1 REAFFIRMATION WITH EDITORIAL REVISION February 0 Process Industry Practices Insulation PIP Hot Service Insulation Materials and Installation Specification

2 PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort minimize the cost of process industry facilities, this Practice has been prepared from the technical requirements in the existing standards of major industrial users, contracrs, or standards organizations. By harmonizing these technical requirements in a single set of Practices, administrative, application, and engineering costs both the purchaser and the manufacturer should be reduced. While this Practice is expected incorporate the majority of requirements of most users, individual applications may involve requirements that will be appended and take precedence over this Practice. Determinations concerning fitness for purpose and particular matters or application of the Practice particular project or engineering situations should not be made solely on information contained in these materials. The use of trade names from time time should not be viewed as an expression of preference but rather recognized as normal usage in the trade. Other brands having the same specifications are equally correct and may be substituted for those named. All Practices or guidelines are intended be consistent with applicable laws and regulations including OSHA requirements. To the extent these Practices or guidelines should conflict with OSHA or other applicable laws or regulations, such laws or regulations must be followed. Consult an appropriate professional before applying or acting on any material contained in or suggested by the Practice. This Practice is subject revision at any time. Process Industry Practices (PIP), Construction Industry Institute, The University of Texas at Austin, 95 West Braker Lane (R500), Austin, Texas PIP member companies and subscribers may copy this Practice for their internal use. Changes or modifications of any kind are not permitted within any PIP Practice without the express written authorization of PIP. Authorized Users may attach addenda or overlays clearly indicate modifications or exceptions specific sections of PIP Practices. Authorized Users may provide their clients, suppliers and contracrs with copies of the Practice solely for Authorized Users purposes. These purposes include but are not limited the procurement process (e.g., as attachments requests for quotation/ purchase orders or requests for proposals/contracts) and preparation and issue of design engineering deliverables for use on a specific project by Authorized User s client. PIP s copyright notices must be clearly indicated and unequivocally incorporated in documents where an Authorized User desires provide any third party with copies of the Practice. PRINTING HISTORY Ocber 997 Issued August 007 Edirial Revision Ocber 005 Complete Revision February 0 Reaffirmation with Edirial Revision Not printed with State funds Process Industry Practices Page of

3 REAFFIRMATION WITH EDITORIAL REVISION February 0 Process Industry Practices Insulation PIP Hot Service Insulation Materials and Installation Specification Table of Contents. Introduction.... Purpose.... Scope.... References.... Process Industry Practices.... Industry Codes and Standards.... Definitions Requirements Project Scope Materials Srage and Handling of Insulation Materials.... Installation Requirements....5 Quality Plan Inspection....7 Repairs... Data Forms -D Documentation Requirements Sheet The following data forms shall be part of this Practice only if indicated on the purchaser s completed Documentation Requirements Sheet. -D Hot Service Insulation System Project-Specific Requirements -D Extent of Hot-Service Insulation -D Calcium Silicate Insulation System for Pipe and Equipment -D Expanded Perlite Insulation System for Pipe and Equipment -D Mineral Wool Preformed Pipe Sections Insulation System -D Mineral Wool Board Insulation System for Equipment -D Mineral Wool Blanket Insulation System for Pipe and Equipment -D5 Glass Fiber Preformed Pipe Sections Insulation System -D Glass Fiber Board Insulation System for Equipment -D7 Glass Fiber Blanket Insulation System for Pipe and Equipment Process Industry Practices Page of

4 PIP REAFFIRMATION WITH EDITORIAL REVISION Hot Service Insulation Materials and Installation Specification February 0 -D Cellular Glass Block and Fabricated Sections Insulation System -D9 Polyisocyanurate Insulation System -D0 Ceramic Fiber Blanket Insulation System -D Glass Fiber Needled Blanket Insulation System -D Flexible Elasmeric Cellular Thermal Insulation System for Pipe and Equipment -D Rigid Cellular Phenolic Thermal Insulation System for Pipe and Equipment -D User-Defined Thermal Insulation System for Pipe and Equipment -F Calcium Silicate Insulation for HC ASTM C5 Type I (inches) -F Calcium Silicate Insulation for PP ASTM C5 Type I (inches) -F Calcium Silicate Insulation Combined Table ASTM C5 Type I (inches) -F Cellular Glass Insulation for HC ASTM C55 (inches) -F5 Cellular Glass Insulation for Pp ASTM C55 (inches) -F Cellular Glass Insulation Combined Table ASTM C55 (inches) -F7 Fiberglass Insulation for HC ASTM C57, Type / C, Type I (inches) -F Fiberglass Insulation for PP ASTM C57, Type / C, Type I (inches) -F9 Fiberglass Insulation Combined Table ASTM C57, Type / C, Type I (inches) -F Mineral Wool Insulation for HC ASTM C57, Type II or III / C, Type IVB (inches) -F Mineral Wool Insulation for PP ASTM C57, Type II or III / C, Type IVB (inches) -F Mineral Wool Insulation Combined Table ASTM C57, Type II or III / C, Type IVB (inches) -F Expanded Perlite Insulation for HC ASTM C (inches) -F Expanded Perlite Insulation for PP ASTM C (inches) -F5 Expanded Perlite Insulation Combined Table ASTM C (inches) -F Polyisocyanurate for HC ASTM C59, Type II or IV (inches) -F7 Polyisocyanurate Insulation for PP ASTM C59, Type II or IV (inches) -F Polyisocyanurate Insulation Combined Table ASTM C59, Type II or IV (inches) -F9 Elasmeric Foam Insulation for HC ASTM C5, Grade (inches) -F0 Elasmeric Foam Insulation for PP ASTM C5, Grade (inches) -F Elasmeric Foam Insulation Combined Table ASTM C5, Grade (inches) -F Phenolic Foam Insulation for HC ASTM C, Type III, Grade (inches) -F Phenolic Foam Insulation for PP ASTM C, Type III, Grade (inches) -F Phenolic Foam Insulation Combined Table ASTM C, Type III, Grade (inches) -F5 User-Defined Insulation for HC (inches) -F User-Defined Insulation for PP (inches) -F7 User-Defined Insulation Combined Table (inches) -FM Calcium Silicate Insulation for HC ASTM C5 Type I (mm) -FM Calcium Silicate Insulation for PP ASTM C5 Type I (mm) -FM Calcium Silicate Insulation Combined Table ASTM C5 Type I (mm) -FM Cellular Glass Insulation for HC ASTM C55 (mm) -FM5 Cellular Glass Insulation for PP ASTM C55 (mm) -FM Cellular Glass Insulation Combined Table ASTM C55 (mm) -FM7 Fiberglass Insulation for HC ASTM C57, Type / C, Type I (mm) -FM Fiberglass Insulation for PP ASTM C57, Type / C, Type I (mm) -FM9 Fiberglass Insulation Combined Table ASTM C57, Type / C, Type I (mm) -FM Mineral Wool Insulation for HC ASTM C57, Type II or III / C, Type IVB (mm) -FM Mineral Wool Insulation for PP ASTM C57, Type II or III / C, Type IVB (mm) Process Industry Practices Page of

5 PIP REAFFIRMATION WITH EDITORIAL REVISION Hot Service Insulation Materials and Installation Specification February 0 -FM Mineral Wool Insulation Combined Table ASTM C57, Type II or III / C, Type IVB (mm) -FM Expanded Perlite Insulation for HC ASTM C (mm) -FM Expanded Perlite Insulation for PP ASTM C (mm) -FM5 Expanded Perlite Insulation Combined Table ASTM C (mm) -FM Polyisocyanurate for HC ASTM C59, Type II or IV (mm) -FM7 Polyisocyanurate Insulation for PP ASTM C59, Type II or IV (mm) -FM Polyisocyanurate Insulation Combined Table ASTM C59, Type II or IV (mm) -FM9 Elasmeric Foam Insulation for HC ASTM C5, Grade (mm) -FM0 Elasmeric Foam Insulation for PP ASTM C5, Grade (mm) -FM Elasmeric Foam Insulation Combined Table ASTM C5, Grade (mm) -FM Phenolic Foam Insulation for HC ASTM C, Type III, Grade (mm) -FM Phenolic Foam Insulation for PP ASTM C, Type III, Grade (mm) -FM Phenolic Foam Insulation Combined Table ASTM C, Type III, Grade (mm) -FM5 User-Defined Insulation for HC (mm) -FM User-Defined Insulation for PP (mm) -FM7 User-Defined Insulation Combined Table (mm) Process Industry Practices Page of

6 PIP REAFFIRMATION WITH EDITORIAL REVISION Hot Service Insulation Materials and Installation Specification February 0. Introduction. Purpose This Practice provides requirements for materials and installation of hot service insulation systems on the external surfaces of piping and equipment, ambient 9 C (00 F).. Scope. References This Practice describes requirements for hot service insulation materials and accessories, srage and handling of materials, insulation application, extent of insulation, and documentation. Comment: Use of this Practice for contractual purposes requires the purchaser make specific choices and assemble additional supporting documents. Listing of or reference supporting documents within this Practice does not imply suitability for specific designs. Applicable parts of the following Practices, industry codes and standards, and references shall be considered an integral part of this Practice. The edition in effect on the date of contract award shall be used, except as otherwise noted. Short titles are used herein where appropriate.. Process Industry Practices (PIP) PIP INTG00 Insulation Inspection Checklist. Industry Codes and Standards American Petroleum Institute (API) API 5 Guide for Pressure-Relieving and Depressuring Systems American Petroleum Institute American Society for Testing and Materials (ASTM) ASTM C50 Prefabrication and Field Fabrication of Thermal Insulating Fitting Covers for NPS Piping, Vessel Lagging, and Dished Head Segments ASTM C9 Test Method for Evaluating the Influence of Thermal Insulation on the External Stress Corrosion Cracking Tendency of Austenitic Steel ASTM C795 Specification for Wicking-Type Thermal Insulation for Use over Austenitic Stainless Steel ASTM C7 Chemical Analysis of Thermal Insulation Materials for Leachable Chloride, Fluoride, Silicate and Sodium Ions Process Industry Practices Page of

7 PIP REAFFIRMATION WITH EDITORIAL REVISION Hot Service Insulation Materials and Installation Specification February 0. Definitions owner: Party who owns the facility wherein the insulation system will be used purchaser: Party who awards the contract the supplier. The purchaser may be the owner or the owner s authorized agent. supplier: Party responsible for providing the insulation materials and installing the insulation system. Requirements. Project Scope.. Documents required define the scope of the work are listed on Purchaser s Data Sheet PIP -D... Project specific insulation on piping and equipment shall be in accordance with Purchaser s Data Sheet PIP -D. This data sheet describes the surfaces be insulated and the materials be used... The extent of insulation is listed on Purchaser s Data Sheet PIP -D.... This data sheet defines the extent of insulation by surface or component for each insulation type code required for the project.... The extent of equipment insulation may also be defined by the purchaser for individual items... Insulation materials shall be in accordance with Purchaser s Data Sheets PIP -D through PIP -D as required in accordance with Purchaser s Data Sheet PIP -D. These data sheets define requirements for specific insulation materials and accessories...5 Systems requiring additional insulation specifications beyond Practices shall be covered by purchaser s documentation.. Materials.. Insulation and accessory materials shall be furnished in accordance with the requirements of this Practice, including the specific class, grade, or type... Asbess shall not be used as a component in the manufacture of insulation and accessory materials... Materials shall be new and shall be used before the expiration date... Sealant, mastics, and adhesives shall be supplied in facry-sealed containers...5 Multilayer calcium silicate and expanded perlite pipe insulation shall be ordered facry-nested. Process Industry Practices Page 5 of

8 PIP REAFFIRMATION WITH EDITORIAL REVISION Hot Service Insulation Materials and Installation Specification February 0.. All materials shall be qualified for use on austenitic stainless steel in accordance with ASTM C If requested, test reports shall be furnished.... A chemical analysis shall be provided in accordance with ASTM C7 for all materials. This chemical analysis shall not vary by more than 50 percent from the chemical analysis of the production lot tested in accordance with ASTM C9...7 Use of materials other than those specified in this Practice requires prior written approval of the purchaser... Requests for substitutions of materials shall be included as an alternate in the proposal...9 Requests for substitutions of materials after contract award are not permitted... All mastics, cements, adhesives, caulks, labels, marking pens, and tapes that come in contact with stainless steel shall have a maximum leachable chloride content of less than 50 ppm, when tested in accordance with ASTM C7... Use curved segments, beveled lags and V-grooved materials manufactured specific inside diameters that assure complete inside and outside diameter closure... Fabricated insulation shall conform with ASTM C50 and the Adjunct.. Srage and Handling of Insulation Materials.. From delivery the installed finished product, insulation materials shall at all times be protected from the elements and have adequate drainage... Insulation materials shall be handled and sred in accordance with the manufacturer s printed recommendations... Mastics, adhesives, and sealers that are exposed temperatures outside the recommended temperature ranges during srage shall be removed from the site and replaced with new material... Materials that have exceeded shelf life and dates shall be removed from the site and replaced with new material.. Installation Requirements.. General... All materials shall be sred, mixed, thinned, and applied in accordance with the manufacturer s printed instructions.... All conflicts between this Practice and the manufacturer s printed instructions shall be brought the attention of the purchaser for resolution.... Authorization proceed with application of insulation shall be obtained in writing from the purchaser. Process Industry Practices Page of

