1 UNDP UNITED NATIONS DEVELOPMENT PROGREM TERMS OF REFERENCE AND TECHNICAL SPECIFICATIONS FOR SUB SOIL INVESTIGATION FOR UNDP HOUSING AT UNOCA COMPOUND Issued for Tender only Kabul - Afghanistan September, 2013

2 Index 1.0 PURPOSE 2.0 SCOPE 3.0 TECHNICAL REQUIREMENTS 3.1 GENERAL Location plan for soil exploration General Requirements from Contractor Mobilisation 3.2 BORING Shell and Auger Boring Rotary Mud Circulation Drilling Drilling in Rock Borehole Depth Backfilling of boreholes Termination Criteria 3.3 IN-SITU SAMPLING Trial Pits Undistributed Soil samples from Boreholes Core samples of rock Water Samples 3.4 IN SITU TESTING Standard Penetration Test Static Cone Penetration Test Vane Shear Tests Electrical Resistivity Test 3.5 LABORATORY TESTS Atterberg Limits Natural Moisture Contents Dry Bulk Density and Void Ratio Specific Gravity Grain Size Distribution Triaxial Tests Unconfined Compression Test Free Swelling Index Swelling Pressure Test Consolidation Tests Chemical Tests (ph, sulphates, chlorides) Chemical Tests (Suitability for construction) CBR Tests for sub-grade soils (3 point tests) Proctor Density Tests Levels & Co-Ordinates of Test Location 3.6 REPORT 2

3 1.0 PURPOSE The purpose of this standard is to define specifications to be followed for Soil Investigation work for the mentioned project. 2.0 SCOPE These specifications cover the procedure for soil investigations for foundations. The work shall be carried out in accordance with the specification set out below and as directed by the UNDP Engineer, wherever necessary. These Specifications conform to the relevant Standards on Soils and Foundations for field investigations and Laboratory testing. Reference to any code in these specifications shall mean the latest revision of the code unless otherwise mentioned. In the event of any conflict between the requirements in these specifications and the referred codes, the former shall govern. 3.0 TECHNICAL REQUIREMENTS 3.1 GENERAL The purpose of the proposed sub-soil investigation programme is to provide adequate information on sub-surface and surface conditions for the foundations and other sub-structures for the proposed project, leading to their economical and safe designs. The planning of the work, choice of the method of boring, selection of the type of samples and procedure for sampling though indicated in the Tender. Tenderer, however, shall furnish his tentative programme regarding the above along with his offer which, necessarily, should take into account the site conditions and time schedule for completing the work, comprising subsurface features, borings, in-situ tests, sampling, visual observations and laboratory tests of samples, reporting of the test results, including discussions, correlating the field and the laboratory test values and commendations. These specifications cover the work pertaining to subsoil investigations and recommendations for economical and safe design of foundations and substructures for the proposed project site Location plan for soil exploration A location plan drawing showing various facilities with proposed facilities being marked as Red are attached. The exploration programme in the site will be finalized by the successful bidder in consultation with UNDP Engineer as suited to the site conditions General Requirements from Contractor The CONTRACTOR shall have on site all required survey instruments to carry out the work accurately according to specifications and drawings. All the specified locations for boreholes and field tests shall be set out at site by the CONTRACTOR from two established reference grid lines which will be shown to him by the UNDP Engineer. If required, the CONTRACTOR shall set out the base lines and the locations of boreholes and field tests with reference to the property line as indicated by the UNDP Engineer. At each location of boreholes, plate load tests and other field tests, the CONTRACTOR shall establish the ground level prior to commencing of the operations. The ground level shall be related to an established benchmark or to a GTS benchmark or as directed by the UNDP Engineer. If the area, where the field tests are located, is likely to be inundated by tidal waters, the field work shall include provision for temporary fill, erection and removal of platforms, making good the ground, access, etc., as necessary for carrying out the work in this area. No extra payment for such cases in due, but whatever has covered in the Bill of Quantities under the Soil/Geo Investigation task s cost Mobilisation The Contractor shall mobilise adequate plants and equipment, instruments and personnel (skilled and unskilled) required to carry out the soil investigation work, including access, filling, provision of platforms, etc. 3

4 This scope also includes demobilisation of all equipment / personnel in orderly manner so as to keep the site clean for any further work by Owner. No extra payment for such activities in due, but whatever has been covered in the Bill of Quantities under the Soil/Geo Investigation task s cost. Based on the field examination or tests, bore logs shall be prepared in accordance with IS: On completion of the field records, the soil investigator shall discuss and decide in consultation with the consultants, the schedule of tests to be performed and the exact number of samples to be tested for each test. 3.2 BORING Boring shall be carried out in accordance with the provisions of IS: 1892 and as per the specifications given below: Shell and Auger Boring Augers shall be of helical or posthole type and may be manually operated. The diameter of the borehole shall be 150mm or as specified in BOQ. Uncased holes shall be permitted only up to a depth where the sides of the hole can stand unsupported. In case side fall is noticed, steps shall be taken immediately to stabilise the holes by using bentonite slurry or by casing pipes as directed by the UNDP Engineer. No water shall be added while boring through cohesive soils and cohesion-less soils above water table. While boring through cohesion-less soil below water table, water in the casing shall always be maintained at or above the water table. The cuttings brought up by the auger shall be carefully examined and soil descriptions duly recorded. Representative samples shall be preserved for laboratory testing. Wherever in-situ tests are conducted and undisturbed samples are obtained at specified depths from the borehole, care shall be taken to ensure that the borehole is properly cleaned and free from foreign matters at the time of conducting these operations. Water table in the boreholes shall be carefully recorded and reported. One of the following methods shall be adopted for measuring the water table: a) The water table in the borehole shall be allowed to stabilise after depressing the water level adequately by bailing. Stabilising of the borehole sides and bottom shall be ensured at all times. b) The borehole shall be filled with water and then bailed out to various depths. Observations shall be made at each depth to see if the water is rising or falling. The depth at which neither a fall nor a rise is observed shall be considered as the water table depth. This shall be established by three successive readings of water levels taken at intervals of 2 hours. c) Hyorslev s Method The water level shall be depressed by bailing (to say D below ground level) and shall then be allowed to rise. Water rise at suitable equal intervals of time shall be recorded. The distance of depressed water level from the actual water table shall be obtained by the following formula: Ho = (H1)² / (H1 H2) Where, Ho = distance of depressed water level from actual water table, H1 & H2 = two successive rises of water level in the borehole for the same time interval. The water table depth (Hd) from ground level shall be determined as under: Hd = D Ho 4

