Schedule-1 Overall Project BOQ

Size: px
Start display at page:

Download "Schedule-1 Overall Project BOQ"

Transcription

1 Schedule-1 Overall Project BOQ Sl. No. Item/Description Quantity Unit Total Price excluding GST Lot 1 Design and Detailed Engineering 1 Lot Lot 2 Intake works 1 Lot Lot 3 Raw water reservoir and Pump house inside WTP campus 1 Lot Lot 4 Water Treatment Plant 1 Lot Lot 5 Clear/Treated water storage reservoir and pump house 1 Lot Lot 6 Site development works at both Intake and WTP campus 1 Lot Lot 7 Operation and Maintenance for 3 Years period 1 Lot Total Project Cost (Lot 1 to Lot 7)

2 Schedule 2 - Detailed BOQ Lot 1 Design and Detailed Engineering Civil Mechanical 1.01 Design & Engineering including Process Design, Sizing, Hydraulic Design and Layout of Intake and WTP, Structural design, Electrical system design, Control Instrumentation system and Automation design works and all related drawings and documents Lump Sum Total Total Lot 2 Intake Works Civil Mechanical Total Complete Civil works including earthwork, foundation, superstructure, finishes, testing and commissioning etc. Complete Mechanical Items Including Pumps, Motors, Valves, Header piping, Specials, Hoists/Cranes, AC & ventilation system etc. Complete Electrical, Instrumentation, Control & Automation Items including Transformers, Panels, incomers, breakers, relays, Cables, etc Total Cost of Unit / Structure 2.01 Raw Water Reservoir 2.02 Raw Water Pump House 2.03 HT Room with Toilet and Transformer Area 2.04 Guard Room 2.05 Store Room 2.06 Valve Chamber 2.07 Septic Tank Sub Total Lot 2 Lot 3 Raw water Reservoir works Civil Mechanical 3.01 Raw water reservoir in WTP 3.02 Raw water Pump House in WTP Sub Total Lot 3 Total

3 Lot 4 Water Treatment works Civil Mechanical 4.01 Stilling chamber, parshall flume (throat width), flash mixer Clariflocculator Filter house and rapid sand gravity filter with annex building and pipe 4.03 gallery 4.04 Clarified sludge sump 4.05 Sludge thickener 4.06 Thickened sludge sump 4.07 Centrifuge building 4.08 Filter b/w water recovery sump 4.09 DG room 4.10 MCC room & substation 4.11 Transformer yard 4.12 Admin building, SCADA / operator room 4.13 Security cabin 4.14 Workshop 4.15 Chlorination building 4.16 Air blower room 4.17 Chemical House 4.18 Back Wash Tank 4.19 Laboratory 4.20 Valve Chamber and Inplant piping 4.21 Septic Tank 4.22 RCC Channel 200 RM approx Sub Total Lot 4 Total

4 Lot 5 Clear/Treated water Storage works Civil Mechanical 5.01 Clear wáter reservoir Total Clear wáter pump house with Motor floor room Flowmeter chamber on outlet header Surge Protection Bladder type Air vessel 35 m3 capacity and Surge anticipation valves Sub Total Lot 5 Lot 6 Site Development Works Civil Mechanical Total 6.01 Site Clearing & Grading: Clearing the site, removing trees/bushes and Earthwork excavation for leveling the ground to required level including spreading the earth in low areas and disposal of excess earth, Garden and Lawn, as directed by the Engineer at Both Intake and WTP location Compound Walls: Providing compound wall all-round the INTAKE premises with necessary gates Compound Walls: Providing compound wall all-round the WTP premises with necessary gates Roads; Providing, laying Bitumen Topped internal roads in suitable formation as per approved lay out within WTP premises and also connecting roads for the proposed units in the WTP area with side drains 6.05 Roads; Providing, laying Bitumen Topped internal roads in suitable formation as per approved lay out within Intake premises and also connecting roads for the proposed units in the Intake area with side drains Sub-total Lot 6

5 Lot 7 Operation and Maintenance (for 3 years) Cost Rs. / month Months Total 7.01 Manpower including accomodation,transportation etc Chemical Usage Diesel Usage Disposal of Sludge Civil repairs works during O&M - after DLP E&M repair works during O&M - after DLP 24 Sub total Lot 7 Note : *Payments shall be made on pro rata basis as per payment terms specified in Schedule 3 *Payments shall be on approval of Engineer in charge of respective works Total - Lot 1 to Lot 7

6 Item Schedule 3: Payment Terms Description % Payment of total cost against each item 1 Lot 1 : Design and Detailed Engineering 1.01 Process Design, Drawings, and Documentation for Both Intake and WTP works 1.02 Structural Design, Drawings, and Documentation for all components under this DBO tender at Both Intake and WTP works 1.03 Mechanical Design, Drawings, and Documentation for all components under this DBO tender at Both Intake and WTP works 1.04 Electrical Design, Drawings, and Documentation for all components under this DBO tender at Both Intake and WTP works 1.05 Instrumentation, Control, and Automation Design, Drawings, and Documentation for all components under this DBO tender at Both Intake and WTP works 1.06 As Built Drawings for both Intake and WTP works components 20% 1.07 Other Documentation (O&M Manuals, testing and Training manuals) 20% 2 Civil Works (Lot 2 to Lot 5) 2.01 Completion of Excavation / Earthwork 5% 2.02 Completion of Sub-structure /piling /raft upto plinth level 2.03 Completion of Super Structure 45% 20% 2.04 Completion of allied items such as handrail, painting, epoxy coat, finishes, doors/windows installation etc Completion of satisfactory Hydro Test As applicable /Testing & Commissioning 20% 2.06 Within 90 days of successful Performance Test and issue of Commissioning/ completion

