Industrial Estate Authority of Thailand (IEAT) Saharatananakorn IE., Ayutthaya. Rojana IZ., Ayutthaya. Hi-Tech IE., Ayutthaya

Size: px
Start display at page:

Download "Industrial Estate Authority of Thailand (IEAT) Saharatananakorn IE., Ayutthaya. Rojana IZ., Ayutthaya. Hi-Tech IE., Ayutthaya"

Transcription

1 Saharatananakorn IE., Ayutthaya Rojana IZ., Ayutthaya Hi-Tech IE., Ayutthaya Factory Land IZ., Ayutthaya Bang Pa-In IE., Ayutthaya Navanakorn IZ., Pathum Thani Bangkadi IP., Pathum Thani

2 No Site Total Area (Rais) Total Factories Investment Cost (MB.) Manpower Saharatananakorn, ,34 4,696 Hi-Tech, ,034 56,096 Bang Pa-In, ,0 56,887 Rojana 9, ,504 55,957 Factory Land 70 84,360 3,65 Navanakorn 6, ,000 8,3 Bangkadi, 36 66,000 30,000, ,44 445, 3

3 6

4 7 8

5 9

6 ) High Water Level & Overflow ) High Water Pressure & Land Slide Last Design Criteria. Provide Retention Pond and Dewatering Station for Drainage with Spare Pumps and Serviced Road (Compacted Clay 0.0 m. thickness /.50 m. width min.) for Maintenance. Flood Protection Dike Must Higher than 0 Years Period Max. Flood Level ( m. free board) Width of Road not less than.50 m. Compacted Clay 0.0 m. thickness Not Disturb Water Way Revised Design Criteria. Provide Retention Pond and Dewatering Station for Drainage with Spare Pumps Within hrs. Drainage Capacity Capacity and Efficiency of Spare Pumps not less than Working Pumps Provide Serviced Road surround Retention Pond. Flood Protection Dike Must Higher than 70 Years Period Max. Flood Level ( m. free board) Strong Structure and Resist Hydro- Pressure Width of Road not less than.50 m. Not Disturb Water Way included Quantity and Direction

7 Last Design Criteria 3. In case of Fill Earth Cover the Entire Area, Allow 0.50 m. Higher than Max. Flood Level Revised Design Criteria 3. In case of Fill Earth Cover the Entire Area, Allow 0.50 m. Higher than 70 Years Period Max. Flood Level 4. Designing of Dewatering System must be considered and concerned with the capacity and direction of outer water way 5. Provide periodic maintenance 6. Provide Water monitoring system, Early Warning System and Emergency Response Plan for Flood Protection 7. Annually Inspection and Report 3 TYPE I : EARTH DIKE WITH.50 m. ACCESS ROAD 3.5m.5 m Road +5.4mMSL Highest FloodLevel =+4.9 mmsl Approx. +.4mMSL NewFill.5 Old Fill Geocell (withstones) 4

8 TYPE II : EARTH DIKE WITH RC FLOOD WALL +6.00m MSL Design Flood El.: +5.00m MSL 0 Flood El.: +4.8m MSL Concrete Slab Dike RC Floodwall Dike Crest: +4.40m MSL Precast Concrete Panel Service Road Concrete Cut-off Trench Foundation Soil (Clay) Toe Drain 5 TYPE III : EARTH DIKE WITH CONCRETE RETAINING WALL 3.9m Approx. +.4 mmsl NewFill.5m Road Old Fill +5.4 mmsl Precast Concrete Wall Flat Concrete Sheet Pile Highest Flood Level = +4.9 mmsl Geocell (withstones) 6

9 TYPE IV : FLOOD WALL 7 No. Site Total Factories Operated Fully Partly Total % Saharatananakorn Hi-Tech Bang Pa-In Rojana Factory Land Navanakorn Bangkadi Total