5 Three sets of observation shall be made and the average value of Hd determined. Method (a) is suitable for permeable soil while methods (b) and (c) are suitable for both permeable and impermeable soils. The UNDP Engineer shall indicate the method to be followed. Immediately on completion of a borehole, bore log shall be prepared in an approved Performa and submitted to the UNDP Engineer in duplicate. Auger shall be used for soft to firm clay and for silty deposits at upper depths of 10 metres or up to the water table, whichever is deeper. For deeper depths in such deposits and for very stiff to hard clays and dense sands located at any depth, use of shell may be made. While boring in soft clays and in sandy deposits below water table, it shall be ensured that the shell diameter shall be at least 25 to 50 mm less than the casing diameter. This is to ensure that suction is not created in the borehole during withdrawal of the shell with consequent Caving-in and blowing in the boreholes Rotary Mud Circulation Drilling The drilling shall be carried out (as per IS: 1892) by use of a suitable mechanical rig. Drilling up to water table shall be done by auger and provisions of clauses to shall apply. Below the water table drilling by rotary mud circulation shall be adopted. Use of percussion tools may be permitted in very stiff to hard clays and dense sandy deposits only after obtaining written permission from Clients / Consultants Drilling in Rock In rock strata, boring shall be done by using a rotary cutting tool tipped with diamonds and equipped to recover cores. Drill hole size shall generally be NX. However, in some cases other size holes may be specified Core barrels shall be double-tube ball-bearing, swivel type, with the core lifter located in the lower end of the inner barrel. The Bidder shall confirm the same with his bid. Drilling shall be carried out in such a manner that maximum core is recovered. This requires close surveillance of wash water, drilling pressures, lengths of runs, etc. The drill bit shall be withdrawn and the core removed as often as may be necessary to secure the maximum possible amount of core. CONTRACTOR shall ensure that drilling is carried out with necessary skill and expertise Borehole Depth All boreholes shall be sunk to depths as specified in tender document. It may be difficult to continue the boring due to presence of gravels and boulders. In this case, boreholes shall be advanced up to 6.5 to 7.0 m depth by cement grouting using Ax size drill, followed by drilling with 3½" casing Hx size drill or of a larger size. Initially about 1-1.5m depth shall be used, using Ax size drill, followed by 1:1 cement water grouting. After about hours of grouting, the boreholes shall be redrilled with casing itself (which may have a bit at the bottom or simple teeth). Further drilling shall then be carried out up to another m followed by grouting and redrilling. This sequence will be continued till m depth with every 1 m interval Backfilling of boreholes 5

6 On completion of boreholes, backfilling shall be carried out with an approved material as and when directed by the UNDP Engineer. Unless otherwise specified, the excavated soil shall be used for the purpose Termination Criteria If a very hard stratum is met within the borehole at depths shallower than specified in tender documents, the borehole shall be advanced by coring using double tube core barrel. The borehole may be terminated 3m below the depth where N > 75 values are obtained consistently. Coring the bore hole shall be burnt by contractor until UNDP Engineer Satisfaction enabled. 3.3 IN-SITU SAMPLING Trial Pits Trial pits shall be of minimum 3m x 3mX 3m size at base so as to permit easy access for a visual examination of the walls of the pit and to facilitate sampling and in-situ testing operations. Precautions shall be taken to ensure the stability of pit walls, if necessary by the provision of shoring. Arrangements shall be made for dewatering, if the pit is extended below water table. In-situ tests shall be conducted and undisturbed samples obtained immediately on reaching the specified depths, so as to avoid substantial moisture changes in the subsoil. After completion of tests and examination, the pits shall be suitably backfilled as directed by the UNDP Engineer. Unless otherwise specified, the excavated soil shall be used for this purpose Undistributed Soil samples from Boreholes Samples for recovering undistributed samples from cohesive soils at the specified depth shall conform to IS: However, use of samples less than 70mm diameter shall not be permitted. The sampling procedures shall conform to IS: Both the area ratio of the cutting edge, as well as recovery ratio of the sample shall be measured and reported. For normal soils, area ratio of the sampling tubes, shall conform to IS:2131, that is, it may vary from 10.9% to 12.4% but for sampling in very hard and dense soils, use of thick walled sampling tubes with area ratio not exceeding 20% may be permitted subject to the approval of the UNDP Engineer. In order to reduce the wall friction, suitable precaution such as oiling the inside and outside of the sampling tubes shall be taken. The sampling tube shall have smooth finish. In soft to firm clays, undisturbed samples shall be collected by pushing the tube continuously without impact or twisting. Driving of sampling tubes shall be permitted only if stiff to very stiff and hard deposits exists. For highly sensitive soils, piston samplers shall be employed. For soft clays exceeding more than 15M depth from the ground level, collection of undisturbed samples shall be supplemented by the In-Situ Vane Shear Tests. The top and bottom of the sample shall be clearly marked on the sampling tube. Undisturbed samples shall be tested within a period of two weeks of taking them from the boreholes or trial pit. If any space is left between the end of the tube and top of wax, the same shall be tightly packed with saw dust or any other suitable material. A close fitting lid or screwed cap shall then be placed on each end of the tube and held in position by adhesive tape Core samples of rock The ease or difficulty of drilling at different depths shall be carefully noted and recorded during drilling. 6

7 The returning drill water shall be kept constantly under observation and its character, such as, its clarity or its turbidity; its colour etc. shall be recorded. Coring runs shall be limited to a maximum length of 2.0m. When less than 50% of the core is recovered from a run or when a geological feature is to be accurately determined, the length of the run shall be reduced to 1.0m unless directed otherwise by the ENGINEER. The core shall be removed from the drill hole immediately if blocking of the bit or grinding of the core is apparent, regardless of the length of run, which has been made. The CONTRACTOR shall not use drilling mud or any lubricant in the drill hole other than water. For each run, Core Recovery and Rock Quality Designation (RQD) shall be noted carefully, immediately after cores are taken out of the barrel. Each and every core piece shall be serially and sequentially numbered from top downwards as soon as the core pieces are removed from the core barrel. The serial number shall be painted with good quality enamel paint. All core pieces shall be placed in core boxes in serial order in correct sequence from top downwards. Core boxes shall be made according to specifications laid down in IS: The cores, arranged in core boxes noted earlier, shall be submitted to the OWNER / ENGINEER on submission of the report Water Samples Water samples shall be collected from boreholes as specified. Water samples shall be collected before the addition of water to the hole unless that is not possible. If this is not possible, then prior to collection of water sample, water level in the bore hole shall be lowered up to the bottom of the borehole then allowed to rise by water seeping through the walls of the borehole. The water sample shall then be collected. Care shall be taken to see that water sample is not contaminated by surface water or rainwater. In some cases water samples may be required to be collected from different depths, if so specified. In such cases it is advisable to collect the samples on the completion of the relevant borehole unless a suitable sampler to collect water sample from different depths below free water surface is used. To collect the water sample, in absence of a suitable sampler the borehole shall be dewatered. The sample shall then be collected when the water rises to the required depth. If specified, ground water sample shall also be collected from trial pits. If there are any wells within the area investigated, one water sample from each well shall also be collected. If specified, water samples shall also be collected from well (s) located nearby the area being investigated. The water sample shall be collected in an air tight, scrupulously clean glass or inert plastic bottle or jerry can. The bottle / can shall be rinsed three times with water being sampled, before filling. The quantity of each water sample collected shall be about 1 litre. Water samples shall be tested as soon as possible after sampling for sulphate (as SO3) and chloride contents and its ph, and for other tests as specified. 3.4 IN SITU TESTING Standard Penetration Test The test shall be conducted at specified intervals or at a depth where the strata changes, whichever occurs earlier. The test shall be carried out by driving a standard split spoon by means of 65 kg hammer with a 75 cm free fall. Detailed procedure of testing, as specified in IS: 'Method of Standard Penetration Tests in Soils' shall be followed. The samples obtained in the split spoon shall be labelled and preserved for identification tests in the laboratory. Standard penetration test shall be conducted at 1.5m interval. Sequence of conducting SPT shall be changed in each bore hole. Say for first bore hole SPT started at 1.5 m depth then 3.0 m,.. etc. 7

