Bill of Quantity. Unit Price in words (Nu) Unit Price (Nu) Code Description Unit Quantity. Amount (Nu) CP-AR-
|
|
- Shauna Eaton
- 5 years ago
- Views:
Transcription
1 in RS-AR- 04 RS-AR Access track rehabilitation, to Vegetation clearing as necessary for both the track section to undergo rehabilitation, and track section to be extended/created Earthworks according to TS for creation of track for sections to be extended/created including extension to base of Reldri School landslide. Preparation of suitable track base camber and management of surface water Periodic maintenance during construction site duration Access track surface layer, to Supply, laying, and compaction of 10cm layer of gravelly material along entire track length, for both the track section to undergo rehabilitation, and track section to be extended/created. Thickness refers to compacted thickness. Periodic maintenance of this surface layer during construction site duration as specified in TS Earthworks at Reldri School Road, to All vegetation clearing necessary for earthworks All earthworks and excavations to required elevation levels and using means as described in Technical. Removal of excavated material to deposit area as Surface layer application at Reldri School road, to Supply, laying, and compaction of 10cm thick gravelly layer of material of grade 2/100. Thickness refers to compacted thickness. Excavation earthworks for nailed wall, to Vegetation clearing for vegetation including all trees below 300mm girth as described in the Technical Tree removal for trees above 300mm girth as described Levelling of mounds at top of the landslide Excavations in preparation for wall, carried out using the means Removal of surplus excavated material to deposit as described in Technical Infill using sandbags to create earth platform between profiles 7 and 8, to Infill by earth platform creation using sandbags between profiles 7 and 8 as required m 3 4,800 m² 4,800 m 3 1,100 m² 400 m 3 53,000 m 3 500
2 in Construction of nailed wall, to 08 Supply and installation of wall facing reinforcement in the form of welded wire mesh Supply and installation of formwork including lost formwork where required EW003 0/31 Supply and application of shotcrete for wall facing, including supply and installation of equipment required for shotcreting, accessories such as spacing devices to ensure required steel coverage and width dimensions, and shotcrete provision for compensation terrain-wall layer where required Supply and installation of nail head devices (plate, nuts ) Control tests relating to the construction of the nailed wall, in particular the conformity and control tests on the grout and concrete Borehole drilling and installation of soil nails, to Borehole drilling for wall nails, including supply, installation, and use of drilling equipment and necessary accessories to drilling Supply and installation of wall nail bars of diameter 40mm, including all accessories required (such as spacers, grout socks as described in Technical, all grout ) Control tests relating to the construction of the nailed wall, in particular the conformity and control tests on the soil nails Construction of parapet at top of wall, to All supplies and work relating to the masonry work for the parapet construction at the wall top Construction of sub-horizontal drains, to Borehole drilling for sub-horizontal drains, including supply, installation, and use of drilling equipment and necessary accessories to drilling Supply and installation of pipes in conformity with the Technical Construction of weephole drainage pipes, to Supply and installation of pipes as required for nailed wall, as Excavations for large gabion dams, including: Excavation for foundation of dam using means described in TS m² 1,620 ml 5,250 m ml 590 U 338 m 3 300
3 in Supply of all materials, installation in situ, and filling of AR-12 required volume of principal dam gabions in manner required Supply of all materials, installation in situ, and filling of required volume of thin anti-scour gabions of thickness 0.4m in manner required m 3 1,400 AR-13 EW003 0/31- Backfill for large gabion dams, including: Installation of backfill with compaction to 50% volume as Filling at back of dam at a maximum slope of 7 in conformity with the Technical Excavations for large sandbag dam foundations, to Excavation for foundation of dam using means described in Technical m 3 1,050 m AR-14 Sandbags required for large sandbag dams, filled with sand, to Supply of all materials, filling, and installation in situ of required volume of sandbags for centre of structure in manner required m AR-15 AR-12- Sandbags for large sandbag dams, filled with sand/soil mix, to Supply of all materials, filling with earth/sand mix, and installation in situ of required volume of surface layer sandbags with gunny bags in manner required in the Technical Fill between the sandbags at surface layer as described Gabions of thickness 0.4m for large sandbag dams, to Supply of all materials, installation in situ, and filling of required volume of thin, anti-scour gabions of 0.4m thickness in manner required in the Technical m m AR-13- Backfill for large sandbag dams Installation of backfill with compaction to 50% volume as Filling at back of dam according to slopes described in the Technical m 3 2,300