7 3 Mechanical Works (Lot 2 to Lot 5) 3.01 Supply & Delivery of equipment / material at Site 25% 3.02 Completion of Installation of equipment at Site 35% 3.03 Successful Testing & Commissioning at Site 30% 3.04 Within 90 days of successful Performance Test and issue of Commissioning/ completion 4 (Lot 2 to Lot 5) 4.01 Supply & Delivery of equipment / material at Site 25% 4.02 Completion of Installation of equipment at Site 35% 4.03 Successful Testing & Commissioning at Site 30% 4.04 Within 90 days of successful Performance Test and issue of Commissioning/ completion 5 Site Development Works (Lot 6) 5.01 On completion of work (Pro-rata basis) 90% 5.02 Within 90 days of successful Performance Test and issue of Commissioning/ completion 6 Operation and Maintenance (Lot 7) 6.01 Monthly payment for Manpower 100% 6.02 Chemical Usage in proportion to treated water per month 100% 6.03 Diesel Usage on the basis of norms per hour 100% 6.04 Disposal of Sludge in proportion to treated water per month 100% 6.05 Monthly payment for Civil repairs works 100% 6.06 Monthly payment for E&M repair works 100%

BELLARY THERMAL POWER PROJECT PROJECT INFORMATION

BELLARY THERMAL POWER PROJECT PROJECT INFORMATION BELLARY THERMAL POWER PROJECT PROJECT INFORMATION 1.0 Owner / BHEL : Karnataka Power Corpn. Ltd., Shakthi Bhavan No. 82 Race Course Road, Bangalore 560 001, Karnataka, India. 2.0 Owner / BHEL s Consultant

More information

PRICE BID FOR. Processing zone of Special Economic Zone, MAHINDRA WORLD CITY (JAIPUR) LIMITED, JAIPUR MWCJL/HR/INFRA/HC ZONE/STP/ /T-32

PRICE BID FOR. Processing zone of Special Economic Zone, MAHINDRA WORLD CITY (JAIPUR) LIMITED, JAIPUR MWCJL/HR/INFRA/HC ZONE/STP/ /T-32 PRICE BID FOR DESIGN, SUPPLY, CONSTRUCTION, ERECTION, COMMISSIONING AND OPERATING OF (PHASE I) 3000 M3/DAY CAPACITY SEWAGE TREATMENT PLANT BASED ON ADVANCED SEQUENTIAL BATCH REACTOR TECHNOLOGY AT MAHINDRA

More information

City of Fairfax, Virginia City Council Regular Meeting. Honorable Mayor and Members of Cfy ;ouncil Robert L. Sisson, City Manager /I.

City of Fairfax, Virginia City Council Regular Meeting. Honorable Mayor and Members of Cfy ;ouncil Robert L. Sisson, City Manager /I. City of Fairfax, Virginia City Council Regular Meeting Agenda Item #..,.,C:::o~Or!---!h~--- city Council Meeting q+----4-j/.-...:cx:l..-.>o?...~-/_,_j-=2=; r 1 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: Honorable

More information

Addendum-1. Ref. Original clause Amended Clause

Addendum-1. Ref. Original clause Amended Clause Following clauses of Bid Document for Infrastructure works for Integrated Industrial Township are amended 1 5 Article 19 Clause 19.2.1 Page 64 of 453 2 22 Form of price proposal. 3 31 Schedule-H Contract

More information

Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting

Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting October 12, 2017 Water Treatment Plant Phase 1 Upgrades 22 mgd WTP Expand capacity to 32 mgd Upgrades to most processes Only

More information

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater

More information

Progressive Design Build Services for the th Street, 6217 Wilson Blvd., 7703 Blanding Blvd. and Robitzsch Ln. Wastewater Pump Station

Progressive Design Build Services for the th Street, 6217 Wilson Blvd., 7703 Blanding Blvd. and Robitzsch Ln. Wastewater Pump Station Progressive Design Build Services for the 5104 118th Street, 6217 Wilson Blvd., 7703 Blanding Blvd. and Robitzsch Ln. Wastewater Pump Station Rehabilitation or Replacement for Solicitation Number 025-18

More information

Description of the Work

Description of the Work Description of the Work Construction,Supplying of Electro Mechanical equipment, pipe fittings, erection, installation, testing and commissioning MBBR technology Sewage Treatment Plant ( 300 KLD) at kh.no.54,city

More information

M Observations for Water Treatment Plant

M Observations for Water Treatment Plant M31.2 Opa Water Supply Scheme M31.2.1 Observations for Water Treatment Plant The Opa facility has been augmented over the years and currently consists of 4 river intakes (one for each self contained WTP).

