ANNUAL SURVEY FOR DESIGNATED SUBSTANCES AND HAZARDOUS MATERIALS

Size: px
Start display at page:

Download "ANNUAL SURVEY FOR DESIGNATED SUBSTANCES AND HAZARDOUS MATERIALS"

Transcription

1 ANNUAL SURVEY FOR DESIGNATED SUBSTANCES AND HAZARDOUS MATERIALS East York Civic Centre 850 Coxwell Avenue Toronto, Ontario Presented to: Sara Reid City of Toronto Corporate Services Facilities Management Presented By: ECOH Project: B120 November 15, 2016

2 TABLE OF CONTENTS 1. INTRODUCTION AND REGULATORY REQUIREMENTS INTRODUCTION AND SCOPE REGULATORY REQUIREMENTS SURVEY METHODOLOGY GENERAL APPROACH ASBESTOS SURVEY METHODOLOGY Asbestos Sampling Strategy and Analytical Methods LEAD METHODOLOGY MOULD ASSESSMENT ASSESSMENT FOR PCBS HAZARDOUS MATERIALS SURVEY INVENTORY SURVEY OF OTHER HAZARDOUS MATERIALS FINDINGS AND RECOMMENDATIONS ASBESTOS LEAD MOULD MERCURY SILICA POLYCHLORINATED BIPHENYLS (PCBS) BENZENE OTHER ENVIRONMENTAL CONSIDERATIONS RECOMMENDATIONS ASBESTOS LEAD MOULD MERCURY SILICA POLYCHLORINATED BIPHENYLS (PCBS) OTHER SUBSTANCES CORRECTIVE ACTIONS STATEMENT OF LIMITATIONS APPENDIX I APPENDIX II APPENDIX III APPENDIX IV HAZARDOUS MATERIALS INVENTORY SHEET LABORATORY ANLYSIS REPORTS - BULK SAMPLE ANALYSES VISUALLY IDENTIFIABLE ASBESTOS MATERIAL INFO SHEET SURVEY DRAWINGS ECOH

3 CITY OF TORONTO DESIGNATED SUBSTANCES SURVEY, TORONTO, ONTARIO ECOH / B120 NOVEMBER, INTRODUCTION AND REGULATORY REQUIREMENTS 1.1 Introduction and Scope ECOH Management Inc. (ECOH) was retained by The City of Toronto to conduct a reassessment survey for designated substances and hazardous materials at the East York Civic Centre, located at 850 Coxwell Avenue in Toronto, Ontario (hereafter referred to as the facility or the project area ). The objective of the survey was to determine the condition of previously identified asbestoscontaining materials (ACM), identify and assess the condition of previously-identified designated substances and other hazardous materials, and, if necessary, provide recommendations to assist the City of Toronto in fulfilling requirements to achieve regulatory compliance, as set forth under the Ontario Occupational Health and Safety Act, and enforced by the Ontario Ministry of Labour. This document should be filed as an addendum to the original survey report, which was issued by ECOH in October, This designated substances survey report is for management purposes only. It is not intended to be used to establish the presence of designated substances or hazardous materials in building materials prior to demolition or renovation activities. A pre-renovation/pre-demolition audit of the work area for designated substances and hazardous materials should be conducted prior to any work activities that may disturb building materials potentially containing designated materials or hazardous substances. Ms. Marlene Lopes of ECOH performed the fieldwork on August 17-18, The following designated substances and hazardous materials were included in the re-assessment, if previously identified in the facility: Asbestos Benzene Lead Coke Oven Emissions Mercury Ethylene Oxide Silica Isocyanates Acrylonitrile Vinyl Chloride Monomer Arsenic Mould Polychlorinated Biphenyls (PCB)s The following report details the project regulatory requirements, survey and analytical methodologies, findings and recommendations, and survey statement of limitations. 1.2 Regulatory Requirements Regulatory requirements and guidelines applicable to the designated substances and hazardous materials noted above include, but are not limited to, the following: Ontario Occupational Health and Safety Act and applicable Regulations made under the Act including; Designated Substances Ontario Regulation 490/09, and Designated Substance Asbestos on Construction Projects and in s and Repair Operations Ontario Regulation 278/05. Ontario Environmental Protection Act, and applicable regulations made under the Act. General Waste Management Ontario Regulation 347 ECOH Page 1

4 CITY OF TORONTO DESIGNATED SUBSTANCES SURVEY, TORONTO, ONTARIO ECOH / B120 NOVEMBER, 2016 Waste Management PCB s Ontario Regulation 362. Canadian Environmental Protection Act, 1999 and applicable Regulations made under the Act, including: PCB Regulations (SOR/ ), amended Dec 8, Ministry of Labour Guideline, Lead on Construction Projects, dated April 2011, Ministry of Labour Guideline, Silica on Construction Projects, dated April Canadian Construction Association, Standard Construction Document CCA 82, 2004; Mould Guidelines for the Canadian Construction Industry, Environmental Abatement Council of Ontario (EACO) Mould Abatement Guidelines, Ed. 3, Environment Canada Document, PCB Identification of Lamp Ballasts Containing PCBs, EPS 2/CC/2, dated August Environment Canada Document, Handbook on PCBs in Electrical Equipment EN /1988E, dated April SURVEY METHODOLOGY 2.1 General Approach To ensure familiarity with the building, and prior to commencing the survey, the surveyor made reference to previous surveys, facility floor plans, and other available documentation. The surveyor looked for the most common applications of building materials made with Designated Substances based on historical applications. The investigation performed was non-intrusive in nature (i.e. did not include demolition of building systems to verify concealed conditions). Any rooms that could not be accessed during the survey are noted in the Hazardous s Inventory Sheet in Appendix I and on project drawings in Appendix V. 2.2 Asbestos Survey Methodology Asbestos Sampling Strategy and Analytical Methods Where sampling was required, bulk samples of potentially asbestos-containing materials were collected for analysis. As per the requirements of Ontario Regulation 278/05, multiple samples (ranging from 3 to 7 depending on quantity and type of material) are required to confirm that asbestos is not present in that given material. Only one positive result (i.e. confirmation of the presence of asbestos) is required to classify a material as asbestos-containing. Therefore, ECOH s sampling strategy involves the collection of sufficient numbers of samples to meet regulatory requirements, followed by instructions to the laboratory to cease analysis of all remaining samples within a series when a sample within that series is determined to be asbestos-containing. Sampling requires a small volume of material to either be removed from a damaged section of suspect material or cut from intact material, which is then repaired by sealing with tape to prevent fibre release. The collected samples are placed in plastic bags, sealed, and shipped to an independent laboratory. A formal chain of custody procedure is maintained between ECOH and the subcontracted laboratory during sample transport. Samples are analysed following the analytical procedure prescribed by O. Reg. 278/05 U.S. Environmental Protection Agency Test Method EPA/600/R-93/116: Method for the Determination of Asbestos in Bulk s. June Although not required by provincial regulation, all laboratories used by ECOH are accredited under the U.S. National Voluntary Laboratory Accreditation Program (NVLAP) to ensure consistent, accurate and defensible results. ECOH Page 2

5 CITY OF TORONTO DESIGNATED SUBSTANCES SURVEY, TORONTO, ONTARIO ECOH / B120 NOVEMBER, 2016 s confirmed to be asbestos-containing during any previous assessments of the facility (if applicable) were not re-sampled for this survey. Additionally, samples were not collected of materials that were previously confirmed to be non-asbestos per the requirements of Ontario Regulation 278/05. With the exception of window caulking and roofing materials, all other potentially asbestoscontaining materials (currently recorded as assumed to contain asbestos ) were sampled, unless materials were located at heights exceeding the reach of a surveyor using a 6 step ladder, or were otherwise inaccessible. s assumed or confirmed to contain asbestos in previous years, but not observed during the current survey are retained in the Hazardous s Inventory Sheet in Appendix I with a notation that the material was not observed. 2.3 Lead Methodology Where sampling was required (i.e. where damaged materials were observed), bulk samples of potentially lead-containing materials were collected for analysis by flame atomic absorption spectroscopy. The collected samples were placed in plastic bags, sealed, and shipped to an independent laboratory. A formal chain of custody procedure is maintained between ECOH and the sub-contracted laboratory during sample transport. All laboratories used by ECOH are accredited under the U.S. EPA National Environmental Lead Laboratory Accreditation Program (NLLAP) and/or American Industrial Hygiene Association (AIHA) Environmental Lead Laboratory Accreditation Program (ELLAP) to ensure consistent, accurate and defensible results. Lead concentrations exceeding 1000ppm (0.1%) are considered to indicate the material is leadcontaining per City of Toronto policy and applicable guidelines. 2.4 Mould Assessment The mould assessment of the project area was conducted in accordance with the Canadian Construction Association, Standard Construction Document CCA 82, 2004; Mould Guidelines for the Canadian Construction Industry. Although there are no regulatory requirements or guidelines in Ontario for such an assessment, the preceding protocol has become accepted as the industry standard by most experts, consultants, and the Ontario Ministry of Labour. 2.5 Assessment for PCBs PCBs in commercial facilities can be present in high concentrations in fluorescent or HID light fixtures, and electrical transformers. All potential sources of PCBs identified in the Survey for Designated Substances and Hazardous s conducted for this facility in 2014 were re-examined. Neither dismantling the lights to investigate the ballasts, nor dismantling the transformers to investigate their interiors, was part of the scope of this survey. Without disassembly, determination of whether light ballasts are PCBcontaining is often very difficult. If no labels are present, all such light fixtures are assumed to contain PCB ballasts. Electrical transformers are not disassembled for safety reasons. Determination of PCB content relies on the comparison of information on labels and nameplates located on the exterior of the transformer with standard PCB Identifier Code literature. Transformers must be assumed to contain PCBs if the results of that comparison do not clearly and specifically indicate the transformer does not contain PCBs. ECOH Page 3

6 CITY OF TORONTO DESIGNATED SUBSTANCES SURVEY, TORONTO, ONTARIO ECOH / B120 NOVEMBER, Hazardous s Survey Inventory ECOH s surveyor completed a mould, lead and asbestos field data sheet for each room entered. The data sheet contains the room name, a unique room number assigned by the surveyor, the quantity, type and condition of potentially hazardous materials present in the room, and sampling information. The inventory sheet is included as Appendix I. 2.7 Survey of Other Hazardous s s or equipment suspected of containing other Designated Substances and/or PCBs are identified by appearance, age and knowledge of historic applications. 3. FINDINGS AND RECOMMENDATIONS 3.1 Asbestos Assumed ACM identified within the facility includes the following: Plaster (Non-friable), Mastic (Non-friable), and Window caulking (Non-friable). The locations and quantities of materials assumed or confirmed to be asbestos-containing can be found in the hazardous materials inventory sheet, which is included as Appendix I. Table 1, below, identifies any assumed and/or confirmed ACM observed to be in damaged condition at the time of the reassessment. TABLE 1 Identified Damaged Asbestos s Name, Type and of Analytical Result - All Assumed and/or Confirmed ACM Observed to be in Good at the Time of the Reassessment Survey Table 2, below, summarizes the analytical results for all asbestos bulk samples collected during the current survey. ECOH Page 4

7 CITY OF TORONTO DESIGNATED SUBSTANCES SURVEY, TORONTO, ONTARIO ECOH / B120 NOVEMBER, 2016 TABLE 2 Summary of Analysis - Asbestos Bulk Samples Sample Name Sample Description Analytical Result B120- ASB-01A B120- ASB-02A B120- ASB-02B B120- ASB-02C B120- ASB-02D B120- ASB-02E B120- ASB-03A B120- ASB-03B B120- ASB-03C B120- ASB-03D B120- ASB-03E B120- ASB-03F B120- ASB-03G B120- ASB-04A B120- ASB-04B B120- ASB-04C B120- ASB-04D 1-08 Bike Office Drywall Joint Compound Wall B-02 Elevator Room B-02 Elevator Room B-13 Reception B-13 Reception B-13 Reception 1-02 Corridor 1-03 Lobby Lobby Stairwell Lobby Stairwell Women s Washroom Men s Washroom Electrical Room 2-13 Office 2-15 Corridor 2-17 Women s Washroom 2-19 Corridor Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound ECOH Page 5

8 CITY OF TORONTO DESIGNATED SUBSTANCES SURVEY, TORONTO, ONTARIO ECOH / B120 NOVEMBER, 2016 TABLE 2 Summary of Analysis - Asbestos Bulk Samples Sample B120- ASB-04E B120- ASB-04F B120- ASB-04G B120- ASB-05A B120- ASB-05B B120- ASB-05C B120- ASB-05D B120- ASB-05E B120- ASB-05F B120- ASB-05G Name 2-19 Corridor Women s Washroom Staff Washroom 3-06 Meeting Room 3-07 Servery Electrical Room Electrical Room Men s Washroom Women s Washroom Women s Washroom Sample Description Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Drywall Joint Compound Pink highlighted rows, if present, indicate asbestos-containing materials Analytical Result 3.2 Lead For the purposes of future renovation and/or demolition activities in specific locations within the facility, any building materials not specifically sampled within the renovation project area should be treated as if their asbestos content is not known. Such materials should, therefore, be sampled prior to the occurrence of renovation or demolition work. Additional asbestos-containing materials may be present in areas of the building which were inaccessible at the time of the survey (i.e. above fixed ceilings, behind walls, under flooring, etc.). Analytical results for damaged, potentially lead-containing materials identified within the facility are presented in Table 3 (below). A NEGATIVE result indicates the material contains trace concentrations of lead (i.e. <1000ppm (0.1%)). A POSITIVE result indicates the material is considered lead-containing (i.e. lead concentration >1000ppm (0.1%). ECOH Page 6

9 CITY OF TORONTO DESIGNATED SUBSTANCES SURVEY, TORONTO, ONTARIO ECOH / B120 NOVEMBER, 2016 TABLE 3 Summary of Analysis - Lead Bulk Samples Sample number B120- Pb B120- Pb-02 Name and Type of Analytical Results (ppm) Result 1-07 Office White Paint on <90 ppm Negative 1-07 Office White Paint on <90 ppm Negative Pink highlighted rows, if present, indicate lead-containing materials No other significant potential sources of lead or lead-containing products were identified during the survey. However, lead may be present in: Ceramic tile glazing Internal batteries associated with emergency lighting systems, Wiring connectors and electric cable sheathing, Piping and solder joints on piping, and Cast iron pipe joint packing. 3.3 Mould Table 4 below, indicates the locations where mould growth was identified during the current survey TABLE 4 s of Identified Mould Growth Name Sample Description on Which Mould is Growing B-08 Supply Room B-09 Sprinkler Room B-10 Sprinkler Room 3-08 Janitor s Closet 4 square feet of mould growth 25 square feet of mould growth 5 square feet of mould growth 3 square feet of mould growth non-asbestos fiberglass pipe insulation Drywall with non-asbestos joint compound non-asbestos fiberglass pipe insulation non-asbestos fiberglass pipe insulation 3.4 Mercury Mercury is present in minor quantities within the project area in the following forms: As a vapour within fluorescent light tubes that are present in the project area, As a possible constituent of thermostats, and ECOH Page 7

10 CITY OF TORONTO DESIGNATED SUBSTANCES SURVEY, TORONTO, ONTARIO ECOH / B120 NOVEMBER, 2016 As a possible constituent of paints and adhesives. 3.5 Silica Free crystalline silica, in the form of common construction sand, is present in all concrete and masonry products within the building. 3.6 Polychlorinated Biphenyls (PCBs) The following potential sources of Polychlorinated Biphenyls (PCBs) were identified within the facility by ECOH in 2014 (Survey for Designated Substances and Hazardous s report) and re-evaluated during the current survey. Dismantling lights to investigate ballasts, and/or dismantling transformers to investigate their contents, was not part of the scope of this survey. Therefore, the items listed below must be assumed to contain PCBs, unless specifically stated otherwise: Electrical transformers: o Bell/ Transformer Room, B-06: three (3) transformers were observed. o Based upon transformer labels/nameplates, it was determined that the above-listed transformers DO NOT contain PCBs. Fluorescent light ballasts: o Approximately1000 fluorescent light fixtures are present throughout the facility. Ballasts within these fixtures are assumed to contain PCBs. Additional mechanical equipment or components of mechanical equipment throughout the facility may contain PCBs. These may include, but are not limited to, electrical capacitors and electrical equipment containing capacitors, voltage regulators, switches, re-closers, bushings or electromagnets, cable insulation, heat transfer equipment, hydraulic equipment, vapour diffusion pumps, bridge bearings, and caulking and motor/hydraulic oils. A specific assessment prior to the removal of any mechanical equipment within the facility should be conducted to confirm if PCBs are present within the equipment. 3.7 Benzene The following potential sources of benzene were identified within the facility by ECOH in 2014 (Survey for Designated Substances and Hazardous s report) and re-evaluated during the current survey. Electrical transformers: o Bell/ Transformer Room, B-06: three (3) transformers. Disassembly of transformers was not a part of the scope of work for this survey, and therefore it must be assumed that chlorobenzenes are present within the transformers until proven otherwise. PCBs in PCB-based transformers were typically mixed with chlorobenzenes at the time of installation to reduce PCB viscosity. o Based upon transformer labels/nameplates, it was determined that the transformers present within the facility do not contain chlorobenzenes. 3.8 Other Environmental Considerations The environmental audit also included an investigation for the following compounds, none of which were found to be present: Acrylonitrile Ethylene Oxides Arsenic Isocyanates ECOH Page 8