4 in Sandbags required for small sandbag dams, filled AR-14- with sand, to Preparation of platforms to receive small dams AR-15- Supply of all materials, filling, and installation in situ of required volume of sandbags for centre of structure in manner required Sandbags required for small sandbag dams, filled with sand/soil mix, to Supply of all materials, filling with earth/sand mix, and installation in situ of required volume of surface layer sandbags with gunny bags in manner required in the Technical Fill between the sandbags at surface layer as described m 3 70 m 3 70 AR AR-16 Backfill for small sandbag dams, to Backfill to the dams as described in the Technical Bioengineering, phase 1, on areas of active erosion, to Preparation of the areas to be planted m 3 76 AR-17 sowing seeds and live staking Fencing including the area to be vegetated All seed sowing and planting activities, including supply and installation of geotextile jute mat sowing/planting where necessary. Bioengineering, phase 2, on areas already partially vegetated, to Preparation of the areas to be planted all sowing and planting activities as described in the Technical section All seed sowing and planting activities sowing/planting for each type of planting, where necessary. m² 30,200 m² 84,000
5 in Bioengineering, phase 3, on facing of all sandbag AR-18 dams, to Preparation of the slope to be planted AR-19 sowing seeds and live staking All seed sowing and planting activities, including supply and installation of geotextile jute mat sowing/planting where necessary. Bioengineering, phase 4, in saturated gully beds behind small dams, to Preparation of ground for planting purposes planting seedlings and bamboo culms All planting activites Maintenance work on planting and fencing for a period of one year to include a phase of replacement planting where necessary m² 1,910 m² 800
Bill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No.
Bill 1: Site Preparatory Works Page No. 1/7 Bill 1 Page 1/1 1.1 Construction of access roads to quarry sites LS 1 including their maintenance throughout the working period 1.2 Construction of deviations
More informationContract Identification No. and Package 1. SUHEP-067/68-Lot No.1-AR: Package B 2. SUHEP-067/68-Lot No.1-AR: Package C
Notice of Amendment No.1 Addendum No.1 to the following Contract Packages has been made in the Bids, for which the first date notice was published in the Gorkhapatra daily on December 14, 2010 by Sanjen
More informationEarth Retaining System
Hashemite University Department of Civil Engineering Foundation Engineering Dr. Omar Al-Hattamleh Earth Retaining System Earth slopes and earth retaining structures Used to maintain two different ground
More informationITEM No. D E S C R I P T I O N UNIT QTY. 5-E343.2 In class III material m³ 1,260 - Max. Depth: m For disposal
EARTHWORKS Excavation for foundations 5E343.2 In class III material m³ 1,260 Max. Depth: 0.50 1 m For disposal 5E334.2 In class III material m³ 720 Max. Depth: 1 2 m For disposal Filling Ancillaries 5E723.0
More informationFigure Inlet protection (Source: Minnesota DOT)
3.9 INLET PROTECTION Figure 3.14. Inlet protection (Source: Minnesota DOT) Overview Description: A manufactured protective device or barrier used to trap sediment at a storm drain surface or curb inlet.
More informationSpecial Provision No. 405F03 March 2005
PIPE SUBDRAINS - Item No. VIDEO CAMERA INSPECTION Item No. Special Provision No. 405F03 March 2005 OPSS 405, February 1990, Construction Specification for Pipe Subdrains is deleted in its entirety and
More informationConstruction Inspection Checklists
III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments
More informationSECTION EROSION AND SEDIMENTATION CONTROLS
SECTION 312500 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL REQUIREMENTS which are hereby made
More informationRequirements for Measuring and Pricing of Structural Concrete
Requirements for Measuring and Pricing of Structural Concrete October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing
More informationMethod of Measurement for Road Works Series MM Earthworks
Method of Measurement for Road Works Series MM 600 - CC-RMP-00600 March 2013 CC Construction & Commissioning Standards TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure
More informationSTANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS
TABLE OF CONTENTS 11.01 SCOPE OF WORK... 1 11.02 REFERENCES... 1 11.03 MATERIALS... 2 11.04 GRANULAR & NATIVE BACKFILL... 2 11.05 CONSTRUCTION... 2 11.06 MEASUREMENT FOR PAYMENT... 5 11.07 BASIS OF PAYMENT...