10 Not Operated 684 Operated 0

11 +6.00m MSL Design Flood El.: +5.00m MSL 0 Flood El.: +4.8m MSL Concrete Slab Concrete Cut-off Trench RC Floodwall Dike Crest: +4.40m MSL Precast Concrete Panel Dike Foundation Soil (Clay) Toe Drain Service Road No. 3 Site Saharatananakorn Hi-Tech Bang Pa-In Cost (M ) Started Planned Finish Temporary Dike Construction Feb. 0 3 Aug Feb. 0 3 Aug. 0 4 Rojana, Feb. 0 3 Aug Navanakorn Bangkadi, Feb. 0 3 Aug Mar. 0 3 Aug. 0 Total 5,5.9

12 % WORK PROGRESS REPORT Temporary Dike Construction Project Saha Rattana Nakorn Client : Industrial Estste Authority of Thailand(IEAT) and Saha Rattana Nakorn Co.,LTD Contractor : st Development Division, st Thai Army Area, Royal Thai Army Update to : 9 Sep Contract Start : 7 Aug 0 Finish : 5 October 0 ; 60 Days Report By : IEAT Item Description Quantity Duration 0 Working % Aug Sep Oct Schedule Actual Weight Days Start Finish Start Finished % Progession Mobilization & Preparation L.S. 5 3% 7 Aug 3 Aug 7 Aug 3 Aug 00% Surveying & Clearing 48,000 sq.m. 5 0% Sep 5 Sep 7 Aug Excavation Removed and 3 30,375 cu.m. 5 0% 4 Sep 8 Sep 7 Aug Compaction Existing Dike Fill and Compaction Dike 4 33,030 cu.m. 40 6% 6 Sep 5 Oct 9 Sep Embankment 5 Big Bag Installtion on Dike,6 Pcs 45 9% 9 Sep 3 Oct 4 Sep 97.9% % 75% 50% 6 Frontage Road Improvement 4,774 cu.m. 0 3% Oct 0 Oct Planned 4% 7 Finishing & Modification 5,00 cu.m. 0 6% Oct 0 Oct Actual 9.33% 5% 8 Demobilization & Recovery L.S. 5 3% Oct 5 Oct % 7 Aug 5 Oct Planned Progression Actual Progression 0% Current % 8% 6% 7% 6% 3% 0% Accumulate % 8% 34% 5% 67% 90% 00% Current % 3.50%.37% 3.46% Accumulate % 3.50% 5.87% 9.33% Plan 4.00% Actual 9.33% Delayed.67% 3 5m 4m Local Road +5.4 mmsl Highest Flood Level = +4.9 mmsl Approx. +.4 mmsl New Fill.5 Old Fill Geocell (with Stones) 4

13 3.9m Approx. +.4mMSL NewFill.5m Road OldFill +5.4mMSL Highest FloodLevel =+4.9mMSL Precast ConcreteWall Geocell (withstones) Flat Concrete SheetPile m MSL Design Flood El.: +5.00m MSL 0 Flood El.: +4.8m MSL Concrete Slab Concrete Cut-off Trench RC Floodwall Dike Crest: +4.40m MSL Precast Concrete Panel Dike Foundation Soil (Clay) Toe Drain Service Road 6

14 3.9 m Approx. +.4 m MSL New Fill.5 m Road Old Fill +5.4 m MSL Highest Flood Level = +4.9 m MSL Precast Concrete Wall Geocell (with Stones) Flat Concrete Sheet Pile 7 8

15 No. Site Cumulative Planed Progress (%) Cum. Existing Progress (%) at 7 Sep 0 Compare to Plan Cum. Existing Progress (%) at 30 Aug 0 Compare to Last Update Saharatananakorn 4.00% 9.33% -.67% 3.00% +6.33% Hi-Tech 94.50% 90.9% % 85.0% +5.7% 3 Bang Pa-In 4 Rojana 66.96% 75.00% +7.39% 7.00% +3.00% 00.00% 98.00% -3.00% 94.00% +4.00% 5 Navanakorn 00.00% 97.83% -3.00% 95.00% +.83% 6 Bangkadi 93.97% 84.08% -3.99% 77.9% +6.6% 9 30

WAIKOLOA RESERVOIR NO. 1 EARTHQUAKE REPAIR PROJECT Information Sheet

WAIKOLOA RESERVOIR NO. 1 EARTHQUAKE REPAIR PROJECT Information Sheet March 5, 2015 WAIKOLOA RESERVOIR NO. 1 EARTHQUAKE REPAIR PROJECT Information Sheet Overview The purpose of this Project is to repair damages to the Waikoloa Reservoir No. 1 which were sustained during