11 CITY OF TORONTO DESIGNATED SUBSTANCES SURVEY, TORONTO, ONTARIO ECOH / B120 NOVEMBER, 2016 Coke Oven Emissions Vinyl Chloride Monomer Please note: paint, adhesives and plastics present throughout the project area may contain trace amounts of Acrylonitrile, Arsenic, Benzene, Ethylene Oxides, Isocyanates, Lead, Mercury and Vinyl Chloride Monomer. However, none of these materials were observed in a hazardous or unsafe condition, unless noted previously in Section RECOMMENDATIONS 4.1 Asbestos 4.2 Lead All assumed and/or confirmed ACM were observed to be in GOOD condition at the time of the reassessment. As such, no corrective actions are recommended at this time. Ontario Ministry of Labour Regulation 278/05 requires that an Asbestos Management Program (AMP) be implemented as long as asbestos-containing materials are present (or assumed to be present) in a building. The AMP, original survey report and subsequent reassessment reports must be available at the work place, and must identify the type of asbestos, and where asbestos can be found on a room-by-room basis. NOTE: Interpretation of all sources of asbestos-related information, including but not limited to the original asbestos survey report, asbestos reassessment reports, room-by-room survey data, survey drawings and reports from previous asbestos abatement projects, should be completed by a competent person trained in the historical application of asbestos in building materials, building design and preferably by a person with site-specific knowledge and/or experience. Information contained within any of the above-noted sources may not relieve the Regulatory responsibility of building Owners, or project Employers/Constructors, to complete a detailed site inspection prior to commencement of a project. This report should not be used as a substitute for a detailed site inspection to identify asbestoscontaining building materials, which must be specifically tailored to the scope and nature of any given project, and completed prior to any maintenance, renovation or demolition work that may cause disturbance to building materials. No potentially damaged lead-containing materials were observed at the time of the reassessment. As such, no corrective actions are required at this time. Renovation, demolition or general construction work involving the removal of materials containing only trace concentrations of lead (i.e. Concentrations below 0.1% (1000ppm) by dry weight) can be completed without lead specific safety precautions provided that: a) work does not include 'fume generating activities' (heat producing) such as welding, torching, burning, high temperature cutting, etc., b) work does not include dust-generating activities such as grinding, cutting or chemical stripping, c) dust levels are maintained below 3mg/m 3, and d) general health and safety construction procedures are implemented, which would include dust suppression methods, proper respiratory protection (minimum of a 1/2-face respirator) and protective clothing, as is appropriate for the work being completed. ECOH Page 9

12 CITY OF TORONTO DESIGNATED SUBSTANCES SURVEY, TORONTO, ONTARIO ECOH / B120 NOVEMBER, Mould Any work involving the disturbance of building materials assumed to contain lead (e.g. wiring connectors or electric cable sheathing) should be conducted following recommendations detailed within the Ministry of Labour document Guideline - Lead on Construction Projects, dated April All lead-containing waste materials must be disposed of following requirements set forth in applicable federal and/or provincial regulations, including Ontario Regulation 347: General Waste Management. The removal of all mould-affected building materials should be conducted following recommendations detailed within the Canadian Construction Association, Standard Construction Document CCA 82, 2004; Mould Guidelines for the Canadian Construction Industry or the Environmental Abatement Council of Ontario (EACO) Mould Abatement Guidelines, Ed. 3 (2015). The recommended actions presented in Table 5 are intended to be used to identify the minimum safety requirements for mould abatement work operations. The full scope of work for any mould-related project should be established through consultation with a competent person who is educated in, and experienced with, mould-related construction projects. TABLE 5 Recommendations for Corrective Action - Mould Name B-08 Supply Room B-09 Sprinkler Room B-10 Sprinkler Room 3-08 Janitor s Closet and Type of 4 LF of mould-affected non-acm pipe insulation 25 SF of mould-affected non-acm drywall joint compound 5 LF of mould-affected non-acm pipe insulation 3 LF of mould-affected non-acm pipe insulation Recommended Action Remove (Level I) Remove (Level II) Remove (Level I) Remove (Level I) 4.4 Mercury 4.5 Silica The presence of mercury within assembled units (e.g. fluorescent light bulbs and thermostat bulbs) should not be considered a hazard provided that the assembled units remain sealed and intact. Avoid direct skin contact with mercury and avoid inhalation of mercury vapour. If required, dispose of mercury following applicable legislative requirements. Silica-containing building materials are present throughout the facility (e.g. concrete, brick, cement block, etc.). Any work involving the disturbance of materials that may contain silica should be conducted following recommendations detailed in the Ministry of Labour document Guideline - Silica on Construction Projects, dated April ECOH Page 10

13 CITY OF TORONTO DESIGNATED SUBSTANCES SURVEY, TORONTO, ONTARIO ECOH / B120 NOVEMBER, Polychlorinated Biphenyls (PCBs) No potential sources of PCBs were identified in the facility, and therefore no action is required at this time. Fluorescent light ballasts and other mechanical equipment throughout the facility are assumed to contain PCBs, as neither dismantling the lights to investigate the ballasts, nor dismantling the transformers to investigate their contents, was within the scope of this survey. PCB-containing light ballasts may legally remain in use until December 31, 2025, if they were already in use in the facility on September 5, However, it is ECOH s general recommendation that PCB ballasts are proactively removed to eliminate the possibility of ballasts rupturing, which can cause the release of high concentrations of PCBs into indoor air for extended periods, and/or result in costly remediation. To determine whether light ballasts contain PCBs, they should be disassembled to observe serial codes and then compared to standard PCB Identifier Code literature. Ballasts with unidentifiable serial codes, or from manufacturers who are not included in the standard PCB Identifier Code literature, or which are not clearly labelled as PCB Free, or for which no date is clearly visible (ballasts dated 1981 or later do not contain PCBs), must be assumed to contain PCBs. Disposal of fluorescent light ballasts that contain PCBs must follow Ontario Regulation 347, General Waste Management, Ontario Regulation 362, Waste Management PCB s, and the amended PCB Regulations, 2008 established under the Canadian Environmental Protection Act, Removal of any other PCB-containing substances or equipment in the facility should follow the amended PCB Regulations, 2008, made under the Canadian Environmental Protection Act, 1999 (CEPA). 4.7 Other Substances Dust suppression and personal protection procedures should be implemented during the demolition of materials that may contain Acrylonitrile, Arsenic, Benzene Ethylene Oxides, Isocyanates, and Vinyl Chloride. 5. CORRECTIVE ACTIONS ECOH communicated the deficiencies and recommendations for corrective actions to the City of Toronto. At this time, ECOH understands removal and/or repair work is being arranged by the City of Toronto. 6. STATEMENT OF LIMITATIONS Due to the nature of building construction, some limitations exist as to the possible thoroughness of the designated substance and hazardous materials survey. The field observations, measurements and analysis are considered sufficient in detail and scope to form a reasonable basis for the findings and conclusions presented in this report. The findings and conclusions drawn by ECOH, concerning the designated substance and hazardous materials survey, are limited to the specific scope of work for which ECOH was retained and are based solely on information generated as a result of the specific scope of work authorized by The City of Toronto. The results of the designated substance and hazardous materials survey are limited to visual inspection of areas made accessible to ECOH personnel and information obtained from facility personnel, when obtained. ECOH warrants that the findings and conclusions contained herein have been made in accordance with generally accepted evaluation methods in the industry and applicable regulations at the time of the performance of the designated substance survey. However, there is no warranty, expressed or ECOH Page 11

14 CITY OF TORONTO DESIGNATED SUBSTANCES SURVEY, TORONTO, ONTARIO ECOH / B120 NOVEMBER, 2016 implied, that this building survey has uncovered all environmental considerations on the subject site In addition, ECOH cannot guarantee the completeness or accuracy of information supplied by a third party. This report was prepared by ECOH for The City of Toronto. The material in it reflects ECOH s professional interpretation of information available at the time of report preparation. Any use which a third party makes of this report, or any reliance on or decisions to be made based on it, are the responsibility of such third parties. ECOH Environmental Consulting Occupational Health Prepared by: Reviewed by: Marlene Lopes, B.A. (Env.) Environmental Scientist Steve Bizi Senior Environmental Scientist ECOH Page 12

15 APPENDIX I HAZARDOUS MATERIALS INVENTORY SHEET

16 Address 850 Coxwell Avenue Date(s) of Current Reassessment: August 18, 2016 Name East York Civic Centre Organization completing Asbestos Reassessment: ECOH Summary of Findings Mastic is assumed to be present underneath existing Vinyl Floor Tiles and Vinyl Sheet Flooring throughout the facility. Complete sampling of mastic is recommended prior to any flooring renovations. B-08 Supply Room - 4 LF of mould-impacted non-acm pipe insulation; remove using Level I procedures B-09 Sprinkler Room - 25 SF mould-impacted non-acm drywall joint compund; remove using Level II procedures B-10 Sprinkler Room - 5 LF of mould-impacted non-acm pipe insulation; remove using Level I procedures 3-08 Janitor's Closet - 3 LF of mould-impacted non-acm pipe insulation; remove using Level I procedures Name Observed 0-00 Exterior Roof Roofing s Asbestos A-C Sampled during Pinchin 2012 Pre-reno DSS 0-00 Exterior Wall 0-00 Exterior Mechanical Caulking Asbestos A-C Caulking on the exterior of diesel generator exhaust stack Sampled during Pinchin 2012 Pre-reno DSS 0-00 Exterior Window Window Caulking Asbestos Not Sampled ACM Assumed B-01 Corridor Floor Vinyl Floor Tile 1 Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents B-01 Corridor Wall Concrete B-01 Corridor Wall Concrete Block B-01 Corridor Concrete B-01 Corridor Pipe B-01 Corridor Structure B-02 Elevator Room Floor Concrete B-02 Elevator Room Wall Concrete B-02 Elevator Room Drywall Joint Compound Asbestos B120-ASB-02A,B Sampled during ECOH 2016 Reassessment Survey B-02 Elevator Room Pipe B-02 Elevator Room Structure B-03 Recycling Room Floor Concrete B-03 Recycling Room Wall Concrete Block B-03 Recycling Room Wall Concrete B-03 Recycling Room Concrete B-03 Recycling Room Pipe B-03 Recycling Room Structure B-04 Supply Room Floor No Access during ECOH 2016 Reassessment Survey B-04 Supply Room Wall EAST YORK CIVIC CENTRE PAGE 1 of 50

17 Name Observed B-04 Supply Room B-04 Supply Room Pipe B-04 Supply Room Structure B-05 Corridor Floor Concrete B-05 Corridor Wall Concrete Block B-05 Corridor Wall Concrete B-05 Corridor Concrete B-05 Corridor Pipe B-05 Corridor Structure B-06 Bell / Transformer Room Floor Concrete B-06 Bell / Transformer Room Wall Concrete Block B-06 Bell / Transformer Room Wall Concrete B-06 Bell / Transformer Room Concrete B-06 Bell / Transformer Room Pipe B-06 Bell / Transformer Room Structure B-07 Fuel Tank Room Floor Concrete B-07 Fuel Tank Room Wall Concrete Block B-07 Fuel Tank Room Wall Concrete B-07 Fuel Tank Room Concrete B-07 Fuel Tank Room Pipe B-07 Fuel Tank Room Structure B-08 Supply Room Floor Concrete B-08 Supply Room Wall Concrete Block B-08 Supply Room Wall Paint - Off-white Lead B120-Pb-01A-B <90 ppm (NEGATIVE - Trace concentrations only) Sampled during ECOH 2015 Reassessment Survey B-08 Supply Room Concrete B-08 Supply Room Pipe Insulation Mould Not Sampled Visually confirmed 4 ft² 4 LF of mould-affected non-acm pipe B-08 Supply Room Structure B-09 Sprinkler Room Floor Concrete B-09 Sprinkler Room Wall Drywall Joint Compound Asbestos B120-01A,B Sampled during ECOH 2014 Reassessment Survey EAST YORK CIVIC CENTRE PAGE 2 of 50

18 Name Observed B-09 Sprinkler Room Wall Drywall Joint Compound Mould Not Sampled Visually confirmed 25 ft² 25 SF of mould-affected non-acm DJC B-09 Sprinkler Room Wall Drywall Joint Compound Asbestos B120-ASB-01A-C Sampled during ECOH 2015 Reassessment Survey B-09 Sprinkler Room Wall Paint - White Lead B120-Pb-02A-B <90 ppm (NEGATIVE - Trace concentrations only) Sampled during ECOH 2015 Reassessment Survey B-09 Sprinkler Room Wall Concrete B-09 Sprinkler Room Wall Concrete Block B-09 Sprinkler Room Concrete B-09 Sprinkler Room Pipe B-09 Sprinkler Room Structure B-10 Sprinkler Room Floor Concrete B-10 Sprinkler Room Wall Concrete B-10 Sprinkler Room Concrete B-10 Sprinkler Room Pipe Insulation Mould Not Sampled Visually confirmed 5 ft² 5 LF of mould-affected non-acm pipe B-10 Sprinkler Room Structure B-11 Office Floor Carpet B-11 Office Wall Concrete Block B-11 Office Tile 1 Asbestos B120-01b 2'x4' Short Random Fissure with Pinpoint Sampled during ECOH 2009 DSS B-11 Office Pipe B-11 Office Structure B-12 Office Floor Carpet B-12 Office Wall Drywall Joint Compound Asbestos B120-01E Sampled during ECOH 2014 Reassessment Survey B-12 Office Wall Concrete Block B-12 Office Tile 1 Asbestos B120-01a 2'x4' Short Random Fissure with Pinpoint Sampled during ECOH 2009 DSS B-12 Office Pipe B-12 Office Structure B-13 Reception Floor Carpet B-13 Reception Wall Drywall Joint Compound Asbestos B120-01D Sampled during ECOH 2014 Reassessment Survey B-13 Reception Wall Concrete Block B-13 Reception Tile 1 Asbestos B120-01c 2'x4' Short Random Fissure with Pinpoint Sampled during ECOH 2009 DSS B-13 Reception Drywall Joint Compound Asbestos B120-ASB-02C-E Sampled during ECOH 2016 Reassessment Survey EAST YORK CIVIC CENTRE PAGE 3 of 50

19 Name Observed B-13 Reception Pipe B-13 Reception Structure B-14 Corporate Services Office Floor Vinyl Floor Tile 1 Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents B-14 Corporate Services Office Wall Concrete Block B-14 Corporate Services Office Tile 1 Asbestos Not Sampled B 'x4' Short Random Fissure with Pinpoint B-14 Corporate Services Office Pipe B-14 Corporate Services Office Structure B-15 Storage Room Floor Concrete B-15 Storage Room Wall Drywall Joint Compound Asbestos B120-01C Sampled during ECOH 2014 Reassessment Survey B-15 Storage Room Wall Concrete Block B-15 Storage Room Concrete B-15 Storage Room Pipe B-15 Storage Room Structure B-16 Stairwell Floor Concrete B-16 Stairwell Wall Drywall Joint Compound Asbestos Not Sampled B B120-ASB-01 B-16 Stairwell Concrete B-16 Stairwell Pipe B-16 Stairwell Structure B-17 Storage Room Floor B-17 Storage Room Wall Drywall Joint Compound Asbestos Not Sampled B B120-ASB-01 B-17 Storage Room B-17 Storage Room Pipe B-17 Storage Room Structure B-18 Stairwell Floor Vinyl Floor Tile 1 Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents B-18 Stairwell Wall Concrete B-18 Stairwell Steel Stair Deck steel stair deck above B-18 Stairwell Pipe EAST YORK CIVIC CENTRE PAGE 4 of 50

