1 Design and Bidding of PCB Abatement Projects for Building Materials Brian McCormack Weston & Sampson
2 Design and Bidding of PCB Abatement Projects for Building Materials Brian McCormack P.E. Weston & Sampson
3 My demolition/renovation project has PCB-impacted materials. How do I proceed?
4 So many questions Should I remove PCBs or can I leave in place? Am I dealing with impacted substrate material? How do I mitigate exposure? Do I need EPA approval for what I do? How do I develop a Work Plan or specifications? How do I procure a contractor? How much will it cost? What will be the impact to project schedule?
5 What is the overall project goal? Demolishing/renovating a building Replacing building components Mitigating exposure to remaining PCB materials Adhering to a tight schedule Minimizing overall project costs
6 What are my options under EPA Regulations? Self-Implementing Approach (40 CFR (a)) Prescriptive procedures for sampling and clean-up EPA notification/approval required Performance-Based Approach (40 CFR (b)) Dispose of all waste at TSCA-approved facility Work plan approval from EPA not necessary Risk-Based Approach (40 CFR (c)) Risk exposure assessment EPA notification/approval required
7 Design Decision Matrix Project Goal Self- Implementing Performance- Based Risk-Based Demolition/Renovation Component Replacement Mitigate exposure to remaining PCBs Meet Schedule Minimize Costs
8 Self-Implementing Approach Evaluate completeness of data set. EPA may require additional characterization data (schedule impacts). Correspond with EPA on design intent. Prepare PCB Abatement specification based on SIP. Incorporate approved SIP into bid package. Clearly delineate extent of removal using drawings and details. Include time for verification sampling in sequence of work.
9 Performance-Based Approach Prepare design plans and specifications for bid. Clearly define extent of removal for bulk product and substrate. If extent is well defined, bid work as lump sum. Remove more substrate - save time on verification sampling. Require Abatement Work Plan submittal from contractor. Include time for verification sampling in sequence of work. Specify requirements for containment, monitoring, and waste disposal.
10 Risk-Based Approach Typically used for more complicated projects. Involve Risk Assessor. Collect data sufficient to perform risk assessment. Follow EPA checklist for preparing Risk-Based Cleanup Plans. Include sufficient time in project schedule for Plan approval (can be up to 6-9 months). Incorporate approved Plan into bid specifications package. Clearly define extent of removal and/or encapsulation.
11 Abatement Drawing and Details Provide plans showing full extent of impacted material removal. Include supporting details (e.g., sawcutting and removal of caulked expansion joints, brickwork around windows, etc.).
12 Abatement Specifications Incorporate approved SIP or Risk-Based Plan. Specify requirements for Contractor Work Plan submittal. Specify requirements for Work Area protection, containment, air monitoring, and equipment decon. Provide specifications for encapsulation products (if required). Include requirements for waste handling and disposal. Means and methods are up to contractor, however, specify sequence of material removal, and verification testing where necessary. cleanup,
13 Lessons Learned vacuum clean all surfaces prior to commencing abatement activities... vacuum remove all loose caulk debris and dust work area shall be inspected by Engineer for acceptance prior to commencing next activity
14 Considerations for Public Bid Prequalify contractors experience is key. Has contractor submitted EPA-approved Work Plans? Contractor team includes environmental professionals (sampling, monitoring, documentation). Bid pricing bid item flexibility (additional material removal, adjustment class items, confirmatory sampling). Oversight is very important.
15 PCB Disposal Rule Update PCB-impacted substrate materials can now be disposed of with bulk product waste at state-permitted nonhazardous waste landfills. Simplifies specification language streamlines waste management reduces disposal costs.
16 Contact Information: Brian J. McCormack, P.E. Project Manager Weston & Sampson 5 Centennial Dr. Peabody, MA Mobile: Office: Ext.2329 Fax: mccormackb@wseinc.com Questions?