More information

Open Trench Construction Plan Review The open trench construction plan review involves the following general investigative elements:

Open Trench Construction Plan Review The open trench construction plan review involves the following general investigative elements: TNC Fisher Slough Final Design and Permitting Subject: Inverted Siphon Construction Feasibility To: From: Jenny Baker (TNC) Dave Olson (DD3) Brian Olson (DD17) Bob Boudinot Skagit County David Cline (Tetra

More information

Section 704. STEEL SHEET PILING AND COFFERDAMS

Section 704. STEEL SHEET PILING AND COFFERDAMS Section 704. STEEL SHEET PILING AND COFFERDAMS 704.03 704.01. Description. This work consists of the following: A. Providing and driving permanent steel sheet piling, B. Designing, providing, installing,

More information

q Item meets standard Project ID: X Item not acceptable Contractor: N/A Item not applicable Inspector: C Item requires engineer s cert.

q Item meets standard Project ID: X Item not acceptable Contractor: N/A Item not applicable Inspector: C Item requires engineer s cert. SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION q Item meets

More information

Science and Technology Adaptation for Community Water Resource Management Jittiporn Chantarojsiri

Science and Technology Adaptation for Community Water Resource Management Jittiporn Chantarojsiri Science and Technology Adaptation for Community Water Resource Management Jittiporn Chantarojsiri Hydro and Agro Informatics Institute (HAII), Ministry of Science and Technology, Thailand HAII s Mission

More information

Lake Houston Dam Comprehensive Evaluation of an Ambursen Dam

Lake Houston Dam Comprehensive Evaluation of an Ambursen Dam Lake Houston Dam Comprehensive Evaluation of an Ambursen Dam ASDSO September 10, 2008 John Rutledge - Freese & Nichols, Inc. Chuck Easton - Freese & Nichols, Inc. Janis Murphy - Freese & Nichols, Inc.

More information

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION NEW CASTLE COUNTY DEPARTMENT OF LAND USE ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION For Permanent Structures, pursuant to Delaware Pond Code 378 and Delaware Sediment and

More information

UPPER MISSISSIPPI RIVER COMPREHENSIVE PLAN

UPPER MISSISSIPPI RIVER COMPREHENSIVE PLAN UPPER MISSISSIPPI RIVER COMPREHENSIVE PLAN APPENDIX D COST ESTIMATES Prepared by the U.S. Army Corps of Engineers Rock Island, St. Louis, and St. Paul Districts March 2008 UPPER MISSISSIPPI RIVER COMPREHENSIVE

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

CROSSTOWN LRT Construction Liaison Committee November 1, 2017

CROSSTOWN LRT Construction Liaison Committee November 1, 2017 CROSSTOWN LRT Construction Liaison Committee November 1, 2017 Avenue Construction Updates 2 Avenue Station: What to Expect November & December 2017 Short Term Activities Area Duration Connection borehole

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station By Eric Li - GCG (Asia) Presented to the HKIE Geotechnical Division 18 th June 2008 Sheung Wan

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

Alternative No. 1 Total Cost DRAFT

Alternative No. 1 Total Cost DRAFT OPINION OF PROBABLE PROJECT COSTS SUMMARY OF ALL THREE ALTERNATIVE ALIGNMENTS Item Description Alternative No. 1 Total Cost Alternative No. 2 Total Cost Alternative No. 3 Total Cost Design Phase 1. Preliminary

More information

Storm Drain Inlet Protection

Storm Drain Inlet Protection Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

5.3 Flood Protection Plan

5.3 Flood Protection Plan 5.3 Flood Protection Plan 5.3.1 Existing Conditions (1) Land Elevation The majority of land in the study area is characterized as undeveloped land such as agricultural, unused land and forests which have

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

TRENCHING AND EXCAVATION

TRENCHING AND EXCAVATION TRENCHING AND EXCAVATION The following guide is an aid intended for students who have completed the ClickSafety training course or module associated with Trenching and Excavation. This guide is a resource

