TENDER DOCUMENT. The cover page contains information about the contract and the ratings that are required in order to bid on the project.
|
|
- Dinah Griffin
- 5 years ago
- Views:
Transcription
1 TENDER DOCUMENT 1.0 Introduction The contains the contract provisions. It is generated by the Designer from CPS and contains the design documents that have been prepared, added, and modified by the Designer. The consists of: Tender Cover Page Tender Item List Instructions to Bidders Conflict of Interest Declaration Schedule of Provisions, Contract Plans, Standard Drawings, Specifications, & General Conditions Tax Compliance Declaration Section A: Special Provisions Section B: Fair Wage Program Special Provision Section C: Liquidated Damages Special Provision The Designer must perform a comprehensive check of the document as well as additional editing and formatting in order to produce a final copy suitable for tendering purposes. 2.0 Cover Page The cover page contains information about the contract and the ratings that are required in order to bid on the project. August 2017 (UNDER REVIEW) Page 1 of 24 CDED G-500
2 a) Tender Closing Date and Time The tender closing date and time must be added directly to the cover page, after the is generated from CPS. The date and time is added by the Contract Tendering Section prior to tendering the project. b) Contract Information and Location Specific information about the contract such as its location, the type of improvement, the Hwy number, length, region, etc., is entered by the Designer in CPS using the Proposed Work tab under Form of Tender. The relevant information is automatically transferred to the corresponding fields of the cover page when the is generated from CPS. Note the contract information and location entered on this screen must match the signed key plan in the contract drawings. c) Qualified Versus Designated Contracts The statement for qualified contracts appears by default on the cover page of the generated from CPS. It does not require any further editing or action by the Designer for qualified contracts. August 2017 (UNDER REVIEW) Page 2 of 24 CDED G-500
3 For designated contracts the Designer must manually edit the statement on the cover page of the after it is generated from CPS, as shown below. Designers can obtain further information about Qualified and Designated Contracts from the Qualification Control Section (QCS) and the Contract Tendering Section (CTS). Bonds/bonding is used to: ensure that bidders are serious and will execute a contract, that a contract will be completed should a contractor default, and that payment will be made to those who are not a direct party to the contract. In lieu of the use of bonds, a Qualification System can be used to ensure that a Contractor has the financial resources and skills to perform the Work. Under MTOs Qualification System contractors must be pre-qualified and rated in order to bid on a Qualified Contract. Rated Contractors may also bid on a Designated Contract by using their available Financial Rating or by providing bonds or security. Non-rated contractors can only bid on Designated Contracts and must provide performance bonds, payment bonds, or other forms of security. The s must specify whether a contract is Qualified or Designated. In general, non-highway contracts such as those for equipment, material supply, facilities, and demolition are tendered regionally and highway construction contracts for expansion, reconstruction, structures, intersection improvements, electrical work, and ATMS are tendered by the Provincial Office, Contract Tendering Section (CTS), based in part on their value and complexity. Projects less than $1 million are usually designated and tendered regionally. Projects less than $3 million and/or 15 Tender Items are usually designated and tendered regionally but may also be qualified and tendered by CTS via RAQS/MERX. Projects over $3 million and/or 15 items are Qualified and tendered by CTS via RAQS/MERX. August 2017 (UNDER REVIEW) Page 3 of 24 CDED G-500
4 d) Classification and Ratings In order to bid on a Qualified Contract a Contractor must first be rated. A Contractor is rated based on their financial strength and their ability to do satisfactory work in various classifications. On an annual basis rated contractors are granted a: Basic Financial Rating based on their financial strength and technical ability, and a Maximum Workload Rating based on their 5 year work history for the Ministry. In order for a rated contractor to bid on a contract, their ratings must equal or exceed the ratings placed on a contract in the classification(s) of work assigned. Contractors are rated in the following classifications of work: GR General Road Contract Grading, Drainage, Granular Base, Hot Mix Paving, Concrete Paving S Structure Contract All Structure work E Electrical Contract High Mast Lighting, Advanced Traffic Management System (ATMS) SC Structural Coating Contract Structure Coating GM General Maintenance Contract Area Maintenance Contracts, Noise Barrier Wall, fencing, Landscaping The Designer must assess the type and value of work to be completed, in order to assign appropriate ratings. For projects that will be completed in a single year the Financial Rating will be the same as the Maximum Workload Rating however for multi-year projects the Financial Rating will be based on the highest value of total work expected to be completed in any given year. Categories GR and S may both be assigned to a contract however categories GM, E, and SC are normally stand-alone categories. In determining whether a Contract can be assigned both a GR and an S classification the Designer must take into consideration that, as per the MTO General Conditions of Contract, a contractor can subcontract no more than 60% of the total tender value, therefore: If the value of work in either the GR or S classification is greater than 60% of the total value, then the contract is rated only in the classification that is over 60%. August 2017 (UNDER REVIEW) Page 4 of 24 CDED G-500
5 If the value of work in both the GR and S classifications are both less than 60% of the total value, then the contract is rated in both classifications. Example 1 Grading, Drainage, Granular Base, Paving, Structural, and Electrical Projects: Category Year 1 Year 2 Year 3 Year 4 Year 5 Total % Value GR 2,000,000 1,000,000 1,000, ,000, % S 1,000,000 4,000, ,000, % E 100, , ,000, % SC GM Total 3,100,000 5,900,000 1,000, ,000, % Note: If the % Value of any given category is 60% or greater then only that category applies. The categories and ratings that would be assigned are: NECESSARY AVAILABLE FINANCIAL RATING IS $6,000,000 IN (GR) or (S) NECESSARY AVAILABLE MAXIMUM WORKLOAD RATING IS $10,000,000 Example 2 Grading, Drainage, Granular Base, Paving, Structural, and Electrical Projects: Category Year 1 Year 2 Year 3 Year 4 Year 5 Total % Value GR 1,000,000 1,000,000 1,000, ,000, % S 1,500,000 6,000,000 3,000, ,500, % E 500, , , ,500, % SC GM Total 3,000,000 7,800,000 4,200, ,000, % Note: If the % Value of any given category is 60% or greater then only that category applies. The category and ratings that would be assigned are: NECESSARY AVAILABLE FINANCIAL RATING IS $8,000,000 IN (S) NECESSARY AVAILABLE MAXIMUM WORKLOAD RATING IS $15,000,000 Ratings of less than $5 million are to be rounded up the nearest $500 thousand, and ratings over $5 million are to be rounded up to the nearest $1 million. August 2017 (UNDER REVIEW) Page 5 of 24 CDED G-500