8 For next bore hole it shall be started at 1m depth then 2.5m etc. Similarly for other bore hole. So that staggered value of SPT s obtained for entire site. Disturbed samples to be collected (including packing and transporting) and sent to the Laboratory as per specifications. The standard penetration test shall be discontinued when N is greater than 75 blows for 30 cms of penetration Static Cone Penetration Test The equipment used for this test shall conform to the requirements of IS: 4968 (Part III). The capacity of the equipment to be used for test shall not be less than 10.0 tons. The test shall not be carried out on gravelly soils or for soils with standard penetration value 'N' greater than 50. Test Procedures Test procedure shall meet the requirements of IS: 4968 (Part III). Some of the important points of the procedure are given below: a) The cone is pushed through a distance in accordance with the design of the equipment and the need for the sub-strata and the cone resistance noted. The cone and the friction jacket are pushed together subsequently for a distance depending upon the design of the cone and friction resistance noted. This procedure is repeated at predetermined intervals. b) Equipment shall be securely anchored to the platform at the test point for obtaining the required reaction. c) The rod of the driving mechanism shall be brought to the top most position. The cone friction jacket assembly shall be connected to the first sounding rod and the mantle tube. The assembly shall be positioned over the test point through the mantle tube guide and held vertically. The plunger of the driving mechanism shall be brought down so as to rest against the protruding sounding rod. d) To obtain the cone resistance, only the sounding rod shall be pushed. Switching the gear clutch to the slow position, the drive handle shall be operated at a steady rate of 1 cm / sec. approximately, so as to advance the cone only, to a depth which is possible with the cone assembly available. During the pushing, the mean value of resistance as indicated by pressure gauges shall be noted ignoring erratic changes. e) For finding combined cone and friction resistance of the soil, the sounding rod shall be pushed to the extent the cone has been pushed, at the rate of 1 cm / sec. noting mean resistance on the gauges. f) The above procedure shall be repeated after pushing the combined cone friction jacket and mantle tube assembly to the next depth at which the test is to be performed. g) The sequence of operation of the equipment shall be as per Fig. 5 of IS4968 (Part 3). The pro-forma for record of results of static cone penetration test shall be as approved by Consultants Vane Shear Tests These tests shall be conducted in soft to firm clays and sensitive clays. These tests shall also be conducted in case of stiff fissured clays where samples cannot be taken. Tests shall be generally conducted through boreholes. The apparatus used for vane shear tests shall satisfy the requirements as per IS:

9 For test from bottom of Borehole: a) Vane shall consist of four mutually perpendicular blades, as illustrated in IS: The height of the vane should be twice the blade diameter. It is recommended that the diameter of the vane should be 37.5, 50, 75 or 100 mm. The design of the vane shall be such that it causes as little remoulding or disturbance as possible to the soil when inserted into the ground for a test. The blades shall be as thin as possible, consistent with the strength requirements. The vane should not deform under the maximum torque for which it is designed. The rotating edge of the vane blades shall be sharpened having an included angle of 90 deg. The vane blades shall be welded together suitably either directly or to a central rod, the maximum diameter of which should preferably not exceed 12.5mm. The area ratio of the vane shall be kept as low as possible and shall not exceed 18% for the 37.5 mm vane and 12% for the 50, 65, 70 and 100 mm diameter vanes. The area ratio may be calculated using the following formula: Ar = [[8t (D-d) + πd²] / [πd2]] x 100 (%) Where Ar = area ratio in precent t = thickness of vane blades in mm. D = overall diameter of vane in mm and, d = diameter of central vane rod including any enlargement due to welding in mm. Note 1: The vane selected should be the largest size suitable for the general soil conditions at a site. The vane rod (the rod to which the vane blades are fixed) may be enclosed in a suitably designed sleeve from just above the blades and throughout the length it penetrates the soil to exclude the soil particles and the effects of soil adhesion. This sleeve shall commence above the blades at a distance equivalent to about two diameters of the vane rod. Note 2: The vane shall be frequently checked for straightness. b) Torque Applicator The torque applicator shall have a clamping device to rigidly secure it to the anchor casing and shall have an attachment to securely hold the string of rods connecting the vane. The instrument shall be capable of applying a torque to the vane through the string of rods and to measure the same. It should also have a device to read the angular rotation of the upper end of the extension rods. The torque applicator shall be provided with speed control so that the rate of rotation may be maintained at 0.1 deg. / sec. Friction exerted by the torque applicator shall be of negligible magnitude and shall be checked periodically. Depending upon the estimated shear strength of the soil the following table (Table 1) may be used as a guide for the selection of torque applicator of capacity 60 N.m (600 Kgf.cm). TABLE -1 SELECTION OF TORQUE APPLICATOR 10 (0.1) 20 (0.2) 30 (0.3) 40 (0.4) Estimated Shear Strength in KN/Sq.m (Kgf/sq.cm) Vane size (dia.) suitable for use with 600 Kgf. cm torque applicator All sizes All sizes except 100 mm size All sizes except 100 mm size All sizes except 75 mm size & 100 mm size 9

10 50 (0.5) 60 (0.6) 70 (0.7) All sizes except 75 mm size & 100 mm size 37.5 mm and 50 mm size 37.5 mm and 50 mm size The capacity and accuracy of the instrument shall be one of the following as may be specified by the purchaser: a) Measure torque up to 60 N.m (600 kgf.cm) to an accuracy of 1 N.m (10 kgf.cm), or b) Measure torque up to 200 N.m (2000 kgf.cm) to an accuracy of 2.5 N.m (25 kgf.cm) c) Rod System: The string of torque rods connecting the vane to the torque applicator, called the rod system may be of quick coupling type or of the threaded type. The length of the rods shall be preferably 1m with a few of smaller lengths. These rods shall have sufficient diameter such that their elastic limit is not exceeded when the vane is stressed to its capacity (see Note 3). The threaded rods shall be so coupled that the shoulders of the male and female ends shall meet to prevent any possibility of the coupling tightening when the torque is applied during the test. If vane housing is used, the torque rods shall be equipped with well-lubricated bearings where they pass through the housing. These bearings shall be provided with seals to prevent soil from entering them. The torque rods shall be guided so as to prevent friction from developing between the torque rods and the walls of casing or boring. Note 3: If torque versus rotation curves to be determined, it is essential that the torque rods be calibrated (prior to the use in the field). The amount of rod twist (if any) shall be established in degree per metre per unit torque. This correction becomes progressively more important as depth of test increases. The calibration shall be made at least to the maximum depth of testing anticipated. d) Dummy Rod Of dimensions equal to that of the vane rod. e) Guides for Rod Of suitable type provided with ball bearing attachment so as to enable the rod to rotate freely (see Note 4). Note 4: During the test, it is essential that the rods and vane are placed centrally in the borehole. For this purpose guides shall be used at an interval in depth of not more than 5m. f) Drilling Equipment The equipment shall provide a clean hole of the required diameter for insertion of the vane to ensure that the vane test is performed on undisturbed soil. g) Jacking Arrangement For pushing the shoe and vane (where required). h) The apparatus shall be checked and calibrated as and when required. For Tests by Direct Penetration from Ground Surface a) Vane As specified in a) In addition the vane shall be suitably protected by a shoe. b) Rod System As specified in c) and of suitable type. c) Extension Pipes About one metre length with coupling on the outer face to case the hole. d) Torque Applicator 10