9 PIP REAFFIRMATION WITH EDITORIAL REVISION Hot Service Insulation Materials and Installation Specification February 0... Unless otherwise specified, insulation shall not be applied until completion of the following has been verified: a. Required hydrostatic and/or pneumatic pressure testing b. Application of required substrate protective coating systems, including uch-up of previously applied coatings c. Installation and testing of required tracing systems d. Cleaning of surfaces that require insulation...5 Temporary terminations of installed insulation shall be adequately protected at all times.... All insulation shall be smooth and free from cracks, voids, gaps and depressions greater than mm (/ inch)....7 All cracks, voids, gaps, and depressions in the insulation greater than mm (/ inch) shall be refitted and not filled... Insulation Layering... Unless otherwise specified by purchaser, piping and equipment insulation shall be applied as a multiple layer for operating temperatures of C (00 F) and higher.... Personnel protection insulation shall be applied as a double layer for thicknesses greater than 0 mm ( inches).... If applying single-layer insulation, other than hinged pipe covering, the circumferential butt joints of each half section shall be staggered.... If applying double-layer or multiple-layer insulation, each succeeding layer shall be staggered the longitudinal and circumferential joint of the layer beneath. All joints of all layers shall be staggered....5 Each layer of double-layer or multiple-layer insulation shall be held in place separately... Insulation Securement... Except as modified in accordance with..., insulation up 00 mm ( inches) O.D. shall be held in place with. mm (0.050 inch) diameter Type 0 stainless steel tie wire.... Cellular glass and polyisocyanurate foam insulation up 00 mm ( inches) O.D. may be held in place with fiberglass reinforced pressure-sensitive tape.... Insulation 00 mm ( inches) O.D. 00 mm ( inches) O.D. shall be held in place with mm (0.5 inch) wide by 0.50 mm (0.00 inch) thick Type 0 stainless steel bands and wing seals. Process Industry Practices Page 7 of

10 PIP REAFFIRMATION WITH EDITORIAL REVISION Hot Service Insulation Materials and Installation Specification February 0... Insulation above 00 mm ( inches) O.D. shall be held in place with 9 mm (0.75 inch) wide by 0.50 mm (0.00 inch) thick Type 0 stainless steel bands and wing seals....5 All cut ends of wire shall be embedded in the insulation... Metal Jacketing... If fire protection is required in accordance with API 5, stainless steel jacketing shall be installed on equipment and piping.... If aluminum jacketing is provided on lines with an operating temperature exceeding 00 C (750 F), stainless steel jacketing shall be used at points of contact with insulated surface.... Exposed edges of metal jacketing shall be machine-bent or rolled eliminate sharp edges...5 Metal Jacketing Securement..5. Metal jacketing 00 mm ( inches) O.D. shall be held in place with mm (0.5 inch) wide by 0.50 mm (0.00 inch) thick Type 0 stainless steel bands and wing seals...5. Metal jacketing above 00 mm ( inches) O.D. shall be held in place with 9 mm (0.75 inch) wide by 0.5 mm (0.00 inch) thick Type 0 stainless steel bands and wing seals...5. Jacket banding shall be spaced on maximum 00 mm ( inch) centers... Screws... Screws shall be self-drilling No. by mm (/ inch) stainless steel, with elasmeric washers.... Screw heads shall be hex, Phillips recessed round, round, hex-slotted, or pan type...7 Insulation System Expansion Provisions..7. Expansion joints shall be provided for rigid insulation materials on all piping and horizontal equipment in accordance with Table...7. Expansion joints shall be provided below insulation supports on vertical piping, except if above an elbow at the botm of a pipe run or directly above the pipe flanges...7. The expansion joint spacing shown in Table shall be the maximum distance allowable between restraint points in the insulation system. Comment: Restraint points are typically pipe supports, pipe fittings, branch connections, flanges, and valves. Process Industry Practices Page of

11 PIP REAFFIRMATION WITH EDITORIAL REVISION Hot Service Insulation Materials and Installation Specification February 0 Table Expansion Joints Expansion Joint Spacing, mm (feet) Operating Temperature Range C ( F) Horizontal Piping and Equipment (Note ) Vertical Piping Up (0) 000 (0) 000 (0) (000) 9 9 ( 00) 000 (0) 9000 (0) 9 9 (0 00) 9000 (0) 500 (5) 0 (0 00) 500 (5) 500 (5) 05 0 (0 500) 00 () 00 () 7 (50 700) 700 (9) 700 (9) 7 (70 900) 00 () 00 () 9 (90 00) 00 () 00 ()..7. If piping runs have distances between insulation restraint points that exceed those shown in Table, insulation expansion joints located approximately midway between the restraint points shall be provided Expansion joints shall not be required for personnel protection insulation or fibrous insulation on horizontal equipment and piping...7. Fibrous insulation shall be compressed during installation ensure that circumferential joints are tightly butted gether Except as modified in accordance with..7., expansion joints shall be provided beneath all insulation support rings on vertical equipment and piping, except for the botm support ring...7. Expansion joints should not be provided beneath the insulation support ring if the support is immediately above an elbow or flange Insulation expansion joints shall be installed in all layers of multiple-layer insulation.. Joints in horizontal piping and equipment shall be staggered between layers.. Joints installed below insulation supports on vertical piping and equipment shall not be staggered...7. Insulation expansion joints shall be 5 mm ( inch) wide and packed tightly with mineral fiber blanket insulation compressed a minimum of 50 percent. Process Industry Practices Page 9 of

12 PIP REAFFIRMATION WITH EDITORIAL REVISION Hot Service Insulation Materials and Installation Specification February Insulation bands securing rigid insulation on equipment in hot service shall incorporate 0 mm ( inch) long, flat expansion springs in accordance with Table...7. Insulation bands securing fibrous insulation on equipment in hot service shall not require expansion springs...7. Bands securing equipment insulation weather jacketing in hot service shall incorporate -inch (0-mm) long, compression spring assemblies in accordance with Table. Table Expansion Spring Requirements Equipment O.D. Normal Operating Temperature mm inches C F Number of Expansion Devices per Band 750 & under 0 & under up 9 up 00 none > > none none > > > > none per 9 m (0 ft) of band >00 > none.. Pipe Insulation Supports in Vertical Piping... If specified by purchaser, vertical piping insulation supports shall be furnished shop-installed by the piping fabricar.... If additional vertical piping insulation supports are required, bolt-on supports shall be furnished and field-installed.... Design of vertical pipe insulation supports shall be provided in the proposal, and shall be subject review and approval by purchaser.... Location of pipe insulation supports in vertical piping shall consider: a. Maximum spacing of supports shall be the same as specified in Table for expansion joints in vertical pipe insulation. b. Insulation supports shall be provided above all flanged connections. Process Industry Practices Page of

13 PIP REAFFIRMATION WITH EDITORIAL REVISION Hot Service Insulation Materials and Installation Specification February 0 c. Supports above flanged sections shall be located a minimum one stud bolt length plus 5 mm ( inch) from the back face of the p flange. d. Insulation supports shall be provided above elbows and tees, if the vertical or diagonal run length is equal or greater than the maximum spacing allowed in Table for expansion joints in vertical pipe insulation. e. If required above elbows or tees, supports shall be located mm ( inches) from the pipe--fitting weld....5 Supports shall provide adequate clearance for the installation of required electric or steam tracers...9 Piping Insulation..9. Insulation for fittings, flanges, and valves shall be fabricated in accordance with ASTM C50 and the Adjunct...9. Molded insulation fitting covers shall be used, subject the operating temperature limits of the molded cover material...9. Socketweld or threaded valves, ells, tees and other fittings shall be insulated with strips of glass fiber-needled blanket, wrapped around the valve or fitting and secured with wire...9. Valve insulation shall be terminated directly below the packing gland flange and packing follower Insulation material shall not be applied between the pipe and tracer, except if spacers prevent local overheating of the pipe are specified... Equipment Insulation... Equipment with vessel shell diameters of 900 mm ( inches) or less shall have shell insulation extended cover the heads.. Each head shall be blocked in with an insulation disc, fabricated or cut match the inside diameter of the insulation.. Nominal disc thickness shall be the thickness required for the shell.... Unless specified otherwise, all exposed heads exceeding 900 mm ( inches) shall be insulated with block insulation.. Block insulation shall be installed full thickness and fit follow the curvature of the head.. As an alternate shop-fabricated segments, heads shall be insulated with field fit block if approved by the purchaser.. Scored or V-grooved block shall not be permitted. Process Industry Practices Page of

14 PIP REAFFIRMATION WITH EDITORIAL REVISION Hot Service Insulation Materials and Installation Specification February 0... Unless specified otherwise by purchaser, vertical equipment support legs, lugs, and saddle supports for horizontal equipment shall not be insulated.... Insulation on skirt-supported vertical vessels shall be extended past the botm tangent line, down the exterior surface of the skirt the botm insulation support ring....5 Vessels having skirt inside diameters exceeding 00 mm ( inches) shall have the corresponding inside skirt surface insulated.... Equipment nozzles connected bare piping shall have the equipment insulation system terminated on the nozzle and finished with a metallic cover....7 For insulation of vessel shells, rigid pipe sections or rigid curved radius segments shall be utilized up the maximum commercially available size.... Beveled block insulation for vessel shells shall be used only if shell diameters exceed the commercially available size of curved radius segments.. Edge beveling of the block shall be in accordance with ASTM C50 and the Adjunct.. Bevels shall be applied either one or both block edges....9 Scored block insulation shall not be an acceptable substitute for beveled lags or curved radius segments.... Code or other nameplates shall not be covered by insulation... Machinery Insulation... Machinery, such as pumps and turbines, shall be insulated with removable/reusable insulation covers, as designated in PIP -D.... If required by purchaser, machinery, such as pumps and turbines, shall be insulated with insulating and finishing cement.... Before applying insulating and finishing cement, a layer of 5 mm ( inch) hexagonal chicken wire mesh or expanded metal lath shall be wrapped around the equipment item be insulated with a 5 mm ( inch) overlap at all edges and secured with wire.... All cut wire ends shall be turned in so as not protrude through the finished surface....5 The insulating and finishing cement shall be mixed and applied according the manufacturer's recommendations.... Insulating and finishing cement shall be applied the same thickness as the adjoining insulation. Process Industry Practices Page of

15 PIP REAFFIRMATION WITH EDITORIAL REVISION Hot Service Insulation Materials and Installation Specification February 0.. Insulation Types ET and ST... If insulation design and installation is included with the electrical tracing system design and installation subcontract, alternate insulation materials and thicknesses, and combinations thereof, shall be utilized, provided the intent of the specification is satisfied. Such alternates shall be approved by the purchaser.... Jacketing for insulation on electrical traced piping shall be installed with bands only. Comment: Screws and rivets can damage the electrical tracing and shall not be acceptable fasteners for any jacketing installed finish insulation on electrically traced piping.... Screw and rivet fasteners can however be used in the fabrication of removable insulated covers for use over electrically traced piping components.... Unless required for personnel protection, tube tracer unions located outside of the pipe or equipment insulation shall not be insulated....5 Unless required for personnel protection, tracer expansion loops located outside of insulation shall not be insulated.... If required for personnel protection, insulation for tracer loops shall be installed in accordance with the following: a. The tracer shall be wrapped with mm (/ inch) thick fiberglass tape, using a 50 percent overlap provide a mm (/ inch) thickness. b. The fiberglass tape shall be secured with wire on mm ( inch) centers. c. The outer surface of the fiberglass tape shall be finished with weather barrier mastic, without reinforcing membrane, applied a nominal dry film thickness of mm (/ inch)....7 Pipe insulation shall be oversized, unless otherwise agreed with purchaser.... Grooving or deforming of the insulation accommodate heat tracing is prohibited....9 Oversized insulation shall be installed such that the insulation is not loose on the piping... Insulation Finish... Weather jacketing shall be fitted tightly around vessel and piping attachments that pass through the weather jacketing.... RTV silicone sealant shall be applied the extent necessary prevent the entrance of water around penetrations through the weather jacketing. Process Industry Practices Page of

16 PIP REAFFIRMATION WITH EDITORIAL REVISION Hot Service Insulation Materials and Installation Specification February 0... Circumferential and longitudinal laps in weather jacketing shall be overlapped 50 mm ( inches) 75 mm ( inches).... Unless otherwise specified, insulation surfaces that have not been finished with metal jacketing shall be weatherproofed with membrane-reinforced weather barrier mastic.. The membrane-reinforced mastic shall extend under the adjoining metal jacketing for a distance of 75 mm ( inches) minimum.. The membrane-reinforced mastic shall also extend on uninsulated projections a minimum of 75 mm ( inches)....5 Weather barrier mastic shall be applied by trowel or brushed on large surfaces and by brush or glove on small surfaces.... Two coats of weather-barrier mastic shall be applied in accordance with the material manufacturer's instructions and the following: a. Substrate temperatures shall be within the application temperature range established by the material manufacturer. b. Substrate temperature shall be above dew point temperature at the time of application and until the mastic has dried. c. Substrate shall be dry if the mastic is applied. d. Substrate shall not be subject freezing temperatures within hours of application. e. If weather barrier mastic is scheduled for application over dusty surfaces, the surface shall be primed with suitable primer, as recommended by the weather barrier mastic manufacturer. f. Weather barrier mastic shall not be thinned. g. Reinforcing membrane shall be applied while first coat is still tacky. h. Membrane shall be embedded in first coat of mastic, without wrinkles, so that mastic comes up through the open mesh. i. Membrane seams shall be overlapped 50 mm ( inches). j. The second coat of mastic shall be applied before the first coat dries. k. All outside corners of insulation shall be rounded and the weather barrier mastic provided with a double layer of reinforcing membrane....7 After drying, the membrane reinforced weather barrier mastic shall be inspected for imperfections (i.e., cracks, pinholes, openings, or exposed reinforcing membrane). Such imperfections shall be repaired with the same material as originally applied. Process Industry Practices Page of