More informationMagnumStone Specifications Gravity
MagnumStone Specifications Gravity SPECIFICATION FOR MAGNUMSTONE GRAVITY MECHANICALLY STABILIZED EARTH SYSTEM PART 1: GENERAL.01Description The work consists of supplying and installing all aspects of
More informationB Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1
PRELIMINARIES 1 All rates to be inclusive of all taxes including V.A.T General Matters A Water for the works item 1 B Insurance against injury to persons, property and works item 1 C Performance Bond 5%
More informationAPPENDIX 5: CONSTRUCTION CHECKLISTS
APPENDIX 5: CONSTRUCTION CHECKLISTS This appendix presents the construction checklists for the various retaining wall mitigation strategies: 10.1 Void Fill 10.2 Surface Bond Overlay 10.3 Reinforced Overlay
More informationTABLE OF CONTENTS. 0 Structural calculations 0.1 General 0.2 Safety concept 0.3 Calculations for waterfront structures
Arbeitsausschuß "Ufereinfassungen" der Hafentechnischen Gesellschaft e.v. Recommendations of the Committee for Waterfront Structures Harbours and Waterways 9., completely revised Edition TABLE OF CONTENTS
More informationFOUNDATIONS. Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1
FOUNDATIONS Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1 Liquefaction reduced the soil strength under these apartment buildings in Niigata (Japan) 1964. Liquefaction
More informationGRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION
CHAPTER 23.105 GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION Sections 23.105.101 General... 1 23.105.102 Definitions... 1 23.105.103 Permits required... 3 23.105.104 Hazards.... 4 23.105.105 Permit
More informationWelded Mesh Gabions and Mattresses River Protection Design Guide Anping County Zhuoda Hardware Mesh Co.,Ltd. Wire Mesh Industrial Zone, Anping
Welded Mesh Gabions and Mattresses River Protection Design Guide Anping County Zhuoda Hardware Mesh Co.,Ltd. Wire Mesh Industrial Zone, Anping County, Hebei, P. R. China. Tel : 0086-318-7752001 7531068
More informationPulaski County, Virginia
Pulaski County, Virginia Typical Retaining Wall Details Based on the 2009 International Residential Code CONTENTS Timber Retaining Wall... 2 General Requirements... 2 Wall Construction... 2 Deadmen...
More informationMECHANICALLY STABILIZED EARTH (MSE) WALL SYSTEMS
DRAINAGE SOLUTIONS SINCE 1908 MECHANICALLY STABILIZED EARTH (MSE) WALL SYSTEMS PERMANENT AND TEMPORARY ENGINEERED WALL SOLUTIONS ECONOMICAL DURABLE VERSATILE ARMTEC.COM MSE RETAINING WALLS Armtec Mechanically
More informationSECTION 2831 ITEM F-162 CHAIN-LINK FENCES
SECTION 2831 ITEM F-162 CHAIN-LINK FENCES PART 1 - GENERAL 1.1 DESCRIPTION. This item shall consist of furnishing and erecting a chain-link fence in accordance with these specifications and the details
More informationGravity Wall. A force to be reckoned with... Gravity (SRW) segmental retaining wall systems are structures
A force to be reckoned with... Gravity (SRW) segmental retaining wall systems are structures lower in height that use the FrogStone unit weight combined with gravel core infill to resist earth pressures
More information8.01. SUB TOTAL 1 1,168, ADD 16% VAT 187, TOTAL 1,356, Total Carried Forward to Form of Tender:
Contract No WARD NAM AINAMOI WARD ROAD NAME 3.30 KM SUMMARY Bill No. Description Amount Preliminary and General Items 1.01 Allow a prime cost sum of Ksh.20,000 for Engineer's miscellaneous account and
More informationHUITEX GEOCELL INSTALLATION MANUAL
Table of Contents 1 Site Preparation 2 Installation for the Retaining Wall 2.1 Base Preparation 2.2 Footing Installation 2.3 Placement of the Drainage System 2.4 Placement of the HUITEX Geocell panels
More informationCONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS
More informationStraw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow
Straw Bale Barrier SE-9 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control
More information378 - POND NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION I. SCOPE
