A Primer Indianapolis, Indiana June 16, 2010
|
|
- Barbra Watts
- 5 years ago
- Views:
Transcription
1 Alternative Project Delivery Methods A Primer Indianapolis, Indiana June 16, 2010 Michael Kenig, Holder Construction Company, Past chair of AGC of America s s Project Delivery Committee Jayne O Donnell, O General Manager, Turner s s Aviation Division
2 Overview of this Summit Definitions (Four Stops) Analysis of Options and Issues Identification of Best Practices Looking for Innovation
3 Industry Convergence Lean/ Economic Pressures You Are Here Building Information Modeling (BIM) Transparency in Public Bidding Labor, Tax and Funding Laws Project Delivery including IPD Threats and Risks Sustainability
4 Reference Materials Project Delivery Systems for Construction available though Associated General Contractors
5 Tailored (but dated) Reference Material Joint effort between ACI, ACC and AGC memberships Focused on airport owners Serves as an evolving, collaborative PDS guide Customizes key concepts in AGC PDS textbook
6 The Four Stops on the Road To Alternative Project Delivery 1. Ability to Use an Alternative Project Delivery 2. Definitions and establishing best options for your airport 3. Selecting best options for specific project needs and goals. 4. Implementing best practices and innovations to deliver the project. Baseline Metrics Lessons
7 Ability to Use Alternative Delivery Methods Airports have options: Design-Bid Bid-BuildBuild Construction Management at-risk Design /Build And although not yet implemented: FAA s s pilot program for PPP (private public partnerships)
8 Stop 2: Definitions Management Options Delivery Systems Procurement/Selection Contracting/Payment /Reimbursement
9 Defining Terms Management Options (in-house or out- sourced) Contracting/ Reimbursement (GMP, cost plus, lump sum, ) Delivery Methods (DBB, CMR, DB, Other) Procurement/Selection (low price/ best value / qualification based)
10 Defining Terms Management Options Delivery Methods Procurement/Selection Contracting/Payment /Reimbursement
11 Management Options 1. Use Owner s s Own Staff to manage the project 2. Hire Consultants to Assist in the management (Program Managers, Construction Managers or other staff augmentation)
12 Management Options vs Delivery Methods Owner & Owner Representatives Management Options: Who oversees the process Designer Builder Design- Bid -Build, Construction Management at-risk, Design/Build Delivery Methods: How design and construction is contracted by the Owner
13 Defining Terms Management Options Delivery Systems Procurement/ Selection Contracting/Payment /Reimbursement
14 Contracting/ Reimbursement Defined as: How the Owner wants to pay for the services provided (GMP, Cost plus, negotiated lump sum, lump sum)
15 Defining Terms Management Options Delivery Methods Procurement/Selection Contracting/Payment /Reimbursement
16 Phases of Project Development GOAL Traditional Linear Process Planning Design Bid Construction Occupancy Overlapping Phase Process Planning Design Construction Occupancy
17 Organizational Relationships Based on Delivery Methods How the owner and its consultants interact organizationally
18 Design-Bid Bid-BuildBuild Owner/ Owner Rep Two Separate Contracts for Design & Construction A / E Responsible for Design General Contractor Responsible for Construction Implementation
19 Construction Management at-risk Owner/ Owner Rep Two Separate Contracts for Design & Construction (CMR contracted to take cost and schedule risk) A / E Responsible for Design Construction Manager at Risk Responsible for Construction Implementation
20 Design/Build One Single Contract for Design & Construction Owner Bridging Consultant (optional) Design/Build Entity Responsible for Design and Construction Implementation
21 Optional Structures for Design/Build Entities Design/Build Entity Types Integrated Firm - All services in-house Contractor Led (design subcontracted) Joint Venture (architect-contractor j.v.) Architect Led (construction subcontracted)
22 What Characterizes Design-Bid-Build? Defining Characteristics - There are Separate Contracts for Design & Construction Contractor Selection is Based Entirely on Cost And Typically Design Documents are 100% complete
23 What Characterizes CM At-Risk? Defining Characteristics - There are separate contracts for design & construction Contractor selection is NOT based entirely on cost CMR contracts directly with trades and takes on performance risk (cost and schedule commitments) And Typically though not unique to CMR Schedule allows for overlapping design and construction Owner procures preconstruction services from the CMR Owner expects CMR to provide Guaranteed Maximum Price (GMP) and to commit to delivery schedule
24 What Characterizes Design/Build? Defining Characteristics - Single Point of Responsibility And Typically Schedule allows for overlapping design and construction Owner procures Preconstruction Services from the CMR Owner expects CMR to provide Guaranteed Maximum Price (GMP) and to commit to delivery schedule
25 Strengths of Each Delivery Type DBB -100% design complete CM at Risk bring builder in during design to improve design cost and accelerated schedule D/B single point of contact, fastest
26 Defining Terms Management Options Delivery Methods Procurement/ Selection Contracting/Payment /Reimbursement
27 Contracting Reimbursement What is The Project Cost? Cost of Construction + Contractor s s Fee & General Conditions + Contingencies /Allowances Total Construction Cost + Professional Services Fees + Design Contingencies + Permitting & Other Soft Costs +Owner Contingency Total Project Budget
