1 SECTION 0XXXX FIRESTONE EPIC SYSTEM PART 1 - GENERAL 1.01 CONDITIONS A. The general provisions of the Contract, including General and Supplementary Conditions and General Requirements (if any) apply to the work specified in this Section SCOPE OF WORK A. Furnish all labor, material, equipment and services necessary to provide all Firestone Environmental Passive Integrated Chamber (EPIC) work, complete in place, as indicated on Drawings and Specifications herein. Work specified in this Section, but is not limited to the following: 1. Installation of the EPIC system. 2. Survey work shall ensure that the subgrade of the EPIC installation area is laser level flat, smooth, compacted and free of sharp objects which might puncture the Firestone EPDM (EPDM) geomebrane rolls. The subgrade must be approved by the Owner s Representative. 3. Ensure the finish grade surface elevation is consistent across the field, and laser level flat. 4. Plans and provisions are made for adequate containment of sand and aggregate along the EPIC cell perimeter edges as specified on plans. 5. EPIC parts assembly and related service components are made according to the EPIC approved plans or as supervised by the Owner s Representative. 6. Grading, leveling, and final compaction of the sand fill are to be completed by the Contractor and approved by the Owner s Representative on or before proceeding to the final placement of sod phase. 7. Locate and protect all existing EPIC components, pipes, valves, valve boxes and other physical features of the EPIC area and the immediate vicinity. 8. Protect all pavement and hard surface areas. Damaged areas will be replaced at Contractor s expense. 9. Installation of aggregate and sand shall be done with tracked skid steers, front end loaders, telescoping conveyor or other acceptable industry practices ensuring damage is not done to the EPIC components. 10. Settling, consolidation and compaction shall be done with water, vibra-plate, rolling and/or tracked skid steers as specified and as approved by Owner s Representative. 11. Furnish and apply specified amendments and/or fertilizer.

2 12. Incorporate amendments using a Toro Sand Pro, Blekavator or equivalent machine with 2 to 4- inch cultivating attachments. 13. See the Grading Plan for finish grade elevations. 14. Sod shall be installed per plans and specifications as specified QUALITY ASSURANCE A. Approved EPIC System Contractors 1. The Contractor must take part in an installation training program and at the end of the program must have met certain objectives to be approved for installation of the EPIC System. Approval does not mean the Contractor is certified but rather they have an adequate understanding to install the EPIC System. 2. Training shall include retaining an EPIC Construction Engineer for certain sections of the installation process at the Contractor s expense. Depending on the Contractor s experience, the EPIC Construction Engineer may or may not be on site throughout the entire installation process. B. The Contractor shall obtain and submit imported sand and aggregate samples to Owner s Representative for inspection prior to using imported fill material for each EPIC area. 1. The imported bottom bridging aggregate layer: Submit a one (1) gallon sample of washed 1/4-inch minus bridging aggregate meeting the general specifications for ASTM C33-03 (Table 2 Grading Requirements for Coarse Aggregates, Size No. 89), Standard Specifications for Concrete Aggregates. This material shall be tested by the approved EPIC Testing Agent at the Contractor s expense. 2. The imported sand layer: Refer to EPIC recommendations for Choosing the Right Sand and EPIC Sand Testing Procedure as preliminary screening tools. Submit a two (2) gallon sample of medium washed sand meeting the general specifications for ASTM F , Standard Guide for Construction of High Performance Sand-Based Rootzones for Sports Fields. The imported sand layer shall also meet the specifications detailed by EPIC in regards to particle size, capillary draw, settlement, consolidation, compaction, and drainage characteristics. This material shall be tested by the approved EPIC Testing Agent at the Contractor s expense. This testing shall determine the minimum EPIC system profile height, the proper operating profile height and if any soil amendments are necessary. 3. The test results of the sand and aggregate shall be reviewed by the Owner s Representative, who has the right to reject the imported sand and aggregate if either does not meet specifications. C. The Contractor shall obtain and submit sod & fertilizer information to Owner s Representative for inspection PRODUCT DELIVERY, STORAGE AND HANDLING A. Deliver undamaged products to job with tags and labels intact. B. Arrangements to be made for forklift or equivalent to unload palletized EPIC components

3 off delivery truck. C. Store materials in protected areas, off the ground, and in areas as not to interfere with the progress of the work. D. Transport, store and handle in strict accord with the Manufacturer s written specifications. E. Make delivery to job when notified by Contractor verifying that the job is ready to receive the work of this section and that arrangements have been made to properly store, handle, and protect such materials and work JOB CONDITIONS A. Contractor shall acquaint himself with all existing site conditions. If unknown active utilities are encountered during work, notify Owner s Representative promptly for instructions. Failure to notify will make Contractor liable for damage to these utilities arising from Contractor s operations subsequent to discovery of such unknown active utilities FIELD MEASUREMENTS A. Make and be responsible for all field dimensions necessary for proper fitting and completion of work. Report discrepancies to Owner s Representative before proceeding. B. Submit an As-Built construction conditions survey at the Contractor s expense. PART 2 PRODUCTS 2.01 GENERAL A. All materials shall be of standard, approved and first-grade quality and shall be in prime condition when installed and accepted. Any commercially processed or packaged material shall be delivered to the site in the original unopened container bearing the Manufacturer s guaranteed analysis. B. The Contractor shall supply Owner s Representative with a sample and/or shop drawings of all supplied materials accompanied by analytical data from an approved laboratory source illustrating compliance of bearing the Manufacturer s analysis MANUFACTURERS A. Firestone ATS Mesh Elements, Typical: [Insert local sales representative information] B. Firestone EPIC Chamber, Typical: [Insert local sales representative information] C. Firestone EPIC Grommet, Typical: [Insert local sales representative information] D. Firestone EPDM Geomembrane, Typical: [Insert local sales representative information] E. Firestone Geotextile Fabric, Typical: [Insert local sales representative information]