17 PIP REAFFIRMATION WITH EDITORIAL REVISION Hot Service Insulation Materials and Installation Specification February 0.. Corrosion Moniring Inspection Ports... Corrosion moniring inspection ports shall be installed at locations designated by Owner.... Ports shall be positioned so that the inspection point is in the center of the opening...5 Protection of Installed Insulation..5. Installed insulation shall have the required permanent protection or temporary protection applied before the conclusion of work on that day...5. Installed insulation shall have temporary protection applied if rain or other forms of atmospheric moisture can damage the insulation during each work shift... Wet Insulation... Insulation that becomes wet shall be removed and replaced with dry insulation.... Wet insulation shall be discarded...7 Work Area Housekeeping.5 Quality Plan..7. Insulation materials shall be handled and disposed of in accordance with applicable federal, state, and local laws and regulations...7. Insulation-related materials, such as mastics, shall be handled and applied with care prevent splattering on adjacent facilities, such as concrete foundations, paving, structural steel, equipment, piping, gauge glasses, instruments, machined surfaces, valve stems, and packing...7. All mastic over-spray and splatter shall be removed immediately...7. Flammable materials shall be sred away from ignition sources such as welding operations Debris from insulation application work shall be removed from the work area on a regular basis and placed in containers at the end of the workday. A quality plan shall be provided with the proposal that includes the following: a. Quality assurance, quality control, and inspection criteria b. A method of providing the purchaser with verifiable evidence that all aspects of quality are accepted and found acceptable by the supplier s inspecr during the course of the insulation work c. All elements identified by PIP INTG00 Process Industry Practices Page 5 of

18 PIP REAFFIRMATION WITH EDITORIAL REVISION Hot Service Insulation Materials and Installation Specification February 0 d. Inspection hold points as necessary assure work can be properly inspected before any additional work is performed that could obscure defective materials or installation. Inspection.. All materials, fabrication, and installation work is subject inspection by the purchaser or the owner... The purchaser's inspecr shall review the quality procedures verify the following information: a. Quality procedures are appropriate for the work scope being performed and have been approved by purchaser. b. The approved quality procedures have been implemented and are being administrated by the quality personnel... Items that are not in accordance with the purchase order shall be subject rejection... Rejected material, fabrication, or installation work shall be replaced at no cost purchaser...5 Unless otherwise specified, INTG00 shall be used for inspection documentation..7 Repairs.7. Damage installed insulation shall be promptly reported the purchaser. The report shall include the location and nature of the damage..7. Damage insulation weather jacketing shall be repaired immediately if the damage can result in additional damage the insulation due water leakage in the system..7. Damage the integrity of weather jacketing applied over calcium silicate shall be of prime concern and shall be given p repair priority..7. If permanent repair is not immediately practical, temporary repair of damaged weather jacketing shall be required..7.5 Damaged insulation shall be replaced if the nature of the damage will adversely affect the thermal performance of the system..7. Any disputes regarding the need for replacement of insulation shall be referred the purchaser for resolution. Process Industry Practices Page of

19 DOCUMENTATION REQUIREMENTS SHEET PIP -D HOT SERVICE INSULATION MATERIALS AND INSTALLATION PAGE OF PROJECT NO. FACILITY NAME LOCATION PROJECT DOCUMENT NO. NUMBER TITLE REV DATE NOTES INEG00 INSULATION DESIGN GUIDE INEG000 GUIDELINES FOR USE OF INSULATION PRACTICES INTG00 INSULATION INSPECTION CHECKLIST -D HOT SERVICE INSULATION SYSTEM PROJECT-SPECIFIC REQUIREMENTS -D EXTENT OF HOT-SERVICE INSULATION SELECTED MATERIALS SYSTEM DATA SHEETS -D YES NO CALCIUM SILICATE INSULATION SYSTEM FOR PIPE AND EQUIPMENT -D YES NO EXPANDED PERLITE INSULATION SYSTEM FOR PIPE AND EQUIPMENT -D YES NO MINERAL WOOL PERFORMED PIPE SECTIONS INSULATION SYSTEM -D YES NO MINERAL WOOL BOARD INSULATION SYSTEM FOR EQUIPMENT -D YES NO MINERAL WOOL BLANKET INSULATION SYSTEM FOR PIPE AND EQUIPMENT -D5 YES NO GLASS FIBER PERFORMED PIPE SECTIONS INSULATION SYSTEM -D YES NO GLASS FIBER BLOCK AND BOARD INSULATION SYSTEM -D7 YES NO GLASS FIBER BLANKET INSULATION SYSTEM -D YES NO CELLULAR GLASS BLOCK AND FABRICATED SECTIONS INSULATION SYSTEM -D9 YES NO POLYISOCYANURATE INSULATION SYSTEM -D0 YES NO CERAMIC FIBER BLANKET INSULATION SYSTEM -D YES NO GLASS FIBER NEEDLED BLANKET INSULATION SYSTEM -D YES NO FLEXIBLE ELASTOMERIC CELLULAR THERMAL INSULATION SYSTEM FOR PIPE AND EQUIPMENT -D YES NO RIGID CELLULAR PHENOLIC THERMAL INSULATION SYSTEM FOR PIPE AND EQUIPMENT YES NO YES NO YES NO YES NO YES NO YES NO

20 DOCUMENTATION REQUIREMENTS SHEET PIP -D HOT SERVICE INSULATION MATERIALS AND INSTALLATION PAGE OF PROJECT NO. FACILITY NAME LOCATION PROJECT DOCUMENT NO. SELECTED S INSH0-F YES NO CALCIUM SILICATE INSULATION FOR HC (INCHES) INSH0-F YES NO CALCIUM SILICATE INSULATION FOR PP (INCHES) INSH0-F YES NO CALCIUM SILICATE INSULATION COMBINED TABLE (INCHES) INSH0-F YES NO CELLULAR GLASS INSULATION FOR HC (INCHES) INSH0-F5 YES NO CELLULAR GLASS INSULATION FOR PP (INCHES) INSH0-F YES NO CELLULAR GLASS INSULATION COMBINED TABLE (INCHES) INSH0-F7 YES NO FIBERGLASS INSULATION FOR HC (INCHES) INSH0-F YES NO FIBERGLASS INSULATION FOR PP (INCHES) INSH0-F9 YES NO FIBERGLASS INSULATION COMBINED TABLE (INCHES) INSH0-F YES NO MINERAL WOOL INSULATION FOR HC (INCHES) INSH0-F YES NO MINERAL WOOL INSULATION FOR PP (INCHES) INSH0-F YES NO MINERAL WOOL INSULATION COMBINED TABLE (INCHES) INSH0-F YES NO EXPANDED PERLITE INSULATION FOR HC (INCHES) INSH0-F YES NO EXPANDED PERLITE INSULATION FOR PP (INCHES) INSH0-F5 YES NO EXPANDED PERLITE INSULATION COMBINED TABLE (INCHES) INSH0-F YES NO POLYISOCYANURATE INSULATION FOR HC (INCHES) INSH0-F7 YES NO POLYISOCYANURATE INSULATION FOR PP (INCHES) INSH0-F YES NO POLYISOCYANURATE INSULATION COMBINED TABLE (INCHES) INSH0-F9 YES NO ELASTOMERIC FOAM INSULATION FOR HC (INCHES) INSH0-F0 YES NO ELASTOMERIC FOAM INSULATION FOR PP (INCHES) INSH0-F YES NO ELASTOMERIC FOAM INSULATION COMBINED TABLE (INCHES) INSH0-F YES NO PHENOLIC FOAM INSULATION FOR HC (INCHES) INSH0-F YES NO PHENOLIC FOAM INSULATION FOR PP (INCHES) INSH0-F YES NO PHENOLIC FOAM INSULATION COMBINED TABLE (INCHES) INSH0-FM YES NO CALCIUM SILICATE INSULATION FOR HC (MM) INSH0-FM YES NO CALCIUM SILICATE INSULATION FOR PP (MM) INSH0-FM YES NO CALCIUM SILICATE INSULATION COMBINED TABLE (MM) INSH0-FM YES NO CELLULAR GLASS INSULATION FOR HC (MM)

21 DOCUMENTATION REQUIREMENTS SHEET PIP -D HOT SERVICE INSULATION MATERIALS AND INSTALLATION PAGE OF PROJECT NO. FACILITY NAME LOCATION PROJECT DOCUMENT NO. INSH0-FM5 YES NO CELLULAR GLASS INSULATION FOR PP (MM) INSH0-FM YES NO CELLULAR GLASS INSULATION COMBINED TABLE (MM) INSH0-FM7 YES NO FIBERGLASS INSULATION FOR HC (MM) INSH0-FM YES NO FIBERGLASS INSULATION FOR PP (MM) INSH0-FM9 YES NO FIBERGLASS INSULATION COMBINED TABLE (MM) INSH0-FM YES NO MINERAL WOOL INSULATION FOR HC (MM) INSH0-FM YES NO MINERAL WOOL INSULATION FOR PP (MM) INSH0-FM YES NO MINERAL WOOL INSULATION COMBINED TABLE (MM) INSH0-FM YES NO EXPANDED PERLITE INSULATION FOR HC (MM) INSH0-FM YES NO EXPANDED PERLITE INSULATION FOR PP (MM) INSH0-FM5 YES NO EXPANDED PERLITE INSULATION COMBINED TABLE (MM) INSH0-FM YES NO POLYISOCYANURATE INSULATION FOR HC (MM) INSH0-FM7 YES NO POLYISOCYANURATE INSULATION FOR PP (MM) INSH0-FM YES NO POLYISOCYANURATE INSULATION COMBINED TABLE (MM) INSH0-FM9 YES NO ELASTOMERIC FOAM INSULATION FOR HC (MM) INSH0-FM0 YES NO ELASTOMERIC FOAM INSULATION FOR PP (MM) INSH0-FM YES NO ELASTOMERIC FOAM INSULATION COMBINED TABLE (MM) INSH0-FM YES NO PHENOLIC FOAM INSULATION FOR HC (MM) INSH0-FM YES NO PHENOLIC FOAM INSULATION FOR PP (MM) INSH0-FM YES NO PHENOLIC FOAM INSULATION COMBINED TABLE (MM) YES NO YES NO YES NO YES NO YES NO YES NO YES NO HOT INSULATION INSTALLATION DETAILS INIH000 YES NO PIPING GENERAL ARRANGEMENT INIH000 YES NO PIPING LAYERED INSULATION INIH000 YES NO PIPING VERTICAL INSULATION SUPPORT SINGLE LAYER INIH000 YES NO PIPING VERTICAL INSULATION SUPPORT MULTI-LAYER INIH000 YES NO PIPING FLANGE INSULATION INIH0007 YES NO PIPING INSULATION CONNECTIONS INIH0009 YES NO REMOVABLE AND REUSABLE INSULATION FLEXIBLE INIH00 YES NO VALVE COVER

22 DOCUMENTATION REQUIREMENTS SHEET PIP -D HOT SERVICE INSULATION MATERIALS AND INSTALLATION PAGE OF PROJECT NO. FACILITY NAME LOCATION PROJECT DOCUMENT NO. INIH00 YES NO PIPE SUPPORTS INIH0050 YES NO VERTICAL VESSELS WITH OUTSIDE DIAMETERS OVER (95) INIH005 YES NO VERTICAL VESSELS WITH OUTSIDE DIAMETERS " (95) AND LESS INIH005 YES NO VESSEL COMPOSITE TYPE INIH005 YES NO VESSEL COMPOSITE TYPE INIH005 YES NO VERTICAL VESSEL BOTTOM HEAD INSULATION INIH0055 YES NO TOP/HORIZONTAL HEAD NOZZLES INIH005 YES NO VESSEL STIFFENER INSULATION DETAIL INIH0059 YES NO TYPICAL CLIP DETAILS INIH000 YES NO NOZZLE FLASHING INIH00 YES NO LAP SEAM DETAILS INIH00 YES NO HORIZONTAL VESSELS INIH00 YES NO APPLICATION OF METAL GORES ON HORIZONTAL VESSEL HEADS INIH00 YES NO HORIZONTAL HEAT EXCHANGERS YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO

23 DATA SHEET PIP -D HOT SERVICE INSULATION SYSTEM PROJECT-SPECIFIC REQUIREMENTS FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. SERVICE OR ITEM DESCRIPTION TYPE CODE OPERATING TEMP. C ( F) MATERIAL THICKNESS TABLE SPECIAL REQUIREMENTS

24 DATA SHEET PIP -D EXTENT OF HOT-SERVICE INSULATION PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION REQUIREMENTS FOR PIPING AND EQUIPMENT (NOTE: PROJECT PIPING AND EQUIPMENT INSULATION SPECIFICATIONS MAY MODIFY THESE REQUIREMENTS.) HC - HEAT CONSERVATION SJ - STEAM JACKETED PF - PREVENTION FROM FREEZING PS - PROCESS STABILITY HT - HOT FLUID TRACED PP - PERSONNEL PROTECTION ET - ELECTRIC TRACED HJ - HOT FLUID JACKETED FP - FIRE PROTECTION INSULATION ST - STEAM TRACED ITEMS HC AMB 9 C (AMB TO 00 F) PS AMB 9 C (AMB TO 00 F) PP [] C 9 C ( F 00 F) ET, ST, SJ, HT, HJ, & PF (AS REQUIRED BY THE PURCHASER) STRAIGHT OR BENT PIPE, SOCKETWELD, YES YES [] YES THREADED, OR BUTTWELD PIPE FITTINGS. SOCKETWELD, THREADED, OR BUTTWELD VALVES PIPE UNIONS NO [ NO [ [] YES [, 5] STEAM TRAPS, RELATED STRAINERS NO [ NO [ NO NO [] FLANGED PIPE FITTINGS, FLANGED VALVES YES [5] NO [, 5] [] YES [5] (EXCLUDING RELIEF AND CONTROL VALVES), FLANGE ORIFICE SETS, PIPING FLANGES CONNECTED TO EQUIPMENT NOZZLES AND FLANGED SPECIAL ITEMS (I.E., STRAINERS) PIPE TRUNNIONS, PIPE SUPPORT CLAMPS, NO NO NO NO AND HANGER RODS PRIMARY PIPING FOR INSTRUMENT NO NO NO YES CONNECTIONS, SAMPLE PIPING, VENT AND DRAIN PIPING ROTATION JOINTS, SLIDE VALVES OR NO NO NO NO OTHER ITEMS IN WHICH INSULATION CAN INTERFER WITH NORMAL OPERATION EXPANSION JOINTS NO [] NO [] NO YES [5]