378-1 NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION 378 - POND I. SCOPE The work shall consist of constructing an earthfill embankment and appurtenances to the lines, grades,
More informationfreestone eco Prestige & quality DIY vertical wall Large blocks - 10/m 2 Smooth surface finish No concrete footings
freestone eco Retaining Wall SystemTM The Freestone ECO Retaining Wall System TM is a more sustainable DIY, vertical retaining wall which is manufactured with up to 40% recycled glass aggregate to provide
More informationSpecialty Applications. for Keystone Walls
for Walls SHEET INDEX Title Sheet Sheet 1 Soil Nail Facing Sheet 2 Rock/Shotcrete Facing Sheet 3 Manta Ray Anchor Wall Sheet 4 H-Pile Wall Facing Sheet 5 Sheet Pile Wall Facing Sheet 6 Railing per Site
More information204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)
SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the
More informationCITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS
TEXAS STANDARD CONSTRUCTION NOTES DRWN. BY: DSGN. BY: KJW 1 of 2 *Place geotextile fabric as a permeable seperator to prevent mixing of coarse aggregate and underlying soil. (as needed). 1. GEOTEXTILE
More informationRetaining Walls. Made Easy
Retaining Walls Made Easy Retaining Walls Made Easy! Contents Page 1 Contents Page 2 Foreword Page 3 Demolition Page 3 Removal Vegetation Page 3 Excavation Page 4 Reinforcement Steel Page 6 Concreting
More informationFACING OPTIONS FOR REINFORCED STEEPED SLOPES
FACING OPTIONS FOR REINFORCED STEEPED SLOPES Prepared by: TenCate TM Geosynthetics North America 365 South Holland Drive Pendergrass, GA 30567 Tel 706 693 2226 Fax 706 693 4400 www.tencate.com Revised:
More informationDescription Unit Quantity Rate Kshs. Amount Kshs.
BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove
More informationSECTION SPECIFICATION FOR MECHANICALLY STABILIZED EARTH TWO STAGE WALL SYSTEM
SECTION 02830 SPECIFICATION FOR MECHANICALLY STABILIZED EARTH TWO STAGE WALL SYSTEM ## THIS SECTION IS WRITTEN IN CSI 3-PART FORMAT AND IN CSI PAGE FORMAT. NOTES TO THE SPECIFIER, SUCH AS THIS, ARE INDICATED
More information2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1
2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment
More informationGuide on Risk Mitigation Works
Guide on Risk Mitigation Works Draft Version 1.0 22 February 2018 Guide on Risk Mitigation Works v1.0 Shelter & Site Improvements Technical Working Group SHELTER/NFI SECTOR COX S BAZAR SITE MANAGEMENT
More informationJericho Agro Industrial Park
Bill. 1 Excavation Earth Works and Embankment Work 1 Description Unit QTY Price/ Unit Total USD The Contractor shall when pricing the rates of this bill, take into consideration including and allow for
More informationStraw Bale Barrier. Parallel to a roadway to keep sediment off paved areas
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
More informationStone and Masonry Veneer
Stone and Masonry Veneer R703.7 Stone and masonry veneer, general. Stone and masonry veneer shall be installed in accordance with this chapter, Table R703.4 and Figure R703.7. These veneers installed over
More informationA.2.a Random Riprap... Table
3601 RIPRAP MATERIAL 3601.1 SCOPE Provide stone and filter layer material for use in random or hand-placed riprap, gabion, and revet mattress construction. 3601.2 REQUIREMENTS A Stones A.1 Quality Provide
More informationTION GUIDE ALLA T INS
INSTALLATION GUIDE TENSAR GEOGRIDS Easier installation makes the Sierra Slope Retention System a more affordable alternative to conventional retaining walls. The Sierra System owes its strength and durability
More informationMethod of Measurement for Road Works Series MM Structural Concrete
Method of Measurement for Road Works Series MM 1700 - CC-RMP-01700 December 2013 CC Construction & Commissioning Standards TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure
More informationEROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.