4 F. Pumps, Typical: [Insert manufacturer, model, etc.], [Insert local sales representative information] G. Water level maintaining float valve, Typical: [Insert manufacturer, model, etc.], [Insert local sales representative information] H. Firestone EPDM Geomembrane Penetration Seam Method1. Y2-inch to 2 Y2-inch outside diameter 1. Firestone Quickseam Conduit Flashing 2. Manufacturer s Part No. W inch to inch outside diameter I. Valve boxes for inlet and observation vaults, Typical: [Insert manufacturer, model, etc.], [Insert local sales representative information] 2.03 EPIC SYSTEM COMPONENTS A. Firestone ATS Mesh Elements 1. Structural engineered sand base layer. 2. Manufacturer s Part No. W56WMGTNM01 B. Firestone EPIC Chamber 1. Manufacturer s Part No. W56WMGTEC60 C. Inlet and Observation Vaults 1. Oldcastle Synertech Series, 24"x24"x1 8" D. Firestone EPIC 2-inch Grommets 1. Manufacturer s Part No. W56WMGTEG01 E. Firestone EPDM Geomembrane mil, Non-Reinforced EPDM Membrane 2. Firestone RubberGuard 3. Manufacturer s Part No. RubberGuard F. Firestone EPDM Geomembrane Seam Method 1. 6-inch X 100-feet length rolls G. Firestone Quickseam Batten Cover Strip 3. Manufacturer s Part No. W56-RAC Firestone Quickseam Pipe Flashing

5 2. Manufacturer s Part No. W H. Firestone Geotextile Fabric oz. weight, Non-Woven Geotextile 2. Firestone Geotextile 3. Manufacturer s Part No. W I. Connection pipes between EPIC chambers shall be 2-inch non-pressurized Schedule 40 Solid Wall Construction HDPE, ABS, PVC or approved equal. J. Inlet Header and Zero Drain / Return Header pipes shall be a 6-inch non-pressurized SDR 35 PVC with push-on elastomeric gasketed joints bonded to the inner wall of the gasket recess of the bell socket. K. Pressurized pipe from reservoir sump pump to inlet vaults shall be 1.5-inch Schedule 40 Solid Wall HDPE, ABS, PVC or approved equal. L. Pressurized pipe within manhole to be Schedule 80 solid wall HDPE, ABS, PVC or approved equal. M. All other pipe as shown on the plans or as approved as equal. N. Concrete Manholes 1. Concrete manholes shall be in accordance with plans and specifications. 2. Concrete manholes shall be precast reinforced integrated concrete barrel structure w/top slab & integrated copolymer polypropylene steel steps. Manhole cover shall be minimum 24-inch dia. lightweight solid access hatch w/locking mechanism. 3. Concrete shall be sanitary sewer quality capable of withstanding fertilizer erosion as well as resistance to effects of salt water. 4. Concrete shall have a minimum compressive strength of 4,000 PSI minimum at 28 days. 5. Reinforcing steel to meet the design requirements of H-20 traffic loads for the top slab and 50 PCF lateral soil pressure for the walls and the floor. 6. Contractor to supply and install: pipe and fittings, rubber boot at pipe penetrations larger than 4- inch dia., non-shrink grout at all other pipe penetrations, joint seal at all precast joints. 7. All pipe connections to be waterproof through concrete manhole. 8. All electrical, plumbing, structural work, etc. to be done per local codes and requirements where required and applicable. 9. All electrical and water supply to be design/build by Contractor. 10. Contractor to ensure all pipe connections, and concrete manholes are water tight

6 with water test. a. Test manholes twice prior to acceptance. b. Fill system and let stand for 24 hours. c. Empty, refill and determine water loss over next two (2) hours. d. Any leakage shall be cause for rejection. e. Perform second test. No manhole will be accepted if there is any leakage over the two (2) hour period. O. Reservoir Manhole Pump, [Insert manufacturer, model, etc.] 1. Pump to be installed by a licensed electrical Contractor and shall conform to Local Codes and Regulations. Install per Manufacturer s Specifications. 2. All electrical and water supply to be design/build by Contractor. P. Water level maintaining float valve, [Insert manufacturer, model, etc.] Q. Required electrical to be design/build by Contractor, and that such electrical connections will be designed, certified, and installed per local building codes and regulations by a licensed Contractor. This shall include, but not be limited to supply, control panels, junction boxes, etc WATER SUPPLY LINES A. Water delivery systems supplying water to the storage reservoir manholes to be installed according to plans with minimum delivery pressure of 20 PSI and delivery volume of 12 GPM per acre of turf per pump. B. Required water supply to be design/build by Contractor, and that such water source connections will be designed, certified and installed by others, per local building codes and regulations by a licensed Contractor SAND AND BRIDGING AGGREGATE FILL MATERIAL A. The sand shall meet EPIC Specifications of: 1. General Specifications of ASTM F , Standard Guide for Construction of High Performance Sand-Based Rootzones for Sportsfields. 2. The sand should be advertised as washed sand, where most of the silt and clay particles have been removed. 3. The ph of the sand should be in the neutral range ( ). 4. The sand should feel gritty when rubbed between the fingers, crumble readily when dry, and absorb water quickly when water is poured on top of it. 5. Ideal sand should have 90 to 100 percent of its particles between 0.20 mm