6 The ratings and classification of work must be added directly to the cover page, after the is generated from CPS. For projects advertised by CTS, this information is added by the CTS prior to tendering the project. Designers can obtain further information about classification and ratings from QCS and CTS. 3.0 Table of Contents The table of contents lists the titles of the sections and documents that are included, and is organized in the order in which the sections appear in the document. The Designer must refresh the table of contents after the is generated from CPS. To refresh the table, right click anywhere on the table then select Update Field. This must be repeated after any subsequent edits are made to the. August 2017 (UNDER REVIEW) Page 6 of 24 CDED G-500
7 4.0 Tender Item List The Tender Item List indicates the Tender Item numbers description of the Tender Items, the specification code governing the Tender Items, whether there are one or more Special Provisions against an item, the units of measure, whether an item is a Plan Quantity Payment (PQP) item, and the item quantities. This section of the does not usually require any further editing or action by the Designer however due to limitations of the CPS program, incorrect quantities may sometimes be found in the list, therefore the Designer shall manually verify the Tender Item quantities in the Tender Item List against the Tender Item quantities in the Quantity Sheets before submission of the final documents for tendering. 5.0 Instructions to Bidders The instructions to bidders, details the bidding procedures and requirements of an acceptable tender submission. This section includes: definitions, compliance with instructions, and enquiries during the tender period, joint ventures, electronic bid submission procedures, computer system failure, unbalanced tenders and discrepancies, qualification, bonding, and security requirements, acceptance and rejection of tenders, and contract award procedures. August 2017 (UNDER REVIEW) Page 7 of 24 CDED G-500
8 This section of the does not require any further editing or action by the Designer. Changes to this section shall be made only by CTS. 6.0 Conflict of Interest Declaration This section states the Ontario government s conflict of interest policy and associated submission requirements. The Contractor must complete and submit, as part of the ation, either Part 1(a) or Part 1(b) of the conflict of interest forms, the table for persons who participated in the preparation of the Tender, and the table for former OPS employees. This section of the does not require any further editing or action by the Designer. Changes to this section shall be made only by CTS. August 2017 (UNDER REVIEW) Page 8 of 24 CDED G-500
9 August 2017 (UNDER REVIEW) Page 9 of 24 CDED G-500
10 7.0 Schedule of Provisions, Plans, Drawings, Specifications, and GCs The schedule lists the applicable version numbers and dates of Special Provisions, drawings, and specifications, and general conditions applicable to the contract. The Schedule is organized into sections A through H as follows: A. Special Provisions B. Plans C. Standard Drawings D. General Special Provisions E. Item Specific Special Provisions F. Standard Specifications G. Referenced Standard Specifications H. General Conditions The schedule lists the applicable version of the MTO General Conditions of Contract (GCs) which are issued as Ontario Provincial Standard Specification OPSS.PROV 100 and are therefore also listed in sections F and G of the schedule. The GCs include information related to substantial performance, liens, reliance on contract documents, order of precedence, administration of the contract, delays, extensions of time, changes in the work, additional work, change proposals, clarifications and claims, owner s rights and responsibilities, materials, insurance, protection and damage, Contractor s responsibilities and control of the work, and measurement and payment. This section of the does not require any further editing or action by the Designer however the contents should be reviewed for errors and inconsistencies before submission of final documents for tendering. August 2017 (UNDER REVIEW) Page 10 of 24 CDED G-500
11 8.0 Signed Statement and Tax Compliance Declaration This section of the is automatically included and contains the signed statement by bidder and the Ontario government policy regarding the tenderer s provincial tax standing. The bidder must complete and submit this declaration with their tender to indicate that their provincial taxes have been paid, or that arrangements have been to pay any outstanding balance. This section of the does not require any further editing or action by the Designer. Note: This section of the will be revised to account for recent changes to the tax compliance requirements. August 2017 (UNDER REVIEW) Page 11 of 24 CDED G-500
12 9.0 Section A: Special Provisions Special Provisions are special directions within the Contract Documents containing requirements particular to the Work. Additional information about Special Provisions can be found in Chapters A and E of this manual. The Special Provisions that are included in Section A of the are: General NSSPs (e.g. Notices to Contractor and Operational Constraints) Item Specific NSSPs General SSPs (100 Series) Item-Specific SSPs (200 to 900 Series) Schedule of Materials to Be Supplied By the Owner The Designer shall ensure that all documents imported into CPS are formatted according to Formatting Guidelines outlined in Chapter E. Improperly formatted documents often print and view without any apparent issues from directly within the project file in CPS however when the is produced, auto-numbered items may no longer be numbered correctly, paragraph and text alignments may be lost, hidden edits may appear if the track changes function was not disabled in the source document, and CPS will crash and fail to generate the full if source documents contain section breaks. August 2017 (UNDER REVIEW) Page 12 of 24 CDED G-500
13 This section of the normally requires further editing by the Designer to address formatting issues which may not be readily apparent in the source documents however under no circumstances shall the content of SSPs or NSSPs be added or revised in the final. If changes to the content of an SSP or NSSP are required after generation of the the Designer must edit the documents directly in CPS and re-generate a new Tender Document. 9.1 Non-Standard Special Provisions (NSSPs) NSSPs may be written locally by the design team to address specific design issues or may be imported from the regional and head office copies housed in CPS. Due to a deficiency in CPS the Designer shall remove the warrants and notes to designer from all NSSPs in the. a) General NSSPs General NSSPs such as Notices to Contractor (NTCs) and Operational Constraints (OCs) contain information about constraints and restrictions within the contract that could affect the normal progress of the work and result in an increase in the cost of the contract. Additional information about NSSPs can be found in Chapter E of this manual. General NSSPs are printed in full in the that is produced from CPS. They are printed in the order that they appear in CPS therefore the Designer must organize them before producing the from CPS. To do this the Designer must select an NSSP by left clicking the mouse then dragging and dropping it to the desired location within the list. The types of general NSSPs that may be required, and the order that they must appear in the, when required, are as follows: August 2017 (UNDER REVIEW) Page 13 of 24 CDED G-500