11 As specified in b) e) The apparatus shall be checked and calibrated as and when requested. Procedure for tests from the bottom of a borehole Sink the bore up to the depth required and extend the casing up to the full depth. If the casing is loose, secure it so that it does not move during the tests. Fix the torque applicator anchor plate to the casing. Connect the vane of suitable size (see Note 1) to the rods and lower it to the bottom of the bore-hole, put guides at suitable intervals but not more than about 5m as the rods are extended. Push the vane with a moderately steady force up to a depth of 5 times the diameter of the borehole below the bottom of the borehole or shoe. Take precaution to make sure that no torque is applied to the torque rods during the thrust. No hammering shall be permitted. Fix the torque applicator with frame to the anchor plate and connect the rods to it. Tighten the torque applicator to the frame properly. Allow a minimum period of 5 minutes after insertion of the vane. Turn the gear handle so that the vane is rotated at the rate of 0.1 deg / s. Note the maximum torque reading attained. If necessary, note the torque indicator dial gauge readings at half minute intervals and continue rotating the vane until the reading drops appreciably from the maximum. Just after the determination of the maximum torque, rotate the vane rapidly through a minimum of ten revolutions. The remoulded strength should then be determined (see C; above within one minute after completion of the revolutions). Remove the vane testing assembly, continue boring and collect soil sample from the level of the vane testing for laboratory analysis to ascertain whether the deposit will behave as a purely cohesive soil. In cases where a sleeve is not provided for the vane rod and the soil is in contact with the rod, determine the friction between the soil and the vane rod by conducting tests at appropriate depths using the dummy rod corresponding to that of the vane used in the test. The test should be conducted as with the vane except that the vane is replaced by dummy rod. The test should be conducted in an adjacent borehole at the same depth at which the vane tests were conducted. The dummy rod should be pushed into the ground to the same distance as the vane rod at that depth. Following points shall, however, be carefully supervised in the field: a) Straightness of vane shall be checked while the entire assembly of vane connected with rod is lowered to the bottom of boreholes. Vane shall be pushed with a moderate steady force up to a depth of five times the bore hole diameter below the bottom of boreholes. Precautions shall be taken to ensure that no torque is applied to the torque rods during the thrust. No hammering shall be done. b) An interval of 5 minutes shall be allowed to lapse after insertion of vane. c) Torque indicator readings shall be noted at intervals of 30 seconds until the vane readings drop appreciably from the maximum. d) Samples shall be collected from the levels at which the tests have been conducted. Tests by Direct Penetration from Ground Surface Rods shall remain tight when vane is lowered. Guides shall be placed at every 3m to centralise and reduce friction between rods and extension pipe. Records Records of vane test shall be maintained in approved pro-forma. 11

12 3.4.4 Electrical Resistivity Test This test shall be conducted as per Appendix B, Clause 3.2 of IS The test shall be done by using 4 points. The locations where ERT to be performed shall be finalized in consultation with EIC LABORATORY TESTS The following laboratory tests shall be conducted on samples collected from the field covering all the bores using procedures specified in the relevant Standards. All the Laboratory Tests shall be conducted by skilled personnel only Attenberg Limits The tests result should include liquid limit and plastic limit of the soil samples tested. These tests should be conducted as per IS: 2720 Part V Natural Moisture Content In case of organic soils, the oven temperature shall be 60 C and not 105 C Dry Bulk Density and Void Ratio Specific Gravity This test should be conducted as per IS: 2720, Part Grain Size Distribution Wherever applicable both the sieve and hydrometer analysis shall be conducted to indicate complete range of grain size in the soil sample tested. Generally, Hydrometer analysis will be carried out, wherever percentage passing No.200 sieve is greater than 30% Tri-axial Tests These tests shall be done on specimens saturated by the application of back pressure. Only if the water table is at sufficient depth so that chances of its rising to the base of the footing are meagre or nil, shall the tri-axial tests be performed on specimens at Natural Moisture Content. The magnitude of the backup pressure applied shall be indicated in the report. All stress diagrams as well as Mohr-circle envelopes shall be included in the report. E-value shall be determined from the tri-axial tests. Relevant corrections applied to the computer 'E' shall be clearly illustrated in the report Unconfined Compression Test This test shall be conducted as per IS: 2720, Part X Free Swelling Index This test shall be conducted as per IS: 2911, Part III Swelling Pressure Test This test shall be conducted as per Draft Standard circulated by Technical Committee on Expansive Soils (TC-6) of International Society of Soil Mechanics and Foundation Engineering; 'Evaluation of Swelling Pressure of Expansive Soil in Laboratory' (circulated in November, 1990). 12

13 Consolidation Tests The following loading stage shall be employed: 0, 0.1, 0.25, 1.0, 2.0, 4.0 and 8.0 kg / sq.cm. From e vs. log p curves, pre-consolidation pressure shall be determined to establish whether the soil is normally consolidated or over consolidated. The point (e, p) showing initial condition of the soil under test must be specifically marked on the consolidation curves. Settlement predictions based on the field virgin compression curve shall only be acceptable. The procedure adopted in respect of obtaining compression indices from the field curve and that for computing settlements for the type of clay under consideration shall be clearly illustrated in the report. It is to be noted that deviations from the standard procedure of performing consolidation tests given in IS:2720 are permissible in order to enable computation of settlements based on the above procedure i.e. cycles (s) of loading, unloading and reloading shall be employed wherever required. The following curves shall be included in the report: a) e vs.: log p b) e vs.: p c) Compression vs.: log t or compression vs. t. The choice of relationship depends upon the shape of the plot, which enables a clear determination of Cv, the coefficient of consolidation. The time period required for 50% and 90% primary consolidation should be given in the report. Computation of secondary settlements, if significant, shall also be made and included in the report Chemical Tests On Water & Soil Chemical tests shall be conducted on soil and water samples to report the following: a) ph b) Chloride c) Sulphate d) Sulphite e) Organic contents f) Total hardness Chemical Tests (Suitability of water for Construction) These tests shall be carried out to check suitability of water for construction purpose as required by IS: 456. Other Inorganic Tests as required by World Health Organisation (WHO) to test suitability for drinking purpose shall also be carried out CBR Tests for Sub-Grade soils (3 Point Tests) These tests shall be conducted on soaked and un-soaked samples generally as per IS: 2720 Part XVI. Bulk samples for laboratory tests shall be selected randomly from various road locations and also from locations of stacking areas in consultation with UNDP Engineer. The 3 point test shall consist of preparation of samples with 15, 25, 35 blows per layer, which will give three different densities to soil and then testing each for soaked condition Proctor Density Tests These tests shall be conducted as per IS: 2720 Part VII samples collected randomly in consultation with UNDP Engineer Levels & Co-Ordinates of Test Location 13

14 Contractor shall establish and tabulate reduced levels and co-ordinates of various test locations. Any expense on this account shall be deemed to have been included in the quoted rates. 3.6 REPORT Two copies of Draft\Interim Report shall be submitted to UNDP Engineer before preparing Final Report. The record shall be prepared with due regards to above given requirements in a draft format and submitted for review and comment as soon as field and laboratory works are completed. Contractor shall incorporate the comments/ remarks, if any, furnished by UNDP upon review of the Draft Report and submit the final report. The draft copy of the report shall in general include but not be limited to the following: 1. Plot plan showing all the test locations with respect to reference benchmark. 2. General Geological information of the site 3. Character and genesis of soil 4. Procedure of investigation and methods of various testing adopted. 5. Detailed bore-logs indicating co-ordinates, reduced levels, ground water table etc., sub soil profiles along various profiles along various sections indicating borehole no. depth wise in-situ tests like SPT and other lab results etc. 6. Generalised soil profile of the underlying strata in cross section and longitudinal section wise, shall be furnished based on the bore log in grid pattern 7. All field and laboratory test results shall be plotted against depth and also in tabular form 8. Summary of results obtained from various tests and other interpretation to evaluate various soil parameters. 9. Recommend suitable foundation for above ground buildings. 10. Recommend suitable depth of foundation and foundation to be adopted for all buildings/pavements proposed at the given location. 11. The Contractor shall recommend in the report the suitable foundation system or ground improvements to be adopted for Enclosure wall, roads, drains, Pipeline pedestals and other structures; the permissible bearing pressure expected at the founding level with allowable settlement, if any; details of soil improvements, if any and any other aspect which will have any bearing on the proposed construction. The Contractor shall also provide the suggested filling materials characteristics/ parameters considering locally available soils and economics. 12. Ultimate and safe bearing capacity from shear as well as from settlement criteria (i.e. for 25mm and 40mm) for the shallow combined or raft footings. 13. Recommendation for pile foundation (If necessary) including types of piles, size and depth of pile and safe load in vertical, lateral and pull out. 14. Recommendations if water table location suggests use of Geo Textiles. 15. Comments on chemical aggressiveness of soil and ground water on reinforced concrete, steel and other building materials and firm recommendations on remedial/ preventive measures. 16. Recommendations of CBR value for design of 3 story Building (19mX84m), road, pavement etc. 17. Recommendation of soil resistivity to be considered for design purpose. 14