More information

EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT

EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT Addendum No. 2 Attachment B Contract Document Revisions Specifications: TABLE OF CONTENTS ADDENDUM NO. 2 Attachment B Contract

More information

HAZOP Checklist for Sewage Treatment Plant

HAZOP Checklist for Sewage Treatment Plant HAZOP Checklist for Sewage Treatment Plant CHECKLIST 1.0 Overall Layout of Treatment Plant 1.1 General Layout Property are fenced and gated and the fence height. State where these problems/impacts occur

More information

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD TENDER FOR Construction of Stone Masonry Compound Wall for NIAB Campus at Survey No.37, Serlingampally, Hyderabad VOLUME V January 2013 HSCC

More information

KANPUR SMART CITY LIMITED

KANPUR SMART CITY LIMITED Nagar Nigam Mukhyalay, 3 rd Floor, Moti Jheel, Kanpur - 208002 Tel.: +91 512 2541258, 2546194 Email:ksclkanpur@gmail.com KANPUR SMART CTY LMTED No.: KSCL/PMC/Open Gym/01/2 Date: 17/02/2018 Reply to queries

More information

TENDER FOR " Work for 24 x 7 Water Supply System under Smart City Mission in ABD area of VMC including

TENDER FOR  Work for 24 x 7 Water Supply System under Smart City Mission in ABD area of VMC including VADODARA SMART CITY DEVELOPMENT LIMITED VADODARA SMART CITY DEVELOPMENT LIMITED TENDER FOR " Work for 24 x 7 Water Supply System under Smart City Mission in ABD area of VMC including Refurbishment of existing

More information

SCHEDULE-A MODIFIED CLAUSES/ PAGE NUMBERS: Vol. No. Section/ Description SECTION IA/ ANNEXURE XII :INPUT DRAWINGS (PT plant) Clause no of 920

SCHEDULE-A MODIFIED CLAUSES/ PAGE NUMBERS: Vol. No. Section/ Description SECTION IA/ ANNEXURE XII :INPUT DRAWINGS (PT plant) Clause no of 920 Page 1 of 10 The following modifications/ amendment with respect to Technical Specification for BHEL s Technical specification no PE-TS-421-158-A001 shall apply. Bidder to note that existing clauses/ details

More information

Need-to-Know Criteria Wastewater Treatment Operator Class I

Need-to-Know Criteria Wastewater Treatment Operator Class I 2017 Need-to-Know Criteria Wastewater Treatment Operator Class I A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class I Certification Exam Before You Dive In What is ABC

More information

Central Power Research Institute Prof Sir C V Raman Road, Sadashivnagar Post Office Post Box No: 8066, Bangalore

Central Power Research Institute Prof Sir C V Raman Road, Sadashivnagar Post Office Post Box No: 8066, Bangalore Name of the SH Construction of boundary wall for CPRI office campus and staff colony at Bangalore Cost Rs.1,55,48,700.00 UP-TO-DATE Stone masonry wall work from T&D Gate to DG s residence has been Stone

More information

EVALUATION OF A WATER TREATMENT PLANT PERFORMANCE CASE STUDY

EVALUATION OF A WATER TREATMENT PLANT PERFORMANCE CASE STUDY Seventh International Water Technology Conference IWTC7 Egypt 1-3 April 2003 EVALUATION OF A WATER TREATMENT PLANT PERFORMANCE CASE STUDY M. A. ElDib (1) and Mahmoud A. Azeem Elbayoumy (2) (1) Professor,

More information

PCI AFRICA RANGE OF PRE-ENGINEERED WATER TREATMENT PLANTS

PCI AFRICA RANGE OF PRE-ENGINEERED WATER TREATMENT PLANTS PCI AFRICA Paterson Candy International (SA) (PTY) Limited t/a PCI AFRICA Company Registration Number 53/001821/07 T +27 11 794 5004 F +27 11 794 6357 P O Box 308, North Riding, 2162, RSA 11 Ridge Road,

More information

MOROGORO URBAN WATER SUPPLY AND SANITATION AUTHORITY

MOROGORO URBAN WATER SUPPLY AND SANITATION AUTHORITY MOROGORO URBAN WATER SUPPLY AND SANITATION AUTHORITY MONTH: DECEMBER, 2012 A: IMPLEMENTATION OF WATER SECTOR DEVELOPMENT PROGRAMME (WSDP) PROJECTS Introduction Under Water Sector Development Programme,

More information

There will be a technical and financial evaluation. Technical evaluation will be 70% and 30% for financial.

There will be a technical and financial evaluation. Technical evaluation will be 70% and 30% for financial. ANNEX H (EVALUATION CRITERIA & FINANCIAL PROPOSAL TEMPLATE) There will be a technical and financial evaluation. Technical evaluation will be 70% and 30% for financial. Technical evaluation The returned

More information

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali FINANCIAL BID DOCUMENT Miscellaneous Civil Work in Low Lying Area at

More information

Compiled by: Civil Works Department, SSA Punjab.

Compiled by: Civil Works Department, SSA Punjab. 45 Compiled by: Civil Works Department, SSA Punjab. TIPS FOR CIVIL CONSTRUCTION WORKS 1. ISI marked 43 Grade cement of major manufacture must be used. 2. ISI mark Steel must be used. 3. Clean & Fine Sand

More information

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI ` INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI-110068 NOTICE INVITING QUOTATION IG/CMD/NIQ-civil/2014 Dated: - 26/06/2014 Name of work:- Construction

More information

Construction works for Establishment of School in Al-Najaf M 2 2,600 M 2 750

Construction works for Establishment of School in Al-Najaf M 2 2,600 M 2 750 1 Preparation of a 18-Classroom School BoQ for constructing a 18-Classroom School - Najaf Site Preparation:Works for leveling the site and remove the garbage to authorized location according to supervisor