7 and 1.0 mm in diameter. Within this range, the medium sized particles, with a diameter between 0.25 mm and 0.50 mm, should comprise at least 50 to 70 percent. However, the preferred acceptable ranges are listed below: CLASSIFICATION PARTICLE SIZE (mm) SIEVE # ACCEPTABLE RANGE (%) FINE GRAVEL 2.00 AND UP 10 VERY COURSE SAND COURSE SAND MEDIUM SAND FINE SAND VERY FINE SAND SILT AND CLAY under The sand should be evaluated to ensure after the EPIC sand evaluation, it meets the proper capillary rise and drainage dynamics. B. The bridging aggregate shall meet EPIC specifications of: 1. General Specifications of ASTM C33-03 (Table 2 Grading Requirements for Coarse Aggregates, Size No. 89), Standard Specifications for Concrete Aggregates. 2. The aggregate should be advertised as washed aggregate, where most of the silt and clay particles have been removed. 3. For most aggregates the sieve size should fall within the following parameters: PARTICLE SIZE (mm) ACCEPTABLE RANGE (%) Less than 1 Under 10 2 to 8 80 Greater than 9 Under 10 PART 3 - EXECUTION 4. The aggregate should be evaluated to ensure after the EPIC aggregate evaluation, it meets proper bridging capacity. 5. The aggregate layer must provide an interface barrier to bridge the overlying EPIC sand above it. It must meet the general specifications of the United States Golf Association (USGA) where the bridging factor is D1 5 (aggregate) less than or equal to 8 X D85 (rootzone). 6. As sand sizes vary from very fine (0.05 mm) to course (2.0 mm), the aggregate layer generally follows the 8:1 ratio rule where most of the aggregate particles in the aggregate are not larger than 8 times the particle size of the sand above it.

8 3.01 SUBGRADE PREPARATION A. An excavated containment area shall be prepared by others prior to EPIC subgrade preparation to receive a minimum 14-inch profile of imported washed sand, 2-inch bridging aggregate fill material, and EPIC components over the entire system surface. Overall minimum depths of EPIC areas are 16- inch in turf areas as specified on plans and as determined by tested and approved sand & aggregate samples per Section 1.03 and B. The base of the EPIC cell containment areas shall be laser level flat and sloped 0% in all directions with a grading tolerance of ±0.50-inch. C. After the subgrade has been properly graded, it shall be compacted using a suitable vibrating roller or compactor to a minimum 95% Standard Proctor Density or as outlined in the Geotechnical Report. The subgrade shall be sloped 0% in all directions with a grading tolerance of ±0.5 inches as specified above. D. The Contractor shall provide compaction testing in accordance with the Geotechnical Report OR at a minimum one test per 5,000 square feet per EPIC System. Results of the compaction testing shall be submitted to Owner s Representative and approved prior to proceeding to the installation of subsequent system components. The compaction testing shall be at the Contractor s expense SUBGRADE EVALUATION AND FINISH A. After subgrade compaction the end result should be a smooth, laser level, compacted surface sloped 0% in all directions with a grading tolerance of ±0.50-inch. The subgrade shall be free of sharp objects which might puncture the EPDM geomembrane rolls and must be approved by Owner s Representative. B. If the Contractor encounters unsuitable material for constructing a subgrade per the specifications of Section 3.01, they shall develop and present a plan to Owner s Representative for approval. Any soil correction costs shall be at the Contractor s expense SUBGRADE EPIC EPDM GEOMEMBRANE APPLICATION A. After the subgrade is deemed acceptable by Owner s Representative the installation of the 4.5 oz. non-woven geotextile fabric shall proceed where specified. B. Roll out protective geo-textile fabric sub-liner over bottom and sides of subgrade. Secure in place to prevent wrinkling from vehicle tire and/or tracks. Overlap edges with a minimum of 6 to 12-inches of material OR as per Manufacturer s Specifications. C. Roll out EPDM geomembrane material over smooth sub-grade and remove wrinkles or folds from bottom of liner. Overlap edges with a minimum of 8-inch of material and perform seaming per the Manufacturer s Specifications as shown in the EPDM Geomembrane Quickseam Batten Cover Strip method. D. EPDM geomembrane is extended up the EPIC containment cells slightly above finished grade along perimeter walls separating non EPIC areas. Do not trim excess material until finished grade is established. E. EPDM geomembrane converging into EPIC cell corners is neatly folded over itself to form a watertight continuity.