15 18. Recommendation of design parameters for pressure meter test. Recommendation of foundation system with detailed calculations from pressure meter test result. 18. Recommendation regarding ground water fluctuation, horizontal and vertical permeability of sub soil strata. Contractor shall submit 2 Sets of Final Reports along with soft copy in CD. 15

SITE INVESTIGATION. Foundation Engineering

SITE INVESTIGATION. Foundation Engineering SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface

More information

L.S. 1. m 600. No No. 400

L.S. 1. m 600. No No. 400 , S.No Field Work : Description Unit Quantity Rate (Rs) Amount (Rs) 1 2 3 4 5 6 7 Setting up site organization including complete mobilization of personnel, equipment & accessories as per specification,

More information

2.6 Methods of Soil Sampling

2.6 Methods of Soil Sampling 2-15 2.6 Methods of Soil Sampling Disturbed sampling Þ Grain-size distribution, w n, LL, PL, G s, classification of soil, and shearing characteristics for cohesionless soils Undisturbed sampling (Tube

More information

REPORT ON SOIL INVESTIGATION FOR CONSTRUCTION OF PROPOSED 33/11 KV SUB STATION AT JAUN SAMANA, MARIPAT, GREATER NOIDA IN UTTAR PRADESH

REPORT ON SOIL INVESTIGATION FOR CONSTRUCTION OF PROPOSED 33/11 KV SUB STATION AT JAUN SAMANA, MARIPAT, GREATER NOIDA IN UTTAR PRADESH REPORT ON SOIL INVESTIGATION FOR CONSTRUCTION OF PROPOSED 33/11 KV SUB STATION AT JAUN SAMANA, MARIPAT, GREATER NOIDA IN UTTAR PRADESH CLIENT M/S NOIDA POWER COMPANY LTD. GREATER NOIDA FEBRUARY-2018 PREPARED

More information

Site Investigation MUHAMMAD AZRIL HEZMI

Site Investigation MUHAMMAD AZRIL HEZMI Site Investigation MUHAMMAD AZRIL HEZMI Definition Essential part of the preliminary design workon any important structure in order to provide adequateand reliable geotechnical informationand site condition,

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

TOYO ENGINEERING INDIA LIMITED

TOYO ENGINEERING INDIA LIMITED ENGINEERING SPECIFICATION FOR FOR NITROGEN UNIT FOR HINDUSTAN PETROLEUM CORPORATION LTD. VISAKH REFINERY DHT PROJECT JOB NO. : 6261 DOCUMENT NO. : A-6261- TOTAL NO. OF PAGES: 26 (INCLUDING THIS PAGE) 0

More information

S.No Description Unit Quantity Rate (Rs) Amount (Rs)

S.No Description Unit Quantity Rate (Rs) Amount (Rs) , S.No Description Unit Quantity Rate (Rs) Amount (Rs) 1 2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge method and preparation

More information

Quotation Notice. The salient features and precise requirements:

Quotation Notice. The salient features and precise requirements: Quotation Notice Sealed quotations are invited from reputed firms/agencies for conducting field tests/ Laboratory tests for depicting the nature of sub soils, strata and evaluates the various soil properties

More information

PILING PART-VI CONSTRUCTION AND INSTALLATION OF RCC BORED CAST IN-SITU PILES

PILING PART-VI CONSTRUCTION AND INSTALLATION OF RCC BORED CAST IN-SITU PILES Page 1 of 8 PILING PART-VI OF RCC BORED CAST IN-SITU PILES REV. NO. PRAPARED APPROVED DATE 00 Marina P Mishra COPYRIGHT AND CONFIDENTAL The information on this document is the property of BHARAT HEVY ELECTRICAL

More information

SCOPE OF WORK FOR PILING JOB

SCOPE OF WORK FOR PILING JOB SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala

More information

Mariamman Kullam. Mariamman kullam TOILET BLOCK. 2m wide pathway

Mariamman Kullam. Mariamman kullam TOILET BLOCK. 2m wide pathway Mariamman Kullam TOILET BLOCK 2m wide pathway Mariamman kullam D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D D 75 3.00 0,3 Paver Block 80mm Thick Sand Cushion 300 PCC 1:2:4 using 20mm metal PCC 1:4:8 using 40mm metal

More information

Exploration, Sampling, and In Situ Soil Measurements. Dr. Omar Al-Hattamleh

Exploration, Sampling, and In Situ Soil Measurements. Dr. Omar Al-Hattamleh Exploration, Sampling, and In Situ Soil Measurements Dr. Omar Al-Hattamleh Purpose of Soil Exploration Information to determine the type of foundation required (shallow or deep). Information to allow the

More information

June i TABLE OF CONTENTS

June i TABLE OF CONTENTS June 2005 - i - 05-526 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 1.1 Purpose of the Investigation... 1 1.2 Description of the Project and Scope of Work... 1 1.3 Site Geology... 1 1.4 Site Description

More information

Typical set up for Plate Load test assembly

Typical set up for Plate Load test assembly Major disadvantages of field tests are Laborious Time consuming Heavy equipment to be carried to field Short duration behavior Plate Load Test Sand Bags Platform for loading Dial Gauge Testing Plate Foundation

More information

New Development -Sonic Drilling with Sampling

New Development -Sonic Drilling with Sampling New Development -Sonic Drilling with Sampling Three Forces on Drill Strings: - Rotary force provides slow rotation to enhance vibrating effect -Vertical oscillatory force provides localized displacement

More information

Subsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015

Subsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015 Subsurface Investigations PDCA Professor s Driven Pile Institute Loren R. Anderson Utah State University June 25, 2015 Ralph B. Peck (1962) Subsurface engineering is an art; soil mechanics is an engineering

More information

DHANALAKSHMI COLLEGE OF ENGINEERING, CHENNAI DEPARTMENT OF CIVIL ENGINEERING 2 MARK QUESTIONS WITH ANSWERS CE FOUNDATION ENGINEERING UNIT 1

DHANALAKSHMI COLLEGE OF ENGINEERING, CHENNAI DEPARTMENT OF CIVIL ENGINEERING 2 MARK QUESTIONS WITH ANSWERS CE FOUNDATION ENGINEERING UNIT 1 DHANALAKSHMI COLLEGE OF ENGINEERING, CHENNAI DEPARTMENT OF CIVIL ENGINEERING 2 MARK QUESTIONS WITH ANSWERS CE6502 - FOUNDATION ENGINEERING Subject Code: CE6502 UNIT 1 1. What are the informations obtained

More information

Misan University - College of Engineering Civil Engineering Department

Misan University - College of Engineering Civil Engineering Department CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 02370 AUGER CAST PILES PART 1 - GENERAL 1.1 SECTION INCLUDES: The work covered by these specifications consists of furnishing all labor, equipment and materials for the installation of auger cast

More information

SITE INVESTIGATION Validation and Interpretation of data

SITE INVESTIGATION Validation and Interpretation of data SITE INVESTIGATION Validation and Interpretation of data Dr. G.Venkatappa Rao The Impact 1 The Need To determine the type of foundation To assess bearing capacity/settlement Location of Ground water table,issues

More information

GEO TECHNICAL INVESTIGATION REPORT (1449-R2-NALANDA UNIVERSITY)

GEO TECHNICAL INVESTIGATION REPORT (1449-R2-NALANDA UNIVERSITY) GEO TECHNICAL INVESTIGATION REPORT (1449-R2-NALANDA UNIVERSITY) AT THE SITE FOR PROPOSED SITE FOR NEW CAMPUS OF NALANDA UNIVERSITY, RAJGIR, DISTT. NALANDA, FOR UNIVERSITY ENGINEER NALANDA UNIVERSITY, COUNCIL