20 Name Observed B-18 Stairwell Structure 1-01 Vestibule Floor Ceramic Tile Lead Assumed 1-01 Vestibule Floor Metal Slats 1-01 Vestibule Wall Brick 1-01 Vestibule Drywall Joint Compound Asbestos Not Sampled B120-ASB Vestibule Pipe 1-01 Vestibule Structure 1-02 Corridor Floor Vinyl Sheet Flooring 1 Asbestos B120-06C 1-02 Corridor Wall Drywall Joint Compound Asbestos Not Sampled Grey with white/dark grey spackles Sampled during ECOH 2014 Reassessment Survey 1-02 Corridor Drywall Joint Compound Asbestos B120-ASB-03A Sampled during ECOH 2016 Reassessment Survey 1-02 Corridor Pipe 1-02 Corridor Structure 1-03 Lobby Floor Carpet 1-03 Lobby Wall Drywall Joint Compound Asbestos Not Sampled 1-03 Lobby Drywall Joint Compound Asbestos B120-ASB-03B Sampled during ECOH 2016 Reassessment Survey 1-03 Lobby Pipe 1-03 Lobby Structure 1-04 Office Floor Carpet 1-04 Office Wall Drywall Joint Compound Asbestos Not Sampled 1-04 Office Tile 2 Asbestos Not Sampled 1-04 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-04 Office Structure 1-05 Office Floor Carpet 1-05 Office Wall Drywall Joint Compound Asbestos Not Sampled 1-05 Office Tile 2 Asbestos Not Sampled 1.5 'x 3' Short Random Fissure with Pinpoint EAST YORK CIVIC CENTRE PAGE 5 of 50

21 Name Observed 1-05 Office Pipe 1-05 Office Structure 1-06 Corridor Floor Vinyl Floor Tile 1 Asbestos B120-05B 12"x12" grey with blue & white accents Sampled during ECOH 2014 Reassessment Survey 1-06 Corridor Wall Drywall Joint Compound Asbestos A Sampled during ECOH 2014 Reassessment Survey 1-06 Corridor Concrete Deck 1-06 Corridor Pipe 1-06 Corridor Structure 1-07 Office Floor Vinyl Floor Tile 1 Asbestos Not Sampled 1-07 Office Wall Drywall Joint Compound Asbestos Not Sampled Visually consistent with B Office Concrete 1-07 Office Paint - White Lead B120-Pb-01,02 <90 ppm (NEGATIVE - Trace concentrations only) 1-07 Office Pipe 12"x12" grey with blue & white accents Sampled during ECOH 2016 Reassessment Survey 1-07 Office Structure 1-08 Bike Office Floor Vinyl Floor Tile 1 Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents 1-08 Bike Office Wall Drywall Joint Compound Asbestos A Sampled during ECOH 2016 Reassessment Survey 1-08 Bike Office Concrete 1-08 Bike Office Pipe 1-08 Bike Office Structure 1-09 Bike Office Floor Vinyl Floor Tile 1 Asbestos Not Sampled 1-09 Bike Office Wall Drywall Joint Compound Asbestos Not Sampled Visually consistent with B Bike Office Wall Concrete 12"x12" grey with blue & white accents 1-09 Bike Office Concrete 1-09 Bike Office Pipe 1-09 Bike Office Structure 1-10 Storage Room Floor Vinyl Floor Tile 1 Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents 1-10 Storage Room Wall Drywall Joint Compound Asbestos F Sampled during ECOH 2014 Reassessment Survey EAST YORK CIVIC CENTRE PAGE 6 of 50

22 Name Observed 1-10 Storage Room Wall Plaster Asbestos Not Sampled ACM Assumed not observed in ECOH 2016 Reassessment Survey 1-10 Storage Room Wall Concrete 1-10 Storage Room Concrete 1-10 Storage Room Pipe 1-10 Storage Room Structure 1-11 Storage Room Floor Vinyl Floor Tile 1 Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents 1-11 Storage Room Wall Drywall Joint Compound Asbestos G Sampled during ECOH 2014 Reassessment Survey 1-11 Storage Room Concrete 1-11 Storage Room Pipe 1-11 Storage Room Structure 1-12 Storage Room Floor Vinyl Floor Tile 1 Asbestos B120-05C-a 1-12 Storage Room Floor Mastic - VFT1 Asbestos B120-05C-b ACM Assumed Good 12"x12" grey with blue & white accents Sampled during ECOH 2014 Reassessment Survey Sampled during ECOH 2014 Reassessment Survey Insufficient samples collected to meet regulatory requirements 1-12 Storage Room Wall Drywall Joint Compound Asbestos B Sampled during ECOH 2014 Reassessment Survey 1-12 Storage Room Wall Plaster Asbestos Not Sampled ACM Assumed not observed in ECOH 2016 Reassessment Survey 1-12 Storage Room Concrete 1-12 Storage Room Pipe 1-12 Storage Room Structure 1-13 Photocopy Room Floor Vinyl Floor Tile 1 Asbestos B120-05A 1-13 Photocopy Room Wall Drywall Joint Compound Asbestos Not Sampled 12"x12" grey with blue & white accents Sampled during ECOH 2014 Reassessment Survey 1-13 Photocopy Room Wall Plaster Asbestos Not Sampled ACM Assumed not observed in ECOH 2016 Reassessment Survey 1-13 Photocopy Room Wood not observed in ECOH 2016 Reassessment Survey 1-13 Photocopy Room Pipe 1-13 Photocopy Room Structure Concrete 1-14 Storage Room Floor Vinyl Floor Tile 1 Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents not observed in ECOH 2016 Reassessment Survey 1-14 Storage Room Floor Carpet 1-14 Storage Room Wall Drywall Joint Compound Asbestos Not Sampled 1-14 Storage Room Wall Concrete EAST YORK CIVIC CENTRE PAGE 7 of 50

23 Name Observed 1-14 Storage Room Concrete 1-14 Storage Room Pipe 1-14 Storage Room Structure 1-15 Open Offices Floor Vinyl Floor Tile 1 Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents not observed in ECOH 2016 Reassessment Survey 1-15 Open Offices Floor Carpet 1-15 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 1-15 Open Offices Tile 2 Asbestos Not Sampled 1-15 Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-15 Open Offices Structure 1-16 Storage Room Floor Carpet 1-16 Storage Room Wall Drywall Joint Compound Asbestos Not Sampled 1-16 Storage Room Tile 2 Asbestos Not Sampled 1-16 Storage Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-16 Storage Room Structure 1-17 Open Offices Floor Carpet 1-17 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 1-17 Open Offices Tile 2 Asbestos Not Sampled 1-17 Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-17 Open Offices Structure 1-18 Office Floor Carpet 1-18 Office Wall Drywall Joint Compound Asbestos Not Sampled 1-18 Office Tile 2 Asbestos Not Sampled 1-18 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-18 Office Structure 1-19 Corridor Floor Carpet EAST YORK CIVIC CENTRE PAGE 8 of 50

24 Name Observed 1-19 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 1-19 Corridor Drywall Joint Compound Asbestos Not Sampled B120-ASB Corridor Pipe 1-19 Corridor Structure 1-20 Lobby Stairwell Floor Carpet 1-20 Lobby Stairwell Wall Drywall Joint Compound Asbestos Not Sampled 1-20 Lobby Stairwell Wall Brick 1-20 Lobby Stairwell Drywall Joint Compound Asbestos B120-ASB-03C,D Sampled during ECOH 2016 Reassessment Survey 1-20 Lobby Stairwell Pipe 1-20 Lobby Stairwell Structure 1-21 Storage Room Floor Vinyl Floor Tile 1 Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents 1-21 Storage Room Wall Drywall Joint Compound Asbestos C Sampled during ECOH 2014 Reassessment Survey 1-21 Storage Room Wall Concrete 1-21 Storage Room Concrete 1-21 Storage Room Pipe 1-21 Storage Room Structure 1-22 Corridor Floor Carpet 1-22 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 1-22 Corridor Drywall Joint Compound Asbestos Not Sampled B120-ASB Corridor Pipe 1-22 Corridor Structure 1-23 Meeting Room Floor Carpet 1-23 Meeting Room Wall Drywall Joint Compound Asbestos Not Sampled 1-23 Meeting Room Tile 1 Asbestos Not Sampled B Meeting Room Pipe 2'x4' Short Random Fissure with Pinpoint EAST YORK CIVIC CENTRE PAGE 9 of 50

25 Name Observed 1-23 Meeting Room Structure 1-24 Meeting Room Floor Carpet 1-24 Meeting Room Wall Drywall Joint Compound Asbestos Not Sampled 1-24 Meeting Room Tile 2 Asbestos a 1.5 'x 3' Short Random Fissure with Pinpoint Sampled during ECOH 2009 DSS 1-24 Meeting Room Pipe 1-24 Meeting Room Structure 1-25 Corridor Floor Carpet 1-25 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 1-25 Corridor Drywall Joint Compound Asbestos Not Sampled B120-ASB Corridor Pipe 1-25 Corridor Structure 1-26 Washroom Floor Ceramic Tile Lead Assumed 1-26 Washroom Wall Drywall Joint Compound Asbestos Not Sampled 1-26 Washroom Drywall Joint Compound Asbestos Not Sampled B120-ASB Washroom Pipe 1-26 Washroom Structure 1-27 Men's Washroom Floor Ceramic Tile Lead Assumed 1-27 Men's Washroom Wall Drywall Joint Compound Asbestos Not Sampled 1-27 Men's Washroom Drywall Joint Compound Asbestos Not Sampled B120-ASB Men's Washroom Pipe 1-27 Men's Washroom Structure 1-28 Resource Room Floor Metal vented, metal, square tiles 1-28 Resource Room Wall Drywall Joint Compound Asbestos Not Sampled 1-28 Resource Room Tile 2 Asbestos Not Sampled 1.5 'x 3' Short Random Fissure with Pinpoint EAST YORK CIVIC CENTRE PAGE 10 of 50

26 Name Observed 1-28 Resource Room Pipe 1-28 Resource Room Structure 1-29 Resource Room #4 Floor Metal vented, metal, square tiles 1-29 Resource Room #4 Wall Drywall Joint Compound Asbestos Not Sampled 1-29 Resource Room #4 Tile 2 Asbestos Not Sampled 1-29 Resource Room #4 Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-29 Resource Room #4 Structure 1-30 Computer Room Floor Vinyl Floor Tile 1 Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents 1-30 Computer Room Floor Metal vented, metal, square tiles 1-30 Computer Room Wall Drywall Joint Compound Asbestos Not Sampled 1-30 Computer Room Concrete 1-30 Computer Room Pipe 1-30 Computer Room Structure 1-31 Electrical Room Floor Vinyl Floor Tile 1 Asbestos Not Sampled 1-31 Electrical Room Wall Drywall Joint Compound Asbestos Not Sampled Visually consistent with B Electrical Room Wall Concrete 12"x12" grey with blue & white accents 1-31 Electrical Room Concrete 1-31 Electrical Room Pipe 1-31 Electrical Room Structure 1-32 Stairwell #1 Floor Concrete 1-32 Stairwell #1 Wall Concrete 1-32 Stairwell #1 Steel Deck steel stair deck above 1-32 Stairwell #1 Pipe 1-32 Stairwell #1 Structure 1-33 Meeting Room Floor Carpet EAST YORK CIVIC CENTRE PAGE 11 of 50

27 Name Observed 1-33 Meeting Room Wall Drywall Joint Compound Asbestos Not Sampled 1-33 Meeting Room Tile 2 Asbestos Not Sampled 1-33 Meeting Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-33 Meeting Room Structure 1-34 Corridor Floor Carpet 1-34 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 1-34 Corridor Tile 2 Asbestos Not Sampled 1-34 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-34 Corridor Structure 1-35 Resource Room #5 Floor Carpet 1-35 Resource Room #5 Wall Drywall Joint Compound Asbestos Not Sampled 1-35 Resource Room #5 Tile 2 Asbestos Not Sampled 1-35 Resource Room #5 Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-35 Resource Room #5 Structure 1-36 Storage Room Floor Carpet 1-36 Storage Room Wall Drywall Joint Compound Asbestos Not Sampled 1-36 Storage Room Tile 1 Asbestos Not Sampled 1-36 Storage Room Tile 2 Asbestos Not Sampled B Storage Room Pipe 2'x4' Short Random Fissure with Pinpoint not observed in ECOH 2016 Reassessment Survey 1.5 'x 3' Short Random Fissure with Pinpoint 1-36 Storage Room Structure 1-37 Resource Room #2 Floor Carpet 1-37 Resource Room #2 Wall Drywall Joint Compound Asbestos Not Sampled 1-37 Resource Room #2 Tile 2 Asbestos Not Sampled 1-37 Resource Room #2 Pipe 1.5 'x 3' Short Random Fissure with Pinpoint EAST YORK CIVIC CENTRE PAGE 12 of 50

28 Name Observed 1-37 Resource Room #2 Structure 1-38 Office Floor Carpet 1-38 Office Wall Drywall Joint Compound Asbestos Not Sampled 1-38 Office Tile 2 Asbestos Not Sampled 1-38 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-38 Office Structure 1-39 Office Floor Carpet 1-39 Office Wall Drywall Joint Compound Asbestos Not Sampled 1-39 Office Tile 1 Asbestos Not Sampled B Office Pipe 2'x4' Short Random Fissure with Pinpoint 1-39 Office Structure 1-40 Office Floor Carpet 1-40 Office Wall Drywall Joint Compound Asbestos Not Sampled 1-40 Office Tile 1 Asbestos Not Sampled B Office Pipe 2'x4' Short Random Fissure with Pinpoint 1-40 Office Structure 1-41 Open Offices Floor Carpet 1-41 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 1-41 Open Offices Tile 2 Asbestos Not Sampled 1-41 Open Offices Tile 1 Asbestos Not Sampled B Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint not observed in ECOH 2016 Reassessment Survey 2'x4' Short Random Fissure with Pinpoint 1-41 Open Offices Structure 1-42 Servery Floor Vinyl Floor Tile 1 Asbestos Not Sampled 1-42 Servery Wall Drywall Joint Compound Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents EAST YORK CIVIC CENTRE PAGE 13 of 50

29 Name Observed 1-42 Servery Tile 2 Asbestos Not Sampled 1-42 Servery Tile 1 Asbestos Not Sampled B Servery Pipe 1.5 'x 3' Short Random Fissure with Pinpoint not observed in ECOH 2016 Reassessment Survey 2'x4' Short Random Fissure with Pinpoint 1-42 Servery Structure 1-43 Office Floor Carpet 1-43 Office Wall Drywall Joint Compound Asbestos Not Sampled 1-43 Office Tile 2 Asbestos Not Sampled 1-43 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-43 Office Structure 1-44 Office Floor Carpet 1-44 Office Wall Drywall Joint Compound Asbestos Not Sampled 1-44 Office Tile 2 Asbestos Not Sampled 1-44 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-44 Office Structure 1-45 Office Floor Carpet 1-45 Office Wall Drywall Joint Compound Asbestos Not Sampled 1-45 Office Tile 2 Asbestos Not Sampled 1-45 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-45 Office Structure 1-46 Office Floor Carpet 1-46 Office Wall Drywall Joint Compound Asbestos Not Sampled 1-46 Office Tile 2 Asbestos Not Sampled 1-46 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-46 Office Structure EAST YORK CIVIC CENTRE PAGE 14 of 50