28 Procurement /Selection Types 1. Low Bid Total Construction Cost, is the only selection criteria. (Total Construction weighted 100% ) 2A. Best Value Bid Total Construction Cost is a weighted selection criteria. (Total Construction Cost weighted between 0% & 100% ) 2B. Best Value Fees Fees and/or General Conditions are weighted; but Total Construction Cost is not a weighted selection criteria (Fees weighted between 0% & 100% ) 3. Qualifications Based Selection Price is not a selection criteria. (Price weighted 0% )
29 Typical Public Owner s Delivery Options SELECTION TYPES Price Definition Designer & Contractor 2 separate contracts Design- Builder 1 combined contract 1. Low Bid Total Construction Cost Professional Services Selected on Price Design/Builder Selected on Price 2A. 2B. Price and other Qualifications Total Construction Cost Fees, General Conditions, Contingencies Etc. Pre Qualified Bid Best Value Proposal Design/Build Pre-Qualified Bid Design/Build Best Value Proposal Qualifications ONLY 3. Based Selection None Professional Services based on Qualifications only Design-Build Services Based on Qualifications only
30 Examples of Airports Choices SELECTION TYPES Price Definition Designer & Contractor 2 separate contracts Design- Builder 1 combined contract 1. Low Bid Total Construction Cost John Wayne Airport, Washington Dulles - Contractor services Federal Contracts (FAA, DOT, COE)? 2A. 2B. Price and Other Qualifications Total Construction Cost Fees, General Conditions, Contingencies Etc. JetBlue Terminal 5, JFK Airport Most Common -PHX, SEA, FLL, Sacramento Airport* San Francisco Airport Qualifications ONLY 3. Based Selection None John Wayne Airport (PM/CM and A/E services) San Diego Airport
31 Delivery Methods Selection Options 1. Delivery Method / Selection Types Design-Bid-Build Low Bid Best Value Bid Best Value Fees Qualifications Based Selection (QBS) 2. CM at-risk (aka CM/GC) 3. Design-Build 4. Other
32 Another Way
33 Selection Process Summary SELECTION PROCESSES DELIVERY METHOD IFB 1 RFQ 2 RFP 3 Design-Bid-Build Design-Build, 1-Step Design-Build, 2-Step X X Const. Risk JOC, 1-Step JOC, 2-Step X X Notes: 1. Invitation for Bids, low bid process. 2. Request for Qualifications, a qualifications-based selection process with no element of price considered in the first step. 3. Request for Proposals, a process that combines qualifications, technical capabilities, and price in a Best Value process. X Engineering and Architectural Services Department 33 X X X
34 End of Definitions Next.. we continue to Stop 3 on the Road To Alternative Project Delivery 1. Ability to Use an Alternative Project Delivery 2. Definitions of the each of the Delivery Method Options 3. Selecting the appropriate Project Delivery Method 4. Implementing the chosen Project Delivery Method
35 Benefits and Results of Alternate Delivery Methods Airport Project Delivery Summit II Chicago, IL May 17, 2007 Wylie Bearup, City Engineer
36 APDM Project Summary Delivery Methods Total Projects Projects Awarded Projects Completed Contractors Selected Value ($M) Design-Build $436.9 Risk $2,484.6 Job Order Contracting $ $3,133.9 * Cumulative since passage of legislation in 2000 through December 2006 Engineering and Architectural Services Department 36
37 APDM Benefits Ability to pick Best Qualified contractor Better relationships among all project team members Contractor involvement throughout design phase: more control of budget through design phase true Value Engineering to ensure most costefficient systems enhanced project communications by selecting entire team early more time to plan construction activities better designs through constructability reviews Engineering and Architectural Services Department 37
38 APDM Benefits, con. Better quality from better subcontractors Smoother project close out Better contractor performance for repeat business Reduced completion time with fast tracking and long lead procurement Greater control of subcontractor selection Higher levels of M/W/SBE participation Ability to meet Green Building goals Engineering and Architectural Services Department 38
39 APDM Research Analyzed 59 completed projects: 33 DBB to serve as baseline 20 completed projects 6 completed DB projects Analysis compared results in 3 areas: Schedule Growth Cost Growth Delivery Speed Team perceptions: APDM projects on time, with better quality Engineering and Architectural Services Department 39
40 Schedule Growth 30.0% 25.0% 24.7% 20.0% 15.0% 10.0% 7.0% 5.0% 4.8% 0.0% Design-Bid-Build Design-Build Engineering and Architectural Services Department 40
41 Cost Growth 16.0% 15.2% 14.0% 12.0% 10.0% 8.0% 6.0% 4.7% 4.0% 2.0% 0.0% 0.7% Design-Bid-Build Design-Build Engineering and Architectural Services Department 41
42 Construction Speed 2,500 2,000 2,141 SF/month 1,500 1, , Design-Bid-Build Design-Build CM@Risk Engineering and Architectural Services Department 42
43 Conclusion Process is working very well Methods have provided significant benefits to the City City continues to utilize all of the tools in our tool box Engineering and Architectural Services Department 43
44 6 th Annual FMI/CMAA Survey of Owners
45 6th Annual FMI/CMAA Survey of Owners
46 6th Annual FMI/CMAA Survey of Owners
47 How to Choose the Best Delivery Method Airport Project Delivery Summit II Chicago, IL May 16, 2007 Wylie Bearup, City Engineer, City of Phoenix
48 NUMERICAL ANALYSIS 1. Select and rank criteria. 2. Rate Delivery Methods ability to deliver criteria. 3. Apply ratings to ranked criteria. 4. Sum scores for each method. 5. Highest scored method selected. Engineering and Architectural Services Department 48