PCBs in Building Materials. Lessons from the Trenches
PCBs in Building Materials Lessons from the Trenches Michael Gitten, LSP, PE Environmental Division Manager Kevin Drinan, CIH, PE Industrial Hygiene Services Manager Presentation Overview > Health & Safety
More informationFINAL COMPLETION REPORT
FINAL COMPLETION REPORT SOUTHWEST RESIDENTIAL AREA CONCOURSE PCB CLEANUP CRAMPTON & MACKIMMIE DORMITORIES PREPARED FOR: UNIVERSITY OF MASSACHUSETTS ENVIRONMENTAL HEALTH & SAFETY 118 DRAPER HALL 40 CAMPUS
More informationRemediation Approach. W-3839 July 6, 2009
W-3839 July 6, 2009 Scott Alfonse City of New Bedford Department of Environmental Stewardship 133 William Street, Room 304 New Bedford, MA 02740 Re: Opinion of Probable Remediation Costs Former Polymerine
More informationMay 9, Dear Ms. Tisa:
ASSOCIATES INC. 73 Williams Franks Drive West Springfield, MA 01089 Phone: (413) 781-0070 Fax: (413) 781-3734 www.atcassociates.com May 9, 2011 Ms. Kimberly Tisa Environmental Scientist and PCB Coordinator
More informationSolving NLPCB Impediments to Decommissioning
TRUST PERFORMANCE PEOPLE Environmental and Infrastructure Solutions Energy, Utility & Environment Conference San Diego, California 25 February 2019 Stephen Mitchell, PG Senior Vice President Weston Solutions,
More informationLoureiro Engineering Associates, Inc. 100 Northwest Drive, Plainville, CT
New Strategies and Demands For Hazardous Materials Management Loureiro Engineering Associates, Inc. 100 Northwest Drive, Plainville, CT www.loureiro.com Overview History and Uses Current Regulatory Perspective
More information3/3/2016. Amy Hensley USEPA Office of Resource Conservation & Recovery March 9, Colorless. Odorless. Viscous liquid or solid. Low vapor pressure
Amy Hensley USEPA Office of Resource Conservation & Recovery March 9, 2016 Properties, uses, and health concerns Regulatory history and structure Cleanup options Disposal options Resources Regional PCB
More informationA. Illinois Asbestos Abatement Act, as amended through Public Act , effective July 14, 1995.
April 2012, rev. 00 02 8213 Asbestos Abatement 1. General 1.01 Summary of Work A. Contractor 1.02 Definitions 1. The Contractor shall provide removal and proper disposal of asbestos containing materials.
More informationI. OBJECTIVE DESCRIPTION OF THE PROPERTY
ATTACHMENT C STATE OF OREGON v. OREGON STATE UNIVERSITY CONSENT JUDGMENT (the PROSPECTIVE PURCHASER AGREEMENT ) TAX LOTS 1812060000110, 181206A000719, 1812060000111, 1812060000100 BEND, OREGON REMEDIAL
More informationIn general, the management plan development process consisted of:
NWASCO SCHOOL DISTRICT #21 ASBESTOS MANAGEMENT PLAN PART I: GENERAL PROVISIONS OF THE MANAGEMENT PLAN 1.0 INTRODUCTION This Asbestos Management Plan was developed in accordance with the United States Department
More informationSolving PCB Impediments to Decommissioning
TRUST PERFORMANCE PEOPLE Environmental and Infrastructure Solutions Stephen Mitchell, PG Senior Vice President Weston Solutions, Inc. J.D. Groesbeck, PG Project Manager Weston Solutions, Inc. Plan Decommissioning
More informationSECTION ASBESTOS CONTAINING MATERIALS REMEDIATION
SECTION 13280 ASBESTOS CONTAINING MATERIALS REMEDIATION PART 1 GENERAL 1.1 SECTION INCLUDES A. Furnishing all labor, materials, equipment, and transportation necessary for properly and safely removing,
More informationMarch 6, Outreach Activities for the School Community - PCB Risk-Based Cleanup and Disposal Thomas Prince School Princeton, Massachusetts
March 6, 2012 Ms. Kimberly Tisa, PCB Coordinator (OSRR07-2) Remediation and Restoration II Branch United States Environmental Protection Agency Region 1 5 Post Office Square, Suite 100 Boston, Massachusetts
More informationPCB DELINEATION AND SOURCE BULK SAMPLING REPORT
PCB DELINEATION AND SOURCE BULK SAMPLING REPORT Gymnasium Building John Adams Middle School 2425 16 th Street Santa Monica, CA 90405 Prepared for: Santa Monica-Malibu Unified School District 1651 Sixteenth