More information

UPDATED 04 OCT GEOTECHNICAL INVESTIGATIONS

UPDATED 04 OCT GEOTECHNICAL INVESTIGATIONS 8.0 GEOTECHNICAL INVESTIGATIONS Throughout this section, reference to the Contractor simply means the entity responsible for the subject work. The same procedures and requirements generally apply to anyone

More information

A Safe Bearing Capacity of Soil & Soil investigation

A Safe Bearing Capacity of Soil & Soil investigation A Safe Bearing Capacity of Soil & Soil investigation Rural Water Supply Scheme, Hanumangarh At 17 MSD, Inderpura, Hanumangarh By M/s Degremont Pvt. Ltd. Team Infrastructures (Soil & Construction Material

More information

CERTIFICATE FOR: CADD CONSULTING ENGINEERS PVT. LTD

CERTIFICATE FOR: CADD CONSULTING ENGINEERS PVT. LTD CERTIFICATE This is to certify that the samples are collected from the proposed OPGC PROPOSED FOR SOIL INVESTIGATION WORK FOR CONSTRUCTION OF CHP AREA AT MINE S END The laboratory tests have been performed

More information

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows: ITEM 416 DRILLED SHAFT FOUNDATIONS 416.1. Description. This Item shall govern for the construction of foundations consisting of reinforced concrete drilled shafts and/or nonreinforced concrete drilled

More information

Geotechnical Investigation at Various Locations in Bangalore

Geotechnical Investigation at Various Locations in Bangalore International Journal of Scientific and Research Publications, Volume 7, Issue 7, July 2017 100 Geotechnical Investigation at Various Locations in Bangalore Ranajith Aithal G, and Mr. Kiran. East West

More information

Pavement materials: Soil

Pavement materials: Soil Pavement materials: Soil Lecture Notes in Transportation Systems Engineering Prof. Tom V. Mathew Contents 1 Overview 1 2 Sub grade soil 2 2.1 Desirable properties................................ 2 2.2

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

(Annex.-VI) FAGMIL GRANULATED SINGLE SUPER PHOSPHATE PLANT AT CHITTORGARH, RAJASTHAN TENDER DOCUMENT FOR GEO-TECHNICAL INVESTIGATION WORK FOR

(Annex.-VI) FAGMIL GRANULATED SINGLE SUPER PHOSPHATE PLANT AT CHITTORGARH, RAJASTHAN TENDER DOCUMENT FOR GEO-TECHNICAL INVESTIGATION WORK FOR TENDER FOR PC107-PNCV-TD-202 0 SHEET 0 OF 29 (Annex.-VI) TENDER DOCUMENT FOR FOR FAGMIL GRANULATED SINGLE SUPER PHOSPHATE PLANT AT CHITTORGARH, RAJASTHAN PC107-PNCV-TS-202 0 SHEET 1 OF 16 TECHNICAL SPECIFICATIONS

More information

CERTIFICATE FOR: CADD CONSULTING ENGINEERS PVT. LTD

CERTIFICATE FOR: CADD CONSULTING ENGINEERS PVT. LTD CERTIFICATE This is to certify that the samples are collected from the proposed OPGC PROPOSED FOR SOIL INVESTIGATION WORK FOR CONSTRUCTION OF CHP AREA AT MINE S END The laboratory tests have been performed

More information

Grouting Bilfinger Spezialtiefbau GmbH

Grouting Bilfinger Spezialtiefbau GmbH Grouting Bilfinger Spezialtiefbau GmbH Goldsteinstrasse 114 D-60528 Frankfurt Phone: +49 69 6688-345 Fax: +49 69 6688-277 Email: info.spezialtiefbau@bilfinger.com www.foundation-engineering.bilfinger.com

More information

SECTION SUBSURFACE INVESTIGATION. 1. Protection of the environment; Section

SECTION SUBSURFACE INVESTIGATION. 1. Protection of the environment; Section 02011-1 of 5 SECTION 02011 SUBSURFACE INVESTIGATION 02011.01 GENERAL A. Description Subsurface investigation shall include, but not necessarily be limited to, drilling test holes (in rock), auguring holes,

More information

BANK OF INDIA, GROUND FLOOR, GOD 45- PU-4, SCHEME NO -54, A. B. ROAD, INDORE TENDER DOCUMENT FOR

BANK OF INDIA, GROUND FLOOR, GOD 45- PU-4, SCHEME NO -54, A. B. ROAD, INDORE TENDER DOCUMENT FOR BANK OF INDIA, GROUND FLOOR, GOD 45- PU-4, SCHEME NO -54, A. B. ROAD, INDORE - 452010 TENDER DOCUMENT FOR Soil Investigation Report for Zonal Office Building And Residential Flats for Bank of India at

More information

Consultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations

Consultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations Consultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations Mn/DOT Geotechnical Section - Office of Materials & Road Research http://www.mrr.dot.state.mn.us/geotechnical/foundations/tcontract.asp

More information

SECTION DRILLED CONCRETE PIERS AND SHAFTS

SECTION DRILLED CONCRETE PIERS AND SHAFTS SECTION 31 63 29 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering Earth Mechanics, Inc. Geotechnical & Earthquake Engineering TECHNICAL MEMORANDUM DATE: June 3, 2009 EMI PROJECT NO: 01-143 TO: COPY: FROM: SUBJECT: John Chun, P.E. / Port of Long Beach (POLB) Jorge Castillo

More information

INDIAN INSTITUTE OF TECHNOLOGY GANDHINAGAR Department of Civil Engineering Soil Mechanics Laboratory

INDIAN INSTITUTE OF TECHNOLOGY GANDHINAGAR Department of Civil Engineering Soil Mechanics Laboratory THEORY: INDIAN INSTITUTE OF TECHNOLOGY GANDHINAGAR CONSOLIDATION TEST- (OEDOMETER TEST) (IS 2720-PART-15-1986) Reaffirmed-2002 When a compressive load is applied to soil mass, a decrease in its volume

More information

3. FIELD INVESTIGATION PROGRAM

3. FIELD INVESTIGATION PROGRAM Department of Public Works U.S. Army Corps of Engineers Phase 1B Geotechnical Investigation Geotechnical Data Report 3.3 FIELD METHODS AND PROCEDURES 3. FIELD INVESTIGATION PROGRAM The borings were advanced

More information

704 - PILING SECTION 704 PILING

704 - PILING SECTION 704 PILING SECTION 704 PILING 704.1 DESCRIPTION Drive the specified types of piles to the penetration and bearing values shown in the Contract Documents. BID ITEMS UNITS Piles (*)(**) Test Piles (*) (**) Test Piles

More information

INDIAN INSTITUTE OF TECHNOLOGY GANDHINAGAR Department of Civil Engineering Soil Mechanics Laboratory

INDIAN INSTITUTE OF TECHNOLOGY GANDHINAGAR Department of Civil Engineering Soil Mechanics Laboratory UNCONFINED COMPRESSION TEST (IS-2720-PART-10-1991)Reaffirmed-2006 THEORY: An Unconfined compression test is also known as uniaxial compression tests, is special case of a triaxial test, where confining

More information

4. GEOTECHNICAL FIELD INVESTIGATION SUMMARY

4. GEOTECHNICAL FIELD INVESTIGATION SUMMARY Rev. 0 Date: AUGUST 18, 2012 Project.: COUVA CHILDREN S HOSPITAL - COUVA, TRINIDAD Page 29 Title: EISL-412-DD-TR-2012 PRELIMINARY GEOTECHNICAL FEASIBILITY REPORT 4. GEOTECHNICAL FIELD INVESTIGATION SUMMARY

