate members shall be designed in accordance with the latest edition of MBMA and the AISC, "Specifications for Design, Fabrication and Erection of Structural Steel for Buildings." 2. All light gauge cold formed structural members and exterior covering shall be designed in accordance with the latest addition of AISC, "Specification for the Design of Cold-Formed Steel Structural Members." Design load requirements shall be as determined by local building codes, and as per Manufacturers recommended design referencing the "Low Rise Systems Manual" of the Metal Building Manufactures Association, the U.B.C. and the Building Code of NYS. 3. The basic design loads include roof snow loads, wind loads, dead and seismic loads. Design metal buildings to resist the dead load, the live load, and the combination of these loads as set forth in Metal Building Manufacturers Association (MBMA) "Recommended Design Practices Manual". 4. Metal Building components shall be capable of supporting design loads without permanent deformation, loss of watertightness, or disengagement of any part of installation.

10 D 30 HEATING VENTILATION AIR CONDITIONING General: 1. Provide equipment and design a system that conforms to the following standards a. Building Code of NYS, Mechanical Code of NYS, and all local ordinances. b. ARI Unitary Air-Conditioning Equipment. c. ARI Sound Rating of Outdoor Unitary Equipment. d. ARI 410 Standard for Forced Circulation Air Cooling and Air-Heating Coils e. NFPA 70 - National Electrical Code f. NFPA 90A - Installation of Air Conditioning and Ventilation Systems. g. SMACNA HVAC Duct Construction Standard. 2. Provide outdoor-mounted unit suitable for on-the-ground or rooftop installation. Provide forced air system with ducted returns, based on requirements of the Mechanical Code of NYS and the Building Code of NYS. D50 ELECTRICAL General: 1. Design and provide installation in accordance with the National Electrical Code, state code, and local ordinances. Electrical Service and Distribution: 1. Provide full size separate neutrals for all branch circuits. 2. Install full size ground wire in all electrical installations. Do not depend on the conduit for grounding. 3. Provide minimum conduit size of 1/2 inch from electrical panels to boxes and between boxes. Lighting and Branch Wiring 1. Branch circuits shall be designed so that the maximum voltage drop will be 5 per cent for power circuits and 4 percent for lighting and combination lighting and power circuits. 2. All wire shall be copper and stranded including all branch circuit wiring. 3. The loading of 20 amp branch circuits shall not exceed 80 percent. 4. Convenience outlets shall be considered as a minimum load of 250 watts per duplex outlet.

11

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) Construction Criteria The unit costs for the Physical Fitness Center (Exercise Room) space type are based on the construction quality and design features in

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II Fire Inspection and Code Enforcement, 7 th Edition Chapter 6 Building Construction: Components Today we will Discuss fire walls, party walls, fire partitions, and curtain walls Discuss roof types and coverings

More information

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION: SECTION 13 05 41 SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED 1-25-13 PART 1 GENERAL 1.1 DESCRIPTION: A. Provide seismic restraint in accordance with the requirements of this section

More information

A. Submit the following in addition to the standard requirements.

A. Submit the following in addition to the standard requirements. SECTION [13120] OMNIFLEX 300 MODULAR WALL SYSTEM SECTION 1 GENERAL 1.01 SECTION INCLUDES A. This Section specifies all requirements necessary to furnish and install a complete modular wall system including,

More information

2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone:

2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone: 2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA 94070 Phone: 650-802-4261 PURPOSE: The residential provisions of the 2016 CalGreen

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES SECTION 09 21 16 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SECTION INCLUDES A. Metal stud wall and ceiling framing, 20 gauge. B. Metal channel suspended ceiling framing. C. Gypsum board. D. Gypsum sheathing.

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

COLUMN SPACING TRUCK ACCESS/DOORS EAVE HEIGHT UTILITIES PARKING & DRIVES

COLUMN SPACING TRUCK ACCESS/DOORS EAVE HEIGHT UTILITIES PARKING & DRIVES LOCATION & ACCESS Akron Business Centre I and II 4.2 acre site at Opportunity Parkway (Wooster Avenue) & Pier Drive Located in Downtown Akron Adjacent to Innerbelt Expressway (Route 59) and just north

More information

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE SECTION 13125 PART 1 - GENERAL 1.1 SUMMARY A. Section includes the design, engineering, fabrication and erection of a frame-supported, tensilemembrane structure complete with entrance and exit doors and