More information

Need-to-Know Criteria Wastewater Treatment Operator Class II

Need-to-Know Criteria Wastewater Treatment Operator Class II 2017 Need-to-Know Criteria Wastewater Treatment Operator Class II A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class II Certification Exam Before You Dive In What is ABC

More information

McDuff WTP High Service Pump Replacement

McDuff WTP High Service Pump Replacement T E C H N I C A L M E M O R A N D U M 642-03 MCDUFF WTP HIGH SERVICE PUMP REPLACEMENT 642-03 McDuff WTP High Service Pump Replacement PREPARED FOR: PREPARED BY: Capital Budget Planning Craig Jones DATE:

More information

RUWAIS HOUSING COMPLEX PHASE IV CIVIL & ELECTROMECHANICAL WORKS

RUWAIS HOUSING COMPLEX PHASE IV CIVIL & ELECTROMECHANICAL WORKS AL NASR SCOPE OF WORKS: Construction of water storage tank consisting of: 3 Water storage tanks 2,641,721 gal of 42 m diameter and 7.65 m each 2300 m³ of concrete 2450 m² of water proofing external 4300

More information

WHAT TO CONSIDER IN CHOOSING A SYSTEM

WHAT TO CONSIDER IN CHOOSING A SYSTEM WHAT TO CONSIDER IN CHOOSING A SYSTEM Reflections Comparison Price Include engineering Plan & Report for local council Include excavation and installation of: - Septic Tank - Treatment Plant - Irrigation

More information

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt:

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt: Amendment -1 Date: 17.02.2017 NIT No. RECPDCL/CSR/CWC/2016-17/3368 dt: 20.01.2017 Notice Inviting Tender (Bid Invited through e Tendering mode only) From Implementing Agencies for Turnkey execution of

More information

Construction works for Establishment of School in Al-Latifiyah. Al-Latifiyah BoQ for constructing a 6-pre-fab Classroom School

Construction works for Establishment of School in Al-Latifiyah. Al-Latifiyah BoQ for constructing a 6-pre-fab Classroom School 1 Al-Latifiyah BoQ for constructing a 6-pre-fab Classroom School Preparation of a 6-Classroom School Site Preparation:Works for leveling the site and remove the garbage to authorized location according

More information

MILESTONES : JAIPUR PROJECT

MILESTONES : JAIPUR PROJECT MILE STONE Date Due to be completed MILESTONES : JAIPUR PROJECT Activities to be under taken/ Completed in /buildings mentioned in Col 2 Penalty in case of failure to achieve Milestone 1 1 2 3 4 st 12.06.18

More information

Need-to-Know Criteria Wastewater Treatment Operator Class III

Need-to-Know Criteria Wastewater Treatment Operator Class III 2017 Need-to-Know Criteria Wastewater Treatment Operator Class III A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class III Certification Exam Before You Dive In What is

More information

Jungzhina Water Treatment Plant Thimpu, Bhutan

Jungzhina Water Treatment Plant Thimpu, Bhutan Jungzhina Water Treatment Plant Thimpu, Bhutan 1. Background Information Thimphu, the capital and the largest city of Bhutan, is situated in the western central part of the country. The water supply for

More information

Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka

Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka 1. Background information of the water treatment plant Kegalle is located about 80 Km East of Colombo and the Greater Kegalle water treatment plant

More information

Rehoboth Beach Commissioners Meeting Ocean Outfall & Treatment Plant Project Update July 26, Jeff Sturdevant Principal Kelvin George Principal

Rehoboth Beach Commissioners Meeting Ocean Outfall & Treatment Plant Project Update July 26, Jeff Sturdevant Principal Kelvin George Principal Rehoboth Beach Commissioners Meeting Ocean Outfall & Treatment Plant Project Update July 26, 2017 Jeff Sturdevant Principal Kelvin George Principal Rehoboth Beach Ocean Outfall/CIP Project(s) Update Agenda

More information

California Water Environment Association Technical Certification Program

California Water Environment Association Technical Certification Program Industrial Waste Treatment Plant Operations Grade I 101. Participates in assigned treatment plant rounds, inspecting, monitoring and documenting plant operations by reading plant equipment gauges, dials,

More information

Saraswathi. Floor Plans

Saraswathi. Floor Plans 1 / 15 Saraswathi Saraswathi is situated in a posh yet serene locality in Besant Nagar, a stone s throw away from Elliots Beach. The property covers 3 grounds and houses 8 apartments in a spacious 3 BHK

More information

ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE...

ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE... ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL... 3 2. DESCRIPTION OF ITEMS... 5 3. PRICES TO BE FULLY INCLUSIVE... 5 4. COVERAGE... 6 5. BIDDER TO PRICE EACH ITEM... 6 6.

More information

Transit campus, Govt ITI Berhampur (2nd Floor), Engineering School Junction N.H-59, Berhampur Notice Inviting Tender

Transit campus, Govt ITI Berhampur (2nd Floor), Engineering School Junction N.H-59, Berhampur Notice Inviting Tender Transit campus, Govt ITI Berhampur (2nd Floor), Engineering School Junction N.H-59, Berhampur-760010 Sl. No-IWD / NIQ / PE / 2017-18 /07 Date:- 16.06.17 Notice Inviting Tender The Project Engineer (E),

More information

Existing Condition: (Date: May 2000) Evaluation: In good working condition but the facility is not secured.