14 Notices to Contractor Operational Constraints Operational Constraints (Electrical) Operational Constraints (Environmental) Weighing of Materials - Job Specific Bidding Procedures - New MTO Policy - Attendance to Pre-Bid Meetings - Interim Completion Dates - Incentives/Disincentives - Timing Constraints - Work Around Railways - Night Work - Maintenance of Illumination - Co-ordination of Work - Access/Egress to Work - Maintenance of Existing Drainage - Scheduling of Milling/Paving Operations - Working On or Around Structures - Lane Closures - Hot Mix Paving Restrictions - Blasting Restrictions - Protection of Highways/Other Roads - Temporary Relocation of Signs - Contract Staging - Seasonal Shutdown - Winter Work - Specialized Work Requirements - Relocation/Maintenance of Various Facilities Within the Contract Limits - Work Around/Protecting Existing Utilities (e.g. Hydro, Gas, Bell) - Delivery of Special Material - Other Contractors/Agencies Working Within or Adjacent to the Contract - Staging Requirements - Work Around Utilities - Fishery/Watercourse Protection - Migratory Bird Protection - Protected Animals/Vegetation - Areas for Used Management of Excess Material - Waterways - Erosion and Sediment Control - In-Stream Work - Management of Effluent from Concrete Cutting/Grinding - Control of Emissions During Abrasive Blast Cleaning August 2017 (UNDER REVIEW) Page 14 of 24 CDED G-500
15 b) Item Specific NSSPs Unlike standard SSPs, item specific NSSPs are not automatically attached/linked to Tender Items in CPS. They are added independently of their associated items and must be linked manually by the Designer in the CPS Work Project. An NSSP may be linked to both standard and non-standard Tender Items. To link an NSSP to a Tender Item, select the NSSP, then detail, and then new, on the items reference tab. When editing the content of item specific NSSPs Designers should note that item numbers are not to be added manually to the headings of the actual NSSPs. The item titles and numbers that are printed in the heading of the NSSP in the produced from CPS are based on the items that are attached/linked to the NSSP, therefore the Designer must ensure that all item specific NSSPs are attached/linked to the appropriate items before producing the. The content of item specific NSSPs is printed in full in the produced from CPS and they appear in the numerical order of the item(s) to which they are attached. Example - Item Specific NSSP Not Attached/Linked to Any Tender Items If the Designer fails to attach/link the NSSP to the appropriate Tender Item(s) in CPS the item number(s) will be missing from the NSSP that is printed out in the produced from CPS. There will also be no indication of an SP having been applied to the item(s) on the Tender Item list. August 2017 (UNDER REVIEW) Page 15 of 24 CDED G-500
16 Item titles and numbers are not to be manually revised in the NSSPs themselves however if this is done, and the NSSP is not attached to a Tender Item, then the information from the NSSP will appear in the that is generated. Example - Item Specific NSSP Attached/Linked to Appropriate Tender Item Linking the NSSP to the correct Tender Item ensures that the correct item title and number are printed in the produced from CPS. It also ensures that the Tender Item is flagged in the Tender Item list as having an SP applied against it. August 2017 (UNDER REVIEW) Page 16 of 24 CDED G-500
17 9.2 Standard Special Provisions (SSPs) All SSPs are listed in the schedule of the that is produced from CPS and only the content of modified or fill-in SSPs is printed in full in the Tender Document. The warrants and notes to designer are automatically removed from all the SSPs that are printed in the. a) General SSPs (100 Series) General SSPs are not attached/linked to Tender Items. When modified and/or filled-in they will be printed in full in the and will appear in numerical order. When a GRAD file is created in CPS all of the 100 series SSPs are automatically added to the CPS file and the Designer must manually delete any that do not apply. Designers should note that SSPs with a warrant of all contracts are to remain in all contracts including ones to which they appear to not be applicable. This includes stand-alone projects for ATMS, electrical, structural, etc. For convenience Designers may choose to create a GRAD file for use with standalone projects in order to facilitate the process of adding the general SSPs. Otherwise the applicable general SSPs must be added manually to all standalone projects or combined projects that do not contain a grading component. b) Item Specific SSPs (200 to 900 Series) Item specific SSPs are attached/linked to their relevant Tender Items in CPS and are brought into the CPS file automatically upon insertion of the standard Tender Items to which they are attached however Designers shall still perform a thorough check to ensure that all documents and Tender Items are appropriately attached/linked. When modified and/or filled-in they will be printed in full in the and will appear in the numerical order of the items to which they are attached. August 2017 (UNDER REVIEW) Page 17 of 24 CDED G-500
18 c) Fill-In SSPs When general and item specific SSPs are coded with an F (e.g. 100F06) it means that additional fill-in information must be added. To fill-in an SSP the Designer must first export it, add the appropriate information, and then import the completed copy back into CPS. Upon importing the filled-in copy of the SSP the Designer must toggle the Filled box in CPS. An F will then appear in the M/F status column. All fill-in SSPs in a project file must be filled-in before the Designer can generate the from CPS, failure to do so, will result in an error message upon attempting to generate the. August 2017 (UNDER REVIEW) Page 18 of 24 CDED G-500
19 d) Modified SSPs Both general and item specific SSPs may be modified. To modify an SSP the Designer must first export it, revise the appropriate information, then import the completed copy back into CPS. Upon importing the modified copy of the SSP the Designer must toggle the Modified box in CPS, and an M will then appear in the M/F column. Failure to toggle the Modified box in CPS, when necessary, will result in a discrepancy between the schedule and the content of the that is produced by CPS. Example: Failure to Toggle Modified Button When Necessary Example: Modified Button Toggled When Necessary When modifying an SSP the Designer shall add an M to the right of the SSP number in the title block of the Special Provision. The Designer may also add a tracking date in brackets to the right of the SSP number in the title block, however, under no circumstances is the date of the SSP be revised (e.g. September 2011 as shown below). It must remain the same as the currently active version of the SSP otherwise there will be a discrepancy between the schedule. August 2017 (UNDER REVIEW) Page 19 of 24 CDED G-500