More information

Downloaded from Downloaded from /1

Downloaded from  Downloaded from  /1 PURWANCHAL UNIVERSITY VI SEMESTER FINAL EXAMINATION-2003 LEVEL : B. E. (Civil) SUBJECT: BEG359CI, Foundation Engineering. Full Marks: 80 TIME: 03:00 hrs Pass marks: 32 Candidates are required to give their

More information

Module - CE 3132 Geotechnical Engineering Assignment Triaxial Test Marks 10% Learning Outcome

Module - CE 3132 Geotechnical Engineering Assignment Triaxial Test Marks 10% Learning Outcome Module - CE 3132 Geotechnical Engineering Assignment Triaxial Test Marks 10% Learning Outcome Ability to conduct a Unconsolidated Undrained (UU) triaxial test Ability to evaluate the undrained shear strength

More information

SPECIAL SPECIFICATION 5989 Settlement Gauge

SPECIAL SPECIFICATION 5989 Settlement Gauge 2004 Specifications CSJ 0047-14-067 SPECIAL SPECIFICATION 5989 Settlement Gauge Description. Install, maintain, and subsequently abandon settlement gauges as indicated for the purpose of obtaining foundation

More information

SPECIAL SPECIFICATION 4401 Prestressed Ground Anchors

SPECIAL SPECIFICATION 4401 Prestressed Ground Anchors 2004 Specifications CSJ 0581-02-121 & 0200-11-100 SPECI SPECIFICATION 4401 Prestressed Ground Anchors 1. Description. Install post-tensioned permanent ground anchors in place, with grouting as required

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 22475-1 First edition 2006-09-15 Geotechnical investigation and testing Sampling methods and groundwater measurements Part 1: Technical principles for execution Reconnaissance

More information

Appendix VIII. Guidelines for groundwater bores and wells

Appendix VIII. Guidelines for groundwater bores and wells Appendix VIII Guidelines for groundwater bores and wells Appendix VIII Guidelines for groundwater bores and wells 1. Construction Bores used for water supply are normally constructed by drilling, either

More information

SOIL MECHANICS CIVIL ENGINEERING VIRTUAL LABORATORY

SOIL MECHANICS CIVIL ENGINEERING VIRTUAL LABORATORY SOIL MECHANICS CIVIL ENGINEERING VIRTUAL LABORATORY EXPERIMENT: 10 TRIAXIAL TEST AIM OF THE EXPERIMENT: To find the shear of the soil by Undrained Triaxial Test. APPARATUS REQUIRED: a) Special: i. A constant

More information

SPECIAL CONDITIONS FOR HORIZONTAL AUGER BORING (HAB) October, 2006

SPECIAL CONDITIONS FOR HORIZONTAL AUGER BORING (HAB) October, 2006 Michigan Department Of Transportation 3703B (11/06) 1 Materials SPECIAL CONDITIONS FOR HORIZONTAL AUGER BORING (HAB) October, 2006 Page 1 of 5 1.1 Pipe - Pipe used in this method includes an external steel

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

METHOD FOR OBTAINING AND TESTING DRILLED CORES FROM PCCP AND PRECAST GIRDERS (Kansas Test Method KT-49)

METHOD FOR OBTAINING AND TESTING DRILLED CORES FROM PCCP AND PRECAST GIRDERS (Kansas Test Method KT-49) 5.9.49 METHOD FOR OBTAINING AND TESTING DRILLED CORES FROM PCCP AND PRECAST GIRDERS (Kansas Test Method ) 1. SCOPE 1.1. This test method provides standardized procedures for obtaining and testing specimens

More information

SECTION NONPRESTRESSED ROCK ANCHORS. 1. Placing drawings. 2. Bar details. 3. Manufacturer s data, and recommendations for grout.

SECTION NONPRESTRESSED ROCK ANCHORS. 1. Placing drawings. 2. Bar details. 3. Manufacturer s data, and recommendations for grout. SECTION 02261 NONPRESTRESSED ROCK ANCHORS PART 1 GENERAL 1.1 THE REQUIREMENT A. The Work in this Section consists of all construction operations relating to designing, furnishing, and installing, complete

More information

Building Construction

Building Construction Building Construction Shallow Foundations Module-III Introduction The foundation can be classified broadly into two types: Shallow foundations Deep foundations Shallow foundations Shallow Foundations When

More information

SPECIAL SPECIFICATION 4492 Tie Back Anchors

SPECIAL SPECIFICATION 4492 Tie Back Anchors 2004 Specifications CSJ 0504-02-022 SPECI SPECIFICATION 4492 Tie Back Anchors 1. Description. This Item shall govern for the installation of tie-back anchors in place, with grouting as required in accordance

More information

Soil Mechanics Laboratory Manual

Soil Mechanics Laboratory Manual 2014 Soil Mechanics Laboratory Manual Prepared by: Dr. Arabinda Sharma Civil Engineering Department BRCM College of Engg. & Tech. Bahal-127 028, Bhiwani Haryana LIST OF EXPERIMENTS Sr. No. Name of the

More information

METHOD FOR DETERMINING THE TENSILE ADHESIVE STRENGTH OF ASPHALT PAVEMENT TACK COAT (Kansas Test Method KT-78)

METHOD FOR DETERMINING THE TENSILE ADHESIVE STRENGTH OF ASPHALT PAVEMENT TACK COAT (Kansas Test Method KT-78) 5.9.78 METHOD FOR DETERMINING THE TENSILE ADHESIVE STRENGTH OF ASPHALT PAVEMENT TACK COAT (Kansas Test Method ) 1. SCOPE This method covers the test procedure used to measure the tensile adhesive strength

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

Lantz-Boggio Architects, P.C LBA Project No

Lantz-Boggio Architects, P.C LBA Project No SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely

More information

2. PLANNING AND MAKING A SOIL SURVEY

2. PLANNING AND MAKING A SOIL SURVEY Sample all soil horizons over 10 cm in thickness; all samples should represent natural soil horizons or 2.0 The purpose of the soil survey 2. PLANNING AND MAKING A SOIL SURVEY The purpose of making a soil

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

SECTION IRRIGATION WATER WELL

SECTION IRRIGATION WATER WELL PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 33 21 16 IRRIGATION WATER WELL A. The work shall consist of furnishing all labor, material, equipment, and services necessary for the drilling of irrigation

More information

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

techie-touch.blogspot.com www.vidyarthiplus.com CE2305 FOUNDATION ENGINEERING 2 MARKS QUESTIONS & ANSWERS 16 MARKS QUESTIONS UNIT -1 1. What are components of total foundation settlement? elastic settlement,

More information

SPECIFICATION FOR JET GROUTING

SPECIFICATION FOR JET GROUTING SPECIFICATION FOR JET GROUTING 1.0 GENERAL The Specialist Contractor shall construct jet grout columns of nominal diameter and spacing as specified in the drawing(s) to the requirements of the Contract.

More information

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES PART 1 GENERAL 1.01 SCOPE A. This work shall consist of the underground construction of a pipeline across the state right-ofway, or other facility as indicated on the plans and as

More information

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

SPECIFICATION FOR PREFABRICATED VERTICAL DRAINS

SPECIFICATION FOR PREFABRICATED VERTICAL DRAINS SPECIFICATION FOR PREFABRICATED VERTICAL DRAINS 1.0 GENERAL The work covered under this specification includes the installation of prefabricated vertical drains at the locations shown on the plans and

More information

PROPOSED CONSTRUCTION OF RESIDNTIAL APARTMENT AT BAJANAI KOIL STREET,SELAIYUR

PROPOSED CONSTRUCTION OF RESIDNTIAL APARTMENT AT BAJANAI KOIL STREET,SELAIYUR PROPOSED CONSTRUCTION OF RESIDNTIAL APARTMENT AT BAJANAI KOIL STREET,SELAIYUR Report on Geotechnical Investigation Client: M/s. Alankar Construction, Chennai. MARS SYNERGY GEO TECH Pvt Ltd ISO 9001: 2008

More information

SECTION DUCTILE IRON PILES

SECTION DUCTILE IRON PILES SECTION 31 66 13 DUCTILE IRON PILES PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents. B.