9 F. Do not construct more lined EPIC cells as can be filled in a day. Avoid exposing liner for extend4d periods. Liner placement shall be such as to avoid unnecessary traffic over liner material SYSTEM FEED, RESERVOIR AND DRAIN LINE INSTALLATION A. Install 6-inch diameter Zero-Drain / Return Header Reservoir Manhole Connection Pipes according to plans or specifications. Be sure that connection pipes are at proper elevations to maintain gravity drain function back to appropriate storage reservoirs without sags that can retain water. B. Install 1.25-inch diameter supply line from sump pump with reducing tee to 1.0-inch diameter supply line to inlet vaults. Pipe size and materials as per plans. C. 6-inch Inlet Header and Zero Drain / Return Header pipes must be surrounded by sand or road base material prior to backfilling with native excavated trench material. D. All joints in Inlet Header and Zero Drain / Return Header pipes outside of EPIC System must be connected water tight per accepted & approved industry standards for plastic pipe installation. E. Install the appropriate number of inlet and observation vaults as specified on the construction plans. F. Install storage reservoir at elevation specified on plans. Storage reservoir to be installed on an approved sand or aggregate base per the Manufacturer s requirements FIRESTONE EPIC CHAMBER CONNECTION AND AGGREGATE FILL A. EPIC Chambers are to be installed laser level flat with 0% grade. B. Connect EPIC Chambers, and 2-inch non-pressurized Schedule 40 HDPE/ABS/PVC or approved equal connections as specified on plans. C. Use an appropriate alignment method to maintain straight line separation distance between EPIC Chamber rows as specified on plans. D. For standard EPIC Chamber connections, do not glue but insert 2-inch connection pipes 3.25-inch into Chamber to engage the internal stop nub inside the EPIC Chamber. E. For Zero Drain EPIC Chamber connections, do not glue but insert 2-inch Zero Drain connection pipes 2.25-inch into Chamber. F. For Header Pipe connections, do not glue but insert 2-inch connection pipes through grommet and 2.25-inch into Header pipe. G. After 2-inch connections are made, weigh down all EPIC Chambers with sand bags on top of EPIC crown to prevent shifting during aggregate and sand fill operations. H. Place EPIC approved washed 1/4-inch minus bridging aggregate 2-inch deep along bottom of EPDM geomembrane and along sides of EPIC Chambers. The gravel fill must enter and cover the outside sidewall openings in the EPIC Chamber.

10 I. Remove excess aggregate from crown of EPIC Chamber if present SAND PLACEMENT AND PRELIMINARY FINAL GRADE A. Place all imported sand over aggregate and to depths specified on plans. Use appropriate equipment to install sand over aggregate in a manner that does not disrupt aggregate or damage other system components. Equipment such as telescoping conveyors may be used to place imported sand. B. Remove sand bags on top of EPIC crown as imported sand covers and weighs down EPIC chamber. C. Consolidate sand in two steps: 1) area between 2-inch connection pipes and EPIC Chamber sides and 2) area above Chambers to final grade level in lifts of no more than 8-inch in depth. D. Water settle and roll using a 2-feet x 6-feet smooth roller delivering approximately 100 pounds weight per linear foot width. E. Upon completion of preliminary fine grading and placement of all sand, the Contractor shall notify Owner s Representative, and have available a laser plane system with slope control for inspection. F. The surface of the EPIC system shall be flat with consistent grades, sloped 0% in all directions, and a grading tolerance of ±0.5-inch FIRESTONE ATS MESH ELEMENTS A. ATS Mesh Elements shall be incorporated with a Blekavator or approved equal from finish grade to 43-inch below finish grade in designated areas as specified on plans. B. One bale of ATS Mesh Elements shall be used for every five (5) cubic yards of imported sand or for every 400 sq. ft. when specifying a 43-inch installation depth. A profile reinforced with 43-inch of ATS Mesh Elements shall support snow plow equipment or other vehicles for mowing or maintenance no heavier than medium duty pick-up truck. C. Areas where ATS Mesh Elements are installed must have soil amendments incorporated with a Blekavator or approved equal at the same time in conjunction with the Netlon Mesh Elements to avoid a secondary disturbance of blended mesh material. Take care not to damage subsurface components. 1. Soil Amendments a. Apply surface materials using a drop or cyclone type spreader for uniform distribution of materials ~ Iron Organic Sustane (April/May 2012) ~ Iron Organic Sustane (June 1 st 2012) ~ Iron Organic Sustane (July 15 th 2012)

11 ~ Iron Organic Sustane (September 1 st 2012) Organic Winterizer (October 15 th 2012) 7. Apply Starter Fertilizer at the rate of 1 pound of material per 1,000 sq. ft. 8. Apply ~Iron Organic Sustane at a rate of 1 pound of material per 1,000 sq. ft. 9. Apply Organic Winterizer at a rate of 1 pound of material per 1,000 sq. ft. 10. Areas not receiving Firestone ATS Mesh Elements can have the soil amendments incorporated to a depth of 2 to 4 inches using a Toro Sand Pro (or approved equal) with 2 inch teeth in 2 directions (45 and 90 degrees). Take care not to damage subsurface components. D. Upon final completion of installation of ATS Mesh Elements, burn off of exposed mesh (if seeding is proposed), and approval by Owner s Representative has been provided, proceed to vegetation installation FINAL SURFACE PREPARATION A. Slowly introduce water into the system and observe the pattern of capillary rise to the surface. B. Use the color change in the sand during the water charging process to identify flow restrictions or anomalies if any. Notify Owner s Representative if an even moisture pattern does not develop at the finish grade level. C. Apply moisture or irrigation to settle the surface and roll with a 2-feet x 6-feet roller having approximately 100 lbs. of weight per linear foot width. D. Repeat operation until surface is smooth, level, and firm. Foot printing should not be deeper than 0.5- inch SOD INSTALLATION A. Before seed is applied, Owner s Representative must inspect the field. Sod shall not be applied until further settling is not apparent. B. The EPIC system must be adjusted so that moisture is present in the top 1/4-inch of the surface OPERATIONS AND MANTINANCE MANUAL A. See Manufacturer s operations and maintenance manual. END OF SECTION

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

TABLE OF CONTENTS

TABLE OF CONTENTS DIVISION 33: SEWER AND SEPTIC SYSTEMS 33 3633 UTILITY SEPTIC TANK DRAINAGE FIELD TABLE OF CONTENTS 33 0000-1 SECTION 33 3633-- UTILITY SEPTIC TANK DRAINAGE FIELD PART 1 - GENERAL 1.1 SUMMARY A. Includes