More informationAPPENDIX J Costs for Abatement, Demolition, Construction Oversight, and Required Air Monitoring
APPENDIX J Costs for Abatement, Demolition, Construction Oversight, and Required Air Monitoring January 31, 2011 AIRTEK ENVIRONMENTAL CORP. 39 37 29 th Street, Long Island City, New York, 11101 Phone
More informationLead based Paint Hazard Tutorial. Bidding and WWU
Lead based Paint Hazard Tutorial Bidding and WWU On April 22, 2008, EPA issued a rule requiring the use of lead-safe practices and other actions aimed at preventing lead poisoning. Beginning in April 22,
More informationLEAD HAZARD CONTROL PROGRAM
LEAD HAZARD CONTROL PROGRAM Supervisor s Manual Prepared by Environmental Health and Safety Services Occupational Safety Programs GLOSSARY Abatement or Deleading CFR Control Measure Encapsulation EPA HEPA
More informationWESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101
WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101 Issued 6/1/95 Revised 11/08/2004; 3/6/06 Please direct any questions or comments about the applicability of this document to Luigi
More information!Water-based Polymer Coating for Application on 2.5 CCA treated pilings!!!!
Water-based Polymer Coating for Application on 2.5 CCA treated pilings Part 1: General 1. System Description Specification 21POLY Composite Marine Coating Water-Based Composite Coating A two-part water-based
More informationPCBs in Building Materials. John Gorman Jim Haklar USEPA
PCBs in Building Materials John Gorman Jim Haklar USEPA PCBs in Building Materials What are PCBs Sources of PCBs in Building Materials Regulatory Requirements Levels of PCBs Found Removal & Clean-up Standards
More informationCity of Eagle Point 2017 Paving Instruction to Bidders
City of Eagle Point 2017 Paving Instruction to Bidders Issued: August 2, 2017 Closing Date and Time: Wednesday August 16, 2016 at 2:00 pm Project Summary The City of Eagle Point is requesting bids for
More informationOffice of Design & Construction State University Plaza Albany, New York
Instructions: Consultant should meet with the Campus and Fund at the work area(s) prior to completing this Checklist. At least two (2) meetings are required, one prior to Schematic Phase submission and
More informationSECTION 807 PUMP STATION REHABILITATION
SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but
More informationLEAD-BASED PAINT ABATEMENT SPECIFICATIONS
BARR & CLARK Independent Environmental Testing Asbestos Lead Mold Phase I LEAD-BASED PAINT ABATEMENT SPECIFICATIONS OF 5 BUILDINGS 1400 E. MISSION BOULEVARD POMONA, CA PROJECT NO. 3009860 JUNE 23, 2017
More informationEBC New Hampshire Program. How to Successfully Manage PCBs in Buildings and / or the Environment
EBC New Hampshire Program How to Successfully Manage PCBs in Buildings and / or the Environment Welcome from the Committee Chair Bob Varney Chair, EBC New Hampshire Chapter President, Normandeau Associates,
More informationPolychlorinated Biphenyls 40 CFR Part 761 Mike Dandurand - Region 7 PCB Coordinator
Polychlorinated Biphenyls 40 CFR Part 761 Mike Dandurand - Region 7 PCB Coordinator 1 What are PCBs? Polychlorinated biphenyls Man-made organic chemicals Industrial and commercial applications 2 Reinterpretation:
More informationAsbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager
Asbestos Management Plan Program originated: 02/2000 Last updated: 6/2015 Wendel Reece University Safety Manager TABLE OF CONTENTS I. Introduction II. Purpose III. Operations and Maintenance Asbestos Related
More informationAPPENDIX C SAMPLE ASBESTOS ABATEMENT SPECIFICATION
APPENDIX C SAMPLE ASBESTOS ABATEMENT SPECIFICATION The following appendix includes information and standard drawings that are diagrammatic and are used only to convey intent. Guidelines for Use of Sample
More informationREMOVAL AND DISPOSAL OF MATERIALS CONTAINING LEAD. A. General provisions of the Contract, including General and Supplementary Conditions.