25 DATA SHEET PIP -D EXTENT OF HOT-SERVICE INSULATION PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION REQUIREMENTS FOR PIPING AND EQUIPMENT (NOTE: PROJECT PIPING AND EQUIPMENT INSULATION SPECIFICATIONS MAY MODIFY THESE REQUIREMENTS.) HC - HEAT CONSERVATION SJ - STEAM JACKETED PF - PREVENTION FROM FREEZING PS - PROCESS STABILITY HT - HOT FLUID TRACED PP - PERSONNEL PROTECTION ET - ELECTRIC TRACED HJ - HOT FLUID JACKETED FP - FIRE PROTECTION INSULATION ST - STEAM TRACED ITEMS HC AMB 9 C (AMB TO 00 F) PS AMB 9 C (AMB TO 00 F) PP [] C 9 C ( F 00 F) ET, ST, SJ, HT, HJ, & PF (AS REQUIRED BY THE PURCHASER) INSTRUMENTS AND ASSOCIATED TUBE NO NO NO YES RELIEF VALVES NO NO NO NO CONTROL VALVES NO [, 5] NO [, 5] YES [5] VESSELS, SHELL AND HEAD SURFACES [] N/A VESSEL HAND HOLES NO [, 5] NO [, 5] [] N/A VESSEL MANWAYS NO [, 5] NO [, 5] [] VESSEL INSTRUMENT TRIM NO NO N/A HEAT EXCHANGER SHELL AND INTEGRAL YES YES [] N/A SHELL COVER SURFACES HEAT EXCHANGER FRONT AND REAR YES [5] YES [5] [] N/A HEADS, INCLUDING CHANNEL BARRELS, COVERS, AND BONNETS (EXCLUDING FLANGED JOINTS) HEAT EXCHANGER FLANGED JOINTS NO [, 5] NO [, 5] [] N/A COMPRESSORS NO NO N/A N/A BLOWERS, FANS YES [5] YES [5] N/A TURBINE DRIVERS YES [, 5] YES [, 5] N/A N/A INTERNALLY INSULATED ITEMS NO [] NO [] N/A

26 DATA SHEET PIP -D EXTENT OF HOT-SERVICE INSULATION PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION REQUIREMENTS FOR PIPING AND EQUIPMENT (NOTE: PROJECT PIPING AND EQUIPMENT INSULATION SPECIFICATIONS MAY MODIFY THESE REQUIREMENTS.) HC - HEAT CONSERVATION SJ - STEAM JACKETED PF - PREVENTION FROM FREEZING PS - PROCESS STABILITY HT - HOT FLUID TRACED PP - PERSONNEL PROTECTION ET - ELECTRIC TRACED HJ - HOT FLUID JACKETED FP - FIRE PROTECTION INSULATION ST - STEAM TRACED HC PS PP [] ET, ST, SJ, AMB 9 C AMB 9 C C 9 C HT, HJ, & PF (AMB TO 00 F) (AMB TO 00 F) ( F 00 F) ITEMS (AS REQUIRED BY THE PURCHASER). PERSONNEL PROTECTION (PP) SHALL BE PROVIDED TO 7 FT (0 mm) ABOVE GRADE OR PLATFORMS AND FT (900 mm) HORIZONTALLY FROM THE PERIPHERY OF PLATFORMS, WALKWAYS, OR LADDERS.. INSULATE OR GUARD ONLY IF REQUIRED FOR PERSONNEL PROTECTION.. INSULATION SHALL BE FURNISHED BY EQUIPMENT MANUFACTURER.. PROVIDE REMOVABLE METAL GUARDS OR SUITABLE PERSONNEL BARRIERS IF REQUIRED FOR PERSONNEL PROTECTION. 5. REMOVABLE / REUSABLE COVERS SHALL BE PROVIDED, UNLESS OTHERWISE INDICATED BY PURCHASER.

27 DATA SHEET PIP -D CALCIUM SILICATE INSULATION SYSTEM FOR PIPE AND EQUIPMENT PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Calcium silicate preformed pipe sections, curved segments and flat block shall conform ASTM C5, Type. Beveled lags shall be used in the size range in which curved segments are not commercially available. The material shall be continuously identified throughout indicate that the product does not contain asbess. APPROVED MANUFACTURERS MANUFACTURER BRANDNAME MANUFACTURER BRANDNAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME METAL JACKETING FABRICATION ADHESIVES All jacketing shall be furnished with integral, continuously heat-sealed Polysurlyn moisture barrier. Aluminum jacketing for piping and equipment shall be stucco-embossed finish, except for head segments, fitting and valve covers shall be smooth finish. Metal jacketing on vertical equipment 00 mm ( in.) and larger in diameter shall be aluminum sheets, 0. mm (0.0-in.) thick with mm (-/-in.) pitch corrugations. Corrugated jacketing shall be approximately 5 mm (-in.) 00 mm (-in.) wide by 000 mm (-ft) long. The length of corrugated jacketing shall be modified minimize waste and cutting. Metal jacketing on horizontal equipment 00 mm ( in.) and larger in diameter shall be aluminum 0. mm (0.0-in.) thick. Metal jacketing on vessels less than 00 mm ( in.) in diameter, and all piping, shall be aluminum, 0.5 mm (0.00-in.) thick and machine-rolled for circumferential fit. Stainless steel jacketing, if required, shall be 0.5 mm (0.0-in.) thick. Water based, sodium silicate fibrous adhesive suitable for brush or trowel application.

28 DATA SHEET PIP -D CALCIUM SILICATE INSULATION SYSTEM FOR PIPE AND EQUIPMENT PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Calcium silicate preformed pipe sections, curved segments and flat block shall conform ASTM C5, Type. Beveled lags shall be used in the size range in which curved segments are not commercially available. The material shall be continuously identified throughout indicate that the product does not contain asbess. APPROVED MANUFACTURERS MANUFACTURER BRANDNAME MANUFACTURER BRANDNAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME EXPANSION JOINT MATERIAL Expansion joint material for application 5ºC (00ºF) shall be a 0 9 kg/m³ (5 lb/ft³) nominal density Type E glass fiber blanket in mat form without the use of resinous or organic binders. Expansion joint material for application at temperatures exceeding 5ºC (00ºF) shall be ceramic-free needled silica fiber in mat form. FASTENERS All banding shall conform ASTM A7 and A0/A0M and be furnished deburred. Banding seals shall conform ASTM A7. Crimp seals are required for securing banding expansion springs. Tie wire shall conform ASTM A7 and A50/A50M. Tie wire shall be. mm (0.050 in.) minimum diameter. Glass filament tape shall be 5 mm ( in.) wide with pressure-sensitive adhesive. Sheet metal screws shall be No. by mm (/ in.) long, austenitic stainless steel, Type "A" or "AB" point, with either slotted hex head or slotted pan head. MISCELLANEOUS ACCESSORIES Expansion springs for insulation shall be 0 mm ( in.) long flat springs. Expansion springs for jacketing shall be compression spring assemblies. Woven fiberglass tape shall be mm (/ in.) thick, plain-weave, and suitable for application 5 C (00 F). Metal sealant shall be RTV silicone, aluminum or gray color, suitable for continuous service 0 C (00 F) and intermittent service 0 C (500 F).

29 DATA SHEET PIP -D EXPANDED PERLITE INSULATION SYSTEM FOR PIPE AND EQUIPMENT PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Expanded perlite preformed pipe sections, curved segments and flat block shall conform ASTM C. Beveled lags shall be used in the size range where curved segments are not commercially available. Premolded elbow fitting covers are permitted. APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME METAL JACKETING FABRICATION ADHESIVES All jacketing shall be furnished with integral, continuously heat-sealed Polysurlyn moisture barrier. Aluminum jacketing for piping and equipment shall be stucco-embossed finish, except for head segments, fitting and valve covers shall be smooth finish. Metal jacketing on vertical equipment 00 mm ( in.) and larger in diameter shall be aluminum sheets, 0. mm (0.0-in.) thick with mm (-/-in.) pitch corrugations. Corrugated jacketing shall be approximately 5 mm (-in.) 00 mm (-in.) wide by 000 mm (-ft) long. The length of corrugated jacketing shall be modified minimize waste and cutting. Metal jacketing on horizontal equipment 00 mm ( in.) and larger in diameter shall be aluminum 0. mm (0.0-in.) thick. Metal jacketing on vessels less than 00 mm ( in.) in diameter, and all piping, shall be aluminum, 0.5 mm (0.00-in.) thick and machine-rolled for circumferential fit. Stainless steel jacketing, if required, shall be 0.5 mm (0.0-in.) thick. Water based, sodium silicate fibrous adhesive suitable for brush or trowel application.

30 DATA SHEET PIP -D EXPANDED PERLITE INSULATION SYSTEM FOR PIPE AND EQUIPMENT PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Expanded perlite preformed pipe sections, curved segments and flat block shall conform ASTM C. Beveled lags shall be used in the size range where curved segments are not commercially available. Premolded elbow fitting covers are permitted. APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME EXPANSION JOINT MATERIAL Expansion joint material for application 5ºC (00ºF) shall be a 0 9 kg/m³ (5 lb/ft³) nominal density Type E glass fiber blanket in mat form without the use of resinous or organic binders. Expansion joint material for application at temperatures exceeding 5ºC (00ºF) shall be ceramic-free needled silica fiber in mat form. FASTENERS All banding shall conform ASTM A7 and A0/A0M and be furnished deburred. Banding seals shall conform ASTM A7. Crimp seals are required for securing banding expansion springs. Tie wire shall conform ASTM A7 and A50/A50M. Tie wire shall be. mm (0.050 in.) minimum diameter. Glass filament tape shall be 5 mm ( in.) wide with pressure-sensitive adhesive. Sheet metal screws shall be No. by mm (/ in.) long, austenitic stainless steel, Type "A" or "AB" point, with either slotted hex head or slotted pan head. MISCELLANEOUS ACCESSORIES Expansion springs for insulation shall be in. (0 mm) long flat springs. Expansion springs for jacketing shall be compression spring assemblies. Woven fiberglass tape shall be / in. ( mm) thick, plain-weave, and suitable for application 00 F. Metal sealant shall be RTV silicone, aluminum or gray color, suitable for continuous service 00 F (0 C) and intermittent service 500 F (0 C).

31 DATA SHEET PIP -D MINERAL WOOL PREFORMED PIPE SECTIONS INSULATION SYSTEM PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Mineral wool preformed pipe sections shall conform ASTM C57, Type II or Type III. Premolded ells and other prefabricated fitting covers are permitted. Mineral wool pipe sections cut from board sck are not permitted. Mineral wool pipe insulation fabricated with fibers oriented perpendicular pipe surface is not permitted. Type II Molded, for use C F Grade A Requires No Heat-Up Schedule YES NO Type III Precision V-Groove, for use C F Grade B Heat-Up Schedule Is Required YES NO Specified Density: kg/m³ lb/ft³ Maximum Shot Content In Accordance With ASTM C-: % APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME METAL JACKETING All jacketing shall be furnished with integral, continuously heat-sealed Polysurlyn moisture barrier. Aluminum jacketing for piping and equipment shall be stucco-embossed finish, except for head segments, fitting and valve covers shall be smooth finish. Metal jacketing on vessels less than 00 mm ( in.) in diameter, and all piping, shall be aluminum, 0.5 mm (0.00-in.) thick and machine-rolled for circumferential fit. Stainless steel jacketing, if required, shall be 0.5 mm (0.0-in.) thick. FABRICATION ADHESIVES FACINGS Neoprene-based contact cement Facing shall be as agreed between the purchaser and manufacturer.

32 DATA SHEET PIP -D MINERAL WOOL PREFORMED PIPE SECTIONS INSULATION SYSTEM PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Mineral wool preformed pipe sections shall conform ASTM C57, Type II or Type III. Premolded ells and other prefabricated fitting covers are permitted. Mineral wool pipe sections cut from board sck are not permitted. Mineral wool pipe insulation fabricated with fibers oriented perpendicular pipe surface is not permitted. Type II Molded, for use C F Grade A Requires No Heat-Up Schedule YES NO Type III Precision V-Groove, for use C F Grade B Heat-Up Schedule Is Required YES NO Specified Density: kg/m³ lb/ft³ Maximum Shot Content In Accordance With ASTM C-: % APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME EXPANSION JOINT MATERIAL FASTENERS Expansion joint material for application 5ºC (00ºF) shall be a 0 9 kg/m³ (5 lb/ft³) nominal density Type E glass fiber blanket in mat form without the use of resinous or organic binders. Expansion joint material for application at temperatures exceeding 5ºC (00ºF) shall be ceramic-free needled silica fiber in mat form. All banding shall conform ASTM A7 and A0/A0M and be furnished deburred. Banding seals shall conform ASTM A7. Tie wire shall conform ASTM A7 and A50/A50M. Tie wire shall be. mm (0.050 in.) minimum diameter. Glass filament tape shall be 5 mm ( in.) wide with pressure-sensitive adhesive. Sheet metal screws shall be No. by mm (/ in.) long, austenitic stainless steel, Type "A" or "AB" point, with either slotted hex head or slotted pan head. MISCELLANEOUS ACCESSORIES Woven fiberglass tape shall be mm (/ in.) thick, plain-weave, and suitable for application 5 C (00 F). Metal sealant shall be RTV silicone, aluminum or gray color, suitable for continuous service 0 C (00 F) and intermittent service 0 C (500 F).