EROSION CONTROL GENERAL NOTES EC - 000 EROSION CONTROL GENERAL NOTES EC - 001 INSTALL TEMPORARY DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT EXISTING PAVEMENT OR APPROVED ACCESS POINT OR AS PRACTICABLE
More informationInstallation Guidelines
815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Guidelines Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles (optional),
More informationA complex reinforced structure applied at hilly road repair case in Taiwan
A complex reinforced structure applied at hilly road repair case in Taiwan Introduction In the filed of geotechnical engineering, frequently soil nailing is applied to the application of the shallow-depth
More informationCAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES
CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES INCLUDING KERB & GUTTER (CHANNEL) C224 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C224 ISSUE: NO:1 October 2007 TABLE OF CONTENTS
More informationFREESTONE ECOTM. Retaining Wall SystemTM. No one knows Blocks and Pavers better
FREESTONE ECOTM Retaining Wall SystemTM The Freestone ECO Retaining Wall System TM is a more sustainable DIY, vertical retaining wall which is manufactured with up to 40% recycled glass aggregate to provide
More informationTopic: Site Formation
Topic: Site Formation Presentation prepared by Raymond Wong February 2006 Purpose of site formation is to prepare a piece of land in order to: Accommodate building/s or other facilities which will be placed
More informationWATER QUALITY. Our Focus Today. Erosion Control Technologies & Solutions. What is Soil Erosion. Federal Regulations
Erosion Control Technologies & Solutions Our Focus Today What is Erosion? Why should we care? Regulations controlling site development and water quality What can we do? Conventional Erosion Control Solutions
More informationA Complete Retaining Wall Solution >
SYSTEM OVERVIEW Tensar Geogrids SierraScape Walls now offer a more affordable alternative to concrete for steep grade changes. The SierraScape System owes its strength and durability to Uniaxial (UX) Geogrids,
More informationSpecialising in Ground Engineering & Slope Stabilisation
Specialising in Ground Engineering & Slope Stabilisation Ground Engineering & Slope Stabilisation for the Road, Rail, Construction & Mining Industries Company Profile Warner Company is proudly an Australian
More information204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES
SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the
More informationTips with Creation of your Erosion and Sediment Control Plan
Tips with Creation of your Erosion and Sediment Control Plan By Chris Droste, CESCO Senior Erosion Control Specialist Westmoreland Conservation District Forming Your Narrative Use the DEP checklist. Page
More informationDesign and Installation Guidelines for Retaining Walls. 1 P age. Geo Products, LLC 8615 Golden Spike Lane Houston, TX Phone:
Design and Installation Guidelines for Retaining Walls 1 P age Geo Products, LLC 8615 Golden Spike Lane Houston, TX 77086 Phone: 281.820.5493 2011 Geo Products, Fax: 281.820.5499 LLC www.geoproducts.org
More informationADDRESS: 122 LIPSCOMBE ROAD, DECEPTION BAY, QLD,
WWW.TUFFOZYCONCRETESLEEPERS.COM.AU ADDRESS: 122 LIPSCOMBE ROAD, DECEPTION BAY, QLD, 4508 EMAIL: SALESTUFFOZYCONCRETESLEEPERS@HOTMAIL.COM PHONE: 0405233099 1.0 INTRODUCTION 1 2.0 DESIGN ASSUMPTIONS 1 2.1
More informationIndex to Technical Specifications
Index to Technical Specifications Item Number Subject I II EXCAVATION 1.01 Trenching and Excavation Regulations 1.02 Site Grading or General Excavation 1.03 Structural Excavation 1.04 Trench Excavation
More informationSECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More information17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS
17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS 17.1 Description The work covered by this section of the specifications consists of furnishing all labor, the construction and installation of open storm drain
More informationSECTION EROSION CONTROLS
SECTION 31 25 13 EROSION CONTROLS PART 1 GENERAL 1.1 SUMMARY A. Section Includes installing, maintaining and removing: 1. Silt Fence. 2. Temporary Construction Entrances. 3. Diversion Channels. 4. Sediment
More informationGEOTECHNICAL ENGINEERING ECG 503 LECTURE NOTE 05 TOPIC : 2.0 SLOPE RISK ENGINEERING