49 Developing Criteria CRITERIA Low initial design and construction costs High aesthetics of design High quality project Short project schedule High City control of design Low risks to City Non-adversarial relationships Effective coordination of design and construction Maximum flexibility to revise scope Low cost growth Engineering and Architectural Services Department 49
50 Ranking Criteria CRITERIA RANK Low initial design and construction costs 3.5 High aesthetics of design 10 High quality project 8 Short project schedule 6 High City control of design 9 Low risks to City 1 Non-adversarial relationships 2 Effective coordination of design and construction 7 Maximum flexibility to revise scope 3.5 Low cost growth 5 10 = most important, 1 = least important Engineering and Architectural Services Department 50
51 Rating Delivery Methods CRITERIA DBB DB Low initial design and construction costs High aesthetics of design High quality project Short project schedule High City control of design Low risks to City Non-adversarial relationships Effective coordination of design and construction Maximum flexibility to revise scope Low cost growth = best able to deliver, 1 = worst able to deliver Engineering and Architectural Services Department 51
52 Weighted Criteria CRITERIA DBB DB Low initial design and construction costs High aesthetics of design High quality project Short project schedule High City control of design Low risks to City Non-adversarial relationships Effective coordination of design and construction Maximum Flexibility to revise scope Low cost growth TOTAL SCORE CM@R selected as Best Method Engineering and Architectural Services Department 52
53 PROS & CONS ANALYSIS CRITERIA DBB COMMENTS Contractor Selection Subcontractor Selection Design Input Quality Speed Relationships City selects Best Qualified contractor, based on demonstrated performance. Can select best Civic Plaza constructor in the country. DBB must select low bid, even if no experience or poor past performance. provides proposed subcontractors to City for approval. City can veto any poor performers or non-local firms. competes subcontracted work among prequalified, approved subs. DBB, low bid contractor brings own subs, no City control. selected during design process. Participates in design reviews. Provides true value engineering, constructability reviews. Validates design within budget throughout process. DBB, no design input, no constructor estimate until bid day. is selected on past performance. Has opportunity to work with designer, understand Owner s quality needs. Able to price construction cost proposal to satisfy quality requirements. Wants to provide high quality for future selections. DBB, quality reduces profit. CM@R can begin work as phases of design are completed; accelerates project. Can plan construction activities during design - site layout, circulation, etc. Is productive from 1st day on site. DBB, cannot start any work until entire design complete. CM@R, entire project team together throughout project. Able to establish relationships, communications processes up front. CM@R selected through professional process, similar to designer. DBB, contractor selected later, after City and designer working together. Engineering and Architectural Services Department 53
54 Pros & Cons Analysis, con FACTOR DBB COMMENTS Cost Growth Schedule Growth Initial Cost Cost Certainty Litigation Value involvement during design improves drawings and specs. More clearly understands design intent, helps eliminate ambiguities and deficiencies. Is motivated to limit change orders for future business. DBB, can exploit design deficiencies, no motivation to reduce. Prior planning during design makes more efficient, less surprises. Motivated to perform for future business. Paid lump sum for overhead, looses money if project delayed. DBB, negotiates extended General Conditions for changes, covers costs. requires fee to contractor during design, not required by DBB. receives construction phase fee, more visible than DBB. Research indicates can actually save money over project life. City doesn t have sufficient experience to evaluated total cost savings. CM@R gives City Guaranteed Maximum Price, absorbs cost if exceeded. Any savings realized during project returned to City. CM@R involvement during design reduces E&O change orders, cost growth. DBB, final project cost not known until negotiate final change order. Previous litigation used as negative factor in selection process. Improved relationships and communications reduces issues that lead to claims. Desire for repeat business compels CM@R to settle problems early. DBB not concerned about litigation, doesn t impact next low-bid selection. Fees paid to CM@R are investment in the project. Improves relationships, schedule, quality; reduces change orders and litigation. Research indicates CM@R is good value over project life. CM@R selected as Best Method Engineering and Architectural Services Department 54
55 SUMMARY Have applied Numerical Method on limited projects: Lake Pleasant Water Treatment Plant IGC/TGen Headquarters Convention Center Expansion Typically apply some form of Pros & Cons Analysis Engineering and Architectural Services Department 55
56 6 th Annual FMI/CMAA Survey of Owners Primary issues surveyed include role of A/E and C, collaboration, commissioning, sustainability, and delivery methods
57 Need more information?... Contact AGC of America Mike Stark:
58 RECAP: Defining Terms Management Options (in-house or out- sourced) Contracting/ Reimbursement (GMP, cost plus, lump sum, ) Delivery Methods (DBB, CMR, DB, other) Procurement/Selection (low bid / best value / qualification based)
59 From this session Management Options Delivery Systems Procurement/Selection Contracting/Payment /Reimbursement Consensus.