30 Name Observed 1-47 Office Floor Carpet 1-47 Office Wall Drywall Joint Compound Asbestos Not Sampled 1-47 Office Tile 2 Asbestos Not Sampled 1-47 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-47 Office Structure 1-48 Corridor Floor Carpet 1-48 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 1-48 Corridor Tile 2 Asbestos Not Sampled 1-48 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-48 Corridor Structure 1-49 Storage Room Floor Carpet 1-49 Storage Room Wall Drywall Joint Compound Asbestos Not Sampled 1-49 Storage Room Tile 2 Asbestos Not Sampled 1-49 Storage Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-49 Storage Room Structure 1-50 Kitchen Floor Vinyl Floor Tile 1 Asbestos Not Sampled 1-50 Kitchen Wall Drywall Joint Compound Asbestos Not Sampled 1-50 Kitchen Tile 2 Asbestos Not Sampled Visually consistent with B Kitchen Pipe 12"x12" grey with blue & white accents 1.5 'x 3' Short Random Fissure with Pinpoint 1-50 Kitchen Structure 1-51 Storage Room Floor Carpet 1-51 Storage Room Wall Drywall Joint Compound Asbestos Not Sampled 1-51 Storage Room Tile 2 Asbestos Not Sampled 1-51 Storage Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint EAST YORK CIVIC CENTRE PAGE 15 of 50

31 Name Observed 1-51 Storage Room Structure 1-52 Closet Floor Carpet 1-52 Closet Wall Drywall Joint Compound Asbestos Not Sampled 1-52 Closet Tile 2 Asbestos Not Sampled 1-52 Closet Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-52 Closet Structure 1-53 Reception Floor Carpet 1-53 Reception Wall Drywall Joint Compound Asbestos Not Sampled 1-53 Reception Tile 2 Asbestos Not Sampled 1-53 Reception Drywall Joint Compound Asbestos Not Sampled B120-ASB Reception Pipe 1.5 'x 3' Short Random Fissure with Pinpoint not observed in ECOH 2016 Reassessment Survey 1-53 Reception Structure 1-54 Open Offices Floor Carpet 1-54 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 1-54 Open Offices Tile 2 Asbestos Not Sampled 1-54 Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-54 Open Offices Structure 1-55 Open Offices Floor Carpet 1-55 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 1-55 Open Offices Tile 2 Asbestos Not Sampled 1-55 Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-55 Open Offices Structure 1-56 Closet Floor Carpet 1-56 Closet Wall Drywall Joint Compound Asbestos Not Sampled EAST YORK CIVIC CENTRE PAGE 16 of 50

32 Name Observed 1-56 Closet Tile 2 Asbestos Not Sampled 1.5 'x 3' Short Random Fissure with Pinpoint 1-56 Closet Pipe 1-56 Closet Structure 1-57 Office Floor Carpet 1-57 Office Wall Drywall Joint Compound Asbestos Not Sampled 1-57 Office Tile 2 Asbestos Not Sampled 1-57 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-57 Office Structure 1-58 Office Floor Carpet 1-58 Office Wall Drywall Joint Compound Asbestos Not Sampled 1-58 Office Tile 2 Asbestos Not Sampled 1-58 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-58 Office Structure 1-59 Storage Room Floor Carpet 1-59 Storage Room Wall Drywall Joint Compound Asbestos 1-59 Storage Room Tile 2 Asbestos Not Sampled 1-59 Storage Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-59 Storage Room Structure 1-60 Open Offices Floor Carpet 1-60 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 1-60 Open Offices Tile 1 Asbestos Not Sampled 1-60 Open Offices Tile 2 Asbestos Not Sampled B Open Offices Pipe 2'x4' Short Random Fissure with Pinpoint not observed in ECOH 2016 Reassessment Survey 1.5 'x 3' Short Random Fissure with Pinpoint 1-60 Open Offices Structure EAST YORK CIVIC CENTRE PAGE 17 of 50

33 Name Observed 1-61 Office Floor Carpet 1-61 Office Wall Drywall Joint Compound Asbestos Not Sampled 1-61 Office Tile 2 Asbestos Not Sampled 1-61 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-61 Office Structure 1-62 Office Floor Carpet 1-62 Office Wall Drywall Joint Compound Asbestos Not Sampled 1-62 Office Tile 2 Asbestos Not Sampled 1-62 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-62 Office Structure 1-63 Office Floor Carpet 1-63 Office Wall Drywall Joint Compound Asbestos Not Sampled 1-63 Office Tile 2 Asbestos Not Sampled 1-63 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-63 Office Structure 1-64 Open Offices Floor Carpet 1-64 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 1-64 Open Offices Tile 1 Asbestos Not Sampled B Open Offices Pipe 2'x4' Short Random Fissure with Pinpoint 1-64 Open Offices Structure 1-65 Storage Room Floor Carpet 1-65 Storage Room Wall Drywall Joint Compound Asbestos Not Sampled 1-65 Storage Room Tile 2 Asbestos Not Sampled 1-65 Storage Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint EAST YORK CIVIC CENTRE PAGE 18 of 50

34 Name Observed 1-65 Storage Room Structure 1-66 Lobby Floor Vinyl Floor Tile 1 Asbestos Not Sampled 1-66 Lobby Wall Drywall Joint Compound Asbestos Not Sampled Visually consistent with B Lobb Wall Concrete Block 1-66 Lobby Drywall Joint Compound Asbestos Not Sampled B120-ASB Lobby Pipe 12"x12" grey with blue & white accents 1-66 Lobby Structure 1-67 Staiwell #2 Floor Vinyl Floor Tile 1 Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents 1-67 Staiwell #2 Wall Concrete 1-67 Staiwell #2 Steel Stair Deck steel stair deck above 1-67 Staiwell #2 Pipe 1-67 Staiwell #2 Structure 1-68 Women's Washroom Floor Ceramic Tile Lead Assumed 1-68 Women's Washroom Wall Drywall Joint Compound Asbestos E Sampled during ECOH 2014 Reassessment Survey 1-68 Women's Washroom Drywall Joint Compound Asbestos B120-ASB-03E Sampled during ECOH 2016 Reassessment Survey 1-68 Women's Washroom Pipe 1-68 Women's Washroom Structure 1-69 Closet Floor Vinyl Floor Tile 1 Asbestos Not Sampled 1-69 Closet Wall Drywall Joint Compound Asbestos Not Sampled Visually consistent with B Closet Concrete 12"x12" grey with blue & white accents 1-69 Closet Pipe 1-69 Closet Structure 1-70 Men's Washroom Floor Ceramic Tile Lead Assumed 1-70 Men's Washroom Wall Drywall Joint Compound Asbestos Not Sampled 1-70 Men's Washroom Drywall Joint Compound Asbestos B120-ASB-03F Sampled during ECOH 2016 Reassessment Survey 1-70 Men's Washroom Pipe EAST YORK CIVIC CENTRE PAGE 19 of 50

35 Name Observed 1-70 Men's Washroom Structure 1-71 Electrical Room Floor Vinyl Floor Tile 1 Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents 1-71 Electrical Room Wall Drywall Joint Compound Asbestos D Sampled during ECOH 2014 Reassessment Survey 1-71 Electrical Room Drywall Joint Compound Asbestos B120-ASB-03G Sampled during ECOH 2016 Reassessment Survey 1-71 Electrical Room Pipe 1-71 Electrical Room Structure 1-72 Corridor Floor Vinyl Sheet Flooring 1 Asbestos B120-06A 1-72 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 1-72 Corridor Drywall Joint Compound Asbestos Not Sampled B120-ASB Corridor Pipe Grey with white/dark grey spackles Sampled during ECOH 2014 Reassessment Survey 1-72 Corridor Structure 1-73 Cafeteria Floor Vinyl Floor Tile 1 Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents 1-73 Cafeteria Floor Carpet 1-73 Cafeteria Wall Drywall Joint Compound Asbestos Not Sampled 1-73 Cafeteria Tile 2 Asbestos Not Sampled 1-73 Cafeteria Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 1-73 Cafeteria Structure 1-74 Bike Storage Floor Ceramic Tile Lead Assumed 1-74 Bike Storage Wall Brick 1-74 Bike Storage Drywall Joint Compound Asbestos Not Sampled B120-ASB Bike Storage Pipe 1-74 Bike Storage Structure 2-01 Vestibule Floor Ceramic Tile Lead Assumed 2-01 Vestibule Floor Metal Slats 2-01 Vestibule Wall windows only 2-01 Vestibule Drywall Joint Compound Asbestos Not Sampled B120-ASB-04 EAST YORK CIVIC CENTRE PAGE 20 of 50

36 Name Observed 2-01 Vestibule Pipe 2-01 Vestibule Structure 2-02 Main Entrance Floor Ceramic Tile Lead Assumed 2-02 Main Entrance Wall Drywall Joint Compound Asbestos Not Sampled 2-02 Main Entrance Drywall Joint Compound Asbestos Not Sampled B120-ASB Main Entrance Pipe 2-02 Main Entrance Structure 2-03 Lobby Stairwell Floor Ceramic Tile Lead Assumed 2-03 Lobby Stairwell Wall DJC accounted for in Lobby Stairwell Drywall Joint Compound Asbestos Not Sampled B120-ASB Lobby Stairwell Pipe 2-03 Lobby Stairwell Structure 2-04 Lobby Stairwell Floor Ceramic Tile Lead Assumed 2-04 Lobby Stairwell Wall DJC already accounted for in Lobby 2-04 Lobby Stairwell Drywall Joint Compound Asbestos Not Sampled B120-ASB Lobby Stairwell Pipe 2-04 Lobby Stairwell Structure 2-05 Lobby Floor Carpet 2-05 Lobby Wall Brick 2-05 Lobby Wall Drywall Joint Compound Asbestos Not Sampled 2-05 Lobby Tile 1 Asbestos Not Sampled 2-05 Lobby Drywall Joint Compound Asbestos Not Sampled B B120-ASB Lobby Pipe 2'x4' Short Random Fissure with Pinpoint not observed in ECOH 2016 Reassessment Survey 2-05 Lobby Structure 2-06 Waiting Area Floor Carpet 2-06 Waiting Area Wall Drywall Joint Compound Asbestos Not Sampled EAST YORK CIVIC CENTRE PAGE 21 of 50

37 Name Observed 2-06 Waiting Area Drywall Joint Compound Asbestos Not Sampled B120-ASB Waiting Area Pipe 2-06 Waiting Area Structure 2-07 Corridor Floor Carpet 2-07 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 2-07 Corridor Drywall Joint Compound Asbestos Not Sampled B120-ASB Corridor Pipe 2-07 Corridor Structure 2-08 Washroom Floor Ceramic Tile Lead Assumed 2-08 Washroom Wall Drywall Joint Compound Asbestos Not Sampled 2-08 Washroom Drywall Joint Compound Asbestos Not Sampled B120-ASB Washroom Pipe 2-08 Washroom Structure 2-09 Computer Desk Floor not found in 2014 ECOH Reassessment Accounted for in Corridor Floor Carpet 2-10 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 2-10 Corridor Tile 2 Asbestos Not Sampled 2-10 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-10 Corridor Structure 2-11 Meeting Room Floor Carpet 2-11 Meeting Room Wall Drywall Joint Compound Asbestos Not Sampled 2-11 Meeting Room Drywall Joint Compound Asbestos Not Sampled B120-ASB Meeting Room Pipe 2-11 Meeting Room Structure 2-12 Office Floor Carpet 2-12 Office Wall Drywall Joint Compound Asbestos Not Sampled EAST YORK CIVIC CENTRE PAGE 22 of 50

38 Name Observed 2-12 Office Drywall Joint Compound Asbestos Not Sampled B120-ASB Office Pipe 2-12 Office Structure 2-13 Office Floor Carpet 2-13 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-13 Office Drywall Joint Compound Asbestos B120-ASB-04A Sampled during ECOH 2016 Reassessment Survey 2-13 Office Pipe 2-13 Office Structure 2-14 Washroom Floor Ceramic Tile Lead Assumed 2-14 Washroom Wall Drywall Joint Compound Asbestos Not Sampled 2-14 Washroom Wall Ceramic Tile Lead Assumed 2-14 Washroom Drywall Joint Compound Asbestos Not Sampled B120-ASB Washroom Pipe 2-14 Washroom Structure 2-15 Corridor Floor Carpet 2-15 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 2-15 Corridor Drywall Joint Compound Asbestos B120-ASB-04B Sampled during ECOH 2016 Reassessment Survey 2-15 Corridor Pipe 2-15 Corridor Structure 2-16 Men's Washroom Floor Ceramic Tile Lead Assumed 2-16 Men's Washroom Wall Drywall Joint Compound Asbestos Not Sampled 2-16 Men's Washroom Drywall Joint Compound Asbestos Not Sampled B120-ASB Men's Washroom Pipe 2-16 Men's Washroom Structure 2-17 Women's Washroom Floor Ceramic Tile Lead Assumed 2-17 Women's Washroom Wall Drywall Joint Compound Asbestos Not Sampled 2-17 Women's Washroom Drywall Joint Compound Asbestos B120-ASB-04C Sampled during ECOH 2016 Reassessment Survey EAST YORK CIVIC CENTRE PAGE 23 of 50

39 Name Observed 2-17 Women's Washroom Pipe 2-17 Women's Washroom Structure 2-18 Corridor Floor Carpet 2-18 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 2-18 Corridor Tile 2 Asbestos Not Sampled 2-18 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-18 Corridor Structure 2-19 Corridor Floor Concrete 2-19 Corridor Wall Drywall Joint Compound Asbestos G Sampled during ECOH 2014 Reassessment Survey 2-19 Corridor Wall Concrete 2-19 Corridor Drywall Joint Compound Asbestos B120-ASB-04D,E Sampled during ECOH 2016 Reassessment Survey 2-19 Corridor Pipe 2-19 Corridor Structure 2-20 Electrical Room Floor Vinyl Floor Tile 1 Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents 2-20 Electrical Room Wall Drywall Joint Compound Asbestos E Sampled during ECOH 2014 Reassessment Survey 2-20 Electrical Room Concrete 2-20 Electrical Room Pipe 2-20 Electrical Room Structure 2-21 Stairwell #1 Floor Concrete 2-21 Stairwell #1 Wall Drywall Joint Compound Asbestos Not Sampled 2-21 Stairwell #1 Wall Steel Stair Deck steel stair deck above 2-21 Stairwell # Stairwell #1 Pipe 2-21 Stairwell #1 Structure 2-22 Corridor Floor Carpet 2-22 Corridor Wall Drywall Joint Compound Asbestos D Sampled during ECOH 2014 Reassessment Survey 2-22 Corridor Tile 2 Asbestos Not Sampled 1.5 'x 3' Short Random Fissure with Pinpoint EAST YORK CIVIC CENTRE PAGE 24 of 50

40 Name Observed 2-22 Corridor Pipe 2-22 Corridor Structure 2-23 Meeting Room Floor Carpet 2-23 Meeting Room Wall Drywall Joint Compound Asbestos Not Sampled 2-23 Meeting Room Tile 2 Asbestos Not Sampled 2-23 Meeting Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-23 Meeting Room Structure 2-24 Storage Room Floor Carpet 2-24 Storage Room Wall Drywall Joint Compound Asbestos Not Sampled 2-24 Storage Room Tile 2 Asbestos Not Sampled 2-24 Storage Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-24 Storage Room Structure 2-25 Office Floor Carpet 2-25 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-25 Office Tile 2 Asbestos Not Sampled 2-25 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-25 Office Structure 2-26 Office Floor Carpet 2-26 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-26 Office Tile 2 Asbestos Not Sampled 2-26 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-26 Office Structure 2-27 Open Offices Floor Carpet 2-27 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 2-27 Open Offices Tile 2 Asbestos Not Sampled 2-27 Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint EAST YORK CIVIC CENTRE PAGE 25 of 50

41 Name Observed 2-27 Open Offices Structure 2-28 Office Floor Carpet 2-28 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-28 Office Tile 2 Asbestos Not Sampled 2-28 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-28 Office Structure 2-29 Office Floor Carpet 2-29 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-29 Office Tile 2 Asbestos Not Sampled 2-29 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-29 Office Structure 2-30 Office Floor Carpet 2-30 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-30 Office Tile 2 Asbestos Not Sampled 2-30 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-30 Office Structure 2-31 Storage Room Floor Carpet 2-31 Storage Room Wall Drywall Joint Compound Asbestos Not Sampled 2-31 Storage Room Tile 2 Asbestos Not Sampled 2-31 Storage Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-31 Storage Room Structure 2-32 Office Floor Carpet 2-32 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-32 Office Tile 2 Asbestos Not Sampled 2-32 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-32 Office Structure EAST YORK CIVIC CENTRE PAGE 26 of 50