33 DATA SHEET MINERAL WOOL BOARD INSULATION SYSTEM FOR EQUIPMENT PIP -D PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Mineral wool board shall conform ASTM C, Type IVB. Specified Density: kg/m³ lb/ft³ Maximum Shot Content In Accordance With ASTM C-: % APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME METAL JACKETING FABRICATION ADHESIVES All jacketing shall be furnished with integral, continuously heat-sealed Polysurlyn moisture barrier. Aluminum jacketing for piping and equipment shall be stucco-embossed finish, except for head segments, fitting and valve covers shall be smooth finish. Metal jacketing on vertical equipment 00 mm ( in.) and larger in diameter shall be aluminum sheets, 0. mm (0.0-in.) thick with mm (-/-in.) pitch corrugations. Corrugated jacketing shall be approximately 5 mm (-in.) 00 mm (-in.) wide by 000 mm (-ft) long. The length of corrugated jacketing shall be modified minimize waste and cutting. Metal jacketing on horizontal equipment 00 mm ( in.) and larger in diameter shall be aluminum 0. mm (0.0-in.) thick. Metal jacketing on vessels less than 00 mm ( in.) in diameter, and all piping, shall be aluminum, 0.5 mm (0.00-in.) thick and machine-rolled for circumferential fit. Stainless steel jacketing, if required, shall be 0.5 mm (0.0-in.) thick. Neoprene-based contact cement

34 DATA SHEET MINERAL WOOL BOARD INSULATION SYSTEM FOR EQUIPMENT PIP -D PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Mineral wool board shall conform ASTM C, Type IVB. Specified Density: kg/m³ lb/ft³ Maximum Shot Content In Accordance With ASTM C-: % APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME EXPANSION JOINT MATERIAL Expansion joint material for application 5ºC (00ºF) shall be a 0 9 kg/m³ (5 lb/ft³) nominal density Type E glass fiber blanket in mat form without the use of resinous or organic binders. Expansion joint material for application at temperatures exceeding 5ºC (00ºF) shall be ceramic-free needled silica fiber in mat form. FASTENERS All banding shall conform ASTM A7 and A0/A0M and be furnished deburred. Banding seals shall conform ASTM A7. Crimp seals are required for securing banding expansion springs. Sheet metal screws shall be No. by mm (/ in.) long, austenitic stainless steel, Type "A" or "AB" point, with either slotted hex head or slotted pan head. MISCELLANEOUS ACCESSORIES Expansion springs for jacketing shall be compression spring assemblies. Metal sealant shall be RTV silicone, aluminum or gray color, suitable for continuous service 0 C (00 F) and intermittent service 0 C (500 F).

35 DATA SHEET PIP -D MINERAL WOOL BLANKET INSULATION SYSTEM FOR PIPE AND EQUIPMENT PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Mineral wool blanket shall conform ASTM C59, Type II. Facings shall be supplied as indicated. Inside Face: Hex Mesh Metal Lath Material: Stainless Steel Galvanized Outside Face: Hex Mesh Metal Lath Material: Stainless Steel Galvanized Specified Density: kg/m³ lb/ft³ Maximum Shot Content In Accordance With ASTM C-: % APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME METAL JACKETING All jacketing shall be furnished with integral, continuously heat-sealed Polysurlyn moisture barrier. Aluminum jacketing for piping and equipment shall be stucco-embossed finish, except for head segments, fitting and valve covers shall be smooth finish. Metal jacketing on vertical equipment 00 mm ( in.) and larger in diameter shall be aluminum sheets, 0. mm (0.0-in.) thick with mm (-/-in.) pitch corrugations.metal jacketing on vessels less than inches (00 mm) in diameter, and all piping, shall be aluminum, 0.00-inch (0.5-mm) thick and machine-rolled for circumferential fit. Corrugated jacketing shall be approximately 5 mm (-in.) 00 mm (-in.) wide by 000 mm (-ft) long. The length of corrugated jacketing shall be modified minimize waste and cutting. Metal jacketing on horizontal equipment 00 mm ( in.) and larger in diameter shall be aluminum 0. mm (0.0-in.) thick. Metal jacketing on vessels less than 00 mm ( in.) in diameter, and all piping, shall be aluminum, 0.5 mm (0.00-in.) thick and machine-rolled for circumferential fit. Stainless steel jacketing, if required, shall be 0.5 mm (0.0-in.) thick.

36 DATA SHEET PIP -D MINERAL WOOL BLANKET INSULATION SYSTEM FOR PIPE AND EQUIPMENT PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Mineral wool blanket shall conform ASTM C59, Type II. Facings shall be supplied as indicated. Inside Face: Hex Mesh Metal Lath Material: Stainless Steel Galvanized Outside Face: Hex Mesh Metal Lath Material: Stainless Steel Galvanized Specified Density: kg/m³ lb/ft³ Maximum Shot Content In Accordance With ASTM C-: % APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME SEALANT Metal sealant shall be RTV silicone, aluminum or gray color, suitable for continuous service 00 F (0 C) and intermittent service 500 F (0 C). FASTENERS All banding shall conform ASTM A7 and A0/A0M and be furnished deburred. Banding seals shall conform ASTM A7. Sheet metal screws shall be No. by mm (/ in.) long, austenitic stainless steel, Type "A" or "AB" point, with either slotted hex head or slotted pan head.

37 DATA SHEET PIP -D5 GLASS FIBER PREFORMED PIPE SECTIONS INSULATION SYSTEM PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Glass fiber preformed pipe sections shall conform ASTM C57, Type I. Premolded ells and other prefabricated fitting covers are permitted. Glass fiber pipe sections cut from board sck are not permitted. Glass fiber pipe insulation fabricated with fibers oriented perpendicular pipe surface is not permitted. Grade A Requires No Heat-Up Schedule Grade B Heat-Up Schedule Is Required APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME METAL JACKETING All jacketing shall be furnished with integral, continuously heat-sealed Polysurlyn moisture barrier. Aluminum jacketing for piping and equipment shall be stucco-embossed finish, except for head segments, fitting and valve covers shall be smooth finish. Metal jacketing on vessels less than 00 mm ( in.) in diameter, and all piping, shall be aluminum, 0.5 mm (0.00-in.) thick and machine-rolled for circumferential fit. FACINGS EXPANSION JOINT MATERIAL Facing shall be as agreed between the purchaser and manufacturer. Expansion joint material for application 5ºC (00ºF) shall be a 0 9 kg/m³ (5 lb/ft³) nominal density Type E glass fiber blanket in mat form without the use of resinous or organic binders.

38 DATA SHEET PIP -D5 GLASS FIBER PREFORMED PIPE SECTIONS INSULATION SYSTEM PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Glass fiber preformed pipe sections shall conform ASTM C57, Type I. Premolded ells and other prefabricated fitting covers are permitted. Glass fiber pipe sections cut from board sck are not permitted. Glass fiber pipe insulation fabricated with fibers oriented perpendicular pipe surface is not permitted. Grade A Requires No Heat-Up Schedule Grade B Heat-Up Schedule Is Required APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME FASTENERS All banding shall conform ASTM A7 and A0/A0M and be furnished deburred. Banding seals shall conform ASTM A7. Tie wire shall conform ASTM A7 and A50/A50M. Tie wire shall be. mm (0.050 in.) minimum diameter. Glass filament tape shall be 5 mm ( in.) wide with pressure-sensitive adhesive. Sheet metal screws shall be No. by mm (/ in.) long, austenitic stainless steel, Type "A" or "AB" point, with either slotted hex head or slotted pan head. Woven fiberglass tape shall be mm (/ in.) thick, plain-weave, and suitable for application 5 C (00 F). MISCELLANEOUS ACCESSORIES Metal sealant shall be RTV silicone, aluminum or gray color, suitable for continuous service 0 C (00 F) and intermittent service 0 C (500 F). Fabrication adhesive shall be neoprene-based contact cement.

39 DATA SHEET GLASS FIBER BOARD INSULATION SYSTEM FOR EQUIPMENT PIP -D PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Glass fiber board shall conform ASTM C, Type II, Grade A, Category. Specified Density: kg/m³ lb/ft³ APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME METAL JACKETING FABRICATION ADHESIVES All jacketing shall be furnished with integral, continuously heat-sealed Polysurlyn moisture barrier. Aluminum jacketing for piping and equipment shall be stucco-embossed finish, except for head segments, fitting and valve covers shall be smooth finish. Metal jacketing on vertical equipment 00 mm ( in.) and larger in diameter shall be aluminum sheets, 0. mm (0.0-in.) thick with mm (-/-in.) pitch corrugations. Corrugated jacketing shall be approximately 5 mm (-in.) 00 mm (-in.) wide by 000 mm (-ft) long. The length of corrugated jacketing shall be modified minimize waste and cutting. Metal jacketing on horizontal equipment 00 mm ( in.) and larger in diameter shall be aluminum 0. mm (0.0-in.) thick. Metal jacketing on vessels less than 00 mm ( in.) in diameter, and all piping, shall be aluminum, 0.5 mm (0.00-in.) thick and machine-rolled for circumferential fit. Neoprene-based contact cement

40 DATA SHEET GLASS FIBER BOARD INSULATION SYSTEM FOR EQUIPMENT PIP -D PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Glass fiber board shall conform ASTM C, Type II, Grade A, Category. Specified Density: kg/m³ lb/ft³ APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME EXPANSION JOINT MATERIAL Expansion joint material for application 5ºC (00ºF) shall be a 0 9 kg/m³ (5 lb/ft³) nominal density Type E glass fiber blanket in mat form without the use of resinous or organic binders. FASTENERS All banding shall conform ASTM A7 and A0/A0M and be furnished deburred. Banding seals shall conform ASTM A7. Crimp seals are required for securing banding expansion springs. Sheet metal screws shall be No. by mm (/ in.) long, austenitic stainless steel, Type "A" or "AB" point, with either slotted hex head or slotted pan head. MISCELLANEOUS ACCESSORIES Expansion springs for jacketing shall be compression spring assemblies. Metal sealant shall be RTV silicone, aluminum or gray color, suitable for continuous service 0 C (00 F) and intermittent service 0 C (500 F).

41 DATA SHEET PIP -D7 GLASS FIBER BLANKET INSULATION SYSTEM FOR PIPE AND EQUIPMENT PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Glass fiber blanket shall conform ASTM C59, Type I. Blanket is not furnished with facings. Specified Density: kg/m³ lb/ft³ APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME METAL JACKETING All jacketing shall be furnished with integral, continuously heat-sealed Polysurlyn moisture barrier. Aluminum jacketing for piping and equipment shall be stucco-embossed finish, except for head segments, fitting and valve covers shall be smooth finish. Metal jacketing on horizontal equipment 00 mm ( in.) and larger in diameter shall be aluminum 0. mm (0.0-in.) thick. Metal jacketing on vessels less than 00 mm ( in.) in diameter, and all piping, shall be aluminum, 0.5 mm (0.00-in.) thick and machine-rolled for circumferential fit. SEALANT Metal sealant shall be RTV silicone, aluminum or gray color, suitable for continuous service 0 C (00 F) and intermittent service 0 C (500 F). FASTENERS All banding shall conform ASTM A7 and A0/A0M and be furnished deburred. Banding seals shall conform ASTM A7. Sheet metal screws shall be No. by mm (/ in.) long, austenitic stainless steel, Type "A" or "AB" point, with either slotted hex head or slotted pan head.

42 DATA SHEET PIP -D7 GLASS FIBER BLANKET INSULATION SYSTEM FOR PIPE AND EQUIPMENT PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Glass fiber blanket shall conform ASTM C59, Type I. Blanket is not furnished with facings. Specified Density: kg/m³ lb/ft³ APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME

43 DATA SHEET PIP -D CELLULAR GLASS BLOCK AND FABRICATED SECTIONS INSULATION SYSTEM PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Cellular glass block and fabricated sections shall conform ASTM C55, Grade, Types,, and, including annexes, and be fabricated the dimensions of ASTM C50. Gypsum cement shall be used for fabrication. APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME METAL JACKETING LAMINATION / FABRICATION ADHESIVE All jacketing shall be furnished with integral, continuously heat-sealed Polysurlyn moisture barrier. Aluminum jacketing for piping and equipment shall be stucco-embossed finish, except for head segments, fitting and valve covers shall be smooth finish. Metal jacketing on vertical equipment 00 mm ( in.) and larger in diameter shall be aluminum sheets, 0. mm (0.0-in.) thick with mm (-/-in.) pitch corrugations. Corrugated jacketing shall be approximately 5 mm (-in.) 00 mm (-in.) wide by 000 mm (-ft) long. The length of corrugated jacketing shall be modified minimize waste and cutting. Metal jacketing on horizontal equipment 00 mm ( in.) and larger in diameter shall be aluminum 0. mm (0.0-in.) thick. Metal jacketing on vessels less than 00 mm ( in.) in diameter, and all piping, shall be aluminum, 0.5 mm (0.00-in.) thick and machine-rolled for circumferential fit. Stainless steel jacketing, if required, shall be 0.5 mm (0.0-in.) thick. Gypsum cement (asphalt is not permitted)

44 DATA SHEET PIP -D CELLULAR GLASS BLOCK AND FABRICATED SECTIONS INSULATION SYSTEM PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Cellular glass block and fabricated sections shall conform ASTM C55, Grade, Types,, and, including annexes, and be fabricated the dimensions of ASTM C50. Gypsum cement shall be used for fabrication. APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME EXPANSION JOINT MATERIAL Expansion joint material for application 5ºC (00ºF) shall be a 0 9 kg/m³ (5 lb/ft³) nominal density Type E glass fiber blanket in mat form without the use of resinous or organic binders. FASTENERS All banding shall conform ASTM A7 and A0/A0M and be furnished deburred. Banding seals shall conform ASTM A7. Crimp seals are required for securing banding expansion springs. Tie wire shall conform ASTM A7 and A50/A50M. Tie wire shall be. mm (0.050 in.) minimum diameter. Glass filament tape shall be 5 mm ( in.) wide with pressure-sensitive adhesive. Sheet metal screws shall be No. by mm (/ in.) long, austenitic stainless steel, Type "A" or "AB" point, with either slotted hex head or slotted pan head. Expansion springs for insulation shall be 0 mm ( in.) long flat springs. MISCELLANEOUS ACCESSORIES Expansion springs for jacketing shall be compression spring assemblies. Woven fiberglass tape shall be mm (/ in.) thick, plain-weave, and suitable for application 5 C (00 F). Metal sealant shall be RTV silicone, aluminum or gray color, suitable for continuous service 0 C (00 F) and intermittent service 0 C (500 F).