20 9.3 Schedule of Materials to be Supplied by the Owner This is covered in Chapter G, Section G Section B: Fair Wage Program (FWP) This section of the outlines the minimum fair wage payable by a Contractor to their employees on a MTO road construction project. The wage amounts are shown in a table based on the classification of the work. The minimum wages will vary depending on where the road construction project is located within the province. Also covered are the hours of work, wages and overtime pay, certification of wage rates, the Contractors' obligations with respect to subcontractors, the employees claims procedures, and the owner s right to holdback to settle employee claims. The Ministry of Labour governs the Fair Wage Program and MTO is mandated by Cabinet order to include the appropriate Fair Wage Schedule in our contracts. The FWP applies to road building projects where the contract value is $160,000 or over. The Designer must toggle the appropriate Fair Wages Schedule SP to be included in the Contract based on the location of the contract using the map provided below. The selected document will be included in the and does not require any further editing or action by the Designer. [Boundary map will be inserted here at a later date.] August 2017 (UNDER REVIEW) Page 20 of 24 CDED G-500
21 11.0 Section C: Liquidated Damages In this section the Contractor is given the requirements regarding time, progress of the work and time for completion, and liquidated damages. The time for completion will be specified through the use of either the Fixed Completion Date Special Provision, or the Working Days Special Provision. Upon generating the Tender Document in CPS, the Designer will be prompted to select the appropriate SP for inclusion in the. Additional information on calculating working days, determining free time, determining start and finish dates, and converting working days to a fixed completion date, can be obtained from Determining Contract Working Time and Production Rates manuals issued by Contract Management Office, Estimating Section. Copies of these manuals are available from the PMBP website at a) Working Days and Charges (Formerly SSP 100F09) Upon generating the in CPS for a working days contract the Designer must toggle the selection for working days under liquidated damages which will activate the fields for entry of additional information. Start Date - The Designer can obtain this information from the Contract Review Officer in consultation with the Contract Tendering Section. Number of Days - The Designer must enter the number of working days. August 2017 (UNDER REVIEW) Page 21 of 24 CDED G-500
22 Free Period Start and End Dates - The Designer must enter appropriate dates based on the following: Contract Type Structural Steel Coating Contracts All Other Contracts Free Period Start Nearest Monday To: Free Period End Nearest Sunday To: Region October 15 May 1 West, Central, Eastern September 30 May 15 North, Northwest December 1 May 15 West, Central, Eastern November 17 May 31 North, Northwest These free times are to be included whether or not winter carry-over is anticipated at the time of Contract tendering. If no free time is allowed, the word NIL would be used in the allotted space. Penalty Amount/Liquidated Damages - The Designer shall enter the. The information entered on this screen will populate the appropriate fields of the Special Provision that is included in the that is generated by CPS. The resultant Special Provision requires further editing by the Designer. Example - Working Days and Charges Information as entered in CPS and the resultant Special Provision as it appears in the generated by CPS. August 2017 (UNDER REVIEW) Page 22 of 24 CDED G-500
23 The working days Special Provision originally contained notes to designer regarding the entry of information and the optional use of paragraph e), however the SSP was cancelled and replaced by a hard-coded version built into CPS. By default paragraph e) is now included however it is only required on contracts with hot mix paving in the fall therefore the Designer may delete it from the, if it is not required. Regardless of whether paragraph e) is included, the word OPTION ** shall be deleted before submission of the for tendering. b) Fixed Completion Date and Charges (Formerly SSP 100F10) Upon generating the in CPS for a fixed completion date contract the Designer must toggle the selection for fixed completion date under liquidated damages which will activate fields for the entry of additional information. August 2017 (UNDER REVIEW) Page 23 of 24 CDED G-500
24 The Designer can obtain the information for the Completion Date and Penalty Amounts, from the Project Manager. The Completion Date entered is typically a Friday. The information entered on this screen will be automatically transferred to the appropriate fields of the Special Provision that is included in the Tender Document that is generated from CPS. The SP does not require any further editing or action by the Designer. Example - Fixed Completion Date and Charges Information as entered in CPS and the resultant Special Provision as it appears in the generated by CPS. August 2017 (UNDER REVIEW) Page 24 of 24 CDED G-500
E1.0 SPECIAL PROVISIONS Reference Documents. The following documents are referenced in this chapter and can be found at the location specified.
E1.0 SPECIAL PROVISIONS 1.0.1 Reference Documents The following documents are referenced in this chapter and can be found at the location specified. Document Title Location of Document OPSS.PROV 100, MTO
More informationNON-STANDARD DOCUMENTATION
NON-STANDARD DOCUMENTATION 1.0 Introduction Non-standard documentation consists of non-standard tender items (NSTIs), nonstandard special provisions (NSSPs), modified standard special provisions (SSPs),
More informationCONTRACT DESIGN, ESTIMATING AND DOCUMENTATION (CDED) VOLUME 2A
CONTRACT DESIGN, ESTIMATING AND DOCUMENTATION (CDED) VOLUME 2A DESIGN AND CONTRACT STANDARDS OFFICE ISSN 2291-0298 (2-VOLUME SET) Copyright Queen s Printer for Ontario 2017 Reproduced With Permission CHAPTER
More informationB441 - WATERMAINS - OPSS GENERAL
B441 - - OPSS 441 441.1 GENERAL Watermains are a component of a water supply network. Watermains are a system of engineered hydraulic components designed for the conveyance of water from storage to consumption.
More informationB701 WATERMAINS- OPSS 701
B701 - OPSS 701 701.1 GENERAL Watermains are a component of a water supply network. Watermains are a system of engineered hydraulic components designed for the conveyance of water from storage to consumption.
More informationSpecial Provision No. 599S22 March 2001
RETAINED SOIL SYSTEM, TRUE ABUTMENT - Item No. RETAINED SOIL SYSTEM, FALSE ABUTMENT - Item No. RETAINED SOIL SYSTEM, WALL/SLOPE, HIGH RETAINED SOIL SYSTEM, WALL/SLOPE, MEDIUM RETAINED SOIL SYSTEM, WALL/SLOPE,
More informationAPPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES
Appendix A RFP No. 894-2014 Page 1 of 1 Template Version: SrC120131129 - Consulting Services RFP APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES Revision: 2014-09-22 DEFINITION OF
More informationSpecial Provision No. 199S53 February 2005
QUALITY CONTROL COMPLIANCE INCENTIVE Special Provision No. 199S53 February 2005 1.0 SCOPE This special provision covers the financial incentive available to the Contractor for compliance with the quality
More informationLIST OF DIRECTIVES AND MEMORANDA
LIST OF DIRECTIVES AND MEMORANDA Technical Policies and Standards HSBM DO 2014-01 Format and Method for Policies Issued by HSB To provide guidance for the format and method of communicating the implementation
More informationSelect Subgrade Material, Compacted
314.1 GENERAL B314 SHOULDER, SELECTED SUBGRADE, AND STOCKPILING OPSS.PROV 314 Granular materials meeting the requirements of OPSS.PROV 1010 are obtained from pits and quarries, and recycled materials.
More informationADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013
ADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013 BIDDING AND CONTRACT DOCUMENTS FOR THE HORRY COUNTY SOLID WASTE AUTHORITY YARD WASTE MANAGEMENT AND COMPOSTING FACILITY HORRY COUNTY, SOUTH CAROLINA ****************************************************************************************************
More informationNOVEMBER 2010 is FAST APPROACHING
Ontario Provincial Standards Unit 301 St. Paul St., 2 nd Floor North St. Catharines, ON L2R 7R4 Telephone: 905-704-2258 Fax: 905-704-2051 REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS
More informationGe#ng Started. Application process:
Ge#ng Started California school districts may require contractors to submit a standardized questionnaire and financial statements to determine if they re qualified to bid. Contractors must declare, under
More informationCherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12
SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and
More informationPW # 2-18 TENDER FOR SUPPLY & APPLY CRUSHED GRANITE
Tender Number: PW #2-18 Sealed Tenders will be clearly marked and received by: Corporation of the Township of Ryerson 28 Midlothian Road Burk s Falls, Ontario P0A 1C0 (705) 382-3232 Closing Date: THURSDAY
More informationSpecial Provision No. 199S53 January 2018
PERFORMANCE REQUIREMENT - QUALITY PROCESSES Special Provision No. 199S53 January 2018 1.0 SCOPE This Special Provision describes the performance requirements for quality processes, assessment of conformance
More informationREQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.
REQUEST FOR TENDER - SERVICES 1. PURPOSE AND SCOPE This specification is intended to govern the supply of all labour, materials and equipment for the dismantling, demolition of a single dwelling on the
More informationCONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR SUBBASE, BASE, SURFACE, SHOULDER, AND STOCKPILING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 314 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR SUBBASE, BASE, SURFACE, SHOULDER, AND STOCKPILING TABLE OF CONTENTS 314.01 SCOPE
More informationContractor Prequalification Instructions
Contractor Prequalification Instructions California Assembly Bill (AB) 1565 went into effect on January 1, 2014. AB 1565 requires ALL General Contractors and M/E/P Subcontractors be prequalified, if the
More informationCHAPTER F QUANTITY SHEETS
CHAPTER F INDEX SECTION 1 - Pg. 1.1 GENERAL F1-1 1.1.1 Reference Publications F1-1 1.1.2 Index of Quantity Sheets F1-1 1.2 GENERAL DOCUMENTATION INSTRUCTIONS F1-2 1.2.1 Limited Plans Format F1-4 1.2.2
More informationSAN ANTONIO WATER SYSTEM University Pump Station Improvements Project SAWS Job No Solicitation No. B DD
TO BIDDER OF RECORD: SAN ANTONIO WATER SYSTEM University Pump Station Improvements Project SAWS Job No. 12-6002 Solicitation No. B-14-002-DD ADDENDUM NO. 1 February 17, 2014 The following changes, additions,
More informationB512 - GABIONS - OPSS 512
B512 - - OPSS 512 512.1 GENERAL Gabions are contained rectangular units made of steel wire mesh and filled with stone. The double twisted wire mesh is galvanized and PVC (polyvinyl chloride) coated. Gabions
More informationWeb-Based Contract Management Services - WBCMS. Overview Contractors
- WBCMS Overview Contractors Background The Ministry wanted to replace paper with data. MTO implemented WBCMS February 2017. Browser based application - Internet Explorer (IE11). Ministry creates contract
More informationCONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 330 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR TABLE OF CONTENTS
More informationGENERAL REQUIREMENTS
CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 01001-1 PART 1 GENERAL 1.1 Work Covered By Contract Documents.1 Work covers, in general terms: demolition, removals, site preparation and complete construction
More informationCONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 314 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING TABLE OF CONTENTS
More informationSpecifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.
Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. General Conditions Scope: It is the intent of these specifications
More informationAmendment to OPSS 416 (Nov 2013) Construction Specification for Pipeline and Utility Installation by Jacking and Boring
Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 416 September 2017 Amendment to OPSS 416 (Nov 2013) Construction Specification for Pipeline and Utility
More informationPUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE
PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE GENERAL Final restoration of areas within the public right-of-way associated with Street Excavation Permits shall be completed as determined
More informationCONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 416 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING TABLE OF CONTENTS 416.01 SCOPE 416.02 REFERENCES
More informationMIRACOSTA COLLEGE. [X] MiraCosta College Bid Opportunities Website /FAX
MIRACOSTA COLLEGE BID ADDENDUM MiraCosta Community College District Distribution: One Barnard Drive [X] Owner [X] Architect Oceanside, California 92056 [X] MiraCosta College Bid Opportunities Website 760.795.6691/FAX
More informationUNIVERSITY OF KENTUCKY Memorial Hall/College of Law Expansion and Renovation UK Project No
PART 1 GENERAL 1.1 RELATED DOCUMENTS REQUIREMENTS COMMON TO ALL WORK CATEGORIES 1. Drawings and general provisions of the Contract, including General Special Conditions and other Division 1 Specification
More informationHow to Do Business with the Ontario Government
To hear the audio for this presentation: please call 416-212-8010 or 1-866-602-5423, and enter access code 2564577# How to Do Business with the Ontario Government A Few Notes Before We Get Started To hear
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5
MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2017.02 Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 The following changes are made to the Proposal, Specifications and Plans: SPECIFICATIONS:
More informationSpecial Provision No. 399F02 January 2017 CONSTRUCTION SPECIFICATION FOR TEMPORARY HOT MIX PAVEMENT
TEMPORARY HOT MIX PAVEMENT - Item No. Special Provision No. 399F02 January 2017 CONSTRUCTION SPECIFICATION FOR TEMPORARY HOT MIX PAVEMENT 1.0 SCOPE This Special Provision covers the requirements for the
More informationGeorge Washington University Workforce Timekeeper 6.0 Upgrade Training
Workforce Timekeeper 6.0 Upgrade Training Table of Contents Topic 1: Workforce Timekeeper 6.0 New Features...4 Topic 2: Logging On and Off...5 Topic 3: Navigating in Workforce Timekeeper...7 Topic 4: Reviewing
More informationEmployment Ontario Information System (EOIS) Service Provider (SP) Connect
Employment Ontario Information System (EOIS) Service Provider (SP) Connect Service Provider User Guide Chapter 5 Business Plan Management Version 1.6 December 2018 Table of Contents Chapter 5 Business
More informationREQUEST FOR QUOTATION DOCUMENT (For Planning/Engineering Assignment) PART C- FORMS AND NOTICES
DOCUMENT (For Planning/Engineering Assignment) PART C- FORMS AND NOTICES Version 2.8 June 2011 Ministry of Transportation Ontario FORM 1(a) - OFFER AND ACCEPTANCE TO: Her Majesty the Queen in right of
More informationCONSTRUCTION SPECIFICATION FOR TACK COATING AND JOINT PAINTING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 308 APRIL 2012 CONSTRUCTION SPECIFICATION FOR TACK COATING AND JOINT PAINTING TABLE OF CONTENTS 308.01 SCOPE 308.02 REFERENCES 308.03 DEFINITIONS
More informationUNC Chapel Hill Informal Contracting Guidelines
UNC Chapel Hill Informal Contracting Guidelines 1. Informal Contracts Informal bids are referenced by NC General Statute (NCGS) 143-131 as construction or repair work that does not reach the limits prescribed
More informationDEPARTMENT OF PROCUREMENT SERVICES CITY OF CHICAGO. January 2, 2018 ADDENDUM NO. 1 FOR
DEPARTMENT OF PROCUREMENT SERVICES CITY OF CHICAGO January 2, 2018 ADDENDUM NO. 1 FOR Median and Boulevard Landscape Maintenance and Services North Region This document contains: Specification No. 220844
More informationJOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106.
JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106. There are notes in the plans regarding driving the test pile without the use of a follower. The
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 12/20/2017
NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 12/20/2017 Control 6316-00-001 Project RMC - 631600001 Highway US0059 County HARRISON Ladies/Gentlemen: Attached please find an addendum on the above captioned
More informationRequest for Proposal Design-Build Reconstruction of Bridge No. 15 and Bridge No. 17
374028 6 th Line, Amaranth ON L9W 0M6 Phone: 519-941-1007 Fax: 519-941-1802 Email: info@amaranth.ca Request for Proposal 1-2017 Design-Build Reconstruction of Bridge No. 15 and Bridge No. 17 Description
More informationSpecial Provision No. 399F01 December 2014
FULL DEPTH CRACK REPAIRS Item No. Special Provision No. 399F01 December 2014 1.0 SCOPE This Special Provision covers the requirements for full depth crack repairs in asphaltic concrete pavements. 2.0 REFERENCES
More informationINSTRUCTIONS FOR DIVISION 00 DOCUMENTS
INSTRUCTIONS FOR DIVISION 00 DOCUMENTS Division 00 is the first section of the specifications for construction. For each advertised bid project, the College/University must direct the Architect/Engineer
More informationDesign Build: CCDC
Ontario Association of Architects Practice Tip PT.23.6 Version 2.0 August 14, 2018 Design Build: CCDC 14-2013 2018, 2015 Ontario Association of Architects (OAA). OAA members in good standing may reproduce
More informationPRIVATE PLAN ROOM. Document Information Sheet
PRIVATE PLAN ROOM Document Information Sheet Job Name: Partial Renovation for Lewes Streets Department Breakroom Bid Date: October 22, 2018 2:00 pm Placed on file by: George, Miles, and Buhr Contact: Lee
More information2.1 The Contractor shall furnish and maintain this system for measuring and delivering realtime messages for the work zone.
Work Zone Intelligent Transportation System NJSP-15-32 1.0 General. The Work Zone Intelligent Transportation System (WZITS) shall be a portable, real-time, automated, solar powered system that calculates
More informationWeb-Based Contract Management Services - WBCMS. Overview CA Firms
- WBCMS Overview CA Firms Background The Ministry wanted to replace paper with data. MTO implemented WBCMS February 2017. Browser based application - Internet Explorer (IE11). Ministry creates contract
More informationPROJECT MANUAL BID DOCUMENT 95% REVIEW CHECKLIST PROJECT BID NO EPWU PEM. CONSULTANT SUBMITTED ON / / as a 95% (A) original
PROJECT BID NO EPWU PEM CONSULTANT SUBMITTED ON / / as a 95% (A) original RESUBMITTED ON / / as a 95% (B) revision 1.0 FRONT COVER 1.1 1.2 1.3 1.4 Title begins with location key words, otherwise with program/project
More informationCONSTRUCTION SPECIFICATION FOR NOISE BARRIER SYSTEMS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 760 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR NOISE BARRIER SYSTEMS TABLE OF CONTENTS 760.01 SCOPE 760.02 REFERENCES 760.03 DEFINITIONS 760.04 DESIGN
More informationMICRO-SURFACING - OPSS 336
- OPSS 336 336.1 GENERAL 336.1.1 Definitions Micro-surfacing is recommended by the Regional Geotechnical Section on a work project specific basis. It is generally used as a preventive maintenance treatment
More informationAppendix 3. POLICY & PROCEDURE No
DEPARTMENT OF PUBLIC WORKS DIVISION: ENGINEERING SERVICES SECTION: ADMINISTRATIVE PAGE NO: 1 OF 10 REVISION NO: 3 DATE: 1995 05 01 ESTABLISHED: 1986 03 03 Appendix 3 POLICY & PROCEDURE No. 2.3.1-020 TITLE:
More informationSpecial Provision No. 314S03 November 2004
GRANULAR A Item No. GRANULAR A, STOCKPILED Item No. GRANULAR A, FROM STOCKPILE Item No. GRANULAR B TYPE I Item No. GRANULAR B TYPE I, STOCKPILED Item No. GRANULAR B TYPE I, FROM STOCKPILE Item No. GRANULAR
More informationCONSTRUCTION SPECIFICATION FOR COMPACTING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 501 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR COMPACTING TABLE OF CONTENTS 501.01 SCOPE 501.02 REFERENCES 501.03 DEFINITIONS 501.04 DESIGN
More informationSection 200 Design Process and Quality Management. Electrical Engineering Centre
Section 200 Design Process and Quality Management Electrical Engineering Centre April 2013 TABLE OF CONTENTS 200 DESIGN PROCESS AND QUALITY MANAGEMENT 201 INTRODUCTION TO DESIGN PROCESS... 1 201.1 ABOUT
More informationB760 - NOISE BARRIER SYSTEMS OPSS 760
B760 - OPSS 760 760.1 GENERAL Proprietary noise barrier systems are designed and manufactured by the noise barrier companies in accordance with the Canadian Highway Bridge Design Code (CHBDC) and the Ministry's
More informationCITY OF TACOMA Department of Public Utilities Tacoma Power
CITY OF TACOMA Department of Public Utilities Tacoma Power ADDENDUM NO. 1 DATE: August 4, 2017 REVISIONS TO: Request for Bids Specification No. PG17-0130F TPU Eductor Waste Decant Facility NOTICE TO ALL
More informationB STEEL BEAM GUIDE RAIL - OPSS 721
B721-2 - - OPSS 721 721-2.1 GENERAL Design guidance and a description of Steel Beam Guide Rail systems, including various types and treatments, are provided in the Roadside Design Manual (RDM). 721-2.2
More informationCONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 416 NOVEMBER 2018 (Formerly OPSS 416, November 2013) Note: The MUNI implemented in November 2018 replaces OPSS 416 COMMON, November 2013 with no technical
More informationSpecial Provision No. 308F01 May 2010
TACK COAT Item No. Special Provision No. 308F01 May 2010 OPSS.PROV 308, April 2007, Construction Specification for Tack Coating and Joint Painting, is deleted in its entirety and replaced with the following:
More informationDesign Team Procedures Practice Note 1, February DESIGN TEAM PROCEDURES PRACTICE NOTE 1 (Revision 2)
DESIGN TEAM PROCEDURES PRACTICE NOTE 1 (Revision 2) CHANGES TO STAGE 2b, STAGE 3 & STAGE 4 ARISING FROM AMENDMENTS TO THE PUBLIC WORKS CONTRACTS 1. Introduction 1.1 Changes to Public Works Contracts (a)
More informationB723 ENERGY ATTENUATORS - OPSS 723
B723 - OPSS 723 723.1 GENERAL Various proprietary permanent and temporary energy attenuators are used to reduce the hazard associated with the ends of permanent and temporary concrete barriers. Tables
More informationCHAPTER 13 MICHIGAN DESIGN MANUAL BRIDGE DESIGN RAILROAD CROSSINGS RAILROAD CROSSINGS IDENTIFICATION OF GRADE SEPARATIONS
CHAPTER 13 RAILROAD CROSSINGS 13.00 RAILROAD CROSSINGS 13.01 IDENTIFICATION OF GRADE SEPARATIONS 13.02 AGREEMENT PREPARATION 13.02.01 Railroad Contacts 13.02.02 Agreement Plans 13.02.03 Force Accounts
More informationAnswer 1: The reference to CB 5 is incorrect. The correct reference should be CB 4. Question 2: Have any potential staging areas been identified?
ADDENDUM NO. 1 July 26, 2017 223837 RE: FROM: TO: CITY OF BARRE HMGP STORM DRAIN IMPROVEMENT PROJECTS DuBOIS & KING, INC. P.O. Box 339 Randolph, Vermont 05060 (802) 728-3376 Prospective Bidders This Addendum
More informationADDENDUM NO. 2 TO BID DOCUMENTS FOR 2014 SEWER LINING PROJECT FOR THE CITY OF ANN ARBOR, MICHIGAN
April 21, 2014 ADDENDUM NO. 2 TO BID DOCUMENTS FOR 2014 SEWER LINING PROJECT FOR THE CITY OF ANN ARBOR, MICHIGAN The following changes, additions, and/or deletions shall be made to the Bid Documents for
More informationB366 - REPAIRING CONCRETE PAVEMENT AND CONCRETE BASE - OPSS 366
B366 - - OPSS 366 366.1 GENERAL The specification for repair of concrete pavement and concrete base includes full depth and partial depth repairs using conventional or high early strength concrete, and
More informationSPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.
2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction
More informationCONSTRUCTION SPECIFICATION FOR RUBBLIZING CONCRETE PAVEMENT AND CONCRETE BASE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 361 NOVEMBER 2011 CONSTRUCTION SPECIFICATION FOR RUBBLIZING CONCRETE PAVEMENT AND CONCRETE BASE TABLE OF CONTENTS 361.01 SCOPE 361.02 REFERENCES 361.03
More informationREQUEST FOR BIDS CULVERT REPLACEMENT PROJECT FREEPORT, MAINE
REQUEST FOR BIDS 1. RECEIPT OF BIDS The Town of Freeport will receive sealed Bids, clearly marked and addressed to: Bid for Culvert Replacement Project 2015-1, Freeport Town Engineer, Town Hall, 30 Main
More informationTown of Whitby Public Works Department
Town of Whitby Public Works Department Guide to Site Alteration Pre-Screening Questionnaire and Site Alteration / Haul Route Permit Application NOTE: FOR AN ACCESSIBLE VERSION OF THIS DOCUMENT PLEASE CONTACT
More informationSpecial Provision No. 599S22 March 2018 REQUIREMENTS FOR RETAINED SOIL SYSTEMS (RSS)
RETAINED SOIL SYSTEM, TRUE ABUTMENT - Item No. RETAINED SOIL SYSTEM, FALSE ABUTMENT - Item No. RETAINED SOIL SYSTEM, WALL/SLOPE, HIGH PERFORMANCE - Item No. RETAINED SOIL SYSTEM, WALL/SLOPE, MEDIUM PERFORMANCE
More informationB STEEL BEAM GUIDE RAIL - OPSS.PROV 721
B721-2 - - OPSS.PROV 721 721-2.1 GENERAL Steel beam guide rail (SBGR) is a semi-rigid barrier system which restrains and redirects vehicles by a combination of beam bending (W-shaped steel section), tension,
More information313-1 HOT MIX ASPHALT - OPSS.PROV 313
313-1 - OPSS.PROV 313 313-1.1 GENERAL Hot mix asphalt consists of several mix types, which are grouped into two categories: Stone Mastic Asphalt and Superpave as detailed below. The type of hot mix asphalt
More informationALLDAY TIME SYSTEMS LTD. Allday Time Manager Lite User Guide
Allday Time Manager Lite User Guide 1 Table of Contents Table of Contents... 2 Starting Allday Time Manager... 3 Logging In... 3 Adding a New Employee... 4 Viewing / Editing an Employees Record... 5 General
More informationREQUEST FOR BIDS METROPOLITAN PARK DISTRICT OF TACOMA Northwest Trek Core Area Fence Upgrade SWR BID NO. T Request for Bids
REQUEST FOR BIDS METROPOLITAN PARK DISTRICT OF TACOMA Northwest Trek Core Area Fence Upgrade SWR BID NO. T-2016-0210-05410910 Request for Bids The Metropolitan Park District of Tacoma will receive sealed
More informationTORONTO MUNICIPAL CODE CHAPTER 67, FAIR WAGE SCHEDULE A, FAIR WAGE POLICY SCHEDULE A FAIR WAGE POLICY
SCHEDULE A FAIR WAGE POLICY 67-A1. Definitions. 67-A2. City of Toronto Council references. 67-A3. Purpose and history of Fair Wage Policy. 67-A4. Intent of Fair Wage Policy. 67-A5. Application. 67-A6.