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

MagnumStone Specifications Gravity

MagnumStone Specifications Gravity MagnumStone Specifications Gravity SPECIFICATION FOR MAGNUMSTONE GRAVITY MECHANICALLY STABILIZED EARTH SYSTEM PART 1: GENERAL.01Description The work consists of supplying and installing all aspects of

More information

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

PERMEABLE INTERLOCKING PAVERS

PERMEABLE INTERLOCKING PAVERS PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement

More information

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM SECTION 32 32 23 SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM PART 1: GENERAL 1.01 Scope Work includes furnishing all materials, labor, equipment, and supervision to install a Stonebridge segmental

More information

PAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS

PAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS SECTION 32 14 13.16 PAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs used as ballast and/or paving on

More information

DRIVABLE GRASS GUIDELINE FOR NON PLANTED DRY INFILL INSTALLATIONS

DRIVABLE GRASS GUIDELINE FOR NON PLANTED DRY INFILL INSTALLATIONS DRIVABLE GRASS GUIDELINE FOR NON PLANTED DRY INFILL INSTALLATIONS Please read through this instruction completely before beginning your installation. Be sure the proper equipment, and safety precautions

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

SECTION STORM DRAIN

SECTION STORM DRAIN PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures. 1-02 RELATED SECTIONS A. Division 00 Contract

More information

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS SECTION 13100 MECHANICALLY STABILIZED EARTH RETAINING WALLS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Includes all labor, material, equipment, testing and submittals required to design and complete construction

More information

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS AFTER FEBRUARY 1, 2011 ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS 481.1 Description. This specification shall govern for the construction of monolithic, reinforced concrete box sewers of the size,

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 321610 - CURBING PART 1 - GENERAL 1.1 DESCRIPTION A. This Section specifies requirements for furnishing and installing all types of curbing including the following: granite curb, concrete and bituminous

More information

GUIDELINE FOR PLANTED INFILL INSTALLATIONS. Please read prior to installation, and have proper equipment and safety precautions in place.

GUIDELINE FOR PLANTED INFILL INSTALLATIONS. Please read prior to installation, and have proper equipment and safety precautions in place. GUIDELINE FOR PLANTED INFILL INSTALLATIONS Please read prior to installation, and have proper equipment and safety precautions in place. For additional information please visit our website at www.soilretention.com

More information

RECONSTRUCTION OF DISTRESSED PAVEMENTS Full-Depth Rehabilitation (FDR) (Portland cement)

RECONSTRUCTION OF DISTRESSED PAVEMENTS Full-Depth Rehabilitation (FDR) (Portland cement) 1.0 DESCRIPTION. RECONSTRUCTION OF DISTRESSED PAVEMENTS Full-Depth Rehabilitation (FDR) (Portland cement) This specification shall govern the process known as Full-Depth Rehabilitation (FDR). FDR consists

More information

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating

More information

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete

More information

DRIVABLE GRASS GUIDELINE FOR DRIVABLE TURF INSTALLATION

DRIVABLE GRASS GUIDELINE FOR DRIVABLE TURF INSTALLATION DRIVABLE GRASS GUIDELINE FOR DRIVABLE TURF INSTALLATION Please read through this instruction completely before beginning your installation. Be sure the proper equipment, and safety precautions are in place.

More information

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

R-TANK SPECIFICATIONS

R-TANK SPECIFICATIONS TECHNICAL STORMWATER MANAGEMENT R-TANK SPECIFICATIONS PART 1 GENERAL 1.01 Related Documents A. Drawings, technical specification and general provisions of the Contract as modified herein apply to this

More information

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu INSTALLATION INSTRUCTIONS Note: The following installation instructions are based off of ASTM E 1643 (Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular

More information

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required

More information

Appendix B.2. Construction Specifications for Infiltration Practices

Appendix B.2. Construction Specifications for Infiltration Practices Appendix B.2 Construction Specifications for Infiltration Practices B.2.A Infiltration Trench General Notes and Specifications An infiltration trench may not receive run-off until the entire contributing

More information

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating

More information

HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS

HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS PART 1 - GENERAL WORK INCLUDED A. Provide all equipment and materials, and do all work necessary to construct a HydroGrid subsurface irrigated fastdry

More information

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES 1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18) Page 1 of 8 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

Cement Stabilized Soil (CSS) (Portland cement)

Cement Stabilized Soil (CSS) (Portland cement) Cement Stabilized Soil (CSS) (Portland cement) 1.0 DESCRIPTION. This specification shall govern the process known as Cement Stabilized Soil (CSS). CSS consists of mixing the existing base, subbase and

More information

Base Course Design and Construction

Base Course Design and Construction Part I General A. This information is to be used as a guideline in construction a dynamic aggregate base and drainage system. Project conditions may vary based on overall scope of work and location. Any

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. Division 01 Specification Sections, Drawings, General Conditions, Supplementary General Conditions, and Special Conditions apply to this section.