42 Name Observed 2-33 Open Offices Floor Carpet 2-33 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 2-33 Open Offices Tile 2 Asbestos Not Sampled 2-33 Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-33 Open Offices Structure 2-34 Open Offices Floor Carpet 2-34 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 2-34 Open Offices Tile 2 Asbestos Not Sampled 2-34 Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-34 Open Offices Structure 2-35 Servery Floor Carpet 2-35 Servery Wall Drywall Joint Compound Asbestos Not Sampled 2-35 Servery Tile 1 Asbestos Not Sampled 2-35 Servery Tile 2 Asbestos Not Sampled B Servery Pipe 2'x4' Short Random Fissure with Pinpoint not observed in ECOH 2016 Reassessment Survey 1.5 'x 3' Short Random Fissure with Pinpoint 2-35 Servery Structure 2-36 Corridor Floor Carpet 2-36 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 2-36 Corridor Tile 2 Asbestos Not Sampled 2-36 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-36 Corridor Structure 2-37 Corridor Floor Carpet 2-37 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 2-37 Corridor Tile 2 Asbestos Not Sampled 2-37 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-37 Corridor Structure EAST YORK CIVIC CENTRE PAGE 27 of 50

43 Name Observed 2-38 Revenue Office Floor Carpet 2-38 Revenue Office Wall Drywall Joint Compound Asbestos Not Sampled 2-38 Revenue Office Tile 2 Asbestos Not Sampled 2-38 Revenue Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-38 Revenue Office Structure 2-39 Vault Room Floor Carpet 2-39 Vault Room Wall Drywall Joint Compound Asbestos Not Sampled 2-39 Vault Room Tile 2 Asbestos Not Sampled 2-39 Vault Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-39 Vault Room Structure 2-40 Open Offices Floor Carpet 2-40 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 2-40 Open Offices Tile 2 Asbestos Not Sampled 2-40 Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-40 Open Offices Structure 2-41 Office Floor Carpet 2-41 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-41 Office Tile 2 Asbestos Not Sampled 2-41 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-41 Office Structure 2-42 Office Floor Carpet 2-42 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-42 Office Tile 2 Asbestos Not Sampled 2-42 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-42 Office Structure 2-43 Meeting Room Floor Carpet EAST YORK CIVIC CENTRE PAGE 28 of 50

44 Name Observed 2-43 Meeting Room Wall Drywall Joint Compound Asbestos Not Sampled 2-43 Meeting Room Tile 2 Asbestos Not Sampled 2-43 Meeting Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-43 Meeting Room Structure 2-44 Office Floor Carpet 2-44 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-44 Office Tile 2 Asbestos Not Sampled 2-44 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-44 Office Structure 2-45 Office Floor Carpet 2-45 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-45 Office Tile 2 Asbestos Not Sampled 2-45 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-45 Office Structure 2-46 Open Office Floor Carpet 2-46 Open Office Wall Drywall Joint Compound Asbestos Not Sampled 2-46 Open Office Tile 2 Asbestos Not Sampled 2-46 Open Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-46 Open Office Structure 2-47 First Aid Room Floor Vinyl Sheet Flooring 1 Asbestos Not Sampled 2-47 First Aid Room Wall Drywall Joint Compound Asbestos Not Sampled 2-47 First Aid Room Tile 2 Asbestos Not Sampled Visually consistent with B First Aid Room Pipe Grey with white/dark grey spackles 1.5 'x 3' Short Random Fissure with Pinpoint 2-47 First Aid Room Structure 2-48 Office Floor Carpet 2-48 Office Wall Drywall Joint Compound Asbestos Not Sampled EAST YORK CIVIC CENTRE PAGE 29 of 50

45 Name Observed 2-48 Office Tile 2 Asbestos Not Sampled 1.5 'x 3' Short Random Fissure with Pinpoint 2-48 Office Pipe 2-48 Office Structure 2-49 Office Floor Carpet 2-49 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-49 Office Tile 2 Asbestos Not Sampled 2-49 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-49 Office Structure 2-50 Office Floor Carpet 2-50 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-50 Office Tile 2 Asbestos Not Sampled 2-50 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-50 Office Structure 2-51 Open Offices Floor Carpet 2-51 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 2-51 Open Offices Tile 2 Asbestos Not Sampled 2-51 Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-51 Open Offices Structure 2-52 Office Floor Carpet 2-52 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-52 Office Tile 2 Asbestos Not Sampled 2-52 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-52 Office Structure 2-53 Office Floor Carpet Unknown 2-53 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-53 Office Tile 2 Asbestos Not Sampled 1.5 'x 3' Short Random Fissure with Pinpoint EAST YORK CIVIC CENTRE PAGE 30 of 50

46 Name Observed 2-53 Office Pipe 2-53 Office Structure 2-54 Open Offices Floor Carpet 2-54 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 2-54 Open Offices Tile 2 Asbestos Not Sampled 2-54 Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-54 Open Offices Structure 2-55 Drafting Office Floor Carpet 2-55 Drafting Office Wall Drywall Joint Compound Asbestos Not Sampled 2-55 Drafting Office Tile 2 Asbestos b 1.5 'x 3' Short Random Fissure with Pinpoint Sampled during ECOH 2009 DSS 2-55 Drafting Office Pipe 2-55 Drafting Office Structure 2-56 Break Room Floor Vinyl Sheet Flooring 1 Asbestos B120-06B Grey with white/dark grey spackles Sampled during ECOH 2014 Reassessment Survey 2-56 Break Room Wall Drywall Joint Compound Asbestos F Sampled during ECOH 2014 Reassessment Survey 2-56 Break Room Tile 2 Asbestos Not Sampled 1.5 'x 3' Short Random Fissure with Pinpoint 2-56 Break Room Pipe 2-56 Break Room Structure 2-57 Photocopy Room Floor Carpet 2-57 Photocopy Room Wall Drywall Joint Compound Asbestos Not Sampled 2-57 Photocopy Room Tile 2 Asbestos Not Sampled 2-57 Photocopy Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-57 Photocopy Room Structure 2-58 Closet Floor Vinyl Floor Tile 1 Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents 2-58 Closet Wall Drywall Joint Compound Asbestos B Sampled during ECOH 2014 Reassessment Survey 2-58 Closet Concrete 2-58 Closet Pipe 2-58 Closet Structure EAST YORK CIVIC CENTRE PAGE 31 of 50

47 Name Observed 2-59 Phone Booth Floor Carpet 2-59 Phone Booth Wall Drywall Joint Compound Asbestos Not Sampled 2-59 Phone Booth Tile 2 Asbestos Not Sampled 2-59 Phone Booth Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-59 Phone Booth Structure 2-60 Corridor Floor Carpet 2-60 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 2-60 Corridor Tile 2 Asbestos Not Sampled 2-60 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-60 Corridor Structure 2-61 Stairwell #2 Floor Concrete 2-61 Stairwell #2 Wall Plaster Asbestos Not Sampled ACM Assumed not observed in ECOH 2016 Reassessment Survey 2-61 Stairwell #2 Wall Concrete 2-61 Stairwell #2 Wall Drywall Joint Compound Asbestos A Sampled during ECOH 2014 Reassessment Survey 2-61 Stairwell # Stairwell #2 Pipe 2-61 Stairwell #2 Structure 2-62 Men's Washroom Floor Ceramic Tile Lead Assumed 2-62 Men's Washroom Wall Drywall Joint Compound Asbestos Not Sampled 2-62 Men's Washroom Drywall Joint Compound Asbestos Not Sampled B120-ASB Men's Washroom Pipe 2-62 Men's Washroom Structure 2-63 Women's Washroom Floor Ceramic Tile Lead Assumed 2-63 Women's Washroom Wall Drywall Joint Compound Asbestos Not Sampled 2-63 Women's Washroom Drywall Joint Compound Asbestos B120-ASB-04F Sampled during ECOH 2016 Reassessment Survey 2-63 Women's Washroom Pipe 2-63 Women's Washroom Structure EAST YORK CIVIC CENTRE PAGE 32 of 50

48 Name Observed 2-64 Electrical Room Floor Vinyl Floor Tile 1 Asbestos Not Sampled 2-64 Electrical Room Wall Drywall Joint Compound Asbestos Not Sampled Visually consistent with B Electrical Room Concrete 12"x12" grey with blue & white accents 2-64 Electrical Room Pipe 2-64 Electrical Room Structure 2-65 Closet Floor Carpet Unknown 2-65 Closet Wall Drywall Joint Compound Asbestos Not Sampled 2-65 Closet Tile 2 Asbestos Not Sampled 2-65 Closet Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-65 Closet Structure 2-66 Corridor Floor Carpet 2-66 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 2-66 Corridor Tile 2 Asbestos Not Sampled 2-66 Corridor Drywall Joint Compound Asbestos Not Sampled B120-ASB Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint not observed in ECOH 2016 Reassessment Survey 2-66 Corridor Structure 2-67 Corridor Floor Carpet 2-67 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 2-67 Corridor Tile 2 Asbestos Not Sampled 2-67 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-67 Corridor Structure 2-68 Staff Washroom Floor Ceramic Tile Lead Assumed 2-68 Staff Washroom Wall Drywall Joint Compound Asbestos Not Sampled 2-68 Staff Washroom Drywall Joint Compound Asbestos B120-ASB-04G Sampled during ECOH 2016 Reassessment Survey 2-68 Staff Washroom Pipe 2-68 Staff Washroom Structure EAST YORK CIVIC CENTRE PAGE 33 of 50

49 Name Observed 2-69 Storage Room Floor Carpet 2-69 Storage Room Wall Drywall Joint Compound Asbestos Not Sampled 2-69 Storage Room Tile 2 Asbestos Not Sampled 2-69 Storage Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-69 Storage Room Structure 2-70 Corridor Floor Carpet 2-70 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 2-70 Corridor Tile 2 Asbestos Not Sampled 2-70 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-70 Corridor Structure 2-71 Office Floor Carpet 2-71 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-71 Office Tile 2 Asbestos Not Sampled 2-71 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-71 Office Structure 2-72 Office Floor Carpet 2-72 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-72 Office Tile 2 Asbestos Not Sampled 2-72 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-72 Office Structure 2-73 Office Floor Carpet 2-73 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-73 Office Tile 2 Asbestos Not Sampled 2-73 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-73 Office Structure 2-74 Office Floor Carpet EAST YORK CIVIC CENTRE PAGE 34 of 50

50 Name Observed 2-74 Office Wall Drywall Joint Compound Asbestos Not Sampled 2-74 Office Tile 2 Asbestos Not Sampled 2-74 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-74 Office Structure 2-75 Corridor Floor Carpet 2-75 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 2-75 Corridor Tile 2 Asbestos Not Sampled 2-75 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-75 Corridor Structure 2-76 Break Room Floor Carpet 2-76 Break Room Wall Drywall Joint Compound Asbestos Not Sampled 2-76 Break Room Tile 2 Asbestos Not Sampled 2-76 Break Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 2-76 Break Room Structure 2-77 Lounge Floor Carpet 2-77 Lounge Wall Drywall Joint Compound Asbestos C Sampled during ECOH 2014 Reassessment Survey 2-77 Lounge Tile 2 Asbestos Not Sampled 1.5 'x 3' Short Random Fissure with Pinpoint 2-77 Lounge Pipe 2-77 Lounge Structure 2-78 Conference Room Floor Carpet 2-78 Conference Room Wall Wood/ Fabric Panels 2-78 Conference Room Drywall Joint Compound Asbestos Not Sampled B120-ASB Conference Room Metal Panels 2-78 Conference Room Pipe 2-78 Conference Room Structure 2-79 Vestibule Floor Ceramic Tile Lead Assumed 2-79 Vestibule Wall Brick EAST YORK CIVIC CENTRE PAGE 35 of 50

51 Name Observed 2-79 Vestibule Tile 2 Asbestos Not Sampled 2-79 Vestibule Drywall Joint Compound Asbestos Not Sampled B120-ASB Vestibule Pipe 1.5 'x 3' Short Random Fissure with Pinpoint not observed in ECOH 2016 Reassessment Survey 2-79 Vestibule Structure 2-80 Lobby Floor Carpet 2-80 Lobby Floor Ceramic Tile Lead Assumed 2-80 Lobby Wall Ceramic Tile Lead Assumed 2-80 Lobby Wall Brick 2-80 Lobby Drywall Joint Compound Asbestos Not Sampled B120-ASB Lobby Pipe 2-80 Lobby Structure 3-01 Lobby Stairwell Floor Ceramic Tile Lead Assumed 3-01 Lobby Stairwell Wall Drywall Joint Compound Asbestos Not Sampled 3-01 Lobby Stairwell Drywall Joint Compound Asbestos Not Sampled B120-ASB Lobby Stairwell Pipe 3-01 Lobby Stairwell Structure 3-02 Lobby Stairwell Floor Ceramic Tile Lead Assumed 3-02 Lobby Stairwell Wall Drywall Joint Compound Asbestos Not Sampled 3-02 Lobby Stairwell Drywall Joint Compound Asbestos Not Sampled B120-ASB Lobby Stairwell Pipe 3-02 Lobby Stairwell Structure 3-03 Lobby Floor Ceramic Tile Lead Assumed 3-03 Lobby Wall Drywall Joint Compound Asbestos Not Sampled 3-03 Lobby Drywall Joint Compound Asbestos Not Sampled B120-ASB Lobby Pipe 3-03 Lobby Structure EAST YORK CIVIC CENTRE PAGE 36 of 50

52 Name Observed 3-04 Corridor Floor Carpet 3-04 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 3-04 Corridor Drywall Joint Compound Asbestos Not Sampled B120-ASB Corridor Pipe 3-04 Corridor Structure 3-05 Waiting Area Floor Carpet 3-05 Waiting Area Wall Drywall Joint Compound Asbestos Not Sampled 3-05 Waiting Area Drywall Joint Compound Asbestos Not Sampled B120-ASB Waiting Area Pipe 3-05 Waiting Area Structure 3-06 Meeting Room Floor Carpet 3-06 Meeting Room Wall Drywall Joint Compound Asbestos Not Sampled 3-06 Meeting Room Drywall Joint Compound Asbestos B120-ASB-05A Sampled during ECOH 2016 Reassessment Survey 3-06 Meeting Room Pipe 3-06 Meeting Room Structure 3-07 Servery Floor Vinyl Floor Tile 1 Asbestos Not Sampled 3-07 Servery Wall Drywall Joint Compound Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents 3-07 Servery Drywall Joint Compound Asbestos B120-ASB-05B Sampled during ECOH 2016 Reassessment Survey 3-07 Servery Pipe 3-07 Servery Structure 3-08 Janitor's Closet Floor Vinyl Floor Tile 1 Asbestos Not Sampled 3-08 Janitor's Closet Wall Drywall Joint Compound Asbestos Not Sampled Visually consistent with B Janitor's Closet Concrete 12"x12" grey with blue & white accents 3-08 Janitor's Closet Pipe Insulation Mould Not Sampled Visually Confirmed 3 ft² 3 SF of mould-impacted non-acm pipe insulation 3-08 Janitor's Closet Structure 3-09 Women's Washroom Floor Ceramic Tile Lead Assumed EAST YORK CIVIC CENTRE PAGE 37 of 50

53 Name Observed 3-09 Women's Washroom Wall Drywall Joint Compound Asbestos Not Sampled 3-09 Women's Washroom Drywall Joint Compound Asbestos Not Sampled B120-ASB Women's Washroom Pipe 3-09 Women's Washroom Structure 3-10 Men's Washroom Floor Ceramic Tile Lead Assumed 3-10 Men's Washroom Wall Drywall Joint Compound Asbestos Not Sampled 3-10 Men's Washroom Drywall Joint Compound Asbestos Not Sampled B120-ASB Men's Washroom Pipe 3-10 Men's Washroom Structure 3-11 Corridor Floor Carpet 3-11 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 3-11 Corridor Tile 2 Asbestos Not Sampled 3-11 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-11 Corridor Structure 3-12 Corridor Floor Carpet 3-12 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 3-12 Corridor Tile 2 Asbestos Not Sampled 3-12 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-12 Corridor Structure 3-13 Electrical Room Floor Vinyl Floor Tile 1 Asbestos Not Sampled 3-13 Electrical Room Wall Drywall Joint Compound Asbestos Not Sampled Visually consistent with B Electrical Room Wall Concrete 12"x12" grey with blue & white accents 3-13 Electrical Room Wall Concrete Block 3-13 Electrical Room Concrete 3-13 Electrical Room Drywall Joint Compound Asbestos B120-ASB-05C,D Sampled during ECOH 2016 Reassessment Survey 3-13 Electrical Room Pipe EAST YORK CIVIC CENTRE PAGE 38 of 50