GEOTECHNICAL ENGINEERING ECG 503 LECTURE NOTE 05 TOPIC : 2.0 SLOPE RISK ENGINEERING 07 AUGUST 2008 TOPIC TO BE COVERED Slope protections and improvements Slope face protection methods, turfing and drainage
More informationTITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY
D DEMOLITION & SITE CLEARANCE D1 GENERAL CLEARANCE 6-D152 Open bush and thicket in and around ha 0.02 the ponds. Locally disposed. D2 REMOVAL OF TREES AND STUMPS 6-D212 Trees of girth: 150 mm - 500 mm
More informationLM2-18 Site Photos Laura Creek
LM2-18 Site Photos Laura Creek View of Laura Creek culvert and embankment looking North-Northeast LM2-18 Site Photos Laura Creek 6 high Gabion wall View of road along canal looking upstream towards Laura
More informationCONSTRUCTION SPECIFICATION FOR TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 577 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES TABLE OF CONTENTS 577.01 SCOPE 577.02 REFERENCES 577.03
More informationCONTRACT NO. : MTK11/2017 REHABILITATION OF MSAULI ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL
SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY & GENERAL 1.1 1200A FIXED CHARGE AND VALUE RELATED ITEMS 8.3.1 CONTRACTUAL REQUIREMENTS 1.1.1 Surety or bank guarantee Sum 1 1.1.2 Common Law Liability
More informationAppendix B.2. Construction Specifications for Infiltration Practices
Appendix B.2 Construction Specifications for Infiltration Practices B.2.A Infiltration Trench General Notes and Specifications An infiltration trench may not receive run-off until the entire contributing
More informationConstruction works for Establishment of School in Al-Najaf M 2 2,600 M 2 750
1 Preparation of a 18-Classroom School BoQ for constructing a 18-Classroom School - Najaf Site Preparation:Works for leveling the site and remove the garbage to authorized location according to supervisor
More informationStatement of Special Inspection Requirements
Statement of Special Inspection Requirements California Building Code Chapter 17 Construction plans shall include a statement of special inspection in accordance with CBC chapter 17. The statement of special
More informationINSTALLATION GUIDE SLABS
INSTALLATION OUTLINE techo-bloc.com 01 EXCAVATION A. Before excavating, call all the local utility companies (e.g., phone, gas, electrical) to ensure that the area in which you plan to dig is clear of
More information5-20 FOUNDATION REPORT/GEOTECHNICAL DESIGN
5-20 FOUNDATION REPORT/GEOTECHNICAL DESIGN REPORT CHECKLIST FOR EARTH RETAINING SYSTEMS Introduction This checklist was developed to assist the geotechnical project professionals in preparing the Foundation
More informationa. Unless otherwise specified, all lengths shall be horizontal distances.
SECTION 01025 PART 1- GENERAL 1.01 DESCRIPTION A. This section describes the method used to determine quantities of Work performed or materials supplied for which a price is given in the Bid. It establishes
More informationScanned by CamScanner
JODHPUR MUNICIPAL CORPORATION G-SCHDULE NIT No. Date Sr No. Last Date of Sale :- Earnest Money : Rs... Date of Receipt :- CR No. Dated.. Copy issued to M/s STORM WATER DRAINAGE MASTER PLAN FOR THE CITY
More informationLyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual
Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This
More informationSPECIFICATION FOR REINFORCED SOIL WALL
SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details
More informationreinforced besser block retaining walls
reinforced besser block retaining walls Preface The designs shown in the brochure are based on limit state design in accordance with the provisions of AS4678-2002 Earth retaining structures standard including
More information1.02 RELATED WORK: Refer to the following sections for related work:
SECTION 4200 - CONCRETE STRUCTURES PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of header curb, retaining walls, energy dissipation structures for drainage channels, reinforced concrete
More informationCITY OF ORANGE PUBLIC WORKS DEPARTMENT GRADING FIELD INSPECTION REQUIREMENTS
REQUIRED INSPECTIONS FOR GRADING CITY OF ORANGE PUBLIC WORKS DEPARTMENT GRADING FIELD INSPECTION REQUIREMENTS The following is a list of normally required inspection to be made by the City Inspector: A.
More information1. Remove worn-out old plaster (or any other finishing).