A. Division 01 Specification Sections, Drawings, General Conditions, Supplementary General Conditions, and Special Conditions apply to this section. Note: This guide specification for U.S. applications is for concrete grid units placed on a sand bedding course over a compacted dense-graded aggregate base. The text allows an option of topsoil and grass

More information

SPECIFICATION FOR MAGNUMSTONE GEOGRID REINFORCED Mechanically Stabilized Earth (MSE) SYSTEM

SPECIFICATION FOR MAGNUMSTONE GEOGRID REINFORCED Mechanically Stabilized Earth (MSE) SYSTEM MagnumStone Specifications Geogrid Reinforced SPECIFICATION FOR MAGNUMSTONE GEOGRID REINFORCED Mechanically Stabilized Earth (MSE) SYSTEM PART 1: GENERAL 1.01 Description The work consists of supplying

More information

Section (1997 Section 02795) PERMEABLE, FLEXIBLE and PLANTABLE CONCRETE EROSION CONTROL SYSTEM

Section (1997 Section 02795) PERMEABLE, FLEXIBLE and PLANTABLE CONCRETE EROSION CONTROL SYSTEM PART 1: Section 32 12 43 (1997 Section 02795) PERMEABLE, FLEXIBLE and PLANTABLE CONCRETE EROSION CONTROL SYSTEM GENERAL 1.01 Description A. Work shall consist of furnishing all material, labor, services

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

SECTION SUBDRAINAGE

SECTION SUBDRAINAGE SECTION 33 46 00 SUBDRAINAGE PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish all labor, tools, and equipment and perform all Work necessary for, or incidental to, the supply and installation

More information

DETENTION, RETENTION AND RECHARGE STRUCTURES

DETENTION, RETENTION AND RECHARGE STRUCTURES DETENTION, RETENTION AND RECHARGE STRUCTURES Introduction Foundation, trenchwall, bedding and backfill considerations for multiple barrel detention systems are not unlike those for conventional CSP installations.

More information

50.20 Drainage Structure Design

50.20 Drainage Structure Design 50.20 Drainage Structure Design All drainage structures, with the exception of bridges, culvert bridges and, in some cases, culverts, shall be designed for HS20-44 loading. Refer to Section 50.22 for design

More information

StormTech Construction Guide

StormTech Construction Guide M /M 00 35 C- A division of REQUIRED MATERIALS AND EQUIPMENT LIST 00 45 C- StormTech Construction Guide Detention Retention Water Quality Acceptable fill materials per Table 1 Woven and non-woven geotextiles

More information

Installation Guidelines

Installation Guidelines 815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Guidelines Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles (optional),

More information

SPECIFICATION FOR CORNERSTONE GEOGRID REINFORCED SEGMENTAL RETAINING WALL SYSTEM

SPECIFICATION FOR CORNERSTONE GEOGRID REINFORCED SEGMENTAL RETAINING WALL SYSTEM CornerStone Specifications Geogrid Reinforced SPECIFICATION FOR CORNERSTONE GEOGRID REINFORCED SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL 1.01 Description The work consists of supplying and installing

More information

SECTION SUBSURFACE DRAINAGE (Vertical applications)

SECTION SUBSURFACE DRAINAGE (Vertical applications) SECTION 02620 SUBSURFACE DRAINAGE (Vertical applications) PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Prefabricated Sheet Drainage System as a hydrostatic water relief system {NOTE TO SPECIFIER: Edit

More information

B. Fiberglass for construction in back lot easements placed on cast-in-place base.

B. Fiberglass for construction in back lot easements placed on cast-in-place base. Section 02083 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fiberglass manholes for unpaved areas placed on top of a precast base to form a manhole. B. Fiberglass for construction in back lot easements

More information

STORMCAPTURE. Installation Manual

STORMCAPTURE. Installation Manual STORMCAPTURE Installation Manual Introduction Site Preparation Delivery & Installation LinkSlabs Backfill Introduction StormCapture (shown in Figure 1) is a total stormwater management system. The highly-configurable

More information

REGIONAL CONSTRUCTION STANDARDS

REGIONAL CONSTRUCTION STANDARDS REGIONAL CONSTRUCTION STANDARDS SIXTH EDITION Publication Update 6.5 (Full Committee Approved Proposed Revision 6.5 Storm Sewer Joint Wrap - Section 302 As Publication Update 6.5) March 27, 2018 Copyright

More information

SPECIAL SPECIFICATION 3504 Septic Tank System

SPECIAL SPECIFICATION 3504 Septic Tank System 1993 Specifications CSJ s 3136-01-126, etc. & 0683-01-070, etc. SPECIAL SPECIFICATION 3504 Septic Tank System 1. Description. This Item shall govern for all materials, equipment and labor necessary for

More information

SECTION PRECAST CONCRETE MANHOLES

SECTION PRECAST CONCRETE MANHOLES SECTION 03 48 10 PRECAST CONCRETE MANHOLES PART 1: GENERAL 1.01 SECTION INCLUDES A. Precast concrete manholes for sanitary sewers and water lines or as indicated on the Drawings. B. Precast concrete sanitary

More information

SECTION CONCRETE GRID PAVEMENTS (1995 MasterFormat Section 02795)

SECTION CONCRETE GRID PAVEMENTS (1995 MasterFormat Section 02795) SECTION 32 14 13.19 CONCRETE GRID PAVEMENTS (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications is for concrete grid units placed on a sand bedding course over a compacted

More information

SECTION UTILITY MANHOLES AND STRUCTURES

SECTION UTILITY MANHOLES AND STRUCTURES SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition

More information

SECTION 1 STALOK FIBER FOR TURF PARKING / EVENT STAGING AND FIRE LANES

SECTION 1 STALOK FIBER FOR TURF PARKING / EVENT STAGING AND FIRE LANES SECTION 1 Stabilizer Solutions, Inc. 205 S. 28 th St. Phoenix, AZ 85034 800-336-2468 (Fax) 602-225-5902 Website: stabilizersolutions.com E-Mail: info@stabilizersolutions.com STALOK FIBER FOR TURF PARKING