54 Name Observed 3-13 Electrical Room Structure 3-14 Barrier-Free Washroom Floor Ceramic Tile Lead Assumed 3-14 Barrier-Free Washroom Wall Drywall Joint Compound Asbestos Not Sampled 3-14 Barrier-Free Washroom Drywall Joint Compound Asbestos Not Sampled B120-ASB Barrier-Free Washroom Pipe 3-14 Barrier-Free Washroom Structure 3-15 Servery Floor Carpet 3-15 Servery Wall Drywall Joint Compound Asbestos G Sampled during ECOH 2014 Reassessment Survey 3-15 Servery Tile 1 Asbestos Not Sampled 3-15 Servery Tile 2 Asbestos Not Sampled B Servery Pipe 2'x4' Short Random Fissure with Pinpoint not observed in ECOH 2016 Reassessment Survey 1.5 'x 3' Short Random Fissure with Pinpoint 3-15 Servery Structure 3-16 Stairwell #1 Floor Concrete 3-16 Stairwell #1 Wall Plaster Asbestos Not Sampled ACM Assumed not observed in ECOH 2016 Reassessment Survey 3-16 Stairwell #1 Wall Concrete 3-16 Stairwell #1 Wall Concrete Block 3-16 Stairwell #1 Wall Drywall Joint Compound Asbestos Not Sampled 3-16 Stairwell #1 Concrete 3-16 Stairwell #1 Pipe 3-16 Stairwell #1 Structure 3-17 Office Floor Carpet 3-17 Office Wall Drywall Joint Compound Asbestos Not Sampled 3-17 Office Tile 2 Asbestos Not Sampled 3-17 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-17 Office Structure 3-18 Office Floor Carpet 3-18 Office Wall Drywall Joint Compound Asbestos Not Sampled EAST YORK CIVIC CENTRE PAGE 39 of 50

55 Name Observed 3-18 Office Tile 2 Asbestos Not Sampled 1.5 'x 3' Short Random Fissure with Pinpoint 3-18 Office Pipe 3-18 Office Structure 3-19 Office Floor Carpet 3-19 Office Wall Drywall Joint Compound Asbestos Not Sampled 3-19 Office Tile 2 Asbestos Not Sampled 3-19 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-19 Office Structure 3-20 Storage Room Floor Carpet Unknown 3-20 Storage Room Wall Drywall Joint Compound Asbestos Not Sampled 3-20 Storage Room Tile 2 Asbestos Not Sampled 3-20 Storage Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-20 Storage Room Structure 3-21 Corridor Floor Carpet 3-21 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 3-21 Corridor Tile 2 Asbestos Not Sampled 3-21 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-21 Corridor Structure 3-22 Office Floor Carpet 3-22 Office Wall Drywall Joint Compound Asbestos Not Sampled 3-22 Office Tile 2 Asbestos Not Sampled 3-22 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-22 Office Structure 3-23 Office Floor Carpet 3-23 Office Wall Drywall Joint Compound Asbestos Not Sampled 3-23 Office Tile 2 Asbestos Not Sampled 1.5 'x 3' Short Random Fissure with Pinpoint EAST YORK CIVIC CENTRE PAGE 40 of 50

56 Name Observed 3-23 Office Pipe 3-23 Office Structure 3-24 Office Floor Carpet 3-24 Office Wall Drywall Joint Compound Asbestos Not Sampled 3-24 Office Tile 2 Asbestos Not Sampled 3-24 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-24 Office Structure 3-25 Corridor Floor Carpet 3-25 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 3-25 Corridor Tile 2 Asbestos Not Sampled 3-25 Corridor Drywall Joint Compound Asbestos Not Sampled B120-ASB Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint not observed in ECOH 2016 Reassessment Survey 3-25 Corridor Structure 3-26 Open Offices Floor Carpet 3-26 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 3-26 Open Offices Tile 2 Asbestos Not Sampled 3-26 Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-26 Open Offices Structure 3-27 Open Offices Floor Carpet 3-27 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 3-27 Open Offices Tile 2 Asbestos Not Sampled 3-27 Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-27 Open Offices Structure 3-28 Open Offices Floor Carpet 3-28 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 3-28 Open Offices Tile 2 Asbestos Not Sampled 1.5 'x 3' Short Random Fissure with Pinpoint EAST YORK CIVIC CENTRE PAGE 41 of 50

57 Name Observed 3-28 Open Offices Pipe 3-28 Open Offices Structure 3-29 Public Area Floor Carpet 3-29 Public Area Wall Drywall Joint Compound Asbestos Not Sampled 3-29 Public Area Tile 2 Asbestos Not Sampled 3-29 Public Area Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-29 Public Area Structure 3-30 Open Offices Floor Carpet 3-30 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 3-30 Open Offices Tile 2 Asbestos Not Sampled 3-30 Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-30 Open Offices Structure 3-31 Vault Room Floor Carpet 3-31 Vault Room Wall Drywall Joint Compound Asbestos Not Sampled 3-31 Vault Room Tile 2 Asbestos Not Sampled 3-31 Vault Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-31 Vault Room Structure 3-32 Corridor Floor Carpet 3-32 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 3-32 Corridor Tile 2 Asbestos Not Sampled 3-32 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-32 Corridor Structure 3-33 Office Floor Carpet 3-33 Office Wall Drywall Joint Compound Asbestos Not Sampled 3-33 Office Tile 2 Asbestos Not Sampled 3-33 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint EAST YORK CIVIC CENTRE PAGE 42 of 50

58 Name Observed 3-33 Office Structure 3-34 Break Room Floor Carpet 3-34 Break Room Wall Drywall Joint Compound Asbestos Not Sampled 3-34 Break Room Tile 2 Asbestos Not Sampled 3-34 Break Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-34 Break Room Structure 3-35 Open Offices Floor Carpet 3-35 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 3-35 Open Offices Tile 2 Asbestos Not Sampled 3-35 Open Offices Drywall Joint Compound Asbestos Not Sampled B120-ASB Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-35 Open Offices Structure 3-36 Open Offices Floor Carpet 3-36 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 3-36 Open Offices Tile 2 Asbestos Not Sampled 3-36 Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-36 Open Offices Structure 3-37 Open Offices Floor Carpet 3-37 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 3-37 Open Offices Tile 2 Asbestos Not Sampled 3-37 Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-37 Open Offices Structure 3-38 Servery Floor Vinyl Floor Tile 1 Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents 3-38 Servery Wall Drywall Joint Compound Asbestos F Sampled during ECOH 2014 Reassessment Survey 3-38 Servery Tile 2 Asbestos Not Sampled 1.5 'x 3' Short Random Fissure with Pinpoint 3-38 Servery Pipe EAST YORK CIVIC CENTRE PAGE 43 of 50

59 Name Observed 3-38 Servery Structure 3-39 High Density Storage Floor Carpet 3-39 High Density Storage Wall Drywall Joint Compound Asbestos Not Sampled 3-39 High Density Storage Tile 2 Asbestos Not Sampled 3-39 High Density Storage Drywall Joint Compound Asbestos Not Sampled B120-ASB High Density Storage Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-39 High Density Storage Structure 3-40 Corridor Floor Carpet 3-40 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 3-40 Corridor Tile 2 Asbestos Not Sampled 3-40 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-40 Corridor Structure 3-41 Office Floor Carpet 3-41 Office Wall Drywall Joint Compound Asbestos Not Sampled 3-41 Office Tile 2 Asbestos Not Sampled 3-41 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-41 Office Structure 3-42 Office Floor Carpet 3-42 Office Wall Drywall Joint Compound Asbestos Not Sampled 3-42 Office Tile 2 Asbestos Not Sampled 3-42 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-42 Office Structure 3-43 Open Offices Floor Carpet 3-43 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 3-43 Open Offices Tile 2 Asbestos Not Sampled 3-43 Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint EAST YORK CIVIC CENTRE PAGE 44 of 50

60 Name Observed 3-43 Open Offices Structure 3-44 Closet Floor Carpet 3-44 Closet Wall Drywall Joint Compound Asbestos Not Sampled 3-44 Closet Tile 2 Asbestos Not Sampled 3-44 Closet Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-44 Closet Structure 3-45 Corridor Floor Carpet 3-45 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 3-45 Corridor Tile 2 Asbestos Not Sampled 3-45 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-45 Corridor Structure 3-46 Files Storage Floor Carpet 3-46 Files Storage Wall Drywall Joint Compound Asbestos E Sampled during ECOH 2014 Reassessment Survey 3-46 Files Storage Tile 2 Asbestos Not Sampled 1.5 'x 3' Short Random Fissure with Pinpoint 3-46 Files Storage Pipe 3-46 Files Storage Structure 3-47 Storage Floor Carpet 3-47 Storage Wall Drywall Joint Compound Asbestos Not Sampled 3-47 Storage Tile 2 Asbestos Not Sampled 3-47 Storage Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-47 Storage Structure 3-48 Corridor Floor Carpet 3-48 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 3-48 Corridor Tile 2 Asbestos Not Sampled 3-48 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-48 Corridor Structure EAST YORK CIVIC CENTRE PAGE 45 of 50

61 Name Observed 3-49 Storage Room Floor Carpet 3-49 Storage Room Wall Drywall Joint Compound Asbestos Not Sampled 3-49 Storage Room Tile 2 Asbestos Not Sampled 3-49 Storage Room Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-49 Storage Room Structure 3-50 Open Offices Floor Carpet 3-50 Open Offices Wall Drywall Joint Compound Asbestos Not Sampled 3-50 Open Offices Tile 2 Asbestos Not Sampled 3-50 Open Offices Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-50 Open Offices Structure 3-51 Office Floor Carpet 3-51 Office Wall Drywall Joint Compound Asbestos Not Sampled 3-51 Office Tile 2 Asbestos Not Sampled 3-51 Office Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-51 Office Structure 3-52 Men's Washroom Floor Ceramic Tile Lead Assumed 3-52 Men's Washroom Wall Drywall Joint Compound Asbestos Not Sampled 3-52 Men's Washroom Drywall Joint Compound Asbestos B120-ASB-05E Sampled during ECOH 2016 Reassessment Survey 3-52 Men's Washroom Pipe 3-52 Men's Washroom Structure 3-53 Women's Washroom Floor Ceramic Tile Lead Assumed 3-53 Women's Washroom Wall Drywall Joint Compound Asbestos C Sampled during ECOH 2014 Reassessment Survey 3-53 Women's Washroom Drywall Joint Compound Asbestos B120-ASB-05F,G Sampled during ECOH 2016 Reassessment Survey 3-53 Women's Washroom Pipe 3-53 Women's Washroom Structure 3-54 Electrical Room Floor Vinyl Floor Tile 1 Asbestos Not Sampled Visually consistent with B "x12" grey with blue & white accents 3-54 Electrical Room Wall Drywall Joint Compound Asbestos D Sampled during ECOH 2014 Reassessment Survey EAST YORK CIVIC CENTRE PAGE 46 of 50

62 Name Observed 3-54 Electrical Room Concrete 3-54 Electrical Room Pipe 3-54 Electrical Room Structure Firestop Asbestos B120-07A-C 3-55 Janitor's Closet Floor Vinyl Floor Tile 1 Asbestos Not Sampled 3-55 Janitor's Closet Wall Drywall Joint Compound Asbestos Not Sampled Visually consistent with B Janitor's Closet Concrete Green Sampled during ECOH 2014 Reassessment Survey 12"x12" grey with blue & white accents 3-55 Janitor's Closet Pipe 3-55 Janitor's Closet Structure 3-56 Storage / Lounge Floor Carpet 3-56 Storage / Lounge Wall Drywall Joint Compound Asbestos A Sampled during ECOH 2014 Reassessment Survey 3-56 Storage / Lounge Tile 2 Asbestos Not Sampled 1.5 'x 3' Short Random Fissure with Pinpoint 3-56 Storage / Lounge Pipe 3-56 Storage / Lounge Structure 3-57 Office Floor not found in 2016 ECOH Reassessment 3-58 Corridor Floor Carpet 3-58 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 3-58 Corridor Tile 2 Asbestos Not Sampled 3-58 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-58 Corridor Structure 3-59 Office Floor Carpet 3-59 Office Wall Drywall Joint Compound Asbestos Not Sampled 3-59 Office Tile 2 Asbestos c 1.5 'x 3' Short Random Fissure with Pinpoint Sampled during ECOH 2009 DSS 3-59 Office Pipe 3-59 Office Structure 3-60 Stairwell #2 Floor Concrete 3-60 Stairwell #2 Wall Drywall Joint Compound Asbestos Not Sampled not observed in ECOH 2016 Reassessment Survey 3-60 Stairwell #2 Wall Concrete EAST YORK CIVIC CENTRE PAGE 47 of 50

63 Name Observed 3-60 Stairwell #2 Tile 2 Asbestos Not Sampled 1.5 'x 3' Short Random Fissure with Pinpoint not observed in ECOH 2016 Reassessment Survey 3-60 Stairwell #2 Concrete 3-60 Stairwell #2 Pipe 3-60 Stairwell #2 Structure 3-61 Stairwell Floor Concrete 3-61 Stairwell Wall Drywall Joint Compound Asbestos Not Sampled 3-61 Stairwell Wall Concrete 3-61 Stairwell Wall Concrete Block 3-61 Stairwell Drywall Joint Compound Asbestos Not Sampled B120-ASB Stairwell Pipe 3-61 Stairwell Structure 3-62 Corridor Floor Carpet 3-62 Corridor Wall Drywall Joint Compound Asbestos Not Sampled 3-62 Corridor Tile 2 Asbestos Not Sampled 3-62 Corridor Pipe 1.5 'x 3' Short Random Fissure with Pinpoint 3-62 Corridor Structure 3-63 Stairwell Floor Carpet 3-63 Stairwell Wall Drywall Joint Compound Asbestos Not Sampled 3-63 Stairwell Drywall Joint Compound Asbestos Not Sampled B120-ASB Stairwell Pipe 3-63 Stairwell Structure 3-64 Balcony Floor Carpet 3-64 Balcony Wall Panelling Acoustic Panelling 3-64 Balcony Panelling Acoustic Panelling 3-64 Balcony Pipe 3-64 Balcony Structure 3-65 Sound Room Floor Carpet EAST YORK CIVIC CENTRE PAGE 48 of 50

64 Name Observed 3-65 Sound Room Wall Drywall Joint Compound Asbestos Not Sampled 3-65 Sound Room Drywall Joint Compound Asbestos Not Sampled B120-ASB Sound Room Pipe 3-65 Sound Room Structure 3-66 Servery Floor Vinyl Floor Tile 1 Asbestos Not Sampled 3-66 Servery Wall Drywall Joint Compound Asbestos Not Sampled 3-66 Servery Drywall Joint Compound Asbestos Not Sampled Visually consistent with B B120-ASB Servery Pipe 12"x12" grey with blue & white accents 3-66 Servery Structure 3-67 Meeting Room Floor Carpet 3-67 Meeting Room Wall Drywall Joint Compound Asbestos Not Sampled 3-67 Meeting Room Drywall Joint Compound Asbestos Not Sampled B120-ASB Meeting Room Pipe 3-67 Meeting Room Structure 3-68 Waiting Area Floor Carpet 3-68 Waiting Area Wall Drywall Joint Compound Asbestos Not Sampled 3-68 Waiting Area Drywall Joint Compound Asbestos Not Sampled B120-ASB Waiting Area Pipe 3-68 Waiting Area Structure 3-69 Office Floor Carpet 3-69 Office Wall Drywall Joint Compound Asbestos B Sampled during ECOH 2014 Reassessment Survey 3-69 Office Tile 1 Asbestos Not Sampled B 'x4' Short Random Fissure with Pinpoint 3-69 Office Pipe 3-69 Office Structure P-01 South Penthouse Floor Concrete P-01 South Penthouse Wall Concrete Block EAST YORK CIVIC CENTRE PAGE 49 of 50