More information

General Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours

General Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours Basic Edition Standard Estimate Report Page 1 Name 1000 General Conditions 1107 Professional Consultant 10 Surveying 1.00 day 600.000 /day 600 - - - - - - 600 Professional Consultant 600 600 8.00 hours

More information

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL). 16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the

More information

RESIDENTIAL BUILDING REQUIREMENTS

RESIDENTIAL BUILDING REQUIREMENTS RESIDENTIAL BUILDING REQUIREMENTS Residential Building Requirements This is an informational booklet with some of the general residential construction requirements taken from the codes adopted by Campbell

More information

Building Systems and Design Elements included in SliDeRulE

Building Systems and Design Elements included in SliDeRulE Building Systems and Design Elements included in SliDeRulE No. System Subsystem Design Element 1.1.1 Foundation Deep Foundation Steel H-pile 1.1.2 Foundation Deep Foundation Steel pipe pile 1.1.3 Foundation

More information

(Condensed from National Electric Code)

(Condensed from National Electric Code) WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

HAMBRO COMPOSITE FLOOR SYSTEM

HAMBRO COMPOSITE FLOOR SYSTEM HAMBRO COMPOSITE FLOOR SYSTEM OUR EXPERTISE AT YOUR SERVICE Canam has been offering owners, real estate developers, architects, engineers and contractors an array of construction solutions since 1970.

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

Section BUILDINGS, SHELTERS, ENCLOSURES

Section BUILDINGS, SHELTERS, ENCLOSURES Section 13121 BUILDINGS, SHELTERS, ENCLOSURES Part 1 GENERAL 1.1 SECTION INCLUDES 1.2 A. Pre-engineered buildings. B. Pre-engineered shelters. C. Pre-engineered enclosures. D. Electrical wiring and devices

More information

A. This Section includes ceiling- and wall-mounted diffusers, registers, grilles and louvers.

A. This Section includes ceiling- and wall-mounted diffusers, registers, grilles and louvers. SECTION 23 37 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan Executive Summary: 200 Minuteman Park currently stands as a three story commercial building. The original design was limited to three stories by an industrial zoning law in Andover, Massachusetts. If this

More information

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural cantilever rack design. In addition, it is

More information

GENERAL PLAN REVIEW REQUIREMENTS

GENERAL PLAN REVIEW REQUIREMENTS GENERAL PLAN REVIEW REQUIREMENTS Cover Letter A letter (or an authorized pre-printed form) authorizing CCIS to perform the Plan Review is required. CCIS performs plan reviews for the ICC International

More information

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards Laboratory Standards These criteria include general planning guidelines. They are intended for use of Designers during the design phases of the project. Planning Assumptions Overview In order to maximize

More information

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING 2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending

More information

Facility Improvements

Facility Improvements CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation

More information

School Without Walls

School Without Walls INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Structural Technical Report #2 Pro/Con Study of Alternate Floor Systems

Structural Technical Report #2 Pro/Con Study of Alternate Floor Systems Christopher McCune Structural Option Eight Tower Bridge Faculty Advisor: Dr. Hanagan October 31 st, 2005 Structural Technical Report #2 Pro/Con Study of Alternate Floor Systems Executive Summary This technical

More information

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Property Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711

Property Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711 Property Offering Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711 Executive Summary We are pleased to present an outstanding cold storage opportunity in Evansville, Indiana. Built in

More information

LECKIE ELEMENTARY SCHOOL

LECKIE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

CATAMARAN TOWER - 1 Seef Area Plot 19, 20

CATAMARAN TOWER - 1 Seef Area Plot 19, 20 STATUS REPORT NO 18 [As on September 30, 2017] This report is intended as a status report and covers only the activities completed till date, non-completed works and work-in-progress. A. Project Details

More information

Communications Page 1 of 9

Communications Page 1 of 9 Page 1 of 9 Last Update: April 23 rd, 2014 Introduction Design In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a

More information

Structural Inspection

Structural Inspection General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized

More information

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS SECTION 13096 MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS Prepared by: NELCO 125 Chenoweth Lane, Ste. 206 Louisville, KY 40207 (502) 899-3726 13096-1 MODULAR GALVANIZED RF SHIELDING SYSTEM PART

More information

BUILDING CODES & DESIGN CRITERIA

BUILDING CODES & DESIGN CRITERIA BUILDING CODES & DESIGN CRITERIA Adopted Building Codes: 2006 International Building Code (IBC) 2006 International Residential Code (IRC) 2006 International Mechanical Code (IMC) 2006 International Plumbing