More information

SECTION 10 - TRENCHING AND BACKFILLING

SECTION 10 - TRENCHING AND BACKFILLING SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 04821 TEMPORARY VEHICLE AND EQUIPMENT FUELING AREA PART 1 - GENERAL 1.01 Description Installation of erosion and sediment control for a temporary vehicle and equipment fueling

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

StormTech Construction Guide

StormTech Construction Guide Stormtech MC-3500 Construction Guide 12/31/14 11:18 AM Page 1 M /M 00 35 C- A division of REQUIRED MATERIALS AND EQUIPMENT LIST 00 45 C- StormTech Construction Guide Detention Retention Water Quality Acceptable

More information

BIO-AQUIFER STORM SYSTEM

BIO-AQUIFER STORM SYSTEM BIO-AQUIFER STORM SYSTEM Specifications for Construction PART 1 GENERAL 1.01 SECTION INCLUDES A. Providing labor, materials, tools and equipment to furnish and install a permeable concrete paving stone

More information

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES AFTER MARCH 1, 2012 ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES 430.1 Description. This item shall govern for all excavation required for the construction of sewers, sewer structures, pipe culverts,

More information

PaveDrain Installation Manual. Table of Contents. Hand-Placement of individual PaveDrain Units. PaveDrain End Cap

PaveDrain Installation Manual. Table of Contents. Hand-Placement of individual PaveDrain Units. PaveDrain End Cap Installation Manual PaveDrain Installation Manual Table of Contents Section 1: Base Preparation Section 2: Hand-Placement of individual PaveDrain Units Section 3: Mattress Installation Section 4: PaveDrain

More information

SECTION FOUNDATION DRAINAGE

SECTION FOUNDATION DRAINAGE SECTION 33 41 13 SPEC WRITER NOTES: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

StormTech Construction Guide

StormTech Construction Guide REQUIRED MATERIALS AND EQUIPMENT LIST An 80-7 DC 0/ 74 C/S 10-3 SC StormTech Construction Guide company ~ Bc^a\CTRW b^[xs T]S RP_b P]S _at R^aTS T]S RP_b ~ Bc^a\CTRW RWP\QTab ~ Bc^a\CTRW \P]XU^[Sb P]S

More information

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and

More information

SPECIFICATIONS FOR REDI-ROCK WALL SYSTEM

SPECIFICATIONS FOR REDI-ROCK WALL SYSTEM SPECIFICATIONS FOR REDI-ROCK WALL SYSTEM SECTION 1 PART 1: GENERAL 1.1 Scope Work includes furnishing and installing concrete retaining wall units to the lines and grades designated on the construction

More information

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT PERMEABLE BITUMINOUS PAVEMENT PART 1: GENERAL 1.01. RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including Special Requirements General Conditions and Division 1 Specifications Sections,

More information

Changes for the. TOHOPEKALIGA WATER AUTHORITY Standards, Specifications and Details

Changes for the. TOHOPEKALIGA WATER AUTHORITY Standards, Specifications and Details Changes for the 2017 TOHOPEKALIGA WATER AUTHORITY Standards, Specifications and Details The following changes are made to the existing standards and details to clarify or improve existing information.

More information

SECTION GRAVITY WASTEWATER LINES

SECTION GRAVITY WASTEWATER LINES SECTION GRAVITY WASTEWATER LINES 1. DESCRIPTION This specification shall govern all work required for furnishing, handling and installing gravity wastewater lines required to complete the project. 2. MATERIALS

More information

T-WALL Retaining Wall System

T-WALL Retaining Wall System CONSTRUCTION MANUAL T-WALL Retaining Wall System The T-WALL Solution... THE NEEL COMPANY 8328 Traford Lane Springfield, VA 22152 Phone 703-913-7858 Fax 703-913-7859 T-WALL Retaining Wall System CONSTRUCTION

More information

SECTION LIMESTONE SEGMENTAL RETAINING WALLS

SECTION LIMESTONE SEGMENTAL RETAINING WALLS (Specifier Notes: The purpose of this guide specification is to assist the specifier in correctly specifying segmental retaining walls and their installation. The specifier needs to edit this guide specification

More information

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS SECTION 02670 UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of containment

More information

SECTION STORM SEWER COLLECTION SYSTEM

SECTION STORM SEWER COLLECTION SYSTEM SECTION 02722 STORM SEWER COLLECTION SYSTEM PART 1 GENERAL 1.01 SUMMARY A. This section addresses the installation of storm sewer collection mains and includes the acceptable products, materials, and construction

More information

CONCRETE TILE PAVERS

CONCRETE TILE PAVERS Section 32 14 13 CONCRETE TILE PAVERS (1995 MasterFormat Section 02780) Note: This guide specification for the U.S. is for the installation of concrete tile paving units whose thickness are less than the

More information

CONSTRUCTION MANUAL. T-WALL Retaining Wall System FOR RAILROAD PROJECTS. The T-WALL Solution...