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

Sector: AGRICULTURE Sub-Sector: IRRIGATION Activity: Maintenance and Rehabilitation of Irrigation projects. Qty. in unit

Sector: AGRICULTURE Sub-Sector: IRRIGATION Activity: Maintenance and Rehabilitation of Irrigation projects. Qty. in unit ANNEX AGR I - 7 Sector: AGRICULTURE Sub-Sector: IRRIGATION Activity: Maintenance and Rehabilitation of Irrigation projects Priority within the Sector: First Total requested fund : Code Item Description

More information

Chapter A-15. CID-MO Structural Analysis

Chapter A-15. CID-MO Structural Analysis Kansas Citys, Missouri and Kansas Flood Risk Management Feasibility Study Engineering Appendix to the Final Feasibility Study Chapter A-15 CID-MO Structural Analysis Chapter A-15 CID-MO Structural Analysis

More information

Storm Drain Inlet Protection for Construction Sites (1060)

Storm Drain Inlet Protection for Construction Sites (1060) Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain

More information

Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP)

Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP) Tararua District Council Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP) NOTE: This is a draft ESCP in current preparation. Additional and updated information will

More information

Experiences on embankment fill in land expressway over soft ground

Experiences on embankment fill in land expressway over soft ground Second International Seminar on the Design & Construction of the Second Penang Bridge Experiences on embankment fill in land expressway over soft ground Prepared by ; AZMI MADMARJUKI Project Location JAMBATAN

More information

Installation and Maintenance of Erosion Control BMPs

Installation and Maintenance of Erosion Control BMPs Installation and Maintenance of Erosion Control BMPs Or Common BMPs Applications Specifications Installation Problems Maintenance Utility Design Professionals Clarifications, proactive problem solving

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 2 SPECIAL BENCHING AND SIDEHILL EMBANKMENT FILLS Geotechnical Bulletin GB2

More information

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES SECTION 02215 EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES PART 1 - GENERAL 1.1 DESCRIPTION: This section includes materials, testing, and installation of earthwork for excavations, fills, and

More information

Builder s enviro guide

Builder s enviro guide BC3337 Builder s enviro guide Preventing pollution from your building project Find out more: phone Auckland Council on 09 301 0101 or visit aucklandcouncil.govt.nz Contents Why compliance matters 2 The

More information

INTERLOCK BETWEEN PARTICLES AT EACH PERFORATION

INTERLOCK BETWEEN PARTICLES AT EACH PERFORATION for Storm Water Management RUN OFF CONTROLS Porous Parking & Vehicle Access Cellular Confinement Systems (CCS) A Cellular Confinement System (CCS) is an engineered, expandable, polyethylene, honeycomb-like

More information

TEMPORARY SEDIMENT TRAP CODE

TEMPORARY SEDIMENT TRAP CODE ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY SEDIMENT TRAP CODE 960 Source: DEFINITION A small temporary stormwater storage structure designed to trap sediment. PURPOSE The purpose of this practice

More information

Estimate FOR THE SEPTIC TANK

Estimate FOR THE SEPTIC TANK Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

SECTION STORM DRAIN

SECTION STORM DRAIN PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures. 1-02 RELATED SECTIONS A. Division 00 Contract

More information

Table of Contents for Guide Specifications

Table of Contents for Guide Specifications Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan

More information

1.364 ADVANCED GEOTECHNICAL ENGINEERING HOMEWORK No. 5

1.364 ADVANCED GEOTECHNICAL ENGINEERING HOMEWORK No. 5 .364 ADVANCED GEOTECHNICAL ENGINEERING HOMEWORK No. Due: Friday December 2. This question concerns the stability of an open slope cutting that will be used to provide construction access for a 3.2m deep

More information

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions) Adams Co. Conservation District 670 Old Harrisburg Road, Suite 201 Gettysburg, PA 17325 Telephone: 334-0636 Fax: 337-0730 www.adamscounty.us Erosion and Sediment Pollution Control Guidelines for Residential

More information

Design and construction of an immersed concrete tunnel using an integrated dock facility