028333 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. General provisions of the Contract, including General and Supplementary Conditions. B. Contract Drawings. 1.2 SUMMARY A. The lead removal work is in support
More informationTABLE OF CONTENTS 4. PREPARATION, COMMUNICATIONS, AND CONTROLS
TABLE OF CONTENTS SECTION PAGE NO. 1. INTRODUCTION... 1-1 1.1 Background... 1-1 1.2 Conceptual Site Model... 1-1 1.3 Plan Organization... 1-2 1.4 Certification... 1-3 2. SAMPLE COLLECTION, ANALYSIS, AND
More informationOVERVIEW SCOPE OF WORK (SOW)
Site Description The subject property is occupied by the former Parker Service Station, which contained a former Service Garage (now called Former Garage) and Filling Station Store (now called Storage
More informationA. Prior to commencement of any work, make a complete inspection of all of the facilities listed in this specification
SECTION 028200 - ABESTOS ABATEMENT PART 1 - GENERAL 1.1 SCOPE OF WORK A. The following asbestos-containing materials is known to be present on the First and Second Floor classrooms of the North Wing of
More informationIf you have any questions, please contact the undersigned at (781) Division Manager, Environmental Services
ASSOCIATES INC. 600 West Cummings Park, Suite 5450 Woburn, MA 01801 www.atcassociates.com Phone 781.932.9400 Fax 781.932.6211 April 13, 2012 Kim Tisa, PCB Coordinator U.S. Environmental Protection Agency,
More informationSECTION PCB REMEDIATION OF BUILDING MATERIALS
SECTION 020720 PCB REMEDIATION OF BUILDING MATERIALS PART 1 - GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the Contract and General Conditions and all Sections within Division 1 - General
More information1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:
125 Syndicate Avenue, Thunder Bay, Ontario Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:.1 Removing asbestos-containing transite
More informationENVIRONMENTAL GUIDELINES
ENVIRONMENTAL GUIDELINES PART 1: GENERAL 1.01 INTENT AND BACKGROUND A. The intent of this Section is to clarify Cornell s policies and standards regarding the protection of the environment as it relates
More informationPCB S IN BUILDING MATERIALS
PCB S IN BUILDING MATERIALS Thomas J. Broido Branch Manager/Principal Scientist ATC Group Services, LLC 171 Commerce St. Williston, VT 05495 802-862-1980 tom.broido@atcassociates.com PCB S IN BUILDING
More informationPCB DELINEATION SAMPLING
PCB DELINEATION SAMPLING Athletic Field Project-Restroom Demolition 500 Building Lincoln Middle School 1501 California Avenue Santa Monica, California 90403 Prepared for: Santa Monica-Malibu Unified School
More informationEsquimalt Graving Dock Waterlot Remediation Mega-Site (Phase 1B): Design, Contracting, and Construction Challenges
Esquimalt Graving Dock Waterlot Remediation Mega-Site (Phase 1B): Design, Contracting, and Construction Challenges Presented by Dan Berlin and Tom Wang, Anchor QEA, LLC Andrew Mylly and Rae-Ann Sharp,
More informationTheresa Wolejko, University of Massachusetts
COMMITMENT & INTEGRITY DRIVE RESULTS 40 Shattuck Road Suite 110 Andover, Massachusetts 01810 www.woodardcurran.com T 866.702.6371 T 978.557.8150 F 978.557.7948 January 8, 2013 Ms. Kimberly Tisa PCB Coordinator
More informationREQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST
REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST MENDON, VT 05701 TOWN OF MENDON, VERMONT August, 2018 1 1. SUMMARY AND BACKGROUND The Town of Mendon s original Town
More informationThe Future of ODOT s Erosion and Sediment Control Specification SS832
The Future of ODOT s Erosion and Sediment Control Specification SS832 Hans Gucker, P.E., CPESC ODOT Office of Construction Administration Construction Hydraulic Engineer MS4 AUDIT FINDINGS 2013-2016 Ohio
More informationAPPLICATION GUIDELINE
PROVEN ACRYLIC ROOFING SYSTEMdesigned to restore & protect metal roofs METAL To ensure warranty eligibility, each job must be approved by American WeatherStar before it begins. PART 1 GENERAL 1.01 DESCRIPTION
More informationBeth Israel Deaconess Medical Center Environment of Care Manual