CONSTRUCTION MANUAL. T-WALL Retaining Wall System FOR RAILROAD PROJECTS. The T-WALL Solution... T-WALL Retaining Wall System CONSTRUCTION MANUAL FOR RAILROAD PROJECTS T-WALL railroad units are 5.0' high x 7.5' wide. (stem lengths will vary) The T-WALL Solution... T-WALL Retaining Wall System CONSTRUCTION

More information

SECTION CONCRETE GRID PAVEMENTS (Turfstone) (1995 MasterFormat Section 02795)

SECTION CONCRETE GRID PAVEMENTS (Turfstone) (1995 MasterFormat Section 02795) SECTION 32 14 13.19 CONCRETE GRID PAVEMENTS (Turfstone) (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications is for concrete grid units placed on a sand bedding course

More information

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM SECTION 02832 CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1.: GENERAL 1.01 WORK INCLUDED A. This section includes the following: The Specifications on furnishing the design, materials and labor required

More information

SECTION D2 MANHOLES AND CATCH BASINS GENERAL MATERIALS

SECTION D2 MANHOLES AND CATCH BASINS GENERAL MATERIALS SECTION D2 MANHOLES AND CATCH BASINS GENERAL This section covers the installation of new manholes, catch basins, drop inlets, drywall structures and the installation of hoods in existing catch basins.

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information

SECTION STORM SEWER PIPE

SECTION STORM SEWER PIPE SECTION 4200 - STORM SEWER PIPE 4200.1 SCOPE: This section covers the requirements for all labor, equipment and materials for the installation of storm sewers pipes. Trenching guidelines are provided in

More information

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS

17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS 17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS 17.1 Description The work covered by this section of the specifications consists of furnishing all labor, the construction and installation of open storm drain

More information

SECTION SEGMENTAL CONCRETE UNIT MASONRY RETAINING WALL MAXIMUM HEIGHT OF 5-0 HIGH

SECTION SEGMENTAL CONCRETE UNIT MASONRY RETAINING WALL MAXIMUM HEIGHT OF 5-0 HIGH DIVISION 32 EXTERIOR IMPROVEMENTS SECTION 32 32 23.13 SEGMENTAL CONCRETE UNIT MASONRY RETAINING WALL MAXIMUM HEIGHT OF 5-0 HIGH PART 1: GENERAL 1.01 Scope of Standards A. This standard provides general

More information

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES AGGREGATE BASES PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, accessories, and equipment necessary

More information

GEOGRID CONNECTION DETAIL OLYMPIA RADIUS UNIT

GEOGRID CONNECTION DETAIL OLYMPIA RADIUS UNIT PLACE TWO STANDARD CONNECTORS IN EACH UNIT AS SHOWN (VERTICAL ORIENTATION) INSERT TWO CONNECTORS PER HORIZONTALLY ORIENTED BLOCK; INSERT ONE CONNECTOR PER VERTICALLY ORIENTED BLOCK SHIM BETWEEN BLOCK COURSES

More information

SECTION ASPHALT CONCRETE

SECTION ASPHALT CONCRETE SECTION 02740 ASPHALT CONCRETE PART 1. GENERAL 1.01 SECTION INCLUDES A. Work includes but is not limited to the following: 1.02 RELATED SECTIONS 1. Provide all material, labor, and equipment to prepare

More information

Lantz-Boggio Architects, P.C LBA Project No

Lantz-Boggio Architects, P.C LBA Project No SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely

More information

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB

More information

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....

More information

ROAD COMMISSION FOR OAKLAND COUNTY. SPECIAL PROVISION FOR GABION WALL RCOC/DESIGN: AB Page 1 of 8 RCOC12SP706F 10/28/2013

ROAD COMMISSION FOR OAKLAND COUNTY. SPECIAL PROVISION FOR GABION WALL RCOC/DESIGN: AB Page 1 of 8 RCOC12SP706F 10/28/2013 ROAD COMMISSION FOR OAKLAND COUNTY SPECIAL PROVISION FOR GABION WALL RCOC/DESIGN: AB Page 1 of 8 RCOC12SP706F a. Description This work shall be done in accordance with Section 205 and 206 of the 2012 Michigan

More information

PROPOSED SEGMENTAL RETAINING WALLS ARGONAUT RETAIL VILLAGE - PHASE I PENSACOLA, FLORIDA

PROPOSED SEGMENTAL RETAINING WALLS ARGONAUT RETAIL VILLAGE - PHASE I PENSACOLA, FLORIDA CERTIFICATE AUTHORIZATION: 2 24 ANCHOR WALL ENGINEERING, LLC MATERIAL NOTES. Concrete Retaining Wall Units: "Anchor Diamond Pro Retaining Wall Units" as manufactured by Block USA under license from Anchor

More information

Uwall UNIVERSAL CONSTRUCTION MANUAL

Uwall UNIVERSAL CONSTRUCTION MANUAL Uwall UNIVERSAL Retaining Wall System CONSTRUCTION MANUAL TM President s Letter CSI is a leader in its industry supplying precast infrastructure products throughout New England and beyond since 1972, developing

More information

SECTION 920 SANITARY AND STORM SEWER MANHOLES

SECTION 920 SANITARY AND STORM SEWER MANHOLES SECTION 920 SANITARY AND STORM SEWER MANHOLES 920.1 GENERAL This section contains items which are relative to the installation of sanitary and storm sewer manholes. 920.2 REFERENCES 920.2.1 ASTM C 43 C

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY CAST-IN-PLACE. Section CAST-IN-PLACE CONCRETE MANHOLES

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY CAST-IN-PLACE. Section CAST-IN-PLACE CONCRETE MANHOLES PART 1 GENERAL 1.01 SUMMARY This Section includes: Section 02081 CAST-IN-PLACE A. Cast-in-place concrete manholes for sanitary sewers and storm sewers, including box sewers. B. Pile-supported concrete

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation SECTION 33 40 00 STORM DRAINAGE UTILITIES 1. PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 00: Excavation and Fill B. Section 32 00 01: Site Restoration and Rehabilitation C. Special Conditions for

More information