Design and construction of an immersed concrete tunnel using an integrated dock facility Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Design and construction of an immersed concrete tunnel using an integrated dock facility

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

LANDSCAPE RETAINING WALLS

LANDSCAPE RETAINING WALLS SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9070 - Landscape Retaining Walls LANDSCAPE RETAINING WALLS PART - GENERAL.0 SECTION INCLUDES A. Modular Block Retaining Walls

More information

Geosynthetics Cost/Benefit Analysis for the Development of a Landfill Expansion Module in Monterey, California

Geosynthetics Cost/Benefit Analysis for the Development of a Landfill Expansion Module in Monterey, California The First Pan American Geosynthetics Conference & Exhibition 2-5 March 2008, Cancun, Mexico Geosynthetics Cost/Benefit Analysis for the Development of a Landfill Expansion Module in Monterey, California

More information

PAPERWORK REDUCTION ACT A. GENERAL

PAPERWORK REDUCTION ACT A. GENERAL U.S. DEPARTMENT OF HOMELAND SECURITY - FEDERAL EMERGENCY MANAGEMENT AGENCY RIVERINE STRUCTURES FORM O.M.B No. 1660-0016 Expires: 12/31/2010 PAPERWORK REDUCTION ACT Public reporting burden for this form

More information

Dry Stacking of Cycloned Tailings

Dry Stacking of Cycloned Tailings Dry Stacking of Cycloned Tailings W. Lugão - VOGBR, Brazil M. Almeida - VOGBR, Brazil A. Guimarães - VOGBR, Brazil F. Magalhães - VOGBR, Brazil S. Mohallem - ARCELORMITTAL, Brazil Introduction Tailings

More information

Sediment Basin. Fe= (Depends on soil type)

Sediment Basin. Fe= (Depends on soil type) 3.9 Sediment Control Description: A sediment basin is an embankment with a controlled outlet that detains stormwater runoff, resulting in the settling of suspended sediment. The basin provides treatment

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No Environmental Resources Management January 13, 2017 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0352436 CityCentre Four 840 West Sam Houston Parkway North, Suite 600 Houston,

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016 SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri September 21, 2016 CONTENT Introduction Potential in Southeast Asia Challenges in Small Hydro Main Design Steps (Bad) Examples

More information

A. BILL OF QUANTITIES FOR SANITARY SEWER

A. BILL OF QUANTITIES FOR SANITARY SEWER Note: Unit prices of BoQ items shall include the execution of all small and unforeseen works not covered by BoQ, but that are necessary to be carried out during construction for smooth process of works

More information

CHOLLA POWER PLANT BOTTOM ASH POND INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CH_Inflowflood_003_

CHOLLA POWER PLANT BOTTOM ASH POND INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CH_Inflowflood_003_ CHOLLA POWER PLANT BOTTOM ASH POND INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CH_Inflowflood_003_20161017 This Inflow Design Flood Control System Plan (Plan) document has been prepared specifically for the

More information

Lecture 7 BALLAST & SUBGRADE. Dr. Charisma Choudhury. April 2011

Lecture 7 BALLAST & SUBGRADE. Dr. Charisma Choudhury. April 2011 Transportation Engineering II: Highway Design & Railways Lecture 7 BALLAST & SUBGRADE Dr. Charisma Choudhury April 2011 Ballast Functions Provide a hard and level bed for sleepers Hold sleepers in place

More information

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES RFP/GRC/LSV/2017-003: RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES 1/7 The Contractor shall consider in his price all costs or expenses of all requirements stipulated

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

Case study analysis for the successful completion and sustainable construction of infrastructure projects

Case study analysis for the successful completion and sustainable construction of infrastructure projects Environmental Impact II 373 Case study analysis for the successful completion and sustainable construction of infrastructure projects I. Othman, M. Napiah & N. S. Potty UniversitiTeknologi PETRONAS, Malaysia

More information

Topic: Site Formation

Topic: Site Formation Topic: Site Formation Presentation prepared by Raymond Wong February 2006 Purpose of site formation is to prepare a piece of land in order to: Accommodate building/s or other facilities which will be placed