Title: ASBESTOS MANAGEMENT POLICY Policy #: EC-66 Purpose: Beth Israel Deaconess Medical Center Environment of Care Manual This policy has been developed to provide guidance and assistance with the management
More informationAPPROACH FOR IMPLEMENTION OF HUD S LEAD SAFE HOUSING RULE REGULATIONS (24 CFR Part 35, Subpart H, )
January 16, 2008 Mississippi Development Authority Homeowner Elevation Grant Program and Small Rental Assistance Program in Hancock, Harrison, Jackson, and Pearl River Counties, Mississippi APPROACH FOR
More informationPROJECT SPECIFICATIONS FOR THE REMOVAL OF PCB AND MERCURY
PROJECT SPECIFICATIONS FOR THE REMOVAL OF PCB AND MERCURY MARSHALL COURTS PHASE IV AND V 741 34 TH STREET NEWPORT NEWS, VIRGINIA ECS PROJECT NO. 47:3961 FOR VIA DESIGN ARCHITECTS, PC JUNE 9, 2017 PROJECT
More informationManagement of PCB Bulk Product Waste. 3 rd Annual Landfill Operators Conference February 13, 2013
Management of PCB Bulk Product Waste 3 rd Annual Landfill Operators Conference February 13, 2013 What are PCBs? Polychlorinated Biphenyl (PCBs) are a class of 209 toxic man-made chemicals that persist
More informationREQUEST FOR PROPOSALS Garfield Charter Township Hall Sidewalk Snowmelt Heating System Repairs Garfield Township, Grand Traverse County
REQUEST FOR PROPOSALS Garfield Charter Township Hall Sidewalk Snowmelt Heating System Repairs Garfield Township, Grand Traverse County Proposals Due: 10:00 A.M., Thursday, March 28, 2019 Address Proposals
More informationNAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control
NAVSEA STANDARD ITEM ITEM NO: 009-10 DATE: 18 NOV 2016 CATEGORY: I 1. SCOPE: 1.1 Title: Asbestos-Containing Material (ACM); control 2. REFERENCES: 2.1 29 CFR 1915.1001, Occupational Safety and Health Standards
More informationLEAD PAINT MANAGEMENT PROGRAM
LEAD PAINT MANAGEMENT PROGRAM CONTENTS 1.0 PURPOSE 2.0 APPLICABILITY AND SCOPE 3.0 APPLICABLE REGULATIONS AND STANDARDS 4.0 DEFINITIONS 5.0 RESPONSIBILITIES 5.1 Responsibilities 5.2 Manager and Supervisor
More informationGENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM
1. GENERAL 1.01 DESCRIPTION GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM A. The Contractor shall furnish all labor, equipment and materials necessary
More informationSUMMARY OF BID ITEMS
Addendum 4 Request for Information Village of North Palm Beach Contractor Solicitation Roof Replacement Library & Public Works Facility Invitation for Bids Bid Opening October 9, 2014 3:00 PM E.S.T. Following
More informationSeptic Tank & Drain Field
COMMUNITY ACTION HOUSING REHABILITATION PROGRAM Bids due to Community Action ATTN: BARB ANDERSON 175 Main St. Battle Creek, MI 49014 Owner: Neiwenhuis Property Address: Battle Creek MI 49037 Telephone:
More informationUniversity of Massachusetts. Lederle Graduate Research Center Amherst, Massachusetts New England Business Center Andover, MA
Self-implementing On-Site Cleanup and Disposal Plan University of Massachusetts Lederle Graduate Research Center Amherst, Massachusetts 1.866.702.6371 35 New England Business Center Andover, MA 210918.00
More informationSection Asbestos Removal
Section Cover Page Section 02 82 33 2017-10-01 Use this Section to specify removal of materials containing asbestos, as listed below. Always use in conjunction with Section 02 82 01 - Asbestos Control
More informationCITY OF MARSHALL, MINNESOTA
Office of the Director of Public Works/City Engineer 344 West Main Street Marshall, MN 56258 507-537-6773 Fax: 507-537-6830 CITY OF MARSHALL, MINNESOTA SPECIFICATION AND BIDDING DOCUMENTS FOR REMOVAL OF
More information3. Asbestos Handling Program
1.0 Introduction 3. Asbestos Handling Program This program will establish guidelines and procedures in the operations and maintenance of asbestos containing materials at PLU to protect all employees, contractors,
More informationSite Specific Hazardous Material Abatement Work Plan
Site Specific Hazardous Material Abatement Work Plan Jobsite Location: Pier 31 Building and Roof Repair Project Port of San Francisco San Francisco, California Prepared By: North Tower Environmental, Inc.