60 Agenda for Remainder of Summit Low Bid vs QBS GMP Contracting Funding Best Practices, a Case Study Design Level of Detail Innovations: BIM, Partnering, IPD
61 Alternative Delivery Methods, A Primer Michael Kenig, Holder Construction Company Phone: mkenig@holder.com Jayne O Donnell, O Turner Aviation Phone: JODonnell@tcco.com
62 End
1/4/2014. Alternative Project Delivery Methods 1. Agenda
Steven. C. Thweatt Assistant Vice Chancellor Facilities Management University of Colorado @ Boulder Steven.thweatt@colorado.edu Introduction Fun in the air More Fun in Chattanooga Licensed Architect Georgia
More informationDEFINING THE SPECTRUM OF PROJECT DELIVERY OPTIONS AND THEIR IMPLICATIONS FOR YOUR PROJECT 2017 Airport Construction Strategy Summit
DEFINING THE SPECTRUM OF PROJECT DELIVERY OPTIONS AND THEIR IMPLICATIONS FOR YOUR PROJECT 2017 Special Thanks To: DEFINING THE SPECTRUM OF PROJECT DELIVERY OPTIONS AND THEIR IMPLICATIONS FOR YOUR PROJECT
More informationTime to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO
Time to Build! What to Expect On Your Upcoming and Journey PRESENTED TO Christopher is an award-winning architect with more than 20 years of diversified architectural experience in design of projects from
More informationAirport Owners Guide to Project Delivery Systems White Paper Update
Airport Owners Guide to Project Delivery Systems White Paper Update Steve Riano Chair, ACC Project Delivery Committee Bechtel Infrastructure Corporation Fall 2011 ACI-NA Operations & Technical Affairs
More informationLB 889 The Political Subdivisions Construction Alternatives Act
1 LB 889 The Political Subdivisions Construction Alternatives Act What cities, villages, counties, state colleges, community colleges, and school districts need to know about their construction options.
More informationJim Porter is the Director of Public Works for the County of San Mateo. The Department of Public Works has a staff of over 300 and performs a wide
Jim Porter is the Director of Public Works for the County of San Mateo. The Department of Public Works has a staff of over 300 and performs a wide array of design, construction, construction administration,
More informationChoosing a Project Delivery Method. A Design-Build Done Right Primer
Choosing a Project Delivery Method A Design-Build Done Right Primer DESIGN-BUILD DONE RIGHT PRIMER 1 Choosing a Project Delivery Method A DESIGN-BUILD DONE RIGHT PRIMER A DESIGN-BUILD INSTITUTE OF AMERICA
More informationSession THREE. Face 2 Face (4 hours) Stage 1 Initial actions & appraisals: Self-directed (6 hours)
Session THREE Face 2 Face (4 hours) Stage 1 Initial actions & appraisals: What type of tendering methods are there? What does qualification mean? Do you (the MC) bid for every job? Do you (the MC) price
More informationDesign-Build (DB) and Construction Manager / General Contractor (CMGC)
Design-Build (DB) and Construction Manager / General Contractor (CMGC) IDOT and Industry Preliminary Joint Review for Proposed Legislation December 18, 2012 Welcome Introductions Agenda Purpose Definitions
More informationPROJECT DELIVERY METHODS
Understanding the Construction Contract Project Delivery Methods ISBA April 7,2017 Copyright 2017 by K&L Gates LLP. All rights reserved. Design Bid Build Design Negotiate Build Construction Manager Advisor
More informationWATERTOWN ELEMENTARY SCHOOLS SCHOOL BUILDING COMMITTEE MEETING: OCTOBER 3, 2018
SCHOOL BUILDING COMMITTEE MEETING: OCTOBER 3, 2018 Types of Public Construction Delivery Methods Available: Design-Bid-Build (DBB) under M.G.L Ch. 149 Overview Pros Cons Construction Management at Risk
More informationProgressive Design-Build Discussion
Presentation for: Progressive Discussion February 4, 2011 1 Project Delivery Options Design-Bid-Build Construction Management at Risk Lump Sum Progressive DESIGNER BUILDER DESIGNER CM TRADITIONAL DELIVERY
More informationPublic Building Commission of Chicago Terms and Tools for Public Capital Development and Financing
Project Delivery Methods January 30, 2012 Public Building Commission of Chicago Terms and Tools for Public Capital Development and Financing Terms Capital Project Capital Program Prioritized Capital Plan
More informationDesign Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright
Design Process 101 Michael Barnard, AIA, NCARB animalsheltering.org/expo #AnimalCareExpo Copyright 1 Design and Construction Process Needs Assessment Conceptual Design Schematic Design Design Development
More informationDESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors
DESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors YOUR SUPERHERO TRAINERS TODAY ADAM NELSON Senior Architectural
More informationConstruction Project Delivery Methods Overview and Comparison. Operations Division
Construction Project Delivery Methods Overview and Comparison Operations Division 1 Four Types of Delivery Methods Design/Bid/Build (CM Multi-Prime) CM at Risk Design/Build Lease/Leaseback 2 Considerations
More informationCMAA Owners Group Construction Delivery Methods
CMAA Owners Group Construction Delivery Methods January 25, 2017 Today s Agenda Welcome Participants Introduce Themselves Goals for the Year Mission Statement Upcoming Events CMAA Membership CCM Certification
More informationPartnering for Alternative Delivery Projects
Partnering for Alternative Delivery Projects Presented by: Renee L. Hoekstra, CVS Managing Partner RHA, LLC Julie Kliewer, PhD, P.E. State Construction & Materials Engineer - ADOT Training Objectives Understanding
More informationQualifications Based Selection of Contractors
Qualifications Based Selection of Contractors AGC of America Project Delivery Committee QBS Working Group 1 Table of Contents QBS & The Industry: An Introduction Pages 3-4 Selection Criteria for QBS Page
More information1/12/2015. Collaborative IPD-ish Project Delivery using Design-Build, P3 or CM at-risk: the Einstein Approach
Collaborative IPD-ish Project Delivery using Design-Build, P3 or CM at-risk: the Einstein Approach DRAFT for AIA CCA Knowledge Community 2015 Dale Munhall, AIA not a sign of teamwork Director of Construction