More information

New Hope Crushed Stone. Monthly Update Solebury Communications Group October 2017

New Hope Crushed Stone. Monthly Update Solebury Communications Group October 2017 New Hope Crushed Stone Monthly Update Solebury Communications Group October 2017 Tom Wolf, Governor Patrick McDonnell, Secretary October 2017 Project Status STATUS AS OF: October 31, 2017 PROJECT START

More information

HOLDER CONSTRUCTION COMPANY Superintendents Weekly Activity Report #92 Douthit Hills Student Community, Clemson University Project Joe Jett

HOLDER CONSTRUCTION COMPANY Superintendents Weekly Activity Report #92 Douthit Hills Student Community, Clemson University Project Joe Jett SAFETY» Total Man Hours Worked This Week: 19935» Total Man Hours on Project: 689727» Crafts On Project This Week: 24» OSHA Recordable Rate: 0 November 13, 2016 Page 1 CURRENT CONSTRUCTION ACTIVITIES East

More information

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018 STANDARD CONSTRUCTION DETAILS REVISED - JANUARY 2018 TABLE OF CONTENTS STORM WATER POLLUTION PLAN NOTES - - - - - - - - - - - - - - - - - - - - - - - - - SD-EC01 SILT FENCE NOTES - - - - - - - - - - -

More information

RIGID INCLUSIONS. Rigid Inclusions offer an economical approach for building on sites underlain by soft soil.

RIGID INCLUSIONS. Rigid Inclusions offer an economical approach for building on sites underlain by soft soil. H A Y W A R D B A K E R I N C. RIGID INCLUSIONS Rigid Inclusions offer an economical approach for building on sites underlain by soft soil. Above: HBI installed Rigid Inclusions on a congested downtown

More information

SECTION GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS

SECTION GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS SECTION 2100 - GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS The City of Lee s Summit hereby adopts Section 2100 of the Kansas City Metropolitan Chapter of APWA Construction

More information

2.1 Backfill - General

2.1 Backfill - General 2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

Modular Sediment Barriers (Instream)

Modular Sediment Barriers (Instream) Modular Sediment Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

Dewatering & Foundations. Water. Low tech

Dewatering & Foundations. Water. Low tech Dewatering & Foundations Water It seems every time we dig a hole it fills up with rainwater, or groundwater.if we re lucky we hit an underground river or spring that keeps the hole nice and wet. But a

More information

Mill Pond Dam Modifications Feasibility Study

Mill Pond Dam Modifications Feasibility Study May 1, 2013 Mill Pond Dam Modifications Feasibility Study Village of Goodrich, MI Table of Contents 1. Background...1 1.1 Michigan Department of Environmental Quality (MDEQ) Regulation Dam Safety Unit

More information

PART 1 GENERAL REQUIREMENTS

PART 1 GENERAL REQUIREMENTS PART 1 GENERAL REQUIREMENTS Contract Closeout Plan 110 Arrow diagram for project close-out...3 Erosion Control 121 Straw bale barrier... 5 122 Silt fence... 7 123 Diversion dike... 9 124 Inlet protection...

More information

A.2.a Random Riprap... Table

A.2.a Random Riprap... Table 3601 RIPRAP MATERIAL 3601.1 SCOPE Provide stone and filter layer material for use in random or hand-placed riprap, gabion, and revet mattress construction. 3601.2 REQUIREMENTS A Stones A.1 Quality Provide

More information

Scott Hockly. Environmental Management of an Inner City Roading Project

Scott Hockly. Environmental Management of an Inner City Roading Project Scott Hockly Environmental Management of an Inner City Roading Project Overview National War Memorial Park (Pukeahu) The big picture The Alliance Constraints Memorial Park Empowering Act Approach Reality

More information

POST CLOSURE PLAN. CFR (d) GERS Landfill. Pirkey Plant Hallsville, Texas. October, 2016

POST CLOSURE PLAN. CFR (d) GERS Landfill. Pirkey Plant Hallsville, Texas. October, 2016 POST CLOSURE PLAN CFR 257.104(d) Landfill Pirkey Plant Hallsville, Texas October, 2016 Prepared for : Southwest Electric Power Company Pirkey Power Plant Hallsville, Texas Prepared by: American Electric

More information

Tsunami Countermeasures at Hamaoka Nuclear Power Station

Tsunami Countermeasures at Hamaoka Nuclear Power Station Tsunami Countermeasures at Hamaoka Nuclear Power Station Reference Reactor No. 5 Reactor No. 4 Reactor No. 3 Reactor No. 2 Reactor No. 1 March 16, 2012 2011 Chubu Electric Power Co., Inc. All rights reserved.