Existing Condition: (Date: May 2000) Evaluation: In good working condition but the facility is not secured. Atauro 05 - Tangke Cementerio 1998 AusAID Facility: Service reservoir Structure: Concrete Shape: Rectangular Dimension: 2.5m x 3.5m x 2.3m Capacity: 15m 3 Function: Storage Source of Water: Tulai spring

More information

Chapter 5: Treatment Assessment Future Condition

Chapter 5: Treatment Assessment Future Condition 2020 Facilities Plan Treatment Report 5.1 Introduction Chapter 5: Treatment Assessment Future Condition The future performance of the Milwaukee Metropolitan Sewerage District (MMSD) wastewater treatment

More information

PROGRESS MEERUT PROJECT AS ON 15 MAY 2017

PROGRESS MEERUT PROJECT AS ON 15 MAY 2017 REPAIRING OF TILES INSTALLATION OF FEEDER PILLAR TOWER-1 (TYPE A-1) (Overall completion 91.85 %) Total Floor Stilt + 10 Total flat = 60 Progress Fixing of false ceiling in toilets, Glass fixing in Aluminum

More information

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: EPI/WRO/CON/757/0119 FOR Construction of Boundary Wall and allied works for DHH & MCH Hospital at Kendrapara at Odisha state VOLUME III PRICE BID

More information

Zero Liquid Discharge Project Extends Potable Water Supplies

Zero Liquid Discharge Project Extends Potable Water Supplies http://dx.doi.org/10.5991/opf.2014.40.0078 Ryan R. Popko, PE, and Phillip J. Locke, PE, are with McKim & Creed (www.mckimcreed.com), Clearwater, Fla. Fred J. Greiner is with the city of Palm Coast, Fla.

More information

i LAWSS Capital & Major Maintenance 2019 Recommended Capital/Major Maintenance from 2019 to 2024 The Ontario Clean Water Agency has identified the fol

i LAWSS Capital & Major Maintenance 2019 Recommended Capital/Major Maintenance from 2019 to 2024 The Ontario Clean Water Agency has identified the fol i LAWSS Capital & Major Maintenance 2019 Recommended Capital/Major Maintenance from 2019 to 2024 The Ontario Clean Water Agency has identified the following capital projects/major maintenance for your

More information

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell) ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) Bill of Quantity (BOQ) PART-I : FIRE FIGHTING SYSTEM. Sr No Description Qty Unit Rate/Unit Amount 1 Dismantling, loading, shifting and unloading of following Fire Fighting Equipments from Berth No.8 to

More information

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP Timothy McCann AECOM Keith Bovard Rocky River WWTP WWTP Infrastructure Redundancy Redundancy As NASA Would Say: A Backup Plan for the Backup Plan Nuclear Power Plant Wastewater Treatment Plant Page 3 Infrastructure

More information

Labugama Kalatuwawa WTP Rehabilitation Project for Web site updating

Labugama Kalatuwawa WTP Rehabilitation Project for Web site updating Labugama Kalatuwawa WTP Rehabilitation Project for Web site updating 1 2 3 4 5 6 7 8 9 10 Name of the Project : Name of the Project Director : Project Office Address : Telephone Number : Mobile Number

More information

REFLECTION ISF INFORMATION RWTS.CO.NZ. Pure. Wastewater. Solutions.

REFLECTION ISF INFORMATION RWTS.CO.NZ. Pure. Wastewater. Solutions. REFLECTION ISF INFORMATION RWTS.CO.NZ Pure. Wastewater. Solutions. WITH MORE THAN 3000 WASTEWATER SYSTEMS TREATING IN EXCESS OF 2.5 MILLION LITRES OF WASTEWATER EVERY DAY THROUGHOUT THE REGION, OUR TRACK

More information

1 X 500 MW FGUTPP THERMAL POWER PLANT STAGE IV DETAILS OF CIVIL, STRUCTURAL AND ARCHITECTURAL WORKS. RCC framed

1 X 500 MW FGUTPP THERMAL POWER PLANT STAGE IV DETAILS OF CIVIL, STRUCTURAL AND ARCHITECTURAL WORKS. RCC framed SI No. Civil Works Structure Type Unit Details Balance of Plant Systems nos nos m m m 608 Permanent Store O & M Store of 3000sqm RCC framed 2 60 Canteen Building (Green Building) RCC framed 4 (000 sqmtr)

More information

IND: Tamil Nadu Urban Flagship Investment Program (TNUFIP) Due Diligence Report for Water Treatment Plant

IND: Tamil Nadu Urban Flagship Investment Program (TNUFIP) Due Diligence Report for Water Treatment Plant Due Diligence Report Document stage: Draft for Consultation Project Number: 49107-005 February 2019 IND: Tamil Nadu Urban Flagship Investment Program (TNUFIP) Due Diligence Report for Water Treatment Plant

More information

Damages and risks which are attributed to water leaks are summarized as follows:

Damages and risks which are attributed to water leaks are summarized as follows: Preamble Water leaks are one of the most important issues that concerns us and the customers. Leaks from pipes, plumbing fixtures and fittings are a significant source of water waste for many premises.