More informationPROGRESSIVE DESIGN-BUILD. Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA
PROGRESSIVE DESIGN-BUILD Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA ADVANTAGES/DISADVANTAGES DESIGN BID BUILD (HARD BID) The traditional project delivery method, which customarily
More informationComparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013
Comparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013 Outline Alternative Delivery Options Oregon and Washington Legal Context Things an Owner Should
More informationAPPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1)
APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1) The first tier in the systematic approach developed in this guidebook is the Analytical Delivery Decision Approach discussed in Chapter
More informationProcurement Documents for Progressive Design-Build Projects
Procurement Documents for Progressive Design-Build Projects March 22, 2013 John Awezec, P.E., DBIA HDR Engineering, Inc. John Doller, P.E. Carollo Engineers, Inc. Peter Hughes Executive Director WDBC Model
More informationReport on Effectiveness of the Construction Manager at Risk Project Delivery Method
Report on Effectiveness of the Construction Manager at Risk Project Delivery Method The project management plans described below, establish several elements or criteria for university project staff to
More informationAPPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1)
APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1) The first tier in the systematic approach developed in this guidebook is the Analytical Delivery Decision Approach discussed in Chapter
More informationALTERNATE FORMS OF PROJECT DELIVERY
ALTERNATE FORMS OF PROJECT DELIVERY 1 INTRODUCTION 1.1 BACKGROUND.1 In the building industry today, conventional methods of project delivery are being challenged by Clients, Consultants and Contractors
More informationCMAA has met the standards and requirements of the Registered Continuing Education Program. Credit earned on completion of this program will be
Thanks to our host CMAA has met the standards and requirements of the Registered Continuing Education Program. Credit earned on completion of this program will be reported to RCEP at RCEP.net. A certificate
More informationConstruction Project Delivery Methods
Construction Project Delivery Methods Purchasing Requirements and Applications 9/20/2012 1 General Purchasing Requirements 9/20/2012 2 Governmental Purchasing Requirements Law: Texas Education Code 44.031
More informationPioneering Alternative Project Delivery in Ohio
Pioneering Alternative Project Delivery in Ohio Ali Bahar, PE Principal Engineer Metropolitan Sewer District of Greater Cincinnati Tim Koch, PE, Vice President, Brown and Caldwell 1 Agenda Construction
More informationConstruction Manager as Constructor (CMc) Manual
Construction Manager as Constructor (CMc) Manual Manual Courtesy of Purdue University Presented By Table of Contents 1.0 Executive Summary 2.1 House Bill 1196 2.2 Analysis of House Bill 1196 and Requirements
More informationPresented By: Jeffrey T. Folden, P.E. Chief, Innovative Contracting Division
Presented By: Jeffrey T. Folden, P.E. Chief, Innovative Contracting Division Project Delivery Methods Design-Bid-Build (DBB) Indefinite Delivery/Indefinite Quantity (ID/IQ) Construction Management at Risk
More informationConsensusDocs. Catalog. Updated Docs Inside
ConsensusDocs ConsensusDocs Contracts Catalog Updated Docs Inside ConsensusDocs Keeping You Ahead of the Cur ve ConsensusDocs... Building A Better Way! Whether working at the office, from the road or even
More informationProgressive Design Build
Progressive Design Build July 19, 2018 Ash Dhingra P.E.,S.E TRADITIONAL PROCUREMENT Design-Bid-Build (DBB) Design to 100%, procurement (bid), and construction proceed sequentially Construction contract
More informationLease-Leaseback Project Delivery Method
Lease-Leaseback Project Delivery Method ASBA Technical Meeting & Tradeshow Winter 2013 Presented by: Mark Baginski Principal Verde Design, Inc. James Moore V.P. of Pre-Construction Services Robert A. Bothman,
More informationSounds good. What could possibly go wrong? 5/6/2014. Potential Benefits of Design Build. Potential Downsides of Design Build
When Design Build Goes Wrong: Worst Practices to Avoid DBIA Edition for the O.N.E. Conference Blue Springs MO May 8, 2014 Dale Munhall, AIA Sounds good. What could possibly go wrong? Potential Benefits
More informationProject Delivery Systems
Project Delivery Systems National Society of Professional Engineers Alaska Society of Professional Engineers 2011 Western and Pacific Region Annual Meeting and Conference Jeffrey Callahan April 1, 2011
More informationAN OWNER S GUIDE TO PROJECT DELIVERY METHODS: CONSTRUCTION MANAGEMENT ASSOCIATION OF AMERICA
AN OWNER S GUIDE TO PROJECT DELIVERY METHODS: CONSTRUCTION MANAGEMENT ASSOCIATION OF AMERICA PREFACE This document is an introductory guide for owners who face the choice of delivery methods for their
More informationRisks Associated with Alternative Delivery Methods. Managing Expectations. Presented by Dan Becker, CCM, PMP, CCE
Risks Associated with Alternative Delivery Methods Managing Expectations Presented by Dan Becker, CCM, PMP, CCE 1 3 Primary Methods for Delivering Projects in WA and OR Design/Bid/Build Design/Build CM
More informationProject Delivery Selection Matrix If the Project Delivery Approach Fits, Use It
Project Delivery Selection Matrix If the Project Delivery Approach Fits, Use It Jim Mallorey, P.E. Metro Wastewater Reclamation District Chris Harper - University of Colorado Boulder January 23, 2014 1
More informationFacility Basics for Bond Project Communications
Facility Basics for Bond Project Communications TSPRA Annual Conference February 19, 2013 Presented by: Cathy Brandewie O Connell Robertson Architectural Teams can help with Evaluating / Assessing Facilities