More informationGENERAL SPECIFICATION FOR THE USE OF EXPLOSIVES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 120 NOVEMBER 2014 GENERAL SPECIFICATION FOR THE USE OF EXPLOSIVES TABLE OF CONTENTS 120.01 SCOPE 120.02 REFERENCES 120.03 DEFINITIONS 120.04 DESIGN
More informationGENERAL SPECIFICATION FOR ELECTRICAL WORK
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 106 April 2017 GENERAL SPECIFICATION FOR ELECTRICAL WORK TABLE OF CONTENTS 106.01 SCOPE 106.02 REFERENCES 106.03 DEFINITIONS 106.04 DESIGN AND
More informationSTANDARD SPECIFICATION SECTIONS. November 2016 Physical Resources Design, Engineering and Construction
STANDARD SPECIFICATION SECTIONS Design, Engineering and Construction SPECIFICATIONS for Replacement of Heating System Building 045 Project Number XXXXXX June 25, 2004 Consultant Name and Address, etc.
More informationB510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement
B510-5 OPSS 510 510-5.1 GENERAL This section is for Pavement Work removal tender items. The work covered by these tender items includes the removal and disposal of materials. 510-5.2 REFERENCES CDED B510-0
More informationCONTRACTOR QUICK REFERENCE GUIDE Available at: lifestorage.com/bigsky
CONTRACTOR QUICK REFERENCE GUIDE Available at: lifestorage.com/bigsky URL: https://ework.bigskytech.com/lifestorage Username: Password: Contractor Number: IVR Phone Number: 858-244-2308, prompt 2 For acknowledgement
More information313-1 HOT MIX ASPHALT - OPSS.PROV 313
313-1 - OPSS.PROV 313 313-1.1 GENERAL Hot mix asphalt consists of several mix types, which are grouped into two categories: Stone Mastic Asphalt and Superpave as detailed below. The type of hot mix asphalt
More informationEnvironmental Planning/Environmental Technical Specialty
Planning/ Specialty No. Phase/Task Methodology Deliverables Reference Manuals 1. Background Data Collection Review correspondence, photos, reports, historical records, site data Summary and specialty reports
More informationHow to Do Business with the Ontario Government
How to Do Business with the Ontario Government Ministry of Government Services Landscape Ontario Congress 2012 Agenda To maximize your chances of being successful in obtaining business with the Ontario
More informationContractor Data Systems (CDS) Monthly Amounts Paid and EPI Submissions May 2017 v2
Contractor Data Systems (CDS) Monthly Amounts Paid and EPI Submissions v2 New CDS Website https://hosting.portseattle.org/cds Used by Port Contractors and Consultants to submit, edit and view EPI (electronic
More informationSpecial Provision No. 199S66 March For the purpose of this Special Provision, the following definitions apply:
QUALITY CONFORMANCE REQUIREMENTS Special Provision No. 199S66 March 2018 1.0 SCOPE This Special Provision describes the process for the assessment of conformance to the quality requirements and the administrative
More informationSpecial Provision No. 199S53 February 2012
PERFORMANCE REQUIREMENT QUALITY PROCESSES Special Provision No. 199S53 February 2012 1.0 SCOPE This Special Provision describes the performance requirements for quality processes, assessment of conformance
More informationDesign -- geometric and structural design of roadways and bridges, and preparation of detailed plans and specifications for individual projects;
WELCOME Welcome to the Estimates Chapter One Lesson. This Final Estimates training course covers the preparation of final estimates by field personnel. In this first chapter, you will become familiar with
More informationCONSTRUCTION SPECIFICATION FOR TRAFFIC CONTROL SIGNING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 706 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR TRAFFIC CONTROL SIGNING TABLE OF CONTENTS 706.01 SCOPE 706.02 REFERENCES 706.03 DEFINITIONS 706.04
More informationCONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 330 NOVEMBER 2011 CONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR TABLE OF CONTENTS 330.01
More informationOhio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011)
Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011) Sec. 153.65. As used in sections 153.65 to 153.73 of the Revised Code: (A)(1)
More informationADDENDUM NO. 1. March 3, 2017
ADDENDUM NO. 1 March 3, 2017 INDIANAPOLIS INTERNATIONAL AIRPORT Cargo Apron Utility Corridor Relocations Temporary AOA Fence Realignment IAA Project No. I-17-004 CONTENTS ADDENDUM NO. 1 TEXT PAGES 2-4
More informationHow To Do Business with the Ontario Government. Supply Chain Management, Ontario Shared Services Ministry of Government Services January 2010
How To Do Business with the Ontario Government Supply Chain Management, Ontario Shared Services Ministry of Government Services January 2010 1 Agenda To maximize your chances of being successful in obtaining
More informationDOCUMENT BID PROPOSAL
DOCUMENT 00 41 13 BID PROPOSAL TO: SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT, a California Community College District, acting by and through its Board of Trustees ("the District"). FROM: (Name of
More informationTown of Brandon, Vermont Brandon Union St. Sidewalk STP EH 05 (4) Request for Qualifications Construction Inspection and Testing Services
, Vermont Brandon Union St. Sidewalk STP EH 05 (4) Request for Qualifications Construction Inspection and Testing Services Issued: March 13, 20192 Due: April 3, 2019 I. INTRODUCTION The, Vermont, herein
More informationEclipse Time Clock Maintenance. Release (Eterm)
Eclipse Time Clock Maintenance Release 8.6.5 (Eterm) Legal Notices 2009 Activant Solutions Inc. All rights reserved. Unauthorized reproduction is a violation of applicable laws. Activant and the Activant
More informationCONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 492 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES TABLE OF
More informationTENDERING #4 Tendering (CONS6811) Lara Tookey
TENDERING #4 Session FOUR Face 2 Face (4 hours) Stage 2 Project appreciation & enquiries Introduction to subcontracting Why does a MC need subbies? How is the work split between the various parties? Self-directed
More information