45 DATA SHEET PIP -D9 POLYISOCYANURATE INSULATION SYSTEM PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Rigid, cellular polyisocyanurate block and fabricated sections shall conform ASTM C59, Grade, Type II or IV, and be fabricated the dimensions of ASTM C50. Type II 0 kg/m³ (.5 lbs/ft³) Minimum Density Type IV kg/m³ (.0 lbs/ft³) Minimum Density APPROVED MANUFACTURERS MANUFACTURER BRANDNAME MANUFACTURER BRANDNAME ACCESSORY DESCRIPTION MANUFACTURER BRANDNAME METAL JACKETING All jacketing shall be furnished with integral, continuously heat-sealed Polysurlyn moisture barrier. Aluminum jacketing for piping and equipment shall be stucco-embossed finish, except for head segments, fitting and valve covers shall be smooth finish. Metal jacketing on vertical equipment 00 mm ( in.) and larger in diameter shall be aluminum sheets, 0. mm (0.0-in.) thick with mm (-/-in.) pitch corrugations. Corrugated jacketing shall be approximately 5 mm (-in.) 00 mm (-in.) wide by 000 mm (-ft) long. The length of corrugated jacketing shall be modified minimize waste and cutting. Metal jacketing on horizontal equipment 00 mm ( in.) and larger in diameter shall be aluminum 0. mm (0.0-in.) thick. Metal jacketing on vessels less than 00 mm ( in.) in diameter, and all piping, shall be aluminum, 0.5 mm (0.00-in.) thick and machine-rolled for circumferential fit. FABRICATION ADHESIVE Solvent-borne adhesive.

46 DATA SHEET PIP -D9 POLYISOCYANURATE INSULATION SYSTEM PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Rigid, cellular polyisocyanurate block and fabricated sections shall conform ASTM C59, Grade, Type II or IV, and be fabricated the dimensions of ASTM C50. Type II 0 kg/m³ (.5 lbs/ft³) Minimum Density Type IV kg/m³ (.0 lbs/ft³) Minimum Density APPROVED MANUFACTURERS MANUFACTURER BRANDNAME MANUFACTURER BRANDNAME ACCESSORY DESCRIPTION MANUFACTURER BRANDNAME EXPANSION JOINT MATERIAL Expansion joint material for application 5ºC (00ºF) shall be a 0 9 kg/m³ (5 lb/ft³) nominal density Type E glass fiber blanket in mat form without the use of resinous or organic binders. FASTENERS MISCELLANEOUS ACCESSORIES All banding shall conform ASTM A7 and A0/A0M and be furnished deburred. Banding seals shall conform ASTM A7. Tie wire shall conform ASTM A7 and A50/A50M. Tie wire shall be. mm (0.050 in.) minimum diameter. Glass filament tape shall be 5 mm ( in.) wide with pressure-sensitive adhesive. Sheet metal screws shall be No. by mm (/ in.) long, austenitic stainless steel, Type "A" or "AB" point, with either slotted hex head or slotted pan head. Metal sealant shall be RTV silicone, aluminum or gray color, suitable for continuous service 0 C (00 F) and intermittent service 0 C (500 F).

47 DATA SHEET PIP -D0 CERAMIC FIBER BLANKET INSULATION SYSTEM FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Ceramic fiber blanket shall conform ASTM C9, Type II. Nominal Density: kg/m³ lb/ft³ APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME

48 DATA SHEET PIP -D GLASS FIBER NEEDLED BLANKET INSULATION SYSTEM FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Type E glass fiber needled blanket shall be constructed of mechanically needled, textile glass fiber mat without binder. Insulation shall be suitable for continuous service at 9 C (00 F), and shall have a nominal density of kg/m³ ( lb/ft³). APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME

49 DATA SHEET PIP -D FLEXIBLE ELASTOMERIC CELLULAR THERMAL INSULATION SYSTEM FOR PIPE AND EQUIPMENT FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Flexible elasmeric cellular thermal insulation shall conform ASTM C5, Grade, Type I (tubular) and Type II (sheet). APPROVED MANUFACTURERS MANUFACTURER BRANDNAME MANUFACTURER BRANDNAME ACCESSORY DESCRIPTION MANUFACTURER BRANDNAME NONMETALLIC JACKETING Liquid-applied coating and reinforcing membrane, as recommended by manufacturer. Sheet material, thickness and composition as recommended by manufacturer. ADHESIVES Application adhesives shall be as recommended by manufacturer.

50 DATA SHEET PIP -D RIGID CELLULAR PHENOLIC THERMAL INSULATION SYSTEM FOR PIPE AND EQUIPMENT PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Rigid cellular phenolic thermal insulation shall conform ASTM C, Type III, Grade. Facings shall be supplied as indicated. APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME METAL JACKETING All jacketing shall be furnished with integral, continuously heat-sealed Polysurlyn moisture barrier. Aluminum jacketing for piping and equipment shall be stucco-embossed finish, except for head segments, fitting and valve covers shall be smooth finish. Metal jacketing on vertical equipment 00 mm ( in.) and larger in diameter shall be aluminum sheets, 0. mm (0.0-in.) thick with mm (-/-in.) pitch corrugations. Corrugated jacketing shall be approximately 5 mm (-in.) 00 mm (-in.) wide by 000 mm (-ft) long. The length of corrugated jacketing shall be modified minimize waste and cutting. Metal jacketing on horizontal equipment 00 mm ( in.) and larger in diameter shall be aluminum 0. mm (0.0-in.) thick. Metal jacketing on vessels less than 00 mm ( in.) in diameter, and all piping, shall be aluminum, 0.5 mm (0.00-in.) thick and machine-rolled for circumferential fit. FABRICATION ADHESIVE Solvent-borne adhesive.

51 DATA SHEET PIP -D RIGID CELLULAR PHENOLIC THERMAL INSULATION SYSTEM FOR PIPE AND EQUIPMENT PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: Rigid cellular phenolic thermal insulation shall conform ASTM C, Type III, Grade. Facings shall be supplied as indicated. APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME EXPANSION JOINT MATERIAL Expansion joint material for application 5ºC (00ºF) shall be a 0 9 kg/m³ (5 lb/ft³) nominal density Type E glass fiber blanket in mat form without the use of resinous or organic binders. FASTENERS All banding shall conform ASTM A7 and A0/A0M and be furnished deburred. Banding seals shall conform ASTM A7. Tie wire shall conform ASTM A7 and A50/A50M. Tie wire shall be. mm (0.050 in.) minimum diameter. Glass filament tape shall be 5 mm ( in.) wide with pressure-sensitive adhesive. Sheet metal screws shall be No. by mm (/ in.) long, austenitic stainless steel, Type "A" or "AB" point, with either slotted hex head or slotted pan head. MISCELLANEOUS ACCESSORIES Metal sealant shall be RTV silicone, aluminum or gray color, suitable for continuous service 0 C (00 F) and intermittent service 0 C (500 F).

52 DATA SHEET PIP -D USER-DEFINED INSULATION SYSTEM FOR PIPE AND EQUIPMENT PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME METAL JACKETING NON-METALLIC JACKETING FABRICATION ADHESIVE EXPANSION JOINT MATERIAL

53 DATA SHEET PIP -D USER-DEFINED INSULATION SYSTEM FOR PIPE AND EQUIPMENT PAGE OF FACILITY NAME LOCATION PROJECT NO. PROJECT DOCUMENT NO. INSULATION SPECIFICATION: APPROVED MANUFACTURERS MANUFACTURER BRAND NAME MANUFACTURER BRAND NAME ACCESSORY DESCRIPTION MANUFACTURER BRAND NAME FASTENERS MISCELLANEOUS ACCESSORIES

54 CALCIUM SILICATE INSULATION FOR HC ASTM C5 Type I (Inches) PIP -F / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

55 CALCIUM SILICATE INSULATION FOR PP ASTM C5 Type I (Inches) PIP -F / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

56 PIP -F CALCIUM SILICATE INSULATION COMBINED TABLE ASTM C5 Type I (Inches) / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

57 CELLULAR GLASS INSULATION FOR HC ASTM C55 (Inches) PIP -F / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

58 CELLULAR GLASS INSULATION FOR PP ASTM C55 (Inches) PIP -F / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

59 PIP -F CELLULAR GLASS INSULATION COMBINED TABLE ASTM C55 (Inches) / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

60 FIBERGLASS INSULATION FOR HC ASTM C57, Type / C, Type I (Inches) PIP -F / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

61 FIBERGLASS INSULATION FOR PP ASTM C57, Type / C, Type I (Inches) PIP -F / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

62 FIBERGLASS INSULATION COMBINED TABLE ASTM C57, Type / C, Type I (Inches) PIP -F / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

63 PIP -F MINERAL WOOL INSULATION FOR HC ASTM C57, Type II or III / C, Type IVB (Inches) / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

64 PIP -F MINERAL WOOL INSULATION FOR PP ASTM C57, Type II or III / C, Type IVB (Inches) / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

65 PIP -F MINERAL WOOL INSULATION COMBINED TABLE ASTM C57, Type II or III / C, Type IVB (Inches) / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

66 EXPANDED PERLITE INSULATION FOR HC ASTM C (Inches) PIP -F / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

67 EXPANDED PERLITE INSULATION FOR PP ASTM C (Inches) PIP -F / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

68 PIP -F5 EXPANDED PERLITE INSULATION COMBINED TABLE ASTM C (Inches) / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

69 POLYISOCYANURATE FOR HC ASTM C59 (Inches) PIP -F / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

70 POLYISOCYANURATE FOR PP ASTM C59 (Inches) PIP -F / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

71 POLYISOCYANURATE COMBINED TABLE ASTM C59 (Inches) PIP -F / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

72 ELASTOMERIC FOAM INSULATION FOR HC ASTM C5 (Inches) PIP -F / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

73 ELASTOMERIC FOAM INSULATION FOR PP ASTM C5 (Inches) PIP -F / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

74 PIP -F ELASTOMERIC FOAM INSULATION COMBINED TABLE ASTM C5 (Inches) / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

75 PHENOLIC FOAM INSULATION FOR HC ASTM C (Inches) PIP -F / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

76 PHENOLIC FOAM INSULATION FOR PP ASTM C (Inches) PIP -F / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

77 PIP -F PHENOLIC FOAM INSULATION COMBINED TABLE ASTM C (Inches) / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

78 USER-DEFINED INSULATION FOR HC (Inches) PIP -F5 INSULATION: / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

79 USER-DEFINED INSULATION FOR PP (Inches) PIP -F INSULATION: / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

80 PIP -F7 USER-DEFINED INSULATION - COMBINED TABLE (Inches) INSULATION: / / -/ 0 0. Thicknesses are in inches Operating Temperature, F

81 CALCIUM SILICATE INSULATION FOR HC ASTM C5 Type I (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

82 CALCIUM SILICATE INSULATION FOR PP ASTM C5 Type I (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

83 PIP -FM CALCIUM SILICATE INSULATION COMBINED TABLE ASTM C5 Type I (mm) / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

84 CELLULAR GLASS INSULATION FOR HC ASTM C55 (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

85 CELLULAR GLASS INSULATION FOR PP ASTM C55 (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

86 PIP -FM CELLULAR GLASS INSULATION COMBINED TABLE ASTM C55 (mm) / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

87 FIBERGLASS INSULATION FOR HC ASTM C57, Type / C, Type I (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

88 FIBERGLASS INSULATION FOR PP ASTM C57, Type / C, Type I (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

89 FIBERGLASS INSULATION COMBINED TABLE ASTM C57, Type / C, Type I (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

90 MINERAL WOOL INSULATION FOR HC ASTM C57, Type II or III / C, Type IVB (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

91 MINERAL WOOL INSULATION FOR PP ASTM C57, Type II or III / C, Type IVB (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

92 PIP -FM MINERAL WOOL INSULATION COMBINED TABLE ASTM C57, Type II or III / C, Type IVB (mm) / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

93 EXPANDED PERLITE INSULATION FOR HC ASTM C (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

94 EXPANDED PERLITE INSULATION FOR PP ASTM C (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

95 PIP -FM5 EXPANDED PERLITE INSULATION COMBINED TABLE ASTM C (mm) / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

96 POLYISOCYANURATE FOR HC ASTM C59 (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm. Operating Temperature, C

97 POLYISOCYANURATE FOR PP ASTM C59 (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm. Operating Temperature, C

98 POLYISOCYANURATE COMBINED TABLE ASTM C59 (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm. Operating Temperature, C

99 ELASTOMERIC FOAM INSULATION FOR HC ASTM C5 (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm. Operating Temperature, C

100 ELASTOMERIC FOAM INSULATION FOR PP ASTM C5 (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm. Operating Temperature, C

101 PIP -FM ELASTOMERIC FOAM INSULATION COMBINED TABLE ASTM C5 (mm) / / -/ 0 0. Thicknesses are in mm. Operating Temperature, C