More informationConstruction Documents Education Program
PLANNING AND PRE-DESIGN THE CONSTRUCTION SPECIFICATIONS INSTITUTE 110 South Union Street, Suite 100 Alexandria, VA 22314-3351 www.csinet.org CDEP 1.0.1: 03-1 Copyright Materials This presentation is protected
More informationConsensusDocs. ConsensusDocs CONTRACTS CATALOG. Updated Docs Inside. ou Ah. ead o f the Cur v. e K
CONTRACTS CATALOG Updated Docs Inside ou Ah ead o f the Cur v e gy epin e K ... BUILDING A BETTER WAY! Whether working at the office, from the road or even at home, the platform provides instant access
More informationFairfax County Government Construction Management At Risk (CMAR)
Fairfax County Government Construction Management At Risk (CMAR) Presented for: CMAA - Owner s Committee Presented by: Matt Doyle Branch Chief, Wastewater Design and Construction Division Department of
More informationStakeholders and project delivery methods
Stakeholders and project delivery methods CIV-E.1040 Construction Management Lecture II 8 th November 2016 Antti Peltokorpi Assistant Professor Department of Civil Engineering, Aalto University antti.peltokorpi@aalto.fi
More informationPROFESSIONAL PRACTICE 544
PROFESSIONAL PRACTICE 544 April 20, 2015 Contracting Methods Alternative Project Delivery Methods Michael J. Hanahan, Esq. Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com
More informationREQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) SERVICES
REQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) SERVICES Pueblo Urban Renewal Authority (PURA) Pueblo Convention Center Expansion &
More informationConstruction Manager at Risk Delivery Method
County of Alameda Board of Supervisors Transportation and Planning Committee May 4, 2015 Caroline Judy, Acting Director Construction Manager at Risk Delivery Method Briefing and Discussion Purpose Briefing
More informationFACILITIES CONFERENCE
FACILITIES CONFERENCE April 24-26, 2013 Construction Manager at Risk Lessons Learned Minnesota State Colleges and Universities The Minnesota State Colleges and Universities system is an Equal Opportunity
More informationFACILITY PROJECT BIDDING OPTIONS OVERVIEW
FACILITY PROJECT BIDDING OPTIONS OVERVIEW A Presentation to the Board of Education Galt Joint Union High School District February 14, 2017 January 10, 2017 GHSD Measure E Bidding Options Overview 2 Overview
More informationSeattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices
Seattle Public Schools Office of Internal Audit Issue Date: December 5, 2017 Introduction and Background In accordance with the fiscal year 2018 capital audit plan, we have completed an audit of the district
More informationDesign-Build Data Sourcebook
Design-Build Data Sourcebook What Is Design-Build? It s the fastest growing, most cost and time efficient method used to deliver construction projects in America. Design-build saves time and money by encouraging
More informationProfessional Practice 544
Spring Semester 2017 Professional Practice 544 Michael J. Hanahan Partner Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com Schiff Hardin LLP. All rights
More informationALTERNATIVE CONTRACTING METHODS
ALTERNATIVE CONTRACTING METHODS Conventional Design-Bid-Build Design/Build Negotiated General Contractor By Jeff Warner, AIA, LEED AP Principal, ALSC Architects CONVENTIONAL DESIGN-BID-BUILD The most traditional
More informationProfessional Practice 544
Spring Semester 2018 Professional Practice 544 Michael J. Hanahan Partner Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com Schiff Hardin LLP. All rights
More informationProject Delivery Method
City Green - Project Delivery Method Roswell City Council Work Session September 14, 2016 Agenda Debrief on HPC Work Session Project Schedule Update Alternative Project Delivery Methods Discussion / Direction
More informationDESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD
OWNER OWNER OWNER DESIGNER GC DESIGNER DESIGN CONSULTANTS TRADE SUBS DESIGN CONSULTANTS TRADE SUBS DESIGN CONSULTANTS TRADE SUBS DESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD Contracts Communications
More informationSchool Construction: Contract Basics OSBA BONDS, BALLOTS AND BUILDINGS CONFERENCE FEBRUARY 09, 2018
School Construction: Contract Basics OSBA BONDS, BALLOTS AND BUILDINGS CONFERENCE FEBRUARY 09, 2018 Who we are Presenters Rob Wilkinson, Partner, Ball Janik LLP Scott Rogers, CPPB, Senior Project Manager,
More informationAlternative Project Delivery Methods and Procurement
Alternative Project Delivery Methods and Procurement Board of Airport Commissioners Meeting 2 June 2014 Presented by: Roger A. Johnson, Deputy Executive Director Definitions Project Delivery Method o The
More informationDifferent Ways to Contract for Lean Project Delivery. Joel Darrington San Diego COP 3/27/19
Different Ways to Contract for Lean Project Delivery Joel Darrington San Diego COP 3/27/19 Relevance of Contracts? Increase alignment among parties Parameters for Lean behavior and activities First collaborative
More informationAlternate Project Delivery Experience at UOSA and PWCSA
Alternate Project Delivery Experience at UOSA and PWCSA Bob Angelotti, Director of Technical Services at UOSA Samer Beidas, Director of Engineering and Planning at PWCSA Presented at the VWEA 2015 Education
More informationA/E-LED INTEGRATED PROJECT DELIVERY
A/E-LED INTEGRATED PROJECT DELIVERY PRESENTED BY: Mark C. Friedlander Schiff Hardin LLP 233 South Wacker Drive Suite 6600 Chicago, Illinois 60606 (312) 258-5500/Fax: (312) 258-5600 mfriedla@schiffhardin.com
More informationDTX Project Delivery Methodology and Options. January 9, 2014
DTX Project Delivery Methodology and Options January 9, 2014 1 Outline/Agenda Overview of Common Project Procurement and Delivery Methods Examples of Past Project Delivery Methods ( The Good, The Bad,
More informationProgressive Design-Build
November 15,2016 Progressive Design-Build A Smart Alternative to Lease/Lease back? PRESENTERS Praful Kulkarni, AIA Rebekah Gladson, FAIA, DBIA Robynne T. Parkinson, JD, DBIA Presentation Outline Value