65 Name Observed P-01 South Penthouse Steel Deck P-01 South Penthouse Pipe P-01 South Penthouse Structure P-02 Generator Room Floor Concrete P-02 Generator Room Wall Concrete Block P-02 Generator Room Steel Deck P-02 Generator Room Pipe P-02 Generator Room Structure P-02 Generator Room Mechanical Tar Asbestos A-C Black tar on the diesel generator exhaust stack Sampled during Pinchin 2012 Pre-reno DSS P-03 North Penthouse Floor Concrete P-03 North Penthouse Wall Concrete Block P-03 North Penthouse Steel Deck P-03 North Penthouse Pipe P-03 North Penthouse Structure Surveyor's Field Notes EAST YORK CIVIC CENTRE PAGE 50 of 50

66 APPENDIX II RESULTS OF BULK SAMPLE ANALYSES

67 EMSL Canada Inc Slough Street Mississauga, ON L9T 5N4 Tel/Fax: (289) / (289) / torontolab@emsl.com EMSL Canada Order: Customer ID: 55ECOH45 Customer PO: B120 Project ID: PROJECT# Attention: STEVE BIZI Phone: (647) ECOH Management, Inc. Fax: (905) Courtneypark Drive West Received Date: 08/29/2016 5:00 PM Unit 1 Analysis Date: 08/31/2016 Mississauga, ON L5W 0E3 Collected Date: 08/17/2016 Project: B COXWELL AVE (PROJECT# 16608) Test Report: Asbestos Analysis of Bulk s via EPA 600/R-93/116 Method using Polarized Light Microscopy Non-Asbestos Sample Description Appearance % Fibrous % Non-Fibrous Asbestos % Type A Loc Drywall Joint Compound - Wall White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-02A Loc C-02 - Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-02B Loc C-02 - Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-02C Loc C-13 - Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-02D Loc C-13 - Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-02E Loc C-13 - Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-03A Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-03B Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-03C Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-03D Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-03E Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-03F Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-03G Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-04A Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-04B Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-04C Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) Initial report from: 09/06/ :04:24 ASB_PLM_ Printed: 9/6/2016 3:04 PM Page 1 of 2

68 EMSL Canada Inc Slough Street Mississauga, ON L9T 5N4 Tel/Fax: (289) / (289) / torontolab@emsl.com EMSL Canada Order: Customer ID: 55ECOH45 Customer PO: B120 Project ID: PROJECT# Test Report: Asbestos Analysis of Bulk s via EPA 600/R-93/116 Method using Polarized Light Microscopy Non-Asbestos Sample Description Appearance % Fibrous % Non-Fibrous Asbestos % Type B120-ASB-04D Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-04E Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-04F Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-04G Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-05A Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-05B Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-05C Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-05D Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-05E Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-05F Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) B120-ASB-05G Loc Drywall Joint Compound - White Non-Fibrous Homogeneous 100% Non-fibrous (Other) Analyst(s) Ronald Ng (16) Romeo Samson (11) Matthew Davis or Other Approved Signatory EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1% Samples analyzed by EMSL Canada Inc. Mississauga, ON NVLAP Lab Code Initial report from: 09/06/ :04:24 ASB_PLM_ Printed: 9/6/2016 3:04 PM Page 2 of 2

69 Attn: Project: EMSL Canada Inc Slough Street, Mississauga, ON L9T 5N4 Phone/Fax: / (289) torontolab@emsl.com STEVE BIZI ECOH Management, Inc. 75 Courtneypark Drive West Unit 1 Mississauga, ON L5W 0E B120 EMSL Canada Or CustomerID: 55ECOH45 CustomerPO: B120 ProjectID: PROJECT# Phone: (905) Fax: (905) Received: 08/29/16 11:19 AM Collected: 8/17/2016 Test Report: Lead in Paint Chips by Flame AAS (SW B/7000B)* Client Sample Description Lab ID Collected Analyzed B120-PB /17/2016 9/1/2016 Site: LOC WHITE PAINT (CEILING) B120-PB /17/2016 9/1/2016 Site: LOC WHITE PAINT (CEILING) Lead Concentration <90 ppm <90 ppm Jeff Siria / Shiraz Saloojee or other approved signatory *Analysis following Lead in Paint by EMSL SOP/Determination of Environmental Lead by FLAA. Reporting limit is % wt based on the minimum sample weight per our SOP. Unless noted, results in this report are not blank corrected. This report relates only to the samples reported above and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities. Samples received in good condition unless otherwise noted. "<" (less than) result signifies that the analyte was not detected at or above the reporting limit. Measurement of uncertainty is available upon request. The QC data associated with the sample results included in this report meet the recovery and precision requirements unless specifically indicated otherwise. Definitions of modifications are available upon request. Samples analyzed by EMSL Canada Inc. Mississauga, ON A2LA Accredited Environmental Testing Cert # Initial report from 09/06/ :39:42 Test Report ChmSnglePrm/nQC Printed: 9/6/2016 9:39:42 AM Page 1 of 1

LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for

LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Physical Plant Division Engineering and Architectural Services Department

More information

ST. LUKE CATHOLIC ELEMENTARY SCHOOL

ST. LUKE CATHOLIC ELEMENTARY SCHOOL ST. LUKE CATHOLIC ELEMENTARY SCHOOL Final 2017 ACM Re-Assessment Report Project Location: 345 Albright Road Hamilton, ON Prepared for: Hamilton Wentworth Catholic District School Board 57 Stuart Street

More information

OWNER S DUTIES. Designated Substances on construction projects BEFORE CONTRACTS ARE FINALIZED, THE PROJECT OWNER MUST DO THE FOLLOWING

OWNER S DUTIES. Designated Substances on construction projects BEFORE CONTRACTS ARE FINALIZED, THE PROJECT OWNER MUST DO THE FOLLOWING In Ontario, section 30 of the Occupational Health and Safety Act requires that a project owner identify designated substances on the project and provide a list to prospective constructors before contracts

More information

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for. SSOE, Inc Wilshire Drive Suite 260 Troy, Michigan 48084

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for. SSOE, Inc Wilshire Drive Suite 260 Troy, Michigan 48084 POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT for SSOE, Inc. 1050 Wilshire Drive Suite 260 Troy, Michigan 48084 at Michigan State University Physics Astronomy Building (Now Psychology) East

More information

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL Project #: 13916 ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL Prepared for: Sheila Miller Director, Department of Health and Safety Memorial University of Newfoundland

More information

Limited Asbestos Demolition Survey

Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Former Fire Station Facility 25 to 45 S. Orlando Avenue Cocoa Beach, Florida Client: City of Cocoa Beach Public Works Department 1600

More information

Prepared for Florida State University Facilities Planning& Construction By Environmental Health & Safety Tallahassee, Fl

Prepared for Florida State University Facilities Planning& Construction By Environmental Health & Safety Tallahassee, Fl SITE ASSESSMENT CHECKLIST FOR DEMOLITION AND RENOVATION PROJECTS INSERT BUILDING NAME FSU BUILDING NUMBER XXX CAMPUS OF FLORIDA STATE UNIVERSITY TALLAHASSEE, FLORIDA Prepared for Florida State University

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

FINAL REPORT. Asbestos-Containing Building Material Assessment

FINAL REPORT. Asbestos-Containing Building Material Assessment FINAL REPORT Asbestos-Containing Building Material Assessment Toronto Catholic District School Board Nativity of Our Lord Catholic School 35 Saffron Crescent Etobicoke, Ontario PROJECT NO. 1025760 PROJECT

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Asbestos Elevator Industry Workshop November 25, 2015

Asbestos Elevator Industry Workshop November 25, 2015 Asbestos Elevator Industry Workshop November 25, 2015 BOB SWING CONTACT INFO EMAIL: Bob.Swing@ThyssenKrupp.com Phone: 604-499-5714 SOME ASBESTOS-CONTAINING MATERIALS Cement Pipes Cement Wallboard Cement

More information

Dale Livingston, Asbestos Group, Environmental Health and Safety, 153 U-Tech Building, 2331 University Avenue S.E., Minneapolis, MN 55414

Dale Livingston, Asbestos Group, Environmental Health and Safety, 153 U-Tech Building, 2331 University Avenue S.E., Minneapolis, MN 55414 July 5, 2007 REPORT: Full Building Survey TO: Linda McCracken-Hunt, Project Development, 400 Shops Building Fay Thompson, Department of Environmental Health and Safety, Director Tim Nelson, Facilities

More information

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM Revised January 2017 Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Introduction 1 Scope 1 Policy Statement

More information

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22 Page 1 of 22 Asbestos Survey Project Summary Pursuant to your request; Environmental, Inc., has performed an Asbestos Building Survey on 8/13/2014 and limited to the above referenced location. The Interior/Exterior/Roof

More information

Lead Management Program for Building Maintenance and Construction Projects. Office of Environmental Health and Safety University of Toronto

Lead Management Program for Building Maintenance and Construction Projects. Office of Environmental Health and Safety University of Toronto Lead Management Program for Building Maintenance and Construction Projects Office of Environmental Health and Safety University of Toronto TABLE OF CONTENTS 1 INTRODUCTION 4 OBJECTIVES 4 PROGRAM ELEMENTS

More information

PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278

PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278 PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278 PREPARED FOR: Mr. Roberto Aguirre City of San Francisco DPW, SAR, BCM 1680 Mission Street San Francisco, California PREPARED

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-3013

More information

Pre-demolition Hazardous Building Materials Survey Report

Pre-demolition Hazardous Building Materials Survey Report Pre-demolition Hazardous Building Materials Survey Report 607 Cliff Avenue Enderby, BC Prepared for: City of Enderby PO Box 400, 619 Cliff Avenue Enderby, BC V0E 1V0 Attention: Mr. Tate Bengtson Chief

More information

FINAL Asbestos Management Program University of Windsor 401 Sunset Avenue, Windsor, Ontario

FINAL Asbestos Management Program University of Windsor 401 Sunset Avenue, Windsor, Ontario FINAL Asbestos Management Program University of Windsor 401 Sunset Avenue, Windsor, Ontario Prepared for: University of Windsor 401 Sunset Avenue Windsor, Ontario, N9B 3P4 Attn: Danny A. Castellan, P.Eng.

More information

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall July 3, 2007 REPORT: Full Building Survey TO: Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall FROM: Bryan

More information

Asbestos-Containing Material and Hazardous Material Survey Summary Report

Asbestos-Containing Material and Hazardous Material Survey Summary Report Asbestos-Containing Material and Hazardous Material Survey Summary Report Site: Haas Park Fieldhouse PS1757 2404 North Washtenaw Street Chicago, Illinois 60647 Survey Date: January 15, 2010 PBCC Project

More information

DF Technical & Consulting Services Ltd Avenue, Edmonton, AB T6B 2N2 Ph: Fax: Toll Free:

DF Technical & Consulting Services Ltd Avenue, Edmonton, AB T6B 2N2 Ph: Fax: Toll Free: 4407 68 Avenue, Edmonton, AB T6B 2N2 Ph: 780.468.3131 Fax: 780.468.3224 Toll Free: 855.668.3131 August 31, 2015 ClaimsPro #200, 11530 97 Avenue Grande Prairie, Alberta T8V 6R8 Attention: Mr. Kyler Moore

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-381X

More information

ASBESTOS & HAZARDOUS MATERIALS INSPECTION

ASBESTOS & HAZARDOUS MATERIALS INSPECTION ASBESTOS & HAZARDOUS MATERIALS INSPECTION of 2819 Shadeland Avenue Pittsburgh, Pennsylvania Prepared for Facilities Division Pittsburgh Public Schools 1305 Muriel Street 15203-1513 Prepared by L. ROBERT

More information

Office of Design & Construction State University Plaza Albany, New York

Office of Design & Construction State University Plaza Albany, New York Instructions: Consultant should meet with the Campus and Fund at the work area(s) prior to completing this Checklist. At least two (2) meetings are required, one prior to Schematic Phase submission and

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2270

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Asbestos Survey Report

Asbestos Survey Report Asbestos Survey Report Downtown Duluth Old City Hall Block Buildings for renovation 3087 Main Street, 3097 Main Street, New Dawn Theater, 3530 W. Lawrenceville Street, Old City Hall/Church Duluth, Georgia

More information

HERRON Enterprises USA, Inc.

HERRON Enterprises USA, Inc. Phone (303) 763 9639 To: City of Montrose / Mr. Mark Armstrong HERRON Project No.: 1120145 Job No.: Verbal Location: Multiple Buildings, 950 and 970 Chipeta Rd., Montrose, CO 81403 Dates of Service: November

More information

CHAPTER 34 ASBESTOS. Where is it Found? 34 ASBESTOS. What is Asbestos?

CHAPTER 34 ASBESTOS. Where is it Found? 34 ASBESTOS. What is Asbestos? CHAPTER 34 ASBESTOS 34 ASBESTOS This chapter provides some brief information about asbestos in construction. If you encounter asbestos on the job, you will need more information. Here are the two main

More information

Learn Charter School Excel Campus

Learn Charter School Excel Campus ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California November 12, 2014 Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 RE: Pre-Renovation Asbestos Survey Report 5862 Rupert Avenue, Marysville, California

More information

PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA. Prepared for

PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA. Prepared for ENVIRONMENTAL SERVICES, LLC PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA Prepared for CITY OF OCALA REVITILIZATION STRATEGIES-CODE ENFORCEMENT DIVISION

More information

Project & Environmental Review. Guidelines Demolition. May 2016

Project & Environmental Review. Guidelines Demolition. May 2016 Project & Environmental Review Guidelines Demolition May 2016 TABLE OF CONTENTS 1. Introduction... 3 2. Objectives... 3 3. Applicability and Building Permits... 3 4. Guidelines for Preparing a Project

More information

Pre-Renovation Asbestos Survey

Pre-Renovation Asbestos Survey Pre-Renovation Asbestos Survey L640 Level 2 Remodel College Complex Los Medanos College Pittsburg, California November 23, 2016 Terracon Project No. R1167D98 Prepared for: Contra Costa Community College

More information

ASBESTOS MANAGEMENT PLAN PROCEDURE

ASBESTOS MANAGEMENT PLAN PROCEDURE ADMINISTRATIVE PROCEDURE Approval Date January 2011 Review Date 2016 Contact Person/Department Superintendent of Business Replacing All Previous Procedures Page 1 of 6 Identification BU-3565 ASBESTOS MANAGEMENT

More information

Assessment Completed by: Asbestos Inspections, LLC 4686 Pee Dee Highway Conway, South Carolina (843)

Assessment Completed by: Asbestos Inspections, LLC 4686 Pee Dee Highway Conway, South Carolina (843) ASBESTOS INSPECTION REPORT 1814 PRINCE STREET 2-STORY Georgetown, South Carolina Asbestos Inspections, LLC Project # 2017-48 Performed in general accordance with SCDHEC regulation 61-86.1 along with OSHA

More information

Thames Valley District School Board. The Board has assigned the following responsibilities to ensure compliance with the above Policy and Legislation.