More informationBoot Camp - Construction Breakout Session #4. September 20, 2018 Pam Liston Moderator Program Manager Local Assistance Division - VDOT
Boot Camp - Construction Breakout Session #4 September 20, 2018 Pam Liston Moderator Program Manager Local Assistance Division - VDOT Successful Delivery Marty R. Halloway, PE, CCM VDOT Bristol District
More information2. Clarification: The building address is 801 Henderson Street.
East Energy Structural Steel Painting University of South Carolina Project Number H27-Z037 Addendum One October 19, 2015 NOTE: The following amendments, additions, and deletions shall be made to the Construction
More informationAsbestos and Lead-Based Paint Abatement Requirements at Brownfields/Voluntary Cleanup Program Sites
Asbestos and Lead-Based Paint Abatement Requirements at Brownfields/Voluntary Cleanup Program Sites Hazardous Waste Program Fact Sheet Asbestos-containing materials and lead-based paint have the potential
More informationSECTION ADDENDA
SECTION 00 91 03 ADDENDA ADDENDUM NO. 2 June 14, 2017 RE: Cana Island Light Station Phase 2 Baileys Harbor, WI RA 1372.A FROM: TO: River Architects, Inc. 740 7 th Street North La Crosse, Wisconsin 54601
More informationA. Project will be constructed under a general construction contract.
SECTION 01100 SUMMARY AND PAYMENT ITEMS 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections,
More informationCity of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders
City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders Issued: November 15, 2017 Closing Date and Time: January 16, 2018, at 2:00 pm Project Summary The City of Eagle Point is requesting
More information40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT INDIAN HEAD ELEMENTARY SCHOOL
69 Bridge Street Dedham, MA 02026 Phone 781.251.0040 Fax 781.251.0901 40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT for INDIAN HEAD ELEMENTARY SCHOOL 726 Indian Head Street Hanson,
More informationApril 13, U.S. Environmental Protection Agency, Region 1 5 Post Office Square, Suite 100 Mail Code: OSRR07-2 Boston, MA
600 West Cummings Park, Suite 5450 Woburn, MA 01801 www.atcassociates.com Phone 781.932.9400 Fax 781.932.6211 April 13, 2012 Kim Tisa, PCB Coordinator U.S. Environmental Protection Agency, Region 1 5 Post
More informationMississippi Department of Environmental Quality. Policy for Handling Demolitions of Structures to Address Potential Asbestos January 3, 2006
Disclaimer: Mississippi Department of Environmental Quality Policy for Handling Demolitions of Structures to Address Potential Asbestos January 3, 2006 This guidance supersedes MDEQ December 16, 2005,
More informationDESIGN BUILD LA 318 INTERCHANGE FUTURE I-49 SOUTH
DESIGN BUILD LA 318 INTERCHANGE FUTURE I-49 SOUTH Post Office Box 94245 Baton Rouge, LA 70804-9245 Timothy Nickel, P.E. Senior Project Manager (225) 379-1110 Timothy.Nickel@la.gov 1. First DOTD Design
More informationUrzgan Rural Access Program
00083939 Urzgan Rural Access Program Rehabilitation of Gravel Road from Surkhliz to Chinartu, Ch. (18+000-27+000)km in Urzgan Province of Afghanistan Lot 3 United Nations Office for Project Services (
More informationTighe&Bond. Hazardous Building Materials Assessment. Ramage Paper Mill Monroe, Massachusetts. Prepared For:
Tighe&Bond Ramage Paper Mill Monroe, Massachusetts Hazardous Building Materials Assessment Prepared For: Franklin Regional Council of Governments Greenfield, Massachusetts May 25, 2016 F01372-12 May 25,
More informationPCB INTERIM MEASURES PLAN
PCB INTERIM MEASURES PLAN University of Massachusetts Lederle Graduate Research Center Amherst, Massachusetts 1.866.702.6371 35 New England Business Center Andover, MA 210918.01 UMass LGRC May 2012 TABLE
More informationCHAPTER NINE LEAD-BASED PAINT
CHAPTER NINE LEAD-BASED PAINT 1. OVERVIEW A. Lead Safe Housing Rule (LSHR): In 1992, Congress enacted into law the Housing and Community Development Act of 1992. Title X of that Act, the Residential Lead-based