More informationUNIVERSITY OF CALIFORNIA, SAN DIEGO
BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANT A BARBARA SANT A CRUZ OFFICE OF THE ASSOCIATE VICE CHANCELLOR CAPITAL PROGRAM MANAGEMENT TEL: (858) 534-2177 FAX: (858) 534-4363
More informationSCADA System Procurement Alternatives
SCADA System Procurement Alternatives 2017 Automation Committee Seminar August 24, 2017 Terry M. Draper, PE, PMP Discussion Topics SCADA Overview System Hardware / Software Procurement Additional System
More informationAlternative Delivery for Municipal Water & Wastewater Projects in 2012
Alternative Delivery for Municipal Water & Wastewater Projects in 2012 a OWEA 2012 Making a Pass at Going Green Looking Towards the Future June 20, 2012 Dennis Tinkler, P.E. Agenda Ohio s Methods of Performing
More informationThe Owner s Role in Successful Design-Build Project Delivery
The Owner s Role in Successful Design-Build Project Delivery Northwest Construction Consumer Council Tulalip Resort Casino & Conference Center October 23, 2013 presented by: Barbara Wagner Design-Build
More informationAlternative Delivery Methods in the Post-Davis World
CASBO 2017 Annual Conference April 2017 Alternative Delivery Methods in the Post-Davis World Alan Reising Long Beach Unified School District areising@lbschools.net Phil Henderson Orbach Huff Suarez & Henderson
More informationEVOLUTION OF DESIGN BUILD IN THE W/WW INDUSTRY
EVOLUTION OF DESIGN BUILD IN THE W/WW INDUSTRY Thomas O. Crowley, P.E. Carollo Engineers Southwest Section AWWA October 17, 2017 Agenda Project Delivery Overview Oklahoma Legislation Project Delivery Methods
More informationICOC Procurement Briefing
ICOC Procurement Briefing How we acquire goods and services Overview Procurement of Professional Services Engineering, architecture, design build, construction manager Projects < $2 million use continuing
More informationCHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS
CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS 1) THE LIFE CYCLE OF A CONSTR. PROJECT: 1.1:CONCEPT AND FEASIBILITY STUDIES: THE START Recognition of a need for a new facility conceptual analyses Technical
More informationDesign/Build Institute of America Rocky Mountain Region Water/Wastewater Committee. Project Delivery Selection Approach
Design/Build Institute of America Rocky Mountain Region Water/Wastewater Committee Project Delivery Selection Approach Overview This document provides an approach for water and wastewater project delivery
More informationContinuing Education Credits
Recent Developments in (IPD) for NECA Members October 14, 2013 9:00-9:50 AM Following this session, you will be able to: Explain the concept and structure of an IPD project. Identify the issues and risks
More informationADDENDUM #2. Design/Build Contractor RFP Bid # for the. Joint-Use 21 st Century Post-Century Education Center.
ADDENDUM #2 Design/Build Contractor RFP Bid #0606-14 for the Joint-Use 21 st Century Post-Century Education Center SJECCD California July 7, 2014 SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT 4750 San
More informationREQUEST FOR QUALIFICATIONS AND PROPOSALS
REQUEST FOR QUALIFICATIONS AND PROPOSALS CONSTRUCTION MANAGER AT RISK SERVICES Preconstruction Phase Services and Construction Phase Services Sheridan Economic and Educational Development Authority Sheridan
More informationINTEGRATED PROJECT DELIVERY IN PUBLIC PROJECTS: LIMITATIONS AND OPPORTUNITY
Kim, Y., Rezquallah, K., Lee, H., and Angeley, J. (2016). Integrated Project Delivery in Public Projects: Limitations and Opportunity." In: Proc. 24 th Ann. Conf. of the Int l. Group for Lean Construction,
More informationFinalize Implementation Plan Conduct Introductory Campus Meetings Kickoff Several Comprehensive Projects Secured Program Managers
CBOC: Bond Update Since the Bond Passed Finalize Implementation Plan Conduct Introductory Campus Meetings Kickoff Several Comprehensive Projects Secured Program Managers Bond Implementation Plan Considers
More informationPROVING OUR PROFESSIONALISM
PROVING OUR PROFESSIONALISM 49 TH ANNUAL CONFERENCE MAY 22-25, 2016 ORLANDO, FLORIDA DESIGN-BUILD 101 Joanne Flick, CPPO, CPPB TODAY S TOPICS Project Delivery Overview Comparing Project Delivery Methods
More informationTOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR
February 5, 2018 SUMMARY OF CM/GC SELECTION PROCESS FOR DIMMIT II APARTMENT BUILDING The Town of Winter Park requests proposals from qualified Construction Manager / General Contractor (CM/GC) firms for
More informationWelcome! Achieving Collaborative IPD-ish Delivery with basic D-B, P3 or CM contracts: Yes, there is a way
Welcome! Achieving Collaborative IPD-ish Delivery with basic D-B, P3 or CM contracts: Yes, there is a way Wed, June 10, 2015 1:00 PM - 2:00 PM EDT Earn 1.0 AIA HSW LUs Moderator Jane Cameron, AIA, LEED
More informationSuccessful Use of Progressive Design-Build in California Community Colleges
Successful Use of Progressive Design-Build in California Community Colleges The Panelists Bill Pate Devaney Pate Cameron & Morris LLP Chris Strugar-Fritsch San Mateo County Community College District Dennis
More informationREQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES. For the renovation of existing apartment buildings. August 15, 2016
REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES For the renovation of existing apartment buildings August 15, 2016 INVITATION Bath Housing Development Corporation is soliciting proposals for
More informationAudio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program
Audio Sessions Session 4 PROCUREMENT Construction Contract Administration Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course 2011 The Construction Specifications
More informationJob Order Contracting (JOC) ITB JE Overview August 2016
Job Order Contracting (JOC) ITB 16-14204-JE Overview August 2016 Job Order Contracting (JOC) What is JOC? Using general and specialty trade contractors to perform a series of projects on an as-needed basis.