Thames Valley District School Board. The Board has assigned the following responsibilities to ensure compliance with the above Policy and Legislation. Thames Valley District School Board PROCEDURE Title ASBESTOS PROCEDURES Procedure No. 2005a Department ORGANIZATIONAL SUPPORT SERVICES (HUMAN RESOURCES) Reference(s) Policy: Health and Safety - Occupational

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION NARRATIVE REPORT 1.0 BUILDING INFORMATION Bentson Bunker Fieldhouse was originally constructed in 1931; the building has had several renovations, notably, a 1976-1980 multi-phase renovation throughout

More information

HAZARDOUS MATERIALS BUILDING INSPECTION ARTS AND SCIENCE CENTER PROJECT NEW RIVER COMMUNITY & TECHNICAL COLLEGE LEWISBURG, WEST VIRGINIA

HAZARDOUS MATERIALS BUILDING INSPECTION ARTS AND SCIENCE CENTER PROJECT NEW RIVER COMMUNITY & TECHNICAL COLLEGE LEWISBURG, WEST VIRGINIA HAZARDOUS MATERIALS BUILDING INSPECTION ARTS AND SCIENCE CENTER PROJECT NEW RIVER COMMUNITY & TECHNICAL COLLEGE LEWISBURG, WEST VIRGINIA DECEMBER, 2011 JANUARY, 2012 1 HAZARDOUS MATERIALS BUILDING INSPECTION

More information

MIE - H&S WHMIS

MIE - H&S WHMIS MIE - H&S - 07 - WHMIS Please watch this video first. WHMIS WHMIS: What Does It Mean? The Workplace Hazardous Materials Information System WHMIS is part of your right to know about the hazards of the chemicals

More information

Asbestos Management Program April 27, 2017

Asbestos Management Program April 27, 2017 Asbestos Management Program April 27, 2017 1. INTRODUCTION 1.1. Purpose Indiana University Environmental Health and Safety (IUEHS) has developed this Program to identify practices and procedures for the

More information

Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina

Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina Prepared for: Northside Development Group 410 Magnolia Street Spartanburg, South Carolina Prepared by: Apex Environmental

More information

Velma F Thomas Early Childhood Center

Velma F Thomas Early Childhood Center Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Building Inspection Report

Building Inspection Report Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941

More information

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work: 125 Syndicate Avenue, Thunder Bay, Ontario Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:.1 Removing asbestos-containing transite

More information

Report of. Asbestos Survey

Report of. Asbestos Survey Report of Asbestos Survey of Curtis Block and Marlowe Buildings 14501, 14505, 14509, 14511 & 14515 Detroit Avenue and 1412 Marlowe Avenue Lakewood, Ohio 44107 Prepared for City of Lakewood 12650 Detroit

More information

Asbestos & Lead Based Paint Assessment City of Anderson 220 Wardlaw Street Anderson, South Carolina 29624

Asbestos & Lead Based Paint Assessment City of Anderson 220 Wardlaw Street Anderson, South Carolina 29624 Asbestos & Lead Based Paint Assessment City of Anderson 220 Wardlaw Street Anderson, South Carolina 29624 Prepared for: City of Anderson Community Development Department 601 South Main Street Anderson,

More information

Asbestos. Asbestos is a naturally occurring fibrous mineral that is mined from the earth and

Asbestos. Asbestos is a naturally occurring fibrous mineral that is mined from the earth and Asbestos What is asbestos? Asbestos is a naturally occurring fibrous mineral that is mined from the earth and found in many parts of the world. Its composition is such that it can be separated into smaller

More information

FINAL REPORT. Asbestos-Containing Building Material Assessment. Toronto Catholic District School Board

FINAL REPORT. Asbestos-Containing Building Material Assessment. Toronto Catholic District School Board FINAL REPORT Asbestos-Containing Building Material Assessment Toronto Catholic District School Board Regina Mundi Catholic School, 70 Playfair Avenue North York, Ontario PROJECT NO. 1025760 PROJECT NO.

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

EPA s Lead Program Rule At-A-Glance

EPA s Lead Program Rule At-A-Glance EPA s Lead Program Rule At-A-Glance FLOW CHART 1: Do the Requirements Apply to the Renovation? If you will be getting paid to do work that disturbs painted surfaces in a pre-1978 home, apartment building,

More information

DP ASBESTOS MANAGEMENT

DP ASBESTOS MANAGEMENT DP 057 1997-12-03 ASBESTOS MANAGEMENT Table of Contents 1. Background 2. Policy 3. Scope 4. Definitions 5. Roles and Responsibilities 6. Guidelines 1. Implementation 2. Monitoring 7. Procedures 8. Compliance

More information

National Guidance: Best Management Practices for Preparing Vessels Intended to Create Artificial Reefs

National Guidance: Best Management Practices for Preparing Vessels Intended to Create Artificial Reefs U.S. Environmental Protection Agency U.S. Maritime Administration This document is one section from the National Guidance: Best Management Practices for Preparing Vessels Intended to Create Artificial

More information

Asbestos/Lead Paint Survey

Asbestos/Lead Paint Survey Asbestos/ Survey At: Camp Lejeune Bldg. 500 Repair Indoor Physical Fitness Center Prepared for: The Walker Group Architecture Inc. PO Box 541 New Bern, NC 28563 PEI Project No.: Walker Group Project No.:

More information

PCBs in Building Materials. John Gorman Jim Haklar USEPA

PCBs in Building Materials. John Gorman Jim Haklar USEPA PCBs in Building Materials John Gorman Jim Haklar USEPA PCBs in Building Materials What are PCBs Sources of PCBs in Building Materials Regulatory Requirements Levels of PCBs Found Removal & Clean-up Standards

More information

UI Procedures for Asbestos Management

UI Procedures for Asbestos Management UI Procedures for Asbestos Management The University of Iowa Rev.10/22/08, 10/15/09 These procedures apply to employees and contractors involving the identification, work on, removal, or repair of asbestos-containing

More information

ASBESTOS BUILDING INSPECTION

ASBESTOS BUILDING INSPECTION ASBESTOS BUILDING INSPECTION LOCATION: BURT HALL 2651 SW ORCHARD AVENUE CORVALLIS, OREGON 97331 NOVEMBER 28, 2008 FORENSIC ANALYTICAL PROJECT NO. PJ6263 PREPARED FOR: OREGON STATE UNIVERSITY 127 OAK CREEK

More information

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING WWW.STOPWASTE.ORG New Addition Consider the following green remodeling options in a new addition.

More information

Asbestos Inspection Cover Letter

Asbestos Inspection Cover Letter Asbestos Inspection Cover Letter Date Issued: January 27, 2016 Site Name/Location Residential Structure 4 Cauthen Street Rock Hill, South Carolina Asbestos Inspection Performed For Hank Williams Right

More information

SURVEY FINDINGS Building: 1101

SURVEY FINDINGS Building: 1101 SURVEY FINDINGS Building: 1101 Friable ACM identified DESCRIPTION LOCATION Date Quantity No friable ACM records found in database Non-friable ACM identified DESCRIPTION LOCATION Date Quantity ROOFING SEALANT,

More information

Demolition Plan A1 A3. Scale: 3/32" = 1'-0" Arch. Men N.I.C. Elev. Lobby. Stairs N.I.C. N.I.C. Women N.I.C. Issued for Tender.

Demolition Plan A1 A3. Scale: 3/32 = 1'-0 Arch. Men N.I.C. Elev. Lobby. Stairs N.I.C. N.I.C. Women N.I.C. Issued for Tender. inc. 400-7 avenue edmonton, alberta, canada tr y t: (780) 48 47 f: (780) 48 00 e: lesnider@shaw.ca 4 door to North Common Corridor doors to door to F. H. C. Men Women ELEC/TEL UP Stairs DN F. H. C. DN

More information

patersongroup Phase I - Environmental Site Assessment 450 Churchill Avenue North Ottawa, Ontario Prepared For Kitchissippi United Church March 8, 2010

patersongroup Phase I - Environmental Site Assessment 450 Churchill Avenue North Ottawa, Ontario Prepared For Kitchissippi United Church March 8, 2010 Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing 450 Churchill Avenue North Building Science Prepared For Kitchissippi United Church

More information

DIVISION 02 SELECTIVE DEMOLITION

DIVISION 02 SELECTIVE DEMOLITION DIVISION 02 SELECTIVE DEMOLITION SECTION 02 41 19 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Demolition and removal of selected portions of a building.

More information

Land Reclamation Site Siting and Application Guidelines

Land Reclamation Site Siting and Application Guidelines Department of Environment and Local Government Land Reclamation Site Siting and Application Guidelines Rationale In an effort to reduce the cost associated with the transportation of demolition wastes,

More information

Asbestos Management Plan

Asbestos Management Plan Asbestos Management Plan Management Plan Statement The following management plan has been produced and will be implemented so that the risks associated with known or presumed asbestos containing materials

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 Department Title: Safety Department Page: 2 Department Title: Safety Department Page:

More information

Asbestos Awareness Program

Asbestos Awareness Program Safety Manual 1 of 9 Safety Manual Sect: 1.0 Purpose 2.0 Scope Rel. Date: Last Review: This program covers Ardent policy related to asbestos, either discovered or suspected in the workplace. Ardent recognizes

More information

Limited Hazardous Materials Survey Report

Limited Hazardous Materials Survey Report Limited Hazardous Materials Survey Report Contra Costa Community College Applied Arts Building Chiller Replacement Project 2600 Mission Bell San Pablo, California RGA Project No: R1167404 June 29, 2016

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

FINAL REPORT. Asbestos-Containing Building Material Assessment. Toronto Catholic District School Board

FINAL REPORT. Asbestos-Containing Building Material Assessment. Toronto Catholic District School Board FINAL REPORT Asbestos-Containing Building Material Assessment Toronto Catholic District School Board Loretto Abbey Secondary School 101 Mason Boulevard Toronto, ONTARIO PROJECT NO. 1025760 PROJECT NO.

More information

Final Asbestos Inspection Report and Lead Paint Survey

Final Asbestos Inspection Report and Lead Paint Survey Final Asbestos Inspection Report and Lead Paint Survey Proposed Retail Takeover, Store #3178-00 2444 East Powell Boulevard Gresham, Multnomah County, Oregon October 7, 2011 Terracon Project No. 82117017

More information

PREPARED FOR: City of Beverly Hills 345 North Foothill Road Beverly Hills, California 90210

PREPARED FOR: City of Beverly Hills 345 North Foothill Road Beverly Hills, California 90210 HAZARDOUS BUILDING MATERIAL SURVEY BEVERLY GARDENS PARK RESTROOM STRUCTURE SANTA MONICA BOULEVARD AND NORTH BEVERLY DRIVE BEVERLY HILLS, CALIFORNIA 90210 PREPARED FOR: City of Beverly Hills 345 North Foothill

More information

Report No: ACM October 29, 2012

Report No: ACM October 29, 2012 PbO3 ENVIRONMENTAL INCORPORATED TESTING & SVC. CO. Report No: ACM-0223-10-29-12-022 October 29, 2012 Client: Lunacon Construction Group 16890 South Dixie Highway Miami, Florida 33157 Attn: Ozzie Gomez

More information

Seasons Business Center New Construction!

Seasons Business Center New Construction! Seasons Business Center New Construction!...Seasons Business Center Stow, Ohio 114,188 SF of High Bay Space 32 Clear Height 80 480 ESFR Sprinklers Tax Abatement Available 8 Reinforced Concrete Floor 271

More information

SECTION UNIT PRICES. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION UNIT PRICES. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 012200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager Asbestos Management Plan Program originated: 02/2000 Last updated: 6/2015 Wendel Reece University Safety Manager TABLE OF CONTENTS I. Introduction II. Purpose III. Operations and Maintenance Asbestos Related

More information

Kitchen Remodel Estimator. Contact Info: Project Summary: Design. Demo

Kitchen Remodel Estimator. Contact Info: Project Summary: Design. Demo Kitchen Remodel Estimator Thinking about remodeling your kitchen? If you would like a free bid from Excel Builders, we have provided a list of questions that will need to be filled out with detail in order

More information

Standard Operating Procedure PCB Fluorescent Light Ballast Management

Standard Operating Procedure PCB Fluorescent Light Ballast Management Page # 1 of 5 Implementation SOP Owner Devlin Piplic Approval Standard Operating Procedure PCB Management 1. Purpose This Standard Operating Procedure (SOP) outlines the work instructions for the handling

More information

Asbestos Survey Report

Asbestos Survey Report > This report was produced in 5 seconds with PocketSurvey How long does it take you? Handheld Systems Ltd Your Address Your Town County, Post Code Email: youremail@yourdomain.com

More information

1116 Willow Pass Court DESTRUCTIVE TESTING Concord, CA SFUSD PROJECT NO SAN FRANCISCO UNIFIED SCHOOL DISTRICT

1116 Willow Pass Court DESTRUCTIVE TESTING Concord, CA SFUSD PROJECT NO SAN FRANCISCO UNIFIED SCHOOL DISTRICT SUMMARY OF HAZARDOUS MATERIALS WORK DESTRUCTIVE TESTING 1.01 GENERAL A. The San Francisco Unified School District (SFUSD) is soliciting proposals for conducting asbestos related work to support Destructive

More information

COOLIDGE SENIOR HIGH SCHOOL

COOLIDGE SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1940 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1240 ENROLLMENT 2008 652 WARD 4 PROPOSED PROGRAM CAPACITY 1100 Site Plan COOLIDGE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Guide for Asbestos Management

Guide for Asbestos Management Guide for Asbestos Management May 2017 TABLE OF CONTENTS Introduction...2 Regulatory Information...5 Asbestos Management...7 1. Asbestos Inventory...8 2. Asbestos Control Plan...16 3. Training...24 4.

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Façade Characterization Report

Façade Characterization Report Preliminary Façade Characterization Report Remediation and Deconstruction of Fiterman Hall, 30 West Broadway, New York, New York Prepared for: Dormitory Authority of the State of New York & The City University

More information

ASBESTOS INSPECTION AND LEAD TESTING REPORT FOR INSPECTORS. For

ASBESTOS INSPECTION AND LEAD TESTING REPORT FOR INSPECTORS. For ASBESTOS INSPECTION AND LEAD TESTING REPORT FOR CITY OF ROCK HILL 150 Johnston Street Rock Hill, SC 29731 (803) 448-3351 LOCATION Vacant Building 302 Sidney Street Rock Hill, South Carolina INSPECTION

More information

ASBESTOS & HAZARDOUS MATERIALS INSPECTION

ASBESTOS & HAZARDOUS MATERIALS INSPECTION ASBESTOS & HAZARDOUS MATERIALS INSPECTION of Rogers Creative and Performing Arts Middle School 5520 Colombo Street Pittsburgh, Pennsylvania Prepared for Facilities Division Pittsburgh Public Schools 1305

More information

ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps)

ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps) Los Rios Community College District Sacramento City College ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps) GENERAL This addendum forms a part

More information

Crothers Environmental Group, LLC

Crothers Environmental Group, LLC , LLC Morrisville, Vermont 05661 Phone 802-888-1936 info@crothersiaq.com June 26, 2009 Mr. Joe Aja, Project Engineer State of Vermont - Department of Buildings & General Services 5 Perry Street, Suite

More information

Asbestos-Containing Material Inspection Mount Vernon Apartments 677 West Alexandrine Street Detroit, Michigan. Mount Vernon Apartments II LDHA, LP

Asbestos-Containing Material Inspection Mount Vernon Apartments 677 West Alexandrine Street Detroit, Michigan. Mount Vernon Apartments II LDHA, LP Asbestos-Containing Material Inspection Mount Vernon Apartments 677 West Alexandrine Street Detroit, Michigan Mount Vernon Apartments II LDHA, LP February 26, 2016 Asbestos-Containing Material Inspection

More information

Training Certification Categories

Training Certification Categories Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and

More information

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 CONTENTS A. PURPOSE B. DESIGNATED RESPONSIBILITIES C. DEFINITIONS D. PROJECT SUBMITTAL PROCEDURE E. REQUIREMENTS

More information

LIMITED ASBESTOS-CONTAINING BUILDING MATERIALS SURVEY. Wal-Mart # Highway 51 North Ripley, TN ATC Project Number

LIMITED ASBESTOS-CONTAINING BUILDING MATERIALS SURVEY. Wal-Mart # Highway 51 North Ripley, TN ATC Project Number LIMITED ASBESTOS-CONTAINING BUILDING MATERIALS SURVEY Wal-Mart #0097 628 Highway 51 North Ripley, TN 38063 ATC Project Number 30.75300.0612 Prepared for: Wal-Mart Stores, Inc. Ms. Vicki Ingram Store Planning

More information

Asbestos Management Plan. Approved by TRCA Strategy Committee: May 19, 2016

Asbestos Management Plan. Approved by TRCA Strategy Committee: May 19, 2016 Asbestos Management Plan Approved by TRCA Strategy Committee: May 19, 2016 Table of Contents 1.Objectives... 3 1.1 Purpose and Scope... 3 1.2 Elements of the Asbestos Management Plan... 4 1.3 Roles and

More information

Abatement Scope of Work and Project Requirements for Library Painting Project Bay Shore Library Bret Harte Library Dana Library Long Beach, California

Abatement Scope of Work and Project Requirements for Library Painting Project Bay Shore Library Bret Harte Library Dana Library Long Beach, California for Bay Shore Library Bret Harte Library Dana Library Background Information Site/Building Owner: City of Long Beach Site Contact: The City of Long Beach Public Works Department, 333 West Ocean Blvd. Long

More information

Property Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711

Property Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711 Property Offering Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711 Executive Summary We are pleased to present an outstanding cold storage opportunity in Evansville, Indiana. Built in

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 8113.53 - SUSTAINABLE DESIGN REQUIREMENTS - GREEN GLOBES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information