More information

ITEM No. D E S C R I P T I O N UNIT QTY. 5-E343.2 In class III material m³ 1,260 - Max. Depth: m For disposal

ITEM No. D E S C R I P T I O N UNIT QTY. 5-E343.2 In class III material m³ 1,260 - Max. Depth: m For disposal EARTHWORKS Excavation for foundations 5E343.2 In class III material m³ 1,260 Max. Depth: 0.50 1 m For disposal 5E334.2 In class III material m³ 720 Max. Depth: 1 2 m For disposal Filling Ancillaries 5E723.0

More information

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv 1 Lake County WTP Improvements and Capacity Increase OTCO 9 th Annual Water and Wastewater Workshop 7.31.2013 Nick Pizzi Aqua Serv Rick Douglas Lake County Presentation Agenda Some topics we will cover:

More information

TABLE OF CONTENTS. SECTION 1 INTRODUCTION 1.1 Background Purpose and Scope

TABLE OF CONTENTS. SECTION 1 INTRODUCTION 1.1 Background Purpose and Scope TABLE OF CONTENTS EXECUTIVE SUMMARY... Page ES-1 SECTION 1 INTRODUCTION 1.1 Background... 1-1 1.2 Purpose and Scope... 1-2 SECTION 2 BASIS OF DESIGN 2.1 Existing Discharge Permit... 2-1 2.2 Plant Capacity

More information

SUM i) Carry out calibration of 100,000 litres day tank. ii) Pipes, valves and other fittings connection to fuel offloading SUM

SUM i) Carry out calibration of 100,000 litres day tank. ii) Pipes, valves and other fittings connection to fuel offloading SUM 31 st July 2017 TENDER FOR RELOCATION OF ONE GE FRAME 6 GAS TURBINE FROM EMBAKASI IN NAIROBI TO MUHORONI NEAR KISUMU: KGN-GT-012-2017 KenGen wishes to make the following clarification and changes through

More information

Facility & Operations Field Division

Facility & Operations Field Division Facility & Operations Field Division Mission Statement: To regularly inspect utility facilities and review plant operating practices to ensure regulated utility service providers deliver safe, reliable

More information

Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager

Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager Pittsburgh Water Treatment Plant Projects by Jay R. Lucas, P.E. Senior Project Manager Who Is American Water We are the largest publicly traded water and wastewater utility in the United States Broad national

More information

PRICED BILL OF QUANTITIES

PRICED BILL OF QUANTITIES Engineering Projects (dia) Limited (A Govt of dia Enterprise) Words 1 EARTH WORK 1.1 Earth work in excavation by mechanical means (Hydraulic Excavator) / Manual means over areas (exceeding 30 cm in depth,

More information

Nairobi Funeral Home and Forensics BOREHOLE BILLS OF QUANTITIES

Nairobi Funeral Home and Forensics BOREHOLE BILLS OF QUANTITIES Nairobi Funeral Home and Forensics BOREHOLE BILLS OF QUANTITIES 26/10/2015 Item Description Qty Unit Supply, deliver, install, test and commission the following borehole equipment including all materials

More information

PRE-BID QUERRIES REPLY, PAHARI SEWERAGE NETWORK ZONE V

PRE-BID QUERRIES REPLY, PAHARI SEWERAGE NETWORK ZONE V PRE-BID QUERRIES REPLY, PAHARI SEWERAGE NETWORK ZONE V Name of work INTERNATIONAL COMPETITIVE BIDDING DOCUMENTS SURVEY, REVIEW THE DESIGNS, REDESIGN WHERE NECESSARY AND BUILD NEW SEWERAGE NETWORK OF ABOUT

More information

6.5 Filtration General

6.5 Filtration General 6.5 Filtration 6.5.1 General Turbidity and algae are removed from raw waters by screens, gravel filters and slow sand or rapid gravity filters. The difference between slow and rapid sand filtration is

More information

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT. Ref:NITT/COW/EMD/Civil Works/Enq.No.01. Date:

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT. Ref:NITT/COW/EMD/Civil Works/Enq.No.01. Date: NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI 620 015 ESTATE MAINTENANCE DEPARTMENT Ref:NITT/COW/EMD/Civil Works/Enq..01. Date: 19.05.2015. QUOTATION Sealed quotations for the following work are called

More information

Calculation of requirement of Labour. for construction of IAY/CMRHM

Calculation of requirement of Labour. for construction of IAY/CMRHM Calculation of requirement of Labour for construction of IAY/CMRHM Total cost as per 2012 SOR = Rs 7,01,746.00 Deduct 7.5% Contractor s profit = Rs (-) 52,631.00 = Rs 6,49,115.00 Taking 1/3 as the Labour

More information

TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION

TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION PREPARED BY: VICKIE GRAFF, CTPM, CPPB FAX: (512) 374-5480 E-MAIL: vgraff@dot.state.tx.us WASTEWATER TREATMENT PLANT OPERATIONS, TESTING, AND

More information

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title TABLE OF CONTENTS CONTRACT DOCUMENTS 00001 Inside Title Page 00003 Table of Contents 00004 List of Drawings 00020 Invitation to Bid 00100 Instructions to Bidders 00300 Bid 00500 Agreement 00610 Construction

More information

United Nations Development Programme

United Nations Development Programme PROJECT UPGRADE OF EXISTING ISLAND WASTE MANAGMENT CENTER AT FONADHOO ISLAND PREPARED BY CONTENT FONADHOO DRAWINGS SL.NO DRAWING NAME DRAWING NUMBER 1 SITE PLAN /2017/IWMC/FON/001 2 FLOOR PLAN /2017/IWMC/FON/002

More information

SECTION 807 PUMP STATION REHABILITATION

SECTION 807 PUMP STATION REHABILITATION SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but

More information

KGN-BDD TENDER FOR SUPPLY OF LABORATORY EQUIPMENT AND PROVISION OF CIVIL WORKS FOR THE OLKARIA CIVIL ENGINEERING LABORATORY.