More information

Outdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R

Outdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R Outdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R Product Brochure www.apt-power.com 433 N. 36 th Street PROVIDING A COMPREHENSIVE Lafayette, IN 47905 www.apt-power.com 433

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information Anderson Central 100B, PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G

More information

TENANT CRITERIA MANUAL INSERT PHOTO HERE

TENANT CRITERIA MANUAL INSERT PHOTO HERE G TENANT CRITERIA MANUAL GREENWOOD MALL INSERT PHOTO HERE General Growth Properties, Inc. 110 N. Wacker Drive Chicago, IL 60606 (312)-960-5000 Tenant shall supply and install an electrical meter

More information

Telecommunication Spaces

Telecommunication Spaces Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137

More information

APPLICATION NUMBER:, TAX MAP KEY: STREET ADDRESS:, PRPOJECT: APPLICANT:, PHONE NO: MAILING ADDRESS:, FAX NO:

APPLICATION NUMBER:, TAX MAP KEY: STREET ADDRESS:, PRPOJECT: APPLICANT:, PHONE NO: MAILING ADDRESS:, FAX NO: COUNTY OF KAUAI BUILDING DIVISION, DEPARTMENT OF PUBLIC WORKS 4444 RICE STREET, SUITE 175, LIHUE, HAWAII 96766 Telephone: (808) 241-6655 Fax Number: (808) 241-6806 BUILDING CODE COMMERCIAL CHECKLIST APPLICATION

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

Engineering Specifications for the CXI Room of the FEH LUSI Document # ESD SP

Engineering Specifications for the CXI Room of the FEH LUSI Document # ESD SP LCLS Engineering Specifications Document # 1.9-114 LUSI, CF, XES Revision 0 Engineering Specifications for the CXI Room of the FEH LUSI Document # ESD SP-391-001-37 Aymeric Robert Author, LUSI Scientist

More information

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING WWW.STOPWASTE.ORG New Addition Consider the following green remodeling options in a new addition.

More information

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen:

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen: March 6, 2018 Subject: Addendum No. 2 Toyota Park Transit Center Phase II Ladies and Gentlemen: This Addendum No. 2 is being issued to provide responses to questions submitted by potential bidders and

More information

INTERIOR ENVIRONMENT

INTERIOR ENVIRONMENT CHAPTER 12 INTERIOR ENVIRONMENT > SECTION 1201 GENERAL 1201.1 Scope. The provisions of this chapter shall govern ventilation, temperature control, lighting, yards and courts, sound transmission, room dimensions,

More information

Power Zone Center. Your solution for power distribution and control systems

Power Zone Center. Your solution for power distribution and control systems Power Zone Center Your solution for power distribution and control systems The Strength of One Powerful When you need to install a new power distribution center in your facility, you need it done in fastest

More information

Typical Finished Basement Details

Typical Finished Basement Details Albemarle County, Virginia Typical Finished Basement Details Based on the 2012 Virginia Residential Code Finished basements must be constructed in conformance with these details. For requirements, details

More information

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT 1 East Franklin Street Phone: 301-790-4163 Third Floor Hagerstown, MD 21740 Fax: 301-791-2650 BUILDING PERMIT APPLICATION FOR RESIDENTIAL ACCESSORY

More information

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ 08014 856-467-3626--- FAX 856-467-9260 Application for Certificate of Occupancy for Change of Occupancy Pursuant to Chapter 119 of the Township

More information

COOLIDGE SENIOR HIGH SCHOOL

COOLIDGE SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1940 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1240 ENROLLMENT 2008 652 WARD 4 PROPOSED PROGRAM CAPACITY 1100 Site Plan COOLIDGE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Hollowcore. Roof & Floor Systems. Roof & Floor Systems. Commercial Applications

Hollowcore. Roof & Floor Systems. Roof & Floor Systems. Commercial Applications Hollowcore Roof & Floor Systems Roof & Floor Systems Two Rivers Senior Housing Precast columns Precast Inverted Tee Beams Commercial Applications Hollowcore Roof & Floor Systems Wilmar Wastewater Treatment

More information

Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report

Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report Michael A. Troxell Structural Option Advisor: Professor Parfitt College of Business Administration Oct. 5, 2005 Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report

More information

DICTATOR Lift Shaft System

DICTATOR Lift Shaft System DICTATOR Lift Shaft System The Modular Lift Shaft System, also for Retrofitting Certified According to EN 1090 A lift is becoming more and more important for daily life, not only in newly constructed buildings