More information

UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ. Original Issue Bamyan MAC Site Services - Phase 1 Bamyan, Bamyan, Afghanistan

UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ. Original Issue Bamyan MAC Site Services - Phase 1 Bamyan, Bamyan, Afghanistan UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ Original Issue Bamyan MAC Site Services Phase Bamyan, Bamyan, Afghanistan Project Components:. Site Services Phase NOTICE TO ALL BIDDERS COMPLETE

More information

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT SECTION 322 - STORM DRAINAGE AND STORMWATER MANAGEMENT 322.01 DESCRIPTION Work includes all labor, material and equipment to construct storm drain systems and stormwater management facilities, including

More information

6 Preliminary Assessment of Construction Method and Constructability Issues

6 Preliminary Assessment of Construction Method and Constructability Issues 6 Preliminary Assessment of Construction Method and Constructability Issues 6.1 Construction Approach Appendix C includes conceptual designs of the alternatives discussed below. Generally, the conceptual

More information

CHANGE OF AN OLD NAVY BASE TO A MODERN MARINA IN BOLTENHAGEN (BALTIC SEA)

CHANGE OF AN OLD NAVY BASE TO A MODERN MARINA IN BOLTENHAGEN (BALTIC SEA) CHANGE OF AN OLD NAVY BASE TO A MODERN MARINA IN BOLTENHAGEN (BALTIC SEA) Siegmund Schlie*, Bernd Opfermann** and Torsten Retzlaff*** * Heinrich Hirdes GmbH, Rostock ** b & o - Ingenieure, Hamburg ***

More information

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer

More information

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR -SQA- SCOTTISH QUALIFICATIONS AUTHORITY Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR -Module Number- 4281010 -Session-1990-91 -Superclass- TH -Title- GAS DISTRIBUTION:

More information

Planning & Building Department. Requirements for Erosion and Sediment Control

Planning & Building Department. Requirements for Erosion and Sediment Control Planning & Building Department 455 County Center, 2nd Floor Redwood City, California 94063 Tel: 540/863-4161/Fax: 650/363-4849 Mail Drop PLN122 plngbldg@smcgov.org http://planning.smcgov.org Requirements

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN Bremo Power Station CCR Surface Impoundment: North Ash Pond Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo

More information

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014 1 0 1 0 1 0 1 SECTION 1. TRENCHING BASED ON DFD MASTER SPECIFICATION DATED // P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all work, materials, labor, equipment,

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

Steps And Stairs Installation Steps In Wall - Option 1 Steps In Front of Walls - Option 2 Steps In Wall; 10 (25cm) Tread - Option 3 Step Parallel to

Steps And Stairs Installation Steps In Wall - Option 1 Steps In Front of Walls - Option 2 Steps In Wall; 10 (25cm) Tread - Option 3 Step Parallel to Steps And Stairs Installation Steps In Wall - Option 1 Steps In Front of Walls - Option 2 Steps In Wall; 10 (25cm) Tread - Option 3 Step Parallel to Wall - Option 4 Steps and Stairs Q & A E CONSTRUCTION

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL GEOTECHNICAL CONSULTANT Prepared by Checked by Approved by Mr. C Allen Dr. Derek Gay Dr. Derek Gay Signature Date Signature Date

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

Infiltration Stormwater Control Measures. Andrew R. Anderson, M.S., E.I.T. Extension Associate Engineer

Infiltration Stormwater Control Measures. Andrew R. Anderson, M.S., E.I.T. Extension Associate Engineer Infiltration Stormwater Control Measures Andrew R. Anderson, M.S., E.I.T. Extension Associate Engineer Overview of Presentation NCDENR Infiltration Devices Infiltration and the SHWT Innovative infiltration