KGN-BDD TENDER FOR SUPPLY OF LABORATORY EQUIPMENT AND PROVISION OF CIVIL WORKS FOR THE OLKARIA CIVIL ENGINEERING LABORATORY. KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-BDD-07-2017 TENDER FOR SUPPLY OF LABORATORY EQUIPMENT AND PROVISION OF CIVIL WORKS FOR THE OLKARIA CIVIL ENGINEERING LABORATORY. 11 th May 2017 In accordance

More information

EARTHSAFE OWNERS MANUAL WASTEWATER TREATMENT SYSTEMS. All information contained within this manual is the property of EcoWater (QLD) Pty Ltd.

EARTHSAFE OWNERS MANUAL WASTEWATER TREATMENT SYSTEMS. All information contained within this manual is the property of EcoWater (QLD) Pty Ltd. All information contained within this manual is the property of EcoWater (QLD) Pty Ltd. Any duplication, alteration and/or redistribution is forbidden without written expressed permission of EcoWater (QLD)

More information

Estimate FOR THE SEPTIC TANK

Estimate FOR THE SEPTIC TANK Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks

More information

Dipti Shah, Town of Gilbert Tuesday, January 25, 2011

Dipti Shah, Town of Gilbert Tuesday, January 25, 2011 Dipti Shah, Town of Gilbert Tuesday, January 25, 2011 Background Treatment Plant Water Treatment Process Filter types Experiments Results Review Historical BAF /Non- BAF data Conclusion Recommendation

More information

DEPARTMENT OF CIVIL ENGINEERING

DEPARTMENT OF CIVIL ENGINEERING DEPARTMENT OF CIVIL ENGINEERING VII SEMESTER CE 2402 - ESTIMATION AND QUANTITY SURVEYING Two Marks 1. What are methods to be adopted for volume calculating? 2. Define analysis of rates. 3. Define a tender.

More information

120 MLD Water Treatment Plant & 24 MLD Zero Liquid Discharge Plant

120 MLD Water Treatment Plant & 24 MLD Zero Liquid Discharge Plant 120 MLD Water Treatment Plant & 24 MLD Zero Liquid Discharge Plant 1. Name of the Project: 120 MLD Capacity WTP (Water Treatment Plant) at Sarthana Water Works, Sarthana& ZLD (Zero Liquid Discharge) Plant

More information

Water and Waste Department

Water and Waste Department Water and Waste Department 2012 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association, March 7 th, 2012 Capital Budget Capital s Summary 2012 Capital Budget 2013 to

More information

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15.

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15. Tender ref no: SBIIMS/BHU/AO/08-9/ Date: 0.0.09 Sl. No. ITEM SPECIFICATION UNIT QTY RATES AMOUNT PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING Earth work in excavation of recharge

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building... Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3

More information

PUR-1241 ADDENDUM NO. 2 INVITATION TO BID GREENSAND FILTER SYSTEM AT ELK RIDGE WATER TREATMENT PLANT

PUR-1241 ADDENDUM NO. 2 INVITATION TO BID GREENSAND FILTER SYSTEM AT ELK RIDGE WATER TREATMENT PLANT WASHINGTON COUNTY PURCHASING DEPARTMENT Washington County Administration Building 100 West Washington Street, Room 320 Hagerstown, Maryland 21740-4748 Telephone: 240-313-2330, FAX: 240-313-2331 ADDENDUM

More information

WASTEWATER FACILITIES OPERATOR I WASTEWATER FACILITIES OPERATOR II

WASTEWATER FACILITIES OPERATOR I WASTEWATER FACILITIES OPERATOR II CITY OF REDLANDS WASTEWATER FACILITIES OPERATOR I WASTEWATER FACILITIES OPERATOR II DEFINITION Under general supervision, to perform a variety of skilled technical duties in the operation of the City s

More information

a. Unless otherwise specified, all lengths shall be horizontal distances.

a. Unless otherwise specified, all lengths shall be horizontal distances. SECTION 01025 PART 1- GENERAL 1.01 DESCRIPTION A. This section describes the method used to determine quantities of Work performed or materials supplied for which a price is given in the Bid. It establishes

More information

Regulation 18 August 2009 NO Operations and Maintenance LEVEE ENCROACHMENT STANDARDS AND PROCEDURES

Regulation 18 August 2009 NO Operations and Maintenance LEVEE ENCROACHMENT STANDARDS AND PROCEDURES CENWP-EC DEPARTMENT OF THE ARMY PDR 30-2-5 Portland District, Corps of Engineers (Draft) P.O. Box 2946 Portland, Oregon 97208 Regulation 8 August 2009 NO. 30-2-5 Operations and Maintenance LEVEE ENCROACHMENT

More information

MIEL I Hydroelectric Power Plant

MIEL I Hydroelectric Power Plant MIEL I Hydroelectric Power Plant The Miel I Power Plant, which is located in the municipality of Norcasia, forms part of the hydro potential in western Caldas. This region comprises the basins of the rivers

More information

Sand Interceptor Sector Control Policy For Automotive Shops, Car Washes, & Facilities with Significant Potential for Sand or Inert Debris Discharge