More information

WALL MOUNTED ARTICULATING JIB CRANE

WALL MOUNTED ARTICULATING JIB CRANE SECTION 14656 WALL MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and

More information

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS 1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new

More information

1. Unified Facilities Criteria - Design: General Building Requirements (UFC ).

1. Unified Facilities Criteria - Design: General Building Requirements (UFC ). 1. GENERAL GUIDANCE REGARDING DESIGN A. Commissary facilities are Department of Defense (DoD) projects, and as such must be constructed in accordance with the following criteria, codes, and standards.

More information

10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction.

10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction. Plan Examination 1 Plan ExaminationPurpose 2 Catch problems in advance of construction. 3 1 Discovery of problems in the field results in higher cost. 4 Can a good plan review eliminate all problems in

More information

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity System Codes and Criteria Design Codes and Standards The design code used is the Wisconsin Administrative Code along with the State of Wisconsin Department of Commerce-Safety & Buildings Chapters Comm

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. GORBEL PRODUCT SPECIFICATIONS 2010 Gorbel, Inc., P.O., Box 593, Fisher, New York 14453-0593 PHONE: 800-821-0086, FAX: 585-924-6273; WEBSITE: www.gorbel.com November SECTION 41 22 31PRIVATE FREE STANDING

More information

ACBC Floor Mounted Active Beam

ACBC Floor Mounted Active Beam Floor Mounted Active Beam The Price Floor Mounted Active Beam,, is designed for occupant comfort. It provides high cooling and heating capacities while simultaneously supplying ventilation air from a DOAS

More information

THE STRATA UNIT May 25, 2008

THE STRATA UNIT May 25, 2008 THE STRATA UNIT May 25, 2008 Over the years, we have been asked time and time again from our experience as a cost consultant and a project manager from both a restoration and renovation point of view What

More information

The facility is approximately 439,350 square feet, located on a acre parcel on Wood Dale Road in Wood Dale, Illinois. 439,350 Square Feet

The facility is approximately 439,350 square feet, located on a acre parcel on Wood Dale Road in Wood Dale, Illinois. 439,350 Square Feet 1.0 DESIGN SPECIFICATIONS 1.1 Size of Building and Tract: The facility is approximately 439,350 square feet, located on a 21.86-acre parcel on Wood Dale Road in Wood Dale, Illinois. 1.2 Size of Building

More information

WIRING METHODS CHAPTER 38

WIRING METHODS CHAPTER 38 CHAPTER 38 WIRING METHODS SECTION E3801 GENERAL REQUIREMENTS E3801.1 Scope. This chapter covers the wiring methods for services, feeders and branch circuits for electrical power and distribution. E3801.2

More information

DESIGN DEVELOPMENT PHASE

DESIGN DEVELOPMENT PHASE UNIVERSITY OF MICHIGAN DESIGN DELIVERABLES FEBRUARY 2012 As part of the deliverables for formal UM review at each of the major phases of design listed below, the Design Professional shall submit this "Design

More information

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification

More information

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies MasterFormat LEVEL TWO NUMBERS AND TITLES Introductory Information 00001 Project Title Page 00005 Certifications Page 00007 Seals Page 00010 Table of Contents 00015 List of Drawings 00020 List of Schedules

More information

Seasons Business Center New Construction!

Seasons Business Center New Construction! Seasons Business Center New Construction!...Seasons Business Center Stow, Ohio 114,188 SF of High Bay Space 32 Clear Height 80 480 ESFR Sprinklers Tax Abatement Available 8 Reinforced Concrete Floor 271

More information

Executive Summary. References. TSM 371Lecture Remodeling. Why Remodel? Areas To Remodel Pitfalls Associated Costs Finished Products

Executive Summary. References. TSM 371Lecture Remodeling. Why Remodel? Areas To Remodel Pitfalls Associated Costs Finished Products TSM 371Lecture Remodeling Executive Summary Why Remodel? Areas To Remodel Pitfalls Associated Costs Finished Products References Course Textbook House Planning Handbook, MWPS-16, Second Edition, 1988.