More information

Soil Improvement by Compaction Grouting

Soil Improvement by Compaction Grouting CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 31-3223.12 Soil Improvement by Compaction Grouting Part 1 - General 1.01 Introduction

More information

SECTION IRRIGATION WATER WELL

SECTION IRRIGATION WATER WELL PART 1 GENERAL 1.1 SECTION INCLUDES: SECTION 02670 IRRIGATION WATER WELL A. The work shall consist of furnishing all labor, material, equipment and services necessary for the drilling of irrigation water

More information

Rapid Axial Load Testing of Drilled Shafts

Rapid Axial Load Testing of Drilled Shafts Supplemental Technical Specification for Rapid Axial Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 4, 2015 1.0 GENERAL This work shall consist of performing a rapid axial

More information

Conventional Field Testing Methods and Issues

Conventional Field Testing Methods and Issues Conventional Field Testing Methods and Issues Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 15 17 October, 2015 1 Conventional

More information

STANDARD SPECIFICATION Section Auger-Grout Injected Piles Civil Engineering Group Revised: August, 2000

STANDARD SPECIFICATION Section Auger-Grout Injected Piles Civil Engineering Group Revised: August, 2000 DIVISION 2: SITE WORK SECTION 02320 AUGER-GROUT INJECTED PILES STANDARD SPECIFICATION PART 1 GENERAL 1.0 DESCRIPTION OF WORK This work shall include all excavation, concrete, equipment and accessories

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,

More information

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Table of Contents 1. Title 2. Designation 3. List of Figures 4. Scope 5. Referenced

More information

Atterberg limits Clay A Clay B. Liquid limit 44 % 55% Plastic limit 29% 35% Natural water content 30% 50%

Atterberg limits Clay A Clay B. Liquid limit 44 % 55% Plastic limit 29% 35% Natural water content 30% 50% CE 6405 SOIL MECHANICS UNIT I INTRODUCTION Part A 1. Distinguish between Residual and Transported soil. 2. Give the relation between γ sat, G, γ w and e 3. A compacted sample of soil with a bulk unit weight

More information

Technical Bulletin No. MK3176. PREPARED: July, 2010

Technical Bulletin No. MK3176. PREPARED: July, 2010 Geoprobe DT45 Dual Tube Sampling System Standard Operating Procedure Technical Bulletin No. MK3176 PREPARED: July, 2010 A. B. C. D. E. A. Assembled outer casing with sample sheath and liner driven to collect

More information

U. S. EPA ENVIRONMENTAL RESPONSE TEAM

U. S. EPA ENVIRONMENTAL RESPONSE TEAM STANDARD OPERATING PROEDURES PAGE: 1 of 13 ONTENTS 1.0 SOPE AND APPLIATION 2.0 METHOD SUMMARY 3.0 SAMPLE PRESERVATION, ONTAINERS, HANDLING, AND STORAGE 4.0 POTENTIAL PROBLEMS 5.0 EQUIPMENT 6.0 REAGENTS

More information

SITE CHARACTERIZATION & INSTRUMENTATION MODULE 6

SITE CHARACTERIZATION & INSTRUMENTATION MODULE 6 Module6: Sampling Topics: Introduction Sample sizes Soil Disturbance Soil disturbance during drilling Soil disturbance during sampling Disturbance after sampling Undisturbed sampling techniques Sand Sampling

More information

SPECIFICATION FOR PREFABRICATED VERTICAL DRAIN

SPECIFICATION FOR PREFABRICATED VERTICAL DRAIN SPECIFICATION FOR PREFABRICATED VERTICAL DRAIN 1.0 GENERAL This work comprises of supply and installation of prefabricated vertical drains in accordance to the Specifications and Drawings. 2.0 MATERIALS

More information

3.1 Scope of the work-capacity Estimation of Drilled Shaft Bearing on Rock

3.1 Scope of the work-capacity Estimation of Drilled Shaft Bearing on Rock Chapter 3-Methodology 3.1 Scope of the work-capacity Estimation of Drilled Shaft Bearing on Rock The research work involved the use of high strain dynamic stress wave measurements for capacity estimation

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

Construction Technology B (CON4313)

Construction Technology B (CON4313) 3 - Basement 1 Quick Revision 1.1 Problems arising from basement construction a. Excavation method. b. Surface and ground water control c. Lateral stability of basement excavation. d. Stability of adjoining

More information

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1993 SPECIFICATIONS CSJ 581-1-95 SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1. DESCRIPTION. This Item shall govern for the furnishing and installation of all materials and equipment for

More information

SUBSURFACE ROTARY DRILLING INVESTIGATION SPECIFICATIONS

SUBSURFACE ROTARY DRILLING INVESTIGATION SPECIFICATIONS I. SCOPE OF WORK SUBSURFACE ROTARY DRILLING INVESTIGATION SPECIFICATIONS The Department of Environmental Protection, Bureau of Abandoned Mine Reclamation requires a contractor to conduct subsurface rotary

More information

SPECIFICATION FOR ENGINEERED FILLS

SPECIFICATION FOR ENGINEERED FILLS SPECIFICATION FOR ENGINEERED FILLS This specification is intended to be used for the engineered fill. The specification is suitable for most purposes but there may be special conditions existing at some

More information

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items: ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the

More information

EXHIBIT G GEOTECHNICAL REPORT (DRAFT)

EXHIBIT G GEOTECHNICAL REPORT (DRAFT) EXHIBIT G GEOTECHNICAL REPORT (DRAFT) APPENDIX 1 PROJECT SITE 'B' B-1 B-2 I-2 B-3 B-4 B-5 I-1 PROJECT LOCATION LEGEND B-1 = APPROXIMATE BORING LOCATION I-1 = APPROXIMATE INFILTRATION

More information

DETERMINATION OF WORKABILITY OF FRESH CONCRETE BY SLUMP TEST

DETERMINATION OF WORKABILITY OF FRESH CONCRETE BY SLUMP TEST DETERMINATION OF WORKABILITY OF FRESH CONCRETE BY SLUMP TEST Aim: To determine the workability of concrete by Slump test as per IS : 1199-1959 Mould - in the form of the frustum of a cone having the following

More information

SUPPLEMENTAL TECHNICAL SPECIFICATION

SUPPLEMENTAL TECHNICAL SPECIFICATION July 14, 2015 HIGH STRAIN DYNAMIC LOAD TESTING OF DRILLED SHAFTS 1.0 GENERAL This work shall consist of performing high-strain dynamic testing using a drop weight loading system on a test drilled shaft

More information

DEFINITIONS. A shallow bored hole under the derrick substructure in which the kelly is temporarily stored during tripping operations.

DEFINITIONS. A shallow bored hole under the derrick substructure in which the kelly is temporarily stored during tripping operations. DEFINITIONS 1. Conductor Hole A large diameter hole bored to facilitate steel pipe. May be cemented in place to allow conventional oil and gas well drilling operations,and also allows fluid returns to

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

SECTION GRAVEL PACKED WATER WELL

SECTION GRAVEL PACKED WATER WELL SECTION 02520 GRAVEL PACKED WATER WELL PART 1 GENERAL 1.01 SECTION INCLUDES A. Gravel packed water well includes drilling, installing, cleaning, developing, testing, videoing, abandoning, and site clean