Sand Interceptor Sector Control Policy For Automotive Shops, Car Washes, & Facilities with Significant Potential for Sand or Inert Debris Discharge Sand Interceptor Sector Control Policy For Automotive Shops, Car Washes, & Facilities with Significant Potential for Sand or Inert Debris Discharge For the Service Area of the Littleton/Englewood Wastewater

More information

Scanned by CamScanner

Scanned by CamScanner JODHPUR MUNICIPAL CORPORATION G-SCHDULE NIT No. Date Sr No. Last Date of Sale :- Earnest Money : Rs... Date of Receipt :- CR No. Dated.. Copy issued to M/s STORM WATER DRAINAGE MASTER PLAN FOR THE CITY

More information

Client: City of Pontiac Project Name: Regional WWTP Feasibility Location: Pontiac, MI Project Number: Issue Date: October 23, 2006

Client: City of Pontiac Project Name: Regional WWTP Feasibility Location: Pontiac, MI Project Number: Issue Date: October 23, 2006 Client: City of Pontiac Project Name: Regional WWTP Feasibility Location: Pontiac, MI Project Number: 13649553 Issue Date: October 23, 2006 Subject: WWTP Condition Assessment Auburn Plant 1. Grit Removal:

More information

TENDER FOR PREMISES AND FACILITY MANAGEMENT SERVICES CONTRACT FOR SIDBI S OFFICE BUILDING AT BKC, MUMBAI. (PART III- Financial Bid)

TENDER FOR PREMISES AND FACILITY MANAGEMENT SERVICES CONTRACT FOR SIDBI S OFFICE BUILDING AT BKC, MUMBAI. (PART III- Financial Bid) TENDER FOR PREMISES AND FACILITY MANAGEMENT SERVICES CONTRACT FOR SIDBI S OFFICE BUILDING AT BKC, MUMBAI (PART III- Financial Bid) LAST DATE OF SUBMISSION April 13, 2017 UPTO 1500 HRS. Issued to :- The

More information

NOTICE INVITING QUOTATION

NOTICE INVITING QUOTATION Page 1 of 5 CONSTRUCTION CELL NEW MARKET COMPLEX CMC BUILDING(6 TH FLOOR) 15N,NELLIE SENGUPTA SARANI KOLKATA-700 087 No.CWC/CC-Kol/NIQ-AR&MO/CW-Mohania/2015-16/ Date- 08.09.2015 NOTICE INVITING QUOTATION

More information

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI. SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST RAIGARH, MUMBAI. Tender Reference No. BL/LI/CC/TCWMUM/BOUNDARY WALL/1617/04

More information

RCC PRECAST TOILET UNITS

RCC PRECAST TOILET UNITS RCC PRECAST TOILET UNITS TOILET UNIT PHOTO TOILET UNIT PLANS PDG Vinay Kulkarni Wins Coordinator West Zone Quotation for Toilet Units with Bio Digester Sr. Description Price (Rs.) Unit No. 1 TTSS1: 1 Super

More information

D R A F T - 02/22/08

D R A F T - 02/22/08 ADDENDUM NO. 1 Issued March 3, 2008 TO REQUEST FOR BIDS FOR OPERATION AND MAINTENANCE OF THE ELLINGTON LANDFILL GAS COLLECTION SYSTEM AND THERMAL OXIDIZER STATION (Bid Number FY08-EN-004 (RFB Issued February

More information

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI 620 015 ESTATE MAINTENANCE DEPARTMENT NOTICE INVITING TENDERS NO: NITT/EMD//Civil works / 2015 TENDER NOTIFICATION Ref: NITT/EMD/ CoW/Civil Works /15-16

More information

Trident. Package Water Treatment System

Trident. Package Water Treatment System Trident Package Treatment System The Trident Package Treatment System When Microfloc products first introduced the Trident technology, it represented a significant advancement in water and wastewater treatment

More information

Ali Leeds, MWH Austin Peters, MWH

Ali Leeds, MWH Austin Peters, MWH Ali Leeds, MWH Austin Peters, MWH Presented for PNWS-AWWA Bellevue, WA May 1, 2015 Where do Water Treatment Plants Come From? Water Treatment Plant Incubation Background of the Two Plants Key Drivers of

More information

SEPTIC TANK CONSTRUCTION GUIDELINES

SEPTIC TANK CONSTRUCTION GUIDELINES SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic

More information

Nairobi Funeral Home and Forensics INCINERATOR BILLS OF QUANTITIES

Nairobi Funeral Home and Forensics INCINERATOR BILLS OF QUANTITIES Nairobi Funeral Home and Forensics INCINERATOR BILLS OF QUANTITIES 26/10/2015 Item Description Qty Unit INCINERATOR INSTALLATION Supply, deliver, install, test and commission the following incinerator

More information

PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR

PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR PROPOSED CONSTRUCTION BUILDING PROJECT OF NILA INFRASTRUCTURES LTD (25988.59 m 2 Built up Area)

More information

United Nations Development Programme

United Nations Development Programme PROJECT UPGRADE OF EXISTING ISLAND WASTE MANAGMENT CENTER AT MUNDOO ISLAND PREPARED BY CONTENT MUNDHOO DRAWINGS SL.NO DRAWING NAME DRAWING NUMBER 1 SITE PLAN /2017/IWMC/MUN/001 2 FLOOR PLAN /2017/IWMC/MUN/002

More information