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

Budget Estimate Basic Tenant Improvement

Budget Estimate Basic Tenant Improvement Building work rules, conditions and insurance: 1. Review the work rules. If they are not available no budget should be provided. 2. Hours available for construction 3. Insurance requirements 4. Entities

More information

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS BASEMENT FINISH REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS A construction permit is required. A homeowner may perform the construction work on his own property where he resides, without a

More information

PRESENTATION CENTER SURREY, BC CANADA

PRESENTATION CENTER SURREY, BC CANADA PRESENTATION CENTER SURREY, BC CANADA 1 VIEW OF THE PROPOSED OPTIMA 3 TOWERS (AFTER OBTAINING THE HIGH DENSITY THAT IS UNDER STUDY) ALONG WEST WHALLEY RING ROAD 2 3 IHI WILL BUILD THE OPTIMA PRESENTATION

More information

INC Pre-Assembled Structures

INC Pre-Assembled Structures INC Pre-Assembled Structures Drop-In In-Place Noise Control Pre-Engineered Factory Finished High Performance Rugged Durability INC pre-assembled structures offer a high performance, cost-effective alternative

More information

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco

More information

A. Types of lightgauge metal framing units include the following: 1. C-shaped structural steel studs Uniform Building Code.

A. Types of lightgauge metal framing units include the following: 1. C-shaped structural steel studs Uniform Building Code. SECTION 05400 COLD-FORMED METAL FRAMING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification

More information

OFFICE OF EDUCATIONAL FACILITIES FLORIDA BUILDING CODE SECTION 423 APPLICATION MATRIX

OFFICE OF EDUCATIONAL FACILITIES FLORIDA BUILDING CODE SECTION 423 APPLICATION MATRIX 423.1 Scope: Public educational facilities 423.2 Public schools and community colleges general requirements 423.2.1 Owner 423.2.2 Exemption from local requirements 423.2 Code enforcement 423.3.1 School

More information

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March

More information

Basement Renovation Guide For Residential Dwellings

Basement Renovation Guide For Residential Dwellings 1 Development Services Department Building Permit & Inspection Services Basement Renovation Guide For Residential Dwellings This document is a guide for home owners and does not cover all possible conditions.

More information

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT Building Permit Application Instructions NOTICE: Keep these instructions for your records. Please read and understand these instructions completely prior to completing and submitting your building permit

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF WELDED SYSTEM PART 1 GENERAL 1.1 SECTION

More information

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee The Structural Redesign of Boyds Bear Country and its Related Systems Included in this Presentation: Background and Existing System Proposal Problem / Solution Structural System Redesigns Pre-cast Concrete

More information

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION CHAPTER 26 PLASTIC SECTION BC 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic

More information

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) 2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:

More information

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will

More information

SIERRA MODEL 12 X 24 SPECIFICATIONS

SIERRA MODEL 12 X 24 SPECIFICATIONS SIERRA MODEL 12 X 24 SPECIFICATIONS Dimensions: Roof Dimensions 12-0 x 24-0 Column Dimensions (center to center) 9-0 x 21-0 Minimum Clearance 8-0 Shed Roof 1:12 pitch Square Feet Under Roof 288 Columns

More information

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SIMEILINGS TORSION SPRING CEILING SYSTEM SPECIFICATION

SIMEILINGS TORSION SPRING CEILING SYSTEM SPECIFICATION TORSION SPRING CEILING SYSTEM SPECIFICATION NOTICE: Consult your local Sound Concepts representative or contact Sound Concepts at 204.783.6297 before specifying any optional or custom element as shape,

More information

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding

More information

DESIGN CRITERIA. Allowable Stress Design (ASD) AISC-1999.

DESIGN CRITERIA. Allowable Stress Design (ASD) AISC-1999. DESIGN CRITERIA 1. INTRODUCTION This appendix summarizes the codes, standards, criteria, and practices that are generally used in the design and construction structural engineering system for the Sarker

More information

ALL-ALUMINUM DOOR & WINDOW FRAMING

ALL-ALUMINUM DOOR & WINDOW FRAMING ALL-ALUMINUM DOOR & WINDOW FRAMING WITH INTEGRATED ALUMINUM DOOR STOP SECTION 08 41 13 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS SPECIFICATION PART 1 GENERAL 1.1 SECTION INCLUDES: A. Prefinished aluminum

More information

How to estimate the cost of new air conditioning system to an existing storage warehouse.

How to estimate the cost of new air conditioning system to an existing storage warehouse. How to estimate the cost of new air conditioning system to an existing storage warehouse. 1 How to estimate the cost of new air conditioning system to an existing storage warehouse. Table of Contents Section

More information