102 PHENOLIC FOAM INSULATION FOR HC ASTM C (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

103 PHENOLIC FOAM INSULATION FOR PP ASTM C (mm) PIP -FM / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

104 PIP -FM PHENOLIC FOAM INSULATION COMBINED TABLE ASTM C (mm) / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

105 USER-DEFINED INSULATION FOR HC (mm) PIP -FM5 INSULATION: / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

106 USER-DEFINED INSULATION FOR PP (mm) PIP -FM INSULATION: / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

107 PIP -FM7 USER-DEFINED INSULATION - COMBINED TABLE (mm) INSULATION: / / -/ 0 0. Thicknesses are in mm Operating Temperature, C

PIP INSC1000 Cold Service Insulation Materials and Installation Specification

PIP INSC1000 Cold Service Insulation Materials and Installation Specification COMPLETE REVISION Ocber 2017 Insulation PIP Cold Service Insulation Materials and Installation Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort minimize the cost of process industry

More information

PIP INSR1000 Installation of Flexible, Removable/Reusable Insulation Covers for Hot Insulation Service

PIP INSR1000 Installation of Flexible, Removable/Reusable Insulation Covers for Hot Insulation Service TECHNICAL REVISION August 2015 Insulation PIP INSR1000 Installation of Flexible, Removable/Reusable Insulation Covers for Hot Insulation Service PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort

More information

PIP INSA1000 Acoustic Insulation Systems Specification

PIP INSA1000 Acoustic Insulation Systems Specification TECHNICAL REVISION April 2015 Insulation PIP INSA1000 Acoustic Insulation Systems Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

EDITORIAL REVISION August Process Industry Practices Insulation. PIP INEG2000 Guidelines for Use of Insulation Practices

EDITORIAL REVISION August Process Industry Practices Insulation. PIP INEG2000 Guidelines for Use of Insulation Practices August 2013 Process Industry Practices Insulation PIP INEG2000 Guidelines for Use of Insulation Practices PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry

More information

ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT

ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT Specification for Acoustical Insulation (Lagging) for Piping and Equipment 1 of 5 TABLE OF CONTENTS 1.0SCOPE..... 3 2.0REFERENCED PUBLICATIONS...

More information

PIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping

PIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping July 2017 Piping PIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice

More information

SECTION HVAC INSULATION

SECTION HVAC INSULATION PART 1 GENERAL 1.1 SUMMARY SECTION 23 07 00 HVAC INSULATION A. Section Includes: 1. Ductwork insulation. 2. Duct liner. 3. Insulation jackets. 4. Equipment insulation 5. Piping system insulation. 6. Insulation

More information

1. Division 23 Section "Hangers and Supports for HVAC Piping and Equipment" for pipe insulation shields and protection saddles.

1. Division 23 Section Hangers and Supports for HVAC Piping and Equipment for pipe insulation shields and protection saddles. SECTION 23 07 19 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SPECIFICATION FOR COLD INSULATION

SPECIFICATION FOR COLD INSULATION SPECIFICATION FOR COLD INSULATION Specification for Cold Insulation 1 of 21 TABLE OF CONTENTS 1.0. SCOPE..... 3 2.0. REFERENCED PUBLICATIONS... 3 3.0. GENERAL CONDITIONS... 3 4.0. MATERIALS... 5 5.0. APPLICATIONS...

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

University of Delaware

University of Delaware University Contact: Energy & Engineering Group (302) 831-1744 SECTION 23 07 00_ HVAC INSULATION PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Piping system insulation. 2. Equipment insulation. 3.

More information

SPECIFICATION GUIDELINES FOR THE USE OF CRYOGEL Z ON COLD PIPING AND EQUIPMENT

SPECIFICATION GUIDELINES FOR THE USE OF CRYOGEL Z ON COLD PIPING AND EQUIPMENT SPECIFICATION GUIDELINES FOR THE USE OF CRYOGEL Z ON COLD PIPING AND EQUIPMENT Page 1 of 15 Ver. 3-0 March 2010 TABLE OF CONTENTS 1. Scope... 3 2. General System Requirements... 3 3. Installation Details...

More information

FIRE STATION 55 June 14, 2010

FIRE STATION 55 June 14, 2010 SECTION 15250 MECHANICAL INSULATION PART 1 - GENERAL 1.01 DESCRIPTION A. Work Includes 1. Insulation of Domestic Water Piping. 2. Pipe Insulation of refrigerant piping. 3. Insulation of ductwork. 4. Aluminum

More information

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER Dyplast Products Copyright 2012 1 Rev 0112 DYPLAST PRODUCTS

More information

A. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness.

A. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness. SECTION 15250 PIPING AND EQUIPMENT INSULATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract including General and Supplementary Conditions, Division 1 Specification

More information

PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces

PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces TECHNICAL CORRECTION January 2017 Structural PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process

More information

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 075423 - THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including Division 00 Bidding Requirements and other Division

More information

FOAMGLAS INSULATION SPECIFICATION

FOAMGLAS INSULATION SPECIFICATION FOAMGLAS INSULATION SPECIFICATION PITTSBURGH CORNING CORPORATION FOAMGLAS Products Technical Support 800 Presque Isle Drive Pittsburgh, PA 15239 724-327-6100 SPECIFICATION # I-H/C-89-02-01 REVISION 06/28/2004

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION HANGERS AND SUPPORTS FOR PLUMBING SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION 07530CP EPDM MEMBRANE ROOFING

SECTION 07530CP EPDM MEMBRANE ROOFING PART 1 GENERAL 1.1 SUMMARY SECTION 07530CP EPDM MEMBRANE ROOFING A. Section includes: 1. Adhered membrane roofing and flashing 2. Mechanically fastened roof insulation 3. Walkway pads 1.2 ARCHITECTURAL

More information

PIP PCEPA003 Process Analyzer System Field Installation Guidelines

PIP PCEPA003 Process Analyzer System Field Installation Guidelines January 2016 Process Control PIP PCEPA003 Process Analyzer System Field Installation Guidelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

PIP PNSC0035 Steam Tracing Specification

PIP PNSC0035 Steam Tracing Specification REAFFIRMATION W/EDITORIAL REVISION August 2017 Piping PIP PNSC0035 Steam Tracing Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

COMPLETE REVISION April Process Industry Practices Piping. PIP PNC00004 Piping Stress Analysis Criteria for ASME B31.

COMPLETE REVISION April Process Industry Practices Piping. PIP PNC00004 Piping Stress Analysis Criteria for ASME B31. April 2012 Process Industry Practices Piping PIP PNC00004 Piping Stress Analysis Criteria for ASME B31.3 Metallic Piping PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost

More information

NCCER Progress Blvd, Alachua, Florida Tel: (888)

NCCER Progress Blvd, Alachua, Florida Tel: (888) NCCER 13614 Progress Blvd, Alachua, Florida 32615 Tel: (888) 622-3720 E-mail: info@nccer.org INSULATING Competencies / Objectives Level One MODULE 19101 - ORIENTATION 1. Explain what insulation is and

More information

PIPEWORK INSULATION. 14/ Page 1 of 10 Pipework Insulation Rev D

PIPEWORK INSULATION. 14/ Page 1 of 10 Pipework Insulation Rev D PIPEWORK INSULATION 14/10-2014 Page 1 of 10 Pipework Insulation Rev D Contents INTRODUCTION General Scope Surfaces to be Insulated Pumps, Turbines etc Performance Minimum Pipe Insulation Thickness Physical

More information

SECTION PIPING INSULATION

SECTION PIPING INSULATION SECTION 23 07 19 PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Piping insulation for refrigerant piping within building envelope. 2. Furnishing and installation of insulation.

More information

PIP STF05521 Details for Angle Railings for Walking and Working Surfaces

PIP STF05521 Details for Angle Railings for Walking and Working Surfaces TECHNICAL CORRECTION January 2017 Structural PIP STF05521 Details for Angle Railings for Walking and Working Surfaces PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of

More information

SECTION (15081) - HVAC INSULATION

SECTION (15081) - HVAC INSULATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: SECTION 23 07 00 (15081) - HVAC INSULATION 1. Insulation Materials 2. Jackets 3. Accessories and Attachments 4. Vapor Retarders B. Related Sections: 1.02

More information

This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin

This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin PART 1: GENERAL 1.01 Purpose: This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin 1.02 Scope: A. Extent of mechanical insulation

More information

Recommended Installation and Repair Guide

Recommended Installation and Repair Guide Revision 1 7/20/2017 Insulation Jacketing Products Recommended Installation and Repair Guide Pipe and Equipment Insulation Jacketed with Factory and Field Installed Products Table of Contents 1. Scope...

More information

COMPLETE REVISION November Process Industry Practices Architectural. PIP ARS08111 Standard Steel Doors and Frames Supplier Specification

COMPLETE REVISION November Process Industry Practices Architectural. PIP ARS08111 Standard Steel Doors and Frames Supplier Specification November 2012 Process Industry Practices Architectural PIP ARS08111 Standard Steel Doors and Frames Supplier Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost

More information

STANDARD ENGINEERING SPECIFICATION for THERMAL INSULATION DESIGN

STANDARD ENGINEERING SPECIFICATION for THERMAL INSULATION DESIGN STANDARD ENGINEERING SPECIFICATION for HINDUSTAN PETROLEUM CORPORATION. VISAKH REFINERY DHT PROJECT JOB NO. : 6261 DOCUMENT NO. : A-6261-480-007 0 22/10/2008 FOR BID ENQUIRY AMS MAM JMG REV. DATE DESCRIPTION

More information

MECHANICAL INSULATION

MECHANICAL INSULATION MECHANICAL INSULATION GENERAL INFORMATION 1.1 Comply with more stringent of following latest edition of Energy Conservation and Construction Code of New York City, ASHRAE and this Guideline. DESIGN REQUIREMENTS

More information

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION SECTION 230713 DUCT INSULATION PART 1 GENERAL 1.1 SUMMARY A. Related Sections: 1. 233113 Ductwork and Accessories 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. E84-96a Test Method

More information

University of Houston Master Construction Specifications Insert Project Name

University of Houston Master Construction Specifications Insert Project Name SECTION 23 07 00 - SYSTEM INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01 00, "Mechanical

More information

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers. SECTION 230529 - HANGERS AND SUPPORTS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe hangers and supports. 2. Hanger rods. 3. Inserts. 4. Flashing. 5. Sleeves. 6. Mechanical sleeve seals. 7. Firestopping

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

PIP PNSC0011 Installation of ASME B31.3 Metallic Piping

PIP PNSC0011 Installation of ASME B31.3 Metallic Piping February 2015 Piping PIP PNSC0011 Installation of ASME B31.3 Metallic Piping PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice

More information

Mechanical Insulation for Refrigeration Systems

Mechanical Insulation for Refrigeration Systems Mechanical Insulation for Refrigeration Systems INDUSTRIAL REFRIGERATION CONSORTIUM RESEARCH & TECHNOLOGY FORUM MAY 2-3, 2012 Peter Gauchel, President/CEO L&C Insulation Inc. Overview Current trends in

More information

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 13686.00 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 230529-1 SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 1.1 SUMMARY A. Section Includes: 1. Metal pipe hangers and supports.

More information

SECTION HVAC PIPING INSULATION

SECTION HVAC PIPING INSULATION SECTION 23 0719 HVAC PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install insulation on above ground refrigerant piping and fittings as described in Contract

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT Page 220529-1 SECTION 220529 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide

More information

CFC & HCFC Free Thermal Insulation INSTALLATION AND SPECIFICATION GUIDE

CFC & HCFC Free Thermal Insulation INSTALLATION AND SPECIFICATION GUIDE Resolco Insul-Phen CFC & HCFC Free Thermal Insulation INSTALLATION AND SPECIFICATION GUIDE TABLE OF CONTENTS RESOLCO INC. Specification: Insul-Phen closed cell CFC & HCFC free phenolic foam Pipe & Equipment

More information

SECTION HVAC INSULATION

SECTION HVAC INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. B. Related

More information

STANDARD SPECIFICATIONS. Followings have been covered in this section. The work is to be carried based on the standard specifications:

STANDARD SPECIFICATIONS. Followings have been covered in this section. The work is to be carried based on the standard specifications: STANDARD SPECIFICATIONS APPENDIX -3 Followings have been covered in this section. The work is to be carried based on the standard specifications: 1) Standard Specifications for Cold Insulation 2) Standard

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Steel pipe hangers and supports. 2. Metal framing systems. 3. Thermal-hanger shield inserts. 4. Fastener systems.

More information

PERM-FLEX (JC) ASSEMBLY DIRECT APPLICATION TO CEMENT BOARD SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960

PERM-FLEX (JC) ASSEMBLY DIRECT APPLICATION TO CEMENT BOARD SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960 STUC-O-FLEX PERM-FLEX (JC) ASSEMBLY DIRECT APPLICATION TO CEMENT BOARD SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960 PART 1 - GENERAL 1.01 DESCRIPTION A. Provide all labor, materials and equipment

More information

Installation Guidelines for ITW Insulation Systems Metal Jacketing Used on Insulated Pipe

Installation Guidelines for ITW Insulation Systems Metal Jacketing Used on Insulated Pipe Installation Guidelines for ITW Insulation Systems Metal Jacketing Used on Insulated Pipe 1 SCOPE 1.1 This guideline covers the installation of ITW Insulation Systems Pabco-Childers brand aluminum and

More information

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems Pipe and Equipment Insulations Zeston PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems Zeston PVC Insulated Fitting Covers Installation Instructions for Hot,

More information

A. Product Data: Submit manufacturer s product data, with complete general and specific installation instructions, recommendations, and limitations.