More informationWork Plan for Window Removal and Remediation Rooms: 200 Wing classrooms, Cafeteria and Kitchen Thomas Prince School Princeton, Massachusetts
1) Introduction Work Plan for Window Removal and Remediation Rooms: 200 Wing classrooms, Cafeteria and Kitchen Thomas Prince School Princeton, Massachusetts Triumvirate Environmental Inc. (TEI) shall perform
More informationPROJECT NAME SECTION GENERAL COMMISSIONING REQUIREMENTS
PART 1 - GENERAL 1.1 SUMMARY A. The Owner has contracted an independent Commissioning Authority. The Commissioning Authority is an independent and knowledgeable third party, hired to verify that the systems
More informationI. Development, Submittal, and Acceptance of a Quality Management System
I. Development, Submittal, and Acceptance of a Quality Management System 1. Scope Under the Contract, quality assurance and quality control management are the responsibility of the Contractor. The Contractor
More informationPURCHASING DEPARTMENT. Project # Addendum # # of Pages Original Issue Date. 7 (including title page) March 3, 2017
PURCHASING DEPARTMENT The bid listed below has had addenda issued. Documents are available over the Internet at http://www.norwalkct.org Adobe Acrobat reader is required to view this document. If you do
More informationMANAGEMENT OF SONOMA COUNTY WILDFIRE DEBRIS
Planning & Economic Development 100 Santa Rosa Ave, Rm. 3 Santa Rosa, CA 95404 Phone: (707) 543-4691 Email: planning@srcity.org MANAGEMENT OF SONOMA COUNTY WILDFIRE DEBRIS To ensure safety to workers,
More informationHerrington Architects PC 101 Richard Arrington Jr. Blvd. S. Birmingham, AL phone fax
Herrington Architects PC 101 Richard Arrington Jr. Blvd. S. Birmingham, AL 35233 phone 205.326.1131 fax 205.326.1164 ADDENDUM #04 PROJECT: Alabama State University Renovations to Life Sciences Building
More informationPCBs in Demolition Projects. M.L. Press PCB POLLUTANT MINIMIZATION PLAN WORKSHOP JANUARY 30, 2007
PCBs in Demolition Projects PCB POLLUTANT MINIMIZATION PLAN WORKSHOP JANUARY 30, 2007 2 "These materials were prepared solely for internal use by DuPont and may not be used or relied upon by any other
More informationTimothy Stokes, PE, MBA Parsons, Principal Project Manager Denver, Colorado
A SE Approach to Enhance and Support the Acceptance Process for RTD FastTrack's Projects Timothy Stokes, PE, MBA Parsons, Principal Project Manager Denver, Colorado Key Take Away Points 1. Alternative
More informationPost Abatement Project Report - Sample Draft Form:
Post Abatement Project Report - Sample Draft Form: 3701-3215 (B) (B) Each lead abatement contractor or lead abatement project designer shall issue a report for each lead abatement project performed. The
More informationMISSOURI DEPARTMENT OF NATURAL RESOURCES. Requirements for Asbestos and Lead Paint Abatement at Voluntary Cleanup Program Sites Technical Bulletin
MISSOURI DEPARTMENT OF NATURAL RESOURCES Requirements for Asbestos and Lead Paint Abatement at Voluntary Cleanup Program Sites Technical Bulletin 7/2001 Division of Environmental Quality Hazardous Waste
More informationCOMMUNITY ACTION CHIP LEAD PROGRAM Bids due to Community Action ATTN: BERNADETTE JOHNSON 175 Main St. Battle Creek, MI 49014
COMMUNITY ACTION CHIP LEAD PROGRAM Bids due to Community Action ATTN: BERNADETTE JOHNSON 175 Main St. Battle Creek, MI 49014 Owner: Eastin Property Address: Owner Telephone: 1- Date of Specification: November
More informationOverview of the Project Development Process. Brian Blanchard, PE Assistant Secretary for Engineering and Operations
Overview of the Project Development Process Brian Blanchard, PE Assistant Secretary for Engineering and Operations Overall Project Development Process The time it takes to produce a project varies significantly
More informationThese procedures are to be followed by all persons required to perform the following work:
These procedures are to be followed by all persons required to perform the following work: Entry into any ceiling space above which an asbestos-containing fireproofing or thermal insulation is present.