More informationConstruction Family of Documents
Construction Family of Documents The EJCDC Construction Family Documents (C-Series) is intended for engineered construction projects. The current edition (2013) is endorsed by both the Construction Specifications
More informationStrategic Management and Project Selection
Strategic Management and Project Selection Strategic Management and Project Selection Maturity of Project Management Overview Criteria for PS Models Nature of PS Models Types of PS Models Uncertainty Analysis
More informationAN OVERVIEW OF DESIGN-BUILD. Presented by: David Umstot, PE, CEM Umstot Project and Facilities Solutions, LLC January 20, 2014
AN OVERVIEW OF DESIGN-BUILD Presented by: David Umstot, PE, CEM Umstot Project and Facilities Solutions, LLC January 20, 2014 Design-Build Not a New Concept In California: Multiple statutes govern design-build
More informationLegal Issues Related to Design Build
Legal Issues Related to Design Build Presented by Aaron O. Martin CLARK, MIZE & LINVILLE, CHARTERED 129 S. 8 th, St. Salina, KS 67401 Telephone: (785) 823 6325 Facsimile: (785) 823 1868 aomartin@cml law.com
More informationREQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services
REQUEST FOR PROPOSALS Construction Manager CM Services Pre-Construction and Construction Services Big Sky Fire Department Station 1 Project Big Sky Fire District OWNER Big Sky, Montana November 2016 Request
More informationSIXTH ANNUAL AIRPORT PROJECT DELIVERY SUMMIT
SIXTH ANNUAL AIRPORT PROJECT DELIVERY SUMMIT Terminal 1 In Line Baggage Screening Project June 8th & 9th, 2011 San José, CA Marc Gambrill, P.E, Director of Capital Improvement Program Fort Lauderdale-Hollywood
More informationA , Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum
A101 2007, Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AIA Document A101 2007 is a standard form of agreement between owner and contractor for
More informationSEPARATED PROJECT DELIVERY SYSTEMS
SEPARATED PROJECT DELIVERY SYSTEMS Separated (aka Traditional) The traditional delivery method typically involves three sequential project phases: The design phase, which requires the services of a designer
More informationGeneral Session 2 Procurement Update. #AirportsTechnical
General Session 2 Procurement Update #AirportsTechnical Procurement Update Moderator: Jeff Kirby, Parish & Partners Mike Rottinghaus, FAA, Office of Airport Planning and Programming Jim Harris, Coffman
More informationProcurement Guidelines
Reference 21 CM@Risk Procurement Guidelines Draft June 5, 2014 Purpose: These guidelines are intended to provide (1) assistance to those who may be responsible for implementation, processing and/or management
More informationJOB ORDER CONTRACTING. United Brotherhood of Carpenters and Joiners Interior-Exterior Systems Leadership Conference
JOB ORDER CONTRACTING United Brotherhood of Carpenters and Joiners Interior-Exterior Systems Leadership Conference March, 2015 AGENDA Who is the Gordian Group Introduction to Job Order Contracting Explanation
More informationWhAt Are my OptIONs?
ALTERNATIVE WAYS TO DESIGN AND CONSTRUCT BUILDING PROJECTS FOR POLITICAL SUBDIVISIONS IN NEBRASKA WhAt Are my OptIONs? Save Time and money with ReSouRceS from The nebraska design & construction industry
More informationIntegrated Project Delivery (IPD) Across the Spectrum of Delivery Systems Who Owns/Controls the Risk? An Owner s Perspective
CMAA National Conference October 13, 2008 Integrated Project Delivery (IPD) Across the Spectrum of Delivery Systems Who Owns/Controls the Risk? An Owner s Perspective Date Presenters Howard W. Ashcraft,
More informationIntegrated Project Delivery
2014 HDR Architecture, 2014 HDR, Inc., all all rights reserved. Integrated Project Delivery It s A New World, And How It Can Benefit Municipal Owners Rich Atoulikian, PMP, PE Rich.Atoulikian@hdrinc.com
More information