A. Product Data: Submit manufacturer s product data, with complete general and specific installation instructions, recommendations, and limitations. SECTION 071700 - BENTONITE WATERPROOFING PART 1 - GENERAL 1.1 WORK SUMMARY A. The work of this section includes, but is not limited to the furnishing and installing the following materials, per project

More information

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate Colphene BSW Training and Application Guide Colphene BSW Waterproofing Membrane. 1. Prepare substrate Substrate must be structurally sound. Surface must be free of voids, spalled areas, loose aggregate,

More information

40'-0" PIPE SUPPORT (TYP.) (SEE DWG. NO. SK-2 OR DWG. NO. SK-4)

40'-0 PIPE SUPPORT (TYP.) (SEE DWG. NO. SK-2 OR DWG. NO. SK-4) SK-1 STANDARD LENGTH 4.301 40'-0" A 6" 2'-0" 9'-0" 9'-0" 9'-0" 9'-0" 2'-0" A 3" OF EXPOSED AT EACH END OF PIPE. PIPE SUPPORT (TYP.) (SEE DWG. NO. SK-2 OR DWG. NO. SK-4) EXPOSED PIPE MINIMUM GAUGE AND THICKNESS

More information

FIRESTOP JOINT SPRAY CFS-SP WB. 2mm (0.079") WET FILM ± 7.5 ± 5

FIRESTOP JOINT SPRAY CFS-SP WB. 2mm (0.079) WET FILM ± 7.5 ± 5 Design No. CEJ 27 P (HI/JS 20-05) Table. CONCRETE FLOOR ASSEMBLY: Max. two-hour rated concrete floor assembly made from either lightweight or normal weight concrete with a density of 00-50 pcf, with a

More information

Pipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines

Pipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines February 2017 Pipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process

More information

Installation Manual PIPE AND EQUIPMENT INSULATION

Installation Manual PIPE AND EQUIPMENT INSULATION PIPE AND EQUIPMENT INSULATION Contents (Click below to jump to section) Safety First 3 Material Handling 3 Preparation and Storage 4 Optimal Work Setup 5 Single Wrap Pipe 6 Double Wrap Pipe 7 Multi-Layer

More information

HVAC Piping Insulation- FIBERGLAS Insulation

HVAC Piping Insulation- FIBERGLAS Insulation PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: WATER RESISTIVE BARRIERS/WEATHER BARRIERS REPORT HOLDER: PAREX USA, INC.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: WATER RESISTIVE BARRIERS/WEATHER BARRIERS REPORT HOLDER: PAREX USA, INC. 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2045 Reissued 01/2017 This report is subject to renewal 01/2019. DIVISION: 07 00

More information

REPORT HOLDER: GREENMAKER INDUSTRIES, LLC 697 OAKWOOD AVENUE WEST HARTFORD, CONNECTICUT EVALUATION SUBJECT: DECOPLAST DDARS NOTCHED

REPORT HOLDER: GREENMAKER INDUSTRIES, LLC 697 OAKWOOD AVENUE WEST HARTFORD, CONNECTICUT EVALUATION SUBJECT: DECOPLAST DDARS NOTCHED 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3428 Reissued 07/2017 This report is subject to renewal 07/2019. DIVISION: 07 00

More information

Daytona Beach Pier Building Renovation Jun 2010

Daytona Beach Pier Building Renovation Jun 2010 SECTION 15060 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

PIP STE05501 Fixed Ladders and Cages Design Guide

PIP STE05501 Fixed Ladders and Cages Design Guide TECHNICAL CORRECTION January 2017 Structural PIP STE05501 Fixed Ladders and Cages Design Guide PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

SECTION MANUFACTURED ROOF EXPANSION JOINTS

SECTION MANUFACTURED ROOF EXPANSION JOINTS SECTION 07 71 29 - MANUFACTURED ROOF EXPANSION JOINTS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

DIVISION 7 THERMAL AND MOISTURE PROTECTION SECTION PENETRATION FIRESTOPPING

DIVISION 7 THERMAL AND MOISTURE PROTECTION SECTION PENETRATION FIRESTOPPING DIVISION 7 THERMAL AND MOISTURE PROTECTION SECTION 07 84 13 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

HVAC INSULATION. A. General Requirements for Flexible Elastomeric Insulation: 3. Use pre-molded roll on pipe sizes 3.5" and below.

HVAC INSULATION. A. General Requirements for Flexible Elastomeric Insulation: 3. Use pre-molded roll on pipe sizes 3.5 and below. 230700 HVAC INSULATION PART 1: GENERAL 1.01 RELATED SECTIONS A. Section 232300 Refrigeration B. Section 233100 Air Distribution 1.02 INSULATION A. General Requirements for Flexible Insulation: 1. Use is

More information

SECTION ROOF SPECIALTIES

SECTION ROOF SPECIALTIES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 71 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

SECTION COLD APPLIED RUBBER MODIFIED ASPHALT WATERPROOFING

SECTION COLD APPLIED RUBBER MODIFIED ASPHALT WATERPROOFING P.O. Box 599 - Mars, PA 16046 800-321-3337 SECTION 07555 COLD APPLIED RUBBER MODIFIED ASPHALT WATERPROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including

More information

INSTALLATION GUIDELINE FOR TRYMER SUPERCEL PHENOLIC INSULATION

INSTALLATION GUIDELINE FOR TRYMER SUPERCEL PHENOLIC INSULATION INSTALLATION GUIDELINE FOR TRYMER SUPERCEL PHENOLIC INSULATION TRYMER SUPERCEL PHENOLIC INSULATION IN CHILLED WATER APPLICATIONS (35 F to 60 F) Vers. 1.0 1 SCOPE 1.1 This guideline covers the installation

More information

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017 SECTION 055213 - PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Review of ASME Guidance Articles on Repair Strategies

Review of ASME Guidance Articles on Repair Strategies Review of ASME Guidance Articles on Repair Strategies Clay Rodery BP Chemicals Technology & Engineering Member/ASME Post Construction Standards Committee ASME PCC-2: Repair of Pressure Equipment and Piping

More information

FLUID APPLIED WATERPROOFING

FLUID APPLIED WATERPROOFING SECTION 07120 FLUID APPLIED WATERPROOFING PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03300 - Cast-In-Place Concrete. 2. 09200 - Metal Studs, Metal Lath, Suspension Ceilings, Plaster, and Stucco.

More information

A. National Roofing Contractors Association (NRCA) Roofing and Waterproofing Manual

A. National Roofing Contractors Association (NRCA) Roofing and Waterproofing Manual SECTION 07 22 16 - ROOF AND DECK INSULATION Specifier Note: There are numerous types of roof insulation, some which are installed in multiple-layer roof assemblies. Specifier to verify Project requirements

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The General Conditions, Special Conditions and Division 1 through Division 22 as set forth in

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

Fire Barrier Duct Wrap 615+

Fire Barrier Duct Wrap 615+ Fire Barrier Duct Wrap 615+ Duct Wrap Fire Protection System for Commercial Kitchen Grease and Ventilation Air Ducts Product Data Batts and blankets for use in fire resistive duct assemblies see UL fire

More information

Light-Metal Roof Edge, Raised

Light-Metal Roof Edge, Raised NAIL WOOD CANT TO BLOCKING 2 ROWS STAGGERED EACH ROW 24 O.C. 1/2 MIN. 10 0 MAX. FASTEN 18 O.C. WITH NEOPRENE GASKETED FASTENERS 3-1/2 MIN. 4 6 JOINT COVER PLATE SET IN TWO BEADS OF SEALANT 4 MIN. SPECIFIED

More information

PIP STF05511 Fixed Industrial Stairs

PIP STF05511 Fixed Industrial Stairs TECHNICAL CORRECTION January 2017 Structural PIP STF05511 Fixed Industrial Stairs PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice

More information

ITEM 458 WATERPROOFING FOR STRUCTURES

ITEM 458 WATERPROOFING FOR STRUCTURES ITEM 458 WATERPROOFING FOR STRUCTURES 458.1. Description. This Item shall govern for the furnishing and placing of waterproofing on concrete and steel bridge decks of railroad structures and on other structures

More information

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO SECTION 07220 - ROOF INSULATION PART 1 - GENERAL 1.01 DESCRIPTION A. Work included: The Roofing Contractor will provide all polyisocyanurate insulation and high density wood fiber roof insulation (tapered

More information

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section.

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section. 1.01 RELATED DOCUMENTS SECTION 15060 HANGERS AND SUPPORTS PART 1 - GENERAL A. Drawings and Division 1 Specification Sections, apply to this Section. 1.02 SUMMARY A. This Section includes hangers and supports

More information

1.2 The Engineer shall select appropriate sections of the specification to ensure that the specification is comprehensive for specified work.

1.2 The Engineer shall select appropriate sections of the specification to ensure that the specification is comprehensive for specified work. STAC Coating System Specification & Installation Guide 1.0 Scope 1.1 This specification may be used for the priming, caulking and wrapping with the STAC Petrolatum Coating System of any of the following

More information

ICC-ES Evaluation Report Reissued May 1, 2010 This report is subject to re-examination in two years.

ICC-ES Evaluation Report Reissued May 1, 2010 This report is subject to re-examination in two years. ICC-ES Evaluation Report ESR-1255 Reissued May 1, 2010 This report is subject to re-examination in two years. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council

More information

COMPLETE REVISION November Process Industry Practices Structural. PIP STF05530 Grating Fabrication Details

COMPLETE REVISION November Process Industry Practices Structural. PIP STF05530 Grating Fabrication Details COMPLETE REVISION November 2006 Process Industry Practices Structural PIP STF05530 Grating Fabrication Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process

More information

SECTION PRE-ENGINEERED BUILDING INSULATION

SECTION PRE-ENGINEERED BUILDING INSULATION PART 1 GENERAL SECTION 07213 PRE-ENGINEERED BUILDING INSULATION Microsoft Word Instructions: Display hidden notes to specifier by using "Tools"/"Options"/"View"/"Hidden Text". 1.1 SECTION INCLUDES A. Pre-Engineered

More information

PIPE AND EQUIPMENT INSULATION

PIPE AND EQUIPMENT INSULATION Contents (Click below to jump to section) Safety First 2 Material Handling 2 Preparation and Storage 3 Optimal Work Setup 4 Single Wrap Pipe 6 Double Wrap Pipe 7 Multi-Layer Wrap Pipe 8 Pipe Fittings 10

More information

JC Code & Construction Consultants, Inc. Advanced Training: The FBC & ASTM C 1063

JC Code & Construction Consultants, Inc. Advanced Training: The FBC & ASTM C 1063 JC Code & Construction Consultants, Inc. Advanced Training: The FBC & ASTM C 1063 1 Welcome! This course was developed by : JC Code & Construction Consultants, Inc. DBPR Provider Number 0003379 www.jccode.com

More information

1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards

1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards SECTION 07185 TRAFFIC MEMBRANE PART 1 GENERAL 1.1 SECTION INCLUDES A. Traffic membrane, consisting of welded seam PVC waterproofing, over f following surfaces: 1. Decks, balconies, and sun porches 2. Walkways,

More information

Cryogenic Pipe Support Systems

Cryogenic Pipe Support Systems Cryogenic Pipe Support Systems Overview Rilco cryogenic pipe supports are developed to support cold piping in various applications ranging from chilled water to liquefied natural gas. The qualified service

More information

A. Meet at Project site <insert number> days before starting installation.

A. Meet at Project site <insert number> days before starting installation. SECTION 074643 - COMPOSITION SIDING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Engineered wood cladding. 2. Soffit panels. 3. Trim and fascia. 4. Sealant. 5. Weather barrier. 6. Flashing. 1.2

More information

HALIFAX HUMANE SOCIETY BOARDING AND GROOMING FACILITY SECTION STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS

HALIFAX HUMANE SOCIETY BOARDING AND GROOMING FACILITY SECTION STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS SECTION 075216 - PART 1 - GENERAL 1.1 SUMMARY A. Section includes styrene-butadiene-styrene (SBS) modified bituminous membrane roofing. 1.2 DEFINITIONS A. Hot Roofing Asphalt: Roofing asphalt heated to

More information

SECTION RESILIENT SHEET FLOORING

SECTION RESILIENT SHEET FLOORING SECTION 09 65 16 RESILIENT SHEET FLOORING SPEC WRITER NOTE: Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1.

More information

SECTION REINFORCING STEEL

SECTION REINFORCING STEEL SECTION REINFORCING STEEL 1. DESCRIPTION This specification shall govern the furnishing and placing of reinforcing steel, deformed and smooth, of the size and quantity designated on the plans and in accordance

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: MINERAL FIBER FIREPROOFING REPORT HOLDER: UNIFRAX I LLC

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: MINERAL FIBER FIREPROOFING REPORT HOLDER: UNIFRAX I LLC 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2224 Reissued 08/2017 This report is subject to renewal 08/2018. DIVISION: 07 00

More information

EDITORIAL REVISION March Process Industry Practices Refractory. PIP RFSM1000 Monolithic Refractory Material Specification

EDITORIAL REVISION March Process Industry Practices Refractory. PIP RFSM1000 Monolithic Refractory Material Specification March 2013 Process Industry Practices Refractory PIP RFSM1000 Monolithic Refractory Material Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05400 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide all cold formed metal framing. B. This Section includes:

More information

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of

More information

Division 11 - Equipment Section 11401

Division 11 - Equipment Section 11401 PART 1 - GENERAL 1.1 GENERAL A. Division 1 General Requirements applies and becomes a part of this Section of the Specification as fully as if repeated herein. B. Items of equipment which are included

More information

INSULATION SECTION 15250

INSULATION SECTION 15250 INSULATION SECTION 15250 PART 1 GENERAL 1.1 DESCRIPTION A. Provide complete systems of insulation for piping, ducts, boiler stacks and breeching, and mechanical equipment as specified. B. Related work