More information

Bioreactor Landfill Design

Bioreactor Landfill Design Bioreactor Landfill Design Timothy Townsend, PhD, PE Department of Environmental Engineering Sciences University of Florida ttown@ufl.edu Bioreactor Landfill Design Modern landfill design entails many

More information

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CS 3-01 GENERAL: A. The foundation, bedding and backfill for all trenches shall conform with the requirements of the City Standard

More information

Filter Tube Barriers (Instream)

Filter Tube Barriers (Instream) Filter Tube Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

INSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN

INSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN INSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN Bates College 55 & 65 Campus Avenue Housing Lewiston, Maine Introduction The following plan outlines the anticipated inspection and maintenance procedures

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

Last Updated March 15, 2016

Last Updated March 15, 2016 CASS COUNTY, MISSOURI BUILDING CODES, ENVIRONMENTAL HEALTH AND ZONING DEPARTMENT 30508 S. West Outer Road, Harrisonville, MO 64701 P- (816) 380-8134 F- (816) 380-8130 Last Updated March 15, 2016 Information

More information

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 ) SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 ) WARNING - When unpacking SpaVault, DO NOT discard styrofoam pieces, these are not packaging materials. Step 1 Excavation Important:

More information

Lower Columbia River Pile Dike Assessment

Lower Columbia River Pile Dike Assessment Lower Columbia River Pile Dike Assessment David Gorman, PE August 2, 2011 Credits Hans R. Moritz, US Army Corps of Engineers Portland District Carl Kassebaum, AECOM Project Manager AECOM Coastal and Rivers

More information

COMBINED CONCRETE SIDEWALK AND RETAINING WALL. Comply with Division 1 - General Provisions and Covenants, as well as the following:

COMBINED CONCRETE SIDEWALK AND RETAINING WALL. Comply with Division 1 - General Provisions and Covenants, as well as the following: SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9072 - Combined Concrete Sidewalk and Retaining Wall PART 1 - GENERAL 1.01 SECTION INCLUDES COMBINED CONCRETE SIDEWALK AND RETAINING

More information

Temporary Shoring. Specifications, Applications, & Best Practices. Stephen M. (Matt) Revell, P.E. Assistant Geotechnical Engineer

Temporary Shoring. Specifications, Applications, & Best Practices. Stephen M. (Matt) Revell, P.E. Assistant Geotechnical Engineer Temporary Shoring Specifications, Applications, & Best Practices Stephen M. (Matt) Revell, P.E. Assistant Geotechnical Engineer Temporary Shoring Specifications, Applications, & Best Practices Temporary

More information

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14 Planning and Building Department 525 San Anselmo Avenue Building Division San Anselmo, CA 94960 Phone: (415) 258-4616 Fax: (415) 454-4683 GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter

More information

Sampling of Aggregates

Sampling of Aggregates Standard Method of Test for Sampling of Aggregates AASHTO Designation: T 2-91 (2000) ASTM Designation: D 75-87 (1992) є1 AASHTO T 2-91 is identical to ASTM D 75-87 (1992) є1 except that all references

More information

SAND POINT CITY DOCK REPLACEMENT ALTERNATIVES ANALYSIS REPORT

SAND POINT CITY DOCK REPLACEMENT ALTERNATIVES ANALYSIS REPORT SAND POINT CITY DOCK REPLACEMENT ALTERNATIVES ANALYSIS REPORT Prepared for: City of Sand Point 3380 C Street, Suite 205 Anchorage, Alaska 99503 Prepared by: PND Engineers, Inc. 1506 W. 36 th Avenue Anchorage,

More information

RUWAIS HOUSING COMPLEX PHASE IV CIVIL & ELECTROMECHANICAL WORKS

RUWAIS HOUSING COMPLEX PHASE IV CIVIL & ELECTROMECHANICAL WORKS AL NASR SCOPE OF WORKS: Construction of water storage tank consisting of: 3 Water storage tanks 2,641,721 gal of 42 m diameter and 7.65 m each 2300 m³ of concrete 2450 m² of water proofing external 4300

More information