Annexure A SCOPE OF WORK The work should be implemented by contractor under the supervision of Norwegian Refugee Co BoQ s and below instructions. NRC reserves the right to provide further clarifications/drawings
More informationCITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition
CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION PURPOSE, INTENT AND INTERPRETATION OF SPECIFICATIONS The purpose of these Specifications is to establish, where applicable, minimum acceptable standards
More informationThe design of soil nailed structures to AS4678
The design of soil nailed structures to AS4678 Chris Bridges Technical Principal - Geotechnics chris.bridges@smec.com 7 December 2016 1 Presentation Layout Introduction Soil Nailing in AS4678 Design Process
More informationNorth Umpqua Hydroelectric Project (FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form
(FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form Site # CW2-3 Priority Ranking Med Locator Information/GPS Lat: Long: Impact Rating 3 Start Project Development: Clearwater 2 Risk Rating
More informationConstruction works for Establishment of School in Al-Latifiyah. Al-Latifiyah BoQ for constructing a 6-pre-fab Classroom School
1 Al-Latifiyah BoQ for constructing a 6-pre-fab Classroom School Preparation of a 6-Classroom School Site Preparation:Works for leveling the site and remove the garbage to authorized location according
More informationBELMURO WALL SYSTEM INSTALLATION GUIDE
BELMURO WALL SYSTEM INSTALLATION GUIDE TABLE OF CONTENTS TABLE OF CONTENTS... 1 SYSTEM DESCRIPTION... 2 DRY STACK SYSTEM: INSTALLATION GUIDE... 5 GEOGRID WALL SYSTEM: INSTALLATION GUIDE... 9 MASONRY WALL
More informationCLEARING & GRADING GENERAL NOTES CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS SHEETNUMBER BCP PROJECT NO.: DATE: 11/1/18
L:\Engineer\Standard Details and Technical Specifications\Standard Details\201\DRAINAGE & ENV\DRAINAGE AND ENVIRONMENTAL DETAILS 11.01.201.dwg I N COR P ORA T E D TEXAS DRWN. BY: CLEARING & GRADING GENERAL
More informationCONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8, Classic 6 and Legend unit segmental
More informationProperly constructing and maintaining a road drainage system is the most effective ways to reduce flood damage
Mitigating Flood Damage to Vermont Local Roads Properly constructing and maintaining a road drainage system is the most effective ways to reduce flood damage Vermont Emergency Management Vermont Local
More informationBASED ON DFD MASTER SPECIFICATION DATED 2/24/2014
1 0 1 0 1 0 1 SECTION 1. TRENCHING BASED ON DFD MASTER SPECIFICATION DATED // P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all work, materials, labor, equipment,
More informationCONSTRUCTION SPECIFICATION
CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES GENERAL C220 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C220 ISSUE: NO:3 July 2018 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL...
More informationCONSTRUCTION SPECIFICATION FOR TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 805 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES TABLE OF CONTENTS 805.01 SCOPE 805.02 REFERENCES 805.03
More informationC231 Subsoil and Foundation Drains
CONSTRUCTION SPECIFICATION FOR DEVELOPMENTS AND SUBDIVISIONS C231 Subsoil and Foundation Drains Tamworth Regional Council Page :1 TABLE OF CONTENTS CLAUSE CONTENTS PAGE ORIGIN OF DOCUMENT, COPYRIGHT...
More informationFence Stone. Self locating Wall System
Fence Stone Self locating Wall System Between wall panels End of walls at gate openings etc Internal & external right angles Do it yourself No bricklaying skills required Attractive & efficient For fences
More informationCAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES PRECAST BOX CULVERTS CONSTRUCTION SPECIFICATION
CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C222 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C222 ISSUE: NO:3 July 2018 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL... 2 C222.01
More informationF500 Steeplechase Waterjump with Valve Option
Gill Athletics www.gillathletics.com Phone: (800) 367-3090 Fax: (217) 367-8440 Excavation F500 Steeplechase Waterjump with Valve Option Installation Guide Read all instructions before installing!!! Establish
More informationCity of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING
January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01
More informationWORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00
Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type
More informationAN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR
AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: EPI/WRO/CON/757/0119 FOR Construction of Boundary Wall and allied works for DHH & MCH Hospital at Kendrapara at Odisha state VOLUME III PRICE BID
More informationq Item meets standard Project ID: X Item not acceptable Contractor: N/A Item not applicable Inspector: C Item requires engineer s cert.
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION q Item meets
More information