More information40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT
69 Bridge Street Dedham, MA 02026 Phone 781.251.0040 Fax 781.251.0901 40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT for WHITMAN MIDDLE SCHOOL 100 Corthell Avenue Whitman, MA 02382 Initial
More informationOwner's Representative Scope Matrix - D/B Rev 10/28/2013
Ecluded Owner's Representative Scope Matri - D/B Rev 10/28/2013 The following matri is a worksheet to identify required and optional scope for Owner's Representative services. Please identify the scope
More informationNORWELL PUBLIC LIBRARY 64 South St, Norwell, MA 02061
INSPECTION REPORT FOR HAZARDOUS BUILDING MATERIALS NORWELL PUBLIC LIBRARY 64 South St, Norwell, MA 02061 Prepared For: Mr. Rick Pomroy Pomroy Associates LLC Village Place 448 Turnpike Street, Suite 1-1
More informationThe Port Authority will demolish, remediate, and clear the site for future development by a company or end user.
Who is the Port of Greater Cincinnati Development Authority? The Port of Greater Cincinnati Development Authority (Port Authority) is a quasi-governmental, economic development agency that initiates projects
More informationDIVISION 02 EXISTING CONDITIONS 2010 Edition, Published January 1, 2010; Document Revision Date: February 7, 2017
2010 Edition, Published January 1, 2010; Document Revision Date: February 7, 2017 02 00 00. EXISTING CONDITIONS 02 30 00. SUBSURFACE INVESTIGATION.1 Architect/Engineer RESPONSIBILITIES: The Architect/Engineer
More informationBRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02
BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 Department Title: Safety Department Page: 2 Department Title: Safety Department Page:
More informationMPA Project No. L1294-C1 Project Title: LOGAN EXPRESS BUS TERMINAL SITE IMPROVEMENTS, PEABODY. Location: 164 Newbury Street, Peabody, MA
MPA Project No. L1294-C1 Project Title: LOGAN EXPRESS BUS TERMINAL SITE IMPROVEMENTS, PEABODY Location: 164 Newbury Street, Peabody, MA RESPONSES TO QUESTIONS and/or RFI s Date: 08-10-2018 The attention
More informationAsbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22
Page 1 of 22 Asbestos Survey Project Summary Pursuant to your request; Environmental, Inc., has performed an Asbestos Building Survey on 8/13/2014 and limited to the above referenced location. The Interior/Exterior/Roof
More informationDESIGN & CONSTRUCTION PHASE COMMISSIONING PLAN TEMPLATE
DESIGN & CONSTRUCTION PHASE COMMISSIONING PLAN TEMPLATE Based upon B3 Minnesota Sustainable Building Guidelines VERSION 2.1 Notes to the reader have been added to this document within numerous text boxes
More informationEnsure policy is adhered to by all employees. Follow policy requirements.
1.0 Scope and Application This policy as been developed to minimize the potential health risk to County employees and the public resulting from the presence of Asbestos Containing Materials (ACM) or Presumed
More informationAPPLIED SYNERGY IN WASTE MANAGEMENT ACTIVITIES FOR DECOMMISSIONING AT THE LOS ALAMOS NATIONAL LABORATORY
APPLIED SYNERGY IN WASTE MANAGEMENT ACTIVITIES FOR DECOMMISSIONING AT THE LOS ALAMOS NATIONAL LABORATORY A. Drom Duratek Federal Services, Inc. Los Alamos Operations Office 555 Oppenheimer, Suite 101,
More informationWater Pollution Control for Work in Sensitive Areas
Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed